Prior art keywords
remote
power supply
computer system
transmission control
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015202235A
Other languages
Japanese (ja)
Inventor
雅之 中川
Masayuki Nakagawa
雅之 中川
克也 上番増
Katsuya Uebanso
克也 上番増
裕 佃
Yutaka Tsukuda
裕 佃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2015202235A priority Critical patent/JP2017076186A/en
Publication of JP2017076186A publication Critical patent/JP2017076186A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

PROBLEM TO BE SOLVED: To provide a power supply management support system and power supply management support method that, when electricity supply is stopped, can remotely control a remote transmission control apparatus with one portable information terminal, can register the result of a supply stop service, and can easily and accurately perform a supply stop execution service.SOLUTION: A power supply management support system 1 includes: a computer system 3 installed and managed by an electric power company; and a handy terminal 2 capable of transmitting and receiving data from the computer system 3. A remote control unit 27 of the handy terminal 2 registers, to the computer system 3, the installation of a remote transmission control apparatus 101 into a watthour meter 100 of a customer, and remotely controls the remote transmission control apparatus 101. A result registration processing unit 28 registers, to the computer system 3, the result of a stop of the electric power supply to the customer or a stop release service.SELECTED DRAWING: Figure 1

Description

この発明は、電力供給管理支援システムおよび電力供給管理支援方法に関し、特に、電気の供給停止の際に、1台の携帯情報端末で遠隔送電制御機器の遠隔操作と、供給停止業務の結果登録ができ、簡便かつ正確に供給停止施工業務を行い得る電力供給管理支援システムおよび電力供給管理支援方法に関する。   The present invention relates to a power supply management support system and a power supply management support method, and in particular, when electricity supply is stopped, remote operation of a remote power transmission control device and registration of a result of supply stop work can be performed with one portable information terminal. The present invention relates to a power supply management support system and a power supply management support method that can perform a supply stop construction work easily and accurately.

電力事業における電力供給管理支援技術として、例えば、特許文献1には、電気料金の集金に関わる集金端末(集金ハンディターミナル)、集金システムおよび集金方法の手法が提案されている。集金員が集金ハンディターミナルを携行して需要家宅を訪れ、集金ハンディターミナルを用いて集金業務を行うものである。   As a power supply management support technique in the power business, for example, Patent Document 1 proposes a method of a collection terminal (collection handy terminal), a collection system, and a collection method related to collection of electricity charges. A collector will carry a collection handy terminal to a customer's house and collect money using the collection handy terminal.

他方で、電力会社は、顧客が一定の期限までに電気料金を支払わなかった場合には、事前に供給停止の通知をした上で、電力を供給停止している。具体的には、実際に供給停止をする場合は、集金員が現地へ訪問し、遠隔操作により電力の供給停止・再接続ができる遠隔送電制御機器を、顧客の電力量計に取り付けて、これを遠隔操作する作業を行っている。ここで、顧客の電力量計に遠隔送電制御機器を設置して、顧客への電力を供給停止または停止解除する業務に関わる公知技術としては、例えば、特許文献2に開示された遠隔送電制御装置および遠隔送電制御システム並びに遠隔送電制御方法がある。   On the other hand, if the customer has not paid the electricity fee by a certain time limit, the power company has stopped supplying power after notifying the supply stop in advance. Specifically, when the supply is actually stopped, the collector will visit the site and attach a remote power transmission control device that can remotely stop and reconnect the power to the customer's electricity meter. Is working remotely. Here, as a publicly known technique related to a business of installing a remote power transmission control device in a customer watt-hour meter and stopping or canceling the supply of power to the customer, for example, a remote power transmission control device disclosed in Patent Document 2 And a remote power transmission control system and a remote power transmission control method.

従来、この供給停止施工業務を、次のような作業手順で行っている。
(1)遠隔送電制御機器の設置作業:供給停止施工として、顧客の電力量計に遠隔送電制御機器を取り付ける。
(2)遠隔送電制御機器の情報登録作業:携帯電話の通信機能を利用して、遠隔送電制御機器の操作と、取り付けた遠隔送電制御機器の情報を、営業所の遠隔送電制御機器操作用端末に登録する。この登録作業は、携帯電話会社のネットワークと、電力会社の遠隔送電管理サーバを介して行う。
(3)供給停止施工結果の登録作業:ハンディターミナルから、電力会社のホスト電算機へ供給停止施工結果を登録する。この結果登録作業は、報告画面に遠隔送電制御機器の識別番号を入力して、モバイル伝送で電力会社のコンピュータシステムに送信し、登録をすることにより行われる。なお、その登録内容は、営業オンラインを通じて各営業所の営業オンライン端末で閲覧が可能となる。
Conventionally, this supply stop construction work is performed in the following work procedure.
(1) Installation work of remote power transmission control device: As a supply stop construction, the remote power transmission control device is attached to the customer's electricity meter.
(2) Remote power transmission control device information registration work: Using the communication function of the mobile phone, the remote power transmission control device operation and the information on the installed remote power transmission control device, the remote power transmission control device operation terminal of the sales office Register with. This registration work is performed via the network of the mobile phone company and the remote power transmission management server of the power company.
(3) Supply stop construction result registration work: The supply stop construction result is registered from the handy terminal to the host computer of the power company. As a result, the registration work is performed by inputting the identification number of the remote power transmission control device on the report screen, transmitting it to the computer system of the power company by mobile transmission, and registering it. The registered contents can be viewed on the sales online terminal of each sales office through the sales online.

特開2009−258792号公報JP 2009-258792 A 特開2008−17597号公報JP 2008-17597 A

上述したように、従来の作業手順では、現場において、携帯電話と集金用ハンディターミナルの2種の携帯情報端末を別個に操作することにより行っている。したがって、登録作業や報告作業において、入力ミスや入力漏れが発生する危険性が高い。また、入力ミスや入力漏れが発生した場合には、供給停止解除をするために行う遠隔送電制御機器の再接続操作を、遠隔で行うことができず、作業員が直接現地に赴いて作業をせざるを得ないため、供給再開までに時間をロスすることとなり、顧客の不満の原因となっていた。   As described above, in the conventional work procedure, two types of portable information terminals, that is, a mobile phone and a collecting handy terminal are separately operated on site. Therefore, there is a high risk of input mistakes and input omissions in registration work and reporting work. In addition, if an input error or input leak occurs, the remote power transmission control device reconnection operation to release the supply stop cannot be performed remotely, and the worker can go directly to the site and work. As a result, time was lost until the supply was resumed, causing customer dissatisfaction.

特に、夜間(例えば、17時20分から翌8時50分までの間)に再接続を受け付けたときは、営業所当直者または委託会社へ再接続工事を依頼することになり、現地での再接続工事のために完了まで一層時間がかかっていた。そして、委託会社へ依頼した場合は、委託料が余計に必要となるという問題もあった。   In particular, when reconnection is accepted at night (for example, from 17:20 to the next 8:50), the relocation work will be requested to the sales office supervisor or the consignment company. It took longer to complete due to the connection work. And when requesting to a consignment company, there was also a problem that an extra consignment fee was required.

さらに、2台の端末の操作や入力の作業が作業員の負担となっており、特に施工する件数が多数ある場合には件数を調整せざるを得ない事態が発生し、適正な供給停止施工業務の妨げとなっていた。   In addition, the operation of the two terminals and the input work are burdened by the workers, especially when there are a large number of constructions, there is a situation where the number of cases must be adjusted, and appropriate supply stop construction It was a hindrance to work.

そこでこの発明は、電気の供給停止の際に、1台の携帯情報端末で遠隔送電制御機器の遠隔操作と、供給停止業務の結果登録ができ、簡便かつ正確に供給停止施工業務を行い得る電力供給管理支援システムおよび電力供給管理支援方法を提供することを目的とする。   In view of this, the present invention provides a power supply that can perform remote operation of a remote power transmission control device and result of a supply stop operation at one portable information terminal, and can easily and accurately perform a supply stop construction operation when electricity supply is stopped. It is an object to provide a supply management support system and a power supply management support method.

上記課題を解決するために、請求項1の発明は、電力会社が設置、管理するコンピュータシステムと、前記コンピュータシステムとデータ送受信可能なハンディターミナルと、を備え、顧客への電力の供給停止または停止解除業務を支援する電力供給管理支援システムであって、前記ハンディターミナルは、顧客の電力量計への遠隔送電制御機器の設置登録を前記コンピュータシステムに対して行うと共に、前記遠隔送電制御機器を遠隔操作する遠隔操作部と、顧客への電力の供給停止または停止解除業務の結果を前記コンピュータシステムに対して登録する結果登録処理部と、を有することを特徴とする。   In order to solve the above problems, the invention of claim 1 comprises a computer system installed and managed by an electric power company, and a handy terminal capable of transmitting and receiving data to and from the computer system, and stopping or stopping the supply of power to customers. A power supply management support system for supporting a release operation, wherein the handy terminal registers a remote power transmission control device to a watt-hour meter of a customer with respect to the computer system, and remotely connects the remote power transmission control device to the computer system. It has a remote operation unit to be operated, and a result registration processing unit for registering the result of the operation of stopping or canceling the supply of power to the customer to the computer system.

請求項2の発明は、請求項1に記載の電力供給管理支援システムにおいて、前記コンピュータシステムは、前記ハンディターミナルの遠隔操作部で入力された遠隔送電制御機器の設置情報を、付設のデータベースで管理するホスト計算機と、前記ハンディターミナルの結果登録処理部で入力された供給停止または停止解除業務結果情報を、付設のデータベースで管理する遠隔送電管理システムと、を有することを特徴とする。   According to a second aspect of the present invention, in the power supply management support system according to the first aspect, the computer system manages the installation information of the remote power transmission control device input by the remote control unit of the handy terminal in an attached database. And a remote power transmission management system for managing the supply stop or stop cancellation work result information input by the result registration processing unit of the handy terminal using an attached database.

請求項の発明は、請求項1または請求項2の何れか1項に記載の電力供給管理支援システムにおいて、前記遠隔操作部は、遠隔送電制御機器の設置情報を前記コンピュータシステムに対して送信する前に、入力内容を確認する機能を有し、前記結果登録処理部は、供給停止または停止解除業務結果情報を前記コンピュータシステムに対して送信する前に、入力内容を確認する機能を有することを特徴とする。 According to a third aspect of the present invention, in the power supply management support system according to any one of the first or second aspects, the remote operation unit transmits installation information of a remote power transmission control device to the computer system. The result registration processing unit has a function of confirming the input content before transmitting the supply stop or stop cancellation work result information to the computer system. It is characterized by.

請求項4の発明は、電力会社が設置、管理するコンピュータシステムと、前記コンピュータシステムとデータ送受信可能なハンディターミナルと、を備えた電力供給管理支援システムにおける、顧客への電力の供給停止または停止解除業務を支援する電力供給管理支援方法であって、前記ハンディターミナルから、顧客の電力量計への遠隔送電制御機器の設置登録を前記コンピュータシステムに対して行うと共に、前記遠隔送電制御機器を遠隔操作する遠隔操作ステップと、前記ハンディターミナルから、顧客への電力の供給停止または停止解除業務の結果を前記コンピュータシステムに対して登録する結果登録処理ステップと、を有することを特徴とする。   According to a fourth aspect of the present invention, in a power supply management support system comprising a computer system installed and managed by an electric power company and a handy terminal capable of transmitting and receiving data to and from the computer system, power supply to the customer is stopped or released. A power supply management support method for supporting business, wherein the installation registration of a remote power transmission control device to a customer's watt hour meter is performed with respect to the computer system from the handy terminal, and the remote power transmission control device is remotely operated A remote operation step, and a result registration processing step of registering the result of the operation of stopping or canceling the supply of power to the customer from the handy terminal to the computer system.

請求項1および請求項4の発明によれば、従来、供給停止施工の結果登録をハンディターミナルで行い、遠隔送電制御機器の情報登録を携帯電話で行って、2台(2種)の携帯情報端末が必要であったのに対して、本発明では、1台(1種)のハンディターミナルで供給停止施工の結果登録および遠隔送電制御機器の情報登録行うことが可能である。これにより、遠隔送電制御機器の登録や、施工状況の報告において、入力ミスや入力漏れを極力防ぐことができる。また、遠隔操作部および結果登録処理部の入力操作で重複する情報については1度の入力操作のみで済むため、作業現場での入力や機器の操作等の作業内容が減ることにより、作業時間を短縮することが可能である。また、入力ミスや入力漏れが防止可能であることから、供給停止の解除を遠隔操作で行う場合におけるトラブル発生を抑えることができ、早期の供給再開が可能となる。   According to the first and fourth aspects of the invention, conventionally, the result of the supply stop construction is registered at the handy terminal, the information registration of the remote power transmission control device is performed at the mobile phone, and the two portable information (two types) are stored. Whereas a terminal is required, in the present invention, it is possible to register the result of the supply stop construction and register information on the remote power transmission control device with one (one type) handy terminal. Thereby, it is possible to prevent input errors and input leaks as much as possible in the registration of remote power transmission control devices and the reporting of construction status. In addition, information that overlaps in the input operations of the remote control unit and the result registration processing unit need only be input once. Therefore, the work content such as input at the work site and operation of the equipment is reduced, thereby reducing the work time. It can be shortened. Further, since it is possible to prevent an input error or an input leakage, it is possible to suppress the occurrence of trouble when the supply stop is canceled by remote operation, and it is possible to restart the supply at an early stage.

請求項2の発明によれば、従来、電力会社のコンピュータシステムと、遠隔操作管理システムとの独立した2系統の情報管理システムが必要であったのに対して、本発明では、1系統のコンピュータシステム3に統合することが可能である。これにより、情報管理システムの簡素化が図られ、管理に必要な作業や費用を削減できると共に、ホスト計算機に付設のデータベースと、遠隔送電管理システムに付設のデータベースとの間の登録データの食い違いを極力減らすことが可能である。   According to the invention of claim 2, conventionally, an information management system of two systems independent of a computer system of an electric power company and a remote operation management system has been required. It can be integrated into the system 3. This simplifies the information management system, reduces the work and costs required for management, and eliminates discrepancies in registration data between the database attached to the host computer and the database attached to the remote power transmission management system. It is possible to reduce as much as possible.

請求項3の発明によれば、コンピュータシステムに対して送信する前に、遠隔操作部によって遠隔送電制御機器の設置情報を、結果登録処理部によって供給停止または停止解除業務結果情報を、それぞれ確認するので、入力ミスや入力漏れを極力防ぐことができる。   According to the invention of claim 3, before transmitting to the computer system, the remote operation unit confirms the installation information of the remote power transmission control device, and the result registration processing unit confirms the supply stop or stop cancellation work result information. Therefore, input errors and input leakage can be prevented as much as possible.

この発明の実施の形態に係る電力供給管理支援システム1の概略構成図である。1 is a schematic configuration diagram of a power supply management support system 1 according to an embodiment of the present invention. 実施の形態のハンディターミナル2の外観を例示する斜視図である。It is a perspective view which illustrates the appearance of handy terminal 2 of an embodiment. 実施の形態のハンディターミナル2の機能の概略を例示する構成図である。It is a block diagram which illustrates the outline of the function of the handy terminal 2 of embodiment. 遠隔操作部27起動時の専用画面である登録画面を例示する説明図である。It is explanatory drawing which illustrates the registration screen which is a special screen at the time of remote control part 27 starting. 遠隔操作部27起動時の専用画面である操作画面を例示する説明図である。It is explanatory drawing which illustrates the operation screen which is an exclusive screen at the time of remote control part 27 starting. 結果登録処理部28起動時の専用画面である施工入力画面を例示する説明図である。It is explanatory drawing which illustrates the construction input screen which is an exclusive screen at the time of the result registration process part 28 starting. 結果登録処理部28起動時の専用画面である指示数入力画面を例示する説明図である。It is explanatory drawing which illustrates the instruction number input screen which is a special screen at the time of the result registration process part 28 starting.

以下、この発明を図示の実施の形態に基づいて説明する。   The present invention will be described below based on the illustrated embodiments.

図1は、この発明の実施の形態に係る電力供給管理支援システム1の概略構成図である。同図において、電力供給管理支援システム1は、コンピュータシステム3とデータ送受信可能なハンディターミナル2と、電力会社が設置、管理するコンピュータシステム3と、営業オンライン端末4と、遠隔送電制御機器操作端末5と、を備えている。   FIG. 1 is a schematic configuration diagram of a power supply management support system 1 according to an embodiment of the present invention. In the figure, a power supply management support system 1 includes a handy terminal 2 capable of transmitting / receiving data to / from a computer system 3, a computer system 3 installed and managed by an electric power company, a sales online terminal 4, and a remote power transmission control device operation terminal 5. And.

コンピュータシステム3は、電力会社により設置、管理されているサーバとネットワークであり、モバイル専用サーバ31、ホスト電算機32、事業所総合OAサーバ33から構成されている。先ず、モバイル専用サーバ31は、無線通信を行うためのサーバであり、ハンディターミナル2とネットワークNWを介して接続されている。   The computer system 3 is a server and a network that are installed and managed by an electric power company, and includes a mobile dedicated server 31, a host computer 32, and a general office OA server 33. First, the mobile dedicated server 31 is a server for performing wireless communication, and is connected to the handy terminal 2 via the network NW.

次に、ホスト電算機32は、供給停止施工結果登録が行われるサーバであり、モバイル専用サーバ31とは、電力会社のネットワークを介して接続されている。   Next, the host computer 32 is a server on which supply stop construction result registration is performed, and is connected to the mobile dedicated server 31 via a network of an electric power company.

また、ホスト電算機32にはデータベース32bが付設されており、該データベース32bに、各顧客の情報(契約番号、住所、供給方式、直近の指示数、所定の期間の電力の使用実績と電気料金、所定の期間の電気料金の支払状況、設置されている電力量計100の識別番号等)が記憶・管理されている。また、データベース32bには、施工者コード、各ハンディターミナル2に割り当てられた識別番号が記憶・管理されている。すなわち、ホスト電算機32は、ハンディターミナル2の識別番号と施工者コードをもとに、施工者と、使用されているハンディターミナル2を認識する。さらに、ホスト電算機32のデータベース32bには、供給停止施工結果が登録され、記憶・管理される。   Further, the host computer 32 is provided with a database 32b. The database 32b includes information on each customer (contract number, address, supply method, latest number of instructions, power usage record for a predetermined period, and electricity charges). , Payment status of electricity charges for a predetermined period, identification number of installed watt-hour meter 100, etc.) are stored and managed. The database 32b stores and manages the installer code and the identification number assigned to each handy terminal 2. That is, the host computer 32 recognizes the installer and the used handy terminal 2 based on the identification number of the handy terminal 2 and the installer code. Furthermore, the supply stop construction result is registered, stored and managed in the database 32b of the host computer 32.

次に、事業所総合OAサーバ33は、遠隔送電制御機器101の情報が登録されるサーバであり、ホスト電算機32とは、電力会社のネットワークを介して接続されている。   Next, the office general OA server 33 is a server in which information on the remote power transmission control device 101 is registered, and is connected to the host computer 32 via a network of an electric power company.

また、事業所総合OAサーバ33には、ホスト電算機32と同様にデータベース33bが付設されており、該データベース33bに、各顧客の情報(契約番号、住所、供給方式、直近の指示数、所定の期間の電力の使用実績と電気料金、所定の期間の電気料金の支払状況、設置されている電力量計100の識別番号等)、施工者コード、各ハンディターミナル2に割り当てられた識別番号が記憶・管理されている。また、データベース33bには、遠隔送電制御機器101の端末番号が記憶・管理されている。さらに、事業所総合OAサーバ33のデータベース33bには、遠隔送電制御機器101の情報が登録され、記憶・管理される。   In addition, the office general OA server 33 is provided with a database 33b similarly to the host computer 32, and information (contract number, address, supply method, latest number of instructions, predetermined number) of each customer is stored in the database 33b. Power usage record and electricity rate, period of payment of electricity rate for a given period, identification number of installed watt-hour meter 100), installer code, identification number assigned to each handy terminal 2 It is remembered and managed. Further, the terminal number of the remote power transmission control device 101 is stored and managed in the database 33b. Further, the information on the remote power transmission control device 101 is registered, stored and managed in the database 33b of the office general OA server 33.

そして、コンピュータシステム3には、電力会社の営業所のパソコンである、営業オンライン端末4、遠隔送電制御機器操作用端末5と電力会社のネットワークを介して接続されている。営業オンライン端末4は、ホスト電算機32と接続されており、その画面で供給停止施工結果が閲覧できる。また、遠隔送電制御機器操作用端末5は、事業所総合OAサーバ33と接続されており、その画面で遠隔送電制御機器101の情報が閲覧可能である。   The computer system 3 is connected to a business online terminal 4 and a remote power transmission control device operating terminal 5 which are personal computers of the power company's sales offices via the power company's network. The business online terminal 4 is connected to the host computer 32, and the supply stop construction result can be viewed on the screen. Further, the remote power transmission control device operation terminal 5 is connected to the office general OA server 33, and information on the remote power transmission control device 101 can be viewed on the screen.

他方で、顧客の電力量計100に、遠隔送電制御機器101が設置されている。電力量計100は、顧客における使用電力を計量する計器であり、従来のアナログ式誘導型電力量計の他、通信や情報処理機能を有するスマートメータがこれに含まれる。   On the other hand, a remote power transmission control device 101 is installed in the customer's electricity meter 100. The watt-hour meter 100 is a meter that measures power used by a customer, and includes a smart meter having a communication and information processing function in addition to a conventional analog inductive watt-hour meter.

また、遠隔送電制御機器101は、上述の如く、電極の供給停止業務において電力量計に設置され、遠隔操作により電力の供給を停止・再開するための機器である。   Further, as described above, the remote power transmission control device 101 is a device installed in the watt hour meter in the electrode supply stop operation, and is a device for stopping and restarting the supply of power by remote operation.

次に、図2および図3を参照して、ハンディターミナル2について詳細に説明する。ここで、図2はハンディターミナル2の外観を例示する斜視図であり、図3はハンディターミナル2の機能の概略を例示する構成図である。図2において、ハンディターミナル2は、外装部21、表示モニタ22、操作キー23、光インタフェース部24を備えている。   Next, the handy terminal 2 will be described in detail with reference to FIGS. 2 and 3. Here, FIG. 2 is a perspective view illustrating the external appearance of the handy terminal 2, and FIG. 3 is a configuration diagram illustrating an outline of functions of the handy terminal 2. In FIG. 2, the handy terminal 2 includes an exterior part 21, a display monitor 22, operation keys 23, and an optical interface part 24.

先ず、外装部21はプラスチック製の筐体であり、片手で把持できる程度の大きさに設定されており、ハンディターミナル2の他の構成を内外に備えている。   First, the exterior part 21 is a plastic housing, and is set to a size that can be grasped with one hand, and includes other configurations of the handy terminal 2 inside and outside.

また、表示モニタ22は、液晶画面であり、操作キー23からの操作の他に、タッチパネルとして、タッチペンを用いての操作も可能である。   The display monitor 22 is a liquid crystal screen, and can be operated using a touch pen as a touch panel in addition to the operation from the operation keys 23.

また、操作キー23は、プラスチックまたはゴム製のボタンであり、これを操作して、後述するハンディターミナル2の記憶部26や処理部29を作動させることで、ハンディターミナル2を動作させる。   Further, the operation key 23 is a button made of plastic or rubber, and the handy terminal 2 is operated by operating this button to operate a storage unit 26 or a processing unit 29 of the handy terminal 2 described later.

また、光インタフェース部24は、後述する通信部25と外部の通信機器の間で、光通信を行うためのインタフェースである。ここで、光通信は、赤外線により行われる。   The optical interface unit 24 is an interface for performing optical communication between a communication unit 25 described later and an external communication device. Here, optical communication is performed by infrared rays.

次に、図3に示すように、ハンディターミナル2は、上述の表示モニタ22と操作キー23の他に、通信部25、記憶部26および処理部29を備えている。   Next, as shown in FIG. 3, the handy terminal 2 includes a communication unit 25, a storage unit 26, and a processing unit 29 in addition to the above-described display monitor 22 and operation keys 23.

先ず、通信部25は、外部の通信機器と通信を行い、データの送受信を行うための機構であり、無線LANや、赤外線により通信を行う。この実施の形態では、通信部25は、特に遠隔送電制御機器101およびコンピュータシステム3と通信可能に接続されており、後述する遠隔操作部27と結果登録処理部28を実行した際に、入力、選択、または画面表示された情報を、コンピュータシステム3に送信する。   First, the communication unit 25 is a mechanism for communicating with an external communication device and transmitting / receiving data, and performs communication using a wireless LAN or infrared rays. In this embodiment, the communication unit 25 is particularly connected to the remote power transmission control device 101 and the computer system 3 so as to be communicable. When the remote operation unit 27 and the result registration processing unit 28 described later are executed, Information selected or displayed on the screen is transmitted to the computer system 3.

次に、記憶部26は、RAM(Random Access Memory)やフラッシュROM(Read Only Memory)等で構成されている。記憶部26には、顧客情報(住所、供給方式、直近の指示数等)、ハンディターミナル2のパスワード、施工者コード等の予め登録されているデータ情報の他に、後述する処理部29上で実行される遠隔操作部27、結果登録処理部28等の機能プログラムが記憶されている。また、記憶部26には、操作キー23や表示モニタ22の入力手段を介して、ハンディターミナル2に入力された情報、例えば、顧客の契約番号、電力会社の施工作業者に割り当てられた施工者コード、ハンディターミナル2に割り当てられたパスワード、送電制御機器101の端末番号、電力量計100の識別番号などのデータ情報が記憶される。   Next, the storage unit 26 includes a RAM (Random Access Memory), a flash ROM (Read Only Memory), and the like. In the storage unit 26, in addition to customer information (address, supply method, number of latest instructions, etc.), pre-registered data information such as the handy terminal 2 password, installer code, etc., on the processing unit 29 described later Function programs such as the remote operation unit 27 and the result registration processing unit 28 to be executed are stored. The storage unit 26 also has information input to the handy terminal 2 via the operation keys 23 and the input means of the display monitor 22, for example, the contract number of the customer, the contractor assigned to the contractor of the power company. Data information such as a code, a password assigned to the handy terminal 2, a terminal number of the power transmission control device 101, and an identification number of the watt-hour meter 100 is stored.

次に、処理部29は、CPU(Central Processing Unit)等のプロセッサで具現され、操作キー23や表示モニタ22等と連携して、記憶部26に記憶された遠隔操作部27、結果登録処理部28や、その他の機能プログラムを実行する。すなわち、処理部29には、遠隔操作部27および結果登録処理部28を備えている。   Next, the processing unit 29 is implemented by a processor such as a CPU (Central Processing Unit), and in cooperation with the operation keys 23 and the display monitor 22, the remote operation unit 27 and the result registration processing unit stored in the storage unit 26. 28 and other function programs are executed. That is, the processing unit 29 includes a remote operation unit 27 and a result registration processing unit 28.

遠隔操作部27は、コンピュータシステム3に対して遠隔送電制御機器101の設置登録作業をすると共に、遠隔送電制御機器101を遠隔から操作する機能プログラムである。また、結果登録処理部28は、電力会社が設置、管理するコンピュータシステム3に、供給停止業務の報告をする機能プログラムである。   The remote operation unit 27 is a functional program for performing installation registration work of the remote power transmission control device 101 with respect to the computer system 3 and operating the remote power transmission control device 101 remotely. The result registration processing unit 28 is a functional program that reports a supply stop operation to the computer system 3 installed and managed by the electric power company.

また、遠隔操作部27、結果登録処理部28を実行中に、入力されたハンディターミナル2のパスワードの正誤の判定、表示モニタ22への必要情報の記入ミスや記入漏れがあった場合の判定を行う。すなわち、遠隔操作部27は、遠隔送電制御機器の設置情報をコンピュータシステム3に対して送信する前に、入力内容を確認する機能を有し、結果登録処理部28は、供給停止または停止解除業務結果情報をコンピュータシステム3に対して送信する前に、入力内容を確認する機能を有している。   In addition, during execution of the remote control unit 27 and the result registration processing unit 28, determination of correctness / incorrectness of the input password of the handy terminal 2 and determination when there is an input error or omission of necessary information on the display monitor 22 is performed. Do. That is, the remote operation unit 27 has a function of confirming the input contents before transmitting the installation information of the remote power transmission control device to the computer system 3, and the result registration processing unit 28 performs the supply stop or stop release operation. Before transmitting the result information to the computer system 3, it has a function of confirming the input content.

次に、遠隔操作部27の起動時には、表示モニタ22の専用画面上で、所定の情報を入力し操作をするが、具体的な入力・操作について、図4および図5の専用画面を参照して説明する。ここで、図4は遠隔操作部27起動時の専用画面である登録画面を例示する説明図であり、図5は遠隔操作部27起動時の専用画面である操作画面を例示する説明図である。   Next, when the remote control unit 27 is activated, predetermined information is input and operated on the dedicated screen of the display monitor 22, but the specific input / operation is described with reference to the dedicated screens of FIGS. I will explain. 4 is an explanatory diagram illustrating a registration screen that is a dedicated screen when the remote operation unit 27 is activated. FIG. 5 is an explanatory diagram illustrating an operation screen that is a dedicated screen when the remote operation unit 27 is activated. .

図4に示すように、登録画面は、施工者コード欄221、パスワード欄222、端末番号欄223、契約番号欄224、計器NO欄225、登録キー226および操作画面切換キー227を有している。   As shown in FIG. 4, the registration screen has a contractor code column 221, a password column 222, a terminal number column 223, a contract number column 224, an instrument NO column 225, a registration key 226, and an operation screen switching key 227. .

また、図5に示すように、操作画面は、機器状態を表示する、黒線制御状態表示228、赤線制御状態表示229、黒線2次側電圧表示230、赤線2次側電圧表示231、2次側電流表示232と、更新キー233、選択キー234、選択解除キー235、投入キー236、遮断キー237、状態問合キー238、LED点灯キー239、TOP画面切換キー240および機器登録キー241を有している。   Further, as shown in FIG. 5, the operation screen displays a device state, a black line control state display 228, a red line control state display 229, a black line secondary side voltage display 230, and a red line secondary side voltage display 231. Secondary current display 232, update key 233, selection key 234, selection release key 235, input key 236, cutoff key 237, status inquiry key 238, LED lighting key 239, TOP screen switching key 240, and device registration key 241.

ここで、施工者コード欄221は、施工作業者に割り当てられた識別番号を、端末番号欄223は、設置した遠隔送電制御機器101の機体番号を、契約番号224は顧客1件あたりに割り当てられた固有の番号を、計器NO225は、顧客の電力量計100の識別番号を入力する。パスワード欄222には、個々のハンディターミナル2に割り当てられたパスワードを入力する。これを入力することにより、操作画面により、遠隔操作部27が使用可能になる。   Here, the contractor code field 221 is an identification number assigned to the construction worker, the terminal number field 223 is the machine number of the installed remote power transmission control device 101, and the contract number 224 is assigned to each customer. The meter NO 225 inputs the identification number of the customer's watt hour meter 100. In the password field 222, a password assigned to each handy terminal 2 is entered. By inputting this, the remote operation unit 27 can be used on the operation screen.

登録キー226は、登録画面の記入事項を全て記入した段階でクリックすると、記入した内容が、コンピュータシステム3に登録されるキーである。このキーは、未記入や不正記入欄がある場合には、クリックできないようにされている。操作画面切換キー227は、登録画面の記入事項を全て記入した段階でクリックすると、操作画面に移行するキーである。登録キー226と同様に、未記入や不正記入欄がある場合には、クリックできないようにされている。   The registration key 226 is a key for registering the entered contents in the computer system 3 when clicked at the stage where all the items on the registration screen are entered. This key is not clickable if there is an unfilled or incorrect entry field. The operation screen switching key 227 is a key that shifts to the operation screen when clicked at the stage where all the items on the registration screen are entered. Similar to the registration key 226, when there is an unfilled or illegal entry field, it is prohibited from clicking.

黒線制御状態表示228と赤線制御状態表示229は、黒線と赤線の制御状態(投入または遮断)を示す表示である。黒線2次側電圧表示230と赤線2次側電圧表示231は、黒線と赤線の2次側(負荷側)の電圧であり、電気が遮断されている場合は、この表示が「無」となる。2次側電流232は負荷側の電流であり、電気が遮断されている場合は、この数字が0[A]になる。   The black line control state display 228 and the red line control state display 229 are displays indicating the black line and red line control states (on or off). The black line secondary voltage display 230 and the red line secondary voltage display 231 are the voltages on the secondary side (load side) of the black line and the red line. No ". The secondary-side current 232 is a load-side current, and this number is 0 [A] when electricity is cut off.

選択キー234および選択解除キー235は、操作を行う配電線を選択するためのキーであり、何れかをクリックすることにより、選択を切り換える。ここでは、黒線と赤線の何れかを選択する。投入キー236および遮断キー237は、それぞれ選択キー234、選択解除キー235で選択した配電線について、投入と遮断を切り換えるためのキーであり、「投入」か「遮断」の何れかをクリックすることにより、切換を行う。   The selection key 234 and the selection cancellation key 235 are keys for selecting a distribution line to be operated, and the selection is switched by clicking any of them. Here, either the black line or the red line is selected. The input key 236 and the cutoff key 237 are keys for switching on / off for the distribution lines selected by the selection key 234 and the selection release key 235, respectively, and clicking either “ON” or “OFF”. To switch.

状態問合キー238は、機器状態やハンディターミナル2の電波受信状態を確認するためのキーである。LED点灯キー239は、遠隔送電制御機器101のLEDを点灯させるためのキーである。TOP画面切換キー240は、表示モニタ22の表示を、ハンディターミナル2のTOP画面に切り換えるためのキーである。機器登録キー241は、遠隔送電制御機器101の遠隔操作を行った後にクリックをすると、遠隔送電制御機器101の機器情報が電力会社のコンピュータシステム3に送信と登録がされ、結果登録処理部28が使用可能となる。   The status inquiry key 238 is a key for confirming the device status and the radio wave reception status of the handy terminal 2. The LED lighting key 239 is a key for lighting the LED of the remote power transmission control device 101. The TOP screen switching key 240 is a key for switching the display on the display monitor 22 to the TOP screen of the handy terminal 2. When the device registration key 241 is clicked after the remote operation of the remote power transmission control device 101 is performed, the device information of the remote power transmission control device 101 is transmitted and registered to the computer system 3 of the power company, and the result registration processing unit 28 Can be used.

次に、結果登録処理部28の起動時には、表示モニタ22の専用画面上で、所定の情報を入力し操作をするが、具体的な入力・操作について、図6および図7の専用画面を参照して説明する。ここで、図6は結果登録処理部28起動時の専用画面である施工入力画面を例示する説明図であり、図7は結果登録処理部28起動時の専用画面である指示数入力画面を例示する説明図である。   Next, when the result registration processing unit 28 is activated, predetermined information is input and operated on the dedicated screen of the display monitor 22. For specific input / operation, refer to the dedicated screens of FIGS. 6 and 7. To explain. Here, FIG. 6 is an explanatory diagram illustrating a construction input screen that is a dedicated screen when the result registration processing unit 28 is activated, and FIG. 7 illustrates an instruction number input screen that is a dedicated screen when the result registration processing unit 28 is activated. It is explanatory drawing to do.

図6に示すように、施工入力画面は、操作画面で、顧客の住所表示250、契約番号表示251、施工中止キー252、詳細情報表示キー253、電源処置切換キー254、施工状況切換キー255、配布状況切換キー256、無停電端子切換キー257、遠隔端末番号欄258、供給方式表示259、計器NO表示260、戻るキー261、領収書発行キー262および指示数入力キー263を有している。   As shown in FIG. 6, the construction input screen is an operation screen, which includes a customer address display 250, contract number display 251, construction stop key 252, detailed information display key 253, power treatment switching key 254, construction status switching key 255, It has a distribution status switch key 256, an uninterruptible terminal switch key 257, a remote terminal number field 258, a supply method display 259, an instrument NO display 260, a return key 261, a receipt issue key 262, and an instruction number input key 263.

契約番号表示251、遠隔端末番号欄258および計器NO表示260は、それぞれ登録画面(図4参照)で入力した契約番号224、端末番号223、計器NO225であり、施工入力画面に自動的に表示される。   Contract number display 251, remote terminal number column 258, and instrument NO display 260 are contract number 224, terminal number 223, and instrument NO 225 input on the registration screen (see FIG. 4), and are automatically displayed on the construction input screen. The

施工入力画面には、顧客の固有の情報である、住所表示250および供給方式表示259が表示されている。これらは、予め、ハンディターミナル2の記憶部26に記憶されている情報が、登録画面で入力された契約番号に基づいて、自動的に表示される。   On the construction input screen, an address display 250 and a supply method display 259 which are unique information of the customer are displayed. The information stored in advance in the storage unit 26 of the handy terminal 2 is automatically displayed based on the contract number input on the registration screen.

住所表示250は、施工対象となる顧客の住所である。また、供給方式表示259は、顧客に対する電力の供給方式を表示するものであり、単相2線式、単相3線式、3相3線式の何れかが表示される。なお、図6では、単相3線式が表示されている。 The address display 250 is the address of a customer who is a construction target. The supply method display 259 displays the power supply method for the customer, and displays either single-phase two-wire, single-phase three-wire, or three-phase three-wire. In FIG. 6, a single- phase three- wire system is displayed.

また、施工中止キー252は、供給停止施工業務を中止する場合にクリックする。これにより、施工入力画面に入力した情報はリセットされ、画面がスタート画面に切り替わる。詳細情報表示キー253は、これをクリックすると、表示されている情報以外の、顧客に関する諸情報の詳細が表示される。   The construction stop key 252 is clicked when the supply stop construction work is stopped. Thereby, the information input on the construction input screen is reset, and the screen is switched to the start screen. When the detailed information display key 253 is clicked, details of various information about the customer other than the displayed information are displayed.

電源処置切換キー254、施工状況切換キー255、配布状況切換キー256および無停電端子切換キー257は、供給停止施工業務の報告内容となる情報を入力するためのものである。入力は、左右のキーをクリックしてメニューを切り換えて、選択をすることで行う。   The power supply treatment switching key 254, the construction status switching key 255, the distribution status switching key 256, and the uninterruptible terminal switching key 257 are for inputting information that is the report contents of the supply stop construction work. Input is done by clicking the left and right keys to switch menus and making selections.

先ず、電源処置切換キー254は、電源の処置方法を入力するためのものであり、電力量計100を切断した場合には「計器切断」を、接続中である場合には「計器接続」を選択する。次に、施工状況切換キー255は、施工時に顧客が在宅であったかどうかを入力するためのものであり、「在宅施工」または「不在施工」を入力する。   First, the power supply changeover key 254 is used to input a power supply treatment method. When the watt hour meter 100 is disconnected, “instrument disconnection” is selected. select. Next, the construction status switching key 255 is used to input whether the customer is at home at the time of construction, and inputs “home construction” or “absent construction”.

また、配布状況切換キー256は、電算機で別途印刷された、供給停止に関する通知をどのようにして配布したかを入力するためのものであり、「ドアポスト」、「集合ポスト」、「手渡し」等から選択する。無停電端子切換キー257は、無停電端子を設置したかどうかを選択するためのものであり「有」「無」の何れかから選択する。   The distribution status switch key 256 is used to input how the notice about supply stop, which is printed separately by a computer, is distributed, and includes “door post”, “collection post”, and “handing”. Select from etc. The uninterruptible terminal switching key 257 is used to select whether or not an uninterruptible terminal is installed, and is selected from “present” and “no”.

また、戻るキー261は、直前の画面に戻り、入力をやり直すためのキーである。領収書発行キー262は、ハンディターミナル2を集金目的に使用する際に、外付けの分離プリンタ(図示略)で領収書を発行するためのキーである。指示数入力キー263は、施工入力画面の操作を行った後に、指示数入力画面に切り換えるためのキーである。   The return key 261 is a key for returning to the previous screen and re-inputting. The receipt issue key 262 is a key for issuing a receipt with an external separation printer (not shown) when the handy terminal 2 is used for collecting money. The instruction number input key 263 is a key for switching to the instruction number input screen after operating the construction input screen.

また、図7に示すように、指示数入力画面は、施工入力画面(図6参照)と同様に、契約番号表示251、詳細情報表示キー253、計器NO表示260および戻るキー261を有しており、また、指示数入力欄264と結果登録キー265を有している。   As shown in FIG. 7, the instruction number input screen has a contract number display 251, a detailed information display key 253, an instrument NO display 260 and a return key 261, similar to the construction input screen (see FIG. 6). In addition, an instruction number input field 264 and a result registration key 265 are provided.

指示数入力欄264は、4箇所設けられており、それぞれの指定NOに対応する場所に、供給停止の時点での電力量計100の指示数を入力する。   The number-of-instructions input column 264 is provided in four places, and the number of instructions of the watt-hour meter 100 at the time of the supply stop is input to a location corresponding to each designated NO.

また、登録キー265は、施工入力画面と指示数入力画面で操作と入力が終わった後にクリックすることで、コンピュータシステム3に供給停止結果登録が行われる。   The registration key 265 is clicked after the operation and input are completed on the construction input screen and the instruction number input screen, so that the supply stop result is registered in the computer system 3.

次に、この実施の形態の電力供給管理支援システム1における顧客への電力の供給停止または停止解除業務を支援する電力供給管理支援方法について説明する。顧客の電気料金の滞納などの理由により、電力の供給停止業務を行う場合において、電力量計100に、遠隔送電制御機器101を取り付けた後に、ハンディターミナル2の遠隔操作部27により、遠隔送電制御機器101の操作と登録を行う。   Next, a power supply management support method for supporting power supply stoppage or stop release work to a customer in the power supply management support system 1 of this embodiment will be described. When power supply is stopped due to reasons such as a customer's late payment of electricity charges, remote power transmission control is performed by the remote control unit 27 of the handy terminal 2 after the remote power transmission control device 101 is attached to the watt hour meter 100. The device 101 is operated and registered.

まず、表示モニタ22、操作キー23を操作して、登録画面(図4参照)の施工者コード欄221に施工作業を行う者の識別番号を、端末番号欄223に設置した遠隔送電制御機器101の機体番号を、契約番号224に顧客の契約番号を、計器NO225に顧客の電力量計100の識別番号を入力する。このとき、ハンディターミナル2の記憶部26は、施工者コード、遠隔送電制御機器101の機体番号、顧客の契約番号、顧客の電力量計100の識別番号を記憶する。   First, by operating the display monitor 22 and the operation key 23, the identification number of the person who performs the construction work in the construction code column 221 of the registration screen (see FIG. 4), the remote power transmission control device 101 installed in the terminal number column 223. The customer's contract number is input to the contract number 224, and the identification number of the customer's watt-hour meter 100 is input to the meter NO225. At this time, the storage unit 26 of the handy terminal 2 stores the installer code, the machine number of the remote power transmission control device 101, the customer contract number, and the identification number of the customer electricity meter 100.

次に、パスワード欄222にハンディターミナル2に割り当てられた所定のパスワードを入力して、遠隔操作部27を使用可能にする。処理部29は、記憶部26に記憶されているパスワードと照合し、正しければ、操作画面により、遠隔操作部27を使用可能にする。   Next, a predetermined password assigned to the handy terminal 2 is entered in the password field 222 to enable the remote operation unit 27. The processing unit 29 checks the password stored in the storage unit 26 and, if it is correct, enables the remote operation unit 27 through the operation screen.

次に、遠隔送電制御機器101を操作するために、操作画面切換キー227をクリックして、操作画面に切り換える。このとき、処理部29は、登録画面において、記入漏れや不正な記入が有るかどうかを判定し、無い場合には、表示モニタ22の画面を操作画面(図5参照)に切り換える。   Next, in order to operate the remote power transmission control device 101, the operation screen switching key 227 is clicked to switch to the operation screen. At this time, the processing unit 29 determines whether there is any omission or incorrect entry on the registration screen, and if there is no entry, switches the screen of the display monitor 22 to the operation screen (see FIG. 5).

供給停止を行う場合には、投入キー236、遮断キー237と、選択キー234、選択解除キー235を操作する。例えば、赤線を遮断するときは、選択キー234で赤線を選択し、遮断キー237で遮断を入力する。このとき、ハンディターミナル2の処理部29は、赤線を選択する処理と、赤線を遮断する処理を行い、通信部25はこれを遠隔送電制御機器101に送信をして、電力量計100の赤線について遮断を行う。黒線を遮断する場合も同様である。そして、黒線制御状態表示228と赤線制御状態表示229は「遮断」となり、黒線2次側電圧表示230と赤線2次側電圧表示231は、それぞれ「無」となり、2次側電流232は0[A]になる。   When the supply is stopped, the input key 236, the cutoff key 237, the selection key 234, and the selection release key 235 are operated. For example, when the red line is cut off, the red line is selected with the selection key 234 and the cut-off key 237 is inputted. At this time, the processing unit 29 of the handy terminal 2 performs a process of selecting the red line and a process of blocking the red line, and the communication unit 25 transmits this to the remote power transmission control device 101 and the watt hour meter 100. The red line is blocked. The same applies when the black line is cut off. Then, the black line control state display 228 and the red line control state display 229 are “cut off”, and the black line secondary side voltage display 230 and the red line secondary side voltage display 231 are “none”, respectively. 232 becomes 0 [A].

一方、供給停止状態を解除する場合には、これとは逆に、黒線、赤線についてそれぞれ投入を行う。例えば、赤線を投入するときは、選択キー234で赤線を選択し、遮断キー237で投入を入力する。このとき、ハンディターミナル2の処理部29は、赤線を選択する処理と、赤線を投入する処理を行い、通信部25はこれを遠隔送電制御機器101に送信をして、電力量計100の赤線について、投入を行う。黒線を投入する場合も同様である。そして、これにより、黒線制御状態表示228と赤線制御状態表示229、黒線2次側電圧表示230と赤線2次側電圧表示231は、それぞれ「投入」となり、負荷側で電気を使用可能となる。   On the other hand, when canceling the supply stop state, on the contrary, the black line and the red line are respectively turned on. For example, when a red line is to be input, the red line is selected with the selection key 234 and input is input with the blocking key 237. At this time, the processing unit 29 of the handy terminal 2 performs a process of selecting a red line and a process of inputting a red line, and the communication unit 25 transmits this to the remote power transmission control device 101 and the watt hour meter 100. The red line is filled. The same applies when black lines are inserted. As a result, the black line control state display 228 and the red line control state display 229, the black line secondary side voltage display 230, and the red line secondary side voltage display 231 are “on”, and electricity is used on the load side. It becomes possible.

そして、機器登録キー241をクリックすると、遠隔送電制御機器101の機器情報は通信部25から、ネットワークNWと電力会社のネットワークを通じて、その内容がコンピュータシステム3の事業所総合OAサーバ33に送信される。このとき、事業所総合OAサーバ33は、付設されているデータベース33bにこの情報を登録する。   When the device registration key 241 is clicked, the device information of the remote power transmission control device 101 is transmitted from the communication unit 25 to the office general OA server 33 of the computer system 3 through the network NW and the power company network. . At this time, the establishment general OA server 33 registers this information in the attached database 33b.

次に、結果登録処理部28により、コンピュータシステム3に、供給停止業務の結果登録をする。操作画面(図5参照)で機器登録キー241をクリックすると、処理部29は、画面を施工入力画面に切り換え、結果登録処理部28が起動する。   Next, the result registration processing unit 28 registers the result of the supply stop task in the computer system 3. When the device registration key 241 is clicked on the operation screen (see FIG. 5), the processing unit 29 switches the screen to the construction input screen, and the result registration processing unit 28 is activated.

施工入力画面(図6参照)の電源処置切換キー254で「計器切断」または「計器接続」を、施工状況切換キー255で「在宅施工」または「不在施工」を、配布状況切換キー256で「ドアポスト」、「集合ポスト」、または「手渡し」を、無停電端子切換キー257で「有」または「無」を、それぞれ状態に応じて選択する。このとき、このとき、ハンディターミナル2の記憶部26はこれを記憶する。   On the construction input screen (see FIG. 6), “instrument disconnection” or “instrument connection” is selected with the power supply action switching key 254, “at-home construction” or “absent construction” is selected with the construction status switching key 255, and “distribution status switching key 256” “Door post”, “collection post”, or “hand-off” is selected by the uninterruptible terminal switching key 257 according to the state. At this time, the storage unit 26 of the handy terminal 2 stores this.

また、遠隔端末番号欄258には、登録画面で入力し、記憶部26に記憶されている、遠隔送電制御機器101の機体番号が表示されている。   In the remote terminal number column 258, the machine number of the remote power transmission control device 101 that is input on the registration screen and stored in the storage unit 26 is displayed.

契約番号表示251、遠隔端末番号欄258、計器NO表示260に、登録画面で入力し、記憶部26に記憶されている、端末番号223、契約番号224、計器NO225が、表示されていることを確認する。   The terminal number 223, the contract number 224, and the meter NO225 stored in the storage unit 26 are entered in the contract number display 251, remote terminal number field 258, and meter NO display 260 on the registration screen. Check.

次に、指示数入力キー263をクリックして、指示数入力画面(図7参照)を開き、指示数入力欄264に供給停止時点での顧客の電力量計100の指示数を入力して、記憶部26に記憶させる。そして、結果登録キー265をクリックして、通信部25から、ネットワークNWと電力会社のネットワークを通じて、コンピュータシステム3のホスト電算機32に、供給停止業務の結果を送信する。そして、ホスト電算機32は、供給停止業務の結果を付設されているデータベース32bに登録する。   Next, the instruction number input key 263 is clicked to open the instruction number input screen (see FIG. 7), and the instruction number of the watt-hour meter 100 of the customer at the time of the supply stop is input to the instruction number input field 264. The data is stored in the storage unit 26. Then, the result registration key 265 is clicked, and the result of the supply stop operation is transmitted from the communication unit 25 to the host computer 32 of the computer system 3 through the network NW and the power company network. Then, the host computer 32 registers the result of the supply stop task in the attached database 32b.

そして、ホスト電算機32と事業所総合OAサーバ33に登録された供給停止業務の結果や遠隔送電制御機器101の機器情報は、それぞれ営業オンライン端末4、遠隔送電制御機器操作端末5の画面から閲覧が可能となる。   Then, the result of the supply stop operation registered in the host computer 32 and the office general OA server 33 and the device information of the remote power transmission control device 101 are browsed from the screens of the sales online terminal 4 and the remote power transmission control device operation terminal 5, respectively. Is possible.

以上説明したように、この実施の形態の電力供給管理支援システムおよび電力供給管理支援方法では、電力会社が設置、管理するコンピュータシステム3と、コンピュータシステム3とデータ送受信可能なハンディターミナル2と、を備えた電力供給管理支援システム1において、ハンディターミナル2の遠隔操作部27により、顧客の電力量計100への遠隔送電制御機器101の設置登録をコンピュータシステム3に対して行うと共に、遠隔送電制御機器101を遠隔操作し、結果登録処理部28により、顧客への電力の供給停止または停止解除業務の結果をコンピュータシステム3に対して登録する。   As described above, in the power supply management support system and the power supply management support method of this embodiment, the computer system 3 installed and managed by the power company and the handy terminal 2 capable of transmitting and receiving data to and from the computer system 3 are provided. In the power supply management support system 1 provided, the remote operation unit 27 of the handy terminal 2 performs installation registration of the remote power transmission control device 101 to the customer's watt hour meter 100 with respect to the computer system 3 and the remote power transmission control device. 101 is remotely operated, and the result registration processing unit 28 registers the result of the power supply stoppage or stop-release operation for the customer in the computer system 3.

従来、供給停止施工の結果登録をハンディターミナルで行い、遠隔送電制御機器の情報登録を携帯電話で行っており、2台(2種)の携帯情報端末が必要であったのに対して、この実施の形態では、1台(1種)のハンディターミナル2で供給停止施工の結果登録および遠隔送電制御機器の情報登録を行うことが可能である。これにより、遠隔送電制御機器101の登録や、施工状況の報告において、入力ミスや入力漏れを極力防ぐことができる。また、遠隔操作部27および結果登録処理部28の入力操作で重複する情報については1度の入力操作のみで済むため、作業現場での入力や機器の操作等の作業内容が減ることにより、作業時間を短縮することが可能である。また、入力ミスや入力漏れが防止可能であることから、供給停止の解除を遠隔操作で行う場合におけるトラブル発生を抑えることができ、早期の供給再開が可能となる。   In the past, registration of the result of the supply suspension was performed at the handy terminal, and information on the remote power transmission control device was registered at the mobile phone, which required two (two types) portable information terminals. In the embodiment, it is possible to register the result of the supply stop construction and the information registration of the remote power transmission control device with one (one type) handy terminal 2. Thereby, in the registration of the remote power transmission control device 101 and the report of the construction status, it is possible to prevent input errors and input leakage as much as possible. In addition, information that is duplicated in the input operations of the remote operation unit 27 and the result registration processing unit 28 need only be input once. It is possible to shorten the time. Further, since it is possible to prevent an input error or an input leakage, it is possible to suppress the occurrence of trouble when the supply stop is canceled by remote operation, and it is possible to restart the supply at an early stage.

また、この実施の形態では、コンピュータシステム3に、ハンディターミナル2の遠隔操作部27で入力された遠隔送電制御機器の設置情報を、付設のデータベース32bで管理するホスト計算機32と、ハンディターミナル2の結果登録処理部28で入力された供給停止または停止解除業務結果情報を、付設のデータベース33bで管理する事業所総合OAサーバ33(遠隔送電管理システム)と、を備えている。   In this embodiment, the computer system 3 has a host computer 32 that manages the installation information of the remote power transmission control device input by the remote operation unit 27 of the handy terminal 2 in the attached database 32b, and the handy terminal 2 And a business establishment general OA server 33 (remote power transmission management system) for managing the supply stop or stop cancellation work result information input by the result registration processing unit 28 using the attached database 33b.

従来、電力会社のコンピュータシステム3と、遠隔操作管理システム(事業所総合OAサーバ33)との独立した2系統の情報管理システムが必要であったのに対して、この実施の形態では、1系統のコンピュータシステム3に統合されている。これにより、情報管理システムの簡素化が図られ、管理に必要な作業や費用を削減できると共に、ホスト計算機32に付設のデータベース32bと、事業所総合OAサーバ33(遠隔送電管理システム)に付設のデータベース33bとの間の登録データの食い違いを極力減らすことが可能である。   Conventionally, two independent information management systems, that is, a computer system 3 of an electric power company and a remote operation management system (the office general OA server 33), are required. Are integrated into the computer system 3. As a result, the information management system can be simplified, the work and cost required for management can be reduced, and the database 32b attached to the host computer 32 and the office integrated OA server 33 (remote power transmission management system) can be reduced. It is possible to reduce the discrepancy of registration data with the database 33b as much as possible.

また、この実施の形態では、遠隔操作部27は、遠隔送電制御機器101の設置情報をコンピュータシステム3に対して送信する前に、入力内容を確認する機能を有し、結果登録処理部28は、供給停止または停止解除業務結果情報をコンピュータシステム3に対して送信する前に、入力内容を確認する機能を有している。これにより、入力ミスや入力漏れを極力防ぐことができる。   In this embodiment, the remote operation unit 27 has a function of confirming input contents before transmitting the installation information of the remote power transmission control device 101 to the computer system 3, and the result registration processing unit 28 includes In addition, it has a function of confirming the input content before sending the supply stop or stop cancellation work result information to the computer system 3. As a result, input errors and input leakage can be prevented as much as possible.

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。   Although the embodiment of the present invention has been described above, the specific configuration is not limited to the above embodiment, and even if there is a design change or the like without departing from the gist of the present invention, Included in the invention.

1 電力供給管理支援システム
2 ハンディターミナル
3 コンピュータシステム
4 営業オンライン端末
5 遠隔送電制御機器操作端末
21 外装部
22 表示モニタ
23 操作キー
24 光インタフェース部
25 通信部
26 記憶部
27 遠隔操作部
28 結果登録処理部
29 処理部
31 モバイル専用サーバ
32 ホスト電算機
33 事業所総合OAサーバ
32b,33b データベース
100 電力量計
101 遠隔送電制御機器
221 施工者コード欄
222 パスワード欄
223 端末番号欄
224 契約番号欄
225 計器NO欄
226 登録キー
227 操作画面切換キー
228 黒線制御状態表示
229 赤線制御状態表示
230 黒線2次側電圧表示
231 赤線2次側電圧表示
232 2次側電流表示
233 更新キー
234 選択キー
235 選択解除キー
236 投入キー
237 遮断キー
238 状態問合キー
239 LED点灯キー
240 TOP画面切換キー
241 機器登録キー
250 顧客の住所表示
251 契約番号表示
252 施工中止キー
253 詳細情報表示キー
254 電源処置切換キー
255 施工状況切換キー
256 配布状況切換キー
257 無停電端子切換キー
258 遠隔端末番号欄
259 供給方式表示
260 計器NO表示
261 戻るキー
262 領収書発行キー
263 指示数入力キー
264 指示数入力欄
265 結果登録キー
NW ネットワーク
DESCRIPTION OF SYMBOLS 1 Power supply management support system 2 Handy terminal 3 Computer system 4 Sales online terminal 5 Remote power transmission control equipment operation terminal 21 Exterior part 22 Display monitor 23 Operation key 24 Optical interface part 25 Communication part 26 Storage part 27 Remote operation part 28 Result registration process Unit 29 Processing Unit 31 Mobile Dedicated Server 32 Host Computer 33 Office General OA Server 32b, 33b Database 100 Energy Meter 101 Remote Power Transmission Control Equipment 221 Contractor Code Column 222 Password Column 223 Terminal Number Column 224 Contract Number Column 225 Instrument NO Field 226 Registration key 227 Operation screen switching key 228 Black line control state display 229 Red line control state display 230 Black line secondary side voltage display 231 Red line secondary side voltage display 232 Secondary side current display 233 Update key 234 Select key 35 Selection Release Key 236 Input Key 237 Shutdown Key 238 Status Inquiry Key 239 LED Lighting Key 240 TOP Screen Switch Key 241 Device Registration Key 250 Customer Address Display 251 Contract Number Display 252 Construction Cancel Key 253 Detailed Information Display Key 254 Power Supply Procedure Switch Key 255 Construction status switching key 256 Distribution status switching key 257 Uninterruptible terminal switching key 258 Remote terminal number field 259 Supply method display 260 Instrument NO display 261 Return key 262 Receipt issue key 263 Instruction number input key 264 Instruction number input field 265 Result Registration key NW network

Claims (4)

電力会社が設置、管理するコンピュータシステムと、
前記コンピュータシステムとデータ送受信可能なハンディターミナルと、を備え、顧客への電力の供給停止または停止解除業務を支援する電力供給管理支援システムであって、
前記ハンディターミナルは、
顧客の電力量計への遠隔送電制御機器の設置登録を前記コンピュータシステムに対して行うと共に、前記遠隔送電制御機器を遠隔操作する遠隔操作部と、
顧客への電力の供給停止または停止解除業務の結果を前記コンピュータシステムに対して登録する結果登録処理部と、
を有することを特徴とする電力供給管理支援システム。
A computer system installed and managed by an electric power company;
A power supply management support system comprising a handy terminal capable of transmitting and receiving data with the computer system, and supporting power supply stoppage or stoppage cancellation work to a customer,
The handy terminal is
A remote operation unit for performing remote registration of the remote power transmission control device while performing installation registration of the remote power transmission control device to the customer watt-hour meter with respect to the computer system;
A result registration processing unit for registering the result of the power supply stoppage or stoppage cancellation work to the customer with respect to the computer system;
A power supply management support system comprising:
前記コンピュータシステムは、
前記ハンディターミナルの遠隔操作部で入力された遠隔送電制御機器の設置情報を、付設のデータベースで管理するホスト計算機と、
前記ハンディターミナルの結果登録処理部で入力された供給停止または停止解除業務結果情報を、付設のデータベースで管理する遠隔送電管理システムと、
を有することを特徴とする請求項1に記載の電力供給管理支援システム。
The computer system includes:
A host computer that manages the installation information of the remote power transmission control device input in the remote control unit of the handy terminal, using an attached database;
Remote power transmission management system for managing supply stop or stop cancellation work result information input in the result registration processing unit of the handy terminal in an attached database;
The power supply management support system according to claim 1, comprising:
前記遠隔操作部は、遠隔送電制御機器の設置情報を前記コンピュータシステムに対して送信する前に、入力内容を確認する機能を有し、
前記結果登録処理部は、供給停止または停止解除業務結果情報を前記コンピュータシステムに対して送信する前に、入力内容を確認する機能を有することを特徴とする請求項1または請求項2の何れか1項に記載の電力供給管理支援システム。
The remote operation unit has a function of confirming input contents before transmitting installation information of a remote power transmission control device to the computer system,
3. The result registration processing unit has a function of confirming an input content before transmitting supply stop or stop cancellation work result information to the computer system. The power supply management support system according to Item 1.
電力会社が設置、管理するコンピュータシステムと、
前記コンピュータシステムとデータ送受信可能なハンディターミナルと、を備えた電力供給管理支援システムにおける、顧客への電力の供給停止または停止解除業務を支援する電力供給管理支援方法であって、
前記ハンディターミナルから、顧客の電力量計への遠隔送電制御機器の設置登録を前記コンピュータシステムに対して行うと共に、前記遠隔送電制御機器を遠隔操作する遠隔操作ステップと、
前記ハンディターミナルから、顧客への電力の供給停止または停止解除業務の結果を前記コンピュータシステムに対して登録する結果登録処理ステップと、
を有することを特徴とする電力供給管理支援方法。
A computer system installed and managed by an electric power company;
In a power supply management support system comprising a handy terminal capable of transmitting and receiving data to and from the computer system, a power supply management support method for supporting a power supply stoppage or a stop release operation to a customer,
A remote operation step of performing remote registration of the remote power transmission control device from the handy terminal to the computer system for installation registration of a remote power transmission control device to a customer watt hour meter,
From the handy terminal, a result registration processing step of registering the result of the power supply stoppage or stop release business to the customer with respect to the computer system;
A power supply management support method comprising:
JP2015202235A 2015-10-13 2015-10-13 Power supply management support system and power supply management support method Pending JP2017076186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015202235A JP2017076186A (en) 2015-10-13 2015-10-13 Power supply management support system and power supply management support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015202235A JP2017076186A (en) 2015-10-13 2015-10-13 Power supply management support system and power supply management support method

Publications (1)

Publication Number Publication Date
JP2017076186A true JP2017076186A (en) 2017-04-20

Family

ID=58551327

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015202235A Pending JP2017076186A (en) 2015-10-13 2015-10-13 Power supply management support system and power supply management support method

Country Status (1)

Country Link
JP (1) JP2017076186A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108539862A (en) * 2018-05-16 2018-09-14 全球能源互联网研究院有限公司 A kind of electric operating householder method and device
CN109995142A (en) * 2019-04-23 2019-07-09 四川华宇电力有限公司 It is remotely controlled switching off/on device, system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108539862A (en) * 2018-05-16 2018-09-14 全球能源互联网研究院有限公司 A kind of electric operating householder method and device
CN109995142A (en) * 2019-04-23 2019-07-09 四川华宇电力有限公司 It is remotely controlled switching off/on device, system and method

Similar Documents

Publication Publication Date Title
KR101233792B1 (en) Unmanned selling system of power for charge of electric car and method thereof
US11361299B2 (en) Methods and systems for communication between a fuel dispenser and a mobile device
US8855831B2 (en) Energy control apparatus and method
CN102511129A (en) Nfc communication apparatus and method for controlling same
KR20130020416A (en) An information management system for home appliance
JP2015167459A (en) Charging system and charging control device for electric vehicle
US9582837B2 (en) Management system for gas cock opening and closing
JP6483996B2 (en) Gas usage status management method and program
KR200497378Y1 (en) Handheld setting unit for watt hour meter
JP2014207496A (en) System, program and method for equipment management
JP2017076186A (en) Power supply management support system and power supply management support method
KR20200049559A (en) System and method of charging electric car using gateway having platform
WO2013125168A1 (en) Apparatus management system and apparatus management method
US20170343973A1 (en) Server, user terminal, and program
WO2020027265A1 (en) Charging control system, application program, and control method in charging control system
JP5866110B1 (en) Bicycle parking and / or check-in system for parking facilities
JP6128693B2 (en) Power management apparatus, power management system, terminal apparatus, power management method, and program
CN203117960U (en) Installation terminal and system of mobile phone application programs
KR20150010017A (en) Electric Charging System for Electric Vehicle Using Smart Phone and Method for Charging Electric Vehicle with the Same
JP2017077056A (en) handy terminal
JP6466017B1 (en) Service linkage system
JP2019080435A (en) Smart meter determination system
JP2003241827A (en) Management system of electrical appliance using network
JP3078984B2 (en) Gas meter
KR101762618B1 (en) System and method for automatically managing the installation of smart meters