JP2020102591A - Work management system and component mounting system - Google Patents

Work management system and component mounting system Download PDF

Info

Publication number
JP2020102591A
JP2020102591A JP2018241411A JP2018241411A JP2020102591A JP 2020102591 A JP2020102591 A JP 2020102591A JP 2018241411 A JP2018241411 A JP 2018241411A JP 2018241411 A JP2018241411 A JP 2018241411A JP 2020102591 A JP2020102591 A JP 2020102591A
Authority
JP
Japan
Prior art keywords
work
information
worker
notification
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018241411A
Other languages
Japanese (ja)
Other versions
JP7189010B2 (en
Inventor
祐一 松下
Yuichi Matsushita
祐一 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yamaha Motor Co Ltd
Original Assignee
Yamaha Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yamaha Motor Co Ltd filed Critical Yamaha Motor Co Ltd
Priority to JP2018241411A priority Critical patent/JP7189010B2/en
Publication of JP2020102591A publication Critical patent/JP2020102591A/en
Application granted granted Critical
Publication of JP7189010B2 publication Critical patent/JP7189010B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide a work management system and a component mounting system, capable of making support work by a worker be efficient, for supporting production of component loading boards by a component mounting machine.SOLUTION: A work management system 3 comprises: an information management device 31; and a plurality of portable terminal devices 32 held by respective workers. The information management device 31 receives work request information J2 from a component mounting machine 2 and adds work attribute information J3 to the work request information J2 to generate work instruction information J4. The information management device 31 transmits the work instruction information J4 to the respective portable terminal devices 32. Each portable terminal device 32 includes a notification determination unit 3251 and a notification control unit 3252 for controlling a notification unit 322. The notification determination unit 3251 determines necessity of notification, at the notification unit 322, of the work request information J2 included in the work instruction information J4. Depending on a determination result by the notification determination unit 3251, the notification control unit 3252 controls notification operation of the notification unit 322.SELECTED DRAWING: Figure 3

Description

本発明は、基板に部品を搭載する部品実装機が複数配列された実装ラインに対して作業者が実施する支援作業の管理を行う作業管理システム、及びそれを備えた部品実装システムに関する。 The present invention relates to a work management system that manages support work performed by a worker on a mounting line in which a plurality of component mounters for mounting components on a board are arranged, and a component mounting system including the work management system.

プリント配線板等の基板上に電子部品(以下、単に「部品」という)が搭載された部品搭載基板を生産する実装ラインは、基板上に部品を搭載する部品実装機が複数配列されて構成されている。各部品実装機による部品搭載基板の生産に際しては、その生産を支援するための、部品供給装置に部品を補給する部品補給作業等の支援作業が作業者によって実施される。 A mounting line that produces a component mounting board in which electronic components (hereinafter simply referred to as "components") are mounted on a substrate such as a printed wiring board is configured by arranging a plurality of component mounters for mounting the components on the board. ing. When a component mounting board is produced by each component mounter, an operator performs a supporting work such as a component replenishing work for replenishing the component supplying device with a component to support the production.

作業者による支援作業の効率化を図るための技術が、例えば特許文献1に開示されている。特許文献1に開示される技術では、中央処理装置は、部品実装機における部品切れの発生時刻を算出し、この算出結果を含む部品切れ予告情報を作業者が携帯する携帯端末装置へ配信する。部品切れ予告情報を受信した携帯端末装置は、その情報を表示する。これにより、部品切れ予告情報を作業者に提供することができ、作業者の作業効率の向上を図ることができるとされている。 A technique for improving the efficiency of support work by a worker is disclosed in Patent Document 1, for example. In the technique disclosed in Patent Document 1, the central processing unit calculates the time of occurrence of component shortage in the component mounter, and delivers the component shortage notice information including the calculation result to the mobile terminal device carried by the worker. The mobile terminal device that has received the part-out notice information displays the information. It is said that this makes it possible to provide the worker with advance notice of parts shortage and to improve the work efficiency of the worker.

特開2002−164697号公報JP 2002-164697 A

しかしながら、特許文献1に開示される技術では、部品切れ予告情報は、実装ラインにおいて支援作業を実施する全ての作業者を対象として配信される。すなわち、中央処理装置から全ての携帯端末装置へ部品切れ予告情報が配信され、全ての携帯端末装置においてその情報が表示される。部品切れ予告情報に対応した支援作業の実施を担当する作業者にとっては、自身が携帯する携帯端末装置に表示される情報に基づいて支援作業を実施することができる。一方、担当者以外の作業者にとっては、その情報の提供は不要であり、携帯端末装置に不要な情報が表示されることによって、かえって混乱してしまう虞がある。このため、担当者以外の作業者による作業効率が低下する虞がある。 However, in the technique disclosed in Patent Document 1, the part-out notice information is distributed to all workers who perform support work on the mounting line. That is, the information indicating that the parts are out of stock is distributed from the central processing unit to all the mobile terminal devices, and the information is displayed on all the mobile terminal devices. For the worker who is in charge of performing the support work corresponding to the part-out notice information, the support work can be performed based on the information displayed on the mobile terminal device carried by the worker. On the other hand, the worker other than the person in charge does not need to provide the information, and displaying unnecessary information on the mobile terminal device may cause confusion. For this reason, the work efficiency by workers other than the person in charge may decrease.

本発明は、このような事情に鑑みてなされたものであり、その目的とするところは、部品実装機による部品搭載基板の生産を支援するための、作業者による支援作業の効率化を図ることが可能な作業管理システム、及びそれを備えた部品実装システムを提供することにある。 The present invention has been made in view of the above circumstances, and an object of the present invention is to improve the efficiency of support work by a worker for supporting the production of a component mounting board by a component mounter. It is to provide a work management system capable of performing the above, and a component mounting system including the work management system.

本発明の一の局面に係る作業管理システムは、基板に部品を搭載し部品搭載基板を生産する部品実装機が複数配列された複数の実装ラインにおいて、前記部品搭載基板の生産を支援するために作業者が実施する各種の支援作業の管理を行うシステムである。この作業管理システムは、前記複数の部品実装機の各々と情報通信可能に接続される情報管理装置と、前記情報管理装置と情報通信可能に接続され、前記支援作業を実施する各作業者によって携帯される複数の携帯端末装置と、を備える。前記情報管理装置は、前記部品実装機から送信された前記支援作業の実施を要求する作業要求情報を受信可能な第1通信部と、前記作業要求情報にて実施が要求される支援作業である実施要求作業の属性を示す作業属性情報を、前記作業要求情報に付加して作業指示情報を生成する作業指示生成部と、前記作業指示情報を前記複数の携帯端末装置の各々へ送信可能な第2通信部と、を含む。前記複数の携帯端末装置の各々は、情報の報知が可能な報知部と、前記第2通信部との間で情報通信が可能であって、前記作業指示情報を受信可能な端末側通信部と、前記携帯端末装置を携帯する作業者の属性を示す作業者属性情報を、作業者による前記支援作業の進捗状況に応じて書き換え可能に記憶する記憶部と、前記作業指示情報に含まれる前記作業属性情報と前記作業者属性情報とを比較することにより、前記作業指示情報に含まれる前記作業要求情報の前記報知部での報知の要否を判定する報知判定部と、前記報知判定部によって前記作業要求情報の前記報知部での報知が必要であると判定された場合に、前記報知部の報知動作を制御する報知制御部と、を含む。 A work management system according to an aspect of the present invention, in order to support production of the component mounting board in a plurality of mounting lines in which a plurality of component mounters for mounting components on the board to produce the component mounting board are arranged. This is a system that manages various types of support work performed by workers. This work management system is an information management device that is connected to each of the plurality of component mounters so as to be able to communicate information, and is connected to the information management device so as to be capable of communicating information, and is carried by each worker who performs the support work. A plurality of portable terminal devices that are The information management device is a first communication unit capable of receiving work request information requesting the execution of the support work transmitted from the component mounter, and the support work requested to be executed by the work request information. A work instruction generation unit that adds work attribute information indicating an attribute of work to be performed to the work request information to generate work instruction information, and a work instruction information transmission unit that can transmit the work instruction information to each of the plurality of mobile terminal devices. And two communication units. Each of the plurality of mobile terminal devices includes a notification unit capable of notifying information, and a terminal-side communication unit capable of information communication between the second communication unit and capable of receiving the work instruction information. A storage unit that rewritably stores worker attribute information indicating attributes of a worker who carries the portable terminal device according to a progress status of the support work by the worker; and the work included in the work instruction information. By comparing attribute information and the worker attribute information, a notification determination unit that determines whether or not notification by the notification unit of the work request information included in the work instruction information is necessary, and the notification determination unit And a notification control unit that controls the notification operation of the notification unit when it is determined that the notification of the work request information is necessary by the notification unit.

この作業管理システムによれば、部品実装機からの作業要求情報に作業属性情報が付加された作業指示情報が、情報管理装置から各携帯端末装置へ送信される。作業指示情報を受信した各携帯端末装置において、報知判定部は、記憶部から作業者属性情報を読み出し、当該作業者属性情報と作業指示情報に含まれる作業属性情報とを比較することにより、作業要求情報の報知部での報知の要否を判定する。そして、報知部での報知が必要であると判定された場合に、報知制御部の制御によって報知部が作業要求情報を報知する。 According to this work management system, work instruction information in which work attribute information is added to work request information from the component mounter is transmitted from the information management device to each mobile terminal device. In each mobile terminal device that has received the work instruction information, the notification determination unit reads the worker attribute information from the storage unit and compares the worker attribute information with the work attribute information included in the work instruction information, Whether or not the notification of the request information by the notification unit is necessary is determined. Then, when it is determined that the notification by the notification unit is necessary, the notification unit notifies the work request information by the control of the notification control unit.

すなわち、各携帯端末装置において個別に、作業要求情報にて実施が要求される実施要求作業の属性と作業者の属性とが考慮されて、作業要求情報の報知の要否が判定される。そして、作業要求情報の報知が必要な携帯端末装置においてのみ、その情報が報知される。これにより、作業要求情報が報知される携帯端末装置を携帯する作業者は、その作業要求情報に基づき支援作業の実施が必要な部品実装機を認識することができる。一方、作業要求情報の報知が不要な作業者には、その情報が報知されないので、情報が報知されることに起因した混乱を回避することができる。この結果、複数の実装ラインの全体としては、作業者による支援作業の効率化を図ることが可能となる。 That is, in each mobile terminal device, the necessity of notifying the work request information is determined in consideration of the attribute of the work requested to be performed in the work request information and the attribute of the worker. Then, only in the mobile terminal device that needs to be notified of the work request information, the information is notified. Thus, the worker carrying the portable terminal device notified of the work request information can recognize the component mounter that needs to perform the support work based on the work request information. On the other hand, since the worker who does not need to be notified of the work request information is not notified of the information, it is possible to avoid confusion caused by the notification of the information. As a result, the efficiency of the support work by the worker can be improved for the plurality of mounting lines as a whole.

また、支援作業の実施が必要な部品実装機から離れた位置で作業者が、別の作業をしていたとしても、携帯端末装置にて報知される作業要求情報を確認することにより、支援作業の実施の必要性を把握することができる。 In addition, even if the worker is doing another work at a position away from the component mounter that needs to perform the support work, by checking the work request information notified by the mobile terminal device, the support work can be performed. Can understand the necessity of implementation of

また、既述の通り、各携帯端末装置において個別に、作業要求情報にて実施が要求される実施要求作業の属性と作業者の属性とが考慮されて、作業要求情報の報知の要否が判定される。これにより、情報管理装置において判定に必要な情報を一括管理する必要がない。このため、各携帯端末装置において高い機動力で、作業要求情報の報知の要否を判定することができる。 Further, as described above, in each mobile terminal device, the necessity of notification of the work request information is individually considered in consideration of the attribute of the work requested to be performed in the work request information and the attribute of the worker. To be judged. As a result, it is not necessary for the information management device to collectively manage the information necessary for the determination. Therefore, it is possible to determine whether or not to notify the work request information with high mobility in each mobile terminal device.

上記の作業管理システムにおいて、前記作業属性情報は、前記実施要求作業の重大度に応じて設定された、前記作業要求情報を報知すべき作業者の権限レベルの上限を示す報知権限情報と、前記作業要求情報を送信した前記部品実装機が配置される前記実装ラインを特定するライン特定情報と、を含む情報であり、前記作業者属性情報は、作業者の権限レベルを示す作業者権限情報と、前記複数の実装ラインにおいて、作業者が前記支援作業の実施を担当する実装ラインを示す作業担当ライン情報と、を含む情報である。そして、前記報知判定部は、前記作業者権限情報で示される権限レベルが前記報知権限情報で示される権限レベルの上限以下であることを表す権限レベル条件と、前記ライン特定情報で特定される実装ラインが前記作業担当ライン情報に含まれることを表すライン条件と、を満たす場合に、前記作業要求情報の前記報知部での報知が必要であると判定する。 In the above work management system, the work attribute information is set in accordance with the severity of the work requested, notification authority information indicating the upper limit of the authority level of the worker who should be notified of the work request information, Line identification information that identifies the mounting line on which the component mounter that has transmitted the work request information is arranged, and the worker attribute information is worker authority information that indicates the authority level of the worker. , Work line information indicating a mounting line in which the worker is in charge of performing the support work in the plurality of mounting lines. Then, the notification determination unit is an implementation specified by the line level specifying information and an authority level condition indicating that the authority level indicated by the worker authority information is equal to or lower than the upper limit of the authority level indicated by the notification authority information. When the line condition indicating that a line is included in the work line information is satisfied, it is determined that the notification of the work request information by the notification unit is necessary.

この態様では、各携帯端末装置において、報知判定部は、権限レベル条件を満たし、且つライン条件を満たす場合に、作業要求情報の報知部での報知が必要であると判定することができる。 In this aspect, in each mobile terminal device, the notification determination unit can determine that the notification unit of the work request information needs to be notified when the authority level condition is satisfied and the line condition is satisfied.

上記の作業管理システムにおいて、前記複数の携帯端末装置の各々は、当該携帯端末装置の位置を特定し、その特定した位置を作業者の現在位置を示す作業者位置情報として前記作業者属性情報に付加する位置特定部を、更に含む。前記報知判定部は、前記作業者位置情報で示される作業者の現在位置が、前記作業要求情報を送信した前記部品実装機から所定の範囲内に位置することを表す作業者位置条件を満たす場合、前記ライン条件を満たしていなくても前記権限レベル条件を満たしていれば、前記作業要求情報の前記報知部での報知が必要であると判定する。 In the above work management system, each of the plurality of mobile terminal devices specifies the position of the mobile terminal device, and uses the specified position as the worker position information indicating the current position of the worker in the worker attribute information. It further includes a position specifying unit to be added. In the case where the notification determining unit satisfies the worker position condition indicating that the current position of the worker indicated by the worker position information is located within a predetermined range from the component mounter that has transmitted the work request information. If the authority level condition is satisfied even if the line condition is not satisfied, it is determined that the notification of the work request information by the notification unit is necessary.

この態様では、各携帯端末装置において、報知判定部は、作業者位置条件を満たす場合に、ライン条件を満たしていなくても権限レベル条件を満たしていれば、作業要求情報の報知部での報知が必要であると判定することができる。これにより、支援作業の実施が必要な部品実装機の近くにいる作業者に、作業要求情報を報知することができる。 In this aspect, in each mobile terminal device, the notification determining unit notifies the work request information to the notification unit if the worker position condition is satisfied and the authority level condition is satisfied even if the line condition is not satisfied. Can be determined to be required. As a result, it is possible to notify the work request information to the worker near the component mounter that needs to perform the support work.

上記の作業管理システムにおいて、前記作業属性情報は、前記実施要求作業の実施の優先度レベルを示す要求作業優先度情報を更に含み、前記作業者属性情報は、作業者が実施中の前記支援作業の優先度レベルを示す実施作業優先度情報を更に含む。そして、前記報知判定部は、前記権限レベル条件及び前記ライン条件を満たすか、又は前記権限レベル条件及び前記作業者位置条件を満たし、且つ、前記実施作業優先度情報で示される優先度レベルが前記要求作業優先度情報で示される優先度レベルよりも低いレベルであることを表す優先レベル条件を満たす場合に、前記作業要求情報の前記報知部での報知が必要であると判定する。 In the above work management system, the work attribute information further includes required work priority information indicating a priority level of implementation of the implementation required work, and the worker attribute information is the support work being performed by the worker. Further, the work priority information indicating the priority level of is included. The notification determining unit satisfies the authority level condition and the line condition, or satisfies the authority level condition and the worker position condition, and the priority level indicated by the performed work priority information is the priority level. When the priority level condition indicating that it is lower than the priority level indicated by the requested work priority information is satisfied, it is determined that the notification of the work request information by the notification unit is necessary.

この態様では、各携帯端末装置において、報知判定部は、優先レベル条件を満たす場合に、作業要求情報の報知部での報知が必要であると判定することができる。すなわち、現在実施中の支援作業の優先度レベルが、実施要求作業の優先度レベルよりも低い場合に、作業要求情報が報知される。一方、現在実施中の支援作業の優先度レベルが、実施要求作業の優先度レベル以上の場合には、作業要求情報が報知されない。これにより、作業者は、優先度レベルの低い実施要求作業に関する作業要求情報の報知に混乱されることから回避され、優先度レベルの高い支援作業を集中して実施することができる。 In this aspect, in each mobile terminal device, the notification determination unit can determine that the notification of the work request information by the notification unit is necessary when the priority level condition is satisfied. That is, when the priority level of the support work currently being carried out is lower than the priority level of the work requested to be carried out, the work request information is notified. On the other hand, when the priority level of the support work currently being carried out is equal to or higher than the priority level of the work requested to be carried out, the work request information is not notified. As a result, the worker is prevented from being confused by the notification of the work request information regarding the work requested to be performed with a low priority level, and can concentrate on the support work with a high priority level.

上記の作業管理システムにおいて、前記複数の携帯端末装置の各々は、作業者の入力操作によって各種情報が入力される入力部を更に含む。前記複数の携帯端末装置のうち、前記報知部が前記作業要求情報を報知する報知動作を実行した特定の携帯端末装置の各々において、前記実施要求作業の実施の可否を示す作業可否情報が前記入力部に入力された場合、前記端末側通信部は、前記作業可否情報を前記情報管理装置へ送信する。 In the above work management system, each of the plurality of mobile terminal devices further includes an input unit into which various information is input by an input operation by an operator. Of the plurality of mobile terminal devices, in each of the specific mobile terminal devices that have performed the notification operation of notifying the work request information by the notification unit, the work availability information indicating whether or not the work requested to be performed is input. When input to the section, the terminal side communication section transmits the work availability information to the information management device.

この態様では、作業要求情報の報知が行われた特定の携帯端末装置の各々から情報管理装置へ作業可否情報が送信される。この作業可否情報を受信することによって情報管理装置は、複数の携帯端末装置のうち、作業要求情報の報知が行われた特定の携帯端末装置を把握することができる。 In this aspect, work availability information is transmitted from each of the specific mobile terminal devices that have been notified of the work request information to the information management device. By receiving the work permission/prohibition information, the information management device can grasp the specific mobile terminal device among the plurality of mobile terminal devices to which the work request information is notified.

上記の作業管理システムにおいて、前記情報管理装置は、前記特定の携帯端末装置の各々からの前記作業可否情報を前記第2通信部が受信した場合、当該各作業可否情報に基づき前記実施要求作業の実施が可能な作業者の存否を判定する作業可能者判定部と、前記作業可能者判定部の判定結果に応じた情報を生成する情報生成部と、を更に含む。前記情報生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在することを表す場合に、その判定結果を示す作業可能者決定情報を生成する。前記第2通信部は、前記作業可能者決定情報を、前記特定の携帯端末装置の各々へ送信する。前記特定の携帯端末装置の各々において、前記報知制御部は、前記報知部に前記作業可能者決定情報を報知させる。 In the above work management system, when the second communication unit receives the work availability information from each of the specific mobile terminal devices, the information management device performs the work required work based on the work availability information. The system further includes a work possible worker determination unit that determines whether or not there is a workable worker, and an information generation unit that generates information according to the determination result of the work possible worker determination unit. When the determination result of the workable person determination unit indicates that there is a worker who can perform the work required work, the information generation unit generates workable person determination information indicating the determination result. The second communication unit transmits the workable person determination information to each of the specific mobile terminal devices. In each of the specific mobile terminal devices, the notification control unit causes the notification unit to notify the work possible person determination information.

この態様では、情報管理装置は、作業可否情報に基づき実施要求作業を実施可能な作業者が存在していると判定した場合に、作業可能者決定情報を特定の携帯端末装置の各々へ送信する。そして、特定の携帯端末装置においては、前記作業可能者決定情報を報知する。これにより、特定の携帯端末装置を携帯する各作業者は、実施要求作業を実施可能な作業者が存在することを確認することができる。このため、複数人が重複して実施要求作業を実施することを回避することができる。 In this aspect, when the information management device determines that there is a worker who can perform the work requested based on the work availability information, the information management device transmits the work possible worker determination information to each of the specific mobile terminal devices. .. Then, in a specific mobile terminal device, the workable person determination information is notified. Thereby, each worker who carries a specific mobile terminal device can confirm that there is a worker who can perform the work requested to be performed. Therefore, it is possible to prevent a plurality of people from duplicating the required work.

上記の作業管理システムにおいて、前記作業指示生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在しないことを表す場合、前記報知権限情報で示される権限レベルの上限を高く設定した新たな前記作業指示情報を生成する。前記第2通信部は、前記新たな作業指示情報を、前記複数の携帯端末装置の各々へ送信する。 In the above work management system, the work instruction generation unit, when the judgment result of the work possible worker judgment unit indicates that there is no worker capable of performing the work requested work, the authority indicated by the notification authority information. The new work instruction information in which the upper limit of the level is set high is generated. The second communication unit transmits the new work instruction information to each of the plurality of mobile terminal devices.

この態様では、情報管理装置は、作業可否情報に基づき実施要求作業を実施可能な作業者が存在していないと判定した場合に、新たな作業指示情報を全ての携帯端末装置へ送信する。この新たな作業指示情報は、少なくとも報知権限情報で示される権限レベルの上限が高く設定されたものである。これにより、作業要求情報を報知する必要があると判定される携帯端末装置の対象範囲を広くすることができる。このため、実施要求作業を実施可能な作業者が存在する可能性を高めることができる。 In this aspect, the information management device transmits new work instruction information to all the mobile terminal devices when it is determined that there is no worker who can perform the work requested based on the work availability information. In this new work instruction information, at least the upper limit of the authority level indicated by the notification authority information is set high. Accordingly, it is possible to widen the target range of the mobile terminal device that is determined to need to be notified of the work request information. Therefore, it is possible to increase the possibility that there are workers who can perform the work requested to be performed.

上記の作業管理システムにおいて、前記情報生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在しないことを表す場合に、前記報知権限情報で示される権限レベルが最高位の作業者に、前記実施要求作業を実施する作業者の決定を促す作業者決定催促情報を生成する。前記第2通信部は、前記作業者決定催促情報を、前記特定の携帯端末装置の各々へ送信する。前記特定の携帯端末装置の各々において、前記報知制御部は、前記報知部に前記作業者決定催促情報を報知させる。 In the above work management system, the information generation unit is the authority indicated by the notification authority information when the determination result of the work possible person determination unit indicates that there is no worker who can perform the work requested to be performed. The worker determination reminder information is generated for prompting the worker having the highest level to determine the worker who will perform the required work. The second communication unit transmits the worker determination reminder information to each of the specific mobile terminal devices. In each of the specific mobile terminal devices, the notification control unit causes the notification unit to notify the worker determination reminder information.

この態様では、情報管理装置は、作業可否情報に基づき実施要求作業を実施可能な作業者が存在していないと判定した場合に、作業者決定催促情報を特定の携帯端末装置へ送信する。そして、特定の携帯端末装置においては、前記作業者決定催促情報を報知する。権限レベルが最高位の作業者は、自身の携帯端末装置にて報知される作業者決定催促情報を確認することにより、実施要求作業を実施する作業者を決定することができる。これにより、実施要求作業を確実に実施することができる。 In this aspect, the information management device transmits the worker determination reminder information to the specific mobile terminal device when it is determined that there is no worker who can carry out the work requested based on the work availability information. Then, in the specific mobile terminal device, the worker determination reminder information is notified. The worker with the highest authority level can determine the worker who will carry out the work requested to be performed by checking the worker determination reminder information notified by his/her mobile terminal device. As a result, it is possible to reliably carry out the work requested to be carried out.

本発明の他の局面に係る部品実装システムは、基板に部品を搭載し部品搭載基板を生産する部品実装機が複数配列された複数の実装ラインと、前記部品搭載基板の生産を支援するために作業者が実施する各種の支援作業の管理を行う、上記の作業管理システムと、を備える。 A component mounting system according to another aspect of the present invention provides a plurality of mounting lines in which a plurality of component mounters for mounting components on a board to produce a component mounting board are arranged, and supporting the production of the component mounting board. The above-described work management system that manages various types of support work performed by a worker.

以上説明したように、本発明によれば、部品実装機による部品搭載基板の生産を支援するための、作業者による支援作業の効率化を図ることが可能な作業管理システム、及びそれを備えた部品実装システムを提供することができる。 As described above, according to the present invention, the work management system capable of improving the efficiency of the support work by the worker for supporting the production of the component mounting board by the component mounter, and the work management system are provided. A component mounting system can be provided.

本発明の一実施形態に係る作業管理システムが適用された部品実装システムの構成を概略的に示す図である。It is a figure which shows roughly the structure of the component mounting system to which the work management system which concerns on one Embodiment of this invention was applied. 部品実装機の構成を示す平面図である。It is a top view which shows the structure of a component mounter. 各実装ラインにおける作業者による支援作業の実施の様子を示す図である。It is a figure which shows the mode of implementation of the support work by the worker in each mounting line. 情報管理装置の構成を示すブロック図である。It is a block diagram which shows the structure of an information management apparatus. 情報管理装置の記憶部に記憶される作業管理情報を説明するための図である。It is a figure for demonstrating the work management information memorize|stored in the memory|storage part of an information management apparatus. 情報管理装置に入力される作業要求情報を説明するための図である。It is a figure for explaining work demand information inputted into an information management device. 情報管理装置の作業指示生成部により生成される作業属性情報を説明するための図である。It is a figure for demonstrating the work attribute information produced|generated by the work instruction production|generation part of an information management apparatus. 作業指示生成部により生成される作業指示情報を説明するための図である。FIG. 9 is a diagram for explaining work instruction information generated by a work instruction generation unit. 携帯端末装置の構成を示すブロック図である。It is a block diagram which shows the structure of a portable terminal device. 携帯端末装置の記憶部に記憶される作業者属性情報を説明するための図である。It is a figure for demonstrating the worker attribute information memorize|stored in the memory|storage part of a portable terminal device. 情報管理装置が実行する作業指示処理と、携帯端末装置が実行する報知判定処理とを説明するための図である。It is a figure for demonstrating the work instruction|indication process which an information management apparatus performs, and the notification determination process which a portable terminal device performs. 携帯端末装置が実行する作業可否通知処理を説明するための図である。It is a figure for demonstrating the work availability notification process which a portable terminal device performs. 情報管理装置が実行する作業可能者通知処理を説明するための図である。It is a figure for demonstrating the work possible person notification process which an information management apparatus performs. 情報管理装置が実行する作業可能者通知処理を説明するための図である。It is a figure for demonstrating the work possible person notification process which an information management apparatus performs. 作業指示処理のフローチャートである。It is a flowchart of a work instruction process. 報知判定処理のフローチャートである。It is a flowchart of a notification determination process. 作業可否通知処理のフローチャートである。It is a flowchart of a work availability notification process. 作業可能者通知処理のフローチャートである。It is a flow chart of work possible person notification processing. 携帯端末装置の作業可否通知処理、及び情報管理装置の作業可能者通知処理の変形例を説明するための図である。It is a figure for demonstrating the modification of the work availability notification processing of a portable terminal device, and the work possible person notification processing of an information management apparatus. 携帯端末装置の作業可否通知処理、及び情報管理装置の作業可能者通知処理の変形例を説明するための図である。It is a figure for demonstrating the modification of the work availability notification processing of a portable terminal device, and the work possible person notification processing of an information management apparatus. 携帯端末装置の作業可否通知処理、及び情報管理装置の作業可能者通知処理の変形例を説明するための図である。It is a figure for demonstrating the modification of the work availability notification processing of a portable terminal device, and the work possible person notification processing of an information management apparatus. 変形例に係る作業可否通知処理のフローチャートである。It is a flowchart of the work availability notification process which concerns on a modification. 変形例に係る作業可能者通知処理のフローチャートである。It is a flowchart of the work possible person notification process which concerns on a modification.

以下、本発明の実施形態に係る作業管理システム及び部品実装システムについて図面に基づいて説明する。 Hereinafter, a work management system and a component mounting system according to an embodiment of the present invention will be described with reference to the drawings.

[部品実装システムの全体構成]
図1は、本発明の一実施形態に係る作業管理システム3が適用された部品実装システム1の構成を概略的に示す図である。部品実装システム1は、複数の実装ラインL01,L02,L03,L04と、作業管理システム3と、を備える。
[Overall configuration of component mounting system]
FIG. 1 is a diagram schematically showing a configuration of a component mounting system 1 to which a work management system 3 according to an embodiment of the present invention is applied. The component mounting system 1 includes a plurality of mounting lines L01, L02, L03, L04 and a work management system 3.

複数の実装ラインL01,L02,L03,L04の各々は、複数の部品実装機2が配列されてなる。図1に示す例では、4つの実装ラインL01,L02,L03,L04の各々において、4台の部品実装機2が配列されている。実装ラインL01,L02,L03,L04の数、及び1つの実装ラインに配列される部品実装機2の数は、特に限定されるものではない。 Each of the plurality of mounting lines L01, L02, L03, L04 has a plurality of component mounters 2 arranged therein. In the example shown in FIG. 1, four component mounters 2 are arranged in each of the four mounting lines L01, L02, L03, L04. The number of mounting lines L01, L02, L03, L04 and the number of component mounters 2 arranged on one mounting line are not particularly limited.

[部品実装機の構成]
まず、図2の平面図を参照して部品実装機2の構成を説明する。なお、以下では、方向関係については水平面上のXY直交座標軸を用いて説明する。X軸方向の一方向側を「+X側」と称し、X軸方向の一方向側とは反対の他方向側を「−X側」と称する。また、Y軸方向の一方向側を「+Y側」と称し、Y軸方向の一方向側とは反対の他方向側を「−Y側」と称する。
[Component mounter configuration]
First, the configuration of the component mounter 2 will be described with reference to the plan view of FIG. In the following, the directional relationship will be described using XY orthogonal coordinate axes on a horizontal plane. One side in the X-axis direction is referred to as "+X side", and the other side opposite to the one side in the X-axis direction is referred to as "-X side". In addition, one direction side of the Y-axis direction is referred to as “+Y side”, and the other direction side opposite to the one direction side of the Y-axis direction is referred to as “−Y side”.

部品実装機2は、基板Pに部品Eを搭載(実装)して部品搭載基板を生産する装置である。なお、部品実装機2による部品Eの搭載前において基板Pには、塗布装置29Cによって接着剤が塗布される。また、部品実装機2による部品Eの搭載前において基板Pには、印刷機によって半田ペーストのパターンが印刷されている。部品実装機2は、本体フレーム21と、移動フレーム22と、コンベア23と、部品供給部24と、ヘッドユニット25と、第1駆動機構26と、第2駆動機構27と、基板支持装置28とを備える。 The component mounter 2 is a device that mounts (mounts) the component E on the substrate P to produce a component mounting substrate. Before the component E is mounted by the component mounter 2, the substrate P is coated with the adhesive by the coating device 29C. In addition, before the component E is mounted by the component mounter 2, a solder paste pattern is printed on the substrate P by a printer. The component mounter 2 includes a main body frame 21, a moving frame 22, a conveyor 23, a component supply unit 24, a head unit 25, a first drive mechanism 26, a second drive mechanism 27, and a substrate support device 28. Equipped with.

本体フレーム21は、部品実装機2を構成する各部が配置される構造体であり、X軸方向及びY軸方向の両方向と直交する鉛直方向から見た平面視で略矩形状に形成されている。コンベア23は、X軸方向に延び、本体フレーム21に配置される。コンベア23は、基板PをX軸方向に搬送する。コンベア23上を搬送される基板Pは、所定の作業位置(基板P上に部品Eが搭載される部品搭載位置)に、基板支持装置28によって位置決めされるようになっている。基板支持装置28は、バックアップピンにより基板Pを支持することにより、当該基板Pを位置決めする。なお、バックアップピンは、作業者によってバックアップピン準備装置29Aを用いて準備される。 The main body frame 21 is a structure in which the respective parts configuring the component mounter 2 are arranged, and is formed in a substantially rectangular shape in a plan view when viewed from a vertical direction orthogonal to both the X-axis direction and the Y-axis direction. .. The conveyor 23 extends in the X-axis direction and is arranged on the main body frame 21. The conveyor 23 conveys the substrate P in the X-axis direction. The board P conveyed on the conveyor 23 is positioned by the board supporting device 28 at a predetermined work position (a component mounting position where the component E is mounted on the board P). The substrate support device 28 positions the substrate P by supporting the substrate P with backup pins. The backup pin is prepared by the operator using the backup pin preparation device 29A.

部品供給部24は、本体フレーム21におけるY軸方向の+Y側及び−Y側の領域部分にそれぞれ、X軸方向に2箇所ずつ合計4箇所に配置される。部品供給部24は、基板Pに搭載される部品Eを供給するものであり、複数の部品供給装置241が並設される。部品供給装置241は、基板Pに搭載される部品Eを所定の部品供給位置に供給する装置である。部品供給装置32は、部品供給方式の違いにより、テープフィーダー、トレイフィーダー及びスティックフィーダーに大別される。各部品供給部24には、部品供給方式が同一の1種の部品供給装置241が配置されていてもよいし、部品供給方式が異なる2種以上の部品供給装置241がそれぞれ配置されていてもよい。テープフィーダーは、部品Eが収納された部品収納テープを部品供給位置に向けて送出することにより部品Eを供給する方式の装置である。トレイフィーダーは、複数の部品Eを保持したトレイが載置されたパレットを部品供給位置に移動させることにより部品Eを供給する方式の装置である。スティックフィーダーは、筒状のスティックに収納された部品Eを当該スティックから押し出しながら部品供給位置に供給する方式の装置である。なお、部品供給装置241への部品Eの補給作業は、作業者によって実施される。 The component supply parts 24 are arranged at the +Y side and the −Y side region portions of the main body frame 21 in the Y-axis direction, respectively, in two places in the X-axis direction, for a total of four places. The component supply part 24 supplies the component E mounted on the board|substrate P, and the some component supply apparatus 241 is installed in parallel. The component supply device 241 is a device that supplies the component E mounted on the substrate P to a predetermined component supply position. The component supply device 32 is roughly classified into a tape feeder, a tray feeder, and a stick feeder according to the difference in the component supply system. In each component supply unit 24, one type of component supply device 241 having the same component supply system may be arranged, or two or more types of component supply device 241 having different component supply systems may be respectively arranged. Good. The tape feeder is a device of a system that supplies the component E by feeding a component storage tape containing the component E toward a component supply position. The tray feeder is a device of a system that supplies the component E by moving a pallet on which a tray holding a plurality of components E is placed to a component supply position. The stick feeder is a device of a type that supplies a component E housed in a cylindrical stick to a component supply position while pushing the component E out of the stick. The replenishment work of the parts E to the parts supply device 241 is carried out by a worker.

移動フレーム22は、X軸方向に延び、本体フレーム21に、所定の移動方向(Y軸方向)に移動可能に支持される。この移動フレーム22にヘッドユニット25が搭載されている。ヘッドユニット25は、X軸方向に移動可能となるように、移動フレーム22に搭載される。すなわち、ヘッドユニット25は、移動フレーム22の移動に伴ってY軸方向に移動可能であり、且つ、移動フレーム22に沿ってX軸方向に移動可能である。ヘッドユニット25は、部品供給部24とコンベア23により搬送された基板Pの所定の作業位置とにわたって移動可能とされ、部品供給部24から部品を取り出すとともに、その取り出した部品Eを基板P上に搭載する。 The moving frame 22 extends in the X-axis direction and is supported by the main body frame 21 so as to be movable in a predetermined moving direction (Y-axis direction). A head unit 25 is mounted on the moving frame 22. The head unit 25 is mounted on the moving frame 22 so as to be movable in the X-axis direction. That is, the head unit 25 is movable in the Y-axis direction along with the movement of the moving frame 22, and is also movable in the X-axis direction along the moving frame 22. The head unit 25 is movable between the component supply unit 24 and a predetermined work position of the substrate P conveyed by the conveyor 23. The head unit 25 takes out the component from the component supply unit 24 and places the taken-out component E on the substrate P. Mount.

ヘッドユニット25は、吸着ノズル251を備えている。吸着ノズル251は、部品供給部24により供給された部品Eを吸着して保持可能な保持具である。吸着ノズル251は、電動切替弁を介して負圧発生装置、正圧発生装置及び大気の何れかに連通可能とされている。つまり、吸着ノズル251に負圧が供給されることで当該吸着ノズル251による部品Eの吸着保持(部品Eの取り出し)が可能となり、その後、正圧が供給されることで当該部品Eの吸着保持が解除される。なお、吸着ノズル251は、作業者によってノズル準備装置29Bを用いて準備される。 The head unit 25 includes a suction nozzle 251. The suction nozzle 251 is a holder capable of sucking and holding the component E supplied by the component supply unit 24. The adsorption nozzle 251 can communicate with any of a negative pressure generation device, a positive pressure generation device, and the atmosphere via an electric switching valve. That is, by supplying a negative pressure to the suction nozzle 251, it becomes possible to suction-hold the component E by the suction nozzle 251 (take out the component E), and then by supplying a positive pressure, suction-hold the component E. Is released. The suction nozzle 251 is prepared by an operator using the nozzle preparation device 29B.

第1駆動機構26は、本体フレーム21の+X側及び−X側の端部に配設される。第1駆動機構26は、移動フレーム22をY軸方向に移動させる機構である。第1駆動機構26は、例えば、駆動モーターと、Y軸方向に延び、駆動モーターに連結されるボールねじ軸と、移動フレーム22に配設されてボールねじ軸と螺合するボールナットと、を含んで構成される。このような構成の第1駆動機構26は、駆動モーターによるボールねじ軸の回転駆動に伴ってボールナットがボールねじ軸に沿って進退することにより、移動フレーム22をY軸方向に移動させる。 The first drive mechanism 26 is disposed at the +X side and −X side ends of the main body frame 21. The first drive mechanism 26 is a mechanism that moves the moving frame 22 in the Y-axis direction. The first drive mechanism 26 includes, for example, a drive motor, a ball screw shaft that extends in the Y-axis direction and is connected to the drive motor, and a ball nut that is disposed on the moving frame 22 and that is screwed into the ball screw shaft. It is configured to include. The first drive mechanism 26 having such a configuration moves the moving frame 22 in the Y-axis direction by the ball nut moving forward and backward along the ball screw shaft as the ball screw shaft is rotationally driven by the drive motor.

第2駆動機構27は、移動フレーム22に配設される。第2駆動機構27は、ヘッドユニット25を移動フレーム22に沿ったX軸方向に移動させる機構である。第2駆動機構27は、第1駆動機構26と同様に、例えば、駆動モーターと、X軸方向に延び、駆動モーターに連結されるボールねじ軸と、ヘッドユニット25に配設されてボールねじ軸と螺合するボールナットと、を含んで構成される。このような構成の第2駆動機構27は、駆動モーターによるボールねじ軸の回転駆動に伴ってボールナットがボールねじ軸に沿って進退することにより、ヘッドユニット25をX軸方向に移動させる。 The second drive mechanism 27 is arranged on the moving frame 22. The second drive mechanism 27 is a mechanism that moves the head unit 25 in the X-axis direction along the moving frame 22. Similar to the first drive mechanism 26, the second drive mechanism 27 includes, for example, a drive motor, a ball screw shaft extending in the X-axis direction and connected to the drive motor, and a ball screw shaft provided in the head unit 25. And a ball nut screwed together. The second drive mechanism 27 having such a configuration moves the head unit 25 in the X-axis direction by moving the ball nut forward and backward along the ball screw shaft as the ball screw shaft is rotationally driven by the drive motor.

[作業管理システムの構成]
作業管理システム3は、複数の実装ラインL01,L02,L03,L04において、部品実装機2による部品搭載基板の生産を支援するために作業者が実施する各種の支援作業の管理を行うシステムである。支援作業としては、例えば、部品供給準備作業、部品補給作業、ピン準備作業、ノズル準備作業、接着剤補充作業などが挙げられる。部品供給準備作業は、部品供給部24に、部品搭載基板の生産に必要な部品供給装置241を設置する、或いは部品供給装置241を交換する作業である。部品補給作業は、部品供給装置241に新たな部品Eを補給する作業である。ピン準備作業は、基板支持装置28に備えられるバックアップピンに関し、基板品種ごとに、基板Pの支持に適したバックアップピンを準備しておく作業であり、バックアップピン準備装置29Aを用いて行われる。ノズル準備作業は、ヘッドユニット25に備えられる吸着ノズル251に関し、基板品種ごとに、部品Eの保持に適した吸着ノズル251を準備しておく作業であり、ノズル準備装置29Bを用いて行われる。接着剤補充作業は、基板Pに対する部品接着用の接着剤を塗布装置29Cに補充する作業である。
[Work management system configuration]
The work management system 3 is a system that manages various types of support work performed by a worker in a plurality of mounting lines L01, L02, L03, L04 to support the production of component mounting boards by the component mounter 2. .. Examples of the support work include a component supply preparation work, a component supply work, a pin preparation work, a nozzle preparation work, and an adhesive supply work. The component supply preparation work is a work of installing the component supply device 241 necessary for the production of the component mounting board in the component supply unit 24 or replacing the component supply device 241. The component supply operation is an operation for supplying a new component E to the component supply device 241. The pin preparation work is a work of preparing backup pins suitable for supporting the substrate P for each substrate type with respect to the backup pins provided in the substrate support device 28, and is performed using the backup pin preparation device 29A. The nozzle preparation work is a work of preparing the suction nozzle 251 suitable for holding the component E for each board type with respect to the suction nozzle 251 provided in the head unit 25, and is performed using the nozzle preparation device 29B. The adhesive replenishing operation is an operation of replenishing the coating device 29C with an adhesive for adhering the component to the substrate P.

図3は、各実装ラインL01,L02,L03,L04における作業者OPA,OPB,OPC,OPD,OPEによる支援作業の実施の様子を示す図である。各作業者OPA,OPB,OPC,OPD,OPEは、カートCTを押しながら実装ラインL01,L02,L03,L04が配置される領域を移動し、各部品実装機2において支援作業を実施する。カートCTには、支援作業を実施する際に使用する物品(例えば、部品補給作業用の部品収納部材など)が収容されている。作業者OPA,OPB,OPC,OPD,OPEは、物品収納庫242において支援作業で使用する物品を準備してカートCTに収容し、そのカートCTを押しながら作業対象の部品実装機2に向けて移動する。 FIG. 3 is a diagram showing how support work is performed by the workers OPA, OPB, OPC, OPD, and OPE on each mounting line L01, L02, L03, and L04. Each worker OPA, OPB, OPC, OPD, OPE moves the area in which the mounting lines L01, L02, L03, L04 are arranged while pressing the cart CT, and carries out the support work in each component mounter 2. The cart CT stores articles (for example, component storage members for component replenishment work) used when performing support work. The workers OPA, OPB, OPC, OPD, and OPE prepare articles to be used in the support work in the article storage 242 and store them in the cart CT, and push the cart CT toward the component mounter 2 to be worked. Moving.

また、作業者OPA,OPB,OPC,OPD,OPEは、後述の携帯端末装置32を携帯している。図3に示す例では、作業者OPAが携帯端末装置32Aを携帯し、作業者OPBが携帯端末装置32Bを携帯し、作業者OPCが携帯端末装置32Cを携帯し、作業者OPDが携帯端末装置32Dを携帯し、作業者OPEが携帯端末装置32Eを携帯している。以下の説明では、携帯端末装置32A,32B,32C,32D,32Eを総称して「携帯端末装置32」という場合がある。また、作業者OPA,OPB,OPC,OPD,OPEを総称して「作業者OP」という場合がある。携帯端末装置32には、支援作業の内容を示す情報等が入力され、当該情報が報知(表示)される。各作業者OPは、携帯端末装置32にて報知される情報を参照しつつ、支援作業を実施することができる。 The workers OPA, OPB, OPC, OPD, and OPE carry a mobile terminal device 32, which will be described later. In the example shown in FIG. 3, the worker OPA carries the mobile terminal device 32A, the worker OPB carries the mobile terminal device 32B, the worker OPC carries the mobile terminal device 32C, and the worker OPD carries the mobile terminal device. 32D is carried, and the worker OPE carries the portable terminal device 32E. In the following description, the mobile terminal devices 32A, 32B, 32C, 32D, 32E may be collectively referred to as "mobile terminal device 32". In addition, the workers OPA, OPB, OPC, OPD, and OPE may be collectively referred to as “workers OP”. Information or the like indicating the content of the support work is input to the mobile terminal device 32, and the information is notified (displayed). Each worker OP can perform support work while referring to the information notified by the mobile terminal device 32.

また、各実装ラインL01,L02,L03,L04の部品実装機2に対する支援作業の実施の担当者が予め決められている。以下の説明では、作業者OPAが実装ラインL01を担当し、作業者OPBが実装ラインL02を担当し、作業者OPCが実装ラインL03を担当し、作業者OPDが実装ラインL04を担当するものとする。作業者OPEは、各作業者OPA,OPB,OPC,OPDの作業を統括的に管理する立場の作業者であって、実装ラインL01,L02,L03,L04の全てを担当するものとする。 Further, the person in charge of carrying out the support work for the component mounters 2 on the respective mounting lines L01, L02, L03, L04 is predetermined. In the following description, it is assumed that the worker OPA is in charge of the mounting line L01, the worker OPB is in charge of the mounting line L02, the worker OPC is in charge of the mounting line L03, and the worker OPD is in charge of the mounting line L04. To do. The worker OPE is a worker in a position of comprehensively managing the work of each worker OPA, OPB, OPC, OPD, and is in charge of all the mounting lines L01, L02, L03, L04.

作業管理システム3は、情報管理装置31と、各作業者OPによって携帯される複数の携帯端末装置32と、を備える。 The work management system 3 includes an information management device 31 and a plurality of mobile terminal devices 32 carried by each worker OP.

<情報管理装置について>
情報管理装置31は、各実装ラインL01,L02,L03,L04に配列された全ての部品実装機2と情報通信可能に接続されると共に、全ての携帯端末装置32と情報通信可能に接続されている。図4のブロック図を参照して説明すると、情報管理装置31は、第1通信部311と、第2通信部312と、記憶部313と、制御部314とを含んで構成される。
<About information management device>
The information management device 31 is connected to all the component mounters 2 arranged on each mounting line L01, L02, L03, L04 so as to be able to communicate information, and is also connected to be able to communicate with all the portable terminal devices 32. There is. Explaining with reference to the block diagram of FIG. 4, the information management device 31 is configured to include a first communication unit 311, a second communication unit 312, a storage unit 313, and a control unit 314.

記憶部313は、図5に示す作業管理情報J1を予め記憶する。作業管理情報J1は、作業者OPによって実施される支援作業を管理するための情報である。作業管理情報J1は、作業種情報J11と、重大度情報J12と、優先度情報J13とが関連付けられた情報である。作業種情報J11は、支援作業の種別を示す情報であり、図5に示す例では、「W01」、「W02」などが登録されている。重大度情報J12は、支援作業の重大度レベルを示す情報であり、図5に示す例では、「W01」の支援作業に対して「レベル7」が登録され、「W02」の支援作業に対して「レベル6」が登録されている。重大度情報J12で示される重大度レベルが大きな値を示すほど、重大度レベルが高い支援作業であることを表す。支援作業の重大度レベルは、部品搭載基板の生産に及ぼす影響度に応じて設定される。部品搭載基板の生産に及ぼす影響度が大きいほど、重大度レベルが高くなる。優先度情報J13は、支援作業の実施の優先度レベルを示す情報であり、図5に示す例では、「W01」の支援作業に対して「レベル5」が登録され、「W02」の支援作業に対して「レベル3」が登録されている。優先度情報J13で示される優先度レベルが大きな値を示すほど、優先度レベルが高い支援作業であることを表す。支援作業の優先度レベルは、支援作業の実施の緊急度に応じて設定される。緊急度が高いほど、優先度レベルが高くなる。 The storage unit 313 stores the work management information J1 shown in FIG. 5 in advance. The work management information J1 is information for managing support work performed by the worker OP. The work management information J1 is information in which work type information J11, severity information J12, and priority information J13 are associated with each other. The work type information J11 is information indicating the type of support work, and in the example shown in FIG. 5, “W01”, “W02”, etc. are registered. The severity information J12 is information indicating the severity level of the support work. In the example shown in FIG. 5, “level 7” is registered for the support work of “W01”, and for the support work of “W02”. "Level 6" is registered. The larger the severity level indicated by the severity information J12, the higher the severity level of the support work. The severity level of the support work is set according to the degree of influence on the production of the component mounting board. The greater the impact on the production of the component mounting board, the higher the severity level. The priority information J13 is information indicating the priority level of the implementation of the support work. In the example shown in FIG. 5, “level 5” is registered for the support work of “W01”, and the support work of “W02”. “Level 3” is registered for. The larger the priority level indicated by the priority information J13, the higher the priority level of the support work. The priority level of support work is set according to the urgency of implementation of support work. The higher the urgency, the higher the priority level.

第1通信部311は、部品実装機2との情報通信を実現させるためのインターフェイス回路である。部品実装機2において支援作業の実施が必要となったときに、部品実装機2から情報管理装置31に向けて、図6に例示される作業要求情報J2が送信される。作業要求情報J2は、支援作業の実施を要求する情報である。例えば、部品供給装置241における部品Eの残量が所定値に達し、部品供給装置241に対して部品補給作業の実施が必要となった場合などに、部品実装機2から作業要求情報J2が送信される。第1通信部311は、部品実装機2から送信された作業要求情報J2を受信可能である。 The first communication unit 311 is an interface circuit for realizing information communication with the mounter 2. When the mounter 2 needs to perform the support work, the mounter 2 sends the work request information J2 illustrated in FIG. 6 to the information management device 31. The work request information J2 is information for requesting implementation of support work. For example, when the remaining amount of the component E in the component supply device 241 reaches a predetermined value and it becomes necessary to perform the component replenishment work for the component supply device 241, the work request information J2 is transmitted from the component mounter 2. To be done. The first communication unit 311 can receive the work request information J2 transmitted from the component mounter 2.

図6に示すように、作業要求情報J2は、例えば、実装ラインID情報J21と、実装機ID情報J22と、作業種情報J11とが関連付けられた情報である。実装ラインID情報J21は、複数の実装ラインL01,L02,L03,L04のうち、支援作業の実施が必要な部品実装機2が配置される実装ラインを特定するための情報である。図6に示す例では、実装ラインID情報J21として、実装ラインL02に対応した「L02」が登録されている。実装機ID情報J22は、各実装ラインにおいて配列された複数の部品実装機2のうち、支援作業の実施が必要な部品実装機2を特定するための情報である。図6に示す例では、実装機ID情報J22として「M01」が登録されている。作業種情報J11は、既述の作業管理情報J1の場合と同様に、支援作業の種別を示す情報であり、図6に示す例では「W01」が登録されている。図6に例示される作業要求情報J2は、実装ライン「L02」の部品実装機「M01」において、作業種「W01」の支援作業が必要であることを表している。 As shown in FIG. 6, the work request information J2 is, for example, information in which the mounting line ID information J21, the mounting machine ID information J22, and the work type information J11 are associated with each other. The mounting line ID information J21 is information for identifying the mounting line on which the component mounting machine 2 that needs to perform the support work is arranged, out of the plurality of mounting lines L01, L02, L03, and L04. In the example illustrated in FIG. 6, “L02” corresponding to the mounting line L02 is registered as the mounting line ID information J21. The mounter ID information J22 is information for identifying the component mounter 2 that needs to perform the support work among the plurality of component mounters 2 arranged in each mounting line. In the example shown in FIG. 6, “M01” is registered as the mounting machine ID information J22. The work type information J11 is information indicating the type of support work, as in the case of the work management information J1 described above, and “W01” is registered in the example shown in FIG. The work request information J2 exemplified in FIG. 6 indicates that the component mounting machine “M01” on the mounting line “L02” needs the support work for the work type “W01”.

第2通信部312は、携帯端末装置32との情報通信を実現させるためのインターフェイス回路である。第2通信部312は、後述の作業指示生成部3141及び情報生成部3143によって生成される情報を携帯端末装置32へ送信可能であると共に、携帯端末装置32からの各種情報を受信可能である。 The second communication unit 312 is an interface circuit for realizing information communication with the mobile terminal device 32. The second communication unit 312 can transmit the information generated by the work instruction generation unit 3141 and the information generation unit 3143, which will be described later, to the mobile terminal device 32 and can receive various information from the mobile terminal device 32.

制御部314は、CPU(Central Processing Unit)、制御プログラムを記憶するROM(Read Only Memory)、CPUの作業領域として使用されるRAM(Random Access Memory)等から構成されている。制御部314は、CPUがROMに記憶された制御プログラムを実行することにより第1通信部311、第2通信部312及び記憶部313を制御すると共に、支援作業の管理に関する各種情報を生成する。制御部314は、図4に示すように、作業指示生成部3141と、作業可能者判定部3142と、情報生成部3143と、を含む。 The control unit 314 includes a CPU (Central Processing Unit), a ROM (Read Only Memory) that stores a control program, a RAM (Random Access Memory) used as a work area of the CPU, and the like. The control unit 314 controls the first communication unit 311, the second communication unit 312, and the storage unit 313 by the CPU executing the control program stored in the ROM, and also generates various kinds of information regarding the management of the support work. As shown in FIG. 4, the control unit 314 includes a work instruction generation unit 3141, a work possible person determination unit 3142, and an information generation unit 3143.

作業指示生成部3141は、第1通信部311を介して作業要求情報J2が受信されると、図7に例示される作業属性情報J3を生成する。作業指示生成部3141は、作業属性情報J3を生成する際に、記憶部313に記憶される作業管理情報J1を参照する。作業属性情報J3は、作業要求情報J2にて実施が要求される支援作業である実施要求作業の属性を示す情報である。図7に示すように、作業属性情報J3は、例えば、報知権限情報J31と、ライン特定情報J32と、要求作業優先度情報J33とが関連付けられた情報である。 When the work request generation unit 3141 receives the work request information J2 via the first communication unit 311, the work instruction generation unit 3141 generates the work attribute information J3 illustrated in FIG. 7. The work instruction generation unit 3141 refers to the work management information J1 stored in the storage unit 313 when generating the work attribute information J3. The work attribute information J3 is information indicating the attribute of the work requested to be carried out, which is the support work requested to be carried out in the work request information J2. As shown in FIG. 7, the work attribute information J3 is, for example, information in which the notification authority information J31, the line identification information J32, and the required work priority information J33 are associated with each other.

報知権限情報J31は、前記実施要求作業の重大度レベルに応じて設定された、作業要求情報J2を報知すべき作業者OPの権限レベルの上限を示す情報である。図7に示す例では、報知権限情報J31として「レベル7」が登録されている。図5〜図7を参照して説明すると、作業要求情報J2の作業種情報J11に登録された前記実施要求作業を示す「W01」には、作業管理情報J1の重大度情報J12にて示される重大度レベルとして「レベル7」が関連付けられている。従って、作業指示生成部3141は、前記実施要求作業の属性を示す報知権限情報J31として、重大度レベルに応じた「レベル7」を設定する。 The notification authority information J31 is information indicating the upper limit of the authority level of the worker OP who should be notified of the work request information J2, which is set according to the severity level of the work requested to be performed. In the example shown in FIG. 7, “level 7” is registered as the notification authority information J31. To describe with reference to FIGS. 5 to 7, “W01” indicating the work required to be performed registered in the work type information J11 of the work request information J2 is indicated by the severity information J12 of the work management information J1. “Level 7” is associated as the severity level. Therefore, the work instruction generation unit 3141 sets “level 7” according to the severity level as the notification authority information J31 indicating the attribute of the work requested to be performed.

ライン特定情報J32は、複数の実装ラインL01,L02,L03,L04のうち、作業要求情報J2を送信した部品実装機2が配置される実装ラインを特定するための情報である。図7に示す例では、ライン特定情報J32として「L02」が登録されている。図6及び図7を参照して説明すると、作業要求情報J2の実装ラインID情報J21には、実装ラインL02を示す「L02」が登録されている。従って、作業指示生成部3141は、前記実施要求作業の属性を示すライン特定情報J32として、実装ラインID情報J21と同一の「L02」を設定する。 The line identification information J32 is information for identifying the mounting line on which the component mounter 2 that has transmitted the work request information J2 is arranged, out of the plurality of mounting lines L01, L02, L03, L04. In the example shown in FIG. 7, “L02” is registered as the line identification information J32. To describe with reference to FIGS. 6 and 7, “L02” indicating the mounting line L02 is registered in the mounting line ID information J21 of the work request information J2. Therefore, the work instruction generation unit 3141 sets the same “L02” as the mounting line ID information J21 as the line identification information J32 indicating the attribute of the work requested to be performed.

要求作業優先度情報J33は、前記実施要求作業の実施の優先度レベルを示す情報である。図7に示す例では、要求作業優先度情報J33として「レベル5」が登録されている。図5〜図7を参照して説明すると、作業要求情報J2の作業種情報J11に登録された前記実施要求作業を示す「W01」には、作業管理情報J1の優先度情報J13にて示される優先度レベルとして「レベル5」が関連付けられている。従って、作業指示生成部3141は、前記実施要求作業の属性を示す要求作業優先度情報J33として、「レベル5」を設定する。 The required work priority information J33 is information indicating the priority level of the implementation of the required work. In the example shown in FIG. 7, “level 5” is registered as the required work priority information J33. Explaining with reference to FIGS. 5 to 7, “W01” indicating the work requested to be performed registered in the work type information J11 of the work request information J2 is indicated by the priority information J13 of the work management information J1. “Level 5” is associated as the priority level. Therefore, the work instruction generation unit 3141 sets “level 5” as the requested work priority information J33 indicating the attribute of the work requested to be performed.

作業指示生成部3141は、上記のようにして生成した作業属性情報J3を、作業要求情報J2に付加することにより、図8に例示される作業指示情報J4を生成する。この作業指示情報J4は、第2通信部312によって全ての携帯端末装置32へ送信される。 The work instruction generating unit 3141 generates the work instruction information J4 illustrated in FIG. 8 by adding the work attribute information J3 generated as described above to the work request information J2. This work instruction information J4 is transmitted to all the mobile terminal devices 32 by the second communication unit 312.

作業可能者判定部3142は、携帯端末装置32から送信される後述の作業可否情報J6(図12)を第2通信部312が受信した場合、当該作業可否情報J6に基づき前記実施要求作業の実施が可能な作業者OPの存否を判定する。情報生成部3143は、作業可能者判定部3142の判定結果に応じた情報を生成する。作業可能者判定部3142の判定結果が前記実施要求作業を実施可能な作業者OPが存在することを表す場合を想定する。この場合、情報生成部3143は、前記実施要求作業を実施可能な作業者OPが存在することを示す後述の作業可能者決定情報J7(図13)を生成する。この作業可能者決定情報J7は、第2通信部312によって特定の携帯端末装置32へ送信される。作業可能者判定部3142及び情報生成部3143の詳細については、後述する。 When the second communication unit 312 receives the work availability information J6 (FIG. 12), which will be described later, transmitted from the mobile terminal device 32, the work possible person determination unit 3142 carries out the work required work based on the work availability information J6. It is determined whether or not there is a worker OP who can do the job. The information generation unit 3143 generates information according to the determination result of the workable person determination unit 3142. It is assumed that the determination result of the workable person determination unit 3142 indicates that there is a worker OP who can carry out the work requiring work. In this case, the information generation unit 3143 generates work enabler determination information J7 (FIG. 13), which will be described later, indicating that there is a worker OP who can perform the work requiring work. The work available person determination information J7 is transmitted to the specific mobile terminal device 32 by the second communication unit 312. Details of the workable person determination unit 3142 and the information generation unit 3143 will be described later.

<携帯端末装置について>
既述の通り、携帯端末装置32は、支援作業を実施する各作業者OPが携帯する端末装置である。携帯端末装置32は、情報管理装置31と情報通信可能に接続されている。図9のブロック図を参照して説明すると、携帯端末装置32は、端末側通信部321と、報知部322と、記憶部323と、入力部324と、制御部325とを含んで構成される。
<About mobile terminal devices>
As described above, the mobile terminal device 32 is a terminal device carried by each worker OP who performs support work. The mobile terminal device 32 is connected to the information management device 31 so as to be able to communicate information. Explaining with reference to the block diagram of FIG. 9, the mobile terminal device 32 is configured to include a terminal side communication unit 321, a notification unit 322, a storage unit 323, an input unit 324, and a control unit 325. ..

端末側通信部321は、情報管理装置31との情報通信を実現させるためのインターフェイス回路である。端末側通信部321は、第2通信部312との間で情報通信が可能に構成される。端末側通信部321は、情報管理装置31から送信される作業指示情報J4や作業可能者決定情報J7を受信可能であると共に、後述の入力部324を介して入力される作業可否情報J6を情報管理装置31へ送信可能である。 The terminal-side communication unit 321 is an interface circuit for realizing information communication with the information management device 31. The terminal-side communication unit 321 is configured to be able to communicate information with the second communication unit 312. The terminal-side communication unit 321 can receive the work instruction information J4 and the work possible person determination information J7 transmitted from the information management device 31, and also includes the work availability information J6 input via the input unit 324 described later. It can be transmitted to the management device 31.

報知部322は、作業者OPに対する各種情報の報知が可能に構成される。報知部322は、情報を表示することにより作業者OPへ報知するように構成されていてもよいし、情報を音声データによって作業者OPへ報知するように構成されていてもよい。作業者OPは、報知部322により報知される情報に基づいて、支援作業を実施する。 The notification unit 322 is configured to notify the operator OP of various information. The notification unit 322 may be configured to notify the operator OP by displaying information, or may be configured to notify the operator OP of the information by voice data. The worker OP performs the support work based on the information notified by the notification unit 322.

記憶部323は、携帯端末装置32を携帯する作業者OPの属性を示す作業者属性情報を、作業者OPによる支援作業の進捗状況に応じて書き換え可能に記憶する。前記作業者属性情報について、図10を参照して説明する。図10(A)に示される作業者属性情報J5Aは、作業者OPAが携帯する携帯端末装置32Aの記憶部323に記憶された情報である。同様に、図10(B)の作業者属性情報J5Bは作業者OPBが携帯する携帯端末装置32Bに記憶され、図10(C)の作業者属性情報J5Cは作業者OPCが携帯する携帯端末装置32Cに記憶され、図10(D)の作業者属性情報J5Dは作業者OPDが携帯する携帯端末装置32Dに記憶され、図10(E)の作業者属性情報J5Eは作業者OPEが携帯する携帯端末装置32Eに記憶されている。 The storage unit 323 stores the worker attribute information indicating the attribute of the worker OP carrying the mobile terminal device 32 in a rewritable manner according to the progress status of the support work by the worker OP. The worker attribute information will be described with reference to FIG. The worker attribute information J5A shown in FIG. 10A is information stored in the storage unit 323 of the mobile terminal device 32A carried by the worker OPA. Similarly, the worker attribute information J5B of FIG. 10(B) is stored in the mobile terminal device 32B carried by the worker OPB, and the worker attribute information J5C of FIG. 10(C) is carried by the worker OPC. 32C, the worker attribute information J5D of FIG. 10D is stored in the mobile terminal device 32D carried by the worker OPD, and the worker attribute information J5E of FIG. 10E is carried by the worker OPE. It is stored in the terminal device 32E.

作業者属性情報J5A〜J5Eは、いずれも、作業者権限情報J51と、作業担当ライン情報J52と、実施作業優先度情報J53と、作業者位置情報J54とを含む。 Each of the worker attribute information J5A to J5E includes worker authority information J51, work line information J52, performed work priority information J53, and worker position information J54.

作業者権限情報J51は、作業者OPの権限レベルを示す情報である。作業者権限情報J51で示される権限レベルが大きな値を示すほど、作業者OPの権限レベルが高いことを表す。作業担当ライン情報J52は、複数の実装ラインL01,L02,L03,L04において、作業者OPが支援作業の実施を担当する実装ラインを示す情報である。作業者権限情報J51及び作業担当ライン情報J52は、作業者OPによる支援作業の進捗状況に応じて書き換えられることはなく、作業者OPの属性を示す情報として固定的に登録されている。 The worker authority information J51 is information indicating the authority level of the worker OP. The larger the authority level indicated by the operator authority information J51, the higher the authority level of the operator OP. The work charge line information J52 is information indicating, in the plurality of mounting lines L01, L02, L03, and L04, the mounting line in which the worker OP is in charge of performing the support work. The worker authority information J51 and the work charge line information J52 are not rewritten according to the progress of the support work by the worker OP, and are fixedly registered as information indicating the attribute of the worker OP.

実施作業優先度情報J53は、作業者OPが実施中の支援作業の優先度レベルを示す情報である。実施作業優先度情報J53で示される優先度レベルが大きな値を示すほど、優先度レベルが高い支援作業が作業者OPによって実施中であることを表す。すなわち、実施作業優先度情報J53で示される優先度レベルが大きな値を示すほど、緊急度の高い支援作業が作業者OPによって実施されていることを表す。作業者位置情報J54は、後述の位置特定部3253によって作業者属性情報に付加される情報である。作業者位置情報J54は、位置特定部3253によって特定される携帯端末装置32の位置に応じた、作業者OPの現在位置を示す情報である。実施作業優先度情報J53及び作業者位置情報J54は、作業者OPによる支援作業の進捗状況に応じて書き換えられる。 The performed work priority information J53 is information indicating the priority level of the support work being performed by the worker OP. The larger the priority level indicated by the implemented work priority information J53, the more the support work with the higher priority level is being carried out by the worker OP. That is, the higher the priority level indicated by the work priority information J53, the more urgent the support work is performed by the worker OP. The worker position information J54 is information added to the worker attribute information by the position specifying unit 3253 described later. The worker position information J54 is information indicating the current position of the worker OP according to the position of the mobile terminal device 32 specified by the position specifying unit 3253. The performed work priority information J53 and the worker position information J54 are rewritten according to the progress of the support work by the worker OP.

図10に例示される作業者属性情報J5A〜J5Eについて説明する。図10(A)の作業者属性情報J5Aは、携帯端末装置32Aの記憶部323に記憶された情報であって、作業者OPAの属性を示す。作業者属性情報J5Aにおいては、作業者権限情報J51として「レベル1」が登録され、作業担当ライン情報J52として「L01」が登録され、実施作業優先度情報J53として「レベル3」が登録され、作業者位置情報J54として「AA」が登録されている。作業者属性情報J5Aは、作業者OPAの属性について、権限レベルが「レベル1」の、実装ライン「L01」の作業担当者であって、位置「AA」において優先度レベルが「レベル3」の支援作業を現在実施中であることを表している。 The worker attribute information J5A to J5E illustrated in FIG. 10 will be described. The worker attribute information J5A in FIG. 10A is information stored in the storage unit 323 of the mobile terminal device 32A and indicates the attribute of the worker OPA. In the worker attribute information J5A, “level 1” is registered as the worker authority information J51, “L01” is registered as the work charge line information J52, and “level 3” is registered as the performed work priority information J53. “AA” is registered as the worker position information J54. Regarding the attribute of the worker OPA, the worker attribute information J5A is the worker in charge of the mounting line “L01” having the authority level “level 1” and the priority level “level 3” at the position “AA”. This indicates that support work is currently underway.

図10(B)の作業者属性情報J5Bは、携帯端末装置32Bの記憶部323に記憶された情報であって、作業者OPBの属性を示す。作業者属性情報J5Bにおいては、作業者権限情報J51として「レベル2」が登録され、作業担当ライン情報J52として「L02」が登録され、実施作業優先度情報J53として「レベル3」が登録され、作業者位置情報J54として「BB」が登録されている。作業者属性情報J5Bは、作業者OPBの属性について、権限レベルが「レベル2」の、実装ライン「L02」の作業担当者であって、位置「BB」において優先度レベルが「レベル3」の支援作業を現在実施中であることを表している。 The worker attribute information J5B in FIG. 10B is information stored in the storage unit 323 of the mobile terminal device 32B and indicates the attribute of the worker OPB. In the worker attribute information J5B, "level 2" is registered as the worker authority information J51, "L02" is registered as the work charge line information J52, and "level 3" is registered as the performed work priority information J53. “BB” is registered as the worker position information J54. Regarding the attribute of the worker OPB, the worker attribute information J5B is the worker in charge of the mounting line “L02” having the authority level “level 2” and the priority level “level 3” at the position “BB”. This indicates that support work is currently underway.

図10(C)の作業者属性情報J5Cは、携帯端末装置32Cの記憶部323に記憶された情報であって、作業者OPCの属性を示す。作業者属性情報J5Cにおいては、作業者権限情報J51として「レベル3」が登録され、作業担当ライン情報J52として「L03」が登録され、実施作業優先度情報J53として「レベル4」が登録され、作業者位置情報J54として「CC」が登録されている。作業者属性情報J5Cは、作業者OPCの属性について、権限レベルが「レベル3」の、実装ライン「L03」の作業担当者であって、位置「CC」において優先度レベルが「レベル4」の支援作業を現在実施中であることを表している。 The worker attribute information J5C in FIG. 10C is information stored in the storage unit 323 of the mobile terminal device 32C and indicates the attribute of the worker OPC. In the worker attribute information J5C, "level 3" is registered as the worker authority information J51, "L03" is registered as the work charge line information J52, and "level 4" is registered as the performed work priority information J53. "CC" is registered as the worker position information J54. Regarding the attribute of the worker OPC, the worker attribute information J5C is the worker in charge of the mounting line “L03” having the authority level of “level 3” and the priority level of “level 4” at the position “CC”. This indicates that support work is currently underway.

図10(D)の作業者属性情報J5Dは、携帯端末装置32Dの記憶部323に記憶された情報であって、作業者OPDの属性を示す。作業者属性情報J5Dにおいては、作業者権限情報J51として「レベル4」が登録され、作業担当ライン情報J52として「L04」が登録され、実施作業優先度情報J53として「レベル5」が登録され、作業者位置情報J54として「DD」が登録されている。作業者属性情報J5Dは、作業者OPDの属性について、権限レベルが「レベル4」の、実装ライン「L04」の作業担当者であって、位置「DD」において優先度レベルが「レベル5」の支援作業を現在実施中であることを表している。 The worker attribute information J5D in FIG. 10D is the information stored in the storage unit 323 of the mobile terminal device 32D and indicates the attribute of the worker OPD. In the worker attribute information J5D, "level 4" is registered as the worker authority information J51, "L04" is registered as the work charge line information J52, and "level 5" is registered as the performed work priority information J53. "DD" is registered as the worker position information J54. Regarding the attribute of the worker OPD, the worker attribute information J5D is the worker in charge of the mounting line “L04” having the authority level “level 4” and the priority level “level 5” at the position “DD”. This indicates that support work is currently underway.

図10(E)の作業者属性情報J5Eは、携帯端末装置32Eの記憶部323に記憶された情報であって、作業者OPEの属性を示す。作業者属性情報J5Eにおいては、作業者権限情報J51として「レベル7」が登録され、作業担当ライン情報J52として「L01、L02、L03、L04」が登録され、実施作業優先度情報J53として「レベル2」が登録され、作業者位置情報J54として「EE」が登録されている。作業者属性情報J5Eは、作業者OPEの属性について、権限レベルが「レベル7」の、全ての実装ライン「L01、L02、L03、L04」の作業を管理する管理者であって、位置「EE」において優先度レベルが「レベル2」の支援作業を現在実施中であることを表している。なお、以下の説明では、作業者属性情報J5A〜J5Eを総称する場合には、「作業者属性情報J5」と称することとする。 The worker attribute information J5E of FIG. 10(E) is information stored in the storage unit 323 of the mobile terminal device 32E and indicates the attribute of the worker OPE. In the worker attribute information J5E, "level 7" is registered as the worker authority information J51, "L01, L02, L03, L04" is registered as the work charge line information J52, and "level" is set as the implemented work priority information J53. 2” is registered, and “EE” is registered as the worker position information J54. The worker attribute information J5E is a manager who manages the work of all the mounting lines “L01, L02, L03, L04” with the authority level of “level 7” for the attribute of the worker OPE, and the position “EE”. Indicates that the support work with the priority level “level 2” is currently being performed. In the following description, the worker attribute information J5A to J5E will be collectively referred to as "worker attribute information J5".

入力部324は、作業者OPの入力操作によって各種情報が入力される部分である。入力部324には、例えば後述の作業可否情報J6が入力される(図12)。 The input unit 324 is a unit to which various information is input by the input operation of the operator OP. The work availability information J6, which will be described later, is input to the input unit 324 (FIG. 12).

制御部325は、図9に示すように、報知判定部3251と、報知制御部3252と、位置特定部3253とを含む。 As shown in FIG. 9, the control unit 325 includes a notification determination unit 3251, a notification control unit 3252, and a position specifying unit 3253.

位置特定部3253は、携帯端末装置32の位置を特定し、その特定した位置を作業者OPの現在位置を示す作業者位置情報J54として作業者属性情報J5に付加する。 The position specifying unit 3253 specifies the position of the mobile terminal device 32, and adds the specified position to the worker attribute information J5 as worker position information J54 indicating the current position of the worker OP.

図11は、情報管理装置31が実行する作業指示処理と、携帯端末装置32が実行する報知判定処理とを説明するための図である。既述の通り、情報管理装置31における作業指示生成部3141の作業指示処理によって作業指示情報J4が生成されると、その作業指示情報J4が全ての携帯端末装置32へ送信される。携帯端末装置32において、報知判定部3251は、端末側通信部321が受信した作業指示情報J4に含まれる作業要求情報J2の報知部322での報知の要否を判定する報知判定処理を実行する。報知判定部3251は、記憶部323に記憶される作業者属性情報J5と、作業指示情報J4に含まれる作業属性情報J3とを比較することにより、作業要求情報J2の報知部322での報知の要否を判定する。報知制御部3252は、報知判定部3251によって作業要求情報J2の報知部322での報知が必要であると判定された場合に、報知部322の報知動作を制御する。 FIG. 11 is a diagram for explaining the work instruction process executed by the information management device 31 and the notification determination process executed by the mobile terminal device 32. As described above, when the work instruction information J4 is generated by the work instruction processing of the work instruction generation unit 3141 in the information management device 31, the work instruction information J4 is transmitted to all the mobile terminal devices 32. In the mobile terminal device 32, the notification determination unit 3251 executes a notification determination process of determining whether or not the notification unit 322 needs to notify the work request information J2 included in the work instruction information J4 received by the terminal communication unit 321. .. The notification determination unit 3251 compares the worker attribute information J5 stored in the storage unit 323 with the work attribute information J3 included in the work instruction information J4 to notify the work request information J2 of the notification unit 322. Determine the necessity. The notification control unit 3252 controls the notification operation of the notification unit 322 when the notification determination unit 3251 determines that the notification of the work request information J2 by the notification unit 322 is necessary.

本実施形態に係る作業管理システム3では、部品実装機2からの作業要求情報J2に作業属性情報J3が付加された作業指示情報J4が、情報管理装置31から各携帯端末装置32へ送信される。作業指示情報J4を受信した各携帯端末装置32において、報知判定部3251は、記憶部323から作業者属性情報J5を読み出し、当該作業者属性情報J5と作業指示情報J4に含まれる作業属性情報J3とを比較することにより、作業要求情報J2の報知部322での報知の要否を判定する。そして、報知部322での報知が必要であると判定された場合に、報知制御部3252の制御によって報知部322が作業要求情報J2を報知する。 In the work management system 3 according to the present embodiment, the work instruction information J4 in which the work attribute information J3 is added to the work request information J2 from the component mounter 2 is transmitted from the information management device 31 to each mobile terminal device 32. .. In each mobile terminal device 32 that has received the work instruction information J4, the notification determination unit 3251 reads the worker attribute information J5 from the storage unit 323, and the work attribute information J3 included in the worker attribute information J5 and the work instruction information J4. By comparing with, it is determined whether or not the notification of the work request information J2 by the notification unit 322 is necessary. Then, when it is determined that the notification by the notification unit 322 is necessary, the notification unit 322 notifies the work request information J2 by the control of the notification control unit 3252.

すなわち、各携帯端末装置32において個別に、作業要求情報J2にて実施が要求される実施要求作業の属性と作業者OPの属性とが考慮されて、作業要求情報J2の報知の要否が判定される。そして、作業要求情報J2の報知が必要な携帯端末装置32においてのみ、その情報が報知される。これにより、作業要求情報J2が報知される携帯端末装置32を携帯する作業者OPは、その作業要求情報J2に基づき支援作業の実施が必要な部品実装機2を認識することができる。一方、作業要求情報J2の報知が不要な作業者OPには、その情報が報知されないので、情報が報知されることに起因した混乱を回避することができる。この結果、複数の実装ラインL01,L02,L03,L04の全体としては、作業者OPによる支援作業の効率化を図ることが可能となる。 That is, in each mobile terminal device 32, the necessity of notification of the work request information J2 is determined in consideration of the attribute of the work requested to be performed in the work request information J2 and the attribute of the worker OP. To be done. Then, the information is notified only in the mobile terminal device 32 that needs to be notified of the work request information J2. Thereby, the worker OP carrying the portable terminal device 32 notified of the work request information J2 can recognize the component mounter 2 that needs to perform the support work based on the work request information J2. On the other hand, since the worker OP who does not need to be notified of the work request information J2 is not notified of the information, it is possible to avoid confusion caused by the notification of the information. As a result, as a whole of the plurality of mounting lines L01, L02, L03, L04, the efficiency of the support work by the worker OP can be improved.

また、支援作業の実施が必要な部品実装機2から離れた位置で作業者OPが、別の作業をしていたとしても、携帯端末装置32にて報知される作業要求情報J2を確認することにより、支援作業の実施の必要性を把握することができる。また、また、既述の通り、各携帯端末装置32において個別に、作業要求情報J2にて実施が要求される実施要求作業の属性と作業者OPの属性とが考慮されて、作業要求情報J2の報知の要否が判定される。これにより、情報管理装置31において判定に必要な情報を一括管理する必要がない。このため、各携帯端末装置32において高い機動力で、作業要求情報J2の報知の要否を判定することができる。 Further, even if the worker OP is performing another work at a position away from the component mounter 2 that needs to perform the support work, the work request information J2 notified by the mobile terminal device 32 should be confirmed. This makes it possible to understand the necessity of carrying out support work. Further, as described above, the work request information J2 is individually considered in each mobile terminal device 32 in consideration of the attribute of the work requested to be performed in the work request information J2 and the attribute of the worker OP. It is determined whether or not to notify. As a result, it is not necessary for the information management device 31 to collectively manage the information necessary for the determination. Therefore, it is possible to determine whether or not the notification of the work request information J2 is necessary with high mobility in each mobile terminal device 32.

報知判定部3251のより詳細な判定動作について説明する。報知判定部3251は、権限レベル条件とライン条件とを満たす場合に、作業要求情報J2の報知部322での報知が必要であると判定する。権限レベル条件は、作業者権限情報J51で示される権限レベルが報知権限情報J31で示される権限レベルの上限以下であることを表す条件である。ライン条件は、ライン特定情報J32で特定される実装ラインが作業担当ライン情報J52に含まれることを表す条件である。図3、図8、図10及び図11を参照して説明すると、作業者権限情報J51で示される権限レベルは、作業者OPA〜OPEのいずれも、報知権限情報J31で示される権限レベルの上限の「レベル7」以下である。このため、作業者OPA〜OPEのいずれも、権限レベル条件は満たしている。一方、ライン特定情報J32で特定される実装ライン「L02」が作業者担当ライン情報J52に含まれているのは、作業者OPB,OPEである。このため、作業者OPB,OPEはライン条件を満たし、作業者OPA,OPC,OPDはライン条件を満たしていない。従って、作業者OPBが携帯する携帯端末装置32B、及び作業者OPEが携帯する携帯端末装置32Eにおいて、報知判定部3251が作業要求情報J2の報知が必要であると判定する。そして、携帯端末装置32B,32Eの報知制御部3252の制御によって報知部322が、作業要求情報J2を報知する。 A more detailed determination operation of the notification determination unit 3251 will be described. The notification determination unit 3251 determines that the notification of the work request information J2 by the notification unit 322 is necessary when the authority level condition and the line condition are satisfied. The authority level condition is a condition indicating that the authority level indicated by the worker authority information J51 is equal to or lower than the upper limit of the authority level indicated by the notification authority information J31. The line condition is a condition indicating that the mounting line specified by the line specifying information J32 is included in the work charge line information J52. Explaining with reference to FIGS. 3, 8, 10, and 11, the authority level indicated by the operator authority information J51 is the upper limit of the authority level indicated by the notification authority information J31 for all of the operators OPA to OPE. "Level 7" or lower. Therefore, all the operators OPA to OPE satisfy the authority level condition. On the other hand, it is the workers OPB and OPE that the mounting line “L02” specified by the line specifying information J32 is included in the worker-in-charge line information J52. Therefore, the workers OPB, OPE satisfy the line condition, and the workers OPA, OPC, OPD do not satisfy the line condition. Therefore, in the mobile terminal device 32B carried by the worker OPB and the mobile terminal device 32E carried by the worker OPE, the notification determination unit 3251 determines that the work request information J2 needs to be notified. Then, the notification unit 322 notifies the work request information J2 under the control of the notification control unit 3252 of the mobile terminal devices 32B and 32E.

また、作業者位置情報J54で示される作業者OPの現在位置が、作業要求情報J2を送信した部品実装機2から所定の範囲AR内に位置することを表す作業者位置条件を満たす場合を想定する(図3参照)。この場合、報知判定部3251は、前記ライン条件を満たしていなくても前記権限レベル条件を満たしていれば、作業要求情報J2の報知部322での報知が必要であると判定する。図3及び図11に示す例では、作業者OPCは、前記ライン条件を満たしていないが、前記作業者位置条件を満たしている。従って、作業者OPB,OPEに加えて、作業者OPCが携帯する携帯端末装置32Cにおいても、報知判定部3251が作業要求情報J2の報知が必要であると判定する。そして、携帯端末装置32Cの報知制御部3252の制御によって報知部322が、作業要求情報J2を報知する。これにより、支援作業の実施が必要な部品実装機2の近くにいる作業者OPCに、作業要求情報J2を報知することができる。 Further, it is assumed that the current position of the worker OP indicated by the worker position information J54 satisfies the worker position condition indicating that the current position of the worker OP is within a predetermined range AR from the component mounter 2 that has transmitted the work request information J2. (See FIG. 3). In this case, the notification determination unit 3251 determines that the notification of the work request information J2 by the notification unit 322 is necessary if the authority level condition is satisfied even if the line condition is not satisfied. In the example shown in FIGS. 3 and 11, the worker OPC does not satisfy the line condition, but satisfies the worker position condition. Therefore, in addition to the workers OPB and OPE, the notification determining unit 3251 also determines that the work request information J2 needs to be notified in the mobile terminal device 32C carried by the worker OPC. Then, the notification unit 322 notifies the work request information J2 under the control of the notification control unit 3252 of the mobile terminal device 32C. As a result, the worker OPC near the component mounter 2 that needs to perform the support work can be notified of the work request information J2.

また、実施作業優先度情報J53で示される優先度レベルが要求作業優先度情報J33で示される優先度レベルよりも低いレベルであることを表す優先レベル条件を満たす場合を想定する。この場合、報知判定部3251は、前記権限レベル条件及び前記ライン条件を満たすか、又は前記権限レベル条件及び前記作業者位置条件を満たし、且つ、前記優先レベル条件を満たす場合に、作業要求情報J2の報知部322での報知が必要であると判定する。図3及び図11に示す例では、作業者OPB,OPC,OPEが上記の条件を満たすものに該当する。従って、作業者OPB,OPC,OPEが携帯する各携帯端末装置32B,32C,32Eにおいて、報知判定部3251が作業要求情報J2の報知が必要であると判定する。そして、各携帯端末装置32B,32C,32Eの報知制御部3252の制御によって報知部322が、作業要求情報J2を報知する。この態様では、各携帯端末装置32において、報知判定部3251は、前記優先レベル条件を満たす場合に、作業要求情報J2の報知部322での報知が必要であると判定することができる。すなわち、現在実施中の支援作業の優先度レベルが、実施要求作業の優先度レベルよりも低い場合に、作業要求情報J2が報知される。一方、現在実施中の支援作業の優先度レベルが、実施要求作業の優先度レベル以上の場合には、作業要求情報J2が報知されない。これにより、作業者OPは、優先度レベルの低い実施要求作業に関する作業要求情報J2の報知に混乱されることから回避され、優先度レベルの高い支援作業を集中して実施することができる。 Further, it is assumed that the priority level indicated by the performed work priority information J53 satisfies the priority level condition indicating that it is lower than the priority level indicated by the required work priority information J33. In this case, when the notification determination unit 3251 satisfies the authority level condition and the line condition, or satisfies the authority level condition and the worker position condition and satisfies the priority level condition, the work request information J2. The notification unit 322 determines that the notification is necessary. In the example shown in FIGS. 3 and 11, the workers OPB, OPC, and OPE correspond to those satisfying the above conditions. Therefore, in each of the mobile terminal devices 32B, 32C, 32E carried by the workers OPB, OPC, OPE, the notification determination unit 3251 determines that the notification of the work request information J2 is necessary. Then, the notification unit 322 notifies the work request information J2 under the control of the notification control unit 3252 of each mobile terminal device 32B, 32C, 32E. In this aspect, in each mobile terminal device 32, the notification determination unit 3251 can determine that the notification of the work request information J2 by the notification unit 322 is necessary when the priority level condition is satisfied. That is, when the priority level of the support work currently being carried out is lower than the priority level of the work requiring work, the work request information J2 is notified. On the other hand, when the priority level of the support work currently being carried out is equal to or higher than the priority level of the work requested to be carried out, the work request information J2 is not notified. As a result, the worker OP is prevented from being confused by the notification of the work request information J2 regarding the work requiring work having a low priority level, and can concentrate on the support work having a high priority level.

図12は、携帯端末装置32が実行する作業可否通知処理を説明するための図である。報知部322による作業要求情報J2の報知動作が実行された特定の携帯端末装置32(以下、「注目端末装置」という)においては、作業者OPの入力操作によって入力部324に作業可否情報J6が入力される。作業可否情報J6は、実施要求作業の実施の可否を示す情報である。図12に示す例では、作業者OPB,OPC,OPEによって携帯される携帯端末装置32B,32C,32Eが前記注目端末装置であり、これらの注目端末装置において入力部324に作業可否情報J6が入力される。入力部324に作業可否情報J6が入力されると、端末側通信部321は、当該作業可否情報J6を情報管理装置31へ送信する作業可否通知処理を実行する。この作業可否情報J6を受信することによって情報管理装置31は、複数の携帯端末装置32のうち、作業要求情報J2の報知が行われた注目端末装置32B,32C,32Eを把握することができる。 FIG. 12 is a diagram for explaining the work availability notification process executed by the mobile terminal device 32. In the specific mobile terminal device 32 (hereinafter, referred to as “attention terminal device”) for which the notification operation of the work request information J2 by the notification unit 322 is performed, the work permission/inhibition information J6 is input to the input unit 324 by the input operation of the worker OP. Is entered. The work permission/inhibition information J6 is information indicating whether or not the work required to be performed can be performed. In the example shown in FIG. 12, the mobile terminal devices 32B, 32C, 32E carried by the operators OPB, OPC, OPE are the target terminal devices, and the work permission/inhibition information J6 is input to the input unit 324 in these target terminal devices. To be done. When the work availability information J6 is input to the input unit 324, the terminal-side communication unit 321 executes work availability notification processing for transmitting the work availability information J6 to the information management device 31. By receiving the work permission/prohibition information J6, the information management device 31 can grasp the target terminal devices 32B, 32C, 32E from among the plurality of mobile terminal devices 32 to which the work request information J2 has been notified.

図13及び図14は、情報管理装置31が実行する作業可能者通知処理を説明するための図である。注目端末装置32B,32C,32Eの各々からの作業可否情報J6を第2通信部312が受信した場合、情報管理装置31は、作業可能者通知処理を実行する。具体的には、情報管理装置31において、作業可能者判定部3142は、各作業可否情報J6に基づき実施要求作業の実施が可能な作業者OPの存否を判定する。そして、情報生成部3143は、作業可能者判定部3142の判定結果に応じた情報を生成する。作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在することを表す場合を想定する。この場合、情報生成部3143は、その判定結果を示す作業可能者決定情報J7を生成する。そして、第2通信部312は、生成された作業可能者決定情報J7を、注目端末装置32B,32C,32Eの各々へ送信する(図13)。 13 and 14 are diagrams for explaining the work possible person notification process executed by the information management device 31. When the second communication unit 312 receives the work availability information J6 from each of the target terminal devices 32B, 32C, 32E, the information management device 31 executes the work available person notification process. Specifically, in the information management device 31, the work possible worker determination unit 3142 determines whether or not there is a worker OP who can carry out the work to be performed based on each work availability information J6. Then, the information generation unit 3143 generates information according to the determination result of the workable person determination unit 3142. It is assumed that the determination result of the workable person determination unit 3142 indicates that there is a worker OP who can perform the work required to be performed. In this case, the information generation unit 3143 generates workable person determination information J7 indicating the determination result. Then, the second communication unit 312 transmits the generated work available person determination information J7 to each of the focused terminal devices 32B, 32C, 32E (FIG. 13).

情報管理装置31からの作業可能者決定情報J7を受信した各注目端末装置32B,32C,32Eにおいては、報知制御部3252が、報知部322に作業可能者決定情報J7を報知させる。これにより、注目端末装置32B,32C,32Eを携帯する各作業者OPB,OPC,OPEは、実施要求作業を実施可能な作業者OPが存在することを確認することができる。このため、複数人が重複して実施要求作業を実施することを回避することができる。 In each of the attention terminal devices 32B, 32C, 32E that have received the workable person determination information J7 from the information management device 31, the notification control unit 3252 causes the notification unit 322 to notify the workable person determination information J7. Thereby, each worker OPB, OPC, OPE carrying the target terminal device 32B, 32C, 32E can confirm that there is a worker OP capable of performing the work requested to be performed. Therefore, it is possible to prevent a plurality of people from duplicating the required work.

一方、作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在しないことを表す場合を想定する。この場合、作業指示生成部3141は、報知権限情報J31で示される権限レベルの上限を高く設定し、且つライン特定情報J32で示される実装ライン種を多く設定した新たな作業指示情報J4Aを生成する。そして、第2通信部312は、生成された新たな作業指示情報J4Aを、全ての携帯端末装置32へ送信する(図14)。新たな作業指示情報J4Aは、少なくとも報知権限情報J31で示される権限レベルの上限が高く設定され、ライン特定情報J32で示される実装ライン種が多く設定されたものである。これにより、作業要求情報J2を報知する必要があると判定される携帯端末装置32の対象範囲を広くすることができる。このため、実施要求作業を実施可能な作業者OPが存在する可能性を高めることができる。 On the other hand, it is assumed that the determination result of the work possible worker determination unit 3142 indicates that there is no worker OP who can perform the work requested to be performed. In this case, the work instruction generation unit 3141 generates new work instruction information J4A in which the upper limit of the authority level indicated by the notification authority information J31 is set high and the mounting line types indicated by the line identification information J32 are set large. .. Then, the second communication unit 312 transmits the generated new work instruction information J4A to all the mobile terminal devices 32 (FIG. 14). In the new work instruction information J4A, at least the upper limit of the authority level indicated by the notification authority information J31 is set to be high, and a large number of mounting line types indicated by the line identification information J32 are set. As a result, the target range of the mobile terminal device 32 that is determined to need to be notified of the work request information J2 can be widened. Therefore, it is possible to increase the possibility that there is a worker OP who can perform the work requested to be performed.

[作業管理システムにおける支援作業の管理に関する制御動作]
次に、作業管理システム3における支援作業の管理に関する制御動作について、図15〜図18のフローチャートを参照して説明する。図15は、情報管理装置31が実行する前記作業指示処理のフローチャートである。図16は、携帯端末装置32が実行する前記報知判定処理のフローチャートである。図17は、携帯端末装置32が実行する前記作業可否通知処理のフローチャートである。図18は、情報管理装置31が実行する前記作業可能者通知処理のフローチャートである。
[Control operation related to management of support work in work management system]
Next, the control operation relating to the management of the support work in the work management system 3 will be described with reference to the flowcharts of FIGS. FIG. 15 is a flowchart of the work instruction process executed by the information management device 31. FIG. 16 is a flowchart of the notification determination process executed by the mobile terminal device 32. FIG. 17 is a flowchart of the work availability notification process executed by the mobile terminal device 32. FIG. 18 is a flowchart of the work possible person notification process executed by the information management device 31.

情報管理装置31において、第1通信部311を介して部品実装機2からの作業要求情報J2が受信されると、作業指示処理が開始される(ステップa1)。まず、作業指示生成部3141は、作業要求情報J2に作業属性情報J3を付加することにより、作業指示情報J4を生成する(ステップa2)。そして、第2通信部312は、生成された作業指示情報J4を全ての携帯端末装置32へ送信する(ステップa3)。作業指示情報J4の送信が完了すると、情報管理装置31による作業指示処理は終了する。 In the information management device 31, when the work request information J2 from the component mounter 2 is received via the first communication unit 311, the work instruction process is started (step a1). First, the work instruction generation unit 3141 generates work instruction information J4 by adding work attribute information J3 to the work request information J2 (step a2). Then, the second communication unit 312 transmits the generated work instruction information J4 to all mobile terminal devices 32 (step a3). When the transmission of the work instruction information J4 is completed, the work instruction processing by the information management device 31 ends.

携帯端末装置32において、端末側通信部321を介して情報管理装置31からの作業指示情報J4が受信されると、報知判定処理が開始される(ステップb1)。まず、報知判定部3251は、作業者権限情報J51と報知権限情報J31とを比較することにより、前記権限レベル条件を満たすか否かを判定する(ステップb2)。報知判定部3251は、前記権限レベル条件を満たす場合にはステップb3に処理を移行する。一方、前記権限レベル条件を満たさない場合には、報知判定部3251は、作業要求情報J2の報知が不要であると判定する(ステップb8)。 When the mobile terminal device 32 receives the work instruction information J4 from the information management device 31 via the terminal side communication unit 321, the notification determination process is started (step b1). First, the notification determination unit 3251 compares the worker authority information J51 with the notification authority information J31 to determine whether the authority level condition is satisfied (step b2). The notification determination unit 3251 shifts the processing to step b3 when the authority level condition is satisfied. On the other hand, when the authority level condition is not satisfied, the notification determination unit 3251 determines that the notification of the work request information J2 is unnecessary (step b8).

ステップb3において、報知判定部3251は、作業担当ライン情報J52とライン特定情報J32とを比較することにより、前記ライン条件を満たすか否かを判定する。報知判定部3251は、前記ライン条件を満たす場合にはステップb4に処理を移行する。一方、前記ライン条件を満たさない場合には、報知判定部3251は、ステップb5に処理を移行する。 In step b3, the notification determination unit 3251 determines whether or not the line condition is satisfied by comparing the work-in-charge line information J52 and the line identification information J32. The notification determination unit 3251 shifts the processing to step b4 when the line condition is satisfied. On the other hand, when the line condition is not satisfied, the notification determination unit 3251 shifts the processing to step b5.

ステップb4において、報知判定部3251は、実施作業優先度情報J53と要求作業優先度情報J33とを比較することにより、前記優先レベル条件を満たすか否かを判定する。報知判定部3251は、前記優先レベル条件を満たす場合には作業要求情報J2の報知が必要であると判定する(ステップb6)。一方、前記優先レベル条件を満たさない場合には、報知判定部3251は、作業要求情報J2の報知が不要であると判定する(ステップb8)。 In step b4, the notification determination unit 3251 determines whether or not the priority level condition is satisfied by comparing the performed work priority information J53 and the requested work priority information J33. The notification determination unit 3251 determines that the notification of the work request information J2 is necessary when the priority level condition is satisfied (step b6). On the other hand, when the priority level condition is not satisfied, the notification determination unit 3251 determines that the notification of the work request information J2 is unnecessary (step b8).

ステップb5において、報知判定部3251は、作業者位置情報J54に基づき前記作業者位置条件を満たすか否かを判定する。報知判定部3251は、前記作業者位置条件を満たす場合には既述のステップb4に処理を移行する。一方、前記作業者位置条件を満たさない場合には、報知判定部3251は、作業要求情報J2の報知が不要であると判定する(ステップb8)。 In step b5, the notification determination unit 3251 determines whether or not the worker position condition is satisfied based on the worker position information J54. If the operator position condition is satisfied, the notification determination unit 3251 shifts the processing to step b4 described above. On the other hand, when the worker position condition is not satisfied, the notification determination unit 3251 determines that the notification of the work request information J2 is unnecessary (step b8).

ステップb6において報知判定部3251によって、作業要求情報J2の報知が必要であると判定されると、報知制御部3252の制御によって報知部322は、作業要求情報J2を報知する(ステップb7)。これにより、作業要求情報J2が報知される携帯端末装置32を携帯する作業者OPは、その作業要求情報J2に基づき支援作業の実施が必要な部品実装機2を認識することができる。一方、作業要求情報J2の報知が不要な作業者OPには、その情報が報知されないので、情報が報知されることに起因した混乱を回避することができる。 When the notification determination unit 3251 determines that the work request information J2 needs to be notified in step b6, the notification unit 322 notifies the work request information J2 under the control of the notification control unit 3252 (step b7). Thereby, the worker OP carrying the portable terminal device 32 notified of the work request information J2 can recognize the component mounter 2 that needs to perform the support work based on the work request information J2. On the other hand, since the worker OP who does not need to be notified of the work request information J2 is not notified of the information, it is possible to avoid confusion caused by the notification of the information.

作業要求情報J2が報知された注目端末装置32B,32C,32Eにおいて、入力部324に作業可否情報J6が入力されると、作業可否通知処理が開始される(ステップc1)。まず、端末側通信部321は、作業可否情報J6を情報管理装置31へ送信する(ステップc2)。作業可否情報J6の送信後に、情報管理装置31からの作業可能者決定情報J7が端末側通信部321によって受信されると(ステップc3)、報知部322は、当該作業可能者決定情報J7を報知する(ステップc4)。これにより、注目端末装置32B,32C,32Eを携帯する各作業者OPB,OPC,OPEは、実施要求作業を実施可能な作業者OPが存在することを確認することができる。 In the target terminal devices 32B, 32C, 32E notified of the work request information J2, when the work availability information J6 is input to the input unit 324, the work availability notification process is started (step c1). First, the terminal-side communication unit 321 transmits the work availability information J6 to the information management device 31 (step c2). When the work possible person determination information J7 from the information management device 31 is received by the terminal side communication unit 321 after the work permission information J6 is transmitted (step c3), the notification unit 322 notifies the work possible person determination information J7. (Step c4). Thereby, each worker OPB, OPC, OPE carrying the target terminal device 32B, 32C, 32E can confirm that there is a worker OP capable of performing the work requested to be performed.

一方、作業可否情報J6の送信後に、情報管理装置31からの新たな作業指示情報J4Aが端末側通信部321によって受信されると(ステップc5)、当該新たな作業指示情報J4Aに基づいて、既述のステップb1〜ステップb8の報知判定処理が新たに実行される。 On the other hand, when new work instruction information J4A from the information management device 31 is received by the terminal-side communication unit 321 after the work permission/inhibition information J6 is transmitted (step c5), based on the new work instruction information J4A, it is determined that The notification determination process of steps b1 to b8 described above is newly executed.

情報管理装置31において、第2通信部312を介して注目端末装置32B,32C,32Eからの作業可否情報J6が受信されると、作業可能者通知処理が開始される(ステップd1)。まず、作業可能者判定部3142は、複数の携帯端末装置32のうち、作業可否情報J6の送信元となる、作業要求情報J2の報知が行われた注目端末装置32B,32C,32Eを特定する(ステップd2)。そして、作業可能者判定部3142は、作業可否情報J6に基づいて、実施要求作業の実施が可能な作業者OPの存否を判定する(ステップd3)。 When the information management device 31 receives the work availability information J6 from the terminal devices 32B, 32C, 32E of interest via the second communication unit 312, the work possible person notification process is started (step d1). First, the work possible person determination unit 3142 identifies the target terminal devices 32B, 32C, 32E from among the plurality of mobile terminal devices 32, which are the transmission sources of the work availability information J6 and have been notified of the work request information J2. (Step d2). Then, the work possible worker determination unit 3142 determines whether or not there is a worker OP who can perform the work requested to be performed, based on the work availability information J6 (step d3).

作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在することを表す場合を想定する。この場合、情報生成部3143は、その判定結果を示す作業可能者決定情報J7を生成する(ステップd4)。そして、第2通信部312は、生成された作業可能者決定情報J7を、注目端末装置32B,32C,32Eの各々へ送信する(ステップd5)。 It is assumed that the determination result of the workable person determination unit 3142 indicates that there is a worker OP who can perform the work required to be performed. In this case, the information generation unit 3143 generates the workable person determination information J7 indicating the determination result (step d4). Then, the second communication unit 312 transmits the generated work enabler determination information J7 to each of the focused terminal devices 32B, 32C, 32E (step d5).

一方、作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在しないことを表す場合を想定する。この場合、作業指示生成部3141は、新たな作業指示情報J4Aを生成する(ステップd6)。そして、第2通信部312は、生成された新たな作業指示情報J4Aを、全ての携帯端末装置32へ送信する(ステップd7)。 On the other hand, it is assumed that the determination result of the work possible worker determination unit 3142 indicates that there is no worker OP who can perform the work requested to be performed. In this case, the work instruction generating unit 3141 generates new work instruction information J4A (step d6). Then, the second communication unit 312 transmits the generated new work instruction information J4A to all the mobile terminal devices 32 (step d7).

以上、本発明の実施形態を説明したが、本発明はこれに限定されるものではなく、例えば次のような変形実施形態を取り得る。 Although the embodiment of the present invention has been described above, the present invention is not limited to this, and for example, the following modified embodiment can be adopted.

[作業管理システムの変形実施形態]
上記実施形態では、注目端末装置32B,32C,32Eから送信された作業可否情報J6が、実施要求作業を実施可能な作業者OPが存在しないことを示す情報であった場合に、新たな作業指示情報J4Aが生成される構成について説明したが、本発明はこの構成に限定されるものではない。変形実施形態に係る作業管理システム3においては、携帯端末装置32の作業可否通知処理、及び情報管理装置31の作業可能者通知処理の処理内容が、上記実施形態とは異なる。図19〜図21を参照して、作業可否通知処理及び作業可能者通知処理の変形例について説明する。
[Modified Embodiment of Work Management System]
In the above embodiment, when the work availability information J6 transmitted from the terminal devices 32B, 32C, 32E of interest is information indicating that there is no worker OP who can perform the work requested, a new work instruction is issued. Although the configuration in which the information J4A is generated has been described, the present invention is not limited to this configuration. In the work management system 3 according to the modified embodiment, the processing contents of the work availability notification processing of the mobile terminal device 32 and the work possible person notification processing of the information management device 31 are different from those of the above embodiment. Modifications of the work availability notification process and the work possible person notification process will be described with reference to FIGS. 19 to 21.

作業要求情報J2を報知した注目端末装置32B,32C,32Eにおいては、作業者OPの入力操作によって入力部324に作業可否情報J6が入力される。入力部324に作業可否情報J6が入力されると、端末側通信部321は、当該作業可否情報J6を情報管理装置31へ送信する作業可否通知処理を実行する。注目端末装置32B,32C,32Eの各々からの作業可否情報J6を第2通信部312が受信した場合、情報管理装置31は、作業可能者通知処理を実行する。具体的には、情報管理装置31において、作業可能者判定部3142は、各作業可否情報J6に基づき実施要求作業の実施が可能な作業者OPの存否を判定する。そして、情報生成部3143は、作業可能者判定部3142の判定結果に応じた情報を生成する。 In the attention terminal devices 32B, 32C, and 32E that have notified the work request information J2, the work availability information J6 is input to the input unit 324 by the input operation of the worker OP. When the work availability information J6 is input to the input unit 324, the terminal-side communication unit 321 executes work availability notification processing for transmitting the work availability information J6 to the information management device 31. When the second communication unit 312 receives the work availability information J6 from each of the target terminal devices 32B, 32C, 32E, the information management device 31 executes the work available person notification process. Specifically, in the information management device 31, the work possible worker determination unit 3142 determines whether or not there is a worker OP who can carry out the work to be performed based on each work availability information J6. Then, the information generation unit 3143 generates information according to the determination result of the workable person determination unit 3142.

作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在することを表す場合を想定する。この場合、情報生成部3143は、その判定結果を示す作業可能者決定情報J7を生成する。そして、第2通信部312は、生成された作業可能者決定情報J7を、注目端末装置32B,32C,32Eの各々へ送信する。 It is assumed that the determination result of the workable person determination unit 3142 indicates that there is a worker OP who can perform the work required to be performed. In this case, the information generation unit 3143 generates workable person determination information J7 indicating the determination result. Then, the second communication unit 312 transmits the generated work available person determination information J7 to each of the focused terminal devices 32B, 32C, 32E.

一方、作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在しないことを表す場合を想定する。この場合、情報生成部3143は、作業者決定催促情報J8を生成する。作業者決定催促情報J8は、報知権限情報J31で示される権限レベルが最高位の作業者OPに、実施要求作業を実施する作業者の決定を促す情報である。図19〜図21に示す例では、携帯端末装置32Eを携帯する作業者OPEが、権限レベルが最高位の作業者に該当する。そして、第2通信部312は、生成された作業者決定催促情報J8を、注目端末装置32B,32C,32Eへ送信する(図19)。 On the other hand, it is assumed that the determination result of the work possible worker determination unit 3142 indicates that there is no worker OP who can perform the work requested to be performed. In this case, the information generation unit 3143 generates the worker determination reminder information J8. The worker decision reminder information J8 is information for urging the worker OP having the highest authority level indicated by the notification authority information J31 to determine the operator who will carry out the required work. In the examples shown in FIGS. 19 to 21, the worker OPE carrying the mobile terminal device 32E corresponds to the worker with the highest authority level. Then, the second communication unit 312 transmits the generated worker determination reminder information J8 to the target terminal devices 32B, 32C, 32E (FIG. 19).

情報管理装置31からの作業者決定催促情報J8を受信した注目端末装置32B,32C,32Eにおいては、報知制御部3252の制御によって報知部322は、当該作業者決定催促情報J8を報知する(図19)。権限レベルが最高位の作業者OPEは、自身の携帯端末装置32Eにて報知される作業者決定催促情報J8を確認することにより、実施要求作業を実施する作業者OPを決定することができる。これにより、実施要求作業を確実に実施することができる。 In the attention terminal devices 32B, 32C, 32E that have received the worker determination reminder information J8 from the information management device 31, the notification unit 322 notifies the worker determination reminder information J8 by the control of the notification control unit 3252 (FIG. 19). The worker OPE having the highest authority level can determine the worker OP who carries out the work requested work by checking the worker determination reminder information J8 notified by the mobile terminal device 32E of the worker. As a result, it is possible to reliably carry out the work requested to be carried out.

作業者決定催促情報J8を確認した作業者OPEは、自身の携帯端末装置32Eの入力部324に作業者指定情報J9を入力すればよい。作業者指定情報J9は、実施要求作業を実施する作業者OPを指定するための情報である。入力部324に入力された作業者指定情報J9は、端末側通信部321によって情報管理装置31へ送信される(図20)。 The worker OPE who has confirmed the worker determination reminder information J8 may input the worker designation information J9 to the input unit 324 of the mobile terminal device 32E of the worker. The worker designation information J9 is information for designating the worker OP who carries out the work requested to be carried out. The worker designation information J9 input to the input unit 324 is transmitted to the information management device 31 by the terminal side communication unit 321 (FIG. 20).

携帯端末装置32Eからの作業者指定情報J9を第2通信部312が受信した場合、情報管理装置31において情報生成部3143は、決定通知情報J10を生成する。決定通知情報J10は、実施要求作業を実施する作業者OPが作業者OPEの指定によって決定したことを通知する情報である。そして、第2通信部312は、生成された決定通知情報J10を、注目端末装置32B,32C,32Eの各々へ送信する(図21)。 When the second communication unit 312 receives the operator designation information J9 from the mobile terminal device 32E, the information generation unit 3143 in the information management device 31 generates the determination notification information J10. The decision notification information J10 is information for notifying that the worker OP who carries out the work requested to carry out the work is determined by the designation of the worker OPE. Then, the second communication unit 312 transmits the generated determination notification information J10 to each of the target terminal devices 32B, 32C, 32E (FIG. 21).

情報管理装置31からの決定通知情報J10を受信した注目端末装置32B,32C,32Eにおいては、報知制御部3252の制御によって報知部322は、当該決定通知情報J10を報知する(図21)。これにより、注目端末装置32B,32C,32Eを携帯する各作業者OPB,OPC,OPEは、実施要求作業を実施する作業者OPを確認することができる。 In the attention terminal devices 32B, 32C, 32E that have received the decision notification information J10 from the information management device 31, the notification unit 322 notifies the decision notification information J10 by the control of the notification control unit 3252 (FIG. 21). Thereby, each worker OPB, OPC, OPE carrying the target terminal device 32B, 32C, 32E can confirm the worker OP who carries out the work requested to be carried out.

次に、変形実施形態に係る作業管理システム3において、携帯端末装置32が実行する作業可否通知処理について図22のフローチャートを参照して説明し、情報管理装置31が実行する作業可能者通知処理について図23のフローチャートを参照して説明する。 Next, in the work management system 3 according to the modified embodiment, the work availability notification process executed by the mobile terminal device 32 will be described with reference to the flowchart of FIG. 22, and the work possible person notification process executed by the information management device 31. This will be described with reference to the flowchart of FIG.

作業要求情報J2が報知された注目端末装置32B,32C,32Eにおいて、入力部324に作業可否情報J6が入力されると、作業可否通知処理が開始される(ステップe1)。まず、端末側通信部321は、作業可否情報J6を情報管理装置31へ送信する(ステップe2)。作業可否情報J6の送信後に、情報管理装置31からの作業者決定催促情報J8が端末側通信部321によって受信されると、報知部322は、当該作業者決定催促情報J8を報知する(ステップe3)。 In the target terminal devices 32B, 32C, 32E notified of the work request information J2, when the work availability information J6 is input to the input unit 324, the work availability notification process is started (step e1). First, the terminal-side communication unit 321 transmits the work availability information J6 to the information management device 31 (step e2). When the worker-side reminder information J8 from the information management device 31 is received by the terminal-side communication unit 321 after the work permission/inhibition information J6 is transmitted, the notification unit 322 notifies the worker-determination reminder information J8 (step e3 ).

作業者決定催促情報J8の報知後の注目端末装置32B,32C,32Eにおいて、制御部325は、作業者権限情報J51に基づいて、作業者OPの権限レベルが最高位であるか否かを判定する(ステップe4)。権限レベルが最高位であると判定した場合にはステップe5に処理を移行し、権限レベルが最高位ではないと判定した場合にはステップe7に処理を移行する。図19〜図21に示す例では、携帯端末装置32Eでは作業者OPEの権限レベルが最高位であると判定され、それ以外の携帯端末装置32B,32Cでは作業者OPB,OPCの権限レベルが最高位ではないと判定される。 In the attention terminal devices 32B, 32C, 32E after the notification of the worker determination reminder information J8, the control unit 325 determines whether or not the authority level of the worker OP is the highest, based on the operator authority information J51. (Step e4). If it is determined that the authority level is the highest, the process proceeds to step e5, and if it is determined that the authority level is not the highest, the process proceeds to step e7. In the examples shown in FIGS. 19 to 21, it is determined that the worker OPE has the highest authority level in the mobile terminal device 32E, and the worker OPB, OPC has the highest authority level in the other mobile terminal devices 32B and 32C. It is determined that it is not a rank.

ステップe5では、携帯端末装置32Eにおいて、作業者OPEの入力操作によって入力部324に作業者指定情報J9が入力される。入力部324に作業者指定情報J9が入力されると、端末側通信部321は、当該作業者指定情報J9を情報管理装置31へ送信する(ステップe6)。 At step e5, in the portable terminal device 32E, the operator designation information J9 is input to the input unit 324 by the input operation of the worker OPE. When the worker designation information J9 is input to the input unit 324, the terminal-side communication unit 321 transmits the worker designation information J9 to the information management device 31 (step e6).

作業者決定催促情報J8の報知後に、情報管理装置31からの決定通知情報J10が端末側通信部321によって受信されると(ステップe7)、報知部322は、当該決定通知情報J10を報知する(ステップe8)。これにより、注目端末装置32B,32C,32Eを携帯する各作業者OPB,OPC,OPEは、実施要求作業を実施する作業者OPを確認することができる。 When the determination notification information J10 from the information management device 31 is received by the terminal-side communication unit 321 after the notification of the worker determination reminder information J8 (step e7), the notification unit 322 notifies the determination notification information J10 ( Step e8). Thereby, each worker OPB, OPC, OPE carrying the target terminal device 32B, 32C, 32E can confirm the worker OP who carries out the work requested to be carried out.

情報管理装置31において、第2通信部312を介して注目端末装置32B,32C,32Eからの作業可否情報J6が受信されると、作業可能者通知処理が開始される(ステップf1)。まず、作業可能者判定部3142は、複数の携帯端末装置32のうち、作業可否情報J6の送信元となる、作業要求情報J2の報知が行われた注目端末装置32B,32C,32Eを特定する(ステップf2)。そして、作業可能者判定部3142は、作業可否情報J6に基づいて、実施要求作業の実施が可能な作業者OPの存否を判定する(ステップf3)。 In the information management device 31, when the work permission/inhibition information J6 is received from the target terminal devices 32B, 32C, 32E via the second communication unit 312, the work possible person notification process is started (step f1). First, the work possible person determination unit 3142 identifies the target terminal devices 32B, 32C, 32E from among the plurality of mobile terminal devices 32, which are the transmission sources of the work availability information J6 and have been notified of the work request information J2. (Step f2). Then, the work possible worker determination unit 3142 determines whether or not there is a worker OP who can perform the work requested to be performed, based on the work availability information J6 (step f3).

作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在することを表す場合を想定する。この場合、情報生成部3143は、その判定結果を示す作業可能者決定情報J7を生成する(ステップf4)。そして、第2通信部312は、生成された作業可能者決定情報J7を、注目端末装置32B,32C,32Eの各々へ送信する(ステップf5)。 It is assumed that the determination result of the workable person determination unit 3142 indicates that there is a worker OP who can perform the work required to be performed. In this case, the information generation unit 3143 generates the workable person determination information J7 indicating the determination result (step f4). Then, the second communication unit 312 transmits the generated work available person determination information J7 to each of the focused terminal devices 32B, 32C, 32E (step f5).

一方、作業可能者判定部3142の判定結果が実施要求作業を実施可能な作業者OPが存在しないことを表す場合を想定する。この場合、情報生成部3143は、作業者決定催促情報J8を生成する(ステップf6)。そして、第2通信部312は、生成された作業者決定催促情報J8を、注目端末装置32B,32C,32Eの各々へ送信する(ステップf7)。 On the other hand, it is assumed that the determination result of the work possible worker determination unit 3142 indicates that there is no worker OP who can perform the work requested to be performed. In this case, the information generation unit 3143 generates the worker determination reminder information J8 (step f6). Then, the second communication unit 312 transmits the generated worker determination reminder information J8 to each of the focused terminal devices 32B, 32C, 32E (step f7).

作業者決定催促情報J8の送信後に、携帯端末装置32Eからの作業者指定情報J9を受信すると(ステップf8)、情報生成部3143は、決定通知情報J10を生成する。そして、第2通信部312は、生成された決定通知情報J10を、注目端末装置32B,32C,32Eの各々へ送信する(ステップf9)。この決定通知情報J10を受信した注目端末装置32B,32C,32Eにおいて、各作業者OPB,OPC,OPEは、実施要求作業を実施する作業者OPを確認することができる。 When the worker designation information J9 from the portable terminal device 32E is received after the worker determination reminder information J8 is transmitted (step f8), the information generation unit 3143 generates the determination notification information J10. Then, the second communication unit 312 transmits the generated determination notification information J10 to each of the target terminal devices 32B, 32C, 32E (step f9). In the noted terminal devices 32B, 32C, 32E that have received this decision notification information J10, each worker OPB, OPC, OPE can confirm the worker OP who carries out the work requested to be performed.

1 部品実装システム
2 部品実装機
3 作業管理システム
31 情報管理装置
311 第1通信部
312 第2通信部
313 記憶部
314 制御部
3141 作業指示生成部
3142 作業可能者判定部
3143 情報生成部
32 携帯端末装置
321 端末側通信部
322 報知部
323 記憶部
324 入力部
325 制御部
3251 報知判定部
3252 報知制御部
3253 位置特定部
E 部品
J1 作業管理情報
J2 作業要求情報
J3 作業属性情報
J31 報知権限情報
J32 ライン特定情報
J33 要求作業優先度情報
J4 作業指示情報
J4A 新たな作業指示情報
J5A〜J5E 作業者属性情報
J51 作業者権限情報
J52 作業担当ライン情報
J53 実施作業優先度情報
J6 作業可否情報
J7 作業可能者決定情報
J8 作業者決定催促情報
J9 作業者指定情報
J10 決定通知情報
L01,L02,L03,L04 実装ライン
OPA〜OPE 作業者
P 基板
DESCRIPTION OF SYMBOLS 1 Component mounting system 2 Component mounting machine 3 Work management system 31 Information management device 311 1st communication part 312 2nd communication part 313 Storage part 314 Control part 3141 Work instruction generation part 3142 Workable person determination part 3143 Information generation part 32 Mobile terminal Device 321 Terminal side communication unit 322 Notification unit 323 Storage unit 324 Input unit 325 Control unit 3251 Notification determination unit 3252 Notification control unit 3253 Position specifying unit E parts J1 Work management information J2 Work request information J3 Work attribute information J31 Notification authority information J32 line Specific information J33 Required work priority information J4 Work instruction information J4A New work instruction information J5A to J5E Worker attribute information J51 Worker authority information J52 Work line information J53 Performed work priority information J6 Work availability information J7 Work possible decision Information J8 Worker decision reminder information J9 Worker designation information J10 Decision notification information L01, L02, L03, L04 Mounting line OPA to OPE Worker P board

Claims (9)

基板に部品を搭載し部品搭載基板を生産する部品実装機が複数配列された複数の実装ラインにおいて、前記部品搭載基板の生産を支援するために作業者が実施する各種の支援作業の管理を行う作業管理システムであって、
前記複数の部品実装機の各々と情報通信可能に接続される情報管理装置と、
前記情報管理装置と情報通信可能に接続され、前記支援作業を実施する各作業者によって携帯される複数の携帯端末装置と、を備え、
前記情報管理装置は、
前記部品実装機から送信された前記支援作業の実施を要求する作業要求情報を受信可能な第1通信部と、
前記作業要求情報にて実施が要求される支援作業である実施要求作業の属性を示す作業属性情報を、前記作業要求情報に付加して作業指示情報を生成する作業指示生成部と、
前記作業指示情報を前記複数の携帯端末装置の各々へ送信可能な第2通信部と、を含み、
前記複数の携帯端末装置の各々は、
情報の報知が可能な報知部と、
前記第2通信部との間で情報通信が可能であって、前記作業指示情報を受信可能な端末側通信部と、
前記携帯端末装置を携帯する作業者の属性を示す作業者属性情報を、作業者による前記支援作業の進捗状況に応じて書き換え可能に記憶する記憶部と、
前記作業指示情報に含まれる前記作業属性情報と前記作業者属性情報とを比較することにより、前記作業指示情報に含まれる前記作業要求情報の前記報知部での報知の要否を判定する報知判定部と、
前記報知判定部によって前記作業要求情報の前記報知部での報知が必要であると判定された場合に、前記報知部の報知動作を制御する報知制御部と、を含む、作業管理システム。
In a plurality of mounting lines in which a plurality of component mounters that mount components on a board and produce a component mounting board are arranged, manage various support work performed by an operator to support the production of the component mounting board. A work management system,
An information management device connected to each of the plurality of component mounters to enable information communication,
A plurality of mobile terminal devices that are communicatively connected to the information management device and are carried by each worker who performs the support work,
The information management device,
A first communication unit capable of receiving work request information that requests the implementation of the support work transmitted from the component mounter;
A work instruction generating unit that adds work attribute information indicating an attribute of an execution requesting work, which is a support work requested to be performed in the work requesting information, to the work requesting information to generate work instruction information;
A second communication unit capable of transmitting the work instruction information to each of the plurality of mobile terminal devices;
Each of the plurality of mobile terminal devices,
An informing section capable of informing information,
A terminal-side communication unit capable of information communication with the second communication unit and capable of receiving the work instruction information;
A storage unit that rewritably stores worker attribute information indicating attributes of a worker who carries the portable terminal device according to the progress of the support work by the worker,
Notification determination for determining whether or not the notification of the work request information included in the work instruction information is necessary by comparing the work attribute information included in the work instruction information with the worker attribute information Department,
A work management system comprising: a notification control unit that controls a notification operation of the notification unit when the notification determination unit determines that the notification of the work request information by the notification unit is necessary.
前記作業属性情報は、
前記実施要求作業の重大度に応じて設定された、前記作業要求情報を報知すべき作業者の権限レベルの上限を示す報知権限情報と、
前記作業要求情報を送信した前記部品実装機が配置される前記実装ラインを特定するライン特定情報と、を含む情報であり、
前記作業者属性情報は、
作業者の権限レベルを示す作業者権限情報と、
前記複数の実装ラインにおいて、作業者が前記支援作業の実施を担当する実装ラインを示す作業担当ライン情報と、を含む情報であり、
前記報知判定部は、
前記作業者権限情報で示される権限レベルが前記報知権限情報で示される権限レベルの上限以下であることを表す権限レベル条件と、
前記ライン特定情報で特定される実装ラインが前記作業担当ライン情報に含まれることを表すライン条件と、を満たす場合に、前記作業要求情報の前記報知部での報知が必要であると判定する、請求項1に記載の作業管理システム。
The work attribute information is
Notification authority information indicating the upper limit of the authority level of the worker who should be notified of the work request information, which is set according to the severity of the work requested to be performed,
Line identification information that identifies the mounting line on which the component mounter that has transmitted the work request information is arranged,
The worker attribute information is
Worker authority information indicating the authority level of the worker,
In the plurality of mounting lines, worker line information indicating a mounting line in which a worker is in charge of performing the support work, and information including:
The notification determination unit,
An authority level condition indicating that the authority level indicated by the worker authority information is less than or equal to the upper limit of the authority level indicated by the notification authority information,
A line condition indicating that the mounting line specified by the line specifying information is included in the work-in-charge line information, and when it is determined that notification by the notification unit of the work request information is necessary, The work management system according to claim 1.
前記複数の携帯端末装置の各々は、当該携帯端末装置の位置を特定し、その特定した位置を作業者の現在位置を示す作業者位置情報として前記作業者属性情報に付加する位置特定部を、更に含み、
前記報知判定部は、前記作業者位置情報で示される作業者の現在位置が、前記作業要求情報を送信した前記部品実装機から所定の範囲内に位置することを表す作業者位置条件を満たす場合、前記ライン条件を満たしていなくても前記権限レベル条件を満たしていれば、前記作業要求情報の前記報知部での報知が必要であると判定する、請求項2に記載の作業管理システム。
Each of the plurality of mobile terminal devices specifies a position of the mobile terminal device, and a position specifying unit that adds the specified position to the worker attribute information as worker position information indicating the current position of the worker, In addition,
In the case where the notification determining unit satisfies the worker position condition indicating that the current position of the worker indicated by the worker position information is located within a predetermined range from the component mounter that has transmitted the work request information. The work management system according to claim 2, wherein if the authority level condition is satisfied even if the line condition is not satisfied, it is determined that the notification of the work request information by the notification unit is necessary.
前記作業属性情報は、前記実施要求作業の実施の優先度レベルを示す要求作業優先度情報を更に含み、
前記作業者属性情報は、作業者が実施中の前記支援作業の優先度レベルを示す実施作業優先度情報を更に含み、
前記報知判定部は、前記権限レベル条件及び前記ライン条件を満たすか、又は前記権限レベル条件及び前記作業者位置条件を満たし、且つ、前記実施作業優先度情報で示される優先度レベルが前記要求作業優先度情報で示される優先度レベルよりも低いレベルであることを表す優先レベル条件を満たす場合に、前記作業要求情報の前記報知部での報知が必要であると判定する、請求項3に記載の作業管理システム。
The work attribute information further includes requested work priority information indicating a priority level of execution of the work requested to be performed,
The worker attribute information further includes performed work priority information indicating a priority level of the support work being performed by the worker,
The notification determining unit satisfies the authority level condition and the line condition, or satisfies the authority level condition and the worker position condition, and the priority level indicated by the performed work priority information is the requested work. 4. The notification unit of claim 3, wherein it is determined that the notification of the work request information is necessary when a priority level condition representing a level lower than the priority level indicated by the priority information is satisfied. Work management system.
前記複数の携帯端末装置の各々は、作業者の入力操作によって各種情報が入力される入力部を更に含み、
前記複数の携帯端末装置のうち、前記報知部が前記作業要求情報を報知する報知動作を実行した特定の携帯端末装置の各々において、前記実施要求作業の実施の可否を示す作業可否情報が前記入力部に入力された場合、前記端末側通信部は、前記作業可否情報を前記情報管理装置へ送信する、請求項2〜4のいずれか1項に記載の作業管理システム。
Each of the plurality of mobile terminal devices further includes an input unit for inputting various information by an input operation of an operator,
Of the plurality of mobile terminal devices, in each of the specific mobile terminal devices that have performed the notification operation of notifying the work request information by the notification unit, the work availability information indicating whether or not the work requested to be performed is input. The work management system according to any one of claims 2 to 4, wherein the terminal side communication unit transmits the work availability information to the information management device when the work management information is input to a unit.
前記情報管理装置は、
前記特定の携帯端末装置の各々からの前記作業可否情報を前記第2通信部が受信した場合、当該各作業可否情報に基づき前記実施要求作業の実施が可能な作業者の存否を判定する作業可能者判定部と、
前記作業可能者判定部の判定結果に応じた情報を生成する情報生成部と、を更に含み、
前記情報生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在することを表す場合に、その判定結果を示す作業可能者決定情報を生成し、
前記第2通信部は、前記作業可能者決定情報を、前記特定の携帯端末装置の各々へ送信し、
前記特定の携帯端末装置の各々において、前記報知制御部は、前記報知部に前記作業可能者決定情報を報知させる、請求項5に記載の作業管理システム。
The information management device,
When the second communication unit receives the work availability information from each of the specific mobile terminal devices, it is possible to perform work to determine whether or not there is a worker who can perform the work requested work based on the work availability information. Person determination section,
An information generation unit that generates information according to the determination result of the workable person determination unit,
The information generation unit, when the judgment result of the work possible worker judgment unit indicates that there is a worker who can carry out the work requested work, generates work possible worker determination information indicating the judgment result,
The second communication unit transmits the workable person determination information to each of the specific mobile terminal devices,
The work management system according to claim 5, wherein in each of the specific mobile terminal devices, the notification control unit causes the notification unit to notify the work possible person determination information.
前記作業指示生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在しないことを表す場合、前記報知権限情報で示される権限レベルの上限を高く設定した新たな前記作業指示情報を生成し、
前記第2通信部は、前記新たな作業指示情報を、前記複数の携帯端末装置の各々へ送信する、請求項6に記載の作業管理システム。
The work instruction generation unit sets the upper limit of the authority level indicated by the notification authority information to be high, when the determination result of the work possible person determination unit indicates that there is no worker who can perform the required work. Generate the new work instruction information,
The work management system according to claim 6, wherein the second communication unit transmits the new work instruction information to each of the plurality of mobile terminal devices.
前記情報生成部は、前記作業可能者判定部の判定結果が前記実施要求作業を実施可能な作業者が存在しないことを表す場合に、前記報知権限情報で示される権限レベルが最高位の作業者に、前記実施要求作業を実施する作業者の決定を促す作業者決定催促情報を生成し、
前記第2通信部は、前記作業者決定催促情報を、前記特定の携帯端末装置の各々へ送信し、
前記特定の携帯端末装置の各々において、前記報知制御部は、前記報知部に前記作業者決定催促情報を報知させる、請求項6に記載の作業管理システム。
The information generation unit, when the determination result of the work possible worker determination unit indicates that there is no worker capable of performing the required work, the worker having the highest authority level indicated by the notification authority information. In, to generate worker decision reminder information that prompts the decision of the worker to carry out the work required work,
The second communication unit transmits the worker determination reminder information to each of the specific mobile terminal devices,
The work management system according to claim 6, wherein in each of the specific mobile terminal devices, the notification control unit causes the notification unit to notify the worker determination reminder information.
基板に部品を搭載し部品搭載基板を生産する部品実装機が複数配列された複数の実装ラインと、
前記部品搭載基板の生産を支援するために作業者が実施する各種の支援作業の管理を行う、請求項1〜8のいずれか1項に記載の作業管理システムと、を備える、部品実装システム。
A plurality of mounting lines in which a plurality of component mounters that mount components on a board and produce a component mounting board are arranged,
The work mounting system according to any one of claims 1 to 8, which manages various types of support work performed by a worker to support the production of the component mounting board.
JP2018241411A 2018-12-25 2018-12-25 Work management system and component mounting system Active JP7189010B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018241411A JP7189010B2 (en) 2018-12-25 2018-12-25 Work management system and component mounting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018241411A JP7189010B2 (en) 2018-12-25 2018-12-25 Work management system and component mounting system

Publications (2)

Publication Number Publication Date
JP2020102591A true JP2020102591A (en) 2020-07-02
JP7189010B2 JP7189010B2 (en) 2022-12-13

Family

ID=71140041

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018241411A Active JP7189010B2 (en) 2018-12-25 2018-12-25 Work management system and component mounting system

Country Status (1)

Country Link
JP (1) JP7189010B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005009101A1 (en) * 2003-07-18 2005-01-27 Fuji Machine Mfg. Co., Ltd. Assisting work management apparatus for substrate work system and assisting work management program for substrate work system
JP2016115739A (en) * 2014-12-12 2016-06-23 パナソニックIpマネジメント株式会社 Management device
JP2017199773A (en) * 2016-04-27 2017-11-02 パナソニックIpマネジメント株式会社 Management apparatus and management method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005009101A1 (en) * 2003-07-18 2005-01-27 Fuji Machine Mfg. Co., Ltd. Assisting work management apparatus for substrate work system and assisting work management program for substrate work system
JP2016115739A (en) * 2014-12-12 2016-06-23 パナソニックIpマネジメント株式会社 Management device
JP2017199773A (en) * 2016-04-27 2017-11-02 パナソニックIpマネジメント株式会社 Management apparatus and management method

Also Published As

Publication number Publication date
JP7189010B2 (en) 2022-12-13

Similar Documents

Publication Publication Date Title
JP6367929B2 (en) Management device
JP5751584B2 (en) Electronic component mounting equipment
WO2012172715A1 (en) Set-up method, component mounting method, and component mounting system
JP2014197594A (en) Electronic component management system
JP6255243B2 (en) Support device
CN107318257B (en) Productivity estimation device and productivity estimation method
JP7126045B2 (en) Plan management method and plan management device
JPWO2015079497A1 (en) Support device
US10845783B2 (en) Component mounting system, worker allocation system, and worker allocation method
JP7367176B2 (en) Component mounting system and component mounting method
JP4955313B2 (en) Production control method
US11009860B2 (en) Preparation schedule creating method and preparation schedule creating apparatus
JP2017208408A (en) Shipping management device, shipping management system, and program
US20190302748A1 (en) Production schedule creating method and production schedule creating apparatus
JP2012134303A (en) Electronic component attachment device, and electronic component attachment method
JP7189010B2 (en) Work management system and component mounting system
JP5038970B2 (en) Mounting condition determining method, mounting condition determining apparatus, component mounting method, component mounter, and program
JP6837198B2 (en) Equipment configuration creation support system and equipment configuration creation support method
JP4887328B2 (en) Mounting condition determination method
JP2018092971A (en) Component mounting system, setup work management system, and setup work management method
JP7192111B2 (en) Parts container storage device, parts supply management system and parts supply management method
JP2005216945A (en) Method and device for setting arrangement of feeder
JP7420698B2 (en) Management device, component mounting system equipped with the same, and management method
JP6155286B2 (en) Work equipment
JP2019208055A (en) Component mounting system, operator allocation system, and operator allocation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210519

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220621

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220804

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221201

R150 Certificate of patent or registration of utility model

Ref document number: 7189010

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150