JP2016509271A5 - - Google Patents

Download PDF

Info

Publication number
JP2016509271A5
JP2016509271A5 JP2015537482A JP2015537482A JP2016509271A5 JP 2016509271 A5 JP2016509271 A5 JP 2016509271A5 JP 2015537482 A JP2015537482 A JP 2015537482A JP 2015537482 A JP2015537482 A JP 2015537482A JP 2016509271 A5 JP2016509271 A5 JP 2016509271A5
Authority
JP
Japan
Prior art keywords
hidden
hierarchical
model
node
variable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015537482A
Other languages
English (en)
Japanese (ja)
Other versions
JP6179598B2 (ja
JP2016509271A (ja
Filing date
Publication date
Priority claimed from US13/758,267 external-priority patent/US8909582B2/en
Application filed filed Critical
Publication of JP2016509271A publication Critical patent/JP2016509271A/ja
Publication of JP2016509271A5 publication Critical patent/JP2016509271A5/ja
Application granted granted Critical
Publication of JP6179598B2 publication Critical patent/JP6179598B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2015537482A 2013-02-04 2014-01-08 階層隠れ変数モデル推定装置 Active JP6179598B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US13/758,267 US8909582B2 (en) 2013-02-04 2013-02-04 Hierarchical latent variable model estimation device, hierarchical latent variable model estimation method, and recording medium
US13/758,267 2013-02-04
PCT/JP2014/000038 WO2014119226A2 (en) 2013-02-04 2014-01-08 Hierarchical latent variable model estimation device

Publications (3)

Publication Number Publication Date
JP2016509271A JP2016509271A (ja) 2016-03-24
JP2016509271A5 true JP2016509271A5 (OSRAM) 2016-07-07
JP6179598B2 JP6179598B2 (ja) 2017-08-16

Family

ID=50071677

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015537482A Active JP6179598B2 (ja) 2013-02-04 2014-01-08 階層隠れ変数モデル推定装置

Country Status (4)

Country Link
US (2) US8909582B2 (OSRAM)
JP (1) JP6179598B2 (OSRAM)
CN (1) CN104969216B (OSRAM)
WO (1) WO2014119226A2 (OSRAM)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8909582B2 (en) * 2013-02-04 2014-12-09 Nec Corporation Hierarchical latent variable model estimation device, hierarchical latent variable model estimation method, and recording medium
US9324026B2 (en) * 2013-09-20 2016-04-26 Nec Corporation Hierarchical latent variable model estimation device, hierarchical latent variable model estimation method, supply amount prediction device, supply amount prediction method, and recording medium
US9355196B2 (en) * 2013-10-29 2016-05-31 Nec Corporation Model estimation device and model estimation method
US9489632B2 (en) * 2013-10-29 2016-11-08 Nec Corporation Model estimation device, model estimation method, and information storage medium
EP3196813A4 (en) 2014-09-03 2018-02-07 Nec Corporation Leave of absence prediction system, prediction rule learning device, prediction device, leave of absence prediction method, and computer-readable recording medium
WO2016063433A1 (ja) 2014-10-21 2016-04-28 日本電気株式会社 推定結果表示システム、推定結果表示方法および推定結果表示プログラム
JP6565925B2 (ja) 2014-10-28 2019-08-28 日本電気株式会社 推定結果表示システム、推定結果表示方法および推定結果表示プログラム
US10521715B1 (en) 2016-01-15 2019-12-31 Google Llc Long short-term memory cells with saturating gating functions
JP6243080B1 (ja) * 2017-08-03 2017-12-06 株式会社日立パワーソリューションズ プリプロセッサおよび異常予兆診断システム
JPWO2019116418A1 (ja) 2017-12-11 2020-12-17 日本電気株式会社 障害分析装置、障害分析方法および障害分析プログラム
CN108460177B (zh) * 2018-01-04 2020-06-23 浙江大学 一种大规模多状态串并联系统的可靠性近似计算方法
CN109598931B (zh) * 2018-11-30 2021-06-11 江苏智通交通科技有限公司 基于交通安全风险的群体划分与差异性分析方法及系统
CN109800342A (zh) * 2018-12-13 2019-05-24 中国科学院信息工程研究所 一种基于节点影响力的多关系网络数据量化表示方法
CN116126538A (zh) * 2019-03-07 2023-05-16 创新先进技术有限公司 业务处理方法、装置、设备及存储介质
US20220391727A1 (en) 2019-10-24 2022-12-08 Nec Corporation Analysis apparatus, control method, and program
CN112464039B (zh) * 2020-11-11 2024-07-09 新奥数能科技有限公司 树形结构的数据显示方法、装置、电子设备和介质
CN116011669A (zh) * 2023-02-07 2023-04-25 北京工业大学 一种二噁英排放浓度选择性集成预测系统及方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7813870B2 (en) * 2006-03-03 2010-10-12 Inrix, Inc. Dynamic time series prediction of future traffic conditions
JP5704162B2 (ja) 2010-03-03 2015-04-22 日本電気株式会社 モデル選択装置、モデル選択方法及びモデル選択プログラム
CN102496028B (zh) * 2011-11-14 2013-03-20 华中科技大学 一种复杂装备的事后维修故障分析方法
US9043261B2 (en) 2012-05-31 2015-05-26 Nec Corporation Latent variable model estimation apparatus, and method
US8909582B2 (en) * 2013-02-04 2014-12-09 Nec Corporation Hierarchical latent variable model estimation device, hierarchical latent variable model estimation method, and recording medium

Similar Documents

Publication Publication Date Title
JP2016509271A5 (OSRAM)
He et al. Fuzzy nonlinear regression analysis using a random weight network
Garcin Estimation of time-dependent Hurst exponents with variational smoothing and application to forecasting foreign exchange rates
WO2014119226A3 (en) Hierarchical latent variable model estimation device
Kastner et al. Ancillarity-sufficiency interweaving strategy (ASIS) for boosting MCMC estimation of stochastic volatility models
Feng et al. Attribute analysis of information systems based on elementary soft implications
Jiang et al. Intelligent optimization models based on hard-ridge penalty and RBF for forecasting global solar radiation
RU2015143556A (ru) Способы и системы сопоставления истории месторождений для улучшенной оценки продуктивности месторождений
EA201490907A1 (ru) Статистическая модель коллектора, основанная на обнаруженных явлениях, связанных с потоком
JP2014524629A5 (OSRAM)
Pimentel et al. A weighted multivariate Fuzzy C-Means method in interval-valued scientific production data
MX382120B (es) Determinacion de uno o mas parametros de un diseño de terminacion de pozo con base en datos de perforacion que corresponden a variables de energia especifica mecanica.
Whidden et al. Ricci–Ollivier curvature of the rooted phylogenetic subtree–prune–regraft graph
RU2016142214A (ru) Интерактивное предсказание в реальном времени
RU2016115039A (ru) Решающее устройство эйконала для квази продольных волн в анизотропной среде
Wang et al. Spline estimation and variable selection for single-index prediction models with diverging number of index parameters
JPWO2021038788A5 (ja) ロバスト性評価装置、ロバスト性評価方法およびプログラム
CN105099731A (zh) 挖掘导致网络应用的用户流失的流失因子的方法及系统
JP7196935B2 (ja) 演算装置、アクション決定方法、及び制御プログラム
CN103578274B (zh) 一种交通流预测方法及装置
CN115391745B (zh) 一种基于概率匹配平均法的降水预报订正方法及系统
Wang et al. A submap joining algorithm for 3d reconstruction using an rgb-d camera based on point and plane features
GB2549028A (en) Integrated a priori uncertainty parameter architecture in simulation model creation
Klouda An exact polynomial time algorithm for computing the least trimmed squares estimate
JP2019500698A5 (OSRAM)