JP2017043437A5 - - Google Patents

Download PDF

Info

Publication number
JP2017043437A5
JP2017043437A5 JP2015165766A JP2015165766A JP2017043437A5 JP 2017043437 A5 JP2017043437 A5 JP 2017043437A5 JP 2015165766 A JP2015165766 A JP 2015165766A JP 2015165766 A JP2015165766 A JP 2015165766A JP 2017043437 A5 JP2017043437 A5 JP 2017043437A5
Authority
JP
Japan
Prior art keywords
contact plate
guide rail
plate
elevator guide
engagement groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015165766A
Other languages
Japanese (ja)
Other versions
JP6339983B2 (en
JP2017043437A (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2015165766A priority Critical patent/JP6339983B2/en
Priority claimed from JP2015165766A external-priority patent/JP6339983B2/en
Priority to CN201610551697.0A priority patent/CN106477420B/en
Publication of JP2017043437A publication Critical patent/JP2017043437A/en
Publication of JP2017043437A5 publication Critical patent/JP2017043437A5/ja
Application granted granted Critical
Publication of JP6339983B2 publication Critical patent/JP6339983B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (10)

昇降体の昇降を案内するガイド部と、該ガイド部と一体となり略T字状となるように形成された背面部と、該背面部に設けられた連結部とから成るエレベーター用ガイドレールの複数本が、前記連結部を介して連結されて昇降路内に立設される際の前記昇降路内への吊り込み時に用いられるエレベーター用ガイドレールの吊り雇において、
前記エレベーター用ガイドレールの前記背面部に当接すると共に、前記連結部に当接可能な当接板と、該当接板が取り付けられ、該当接板との協働で前記エレベーター用ガイドレールを挟持する挟持部と、該挟持部に設けられた吊り点と、前記当接板と前記挟持部とを連結する連結手段とを備え、前記挟持部と前記当接板には、前記挟持部に対する前記当接板の取り付け位置を、前記エレベーター用ガイドレールのサイズに応じて変更可能にする取り付け位置可変手段が形成されていると共に、前記取り付け位置可変手段は、前記挟持部に間隔をあけて形成され、前記当接板が挿入されて係合する複数の挟持部係合溝と、前記当接板に形成され、複数のそれぞれの前記挟持部係合溝に係合可能な当接板係合溝とから成り、係合する前記挟持部係合溝と前記当接板係合溝の深さが異なっていることを特徴とするエレベーター用ガイドレールの吊り雇。
A plurality of elevator guide rails comprising a guide portion for guiding the raising and lowering of the lifting body, a back surface portion integrated with the guide portion and formed in a substantially T shape, and a connecting portion provided on the back surface portion In the suspension of the elevator guide rail used when the book is suspended through the hoistway when the book is connected via the connecting portion and standing in the hoistway,
An abutting plate capable of abutting on the back surface portion of the elevator guide rail and capable of abutting on the connecting portion and a corresponding contact plate are attached, and the elevator guide rail is sandwiched in cooperation with the corresponding contact plate. A clamping unit; a suspension point provided in the clamping unit; and a connecting unit that couples the abutting plate and the clamping unit, wherein the clamping unit and the abutting plate have the contact with the clamping unit. The attachment position variable means that can change the attachment position of the contact plate according to the size of the guide rail for the elevator is formed, and the attachment position variable means is formed at an interval in the holding portion, A plurality of sandwiching portion engaging grooves into which the abutting plate is inserted and engaged; and abutting plate engaging grooves formed on the abutting plate and engageable with the plurality of sandwiching portion engaging grooves, respectively. The clamping part which consists of and engages Hanging employment elevator guide rails, characterized in that the the groove depth of the contact plate engaging grooves are different.
請求項1に記載のエレベーター用ガイドレールの吊り雇において、
前記連結手段は、前記当接板に形成された当接板連結穴と、該当接板連結穴に適合するように前記挟持部に形成された挟持部連結穴と、前記当接板連結穴及び前記挟持部連結穴に挿入される連結ピンとから成ることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 1,
The connecting means includes a contact plate connecting hole formed in the contact plate, a holding part connecting hole formed in the holding part so as to fit the corresponding contact plate connecting hole, the contact plate connecting hole, An elevator guide rail suspension comprising a connecting pin inserted into the holding portion connecting hole.
請求項2に記載のエレベーター用ガイドレールの吊り雇において、
前記当接板は、平板部と、該平板部の一方の面から突出するように所定の間隔をもって設けられ、前記エレベーター用ガイドレールの前記背面部の側部を支持する2つの支持部とから成り、1つの前記支持部より端部側の前記当接板には当接板第1係合溝が、他の前記支持部より端部側の前記当接板には当接板第2係合溝がそれぞれ形成され、一方、前記挟持部は、吊り雇を吊上げるための吊り穴が形成された部材が設けられた天板部と、該天板部の両端部から斜め方向に延びる斜め板部と、該斜め板部のそれぞれから下方に延びる下方板部とから成り、一方の前記下方板部の上側には挟持部第1係合溝が、該挟持部第1係合溝より下側には挟持部第2係合溝が形成され、他方の前記下方板部の上側には挟持部第1係合溝が、該挟持部第1係合溝より下側には挟持部第2係合溝が形成されていることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 2,
The contact plate includes a flat plate portion and two support portions that are provided at a predetermined interval so as to protrude from one surface of the flat plate portion and support the side portion of the back surface portion of the elevator guide rail. The contact plate first engagement groove is provided in the contact plate on the end side from one of the support portions, and the contact plate second engagement is provided in the contact plate on the end side from the other support portion. On the other hand, the sandwiching portion includes a top plate portion provided with a member in which a suspension hole for lifting the suspension is formed, and an oblique direction extending obliquely from both ends of the top plate portion. It comprises a plate portion and a lower plate portion extending downward from each of the oblique plate portions, and a holding portion first engaging groove is below the holding portion first engaging groove above one of the lower plate portions. A clamping part second engagement groove is formed on the side, and a clamping part first engagement groove is formed on the upper side of the other lower plate part. Hanging employment elevator guide rail, wherein the second engagement groove clamping portion is formed below the groove.
請求項3に記載のエレベーター用ガイドレールの吊り雇において、
一方の前記下方板部の前記挟持部第1係合溝と前記挟持部第2係合溝の間には、外方に突出するように挟持部連結板が設けられ、他方の前記下方板部の前記挟持部第1係合溝と前記挟持部第2係合溝の間には、外方に突出するように別の挟持部連結板が設けられていることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 3,
A sandwiching portion connecting plate is provided between the sandwiching portion first engagement groove and the sandwiching portion second engagement groove of one of the lower plate portions so as to protrude outward, and the other lower plate portion. An elevator guide rail characterized in that another clamping part connecting plate is provided between the clamping part first engagement groove and the clamping part second engagement groove so as to protrude outward. The hiring of.
請求項3に記載のエレベーター用ガイドレールの吊り雇において、
前記当接板第1係合溝と前記挟持部第1係合溝及び前記挟持部第2係合溝の深さは一様に浅く、前記当接板第1係合溝と前記挟持部第1係合溝及び前記挟持部第2係合溝の深さは、前記当接板第1係合溝と前記挟持部第1係合溝及び前記挟持部第2係合溝の深さよりは一様に深く形成されていることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 3,
The contact plate first engagement groove, the sandwiching portion first engagement groove, and the sandwiching portion second engagement groove are uniformly shallow, and the contact plate first engagement groove and the sandwiching portion first The depth of the first engaging groove and the second engaging groove of the clamping part is one depth than the depth of the first engaging groove of the contact plate, the first engaging groove of the holding part, and the second engaging groove of the holding part. Elevator guide rails are characterized by being deeply formed.
請求項に記載のエレベーター用ガイドレールの吊り雇において、
前記当接板に形成された当接板連結穴は、前記当接板第1係合溝及び前記当接板第2係合溝のそれぞれの端部側の前記当接板に形成された2つの当接板連結穴から成り、前記2つの当接板連結穴がほぼ同等の位置の前記当接板に形成されていることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 3 ,
The contact plate coupling hole formed in the contact plate is formed in the contact plate on the end side of each of the contact plate first engagement groove and the contact plate second engagement groove. An elevator guide rail suspension comprising two contact plate connecting holes, wherein the two contact plate connecting holes are formed in the contact plate at substantially the same position.
請求項2に記載のエレベーター用ガイドレールの吊り雇において、
前記連結ピンには、前記当接板連結穴と前記挟持部連結穴に貫通させた後に該連結ピンの抜け止めを防止する抜け止めピンが設けられていると共に、前記連結ピンが前記当接板連結穴と前記挟持部連結穴を貫通し過ぎることを防止する貫通止めピンが設けられていることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 2,
The connection pin is provided with a retaining pin for preventing the connection pin from coming off after passing through the contact plate connection hole and the holding portion connection hole, and the connection pin is connected to the contact plate. An elevator guide rail suspension comprising a connecting hole and a through-pin preventing pin for preventing the connecting hole and the pinching portion connecting hole from penetrating too much.
請求項3に記載のエレベーター用ガイドレールの吊り雇において、
前記挟持部の斜め板部のそれぞれには連結ピン支持穴が設けられ、該連結ピン支持穴に通した紐状体によって、前記連結ピンが前記挟持部に保持されることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 3,
A connecting pin support hole is provided in each of the slanting plate portions of the holding portion, and the connecting pin is held in the holding portion by a string-like body that passes through the connecting pin support hole. Hiring guide rails.
請求項3に記載のエレベーター用ガイドレールの吊り雇において、
前記エレベーター用ガイドレールが小さいサイズのときには、前記当接板の支持部を前記挟持部に対向するように位置させて、前記当接板第1係合溝と前記当接板第2係合溝が前記下方板部のそれぞれに形成された前記挟持部第1係合溝に係合されて前記当接板を前記挟持部に取り付ける形態とし、一方、前記エレベーター用ガイドレールが前記小さいサイズよりも大きいサイズのときには、前記当接板の支持部が設けられていない前記当接板の他方の面を前記挟持部に対向するように位置させて、前記当接板第1係合溝と前記当接板第2係合溝が前記下方板部のそれぞれに形成された前記挟持部第2係合溝に係合されて前記当接板を前記挟持部に取り付ける形態とすることを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 3,
When the elevator guide rail is small in size, the contact plate first engagement groove and the contact plate second engagement groove are positioned so that the support portion of the contact plate faces the clamping portion. Is engaged with the first engaging groove of the holding portion formed on each of the lower plate portions, and the contact plate is attached to the holding portion, while the elevator guide rail is smaller than the small size. When the size is large, the other surface of the contact plate on which the support portion of the contact plate is not provided is positioned so as to face the holding portion, and the contact plate first engagement groove and the contact An elevator characterized in that a contact plate second engaging groove is engaged with the holding portion second engaging groove formed in each of the lower plate portions, and the contact plate is attached to the holding portion. Hiring guide rails.
請求項9に記載のエレベーター用ガイドレールの吊り雇において、
前記エレベーター用ガイドレールが小さいサイズのときには、深さの浅い前記当接板第1係合溝及び深さの深い前記当接板第1係合溝と、深さの深い一方の前記挟持部第1係合溝及び深さの浅い他方の前記挟持部第1係合溝が係合し、前記エレベーター用ガイドレールが前記小さいサイズよりも大きいサイズのときには、深さの浅い前記当接板第1係合溝及び深さの深い前記当接板第1係合溝と、深さの深い他方の前記挟持部第1係合溝及び深さの浅い一方の前記挟持部第1係合溝が係合することを特徴とするエレベーター用ガイドレールの吊り雇。
In hiring the elevator guide rail according to claim 9,
When the elevator guide rail has a small size, the contact plate first engagement groove having a shallow depth, the contact plate first engagement groove having a deep depth, and the sandwiching portion of one of the deep depths When the first engaging groove and the other engaging portion first engaging groove having a shallow depth are engaged, and the elevator guide rail has a size larger than the small size, the contact plate first having a shallow depth is used. The engagement groove and the deeper contact plate first engagement groove, the other deeper sandwiching part first engagement groove and the shallower one sandwiching part first engagement groove are engaged. Elevator guide rail suspension, characterized by
JP2015165766A 2015-08-25 2015-08-25 Elevator guide rail suspension Active JP6339983B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2015165766A JP6339983B2 (en) 2015-08-25 2015-08-25 Elevator guide rail suspension
CN201610551697.0A CN106477420B (en) 2015-08-25 2016-07-13 The hanging tool of guide rail for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015165766A JP6339983B2 (en) 2015-08-25 2015-08-25 Elevator guide rail suspension

Publications (3)

Publication Number Publication Date
JP2017043437A JP2017043437A (en) 2017-03-02
JP2017043437A5 true JP2017043437A5 (en) 2017-08-24
JP6339983B2 JP6339983B2 (en) 2018-06-06

Family

ID=58211158

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015165766A Active JP6339983B2 (en) 2015-08-25 2015-08-25 Elevator guide rail suspension

Country Status (2)

Country Link
JP (1) JP6339983B2 (en)
CN (1) CN106477420B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7045296B2 (en) * 2018-09-28 2022-03-31 三菱電機ビルテクノサービス株式会社 Elevator guide rail hanger
CN110271988A (en) * 2019-06-12 2019-09-24 新疆大明矿业集团股份有限公司 Underground oil drum lifter

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6034710Y2 (en) * 1981-05-29 1985-10-16 三菱電機株式会社 Lifting equipment for elevator rails
JPS6111676U (en) * 1984-06-25 1986-01-23 三菱電機株式会社 Lifting device for elevator rails
JPH10297843A (en) * 1997-04-24 1998-11-10 Hitachi Building Syst Co Ltd Suspending device for elevator guide rail
JP2004010175A (en) * 2002-06-03 2004-01-15 Mitsubishi Electric Corp Lifting device for elevator guide rail
JP2005178997A (en) * 2003-12-19 2005-07-07 Otis Elevator Co Cage fall preventing device
EP1717186B1 (en) * 2005-04-27 2010-03-24 Inventio Ag Method and apparatus for installing guide rails in an elevator hoistway
NZ546305A (en) * 2005-04-27 2006-09-29 Inventio Ag Method and device for installation of guide rails in a lift shaft
JP2011136817A (en) * 2009-12-28 2011-07-14 Hitachi Ltd Guide rail mounting tool and guide rail fixing method
CN201850053U (en) * 2010-08-12 2011-06-01 成都新志实业有限公司 Fixture specially used for joist steel
JP2014213975A (en) * 2013-04-23 2014-11-17 株式会社日立ビルシステム Centering device and centering method for inner car guide rail of double deck elevator

Similar Documents

Publication Publication Date Title
EP3103533A3 (en) Game controller
WO2016177352A3 (en) Lifting hook assembly establishing lifting hook posture detection carrier, and crane
EP2594159A3 (en) Guided slide assembly
JP2014142779A5 (en)
MY159906A (en) Shielding apparatus and clutch used for the same
WO2009091265A8 (en) Slip device for suspending a drill or casing string in a drill floor
USD779147S1 (en) Jack stabilizing plate
CA162317S (en) Medical rehab lift actuator
JP2017043437A5 (en)
CN203747152U (en) Socket facilitating use of the blind
MY194023A (en) Lift device
JP2017043438A (en) Suspension fixture of guide rail for elevator
JP6339983B2 (en) Elevator guide rail suspension
CN104229625B (en) Lifting buckle for curtain wall plate
WO2016157187A3 (en) Walker device
JP2016108115A5 (en)
CN204416904U (en) A kind of telescopic suspension hook
CN204369426U (en) For lifting the suspender of C-type steel
USD767964S1 (en) Slot clamp assembly
JP2015054769A5 (en)
CN203140775U (en) Lathe safe-hoisting structure
JP3182160U (en) Light weight structure of futon drying tool
JP2014501140A5 (en)
JP6297480B2 (en) Elevator guide rail suspension
CN104528483B (en) Self-locking lifting appliance