JP2020107055A - Power consumption estimation device and power consumption estimation method - Google Patents

Power consumption estimation device and power consumption estimation method Download PDF

Info

Publication number
JP2020107055A
JP2020107055A JP2018244898A JP2018244898A JP2020107055A JP 2020107055 A JP2020107055 A JP 2020107055A JP 2018244898 A JP2018244898 A JP 2018244898A JP 2018244898 A JP2018244898 A JP 2018244898A JP 2020107055 A JP2020107055 A JP 2020107055A
Authority
JP
Japan
Prior art keywords
power consumption
facility
amount
predetermined period
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018244898A
Other languages
Japanese (ja)
Other versions
JP6867996B2 (en
Inventor
優人 多屋
Masato Taya
優人 多屋
正 柳原
Tadashi Yanagihara
正 柳原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KDDI Corp
Original Assignee
KDDI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KDDI Corp filed Critical KDDI Corp
Priority to JP2018244898A priority Critical patent/JP6867996B2/en
Publication of JP2020107055A publication Critical patent/JP2020107055A/en
Application granted granted Critical
Publication of JP6867996B2 publication Critical patent/JP6867996B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

To estimate a breakdown of power consumption actually consumed in a facility for each target device.SOLUTION: A power consumption estimation device 1 is provided with a specification unit 131 for specifying an in-facility power consumption amount that indicates the amount of power consumed in a predetermined facility during a predetermined period, a first power amount estimation unit 132 installed in the facility for estimating a constant power consumption amount that indicates the amount of power consumed in the predetermined period by a first device operated by constantly consuming the power, a first operation time estimation unit 133 for estimating an operation time in the predetermined period of a second device installed in the facility based on the in-facility power consumption amount specified by the specification unit 131 and the constant power consumption estimated by the first power amount estimation unit 132, and a second power amount estimation unit 134 for estimating the power consumption amount of the second device in the predetermined period based on the operation time estimated by the first operation time estimation unit 133 and the predetermined power consumption amount of the second device.SELECTED DRAWING: Figure 2

Description

本発明は、消費電力推定装置及び消費電力推定方法に関する。 The present invention relates to a power consumption estimation device and a power consumption estimation method.

従来、家庭内等の施設内で消費された電力の消費量を可視化するために、電力の消費量を表示するスマートメータが知られている(例えば、特許文献1参照)。また、建物に設置されている複数の機器の消費電力量を予測する技術が知られている(例えば、特許文献2参照)。 2. Description of the Related Art Conventionally, there is known a smart meter that displays the amount of power consumed in order to visualize the amount of power consumed in facilities such as homes (for example, see Patent Document 1). In addition, a technique for predicting the power consumption of a plurality of devices installed in a building is known (for example, see Patent Document 2).

特開2012−048576号公報JP 2012-048576 A 特許第6091568号公報Japanese Patent No. 6091568

ところで、スマートメータは、施設全体で消費された電力の消費量を表示するに過ぎず、表示された電力の消費量に基づいて、どのようにすれば節電を行えるのかがわからないという問題があった。また、特許文献2に示される複数の機器の消費電力量を予測する技術は、施設に設置されている複数の機器の消費電力量を予測するものであり、施設で実際に消費された電力消費量の機器毎の内訳を推定するものではない。したがって、施設で実際に消費された電力の消費量の機器毎の内訳を推定し、利用者が節電を行えるようにすることが求められている。 By the way, the smart meter only displays the power consumption of the entire facility, and there is a problem that it is not possible to know how to save power based on the displayed power consumption. .. Further, the technique of predicting the power consumption of a plurality of devices disclosed in Patent Document 2 predicts the power consumption of a plurality of devices installed in a facility, and the power consumption actually consumed in the facility. It does not estimate the breakdown of quantity by device. Therefore, it is required to estimate the breakdown of the amount of electric power actually consumed in each facility for each device so that the user can save power.

そこで、本発明はこれらの点に鑑みてなされたものであり、施設で実際に消費された電力の消費量の対象機器毎の内訳を推定することができる消費電力推定装置及び消費電力推定方法を提供することを目的とする。 Therefore, the present invention has been made in view of these points, and provides a power consumption estimation device and a power consumption estimation method that can estimate the breakdown of the amount of power actually consumed in a facility for each target device. The purpose is to provide.

本発明の第1の態様に係る消費電力推定装置は、所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定する特定部と、前記施設に設置され、電力を常時消費することにより稼働する第1の機器により前記所定期間において消費された電力量を示す常時消費電力量を推定する第1電力量推定部と、前記特定部が特定した前記施設内消費電力量と、前記第1電力量推定部が推定した前記常時消費電力量とに基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定する第1稼働時間推定部と、前記第1稼働時間推定部が推定した前記稼働時間と、予め定められた前記第2の機器の消費電力量とに基づいて、前記所定期間における前記第2の機器の消費電力量を推定する第2電力量推定部と、を備える。 A power consumption estimation apparatus according to a first aspect of the present invention includes a specifying unit that specifies an in-facility power consumption that indicates an amount of power consumed in a predetermined facility in a predetermined period, and is installed in the facility to constantly supply power. A first power amount estimation unit that estimates a constant power consumption amount indicating a power amount consumed in the predetermined period by a first device that operates by consuming; and the in-facility power consumption amount that is specified by the specifying unit. A first operating time estimating unit that estimates an operating time of the second device installed in the facility in the predetermined period based on the constant power consumption estimated by the first electric energy estimating unit, Estimating the power consumption of the second device in the predetermined period based on the operating time estimated by the first operating time estimation unit and a predetermined power consumption of the second device 2 electric energy estimation part.

前記消費電力推定装置は、前記施設内消費電力量に対する前記常時消費電力量の割合と、前記第2の機器の消費電力量との割合を示す情報を出力する出力部をさらに備えてもよい。
前記第2の機器は照明機器であり、前記第1稼働時間推定部は、夜間に対応する時間と、前記施設内消費電力量と、前記常時消費電力量とに基づいて、前記稼働時間を推定してもよい。
The power consumption estimation apparatus may further include an output unit that outputs information indicating a ratio between the power consumption of the second device and the ratio of the constant power consumption to the in-facility power consumption.
The second device is a lighting device, and the first operating time estimation unit estimates the operating time based on a time corresponding to night, the in-facility power consumption, and the constant power consumption. You may.

前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれの前記施設で消費された消費電力量の和を前記施設内消費電力量として特定し、前記第1稼働時間推定部は、前記時間枠が夜間の時間枠である場合、当該時間枠に対応する前記消費電力量と、当該時間枠に対応する前記常時消費電力量と、前記照明機器の単位時間当たりにおける消費電力量とに基づいて、前記照明機器が稼働していたか否かを判定することにより、前記稼働時間を推定してもよい。 The specifying unit specifies, as the in-facility power consumption, the sum of the power consumptions of the respective facilities of the plurality of time frames obtained by dividing the predetermined period, and the first operating time estimating unit When the time frame is a night time frame, based on the power consumption corresponding to the time frame, the constant power consumption corresponding to the time frame, and the power consumption per unit time of the lighting device. The operating time may be estimated by determining whether or not the lighting device is operating.

前記第1稼働時間推定部は、前記第2の機器の消費電力量を推定するための要素として、前記施設の広さ、前記施設における部屋数、及び前記施設を利用する利用者の人数の少なくともいずれかを特定し、特定した前記要素に基づいて前記第2の機器の消費電力量を推定してもよい。
前記第1稼働時間推定部は、前記予め定められた前記第2の機器の消費電力量に基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定してもよい。
The first operating time estimation unit has at least the size of the facility, the number of rooms in the facility, and the number of users who use the facility as an element for estimating the power consumption of the second device. Either one may be specified, and the power consumption of the second device may be estimated based on the specified element.
The first operating time estimation unit may estimate the operating time of the second device installed in the facility in the predetermined period based on the power consumption of the second device which is determined in advance. Good.

前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれにおいて前記施設で消費された消費電力量を特定し、当該消費電力量の和を前記施設内消費電力量として特定し、前記第1電力量推定部は、前記複数の時間枠のそれぞれに対応する前記消費電力量のうち、出現割合が最も多い消費電力量を、前記時間枠当たりの前記常時消費電力量と推定し、前記時間枠当たりの前記常時消費電力量に基づいて、前記所定期間における常時消費電力量を推定してもよい。 The specifying unit specifies a power consumption amount consumed in the facility in each of a plurality of time frames obtained by dividing the predetermined period, and specifies the sum of the power consumption amounts as the in-facility power consumption amount, The 1 power amount estimation unit estimates the power consumption amount having the highest appearance ratio among the power consumption amounts corresponding to each of the plurality of time frames as the constant power consumption amount per the time frame, and The constant power consumption in the predetermined period may be estimated based on the constant power consumption per frame.

前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれにおいて前記施設で消費された消費電力量を特定し、当該消費電力量の和を前記施設内消費電力量として特定し、前記第1電力量推定部は、前記複数の時間枠のそれぞれに対応する前記消費電力量のうち、最小の消費電力量を、前記時間枠当たりの前記常時消費電力量と推定し、前記時間枠当たりの前記常時消費電力量に基づいて、前記所定期間における常時消費電力量を推定してもよい。 The specifying unit specifies a power consumption amount consumed in the facility in each of a plurality of time frames obtained by dividing the predetermined period, and specifies the sum of the power consumption amounts as the in-facility power consumption amount, The 1 power amount estimation unit estimates the minimum power consumption amount among the power consumption amounts corresponding to each of the plurality of time frames as the constant power consumption amount per the time frame, and The constant power consumption amount in the predetermined period may be estimated based on the constant power consumption amount.

前記第1電力量推定部は、前記所定期間における前記施設内消費電力量と前記常時消費電力量との関係に基づいて、前記施設が前記利用者に利用されているか否かを判定し、前記利用者に利用されていない場合、前記所定期間における前記施設内消費電力量が前記所定期間における前記常時消費電力量であると推定してもよい。 The first power amount estimation unit determines whether or not the facility is used by the user, based on the relationship between the in-facility power consumption and the constant power consumption in the predetermined period, When not used by the user, it may be estimated that the in-facility power consumption during the predetermined period is the constant power consumption during the predetermined period.

前記消費電力量推定装置は、前記所定期間における前記第2の機器とは異なる第3の機器の稼働時間を推定する第2稼働時間推定部と、前記第2稼働時間推定部が推定した前記第3の機器の稼働時間と、予め定められた前記第3の機器の消費電力量とに基づいて、前記所定期間における前記第3の機器の消費電力量を推定する第3電力量推定部と、をさらに備えてもよい。 The power consumption estimation apparatus includes a second operation time estimation unit that estimates an operation time of a third device different from the second device in the predetermined period, and the second operation time estimation unit estimates the second operation time. A third power amount estimation unit that estimates the power consumption amount of the third device in the predetermined period based on the operating time of the third device and a predetermined power consumption amount of the third device, May be further provided.

前記第2稼働時間推定部は、前記特定部が特定した前記施設内消費電力量と、前記第1電力量推定部が推定した前記常時消費電力量と、前記第2電力量推定部が推定した前記第2の機器の消費電力量とに基づいて、前記第3の機器の稼働時間を推定してもよい。 The second operating time estimation unit estimates the in-facility power consumption specified by the specification unit, the constant power consumption amount estimated by the first power amount estimation unit, and the second power amount estimation unit. The operating time of the third device may be estimated based on the power consumption of the second device.

前記第3の機器は前記施設内の温度を調整する空調機器であり、前記第2稼働時間推定部は、前記所定期間における前記施設の外部の気温を特定し、当該気温が、予め定められた前記空調機器が稼働している可能性が高い稼働温度域に含まれている場合に、前記空調機器が稼働しているか否かを判定することにより前記空調機器の稼働時間を推定してもよい。 The third device is an air conditioner that adjusts the temperature inside the facility, the second operating time estimation unit identifies the temperature outside the facility during the predetermined period, and the temperature is predetermined. When included in the operating temperature range in which the air conditioner is likely to be operating, the operating time of the air conditioner may be estimated by determining whether the air conditioner is operating. ..

前記第2稼働時間推定部は、前記所定期間を分割した前記複数の時間枠のそれぞれに対応する前記施設の外部の過去の気温を示す過去気温情報に基づいて、前記所定期間を分割した複数の時間枠のそれぞれにおける前記施設の外部の気温を特定してもよい。 The second operating time estimation unit divides the predetermined period based on past temperature information indicating past temperature outside the facility corresponding to each of the plurality of time frames obtained by dividing the predetermined period. The temperature outside the facility in each of the time frames may be specified.

前記過去気温情報は、地域別に、複数の時間枠のそれぞれにおける気温を示す情報を含んでおり、前記第2稼働時間推定部は、前記過去気温情報に基づいて、前記施設を含む地域に対応する前記複数の時間枠のそれぞれにおける前記施設の外部の気温を特定してもよい。 The past temperature information includes information indicating temperatures in each of a plurality of time frames for each area, and the second operating time estimation unit corresponds to an area including the facility based on the past temperature information. The temperature outside the facility in each of the plurality of time frames may be specified.

本発明の第2の態様に係る消費電力推定方法は、コンピュータが実行する、所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定するステップと、前記施設に設置され、電力を常時消費することにより稼働する第1の機器により前記所定期間において消費された電力量を示す常時消費電力量を推定するステップと、特定された前記施設内消費電力量と、推定された前記常時消費電力量とに基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定するステップと、推定された前記稼働時間と、予め定められた前記第2の機器の消費電力量とに基づいて、前記所定期間における前記第2の機器の消費電力量を推定するステップと、を備える。 A power consumption estimation method according to a second aspect of the present invention is a step executed by a computer for identifying an in-facility power consumption amount indicating a power amount consumed in a predetermined facility in a predetermined period, and being installed in the facility. , Estimating a constant power consumption amount indicating the amount of power consumed in the predetermined period by the first device that operates by constantly consuming power, and the estimated power consumption amount in the facility, Based on the constant power consumption, a step of estimating an operating time of the second device installed in the facility in the predetermined period, the estimated operating time, and the predetermined second Estimating the power consumption of the second device in the predetermined period based on the power consumption of the device.

本発明によれば、施設で実際に消費された電力の消費量の対象機器毎の内訳を推定することができるという効果を奏する。 Advantageous Effects of Invention According to the present invention, it is possible to estimate the breakdown of power consumption actually consumed in a facility for each target device.

本実施形態に係る消費電力推定装置の概要を示す図である。It is a figure which shows the outline of the power consumption estimation apparatus which concerns on this embodiment. 本実施形態に係る消費電力推定装置の構成を示す図である。It is a figure which shows the structure of the power consumption estimation apparatus which concerns on this embodiment. 所定の施設の所定期間における消費電力量の一例を示す図である。It is a figure which shows an example of the power consumption in the predetermined period of a predetermined facility. 本実施形態に係る携帯端末に表示される分析画面の例を示す図である。It is a figure which shows the example of the analysis screen displayed on the portable terminal which concerns on this embodiment. 本実施形態に係る消費電力推定装置における処理の流れの一例を示すフローチャートである。It is a flowchart which shows an example of the flow of a process in the power consumption estimation apparatus which concerns on this embodiment.

[消費電力推定装置1の概要]
図1は、本実施形態に係る消費電力推定装置1の概要を示す図である。消費電力推定装置1は、所定の施設に設置されている各機器の消費電力量を推定するサーバである。
[Outline of power consumption estimation device 1]
FIG. 1 is a diagram showing an outline of a power consumption estimation device 1 according to this embodiment. The power consumption estimation device 1 is a server that estimates the power consumption of each device installed in a predetermined facility.

消費電力推定装置1は、インターネットや携帯電話回線等の通信ネットワークを介して、スマートメータ2と、携帯端末3とに通信可能に接続されている。スマートメータ2は、所定の施設における消費電力を計測する装置である。携帯端末3は、例えば、所定の施設を利用するユーザが所持するスマートフォン等の携帯電話機である。ここで、所定の施設は、例えば戸建ての住宅や、共同住宅内における1つの世帯に対応する空間である。本実施形態では、所定の施設が戸建ての住宅であり、所定の施設を利用するユーザが当該住宅の住人であるものとして説明を行う。また、以下の説明では、所定の施設を単に施設ともいう。 The power consumption estimation apparatus 1 is communicably connected to the smart meter 2 and the mobile terminal 3 via a communication network such as the Internet or a mobile phone line. The smart meter 2 is a device that measures power consumption in a predetermined facility. The mobile terminal 3 is, for example, a mobile phone such as a smartphone carried by a user who uses a predetermined facility. Here, the predetermined facility is, for example, a detached house or a space corresponding to one household in an apartment house. In the present embodiment, the description will be made assuming that the predetermined facility is a detached house and the user who uses the predetermined facility is a resident of the house. Further, in the following description, the predetermined facility is also simply referred to as a facility.

消費電力推定装置1は、所定期間において施設で消費された電力量を示す施設内消費電力量を示す情報をスマートメータ2から取得することにより施設内消費電力量を特定する(図1の(1))。消費電力推定装置1は、施設に設置され、電力を常時消費することにより稼働する第1の機器により所定期間において消費された電力量である常時消費電力量を推定する(図1の(2))。 The power consumption estimation device 1 specifies the in-facility power consumption by acquiring from the smart meter 2 the information indicating the in-facility power consumption that indicates the amount of power consumed in the facility in a predetermined period ((1 in FIG. 1 )). The power consumption estimation device 1 is installed in a facility and estimates a constant power consumption amount which is a power amount consumed in a predetermined period by a first device which operates by constantly consuming power ((2) in FIG. 1). ).

消費電力推定装置1は、施設内消費電力量と、常時消費電力量とに基づいて、施設に設置されている各機器の所定期間における稼働時間と、消費電力量とを推定する(図1の(3))。消費電力推定装置1は、各機器の消費電力量の割合を示す情報を携帯端末3に出力する(図1の(4))。このようにすることで、ユーザは、施設で実際に消費された消費電力量に対して推定された機器毎の内訳を把握することができ、ユーザが節電を行うことができる。 The power consumption estimation device 1 estimates the operating time and the power consumption of each device installed in the facility in a predetermined period based on the power consumption in the facility and the constant power consumption (see FIG. 1). (3)). The power consumption estimation device 1 outputs information indicating the ratio of power consumption of each device to the mobile terminal 3 ((4) in FIG. 1). By doing so, the user can grasp the breakdown of each device estimated with respect to the power consumption amount actually consumed in the facility, and the user can save power.

[消費電力推定装置1の構成]
続いて、消費電力推定装置1の構成を説明する。図2は、本実施形態に係る消費電力推定装置1の構成を示す図である。図2に示すように、消費電力推定装置1は、通信部11と、記憶部12と、制御部13とを備える。
[Configuration of Power Consumption Estimation Device 1]
Then, the structure of the power consumption estimation apparatus 1 is demonstrated. FIG. 2 is a diagram showing a configuration of the power consumption estimation device 1 according to the present embodiment. As shown in FIG. 2, the power consumption estimation device 1 includes a communication unit 11, a storage unit 12, and a control unit 13.

通信部11は、スマートメータ2及び携帯端末3との間でデータを送受信するための通信インターフェースである。
記憶部12は、ROM(Read Only Memory)及びRAM(Random Access Memory)等を含む記憶媒体である。記憶部12は、制御部13が実行するプログラムを記憶している。例えば、記憶部12は、制御部13を、特定部131、第1電力量推定部132、第1稼働時間推定部133、第2電力量推定部134、第2稼働時間推定部135、第3電力量推定部136、第3稼働時間推定部137、第4電力量推定部138、及び出力部139として機能させる消費電力推定プログラムを記憶している。
The communication unit 11 is a communication interface for transmitting and receiving data between the smart meter 2 and the mobile terminal 3.
The storage unit 12 is a storage medium including a ROM (Read Only Memory) and a RAM (Random Access Memory). The storage unit 12 stores a program executed by the control unit 13. For example, the storage unit 12 controls the control unit 13 to include the specifying unit 131, the first power amount estimating unit 132, the first operating time estimating unit 133, the second power amount estimating unit 134, the second operating time estimating unit 135, and the third operating time. A power consumption estimation program that functions as the power amount estimation unit 136, the third operating time estimation unit 137, the fourth power amount estimation unit 138, and the output unit 139 is stored.

制御部13は、例えばCPU(Central Processing Unit)である。制御部13は、記憶部12に記憶された消費電力推定プログラムを実行することにより、特定部131、第1電力量推定部132、第1稼働時間推定部133、第2電力量推定部134、第2稼働時間推定部135、第3電力量推定部136、第3稼働時間推定部137、第4電力量推定部138、及び出力部139として機能する。 The control unit 13 is, for example, a CPU (Central Processing Unit). The control unit 13 executes the power consumption estimation program stored in the storage unit 12 to specify the identification unit 131, the first power amount estimation unit 132, the first operating time estimation unit 133, the second power amount estimation unit 134, The second operation time estimation unit 135, the third power amount estimation unit 136, the third operation time estimation unit 137, the fourth power amount estimation unit 138, and the output unit 139 function.

特定部131は、所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定する。例えば、特定部131は、施設に設置されているスマートメータ2から、所定期間おきに、施設を識別する施設識別情報と、所定期間を分割した複数の時間枠のそれぞれにおいて施設で消費された消費電力量とを取得する。施設識別情報は、例えば、スマートメータ2の識別情報や、電力会社においてユーザに設定した顧客識別情報である。特定部131は、取得した複数の時間枠のそれぞれにおける消費電力量の和を算出することにより施設内消費電力量を特定する。特定部131は、施設内消費電力量と、所定期間を示す情報(例えば日付)とを関連付けて、消費電力量情報として記憶部12に記憶させる。 The identifying unit 131 identifies the in-facility power consumption that indicates the amount of power consumed in a predetermined facility during a predetermined period. For example, the identifying unit 131 uses, from the smart meter 2 installed in the facility, facility identification information for identifying the facility at predetermined intervals and consumption consumed by the facility in each of a plurality of time frames obtained by dividing the predetermined period. Get the amount of electricity and. The facility identification information is, for example, the identification information of the smart meter 2 or the customer identification information set by the power company for the user. The identifying unit 131 identifies the in-facility power consumption by calculating the sum of the power consumptions in each of the acquired time frames. The identifying unit 131 associates the in-facility power consumption with information (for example, date) indicating a predetermined period and stores the information in the storage unit 12 as power consumption information.

ここで、所定期間は、ユーザの生活周期に対応する期間であり、例えば1日である。1つの時間枠は例えば30分である。特定部131は、スマートメータ2から、1日おきに、1日を30分で分割した48個の時間枠のそれぞれにおいて施設で消費された前日の消費電力量を取得する。そして、特定部131は、48個の時間枠のそれぞれの消費電力量を合計することにより、施設内消費電力量を特定する。 Here, the predetermined period is a period corresponding to the life cycle of the user, and is, for example, one day. One time frame is, for example, 30 minutes. The identifying unit 131 acquires, from the smart meter 2 every other day, the amount of power consumption of the previous day consumed in the facility in each of 48 time frames obtained by dividing the day into 30 minutes. Then, the identifying unit 131 identifies the in-facility power consumption by totaling the power consumptions of the 48 time frames.

第1電力量推定部132は、施設に設置され、電力を常時消費することにより稼働する第1の機器により所定期間において消費された電力量を示す常時消費電力量を推定する。
第1の機器は、例えば冷蔵庫である。第1電力量推定部132は、複数の時間枠のそれぞれに対応する消費電力量のうち、出現割合が最も多い消費電力量を、時間枠当たりの常時消費電力量と推定する。
The first power amount estimation unit 132 estimates the constant power consumption amount indicating the amount of power consumed in a predetermined period by the first device installed in the facility and operating by constantly consuming power.
The first device is, for example, a refrigerator. The first power amount estimation unit 132 estimates the power consumption amount with the highest appearance ratio among the power consumption amounts corresponding to each of the plurality of time frames as the constant power consumption amount per time frame.

図3は、所定の施設の所定期間における消費電力量の一例を示す図である。図3に示す0時〜6時、23時〜24時等の、1日において例えばユーザが就寝している時間帯は、第1の機器以外動作していない可能性が高く、出現割合が最も多い消費電力量となる可能性が高い。したがって、消費電力推定装置1は、出現割合が最も多い消費電力量に基づいて、時間枠当たりの常時消費電力量を精度良く推定することができる。 FIG. 3 is a diagram illustrating an example of the power consumption amount of a predetermined facility in a predetermined period. For example, in the time zone during which the user is sleeping, such as 0:00 to 6:00 and 23:00 to 24:00, shown in FIG. High power consumption is likely. Therefore, the power consumption estimation apparatus 1 can accurately estimate the constant power consumption per time frame based on the power consumption with the highest appearance rate.

なお、第1電力量推定部132は、出現割合が最も多い消費電力量を特定するにあたり、複数の時間枠のそれぞれに対応する消費電力量の小数値の切り捨てや切り上げ等の丸め処理を行ってもよい。このようにすることで、消費電力推定装置1は、複数の時間枠のそれぞれに対応する消費電力量が僅差で全て異なることにより出現割合が最も多い消費電力量を特定できなくなることを抑制することができる。 It should be noted that the first power amount estimation unit 132 performs rounding processing such as rounding down or rounding up of fractional values of the power consumption amount corresponding to each of the plurality of time frames when specifying the power consumption amount having the highest appearance ratio. Good. By doing so, the power consumption estimation apparatus 1 suppresses that the power consumption with the highest appearance ratio cannot be specified because the power consumptions corresponding to the plurality of time frames are all slightly different. You can

また、第1電力量推定部132は、出現割合が最も多い消費電力量を時間枠当たりの常時消費電力量と推定したが、これに限らない。第1電力量推定部132は、複数の時間枠のそれぞれに対応する消費電力量のうち、最小の消費電力量を、時間枠当たりの常時消費電力量と推定してもよい。このようにすることで、消費電力推定装置1は、出現割合が最も多い消費電力量に基づいて、時間枠当たりの常時消費電力量を推定するのと同様に、時間枠当たりの常時消費電力量を精度良く推定することができる。 Further, the first power amount estimation unit 132 estimated the power consumption amount with the highest appearance ratio as the constant power consumption amount per time frame, but the present invention is not limited to this. The first power amount estimation unit 132 may estimate the minimum power consumption amount among the power consumption amounts corresponding to each of the plurality of time frames as the constant power consumption amount per time frame. By doing so, the power consumption estimation apparatus 1 estimates the constant power consumption per time frame based on the power consumption with the highest appearance ratio, similarly to the constant power consumption per time frame. Can be accurately estimated.

そして、第1電力量推定部132は、時間枠当たりの常時消費電力量に基づいて、所定期間における常時消費電力量を推定する。例えば、所定期間が1日であり、1つの時間枠が30分である場合、第1電力量推定部132は、時間枠当たりの常時消費電力量と、1日における時間枠の数である48とを乗算することにより、1日における常時消費電力量を推定する。 Then, the first power amount estimation unit 132 estimates the constant power consumption amount in the predetermined period based on the constant power consumption amount per time frame. For example, when the predetermined period is one day and one time frame is 30 minutes, the first power amount estimation unit 132 is the constant power consumption amount per time frame and the number of time frames in one day. The constant power consumption in one day is estimated by multiplying by.

また、第1電力量推定部132は、所定期間における施設内消費電力量と常時消費電力量との関係に基づいて、施設がユーザに利用されているか否かを判定してもよい。例えば、第1電力量推定部132は、所定期間における施設内消費電力量と常時消費電力量との差が所定の閾値以内である場合、施設がユーザに利用されていないと判定する。ここで、所定の閾値は、例えば、常時消費電力量の5%である。第1電力量推定部132は、施設がユーザに利用されていないと判定すると、所定期間における施設内消費電力量が、所定期間における常時消費電力量であると推定する。 In addition, the first power amount estimation unit 132 may determine whether or not the facility is used by the user based on the relationship between the power consumption amount in the facility and the constant power consumption amount in a predetermined period. For example, the first power amount estimation unit 132 determines that the facility is not used by the user when the difference between the power consumption amount in the facility and the constant power consumption amount in the predetermined period is within the predetermined threshold value. Here, the predetermined threshold is, for example, 5% of the constant power consumption. When the first power amount estimation unit 132 determines that the facility is not used by the user, the first power amount estimation unit 132 estimates that the in-facility power consumption amount in the predetermined period is the constant power consumption amount in the predetermined period.

例えば、ユーザが長期旅行等で施設にいない場合、施設では第1の機器しか電力を消費していないこととなる。したがって、消費電力推定装置1は、施設がユーザに利用されていない場合の施設内消費電力量に基づいて、所定期間における常時消費電力量を精度良く推定することができる。 For example, when the user is not in the facility for a long trip or the like, it means that only the first device consumes power in the facility. Therefore, the power consumption estimation device 1 can accurately estimate the constant power consumption in the predetermined period based on the power consumption in the facility when the facility is not used by the user.

第1電力量推定部132は、常時消費電力量を推定すると、当該常時消費電力量と、所定期間を示す情報(例えば日付)とを関連付けて、消費電力量情報として記憶部12に記憶させる。 When estimating the constant power consumption amount, the first power amount estimation unit 132 associates the constant power consumption amount with information indicating a predetermined period (for example, date), and stores it in the storage unit 12 as power consumption amount information.

第1稼働時間推定部133は、特定部131が特定した施設内消費電力量と、第1電力量推定部132が推定した常時消費電力量とに基づいて、施設に設置されている第2の機器の、ユーザの生活周期に対応する期間を示す所定期間における稼働時間を推定する。第2の機器は、季節に関わらず特定の時間において使用される機器であり、例えば照明機器である。第1稼働時間推定部133は、例えば、夜間に対応する時間と、特定部131が特定した施設内消費電力量と、第1電力量推定部132が推定した常時消費電力量とに基づいて、照明機器の稼働時間を推定する。 The first operating time estimation unit 133 is installed in the facility based on the in-facility power consumption identified by the identification unit 131 and the constant power consumption estimated by the first power consumption estimation unit 132. The operating time of the device in a predetermined period indicating the period corresponding to the life cycle of the user is estimated. The second device is a device used at a specific time regardless of the season, for example, a lighting device. The first operating time estimation unit 133, for example, based on the time corresponding to night, the in-facility power consumption specified by the specification unit 131, and the constant power consumption estimated by the first power consumption estimation unit 132, Estimate the operating hours of lighting equipment.

具体的には、まず、第1稼働時間推定部133は、所定期間における複数の時間枠のうち、1つの時間枠を選択する。第1稼働時間推定部133は、選択した時間枠が夜間の時間枠であるか、昼間の時間枠であるかを特定する。 Specifically, first, the first operating time estimation unit 133 selects one time frame from the plurality of time frames in the predetermined period. The first operating time estimation unit 133 specifies whether the selected time frame is a night time frame or a daytime time frame.

例えば、制御部13は受付部として機能し、施設のユーザが使用する携帯端末3から、施設識別情報と、施設の位置を示す位置情報とを予めユーザから受け付け、当該施設識別情報と、当該位置情報とを関連付けて、施設位置情報として記憶部12に記憶させておく。第1稼働時間推定部133は、当該施設位置情報を参照し、特定部131が施設で消費された消費電力量とともに取得した施設識別情報と関連付けられている位置情報を特定し、当該位置情報を含む地域を特定する。第1稼働時間推定部133は、例えば、地域別及び日別の日出時刻と日入時刻とを記憶する外部サーバを参照し、特定した地域、及び特定部131が取得した消費電力量に対応する日付(前日)に対応する日出時刻と日入時刻とを特定する。 For example, the control unit 13 functions as a reception unit, receives the facility identification information and the position information indicating the position of the facility from the user in advance from the mobile terminal 3 used by the user of the facility, and the facility identification information and the position. The information is associated and stored in the storage unit 12 as facility position information. The first operating time estimation unit 133 refers to the facility location information, identifies the location information associated with the facility identification information acquired by the identification unit 131 together with the power consumption amount consumed in the facility, and determines the location information. Specify the area to include. The first operating time estimation unit 133 refers to, for example, an external server that stores the sunrise and sunset times by region and day, and corresponds to the identified region and the power consumption amount acquired by the identifying unit 131. The sunrise time and sunset time corresponding to the date (previous day) to be specified are specified.

第1稼働時間推定部133は、選択した時間枠が日出時刻から日入時刻までの時間範囲に含まれている場合、当該時間枠が昼間の時間枠であると判定し、選択した時間枠が当該時間範囲に含まれていない場合、当該時間枠が夜間の時間枠であると判定する。なお、日出時刻又は日入時刻では、施設の周囲は明るくなっていないところ、第1稼働時間推定部133は、選択した時間枠に日出時刻又は日入時刻が含まれている場合に、当該時間枠を夜間の時間枠であると判定する。 When the selected time frame is included in the time range from the sunrise time to the sunset time, the first operating time estimation unit 133 determines that the time frame is the daytime time frame, and selects the selected time frame. Is not included in the time range, it is determined that the time frame is the night time frame. In addition, at the sunrise time or the sunset time, the area around the facility is not bright, and the first operating time estimation unit 133, when the selected time frame includes the sunrise time or the sunset time, The time frame is determined to be the night time frame.

第1稼働時間推定部133は、選択した時間枠が夜間の時間枠である場合、当該時間枠に対応する施設で消費された消費電力量と、当該時間枠に対応する常時消費電力量と、照明機器の単位時間当たりにおける消費電力量とに基づいて、照明機器が稼働していたか否かを判定する。 When the selected time frame is the night time frame, the first operating time estimation unit 133, the power consumption amount consumed in the facility corresponding to the time frame, and the constant power consumption amount corresponding to the time frame, Based on the power consumption of the lighting device per unit time, it is determined whether the lighting device is operating.

ここで、第1稼働時間推定部133は、照明機器の消費電力量を推定するための要素として、施設の広さ、施設における部屋数、及び施設を利用する利用者の人数の少なくともいずれかを特定してもよい。例えば、制御部13は受付部として機能し、施設のユーザが使用する携帯端末3から、施設の広さ、施設における部屋数、及び施設を利用する利用者の人数の少なくともいずれかと、施設識別情報とを受け付け、第1電力推定要素情報として記憶部12に記憶させておく。第1稼働時間推定部133は、当該第1電力推定要素情報を参照し、特定部131が取得した施設識別情報と関連付けられている、照明機器の消費電力量を推定するための要素を特定する。そして、第1稼働時間推定部133は、推定した要素に基づいて施設に設置されている照明機器の単位時間当たりにおける消費電力量を推定する。このようにすることで、消費電力推定装置1は、照明機器の単位時間当たりにおける消費電力量の推定精度を高めることができる。例えば、施設の広さ、施設における部屋数、及び施設を利用する利用者の人数のそれぞれが大きければ大きいほど、単位時間当たりにおける消費電力量が大きくなると推定する。 Here, the first operating time estimation unit 133 determines at least one of the size of the facility, the number of rooms in the facility, and the number of users who use the facility as an element for estimating the power consumption of the lighting device. May be specified. For example, the control unit 13 functions as a reception unit, and from the mobile terminal 3 used by the user of the facility, at least one of the size of the facility, the number of rooms in the facility, and the number of users of the facility, and facility identification information. And is stored in the storage unit 12 as the first power estimation element information. The first operating time estimation unit 133 refers to the first power estimation element information, and identifies the element for estimating the power consumption of the lighting device, which is associated with the facility identification information acquired by the identification unit 131. .. Then, the first operating time estimation unit 133 estimates the power consumption amount per unit time of the lighting device installed in the facility based on the estimated elements. By doing so, the power consumption estimation device 1 can improve the estimation accuracy of the power consumption of the lighting device per unit time. For example, it is estimated that the larger the size of the facility, the number of rooms in the facility, and the number of users of the facility, the greater the amount of power consumption per unit time.

また、第1稼働時間推定部133は、施設のユーザが使用する携帯端末3から、施設において使用されている照明機器を識別する型番等の製品識別情報を受け付け、当該製品識別情報を記憶部12に記憶させておいてもよい。第1稼働時間推定部133は、例えば、照明機器のカタログ情報を記憶する外部サーバを参照し、記憶部に記憶されている照明機器の製品識別情報に対応するカタログ情報を特定し、当該カタログ情報に掲載されている照明機器の仕様情報に基づいて、施設に設置されている複数の照明機器の時間枠における消費電力量を特定してもよい。そして、第2稼働時間推定部135は、特定した複数の照明機器の消費電力量に基づいて、施設に設置されている照明機器の単位時間当たりにおける消費電力量を推定してもよい。 Further, the first operating time estimation unit 133 receives product identification information such as a model number for identifying a lighting device used in the facility from the mobile terminal 3 used by the user of the facility, and stores the product identification information in the storage unit 12. It may be stored in. The first operating time estimation unit 133 refers to, for example, an external server that stores the catalog information of the lighting device, specifies the catalog information corresponding to the product identification information of the lighting device stored in the storage unit, and the catalog information. On the basis of the specification information of the lighting device posted in, the power consumption of the plurality of lighting devices installed in the facility in the time frame may be specified. Then, the second operating time estimation unit 135 may estimate the power consumption amount per unit time of the lighting device installed in the facility based on the specified power consumption amounts of the plurality of lighting devices.

例えば、単位時間が1時間、1つの時間枠が30分である場合において、照明機器の単位時間当たりにおける消費電力量をPluとすると、照明機器の時間枠における消費電力量はPlu/2となる。選択した時間枠に対応する施設で消費された消費電力量をPss、当該時間枠に対応する常時消費電力量をPcsとし、単位時間が1時間、1つの時間枠が30分であるとすると、第1稼働時間推定部133は、下記の式(1)を満たしている場合に、照明機器が稼働していたと判定する。
Pss−Pcs−Plu/2≧0・・・(1)
For example, when the unit time is 1 hour and one time frame is 30 minutes, and the power consumption of the lighting device per unit time is Plu, the power consumption of the lighting device in the time frame is Pl/2. .. Let Pss be the power consumption amount consumed in the facility corresponding to the selected time frame, Pcs be the constant power consumption amount corresponding to the time frame, and the unit time is 1 hour, and one time frame is 30 minutes. The first operating time estimation unit 133 determines that the lighting device is operating when the following expression (1) is satisfied.
Pss-Pcs-Plu/2≧0...(1)

また、第1稼働時間推定部133は、時間枠が昼間の時間枠である場合、当該時間枠において照明機器が稼働していないと判定する。そして、第1稼働時間推定部133は、照明機器が稼働していたと判定した時間枠を合計することにより、所定期間における照明機器の稼働時間を推定する。 When the time frame is the daytime time frame, the first operating time estimation unit 133 determines that the lighting device is not operating in the time frame. Then, the first operating time estimation unit 133 estimates the operating time of the lighting device in the predetermined period by summing the time frames determined that the lighting device was operating.

第1稼働時間推定部133は、選択した時間枠に対する照明機器が稼働していたか否かの判定が終了すると、選択した時間枠を示す情報と、照明機器が稼働していたか否かを示す情報を関連付けた照明機器稼働判定情報として記憶部12に記憶させる。続いて、第1稼働時間推定部133は、複数の時間枠のうち、選択されていない時間枠を選択し、選択した時間枠において照明機器が稼働していたか否かの判定を行う。 When the first operating time estimation unit 133 finishes determining whether or not the lighting device is operating for the selected time frame, information indicating the selected time frame and information indicating whether or not the lighting device is operating. Is stored in the storage unit 12 as the lighting device operation determination information associated with. Subsequently, the first operating time estimation unit 133 selects an unselected time frame from the plurality of time frames, and determines whether or not the lighting device is operating in the selected time frame.

第1稼働時間推定部133は、複数の時間枠の全てが選択されるまで、選択されていない時間枠の選択、選択した時間枠において照明機器が稼働していたか否かの判定、及び照明機器稼働判定情報の記憶部12への記憶を繰り返す。 The first operating time estimation unit 133 selects an unselected time frame, determines whether the lighting device is operating in the selected time frame, and lights the lighting device until all of the plurality of time frames are selected. The storage of the operation determination information in the storage unit 12 is repeated.

第2電力量推定部134は、第1稼働時間推定部133が推定した稼働時間と、第1稼働時間推定部133により予め定められた第2の機器(照明機器)の単位時間当たりの消費電力量とに基づいて、所定期間における第2の機器の消費電力量を推定する。具体的には、第2電力量推定部134は、照明機器の単位時間当たりにおける消費電力量と、推定した稼働時間とを乗算することにより、所定期間における照明機器の消費電力量を推定する。 The second power amount estimating unit 134 calculates the operating time estimated by the first operating time estimating unit 133 and the power consumption per unit time of the second device (lighting device) predetermined by the first operating time estimating unit 133. The amount of power consumption of the second device in a predetermined period is estimated based on the amount. Specifically, the second power amount estimation unit 134 estimates the power consumption amount of the lighting device in a predetermined period by multiplying the power consumption amount of the lighting device per unit time by the estimated operating time.

第2電力量推定部134は、照明機器の消費電力量を推定すると、当該照明機器の消費電力量と、所定期間を示す情報(例えば日付)とを関連付けて、消費電力量情報として記憶部12に記憶させる。 When estimating the power consumption amount of the lighting device, the second power amount estimation unit 134 associates the power consumption amount of the lighting device with information (for example, date) indicating a predetermined period, and stores the power consumption amount information as the storage unit 12 Memorize.

第2稼働時間推定部135は、所定期間における第2の機器とは異なる第3の機器の稼働時間を推定する。ここで、第3の機器は、施設内に存在する複数の機器のうち、相対的に長時間にわたって稼働する機器であって、相対的に消費電力量が大きい機器である。第3の機器は、例えば、施設内の温度を調整する空調機器である。 The second operating time estimation unit 135 estimates the operating time of the third device different from the second device in the predetermined period. Here, the third device is a device that operates for a relatively long time out of a plurality of devices existing in the facility and that has a relatively large amount of power consumption. The third device is, for example, an air conditioning device that adjusts the temperature inside the facility.

第2稼働時間推定部135は、特定部131が特定した施設内消費電力量と、第1電力量推定部132が推定した常時消費電力量と、第2電力量推定部134が推定した第2の機器の消費電力量とに基づいて、第3の機器の稼働時間を推定する。 The second operating time estimation unit 135 has the in-facility power consumption identified by the identification unit 131, the constant power consumption estimated by the first power consumption estimation unit 132, and the second power consumption estimated by the second power consumption estimation unit 134. The operating time of the third device is estimated based on the power consumption of the device.

具体的には、まず、第2稼働時間推定部135は、所定期間における施設の外部の温度を特定する。例えば、第2稼働時間推定部135は、所定期間を分割した複数の時間枠のそれぞれに対応する施設の外部の過去の気温を示す過去気温情報に基づいて、所定期間を分割した複数の時間枠のそれぞれにおける施設の外部の気温を特定する。 Specifically, first, the second operating time estimation unit 135 identifies the temperature outside the facility during a predetermined period. For example, the second operating time estimation unit 135 divides the predetermined period into a plurality of time frames based on past temperature information indicating past temperatures outside the facility corresponding to the plurality of time frames obtained by dividing the predetermined period. Temperature outside the facility in each of the.

ここで、過去気温情報は、地域別及び日別に、複数の時間枠のそれぞれにおける気温を含んでいる。第2稼働時間推定部135は、記憶部12に記憶されている施設位置情報を参照し、特定部131が取得した施設識別情報と関連付けられている施設の位置情報を特定し、当該位置情報に基づいて、施設を含む地域を特定する。第2稼働時間推定部135は、過去気温情報に基づいて、施設を含む地域に対応するとともに、特定部131が取得した消費電力量に対応する日付(前日)に対応する、複数の時間枠のそれぞれにおける施設の外部の気温を特定する。 Here, the past temperature information includes the temperature in each of a plurality of time frames by region and by day. The second operating time estimation unit 135 refers to the facility location information stored in the storage unit 12, identifies the location information of the facility associated with the facility identification information acquired by the identification unit 131, and uses the location information as the location information. Based on this, identify the area that includes the facility. The second operating time estimation unit 135 corresponds to the area including the facility based on the past temperature information, and also corresponds to the date (the previous day) corresponding to the power consumption amount acquired by the identification unit 131. Identify the temperature outside the facility in each.

なお、本実施形態では、過去気温情報は、施設の外部に対応する複数の時間枠のそれぞれに対応する過去の気温を示すものとしたが、これに限らない。例えば、過去気温情報は、施設の外部に対応する所定期間(1日)毎の平均気温を示すものであってもよい。この場合、第2稼働時間推定部135は、過去気温情報に基づいて、施設を含む地域に対応するとともに、特定部131が取得した消費電力量に対応する日付(前日)に対応する平均気温を、施設の外部の気温として特定してもよい。 In the present embodiment, the past temperature information indicates past temperatures corresponding to each of a plurality of time frames corresponding to the outside of the facility, but the present invention is not limited to this. For example, the past temperature information may indicate the average temperature for each predetermined period (one day) corresponding to the outside of the facility. In this case, the second operating time estimation unit 135, based on the past temperature information, corresponds to the area including the facility, and the average temperature corresponding to the date (the previous day) corresponding to the power consumption amount acquired by the identification unit 131. Alternatively, it may be specified as the temperature outside the facility.

第2稼働時間推定部135は、特定した気温が、予め定められた空調機器が稼働している可能性が高い稼働温度域に含まれている場合に、空調機器が稼働しているか否かを判定し、当該稼働温度域に含まれていない場合、空調機器が稼働していないと判定する。 The second operating time estimation unit 135 determines whether or not the air conditioner is operating when the specified air temperature is included in an operating temperature range in which the air conditioning device is likely to be operating in advance. If it is determined that the temperature is not included in the operating temperature range, it is determined that the air conditioning equipment is not operating.

例えば、第2稼働時間推定部135は、所定期間における複数の時間枠のうち、1つの時間枠を選択する。第2稼働時間推定部135は、特定した施設の外部の気温のうち、選択した時間枠における施設の外部の気温を特定し、当該施設の外部の気温が、予め定められた空調機器が稼働している可能性が高い稼働温度域に含まれているか否かを判定する。 For example, the second operating time estimation unit 135 selects one time frame from the plurality of time frames in the predetermined period. The second operating time estimation unit 135 identifies the air temperature outside the facility in the selected time frame among the air temperatures outside the identified facility, and the air temperature outside the facility is the predetermined air conditioner operating. It is determined whether or not it is included in the operating temperature range in which there is a high possibility that

第2稼働時間推定部135は、選択した時間枠における施設の外部の気温が稼働温度域に含まれている場合、特定部131が特定した施設内消費電力量と、第1電力量推定部132が推定した常時消費電力量と、第2電力量推定部134が推定した第2の機器の消費電力量とに基づいて、選択した時間枠において第3の機器が稼働していたか否かを判定する。 The second operating time estimation unit 135, when the temperature outside the facility in the selected time frame is included in the operating temperature range, the in-facility power consumption specified by the specifying unit 131 and the first power amount estimation unit 132. It is determined whether the third device is operating in the selected time frame based on the constant power consumption estimated by the second power consumption and the power consumption of the second device estimated by the second power estimation unit 134. To do.

第2稼働時間推定部135は、記憶部12に記憶されている照明機器稼働判定情報に基づいて、選択した時間枠において照明機器が稼働していたか否かを特定することにより、選択した時間枠における照明機器の消費電力量Plsを特定する。例えば、照明機器が稼働していた場合、当該時間枠における照明機器の消費電力量PlsはPlu/2であり、照明機器が稼働していない場合、当該時間枠における照明機器の消費電力量Plsは0である。 The second operating time estimation unit 135 specifies whether or not the lighting device is operating in the selected time frame based on the lighting device operation determination information stored in the storage unit 12, thereby selecting the selected time frame. The power consumption Pls of the lighting device in is specified. For example, when the lighting equipment is operating, the power consumption Pls of the lighting equipment in the time frame is Plu/2, and when the lighting equipment is not operating, the power consumption Pls of the lighting equipment in the time frame is It is 0.

また、単位時間が1時間、1つの時間枠が30分である場合において、空調機器の単位時間当たりの消費電力量をPauとすると、空調機器の時間枠における消費電力量はPau/2となる。 Further, when the unit time is 1 hour and one time frame is 30 minutes, and the power consumption per unit time of the air conditioner is Pau, the power consumption per unit time of the air conditioner is Pau/2. ..

ここで、制御部13は、受付部として機能し、施設のユーザが使用する携帯端末3から、施設識別情報と、施設内の空調機器の台数とを受け付け、第2電力推定要素情報として記憶部12に記憶させておく。第2稼働時間推定部135は、当該第2電力推定要素情報を参照し、特定部131が取得した施設識別情報と関連付けられている、空調機器の台数を特定する。そして、第2稼働時間推定部135は、特定した台数に基づいて施設に設置されている空調機器の単位時間当たりにおける消費電力量を推定する。このようにすることで、消費電力推定装置1は、空調機器の単位時間当たりにおける消費電力量の推定精度を高めることができる。例えば、施設内の空調機器の台数が多ければ多いほど、単位時間当たりにおける消費電力量が大きくなると推定する。 Here, the control unit 13 functions as a reception unit, receives the facility identification information and the number of air conditioners in the facility from the mobile terminal 3 used by the user of the facility, and stores the second power estimation element information as the storage unit. It is stored in 12. The second operating time estimation unit 135 refers to the second power estimation element information, and identifies the number of air conditioners associated with the facility identification information acquired by the identification unit 131. Then, the second operating time estimation unit 135 estimates the power consumption amount per unit time of the air conditioning equipment installed in the facility based on the specified number of units. By doing so, the power consumption estimation device 1 can improve the estimation accuracy of the power consumption per unit time of the air conditioning equipment. For example, it is estimated that the greater the number of air conditioners in the facility, the greater the power consumption per unit time.

また、制御部13は、施設のユーザが使用する携帯端末3から、施設において使用されている空調機器を識別する型番等の製品識別情報を受け付け、当該製品識別情報を記憶部12に記憶させておいてもよい。第2稼働時間推定部135は、例えば、空調機器のカタログ情報を記憶する外部サーバを参照し、記憶部に記憶されている空調機器の製品識別情報に対応するカタログ情報を特定し、当該カタログ情報に掲載されている空調機器の仕様情報に基づいて、施設に設置されている複数の空調機器のそれぞれの時間枠における消費電力量を特定してもよい。そして、第2稼働時間推定部135は、これらの消費電力量に基づいて、施設に設置されている空調機器の単位時間当たりにおける消費電力量を推定してもよい。 In addition, the control unit 13 receives product identification information such as a model number for identifying an air conditioner used in the facility from the mobile terminal 3 used by the user of the facility, and stores the product identification information in the storage unit 12. You can leave it. The second operating time estimation unit 135 refers to, for example, an external server that stores the catalog information of the air conditioning equipment, identifies the catalog information corresponding to the product identification information of the air conditioning equipment stored in the storage unit, and extracts the catalog information. On the basis of the specification information of the air-conditioning equipment listed in, the power consumption in each time frame of the plurality of air-conditioning equipment installed in the facility may be specified. Then, the second operating time estimation unit 135 may estimate the power consumption amount per unit time of the air conditioning equipment installed in the facility based on these power consumption amounts.

第2稼働時間推定部135は、選択した時間枠における施設の外部の気温が稼働温度域に含まれている場合に、下記の式(2)を満たしているとき、空調機器が稼働していたと判定し、下記の式(2)を満たしていないとき、空調機器が稼働していないと判定する。ここで、Pssは施設で消費された消費電力量、Pcsは常時消費電力量、Plsは選択した時間枠における照明機器の消費電力量である。
Pss−Pcs−Pls−Pau/2≧0・・・(2)
When the air temperature outside the facility in the selected time frame is included in the operating temperature range, the second operating time estimation unit 135 determines that the air conditioner is operating when the following expression (2) is satisfied. It is determined that the air conditioner is not operating when the following expression (2) is not satisfied. Here, Pss is the power consumption amount consumed in the facility, Pcs is the constant power consumption amount, and Pls is the power consumption amount of the lighting device in the selected time frame.
Pss-Pcs-Pls-Pau/2≧0...(2)

第2稼働時間推定部135は、選択した時間枠に対して空調機器が稼働していたか否かの判定が終了すると、選択した時間枠を示す情報と、空調機器が稼働していたか否かを示す情報を関連付けた空調機器稼働判定情報として記憶部12に記憶させる。続いて、第2稼働時間推定部135は、複数の時間枠のうち、選択されていない時間枠を選択し、選択した時間枠において空調機器が稼働していたか否かの判定を行う。第2稼働時間推定部135は、複数の時間枠の全てにおいて空調機器が稼働していたか否かの判定が完了すると、空調機器稼働判定情報に基づいて、空調機器が稼働していたと判定された時間枠を特定する。そして、第2稼働時間推定部135は、空調機器が稼働していたと判定された時間枠の数と、当該時間枠の長さを乗算することにより、空調機器の稼働時間を推定する。 When the second operation time estimation unit 135 finishes determining whether or not the air conditioner is operating for the selected time frame, the second operation time estimation unit 135 determines whether the information indicating the selected time frame and whether or not the air conditioner is operating. The storage unit 12 stores the air conditioner operation determination information associated with the information shown. Subsequently, the second operating time estimation unit 135 selects an unselected time frame from the plurality of time frames, and determines whether the air conditioner is operating in the selected time frame. When the determination of whether or not the air conditioner is operating in all of the plurality of time frames is completed, the second operating time estimation unit 135 determines that the air conditioner is operating based on the air conditioner operation determination information. Identify the time frame. Then, the second operating time estimation unit 135 estimates the operating time of the air conditioner by multiplying the number of time frames in which it was determined that the air conditioner was operating by the length of the time frame.

第3電力量推定部136は、第2稼働時間推定部135が推定した第3の機器(空調機器)の稼働時間と、予め定められた第3の機器の消費電力量とに基づいて、ユーザの生活周期に対応する期間を示す所定期間における第3の機器の消費電力量を推定する。具体的には、第3電力量推定部136は、空調機器の単位時間当たりにおける消費電力量と、第2稼働時間推定部135が推定した稼働時間とを乗算することにより、所定期間における空調機器の消費電力量を推定する。 The third power amount estimating unit 136 determines the user based on the operating time of the third device (air conditioner) estimated by the second operating time estimating unit 135 and the predetermined power consumption of the third device. The power consumption of the third device in a predetermined period indicating the period corresponding to the life cycle of the third device is estimated. Specifically, the third power amount estimating unit 136 multiplies the power consumption amount of the air conditioning device per unit time by the operating time estimated by the second operating time estimating unit 135, to thereby obtain the air conditioning device in the predetermined period. Estimate the power consumption of.

第3電力量推定部136は、空調機器の消費電力量を推定すると、当該空調機器の消費電力量と、所定期間を示す情報(例えば日付)とを関連付けて、消費電力量情報として記憶部12に記憶させる。 When the power consumption of the air conditioning equipment is estimated, the third power consumption estimating unit 136 associates the power consumption of the air conditioning equipment with the information (for example, date) indicating a predetermined period, and stores the power consumption information as the storage unit 12. Memorize.

第3稼働時間推定部137は、第4の機器としてのテレビ受信機の消費電力量を推定する。例えば、制御部13は、受付部として機能し、予め携帯端末3から、複数の他の機器の利用状況と、テレビ受信機の利用状況を示す情報を受け付ける。第3稼働時間推定部137は、複数の他の機器の利用状況と、テレビ受信機の利用状況とに基づいて、複数の他の機器と、テレビ受信機との消費電力量の割合を特定する。そして、第3稼働時間推定部137は、特定した割合に基づいて、テレビ受信機が稼働しているか否かを特定するために用いる閾値Aを特定する。 The third operating time estimation unit 137 estimates the power consumption of the television receiver as the fourth device. For example, the control unit 13 functions as a reception unit, and previously receives, from the mobile terminal 3, information indicating the usage status of a plurality of other devices and the usage status of the television receiver. The third operating time estimation unit 137 identifies the ratio of power consumption between the plurality of other devices and the television receiver, based on the use states of the plurality of other devices and the television receiver usage state. .. Then, the third operating time estimation unit 137 identifies the threshold value A used to identify whether or not the television receiver is operating, based on the identified ratio.

単位時間が1時間、1つの時間枠が30分である場合において、テレビ受信機の単位時間当たりにおける消費電力量をPtuとすると、テレビ受信機の時間枠における消費電力量はPtu/2となる。第3稼働時間推定部137は、複数の時間枠から1つの時間枠を選択する。 If the unit time is 1 hour and one time frame is 30 minutes, and the power consumption of the television receiver per unit time is Ptu, the power consumption of the television receiver in the time frame is Ptu/2. .. The third operating time estimation unit 137 selects one time frame from a plurality of time frames.

第3稼働時間推定部137は、下記の式(3)を満たしているとき、テレビ受信機が稼働していたと判定し、下記の式(3)を満たしていないとき、テレビ受信機が稼働していないと判定する。ここで、Pssは施設で消費された消費電力量、Pcsは常時消費電力量、Plsは選択した時間枠における照明機器の消費電力量、Pasは空調機器の消費電力量である。
(Pss−Pcs−Pls−Pas)*(1−A)−Ptu/2≧0・・・(3)
The third operating time estimation unit 137 determines that the television receiver is operating when the following equation (3) is satisfied, and determines that the television receiver is operating when not satisfying the following equation (3). Determine not. Here, Pss is the power consumption of the facility, Pcs is the constant power consumption, Pls is the power consumption of the lighting device in the selected time frame, and Pas is the power consumption of the air conditioner.
(Pss-Pcs-Pls-Pas)*(1-A)-Ptu/2≧0...(3)

第3稼働時間推定部137は、選択した時間枠に対するテレビ受信機が稼働していたか否かの判定が終了すると、選択した時間枠を示す情報と、テレビ受信機が稼働していたか否かを示す情報を関連付けたテレビ受信機稼働判定情報として記憶部12に記憶させる。続いて、第3稼働時間推定部137は、複数の時間枠のうち、選択されていない時間枠を選択し、選択した時間枠においてテレビ受信機が稼働していたか否かの判定を行う。 When the third operating time estimation unit 137 finishes determining whether or not the television receiver is operating for the selected time frame, the third operating time estimating unit 137 determines whether information indicating the selected time frame and whether or not the television receiver is operating. The storage unit 12 stores the television receiver operation determination information associated with the information shown. Subsequently, the third operating time estimation unit 137 selects an unselected time frame from the plurality of time frames, and determines whether or not the television receiver is operating in the selected time frame.

第3稼働時間推定部137は、複数の時間枠の全てが選択されるまで、選択されていない時間枠の選択、選択した時間枠においてテレビ受信機が稼働していたか否かの判定、及びテレビ受信機稼働判定情報の記憶部12への記憶を繰り返す。 The third operating time estimation unit 137 selects an unselected time frame, determines whether or not the television receiver is operating in the selected time frame, and selects the television until all of the plurality of time frames are selected. The storage of the receiver operation determination information in the storage unit 12 is repeated.

第4電力量推定部138は、推定されたテレビ受信機の稼働時間と、テレビ受信機の単位時間当たりの消費電力量とに基づいて、所定期間におけるテレビ受信機の消費電力量を推定する。具体的には、第4電力量推定部138は、テレビ受信機の単位時間当たりにおける消費電力量と、推定した稼働時間とを乗算することにより、所定期間におけるテレビ受信機の消費電力量を推定する。 The fourth power amount estimation unit 138 estimates the power consumption amount of the television receiver in a predetermined period based on the estimated operating time of the television receiver and the power consumption amount of the television receiver per unit time. Specifically, the fourth power estimation unit 138 estimates the power consumption of the television receiver in a predetermined period by multiplying the power consumption of the television receiver per unit time by the estimated operating time. To do.

第4電力量推定部138は、テレビ受信機の消費電力量を推定すると、当該テレビ受信機の消費電力量と、所定期間を示す情報(例えば日付)とを関連付けて、消費電力量情報として記憶部12に記憶させる。 When the fourth power amount estimation unit 138 estimates the power consumption amount of the television receiver, the fourth power amount estimation unit 138 associates the power consumption amount of the television receiver with information indicating a predetermined period (for example, date) and stores the information as power consumption amount information. It is stored in the section 12.

出力部139は、施設内消費電力量に対する常時消費電力量の割合と、第2の機器(照明機器)の消費電力量との割合と、第3の機器(空調機器)の消費電力量の割合と、第4の機器(テレビ受信機)の消費電力量の割合を示す情報を出力する。例えば、出力部139は、携帯端末3から、施設識別情報を含み、消費電力量の分析画面の取得要求を受け付ける。当該取得要求には、施設識別情報と、所定期間を示す情報(例えば日付)とが含まれている。 The output unit 139 calculates the ratio of the constant power consumption amount to the in-facility power consumption amount, the ratio of the power consumption amount of the second device (lighting device), and the ratio of the power consumption amount of the third device (air conditioner). And outputs information indicating the ratio of the power consumption of the fourth device (television receiver). For example, the output unit 139 receives an acquisition request for the power consumption analysis screen including the facility identification information from the mobile terminal 3. The acquisition request includes facility identification information and information indicating a predetermined period (for example, date).

出力部139は、分析画面の取得要求を受け付けると、記憶部12に記憶されている消費電力量情報を参照し、取得要求に含まれている所定期間を示す情報に関連付けられている施設内消費電力量、常時消費電力量、照明機器の消費電力量、空調機器の消費電力量、及びテレビ受信機の消費電力量を特定する。出力部139は、特定した各消費電力量に対応する電気料金を算出し、算出した電気料金を示す情報を含む第1分析画面を生成する。出力部139は、生成した第1分析画面を携帯端末3に送信することにより、当該第1分析画面を携帯端末3に表示させる。 When the output unit 139 receives the analysis screen acquisition request, the output unit 139 refers to the power consumption amount information stored in the storage unit 12, and in-facility consumption associated with the information indicating the predetermined period included in the acquisition request. The power consumption, the constant power consumption, the lighting device power consumption, the air conditioning device power consumption, and the television receiver power consumption are specified. The output unit 139 calculates an electricity charge corresponding to each of the specified power consumption amounts, and generates a first analysis screen including information indicating the calculated electricity charge. The output unit 139 causes the mobile terminal 3 to display the generated first analysis screen by transmitting the generated first analysis screen to the mobile terminal 3.

図4は、本実施形態に係る携帯端末3に表示される分析画面の例を示す図である。図4(a)は、第1分析画面の一例を示す図である。図4(a)には、所定期間(10月13日)における施設内消費電力量に対応する電気料金(351円)が表示されていることが確認できる。また、図4(a)には、常時消費電力量、照明機器の消費電力量、空調機器の消費電力量、テレビ受信機の消費電力量のそれぞれに対応する電気料金が表示されていることが確認できる。また、図4(a)には、施設内消費電力量からこれらの消費電力量を減算して得られる残りの消費電力量に対応する電気量に対応する「その他」の電気料金が表示されていることが確認できる。 FIG. 4 is a diagram showing an example of the analysis screen displayed on the mobile terminal 3 according to the present embodiment. FIG. 4A is a diagram showing an example of the first analysis screen. It can be confirmed that in FIG. 4A, the electricity charge (351 yen) corresponding to the in-facility power consumption during the predetermined period (October 13) is displayed. Further, in FIG. 4A, the electricity charges corresponding to the constant power consumption, the power consumption of the lighting device, the power consumption of the air conditioner, and the power consumption of the television receiver are displayed. I can confirm. In addition, in FIG. 4A, the "other" electricity charges corresponding to the electricity amounts corresponding to the remaining electricity amounts obtained by subtracting these electricity amounts from the in-facility electricity amounts are displayed. Can be confirmed.

出力部139は、図4(a)に示す第1分析画面において、所定の操作を受け付けたことに応じて、施設内消費電力量に対する常時消費電力量の割合と、照明機器の消費電力量との割合と、空調機器の消費電力量の割合と、テレビ受信機の消費電力量の割合とを示す第2分析画面を生成する。所定の操作は、例えば、画面を左右に移動させるフリック操作である。出力部139は、例えば図4(b)に示すように、施設内消費電力量に対する各消費電力量の割合を示す円グラフを生成し、当該円グラフを含む第2分析画面を生成する。出力部139は、生成した第2分析画面を携帯端末3に送信することにより、当該第2分析画面を携帯端末3に表示させる。 The output unit 139, in the first analysis screen illustrated in FIG. 4A, responds to the reception of a predetermined operation, the ratio of the constant power consumption to the power consumption in the facility, and the power consumption of the lighting device. , A ratio of the power consumption of the air conditioner, and a ratio of the power consumption of the television receiver are generated. The predetermined operation is, for example, a flick operation for moving the screen left and right. The output unit 139 generates, for example, as illustrated in FIG. 4B, a pie chart showing the ratio of each power consumption amount to the in-facility power consumption amount, and a second analysis screen including the pie chart. The output unit 139 causes the mobile terminal 3 to display the second analysis screen by transmitting the generated second analysis screen to the mobile terminal 3.

携帯端末3を使用する施設のユーザは、図4に示される第1分析画面及び第2分析画面を確認することにより、施設で実際に消費された電力の消費量の内訳を推定することができる。
[消費電力推定装置1における処理の流れ]
続いて、消費電力推定装置1における処理の流れについて説明する。図5は、本実施形態に係る消費電力推定装置1における処理の流れの一例を示すフローチャートである。
The user of the facility using the mobile terminal 3 can estimate the breakdown of the amount of power actually consumed in the facility by checking the first analysis screen and the second analysis screen shown in FIG. ..
[Process Flow in Power Consumption Estimation Device 1]
Subsequently, a flow of processing in the power consumption estimation device 1 will be described. FIG. 5 is a flowchart showing an example of the flow of processing in the power consumption estimation apparatus 1 according to this embodiment.

まず、特定部131は、所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定する(S1)。
続いて、第1電力量推定部132は、施設に設置されている第1の機器(冷蔵庫)により所定期間において消費された電力量を示す常時消費電力量を推定する(S2)。
First, the identifying unit 131 identifies the in-facility power consumption that indicates the amount of power consumed in a predetermined facility in a predetermined period (S1).
Subsequently, the first power amount estimation unit 132 estimates the constant power consumption amount indicating the power amount consumed by the first device (refrigerator) installed in the facility in a predetermined period (S2).

続いて、第1稼働時間推定部133は、施設に設置されている照明機器の所定期間における稼働時間を推定する(S3)。
続いて、第2電力量推定部134は、S3において推定された稼働時間と、照明機器の単位時間当たりの消費電力量とに基づいて、所定期間における照明機器の消費電力量を推定する(S4)。
Subsequently, the first operating time estimation unit 133 estimates the operating time of the lighting device installed in the facility in a predetermined period (S3).
Then, the second power amount estimation unit 134 estimates the power consumption amount of the lighting device in a predetermined period based on the operating time estimated in S3 and the power consumption amount of the lighting device per unit time (S4). ).

続いて、第2稼働時間推定部135は、所定期間における空調機器の稼働時間を推定する(S5)。
続いて、第3電力量推定部136は、S5において推定された空調機器の稼働時間と、空調機器の単位時間当たりの消費電力量とに基づいて、所定期間における空調機器の消費電力量を推定する(S6)。
Subsequently, the second operating time estimation unit 135 estimates the operating time of the air conditioning equipment in the predetermined period (S5).
Subsequently, the third power amount estimation unit 136 estimates the power consumption amount of the air conditioning device in a predetermined period based on the operating time of the air conditioning device estimated in S5 and the power consumption amount of the air conditioning device per unit time. Yes (S6).

続いて、第3稼働時間推定部137は、所定期間におけるテレビ受信機の稼働時間を推定する(S7)。
続いて、第4電力量推定部138は、S7において推定された空調機器の稼働時間と、テレビ受信機の単位時間当たりの消費電力量とに基づいて、所定期間におけるテレビ受信機の消費電力量を推定する(S8)。
Then, the third operating time estimation unit 137 estimates the operating time of the television receiver in the predetermined period (S7).
Then, the fourth power amount estimation unit 138 calculates the power consumption amount of the television receiver in a predetermined period based on the operating time of the air conditioner estimated in S7 and the power consumption amount of the television receiver per unit time. Is estimated (S8).

続いて、出力部139は、携帯端末3から分析画面の取得要求を受け付けたか否かを判定する(S9)。出力部139は、携帯端末3から分析画面の取得要求を受け付けたと判定すると、S10に処理を移し、携帯端末3から分析画面の取得要求を受け付けていないと判定すると、S9を再実行する。 Subsequently, the output unit 139 determines whether or not an analysis screen acquisition request has been received from the mobile terminal 3 (S9). When determining that the analysis screen acquisition request has been received from the mobile terminal 3, the output unit 139 moves the process to S10, and when determining that the analysis screen acquisition request has not been received from the mobile terminal 3, the output unit 139 re-executes S9.

出力部139は、S9において、携帯端末3から分析画面の取得要求を受け付けたと判定されると、図4に示される分析画面を生成し、携帯端末3に送信することにより、当該分析画面を携帯端末3に表示させる(S10)。 When it is determined in S9 that the acquisition request for the analysis screen has been received from the mobile terminal 3, the output unit 139 generates the analysis screen shown in FIG. 4 and transmits the analysis screen to the mobile terminal 3 to carry the analysis screen. It is displayed on the terminal 3 (S10).

[本実施形態における効果]
以上説明したように、本実施形態に係る消費電力推定装置1は、所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定し、施設に設置され、電力を常時消費することにより稼働する第1の機器により所定期間において消費された電力量を示す常時消費電力量を推定する。そして、消費電力推定装置1は、特定された施設内消費電力量と、推定された常時消費電力量とに基づいて、施設に設置されている第2の機器の所定期間における稼働時間を推定し、当該稼働時間と、予め定められた第2の機器の消費電力量とに基づいて、所定期間における第2の機器の消費電力量を推定する。このようにすることで、消費電力推定装置1は、施設で実際に消費された電力の消費量の内訳を推定することができる。
[Effects of this embodiment]
As described above, the power consumption estimation apparatus 1 according to the present embodiment specifies the in-facility power consumption that indicates the amount of power consumed in a predetermined facility in a predetermined period, is installed in the facility, and constantly consumes power. By doing so, the constant power consumption amount indicating the power amount consumed by the first device operating in the predetermined period is estimated. Then, the power consumption estimation device 1 estimates the operating time of the second device installed in the facility in a predetermined period based on the specified in-facility power consumption and the estimated constant power consumption. , The power consumption of the second device in a predetermined period is estimated based on the operating time and the power consumption of the second device determined in advance. By doing so, the power consumption estimation device 1 can estimate the breakdown of the amount of power actually consumed in the facility.

以上、本発明を実施形態を用いて説明したが、本発明の技術的範囲は上記実施形態に記載の範囲には限定されない。上記実施形態に、多様な変更又は改良を加えることが可能であることが当業者に明らかである。また、特に、装置の分散・統合の具体的な実施形態は以上に図示するものに限られず、その全部又は一部について、種々の付加等に応じて、又は、機能負荷に応じて、任意の単位で機能的又は物理的に分散・統合して構成することができる。 Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments. It is obvious to those skilled in the art that various changes or improvements can be added to the above-described embodiment. Further, in particular, the specific embodiment of the dispersion/integration of the devices is not limited to the one illustrated above, and all or part of them may be arbitrarily added according to various additions or functional loads. The units can be functionally or physically distributed and integrated.

1・・・消費電力推定装置、11・・・通信部、12・・・記憶部、13・・・制御部、131・・・特定部、132・・・第1電力量推定部、133・・・第1稼働時間推定部、134・・・第2電力量推定部、135・・・第2稼働時間推定部、136・・・第3電力量推定部、137・・・第3稼働時間推定部、138・・・第4電力量推定部、139・・・出力部、2・・・スマートメータ、3・・・携帯端末 DESCRIPTION OF SYMBOLS 1... Power consumption estimation apparatus, 11... Communication part, 12... Storage part, 13... Control part, 131... Specification part, 132... 1st power amount estimation part, 133... ..First operating time estimating unit, 134... Second electric energy estimating unit, 135... Second operating time estimating unit, 136... Third electric energy estimating unit, 137... Third operating time Estimating unit, 138... Fourth power amount estimating unit, 139... Output unit, 2... Smart meter, 3... Mobile terminal

Claims (15)

所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定する特定部と、
前記施設に設置され、電力を常時消費することにより稼働する第1の機器により前記所定期間において消費された電力量を示す常時消費電力量を推定する第1電力量推定部と、
前記特定部が特定した前記施設内消費電力量と、前記第1電力量推定部が推定した前記常時消費電力量とに基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定する第1稼働時間推定部と、
前記第1稼働時間推定部が推定した前記稼働時間と、予め定められた前記第2の機器の消費電力量とに基づいて、前記所定期間における前記第2の機器の消費電力量を推定する第2電力量推定部と、
を備える消費電力推定装置。
A specifying unit that specifies the amount of power consumed in a facility that indicates the amount of power consumed in a predetermined facility in a predetermined period,
A first power amount estimation unit that estimates a constant power consumption amount indicating a power amount consumed in the predetermined period by a first device installed in the facility and operating by constantly consuming power;
Based on the in-facility power consumption specified by the specifying unit and the constant power consumption amount estimated by the first power amount estimating unit during the predetermined period of the second device installed in the facility. A first operating time estimation unit that estimates operating time;
Estimating the power consumption of the second device in the predetermined period based on the operating time estimated by the first operating time estimation unit and a predetermined power consumption of the second device 2 electric energy estimation unit,
A power consumption estimation device.
前記施設内消費電力量に対する前記常時消費電力量の割合と、前記第2の機器の消費電力量との割合を示す情報を出力する出力部をさらに備える、
請求項1に記載の消費電力推定装置。
An output unit that outputs information indicating a ratio of the constant power consumption amount to the in-facility power consumption amount and a power consumption amount of the second device,
The power consumption estimation device according to claim 1.
前記第2の機器は照明機器であり、
前記第1稼働時間推定部は、夜間に対応する時間と、前記施設内消費電力量と、前記常時消費電力量とに基づいて、前記稼働時間を推定する、
請求項1又は2に記載の消費電力推定装置。
The second device is a lighting device,
The first operating time estimation unit estimates the operating time based on the time corresponding to nighttime, the facility power consumption, and the constant power consumption.
The power consumption estimation device according to claim 1.
前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれの前記施設で消費された消費電力量の和を前記施設内消費電力量として特定し、
前記第1稼働時間推定部は、前記時間枠が夜間の時間枠である場合、当該時間枠に対応する前記消費電力量と、当該時間枠に対応する前記常時消費電力量と、前記照明機器の単位時間当たりにおける消費電力量とに基づいて、前記照明機器が稼働していたか否かを判定することにより、前記稼働時間を推定する、
請求項3に記載の消費電力推定装置。
The specifying unit specifies, as the in-facility power consumption, a sum of power consumptions consumed in each of the plurality of time frames obtained by dividing the predetermined period.
When the time frame is a night time frame, the first operating time estimation unit includes the power consumption amount corresponding to the time frame, the constant power consumption amount corresponding to the time frame, and the lighting device. Based on the power consumption per unit time, by estimating whether or not the lighting device was operating, to estimate the operating time,
The power consumption estimation device according to claim 3.
前記第1稼働時間推定部は、前記第2の機器の消費電力量を推定するための要素として、前記施設の広さ、前記施設における部屋数、及び前記施設を利用する利用者の人数の少なくともいずれかを特定し、特定した前記要素に基づいて前記第2の機器の消費電力量を推定する、
請求項1から4のいずれか1項に記載の消費電力量推定装置。
The first operating time estimation unit has at least the size of the facility, the number of rooms in the facility, and the number of users who use the facility as an element for estimating the power consumption of the second device. Specifying one of them and estimating the power consumption of the second device based on the specified element,
The power consumption estimation device according to claim 1.
前記第1稼働時間推定部は、前記予め定められた前記第2の機器の消費電力量に基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定する、
請求項1から5のいずれか1項に記載の消費電力量推定装置。
The first operating time estimation unit estimates an operating time of the second device installed in the facility in the predetermined period based on the power consumption of the second device which is predetermined.
The power consumption estimation apparatus according to any one of claims 1 to 5.
前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれにおいて前記施設で消費された消費電力量を特定し、当該消費電力量の和を前記施設内消費電力量として特定し、
前記第1電力量推定部は、前記複数の時間枠のそれぞれに対応する前記消費電力量のうち、出現割合が最も多い消費電力量を、前記時間枠当たりの前記常時消費電力量と推定し、前記時間枠当たりの前記常時消費電力量に基づいて、前記所定期間における常時消費電力量を推定する、
請求項1から6のいずれか1項に記載の消費電力量推定装置。
The identifying unit identifies the power consumption amount consumed in the facility in each of a plurality of time frames obtained by dividing the predetermined period, and identifies the sum of the power consumption amounts as the in-facility power consumption amount,
The first power amount estimation unit estimates, of the power consumption amounts corresponding to each of the plurality of time frames, the power consumption amount having the highest appearance ratio as the constant power consumption amount per the time frame, Estimating the constant power consumption in the predetermined period based on the constant power consumption per the time frame,
The power consumption estimation device according to claim 1.
前記特定部は、前記所定期間を分割した複数の時間枠のそれぞれにおいて前記施設で消費された消費電力量を特定し、当該消費電力量の和を前記施設内消費電力量として特定し、
前記第1電力量推定部は、前記複数の時間枠のそれぞれに対応する前記消費電力量のうち、最小の消費電力量を、前記時間枠当たりの前記常時消費電力量と推定し、前記時間枠当たりの前記常時消費電力量に基づいて、前記所定期間における常時消費電力量を推定する、
請求項1から6のいずれか1項に記載の消費電力量推定装置。
The identifying unit identifies the power consumption amount consumed in the facility in each of a plurality of time frames obtained by dividing the predetermined period, and identifies the sum of the power consumption amounts as the in-facility power consumption amount,
The first power amount estimation unit estimates the minimum power consumption amount among the power consumption amounts corresponding to each of the plurality of time frames as the constant power consumption amount per the time frame, and the time frame. Estimating the constant power consumption in the predetermined period based on the constant power consumption per hit,
The power consumption estimation device according to claim 1.
前記第1電力量推定部は、前記所定期間における前記施設内消費電力量と前記常時消費電力量との関係に基づいて、前記施設が前記利用者に利用されているか否かを判定し、前記利用者に利用されていない場合、前記所定期間における前記施設内消費電力量が前記所定期間における前記常時消費電力量であると推定する、
請求項1から8のいずれか1項に記載の消費電力量推定装置。
The first power amount estimation unit determines whether or not the facility is used by the user, based on the relationship between the in-facility power consumption and the constant power consumption in the predetermined period, If not used by the user, it is estimated that the in-facility power consumption in the predetermined period is the constant power consumption in the predetermined period,
The power consumption estimation device according to any one of claims 1 to 8.
前記所定期間における前記第2の機器とは異なる第3の機器の稼働時間を推定する第2稼働時間推定部と、
前記第2稼働時間推定部が推定した前記第3の機器の稼働時間と、予め定められた前記第3の機器の消費電力量とに基づいて、前記所定期間における前記第3の機器の消費電力量を推定する第3電力量推定部と、
をさらに備える、
請求項1から9のいずれか1項に記載の消費電力量推定装置。
A second operating time estimator that estimates an operating time of a third device different from the second device in the predetermined period;
Power consumption of the third device in the predetermined period based on the operation time of the third device estimated by the second operation time estimation unit and a predetermined power consumption of the third device A third power amount estimation unit that estimates the amount,
Further comprising,
The power consumption estimation device according to any one of claims 1 to 9.
前記第2稼働時間推定部は、前記特定部が特定した前記施設内消費電力量と、前記第1電力量推定部が推定した前記常時消費電力量と、前記第2電力量推定部が推定した前記第2の機器の消費電力量とに基づいて、前記第3の機器の稼働時間を推定する、
請求項10に記載の消費電力推定装置。
The second operating time estimation unit estimates the in-facility power consumption specified by the specification unit, the constant power consumption amount estimated by the first power amount estimation unit, and the second power amount estimation unit. Estimating the operating time of the third device based on the power consumption of the second device;
The power consumption estimation device according to claim 10.
前記第3の機器は前記施設内の温度を調整する空調機器であり、
前記第2稼働時間推定部は、前記所定期間における前記施設の外部の気温を特定し、当該気温が、予め定められた前記空調機器が稼働している可能性が高い稼働温度域に含まれている場合に、前記空調機器が稼働しているか否かを判定することにより前記空調機器の稼働時間を推定する、
請求項10又は11に記載の消費電力量推定装置。
The third device is an air conditioner that adjusts the temperature in the facility,
The second operating time estimation unit identifies an air temperature outside the facility in the predetermined period, and the air temperature is included in an operating temperature range in which the air conditioning device is likely to be operating in advance. If there is, to estimate the operating time of the air conditioning equipment by determining whether the air conditioning equipment is operating,
The power consumption estimation device according to claim 10.
前記第2稼働時間推定部は、前記所定期間を分割した前記複数の時間枠のそれぞれに対応する前記施設の外部の過去の気温を示す過去気温情報に基づいて、前記所定期間を分割した複数の時間枠のそれぞれにおける前記施設の外部の気温を特定する、
請求項12に記載の消費電力量推定装置。
The second operating time estimation unit divides the predetermined period based on past temperature information indicating past temperature outside the facility corresponding to each of the plurality of time frames obtained by dividing the predetermined period. Identify the temperature outside the facility in each of the time frames,
The power consumption estimation device according to claim 12.
前記過去気温情報は、地域別に、複数の時間枠のそれぞれにおける気温を示す情報を含んでおり、
前記第2稼働時間推定部は、前記過去気温情報に基づいて、前記施設を含む地域に対応する前記複数の時間枠のそれぞれにおける前記施設の外部の気温を特定する、
請求項13に記載の消費電力量推定装置。
The past temperature information includes, for each region, information indicating the temperature in each of a plurality of time frames,
The second operating time estimation unit specifies the temperature outside the facility in each of the plurality of time frames corresponding to the area including the facility, based on the past temperature information.
The power consumption estimation device according to claim 13.
コンピュータが実行する、
所定期間において所定の施設で消費された電力量を示す施設内消費電力量を特定するステップと、
前記施設に設置され、電力を常時消費することにより稼働する第1の機器により前記所定期間において消費された電力量を示す常時消費電力量を推定するステップと、
特定された前記施設内消費電力量と、推定された前記常時消費電力量とに基づいて、前記施設に設置されている第2の機器の前記所定期間における稼働時間を推定するステップと、
推定された前記稼働時間と、予め定められた前記第2の機器の消費電力量とに基づいて、前記所定期間における前記第2の機器の消費電力量を推定するステップと、
を備える消費電力推定方法。
Computer running,
A step of identifying the in-facility power consumption indicating the amount of power consumed in a predetermined facility in a predetermined period,
Estimating a constant power consumption amount indicating a power amount consumed in the predetermined period by the first device installed in the facility and operating by constantly consuming power;
Estimating the operating time in the predetermined period of the second device installed in the facility based on the identified in-facility power consumption and the estimated constant power consumption.
Estimating a power consumption amount of the second device in the predetermined period based on the estimated operating time and a predetermined power consumption amount of the second device;
A power consumption estimation method comprising:
JP2018244898A 2018-12-27 2018-12-27 Power consumption estimation device and power consumption estimation method Active JP6867996B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018244898A JP6867996B2 (en) 2018-12-27 2018-12-27 Power consumption estimation device and power consumption estimation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018244898A JP6867996B2 (en) 2018-12-27 2018-12-27 Power consumption estimation device and power consumption estimation method

Publications (2)

Publication Number Publication Date
JP2020107055A true JP2020107055A (en) 2020-07-09
JP6867996B2 JP6867996B2 (en) 2021-05-12

Family

ID=71450839

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018244898A Active JP6867996B2 (en) 2018-12-27 2018-12-27 Power consumption estimation device and power consumption estimation method

Country Status (1)

Country Link
JP (1) JP6867996B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002189779A (en) * 2000-12-22 2002-07-05 Tokyo Energy Research:Kk System and device for processing energy information, server and recording medium
JP2012138123A (en) * 2012-04-16 2012-07-19 Mitsubishi Electric Corp Energy saving support device and energy saving support system
JP2014120108A (en) * 2012-12-19 2014-06-30 Hitachi Ltd Power monitoring device and power monitoring system
JP2015207097A (en) * 2014-04-18 2015-11-19 三菱電機株式会社 Operational management system of facility apparatuses
JP2017147869A (en) * 2016-02-17 2017-08-24 日本電気株式会社 Information processing device, information processing method, and program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002189779A (en) * 2000-12-22 2002-07-05 Tokyo Energy Research:Kk System and device for processing energy information, server and recording medium
JP2012138123A (en) * 2012-04-16 2012-07-19 Mitsubishi Electric Corp Energy saving support device and energy saving support system
JP2014120108A (en) * 2012-12-19 2014-06-30 Hitachi Ltd Power monitoring device and power monitoring system
JP2015207097A (en) * 2014-04-18 2015-11-19 三菱電機株式会社 Operational management system of facility apparatuses
JP2017147869A (en) * 2016-02-17 2017-08-24 日本電気株式会社 Information processing device, information processing method, and program

Also Published As

Publication number Publication date
JP6867996B2 (en) 2021-05-12

Similar Documents

Publication Publication Date Title
US20200393860A1 (en) Optimization of energy use through model-based simulations
US6983210B2 (en) Energy management system, energy management method, and unit for providing information on energy-saving recommended equipment
JP6735492B2 (en) Server for executing recommendation processing of air conditioner and recommendation processing system
US8949052B2 (en) Method to determine utility consumption of individual appliances in a household from periodic measurements of aggregate utility consumption
CN106462122B (en) System and method for maintaining performance of building automation system
JP4294021B2 (en) Energy consumption consumption calculation system and method
CN107923645B (en) Air conditioning operation analysis device and non-transitory computer-readable recording medium having program recorded thereon
KR101355978B1 (en) Electric management system and method for electric consumption prediction
JP2017531876A (en) Method and apparatus for managing air conditioners
US20150213704A1 (en) Alarm output device and alarm output method
US8949051B2 (en) Apparatus and method for sub-metering of household devices
JP5491215B2 (en) Energy saving diagnosis system
CN103477360A (en) Energy management device and energy management system
JP2009076106A (en) Device and method for outputting information on adequacy of energy consumption or the like, and device and method for outputting information on adequacy of power consumption
WO2016088289A1 (en) Controlling device and controlling method
US10885238B1 (en) Predicting future indoor air temperature for building
JP6293291B2 (en) Power consumption estimation device, device management system, power consumption estimation method and program
CN105264299A (en) System and method for climate control in a building
JP6867996B2 (en) Power consumption estimation device and power consumption estimation method
JP6292515B2 (en) Demand forecasting device, program
US20160195886A1 (en) Estimated consumption quantity calculation system, server, estimated consumption quantity calculation method, and computer-readable recording medium whereupon program is recorded
KR101799037B1 (en) System for guiding electronic device and method for the same
JP6513231B2 (en) Power consumption prediction device, power consumption prediction system, power consumption prediction method, and program
KR20210136498A (en) Method and apparatus for displayng information about the power consumed by household appliance
CN205561163U (en) Temperature controller

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201120

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20201120

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20201209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210216

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210308

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210323

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210409

R150 Certificate of patent or registration of utility model

Ref document number: 6867996

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150