JP2020183662A - Eaves gutter support tool - Google Patents

Eaves gutter support tool Download PDF

Info

Publication number
JP2020183662A
JP2020183662A JP2019088357A JP2019088357A JP2020183662A JP 2020183662 A JP2020183662 A JP 2020183662A JP 2019088357 A JP2019088357 A JP 2019088357A JP 2019088357 A JP2019088357 A JP 2019088357A JP 2020183662 A JP2020183662 A JP 2020183662A
Authority
JP
Japan
Prior art keywords
eaves
piece
sandwiching
pieces
gutter support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019088357A
Other languages
Japanese (ja)
Inventor
昌司 北村
Masashi Kitamura
昌司 北村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Otis Inc
Original Assignee
Otis Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otis Inc filed Critical Otis Inc
Priority to JP2019088357A priority Critical patent/JP2020183662A/en
Publication of JP2020183662A publication Critical patent/JP2020183662A/en
Pending legal-status Critical Current

Links

Images

Abstract

To provide an eaves gutter support tool which can be easily attached to an eaves edge portion and in which an eaves edge portion is less likely to be damaged when constructing.SOLUTION: A fixing portion 10 fixed by clamping an eaves edge portion 2 comprises an upper pressing portion 20 and a lower pressing portion 30. The upper pressing portion 20 and the lower pressing portion 30 include cut grooves 25,35 extending in the plate thickness direction from a side end edge of a plate thickness direction, and have a connection structure of crossing to lap at an insertion of each cut groove. With a part where cut grooves connect each other as a fulcrum 15, a clamp portion 16 comprising two freely opening/closing pieces is disposed at a rear side of the fulcrum 15 and an operation portion 17 comprising two freely opening/closing pieces is disposed at a front side of the fulcrum 15. The operation portion 17 is closed in a state where the eaves edge portion 2 is disposed between the two pieces of the clamp portion 16, then the clamp portion 16 is closed to clamp the eaves edge portion 2.SELECTED DRAWING: Figure 1

Description

本発明は軒樋を支持する軒樋支持具に関する。 The present invention relates to an eaves gutter support tool that supports the eaves gutter.

軒樋支持具としては、軒先で前方に突出した軒先庇部を上下より挟み込むことで軒先に固定されるものが知られている(例えば、特許文献1参照)。例えば平板状のスレート屋根材などの板状の屋根材に対して、この種の軒樋支持具が多く用いられている。 As an eaves gutter support tool, one is known to be fixed to the eaves by sandwiching the eaves portion protruding forward at the eaves from above and below (see, for example, Patent Document 1). For example, this type of eaves gutter support is often used for plate-shaped roofing materials such as flat plate-shaped slate roofing materials.

特許文献1のものは、相対する挟着片の内側に鋸状歯を設けて軒先庇部に仮固定できるようになっている。その他のものとして、挟着片の2片間に軒先庇部を圧入させて弾性的で挟み込み、仮固定できるものも多く用いられている。 In Patent Document 1, saw-shaped teeth are provided inside the opposing sandwiching pieces so that they can be temporarily fixed to the eaves eaves. As other things, there are many cases in which the eaves eaves are press-fitted between the two pieces to be elastically sandwiched and temporarily fixed.

実開昭58−45830号公報Jitsukaisho 58-45830

しかしながら、上記文献のものは、挟着片は一体であり、かつ内面に鋸状歯があるため装着隙間が小さく、軒先庇部の2片間への装着はしにくい。特に、圧入による挟着であるため、無理に装着しようとすれば、鋸状歯で軒先庇部が損傷するおそれもある。また、軒先庇部が損傷しないように2片間を弾性に抗して開いた状態で、軒先庇部を挟み込むことはできるが、作業がしにくいものと考えられる。 However, in the above-mentioned document, since the sandwiching pieces are integrated and the inner surface has saw-shaped teeth, the mounting gap is small, and it is difficult to mount the eaves between the two pieces. In particular, since it is sandwiched by press fitting, if it is forcibly attached, the eaves may be damaged by the sawtooth teeth. Further, it is possible to sandwich the eaves eaves in a state where the two pieces are opened against elasticity so as not to damage the eaves eaves, but it is considered that the work is difficult.

本発明は、このような事情を考慮して提案されたもので、その目的は、軒先庇部への取り付けがしやすく、かつ、施工の際に軒先庇部が損傷する可能性の低い軒樋支持具を提供することにある。 The present invention has been proposed in consideration of such circumstances, and an object of the present invention is an eaves gutter that is easy to attach to the eaves eaves and has a low possibility of damaging the eaves eaves during construction. It is to provide a support.

上記目的を達成するために、請求項1に記載の軒樋支持具は、屋根の軒先庇部に固定される軒樋支持具において、軒樋を支持する本体部と、該本体部を吊り支持し、かつ前記軒先庇部を挟み込むことで固定される固定部とを備え、前記固定部は、前記軒先庇部の上面側に配される帯板状の上押さえ部と、該上押さえ部とは別体とした、前記軒先庇部の下面側に配される帯板状の下押さえ部とを備えており、前記上押さえ部と前記下押さえ部とは、板幅方向の側端縁から板幅方向に延びた切り溝を有し、該切り溝同士の差し込みにて交差重合する連結構造とされており、前記切り溝同士で連結した部位を支点として、該支点の後ろ側に、開閉自在な2片よりなる挟着部が配され、前記支点の前側に、開閉自在な2片よりなる操作部が配されており、前記挟着部の2片間に前記軒先庇部を配した状態で、前記操作部を閉じることで、前記挟着部が閉じて前記軒先庇部を挟み込むことを特徴とする。 In order to achieve the above object, the eaves gutter support according to claim 1 is an eaves gutter support that is fixed to the eaves of the roof, and has a main body that supports the eaves and a main body that suspends and supports the main body. The fixing portion is provided with a fixing portion that is fixed by sandwiching the eaves eaves portion, and the fixing portion includes a strip-shaped upper pressing portion arranged on the upper surface side of the eaves eaves portion and the upper pressing portion. Is provided with a strip-shaped lower pressing portion arranged on the lower surface side of the eaves eaves portion, and the upper pressing portion and the lower pressing portion are from the side edge in the plate width direction. It has a cut groove extending in the plate width direction, and has a connecting structure in which cross-polymerization is performed by inserting the cut grooves, and opens and closes behind the fulcrum with the portion connected by the cut grooves as a fulcrum. A sandwiching portion made of two free pieces is arranged, an operation part made of two pieces that can be opened and closed is arranged on the front side of the fulcrum, and the eaves eaves part is arranged between the two pieces of the sandwiching part. By closing the operation portion in this state, the sandwiching portion is closed and the eaves eaves portion is sandwiched.

請求項2に記載の軒樋支持具は、前記挟着部の2片間の内面に、前記軒先庇部を押圧する突起が形成されていることを特徴とする。 The eaves gutter support according to claim 2 is characterized in that a protrusion for pressing the eaves eaves portion is formed on the inner surface between the two pieces of the sandwiching portion.

請求項3に記載の軒樋支持具は、前記軒先庇部に取り付けた状態では、前記操作部の上面が前記挟着部の上面よりも大きく下り傾斜していることを特徴とする。 The eaves gutter support according to claim 3 is characterized in that, when attached to the eaves eaves portion, the upper surface of the operating portion is inclined downward more than the upper surface of the sandwiching portion.

請求項4に記載の軒樋支持具は、前記操作部は圧接手段をさらに備え、前記操作部の両片は、リベットにて、遊びをもって連結されており、前記操作部の一方片と前記リベットの頭部との間に前記圧接手段を介在させて、前記両片が閉じた状態にロックすることを特徴とする。 In the eaves gutter support according to claim 4, the operation unit further includes a pressure welding means, and both pieces of the operation unit are connected with play by rivets, and one piece of the operation unit and the rivet are connected. The pressure welding means is interposed between the head and the head, and both pieces are locked in a closed state.

請求項5に記載の軒樋支持具は、前記操作部の一方片の幅方向の両端部に、前記操作部が閉じたときに、前記操作部の他方片を板幅方向より挟み込む挟み片が形成されていることを特徴とする。 The eaves gutter support according to claim 5 has sandwiching pieces at both ends in the width direction of one piece of the operating portion, which sandwich the other piece of the operating portion from the plate width direction when the operating portion is closed. It is characterized in that it is formed.

請求項1に記載の軒樋支持具は上述した構成とされているため、軒先庇部への取り付けがしやすく、かつ、施工の際に軒先庇部が損傷する可能性はほとんどない。 Since the eaves gutter support according to claim 1 has the above-described configuration, it is easy to attach to the eaves eaves portion, and there is almost no possibility that the eaves eaves portion will be damaged during construction.

請求項2に記載の軒樋支持具は上述した構成とされているため、突起の押圧または食い込みにより、挟着部が軒先庇部にしっかりと挟着し、仮固定の状態でも軒樋支持具をずれのないようにすることができる。 Since the eaves gutter support according to claim 2 has the above-described configuration, the sandwiched portion is firmly sandwiched between the eaves eaves portion by pressing or biting the protrusion, and the eaves gutter support tool is temporarily fixed. Can be kept in place.

請求項3に記載の軒樋支持具は上述した構成とされているため、作業者は操作部に対し前方からの操作をしやすくすることができる。 Since the eaves gutter support according to claim 3 has the above-described configuration, the operator can easily operate the operation unit from the front.

請求項4に記載の軒樋支持具は上述した構成とされているため、操作部の両片を閉じた状態で簡易に固定することができ、軒樋支持具を軒先庇部に対し仮固定または固定状態にすることができる。 Since the eaves gutter support according to claim 4 has the above-described configuration, it can be easily fixed with both pieces of the operation unit closed, and the eaves gutter support is temporarily fixed to the eaves eaves portion. Or it can be fixed.

請求項5に記載の軒樋支持具は上述した構成とされているため、操作部の両片を閉じた状態で簡易に固定することができ、軒樋支持具を軒先庇部に対し仮固定または固定状態にすることができる。 Since the eaves gutter support according to claim 5 has the above-described configuration, it can be easily fixed with both pieces of the operation portion closed, and the eaves gutter support is temporarily fixed to the eaves eaves portion. Or it can be fixed.

本発明の一実施形態に係る軒樋支持具の取付態様を示す側面図である。It is a side view which shows the mounting mode of the eaves gutter support which concerns on one Embodiment of this invention. 同軒樋支持具の固定部の分解斜視図である。It is an exploded perspective view of the fixed part of the eaves gutter support. 同軒樋支持具の取付手順を示す側面図である。It is a side view which shows the mounting procedure of the eaves gutter support. 本発明の他の実施形態に係る軒樋支持具の操作部の固定構造の説明図である。(a)は操作部が固定されていない(ロック解除されている)状態を示す側面図、(b)は操作部が固定されている状態を示す側面図、(c)は操作部の固定に用いられる圧接手段の使用態様図である。It is explanatory drawing of the fixed structure of the operation part of the eaves gutter support according to another embodiment of this invention. (A) is a side view showing a state in which the operation unit is not fixed (unlocked), (b) is a side view showing a state in which the operation unit is fixed, and (c) is for fixing the operation unit. It is a usage mode diagram of the pressure welding means used. 本発明のさらに他の実施形態に係る軒樋支持具の操作部の固定構造の説明図である。(a)は操作部が固定されていない(ロック解除されている)状態を示す側面図、(b)は操作部が固定(ロック)されている状態を示す側面図、(c)はロック解除/ロックの操作切り替えに用いられる回転操作部材の平面図である。It is explanatory drawing of the fixing structure of the operation part of the eaves gutter support according to still another embodiment of this invention. (A) is a side view showing a state in which the operation unit is not fixed (unlocked), (b) is a side view showing a state in which the operation unit is fixed (locked), and (c) is an unlocked state. It is a top view of the rotation operation member used for switching the operation of / lock. 同回転操作部材によるロック解除/ロックの切り替えの説明図である。(a)はロック解除状態の図4(a)のA1方向から見た図、(b)はロック状態の図4(b)のA2方向から見た図である。It is explanatory drawing of the lock release / lock switching by the same rotation operation member. (A) is a view seen from the A1 direction of FIG. 4 (a) in the unlocked state, and (b) is a view seen from the A2 direction of FIG. 4 (b) in the locked state. 同回転操作部材によるロック解除/ロック切り替えの説明図である。(a)はロック解除状態の図4(a)のB1方向から見た図、(b)はロック状態の図4(b)のB2方向から見た図である。It is explanatory drawing of the lock release / lock switching by the same rotation operation member. (A) is a view seen from the B1 direction of FIG. 4 (a) in the unlocked state, and (b) is a view seen from the B2 direction of FIG. 4 (b) in the locked state. 本発明のさらに他の実施形態に係る軒樋支持具の操作部の固定構造の説明図である。(a)は固定状態を示す側面図、(b)は固定に用いられる固定部材の使用態様を示す模式図である。It is explanatory drawing of the fixing structure of the operation part of the eaves gutter support according to still another embodiment of this invention. (A) is a side view showing a fixed state, and (b) is a schematic view showing a usage mode of a fixing member used for fixing. (a)は、本発明のさらに他の実施形態に係る軒樋支持具の要部斜視図である。(b)は操作部に設けた規制片の使用態様を示す模式説明図、(c)は操作部に設けた挟み片の使用態様を示す模式説明図である。(A) is a perspective view of a main part of an eaves gutter support according to still another embodiment of the present invention. (B) is a schematic explanatory view showing a usage mode of the regulation piece provided on the operation unit, and (c) is a schematic explanatory diagram showing a usage mode of the sandwich piece provided on the operation unit. 本発明のさらに実施形態に係る軒樋支持具の取付態様を示す一部断面側面図である。It is a partial cross-sectional side view which shows the mounting mode of the eaves gutter support which concerns on further embodiment of this invention.

以下に、本発明の実施の形態に係る軒樋支持具1ついて、添付図面をもとに説明する。まず、種々の実施形態に係る軒樋支持具1の基本構成について記述する。以下では、軒先に軒樋支持具1が施工された状態を基準として、前後などの方向を規定して説明する。 The eaves gutter support 1 according to the embodiment of the present invention will be described below with reference to the accompanying drawings. First, the basic configuration of the eaves gutter support 1 according to various embodiments will be described. In the following, the front-back and other directions will be defined and described based on the state in which the eaves gutter support 1 is installed on the eaves.

これらの軒樋支持具1は、屋根の軒先庇部2に固定される軒樋支持具1であり、軒樋3を支持する本体部11と、本体部11を吊り支持し、かつ軒先庇部2を挟み込むことで固定される固定部10とを備えている。 These eaves gutter supporters 1 are eaves gutter supporters 1 fixed to the eaves eaves portion 2 of the roof, and the main body portion 11 that supports the eaves gutter 3 and the eaves eaves portion that suspends and supports the main body portion 11. It is provided with a fixing portion 10 which is fixed by sandwiching 2.

固定部10は、軒先庇部2の上面側に配される帯板状の上押さえ部20と、上押さえ部20とは別体とした、軒先庇部2の下面側に配される帯板状の下押さえ部30とを備えている。上押さえ部20と下押さえ部30とは、板幅方向の側端縁から板幅方向に延びた切り溝25、35を有し、切り溝25、35同士の差し込みにて交差重合する連結構造とされている。なお、上押さえ部20および下押さえ部30は金属板で形成されることが望ましい。 The fixing portion 10 is a strip-shaped upper holding portion 20 arranged on the upper surface side of the eaves eaves portion 2 and a strip plate arranged on the lower surface side of the eaves eaves portion 2 which is separate from the upper holding portion 20. It is provided with a shaped lower holding portion 30. The upper pressing portion 20 and the lower pressing portion 30 have cutting grooves 25 and 35 extending in the plate width direction from the side edge in the plate width direction, and have a connecting structure in which the cutting grooves 25 and 35 are cross-polymerized by being inserted into each other. It is said that. It is desirable that the upper pressing portion 20 and the lower pressing portion 30 are formed of a metal plate.

切り溝25、35同士で連結した部位を支点15として、支点15の後ろ側に、開閉自在な2片よりなる挟着部16が配され、支点15の前側に、開閉自在な2片よりなる操作部17が配されている。この軒樋支持具1は、挟着部16の2片間に軒先庇部2が配された状態で、操作部17が閉じることで、挟着部16が閉じて軒先庇部2を挟み込むことで、軒先庇部2に固定される固定構造とされている。 A portion connected by the cut grooves 25 and 35 is used as a fulcrum 15, and a sandwiching portion 16 composed of two openable and closable pieces is arranged behind the fulcrum 15, and two pieces that can be opened and closed are arranged in front of the fulcrum 15. The operation unit 17 is arranged. In this eaves gutter support tool 1, when the operation unit 17 is closed with the eaves eaves portion 2 arranged between the two pieces of the sandwiching portion 16, the sandwiching portion 16 is closed and the eaves eaves portion 2 is sandwiched. It has a fixed structure that is fixed to the eaves eaves 2.

ここで、軒先庇部2は軒先に突出した屋根材の一部とされ、屋根材としては例えば図1に示すような平板状のスレート屋根材が挙げられるが、その他種々の屋根材であってもよい。折板屋根の軒先部であってもよい。 Here, the eaves eaves 2 is a part of the roofing material protruding from the eaves, and examples of the roofing material include flat slate roofing materials as shown in FIG. 1, but various other roofing materials. May be good. It may be the eaves of a folded plate roof.

ついで、各実施形態に係る軒樋支持具1を個別に、詳細に説明する。 Next, the eaves gutter support 1 according to each embodiment will be described in detail individually.

図1に示した軒樋支持具1は、上述したように上押さえ部20と下押さえ部30とで固定部10を構成しており、上押さえ部20と下押さえ部30とが連結された状態では、前側に2片よりなる操作部17が配され、後ろ側に2片よりなる挟着部16が配される。 In the eaves gutter support 1 shown in FIG. 1, as described above, the upper pressing portion 20 and the lower pressing portion 30 form a fixing portion 10, and the upper pressing portion 20 and the lower pressing portion 30 are connected to each other. In the state, the operation unit 17 composed of two pieces is arranged on the front side, and the sandwiching portion 16 composed of two pieces is arranged on the rear side.

操作部17を構成する2片の一方は、下押さえ部30の前端部よりなる上操作片部33であり、他方は上押さえ部20の前端部よりなる下操作片部26である。挟着部16を構成する2片の一方は、上押さえ部20の後部側に配された上挟着片部21であり、他方は下押さえ部30の後部側に配された下挟着片部31である。 One of the two pieces constituting the operation unit 17 is the upper operation piece portion 33 formed of the front end portion of the lower pressing portion 30, and the other is the lower operation piece portion 26 formed of the front end portion of the upper pressing portion 20. One of the two pieces constituting the sandwiching portion 16 is the upper sandwiching piece portion 21 arranged on the rear side of the upper pressing portion 20, and the other is the lower sandwiching piece arranged on the rear side of the lower pressing portion 30. Part 31.

ついで、上押さえ部20と下押さえ部30とを、図1および図2にもとづいて個別に説明する。 Next, the upper pressing portion 20 and the lower pressing portion 30 will be described individually with reference to FIGS. 1 and 2.

上押さえ部20は、下操作片部26と、切り溝25を有した中間部24と、上挟着片部21とを備えている。下押さえ部30は、上操作片部33と、切り溝35を有した下挟着片部31と、下挟着片部31の後端より垂下した、軒樋3の高さ位置調整用の垂下片部40とを備えている。 The upper pressing portion 20 includes a lower operating piece portion 26, an intermediate portion 24 having a cutting groove 25, and an upper sandwiching piece portion 21. The lower holding portion 30 is for adjusting the height position of the eaves gutter 3 which hangs down from the upper operation piece portion 33, the lower sandwiching piece portion 31 having the cut groove 35, and the rear end of the lower sandwiching piece portion 31. It is provided with a hanging piece 40.

上押さえ部20の中間部24は、軒先庇部2の先端面にあてがわれる部位であり、軒先庇部2の厚みよりもやや長く形成されている。切り溝25は、この中間部24の下部に形成されており、上挟着片部21が軒先庇部2の上面に面接触し、中間部24の後面が軒先庇部2の先端面に当接または近接した状態では、軒先庇部2の下面よりも下側に配される。 The intermediate portion 24 of the upper pressing portion 20 is a portion applied to the tip surface of the eaves eaves portion 2, and is formed to be slightly longer than the thickness of the eaves eaves portion 2. The cut groove 25 is formed in the lower part of the intermediate portion 24, the upper sandwiching piece portion 21 is in surface contact with the upper surface of the eaves eaves portion 2, and the rear surface of the intermediate portion 24 is in contact with the tip surface of the eaves eaves portion 2. In a state of being in contact with or in close proximity, it is arranged below the lower surface of the eaves eaves portion 2.

また、上押さえ部20の上挟着片部21の裏面には、中間部24の近傍部(前端部)において、幅方向の両端において長手方向に沿って間隔を空けて連続して配された下向き連続突起22aが形成され、後端部において、幅方向の中央に配された下向き突起22bが形成されている。これらの突起は軒先庇部2の上面を上方から押圧するものである。また、上挟着片部21の後部の板面には、軒先庇部2へ固定具止めするための固定具挿通孔23が開設されている。 Further, on the back surface of the upper sandwiching piece portion 21 of the upper pressing portion 20, in the vicinity portion (front end portion) of the intermediate portion 24, both ends in the width direction are continuously arranged at intervals along the longitudinal direction. A downward continuous protrusion 22a is formed, and a downward protrusion 22b arranged at the center in the width direction is formed at the rear end portion. These protrusions press the upper surface of the eaves eaves portion 2 from above. Further, on the plate surface at the rear of the upper sandwiching piece portion 21, a fixture insertion hole 23 for fixing the fixture to the eaves eaves portion 2 is provided.

その上押さえ部20の下操作片部26は、中間部24の下端より前方へ折曲延出してなり、板面にはボルト用ネジ孔27が開設されている。また、下操作片部26は上挟着片部21よりも大きく下り傾斜しており、取付状態においては前方斜め上方向を向くように形成されている。 The lower operation piece 26 of the upper pressing portion 20 is bent and extended forward from the lower end of the intermediate portion 24, and a screw hole 27 for bolts is provided on the plate surface. Further, the lower operation piece portion 26 is inclined downward more than the upper sandwiching piece portion 21, and is formed so as to face diagonally forward and upward in the mounted state.

一方、下押さえ部30は、上操作片部33と、下挟着片部31と、下挟着片部31の後端より下方に折曲延出した垂下片部40とを備えている。切り溝35は、下挟着片部31の前部に形成されており、この切り溝35と上押さえ部20の切り溝25とが、相互に差し込まれることで、上押さえ部20と下押さえ部30とは、切り溝25、35同士で連結した部位を支点15として、回動が可能なように連結される。 On the other hand, the lower holding portion 30 includes an upper operation piece portion 33, a lower sandwiching piece portion 31, and a hanging piece portion 40 that is bent downward from the rear end of the lower sandwiching piece portion 31. The cut groove 35 is formed in the front portion of the lower sandwiching piece portion 31, and the cut groove 35 and the cut groove 25 of the upper pressing portion 20 are inserted into each other to form the upper pressing portion 20 and the lower pressing portion 20. The portion 30 is connected so as to be rotatable with a portion connected by the cut grooves 25 and 35 as a fulcrum 15.

下押さえ部30の下挟着片部31の上面には、切り溝35の後ろ近傍において、幅方向の両端において長手方向に沿って間隔を空けて連続して配された上向き連続突起32が形成されている。なお、上向き連続突起32と、上押さえ部20の下向き連続突起22aとは、すくなくともどちらか一方が形成されていることが望ましい。 On the upper surface of the lower sandwiching piece portion 31 of the lower holding portion 30, upward continuous protrusions 32 are formed in the vicinity of the back of the cutting groove 35, which are continuously arranged at both ends in the width direction at intervals along the longitudinal direction. Has been done. It is desirable that at least one of the upward continuous protrusion 32 and the downward continuous protrusion 22a of the upper holding portion 20 is formed.

下押さえ部30の上操作片部33は、下挟着片部31の前端より下方へ折曲延出して形成されており、その上操作片部33にはボルト挿通孔34が開設されている。また、上操作片部33は下挟着片部31よりも大きく前方に下り傾斜している。 The upper operating piece 33 of the lower holding portion 30 is formed by bending and extending downward from the front end of the lower sandwiching piece 31, and the upper operating piece 33 is provided with a bolt insertion hole 34. .. Further, the upper operation piece portion 33 is tilted forward more than the lower sandwiching piece portion 31.

上押さえ部20と下押さえ部30は、上挟着片部21と下挟着片部31が軒先庇部2を挟んで略平行な閉じた状態になれば、下操作片部26と上操作片部33も略平行に近接し閉じた状態となり、おおむね仮固定状態となる。この状態で、上操作片部33の上方よりボルト18を、ボルト挿通孔34を介して下操作片部26のボルト用ネジ孔27に螺着することで、上押さえ部20の下向き連続突起22aおよび下向き突起22bは軒先庇部2の上面に食い込み、かつ下押さえ部30の上向き連続突起32は軒先庇部2の下面に食い込み、軒樋支持具1はおおむね固定状態となる。 When the upper holding piece portion 21 and the lower sandwiching piece portion 31 are closed substantially parallel to each other with the eaves eaves portion 2 in between, the upper holding portion 20 and the lower holding portion 30 are operated upward with the lower operation piece portion 26. The one piece 33 is also close to each other in a substantially parallel manner and is in a closed state, and is generally in a temporarily fixed state. In this state, the bolt 18 is screwed into the bolt screw hole 27 of the lower operation piece 26 via the bolt insertion hole 34 from above the upper operation piece 33, so that the downward continuous protrusion 22a of the upper holding portion 20 The downward protrusion 22b bites into the upper surface of the eaves eaves portion 2, and the upward continuous protrusion 32 of the lower holding portion 30 bites into the lower surface of the eaves eaves portion 2, so that the eaves gutter support 1 is generally fixed.

これらの突起(下向き連続突起22a、下向き突起22b、上向き突起32)の形状は、図例のものには限らない。例えば、先細りのものや先端が尖ったものにすれば軒先庇部2の面にしっかりと食い込むため、より望ましい。また、連続突起に代えて、下向き突起22bのように1つの突起でもよい。また、これらの突起は、一部を折り曲げて形成してもよいし、切り起こしにより形成してもよい。さらに、突起は板面の押圧により膨出させたものであってもよい。例えば、図例で示した下向き連続突起22a、上向き連続突起32のそれぞれは対をなすが、これに代えて、板面の幅方向の中央の1箇所に膨出突起を設けてもよい。 The shapes of these protrusions (downward continuous protrusion 22a, downward protrusion 22b, upward protrusion 32) are not limited to those shown in the figure. For example, it is more desirable to use a taper or a pointed tip because it firmly bites into the surface of the eaves eaves 2. Further, instead of the continuous protrusion, one protrusion such as the downward protrusion 22b may be used. Further, these protrusions may be formed by bending a part thereof or by cutting and raising. Further, the protrusion may be bulged by pressing the plate surface. For example, the downward continuous protrusions 22a and the upward continuous protrusions 32 shown in the illustrated example form a pair, but instead, a bulging protrusion may be provided at one position in the center in the width direction of the plate surface.

また、上押さえ部20の上挟着片部21の固定具挿通孔23より、ビスや釘などの固定具を挿通させて、軒先庇部2に固定すれば、軒樋支持具1はずれることなく、さらにしっかりと軒先庇部2に固定される。 Further, if a fixing tool such as a screw or a nail is inserted through the fixing tool insertion hole 23 of the upper sandwiching piece portion 21 of the upper holding portion 20 and fixed to the eaves eaves portion 2, the eaves gutter support tool 1 will not come off. , It is more firmly fixed to the eaves eaves 2.

下押さえ部30の垂下片部40には、長手方向に沿って長孔41が開設されており、その長孔41の適所に樋支持具本体12(本体部11)が取り付けられる。図1の樋支持具本体12は軒樋3を受け支持する湾曲形状のものとされ、その前後端には軒樋3の耳3aを係止する耳係止部11aが形成されている。後ろ側の耳係止部11aが垂下片部40の適切な高さ位置に、ボルト42、蝶ナット43で取り付けできるようになっている。 An elongated hole 41 is provided in the hanging piece portion 40 of the lower holding portion 30 along the longitudinal direction, and the gutter support main body 12 (main body portion 11) is attached to an appropriate position in the elongated hole 41. The gutter support main body 12 of FIG. 1 has a curved shape that receives and supports the eaves gutter 3, and ear locking portions 11a for locking the ears 3a of the eaves gutter 3 are formed at the front and rear ends thereof. The rear ear locking portion 11a can be attached to the hanging piece portion 40 at an appropriate height position with a bolt 42 and a wing nut 43.

以上のように、上押さえ部20は、上挟着片部21と下操作片部26とを有した1つの帯板部材で形成され、下押さえ部30は、下挟着片部31と上操作片部33と垂下片部40とを有した1つの帯板部材で形成されており、固定部10は以上のように2部材が連結された状態で、軒先庇部2に固定される。 As described above, the upper pressing portion 20 is formed of one strip member having the upper sandwiching piece portion 21 and the lower operating piece portion 26, and the lower pressing portion 30 is formed of the lower sandwiching piece portion 31 and the upper portion. It is formed of one strip member having an operation piece portion 33 and a hanging piece portion 40, and the fixing portion 10 is fixed to the eaves eaves portion 2 in a state where the two members are connected as described above.

このようにして、2部材が連結されて軒先庇部2に固定された固定部10は、軒樋3を支持した本体部11を吊り支持する。 In this way, the fixing portion 10 in which the two members are connected and fixed to the eaves eaves portion 2 suspends and supports the main body portion 11 that supports the eaves gutter 3.

図1の例では、軒先庇部2は厚みが略均一な平板状のスレート屋根材で形成されているため、挟着部16を構成する上挟着片部21、下挟着片部31は略平行な状態で固定されているが、厚みが均一でない、例えば前端側に向けて厚さが先細り形状の軒先庇部2に挟着するものであってもよい。その場合でも、軒樋支持具1は、固定された状態では操作部17の両片が平行となるように角度調整がなされればよい。例えば、図1に示した下押さえ部30の上操作片部33と下挟着片部31との折曲部を、角度が小さくなるように曲げて利用することもできる。 In the example of FIG. 1, since the eaves eaves portion 2 is formed of a flat plate-shaped slate roofing material having a substantially uniform thickness, the upper sandwiching piece portion 21 and the lower sandwiching piece portion 31 constituting the sandwiching portion 16 are Although it is fixed in a substantially parallel state, it may be sandwiched between the eaves portion 2 having a non-uniform thickness, for example, a tapering shape toward the front end side. Even in that case, the angle of the eaves gutter support 1 may be adjusted so that both pieces of the operation unit 17 are parallel to each other in the fixed state. For example, the bent portion of the upper operation piece portion 33 and the lower sandwiching piece portion 31 of the lower pressing portion 30 shown in FIG. 1 can be bent so as to have a smaller angle.

この軒樋支持具1は、切り溝25、35の溝間寸法にもよるが、両部材が連結状態にあるときには、操作部17および挟着部16は、それぞれの2片が、切り溝25、35同士の交差連結した部位を支点15として回動が可能とされ、いずれもが開閉自在とされる。例えば、上押さえ部20は、下押さえ部30が停止した状態でも図1の2点鎖線の位置まで回動する。 The eaves gutter support 1 depends on the groove dimensions of the cutting grooves 25 and 35, but when both members are in a connected state, each of the operating portion 17 and the sandwiching portion 16 has two pieces of the cutting groove 25. , 35 can be rotated by using the cross-connected portion of the 35 as a fulcrum 15, and all of them can be opened and closed. For example, the upper holding portion 20 rotates to the position of the alternate long and short dash line in FIG. 1 even when the lower holding portion 30 is stopped.

したがって、軒樋支持具1の設置方法としては、まず下押さえ部30を軒先庇部2の下面側の定位置に配したうえで、上押さえ部20を2点鎖線で示した位置に配して切り溝25、35同士を差し込んで連結し、その後、上挟着片部21を軒先庇部2の上面まで回動させて挟着状態にすればよい。 Therefore, as a method of installing the eaves gutter support tool 1, first, the lower holding portion 30 is arranged at a fixed position on the lower surface side of the eaves eaves portion 2, and then the upper pressing portion 20 is arranged at the position indicated by the alternate long and short dash line. The cut grooves 25 and 35 may be inserted and connected to each other, and then the upper sandwiching piece portion 21 may be rotated to the upper surface of the eaves eaves portion 2 to be in the sandwiched state.

また、図3に示すように、あらかじめ両部材を支点15で連結し、かつ上操作片部33、下操作片部26同士をわずかに開いた状態にボルト18で螺合しておき、挟着部16の先端が開いた状態で、その開いた空間に軒先庇部2が配されるように後方にずらし、その後、操作部17でのボルト18の螺着により挟着部16を閉じて挟着状態にしてもよい。 Further, as shown in FIG. 3, both members are connected in advance by a fulcrum 15, and the upper operation piece 33 and the lower operation piece 26 are screwed together with bolts 18 in a slightly open state, and then sandwiched. With the tip of the portion 16 open, shift it backward so that the eaves portion 2 is arranged in the open space, and then close and pinch the sandwiching portion 16 by screwing the bolt 18 at the operating portion 17. You may put it on.

また、まず上押さえ部20を定位置に配したうえで、下押さえ部30を、切り溝25、35同士を相互に差し込むようにして連結し、その後、下押さえ部30を持ち上げ、下挟着片部31を軒先庇部2の下面まで回動させて挟着状態にしてもよい。 Further, first, the upper pressing portion 20 is arranged at a fixed position, and then the lower pressing portion 30 is connected by inserting the cut grooves 25 and 35 into each other, and then the lower pressing portion 30 is lifted and the lower holding portion 30 is sandwiched. The piece 31 may be rotated to the lower surface of the eaves eaves 2 to be in a sandwiched state.

いずれにせよ、挟着部16は開いた状態で軒先庇部2に取り付けができるため、軒樋支持具1の取り付けの際に、軒樋支持具1の接触により軒先庇部2の先端を傷めるおそれはほとんどない。 In any case, since the sandwiching portion 16 can be attached to the eaves eaves portion 2 in the open state, the tip of the eaves eaves portion 2 is damaged by the contact of the eaves gutter support when the eaves gutter support 1 is attached. There is almost no fear.

また、操作部17の2片が閉じれば挟着部16も軒先庇部2を挟着状態となるように閉じる構成であるため、作業者は、仮固定のためにまず操作部17を閉じる操作をし、さらに操作部17をボルト止めすればよい。いったん操作部17に対する作業が完了すれば、その後、軒樋支持具1がずり落ちたりするおそれはほとんどなく操作部17から手を離した状態でも安心して、上挟着片部21の軒先庇部2への固定作業を行うことができる。 Further, since the sandwiching portion 16 is also configured to close the eaves eaves portion 2 so as to be in the sandwiched state when the two pieces of the operating portion 17 are closed, the operator first closes the operating portion 17 for temporary fixing. Then, the operation unit 17 may be bolted. Once the work on the operation unit 17 is completed, there is almost no possibility that the eaves gutter support 1 will slip off after that, and even when the hand is released from the operation unit 17, the eaves portion of the upper sandwiching piece portion 21 can be safely used. The fixing work to 2 can be performed.

特に、上挟着片部21には下向き連続突起22a、下向き突起22bが形成され、下挟着片部22には上向き連続突起32が形成されているため、操作部17を閉じてから、操作部17をボルト止めする前であっても、ずれは発生しにくい。これらの突起のうち1つでも尖端状にすれば、さらに効果的である。 In particular, since the upper sandwiching piece portion 21 is formed with the downward continuous protrusion 22a and the downward continuous protrusion 22b and the lower sandwiching piece portion 22 is formed with the upward continuous protrusion 32, the operation portion 17 is closed before the operation. Even before bolting the portion 17, deviation is unlikely to occur. It is even more effective if even one of these protrusions has a pointed shape.

また、操作部17はその上面が屋根面よりもさらに下り傾斜した状態に配されるため、操作部17の上面は斜め上前方を向く。そのため、作業者はボルト18の螺合操作をしやすくできる。特に、下操作片部26にボルト用ネジ孔27が設けてあるため、ナットを用いなくてもよく、螺着操作はさらにしやすくなる。もちろん、下操作片部26にも上操作片部33と同様の固定軸挿通孔を設けて、ボルト18、ナットで固定するようにしてもよい。 Further, since the upper surface of the operation unit 17 is arranged so as to be inclined further downward than the roof surface, the upper surface of the operation unit 17 faces diagonally upward and forward. Therefore, the operator can easily screw the bolt 18. In particular, since the lower operation piece 26 is provided with the screw hole 27 for bolts, it is not necessary to use a nut, and the screwing operation becomes easier. Of course, the lower operation piece 26 may be provided with the same fixed shaft insertion hole as the upper operation piece 33, and may be fixed with bolts 18 and nuts.

ついで、挟着部16による軒先庇部2の挟着のための、操作部17の固定構造の他の実施形態について、図4〜図8を参照しながら説明する。 Next, another embodiment of the fixed structure of the operating portion 17 for pinching the eaves eaves portion 2 by the sandwiching portion 16 will be described with reference to FIGS. 4 to 8.

図4および図5〜図7に示した2種の固定構造はいずれも、リベット51と、圧接手段50とを用いるものである。 Both of the two types of fixing structures shown in FIGS. 4 and 5 to 7 use a rivet 51 and a pressure welding means 50.

図4に示した固定構造は、図4(a)に示したように、切り溝25、35同士が差し込みされ、かつ上挟着片部21と下挟着片部31とが軒先庇部2を挟着しない状態で、つまり上操作片部33と、下操作片部26とがわずかに開いた状態、つまり遊びをもって連結された状態で、上操作片部33と、下操作片部26とを連結できる長さのリベット51が用いられている。ようするに、両部材はわずかな回動が許容される程度の長さの軸部51bを有したリベット51で連結されている。なお、この場合、上操作片部33、下操作片部26のいずれにも固定軸挿通孔(不図示)が開設されている。 In the fixed structure shown in FIG. 4, as shown in FIG. 4A, the cut grooves 25 and 35 are inserted into each other, and the upper sandwiching piece portion 21 and the lower sandwiching piece portion 31 are the eaves eaves portion 2. The upper operation piece 33 and the lower operation piece 26 are in a state where the upper operation piece 33 and the lower operation piece 26 are slightly opened, that is, in a state where they are connected with play. A rivet 51 having a length capable of connecting the above is used. In this way, both members are connected by a rivet 51 having a shaft portion 51b having a length that allows slight rotation. In this case, fixed shaft insertion holes (not shown) are provided in both the upper operation piece 33 and the lower operation piece 26.

この状態で、上操作片部33と下操作片部26とを閉じた状態にして、リベット51を上方に引き出し、上操作片部33の上面とリベット51の頭部51aとの隙間に、図4(c)に示した固定部材52を圧入することで、操作部17を構成する両片は閉じた状態に固定され、軒樋支持具1を挟着部16が軒先庇部2を挟み込んだ状態で仮固定状態にすることができる。つまり、この固定部材52が圧接手段50を構成する。 In this state, with the upper operation piece 33 and the lower operation piece 26 closed, the rivet 51 is pulled out upward, and the gap between the upper surface of the upper operation piece 33 and the head 51a of the rivet 51 is shown in the figure. By press-fitting the fixing member 52 shown in 4 (c), both pieces constituting the operating portion 17 were fixed in a closed state, and the eaves gutter support 1 was sandwiched by the sandwiching portion 16 sandwiching the eaves eaves portion 2. It can be temporarily fixed in the state. That is, the fixing member 52 constitutes the pressure welding means 50.

固定部材52は、図4(c)に示すように、リベット51の上操作片部33側あるいは下操作片部26側(図例では上操作片部33側)に露出したネック部51cに嵌り込む凹部52aを有している。凹部52aの開口側には誘導部52bが形成され、その誘導部52bは、凹部52aの開口から先端に向けて広がった誘導路52cを有している。また、誘導部52bは、厚さが先細りのガイド形状とされている。 As shown in FIG. 4C, the fixing member 52 fits into the neck portion 51c exposed on the upper operating piece 33 side or the lower operating piece 26 side (upper operating piece 33 side in the figure) of the rivet 51. It has a recess 52a to insert. A guide portion 52b is formed on the opening side of the recess 52a, and the guide portion 52b has a guide path 52c extending from the opening of the recess 52a toward the tip end. Further, the guide portion 52b has a guide shape having a tapered thickness.

この軒樋支持具1についても、図4(a)に示すように挟着部16を開いた状態で軒先庇部2の挟着作業ができるため、軒先庇部2に簡易に取り付けでき、軒先庇部2の損傷を防止することができる。また、操作部17の2片が連結されているため、施工前、施工時のいずれにおいても取り扱いがしやすい。 As shown in FIG. 4A, the eaves gutter support 1 can also be easily attached to the eaves eaves 2 because the eaves eaves 2 can be sandwiched with the sandwich 16 open. Damage to the eaves 2 can be prevented. Further, since the two pieces of the operation unit 17 are connected, it is easy to handle both before and during the construction.

図5〜図7に示した固定構造も、操作部17の一方片とリベット51との間に圧接手段50を介在させることで、操作部17の両片を閉じた状態にロック(固定)する構造とされている。リベット51は、後述する回転操作部材55を取り付けた状態で、図4のものと同様に、上操作片部33と下操作片部26との間でわずかな回動が許容される程度の長さの軸部51bを有している。 The fixing structure shown in FIGS. 5 to 7 also locks (fixes) both pieces of the operation unit 17 in a closed state by interposing a pressure contact means 50 between one piece of the operation unit 17 and the rivet 51. It is said to be a structure. The rivet 51 has a length that allows a slight rotation between the upper operation piece 33 and the lower operation piece 26, as in the case of FIG. 4, with the rotation operation member 55 described later attached. It has a rivet portion 51b.

具体的には、この軒樋支持具1は、ロック/アンロックの切り替えをするための回転操作部材55をさらに備えた構成とされている。回転操作部材55は、金属等の薄板材で形成されており、図5(a)に示すように、長方形状の基板部56と、その基板部56の両方の長辺縁より略垂直に延びた把持片部57を備えている。基板部56の中央には挿通孔56aが開設され、その長手方向の両側には、基板部56の長手方向に沿ってやや長い小孔56bが形成されている。 Specifically, the eaves gutter support 1 is further provided with a rotation operating member 55 for switching between locking and unlocking. The rotation operation member 55 is made of a thin plate material such as metal, and as shown in FIG. 5A, extends substantially vertically from both the long side edges of the rectangular substrate portion 56 and the substrate portion 56. The gripping piece portion 57 is provided. An insertion hole 56a is formed in the center of the substrate portion 56, and small holes 56b slightly long along the longitudinal direction of the substrate portion 56 are formed on both sides in the longitudinal direction thereof.

この回転操作部材55は、基板部56の挿通孔56aにリベット51の軸部51bが挿通され、図5(a)に示すように、上方に把持片部57を突出させた状態で上操作片部33側に連結されている。なお、図5(a)、図6(a)および図7(a)は同一状態(後述するロック解除位置)の異なる方向から見た図であり、図5(b)、図6(b)および図7(b)は同一状態(後述するロック位置)の異なる方向から見た図である。 In the rotation operating member 55, the shaft portion 51b of the rivet 51 is inserted into the insertion hole 56a of the substrate portion 56, and as shown in FIG. 5A, the upper operating piece is in a state where the gripping piece portion 57 is projected upward. It is connected to the portion 33 side. Note that FIGS. 5 (a), 6 (a) and 7 (a) are views of the same state (unlocked position described later) viewed from different directions, and FIGS. 5 (b) and 6 (b). And FIG. 7B is a view seen from different directions in the same state (lock position described later).

また、この軒樋支持具1では、上操作片部33の外面に、幅方向に沿って延びる2つの膨出部36が略平行に形成されている。各膨出部36は尾根状の頂部が延びてなり、全体として突湾曲形状とされている。膨出部36の頂部の中央には小突起37が形成されている。 Further, in the eaves gutter support tool 1, two bulging portions 36 extending along the width direction are formed substantially parallel to the outer surface of the upper operating piece portion 33. Each bulging portion 36 has a ridge-shaped apex extending and has a curved shape as a whole. A small protrusion 37 is formed in the center of the top of the bulging portion 36.

つまり、膨出部36は、軒樋支持具1を側方から見た場合には略半円形状とされ(図5(a)参照)、正面(図5(a)のA2方向)から見た場合には略半楕円形状とされている。それぞれの膨出部36はボルト挿通孔34より等距離に設けられている。また、2つの膨出部36の間隔は、回転操作部材55の2つの小孔56bの間隔に合致している。 That is, the bulging portion 36 has a substantially semicircular shape when the eaves gutter support 1 is viewed from the side (see FIG. 5A), and is viewed from the front (A2 direction in FIG. 5A). In this case, it has a substantially semi-elliptical shape. Each bulging portion 36 is provided at an equal distance from the bolt insertion hole 34. Further, the distance between the two bulging portions 36 matches the distance between the two small holes 56b of the rotation operating member 55.

回転操作部材55は、操作部17に対し、リベット51の軸部51bを支軸として回転できるように取り付けられている。図5(a)のように、軒樋支持具1を側方から見て回転操作部材55がコ字状に見える位置がアンロック位置とされ、このアンロック位置では、回転操作部材55が膨出部36間に挟まれるような位置に配されている。 The rotation operation member 55 is attached to the operation unit 17 so that it can rotate with the shaft portion 51b of the rivet 51 as a support shaft. As shown in FIG. 5A, the unlocked position is the position where the rotation operating member 55 looks like a U when the eaves gutter support 1 is viewed from the side, and the rotation operating member 55 expands at this unlocked position. It is arranged so as to be sandwiched between the protrusions 36.

図5(a)、図6(a)および図7(a)では、上操作片部33と下操作片部26とが遊びを有し微回動可能な緩んだ状態にあり、かつ回転操作部材55が回転可能な状態にある。そして、回転操作部材55をリベット51の軸部51bを中心に回転させていくと基板部56は膨出部36に圧接状態で乗り上げ、約90度回転させたときには、圧接状態のまま、小突起37が基板部56の小孔56bに入り込んだ状態となる(図5(b)、図6(b)および図7(b)参照)。 In FIGS. 5 (a), 6 (a), and 7 (a), the upper operation piece 33 and the lower operation piece 26 are in a loose state in which there is play and can be slightly rotated, and the rotation operation is performed. The member 55 is in a rotatable state. Then, when the rotation operation member 55 is rotated around the shaft portion 51b of the rivet 51, the substrate portion 56 rides on the bulging portion 36 in a pressure contact state, and when rotated about 90 degrees, the small protrusions remain in the pressure contact state. 37 is in a state of being inserted into the small hole 56b of the substrate portion 56 (see FIGS. 5 (b), 6 (b) and 7 (b)).

図5(b)、図6(b)および図7(b)で示した回転操作部材55の位置がロック位置とされ、この状態では圧接により、操作部17の両片は閉じた状態でロック(固定)され、軒樋支持具1が軒先庇部2を挟み込んだ状態に仮固定状態とすることができる。つまり、回転操作部材55の基板部56と、膨出部36とにより圧接手段50が構成されている。 The position of the rotation operating member 55 shown in FIGS. 5 (b), 6 (b) and 7 (b) is set as the lock position. In this state, both pieces of the operation unit 17 are locked in a closed state by pressure welding. It is (fixed) and can be temporarily fixed in a state where the eaves gutter support 1 sandwiches the eaves eaves portion 2. That is, the pressure welding means 50 is composed of the substrate portion 56 of the rotation operation member 55 and the bulging portion 36.

また、回転操作部材55の回転移動により膨出部36の中央の小突起37と小孔56bとが合致するときに、「カチッ」と音がするため、ロック位置であることを確認できる。また、小突起37が小孔56bに入り込んでいれば、小突起37が回転操作部材55の回転動作の障壁となるため、把持片部57をつまんで操作しないかぎり、ロックが解除される可能性はほとんどない。 Further, when the small protrusion 37 at the center of the bulging portion 36 and the small hole 56b match due to the rotational movement of the rotation operating member 55, a clicking sound is heard, so that the locked position can be confirmed. Further, if the small protrusion 37 is inserted into the small hole 56b, the small protrusion 37 acts as a barrier to the rotational operation of the rotation operation member 55, so that the lock may be released unless the gripping piece portion 57 is pinched and operated. Is almost nonexistent.

このように軒樋支持具1が回転操作部材55を有した構成であるため、図4の固定構造のものと同様、軒先庇部2への挟着取付操作を簡単に行うことができる。また、軒樋支持具1を構成する部品を一体とした連結状態にしておくことができるため、施工前、施工時のいずれにおいても取り扱いがしやすく、管理もしやすい。 Since the eaves gutter support 1 has the rotation operation member 55 as described above, it is possible to easily perform the pinching and attaching operation to the eaves eaves portion 2 as in the case of the fixed structure of FIG. Further, since the parts constituting the eaves gutter support 1 can be integrally connected, it is easy to handle and manage both before and during construction.

図8に示した固定構造は、固定クリップ60を用いて操作部17を固定する構造とされる。固定クリップ60は操作部17を閉じた状態で厚み方向より挟着する部材であり、図8(b)に示すように略コ字形状とされている。 The fixing structure shown in FIG. 8 is a structure in which the operation unit 17 is fixed by using the fixing clip 60. The fixing clip 60 is a member that is sandwiched from the thickness direction with the operation portion 17 closed, and has a substantially U-shape as shown in FIG. 8B.

この固定クリップ60は、基部61と弾性を有した2つの脚片62とを備えており、2つの脚片62で操作部17の両片を挟着する構成とされている。脚片62は、内面側に突出した圧接部62aを有し、先端部には相互に開いたガイド部62bを備えている。 The fixing clip 60 includes a base portion 61 and two elastic leg pieces 62, and is configured to sandwich both pieces of the operation portion 17 between the two leg pieces 62. The leg piece 62 has a pressure contact portion 62a projecting to the inner surface side, and the tip portion includes a guide portion 62b that is open to each other.

このような固定クリップ60を用いれば、作業者は固定クリップ60を操作部17に嵌め込むだけで、簡単に操作部17を仮固定状態とすることができる。また、ボルト18やリベット51などが不要とされ、上操作片部33、下操作片部26には固定軸挿通孔を設けなくてもよい。 By using such a fixing clip 60, the operator can easily put the operating portion 17 in the temporarily fixed state by simply fitting the fixing clip 60 into the operating portion 17. Further, the bolt 18 and the rivet 51 are not required, and the upper operation piece 33 and the lower operation piece 26 do not have to be provided with the fixed shaft insertion holes.

また、この固定クリップ60とリベット51とを組み合わせて、操作部17の2片を挟み込むとともに、上操作片部33の上面とリベット51の頭部51aとの間に、固定クリップ60の一方の脚片62を圧入する構造にしてもよい。この場合の圧入用の脚片62は図4(c)に示すような形状にすればよい。 Further, the fixing clip 60 and the rivet 51 are combined to sandwich the two pieces of the operation portion 17, and one leg of the fixing clip 60 is sandwiched between the upper surface of the upper operation piece portion 33 and the head portion 51a of the rivet 51. The structure may be such that the piece 62 is press-fitted. The press-fitting leg piece 62 in this case may have a shape as shown in FIG. 4 (c).

図9(a)〜(c)は、下操作片部26の幅方向の両端部に、規制片65または挟み片66を設けた軒樋支持具1の説明図である。なお、図9(a)は、規制片65を設けた図例であるが、挟み片66を設けた例については斜視図を省略する。 9 (a) to 9 (c) are explanatory views of an eaves gutter support 1 in which a restricting piece 65 or a sandwiching piece 66 is provided at both ends of the lower operating piece 26 in the width direction. Note that FIG. 9A is an example in which the regulation piece 65 is provided, but the perspective view is omitted in the example in which the sandwich piece 66 is provided.

規制片65は、図9(a)(b)に示すように平板状のものが幅方向の端部より起立するように配され、図9(b)に示すように、両規制片がやや開いた逆ハ字状に設けられることが望ましい。 As shown in FIGS. 9A and 9B, the regulation pieces 65 are arranged so that a flat plate-like one stands up from the end in the width direction, and as shown in FIG. 9B, both regulation pieces are slightly arranged. It is desirable to provide it in an open inverted C shape.

図9(b)のように、下操作片部26が規制片65を有していれば、上操作片部33のぶれを防止できる。特に、上押さえ部20と下押さえ部30とを切り溝25、35だけで連結した状態では、ぶれが生じやすいため、規制片65で上操作片部33のぶれを規制すれば、ボルト18止めがしやすくなる。この規制片65は板幅方向のすくなくとも一方の端部に設けられていてもよい。また、規制片65は、操作部17のうちのすくなくとも1片に設ければよい。 As shown in FIG. 9B, if the lower operation piece 26 has the regulation piece 65, the upper operation piece 33 can be prevented from shaking. In particular, when the upper pressing portion 20 and the lower pressing portion 30 are connected only by the cut grooves 25 and 35, blurring is likely to occur. Therefore, if the regulating piece 65 regulates the blurring of the upper operating piece portion 33, the bolt 18 is stopped. It will be easier to remove. The regulation piece 65 may be provided at at least one end in the plate width direction. Further, the regulation piece 65 may be provided on at least one piece of the operation unit 17.

また、それぞれの挟み片66は、図9(c)のように、先端部が「く字」状に外側に折曲されている。両挟み片66の折曲形状により、開口が徐々に広くなったガイド部66aと、両挟み片66間が窄まるように形成された折曲部66bとが形成されている。 Further, as shown in FIG. 9C, each of the sandwiching pieces 66 has a tip portion bent outward in a “dogleg” shape. Due to the bent shape of both sandwiching pieces 66, a guide portion 66a having a gradually widened opening and a bent portion 66b formed so as to narrow the space between the sandwiching pieces 66 are formed.

開口より挟み片66間に入ってきた上操作片部33は、折曲部66bを外側に弾性的に押圧しながら折曲部66b間を通り、下操作片部26に重なる位置に入り込む。このようにして操作部17の2片は仮固定状態に固定される。さらに2片をボルト18で固定してもよい。 The upper operating piece 33, which has entered between the sandwiched pieces 66 from the opening, passes between the bent 66b while elastically pressing the bent portion 66b outward, and enters a position overlapping the lower operating piece 26. In this way, the two pieces of the operation unit 17 are fixed in the temporarily fixed state. Further, the two pieces may be fixed with the bolt 18.

このように挟み片66を有した構成によれば、軒樋支持具1を簡易に仮固定状態とすることができる。操作部17の両片をさらにボルト18で固定してもよいが、挟着部16が軒先庇部2を挟着し、さらに、上挟着片部21が軒先庇部2に固定されるため、操作部17のボルト18止めはしなくてもよい。 According to the configuration having the sandwich piece 66 as described above, the eaves gutter support 1 can be easily temporarily fixed. Both pieces of the operation unit 17 may be further fixed with bolts 18, but since the sandwiching portion 16 sandwiches the eaves eaves portion 2 and the upper sandwiching piece portion 21 is further fixed to the eaves eaves portion 2. , It is not necessary to fix the bolt 18 of the operation unit 17.

図10は、軒樋3を吊り支持する軒樋支持具1の側面図である。この軒樋支持具1は、本体部11が樋支持具本体12と、取付足部13とを有して構成されている。取付足部13は、後部に固定片部13aを備えており、この固定片部13aを垂下片部40の適宜な高さ位置にボルト42、蝶ナット43で固定することで、軒樋3の高さ調節ができるようになっている。 FIG. 10 is a side view of the eaves gutter support tool 1 that suspends and supports the eaves gutter 3. The eaves gutter support 1 is configured such that the main body 11 has a gutter support main body 12 and a mounting foot portion 13. The mounting foot portion 13 is provided with a fixing piece portion 13a at the rear portion, and by fixing the fixing piece portion 13a at an appropriate height position of the hanging piece portion 40 with a bolt 42 and a wing nut 43, the eaves gutter 3 is provided. The height can be adjusted.

また、樋支持具本体12には前後方向に延びる長孔(不図示)が形成されており、長孔の前後方向の適宜な位置に取付足部13の先端に設けた軸孔(不図示)を合わせてボルト11b、蝶ナット11cで固定することで、軒樋3を適切な出具合位置に調節できるようになっている。なお、出具合調節ができない、つまり取付足部13を有しないものであれば、樋支持具本体12の後ろ側の耳係止部11aを垂下片部40に固定できるようにすればよい。 Further, the gutter support main body 12 is formed with a long hole (not shown) extending in the front-rear direction, and a shaft hole (not shown) provided at an appropriate position in the front-rear direction of the long hole at the tip of the mounting foot portion 13. The eaves gutter 3 can be adjusted to an appropriate protruding position by fixing the gutters 11b and wing nuts 11c together. If the protrusion cannot be adjusted, that is, the gutter support main body 12 does not have the attachment foot portion 13, the ear locking portion 11a on the rear side of the gutter support main body 12 may be fixed to the hanging piece portion 40.

この軒樋支持具1の軒先庇部2に対する取付構造は、図1のものと同様であるため、説明は割愛する。また、図4〜図9の態様については、本軒樋支持具1にも適用が可能とされる。 Since the mounting structure of the eaves gutter support 1 to the eaves eaves 2 is the same as that of FIG. 1, the description thereof is omitted. Further, the aspects of FIGS. 4 to 9 can be applied to the main gutter support tool 1.

以上では、軒樋支持具1は、本体部11が垂下片部40に取り付けられる構造とされるが、本体部11が下押さえ部30に一体となったものであってもよい。なお、軒樋3を受け支持する本体部11の場合には、本体部11が下押さえ部30と一体化されればよい。また、軒樋3を吊り支持する本体部11の場合には、出具合調整が可能なものであれば、取付足部13が下押さえ部30に一体化されればよく、出具合調整ができないものであれば、樋支持具本体12が下押さえ部30と一体化されればよい。 In the above, the eaves gutter support 1 has a structure in which the main body 11 is attached to the hanging piece 40, but the main body 11 may be integrated with the lower holding portion 30. In the case of the main body portion 11 that receives and supports the eaves gutter 3, the main body portion 11 may be integrated with the lower holding portion 30. Further, in the case of the main body portion 11 that suspends and supports the eaves gutter 3, if the protruding condition can be adjusted, the mounting foot portion 13 may be integrated with the lower holding portion 30, and the protruding condition cannot be adjusted. If it is, the gutter support main body 12 may be integrated with the lower holding portion 30.

1 軒樋支持具
2 軒先庇部
3 軒樋
10 固定部
11 本体部
12 樋支持具本体
13 取付足部
13a 固定片部
15 支点
16 挟着部
17 操作部
18 ボルト
20 上押さえ部
21 上挟着片部
22a 下向き連続突起
22b 下向き突起
23 固定具挿通孔
24 中間部
25 切り溝
26 下操作片部
27 ボルト用ネジ孔
30 下押さえ部
31 下挟着片部
32 上向き連続突起
33 上操作片部
34 ボルト挿通孔
35 切り溝
36 膨出部
37 小突起
40 垂下片部
41 長孔
42 ボルト
43 蝶ナット
50 圧接手段
51 リベット
52 固定部材
55 回転操作部材
56 基板部
57 把持片部
60 固定クリップ
61 基部
62 脚片
65 規制片
66 挟み片


1 Eaves gutter support 2 Eaves forehead 3 Eaves gutter 10 Fixing part 11 Main body 12 Gutter support main body 13 Mounting foot 13a Fixed piece 15 fulcrum 16 Nipped 17 Operation 18 Bolt 20 Upper holding One part 22a Downward continuous protrusion 22b Downward protrusion 23 Fixture insertion hole 24 Intermediate part 25 Cutting groove 26 Lower operation piece part 27 Bolt screw hole 30 Lower holding part 31 Lower sandwiching piece part 32 Upward continuous protrusion 33 Upper operation piece part 34 Bolt insertion hole 35 Cutting groove 36 Protrusion part 37 Small protrusion 40 Hanging piece part 41 Long hole 42 Bolt 43 Wingnut 50 Pressure welding means 51 Rivet 52 Fixing member 55 Rotation operating member 56 Board part 57 Gripping piece part 60 Fixing clip 61 Base 62 Leg piece 65 Restriction piece 66 Sandwich piece


Claims (5)

屋根の軒先庇部に固定される軒樋支持具において、
軒樋を支持する本体部と、該本体部を吊り支持し、かつ前記軒先庇部を挟み込むことで固定される固定部とを備え、
前記固定部は、前記軒先庇部の上面側に配される帯板状の上押さえ部と、該上押さえ部とは別体とした、前記軒先庇部の下面側に配される帯板状の下押さえ部とを備えており、
前記上押さえ部と前記下押さえ部とは、板幅方向の側端縁から板幅方向に延びた切り溝を有し、該切り溝同士の差し込みにて交差重合する連結構造とされており、
前記切り溝同士で連結した部位を支点として、該支点の後ろ側に、開閉自在な2片よりなる挟着部が配され、前記支点の前側に、開閉自在な2片よりなる操作部が配されており、
前記挟着部の2片間に前記軒先庇部を配した状態で、前記操作部が閉じることで、前記挟着部が閉じて前記軒先庇部を挟み込むことを特徴とする軒樋支持具。
In the eaves gutter support that is fixed to the eaves of the roof
It is provided with a main body portion that supports the eaves gutter and a fixed portion that suspends and supports the main body portion and is fixed by sandwiching the eaves eaves portion.
The fixing portion has a strip-shaped upper holding portion arranged on the upper surface side of the eaves eaves portion and a strip-shaped upper holding portion arranged on the lower surface side of the eaves eaves portion separately from the upper holding portion. It has a lower presser part and
The upper pressing portion and the lower pressing portion have a cutting groove extending in the plate width direction from the side edge in the plate width direction, and have a connecting structure in which the cutting grooves are cross-polymerized by being inserted into each other.
With the portion connected by the cut grooves as a fulcrum, a sandwiching portion made of two pieces that can be opened and closed is arranged behind the fulcrum, and an operating part made of two pieces that can be opened and closed is arranged on the front side of the fulcrum. Has been
An eaves gutter support tool characterized in that when the operation portion is closed with the eaves eaves portion arranged between two pieces of the sandwiching portion, the sandwiching portion is closed and the eaves eaves portion is sandwiched.
請求項1において、
前記挟着部の2片間の内面に、前記軒先庇部を押圧する突起が形成されていることを特徴とする軒樋支持具。
In claim 1,
An eaves gutter support tool characterized in that a protrusion for pressing the eaves eaves portion is formed on the inner surface between the two pieces of the sandwiching portion.
請求項1または2において、
前記軒先庇部に取り付けた状態では、前記操作部の上面が前記挟着部の上面よりも大きく下り傾斜していることを特徴とする軒樋支持具。
In claim 1 or 2,
An eaves gutter support tool characterized in that, when attached to the eaves eaves portion, the upper surface of the operating portion is inclined downward more than the upper surface of the sandwiching portion.
請求項1〜3のいずれか1項において、
前記操作部は圧接手段をさらに備え、
前記操作部の両片は、リベットにて、遊びをもって連結されており、
前記操作部の一方片と前記リベットの頭部との間に前記圧接手段を介在させて、前記両片が閉じた状態にロックすることを特徴とする軒樋支持具。
In any one of claims 1 to 3,
The operation unit further includes a pressure welding means.
Both pieces of the operation unit are connected by rivets with play.
An eaves gutter support tool characterized in that the pressure welding means is interposed between one piece of the operating portion and the head of the rivet to lock both pieces in a closed state.
請求項1〜3のいずれか1項において、
前記操作部の一方片の板幅方向の両端部に、前記操作部が閉じたときに、前記操作部の他方片を板幅方向より挟み込む挟み片が形成されていることを特徴とする軒樋支持具。



In any one of claims 1 to 3,
An eaves gutter characterized in that sandwiching pieces for sandwiching the other piece of the operating portion from the plate width direction are formed at both ends of one piece of the operating portion in the plate width direction when the operating portion is closed. Support.



JP2019088357A 2019-05-08 2019-05-08 Eaves gutter support tool Pending JP2020183662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019088357A JP2020183662A (en) 2019-05-08 2019-05-08 Eaves gutter support tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019088357A JP2020183662A (en) 2019-05-08 2019-05-08 Eaves gutter support tool

Publications (1)

Publication Number Publication Date
JP2020183662A true JP2020183662A (en) 2020-11-12

Family

ID=73045140

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019088357A Pending JP2020183662A (en) 2019-05-08 2019-05-08 Eaves gutter support tool

Country Status (1)

Country Link
JP (1) JP2020183662A (en)

Similar Documents

Publication Publication Date Title
USRE45825E1 (en) Fast beam clamp
US20010015041A1 (en) Assembly and method for attaching insulation material
JP4192199B1 (en)
US20080313853A1 (en) Handle with insert
JP2020183662A (en) Eaves gutter support tool
JPH0734283U (en) Fasteners such as wire harnesses
JP2015117476A (en) Membrane ceiling structure
JP4936802B2 (en) Clamp
JP3231475U (en) Wiper
JP2017206833A (en) Structure for fixing floor material
JP2628470B2 (en) Sheet holding device
JP2008303935A (en) Shim for adjusting gap
JP2002004432A (en) Mounting metal fitting
JP6627070B1 (en) Fixing bracket and roof plate mounting bracket
JP7019185B2 (en) Snow stopper
JP2007181363A (en) Fixture
JP6279035B1 (en) Long body support
JPH11210932A (en) Support tool for piping
JP2013151826A (en) Downpipe fixture
JP2022003846A (en) Equipotential bonding metal fitting
JPH10238107A (en) Clamp
JP6927795B6 (en) Eaves gutter support tool and eaves gutter support method
JP3695794B2 (en) Long body support
JPH0454025Y2 (en)
JP2023161252A (en) Mounting fixture