JP2016211698A - Blockage and release method for fluid pipe - Google Patents

Blockage and release method for fluid pipe Download PDF

Info

Publication number
JP2016211698A
JP2016211698A JP2015097722A JP2015097722A JP2016211698A JP 2016211698 A JP2016211698 A JP 2016211698A JP 2015097722 A JP2015097722 A JP 2015097722A JP 2015097722 A JP2015097722 A JP 2015097722A JP 2016211698 A JP2016211698 A JP 2016211698A
Authority
JP
Japan
Prior art keywords
case
gate valve
flange
pipe
lid member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015097722A
Other languages
Japanese (ja)
Other versions
JP6488185B2 (en
Inventor
修爾 各務
Shuji Kagami
修爾 各務
山本 大介
Daisuke Yamamoto
大介 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Waterworks Technology Development Organization Co Ltd
Original Assignee
Waterworks Technology Development Organization Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Waterworks Technology Development Organization Co Ltd filed Critical Waterworks Technology Development Organization Co Ltd
Priority to JP2015097722A priority Critical patent/JP6488185B2/en
Publication of JP2016211698A publication Critical patent/JP2016211698A/en
Application granted granted Critical
Publication of JP6488185B2 publication Critical patent/JP6488185B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Valve Housings (AREA)
  • Details Of Valves (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a blockage and release method for a fluid pipe in which a blockage member shutting-off a fluid pipe is removed to enable fluid to be flowed again.SOLUTION: At first, a blockage member installed at an upstream side pipe end PE1 within a case 10 enclosing a pair of pipe ends PE1, PE2 formed by ablating a part of a gas pipe P kept under non-cutoff flow state is removed. Then, the blockage member is arranged inside the case connected to an opening part 11 of the case 10 through a gate valve 40, and the gate valve 40 is closed. Subsequently, a lid member 7 is arranged inside a case 30 connected to the gate valve 40 in place of the case. Then, the gate valve 40 is opened and the lid member 7 is installed at the case 10 and the opening part 11 of the case 10 is closed in tight by the lid member 7. Lastly, the gate valve 40 is removed from the case 10.SELECTED DRAWING: Figure 7

Description

本発明は、ガス管などの流体管を遮断している遮断部材を撤去して流体を再通流させるための方法に関する。   The present invention relates to a method for removing a blocking member blocking a fluid pipe such as a gas pipe and reflowing a fluid.

従来、既設の流体管(例えば、ガス管)の改修やルート変更を行う工事において、不断流状態のまま流体管の一部を切除し、その上流側の管端の開口を密封して流体管を遮断することがある。例えば、特許文献1には、ハウジングで包囲した流体管の一部を切除し、その上流側の管端に遮断部材を装着することで、不断流状態にある流体管を遮断する工法が記載されている。   Conventionally, in the construction of refurbishing an existing fluid pipe (for example, a gas pipe) or changing the route, a part of the fluid pipe is cut off in an uninterrupted state, and the opening at the upstream end of the fluid pipe is sealed. May be cut off. For example, Patent Document 1 describes a method of cutting off a fluid pipe in an unsteady flow state by cutting a part of a fluid pipe surrounded by a housing and attaching a blocking member to a pipe end on the upstream side. ing.

上述のような工事では、流体管の改修など所要の作業を終えた後に、流体を再び通流させることが必要になる場合がある。その場合、管端から取り外した遮断部材を撤去したうえで流体の漏出を防ぐことが大変重要になってくるが、特許文献1はそのための手法を開示するものではない。   In the construction as described above, it may be necessary to allow the fluid to flow again after completing the required work such as repair of the fluid pipe. In that case, it becomes very important to prevent the fluid from leaking after removing the blocking member removed from the pipe end, but Patent Document 1 does not disclose a technique for that purpose.

なお、特許文献2に記載されているように、流体管の一部を切除して形成された一対の管端の間に弁装置を設置する工法も知られているが、特に流体管がガス管である場合には、将来的な気密性の低下を懸念してゴムなどのシール材を使用できないうえ、これに適用できる汎用の弁装置が存在しないことから、遮断部材を管端に装着して流体管を遮断する上記工法の方が、経済性や施工性に優れる傾向にある。   In addition, as described in Patent Document 2, a method of installing a valve device between a pair of pipe ends formed by cutting a part of a fluid pipe is also known. In the case of a pipe, there is no general-purpose valve device applicable to this because there is no rubber or other sealing material due to concerns about future deterioration in airtightness, so a blocking member is attached to the pipe end. Therefore, the above-described construction method that shuts off the fluid pipe tends to be more economical and workable.

特開2008−101702号公報JP 2008-101702 A 特開2001−353613号公報JP 2001-353613 A

本発明は上記実情に鑑みてなされたものであり、その目的は、流体管を遮断している遮断部材を撤去して流体の再通流を可能にする、流体管の遮断解除方法を提供することにある。   The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a fluid tube cutoff release method that enables the reflow of fluid by removing the cutoff member blocking the fluid tube. There is.

上記目的は、下記の如き本発明により達成することができる。即ち、本発明に係る流体管の遮断解除方法は、不断流状態にある流体管の一部を切除して形成された一対の管端を包囲する第1ケースの内部において、その一対の管端のうち上流側の管端に装着されている遮断部材を取り外す工程と、前記第1ケースの開口部に仕切弁を介して接続された第2ケースの内部に前記遮断部材を配置し、前記仕切弁を閉じる工程と、前記仕切弁に接続された前記第2ケースの内部に、または前記第2ケースに代えて前記仕切弁に接続された第3ケースの内部に、蓋部材を配置する工程と、前記仕切弁を開いて前記第1ケースに前記蓋部材を装着し、前記第1ケースの開口部を前記蓋部材によって密封する工程と、前記仕切弁を前記第1ケースから取り外す工程と、を備えるものである。   The above object can be achieved by the present invention as described below. In other words, the fluid pipe shutoff release method according to the present invention includes a pair of pipe ends in a first case surrounding a pair of pipe ends formed by cutting away a part of a fluid pipe in an uninterrupted flow state. Removing the blocking member attached to the upstream pipe end, and disposing the blocking member inside the second case connected to the opening of the first case via a gate valve, A step of closing the valve, and a step of disposing a lid member in the second case connected to the gate valve or in the third case connected to the gate valve instead of the second case; Opening the gate valve, attaching the lid member to the first case, sealing the opening of the first case with the lid member, and removing the gate valve from the first case. It is to be prepared.

かかる方法によれば、管端から取り外した遮断部材を第2ケースの内部に配置した後で、一対の管端を包囲する第1ケースの開口部を蓋部材により密封することから、遮断部材を撤去したうえで流体の漏出を防ぎつつ、流体管の遮断を解除して流体を再通流させることができる。第1ケースから取り外した仕切弁は、第2または第3ケースとともに撤去される。   According to such a method, since the blocking member removed from the pipe end is disposed inside the second case, the opening of the first case surrounding the pair of pipe ends is sealed by the lid member. The fluid pipe can be released and the fluid can be recirculated while preventing the fluid from leaking after being removed. The gate valve removed from the first case is removed together with the second or third case.

前記遮断部材を取り外す工程では、前記第1ケースに設けられた押圧部材を外部から押圧し、それにより前記遮断部材を下流側に向けて押圧することが好ましい。これにより、下流側から遮断部材を引っ張る場合に比べて、遮断部材を管端から簡易に取り外すことができる。   In the step of removing the blocking member, it is preferable that the pressing member provided in the first case is pressed from the outside, thereby pressing the blocking member toward the downstream side. Thereby, compared with the case where the blocking member is pulled from the downstream side, the blocking member can be easily removed from the pipe end.

上記において、前記遮断部材が、管端に被さるクラウン部と、鍔状に張り出したブリム部とを有する帽子形状をなし、前記遮断部材を取り外す工程では、前記押圧部材によって前記遮断部材のブリム部を押圧することが好ましい。この場合、押圧部材を用いて帽子形状の遮断部材を簡易に取り外すことができる。   In the above, the blocking member has a cap shape having a crown portion covering a pipe end and a brim portion protruding in a bowl shape, and in the step of removing the blocking member, the brim portion of the blocking member is moved by the pressing member. It is preferable to press. In this case, the hat-shaped blocking member can be easily removed using the pressing member.

更に上記においては、前記遮断部材を管端から取り外すまで、上流側の管端の外周に固定された鍔状部材に前記ブリム部を押し当てておき、前記遮断部材を取り外す工程では、前記鍔状部材よりも外周側に張り出した前記ブリム部の外周部を前記押圧部材によって押圧することが好ましい。かかる方法によれば、上流側の管端の外周に固定された鍔状部材を使用しながらも、押圧部材によって遮断部材を下流側に押圧することができる。   Further, in the above, the brim portion is pressed against the flange-shaped member fixed to the outer periphery of the upstream pipe end until the blocking member is removed from the tube end, and in the step of removing the blocking member, It is preferable that the outer peripheral portion of the brim portion that protrudes outward from the member is pressed by the pressing member. According to this method, the blocking member can be pressed to the downstream side by the pressing member while using the hook-shaped member fixed to the outer periphery of the upstream pipe end.

また、前記仕切弁は、前記第1ケースの開口部に形成されたフランジの外周部に接合され、前記第1ケースに前記蓋部材を装着する際に、前記フランジの内周部に前記蓋部材を接合することが好ましい。かかる方法によれば、第1ケースの開口部のフランジに仕切弁を接合した状態のまま、そのフランジに蓋部材を接合できる。   The gate valve is joined to an outer peripheral portion of a flange formed in the opening of the first case, and the lid member is attached to an inner peripheral portion of the flange when the lid member is attached to the first case. Are preferably joined. According to this method, the lid member can be joined to the flange while the gate valve is joined to the flange of the opening of the first case.

上記において、前記フランジに前記蓋部材を接合するまで、前記フランジの内周部に形成された貫通孔を封止部材により封止しておき、前記フランジに前記蓋部材を接合する際に、前記封止部材に代えて接合部材を前記貫通孔に取り付け、その接合部材によって前記蓋部材を前記フランジに固定することが好ましい。かかる方法によれば、貫通孔での流体の漏出を封止部材によって防ぐとともに、その貫通孔に取り付けた接合部材によって蓋部材をフランジに固定できる。   In the above, until the lid member is joined to the flange, the through-hole formed in the inner peripheral portion of the flange is sealed with a sealing member, and when the lid member is joined to the flange, It is preferable that a joining member is attached to the through hole instead of the sealing member, and the lid member is fixed to the flange by the joining member. According to this method, leakage of fluid in the through hole can be prevented by the sealing member, and the lid member can be fixed to the flange by the joining member attached to the through hole.

遮断機を準備した状態を示す縦断面図Longitudinal sectional view showing the state where the breaker is prepared 遮断機を下降した状態を示す縦断面図Longitudinal section showing the state where the breaker is lowered 流体管を遮断した状態を示す縦断面図Longitudinal sectional view showing the state where the fluid pipe is shut off 遮断部材を取り外した状態を示す縦断面図Longitudinal sectional view showing a state in which the blocking member is removed 遮断機を引き上げた状態を示す縦断面図Longitudinal section showing the state where the breaker is pulled up 蓋部材を準備した状態を示す縦断面図A longitudinal sectional view showing a state in which a lid member is prepared 蓋部材を装着した状態を示す縦断面図Longitudinal sectional view showing a state where the lid member is mounted 図6のフランジの周辺(A部に相当)を側方から見たときの断面図Sectional view when the periphery of the flange in FIG. 6 (corresponding to part A) is viewed from the side 図7のフランジの周辺(B部に相当)を側方から見たときの断面図Sectional view when the periphery (corresponding to part B) of the flange in FIG. 7 is viewed from the side 仕切弁を取り外した状態を示す縦断面図Longitudinal sectional view showing the state where the gate valve is removed

本発明の実施形態について、図面を参照しながら説明する。本発明は、流体管を遮断している遮断部材を撤去して流体の再通流を可能にする、流体管の遮断解除方法に関するものであるが、その前提となる流体管の遮断について予め簡単に説明する。但し、流体管を遮断する方法は、これに限られるものではない。   Embodiments of the present invention will be described with reference to the drawings. The present invention relates to a method for releasing the shutoff of a fluid pipe that enables the reflow of fluid by removing the shutoff member that shuts off the fluid pipe. Explained. However, the method for blocking the fluid pipe is not limited to this.

[流体管の遮断]
図1に示したガス管P(流体管の一例)は、その一部を切除されて管軸方向に切り離されている。図1では、ガス管Pの切除に用いた切断機を操作軸22から取り外し、代わりに遮断機5を接続している。ガス管Pは不断流状態にあり、流体であるガスが右から左に向かって通流している。ケース10(第1ケースに相当)は、その不断流状態にあるガス管Pの一部を切除して形成された一対の管端PE1,PE2を包囲する。本実施形態では、ケース10が、更に、上流側の管端PE1の外周に溶接などで固定された鍔状部材6を包囲する。
[Blockage of fluid pipe]
A gas pipe P (an example of a fluid pipe) shown in FIG. 1 is partly cut away and separated in the pipe axis direction. In FIG. 1, the cutting machine used for excision of the gas pipe P is removed from the operation shaft 22, and the breaker 5 is connected instead. The gas pipe P is in an uninterrupted state, and a fluid gas flows from the right to the left. The case 10 (corresponding to the first case) surrounds a pair of pipe ends PE1 and PE2 formed by cutting away a part of the gas pipe P in the uninterrupted flow state. In the present embodiment, the case 10 further surrounds the flange-shaped member 6 fixed to the outer periphery of the upstream pipe end PE1 by welding or the like.

ケース10は、上部ケース片10aと下部ケース片10bとを互いに組み付けてなる上下二分割構造を有する。上部ケース片10aの上部には、遮断機5が通過できる開口部11が設けられている。ケース10の開口部11には、仕切弁40を介してケース20(第2ケースに相当)が接続されている。ケース20は、上下を開口させた筒状部材であり、上部の開口をカバー21で覆っている。操作軸22は、カバー21に形成された貫通孔に挿通され、これを操作することにより遮断機5を昇降できる。   The case 10 has an upper and lower divided structure formed by assembling an upper case piece 10a and a lower case piece 10b. An opening 11 through which the circuit breaker 5 can pass is provided in the upper part of the upper case piece 10a. A case 20 (corresponding to a second case) is connected to the opening 11 of the case 10 via a gate valve 40. The case 20 is a cylindrical member having upper and lower openings, and the upper opening is covered with a cover 21. The operation shaft 22 is inserted into a through hole formed in the cover 21 and the breaker 5 can be moved up and down by operating this.

遮断機5は、ガス管Pの管端PE1に対して管軸方向から装着可能に構成された遮断部材50と、その遮断部材50を管軸方向に移動させるのに用いられる棒状のスライド部材53とを備える。本実施形態では、遮断部材50が、管端PE1に被さるクラウン部51と、鍔状に張り出したブリム部52とを有する帽子形状をなす。ブリム部52は、鍔状部材6よりも大径に形成されている。スライド部材53は周方向の複数箇所に設けられ、その各々が長手方向にスライド可能に支持されている。   The circuit breaker 5 includes a blocking member 50 configured to be attachable to the pipe end PE1 of the gas pipe P from the tube axis direction, and a rod-shaped slide member 53 used to move the blocking member 50 in the tube axis direction. With. In the present embodiment, the blocking member 50 has a cap shape having a crown part 51 covering the pipe end PE1 and a brim part 52 protruding in a hook shape. The brim portion 52 is formed to have a larger diameter than the flange-shaped member 6. The slide members 53 are provided at a plurality of locations in the circumferential direction, and each of them is supported so as to be slidable in the longitudinal direction.

図1の状態からガス管Pを遮断するには、まず、図2に示すように、仕切弁40を開いて操作軸22を下降し、開口部11を通じてケース10内に配置した遮断機5を一対の管端PE1,PE2の間に挿入する。続いて、図3に示すように、ケース10に設けられた押込み棒12を外部から押圧し、スライド部材53を介して遮断部材50を上流側へ向けて押圧する。これにより、クラウン部51が管端PE1に被さるとともに、鍔状部材6にブリム部52が押し当たって管端PE1の開口が閉塞する。このようにして管端PE1に遮断部材50が装着される結果、ガス管Pが遮断される。   In order to shut off the gas pipe P from the state of FIG. 1, first, as shown in FIG. 2, the gate valve 40 is opened, the operation shaft 22 is lowered, and the breaker 5 disposed in the case 10 through the opening 11 is installed. It inserts between a pair of pipe ends PE1 and PE2. Subsequently, as shown in FIG. 3, the push rod 12 provided in the case 10 is pressed from the outside, and the blocking member 50 is pressed toward the upstream side via the slide member 53. Thereby, the crown part 51 covers the pipe end PE1, and the brim part 52 presses against the flange-shaped member 6 to close the opening of the pipe end PE1. As a result of mounting the blocking member 50 on the pipe end PE1, the gas pipe P is blocked.

ガス管Pを遮断することにより、不断流状態を保持しながらも、下流側で改修やルート変更など所要の作業が可能な状態になる。そして、所要の作業を終えた後で、ガスを再び通流させることが必要になった場合には、ガス管Pの遮断を解除する必要がある。以下、上記ガス管Pの遮断を解除する方法について、その一例を説明する。   By shutting off the gas pipe P, it becomes possible to perform necessary work such as refurbishment or route change on the downstream side while maintaining the uninterrupted flow state. And when it is necessary to recirculate gas after finishing a required operation | work, it is necessary to cancel | release interruption | blocking of the gas pipe P. FIG. Hereinafter, an example of the method for releasing the shutoff of the gas pipe P will be described.

[流体管の遮断解除]
まず、図4に示すように、ケース10の内部において、管端PE1に装着されている遮断部材50を取り外す。既述のように、ケース10は、不断流状態にあるガス管Pの管端PE1,PE2を包囲し、管端PE1は、その一対の管端PE1,PE2のうち上流側の管端である。管端PE1から遮断部材50を取り外したら操作軸22を上昇させ、図5に示すようにケース20の内部に遮断部材50を配置し、仕切弁40を閉じる。
[Release shut off of fluid pipe]
First, as shown in FIG. 4, the blocking member 50 attached to the pipe end PE <b> 1 is removed inside the case 10. As described above, the case 10 surrounds the pipe ends PE1 and PE2 of the gas pipe P in an uninterrupted flow state, and the pipe end PE1 is an upstream pipe end of the pair of pipe ends PE1 and PE2. . When the blocking member 50 is removed from the pipe end PE1, the operation shaft 22 is raised, the blocking member 50 is disposed inside the case 20 as shown in FIG. 5, and the gate valve 40 is closed.

本実施形態では、遮断部材50を取り外す工程において、ケース10に設けられた押戻し棒13(押圧部材に相当)を外部から押圧し、それにより遮断部材50を下流側に向けて押圧する。これにより、例えば押込み棒12を介して下流側から遮断部材50を引っ張る場合に比べて、遮断部材50を管端PE1から簡易に取り外すことができる。押戻し棒13は、ケース10の上流側の側壁に気密状態で螺合された雄ねじ部材で構成され、周方向の複数箇所に設けられている。ケース10の下流側の側壁に設けられた押込み棒12も、これと同様に構成されている。   In the present embodiment, in the step of removing the blocking member 50, a pushback bar 13 (corresponding to a pressing member) provided on the case 10 is pressed from the outside, thereby pressing the blocking member 50 toward the downstream side. Thereby, compared with the case where the interruption | blocking member 50 is pulled from the downstream via the push rod 12, for example, the interruption | blocking member 50 can be easily removed from pipe end PE1. The push-back bar 13 is composed of a male screw member screwed into the side wall on the upstream side of the case 10 in an airtight state, and is provided at a plurality of locations in the circumferential direction. The push rod 12 provided on the downstream side wall of the case 10 is also configured in the same manner.

上記の如き帽子形状の遮断部材50を使用する場合には、押戻し棒13によって遮断部材50のブリム部52を押圧することが好ましい。本実施形態では、遮断部材50を管端PE1から取り外すまで鍔状部材6にブリム部52を押し当てておき(図3参照)、遮断部材50を取り外す工程において、鍔状部材6よりも外周側に張り出したブリム部52の外周部を押戻し棒13によって押圧する(図4参照)。このため、押戻し棒13を鍔状部材6に干渉させることなく、適切に遮断部材50を下流側に押圧できる。   When the hat-shaped blocking member 50 as described above is used, it is preferable to press the brim portion 52 of the blocking member 50 with the push-back bar 13. In the present embodiment, the brim portion 52 is pressed against the flange-shaped member 6 until the blocking member 50 is removed from the pipe end PE1 (see FIG. 3), and in the step of removing the blocking member 50, the outer peripheral side of the flange-shaped member 6 is removed. The outer peripheral portion of the brim portion 52 that protrudes is pressed by the pushback rod 13 (see FIG. 4). For this reason, the blocking member 50 can be appropriately pressed downstream without causing the pushback bar 13 to interfere with the bowl-shaped member 6.

本実施形態では、遮断部材50を管端PE1に装着するときに、ケース10の側壁ではなく鍔状部材6にブリム部52を押し当てることから、ケース10の上流側の側壁にリブなどの補強材を設ける必要性が低い。それ故、ケース10の上流側の側壁に押戻し棒13を設けるに際し、その本数や位置に対する制約が少なくて済む。このことは、ケース10の側壁に設けた押戻し棒13のような押圧部材によって遮断部材50を下流側に押圧する方法において有利である。   In the present embodiment, when the blocking member 50 is attached to the pipe end PE1, the brim portion 52 is pressed against the flange-like member 6 instead of the side wall of the case 10, so that a rib or the like is reinforced on the upstream side wall of the case 10. The need to provide materials is low. Therefore, when the pushback bar 13 is provided on the upstream side wall of the case 10, there are few restrictions on the number and position of the pushback bar 13. This is advantageous in a method of pressing the blocking member 50 downstream by a pressing member such as a pushback bar 13 provided on the side wall of the case 10.

次に、ケース20とともに遮断機5を撤去し、図6に示すように、ケース20に代えて仕切弁40に接続されたケース30(第3ケースに相当)の内部に蓋部材7を配置する。蓋部材7は、ケース30の上部の貫通孔に挿通された操作軸32に接続され、この操作軸32を操作することで蓋部材7を昇降できる。本実施形態では、カバー21をケース30として使い回している。また、ケース20に代えてケース30を使用する場合に限らず、遮断機5を撤去する際にケース20を残置しておき、その仕切弁40に接続されたケース20の内部に蓋部材7を配置しても構わない。   Next, the circuit breaker 5 is removed together with the case 20, and the lid member 7 is disposed inside the case 30 (corresponding to the third case) connected to the gate valve 40 in place of the case 20, as shown in FIG. . The lid member 7 is connected to an operation shaft 32 inserted through a through hole in the upper part of the case 30, and the lid member 7 can be moved up and down by operating the operation shaft 32. In the present embodiment, the cover 21 is used as the case 30. Moreover, it is not restricted to using the case 30 instead of the case 20, the case 20 is left when the circuit breaker 5 is removed, and the lid member 7 is placed inside the case 20 connected to the gate valve 40. You may arrange.

続いて、図7に示すように、仕切弁40を開いてケース10に蓋部材7を装着し、ケース10の開口部11を蓋部材7によって密封する。本実施形態では、仕切弁40が、ケース10の開口部11に形成されたフランジ14の外周部に接合されており、ケース10に蓋部材7を装着する際には、そのフランジ14の内周部に蓋部材7を接合する(図8,9参照)。よって、フランジ14に仕切弁40を接合した状態のまま、そのフランジ14に蓋部材7を接合できる。これに限られず、開口部11の内部に蓋部材7を挿入し、それによって開口部11を密封しても構わない。   Subsequently, as shown in FIG. 7, the gate valve 40 is opened to attach the lid member 7 to the case 10, and the opening 11 of the case 10 is sealed by the lid member 7. In the present embodiment, the gate valve 40 is joined to the outer peripheral portion of the flange 14 formed in the opening 11 of the case 10, and when the lid member 7 is attached to the case 10, the inner periphery of the flange 14 is The lid member 7 is joined to the portion (see FIGS. 8 and 9). Therefore, the lid member 7 can be joined to the flange 14 while the gate valve 40 is joined to the flange 14. However, the present invention is not limited to this, and the lid member 7 may be inserted into the opening 11 to thereby seal the opening 11.

また、本実施形態では、フランジ14に蓋部材7を接合するまで、図8に示すようにフランジ14の内周部に形成された貫通孔を封止部材15により封止しておき、フランジ14に蓋部材7を接合する際に、図9に示すように封止部材15に代えて接合部材16を貫通孔に取り付ける。これにより、貫通孔からガスを漏出させることなく、接合部材16によって蓋部材7をフランジ14に固定できる。封止部材15は、貫通孔に嵌入されて気密状態を保持しうるボルト部材で形成され、接合部材16は、その先端が蓋部材7に螺合されるボルト部材で形成されている。   Further, in the present embodiment, until the lid member 7 is joined to the flange 14, the through hole formed in the inner peripheral portion of the flange 14 is sealed with the sealing member 15 as shown in FIG. When the lid member 7 is joined to the sealing member 15, the joining member 16 is attached to the through-hole instead of the sealing member 15 as shown in FIG. Thereby, the lid member 7 can be fixed to the flange 14 by the joining member 16 without leaking gas from the through hole. The sealing member 15 is formed of a bolt member that can be fitted into the through-hole and can maintain an airtight state, and the joining member 16 is formed of a bolt member whose tip is screwed to the lid member 7.

ケース10に蓋部材7を装着する際には、レバーブロック(登録商標)などの連結具により操作軸32をケース10(上部ケース片10a)と連結し、ケース10の内圧による反力を受け止めることが好ましい。また、図6に破線で描いたようなロッド71を設けておけば、ケース30から突出したロッド71を外部から押し込むことにより、ケース10の内圧が高い場合であっても蓋部材7を円滑に押し下げることができる。   When attaching the lid member 7 to the case 10, the operating shaft 32 is connected to the case 10 (upper case piece 10 a) by a connecting tool such as a lever block (registered trademark), and the reaction force due to the internal pressure of the case 10 is received. Is preferred. Further, if the rod 71 as drawn with a broken line in FIG. 6 is provided, the lid member 7 can be smoothly moved by pushing the rod 71 protruding from the case 30 from the outside even when the internal pressure of the case 10 is high. Can be pushed down.

最後に、蓋部材7との接続を解除した操作軸32とともにケース30を撤去し、図10に示すように仕切弁40をケース10から取り外す。必要であれば、溶接などによって蓋部材7をケース10(上部ケース片10a)と一体化する。かかる方法により、遮断部材50を撤去したうえでガスの漏出を防ぎつつ、ガス管Pの遮断を解除してガスを再通流させることができる。   Finally, the case 30 is removed together with the operation shaft 32 that has been disconnected from the lid member 7, and the gate valve 40 is removed from the case 10 as shown in FIG. If necessary, the lid member 7 is integrated with the case 10 (upper case piece 10a) by welding or the like. With this method, the gas pipe P can be released and the gas can be recirculated while removing the blocking member 50 and preventing gas leakage.

本実施形態では、ガス管に供された流体管の遮断を解除する例を示したが、これに限られず、水などの液体を通流させるための流体管であってもよい。また、流体管としては鋼管が好ましく用いられるが、これに限定されない。   In this embodiment, the example which cancels | releases interruption | blocking of the fluid pipe | tube provided to the gas pipe | tube was shown, However, It is not restricted to this, The fluid pipe | tube for making liquids, such as water flow, may be sufficient. Moreover, although a steel pipe is preferably used as a fluid pipe, it is not limited to this.

本発明は上述した実施形態に何ら限定されるものではなく、本発明の趣旨を逸脱しない範囲内で種々の改良変更が可能である。   The present invention is not limited to the embodiment described above, and various improvements and modifications can be made without departing from the spirit of the present invention.

6 鍔状部材
7 蓋部材
10 ケース(第1ケース)
11 開口部
12 押込み棒
13 押戻し棒(押圧部材)
14 フランジ
15 封止部材
16 接合部材
20 ケース(第2ケース)
30 ケース(第3ケース)
40 仕切弁
50 遮断部材
51 クラウン部
52 ブリム部
P ガス管(流体管の一例)
PE1 管端
PE2 管端
6 bowl-shaped member 7 lid member 10 case (first case)
11 Opening portion 12 Pushing rod 13 Pushing rod (pressing member)
14 Flange 15 Sealing member 16 Joining member 20 Case (second case)
30 cases (third case)
40 Gate valve 50 Shut-off member 51 Crown portion 52 Brim portion P Gas pipe (an example of a fluid pipe)
PE1 Pipe end PE2 Pipe end

Claims (6)

不断流状態にある流体管の一部を切除して形成された一対の管端を包囲する第1ケースの内部において、その一対の管端のうち上流側の管端に装着されている遮断部材を取り外す工程と、
前記第1ケースの開口部に仕切弁を介して接続された第2ケースの内部に前記遮断部材を配置し、前記仕切弁を閉じる工程と、
前記仕切弁に接続された前記第2ケースの内部に、または前記第2ケースに代えて前記仕切弁に接続された第3ケースの内部に、蓋部材を配置する工程と、
前記仕切弁を開いて前記第1ケースに前記蓋部材を装着し、前記第1ケースの開口部を前記蓋部材によって密封する工程と、
前記仕切弁を前記第1ケースから取り外す工程と、を備える流体管の遮断解除方法。
A blocking member attached to an upstream pipe end of the pair of pipe ends in a first case surrounding a pair of pipe ends formed by cutting off a part of a fluid pipe in an indefinite flow state. Removing the
Disposing the blocking member inside a second case connected to the opening of the first case via a gate valve, and closing the gate valve;
Arranging a lid member in the second case connected to the gate valve or in the third case connected to the gate valve instead of the second case;
Opening the gate valve, attaching the lid member to the first case, and sealing the opening of the first case with the lid member;
Removing the gate valve from the first case.
前記遮断部材を取り外す工程では、前記第1ケースに設けられた押圧部材を外部から押圧し、それにより前記遮断部材を下流側に向けて押圧する請求項1に記載の流体管の遮断解除方法。   The fluid pipe shutoff releasing method according to claim 1, wherein in the step of removing the shutoff member, a press member provided in the first case is pressed from the outside, thereby pressing the shutoff member toward the downstream side. 前記遮断部材が、管端に被さるクラウン部と、鍔状に張り出したブリム部とを有する帽子形状をなし、
前記遮断部材を取り外す工程では、前記押圧部材によって前記遮断部材のブリム部を押圧する請求項2に記載の流体管の遮断解除方法。
The blocking member has a cap shape having a crown portion covering a pipe end and a brim portion protruding in a hook shape,
The fluid pipe blocking release method according to claim 2, wherein in the step of removing the blocking member, the pressing member presses the brim portion of the blocking member.
前記遮断部材を管端から取り外すまで、上流側の管端の外周に固定された鍔状部材に前記ブリム部を押し当てておき、
前記遮断部材を取り外す工程では、前記鍔状部材よりも外周側に張り出した前記ブリム部の外周部を前記押圧部材によって押圧する請求項3に記載の流体管の遮断解除方法。
Until the blocking member is removed from the pipe end, the brim portion is pressed against the flange-shaped member fixed to the outer periphery of the upstream pipe end,
The fluid pipe shut-off release method according to claim 3, wherein in the step of removing the shut-off member, an outer peripheral portion of the brim portion that protrudes outward from the flange-like member is pressed by the pressing member.
前記仕切弁は、前記第1ケースの開口部に形成されたフランジの外周部に接合され、
前記第1ケースに前記蓋部材を装着する際に、前記フランジの内周部に前記蓋部材を接合する請求項1〜4いずれか1項に記載の流体管の遮断解除方法。
The gate valve is joined to an outer peripheral portion of a flange formed in the opening of the first case,
The fluid pipe shutoff releasing method according to any one of claims 1 to 4, wherein the lid member is joined to an inner peripheral portion of the flange when the lid member is attached to the first case.
前記フランジに前記蓋部材を接合するまで、前記フランジの内周部に形成された貫通孔を封止部材により封止しておき、
前記フランジに前記蓋部材を接合する際に、前記封止部材に代えて接合部材を前記貫通孔に取り付け、その接合部材によって前記蓋部材を前記フランジに固定する請求項5に記載の流体管の遮断解除方法。
Until the lid member is joined to the flange, the through-hole formed in the inner peripheral portion of the flange is sealed with a sealing member,
The fluid pipe according to claim 5, wherein when the lid member is joined to the flange, a joining member is attached to the through-hole instead of the sealing member, and the lid member is fixed to the flange by the joining member. Block release method.
JP2015097722A 2015-05-12 2015-05-12 How to release the shutoff of the fluid pipe Active JP6488185B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015097722A JP6488185B2 (en) 2015-05-12 2015-05-12 How to release the shutoff of the fluid pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015097722A JP6488185B2 (en) 2015-05-12 2015-05-12 How to release the shutoff of the fluid pipe

Publications (2)

Publication Number Publication Date
JP2016211698A true JP2016211698A (en) 2016-12-15
JP6488185B2 JP6488185B2 (en) 2019-03-20

Family

ID=57551436

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015097722A Active JP6488185B2 (en) 2015-05-12 2015-05-12 How to release the shutoff of the fluid pipe

Country Status (1)

Country Link
JP (1) JP6488185B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521891A1 (en) * 2018-11-23 2020-06-15 Vat Holding Ag Valve

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6455478A (en) * 1987-08-25 1989-03-02 Bridgestone Corp Gate valve
JPH1030748A (en) * 1996-07-15 1998-02-03 Kubota Corp Valve having repairing device
JP2001353613A (en) * 2001-04-12 2001-12-25 Suido Gijutsu Kaihatsu Kiko:Kk Existing pipe cutting device
JP2002349784A (en) * 2001-05-30 2002-12-04 Kawasaki Steel Corp Piping disconnecting method, and piping disconnecting box body
JP2003156189A (en) * 2001-11-19 2003-05-30 Kawasaki Steel Corp Pipe cutoff method and pipe cutoff case body
JP2006515406A (en) * 2003-02-28 2006-05-25 オクルード Valve insertion and installation method
JP2008101702A (en) * 2006-10-19 2008-05-01 Waterworks Technology Development Organization Co Ltd Existing pipe cut-off method
JP2010043721A (en) * 2008-08-18 2010-02-25 Cosmo Koki Co Ltd Device for attaching/detaching pipe connecting member and method for the same
JP2010043722A (en) * 2008-08-18 2010-02-25 Cosmo Koki Co Ltd Device for attaching/detaching pipe connecting member and method for the same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6455478A (en) * 1987-08-25 1989-03-02 Bridgestone Corp Gate valve
JPH1030748A (en) * 1996-07-15 1998-02-03 Kubota Corp Valve having repairing device
JP2001353613A (en) * 2001-04-12 2001-12-25 Suido Gijutsu Kaihatsu Kiko:Kk Existing pipe cutting device
JP2002349784A (en) * 2001-05-30 2002-12-04 Kawasaki Steel Corp Piping disconnecting method, and piping disconnecting box body
JP2003156189A (en) * 2001-11-19 2003-05-30 Kawasaki Steel Corp Pipe cutoff method and pipe cutoff case body
JP2006515406A (en) * 2003-02-28 2006-05-25 オクルード Valve insertion and installation method
JP2008101702A (en) * 2006-10-19 2008-05-01 Waterworks Technology Development Organization Co Ltd Existing pipe cut-off method
JP2010043721A (en) * 2008-08-18 2010-02-25 Cosmo Koki Co Ltd Device for attaching/detaching pipe connecting member and method for the same
JP2010043722A (en) * 2008-08-18 2010-02-25 Cosmo Koki Co Ltd Device for attaching/detaching pipe connecting member and method for the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521891A1 (en) * 2018-11-23 2020-06-15 Vat Holding Ag Valve

Also Published As

Publication number Publication date
JP6488185B2 (en) 2019-03-20

Similar Documents

Publication Publication Date Title
WO2020049879A1 (en) Installation method and installation device for fluid control device
JP2024036421A (en) Cutoff method of fluid pipe
JP6488185B2 (en) How to release the shutoff of the fluid pipe
JP6608025B2 (en) Valve device mounting method and valve device removal method
JP2006250295A (en) Continuous water gate valve installing method for existing fluid pipe and gate valve installing device
JP2023164928A (en) fluid control device
JP2012189111A (en) Method for removing fluid device in water service pipe system and removal operation jig used in the method
JP4642536B2 (en) Non-continuous water flow path treatment equipment for existing fluid pipes
JP2004286228A (en) Valve installation method for existing pipe and valve used for the method
JP5944705B2 (en) Branch opening communication method
JP6450632B2 (en) Corrosion prevention apparatus and corrosion prevention method for pipe cut surface
JP2013170641A (en) Fluid pipe branching device and method of branching fluid
WO2009128182A1 (en) Pipe connection device
JP4642537B2 (en) Non-continuous water flow path treatment equipment for existing fluid pipes
JP5208686B2 (en) Desorption device for pipe connecting member
JP5892572B2 (en) Pipe connection device
JP6562700B2 (en) Flow path forming method
JP2013200025A (en) Shut-off device
JP6788076B2 (en) Channel forming means
JP7149523B2 (en) Branch pipe removal method and removal tool.
JP2016114251A (en) Pipe connection device
JP5639920B2 (en) Connection member removal method
JP6820012B2 (en) Anticorrosion device and anticorrosion method for pipe cut surface
JP2011241873A (en) Pipe connecting device
JP2006275108A (en) Constant water control body arranging device of existing fluid pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190225

R150 Certificate of patent or registration of utility model

Ref document number: 6488185

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250