JP2018178593A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2018178593A5 JP2018178593A5 JP2017081470A JP2017081470A JP2018178593A5 JP 2018178593 A5 JP2018178593 A5 JP 2018178593A5 JP 2017081470 A JP2017081470 A JP 2017081470A JP 2017081470 A JP2017081470 A JP 2017081470A JP 2018178593 A5 JP2018178593 A5 JP 2018178593A5
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- ground
- underground wall
- construction method
- wall construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims 5
- 238000007710 freezing Methods 0.000 claims 1
- 230000000149 penetrating Effects 0.000 claims 1
- 239000003380 propellant Substances 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
Claims (3)
前記構造体に連結されて本線シールドトンネル又は視線シールドトンネルのセグメントに貫通されるパイプを構築するパイプ構築工程と、
前記パイプから地盤改良して地盤改良体を形成する地盤改良体形成工程と、を備える、
地中壁構築方法。 And structure building constructing a structure in the ground,
A pipe construction step of constructing a pipe connected to the structure and penetrating through a segment of the main shield tunnel or the line-of-sight shield tunnel ;
A ground improvement body forming step of forming a ground improvement body by improving the ground from the pipe,
Underground wall construction method.
請求項1に記載の地中壁構築方法。 The ground improvement is a freezing improvement that forms frozen soil around the pipe,
The underground wall construction method according to claim 1 .
請求項1又は2に記載の地中壁構築方法。
In the pipe construction step, a plurality of the pipes are constructed in a columnar shape by a pipe propellant.
The underground wall construction method according to claim 1 or 2 .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017081470A JP2018178593A (en) | 2017-04-17 | 2017-04-17 | Underground wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017081470A JP2018178593A (en) | 2017-04-17 | 2017-04-17 | Underground wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2018178593A JP2018178593A (en) | 2018-11-15 |
JP2018178593A5 true JP2018178593A5 (en) | 2019-12-05 |
Family
ID=64282985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017081470A Pending JP2018178593A (en) | 2017-04-17 | 2017-04-17 | Underground wall construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2018178593A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6756892B1 (en) * | 2019-11-13 | 2020-09-16 | 鹿島建設株式会社 | Underground skeleton and how to build an underground skeleton |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2594864B2 (en) * | 1992-06-02 | 1997-03-26 | 稔 山本 | Widening method of underground tunnel |
JP4493936B2 (en) * | 2003-05-28 | 2010-06-30 | 鹿島建設株式会社 | Method for constructing tunnel junction and tunnel junction |
JP2005336854A (en) * | 2004-05-27 | 2005-12-08 | Kumagai Gumi Co Ltd | Earth retaining method and earth retaining structure of width expanding object part of shield tunnel |
JP2008075386A (en) * | 2006-09-22 | 2008-04-03 | Ohbayashi Corp | Spectacle shield tunnel structure and method of constructing same |
JP4771170B2 (en) * | 2006-12-25 | 2011-09-14 | 清水建設株式会社 | Construction method of underground cavity |
-
2017
- 2017-04-17 JP JP2017081470A patent/JP2018178593A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201690486A1 (en) | METHOD OF DEVELOPMENT OF DEPOSITS | |
GEP20207062B (en) | Tunnel construction method using pre-support and post-support | |
DOP2018000029A (en) | WELL COVERING PIPE AND WELL COVERING SYSTEM AND METHOD | |
GB2582404B (en) | Systems and methods to determine rotational oscillation of a drill string | |
WO2016077848A3 (en) | Use of a remotely controlled vehicle in a blasting operation | |
JP2018178593A5 (en) | ||
UA122532C2 (en) | Self-supporting three-dimensional prestressed structure, method and device for its construction | |
WO2016036080A3 (en) | Environment-friendly retaining wall and construction method thereof | |
Rodionov | Experience of construction of earth structures with the application of geosynthetics in difficult climatic conditions | |
SA520411361B1 (en) | Extendable Perforation in Cased Hole Completion | |
Chuan et al. | Prototype test study on mechanical characteristics of segmental lining structure of underwater railway shield tunnel | |
DOP2018000176A (en) | MULTIPLE ORIENTED SEGMENTARY WALL BLOCKS, FLOOR REINFORCEMENT SYSTEM, AND METHODS | |
MX2018009420A (en) | Geosynthetic reinforced wall panels comprising soil reinforcing members. | |
NZ724106A (en) | Steel pipe pile with spiral blades, composite pile, and construction method of composite pile | |
RU2561399C1 (en) | Method of protective sleeves installation in horizontal hole under water or other barriers | |
RU2014136152A (en) | Method for isolating formation water inflow in a well | |
CL2020000536A1 (en) | A pipe system of pipe sections with pre-assembled insulated welding backing rings and method of making the same. | |
RU2012128121A (en) | METHOD FOR TORLELESS LAYING OF A BUNCH OF PIPES IN SOIL | |
GB201820970D0 (en) | A polycrystalline super hard construction and a method of making same | |
GB2548494A (en) | Wide bandwidth drill pipe structure for acoustic telemetry | |
IT201700123529A1 (en) | Rapid anchoring system of x-lam walls to the foundations of a building. | |
RU2014100546A (en) | METHOD OF OPENING A PART OF A PIPELINE | |
ZA201803353B (en) | A rock bolt coupling system, and method of manufacture | |
RU139259U1 (en) | LARGE DIAMETER PIPELINE | |
UA82420U (en) | Drainage system |