JP2021036762A - Power storage device - Google Patents

Power storage device Download PDF

Info

Publication number
JP2021036762A
JP2021036762A JP2020184526A JP2020184526A JP2021036762A JP 2021036762 A JP2021036762 A JP 2021036762A JP 2020184526 A JP2020184526 A JP 2020184526A JP 2020184526 A JP2020184526 A JP 2020184526A JP 2021036762 A JP2021036762 A JP 2021036762A
Authority
JP
Japan
Prior art keywords
power
storage battery
virtual storage
control unit
consumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020184526A
Other languages
Japanese (ja)
Other versions
JP6947896B2 (en
Inventor
真一郎 渡利
Shinichiro Watari
真一郎 渡利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Original Assignee
Kyocera Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp filed Critical Kyocera Corp
Priority to JP2020184526A priority Critical patent/JP6947896B2/en
Publication of JP2021036762A publication Critical patent/JP2021036762A/en
Application granted granted Critical
Publication of JP6947896B2 publication Critical patent/JP6947896B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

To provide a power storage device and a power management system that can reduce, for a plurality of users, an initial cost paid by each of the users in installing the power storage device.SOLUTION: In a power management system 1, a power storage device 100 capable of supplying power to a plurality of users comprises: a storage battery 104; a plurality of DC/AC conversion units 102A, 102B in which the respective DC/AC conversion units are connected to separate users; and a control unit 107 that independently controls the plurality of DC/AC conversion units. The control unit 107 divides the capacity of the storage battery into a plurality of virtual storage batteries, and manages the remaining capacity of each of the virtual storage batteries based on electric power converted by the respective DC/AC conversion units.SELECTED DRAWING: Figure 1

Description

本開示は、蓄電装置及び電力管理システムに関する。 The present disclosure relates to a power storage device and a power management system.

従来、蓄電装置のような分散電源を系統に連系させて用いる電力管理システムが知られている(例えば、特許文献1参照)。 Conventionally, a power management system such as a power storage device in which a distributed power source is connected to a system is known (see, for example, Patent Document 1).

蓄電装置を系統に連系させて用いる電力管理システムは、電力需要のピーク時間帯に蓄電装置を放電させることで、ピーク時間帯に購入する電力を抑制することができる。ピーク時間帯に購入する電力を抑制すると、需要家は電気料金を低減することができる。 A power management system that uses a power storage device connected to a grid can suppress power purchase during peak hours by discharging the power storage device during peak hours of power demand. By curbing the electricity purchased during peak hours, consumers can reduce their electricity bills.

特開2011−083089号公報Japanese Unexamined Patent Publication No. 2011-083089

例えば、集合住宅のような複数の需要家がいる施設において、各需要家が蓄電装置を設置すると、各需要家は電気料金を低減することができる。しかしながら、蓄電装置の設置には初期費用が必要であるため、電気料金が低減できても、初期費用の分を回収できない場合があった。 For example, in a facility such as an apartment house where there are a plurality of consumers, if each consumer installs a power storage device, each consumer can reduce the electricity bill. However, since the initial cost is required to install the power storage device, even if the electricity charge can be reduced, the initial cost may not be recovered in some cases.

かかる点に鑑みてなされた本開示の目的は、複数の需要家に対し、蓄電装置を設置する際の各需要家が負担する初期費用を低減させることができる蓄電装置及び電力管理システムを提供することにある。 An object of the present disclosure made in view of such a point is to provide a plurality of consumers with a power storage device and a power management system capable of reducing the initial cost borne by each customer when installing the power storage device. There is.

本開示の一実施形態に係る蓄電装置は、第1需要家と第2需要家とを含む複数の需要家に電力を供給可能な蓄電装置である。前記蓄電装置は、単一の蓄電池と、前記蓄電池の容量を前記第1需要家用の第1仮想蓄電池及び前記第2需要家用の第2仮想蓄電池を含む複数の仮想蓄電池に仮想的に分割する制御部と、前記複数の需要家の電力線のそれぞれに接続されたDC/DC充放電部と、を備える。前記DC/DC充放電部は、前記制御部が前記第1仮想蓄電池の残存容量を第1電力量増やし、前記第2仮想蓄電池の残存容量を第2電力量減らす処理を実行する際に、前記第1需要家の電力線から受電される前記第1電力量と前記第2需要家の電力線に供給する前記第2電力量の差分に相当する電力量を充放電するように前記蓄電池を制御する。 The power storage device according to an embodiment of the present disclosure is a power storage device capable of supplying electric power to a plurality of consumers including a first consumer and a second consumer. The power storage device is a control that virtually divides the capacity of the storage battery into a single storage battery and a plurality of virtual storage batteries including the first virtual storage battery for the first consumer and the second virtual storage battery for the second consumer. A unit and a DC / DC charging / discharging unit connected to each of the power lines of the plurality of consumers are provided. The DC / DC charging / discharging unit is described when the control unit executes a process of increasing the remaining capacity of the first virtual storage battery by the first electric energy and decreasing the remaining capacity of the second virtual storage battery by the second electric energy. The storage battery is controlled so as to charge and discharge the amount of electric power corresponding to the difference between the amount of electric power received from the electric energy line of the first consumer and the amount of electric power supplied to the electric energy line of the second consumer.

本開示の一実施形態に係る蓄電装置及び電力管理システムによれば、複数の需要家に対し、蓄電装置を設置する際の各需要家が負担する初期費用を低減させることができる。 According to the power storage device and the power management system according to the embodiment of the present disclosure, it is possible to reduce the initial cost borne by each customer when installing the power storage device for a plurality of consumers.

本開示の第1実施形態に係る蓄電装置を含む電力管理システムの概略構成を示す図である。It is a figure which shows the schematic structure of the electric power management system including the power storage device which concerns on 1st Embodiment of this disclosure. 図1の蓄電池を仮想的に分割する様子を示すイメージ図である。It is an image diagram which shows the state which the storage battery of FIG. 1 is virtually divided. 図1の蓄電池を仮想的に分割し、充放電を行う様子を説明するためのイメージ図である。It is an image diagram for demonstrating how the storage battery of FIG. 1 is virtually divided and charged / discharged. 図2の仮想蓄電池Aの充放電の様子のイメージ図である。It is an image diagram of the state of charge / discharge of the virtual storage battery A of FIG. 図1の蓄電池全体の充放電の様子のイメージ図である。It is an image diagram of the state of charge / discharge of the entire storage battery of FIG. 図1の蓄電装置の動作の一例を示すフローチャートである。It is a flowchart which shows an example of the operation of the power storage device of FIG. 図1の蓄電装置の動作の一例を示すフローチャートである。It is a flowchart which shows an example of the operation of the power storage device of FIG. 図1の蓄電装置において充電及び放電を行っている際の電力の流れの一例を示す図である。It is a figure which shows an example of the electric power flow at the time of charging and discharging in the power storage device of FIG. 本開示の第2実施形態に係る電力管理システムの概略構成を示す図である。It is a figure which shows the schematic structure of the electric power management system which concerns on 2nd Embodiment of this disclosure. 本開示の第3実施形態に係る電力管理システムの概略構成を示す図である。It is a figure which shows the schematic structure of the electric power management system which concerns on 3rd Embodiment of this disclosure. 太陽光発電装置による発電電力を各需要家で平等に充電する場合のイメージ図である。It is an image diagram in the case where the electric power generated by the solar power generation device is equally charged by each consumer. 本開示の第4実施形態に係る電力管理システムの概略構成を示す図である。It is a figure which shows the schematic structure of the electric power management system which concerns on 4th Embodiment of this disclosure.

以下、本開示の実施形態について、図面を参照して説明する。 Hereinafter, embodiments of the present disclosure will be described with reference to the drawings.

[第1実施形態]
図1に示す電力管理システム1は、蓄電装置100と、第1負荷10Aと、第2負荷10Bと、第1電力量計20Aと、第2電力量計20Bとを備える。
[First Embodiment]
The power management system 1 shown in FIG. 1 includes a power storage device 100, a first load 10A, a second load 10B, a first power meter 20A, and a second power meter 20B.

図1に示すように、蓄電装置100は、需要家Aが系統30から電力を供給されている電力線(以下「需要家Aの電力線」ともいう)と、需要家Bが系統30から電力を供給されている電力線(以下「需要家Bの電力線」ともいう)の2つの電力線に接続されている。なお、図1においては、一例として、蓄電装置100が、需要家Aの電力線と需要家Bの電力線の2つの電力線に接続されている例を示しているが、蓄電装置100は、2以上の任意の複数の需要家の電力線に接続されていてよい。 As shown in FIG. 1, in the power storage device 100, the power line to which the consumer A is supplied with power from the system 30 (hereinafter, also referred to as “the power line of the customer A”) and the power line from which the customer B is supplied from the system 30 It is connected to two power lines of the power line (hereinafter, also referred to as "customer B power line"). Note that FIG. 1 shows, as an example, an example in which the power storage device 100 is connected to two power lines, that is, the power line of the consumer A and the power line of the consumer B, but the power storage device 100 has two or more power lines. It may be connected to the power lines of any number of consumers.

図1において、各機能ブロックを結ぶ実線は主に電力線を示し、破線は主に通信線又は信号線を示す。 In FIG. 1, the solid line connecting each functional block mainly indicates a power line, and the broken line mainly indicates a communication line or a signal line.

蓄電装置100は、複数の需要家、すなわち図1に示す例では需要家A及び需要家Bの両方に対して、独立して電力を供給可能である。また、蓄電装置100は、需要家Aの電力線から受電して、蓄電池104を充電可能である。同様に、蓄電装置100は、需要家Bの電力線から受電して、蓄電池104を充電可能である。蓄電装置100の構成及び機能の詳細については後述する。 The power storage device 100 can independently supply electric power to a plurality of consumers, that is, both the consumer A and the consumer B in the example shown in FIG. Further, the power storage device 100 can charge the storage battery 104 by receiving power from the power line of the consumer A. Similarly, the power storage device 100 can charge the storage battery 104 by receiving power from the power line of the consumer B. Details of the configuration and function of the power storage device 100 will be described later.

第1負荷10Aは、需要家Aの電力線に接続されている電気機器である。第1負荷10Aは、蓄電装置100と通信可能であり、消費電力の情報などを蓄電装置100に送信する。図1においては1台の第1負荷10Aが需要家Aの電力線に接続されている構成を示しているが、第1負荷10Aは、2台以上であってもよい。 The first load 10A is an electric device connected to the power line of the consumer A. The first load 10A can communicate with the power storage device 100, and transmits information such as power consumption to the power storage device 100. Although FIG. 1 shows a configuration in which one first load 10A is connected to the power line of the consumer A, the first load 10A may be two or more.

第2負荷10Bは、需要家Bの電力線に接続されている電気機器である。第2負荷10Bは、蓄電装置100と通信可能であり、消費電力の情報などを蓄電装置100に送信する。図1においては1台の第2負荷10Bが需要家Bの電力線に接続されている構成を示しているが、第2負荷10Bは、2台以上であってもよい。 The second load 10B is an electric device connected to the power line of the consumer B. The second load 10B can communicate with the power storage device 100, and transmits power consumption information and the like to the power storage device 100. Although FIG. 1 shows a configuration in which one second load 10B is connected to the power line of the consumer B, the second load 10B may be two or more.

第1電力量計20Aは、系統30から需要家Aに供給される電力量を測定する。需要家Aの電気料金は、第1電力量計20Aの測定値に基づいて決定される。 The first watt hour meter 20A measures the amount of power supplied from the system 30 to the consumer A. The electricity charge of the consumer A is determined based on the measured value of the first watt hour meter 20A.

第2電力量計20Bは、系統30から需要家Bに供給される電力量を測定する。需要家Bの電気料金は、第2電力量計20Bの測定値に基づいて決定される。 The second watt hour meter 20B measures the amount of power supplied from the system 30 to the consumer B. The electricity charge of the consumer B is determined based on the measured value of the second watt hour meter 20B.

続いて、蓄電装置100の構成及び機能の詳細について説明する。蓄電装置100は、第1電流センサ101Aと、第2電流センサ101Bと、第1DC/AC変換部102Aと、第2DC/AC変換部102Bと、DC/DC充放電部103と、蓄電池104と、通信部105と、記憶部106と、制御部107とを備える。 Subsequently, the details of the configuration and function of the power storage device 100 will be described. The power storage device 100 includes a first current sensor 101A, a second current sensor 101B, a first DC / AC conversion unit 102A, a second DC / AC conversion unit 102B, a DC / DC charging / discharging unit 103, a storage battery 104, and the like. It includes a communication unit 105, a storage unit 106, and a control unit 107.

第1電流センサ101Aは、第1DC/AC変換部102Aと、需要家Aの電力線との間に流れる電流を検出する。第1電流センサ101Aは、検出した電流値を制御部107に送信する。第1電流センサ101Aが検出する電流値は、方向と絶対値の情報を含む。 The first current sensor 101A detects the current flowing between the first DC / AC conversion unit 102A and the power line of the consumer A. The first current sensor 101A transmits the detected current value to the control unit 107. The current value detected by the first current sensor 101A includes information on the direction and the absolute value.

第2電流センサ101Bは、第2DC/AC変換部102Bと、需要家Bの電力線との間に流れる電流を検出する。第2電流センサ101Bは、検出した電流値を制御部107に送信する。第2電流センサ101Bが検出する電流値は、方向と絶対値の情報を含む。 The second current sensor 101B detects the current flowing between the second DC / AC conversion unit 102B and the power line of the consumer B. The second current sensor 101B transmits the detected current value to the control unit 107. The current value detected by the second current sensor 101B includes information on the direction and the absolute value.

第1DC/AC変換部102Aは、双方向に直流電力と交流電力とを変換する。第1DC/AC変換部102Aは、DC/DC充放電部103又は第2DC/AC変換部102Bから供給される直流電力を交流電力に変換して、需要家Aの電力線に供給する。第1DC/AC変換部102Aは、需要家Aの電力線から供給される交流電力を直流電力に変換して、DC/DC充放電部103又は第2DC/AC変換部102Bに供給する。 The first DC / AC conversion unit 102A converts DC power and AC power in both directions. The first DC / AC conversion unit 102A converts the DC power supplied from the DC / DC charge / discharge unit 103 or the second DC / AC conversion unit 102B into AC power and supplies it to the power line of the consumer A. The first DC / AC conversion unit 102A converts the AC power supplied from the power line of the consumer A into DC power and supplies it to the DC / DC charging / discharging unit 103 or the second DC / AC conversion unit 102B.

第2DC/AC変換部102Bは、双方向に直流電力と交流電力とを変換する。第2DC/AC変換部102Bは、DC/DC充放電部103又は第1DC/AC変換部102Aから供給される直流電力を交流電力に変換して、需要家Bの電力線に供給する。第2DC/AC変換部102Bは、需要家Bの電力線から供給される交流電力を直流電力に変換して、DC/DC充放電部103又は第1DC/AC変換部102Aに供給する。 The second DC / AC conversion unit 102B converts DC power and AC power in both directions. The second DC / AC conversion unit 102B converts the DC power supplied from the DC / DC charge / discharge unit 103 or the first DC / AC conversion unit 102A into AC power and supplies it to the power line of the consumer B. The second DC / AC conversion unit 102B converts the AC power supplied from the power line of the consumer B into DC power and supplies it to the DC / DC charging / discharging unit 103 or the first DC / AC conversion unit 102A.

DC/DC充放電部103は、蓄電池104の充放電を制御する。DC/DC充放電部103は、蓄電池104を充電する場合、第1DC/AC変換部102A及び第2DC/AC変換部102Bの少なくともいずれか一方から供給される直流電力の電圧を昇圧又は降圧して蓄電池104に供給し、蓄電池104を充電する。DC/DC充放電部103は、蓄電池104を放電させる場合、蓄電池104が放電した直流電力を昇圧又は降圧して、第1DC/AC変換部102A及び第2DC/AC変換部102Bの少なくともいずれか一方に供給する。 The DC / DC charge / discharge unit 103 controls the charge / discharge of the storage battery 104. When charging the storage battery 104, the DC / DC charging / discharging unit 103 boosts or lowers the voltage of the DC power supplied from at least one of the first DC / AC conversion unit 102A and the second DC / AC conversion unit 102B. It is supplied to the storage battery 104 to charge the storage battery 104. When the DC / DC charging / discharging unit 103 discharges the storage battery 104, the DC / DC charging / discharging unit 103 boosts or lowers the DC power discharged by the storage battery 104 to at least one of the first DC / AC conversion unit 102A and the second DC / AC conversion unit 102B. Supply to.

通信部105は、有線又は無線により第1負荷10A及び第2負荷10Bと接続され、例えば、ECHONET Lite(登録商標)のような所定の通信プロトコルにより、第1負荷10A及び第2負荷10Bと通信を行う。通信部105は、例えば、第1負荷10A及び第2負荷10Bから消費電力の情報などを取得する。また、通信部105は、第1負荷10Aが通信機能を有していない場合、第1負荷10Aの消費電流を検出するように設置された電流センサから、第1負荷10Aの消費電力の情報を取得してもよい。第2負荷10Bが通信機能を有していない場合も同様である。このとき、第1負荷10A及び第2負荷10Bはそれぞれ各需要家の全ての負荷機器を含む。 The communication unit 105 is connected to the first load 10A and the second load 10B by wire or wirelessly, and communicates with the first load 10A and the second load 10B by a predetermined communication protocol such as ECHONET Lite (registered trademark). I do. The communication unit 105 acquires power consumption information and the like from, for example, the first load 10A and the second load 10B. Further, when the first load 10A does not have a communication function, the communication unit 105 obtains information on the power consumption of the first load 10A from a current sensor installed so as to detect the current consumption of the first load 10A. You may get it. The same applies when the second load 10B does not have a communication function. At this time, the first load 10A and the second load 10B include all the load devices of each consumer.

記憶部106は、例えば半導体メモリ及び磁気メモリ等を用いて構成される。記憶部106は、蓄電装置100の動作に必要な種々の情報及びプログラムを記憶する。 The storage unit 106 is configured by using, for example, a semiconductor memory, a magnetic memory, or the like. The storage unit 106 stores various information and programs necessary for the operation of the power storage device 100.

また、記憶部106は、蓄電池104の容量を仮想的に分割して構成した仮想蓄電池A及び仮想蓄電池Bの残存容量を独立して記憶している。以下、仮想蓄電池の考え方について、図2を参照して説明する。 Further, the storage unit 106 independently stores the remaining capacities of the virtual storage battery A and the virtual storage battery B configured by virtually dividing the capacity of the storage battery 104. Hereinafter, the concept of the virtual storage battery will be described with reference to FIG.

図2に示す例においては、蓄電池104の容量を仮想的に分割し、仮想蓄電池A及び仮想蓄電池Bとしている。ここで、「仮想的」に分割するとは、物理的に分割するのではなく、実際には1つの蓄電池であるものを、あたかも複数の別々の蓄電池があるかのように、独立して、各仮想蓄電池の充電及び放電を、数値上制御することを意味する。図2の例では、ひとつの蓄電池104の容量を仮想的に「仮想蓄電池A」、「仮想蓄電池B」、「最低維持容量」及び「確保空き容量」の4つに分割して管理している。なお、「最低維持容量」及び「確保空き容量」は、それぞれ過放電及び過充電から蓄電池104を保護するために用いるものであり、積極的に充電及び放電には用いられない。制御部107が、蓄電池104の容量を仮想的に分割して数値上制御する。 In the example shown in FIG. 2, the capacity of the storage battery 104 is virtually divided into a virtual storage battery A and a virtual storage battery B. Here, "virtually" dividing means that instead of physically dividing, what is actually one storage battery is independently divided as if there were multiple separate storage batteries. It means that the charging and discharging of the virtual storage battery are numerically controlled. In the example of FIG. 2, the capacity of one storage battery 104 is virtually divided into four, "virtual storage battery A", "virtual storage battery B", "minimum maintenance capacity", and "secured free capacity" for management. .. The "minimum maintenance capacity" and "secured free capacity" are used to protect the storage battery 104 from over-discharging and over-charging, respectively, and are not actively used for charging and discharging. The control unit 107 virtually divides the capacity of the storage battery 104 and numerically controls it.

図2は、蓄電池104の容量が20kWhの場合の例である。一般的に、蓄電池は、過充電及び過放電を防いで寿命を延ばすために、残存容量が所定の上限値(以下、第1上限値)を上回らず、且つ、所定の下限値(以下、第1下限値)を下回らないように制御される。図2に示す例においては、第1上限値が90%であり、第1下限値が10%である。したがって、第1上限値の90%を上回る2kWh分の容量は、これ以上は充電されないように確保空き容量として確保される。また、第1下限値の10%を下回る2kWh分の容量は、これ以上は放電されないように最低維持容量として確保される。 FIG. 2 shows an example when the capacity of the storage battery 104 is 20 kWh. Generally, in order to prevent overcharging and overdischarging and extend the life of a storage battery, the remaining capacity does not exceed a predetermined upper limit value (hereinafter, first upper limit value) and a predetermined lower limit value (hereinafter, first upper limit value). It is controlled so as not to fall below 1 lower limit value). In the example shown in FIG. 2, the first upper limit value is 90% and the first lower limit value is 10%. Therefore, the capacity for 2 kWh, which exceeds 90% of the first upper limit value, is secured as the reserved free capacity so as not to be charged any more. Further, the capacity for 2 kWh, which is less than 10% of the first lower limit value, is secured as the minimum maintenance capacity so as not to be discharged any more.

そうすると、図2に示す例においては、蓄電池104が実質的に使用可能な容量は残りの16kWhである。例えば、これを8kWhずつ2つに仮想的に分割して、仮想蓄電池A及び仮想蓄電池Bとすることができる。本実施形態においては、仮想蓄電池Aが需要家A用の蓄電池であり、仮想蓄電池Bが需要家B用の蓄電池であるものとする。なお、仮想蓄電池A及び仮想蓄電池Bに分割する容量の比率は、平等でも良いし、契約電力及び消費電力量に応じて比率を変えてもよい。 Then, in the example shown in FIG. 2, the capacity that can be substantially used by the storage battery 104 is the remaining 16 kWh. For example, this can be virtually divided into two by 8 kWh each to obtain a virtual storage battery A and a virtual storage battery B. In the present embodiment, it is assumed that the virtual storage battery A is the storage battery for the consumer A and the virtual storage battery B is the storage battery for the consumer B. The ratio of the capacities to be divided into the virtual storage battery A and the virtual storage battery B may be equal, or the ratio may be changed according to the contracted power and the power consumption.

再び図1に戻って説明を続ける。 The explanation will be continued by returning to FIG. 1 again.

制御部107は、蓄電装置100が備える各機能ブロックをはじめとして、蓄電装置100の全体を制御及び管理するプロセッサを含む。プロセッサにより実行されるプログラムは、例えば、制御部107が備えるメモリに格納されてもよいし、記憶部106に格納されてもよい。 The control unit 107 includes a processor that controls and manages the entire power storage device 100, including each functional block included in the power storage device 100. The program executed by the processor may be stored in, for example, a memory included in the control unit 107 or may be stored in the storage unit 106.

制御部107は、第1電流センサ101Aから、第1DC/AC変換部102Aと、需要家Aの電力線との間に流れる電流値を取得する。制御部107は、第2電流センサ101Bから、第2DC/AC変換部102Bと、需要家Bの電力線との間に流れる電流値を取得する。 The control unit 107 acquires the current value flowing between the first DC / AC conversion unit 102A and the power line of the consumer A from the first current sensor 101A. The control unit 107 acquires the current value flowing between the second DC / AC conversion unit 102B and the power line of the consumer B from the second current sensor 101B.

制御部107は、第1DC/AC変換部102A、及び第2DC/AC変換部102Bの動作を独立して制御する。また、制御部107は、DC/DC充放電部103の動作を制御する。制御部107は、例えば、通信部105を介して取得した第1負荷10A及び第2負荷10Bの消費電力の情報、並びに、蓄電池104の残存容量に基づいて、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。例えば、制御部107は、第1負荷10Aの消費電力が大きい場合に、仮想蓄電池Aの容量から第1負荷10Aに電力を供給するように、第1DC/AC変換部102A、及びDC/DC充放電部103の動作を制御してもよい。 The control unit 107 independently controls the operations of the first DC / AC conversion unit 102A and the second DC / AC conversion unit 102B. Further, the control unit 107 controls the operation of the DC / DC charge / discharge unit 103. The control unit 107 has, for example, the first DC / AC converter 102A, the first DC / AC converter 102A, based on the power consumption information of the first load 10A and the second load 10B acquired via the communication unit 105 and the remaining capacity of the storage battery 104. It controls the operations of the 2DC / AC conversion unit 102B and the DC / DC charging / discharging unit 103. For example, the control unit 107 charges the first DC / AC converter 102A and DC / DC so as to supply power from the capacity of the virtual storage battery A to the first load 10A when the power consumption of the first load 10A is large. The operation of the discharge unit 103 may be controlled.

また、制御部107は、時間帯に基づいて、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御してもよい。例えば、制御部107は、電気料金が安い深夜時間帯に蓄電池104を充電するように、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御してもよい。また、制御部107は、過去の第1負荷10Aの消費電力情報の履歴から、第1負荷10Aの消費電力が大きいピーク電力時間帯を判定して、該ピーク電力時間帯に仮想蓄電池Aの容量から第1負荷10Aに電力を供給するように、第1DC/AC変換部102A、及びDC/DC充放電部103の動作を制御してもよい。 Further, the control unit 107 may control the operations of the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC charge / discharge unit 103 based on the time zone. For example, the control unit 107 operates the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC charging / discharging unit 103 so as to charge the storage battery 104 at midnight when the electricity charge is low. You may control it. Further, the control unit 107 determines a peak power time zone in which the power consumption of the first load 10A is large from the history of the power consumption information of the first load 10A in the past, and the capacity of the virtual storage battery A in the peak power time zone. The operations of the first DC / AC conversion unit 102A and the DC / DC charging / discharging unit 103 may be controlled so as to supply power to the first load 10A.

制御部107は、蓄電池104の容量を、上述のように需要家A用の仮想蓄電池Aと、需要家B用の仮想蓄電池Bとに分割して管理する。以下の説明においては、制御部107は、蓄電池104の容量20kWhのうち実質的に使用可能な容量である16kWhを、仮想的に2つに分割し、仮想蓄電池A及び仮想蓄電池Bに8kWhずつの容量を割り当てて管理することとする。 The control unit 107 manages the capacity of the storage battery 104 by dividing it into a virtual storage battery A for the consumer A and a virtual storage battery B for the customer B as described above. In the following description, the control unit 107 virtually divides 16 kWh, which is a substantially usable capacity, out of the capacity of 20 kWh of the storage battery 104 into two, and 8 kWh each for the virtual storage battery A and the virtual storage battery B. Capacity will be allocated and managed.

制御部107は、第1DC/AC変換部102Aによって変換される電力に基づいて仮想蓄電池Aの残存容量を管理する。また、制御部107は、第2DC/AC変換部102Bによって変換される電力に基づいて仮想蓄電池Bの残存容量を管理する。制御部107は、仮想蓄電池Aの残存容量、及び仮想蓄電池Bの残存容量を、記憶部106に記憶させて管理する。 The control unit 107 manages the remaining capacity of the virtual storage battery A based on the power converted by the first DC / AC conversion unit 102A. Further, the control unit 107 manages the remaining capacity of the virtual storage battery B based on the power converted by the second DC / AC conversion unit 102B. The control unit 107 stores and manages the remaining capacity of the virtual storage battery A and the remaining capacity of the virtual storage battery B in the storage unit 106.

制御部107は、第1電流センサ101Aから取得した電流の方向に基づいて、第1DC/AC変換部102Aが需要家Aの電力線から受電したか、第1DC/AC変換部102Aが需要家Aの電力線に電力を供給したかを判定する。また、制御部107は、第1電流センサ101Aから取得した電流値の絶対値に基づいて、受電又は供給した電力量を算出する。制御部107は、上述の第1電流センサ101Aから取得した電流値の方向及び絶対値に基づいて、仮想蓄電池Aの残存容量を増減させる。 In the control unit 107, based on the direction of the current acquired from the first current sensor 101A, either the first DC / AC conversion unit 102A receives power from the power line of the consumer A, or the first DC / AC conversion unit 102A receives power from the customer A. Determine if power has been supplied to the power line. Further, the control unit 107 calculates the amount of electric power received or supplied based on the absolute value of the current value acquired from the first current sensor 101A. The control unit 107 increases or decreases the remaining capacity of the virtual storage battery A based on the direction and the absolute value of the current value acquired from the first current sensor 101A described above.

制御部107は、例えば、第1電流センサ101Aから取得した電流値に基づいて、第1DC/AC変換部102Aから需要家Aの電力線に2kWhの電力量が供給されたと判定すると、仮想蓄電池Aの残存容量を2kWhだけ減らす。制御部107は、この際、放電効率を考慮して、仮想蓄電池Aの残存容量から減らす分の電力量を算出してもよい。なお、以下の説明においては、具体的な電力量の数値を用いて説明する場合、簡略化のため放電効率は1.0であるものとして説明する。 When the control unit 107 determines that the power line of the consumer A is supplied with 2 kWh of electric power from the first DC / AC conversion unit 102A based on the current value acquired from the first current sensor 101A, for example, the virtual storage battery A Reduce the remaining capacity by 2kWh. At this time, the control unit 107 may calculate the amount of electric power to be reduced from the remaining capacity of the virtual storage battery A in consideration of the discharge efficiency. In the following description, when a specific numerical value of electric energy is used, the discharge efficiency is assumed to be 1.0 for simplification.

制御部107は、例えば、第1電流センサ101Aから取得した電流値に基づいて、第1DC/AC変換部102Aが需要家Aの電力線から2kWhの電力量を受電したと判定すると、仮想蓄電池Aの残存容量を2kWhだけ増やす。制御部107は、この際、充電効率を考慮して、仮想蓄電池Aの残存容量に対して増やす分の電力量を算出してもよい。なお、以下の説明においては、具体的な電力量の数値を用いて説明する場合、簡略化のため充電効率は1.0であるものとして説明する。 When the control unit 107 determines that the first DC / AC conversion unit 102A has received 2 kWh of electric power from the power line of the consumer A based on the current value acquired from the first current sensor 101A, for example, the virtual storage battery A Increase the remaining capacity by 2kWh. At this time, the control unit 107 may calculate the amount of electric power to be increased with respect to the remaining capacity of the virtual storage battery A in consideration of the charging efficiency. In the following description, when a specific numerical value of electric energy is used, the charging efficiency is assumed to be 1.0 for simplification.

仮想蓄電池Aの残存容量を増減させる場合の具体例を上述のように説明したが、制御部107は、仮想蓄電池Bの残存容量を増減させる場合も同様の処理を行う。 Although a specific example of increasing or decreasing the remaining capacity of the virtual storage battery A has been described above, the control unit 107 performs the same process when increasing or decreasing the remaining capacity of the virtual storage battery B.

制御部107は、仮想蓄電池Aの残存容量が所定の上限値(以下、第2上限値)に達すると、たとえ蓄電池104全体の残存容量(仮想蓄電池Aの残存容量+仮想蓄電池Bの残存容量+最低維持容量)が第1上限値である90%(仮想蓄電池Aの容量+仮想蓄電池Bの容量+最低維持容量+確保空き容量=100に対する割合)に達していなくても、仮想蓄電池Aへの充電を停止させるように第1DC/AC変換部102Aを制御する。第2上限値は、例えば仮想蓄電池Aに割り当てられた容量(8kWh)が100%となる値である。仮想蓄電池Bについても同様である。 When the remaining capacity of the virtual storage battery A reaches a predetermined upper limit value (hereinafter, the second upper limit value), the control unit 107 has the remaining capacity of the entire storage battery 104 (remaining capacity of the virtual storage battery A + remaining capacity of the virtual storage battery B +). Even if the minimum maintenance capacity) does not reach the first upper limit of 90% (capacity of virtual storage battery A + capacity of virtual storage battery B + minimum maintenance capacity + secured free capacity = ratio to 100), the virtual storage battery A is supplied. The first DC / AC conversion unit 102A is controlled so as to stop charging. The second upper limit value is, for example, a value at which the capacity (8 kWh) allocated to the virtual storage battery A is 100%. The same applies to the virtual storage battery B.

制御部107は、仮想蓄電池Aの残存容量が所定の下限値(以下、第2下限値)に達すると、たとえ蓄電池104全体の残存容量が第1下限値である10%に達していなくても、仮想蓄電池Aの放電を停止させるように第1DC/AC変換部102Aを制御する。第2下限値は、例えば仮想蓄電池Aに割り当てられた容量(8kWh)が0%となる値である。仮想蓄電池Bについても同様である。 When the remaining capacity of the virtual storage battery A reaches a predetermined lower limit value (hereinafter, the second lower limit value), the control unit 107 does not reach the first lower limit value of 10% even if the remaining capacity of the entire storage battery 104 does not reach the first lower limit value. , The first DC / AC conversion unit 102A is controlled so as to stop the discharge of the virtual storage battery A. The second lower limit value is, for example, a value at which the capacity (8 kWh) allocated to the virtual storage battery A is 0%. The same applies to the virtual storage battery B.

図3に、仮想蓄電池Aの残存容量が第2上限値である100%に達した場合のイメージ図を示す。図3に示す例では、仮想蓄電池Bにはまだ残存容量が残されている。すなわち、蓄電池104は、物理的にはまだ充電可能な状態である。しかしながら、図3に示すような状態の場合、制御部107は、仮想蓄電池Aへは、これ以上充電させないように第1DC/AC変換部102Aを制御する。 FIG. 3 shows an image diagram when the remaining capacity of the virtual storage battery A reaches 100%, which is the second upper limit value. In the example shown in FIG. 3, the virtual storage battery B still has a remaining capacity. That is, the storage battery 104 is still physically rechargeable. However, in the state shown in FIG. 3, the control unit 107 controls the first DC / AC conversion unit 102A so that the virtual storage battery A is not charged any more.

図4に、仮想蓄電池Aの残存容量の時間依存の一例を示す。図4に示す例では、時刻t1において、仮想蓄電池Aの残存容量は第2上限値である100%に達する。そのため、制御部107は、時刻t1の時点において、仮想蓄電池Aへの充電を停止させるように第1DC/AC変換部102Aを制御する。 FIG. 4 shows an example of the time dependence of the remaining capacity of the virtual storage battery A. In the example shown in FIG. 4, at time t1, the remaining capacity of the virtual storage battery A reaches 100%, which is the second upper limit value. Therefore, the control unit 107 controls the first DC / AC conversion unit 102A so as to stop charging the virtual storage battery A at the time t1.

また、図4に示す例では、時刻t2において、仮想蓄電池Aの残存容量は第2下限値である0%に達する。そのため、制御部107は、時刻t2の時点において、仮想蓄電池Aからの放電を停止させるように第1DC/AC変換部102Aを制御する。 Further, in the example shown in FIG. 4, at time t2, the remaining capacity of the virtual storage battery A reaches 0%, which is the second lower limit value. Therefore, the control unit 107 controls the first DC / AC conversion unit 102A so as to stop the discharge from the virtual storage battery A at the time t2.

制御部107は、蓄電池104全体の残存容量に対しては、過充電保護及び過放電保護の制御を行う。制御部107は、仮想蓄電池Aの残存容量と、仮想蓄電池Bの残存容量と、最低維持容量と、を合算して、蓄電池104全体の残存容量を算出する。制御部107は、蓄電池104全体の残存容量が第1上限値(例えば90%)に達すると、蓄電池104への充電を停止するように、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。また、制御部107は、蓄電池104全体の残存容量が第1下限値(例えば10%)に達すると、蓄電池104からの放電を停止するように、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。 The control unit 107 controls overcharge protection and overdischarge protection for the remaining capacity of the entire storage battery 104. The control unit 107 calculates the remaining capacity of the entire storage battery 104 by adding up the remaining capacity of the virtual storage battery A, the remaining capacity of the virtual storage battery B, and the minimum maintenance capacity. When the remaining capacity of the entire storage battery 104 reaches the first upper limit value (for example, 90%), the control unit 107 stops charging the storage battery 104 with the first DC / AC conversion unit 102A and the second DC / AC conversion unit. It controls the operation of 102B and the DC / DC charging / discharging unit 103. Further, the control unit 107 stops the discharge from the storage battery 104 when the remaining capacity of the entire storage battery 104 reaches the first lower limit value (for example, 10%), so that the first DC / AC conversion unit 102A and the second DC / AC It controls the operation of the conversion unit 102B and the DC / DC charge / discharge unit 103.

図5に、蓄電池104全体の残存容量の時間依存の一例を示す。図5に示す例では、時刻t3において、蓄電池104全体の残存容量は、第1上限値である90%に達する。そのため、制御部107は、時刻t3の時点において、過充電保護のため、蓄電池104への充電を停止するように、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。 FIG. 5 shows an example of time dependence of the remaining capacity of the entire storage battery 104. In the example shown in FIG. 5, at time t3, the remaining capacity of the entire storage battery 104 reaches 90%, which is the first upper limit value. Therefore, at time t3, the control unit 107 stops charging the storage battery 104 for overcharge protection, so that the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC Controls the operation of the charging / discharging unit 103.

図6及び図7に示すフローチャートを参照して、本開示の第1実施形態に係る蓄電装置100の動作の一例について説明する。 An example of the operation of the power storage device 100 according to the first embodiment of the present disclosure will be described with reference to the flowcharts shown in FIGS. 6 and 7.

制御部107は、第1電流センサ101A及び第2電流センサ101Bから電流値を取得する(ステップS101)。 The control unit 107 acquires a current value from the first current sensor 101A and the second current sensor 101B (step S101).

制御部107は、第1電流センサ101Aから取得した電流値に基づいて、記憶部106に記憶している仮想蓄電池Aの残存容量を更新する(ステップS102)。 The control unit 107 updates the remaining capacity of the virtual storage battery A stored in the storage unit 106 based on the current value acquired from the first current sensor 101A (step S102).

制御部107は、仮想蓄電池Aの残存容量が第2上限値以上であるかを判定する(ステップS103)。 The control unit 107 determines whether the remaining capacity of the virtual storage battery A is equal to or greater than the second upper limit value (step S103).

仮想蓄電池Aの残存容量が第2上限値以上であると判定した場合(ステップS103のYes)、制御部107は、仮想蓄電池Aへの充電を停止させて(ステップS104)、ステップS105に進む。 When it is determined that the remaining capacity of the virtual storage battery A is equal to or greater than the second upper limit value (Yes in step S103), the control unit 107 stops charging the virtual storage battery A (step S104) and proceeds to step S105.

仮想蓄電池Aの残存容量が第2上限値以上でないと判定した場合(ステップS103のNo)、制御部107は、ステップS105に進む。 When it is determined that the remaining capacity of the virtual storage battery A is not equal to or greater than the second upper limit value (No in step S103), the control unit 107 proceeds to step S105.

制御部107は、仮想蓄電池Aの残存容量が第2下限値以下であるかを判定する(ステップS105)。 The control unit 107 determines whether the remaining capacity of the virtual storage battery A is equal to or less than the second lower limit value (step S105).

仮想蓄電池Aの残存容量が第2下限値以下であると判定した場合(ステップS105のYes)、制御部107は、仮想蓄電池Aからの放電を停止させて(ステップS106)、ステップS107に進む。 When it is determined that the remaining capacity of the virtual storage battery A is equal to or less than the second lower limit value (Yes in step S105), the control unit 107 stops the discharge from the virtual storage battery A (step S106) and proceeds to step S107.

仮想蓄電池Aの残存容量が第2下限値以下でないと判定した場合(ステップS105のNo)、制御部107は、ステップS107に進む。 When it is determined that the remaining capacity of the virtual storage battery A is not equal to or less than the second lower limit value (No in step S105), the control unit 107 proceeds to step S107.

制御部107は、第2電流センサ101Bから取得した電流値に基づいて、記憶部106に記憶している仮想蓄電池Bの残存容量を更新する(ステップS107)。 The control unit 107 updates the remaining capacity of the virtual storage battery B stored in the storage unit 106 based on the current value acquired from the second current sensor 101B (step S107).

制御部107は、仮想蓄電池Bの残存容量が第2上限値以上であるかを判定する(ステップS108)。 The control unit 107 determines whether the remaining capacity of the virtual storage battery B is equal to or greater than the second upper limit value (step S108).

仮想蓄電池Bの残存容量が第2上限値以上であると判定した場合(ステップS108のYes)、制御部107は、仮想蓄電池Bへの充電を停止させて(ステップS109)、ステップS110に進む。 When it is determined that the remaining capacity of the virtual storage battery B is equal to or greater than the second upper limit value (Yes in step S108), the control unit 107 stops charging the virtual storage battery B (step S109) and proceeds to step S110.

仮想蓄電池Bの残存容量が第2上限値以上でないと判定した場合(ステップS108のNo)、制御部107は、ステップS110に進む。 When it is determined that the remaining capacity of the virtual storage battery B is not equal to or greater than the second upper limit value (No in step S108), the control unit 107 proceeds to step S110.

制御部107は、仮想蓄電池Bの残存容量が第2下限値以下であるかを判定する(ステップS110)。 The control unit 107 determines whether the remaining capacity of the virtual storage battery B is equal to or less than the second lower limit value (step S110).

仮想蓄電池Bの残存容量が第2下限値以下であると判定した場合(ステップS110のYes)、制御部107は、仮想蓄電池Bからの放電を停止させて(ステップS111)、ステップS112に進む。 When it is determined that the remaining capacity of the virtual storage battery B is equal to or less than the second lower limit value (Yes in step S110), the control unit 107 stops the discharge from the virtual storage battery B (step S111) and proceeds to step S112.

仮想蓄電池Bの残存容量が第2下限値以下でないと判定した場合(ステップS110のNo)、制御部107は、ステップS112に進む。 When it is determined that the remaining capacity of the virtual storage battery B is not equal to or less than the second lower limit value (No in step S110), the control unit 107 proceeds to step S112.

制御部107は、仮想蓄電池Aの残存容量と、仮想蓄電池Bの残存容量と、最低維持容量と、を合算して、蓄電池104全体の残存容量を算出する(ステップS112)。 The control unit 107 calculates the remaining capacity of the entire storage battery 104 by adding the remaining capacity of the virtual storage battery A, the remaining capacity of the virtual storage battery B, and the minimum maintenance capacity (step S112).

制御部107は、蓄電池104全体の残存容量が第1上限値以上であるかを判定する(ステップS113)。なお、図示しないが、前記判定においては、電流制御によって第1上限値へ到達した際に、蓄電池104の電圧を測定して第1上限値への誤差を電圧制御の充電によって修正するようにしてもよい。 The control unit 107 determines whether the remaining capacity of the entire storage battery 104 is equal to or greater than the first upper limit value (step S113). Although not shown, in the above determination, when the first upper limit value is reached by current control, the voltage of the storage battery 104 is measured and the error to the first upper limit value is corrected by charging the voltage control. May be good.

蓄電池104全体の残存容量が第1上限値以上であると判定した場合(ステップS113のYes)、制御部107は、過充電保護のため、蓄電池104への充電を停止させて(ステップS114)、ステップS115に進む。 When it is determined that the remaining capacity of the entire storage battery 104 is equal to or greater than the first upper limit value (Yes in step S113), the control unit 107 stops charging the storage battery 104 for overcharge protection (step S114). The process proceeds to step S115.

蓄電池104全体の残存容量が第1上限値以上でないと判定した場合(ステップS113のNo)、制御部107は、ステップS115に進む。 When it is determined that the remaining capacity of the entire storage battery 104 is not equal to or greater than the first upper limit value (No in step S113), the control unit 107 proceeds to step S115.

制御部107は、蓄電池104全体の残存容量が第1下限値以下であるかを判定する(ステップS115)。 The control unit 107 determines whether the remaining capacity of the entire storage battery 104 is equal to or less than the first lower limit value (step S115).

蓄電池104全体の残存容量が第1下限値以下であると判定した場合(ステップS115のYes)、制御部107は、過放電保護のため、蓄電池104からの放電を停止させて(ステップS116)、動作を終了する。 When it is determined that the remaining capacity of the entire storage battery 104 is equal to or less than the first lower limit value (Yes in step S115), the control unit 107 stops the discharge from the storage battery 104 for over-discharge protection (step S116). End the operation.

蓄電池104全体の残存容量が第1下限値以下でないと判定した場合(ステップS115のNo)、制御部107は、動作を終了する。 When it is determined that the remaining capacity of the entire storage battery 104 is not equal to or less than the first lower limit value (No in step S115), the control unit 107 ends the operation.

制御部107は、ステップS101〜ステップS116の動作を所定の時間間隔で繰り返す。 The control unit 107 repeats the operations of steps S101 to S116 at predetermined time intervals.

続いて、図8を参照して、第1DC/AC変換部102Aが、需要家Aの電力線から1.0kWhの電力を受電し、第2DC/AC変換部102Bが、需要家Bの電力線に0.7kWhの電力を供給する場合の例を説明する。なお、説明の簡略化のため、充電効率及び放電効率は1.0であるものとして説明する。 Subsequently, with reference to FIG. 8, the first DC / AC conversion unit 102A receives 1.0 kWh of power from the power line of the consumer A, and the second DC / AC conversion unit 102B 0 to the power line of the customer B. An example of supplying a power of .7 kWh will be described. For the sake of brevity, the charging efficiency and the discharging efficiency will be described as 1.0.

この場合、第1DC/AC変換部102Aは、需要家Aの電力線から受電した1.0kWhの交流電力を直流電力に変換して、0.7kWhの直流電力を第2DC/AC変換部102Bに供給し、0.3kWhの直流電力をDC/DC充放電部103に供給する。 In this case, the first DC / AC conversion unit 102A converts 1.0 kWh of AC power received from the power line of the consumer A into DC power, and supplies 0.7 kWh of DC power to the second DC / AC conversion unit 102B. Then, 0.3 kWh of DC power is supplied to the DC / DC charging / discharging unit 103.

第2DC/AC変換部102Bは、第1DC/AC変換部102Aから供給された0.7kWhの直流電力を交流電力に変換して、需要家Bの電力線に供給する。 The second DC / AC conversion unit 102B converts 0.7 kWh of DC power supplied from the first DC / AC conversion unit 102A into AC power and supplies it to the power line of the consumer B.

DC/DC充放電部103は、第1DC/AC変換部102Aから供給された0.3kWhを蓄電池104に供給して、蓄電池104を充電する。 The DC / DC charging / discharging unit 103 supplies 0.3 kWh supplied from the first DC / AC converter 102A to the storage battery 104 to charge the storage battery 104.

上述の動作において、実体的には、蓄電池104が0.3kWh充電されているが、制御部107は、仮想蓄電池Aの残存容量を1.0kWh増やし、仮想蓄電池Bの残存容量を0.7kWh減らす処理を実行する。 In the above operation, the storage battery 104 is substantially charged by 0.3 kWh, but the control unit 107 increases the remaining capacity of the virtual storage battery A by 1.0 kWh and decreases the remaining capacity of the virtual storage battery B by 0.7 kWh. Execute the process.

図8に示す例においては、DC/DC充放電部103は、差分である0.3kWhを充電する処理を実行するのみであり、1.0kWh充電してから0.7kWh放電するというような処理はしない。これにより、同一の蓄電池104に対して同時に充電と放電が要求される状態にも対応可能とし、且つ、DC/DC充放電部103の変換効率に起因する電力のロスを低減することができる。 In the example shown in FIG. 8, the DC / DC charging / discharging unit 103 only executes a process of charging the difference of 0.3 kWh, and a process of charging 1.0 kWh and then discharging 0.7 kWh. I will not do it. As a result, it is possible to cope with a state in which charging and discharging are required for the same storage battery 104 at the same time, and it is possible to reduce power loss due to the conversion efficiency of the DC / DC charging / discharging unit 103.

なお、実際に充電効率・放電効率を加味して充電電力量及び放電電力量を管理する際においては、蓄電池104の温度、並びに、第1電流センサ101A及び第2電流センサ101Bの個体差などの要因によって、管理上の仮想蓄電池の残存容量と、実際の仮想蓄電池の残存容量との間に差異が蓄積される。例えば、蓄電池104が電流制御による充電によって第1上限値に至ると、制御部107は、第1上限値か確認するために電圧値を測定して補正を行い、前記補正値から補正係数を算出して仮想蓄電池の残存容量に適用して正しい容量に修正してよい。 When actually managing the charge power amount and the discharge power amount in consideration of the charge efficiency and the discharge efficiency, the temperature of the storage battery 104 and the individual differences between the first current sensor 101A and the second current sensor 101B may be determined. Depending on the factor, a difference is accumulated between the remaining capacity of the management virtual storage battery and the remaining capacity of the actual virtual storage battery. For example, when the storage battery 104 reaches the first upper limit value by charging by current control, the control unit 107 measures the voltage value and corrects it in order to confirm whether it is the first upper limit value, and calculates the correction coefficient from the correction value. Then, it may be applied to the remaining capacity of the virtual storage battery to correct the capacity.

このように、本実施形態によれば、制御部107は、蓄電池104の容量を複数の仮想蓄電池に分割し、仮想蓄電池A及び仮想蓄電池Bの残存容量を、それぞれ、第1DC/AC変換部102A及び第2DC/AC変換部102Bによって変換される電力に基づいて管理する。これにより、蓄電装置100は、複数の需要家に対し、あたかも複数の蓄電池があるかのように独立して電力を供給することができる。したがって、本実施形態によれば、1つの蓄電池104を有する1台の蓄電装置100で、複数の需要家に電力を共有することができるため、各需要家が個別に蓄電装置を設置する必要がなくなる。その結果、複数の需要家で1台の蓄電装置を共有することが可能となるため、蓄電装置を設置する際の各需要家が負担する初期費用を低減させることができる。よって、需要家は、個々人で蓄電装置を購入する場合に比べて、蓄電装置を導入しやすくなる。 As described above, according to the present embodiment, the control unit 107 divides the capacity of the storage battery 104 into a plurality of virtual storage batteries, and divides the remaining capacities of the virtual storage battery A and the virtual storage battery B into the first DC / AC conversion unit 102A, respectively. And management is performed based on the power converted by the second DC / AC conversion unit 102B. As a result, the power storage device 100 can independently supply electric power to a plurality of consumers as if there were a plurality of storage batteries. Therefore, according to the present embodiment, one power storage device 100 having one storage battery 104 can share electric power with a plurality of consumers, so that each customer needs to install the power storage device individually. It disappears. As a result, one power storage device can be shared by a plurality of consumers, so that the initial cost borne by each customer when installing the power storage device can be reduced. Therefore, the consumer can easily introduce the power storage device as compared with the case where the power storage device is purchased individually.

また、複数の蓄電池を複数の需要家でそれぞれ1個ずつ使用した場合、使用状態の違いから寿命に差が出ることが想定される。そうすると、蓄電池の交換時期が需要家毎に異なってくるため、例えば集合住宅で各戸ごとに別々の蓄電池を使用した場合、蓄電池の交換時期にばらつきが生じるため、大家など管理者への管理負担が大きくなる。しかしながら、本実施形態によれば、実体的には1つの蓄電池104を仮想的に分割しているだけであるため、各仮想蓄電池の寿命は同じであり、蓄電池の交換の際の大家の管理負担が小さくなる。 Further, when a plurality of storage batteries are used by a plurality of consumers one by one, it is expected that the life will be different due to the difference in the usage state. In that case, the replacement time of the storage battery differs for each consumer. For example, if different storage batteries are used for each house in an apartment house, the replacement time of the storage battery varies, which imposes a management burden on the landlord and other managers. growing. However, according to the present embodiment, since one storage battery 104 is actually only virtually divided, the life of each virtual storage battery is the same, and the landlord's management burden when replacing the storage battery Becomes smaller.

(許可量の設定)
上述の説明では、制御部107は、仮想蓄電池Aの残存容量が第2下限値に達したら、仮想蓄電池Aの放電を停止させるものとして説明した。しかしながら、制御部107は、予め所定の許可量を設定しておき、所定の許可量までは、仮想蓄電池Bの残存容量を需要家Aの電力線への放電に使用できるようにしてもよい。このようにして、仮想蓄電池Bの残存容量を需要家Aの電力線への放電に使用した場合、制御部107は、次回の仮想蓄電池Aの充電の際に、仮想蓄電池Bから借りた分の電力を仮想蓄電池Bに返却してから、仮想蓄電池Aに充電するように、記憶部106内の残存容量の情報を管理する。
(Setting of permitted amount)
In the above description, the control unit 107 has been described as stopping the discharge of the virtual storage battery A when the remaining capacity of the virtual storage battery A reaches the second lower limit value. However, the control unit 107 may set a predetermined permitted amount in advance so that the remaining capacity of the virtual storage battery B can be used for discharging the power line of the consumer A up to the predetermined permitted amount. In this way, when the remaining capacity of the virtual storage battery B is used for discharging the power line of the consumer A, the control unit 107 receives the power borrowed from the virtual storage battery B at the next charging of the virtual storage battery A. Is returned to the virtual storage battery B, and then the information on the remaining capacity in the storage unit 106 is managed so that the virtual storage battery A is charged.

(非常時における制御)
制御部107は、例えば地震などの非常時においては、仮想蓄電池の残存容量が第2下限値以下になっても、蓄電池104の残存容量が第1下限値に達していなければ、放電を可能とするように制御してもよい。
(Control in an emergency)
In an emergency such as an earthquake, the control unit 107 enables discharge even if the remaining capacity of the virtual storage battery falls below the second lower limit value if the remaining capacity of the storage battery 104 does not reach the first lower limit value. It may be controlled to do so.

(複数の蓄電池)
上述の説明では、蓄電装置100内の蓄電池104は1つであるものとして説明したが、蓄電装置100は複数の蓄電池を有してもよい。この場合、制御部107は、複数の蓄電池のそれぞれを仮想蓄電池に分割して管理してよい。例えば、蓄電池Aと蓄電池Bを有している場合であれば蓄電池Aを仮想蓄電池A1と仮想蓄電池B1に分割し、蓄電池Bを仮想蓄電池A2と仮想蓄電池B2に分割して、仮想蓄電池A1と仮想蓄電池A2の容量を合算して管理すればよい。仮想蓄電池B1と仮想蓄電池B2も同様にする。このように、蓄電装置100が複数の蓄電池を有することで、1つの蓄電池を交換している間も他の蓄電池を使用することができるため、蓄電池の交換が必要となる場合も継続して蓄電装置100を使用することができる。
(Multiple storage batteries)
In the above description, the storage battery 104 in the power storage device 100 has been described as one, but the power storage device 100 may have a plurality of storage batteries. In this case, the control unit 107 may manage each of the plurality of storage batteries by dividing them into virtual storage batteries. For example, if the storage battery A and the storage battery B are provided, the storage battery A is divided into the virtual storage battery A1 and the virtual storage battery B1, the storage battery B is divided into the virtual storage battery A2 and the virtual storage battery B2, and the virtual storage battery A1 and the virtual storage battery A1 are virtual. The capacities of the storage batteries A2 may be added up and managed. The same applies to the virtual storage battery B1 and the virtual storage battery B2. As described above, since the power storage device 100 has a plurality of storage batteries, the other storage batteries can be used while one storage battery is being replaced, so that the storage battery can be continuously stored even when the storage battery needs to be replaced. The device 100 can be used.

[第2実施形態]
図9を参照して、本開示の第2実施形態に係る電力管理システム2について説明する。本実施形態においては、第1実施形態と相違する部分について主に説明し、第1実施形態と共通又は類似する内容については、説明を省略する。
[Second Embodiment]
The power management system 2 according to the second embodiment of the present disclosure will be described with reference to FIG. In the present embodiment, the parts different from the first embodiment will be mainly described, and the description of the contents common to or similar to the first embodiment will be omitted.

本実施形態は、電力管理システム2が、電力管理装置40を有する構成である点で第1実施形態と相違する。 This embodiment is different from the first embodiment in that the power management system 2 has a power management device 40.

本実施形態においては、電力管理装置40が、第1実施形態における制御部107が有する機能の一部又は全てを有する。 In the present embodiment, the power management device 40 has a part or all of the functions of the control unit 107 in the first embodiment.

電力管理装置40は、第1電流センサ101Aから取得した電流値に基づいて、仮想蓄電池Aの残存容量を管理する。また、電力管理装置40は、第2電流センサ101Bから取得した電流値に基づいて、仮想蓄電池Bの残存容量を管理する。仮想蓄電池A及び仮想蓄電池Bの残存容量の値は、電力管理装置40が備える記憶部に記憶してもよいし、蓄電装置100内の記憶部に記憶してもよい。 The power management device 40 manages the remaining capacity of the virtual storage battery A based on the current value acquired from the first current sensor 101A. Further, the power management device 40 manages the remaining capacity of the virtual storage battery B based on the current value acquired from the second current sensor 101B. The values of the remaining capacities of the virtual storage battery A and the virtual storage battery B may be stored in the storage unit included in the power management device 40, or may be stored in the storage unit in the power storage device 100.

電力管理装置40は、制御部107に指令を送信して、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御させる。 The power management device 40 transmits a command to the control unit 107 to control the operations of the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC charging / discharging unit 103.

このように、本実施形態によれば、電力管理装置40が、蓄電装置100の制御部107の代わりに高度な処理を実行することができる。これにより、蓄電装置100の制御部107の作業負荷が低減されるため、制御部107を低コストのCPUを用いて構成することが可能となる。電力管理装置40は、例えばHEMS(Home Energy Management System)又はコンピューターソフトウェアなどの形態である。 As described above, according to the present embodiment, the power management device 40 can execute advanced processing instead of the control unit 107 of the power storage device 100. As a result, the workload of the control unit 107 of the power storage device 100 is reduced, so that the control unit 107 can be configured by using a low-cost CPU. The power management device 40 is in the form of, for example, HEMS (Home Energy Management System) or computer software.

[第3実施形態]
図10を参照して、本開示の第3実施形態に係る電力管理システム3について説明する。本実施形態においては、第1実施形態と相違する部分について主に説明し、第1実施形態と共通又は類似する内容については、説明を省略する。
[Third Embodiment]
The power management system 3 according to the third embodiment of the present disclosure will be described with reference to FIG. In the present embodiment, the parts different from the first embodiment will be mainly described, and the description of the contents common to or similar to the first embodiment will be omitted.

本実施形態は、電力管理システム3が、太陽光発電装置50を有する構成である点で第1実施形態と相違する。 The present embodiment is different from the first embodiment in that the power management system 3 has a configuration including a photovoltaic power generation device 50.

太陽光発電装置50は、太陽光のエネルギーから直流電力を発電する。太陽光発電装置50は、発電した直流電力を交流電力に変換して、需要家Aの電力線に供給する。 The photovoltaic power generation device 50 generates DC power from the energy of sunlight. The photovoltaic power generation device 50 converts the generated DC power into AC power and supplies it to the power line of the consumer A.

太陽光発電装置50は、例えば、ECHONET Lite(登録商標)のような所定の通信プロトコルにより蓄電装置100と通信可能であり、発電電力の情報などを蓄電装置100に送信する。 The photovoltaic power generation device 50 can communicate with the power storage device 100 by a predetermined communication protocol such as ECHONET Lite (registered trademark), and transmits information such as generated power to the power storage device 100.

制御部107は、例えば、通信部105を介して取得した第1負荷10A及び第2負荷10Bの消費電力の情報、太陽光発電装置50の発電電力の情報、並びに、蓄電池104の残存容量に基づいて、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。 The control unit 107 is based on, for example, information on the power consumption of the first load 10A and the second load 10B acquired via the communication unit 105, information on the power generated by the photovoltaic power generation device 50, and the remaining capacity of the storage battery 104. The operation of the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC charge / discharge unit 103 is controlled.

制御部107は、太陽光発電装置50による発電電力を、仮想蓄電池Aの充電に用いてもよいし、系統30に逆潮流させて売電してもよい。 The control unit 107 may use the power generated by the photovoltaic power generation device 50 to charge the virtual storage battery A, or may reverse power flow to the system 30 to sell the power.

制御部107は、仮想蓄電池Aの残存容量が第2上限値に達すると、仮想蓄電池Bの残存容量に空きがあっても充電を停止し、系統30に逆潮流させる。 When the remaining capacity of the virtual storage battery A reaches the second upper limit value, the control unit 107 stops charging even if the remaining capacity of the virtual storage battery B is vacant, and causes the system 30 to reverse power flow.

(充電元の限定)
図10に示す構成において、制御部107は、仮想蓄電池Aと仮想蓄電池Bとで充電元を完全に分けるように制御してもよい。例えば、制御部107は、仮想蓄電池Aには太陽光発電装置50のみから充電し、系統30からは充電しないように制御する。また、制御部107は、仮想蓄電池Bには系統30のみから充電するように制御する。このように、充電用の電源を完全に分けることにより、仮想蓄電池Aの残存容量を系統30に売電することが認められるような電力会社との契約も可能となる。
(Limited charging source)
In the configuration shown in FIG. 10, the control unit 107 may control the virtual storage battery A and the virtual storage battery B so that the charging sources are completely separated. For example, the control unit 107 controls the virtual storage battery A so that it is charged only from the photovoltaic power generation device 50 and not from the system 30. Further, the control unit 107 controls the virtual storage battery B so as to be charged only from the system 30. By completely separating the power supply for charging in this way, it is possible to make a contract with an electric power company that allows the remaining capacity of the virtual storage battery A to be sold to the system 30.

(太陽光発電装置の発電電力の共有)
需要家Aと需要家Bとの間の契約により、需要家Aの電力線に接続している太陽光発電装置50の発電電力によって、仮想蓄電池A及び仮想蓄電池Bの両方を充電するようにしてもよい。この場合、実際には、太陽光発電装置50から供給される電力は、第1DC/AC変換部102Aのみによって直流電力に変換され、第2DC/AC変換部102Bによっては変換されないが、制御部107は、第1負荷10Aで消費されなかった太陽光発電装置50の余剰電力を、仮想蓄電池A及び仮想蓄電池Bの双方に充電されたものとして記憶部106に記憶されている仮想蓄電池A及び仮想蓄電池Bの残存容量を更新する。なお、この際、制御部107は、太陽光発電装置50から供給された電力が、半々の比率で蓄電池A及び仮想蓄電池Bの双方に充電されるように記憶部106の情報を管理してもよいし、その他の所定の比率で充電されるように記憶部106の情報を管理してもよい。
(Sharing of power generated by solar power generation equipment)
According to the contract between the consumer A and the consumer B, both the virtual storage battery A and the virtual storage battery B are charged by the generated power of the photovoltaic power generation device 50 connected to the power line of the consumer A. Good. In this case, in reality, the power supplied from the solar power generation device 50 is converted into DC power only by the first DC / AC conversion unit 102A and not by the second DC / AC conversion unit 102B, but is not converted by the control unit 107. Is a virtual storage battery A and a virtual storage battery in which the surplus power of the solar power generation device 50 not consumed by the first load 10A is stored in the storage unit 106 as being charged in both the virtual storage battery A and the virtual storage battery B. Update the remaining capacity of B. At this time, even if the control unit 107 manages the information of the storage unit 106 so that the electric power supplied from the photovoltaic power generation device 50 is charged to both the storage battery A and the virtual storage battery B at a ratio of 50%. Alternatively, the information of the storage unit 106 may be managed so that the battery is charged at another predetermined ratio.

(空き容量の貸し借り)
例えば、制御部107が、太陽光発電装置50から供給された電力を、半々の比率で仮想蓄電池A及び仮想蓄電池Bの双方に充電されるように記憶部106の情報を管理する場合、図11(A)に示すように、仮想蓄電池Aと仮想蓄電池Bとで空き容量が異なる場合がある。図11(A)に示す例では、仮想蓄電池Aの空き容量は2kWhであり、仮想蓄電池Bの空き容量は5kWhである。この場合、仮想蓄電池Aと仮想蓄電池Bに2kWhずつ充電した段階で、仮想蓄電池Aの空き容量はゼロとなってしまうが、この場合、制御部107は、図11(B)に示すように、仮想蓄電池Bの空き容量3kWhのうち1.5kWhを、仮想蓄電池Aに一時的に貸す(仮想蓄電池Bの容量を6.5kWhで100%として管理する)ように制御してもよい。このように、仮想蓄電池Bの空き容量を仮想蓄電池Aに貸すことで、仮想蓄電池A及び仮想蓄電池Bの双方が、太陽光発電装置50から3.5kWh(2kWh+1.5kWh)ずつ充電することができる。この場合、制御部107は、仮想蓄電池Aにおける1.5kWhの借り分は優先的に第1負荷10Aで消費されるように制御する。制御部107は、仮想蓄電池Aの借り分の1.5kWhを放電させると、1.5kWh分の容量を仮想蓄電池Bに返すように制御する。
(Lending and borrowing free space)
For example, when the control unit 107 manages the information of the storage unit 106 so that the electric power supplied from the photovoltaic power generation device 50 is charged to both the virtual storage battery A and the virtual storage battery B at a ratio of 50%. As shown in (A), the free capacity may differ between the virtual storage battery A and the virtual storage battery B. In the example shown in FIG. 11A, the free capacity of the virtual storage battery A is 2 kWh, and the free capacity of the virtual storage battery B is 5 kWh. In this case, when the virtual storage battery A and the virtual storage battery B are charged by 2 kWh each, the free capacity of the virtual storage battery A becomes zero. In this case, the control unit 107 has the control unit 107 as shown in FIG. 11 (B). Of the free capacity of 3 kWh of the virtual storage battery B, 1.5 kWh may be temporarily lent to the virtual storage battery A (the capacity of the virtual storage battery B is managed as 100% at 6.5 kWh). By lending the free capacity of the virtual storage battery B to the virtual storage battery A in this way, both the virtual storage battery A and the virtual storage battery B can be charged by 3.5 kWh (2 kWh + 1.5 kWh) from the photovoltaic power generation device 50. .. In this case, the control unit 107 controls so that the borrowed portion of 1.5 kWh in the virtual storage battery A is preferentially consumed by the first load 10A. The control unit 107 controls so that when 1.5 kWh of the borrowed portion of the virtual storage battery A is discharged, the capacity of 1.5 kWh is returned to the virtual storage battery B.

このような制御は、蓄電池104の空き容量を減らすことができる。よって、例えば、非常時に使用できる電力を確保しやすくなる。この空き容量の貸し借りは、空き容量が所定の閾値を越えた場合に、制御部107が自動的に実行するように制御してもよい。 Such control can reduce the free capacity of the storage battery 104. Therefore, for example, it becomes easy to secure electric power that can be used in an emergency. The lending and borrowing of the free space may be controlled so that the control unit 107 automatically executes it when the free space exceeds a predetermined threshold value.

[第4実施形態]
図12を参照して、本開示の第4実施形態に係る電力管理システム4について説明する。本実施形態においては、第3実施形態と相違する部分について主に説明し、第3実施形態と共通又は類似する内容については、説明を省略する。
[Fourth Embodiment]
The power management system 4 according to the fourth embodiment of the present disclosure will be described with reference to FIG. In the present embodiment, the parts different from the third embodiment will be mainly described, and the description of the contents common to or similar to the third embodiment will be omitted.

本実施形態は、電力管理システム4が有する太陽光発電装置60の構成が、第3実施形態における太陽光発電装置50の構成と相違する。本実施形態に係る太陽光発電装置60は、発電した直流電力を直流電力のまま、蓄電装置100に供給する。また、太陽光発電装置60は、発電した直流電力を、DC/DC充放電部103と、第1DC/AC変換部102A及び第2DC/AC変換部102Bとの間に供給する。 In this embodiment, the configuration of the photovoltaic power generation device 60 included in the power management system 4 is different from the configuration of the photovoltaic power generation device 50 in the third embodiment. The photovoltaic power generation device 60 according to the present embodiment supplies the generated DC power to the power storage device 100 as it is. Further, the photovoltaic power generation device 60 supplies the generated DC power between the DC / DC charging / discharging unit 103, the first DC / AC conversion unit 102A, and the second DC / AC conversion unit 102B.

太陽光発電装置60は、例えば、ECHONET Lite(登録商標)のような所定の通信プロトコルにより蓄電装置100と通信可能であり、発電電力の情報などを蓄電装置100に送信する。 The photovoltaic power generation device 60 can communicate with the power storage device 100 by a predetermined communication protocol such as ECHONET Lite (registered trademark), and transmits information such as generated power to the power storage device 100.

制御部107は、例えば、通信部105を介して取得した第1負荷10A及び第2負荷10Bの消費電力の情報、太陽光発電装置60の発電電力の情報、並びに、蓄電池104の残存容量に基づいて、第1DC/AC変換部102A、第2DC/AC変換部102B、及びDC/DC充放電部103の動作を制御する。 The control unit 107 is based on, for example, information on the power consumption of the first load 10A and the second load 10B acquired via the communication unit 105, information on the power generated by the photovoltaic power generation device 60, and the remaining capacity of the storage battery 104. The operation of the first DC / AC conversion unit 102A, the second DC / AC conversion unit 102B, and the DC / DC charge / discharge unit 103 is controlled.

制御部107は、太陽光発電装置60から取得する発電電力の情報に基づいて、太陽光発電装置60の発電電力によって、仮想蓄電池A及び仮想蓄電池Bが半々の比率で充電されるように、仮想蓄電池A及び仮想蓄電池Bの残存容量を制御する。 Based on the information of the generated power acquired from the photovoltaic power generation device 60, the control unit 107 virtually charges the virtual storage battery A and the virtual storage battery B at a ratio of 50% by the generated power of the photovoltaic power generation device 60. The remaining capacities of the storage battery A and the virtual storage battery B are controlled.

また、例えば、第1DC/AC変換部102Aが第1負荷10Aに太陽光発電装置60の発電電力の一部電力を供給する場合、制御部107は、仮想蓄電池Aへの充電電力が、太陽光発電装置60の発電電力の仮想蓄電池Aへの割り振り分から、第1DC/AC変換部102Aを流れる電力を差し引いた電力となるよう制御する。この際、太陽光発電装置60の発電電力の仮想蓄電池Aへの割り振り分を越える電力が消費されないよう、制御部107は、第1DC/AC変換部102Aを制御する。仮想蓄電池Bの場合も同様である。 Further, for example, when the first DC / AC conversion unit 102A supplies a part of the power generated by the solar power generation device 60 to the first load 10A, the control unit 107 charges the virtual storage battery A with sunlight. The power generated by the power generation device 60 is controlled to be the power obtained by subtracting the power flowing through the first DC / AC conversion unit 102A from the allocated power to the virtual storage battery A. At this time, the control unit 107 controls the first DC / AC conversion unit 102A so that the power generated by the photovoltaic power generation device 60 does not exceed the allocated power to the virtual storage battery A. The same applies to the virtual storage battery B.

また、例えば仮想蓄電池Bが100%充電となった場合には、太陽光発電装置60の発電電力に余剰が生じる。この場合、制御部107は、太陽光発電装置60の発電電力の仮想蓄電池Aへの割り振り分から充電電力を差し引いた電力を、第1DC/AC変換部102Aで第1負荷10Aに給電もしくは系統30へ逆潮流させる。仮想蓄電池Bの場合も同様である。 Further, for example, when the virtual storage battery B is 100% charged, there is a surplus in the generated power of the photovoltaic power generation device 60. In this case, the control unit 107 supplies the power obtained by subtracting the charging power from the allocation of the generated power of the photovoltaic power generation device 60 to the virtual storage battery A to the first load 10A or to the system 30 by the first DC / AC conversion unit 102A. Reverse power flow. The same applies to the virtual storage battery B.

本発明の実施形態を諸図面及び実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形及び修正を行うことが容易であることに注意されたい。従って、これらの変形及び修正は本発明の範囲に含まれることに留意されたい。例えば、各構成部、各ステップなどに含まれる機能などは論理的に矛盾しないように再配置可能であり、複数の構成部又はステップなどを1つに組み合わせたり、或いは分割したりすることが可能である。また、本発明について装置を中心に説明してきたが、本発明は装置の各構成部が実行するステップを含む方法、装置が備えるプロセッサにより実行される方法、プログラム、又はプログラムを記録した記憶媒体としても実現し得るものである。本発明の範囲にはこれらも包含されるものと理解されたい。 Although embodiments of the present invention have been described with reference to the drawings and examples, it should be noted that those skilled in the art can easily make various modifications and modifications based on the present disclosure. Therefore, it should be noted that these modifications and modifications are within the scope of the present invention. For example, the functions included in each component and each step can be rearranged so as not to be logically inconsistent, and a plurality of components or steps can be combined or divided into one. Is. Further, although the present invention has been mainly described with respect to the device, the present invention is a method including steps executed by each component of the device, a method executed by a processor included in the device, a program, or a storage medium for recording the program. Can also be realized. It should be understood that these are also included in the scope of the present invention.

1、2、3、4 電力管理システム
10A 第1負荷
10B 第2負荷
20A 第1電力量計
20B 第2電力量計
30 系統
40 電力管理装置
50 太陽光発電装置
60 太陽光発電装置
100 蓄電装置
101A 第1電流センサ
101B 第2電流センサ
102A 第1DC/AC変換部
102B 第2DC/AC変換部
103 DC/DC充放電部
104 蓄電池
105 通信部
106 記憶部
107 制御部
1, 2, 3, 4 Power management system 10A 1st load 10B 2nd load 20A 1st watt-hour meter 20B 2nd watt-hour meter 30 system 40 Power management device 50 Solar power generation device 60 Solar power generation device 100 Power storage device 101A 1st current sensor 101B 2nd current sensor 102A 1st DC / AC conversion unit 102B 2nd DC / AC conversion unit 103 DC / DC charge / discharge unit 104 Storage battery 105 Communication unit 106 Storage unit 107 Control unit

Claims (6)

第1需要家と第2需要家とを含む複数の需要家に電力を供給可能な蓄電装置であって、
単一の蓄電池と、
前記蓄電池の容量を前記第1需要家用の第1仮想蓄電池及び前記第2需要家用の第2仮想蓄電池を含む複数の仮想蓄電池に仮想的に分割する制御部と、
前記複数の需要家の電力線のそれぞれに接続されたDC/DC充放電部と、を備え、
前記DC/DC充放電部は、前記制御部が前記第1仮想蓄電池の残存容量を第1電力量増やし、前記第2仮想蓄電池の残存容量を第2電力量減らす処理を実行する際に、前記第1需要家の電力線から受電される前記第1電力量と前記第2需要家の電力線に供給する前記第2電力量の差分に相当する電力量を充放電するように前記蓄電池を制御する、蓄電装置。
A power storage device capable of supplying electric power to a plurality of consumers including a first consumer and a second consumer.
With a single storage battery
A control unit that virtually divides the capacity of the storage battery into a plurality of virtual storage batteries including the first virtual storage battery for the first consumer and the second virtual storage battery for the second consumer.
A DC / DC charge / discharge unit connected to each of the power lines of the plurality of consumers is provided.
The DC / DC charging / discharging unit is described when the control unit executes a process of increasing the remaining capacity of the first virtual storage battery by the first electric energy and decreasing the remaining capacity of the second virtual storage battery by the second electric energy. The storage battery is controlled so as to charge and discharge the amount of electric energy corresponding to the difference between the amount of electric energy received from the electric energy line of the first consumer and the amount of electric energy supplied to the electric energy line of the second consumer. Power storage device.
請求項1に記載の蓄電装置において、
前記DC/DC充放電部は前記第1電力量を充電してから前記第2電力量を放電する処理をしないように前記蓄電池を制御する、蓄電装置。
In the power storage device according to claim 1,
The DC / DC charging / discharging unit controls the storage battery so as not to perform a process of charging the first electric energy and then discharging the second electric energy.
請求項2に記載の蓄電装置において、
前記DC/DC充放電部及び前記第1需要家の電力線に接続される第1DC/AC変換部と、前記DC/DC充放電部及び前記第2需要家の電力線に接続される第2DC/AC変換部とを含む複数のDC/AC変換部をさらに備え、
前記第1DC/AC変換部は、前記第1需要家の電力線から受電した前記第1電力量を、交流電力から直流電力に変換し、前記第2電力量を前記第2DC/AC変換部に供給する、蓄電装置。
In the power storage device according to claim 2,
A first DC / AC converter connected to the DC / DC charging / discharging section and the power line of the first consumer, and a second DC / AC connected to the DC / DC charging / discharging section and the power line of the second consumer. Further provided with a plurality of DC / AC converters including a converter,
The first DC / AC conversion unit converts the first electric energy received from the power line of the first consumer from AC power to DC power, and supplies the second electric energy to the second DC / AC conversion unit. Power storage device.
請求項3に記載の蓄電装置において、
前記第2DC/AC変換部は、前記第1DC/AC変換部から供給された前記第2電力量を、直流電力から交流電力に変換し、前記第2需要家の電力線に供給する、蓄電装置。
In the power storage device according to claim 3,
The second DC / AC conversion unit is a power storage device that converts the second electric energy supplied from the first DC / AC conversion unit from DC power to AC power and supplies it to the power line of the second consumer.
請求項1から4のいずれか一項に記載の蓄電装置において、
前記制御部は、前記第2仮想蓄電池の任意の空き容量を前記第1仮想蓄電池に貸すように制御する、蓄電装置。
In the power storage device according to any one of claims 1 to 4.
The control unit is a power storage device that controls to lend an arbitrary free capacity of the second virtual storage battery to the first virtual storage battery.
請求項1から5のいずれか一項に記載の蓄電装置であって、
前記制御部は、前記第1仮想蓄電池及び前記第2仮想蓄電池の充電及び放電の電力量を、数値上制御する、蓄電装置。
The power storage device according to any one of claims 1 to 5.
The control unit is a power storage device that numerically controls the amount of electric power for charging and discharging the first virtual storage battery and the second virtual storage battery.
JP2020184526A 2017-03-28 2020-11-04 Power storage device Active JP6947896B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020184526A JP6947896B2 (en) 2017-03-28 2020-11-04 Power storage device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017063760A JP6789866B2 (en) 2017-03-28 2017-03-28 Power storage device and power management system
JP2020184526A JP6947896B2 (en) 2017-03-28 2020-11-04 Power storage device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2017063760A Division JP6789866B2 (en) 2017-03-28 2017-03-28 Power storage device and power management system

Publications (2)

Publication Number Publication Date
JP2021036762A true JP2021036762A (en) 2021-03-04
JP6947896B2 JP6947896B2 (en) 2021-10-13

Family

ID=63922851

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2017063760A Active JP6789866B2 (en) 2017-03-28 2017-03-28 Power storage device and power management system
JP2020184526A Active JP6947896B2 (en) 2017-03-28 2020-11-04 Power storage device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2017063760A Active JP6789866B2 (en) 2017-03-28 2017-03-28 Power storage device and power management system

Country Status (1)

Country Link
JP (2) JP6789866B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023170931A1 (en) * 2022-03-11 2023-09-14 本田技研工業株式会社 Battery management system, and battery management method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116093998B (en) * 2022-11-28 2024-03-08 国网冀北电力有限公司经济技术研究院 Virtual storage battery control method based on controllable load

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003143763A (en) * 2001-08-24 2003-05-16 Meidensha Corp Power storage system
JP2008029104A (en) * 2006-07-20 2008-02-07 Chugoku Electric Power Co Inc:The Storage battery sharing system and storage battery sharing method
JP2011101529A (en) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Power distribution system
JP2014045636A (en) * 2012-08-29 2014-03-13 Daiwa House Industry Co Ltd Power supply system
JP2016018504A (en) * 2014-07-10 2016-02-01 パナソニックIpマネジメント株式会社 Storage battery management device and storage battery management method
US20160322823A1 (en) * 2015-04-30 2016-11-03 Electronics And Telecommunications Research Institute Energy management system for residential community

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011043173A1 (en) * 2009-10-05 2011-04-14 日本碍子株式会社 Control device, control device network, and control method
JP5481305B2 (en) * 2010-07-30 2014-04-23 株式会社東芝 Output distribution controller
JP5613538B2 (en) * 2010-11-19 2014-10-22 トヨタホーム株式会社 Apartment house and power supply system for apartment house
JP5730699B2 (en) * 2011-07-22 2015-06-10 京セラ株式会社 Portable device, battery control program, and battery control method
JP2014072918A (en) * 2012-09-27 2014-04-21 Kyocera Corp Energy management system, management apparatus, and energy management method
EP2722399A1 (en) * 2012-10-18 2014-04-23 Roche Diagniostics GmbH Method for preventing high molecular weight products during amplification
JP6319053B2 (en) * 2014-11-06 2018-05-09 トヨタ自動車株式会社 Vehicle driven by motor, and control method of charge / discharge of secondary battery mounted on vehicle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003143763A (en) * 2001-08-24 2003-05-16 Meidensha Corp Power storage system
JP2008029104A (en) * 2006-07-20 2008-02-07 Chugoku Electric Power Co Inc:The Storage battery sharing system and storage battery sharing method
JP2011101529A (en) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Power distribution system
JP2014045636A (en) * 2012-08-29 2014-03-13 Daiwa House Industry Co Ltd Power supply system
JP2016018504A (en) * 2014-07-10 2016-02-01 パナソニックIpマネジメント株式会社 Storage battery management device and storage battery management method
US20160322823A1 (en) * 2015-04-30 2016-11-03 Electronics And Telecommunications Research Institute Energy management system for residential community

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023170931A1 (en) * 2022-03-11 2023-09-14 本田技研工業株式会社 Battery management system, and battery management method

Also Published As

Publication number Publication date
JP6789866B2 (en) 2020-11-25
JP2018166385A (en) 2018-10-25
JP6947896B2 (en) 2021-10-13

Similar Documents

Publication Publication Date Title
EP2985857B1 (en) Storage battery management system and storage battery management method
US10938224B2 (en) Hardware/software reconfigurable, intelligent and versatile electrical energy provisioning system for on-grid and off-grid applications
CN109428393B (en) Uninterruptible power supply system and method
KR102400501B1 (en) Uninterruptible power supply
US9520735B2 (en) Storage battery control system and storage battery control method
EP2822138B1 (en) Control device, control system, and storage cell control method
US20140015469A1 (en) Battery Management System For A Distributed Energy Storage System, and Applications Thereof
JP6396531B2 (en) POWER CONTROL DEVICE, DEVICE CONTROL DEVICE, AND METHOD
JP6025332B2 (en) Power supply system, power supply control device, power supply method and program
WO2016002347A1 (en) Power control system, method, and power control device
JP5695464B2 (en) Charge / discharge determination device and charge / discharge determination program
JP6050938B2 (en) Power supply system, power supply control device, power supply method and program
JP6947896B2 (en) Power storage device
WO2012176868A1 (en) Power supply system
US11404877B2 (en) Hierarchical power control system
WO2015098988A1 (en) Storage battery device, device-control apparatus, and control method
JP2013143816A (en) Power supply system, power supply control device, power supply method and program
KR20160023220A (en) Energy storage device for demand and management and method for power management using the same
JP6748452B2 (en) Power supply system
JP2012060829A (en) Power supply system and power supply method
JP2015126560A (en) Power supply device and power supply system
JP2020054136A (en) Charge power calculation device and storage battery charging system
JP2021005985A (en) Dc power network
JP7181036B2 (en) power supply system
JP7219572B2 (en) power supply system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201104

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210812

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210824

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210916

R150 Certificate of patent or registration of utility model

Ref document number: 6947896

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150