JP2019201384A - Control device, control method, and program - Google Patents

Control device, control method, and program Download PDF

Info

Publication number
JP2019201384A
JP2019201384A JP2018096428A JP2018096428A JP2019201384A JP 2019201384 A JP2019201384 A JP 2019201384A JP 2018096428 A JP2018096428 A JP 2018096428A JP 2018096428 A JP2018096428 A JP 2018096428A JP 2019201384 A JP2019201384 A JP 2019201384A
Authority
JP
Japan
Prior art keywords
target area
work
work target
control device
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018096428A
Other languages
Japanese (ja)
Other versions
JP7066519B2 (en
Inventor
正蔵 岸
Shozo Kishi
正蔵 岸
彰 山下
Akira Yamashita
彰 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2018096428A priority Critical patent/JP7066519B2/en
Publication of JP2019201384A publication Critical patent/JP2019201384A/en
Application granted granted Critical
Publication of JP7066519B2 publication Critical patent/JP7066519B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Of Cameras Including Film Mechanisms (AREA)
  • Camera Bodies And Camera Details Or Accessories (AREA)
  • Studio Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To realize a control device or the like capable of managing a construction in which a position of a work target area is changed according to a work progress.SOLUTION: In a construction management system 100, a management control device 2 has at least one of a function as a construction management device and a function as a control device. An imaging control unit 22 controls an imaging device 1. A target area specifying unit 23 specifies a work target area from a captured image including the entire work target area. A work completed area specifying unit 24 specifies a work completed area, which is an area where work in the construction has already been performed. An abnormality detection unit 25 detects an abnormality in the construction on the basis of the captured image. A work progress grasping unit 26 recognizes a state in which a pipe to be laid is lifted using the captured image and grasps the work progress related to the pipe laying from the state. The management control device 2 can transmit an instruction on the basis of a function as the construction management device to a worker terminal 3.SELECTED DRAWING: Figure 1

Description

本発明は、制御装置、制御方法、およびプログラムに関する。   The present invention relates to a control device, a control method, and a program.

従来、工事の管理においては、たとえば、特許文献1に示されるように、一定の作業対象領域を固定で撮影し、この作業対象領域を管理することが一般的であった。   Conventionally, in construction management, for example, as disclosed in Patent Document 1, it is common to photograph a fixed work target area in a fixed manner and manage the work target area.

特開2004−295543号公報JP 2004-295543 A

しかしながら、特許文献1等に開示されている従来技術においては、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが困難であった。   However, in the prior art disclosed in Patent Document 1 and the like, it is difficult to manage the construction in which the position of the work target area changes according to the work progress.

本発明の一態様は、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが可能な、制御装置、制御方法、およびプログラムを実現することを目的とする。   An object of one embodiment of the present invention is to realize a control device, a control method, and a program capable of managing a construction in which the position of a work target area changes according to work progress.

上記の課題を解決するために、本発明の一態様に係る制御装置は、作業対象領域の位置が作業進捗に応じて変更される工事の様子を撮影する撮影装置を制御する制御装置であって、前記作業対象領域の全体が撮影されるように前記撮影装置を制御する撮影制御部を備えていることを特徴としている。   In order to solve the above-described problem, a control device according to one aspect of the present invention is a control device that controls an imaging device that captures a construction state in which the position of a work target area is changed according to work progress. A photographing control unit is provided for controlling the photographing apparatus so that the entire work target region is photographed.

上記の課題を解決するために、本発明の一態様に係る制御方法は、作業対象領域の位置が作業進捗に応じて変更される工事の様子を撮影する撮影装置を制御する制御方法であって、前記作業対象領域の全体が撮影されるように前記撮影装置を制御する撮影制御工程を備えていることを特徴としている。   In order to solve the above-described problem, a control method according to an aspect of the present invention is a control method for controlling a photographing apparatus that photographs a construction state in which the position of a work target area is changed according to work progress. A photographing control step of controlling the photographing device so that the entire work target area is photographed is provided.

上記の構成によれば、位置が作業進捗に応じて変更される作業対象領域の全体が撮影されるように撮影装置を制御する。これにより、作業対象領域の位置が作業進捗に応じて変更する工事において、作業対象領域を漏れなく撮影することができるため、撮影装置によって取得することができる撮影画像に基づいて、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが可能となる。   According to said structure, an imaging device is controlled so that the whole work object area | region where a position is changed according to work progress is image | photographed. Thereby, in the construction in which the position of the work target area is changed according to the work progress, the work target area can be photographed without omission, so that the work target area can be captured based on the photographed image that can be acquired by the photographing device. It is possible to manage the construction whose position changes according to the work progress.

本発明の一態様に係る制御装置は、前記作業対象領域の全体が含まれる撮影画像から、前記作業対象領域を特定する対象領域特定部をさらに備え、前記撮影制御部は、前記対象領域特定部により特定される前記作業対象領域を少なくとも撮影するよう、前記撮影装置を制御することが好ましい。   The control apparatus according to an aspect of the present invention further includes a target area specifying unit that specifies the work target area from a captured image including the entire work target area, and the shooting control unit includes the target area specifying unit. It is preferable to control the photographing apparatus so as to photograph at least the work target area specified by the above.

上記の構成によれば、作業対象領域の全体が含まれる撮影画像から、作業対象領域を特定する。これにより、工事の管理を、作業対象領域の位置の変更に追従させることができるため、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが可能となる。   According to the above configuration, the work target area is specified from the captured image including the entire work target area. Thereby, since the management of the construction can be made to follow the change of the position of the work target area, the construction in which the position of the work target area is changed according to the progress of the work can be managed.

本発明の一態様に係る制御装置において、前記対象領域特定部は、前記作業対象領域について位置が変更されても、前記作業対象領域を追従して特定するものであることが好ましい。   In the control device according to one aspect of the present invention, it is preferable that the target area specifying unit specifies the work target area by following the position even if the position of the work target area is changed.

上記の構成によれば、工事の管理を、作業対象領域の位置の変更に追従させることにより、作業対象領域の位置が作業進捗に応じて変更する工事を管理することを実現することができる。   According to the above configuration, it is possible to realize the management of the construction in which the position of the work target area changes in accordance with the progress of the work by making the construction management follow the change of the position of the work target area.

本発明の一態様に係る制御装置において、前記作業対象領域は、作業対象領域画定物を配置することにより画定されるものであり、前記対象領域特定部は、前記撮影画像内に含まれる前記作業対象領域画定物を認識し、該認識した前記作業対象領域画定物の配置により定まる領域を前記作業対象領域として特定することが好ましい。   In the control device according to one aspect of the present invention, the work target area is defined by arranging a work target area defining object, and the target area specifying unit is included in the captured image. It is preferable to recognize the target area definition and specify the area determined by the arrangement of the recognized work target area definition as the work target area.

上記の構成によれば、作業対象領域画定物によって、作業対象領域として特定すべき領域を明確化することができるため、作業対象領域の特定が容易となる。   According to said structure, since the area | region which should be specified as a work object area | region can be clarified by the work object area | region definition thing, specification of a work object area | region becomes easy.

本発明の一態様に係る制御装置において、前記対象領域特定部は、前記撮影画像においてトリミングされた領域を、前記作業対象領域として特定することが好ましい。   In the control device according to one aspect of the present invention, it is preferable that the target area specifying unit specifies a trimmed area in the captured image as the work target area.

上記の構成によれば、撮影画像のトリミングによって、作業対象領域として特定すべき領域を明確化することができるため、作業対象領域の特定が容易となる。   According to the above configuration, the region to be specified as the work target region can be clarified by trimming the captured image, so that the work target region can be easily specified.

本発明の一態様に係る制御装置において、前記撮影制御部は、前記対象領域特定部により特定される前記作業対象領域を拡大して撮影可能であることが好ましい。   In the control device according to one aspect of the present invention, it is preferable that the imaging control unit is capable of imaging while enlarging the work target area specified by the target area specifying unit.

上記の構成によれば、拡大された撮影画像に基づいて作業対象領域を特定することができるため、作業対象領域をより細やかに特定することが可能となる。   According to the above configuration, since the work target area can be specified based on the enlarged photographed image, the work target area can be specified more finely.

本発明の一態様に係る制御装置において、前記工事は、管を地面に敷設する工程を含む工事であり、前記制御装置は、前記作業対象領域の全体が含まれる撮影画像を用いて、敷設対象の管が吊り上げられている状態を認識するとともに、当該状態から管の敷設に係る作業進捗を把握する作業進捗把握部を備えていることが好ましい。   In the control device according to one aspect of the present invention, the work is a work including a step of laying a pipe on the ground, and the control device uses a captured image including the entire work target area, It is preferable to include a work progress grasping unit that recognizes the state in which the pipe is suspended and grasps the work progress relating to the laying of the pipe from the state.

上記の構成によれば、管の敷設に係る作業進捗を把握することが可能となる。   According to said structure, it becomes possible to grasp | ascertain the work progress which concerns on laying of a pipe | tube.

本発明の一態様に係るプログラムは、上記制御装置における各部としてコンピュータを機能させるためのプログラムである。   The program which concerns on 1 aspect of this invention is a program for functioning a computer as each part in the said control apparatus.

上記の構成によれば、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが可能なプログラムを実現することができる。   According to said structure, the program which can manage the construction which changes the position of a work object area | region according to work progress is realizable.

本発明の一態様によれば、作業対象領域の位置が作業進捗に応じて変更する工事を管理することが可能となる。   According to one aspect of the present invention, it is possible to manage a construction in which the position of the work target area changes according to work progress.

本発明の実施の形態に係る工事管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the construction management system which concerns on embodiment of this invention. 図1に示す工事管理システムの具体的な適用例を示すイメージ図である。It is an image figure which shows the specific example of application of the construction management system shown in FIG. 作業対象領域の全体が含まれる撮影画像の一例を示す図である。It is a figure which shows an example of the picked-up image in which the whole work object area | region is included. (a)〜(c)は、作業対象領域画定物の具体例を示す図である。(A)-(c) is a figure which shows the specific example of a work object area | region demarcation thing. 作業対象領域の特定方法の変形例を示す図である。It is a figure which shows the modification of the identification method of a work object area | region. 敷設対象の管が吊り上げられている状態を示す撮影画像の概略図である。It is the schematic of the picked-up image which shows the state by which the pipe | tube of laying object is suspended.

図1は、本発明の実施の形態に係る工事管理システム100の構成を示すブロック図である。図2は、工事管理システム100の具体的な適用例を示すイメージ図である。工事管理システム100は、撮影装置1、管理制御装置2、および作業者端末3を備えている。   FIG. 1 is a block diagram showing a configuration of a construction management system 100 according to an embodiment of the present invention. FIG. 2 is an image diagram showing a specific application example of the construction management system 100. The construction management system 100 includes a photographing device 1, a management control device 2, and an operator terminal 3.

撮影装置1は、工事の様子を撮影する。なお、この工事は、作業進捗に応じて、作業対象領域101の位置が変更されるものである。特に、本実施の形態においては、この工事の具体例として、地面102の掘削工程および埋戻し工程を含む工事、より具体的には、管103を地面102に敷設する工程を含む工事を想定している。   The photographing apparatus 1 photographs the state of construction. In this construction, the position of the work target area 101 is changed according to the work progress. In particular, in the present embodiment, as a specific example of this construction, a construction including excavation process and backfilling process of the ground 102, more specifically, a construction including a process of laying the pipe 103 on the ground 102 is assumed. ing.

管理制御装置2は、例えば前記工事を管理する管理事務所に設置されたパーソナルコンピュータによって構成されている。管理制御装置2は、通信部21、撮影制御部22、対象領域特定部23、作業済み領域特定部24、異常検知部25、および作業進捗把握部26を有している。   The management control device 2 is composed of, for example, a personal computer installed in a management office that manages the construction. The management control device 2 includes a communication unit 21, an imaging control unit 22, a target area specifying unit 23, a work completed area specifying unit 24, an abnormality detection unit 25, and a work progress grasping unit 26.

管理制御装置2は、工事管理装置としての機能と、制御装置としての機能との、少なくとも一方を有している。工事管理装置としての機能は、対象領域特定部23、作業済み領域特定部24、異常検知部25、および作業進捗把握部26によって実現される機能であって、前記工事を管理する機能である。制御装置としての機能は、撮影制御部22、および対象領域特定部23によって実現される機能であって、撮影装置1を制御する機能である。なお、管理制御装置2における工事管理装置としての機能を持つ各部材と、管理制御装置2における制御装置としての機能を持つ各部材とのそれぞれを備え、これらの機能の両方を実現する構成であってもよい。   The management control device 2 has at least one of a function as a construction management device and a function as a control device. The function as the construction management device is a function realized by the target area specifying unit 23, the work completed area specifying unit 24, the abnormality detecting unit 25, and the work progress grasping unit 26, and is a function for managing the work. The function as the control device is a function realized by the photographing control unit 22 and the target area specifying unit 23 and is a function for controlling the photographing device 1. Each member having a function as a construction management device in the management control device 2 and each member having a function as a control device in the management control device 2 are provided, and both of these functions are realized. May be.

通信部21は、撮影装置1と管理制御装置2との通信を実現するためのものである。該通信の形態は、無線であることが一般的であるが、有線であってもよい。該通信により、管理制御装置2は、撮影装置1の撮影によって得られた画像データ(後述する撮影画像108)を受け取ることができると共に、撮影装置1を制御することができる。   The communication unit 21 is for realizing communication between the imaging device 1 and the management control device 2. The communication form is generally wireless, but may be wired. Through this communication, the management control device 2 can receive image data (captured image 108 to be described later) obtained by photographing by the photographing device 1 and can control the photographing device 1.

撮影制御部22は、撮影装置1を制御するものである。具体的に、撮影制御部22は、上述した作業対象領域101の全体が撮影されるように撮影装置1を制御するものである。   The imaging control unit 22 controls the imaging device 1. Specifically, the photographing control unit 22 controls the photographing apparatus 1 so that the entire work target area 101 described above is photographed.

対象領域特定部23は、作業対象領域101の全体が含まれる撮影画像108(図3参照)から、作業対象領域101を特定する。作業済み領域特定部24は、前記工事における作業が既に行われた領域である作業済み領域104を特定する。異常検知部25は、撮影画像108に基づき、前記工事における異常を検知する。作業進捗把握部26は、撮影画像108を用いて、敷設対象の管103が吊り上げられている状態を認識すると共に、該状態から管103の敷設に係る作業進捗を把握する。対象領域特定部23、作業済み領域特定部24、異常検知部25、および作業進捗把握部26のそれぞれの機能についての詳細な説明は後述する。   The target area specifying unit 23 specifies the work target area 101 from the captured image 108 (see FIG. 3) including the entire work target area 101. The work completed area specifying unit 24 specifies a work completed area 104 that is an area where work in the construction has already been performed. The abnormality detection unit 25 detects an abnormality in the construction based on the captured image 108. The work progress grasping unit 26 uses the captured image 108 to recognize the state in which the pipe 103 to be laid is lifted, and grasps the work progress related to the laying of the pipe 103 from the state. Detailed descriptions of the functions of the target area specifying unit 23, the completed area specifying unit 24, the abnormality detecting unit 25, and the work progress grasping unit 26 will be described later.

通信部21は、管理制御装置2と作業者端末3との通信を実現するためのものでもある。該通信の形態は、無線であることが一般的であるが、有線であってもよい。該通信により、管理制御装置2は、作業者端末3に対して、工事管理装置としての機能に基づく指示を送信することができる。   The communication unit 21 is also for realizing communication between the management control device 2 and the worker terminal 3. The communication form is generally wireless, but may be wired. Through this communication, the management control device 2 can transmit an instruction based on the function as the construction management device to the worker terminal 3.

作業者端末3は、前記指示を受信する端末である。例えば、作業者105と作業者106とのそれぞれが、作業者端末3を所持している。作業者105は、前記工事における工程の管理を行う者であり、作業者106は、ショベルカー等の重機107を運転する者である。管理制御装置2は、作業者105が所持する作業者端末3および作業者106が所持する作業者端末3のそれぞれに対して、互いに独立した指示を送信したり、共通の指示を一括で送信したりする。これにより、作業者105および作業者106のそれぞれは、自身が行っている作業内容に適合した指示を、自身が所持する作業者端末3によって受けることができる。作業者106が作業者端末3を所持する替わりに、重機107に作業者端末3を取り付けてもよい。   The worker terminal 3 is a terminal that receives the instruction. For example, each of the worker 105 and the worker 106 has the worker terminal 3. The worker 105 is a person who manages the process in the construction, and the worker 106 is a person who operates a heavy machine 107 such as an excavator. The management control device 2 transmits an independent instruction to each of the worker terminal 3 possessed by the worker 105 and the worker terminal 3 possessed by the worker 106 or transmits a common instruction in a batch. Or Thereby, each of the worker 105 and the worker 106 can receive an instruction suitable for the work content he / she is performing by the worker terminal 3 he / she owns. Instead of the operator 106 having the operator terminal 3, the operator terminal 3 may be attached to the heavy machine 107.

図3は、作業対象領域101の全体が含まれる撮影画像108の一例を示す図である。撮影画像108には、作業対象領域101を画定すべく配置された4つの作業対象領域画定物109が写っている。対象領域特定部23は、撮影画像108内に含まれるこれらの作業対象領域画定物109を認識し、認識した作業対象領域画定物109の配置により定まる領域を、作業対象領域101として特定する。図3に示す例においては、4つの作業対象領域画定物109によって囲まれた領域を、作業対象領域101としている。   FIG. 3 is a diagram illustrating an example of a captured image 108 that includes the entire work target area 101. In the photographed image 108, four work target area defining objects 109 arranged to demarcate the work target area 101 are shown. The target area specifying unit 23 recognizes these work target area defining items 109 included in the captured image 108 and specifies the area determined by the arrangement of the recognized work target area defining objects 109 as the work target area 101. In the example shown in FIG. 3, an area surrounded by four work target area defining objects 109 is a work target area 101.

図4の(a)〜(c)は、作業対象領域画定物109の具体例を示す図である。図4の(a)に示すとおり、作業対象領域画定物109は、単色または模様入りのカラーコーン(登録商標)109aであってもよい。また、図4の(b)に示すとおり、作業対象領域画定物109は、単色または模様入りのコーンバー109bであってもよい。また、図4の(c)に示すとおり、作業対象領域画定物109は、模様入り、もしくは標識として機能する文字(例:立入禁止)および模様入りのテープ109cであってもよい。他にも、作業対象領域画定物109は、ガードバー、バリアリール、または標識ロープ(トラロープ)であってもよい。なお、図3には、4つの作業対象領域画定物109の各々が、単色のカラーコーンである例を示している。   FIGS. 4A to 4C are diagrams showing a specific example of the work target area defining object 109. As shown in FIG. 4A, the work target area defining object 109 may be a single color or patterned color cone (registered trademark) 109 a. Further, as shown in FIG. 4B, the work target area defining object 109 may be a single color or patterned cone bar 109b. Further, as shown in FIG. 4C, the work target area defining object 109 may be a pattern or a character (for example, entry prohibition) functioning as a sign and a pattern tape 109c. In addition, the work area definition 109 may be a guard bar, a variaryl, or a sign rope (tra-rope). FIG. 3 shows an example in which each of the four work area defining items 109 is a single color cone.

また、位置情報を取得可能な機器(例:GPS(Global Positioning System)センサ)を作業対象領域画定物109に取り付け、該位置情報を管理制御装置2が参照できるようにしてもよい。これにより、対象領域特定部23が、作業対象領域画定物109の絶対的な位置(例:緯度および/または経度)を認識することができる。   In addition, a device (for example, a GPS (Global Positioning System) sensor) that can acquire position information may be attached to the work target area defining object 109 so that the management control apparatus 2 can refer to the position information. Thereby, the target area specifying unit 23 can recognize the absolute position (for example, latitude and / or longitude) of the work target area defining object 109.

さらに、作業対象領域画定物109の配置をそのままに、作業対象領域101の特定方法を変更することによって、作業対象領域101に該当する領域を変更することも可能である。作業進捗または時間等に応じて、このような作業対象領域101に該当する領域を変更することを行ってもよい。   Furthermore, it is also possible to change the area corresponding to the work target area 101 by changing the method of specifying the work target area 101 while keeping the arrangement of the work target area defining object 109 as it is. The area corresponding to the work target area 101 may be changed according to the work progress or time.

図5は、作業対象領域101の特定方法の変形例を示す図である。図5によれば、2つの作業対象領域画定物109と、これらの作業対象領域画定物109から隔てられた位置にある建築物等の壁110とによって囲まれた領域を、作業対象領域101としている。前記工事が行われている位置のごく近くに壁110が存在する場合、壁110に近い位置に配置すべき作業対象領域画定物109を適切な位置に配置することが困難な場合がある。この場合、作業対象領域画定物109の替わりに壁110を用いて、作業対象領域101を特定してもよい。つまり、適切に配置することができた作業対象領域画定物109の配置点、または適切に配置することができた2つの作業対象領域画定物109を結んだ直線を起点として定められた所定の範囲を、作業対象領域101としてもよい。   FIG. 5 is a diagram illustrating a modification of the method for specifying the work target area 101. According to FIG. 5, an area surrounded by two work target area defining objects 109 and a wall 110 such as a building at a position separated from these work target area defining objects 109 is defined as a work target area 101. Yes. When the wall 110 exists in the immediate vicinity of the position where the construction is being performed, it may be difficult to arrange the work target area definition 109 to be arranged at a position close to the wall 110 at an appropriate position. In this case, the work target area 101 may be specified using the wall 110 instead of the work target area defining object 109. In other words, the predetermined range determined from the starting point of the arrangement point of the work target area definition 109 that can be properly arranged, or the two straight lines connecting the two work object area definition 109 that can be appropriately arranged May be the work target area 101.

他にも、対象領域特定部23は、撮影画像108においてトリミングされた領域を、作業対象領域101として特定してもよい。また、対象領域特定部23は、作業対象領域101について位置が変更されても、作業対象領域101を追従して特定してもよい。   In addition, the target area specifying unit 23 may specify a trimmed area in the captured image 108 as the work target area 101. Moreover, even if the position of the work target area 101 is changed, the target area specifying unit 23 may specify the work target area 101 by following it.

また、撮影制御部22は、対象領域特定部23により特定される作業対象領域101を少なくとも撮影するように、撮影装置1を制御することとなる。撮影制御部22は、撮影装置1の制御または撮影制御部22自身の機能によって、対象領域特定部23により特定される作業対象領域101を拡大して撮影可能であってもよい。   Further, the imaging control unit 22 controls the imaging device 1 so as to capture at least the work target area 101 specified by the target area specifying unit 23. The imaging control unit 22 may be able to magnify the work target area 101 specified by the target area specifying unit 23 according to the control of the imaging apparatus 1 or the function of the imaging control unit 22 itself.

作業済み領域特定部24は、撮影画像108における埋戻し済みの地面111の色と、未掘削の地面112の色との相違に基づき、地面埋戻し済みの領域(すなわち、当該相違によって特定された埋戻し済みの地面111の領域)を、埋戻し済み領域として特定する。また、図3には詳細を示していないが、作業済み領域特定部24は、撮影画像108に含まれる敷設済みの管103の画像領域を、管敷設済み領域として特定することも可能である。作業済み領域特定部24は、これら埋戻し済み領域および/または管敷設済み領域を、作業済み領域104として特定することができる。   Based on the difference between the color of the backfilled ground 111 and the color of the unexcavated ground 112 in the captured image 108, the work done area specifying unit 24 specifies the area that has been backfilled (that is, specified by the difference). The area of the backfilled ground 111) is specified as the backfilled area. Although not shown in detail in FIG. 3, the worked area specifying unit 24 can also specify the image area of the pipe 103 that has been laid included in the captured image 108 as the pipe laid area. The worked area specifying unit 24 can specify the backfilled area and / or the pipe laid area as the worked area 104.

異常検知部25は、掘削後に地下埋設物の存在を検知することで、前記工事における異常を検知する。地下埋設物とは、掘削した場所に存在する大きな岩であったり、同場所に存在する敷設済みの管103であったりする。また、異常検知部25は、前記工事に関わる設備の存在を検知することで、前記工事における異常を検知してもよい。前記工事に関わる設備とは、掘削した場所に残った重機107であったり、同場所に残った作業者105または106の着用物(ヘルメット等)であったりする。特に、作業時間外に前記工事に関わる設備が存在することは、異常検知部25による異常検知の有力な根拠となる。   The abnormality detection unit 25 detects an abnormality in the construction by detecting the presence of an underground object after excavation. The underground buried object is a large rock that exists in the excavated place or a pipe 103 that has been laid in the same place. In addition, the abnormality detection unit 25 may detect an abnormality in the construction by detecting the presence of equipment related to the construction. The equipment related to the construction may be the heavy machinery 107 remaining in the excavated place, or the wear (such as a helmet) of the worker 105 or 106 remaining in the excavated place. In particular, the presence of equipment related to the construction outside the working hours is an effective basis for abnormality detection by the abnormality detection unit 25.

図6は、敷設対象の管103が吊り上げられている状態を示す撮影画像108´の概略図である。撮影画像108´は、撮影画像108と同じく、作業対象領域101の全体が含まれる撮影画像である。作業進捗把握部26が認識すべき状態は、撮影画像108´に表された状態であると言える。作業進捗把握部26が把握する作業進捗とは、管103の敷設または接合作業がこれから開始されようとしている、あるいは実施中であることである。   FIG. 6 is a schematic view of a photographed image 108 ′ showing a state where the pipe 103 to be laid is suspended. The captured image 108 ′ is a captured image that includes the entire work target area 101, as with the captured image 108. It can be said that the state to be recognized by the work progress grasping unit 26 is the state represented in the photographed image 108 '. The work progress grasped by the work progress grasping unit 26 means that the laying or joining work of the pipe 103 is about to start or is being performed.

なお、管理制御装置2における工事管理装置としての機能に対応する工事管理方法についても、本発明の範疇に含まれる。すなわち、本発明に係る工事管理方法は、作業対象領域101の位置が作業進捗に応じて変更する工事を管理する工事管理方法であって、作業対象領域101の全体が含まれる撮影画像108から、作業対象領域101を特定する対象領域特定工程を備えていると解釈することができる。   The construction management method corresponding to the function as the construction management apparatus in the management control apparatus 2 is also included in the scope of the present invention. That is, the construction management method according to the present invention is a construction management method for managing a construction in which the position of the work target area 101 is changed according to the progress of the work, and from the captured image 108 including the entire work target area 101, It can be interpreted that a target area specifying step for specifying the work target area 101 is provided.

同様に、管理制御装置2における制御装置としての機能に対応する制御方法についても、本発明の範疇に含まれる。すなわち、本発明に係る制御方法は、作業対象領域101の位置が作業進捗に応じて変更される工事の様子を撮影する撮影装置1を制御する制御方法であって、作業対象領域101の全体が撮影されるように撮影装置1を制御する撮影制御工程を備えていると解釈することができる。   Similarly, a control method corresponding to a function as a control device in the management control device 2 is also included in the scope of the present invention. In other words, the control method according to the present invention is a control method for controlling the photographing apparatus 1 that captures the construction work in which the position of the work target area 101 is changed according to the work progress. It can be interpreted that a photographing control process for controlling the photographing apparatus 1 so as to be photographed is provided.

管理制御装置2の制御ブロック(特に、撮影制御部22、対象領域特定部23、作業済み領域特定部24、異常検知部25、および作業進捗把握部26)は、集積回路(ICチップ)等に形成された論理回路(ハードウェア)によって実現してもよいし、ソフトウェアによって実現してもよい。   The control blocks of the management control device 2 (in particular, the imaging control unit 22, the target area specifying unit 23, the work completed area specifying unit 24, the abnormality detecting unit 25, and the work progress grasping unit 26) are integrated into an integrated circuit (IC chip) or the like. It may be realized by a formed logic circuit (hardware) or may be realized by software.

後者の場合、管理制御装置2は、各機能を実現するソフトウェアであるプログラムの命令を実行するコンピュータを備えている。このコンピュータは、例えば1つ以上のプロセッサを備えていると共に、上記プログラムを記憶したコンピュータ読み取り可能な記録媒体を備えている。そして、上記コンピュータにおいて、上記プロセッサが上記プログラムを上記記録媒体から読み取って実行することにより、本発明の目的が達成される。上記プロセッサとしては、例えばCPU(Central Processing Unit)を用いることができる。上記記録媒体としては、「一時的でない有形の媒体」、例えば、ROM(Read Only Memory)等の他、テープ、ディスク、カード、半導体メモリ、プログラマブルな論理回路などを用いることができる。また、上記プログラムを展開するRAM(Random Access Memory)などをさらに備えていてもよい。また、上記プログラムは、該プログラムを伝送可能な任意の伝送媒体(通信ネットワークや放送波等)を介して上記コンピュータに供給されてもよい。なお、本発明の一態様は、上記プログラムが電子的な伝送によって具現化された、搬送波に埋め込まれたデータ信号の形態でも実現され得る。   In the latter case, the management control device 2 includes a computer that executes instructions of a program that is software for realizing each function. The computer includes, for example, one or more processors and a computer-readable recording medium storing the program. In the computer, the processor reads the program from the recording medium and executes the program, thereby achieving the object of the present invention. As the processor, for example, a CPU (Central Processing Unit) can be used. As the recording medium, a “non-temporary tangible medium” such as a ROM (Read Only Memory), a tape, a disk, a card, a semiconductor memory, a programmable logic circuit, or the like can be used. Further, a RAM (Random Access Memory) for expanding the program may be further provided. The program may be supplied to the computer via an arbitrary transmission medium (such as a communication network or a broadcast wave) that can transmit the program. Note that one embodiment of the present invention can also be realized in the form of a data signal embedded in a carrier wave, in which the program is embodied by electronic transmission.

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。   The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope shown in the claims, and embodiments obtained by appropriately combining technical means disclosed in different embodiments. Is also included in the technical scope of the present invention.

1 撮影装置
2 管理制御装置(工事管理装置、制御装置)
22 撮影制御部
23 対象領域特定部
24 作業済み領域特定部
25 異常検知部
26 作業進捗把握部
101 作業対象領域
102 地面
103 管
104 作業済み領域
108、108´ 撮影画像
109 作業対象領域画定物
111 埋戻し済みの地面
112 未掘削の地面
1 photographing device 2 management control device (construction management device, control device)
22 Shooting control unit 23 Target region specifying unit 24 Worked region specifying unit 25 Abnormality detecting unit 26 Work progress grasping unit 101 Work target region 102 Ground 103 Pipe 104 Worked region 108, 108 ′ Captured image 109 Work target region demarcation 111 embedded Returned ground 112 Unexcavated ground

Claims (9)

作業対象領域の位置が作業進捗に応じて変更される工事の様子を撮影する撮影装置を制御する制御装置であって、
前記作業対象領域の全体が撮影されるように前記撮影装置を制御する撮影制御部を備えていることを特徴とする制御装置。
A control device that controls a photographing device that photographs the state of the construction in which the position of the work target area is changed according to work progress,
A control apparatus comprising: a photographing control unit that controls the photographing apparatus so that the entire work target area is photographed.
前記作業対象領域の全体が含まれる撮影画像から、前記作業対象領域を特定する対象領域特定部をさらに備え、
前記撮影制御部は、前記対象領域特定部により特定される前記作業対象領域を少なくとも撮影するよう、前記撮影装置を制御することを特徴とする請求項1に記載の制御装置。
From a captured image including the entire work target area, further comprising a target area specifying unit for specifying the work target area,
The control device according to claim 1, wherein the photographing control unit controls the photographing device so as to photograph at least the work target area specified by the target area specifying unit.
前記対象領域特定部は、前記作業対象領域について位置が変更されても、前記作業対象領域を追従して特定するものであることを特徴とする請求項2に記載の制御装置。   The control device according to claim 2, wherein the target area specifying unit is configured to specify the work target area following the work target area even if the position of the work target area is changed. 前記作業対象領域は、作業対象領域画定物を配置することにより画定されるものであり、
前記対象領域特定部は、前記撮影画像内に含まれる前記作業対象領域画定物を認識し、該認識した前記作業対象領域画定物の配置により定まる領域を前記作業対象領域として特定することを特徴とする請求項2に記載の制御装置。
The work target area is defined by arranging a work target area definition,
The target area specifying unit recognizes the work target area definition included in the captured image, and specifies an area determined by the arrangement of the recognized work target area definition as the work target area. The control device according to claim 2.
前記対象領域特定部は、前記撮影画像においてトリミングされた領域を、前記作業対象領域として特定することを特徴とする請求項2に記載の制御装置。   The control device according to claim 2, wherein the target area specifying unit specifies an area trimmed in the captured image as the work target area. 前記撮影制御部は、前記対象領域特定部により特定される前記作業対象領域を拡大して撮影可能であることを特徴とする請求項2から5のいずれか1項に記載の制御装置。   6. The control device according to claim 2, wherein the photographing control unit is capable of performing photographing while enlarging the work target area specified by the target area specifying unit. 前記工事は、管を地面に敷設する工程を含む工事であり、
前記制御装置は、前記作業対象領域の全体が含まれる撮影画像を用いて、敷設対象の管が吊り上げられている状態を認識するとともに、当該状態から管の敷設に係る作業進捗を把握する作業進捗把握部を備えていることを特徴とする請求項1から6のいずれか1項に記載の制御装置。
The construction is a construction including a step of laying a pipe on the ground,
The control device recognizes a state in which the pipe to be laid is lifted using a captured image including the entire work target area, and grasps a work progress related to pipe laying from the state. The control device according to claim 1, further comprising a grasping unit.
作業対象領域の位置が作業進捗に応じて変更される工事の様子を撮影する撮影装置を制御する制御方法であって、
前記作業対象領域の全体が撮影されるように前記撮影装置を制御する撮影制御工程を備えていることを特徴とする制御方法。
A control method for controlling a photographing device for photographing a construction state in which a position of a work target area is changed according to work progress,
A control method comprising: an imaging control step of controlling the imaging apparatus so that the entire work target area is imaged.
請求項1から7のいずれか1項に記載の制御装置における各部としてコンピュータを機能させるためのプログラム。   The program for functioning a computer as each part in the control apparatus of any one of Claim 1 to 7.
JP2018096428A 2018-05-18 2018-05-18 Controls, control methods, and programs Active JP7066519B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018096428A JP7066519B2 (en) 2018-05-18 2018-05-18 Controls, control methods, and programs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018096428A JP7066519B2 (en) 2018-05-18 2018-05-18 Controls, control methods, and programs

Publications (2)

Publication Number Publication Date
JP2019201384A true JP2019201384A (en) 2019-11-21
JP7066519B2 JP7066519B2 (en) 2022-05-13

Family

ID=68612364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018096428A Active JP7066519B2 (en) 2018-05-18 2018-05-18 Controls, control methods, and programs

Country Status (1)

Country Link
JP (1) JP7066519B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021131998A1 (en) * 2018-12-27 2021-07-01 株式会社クボタ Waterworks management system, notification device, waterworks management method, and program

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011202383A (en) * 2010-03-25 2011-10-13 Toda Constr Co Ltd Concrete placing management system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011202383A (en) * 2010-03-25 2011-10-13 Toda Constr Co Ltd Concrete placing management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021131998A1 (en) * 2018-12-27 2021-07-01 株式会社クボタ Waterworks management system, notification device, waterworks management method, and program

Also Published As

Publication number Publication date
JP7066519B2 (en) 2022-05-13

Similar Documents

Publication Publication Date Title
JP5679521B2 (en) Information display device and information display system
JP6071746B2 (en) Information providing apparatus and information providing system
AU2018226452A1 (en) Construction management system, construction management method and management device
KR101871764B1 (en) Industrial infrastructure management platform building system based on virtual reality
AU2017305113B2 (en) Management system
JP2007257207A (en) Operation support system, operation support device and computer program
JP2021093219A (en) Operation information transmission device, construction management system, operation information transmission method, and program
US10379514B2 (en) Systems and methods for controlling a home automation system based on identifying a user location via a wi-fi fingerprint
WO2020242947A1 (en) Systems and methods for preventing damage to unseen utility assets
JP2019201384A (en) Control device, control method, and program
JP6195809B2 (en) Monitoring system
JP2005344418A (en) Integrated management system for tunnel construction site
CN112655027A (en) Maintenance support system, maintenance support method, program, method for generating processed image, and processed image
JP2018199950A (en) Capacity calculation device, capacity calculation method, and program
JP2019200723A (en) Construction management device, construction management method, and program
JP2019176380A (en) Control unit and monitoring system
JP2019087936A5 (en)
US20180352197A1 (en) Information processing device and method for controlling image data thereof
JP6664411B2 (en) Security device, security control method, program, and storage medium
JP5683345B2 (en) Construction work guidance management system
JP7281955B2 (en) Safety support device and safety monitoring method
JP2019066368A (en) System and method for detecting displacement of structure
JP2018091003A (en) Underground survey system
KR101944817B1 (en) Detection Automatic System of Excavating Work Using Mobile Terminal
CN113785091A (en) Construction machine image acquisition device, information management system, information terminal, and construction machine image acquisition program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220204

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220419

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220427

R150 Certificate of patent or registration of utility model

Ref document number: 7066519

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150