JP2020017193A - Decision-making support device and program - Google Patents

Decision-making support device and program Download PDF

Info

Publication number
JP2020017193A
JP2020017193A JP2018141335A JP2018141335A JP2020017193A JP 2020017193 A JP2020017193 A JP 2020017193A JP 2018141335 A JP2018141335 A JP 2018141335A JP 2018141335 A JP2018141335 A JP 2018141335A JP 2020017193 A JP2020017193 A JP 2020017193A
Authority
JP
Japan
Prior art keywords
decision
instruction
assignment
support device
assignment instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018141335A
Other languages
Japanese (ja)
Other versions
JP6604690B1 (en
Inventor
薫 河田
Kaoru Kawada
薫 河田
聡 岩城
Satoshi Iwaki
聡 岩城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Information Systems Corp
Original Assignee
Mitsubishi Electric Information Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Information Systems Corp filed Critical Mitsubishi Electric Information Systems Corp
Priority to JP2018141335A priority Critical patent/JP6604690B1/en
Application granted granted Critical
Publication of JP6604690B1 publication Critical patent/JP6604690B1/en
Publication of JP2020017193A publication Critical patent/JP2020017193A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a decision support device and a program capable of supporting decision-making work for handling various purposes.SOLUTION: A decision-making support device 10 receives an input of a first assignment instruction A1 to store it as an assignment instruction during management. The decision-making support device 10 receives an input of one or more second assignment instructions A2, A3 related to the first assignment instruction A1 from a first decision maker D1. The decision-making support device 10 stores the second assignment instructions A2, A3 as the assignment instruction during management. In response to input or generation of second completion information relative to the second assignment instructions A2, A3, the decision-making support device 10 cancels storage of the corresponding second assignment instructions A2, A3 as the assignment instruction during management. The decision-making support device 10 releases the storage as the assignment instruction during management of the first assignment instructions A1 in response to input or generation of the second completion information relative to all the second assignment instructions A2, A3 regarding the first assignment instruction A1.SELECTED DRAWING: Figure 5

Description

本発明は、意思決定支援装置およびプログラムに関する。   The present invention relates to a decision support device and a program.

例えば、企業活動における、経営管理、事業計画立案、資金調達、ブランド形成、市場調査、顧客探索、商品企画、製品設計、部材調達、物品製造、設備状態監視、設備保全、部材状態監視、作業者状態監視、人材教育、物流、販売、利益管理など、何らかの目的および役割の遂行にあたり、その遂行を管理する者が意思決定を行う際に、これを支援するシステムが公知である。このようなシステムの例は、特許文献1〜3に記載される。   For example, business management, business planning, fund procurement, brand formation, market research, customer search, product planning, product design, material procurement, product manufacturing, equipment condition monitoring, equipment maintenance, material condition monitoring, workers in corporate activities 2. Description of the Related Art There is known a system for assisting a person who manages the execution of a certain purpose and role, such as condition monitoring, human resource education, distribution, sales, and profit management, when making a decision. Examples of such a system are described in Patent Documents 1 to 3.

特開2017−194730号公報JP 2017-194730A 特開2004−110469号公報JP-A-2004-110469 特開2018−63656号公報JP 2018-63656 A

しかしながら、従来の技術では、システムごとに目的および役割が限定されるという問題があった。異なる目的および役割の意思決定作業に対応するためには、目的および役割ごとにシステムを別個に構築しなければならない。   However, the conventional technology has a problem that the purpose and role are limited for each system. In order to support decision making tasks with different purposes and roles, a system must be built separately for each purpose and role.

規模の大小にかかわらず、組織あるいは社会は、多数の目的および役割の繋がりと、それぞれの目的および役割を実行する系、そして、それぞれの目的および役割の遂行を管理する意思決定者の集合体として構成される。したがって、目的および役割ごとに個別に必要となる従来の意思決定支援システムでは、例えば、市況変動に応じた目的および役割の変更に伴う、範囲もしくは規模の拡大などに対応することが困難である。それに加え、ある時点での組織あるいは社会の構造を反映した固定的なシステム構造の一部とならざるを得ず、企業活動など、常時、生成と消滅を繰り返す、組織あるいは社会における目的および役割の遂行状態を動的に反映し、個々の目的および役割が、それぞれの意思決定作業を求められる時点で、相互に及ぼし合う影響を把握するシステム構造を形成することが困難である。このことから、特定の目的領域だけの意思決定を支援しても、限られた情報範囲での支援となり、組織あるいは社会全体に与えられる効果が制限される問題がある。   An organization or society, large or small, is a collection of connections between a number of objectives and roles, a system that performs each objective and role, and a set of decision makers who manage the performance of each objective and role. Be composed. Therefore, it is difficult for a conventional decision support system, which is individually required for each purpose and role, to cope with, for example, an increase in the range or scale accompanying a change in the purpose and role in response to market fluctuations. In addition, it must be part of a fixed system structure that reflects the structure of the organization or society at a certain point in time. It is difficult to form a system structure that dynamically reflects the state of performance and grasps the mutual effects of individual goals and roles at the time each task is required for decision making. For this reason, there is a problem that even if the decision making is supported only in a specific target area, the support is provided in a limited information range, and the effect given to the organization or the whole society is limited.

この発明は、このような問題点を解決するためになされたものであり、組織あるいは社会全体に存在する様々な目的および役割を俯瞰し、組織あるいは社会全体における目的および役割の繋がりの観点から、それぞれの目的および役割ごとの遂行に必要な情報を収集する。そして、個々の目的および役割の遂行を管理する意思決定者それぞれに、それぞれが必要とする意思決定支援情報を提供し、組織あるいは社会全体に対して効果的な意思決定作業を支援する意思決定支援装置およびプログラムを提供することを目的とする。   The present invention has been made in order to solve such problems, overlooking various purposes and roles existing in an organization or the whole society, and from the viewpoint of connection of the purpose and role in the entire organization or society, Gather the information needed to perform each purpose and role. Provide decision support information to each decision maker who manages the fulfillment of each purpose and role, and provide effective decision support to the organization or society as a whole. It is intended to provide a device and a program.

上述の問題点を解決するため、この発明に係る意思決定支援装置は、
複数の意思決定者のそれぞれに、通知送信先を関連付けて記憶する機能と、
1つ以上の第1割当指示の入力を受け付ける機能と、
前記第1割当指示を管理中割当指示として記憶する機能と、
前記第1割当指示が第1意思決定者を表す情報を含む場合に、
‐前記第1意思決定者の通知送信先に、割当通知を送信する機能と、
‐前記第1意思決定者から、前記第1割当指示に係る1つ以上の第2割当指示の入力を受け付ける機能と、
‐前記第2割当指示を管理中割当指示として記憶する機能と、
‐各前記第2割当指示に対する第2完了情報の入力または生成に応じ、対応する第2割当指示の管理中割当指示としての前記記憶を解除する機能と、
‐各前記第1割当指示について、当該第1割当指示に係るすべての第2割当指示に対する前記第2完了情報の入力または生成に応じ、当該第1割当指示の管理中割当指示としての前記記憶を解除する機能と、
を備える。
特定の態様によれば、前記第1割当指示および前記第2割当指示はさらに、業務目標と、制約条件とを表す情報を含む。
特定の態様によれば、前記業務目標は、生成される人材の能力と人数と、生成される設備の能力と台数と、生成される材料の種別と数量と、生成されるルールあるいは設計値と、生成される資金と、生成される時間と、に係る情報のうち少なくとも1つを含む。
特定の態様によれば、前記制約条件は、利用可能な人材と、利用可能な設備と、利用可能な材料と、利用可能なルールあるいは設計値と、利用可能な資金と、利用可能な時間と、に係る情報とのうち少なくとも1つを含む。
特定の態様によれば、前記意思決定支援装置は、各第1意思決定者および各第2意思決定者を関連付けて階層的に表示する階層表示機能をさらに備える。
特定の態様によれば、前記階層表示機能において、制約条件に抵触していない第1割当指示および第2割当指示と、制約条件に抵触している第1割当指示および第2割当指示とは、異なる態様で表示される。
また、この発明に係るプログラムは、コンピュータに上述の意思決定支援装置として機能させる。
In order to solve the above-mentioned problems, a decision support device according to the present invention is
A function of storing a notification destination in association with each of a plurality of decision makers;
A function for receiving an input of one or more first assignment instructions,
A function of storing the first assignment instruction as a management assignment instruction;
When the first assignment instruction includes information representing a first decision maker,
A function of transmitting an allocation notification to a notification destination of the first decision maker;
A function of receiving, from the first decision maker, an input of one or more second allocation instructions related to the first allocation instruction;
A function of storing the second assignment instruction as a management assignment instruction;
A function of releasing the storage of the corresponding second allocation instruction as a management allocation instruction in response to input or generation of second completion information for each of the second allocation instructions;
For each of the first allocation instructions, according to the input or generation of the second completion information for all of the second allocation instructions related to the first allocation instruction, storing the storage as the managed allocation instruction of the first allocation instruction. Function to release,
Is provided.
According to a specific aspect, the first assignment instruction and the second assignment instruction further include information indicating a business goal and a constraint.
According to a specific aspect, the business objectives include the capacity and the number of generated human resources, the capacity and number of generated facilities, the type and quantity of generated materials, and the generated rules or design values. , Generated funds, and generated time.
According to a particular aspect, the constraints include available human resources, available equipment, available materials, available rules or design values, available funds, and available time. , At least one of
According to a specific mode, the decision support device further includes a hierarchical display function of hierarchically displaying the first decision maker and the second decision maker in association with each other.
According to a specific mode, in the hierarchical display function, the first assignment instruction and the second assignment instruction that do not conflict with the constraint, and the first assignment instruction and the second assignment instruction that conflict with the constraint are: It is displayed in a different manner.
Further, a program according to the present invention causes a computer to function as the above-described decision support device.

この発明に係る意思決定支援装置およびプログラムによれば、単一のシステムで様々な目的および役割に対し、それぞれの意思決定作業を支援するとともに、組織あるいは社会全体に対して効果的な意思決定作業を支援することができる。   ADVANTAGE OF THE INVENTION According to the decision support apparatus and program which concern on this invention, while making a single system support various decision work for various objectives and roles, effective decision work for an organization or the whole society Can help.

本発明の実施の形態1に係る意思決定支援装置の例を示す図である。FIG. 2 is a diagram showing an example of a decision support device according to Embodiment 1 of the present invention. 図1の意思決定支援装置が、割当指示が入力された場合に実行する処理の流れを説明するフローチャートである。2 is a flowchart illustrating a flow of processing executed by the decision support device of FIG. 1 when an assignment instruction is input. 管理中割当指示のツリー構造の例である。It is an example of a tree structure of an assignment instruction during management. 図1の意思決定支援装置が、完了情報が入力された場合に実行する処理の流れを説明するフローチャートである。3 is a flowchart illustrating a flow of a process executed by the decision support device of FIG. 1 when completion information is input. 管理中割当指示のツリー構造の表示例である。It is a display example of the tree structure of the allocation instruction under management.

以下、この発明の実施の形態を添付図面に基づいて説明する。
実施の形態1.
図1に、本発明の実施の形態1に係る意思決定支援装置10の構成の例を示す。意思決定支援装置10は、意思決定者による意思決定作業を支援するための装置である。また、意思決定支援装置10は、組織によるプロジェクトの計画構築または計画実行を管理するための装置としても機能する。
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
Embodiment 1 FIG.
FIG. 1 shows an example of a configuration of a decision support device 10 according to Embodiment 1 of the present invention. The decision support device 10 is a device for supporting a decision maker by a decision maker. In addition, the decision support device 10 also functions as a device for managing the construction or execution of a project plan by an organization.

図1に示すように、意思決定支援装置10は公知のコンピュータとしての構成を有し、演算を行う演算手段11と、情報を格納する記憶手段12とを備える。演算手段11はたとえばCPU(中央処理装置)を含み、記憶手段12はたとえば半導体メモリおよびHDD(ハードディスクドライブ)を含む。   As shown in FIG. 1, the decision support device 10 has a configuration as a known computer, and includes an operation unit 11 that performs an operation and a storage unit 12 that stores information. Arithmetic means 11 includes, for example, a CPU (Central Processing Unit), and storage means 12 includes, for example, a semiconductor memory and an HDD (hard disk drive).

記憶手段12は、ワークスペース20と、運用リソース管理部21と、プロジェクト情報リソース管理部22と、ジョブ実行情報管理部23と、実行・材料リソース管理部24とを備える。また、記憶手段12は図示しない意思決定支援プログラムを格納しており、演算手段11がこの意思決定支援プログラムを実行することによって、意思決定支援装置10は本明細書に記載される機能を実現する。すなわち、この意思決定支援プログラムは、コンピュータを意思決定支援装置10として機能させるものである。   The storage unit 12 includes a workspace 20, an operation resource management unit 21, a project information resource management unit 22, a job execution information management unit 23, and an execution / material resource management unit 24. The storage unit 12 stores a decision support program (not shown), and the arithmetic unit 11 executes the decision support program, so that the decision support device 10 realizes the functions described in this specification. . That is, this decision support program causes a computer to function as the decision support device 10.

意思決定支援装置10は、複数の意思決定者のそれぞれに、通知送信先を関連付けて記憶手段12に記憶することができる。これはたとえば運用リソース管理部21において行われる。意思決定者はたとえば一意の識別情報(意思決定者ID等)によって表される。通知送信先の表現形式は任意であるが、たとえばメールアドレス、ログインID、公知のメッセージ送信サービスのアカウント、等であってもよい。   The decision support device 10 can store the notification destination in the storage unit 12 in association with each of the plurality of decision makers. This is performed in the operation resource management unit 21, for example. The decision maker is represented by, for example, unique identification information (decision maker ID or the like). The expression format of the notification destination is arbitrary, but may be, for example, a mail address, a login ID, an account of a known message transmission service, or the like.

意思決定支援装置10は、公知のコンピュータが通常備える他の構成要素を備えてもよい。たとえば、出力装置であるディスプレイおよびプリンタ、入力装置であるキーボードおよびマウス、通信ネットワークに対する入力装置と出力装置とを兼ねるネットワークインタフェース、等を備えてもよい。   The decision support device 10 may include other components that are commonly included in a known computer. For example, a display and a printer as output devices, a keyboard and a mouse as input devices, a network interface serving as an input device and an output device for a communication network, and the like may be provided.

以上のような構成を備える意思決定支援装置10の動作を、図2〜4を用いて以下に説明する。
図2は、割当指示が入力された場合の意思決定支援装置10の処理の流れを説明するフローチャートである。まず意思決定支援装置10は、割当指示(第1割当指示)の入力を受け付ける(ステップS1)。割当指示とは、たとえば、ある意思決定者(たとえば上司)が、別の意思決定者(たとえば部下、あるいは外注先)または作業実行者に、業務を割り当てるための指示を表す情報である。割当指示は、この別の意思決定者(第1意思決定者)を表す情報を含む場合がある。
The operation of the decision support device 10 having the above configuration will be described below with reference to FIGS.
FIG. 2 is a flowchart illustrating a processing flow of the decision support device 10 when an assignment instruction is input. First, the decision support device 10 receives an input of an assignment instruction (first assignment instruction) (step S1). The assignment instruction is, for example, information indicating an instruction for assigning a task by a certain decision maker (for example, a supervisor) to another decision maker (for example, a subordinate or a subcontractor) or a work executor. The assignment instruction may include information indicating the different decision maker (first decision maker).

割当指示を入力する意思決定者と、その割当指示によって業務が割り当てられる意思決定者は、一般的には異なる人物であるが、これらは同一人物であってもよい。役職者が業務の一部を自ら実行する場合等には、これらは同一人物となる。また、例えば、ある製品の生産を目的とする場合など、作業員管理、製造指示、部材配送、設備保全など、複数の業務が存在する場合、割当指示は複数入力されてもよく、その場合には図2の処理が逐次にまたは並列的に複数回実行されてもよい。   The decision maker who inputs the assignment instruction and the decision maker to whom the work is assigned by the assignment instruction are generally different persons, but may be the same person. In the case where the official executes a part of the work himself / herself, they are the same person. Also, for example, when there is a plurality of operations such as worker management, manufacturing instructions, material delivery, equipment maintenance, etc., such as when the purpose is to produce a certain product, a plurality of assignment instructions may be input. May be executed a plurality of times sequentially or in parallel.

割当指示は、さらに業務目標を表す情報を含んでもよい。業務目標は、たとえば、ある業務によって生成され、他の業務により利用されるリソースのレベルならびに大きさ(数量あるいは長さ等)などを表す。より具体的には、業務が教育である場合には、業務目標は、生成される人材の能力および人数(すなわち生成される人材が運用リソースの場合、教育によって、ある目的および役割の遂行を管理することができる意思決定者となり得るだけの知識のレベル、ならびに獲得を目指す人数など、もしくは生成される人材が実行リソースの場合、教育によって、ある目的および役割の実行を可能とする知識ならびに技量のレベル、ならびに獲得を目指す人数など)を表す情報を含んでもよい。業務が設備の生産である場合には、業務目標は生成される設備の能力(または性能)ならびに台数などを表す情報を含んでもよく、業務が材料の生産である場合には、業務目標は生成される材料の種別、仕様、数量などを表す情報を含んでもよい。また、業務目標は、生成されるルールあるいは設計値を表す情報を含んでもよく、生成される資金を表す情報を含んでもよく、生成される時間を表す情報を含んでもよい。   The assignment instruction may further include information indicating a business goal. The business goal represents, for example, the level and size (such as quantity or length) of resources generated by a certain business and used by another business. More specifically, if the task is education, the task goal is the ability and number of talents to be generated (ie, if the talents to be generated are operational resources, education will manage the performance of certain objectives and roles. The level of knowledge that can be a decision maker who can make a decision and the number of people who aim to acquire, or if the generated human resources are execution resources, the education will provide knowledge and skills that will enable them to perform certain objectives and roles. Level, as well as the number of people aiming to acquire). If the operation is production of equipment, the operation target may include information indicating the capacity (or performance) of the equipment to be generated and the number of units, and if the operation is production of materials, the operation target is generated. Information indicating the type, specification, quantity, etc. of the material to be used may be included. Further, the business goal may include information indicating a generated rule or a design value, may include information indicating a generated fund, or may include information indicating a generated time.

また、割当指示は、さらに制約条件を表す情報を含んでもよい。制約条件とは、たとえばその業務を実行する際に守らなければならない条件を表す。より具体的には、制約条件は、その業務の遂行に際して利用可能な人材(運用者もしくは実行者)ならびに個々の人材ごとの利用可能な用役、利用可能な期間などの情報を含んでもよく、同様に、その業務の実行において利用可能な設備を含んでもよく、その業務の実行において利用可能な材料を含んでもよく、その業務を運用もしくは実行する際に利用可能なルールあるいは設計値(すなわち作業手順、作業の管理値、設計図、社内規則、法令など)を含んでもよく、その業務の運用もしくは実行において利用可能な予算、資金を含んでもよく、その業務に利用可能な時間(すなわち完了すべき期限)を含んでもよい。すべての割当指示を通して利用可能な運用者もしくは実行者、設備、材料、ルールあるいは設計値、資金、期限等に関する情報(人あるいは設備の識別ID、所属情報、性能あるいは能力レベル、総量、設置場所、納期等)に関する情報は、運用者すなわち後の意思決定者として利用するリソースに関する情報については運用リソース管理部21、それ以外の作業実行に係わる情報については、実行・材料リソース管理部24に格納されていてもよい。   Further, the assignment instruction may further include information indicating a constraint condition. The constraint conditions represent, for example, conditions that must be observed when executing the business. More specifically, the constraints may include information such as available human resources (operator or executor) in performing the business and available services and available periods for each individual human resource, Similarly, it may include equipment that can be used in the performance of the business, may include materials that can be used in the performance of the business, and may use rules or design values (ie, work values) that can be used in operating or performing the business. Procedures, control values for work, blueprints, company rules, laws and regulations, etc., and may include budgets and funds available for the operation or execution of the work, and the time available for the work (ie, Expiration date). Information on the operator or executor, equipment, materials, rules or design values, funds, deadlines, etc. available through all assignment instructions (identification ID of person or equipment, affiliation information, performance or capability level, total amount, installation location, Information on the delivery date) is stored in the operation resource management unit 21 for information on resources used as an operator, that is, a later decision maker, and is stored in the execution / material resource management unit 24 for information related to other work execution. May be.

意思決定支援装置10は、入力された制約条件を、当該割当指示に関連付けてプロジェクト情報リソース管理部22に格納してもよい。   The decision support device 10 may store the input constraint condition in the project information resource management unit 22 in association with the assignment instruction.

また、割当指示は、さらに実作業(ジョブ)に関する情報を含んでもよい。たとえば、特定の実作業を実行するための実行者、設備、材料、プログラム等の情報を含んでもよい。これらの情報は、ジョブ実行情報管理部23に格納されてもよい。また、これらの情報を決定するために必要な選択肢に関する情報(たとえば、実行者、設備、材料、プログラム等のリスト)は、実行・材料リソース管理部24に格納されていてもよい。   Further, the assignment instruction may further include information on the actual work (job). For example, it may include information such as an operator, equipment, materials, and a program for executing a specific actual operation. These pieces of information may be stored in the job execution information management unit 23. Further, information on options necessary for determining such information (for example, a list of executors, equipment, materials, programs, and the like) may be stored in the execution / material resource management unit 24.

意思決定支援装置10は、入力された割当指示を、管理中割当指示として記憶する(ステップS2)。これはたとえばワークスペース20において行われる。「管理中」とは、業務が仕掛り中となっている状態を意味する。すなわち、ある割当指示に対し、業務が割り当てられた後にその業務がまだ完了していない状態となっていることを意味する。たとえば、後述の完了情報(図4に関連して説明する)が入力されていない状態の割当指示がこれに該当する。   The decision support device 10 stores the input assignment instruction as a management assignment instruction (step S2). This is performed in the workspace 20, for example. “Managed” means a state in which the business is in process. In other words, this means that after a task is assigned to a certain assignment instruction, the task is not yet completed. For example, this corresponds to an assignment instruction in a state where completion information (described later with reference to FIG. 4) has not been input.

次に、意思決定支援装置10は、第1割当指示が第1意思決定者を表す情報を含むか否かを判定する(ステップS3)。第1割当指示が第1意思決定者を含まない場合には、意思決定支援装置10は図2の処理を終了する。   Next, the decision support device 10 determines whether the first assignment instruction includes information indicating the first decision maker (Step S3). When the first assignment instruction does not include the first decision maker, the decision support device 10 ends the processing in FIG.

第1割当指示が第1意思決定者を含む場合には、意思決定支援装置10は、第1意思決定者の通知送信先に割当通知を送信する(ステップS4)。割当通知は、割当指示を第1意思決定者に通知する情報である。割当通知の形式は任意に設計可能であるが、たとえば業務が割り当てられたことを表す文章を含む電子メールまたはその他の電子的メッセージを用いることができる。   When the first assignment instruction includes the first decision maker, the decision support device 10 transmits the assignment notice to the notification destination of the first decision maker (step S4). The assignment notification is information for notifying the first decision maker of the assignment instruction. The form of the assignment notification can be arbitrarily designed, but may be, for example, an e-mail or other electronic message including a text indicating that the work has been assigned.

意思決定支援装置10は、第1割当指示に関する業務目標および制約条件を第1意思決定者が認識できるようにするための構成を備える。たとえば、割当通知が、第1割当指示に係る業務目標および制約条件を表す情報を含んでもよい。または、第1意思決定者が、意思決定支援装置10にアクセスする(たとえばログイン操作を行う)ことにより、第1割当指示に係る業務目標および制約条件を表す情報を閲覧することができるよう、意思決定支援装置10が構成されてもよい。このような情報伝達方法は、公知の構成を用いて適宜設計および実施可能である。   The decision support device 10 is provided with a configuration for enabling the first decision maker to recognize the business objectives and constraints related to the first assignment instruction. For example, the assignment notification may include information indicating the business target and the constraint condition related to the first assignment instruction. Alternatively, the first decision maker accesses the decision support device 10 (for example, performs a log-in operation) so that the first decision maker can view information representing the business target and the constraint condition related to the first assignment instruction. The decision support device 10 may be configured. Such an information transmission method can be appropriately designed and implemented using a known configuration.

次に、意思決定支援装置10は、第1意思決定者から、再帰的に、第1割当指示に係る別の割当指示(第2割当指示)の入力を受け付けることができる(ステップS5)。このステップS5は、別途実行される図2の処理におけるステップS1に該当する。第2割当指示は複数入力されてもよい。   Next, the decision support device 10 can recursively receive another assignment instruction (second assignment instruction) related to the first assignment instruction from the first decision maker (step S5). This step S5 corresponds to step S1 in the processing of FIG. 2 which is executed separately. A plurality of second assignment instructions may be input.

ここで、意思決定支援装置10は、第1割当指示と第2割当指示との関連を示す情報を記憶する。たとえば、第1割当指示と第2割当指示とは親子関係または階層的上下関係にあるということができる。このような情報は、プロジェクト情報リソース管理部22に格納されてもよい。たとえば、この情報は、下位の割当指示(第2割当指示)から上位の割当指示(第1割当指示)へのポインタとして表現することができる。   Here, the decision support device 10 stores information indicating the relationship between the first assignment instruction and the second assignment instruction. For example, it can be said that the first assignment instruction and the second assignment instruction have a parent-child relationship or a hierarchical hierarchical relationship. Such information may be stored in the project information resource management unit 22. For example, this information can be expressed as a pointer from a lower allocation instruction (second allocation instruction) to a higher allocation instruction (first allocation instruction).

第2割当指示が入力された場合には、図2の処理が繰り返されることになる。すなわち、意思決定支援装置10は、第2割当指示を管理中割当指示として記憶し(ステップS2)、第2割当指示が第2意思決定者を表す情報を含む場合に、第2意思決定者の通知送信先に、割当通知を送信する(ステップS4)。さらに再帰的に、第2割当指示に係る別の割当指示(第3割当指示)の入力を受け付けることができる(ステップS5)。   When the second assignment instruction is input, the processing in FIG. 2 is repeated. That is, the decision support device 10 stores the second assignment instruction as a management assignment instruction (step S2), and when the second assignment instruction includes information indicating the second decision maker, the The allocation notification is transmitted to the notification transmission destination (step S4). Further, it is possible to recursively receive an input of another assignment instruction (third assignment instruction) related to the second assignment instruction (step S5).

図3に、図2の処理が再帰的に繰り返されて生成される、管理中割当指示のツリー構造の例を示す。最上階層の割当指示A1(第1割当指示)には、意思決定者D1が含まれる。すなわち、割当指示A1は意思決定者D1に対して発せられたものである。意思決定者D1は、2つの割当指示(第2割当指示)を入力しており、これが第2階層の割当指示A2およびA3となる。意思決定者D1は、割当指示A2において意思決定者D2を指定し、割当指示A3において意思決定者D3を指定している。   FIG. 3 shows an example of a tree structure of a management-related assignment instruction generated by recursively repeating the processing of FIG. The assignment instruction A1 (first assignment instruction) at the top hierarchy includes the decision maker D1. That is, the assignment instruction A1 is issued to the decision maker D1. The decision maker D1 has input two assignment instructions (second assignment instructions), which are assignment instructions A2 and A3 of the second hierarchy. The decision maker D1 designates the decision maker D2 in the assignment instruction A2, and designates the decision maker D3 in the assignment instruction A3.

意思決定者D2およびD3はそれぞれ割当通知を受信し、さらに割当指示を入力する。意思決定者D2は、割当指示(第3割当指示)を入力し、これが第3階層の割当指示A4となる。意思決定者D2は、割当指示A4において意思決定者D4を指定する。   Each of the decision makers D2 and D3 receives the assignment notification and further inputs an assignment instruction. The decision maker D2 inputs an assignment instruction (third assignment instruction), which becomes an assignment instruction A4 of the third hierarchy. The decision maker D2 specifies the decision maker D4 in the assignment instruction A4.

意思決定者D4は、さらに割当指示を入力するが、この割当指示には意思決定者が含まれず、実作業の実行者および設備のみが割り当てられる。このようにして、割当指示のツリー構造が形成される。このようなツリー構造を表す情報は、プロジェクト情報リソース管理部22に格納されてもよい。   The decision maker D4 further inputs an assignment instruction, but the assignment instruction does not include the decision maker, and only the actual work executor and equipment are assigned. In this way, a tree structure of the assignment instruction is formed. Information representing such a tree structure may be stored in the project information resource management unit 22.

図4は、完了情報が入力された場合の意思決定支援装置10の処理の流れを説明するフローチャートである。まず意思決定支援装置10は、完了情報の入力を受け付ける(ステップS11)。完了情報とは、ある割当指示に係る業務の実行が完了したことを表す情報である。完了情報の具体的な表現形式および入力方法は任意に設計可能であるが、たとえば業務の実行責任者が、意思決定支援装置10にアクセスする(たとえばログイン操作を行う)ことにより、個別の完了情報を入力するためのインタフェース画面が表示されてもよい。   FIG. 4 is a flowchart illustrating the flow of the process of the decision support device 10 when the completion information is input. First, the decision support device 10 receives input of completion information (step S11). The completion information is information indicating that the execution of the task related to a certain assignment instruction has been completed. The specific expression form and input method of the completion information can be arbitrarily designed. For example, when the person in charge of the business accesses the decision support device 10 (for example, performs a login operation), the individual completion information is May be displayed.

以下では、図2に関連して説明した第2割当指示に対する完了情報(第2完了情報)が入力された場合を例にとって説明する。   Hereinafter, a case will be described as an example where the completion information (second completion information) for the second assignment instruction described with reference to FIG. 2 is input.

意思決定支援装置10は、第2完了情報の入力に応じ、対応する割当指示(第2割当指示)の管理中割当指示としての記憶を解除する(ステップS12)。たとえば、ワークスペース20から第2割当指示に係る情報を消去してもよい。または、ワークスペース20において、第2割当指示が管理中であることを示すフラグをリセットしてもよい。   In response to the input of the second completion information, the decision support device 10 releases the storage of the corresponding assignment instruction (second assignment instruction) as the management assignment instruction (step S12). For example, the information related to the second assignment instruction may be deleted from the workspace 20. Alternatively, in the workspace 20, a flag indicating that the second assignment instruction is being managed may be reset.

次に、意思決定支援装置10は、第2割当指示の親に相当する第1割当指示について、当該第2割当指示と同階層の割当指示が管理中となっているか否かを判定する(ステップS13)。言い換えると、第1割当指示について、関連するすべての第2割当指示が管理中でなくなったか否かを判定する。意思決定支援装置10は、ある第1割当指示について、管理中である第2割当指示が存在しない場合(すなわち、ある第1割当指示に係るすべての第2割当指示に対する第2完了情報の入力または生成に応じて)、当該第1割当指示の管理中割当指示としての記憶を再帰的に解除する(ステップS14)。このステップS14は、別途実行される図4の処理におけるステップS11(第1完了情報の入力)またはS12に該当する。   Next, for the first assignment instruction corresponding to the parent of the second assignment instruction, the decision support device 10 determines whether or not the assignment instruction of the same hierarchy as the second assignment instruction is being managed (step S13). In other words, for the first assignment instruction, it is determined whether or not all the related second assignment instructions are no longer being managed. When there is no second allocation instruction being managed for a certain first allocation instruction (that is, input of second completion information for all second allocation instructions related to a certain first allocation instruction or In response to the generation, the storage of the first assignment instruction as the management assignment instruction is recursively released (step S14). This step S14 corresponds to step S11 (input of first completion information) or S12 in the processing of FIG. 4 which is separately executed.

なお、上記の例では、第2完了情報は業務の実行責任者によって入力されたが、意思決定支援装置10自身によって再帰的に入力、生成または取得されたものであっても同様である。たとえば、第2割当指示に係る管理中の第3割当指示が存在しなくなることに応じて、意思決定支援装置10は当該第2割当指示に係る完了情報を生成し、これが入力されたものとしてステップS12以降を実行してもよい。   In the above example, the second completion information is input by the person in charge of the business, but the same applies to the case where the second completion information is recursively input, generated, or acquired by the decision support device 10 itself. For example, in response to the absence of the managed third assignment instruction related to the second assignment instruction, the decision support device 10 generates completion information related to the second assignment instruction, and determines that the completion information has been input. S12 and subsequent steps may be executed.

完了情報は、割当指示の実行結果を表す情報を含んでもよい。その場合には、意思決定支援装置10は、実行結果を表す情報を、プロジェクト情報リソース管理部22またはジョブ実行情報管理部23に格納してもよい。
また、割当指示の実行結果は、実行後の実行・材料リソースの状態すなわち作業実行者の能力、設備能力、材料使用料、ルール適用実績、予算消費額などの状態を表す情報を含んでもよい。その場合には、意思決定支援装置10は、利用された実行・材料リソースの状態情報を、実行・材料リソース管理部24に格納してもよい。
The completion information may include information indicating an execution result of the assignment instruction. In that case, the decision support device 10 may store the information indicating the execution result in the project information resource management unit 22 or the job execution information management unit 23.
Further, the execution result of the assignment instruction may include information indicating the state of the execution / material resource after execution, that is, the state of the work executor's ability, equipment capacity, material usage fee, rule application result, budget consumption amount, and the like. In that case, the decision support device 10 may store the status information of the used execution / material resource in the execution / material resource management unit 24.

完了情報の入力またはその他の情報の入力により、新たな運用リソースもしくは実行リソースが生成される場合がある。たとえば、業務が人材の教育である場合(すなわち業務目標が意思決定者としてのスキルに相当する知識と技量を有する人材、もしくは特定の作業を実行するための知識と技量を有する人材の生成である場合)には、意思決定支援装置10は、生成された意思決定者としてのスキルに相当する知識と技量を有する人材に関する情報(通知送信先を含む)を、運用リソース管理部21に格納してもよい。また、特定の作業を実行するための知識と技量を有する人材に関する情報を、実行・材料リソース管理部24に格納してもよい。同様に、業務目標が設備または材料の生成・生産である場合には、意思決定支援装置10は、生成された新たな設備または材料に関する情報を、実行・材料リソース管理部24に格納してもよい。   New operation resources or execution resources may be generated by inputting completion information or inputting other information. For example, when the task is education of human resources (that is, the task goal is to generate human resources having knowledge and skills corresponding to the skills as a decision maker, or human resources having knowledge and skills to perform a specific task). In this case, the decision support device 10 stores the generated information (including the destination of the notification) on the human resources having the knowledge and skills corresponding to the skills as the decision maker in the operation resource management unit 21. Is also good. Further, information on human resources having knowledge and skills for executing a specific task may be stored in the execution / material resource management unit 24. Similarly, when the business target is generation or production of equipment or material, the decision support device 10 stores information on the generated new equipment or material in the execution / material resource management unit 24. Good.

このように、本発明の実施の形態1に係る意思決定支援装置10によれば、ワークスペース20が白紙の状態から新たな業務に係る割当指示を受け付けることができ、また、業務が完了すると割当指示をクリアする。このため、進行中の業務体系に係る割当指示を動的に管理することができ、特定業務の形式に縛られることがないことに加え、ワークスペース上には、企業活動など、常時、生成と消滅を繰り返す、組織あるいは社会における個々の目的および役割遂行の全体像が表現されることから、様々な目的の業務に対する意思決定を、他の業務との関連性を加味しながら動的に支援することができる。   As described above, according to the decision support device 10 according to Embodiment 1 of the present invention, the work space 20 can receive an assignment instruction for a new job from a blank state, and when the work is completed, the assignment is completed. Clear the instructions. Therefore, it is possible to dynamically manage the assignment instructions related to the ongoing business system, not to be restricted by the format of a specific business, and to constantly generate and store corporate activities on the workspace. Representing the entire picture of individual goals and roles fulfilled in an organization or society that repeatedly disappears, dynamically supports decision making for tasks of various purposes, taking into account the relevance of other tasks be able to.

また、意思決定支援装置10は、管理中割当指示のツリー構造を表示する機能を有してもよい。この機能は、図2および図4の処理とは独立に実行可能であってもよい。この機能は、各第1意思決定者および各第2意思決定者を関連付けて階層的に表示する階層表示機能であるということができる。意思決定支援装置10は、たとえば所定の俯瞰表示指令が入力されることに応じて、このような階層表示を行う。   Further, the decision support device 10 may have a function of displaying a tree structure of the assignment instruction during management. This function may be executable independently of the processing of FIGS. This function can be said to be a hierarchical display function that hierarchically displays each first decision maker and each second decision maker in association with each other. The decision support device 10 performs such a hierarchical display in response to, for example, input of a predetermined overhead view display command.

図5に、このような表示の具体例を示す。最上階層に1つの管理中割当指示が存在し、この割当指示に対応するアイコン(考える人物すなわち個々の業務の遂行を管理する意思決定者を模したもの)が表示されている。同様に、第2階層に3つのアイコン、第3階層に9つのアイコンというように、第5階層までの構造が表示されている。   FIG. 5 shows a specific example of such a display. One management assignment instruction exists at the top level, and an icon corresponding to the assignment instruction (a model of a person who thinks, that is, a decision maker who manages the performance of each task) is displayed. Similarly, the structure up to the fifth layer is displayed, such as three icons on the second layer and nine icons on the third layer.

意思決定支援装置10は、割当指示に係る業務の状態に応じて、アイコンの表示態様を変更してもよい。たとえば、制約条件に抵触していない割当指示(第1割当指示および第2割当指示を含む)と、制約条件に抵触している割当指示(第1割当指示および第2割当指示を含む)とを、異なる態様で表示してもよい。   The decision support device 10 may change the display mode of the icons according to the status of the work related to the assignment instruction. For example, an assignment instruction (including the first assignment instruction and the second assignment instruction) that does not conflict with the constraint condition and an assignment instruction (including the first assignment instruction and the second assignment instruction) that conflicts with the constraint condition are defined. May be displayed in a different manner.

より具体的な例としては、制約条件に指定された期限を超過しているものと、そうでないものとで色を変更してもよい。図5の例では、期限そのものは表示されていないが、期限内のものは黒塗りのアイコンが、制約条件に指定された期限を超過している場合には白抜きのアイコンが、それぞれ表示されている。また、期限超過の度合いに応じて、アイコンの表示色を3色以上に異ならせてもよい。   As a more specific example, the color may be changed depending on whether the time limit specified in the constraint is exceeded or not. In the example of FIG. 5, the deadline itself is not displayed, but those within the deadline are displayed with black icons, and those over the deadline specified in the constraint conditions are displayed with white icons. ing. Further, the display colors of the icons may be changed to three or more colors according to the degree of the time limit being exceeded.

このように、割当指示のツリーを俯瞰表示することにより、各意思決定者は、プロジェクト全体の構造を迅速かつ容易に把握することができる。また、アイコンの表示態様を変更することにより、プロジェクト内における各作業の進捗状況等を迅速かつ容易に把握することができる。   In this way, by displaying the tree of the assignment instructions in a bird's-eye view, each decision maker can quickly and easily grasp the structure of the entire project. Further, by changing the display mode of the icons, it is possible to quickly and easily grasp the progress status of each work in the project.

実施の形態1では意思決定支援装置10は単一のコンピュータによって構成されるが、変形例として複数のコンピュータによって構成されてもよい。その場合には、図2および図4の各ステップはそれぞれ異なるコンピュータによって実行されてもよい。   In the first embodiment, the decision support device 10 is configured by a single computer, but may be configured by a plurality of computers as a modification. In that case, each step of FIGS. 2 and 4 may be executed by a different computer.

10 意思決定支援装置(コンピュータ)、A1 割当指示(第1割当指示)、A2,A3 割当指示(第2割当指示)、A4 割当指示、D1 意思決定者(第1意思決定者)、D2,D3 意思決定者(第2意思決定者)、D4 意思決定者。   10 decision support device (computer), A1 assignment instruction (first assignment instruction), A2, A3 assignment instruction (second assignment instruction), A4 assignment instruction, D1 decision maker (first decision maker), D2, D3 Decision maker (second decision maker), D4 decision maker.

Claims (7)

複数の意思決定者のそれぞれに、通知送信先を関連付けて記憶する機能と、
1つ以上の第1割当指示の入力を受け付ける機能と、
前記第1割当指示を管理中割当指示として記憶する機能と、
前記第1割当指示が第1意思決定者を表す情報を含む場合に、
‐前記第1意思決定者の通知送信先に、割当通知を送信する機能と、
‐前記第1意思決定者から、前記第1割当指示に係る1つ以上の第2割当指示の入力を受け付ける機能と、
‐前記第2割当指示を管理中割当指示として記憶する機能と、
‐各前記第2割当指示に対する第2完了情報の入力または生成に応じ、対応する第2割当指示の管理中割当指示としての前記記憶を解除する機能と、
‐各前記第1割当指示について、当該第1割当指示に係るすべての第2割当指示に対する前記第2完了情報の入力または生成に応じ、当該第1割当指示の管理中割当指示としての前記記憶を解除する機能と、
を備える、意思決定支援装置。
A function of storing a notification destination in association with each of a plurality of decision makers;
A function for receiving an input of one or more first assignment instructions,
A function of storing the first assignment instruction as a management assignment instruction;
When the first assignment instruction includes information representing a first decision maker,
A function of transmitting an allocation notification to a notification destination of the first decision maker;
A function of receiving, from the first decision maker, an input of one or more second allocation instructions related to the first allocation instruction;
A function of storing the second assignment instruction as a management assignment instruction;
A function of releasing the storage of the corresponding second allocation instruction as a management allocation instruction in response to input or generation of second completion information for each of the second allocation instructions;
For each of the first allocation instructions, according to the input or generation of the second completion information for all of the second allocation instructions related to the first allocation instruction, storing the storage as the managed allocation instruction of the first allocation instruction. Function to release,
A decision support device comprising:
前記第1割当指示および前記第2割当指示はさらに、業務目標と、制約条件とを表す情報を含む、請求項1に記載の意思決定支援装置。   The decision support device according to claim 1, wherein the first assignment instruction and the second assignment instruction further include information indicating a business goal and a constraint condition. 前記業務目標は、生成される人材の能力と人数と、生成される設備の能力と台数と、生成される材料の種別と数量と、生成されるルールあるいは設計値と、生成される資金と、生成される時間と、に係る情報のうち少なくとも1つを含む、請求項2に記載の意思決定支援装置。   The business goal is the capacity and the number of human resources to be generated, the capacity and the number of facilities to be generated, the type and quantity of materials to be generated, the rules or design values to be generated, and the funds to be generated, The decision support device according to claim 2, wherein the decision support device includes at least one of the information related to the generated time. 前記制約条件は、利用可能な人材と、利用可能な設備と、利用可能な材料と、利用可能なルールあるいは設計値と、利用可能な資金と、利用可能な時間と、に係る情報とのうち少なくとも1つを含む、請求項2または3に記載の意思決定支援装置。   The constraint conditions include information on available human resources, available facilities, available materials, available rules or design values, available funds, and available time. The decision support device according to claim 2, comprising at least one. 前記意思決定支援装置は、各第1意思決定者および各第2意思決定者を関連付けて階層的に表示する階層表示機能をさらに備える、請求項1〜4のいずれか一項に記載の意思決定支援装置。   The decision-making device according to any one of claims 1 to 4, wherein the decision-making support device further includes a hierarchical display function for hierarchically displaying each first decision-maker and each second decision-maker in association with each other. Support equipment. 前記階層表示機能において、制約条件に抵触していない第1割当指示および第2割当指示と、制約条件に抵触している第1割当指示および第2割当指示とは、異なる態様で表示される、請求項5に記載の意思決定支援装置。   In the hierarchical display function, the first assignment instruction and the second assignment instruction that do not conflict with the constraint and the first assignment instruction and the second assignment instruction that conflict with the constraint are displayed in different modes. The decision support device according to claim 5. コンピュータを請求項1〜6のいずれか一項に記載の意思決定支援装置として機能させる、意思決定支援プログラム。   A decision support program that causes a computer to function as the decision support device according to claim 1.
JP2018141335A 2018-07-27 2018-07-27 Decision support apparatus and program Active JP6604690B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018141335A JP6604690B1 (en) 2018-07-27 2018-07-27 Decision support apparatus and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018141335A JP6604690B1 (en) 2018-07-27 2018-07-27 Decision support apparatus and program

Publications (2)

Publication Number Publication Date
JP6604690B1 JP6604690B1 (en) 2019-11-13
JP2020017193A true JP2020017193A (en) 2020-01-30

Family

ID=68532186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018141335A Active JP6604690B1 (en) 2018-07-27 2018-07-27 Decision support apparatus and program

Country Status (1)

Country Link
JP (1) JP6604690B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11288435A (en) * 1998-04-01 1999-10-19 Hitachi Ltd Talent assignment supporting system
JP2013088829A (en) * 2011-10-13 2013-05-13 Hitachi Ltd Method and system for supporting decision making
US20170236081A1 (en) * 2015-04-29 2017-08-17 NetSuite Inc. System and methods for processing information regarding relationships and interactions to assist in making organizational decisions

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11288435A (en) * 1998-04-01 1999-10-19 Hitachi Ltd Talent assignment supporting system
JP2013088829A (en) * 2011-10-13 2013-05-13 Hitachi Ltd Method and system for supporting decision making
US20170236081A1 (en) * 2015-04-29 2017-08-17 NetSuite Inc. System and methods for processing information regarding relationships and interactions to assist in making organizational decisions

Also Published As

Publication number Publication date
JP6604690B1 (en) 2019-11-13

Similar Documents

Publication Publication Date Title
Eloranta et al. Exploring ScrumBut—An empirical study of Scrum anti-patterns
US10192181B2 (en) Resource demand-based project team staffing
Wong et al. Integrated process planning and scheduling/rescheduling—an agent-based approach
US9064220B2 (en) Linear visualization for overview, status display, and navigation along business scenario instances
US20030033191A1 (en) Method and apparatus for a product lifecycle management process
KR100989494B1 (en) Process Management Support System and Simulation Method
Wesz et al. Planning and controlling design in engineered-to-order prefabricated building systems
WO2001026010A1 (en) Method and estimator for production scheduling
CN113626914A (en) Engineering project management method, device and system based on digital twins
JP6299599B2 (en) Information system construction support apparatus, information system construction support method, and information system construction support program
US20140257901A1 (en) System and method for integrated services, projects, assets and resource management using modular analytic tool and relative variance technology
JP6914701B2 (en) Manufacturing material supply chain disruption management system
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP6604690B1 (en) Decision support apparatus and program
US11848835B2 (en) System for quantifying data center infrastructure utilization units
US20230237398A1 (en) Data Center Infrastructure Recommendation System
US20230229997A1 (en) System for Generating Organizational Value Data Center Infrastructure Recommendations
JP2023127445A (en) Workflow management program, workflow management system, and workflow management method
KR102098531B1 (en) Method and Apparatus for Managing of Manpower
Stevenson et al. The development and application of an interactive end-user training tool: part of an implementation strategy for workload control
AU2016202814A1 (en) Systems and methods for managing cpu usage during qualitatively assessment of task data
US20150081375A1 (en) Visual scheduling tool for optimizing capacity utilization
US10423913B2 (en) System and method for process-based analysis
Meier et al. Robust Manufacturing Through Integrated Industrial Services: The Delivery Management
US20140324498A1 (en) Risk-limited dispatch of knowledge work

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191001

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191011

R150 Certificate of patent or registration of utility model

Ref document number: 6604690

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250