JP2017224102A - Test system for confirming normal operation of facilities in system room - Google Patents
Test system for confirming normal operation of facilities in system room Download PDFInfo
- Publication number
- JP2017224102A JP2017224102A JP2016118089A JP2016118089A JP2017224102A JP 2017224102 A JP2017224102 A JP 2017224102A JP 2016118089 A JP2016118089 A JP 2016118089A JP 2016118089 A JP2016118089 A JP 2016118089A JP 2017224102 A JP2017224102 A JP 2017224102A
- Authority
- JP
- Japan
- Prior art keywords
- normal operation
- computer
- operation confirmation
- power
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Abstract
Description
本発明は、サーバコンピュータ室などの電算機室に代表されるいわゆるシステム室の各設備が正常に動作しているか否かを確認試験できるシステム室の設備正常動作確認試験システムに関するものである。
The present invention relates to a system room equipment normal operation confirmation test system capable of confirming whether or not each equipment in a so-called system room represented by a computer room such as a server computer room is operating normally.
一般に、例えばサーバコンピュータなどの電子機器が所定のラックに装着され、その電算機ラックが複数台設置されたシステム室(電算機室)は、きわめて重要な箇所、拠点となり、ソフト面及びハード面の双方での充分なセキュリティが求められ、またハード面においては充分な正常稼働性と耐久性のある正常稼働管理が求められる。 In general, a system room (computer room) in which electronic equipment such as a server computer is mounted in a predetermined rack and a plurality of computer racks are installed is an extremely important place or base, and has both software and hardware aspects. Sufficient security on both sides is required, and on the hardware side, normal operation management with sufficient normal operation and durability is required.
例えば、当該電算機室の各電算機に商用電力などの電源が所定の電圧をもって正常に継続して供給されるか否か、また、電源から送出された電力がいわゆる分電盤や配電盤により正常に送出制御されているか否か、さらに使用されている送出ケーブルが正常に動作しているか否か、電算機室の空調設備は適正に機能しているか否かなどがハード面の正常稼働の動作としてチェックされなければならない。 For example, whether or not a power source such as commercial power is normally supplied continuously with a predetermined voltage to each computer in the computer room, and the power sent from the power source is normal by a so-called distribution board or switchboard. Normal operation of the hardware, such as whether or not the transmission cable is controlled, whether or not the transmission cable being used is operating normally, and whether the air conditioning equipment in the computer room is functioning properly Must be checked as.
そして、前述した各チェック試験は、電算機室内において、複数の電算機が所定のラックに装着された状態で、かつ実際に稼働している状態で行うことが最も好ましい。 Each check test described above is most preferably performed in a computer room in a state where a plurality of computers are mounted in a predetermined rack and are actually operating.
しかしながら、前述の複数の電算機が所定のラックにおいて所定の箇所にあらかじめ装着された状態で、かつ実際に複数の電算機が稼働している状態で前述のチェック試験を行うことは難しく、通常は、前記電算機室において使用される電算機と同様な負荷を有する負荷抵抗試験装置を持ち込み、該負荷抵抗試験装置を前記電算機と同様の電気使用量を有する数量分用意し、これらを電算機室内に持ち込み、試験を行っていた。 However, it is difficult to perform the above-described check test in a state where the plurality of computers are mounted in a predetermined position in a predetermined rack in advance and a plurality of computers are actually operating. Bringing in a load resistance test device having the same load as the computer used in the computer room, preparing a quantity of the load resistance test device having the same amount of electricity used as the computer, these being the computer I brought it into the room and tested it.
しかもその試験は、停電などで商用電源が使用不可能になったとき、非常用の発電機が正常に作動するか否かのみの試験であり、前述した試験が全て行えるものではなかった。 Moreover, the test is only a test of whether or not the emergency generator operates normally when the commercial power supply becomes unusable due to a power failure or the like, and all of the above-described tests cannot be performed.
また、上記の負荷試験においても、前記複数のラック内に装着してあった、あるいは装着予定の電算機に替えて負荷抵抗試験装置を装着し、現実の使用に近い状態で負荷試験を行うものではなかった。
Also, in the above load test, a load resistance test device is installed instead of the computer that is installed in the plurality of racks or is scheduled to be installed, and the load test is performed in a state close to actual use. It wasn't.
かくして、本発明は、前記従来の課題に対処すべく創案されたものであって、電算機室の各電算機に商用電力が継続して正常に供給されるか否か、いわゆる分電盤や配電盤が正常に電力送出制御稼働しているか否か、送出ケーブルが正常に機能しているか否か、電算機室の空調設備が適正に機能しているか否かなどがチェックでき、該チェック試験が、電算機室内において、複数の電算機が所定のラックに装着された状態に近い状態で、かつ実際に稼働している状態とほぼ同様の状態で行え、また、この負荷抵抗試験装置によって、商用電源に対する負荷試験のみならず、停電などで商用電源が使用不可能になったとき、非常用の発電機が正常に作動するか否かの試験も行えるシステム室の設備正常動作確認試験システムを提供することを目的とするものである。
Thus, the present invention was devised to address the above-described conventional problems, and whether or not commercial power is continuously supplied normally to each computer in the computer room, so-called distribution boards and It is possible to check whether the switchboard is operating normally with power delivery control, whether the delivery cable is functioning normally, whether the air conditioning equipment in the computer room is functioning properly, etc. In a computer room, it can be performed in a state close to a state in which a plurality of computers are mounted in a predetermined rack, and in a state almost the same as an actual operation state. Providing a system room equipment normal operation confirmation test system that can test not only the load test on the power supply but also whether the emergency generator operates normally when the commercial power supply becomes unusable due to a power failure, etc. Eyes to do It is an.
本発明は、
電算機ラックに複数の電算機が配置された電算機棟が複数棟設置されてなるシステム室の設備正常動作確認試験システムであり、
前記電算機棟の決められた箇所に配置した各々の電算機を前記各々の電算機の消費電力と同様の消費電力に設定可能な負荷抵抗試験装置に変更し、前記負荷抵抗試験装置は、対応する各電算機が配置された電算機棟の略同じ箇所に配置され、
前記負荷抵抗試験装置に電源から電力を送出して、前記システム室の設備正常動作を確認する試験が行える、
ことを特徴とし、
または、
前記システム室の設備には、電源からシステム室の設備に電力を送出する送出制御を行う制御盤を含み、前記システム室の設備正常動作確認試験システムは、前記制御盤の正常動作確認試験が行える、
ことを特徴とし、
または、
前記システム室の設備には、前記システム室に設置された空調設備を含み、前記システム室の設備正常動作確認試験システムは、前記システム室に配置された各電算機棟の電算機と略同じ箇所に配置された負荷抵抗試験装置の温度上昇に対し前記空調設備が正常に動作するか否かの正常動作確認試験が行える、
ことを特徴とし、
または、
前記システム室の設備には、前記システム室の設備に電力を送出する電源を含み、前記システム室の設備正常動作確認試験システムは、前記電源の電力送出正常動作確認試験が行える、
ことを特徴とし、
または、
前記電源には、通常時に電力送出を行う商用電源と、非常時に電力送出を行う発電機あるいはその他の電力送出機器である、
ことを特徴とし、
または、
前記負荷抵抗試験装置は、複数の乾式抵抗体により構成された抵抗ユニットと、該抵抗ユニットを冷却する冷却装置とを含んで構成された、
ことを特徴とするものである。
The present invention
It is a system room equipment normal operation confirmation test system in which multiple computer buildings with multiple computers arranged in a computer rack are installed.
Change each computer placed at a determined location of the computer building to a load resistance test device that can be set to the same power consumption as the power consumption of each computer, the load resistance test device, Are placed at approximately the same location in the computer building where each computer is placed,
Power can be sent from the power source to the load resistance test device, and a test for confirming normal operation of the equipment in the system room can be performed.
It is characterized by
Or
The system room equipment includes a control panel that performs transmission control for sending power from the power source to the system room equipment, and the system room equipment normal operation confirmation test system can perform a normal operation confirmation test of the control panel. ,
It is characterized by
Or
The equipment in the system room includes air conditioning equipment installed in the system room, and the equipment normal operation confirmation test system in the system room is substantially the same location as the computers in each computer building located in the system room. A normal operation confirmation test can be performed as to whether or not the air conditioning equipment normally operates in response to a temperature rise of the load resistance test apparatus disposed in
It is characterized by
Or
The system room equipment includes a power source that sends power to the system room equipment, and the system room equipment normal operation confirmation test system can perform a power transmission normal operation confirmation test of the power source.
It is characterized by
Or
The power source is a commercial power source that normally sends power, and a generator or other power sending device that sends power in an emergency.
It is characterized by
Or
The load resistance test apparatus includes a resistance unit including a plurality of dry resistors and a cooling device for cooling the resistance unit.
It is characterized by this.
本発明によるシステム室の設備正常動作確認試験システムであれば、電算機室の各電算機に商用電力が継続して正常に供給されるか否か、いわゆる分電盤や配電盤が正常に電力送出稼働しているか否か、送出ケーブルが正常に機能しているか否か、電算機室の空調設備が適正に機能しているか否かなどがチェックでき、該チェック試験が、電算機室内において、複数の電算機が所定のラックに装着された状態に近い状態で、かつ実際に稼働している状態で行え、また、この試験機によって、商用電源に対する負荷試験のみならず、停電などで商用電源が使用不可能になったとき、非常用の発電機が正常に作動するか否かの試験も行えるとの優れた効果を奏する。
In the system room equipment normal operation confirmation test system according to the present invention, whether or not commercial power is continuously supplied normally to each computer in the computer room, so-called distribution boards and switchboards send power normally. It can be checked whether it is operating, whether the delivery cable is functioning normally, whether the air conditioning equipment in the computer room is functioning properly, etc. This computer can be used in a state that is close to the state where it is installed in a specified rack and is actually in operation. When it becomes impossible to use, it is possible to test whether or not the emergency generator operates normally.
以下、図面に基づいて本発明の最良の実施形態を説明する。 Hereinafter, the best embodiment of the present invention will be described with reference to the drawings.
図において、符号1は電算機室を示す。該電算機室1内には、複数の電算機棟2・・・が所定の間隔をおいて設置される。
この電算機棟2は、電算機ラック3内に複数の電算機4・・・が配置されて形成される(図4参照)。
In the figure, reference numeral 1 denotes a computer room. In the computer room 1, a plurality of
This
なお、前記電算機棟2に配置される電算機4・・・は、同じ規格を有する電算機4ばかりではなく、それぞれの用途に応じ、消費電力が異なったもの、稼働の際の放出する熱エネルギーが異なったもの、扱うソフトが異なったもの、起動スピードに差のあるものなど複数種類の電算機4・・・が、あらかじめ決定された箇所に配置され、かつ所定の間隔をおいて配置されるものとなる。
In addition, the computer 4 ... arrange | positioned in the said
ここで、前述の如く、実際に電算機4・・・を所定の決められた箇所に搭載した電算機棟2が電算機室1内に所定間隔をおいて配置され、前記複数の電算機4・・・が現実に稼働している状態で、電算機室1の各設備正常稼働の試験を行うのが好ましい。
Here, as described above, the
前記電算機室1における各電算機4・・・や電算機室設備の正常稼働はきわめて重要であり、そのため、電算機室1周辺の設備については、実際に使用されている状態でのレイアウトでかつ実際に稼働させた状態での入念なチェックが必要だからである。 The normal operation of each computer 4... And computer room equipment in the computer room 1 is extremely important. Therefore, the equipment around the computer room 1 is in a layout in which it is actually used. It is also necessary to carefully check the actual operating state.
通常では、前記設備につき、電算機室1を立ち上げる前に入念な各種チェックが行なわれる。
そして、そのチェックは、電算機室1の各電算機棟2における電算機4・・・に、商用電力が継続的に正常に供給されるか否か、また電源からの送出電力を制御する分電盤や配電盤が正常に稼働するか否か、電力の送出ケーブルが正常に機能するか否か、電算機室1の空調設備5が適正に機能するか否かなどのチェックとなる。
Usually, before the computer room 1 is started up, various careful checks are performed on the equipment.
The check is performed to check whether commercial power is continuously supplied normally to the computers 4... In each
しかして、本発明ではこれらのチェックを乾式の負荷抵抗試験装置6のみを用いて行うものとした。 In the present invention, these checks are performed using only the dry load resistance test apparatus 6.
ここで、本発明で使用される負荷抵抗試験装置6の構成につき説明する。
図から理解されるように、負荷抵抗試験装置6は、複数の棒状抵抗体7・・・を略水平方向に間隔をおいて配置し、必要があれば水平方向に配置した抵抗体群を上下方向に複数段配置し、これら抵抗体7・・・の接続や切替を操作部8により可能にして構成された抵抗ユニット9と、該抵抗ユニット9を冷却する冷却装置10とを含んで構成される。
Here, the configuration of the load resistance test apparatus 6 used in the present invention will be described.
As can be seen from the figure, the load resistance test apparatus 6 has a plurality of rod-
そして、前記負荷抵抗試験装置6の操作部8を各々操作することにより、前記複数の抵抗体7・・・の接続を切り替えて制御し、もって、複数の電算機棟2・・・に配置されている、あるいは配置されるべき電算機4の消費電力にあわせ、かつ複数の電算機棟2・・・に配置されている、あるいは配置されるべき箇所に当該負荷抵抗試験装置6を設置するのである。
And by operating each
図から理解されるように、負荷抵抗試験装置6は、電算機ラック3内に配置される電算機4と同様の外形に形成してあり、前記電算機4に替え簡単に電算機ラック3内にマウント出来る様になっている。 As can be understood from the figure, the load resistance test device 6 is formed in the same external shape as the computer 4 arranged in the computer rack 3, and can be easily replaced with the computer 4 in the computer rack 3. It can be mounted on.
ここで、前記電算機ラック3内に3台の電算機4が配置予定の場合、3台の負荷抵抗試験装置6を同様の箇所にマウントして設置してもよいし、1台の負荷抵抗試験装置6を前記設置されるべき電算機ラック3内の3箇所の範囲のほぼ真ん中の箇所に配置しても構わない。
上記の場合、設置した1台の負荷抵抗試験装置6については、電算機4の3台分の消費電力が生じるよう負荷を調節しておく必要がある。
Here, when three computers 4 are scheduled to be arranged in the computer rack 3, three load resistance test devices 6 may be mounted and installed at the same location, or one load resistance may be installed. You may arrange | position the test apparatus 6 in the substantially middle place of the range of three places in the computer rack 3 which should be installed.
In the above case, it is necessary to adjust the load of the installed load resistance test apparatus 6 so that power consumption corresponding to three computers 4 is generated.
しかして、上記の様にセットした複数の負荷抵抗試験装置6に商用電源から電力を送出して試験が行われる。
すなわち、商用電源から送出された電力を、前記負荷抵抗試験装置6が実際の電算機4・・・の設置と同様に各電算機棟2に配置され、この配置された電算機4と同様の消費電力を有する状態にして送出電力の試験が行われる。
Thus, the test is performed by sending electric power from the commercial power source to the plurality of load resistance test apparatuses 6 set as described above.
That is, the power sent from the commercial power source is arranged in each
この負荷試験は通常数時間を要するものであり、精密器機である電算機4・・・を用いての通電試験は行わない。精密器機である電算機4に予定しない過大な負荷をかけて試験を行う場合も生じ、前記精密機器である電算機4に損傷を与える恐れがあるからである。 This load test usually requires several hours, and an energization test using the computers 4... Which are precision instruments is not performed. This is because there is a case where a test is performed by applying an excessive load unscheduled to the computer 4 which is a precision instrument, and the computer 4 which is the precision instrument may be damaged.
しかるに、前記の負荷試験により、商用電源からの電力が、適正な電圧、すなわち、たとえば、交流の200V、あるいは100Vで送出されているか否か、電算機室1内の制御棟11に設置されている分電盤や配電盤が正常に電力送出制御を行っているか否か、あるいは電力送出ケーブルに異常がないか否か、さらには電算機室1に設置された空調設備5の空調動作が適正か否かなどが試験されるものとなる。
However, according to the load test, whether or not the electric power from the commercial power source is sent at an appropriate voltage, for example, AC 200V or 100V, is installed in the control building 11 in the computer room 1. Whether or not the distribution board or switchboard is normally performing power transmission control, whether or not the power transmission cable is normal, and whether the air-conditioning operation of the air-
空調動作の適性試験とは、例えば消費電力が大きく、熱エネルギーの放出が大きい電算機4が設置してある箇所などに対し、適正に空調動作が行われているかなどでの試験を指標する。 The suitability test of the air conditioning operation is an index indicating, for example, whether or not the air conditioning operation is properly performed at a location where the computer 4 that consumes a large amount of power and releases a large amount of thermal energy is installed.
図2に示す様に、空調設備5は、電算機室1内に複数の空気吹き出し口12を有しており、前記の試験結果に基づき、現実の電算機室1の稼働に際して、各空気吹き出し口12の空気吹き出し量や温度を変えるべく調節したり、適正な空調動作が長時間行える様設定したりするものとなる。
As shown in FIG. 2, the
ここで、本発明によるシステム室の設備正常動作確認試験となる負荷試験の概略につき説明する。 Here, an outline of a load test, which is a facility room normal operation confirmation test according to the present invention, will be described.
まず、電算機室1内の各電算機棟2につき、所定の箇所に配置される、あるいは配置されていた各電算機4に替えて、同様の消費電力となるよう負荷を調節できる負荷抵抗試験装置6をセットする。このセットに当たっては、あくまでも配置されるべき各電算機4の設置箇所にあわせて負荷抵抗試験装置6をセットしていく。
First, for each
次いで、セットした負荷抵抗試験装置6・・・に通常使用する商用電源を繋ぎ、電力を送出する。商用電源から送出された電力は、制御棟11内に設置された分電盤や配電盤を介して送出電力が分岐され、各電算機4に替えてセットされた各負荷抵抗試験装置6・・・へ送出される。 Next, a commercial power supply that is normally used is connected to the set load resistance test apparatus 6. The power sent from the commercial power source is branched through the distribution board and distribution board installed in the control building 11 and each load resistance test device 6 set in place of each computer 4... Is sent to.
ここで、数時間の通電試験が行われ、場合によっては各負荷抵抗試験装置6の電圧値を若干上昇させたり低下させたりなど変更し、その様な状態でも異常がないかが試験される。 Here, an energization test for several hours is performed, and in some cases, the voltage value of each load resistance test device 6 is changed slightly, for example, and is tested to determine whether there is any abnormality even in such a state.
尚、商用電源からの電力送出において、送出される電力の電圧値が、例えば周辺地域での電力消費量の違いにより、時間によって200Vあるいは100Vから変動する場合もあり、この様な電圧変化も確認される。 When sending power from a commercial power supply, the voltage value of the sent power may vary from 200V or 100V depending on the time due to, for example, differences in power consumption in the surrounding area. Is done.
試験される設備は、前記の様に商用電源自体であり、また商用電源からの電力を制御する制御棟11に設置されている分電盤や配電盤であり、送出用のケーブルなどが挙げられる。 The equipment to be tested is the commercial power supply itself as described above, and is a distribution board or a distribution board installed in the control building 11 for controlling the power from the commercial power supply, such as a cable for transmission.
さらに、数時間の通電試験にあっては、各負荷抵抗試験装置6・・・が熱エネルギーの放出により温度上昇を招く。
この温度上昇に対し、電算機室1内には空調設備5が設置され、電算機室1自体が過度な温度上昇を起こさないように、また電算機室1に複数設置されているいずれかの電算機棟2が他の電算機棟2と比較して過度な温度上昇を起こさないよう、さらに各電算機棟2内にセットされた電算機4・・・が過度な温度上昇を起こさないよう調節する必要がある。
Furthermore, in the energization test for several hours, each load resistance test apparatus 6 ... raises temperature by discharge | release of a thermal energy.
In response to this temperature rise, an
よって、前記の状態をチェックすべく通電試験を行い、空調設備5の空調正常作動試験を行うのである。
Therefore, an energization test is performed to check the above state, and an air conditioning normal operation test of the
さらに、本発明では停電などによって商用電源が使用できないとき、当該電算機室1では、非常用の発電機からの電力供給を受ける。よって、非常時を想定して前記非常用の発電機が正常に稼働するか否かの試験も行えるものとなっている。 Furthermore, in the present invention, when the commercial power source cannot be used due to a power failure or the like, the computer room 1 receives power supply from an emergency generator. Therefore, it is possible to test whether or not the emergency generator operates normally in an emergency.
本発明では前記の電源につき、商用電源に替え非常時に使用する非常用発電機からの送電試験をも行える。すなわち、例えば、停電などの非常事態が生じたとき、電算機室1での作業を中断することなく、作業が行えるように、別途発電機が用意されている。しかるにこの発電機につき、正常に電力が送出できるか否かは定期的に通電試験を行う必要があるからである。 In the present invention, a power transmission test from an emergency generator used in an emergency can be performed for the power source instead of a commercial power source. That is, for example, when an emergency such as a power failure occurs, a separate generator is prepared so that work can be performed without interrupting work in the computer room 1. However, it is necessary to periodically conduct an energization test to determine whether or not power can be normally transmitted for this generator.
さらに、前記発電機により電算機室1へ送電試験が行われたとき、制御棟11の分電盤や配電盤が正常に稼働しているか否か、また送出用のケーブルが正常に稼働するか否か、あるいは空調設備5が正常に稼働るか否かも行えるものとなっている。
Further, when a power transmission test is performed by the generator to the computer room 1, whether the distribution board and the distribution board of the control building 11 are operating normally, and whether the sending cable is operating normally. Or whether the
1 電算機室
2 電算機棟
3 電算機ラック
4 電算機
5 空調設備
6 負荷抵抗試験装置
7 抵抗体
8 操作部
9 抵抗体ユニット
10 冷却装置
11 制御棟
12 空気吹き出し口
DESCRIPTION OF SYMBOLS 1
Claims (6)
前記電算機棟の決められた箇所に配置した各々の電算機を前記各々の電算機の消費電力と同様の消費電力に設定可能な負荷抵抗試験装置に変更し、前記負荷抵抗試験装置は、対応する各電算機が配置された電算機棟の略同じ箇所に配置され、
前記負荷抵抗試験装置に電源から電力を送出して、前記システム室の設備正常動作を確認する試験が行える、
ことを特徴とするシステム室の設備正常動作確認試験システム。
It is a system room equipment normal operation confirmation test system in which a plurality of computer buildings with a plurality of computers arranged in a computer rack are installed.
Change each computer placed at a determined location of the computer building to a load resistance test device that can be set to the same power consumption as the power consumption of each computer, the load resistance test device, Are placed at approximately the same location in the computer building where each computer is placed,
Power can be sent from the power source to the load resistance test device, and a test for confirming normal operation of the equipment in the system room can be performed.
System room equipment normal operation confirmation test system characterized by that.
ことを特徴とする請求項1記載のシステム室の設備正常動作確認試験システム。
The system room equipment includes a control panel that performs transmission control for sending power from the power source to the system room equipment, and the system room equipment normal operation confirmation test system can perform a normal operation confirmation test of the control panel. ,
The system room equipment normal operation confirmation test system according to claim 1, wherein
ことを特徴とする請求項1記載のシステム室の設備正常動作確認試験システム。
The equipment in the system room includes air conditioning equipment installed in the system room, and the equipment normal operation confirmation test system in the system room is substantially the same location as the computers in each computer building located in the system room. A normal operation confirmation test can be performed as to whether or not the air conditioning equipment normally operates in response to a temperature rise of the load resistance test apparatus disposed in
The system room equipment normal operation confirmation test system according to claim 1, wherein
ことを特徴とする請求項1記載のシステム室の設備正常動作確認試験システム。
The system room equipment includes a power source that sends power to the system room equipment, and the system room equipment normal operation confirmation test system can perform a power transmission normal operation confirmation test of the power source.
The system room equipment normal operation confirmation test system according to claim 1, wherein
ことを特徴とする請求項4記載のシステム室の設備正常動作確認試験システム。
The power source is a commercial power source that normally sends power, and a generator or other power sending device that sends power in an emergency.
The system room equipment normal operation confirmation test system according to claim 4, wherein
ことを特徴とする請求項1乃至請求項5のいずれかに記載されたシステム室の設備正常動作確認試験システム。 The load resistance test apparatus includes a resistance unit including a plurality of dry resistors and a cooling device for cooling the resistance unit.
6. A system room equipment normal operation confirmation test system according to claim 1, wherein the system room equipment normal operation confirmation test system is provided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016118089A JP6684520B2 (en) | 2016-06-14 | 2016-06-14 | System room equipment normal operation confirmation test system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016118089A JP6684520B2 (en) | 2016-06-14 | 2016-06-14 | System room equipment normal operation confirmation test system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017224102A true JP2017224102A (en) | 2017-12-21 |
JP6684520B2 JP6684520B2 (en) | 2020-04-22 |
Family
ID=60688081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016118089A Active JP6684520B2 (en) | 2016-06-14 | 2016-06-14 | System room equipment normal operation confirmation test system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6684520B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021059785A1 (en) * | 2019-09-24 | 2021-04-01 | 株式会社辰巳菱機 | Testing system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000121709A (en) * | 1998-10-14 | 2000-04-28 | Kanto Denki Hoan Kyokai | Unit-type generator load-testing device |
JP2010165321A (en) * | 2009-01-19 | 2010-07-29 | Toshiba Corp | Switchboard inspection system |
JP2013031359A (en) * | 2011-07-28 | 2013-02-07 | Quanta Computer Inc | Rack server system and control method thereof |
JP2015087276A (en) * | 2013-10-31 | 2015-05-07 | サコス株式会社 | Load testing device for one person work |
-
2016
- 2016-06-14 JP JP2016118089A patent/JP6684520B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000121709A (en) * | 1998-10-14 | 2000-04-28 | Kanto Denki Hoan Kyokai | Unit-type generator load-testing device |
JP2010165321A (en) * | 2009-01-19 | 2010-07-29 | Toshiba Corp | Switchboard inspection system |
JP2013031359A (en) * | 2011-07-28 | 2013-02-07 | Quanta Computer Inc | Rack server system and control method thereof |
JP2015087276A (en) * | 2013-10-31 | 2015-05-07 | サコス株式会社 | Load testing device for one person work |
Non-Patent Citations (1)
Title |
---|
東京精電株式会社: "模擬発熱体ユニット", インターネット, JPN6020005164, 14 November 2013 (2013-11-14), JP, ISSN: 0004211540 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021059785A1 (en) * | 2019-09-24 | 2021-04-01 | 株式会社辰巳菱機 | Testing system |
JPWO2021059785A1 (en) * | 2019-09-24 | 2021-10-07 | 株式会社辰巳菱機 | Test system |
Also Published As
Publication number | Publication date |
---|---|
JP6684520B2 (en) | 2020-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2947219C (en) | Flexible data center infrastructure distribution | |
JP5731514B2 (en) | Modular system for data centers | |
US7393248B2 (en) | Modular power control system with multipin connectors and airflow conrol module | |
CN102906957B (en) | For sequentially applying the system and method for electric power to each electric loading | |
EP1875139B1 (en) | Intelligent fan assisted tiles for adaptive environmental management | |
US20090056359A1 (en) | System and method for cooling electronic equipment | |
US7799474B2 (en) | System and method for managing electrically isolated fuel cell powered devices within an equipment rack | |
CN104793127B (en) | Intelligent weatherometer | |
CN104564764A (en) | Server system | |
JP6684520B2 (en) | System room equipment normal operation confirmation test system | |
US11221376B2 (en) | Load bank assembly | |
US8421268B2 (en) | Combined power switch and data distribution unit | |
US9983248B1 (en) | Incremental data center infrastructure commissioning | |
KR102081218B1 (en) | Digital twin device | |
CN105091232A (en) | Air conditioner self-diagnosis debugging method and device thereof | |
JP6429959B2 (en) | Air conditioning system | |
JP2014228188A (en) | Air conditioning system | |
US9516783B2 (en) | Thermoelectric cooler controller | |
JP5917438B2 (en) | Ship control panel humidity control system | |
JP2015099542A (en) | Supervisory control device, terminal device, supervisory control method, supervisory control program, and supervisory control system | |
Nishida et al. | Relationship between the reliability of a data-center air-conditioning system and the air-conditioning power supply | |
CN106369738A (en) | Novel computer room environment maintaining method | |
JP2011244584A (en) | Facility equipment control system | |
US20160123616A1 (en) | Controlled heat delivery | |
TW201227218A (en) | Movable server room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190610 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200115 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200212 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200310 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200327 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200327 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6684520 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |