JP2017120225A - Anchoring part structure of pc steel stranded wire, ground anchor, measuring device, and measurement method - Google Patents

Anchoring part structure of pc steel stranded wire, ground anchor, measuring device, and measurement method Download PDF

Info

Publication number
JP2017120225A
JP2017120225A JP2015257020A JP2015257020A JP2017120225A JP 2017120225 A JP2017120225 A JP 2017120225A JP 2015257020 A JP2015257020 A JP 2015257020A JP 2015257020 A JP2015257020 A JP 2015257020A JP 2017120225 A JP2017120225 A JP 2017120225A
Authority
JP
Japan
Prior art keywords
optical fiber
steel stranded
stranded wire
steel
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015257020A
Other languages
Japanese (ja)
Other versions
JP6474345B2 (en
Inventor
山野辺 慎一
Shinichi Yamanobe
慎一 山野辺
直樹 曽我部
Naoki Sogabe
直樹 曽我部
道男 今井
Michio Imai
道男 今井
山本 徹
Toru Yamamoto
徹 山本
及川 雅司
Masashi Oikawa
雅司 及川
山田 眞人
Masato Yamada
眞人 山田
松原 喜之
Yoshiyuki Matsubara
喜之 松原
晋志 中上
Shinji Nakagami
晋志 中上
一芳 千桐
Kazuyoshi Chigiri
一芳 千桐
小林 俊之
Toshiyuki Kobayashi
俊之 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Sumitomo SEI Steel Wire Corp
Hien Electric Industries Ltd
Original Assignee
Kajima Corp
Sumitomo SEI Steel Wire Corp
Hien Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Sumitomo SEI Steel Wire Corp, Hien Electric Industries Ltd filed Critical Kajima Corp
Priority to JP2015257020A priority Critical patent/JP6474345B2/en
Publication of JP2017120225A publication Critical patent/JP2017120225A/en
Application granted granted Critical
Publication of JP6474345B2 publication Critical patent/JP6474345B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide anchoring part structure of a PC steel stranded wire, a ground anchor, a measuring device, and a measurement method capable of measuring tension of a PC steel stranded wire up to a position of a crimping part.SOLUTION: Anchoring part structure of a PC steel stranded wire anchors a PC steel stranded wire 1 having an optical fiber that has a PC steel stranded wire 3 having twisting and an optical fiber part 20 installed in the twisting to a part to be anchored. The anchoring part structure includes: a load bearing body 56 for anchoring a PC steel stranded wire 1 having an optical fiber to an anchoring hole; and an anchoring part 60 that is provided in the load bearing body 56 and anchors the PC steel stranded wire 1 having an optical fiber anchored by the load bearing body 56 to the load bearing body 56. The anchoring part 60 includes a crimping part 30 crimped to a front end part 1a by insertion of the PC steel stranded wire 1 having an optical fiber in the front end part 1a of the PC steel stranded wire 1 having an optical fiber. The optical fiber part includes: an optical fiber wire disposed in twisting; and a protecting tube that is disposed between an inner wall surface of the crimping part 30 and the PC steel stranded wire 3 and stores the optical fiber wire.SELECTED DRAWING: Figure 4

Description

本発明は、PC鋼撚線の定着部構造、グラウンドアンカー、測定装置及び測定方法に関する。   The present invention relates to a fixing structure of a PC steel stranded wire, a ground anchor, a measuring device, and a measuring method.

従来、各種構造物(橋梁、建物、法面等)の引張材や緊張材等に用いられるPC鋼撚線に光ファイバを取り付けた光ファイバ付PC鋼撚線によって、当該PC鋼撚線の張力を計測することが行われている。このような光ファイバ付PC鋼撚線に関する技術として、例えば特許文献1に記載された緊張部材が知られている。この緊張部材は、中空体と、中空体の内部に収納された光ファイバと、中空体の外周を取り囲むように撚り合わされ緊張力を負担する複数の緊張素線と、を備える。   Conventionally, the tension of the PC steel stranded wire by the PC steel stranded wire with an optical fiber in which the optical fiber is attached to the PC steel stranded wire used for tensile materials and tension materials of various structures (bridges, buildings, slopes, etc.) Is being measured. As a technique related to such a PC steel stranded wire with an optical fiber, for example, a tension member described in Patent Document 1 is known. The tension member includes a hollow body, an optical fiber housed inside the hollow body, and a plurality of tension strands that are twisted so as to surround the outer periphery of the hollow body and bear a tension force.

特許第5604760号公報Japanese Patent No. 5604760

PC鋼撚線は、例えば当該PC鋼撚線の端部に圧着され装着された圧着部によって耐荷体等に固定される。この耐荷体等が被定着部に定着されることにより、PC鋼撚線は、圧着部を介して緊張力等を伝達する。そのため、圧着部の位置までPC鋼撚線の張力を計測できるように、光ファイバ付PC鋼撚線を定着することが望まれる。   The PC steel stranded wire is fixed to a load-bearing body or the like, for example, by a crimping portion that is crimped and attached to an end portion of the PC steel stranded wire. By fixing the load-bearing body or the like on the fixing portion, the PC steel stranded wire transmits a tension force or the like via the crimping portion. Therefore, it is desirable to fix the PC steel stranded wire with an optical fiber so that the tension of the PC steel stranded wire can be measured up to the position of the crimping portion.

ところで、複数のPC鋼素線が撚られて形成され螺旋状の撚り目を有するPC鋼撚線に光ファイバ部を取り付ける場合、撚り目に光ファイバ部を設置することがある。この場合、圧着部の位置までPC鋼撚線の張力を計測するためには、圧着部の内壁面とPC鋼撚線との間に光ファイバ部を通すこととなる。しかしながら、圧着部を用いるPC鋼撚線の定着部構造では、通常、前端部において周囲を圧着部によって圧着されたPC鋼撚線が径方向に強く圧迫されて、PC鋼撚線に圧着部が密着する。そのため、圧着部の内壁面とPC鋼撚線との間に光ファイバ部を通すことが困難である。その結果、圧着部の位置までPC鋼撚線の張力を計測することが困難である。   By the way, when attaching an optical fiber part to a PC steel twisted wire formed by twisting a plurality of PC steel strands and having a helical twist, the optical fiber may be installed at the twist. In this case, in order to measure the tension of the PC steel stranded wire up to the position of the crimping portion, the optical fiber portion is passed between the inner wall surface of the crimping portion and the PC steel stranded wire. However, in the fixing part structure of the PC steel stranded wire using the crimping part, usually, the PC steel stranded wire crimped by the crimping part around the front end is strongly pressed in the radial direction, and the PC steel stranded wire has the crimping part. In close contact. Therefore, it is difficult to pass the optical fiber portion between the inner wall surface of the crimping portion and the PC steel stranded wire. As a result, it is difficult to measure the tension of the PC steel stranded wire up to the position of the crimping part.

そこで、本発明は、圧着部の位置までPC鋼撚線の張力を計測することが可能なPC鋼撚線の定着部構造、グラウンドアンカー、測定装置及び測定方法を提供することを目的とする。   Then, an object of this invention is to provide the fixing | fixed part structure of PC steel twisted wire, a ground anchor, a measuring apparatus, and a measuring method which can measure the tension | tensile_strength of PC steel twisted wire to the position of a crimping | compression-bonding part.

本発明に係るPC鋼撚線の定着部構造は、複数のPC鋼素線が撚られて形成され螺旋状の撚り目を有するPC鋼撚線と、撚り目に設置された光ファイバ部と、を有する光ファイバ付PC鋼撚線を被定着部に定着させる光ファイバ付PC鋼撚線の定着部構造であって、被定着部に削孔された定着孔の内部に設けられ、定着孔の内部に充填された充填材を介して光ファイバ付PC鋼撚線を定着孔に定着させる耐荷体と、耐荷体に設けられ、耐荷体によって定着される光ファイバ付PC鋼撚線を耐荷体に固定する固定部と、を備え、固定部は、光ファイバ付PC鋼撚線の前端部において光ファイバ付PC鋼撚線の周囲に圧着される圧着部を有し、光ファイバ部は、撚り目に配置された光ファイバ素線と、圧着部の内壁面とPC鋼撚線との間に配置され、光ファイバ素線を収容する保護管と、を有する。   The fixing structure of the PC steel stranded wire according to the present invention is a PC steel stranded wire formed by twisting a plurality of PC steel strands and having a helical knitting, an optical fiber portion installed at the knitting, A fixing portion structure of a PC steel stranded wire with an optical fiber that fixes a PC steel stranded wire with an optical fiber to a fixing portion, and is provided inside a fixing hole cut in the fixing portion. A load-bearing body for fixing a PC steel stranded wire with an optical fiber to a fixing hole through a filler filled inside, and a PC steel stranded wire with an optical fiber provided in the load-bearing body and fixed by the load-bearing body as a load-bearing body A fixing portion for fixing, and the fixing portion includes a crimping portion that is crimped around the PC steel stranded wire with optical fiber at the front end portion of the PC steel stranded wire with optical fiber, and the optical fiber portion has a twisted line. Placed between the optical fiber strand placed on the inner wall surface of the crimping part and the PC steel stranded wire. Has a protective tube for accommodating the optical fiber, the.

このPC鋼撚線の定着部構造では、光ファイバ付PC鋼撚線は、その前端部において周囲を圧着部によって圧着されることで耐荷体に固定され、充填材を介して定着孔に定着される。この構造では、PC鋼撚線の前端部が圧着部と共に圧着されるため、圧着部の内壁面によって径方向に強く圧迫され、PC鋼撚線の前端部の外周面と圧着部とが密着する。ここで、光ファイバ素線が保護管に収容されることで、圧着部の内壁面によって径方向に強く圧迫されて圧着部の内壁面から加えられる圧迫力から光ファイバ素線を保護することができる。そのため、光ファイバ付PC鋼撚線の光ファイバ部を、光ファイバ素線が保護管に収容された状態でPC鋼撚線の撚り目に設置して、圧着部の内壁面とPC鋼撚線との間に配置することができる。従って、圧着部の内壁面とPC鋼撚線との間に光ファイバ部を通すことが可能となり、圧着部の位置までPC鋼撚線の張力を計測することが可能となる。   In this PC steel stranded wire fixing part structure, the PC steel stranded wire with optical fiber is fixed to the load bearing body by being crimped by a crimping part at the front end thereof, and fixed to the fixing hole via a filler. The In this structure, since the front end portion of the PC steel stranded wire is crimped together with the crimping portion, it is strongly pressed in the radial direction by the inner wall surface of the crimping portion, and the outer peripheral surface of the PC steel stranded wire and the crimping portion are in close contact with each other. . Here, since the optical fiber is accommodated in the protective tube, the optical fiber can be protected from the pressing force applied from the inner wall surface of the crimping portion by being strongly pressed in the radial direction by the inner wall surface of the crimping portion. it can. Therefore, the optical fiber portion of the PC steel stranded wire with optical fiber is installed at the strand of the PC steel stranded wire in a state where the optical fiber strand is accommodated in the protective tube, and the inner wall surface of the crimping portion and the PC steel stranded wire Can be placed between. Therefore, the optical fiber portion can be passed between the inner wall surface of the crimping portion and the PC steel stranded wire, and the tension of the PC steel stranded wire can be measured up to the position of the crimping portion.

また、PC鋼撚線の定着部構造では、保護管は、圧着部の降伏強度よりも高い降伏強度を有することが好ましい。この場合、圧着部の内壁面からの圧迫力から光ファイバ素線をより確実に保護することができる。   Further, in the PC steel stranded wire fixing part structure, the protective tube preferably has a yield strength higher than the yield strength of the crimping part. In this case, the optical fiber can be more reliably protected from the pressing force from the inner wall surface of the crimping portion.

また、PC鋼撚線の定着部構造では、光ファイバ付PC鋼撚線は、少なくとも一対の光ファイバ素線を有し、一対の光ファイバ素線は、光ファイバ付PC鋼撚線の前端部において互いに接続されていてもよい。この場合、例えば測定装置を用いて1本の光ファイバ付PC鋼撚線の歪を測定する際、往復分の歪に関する情報を取得することができる。また、一対の光ファイバ素線を互いに接続する接続作業を光ファイバ付PC鋼撚線の前端部において容易に行うことができる。   Further, in the fixing structure of the PC steel stranded wire, the PC steel stranded wire with optical fiber has at least a pair of optical fiber strands, and the pair of optical fiber strands is a front end portion of the PC steel stranded wire with optical fiber. May be connected to each other. In this case, for example, when measuring the strain of one PC fiber stranded wire with an optical fiber using a measuring device, information on the reciprocal strain can be acquired. Moreover, the connection operation | work which connects a pair of optical fiber strands mutually can be easily performed in the front-end part of PC steel twisted wire with an optical fiber.

また、本発明は、上記のPC鋼撚線の定着部構造を有するグラウンドアンカーの発明としても捉えることができる。   The present invention can also be understood as an invention of a ground anchor having the above-mentioned PC steel stranded wire fixing portion structure.

このグラウンドアンカーでは、例えば測定装置を用いて1本の光ファイバ付PC鋼撚線について光ファイバ素線の歪を測定する際、往復分の歪に関する情報を取得することができるため、定着孔に設けられたグラウンドアンカーにおける光ファイバ付PC鋼撚線の歪を好適に測定することができる。   In this ground anchor, for example, when measuring the strain of an optical fiber for a PC steel stranded wire with an optical fiber using a measuring device, information on the reciprocal strain can be acquired. The distortion of the PC steel stranded wire with an optical fiber in the provided ground anchor can be suitably measured.

また、本発明は、測定装置の発明としても捉えることができ、測定装置は、上記のPC鋼撚線の定着部構造における光ファイバ付PC鋼撚線の歪を測定するための測定装置であって、前端部において互いに接続された光ファイバ素線の一方の後端部に光信号を発信する光信号発信部と、前端部において互いに接続された光ファイバ素線の他方の後端部からの光信号を受信する光信号受信部と、光信号受信部で受信された光信号を解析し光ファイバ付PC鋼撚線の歪に関する情報を取得する解析部と、を備える。   The present invention can also be understood as an invention of a measuring device, which is a measuring device for measuring the strain of a PC steel stranded wire with an optical fiber in the fixing structure of the PC steel stranded wire. The optical signal transmitting unit for transmitting an optical signal to one rear end of the optical fiber strands connected to each other at the front end, and the other rear end of the optical fiber strand connected to each other at the front end An optical signal receiving unit that receives an optical signal, and an analysis unit that analyzes the optical signal received by the optical signal receiving unit and acquires information related to distortion of the PC steel stranded wire with optical fiber.

この測定装置では、光信号発信部によって光ファイバ素線の一方の後端部に光信号を発信することで、光信号受信部によって光ファイバ素線の他方の後端部からの光信号を受信することができる。そのため、2本の光ファイバ素線に対して一組の光信号発信部及び光信号受信部で済むため、光ファイバ素線の数に対する光信号発信部及び光信号受信部の数を減らすことができる。   In this measuring device, an optical signal is transmitted to one rear end of the optical fiber by the optical signal transmitter, and an optical signal is received from the other rear end of the optical fiber by the optical signal receiver. can do. Therefore, a pair of optical signal transmitters and optical signal receivers is sufficient for two optical fiber strands, so the number of optical signal transmitters and optical signal receivers can be reduced with respect to the number of optical fiber strands. it can.

また、本発明は、測定方法の発明としても捉えることができ、測定方法は、上記のPC鋼撚線の定着部構造を有するグラウンドアンカーを準備し、グラウンドアンカーを斜面に複数本設置する準備工程と、光信号を発信する光信号発信部を、前端部において互いに接続された光ファイバ素線の一方の後端部に接続すると共に、光信号を受信する光信号受信部を、前端部において互いに接続された光ファイバ素線の他方の後端部に接続する接続工程と、光信号受信部で受信された光信号を解析部によって解析して光ファイバ付PC鋼撚線の歪に関する情報を取得し、斜面における地中の歪を測定する測定工程と、を備える。   Moreover, this invention can also be grasped | ascertained also as invention of a measuring method, and the measuring method prepares the ground anchor which has the fixing | fixed part structure of said PC steel twisted wire, and the preparatory process which installs multiple ground anchors on a slope And an optical signal transmitter that transmits an optical signal is connected to one rear end of optical fiber wires connected to each other at the front end, and an optical signal receiver that receives an optical signal is connected to each other at the front end. The connection process for connecting to the other rear end of the connected optical fiber, and the optical signal received by the optical signal receiving unit are analyzed by the analyzing unit to obtain information on the distortion of the PC steel stranded wire with optical fiber. And a measuring step for measuring the underground strain on the slope.

この測定方法では、設置工程において設置するグラウンドアンカーが往復分の歪に関する情報を取得することができるものであるため、光信号発信部を光ファイバ素線の一方の後端部に接続して光信号受信部を光ファイバ素線の他方の後端部に接続することで、斜面における地中の歪を容易に測定することができる。   In this measurement method, since the ground anchor installed in the installation process can acquire information related to the reciprocal distortion, the optical signal transmission unit is connected to one rear end of the optical fiber to connect the optical fiber. By connecting the signal receiving unit to the other rear end of the optical fiber, the underground strain on the slope can be easily measured.

本発明によれば、圧着部の位置までPC鋼撚線の張力を計測することが可能なPC鋼撚線の定着部構造、グラウンドアンカー、測定装置及び測定方法を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the fixing | fixed part structure, ground anchor, measuring apparatus, and measuring method of PC steel twisted wire which can measure the tension | tensile_strength of PC steel twisted wire to the position of a crimping | compression-bonding part can be provided.

図1は、本発明の実施形態に係るPC鋼撚線の定着部構造が適用されたグラウンドアンカーの全体構成を示す図である。FIG. 1 is a diagram showing an overall configuration of a ground anchor to which a PC steel stranded wire fixing portion structure according to an embodiment of the present invention is applied. 図2(a)は、光ファイバ付PC鋼撚線の斜視図である。図2(b)は、保護管の一例を示す斜視図である。Fig.2 (a) is a perspective view of PC steel twisted wire with an optical fiber. FIG. 2B is a perspective view showing an example of the protective tube. 図3は、光ファイバ付PC鋼撚線及び圧着部を示す一部断面図である。FIG. 3 is a partial cross-sectional view showing a PC steel stranded wire with an optical fiber and a crimping portion. 図4は、図1におけるアンカー体長部を示す一部断面図である。FIG. 4 is a partial cross-sectional view showing the anchor body length in FIG. 図5(a)は、圧着部の中心軸線に沿っての断面図である。図5(b)は、挿入部の中心軸線に沿っての一部断面図及び挿入部の平面図である。Fig.5 (a) is sectional drawing along the center axis line of a crimping | compression-bonding part. FIG. 5B is a partial cross-sectional view along the central axis of the insertion portion and a plan view of the insertion portion. 図6は、測定装置の例を示すブロック図である。FIG. 6 is a block diagram illustrating an example of a measurement apparatus.

以下、図面を参照しつつ、本発明に係るPC鋼撚線の定着部構造、グラウンドアンカー、測定装置及び測定方法の実施形態について詳細に説明する。なお、説明において、同一要素又は同一機能を有する要素には、同一符号を用いる場合があり、重複する説明は省略する。以下の説明において、「前方」、「後方」、「前端」、「後端」などの前後の概念を持つ語を用いる場合には、図1及び図4における紙面上方を後方、図1における紙面下方を前方とする。   Hereinafter, embodiments of a PC steel twisted wire fixing portion structure, a ground anchor, a measuring device, and a measuring method according to the present invention will be described in detail with reference to the drawings. Note that in the description, the same elements or elements having the same function may be denoted by the same reference numerals, and redundant description will be omitted. In the following description, when words having concepts such as “front”, “rear”, “front end”, “rear end”, etc. are used, the upper side in FIG. 1 and FIG. The lower part is the front.

図1は、本発明の実施形態に係るPC鋼撚線の定着部構造を有するグラウンドアンカーの全体構成を示す図である。図2(a)は、光ファイバ付PC鋼撚線の斜視図である。図2(b)は、保護管の一例を示す斜視図である。本実施形態に係るPC鋼撚線の定着部構造100は、例えば、ダム及び斜面等において、岩盤(被定着部)R上に設けられた擁壁等の構造物101を岩盤R側に押し付けて力学的な安定性を確保するためのグラウンドアンカー50に適用される。なお、グラウンドアンカー50を構成する複数のPC鋼撚線は、必ずしも全てが光ファイバ付PC鋼撚線1である必要はなく、一部のPC鋼撚線に光ファイバ部が配置されていなくてもよい。以下の説明では、「光ファイバ付PC鋼撚線1」及び「光ファイバ部が配置されていない一部のPC鋼撚線」をまとめて「PC鋼撚線1,3」と略記することがある。   FIG. 1 is a diagram illustrating an overall configuration of a ground anchor having a fixing structure of a PC steel stranded wire according to an embodiment of the present invention. Fig.2 (a) is a perspective view of PC steel twisted wire with an optical fiber. FIG. 2B is a perspective view showing an example of the protective tube. The PC steel stranded wire fixing part structure 100 according to the present embodiment presses a structure 101 such as a retaining wall provided on a rock mass (fixed part) R to the rock mass R side, for example, on a dam or a slope. It is applied to the ground anchor 50 for ensuring the mechanical stability. The plurality of PC steel stranded wires constituting the ground anchor 50 do not necessarily have to be the PC steel stranded wire 1 with an optical fiber, and the optical fiber portion is not disposed on some PC steel stranded wires. Also good. In the following description, “PC steel stranded wire with optical fiber 1” and “part of PC steel stranded wire in which the optical fiber portion is not disposed” may be collectively abbreviated as “PC steel stranded wire 1, 3”. is there.

図1に示されるように、グラウンドアンカー50は、岩盤R及び構造物101に削孔された定着孔103の内部に設けられている。定着孔103は、岩盤R及び構造物101に例えば直径90〜165mmで削孔される。グラウンドアンカー50では、PC鋼撚線1,3の前端側が例えば20〜100m程度の長さで定着孔103に挿入されており、PC鋼撚線1,3の後端側が例えば150〜350mm程度の長さで表面101aから後方に突出している。   As shown in FIG. 1, the ground anchor 50 is provided inside a fixing hole 103 drilled in the rock mass R and the structure 101. The fixing hole 103 is drilled in the rock mass R and the structure 101 with a diameter of 90 to 165 mm, for example. In the ground anchor 50, the front end side of the PC steel stranded wires 1 and 3 is inserted into the fixing hole 103 with a length of about 20 to 100 m, for example, and the rear end side of the PC steel stranded wires 1 and 3 is about 150 to 350 mm, for example. It protrudes backward from the surface 101a in length.

グラウンドアンカー50は、PC鋼撚線の定着部構造100を含む頭部51と、アンカー自由長部52と、アンカー体長部55と、複数のPC鋼撚線1,3と、を備える。頭部51は、構造物101の表面101aにおける定着孔103の開口部に設けられている。頭部51では、PC鋼撚線1,3に所定の緊張力が加えられた後、その緊張力を保持するようにPC鋼撚線1,3の後端部が構造物101に定着される。   The ground anchor 50 includes a head 51 including a PC steel stranded wire fixing part structure 100, an anchor free length 52, an anchor body length 55, and a plurality of PC steel stranded wires 1 and 3. The head 51 is provided at the opening of the fixing hole 103 on the surface 101 a of the structure 101. In the head 51, after a predetermined tension is applied to the PC steel stranded wires 1 and 3, the rear ends of the PC steel stranded wires 1 and 3 are fixed to the structure 101 so as to maintain the tension. .

アンカー自由長部52は、表面101aから前方側のグラウンドアンカー50においてPC鋼撚線1,3が定着されていない部分である。アンカー自由長部52では、頭部51とアンカー体長部55とを結ぶようにPC鋼撚線1,3が延在する。アンカー自由長部52は、構造物101の定着孔103内に設けられた押え板53及び配列板54を有する。押え板53は、PC鋼撚線1,3が挿通され、表面101aと配列板54との間で定着孔103を密閉する。配列板54には、PC鋼撚線1,3が挿通されている。配列板54は、当該配列板54よりも後方においてPC鋼撚線1,3が互いに略平行となるようにPC鋼撚線1,3を整列させる。   The anchor free length portion 52 is a portion where the PC steel stranded wires 1 and 3 are not fixed in the ground anchor 50 on the front side from the surface 101a. In the anchor free long part 52, the PC steel stranded wires 1 and 3 extend so as to connect the head part 51 and the anchor body long part 55. The anchor free long portion 52 includes a presser plate 53 and an array plate 54 provided in the fixing hole 103 of the structure 101. The holding plate 53 is inserted with the PC steel stranded wires 1 and 3, and seals the fixing hole 103 between the surface 101 a and the array plate 54. PC steel stranded wires 1 and 3 are inserted through the array plate 54. The array plate 54 aligns the PC steel stranded wires 1 and 3 so that the PC steel stranded wires 1 and 3 are substantially parallel to each other behind the array plate 54.

アンカー体長部55は、グラウンドアンカー50においてPC鋼撚線1,3の前端部を定着する部分である。アンカー体長部55は、PC鋼撚線の定着部構造100によってPC鋼撚線1,3の前端部を岩盤Rの定着孔103に定着させる。具体的には、アンカー体長部55は、アンカー自由長部52から連続して延在するPC鋼撚線1,3の前端部を定着するための耐荷体56を有する。耐荷体56は、後述の充填材5を介してPC鋼撚線1,3を定着孔103に定着させる。   The anchor body length portion 55 is a portion for fixing the front end portions of the PC steel stranded wires 1 and 3 in the ground anchor 50. The anchor body long portion 55 fixes the front end portions of the PC steel stranded wires 1 and 3 to the fixing hole 103 of the rock mass R by the fixing portion structure 100 of the PC steel stranded wire. Specifically, the anchor body length portion 55 has a load-bearing body 56 for fixing the front end portions of the PC steel stranded wires 1 and 3 continuously extending from the anchor free length portion 52. The load-bearing body 56 fixes the PC steel stranded wires 1 and 3 to the fixing hole 103 through the filler 5 described later.

アンカー体長部55では、一例として、複数の耐荷体56が定着孔103の内部に直列的に設けられている。耐荷体56は、PC鋼撚線1,3に沿って所定のピッチ(例えば1.5mごと)で配置されている。耐荷体56の個数は、例えばPC鋼撚線1,3の設置本数を2で割った個数である。PC鋼撚線1,3の設置本数は、特に限定されないが、偶数の設置本数(ここでは4本)であってもよい。   In the anchor body long part 55, as an example, a plurality of load bearing bodies 56 are provided in series inside the fixing hole 103. The load-bearing bodies 56 are arranged at a predetermined pitch (for example, every 1.5 m) along the PC steel stranded wires 1 and 3. The number of load-bearing bodies 56 is, for example, the number obtained by dividing the number of installed PC steel stranded wires 1 and 3 by two. The number of installed PC steel stranded wires 1 and 3 is not particularly limited, but may be an even number (4 in this case).

耐荷体56は、PC鋼撚線1,3の前端部が配置される耐荷体本体57と、耐荷体本体57の後方でPC鋼撚線1,3を取り巻くように設けられる補強筋58と、を有する。
耐荷体本体57は、例えばアルミ合金等の鋳造により形成された柱状の部材である。耐荷体本体57には、当該耐荷体本体57によって定着されるPC鋼撚線1,3を耐荷体本体57に固定するための固定部60と、当該耐荷体本体57によって定着されないPC鋼撚線1,3を挿通可能な貫通孔57a(図1参照)と、が設けられている。耐荷体本体57には、例えば2つの固定部60が設けられ、PC鋼撚線1,3の設置本数よりも2だけ少ない数の貫通孔57aが設けられている。固定部60の詳細については、後述する。
The load-bearing body 56 includes a load-bearing body main body 57 in which the front ends of the PC steel stranded wires 1 and 3 are disposed, a reinforcing bar 58 provided so as to surround the PC steel stranded wires 1 and 3 behind the load-bearing body main body 57, and Have
The load-bearing body main body 57 is a columnar member formed by casting aluminum alloy or the like, for example. The load-bearing body 57 includes a fixing portion 60 for fixing the PC steel stranded wires 1 and 3 fixed by the load-bearing body 57 to the load-bearing body 57 and a PC steel stranded wire not fixed by the load-bearing body 57. A through hole 57a (see FIG. 1) through which 1 and 3 can be inserted is provided. The load-bearing body 57 is provided with, for example, two fixing portions 60, and is provided with a number of through holes 57 a that are two less than the number of PC steel stranded wires 1 and 3 installed. Details of the fixing unit 60 will be described later.

アンカー体長部55の最前端以外の耐荷体本体57では、当該耐荷体本体57によって定着されるPC鋼撚線1,3が固定部60に固定されると共に、当該耐荷体本体57の前方側に延長されるPC鋼撚線1,3が貫通孔に挿通される。アンカー体長部55の最前端の耐荷体本体57では、当該耐荷体本体57によって定着されるPC鋼撚線1,3が固定部60に固定される。   In the load-bearing body main body 57 other than the foremost end of the anchor body long portion 55, the PC steel stranded wires 1 and 3 fixed by the load-bearing body main body 57 are fixed to the fixing portion 60, and on the front side of the load-bearing body main body 57. PC steel stranded wires 1 and 3 to be extended are inserted into the through holes. In the load bearing body main body 57 at the foremost end of the anchor body long portion 55, the PC steel stranded wires 1 and 3 fixed by the load bearing body main body 57 are fixed to the fixing portion 60.

補強筋58は、それぞれの耐荷体本体57の後方に設けられた金属製のバネ状部材である。補強筋58は、それぞれの耐荷体本体57の後方の充填材5内において三次元的に延在し、その周囲の充填材5の強度を補強する。補強筋58は、その前端部が耐荷体本体57の段付部57f(図4参照)に配置される。   The reinforcing bars 58 are metal spring-like members provided behind the respective load-bearing body main bodies 57. The reinforcing bars 58 extend three-dimensionally in the filler 5 behind each load-bearing body main body 57, and reinforce the strength of the surrounding filler 5. The front end of the reinforcing bar 58 is disposed on the stepped portion 57f (see FIG. 4) of the load-bearing body main body 57.

アンカー自由長部52における定着孔103の内部には、押え板53よりも前方側において充填材5が充填されている。アンカー体長部55における定着孔103には、アンカー自由長部52から連続して充填材5が充填されている。充填材5は、例えばセメントミルク及びモルタル等であり、PC鋼撚線1,3を定着孔103に定着させるために定着孔103に充填されて硬化される。   The inside of the fixing hole 103 in the anchor free length portion 52 is filled with the filler 5 in front of the pressing plate 53. The fixing hole 103 in the anchor body length portion 55 is filled with the filler 5 continuously from the anchor free length portion 52. The filler 5 is, for example, cement milk, mortar, or the like, and is filled into the fixing hole 103 and cured in order to fix the PC steel stranded wires 1 and 3 to the fixing hole 103.

図2に示されるように、光ファイバ付PC鋼撚線1は、PC鋼撚線3と、PC鋼撚線3の表面に配置された光ファイバ部20と、を有する。光ファイバ付PC鋼撚線1は、少なくとも一対の光ファイバ部20を有することが好ましい。PC鋼撚線3は、例えばストランド鋼材からなる同一径の複数本(本実施形態では19本)のPC鋼素線4a〜4cが撚られて形成された撚線である。PC鋼素線4aは、PC鋼撚線3の最外周に配置された素線である。PC鋼素線4bは、PC鋼素線4aの内側に配置された素線である。PC鋼素線4cは、PC鋼素線4bの内側に配置され、PC鋼撚線3の中心に配置された素線である。   As shown in FIG. 2, the PC steel stranded wire 1 with an optical fiber includes a PC steel stranded wire 3 and an optical fiber portion 20 disposed on the surface of the PC steel stranded wire 3. The PC steel stranded wire with optical fiber 1 preferably has at least a pair of optical fiber portions 20. The PC steel stranded wire 3 is a stranded wire formed by twisting a plurality (19 in this embodiment) of PC steel strands 4a to 4c made of, for example, a strand steel material. The PC steel strand 4 a is a strand disposed on the outermost periphery of the PC steel stranded wire 3. The PC steel strand 4b is a strand arranged inside the PC steel strand 4a. The PC steel strand 4 c is a strand disposed inside the PC steel strand 4 b and disposed at the center of the PC steel stranded wire 3.

PC鋼撚線3の表面には、互いに隣接する2本のPC鋼素線4a,4a同士の間の谷間として、PC鋼撚線3の撚り目3aが形成されている。この谷間は、PC鋼撚線3の表面においてPC鋼撚線3の中心軸線Aに平行に延びる母線に対して所定の角度で傾斜しており、中心軸線Aを中心とした螺旋状に延在する。つまり、PC鋼撚線3は、螺旋状の撚り目3aを有する。PC鋼撚線3の表面には、腐食防止等のための被覆としてシース2が設けられている。   On the surface of the PC steel stranded wire 3, a twist line 3a of the PC steel stranded wire 3 is formed as a valley between the two adjacent PC steel strands 4a, 4a. The valley is inclined at a predetermined angle on the surface of the PC steel stranded wire 3 with respect to the bus extending parallel to the central axis A of the PC steel stranded wire 3 and extends in a spiral shape with the central axis A as the center. To do. In other words, the PC steel stranded wire 3 has a helical twist 3a. A sheath 2 is provided on the surface of the PC steel stranded wire 3 as a coating for preventing corrosion.

光ファイバ部20は、上記撚り目3aのうちの2つにそれぞれ設置され螺旋状に延在している。この一対の光ファイバ部20のそれぞれは、光ファイバ本体21と、光ファイバ本体21を収容する保護管25と、を有する。光ファイバ本体21は、光信号を伝送する光ファイバ素線23と、光ファイバ素線23を覆う被覆24を有する。被覆24は、例えばポリアミド系材料からなる。保護管25は、光ファイバ本体21を収容し、収容した光ファイバ本体21を、圧着部30の内壁面から加えられる圧迫力から保護する。   The optical fiber portions 20 are respectively installed on two of the twist lines 3a and extend in a spiral shape. Each of the pair of optical fiber portions 20 includes an optical fiber main body 21 and a protective tube 25 that accommodates the optical fiber main body 21. The optical fiber main body 21 has an optical fiber strand 23 that transmits an optical signal and a coating 24 that covers the optical fiber strand 23. The coating 24 is made of, for example, a polyamide-based material. The protective tube 25 accommodates the optical fiber main body 21 and protects the accommodated optical fiber main body 21 from the pressing force applied from the inner wall surface of the crimping portion 30.

保護管25は、上記撚り目3aのうちの2つにそれぞれ設置され螺旋状に延在している。保護管25は、上記の谷間に埋め込まれるように設置され、互いに隣接するPC鋼素線4a,4a同士の間において当該隣接するPC鋼素線4a,4aに沿って螺旋状に延在するように設置されている。従って、保護管25に収容された光ファイバ本体21(光ファイバ素線23)は、撚り目3aに沿って螺旋状に延在する。   The protective tubes 25 are respectively installed on two of the folds 3a and extend spirally. The protective tube 25 is installed so as to be embedded in the valley and extends spirally along the adjacent PC steel wires 4a, 4a between the adjacent PC steel wires 4a, 4a. Is installed. Therefore, the optical fiber main body 21 (optical fiber strand 23) accommodated in the protective tube 25 extends spirally along the fold 3a.

保護管25は、PC鋼撚線1,3の中心軸線方向に直交する断面内において、隣接するPC鋼素線4a,4aのそれぞれの表面と、PC鋼撚線1,3を構成するPC鋼素線4a〜4cの共通の外接円と、で囲まれた領域内に収容されている(図3参照)。すなわち、光ファイバ部20は、光ファイバ素線23が保護管25に収容された状態でPC鋼撚線3の撚り目3aに設置されて、圧着部30の内壁面(後述する挿入部32の32d)とPC鋼撚線3との間に配置される。保護管25は、圧着される前の圧着部30(後述の本体部31及び挿入部32)の降伏強度よりも高い降伏強度を有する。保護管25の材質としては、例えば窒化チタン、高速度工具鋼鋼材、又は合金工具鋼鋼材等の材料が好ましい。   Protective tube 25 includes PC steel constituting PC steel stranded wires 1 and 3 and the surfaces of adjacent PC steel strands 4a and 4a in the cross section perpendicular to the central axis direction of PC steel stranded wires 1 and 3, respectively. It is accommodated in a region surrounded by a common circumscribed circle of the strands 4a to 4c (see FIG. 3). That is, the optical fiber portion 20 is installed on the strand 3a of the PC steel stranded wire 3 in a state where the optical fiber strand 23 is accommodated in the protective tube 25, and the inner wall surface of the crimping portion 30 (the insertion portion 32 described later). 32d) and the PC steel stranded wire 3. The protective tube 25 has a yield strength higher than the yield strength of the crimping portion 30 (a main body portion 31 and an insertion portion 32 described later) before being crimped. As a material of the protective tube 25, for example, a material such as titanium nitride, high-speed tool steel, or alloy tool steel is preferable.

図4は、図1におけるアンカー体長部を示す一部断面図である。図5(a)は、圧着部の中心軸線に沿っての断面図である。図5(b)は、挿入部の中心軸線に沿っての一部断面図及び挿入部の平面図である。   FIG. 4 is a partial cross-sectional view showing the anchor body length in FIG. Fig.5 (a) is sectional drawing along the center axis line of a crimping | compression-bonding part. FIG. 5B is a partial cross-sectional view along the central axis of the insertion portion and a plan view of the insertion portion.

図4に示されるように、PC鋼撚線の定着部構造100では、耐荷体本体57に設けられた固定部60によってPC鋼撚線1,3が耐荷体本体57に固定される。固定部60は、耐荷体本体57に設けられた2つの係止部57bと、PC鋼撚線1,3と共に圧着された状態で係止部57bに係止される圧着部30と、を有する。係止部57bは、圧着後の圧着部30の外径よりも大きい内径を有する円筒状の孔である。係止部57bの後側には、内径が光ファイバ付PC鋼撚線1の外径よりも大きく且つ係止部57bの内径よりも小さい貫通孔57gが係止部57bと同軸に形成されている。当該貫通孔57gに対してPC鋼撚線1,3が後側から挿通されており、貫通孔57gの前側においてPC鋼撚線1,3の前端部の周囲を囲む圧着部30が装着されていることで、PC鋼撚線1,3は貫通孔57gから後側に抜けないようになっている。このような構造により、圧着部30が係止部57bに係止されるため、圧着部30と共に圧着されたPC鋼撚線1,3が耐荷体本体57に固定され、PC鋼撚線1,3の緊張力が耐荷体本体57によって支持される。   As shown in FIG. 4, in the PC steel stranded wire fixing unit structure 100, the PC steel stranded wires 1 and 3 are fixed to the load bearing body main body 57 by a fixing portion 60 provided on the load bearing body main body 57. The fixing portion 60 includes two locking portions 57b provided on the load-bearing body main body 57, and a crimping portion 30 that is locked to the locking portion 57b in a state of being crimped together with the PC steel stranded wires 1 and 3. . The locking part 57b is a cylindrical hole having an inner diameter larger than the outer diameter of the crimping part 30 after crimping. A through hole 57g having an inner diameter larger than the outer diameter of the PC steel stranded wire with optical fiber 1 and smaller than the inner diameter of the locking portion 57b is formed coaxially with the locking portion 57b on the rear side of the locking portion 57b. Yes. PC steel stranded wires 1 and 3 are inserted into the through hole 57g from the rear side, and a crimping portion 30 surrounding the front end portion of the PC steel stranded wires 1 and 3 is attached to the front side of the through hole 57g. Therefore, the PC steel stranded wires 1 and 3 are prevented from coming out from the through hole 57g to the rear side. With such a structure, since the crimping portion 30 is locked to the locking portion 57b, the PC steel stranded wires 1, 3 crimped together with the crimping portion 30 are fixed to the load-bearing body main body 57, and the PC steel stranded wire 1, 3 tension force is supported by the load-bearing body 57.

図5に示されるように、圧着部30は、円筒状の本体部31と、本体部31の内壁面31dに重ねられる円筒状の挿入部32と、を有する。図5の例では、圧着される前の状態の圧着部30が示されている。本体部31は、例えば材質がSCM435である円筒状部材である。本体部31が係止部57bに係止されている状態において、本体部31の外壁面31aは、係止部57bの内壁面に対向し、本体部31の後端部31bは、係止部57bの後方の面57hと当接する。本体部31の内壁面31dには、その後端部31b側において周方向に延在する溝31eが形成されている。   As shown in FIG. 5, the crimping portion 30 includes a cylindrical main body portion 31 and a cylindrical insertion portion 32 that overlaps the inner wall surface 31 d of the main body portion 31. In the example of FIG. 5, the crimping portion 30 in a state before being crimped is shown. The main body 31 is a cylindrical member made of, for example, SCM435. In the state where the main body 31 is locked to the locking portion 57b, the outer wall surface 31a of the main body 31 faces the inner wall surface of the locking portion 57b, and the rear end portion 31b of the main body 31 is the locking portion. It contacts the rear surface 57h of 57b. On the inner wall surface 31d of the main body 31, a groove 31e extending in the circumferential direction is formed on the rear end 31b side.

挿入部32は、例えば材質がSCM415である円筒状部材である。挿入部32は、本体部31よりも中心軸線方向に短い全長を有する。本体部31が係止部57bに係止されている状態において、挿入部32の外壁面32aは、本体部31の内壁面31dにおける前方に当接し、挿入部32の後端部32bは、本体部31の後端部31bよりも前方側に位置し、挿入部32の前端部32cは、本体部31の前端部31cと略面一に位置する。挿入部32の内壁面32dは、圧着によりPC鋼撚線1,3の最外周のPC鋼素線4aに密着する。挿入部32には、後端部32bから前方に向かって中心軸線に沿って延びる一対の切欠部32eが設けられている。なお、本体部31の内壁面31dの後方側には、挿入部32が配置されない領域が存在する。この領域は、圧着によりPC鋼撚線1,3のシース2の外周面に密着する(図4参照)。   The insertion part 32 is a cylindrical member whose material is SCM415, for example. The insertion part 32 has a shorter overall length in the central axis direction than the main body part 31. In a state where the main body portion 31 is locked to the locking portion 57b, the outer wall surface 32a of the insertion portion 32 abuts the front of the inner wall surface 31d of the main body portion 31, and the rear end portion 32b of the insertion portion 32 is the main body. The front end portion 32 c of the insertion portion 32 is positioned substantially flush with the front end portion 31 c of the main body portion 31. The inner wall surface 32d of the insertion portion 32 is brought into close contact with the outermost PC steel strand 4a of the PC steel stranded wires 1 and 3 by pressure bonding. The insertion portion 32 is provided with a pair of cutout portions 32e extending along the central axis from the rear end portion 32b toward the front. A region where the insertion portion 32 is not disposed is present on the rear side of the inner wall surface 31 d of the main body portion 31. This region is in close contact with the outer peripheral surface of the sheath 2 of the PC steel stranded wires 1 and 3 by crimping (see FIG. 4).

このような固定部60では、PC鋼撚線1,3の前端部1aに挿入された圧着部30と共に当該前端部1aが圧着されることで、PC鋼撚線1,3が耐荷体本体57に固定される。これにより、PC鋼撚線1,3が充填材5を介して定着孔103に定着される。この構造では、圧着部30が圧着されると、圧着部30の内壁面(本体部31の内壁面31d及び挿入部32の内壁面32d)によってPC鋼撚線1,3が径方向に強く圧迫され、圧着部30の内壁面とPC鋼撚線1,3の前端部1aの外周面とが密着する。   In such a fixing portion 60, the front end portion 1a is crimped together with the crimping portion 30 inserted into the front end portion 1a of the PC steel stranded wires 1, 3, so that the PC steel stranded wires 1, 3 are connected to the load-bearing body main body 57. Fixed to. Thereby, the PC steel stranded wires 1 and 3 are fixed to the fixing hole 103 through the filler 5. In this structure, when the crimping portion 30 is crimped, the PC steel stranded wires 1 and 3 are strongly pressed in the radial direction by the inner wall surface of the crimping portion 30 (the inner wall surface 31d of the main body 31 and the inner wall surface 32d of the insertion portion 32). Then, the inner wall surface of the crimping portion 30 and the outer peripheral surface of the front end portion 1a of the PC steel stranded wires 1 and 3 are in close contact with each other.

ここで、PC鋼撚線3の撚り目3aに保護管25が設置されていることにより、圧着によって圧着部30の内壁面とPC鋼撚線1,3の前端部1aの外周面とが密着したとしても、保護管25によって保護管25の内部空間が潰れることが回避される。このように、圧着部30の内壁面とPC鋼撚線1,3との間に光ファイバ本体21を通す経路が確保されると共に、圧着部30の内壁面から加えられる圧迫力から光ファイバ本体21が保護される。その結果、圧着部30の位置まで光ファイバ付PC鋼撚線1の張力を計測することが可能となる。   Here, since the protective tube 25 is installed in the twist line 3a of the PC steel stranded wire 3, the inner wall surface of the crimping portion 30 and the outer peripheral surface of the front end portion 1a of the PC steel stranded wire 1, 3 are brought into close contact by crimping. Even if it does, it will be avoided that the internal space of the protective tube 25 is crushed by the protective tube 25. In this way, a path through which the optical fiber main body 21 is passed between the inner wall surface of the crimping portion 30 and the PC steel stranded wires 1 and 3 is secured, and the optical fiber main body from the pressing force applied from the inner wall surface of the crimping portion 30. 21 is protected. As a result, the tension of the optical fiber-attached PC steel stranded wire 1 can be measured up to the position of the crimping portion 30.

なお、耐荷体本体57には、前端部を封止するキャップ57cが取り付けられる。キャップ57cは、キャップ固定ボルト57dが固定ボルト孔57eに螺合することで耐荷体本体57に取り付けられる。キャップ57cには、一対のボルトBが螺合される貫通孔が設けられており、当該貫通孔を介して係止部57bの前方の空間57vに防錆油等が注入される。空間57vでは、光ファイバ付PC鋼撚線1の前端部1aにおいて一対の光ファイバ部20の各光ファイバ素線23が互いに接続されている。   A cap 57 c that seals the front end portion is attached to the load-bearing body main body 57. The cap 57c is attached to the load bearing body 57 by screwing the cap fixing bolt 57d into the fixing bolt hole 57e. The cap 57c is provided with a through hole into which the pair of bolts B are screwed, and rust preventive oil or the like is injected into the space 57v in front of the locking portion 57b through the through hole. In the space 57v, the optical fiber strands 23 of the pair of optical fiber portions 20 are connected to each other at the front end portion 1a of the PC steel stranded wire 1 with an optical fiber.

以上説明したように、本実施形態に係るPC鋼撚線の定着部構造100では、光ファイバ付PC鋼撚線1は、その前端部1aにおいて周囲を圧着部30によって圧着されることで耐荷体本体57に固定され、充填材5を介して定着孔103に定着される。この構造では、光ファイバ付PC鋼撚線1の前端部1aが圧着部30と共に圧着されるため、圧着部30の内壁面によって径方向に強く圧迫され、光ファイバ付PC鋼撚線1の前端部1aの外周面と圧着部30とが密着する。ここで、光ファイバ本体21が保護管25に収容されることで、圧着部30の内壁面によって径方向に強く圧迫されて圧着部30の内壁面から加えられる圧迫力から光ファイバ本体21を保護することができる。そのため、光ファイバ付PC鋼撚線1の光ファイバ部20を、光ファイバ本体21が保護管25に収容された状態でPC鋼撚線3の撚り目3aに設置して、圧着部30の内壁面とPC鋼撚線3との間に配置することができる。従って、圧着部30の内壁面とPC鋼撚線3との間に光ファイバ部20を通すことが可能となり、圧着部30の位置まで光ファイバ付PC鋼撚線1の張力を計測することが可能となる。   As described above, in the PC steel stranded wire fixing portion structure 100 according to the present embodiment, the PC steel stranded wire with optical fiber 1 is crimped around the front end portion 1a by the crimping portion 30 so as to have a load bearing body. It is fixed to the main body 57 and fixed to the fixing hole 103 via the filler 5. In this structure, since the front end 1a of the PC steel stranded wire with optical fiber 1 is crimped together with the crimping portion 30, it is strongly pressed in the radial direction by the inner wall surface of the crimping portion 30, and the front end of the PC steel stranded wire with optical fiber 1 The outer peripheral surface of the portion 1a and the crimping portion 30 are in close contact. Here, since the optical fiber main body 21 is accommodated in the protective tube 25, the optical fiber main body 21 is protected from the pressing force applied from the inner wall surface of the crimping portion 30 by being strongly compressed in the radial direction by the inner wall surface of the crimping portion 30. can do. Therefore, the optical fiber portion 20 of the PC steel stranded wire with optical fiber 1 is installed in the stranded portion 3a of the PC steel stranded wire 3 in a state where the optical fiber main body 21 is accommodated in the protective tube 25. It can arrange | position between a wall surface and the PC steel twisted wire 3. FIG. Therefore, the optical fiber portion 20 can be passed between the inner wall surface of the crimping portion 30 and the PC steel stranded wire 3, and the tension of the PC steel stranded wire with optical fiber 1 can be measured up to the position of the crimping portion 30. It becomes possible.

また、PC鋼撚線の定着部構造100では、保護管25は、圧着される前の圧着部30の降伏強度よりも高い降伏強度を有する。これにより、圧着部30の内壁面からの圧迫力から光ファイバ本体21をより確実に保護することができる。   Further, in the PC steel stranded wire fixing part structure 100, the protective tube 25 has a yield strength higher than the yield strength of the crimping part 30 before being crimped. Thereby, the optical fiber main body 21 can be more reliably protected from the pressing force from the inner wall surface of the crimping part 30.

また、PC鋼撚線の定着部構造100では、光ファイバ付PC鋼撚線1は、少なくとも一対の光ファイバ素線23を有し、一対の光ファイバ素線23は、光ファイバ付PC鋼撚線1の前端部1aにおいて互いに接続されている。これにより、例えば後述する測定装置70を用いて1本の光ファイバ付PC鋼撚線1の歪を測定する際、往復分の歪に関する情報を取得することができる。また、一対の光ファイバ素線23を互いに接続する接続作業を光ファイバ付PC鋼撚線1の前端部1aにおいて容易に行うことができる。   Moreover, in the fixing part structure 100 of the PC steel stranded wire, the PC steel stranded wire with optical fiber 1 has at least a pair of optical fiber strands 23, and the pair of optical fiber strands 23 is a PC steel stranded wire with optical fiber. The front ends 1a of the lines 1 are connected to each other. Thereby, for example, when measuring the strain of one optical steel-attached PC steel stranded wire 1 using a measuring device 70 described later, it is possible to acquire information on the reciprocal strain. Moreover, the connection operation | work which connects a pair of optical fiber strand 23 mutually can be easily performed in the front-end part 1a of the PC steel twisted wire 1 with an optical fiber.

本実施形態に係るグラウンドアンカー50では、例えば後述する測定装置70を用いて1本の光ファイバ付PC鋼撚線1について光ファイバ素線23の歪を測定する際、往復分の歪に関する情報を取得することができるため、定着孔103に設けられたグラウンドアンカー50における歪を好適に測定することができる。   In the ground anchor 50 according to the present embodiment, for example, when measuring the strain of the optical fiber 23 with respect to one PC steel twisted wire 1 with an optical fiber using a measuring device 70 described later, information on the reciprocal strain is provided. Since it can be acquired, the strain at the ground anchor 50 provided in the fixing hole 103 can be suitably measured.

なお、従来のPC鋼撚線の定着部構造では、圧着部による光ファイバ部の圧迫を避けようとする場合、圧着部の内壁面とPC鋼撚線との間に光ファイバ部を通さないように、圧着部よりも前方側で光ファイバ付PC鋼撚線から光ファイバ部を引き出して光ファイバ付PC鋼撚線を定着する必要がある。そうすると、圧着部の位置までPC鋼撚線の張力を計測することができず、圧着部の直近の歪に関する情報を取得することができない。本来は、圧着部の直近が最もPC鋼撚線の不具合等が出易いため、圧着部の直近部分こそ最もPC鋼撚線の張力を計測(つまり光ファイバ素線の歪を計測)することが望まれる部分である。これに対しPC鋼撚線の定着部構造100では、圧着部30の内壁面とPC鋼撚線3との間に光ファイバ部20を通して光ファイバ付PC鋼撚線1の端面から光ファイバ部20を引き出すことができるので、圧着部30の直近部分まで光ファイバ付PC鋼撚線1の張力を計測することが可能となる。   In addition, in the conventional PC steel stranded wire fixing part structure, when trying to avoid compression of the optical fiber part by the crimping part, do not pass the optical fiber part between the inner wall surface of the crimping part and the PC steel stranded wire. In addition, it is necessary to pull out the optical fiber portion from the PC steel stranded wire with optical fiber and fix the PC steel stranded wire with optical fiber on the front side of the crimping portion. If it does so, the tension | tensile_strength of PC steel twisted wire cannot be measured to the position of a crimping | compression-bonding part, but the information regarding the latest distortion of a crimping | compression-bonding part cannot be acquired. Originally, the closest part of the crimping part is most likely to cause problems with the twisted PC steel wire, so the nearest part of the crimping part can measure the tension of the PC steel twisted wire (that is, measure the strain of the optical fiber). This is the desired part. On the other hand, in the PC steel stranded wire fixing portion structure 100, the optical fiber portion 20 passes through the optical fiber portion 20 between the inner wall surface of the crimping portion 30 and the PC steel stranded wire 3 from the end face of the PC steel stranded wire 1 with optical fiber. Therefore, it is possible to measure the tension of the optical fiber-attached PC steel stranded wire 1 up to the immediate vicinity of the crimping portion 30.

以上、本発明の実施形態について説明したが、本発明は、上記実施形態に限られるものではなく、各請求項に記載した要旨を変更しない範囲で変形したものであってもよい。   As mentioned above, although embodiment of this invention was described, this invention is not restricted to the said embodiment, You may change in the range which does not change the summary described in each claim.

例えば、本発明は、上記実施形態のような19本のPC鋼素線4a〜4cを有するPC鋼撚線3に適用する場合に限定されず、例えば7本撚りのPC鋼撚線、あるいは他のPC鋼撚線にも同様に適用することができる。   For example, the present invention is not limited to the case where the present invention is applied to a PC steel stranded wire 3 having 19 PC steel strands 4a to 4c as in the above-described embodiment, for example, a 7-stranded PC steel stranded wire, or other It can be similarly applied to PC steel stranded wires.

上記実施形態に係るPC鋼撚線の定着部構造100においては、現場で、その前端部1aにおいて周囲を圧着部30で圧着した光ファイバ付PC鋼撚線1を準備してもよいし、その前端部1aにおいて周囲を圧着部30で圧着した光ファイバ付PC鋼撚線1を予め工場で製造してもよい。   In the fixing part structure 100 of the PC steel stranded wire according to the above embodiment, the PC steel stranded wire with optical fiber 1 whose periphery is crimped by the crimping part 30 at the front end part 1a may be prepared in the field, The optical steel-attached PC steel stranded wire 1 whose periphery is crimped by the crimping portion 30 at the front end portion 1a may be manufactured in advance at a factory.

上記実施形態では、耐荷体本体57は、2つの固定部60を有していたが、固定部60の数はこれに限定されない。また、圧着部30は、本体部31及び挿入部32を有していたが、圧着部30の構造はこれに限定されない。また、光ファイバ付PC鋼撚線1には、光ファイバ部20として保護管25に収容された光ファイバ本体21が2つ配置されていたが、光ファイバ部20の数はこれに限定されない。   In the said embodiment, although the load-bearing body main body 57 had the two fixing | fixed parts 60, the number of the fixing | fixed parts 60 is not limited to this. Moreover, although the crimping | compression-bonding part 30 had the main-body part 31 and the insertion part 32, the structure of the crimping | compression-bonding part 30 is not limited to this. Moreover, although the two optical fiber main bodies 21 accommodated in the protective tube 25 as the optical fiber part 20 are arrange | positioned at the PC steel stranded wire 1 with an optical fiber, the number of the optical fiber parts 20 is not limited to this.

続いて、本発明の測定装置の実施形態として、上記光ファイバ付PC鋼撚線1の歪を測定するための測定装置70を説明する。   Subsequently, as an embodiment of the measuring apparatus of the present invention, a measuring apparatus 70 for measuring the strain of the PC fiber stranded wire with optical fiber 1 will be described.

図6は、測定装置の例を示すブロック図である。図6に示されるように、測定装置70は、光ファイバ素線23の両端からレーザ光を入出力するタイプの測定装置である。測定装置70は、前端部23a,23bにおいて互いに接続された一対の光ファイバ素線23の一方の後端部23cに光信号を発信する光信号発信部73と、前端部23a,23bにおいて互いに接続された一対の光ファイバ素線23の他方の後端部23dからの光信号を受信する光信号受信部74と、光信号受信部74で受信された光信号を解析し光ファイバ付PC鋼撚線1の歪を取得する解析部71と、解析部71で取得された歪状態を表示する表示部72と、を備える。   FIG. 6 is a block diagram illustrating an example of a measurement apparatus. As shown in FIG. 6, the measuring device 70 is a type of measuring device that inputs and outputs laser light from both ends of the optical fiber strand 23. The measuring device 70 is connected to an optical signal transmitter 73 that transmits an optical signal to one rear end 23c of a pair of optical fiber wires 23 connected to each other at the front ends 23a and 23b, and to the front ends 23a and 23b. An optical signal receiving unit 74 that receives an optical signal from the other rear end 23d of the pair of optical fiber strands 23, and an optical signal received by the optical signal receiving unit 74 to analyze a PC steel twisted optical fiber An analysis unit 71 that acquires the distortion of the line 1 and a display unit 72 that displays the strain state acquired by the analysis unit 71 are provided.

光信号発信部73と光信号受信部74とは例えば一体の測定器として構成されてもよい。解析部71は例えばコンピュータ等の演算装置であり、表示部72は例えば演算装置による演算結果を画面表示するディスプレイモニタである。解析部71と表示部72とを一体で備えるパーソナルコンピュータ等を採用してもよい。光信号発信部73、光信号受信部74、及び光ファイバ素線23は、光分岐器75、カプラ等を介しながら適宜接続される。図6の方式の測定装置の詳細は、例えば、特許第5192742号公報に示されている。具体的には、入出力される光信号に基づいて光ファイバ素線23の長手方向の歪分布を測定することにより、PC鋼撚線3の長手方向の各位置に発生している歪を間接的に知ることができる。   The optical signal transmitter 73 and the optical signal receiver 74 may be configured as an integrated measuring device, for example. The analysis unit 71 is a computing device such as a computer, for example, and the display unit 72 is a display monitor that displays a computation result by the computing device, for example. You may employ | adopt the personal computer etc. which are provided with the analysis part 71 and the display part 72 integrally. The optical signal transmitter 73, the optical signal receiver 74, and the optical fiber strand 23 are appropriately connected through an optical branching device 75, a coupler, and the like. The details of the measuring device of the method shown in FIG. 6 are disclosed in, for example, Japanese Patent No. 5192742. Specifically, the strain generated in each position in the longitudinal direction of the PC steel stranded wire 3 is indirectly measured by measuring the longitudinal strain distribution of the optical fiber strand 23 based on the input / output optical signals. Can know.

この測定装置70によれば、光信号発信部73によって光ファイバ素線23の一方の後端部23cに光信号を発信することで、光信号受信部74によって光ファイバ素線23の他方の後端部23dからの光信号を受信することができる。そのため、一対の2本の光ファイバ素線23に対して一組の光信号発信部73及び光信号受信部74で済むため、光ファイバ素線23の数に対する光信号発信部73及び光信号受信部74の数を減らすことができる。   According to this measuring apparatus 70, an optical signal is transmitted to one rear end 23 c of the optical fiber 23 by the optical signal transmitter 73, and the other rear of the optical fiber 23 is transmitted by the optical signal receiver 74. An optical signal from the end 23d can be received. Therefore, since a pair of optical signal transmitters 73 and optical signal receivers 74 is sufficient for a pair of two optical fiber strands 23, the optical signal transmitters 73 and optical signal receivers for the number of optical fiber strands 23 are sufficient. The number of parts 74 can be reduced.

続いて、本発明の測定方法の実施形態として、上記PC鋼撚線3の歪を測定するための測定方法の例を説明する。   Then, the example of the measuring method for measuring the distortion of the said PC steel twisted wire 3 is demonstrated as embodiment of the measuring method of this invention.

(準備工程)
上述したグラウンドアンカー50を準備し、当該グラウンドアンカー50を斜面に複数本設置する。このとき、PC鋼撚線の定着部構造100を有するグラウンドアンカー50を準備する。具体的には、光ファイバ部20を光ファイバ付PC鋼撚線1から引き剥がし、光ファイバ本体21を保護管25に収容する。このように光ファイバ本体21を保護管25に収容した光ファイバ部20を少なくとも一対準備する。そして、グラウンドアンカー50のアンカー体長部55において、1本の光ファイバ付PC鋼撚線1に少なくとも一対の光ファイバ部20を、光ファイバ本体21が保護管25に収容された状態で、PC鋼撚線3の撚り目3aに設置する。この一対の光ファイバ本体21を光ファイバ付PC鋼撚線1の前端部1a(図4参照)の端面から引き出すと共に、光ファイバ本体21を当該前端部1aで互いに繋いで2倍の長さの往復の光ファイバ部20とする。
(Preparation process)
The ground anchor 50 described above is prepared, and a plurality of the ground anchors 50 are installed on the slope. At this time, a ground anchor 50 having a PC steel stranded wire fixing part structure 100 is prepared. Specifically, the optical fiber portion 20 is peeled off from the optical steel-attached PC steel stranded wire 1, and the optical fiber main body 21 is accommodated in the protective tube 25. In this way, at least a pair of optical fiber portions 20 in which the optical fiber main body 21 is accommodated in the protective tube 25 are prepared. And in the anchor body long part 55 of the ground anchor 50, in the state in which the optical fiber main body 21 was accommodated in the protective tube 25 in the state in which the optical fiber main body 21 was accommodated in one PC steel twisted wire 1 with an optical fiber, PC steel. It installs in the twist 3a of the stranded wire 3. The pair of optical fiber main bodies 21 are pulled out from the end face of the front end portion 1a (see FIG. 4) of the PC steel stranded wire 1 with an optical fiber, and the optical fiber main bodies 21 are connected to each other at the front end portion 1a to double the length. A reciprocating optical fiber unit 20 is used.

(接続工程)
次に、光ファイバ付PC鋼撚線1の前端部1a(図4及び図6参照)において、一対の光ファイバ部20のそれぞれの光ファイバ素線23の前端部23a,23bを互いに接続する。また、PC鋼撚線3の後端部1b(図6参照)において、光信号を発信する光信号発信部73を、前端部23a,23bを互いに接続された一対の光ファイバ素線23の一方の後端部23cに接続する。PC鋼撚線3の後端部1bにおいて、光信号を受信する光信号受信部74を、当該一対の光ファイバ素線23の他方の後端部23dに接続する。これにより、光ファイバ付PC鋼撚線1のほぼ全長分を往復する1本の光ファイバ部20,20が形成される。
(Connection process)
Next, in the front end portion 1a of the PC steel stranded wire with optical fiber 1 (see FIGS. 4 and 6), the front end portions 23a and 23b of the optical fiber strands 23 of the pair of optical fiber portions 20 are connected to each other. Further, in the rear end portion 1b (see FIG. 6) of the PC steel stranded wire 3, one of the pair of optical fiber wires 23 in which the optical signal transmitting portion 73 that transmits an optical signal is connected to the front end portions 23a and 23b. To the rear end 23c. At the rear end portion 1 b of the PC steel stranded wire 3, an optical signal receiving portion 74 that receives an optical signal is connected to the other rear end portion 23 d of the pair of optical fiber strands 23. Thereby, the one optical fiber part 20 and 20 which reciprocates the substantially full length of PC steel twisted wire 1 with an optical fiber is formed.

(測定工程)
その後、測定装置70を用い、光信号受信部74で受信された光信号を解析部71によって解析して光ファイバ付PC鋼撚線1の歪に関する情報(歪分布)を取得し、斜面における地中の歪を測定する。これにより、光ファイバ部20,20の全長分の各箇所の歪の分布が測定される。ここでは、光ファイバ部20,20の前半部分の歪分布と後半部分の歪分布は、互いにPC鋼撚線3の中心軸線Aを挟む対称位置の歪を示すことになる。従って、例えば、PC鋼撚線3が屈曲している箇所があった場合、当該箇所の屈曲内側の歪と屈曲外側の歪との両方の情報を得ることができる。よって、このような2つの歪分布の情報を用いることにより、PC鋼撚線3の歪状態をより正確に知ることができる。なお、上述したとおり、光ファイバ部20を一対のみならず2対以上設置することにより、更にPC鋼撚線3の歪状態を詳細に知ることもできる。
(Measurement process)
Then, using the measuring device 70, the optical signal received by the optical signal receiving unit 74 is analyzed by the analyzing unit 71 to obtain information (strain distribution) on the strain of the PC steel stranded wire with optical fiber 1, and the ground on the slope Measure the strain inside. Thereby, the distribution of strain at each location corresponding to the entire length of the optical fiber portions 20 and 20 is measured. Here, the strain distribution in the first half portion and the strain distribution in the second half portion of the optical fiber portions 20, 20 indicate strains at symmetrical positions sandwiching the central axis A of the PC steel stranded wire 3. Therefore, for example, when there is a portion where the PC steel stranded wire 3 is bent, information on both the strain inside the bent portion and the strain outside the bent portion can be obtained. Therefore, the strain state of the PC steel stranded wire 3 can be known more accurately by using such information of two strain distributions. In addition, as above-mentioned, the distortion state of PC steel twisted wire 3 can also be known in detail by installing not only a pair but 2 or more pairs of optical fiber parts.

以上説明したように、この設置工程によれば、斜面に設置するグラウンドアンカー50が往復分の歪分布を測定することができるものであるため、光信号発信部73を光ファイバ素線23の一方の後端部23cに接続して光信号受信部74を光ファイバ素線23の他方の後端部23dに接続することで、斜面における地中の歪を容易に測定することができる。このとき、上述のとおり2本の光ファイバ部20を光ファイバ付PC鋼撚線1の前端部1aの端面から引き出すことができることから、上記前端部1a側において一対の光ファイバ素線23を互いに繋ぐ作業を容易に行うことができる。   As described above, according to this installation step, the ground anchor 50 installed on the slope can measure the reciprocal strain distribution, so that the optical signal transmitter 73 is connected to one of the optical fiber strands 23. By connecting the optical signal receiving unit 74 to the other rear end portion 23d of the optical fiber 23 by connecting to the rear end portion 23c, the underground strain on the slope can be easily measured. At this time, since the two optical fiber portions 20 can be pulled out from the end surface of the front end portion 1a of the PC steel stranded wire with optical fiber 1 as described above, the pair of optical fiber strands 23 are connected to each other on the front end portion 1a side. Connection work can be easily performed.

上記実施形態の測定方法では、光ファイバ素線23の本数が一対2本の例を示したが、この例に限られず、光ファイバ素線23の本数は所望の本数であればよい。   In the measurement method of the above-described embodiment, an example in which the number of the optical fiber strands 23 is one to two is shown. However, the number is not limited to this example, and the number of the optical fiber strands 23 may be a desired number.

1…光ファイバ付PC鋼撚線、1a…前端部、1b…後端部、3…PC鋼撚線、3a…撚り目、4a〜4c…PC鋼素線、5…充填材、20…光ファイバ部、23…光ファイバ素線、23a,23b…前端部、23c,23d…後端部、25…保護管、30…圧着部、31d,32d…内壁面、50…グラウンドアンカー、56…耐荷体、60…固定部、70…測定装置、71…解析部、73…光信号発信部、74…光信号受信部、100…PC鋼撚線の定着部構造、101…構造物、103…定着孔、R…岩盤(被定着部)。   DESCRIPTION OF SYMBOLS 1 ... PC steel twisted wire with optical fiber, 1a ... Front end part, 1b ... Rear end part, 3 ... PC steel twisted wire, 3a ... Twist, 4a-4c ... PC steel strand, 5 ... Filler, 20 ... Light Fiber part, 23 ... Optical fiber, 23a, 23b ... Front end part, 23c, 23d ... Rear end part, 25 ... Protection tube, 30 ... Crimping part, 31d, 32d ... Inner wall surface, 50 ... Ground anchor, 56 ... Load resistance , 60 ... fixing part, 70 ... measuring device, 71 ... analyzing part, 73 ... optical signal transmitting part, 74 ... optical signal receiving part, 100 ... fixing structure of PC steel stranded wire, 101 ... structure, 103 ... fixing Hole, R ... Rock (fixed part).

Claims (6)

複数のPC鋼素線が撚られて形成され螺旋状の撚り目を有するPC鋼撚線と、前記撚り目に設置された光ファイバ部と、を有する光ファイバ付PC鋼撚線を被定着部に定着させる光ファイバ付PC鋼撚線の定着部構造であって、
前記被定着部に削孔された定着孔の内部に設けられ、前記定着孔の内部に充填された充填材を介して前記光ファイバ付PC鋼撚線を前記定着孔に定着させる耐荷体と、
前記耐荷体に設けられ、前記耐荷体によって定着される前記光ファイバ付PC鋼撚線を前記耐荷体に固定する固定部と、を備え、
前記固定部は、
前記光ファイバ付PC鋼撚線の前端部において前記光ファイバ付PC鋼撚線の周囲に圧着される圧着部を有し、
前記光ファイバ部は、
前記撚り目に配置された光ファイバ素線と、前記圧着部の内壁面と前記PC鋼撚線との間に配置され、前記光ファイバ素線を収容する保護管と、を有する、PC鋼撚線の定着部構造。
A PC steel stranded wire with an optical fiber having a PC steel stranded wire formed by twisting a plurality of PC steel strands and having a spiral fold, and an optical fiber portion installed at the fold, It is a fixing part structure of PC steel stranded wire with optical fiber to be fixed to,
A load-bearing body that is provided in a fixing hole cut in the fixing portion and fixes the PC steel stranded wire with an optical fiber to the fixing hole via a filler filled in the fixing hole;
A fixing portion that is provided on the load bearing body and fixes the PC steel stranded wire with an optical fiber fixed to the load bearing body to the load bearing body,
The fixing part is
A crimping part that is crimped around the PC steel stranded wire with optical fiber at the front end of the PC steel stranded wire with optical fiber;
The optical fiber portion is
A PC steel twist, comprising: an optical fiber strand disposed in the twisted line; and a protective tube disposed between the inner wall surface of the crimping portion and the PC steel twisted wire and accommodating the optical fiber strand. Wire fixing part structure.
前記保護管は、前記圧着部の降伏強度よりも高い降伏強度を有する、請求項1に記載のPC鋼撚線の定着部構造。   2. The PC steel stranded wire fixing portion structure according to claim 1, wherein the protective tube has a yield strength higher than a yield strength of the crimping portion. 前記光ファイバ付PC鋼撚線は、少なくとも一対の前記光ファイバ素線を有し、
前記一対の光ファイバ素線は、前記光ファイバ付PC鋼撚線の前端部において互いに接続されている、請求項1又は2に記載のPC鋼撚線の定着部構造。
The PC steel stranded wire with optical fiber has at least a pair of the optical fiber strands,
The pair of optical fiber strands is a PC steel stranded wire fixing portion structure according to claim 1 or 2, wherein the pair of optical fiber strands are connected to each other at a front end portion of the optical fiber-attached PC steel stranded wire.
請求項1〜3の何れか一項に記載のPC鋼撚線の定着部構造を有する、グラウンドアンカー。   The ground anchor which has the fixing | fixed part structure of the PC steel twisted wire as described in any one of Claims 1-3. 請求項1〜3の何れか一項に記載のPC鋼撚線の定着部構造における光ファイバ付PC鋼撚線の歪を測定するための測定装置であって、
前記前端部において互いに接続された前記光ファイバ素線の一方の後端部に光信号を発信する光信号発信部と、
前記前端部において互いに接続された前記光ファイバ素線の他方の後端部からの光信号を受信する光信号受信部と、
前記光信号受信部で受信された前記光信号を解析し前記光ファイバ付PC鋼撚線の歪に関する情報を取得する解析部と、を備える、測定装置。
A measuring device for measuring strain of a PC steel stranded wire with an optical fiber in the fixing portion structure of the PC steel stranded wire according to any one of claims 1 to 3,
An optical signal transmitter that transmits an optical signal to one rear end of the optical fiber wires connected to each other at the front end;
An optical signal receiver that receives an optical signal from the other rear end of the optical fiber wire connected to each other at the front end;
An analysis unit comprising: an analysis unit that analyzes the optical signal received by the optical signal reception unit and acquires information related to distortion of the PC steel stranded wire with optical fiber.
請求項3に記載のPC鋼撚線の定着部構造を有するグラウンドアンカーを準備し、前記グラウンドアンカーを斜面に複数本設置する準備工程と、
光信号を発信する光信号発信部を、前記光ファイバ付PC鋼撚線の前端部において互いに接続された前記光ファイバ素線の一方の後端部に接続すると共に、光信号を受信する光信号受信部を、前記前端部において互いに接続された前記光ファイバ素線の他方の後端部に接続する接続工程と、
前記光信号受信部で受信された前記光信号を解析部によって解析して前記光ファイバ付PC鋼撚線の歪に関する情報を取得し、前記斜面における地中の歪を測定する測定工程と、を備える、測定方法。
Preparing a ground anchor having a fixing structure of a PC steel stranded wire according to claim 3, and preparing a plurality of ground anchors on a slope;
An optical signal transmitting part for transmitting an optical signal is connected to one rear end part of the optical fiber strands connected to each other at a front end part of the PC steel stranded wire with optical fiber and receives an optical signal. Connecting the receiving unit to the other rear end of the optical fiber wires connected to each other at the front end; and
A measurement step of analyzing the optical signal received by the optical signal reception unit by an analysis unit to obtain information on the strain of the PC steel stranded wire with an optical fiber, and measuring the underground strain on the slope; A measuring method.
JP2015257020A 2015-12-28 2015-12-28 PC steel twisted wire fixing part structure, ground anchor, measuring device and measuring method Active JP6474345B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015257020A JP6474345B2 (en) 2015-12-28 2015-12-28 PC steel twisted wire fixing part structure, ground anchor, measuring device and measuring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015257020A JP6474345B2 (en) 2015-12-28 2015-12-28 PC steel twisted wire fixing part structure, ground anchor, measuring device and measuring method

Publications (2)

Publication Number Publication Date
JP2017120225A true JP2017120225A (en) 2017-07-06
JP6474345B2 JP6474345B2 (en) 2019-02-27

Family

ID=59271771

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015257020A Active JP6474345B2 (en) 2015-12-28 2015-12-28 PC steel twisted wire fixing part structure, ground anchor, measuring device and measuring method

Country Status (1)

Country Link
JP (1) JP6474345B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064616A (en) * 2020-08-25 2020-12-11 南京地下空间高技术产业研究院有限公司 GFRP combined anchor rod suitable for soil deformation monitoring and implementation method thereof
KR102234099B1 (en) * 2020-06-08 2021-03-30 오순옥 Steel wire with an optical fiber and structure monitoring system using the same

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61169147U (en) * 1985-04-06 1986-10-20
JPH0921661A (en) * 1995-07-06 1997-01-21 Sumitomo Electric Ind Ltd Apparatus for monitoring underground state of anchor construction part
JP2000046527A (en) * 1998-07-29 2000-02-18 Tokyu Constr Co Ltd Pc material with strain detection system and method for detecting strain
JP2001318011A (en) * 2000-05-02 2001-11-16 Toa Grout Kogyo Co Ltd Method of measuring strain or tensile force of tension steel member
JP2002070005A (en) * 2000-08-28 2002-03-08 Toa Grout Kogyo Co Ltd Anchor
JP2007297777A (en) * 2006-04-27 2007-11-15 Nippon Steel Engineering Co Ltd Cable for suspension structure and measurement system
WO2012025886A1 (en) * 2010-08-25 2012-03-01 Micomo S.A. Reinforcing bolts comprising fibre optic for the detection of deformations by means of brillouin optical time-domain reflectometry
JP2014038039A (en) * 2012-08-17 2014-02-27 Research Institute Of Innovative Technology For The Earth Measurement system of pressure, temperature, and strain distribution of material, method for monitoring carbon dioxide underground storage using this system, method for assessing impact on stability of geological layer due to carbon dioxide injection, and monitoring method for freezing
US20150077740A1 (en) * 2011-11-01 2015-03-19 Empire Technology Development Llc Cable with optical fiber for prestressed concrete

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61169147U (en) * 1985-04-06 1986-10-20
JPH0921661A (en) * 1995-07-06 1997-01-21 Sumitomo Electric Ind Ltd Apparatus for monitoring underground state of anchor construction part
JP2000046527A (en) * 1998-07-29 2000-02-18 Tokyu Constr Co Ltd Pc material with strain detection system and method for detecting strain
JP2001318011A (en) * 2000-05-02 2001-11-16 Toa Grout Kogyo Co Ltd Method of measuring strain or tensile force of tension steel member
JP2002070005A (en) * 2000-08-28 2002-03-08 Toa Grout Kogyo Co Ltd Anchor
JP2007297777A (en) * 2006-04-27 2007-11-15 Nippon Steel Engineering Co Ltd Cable for suspension structure and measurement system
WO2012025886A1 (en) * 2010-08-25 2012-03-01 Micomo S.A. Reinforcing bolts comprising fibre optic for the detection of deformations by means of brillouin optical time-domain reflectometry
US20150077740A1 (en) * 2011-11-01 2015-03-19 Empire Technology Development Llc Cable with optical fiber for prestressed concrete
JP2014038039A (en) * 2012-08-17 2014-02-27 Research Institute Of Innovative Technology For The Earth Measurement system of pressure, temperature, and strain distribution of material, method for monitoring carbon dioxide underground storage using this system, method for assessing impact on stability of geological layer due to carbon dioxide injection, and monitoring method for freezing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102234099B1 (en) * 2020-06-08 2021-03-30 오순옥 Steel wire with an optical fiber and structure monitoring system using the same
CN112064616A (en) * 2020-08-25 2020-12-11 南京地下空间高技术产业研究院有限公司 GFRP combined anchor rod suitable for soil deformation monitoring and implementation method thereof
CN112064616B (en) * 2020-08-25 2022-02-01 南京地下空间高技术产业研究院有限公司 GFRP combined anchor rod suitable for soil deformation monitoring and implementation method thereof

Also Published As

Publication number Publication date
JP6474345B2 (en) 2019-02-27

Similar Documents

Publication Publication Date Title
US9429485B1 (en) Bolt shear force sensor
US5929341A (en) Stress measuring rock support device
CN102782232B (en) Method and system for equally tensioning multiple strands
CN215639896U (en) Linkage monitoring system for monitoring loosening of bolt or nut
JP6440858B2 (en) DPTSS cable
JP6474345B2 (en) PC steel twisted wire fixing part structure, ground anchor, measuring device and measuring method
US6696974B1 (en) Cable device for detecting and monitoring rock and soil displacement
KR20100026145A (en) Method for measuring pre-stress or strain using fiber bragg grating(fbg) sensor
Schroeck et al. Strain monitoring in steel rock bolts using FBG sensor arrays
CN105674942A (en) Concrete strainmeter subassembly and installation method
JP3643097B2 (en) Axial force meter
JP2006207230A (en) Cable end structure of bridge cable
JP2017078617A (en) Monitoring system and monitoring method
JP2013181819A (en) Bolt-type distortion detector
KR102152868B1 (en) River cable
JP6640676B2 (en) Management method and management device
KR102323526B1 (en) Prestressing force monitoring system of prestressins strand using smart anchoring plate based on distributed optical fiber sensor, and method for the same
JP6669503B2 (en) Anchor structure and wedge body of PC steel stranded wire
JP7069748B2 (en) Construction method of uncurtain don and ground anchor
KR101754400B1 (en) 7-wire strand with fiber-optic sensor encapsulated helical wire and method for manufacturing of the same
JP6993643B2 (en) Fixing structure and fixing method
JP4049682B2 (en) Threaded joint for steel pipe pile and fastening method
JP5558742B2 (en) Girder reinforcement method
JP2019203332A (en) Pre-grout pc steel, and monitoring device and monitoring method using pre-grout pc steel
WO2001023831A2 (en) Cable device for detecting and monitoring rock and soil displacement

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180413

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190116

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190129

R150 Certificate of patent or registration of utility model

Ref document number: 6474345

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250