JP2015228166A - Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program - Google Patents

Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program Download PDF

Info

Publication number
JP2015228166A
JP2015228166A JP2014114085A JP2014114085A JP2015228166A JP 2015228166 A JP2015228166 A JP 2015228166A JP 2014114085 A JP2014114085 A JP 2014114085A JP 2014114085 A JP2014114085 A JP 2014114085A JP 2015228166 A JP2015228166 A JP 2015228166A
Authority
JP
Japan
Prior art keywords
power consumption
production
power
information
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014114085A
Other languages
Japanese (ja)
Other versions
JP6519990B2 (en
Inventor
勲 後藤
Isao Goto
勲 後藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2014114085A priority Critical patent/JP6519990B2/en
Publication of JP2015228166A publication Critical patent/JP2015228166A/en
Application granted granted Critical
Publication of JP6519990B2 publication Critical patent/JP6519990B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a production management apparatus, a power consumption management apparatus, a power consumption management system, a production management method, a power consumption management method, a production management program, and a power consumption management program capable of flexibly creating a production plan while considering power saving in an electric power demanding facilities such as plants.SOLUTION: The production management apparatus is an apparatus for creating a production plan in an electric power demanding facility, which includes: an instruction acquisition section that acquires a piece of instruction information relevant to a power consumption in the electric power demanding facility; and a planning section that determines on an alteration of the production plan based on the instruction information acquired by the instruction acquisition section.

Description

本発明は、生産管理装置、電力消費管理装置、電力消費管理システム、生産管理方法、電力消費管理方法、生産管理プログラム、および電力消費管理プログラムに関し、特に、生産計画に関する処理を行う生産管理装置、電力消費管理装置、電力消費管理システム、生産管理方法、電力消費管理方法、生産管理プログラム、および電力消費管理プログラムに関する。   The present invention relates to a production management device, a power consumption management device, a power consumption management system, a production management method, a power consumption management method, a production management program, and a power consumption management program, and in particular, a production management device that performs processing related to a production plan, The present invention relates to a power consumption management device, a power consumption management system, a production management method, a power consumption management method, a production management program, and a power consumption management program.

工場等における生産計画を策定するシステムとして、たとえば、特許文献1(特開2012−230461号公報)には、以下のような技術が開示されている。すなわち、スケジューリング装置は、複数の生産資源のそれぞれに関連付けられ、前記複数の生産資源のそれぞれの稼働・非稼働の時間帯に関する情報であるカレンダ情報と、前記複数の生産資源のそれぞれに関連付けられ、前記複数の生産資源のそれぞれの処理時間及び能力に関する情報を含む生産資源情報と、前記複数の生産資源のそれぞれに関連付けられ、前記複数の生産資源のそれぞれの作業でのユーティリティの使用量に関する情報であるユーティリティ情報と、複数の作業間の量関連、及び前記複数の作業間の時間関連を表すレシピに関する情報であるレシピ情報と、生産品目・数量・納期を含む情報であるオーダ情報との各情報が事前に与えられ、前記カレンダ情報、前記生産資源情報、前記オーダ情報及び前記レシピ情報に基づいて、各生産資源の能力に対して負荷の山積み・山崩しを行って、各生産資源に作業を割り付けてスケジューリングを行い、前記ユーティリティ情報に基づいて、スケジューリング結果の各作業のユーティリティ使用量を算出するスケジューリング処理部と、前記スケジューリング処理部によるスケジューリング結果とユーティリティ使用量の算出結果とを用いて、スケジューリング結果とユーティリティ使用量の算出結果とを同一の時間軸上で表すための生産管理図のデータを生成する生産管理図生成部とを備える。   As a system for formulating a production plan in a factory or the like, for example, Japanese Patent Application Laid-Open No. 2012-230461 discloses the following technology. That is, the scheduling device is associated with each of the plurality of production resources, and is associated with each of the plurality of production resources, calendar information that is information related to each operation / non-operation time zone of the plurality of production resources, Production resource information including information on the processing time and capacity of each of the plurality of production resources, and information on utility usage associated with each of the plurality of production resources and in each work of the plurality of production resources Each information of certain utility information, recipe information that is information about a recipe that represents a quantity relationship between a plurality of operations, and a time relationship between the plurality of operations, and order information that is information including a production item, quantity, and delivery date Is given in advance, and in the calendar information, the production resource information, the order information, and the recipe information Therefore, load is piled up / collapsed for the capacity of each production resource, work is allocated to each production resource, scheduling is performed, and utility usage of each work of the scheduling result is calculated based on the utility information. A production control chart for expressing a scheduling result and a calculation result of utility usage on the same time axis using a scheduling processing unit to calculate, and a scheduling result and a calculation result of utility usage by the scheduling processing unit A production control chart generating unit for generating data.

特開2012−230461号公報JP 2012-230461 A 特開2012−147546号公報JP2012-147546A

ところで、工場等においては策定した生産計画に従って各生産工程が行われるため、電力需給の逼迫が予想される場合でも節電を行うことが困難な場合がある。   By the way, since each production process is performed in a factory or the like in accordance with the established production plan, it may be difficult to save power even when power supply and demand are expected to be tight.

この発明は、上述の課題を解決するためになされたもので、その目的は、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することが可能な生産管理装置、電力消費管理装置、電力消費管理システム、生産管理方法、電力消費管理方法、生産管理プログラム、および電力消費管理プログラムを提供することである。   The present invention has been made to solve the above-mentioned problems, and its purpose is to produce a production management device capable of developing a flexible production plan in consideration of power saving in a power demand facility such as a factory, and power consumption. A management apparatus, a power consumption management system, a production management method, a power consumption management method, a production management program, and a power consumption management program are provided.

(1)上記課題を解決するために、この発明のある局面に係る生産管理装置は、電力需要施設における生産計画を作成する生産管理装置であって、前記電力需要施設における電力消費に関する指示情報を取得する指示取得部と、前記指示取得部によって取得された前記指示情報に基づいて前記生産計画の変更に関する判断を行う計画部とを備える。   (1) In order to solve the above-described problem, a production management device according to an aspect of the present invention is a production management device that creates a production plan in a power demand facility, and includes instruction information related to power consumption in the power demand facility. An instruction acquisition unit to be acquired, and a planning unit that makes a determination regarding a change in the production plan based on the instruction information acquired by the instruction acquisition unit.

(5)上記課題を解決するために、この発明のある局面に係る電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得する消費情報取得部と、前記消費情報取得部によって取得された前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成する指示作成部と、前記指示作成部によって作成された前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知する指示通知部とを備える。   (5) In order to solve the above-described problem, a power consumption management device according to an aspect of the present invention is acquired by a consumption information acquisition unit that acquires power consumption information related to power consumption from the power system side, and the consumption information acquisition unit. Based on the generated power consumption information, an instruction creation unit that creates instruction information related to power consumption in the power demand facility, and the instruction information created by the instruction creation unit creates a production plan in the power demand facility An instruction notification unit for notifying the production management apparatus.

(6)上記課題を解決するために、この発明のある局面に係る電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備え、前記電力消費管理装置は、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する。   (6) In order to solve the above problems, a power consumption management system according to an aspect of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a production that creates a production plan in the power demand facility. A management device, wherein the power consumption management device transmits instruction information regarding power consumption in the power demand facility to the production management device, and the production management device receives the instruction information from the power consumption management device. Based on the received instruction information, a determination is made regarding the change in the production plan, and information based on the determination result is transmitted to the power consumption management device.

(8)またこの発明の別の局面に係る電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設から前記電力需要施設における生産計画を取得し、取得した前記生産計画の変更に関する判断を行う生産管理装置とを備え、前記電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記判断を行う。   (8) Moreover, the power consumption management system which concerns on another situation of this invention acquires the production plan in the said power demand facility from the power consumption management apparatus which manages the power consumption in a power demand facility, and the said power demand facility, and acquires it A production management device that makes a determination on the change of the production plan, the power consumption management device acquires power consumption information related to power consumption from the power system side, and based on the acquired power consumption information, the power Instruction information related to power consumption at the demand facility is transmitted to the production management apparatus, and the production management apparatus receives the instruction information from the power consumption management apparatus and makes the determination based on the received instruction information.

(9)上記課題を解決するために、この発明のある局面に係る生産管理方法は、電力需要施設における生産計画を作成する生産管理装置、における生産管理方法であって、前記電力需要施設における電力消費に関する指示情報を取得するステップと、取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを含む。   (9) In order to solve the above-described problem, a production management method according to an aspect of the present invention is a production management method in a production management apparatus that creates a production plan in a power demand facility, and the power in the power demand facility Acquiring instruction information relating to consumption, and making a determination relating to a change in the production plan based on the acquired instruction information.

(10)上記課題を解決するために、この発明のある局面に係る電力消費管理方法は、電力消費管理装置における電力消費管理方法であって、電力系統側から電力消費に関する電力消費情報を取得するステップと、取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを含む。   (10) In order to solve the above problem, a power consumption management method according to an aspect of the present invention is a power consumption management method in a power consumption management device, and acquires power consumption information related to power consumption from the power system side. A step of creating instruction information relating to power consumption in the power demand facility based on the acquired power consumption information, and notifying the created instruction information to a production management device that creates a production plan in the power demand facility Including the step of.

(11)またこの発明の別の局面に係る電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを含む。   (11) A power consumption management method according to another aspect of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a power management device that creates a production plan in the power demand facility. A power consumption management method in a consumption management system, wherein the power consumption management device transmits instruction information regarding power consumption in the power demand facility to the production management device, and the production management device receives the instruction information. Receiving from the power consumption management device, making a determination on the change of the production plan based on the received instruction information, and transmitting information based on the determination result to the power consumption management device.

(12)またこの発明の別の局面に係る電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを含む。   (12) A power consumption management method according to another aspect of the present invention is a power consumption management method in a power consumption management system including a power consumption management device for managing power consumption in a power demand facility and a production management device. The production management device acquires a production plan in the power demand facility from the power demand facility, and the power consumption management device acquires power consumption information related to power consumption from the power system side and acquires the power plan. Based on the power consumption information, transmitting the instruction information regarding the power consumption in the power demand facility to the production management device; and the production management device receives the instruction information from the power consumption management device and receives the instruction information. And a step of making a determination on the change of the acquired production plan based on the instruction information.

(13)上記課題を解決するために、この発明のある局面に係る生産管理プログラムは、電力需要施設における生産計画を作成する生産管理装置、において用いられる生産管理プログラムであって、コンピュータに、前記電力需要施設における電力消費に関する指示情報を取得するステップと、取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを実行させるためのプログラムである。   (13) In order to solve the above-described problem, a production management program according to an aspect of the present invention is a production management program used in a production management apparatus that creates a production plan in a power demand facility, and It is a program for executing a step of acquiring instruction information related to power consumption in a power demand facility and a step of making a determination regarding change of the production plan based on the acquired instruction information.

(14)上記課題を解決するために、この発明のある局面に係る電力消費管理プログラムは、電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、電力系統側から電力消費に関する電力消費情報を取得するステップと、取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを実行させるためのプログラムである。   (14) In order to solve the above-described problem, a power consumption management program according to an aspect of the present invention is a power consumption management program used in a power consumption management apparatus, and the power related to power consumption from the power system side to the computer A step of obtaining consumption information, a step of creating instruction information relating to power consumption in a power demand facility based on the obtained power consumption information, and a production plan in the power demand facility based on the created instruction information This is a program for executing the step of notifying the production management apparatus.

(15)またこの発明の別の局面に係る電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを実行させるためのプログラムである。   (15) A power consumption management program according to another aspect of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a production management device that creates a production plan in the power demand facility. A power consumption management program used in a consumption management system, wherein the power consumption management device transmits instruction information regarding power consumption in the power demand facility to the production management device, and the production management device Receiving the instruction information from the power consumption management device, performing a determination on the change of the production plan based on the received instruction information, and transmitting information based on the determination result to the power consumption management device. It is a program to make it.

(16)またこの発明の別の局面に係る電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを実行させるためのプログラムである。   (16) A power consumption management program according to another aspect of the present invention is a power consumption management program used in a power consumption management system including a power consumption management device that manages power consumption in a power demand facility and a production management device. In the computer, the production management device obtains a production plan in the power demand facility from the power demand facility, and the power consumption management device obtains power consumption information related to power consumption from the power system side. And, based on the acquired power consumption information, transmitting instruction information relating to power consumption at the power demand facility to the production management device; and the production management device receives the instruction information from the power consumption management device. Then, based on the received instruction information, a determination is made regarding the change in the acquired production plan. Is a program for executing the step.

本発明は、このような特徴的な処理部を備える電力消費管理装置として実現することができるだけでなく、電力消費管理装置の一部または全部を実現する半導体集積回路として実現することができる。   The present invention can be realized not only as a power consumption management device including such a characteristic processing unit, but also as a semiconductor integrated circuit realizing part or all of the power consumption management device.

本発明によれば、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   ADVANTAGE OF THE INVENTION According to this invention, the flexible production plan which considered the power saving in electric power demand facilities, such as a factory, can be drawn up.

図1は、本発明の第1の実施の形態に係る電力消費管理システムの概要を説明するための図である。FIG. 1 is a diagram for explaining the outline of the power consumption management system according to the first embodiment of the present invention. 図2は、本発明の第1の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 2 is a diagram showing the configuration of the power consumption management system according to the first embodiment of the present invention. 図3は、本発明の第1の実施の形態に係る電力消費管理装置の構成を示す図である。FIG. 3 is a diagram showing a configuration of the power consumption management apparatus according to the first embodiment of the present invention. 図4は、本発明の第1の実施の形態に係る生産管理装置の構成を示す図である。FIG. 4 is a diagram showing the configuration of the production management apparatus according to the first embodiment of the present invention. 図5は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のアローダイアグラムの一例を示す図である。FIG. 5 is a diagram showing an example of an existing plan arrow diagram formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図6は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のガントチャートの一例を示す図である。FIG. 6 is a diagram illustrating an example of a Gantt chart of an existing plan formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図7は、本発明の第1の実施の形態に係る生産管理装置における計画部が立案した代替計画のガントチャートの一例を示す図である。FIG. 7 is a diagram illustrating an example of a Gantt chart of an alternative plan prepared by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図8は、本発明の実施の形態に係る生産管理装置における計画部が代替計画のメリットの判断に用いる数値の算出の一例を示す図である。FIG. 8 is a diagram illustrating an example of calculation of numerical values used by the planning unit in the production management apparatus according to the embodiment of the present invention to determine the merit of the alternative plan. 図9は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のアローダイアグラムの一例を示す図である。FIG. 9 is a diagram showing an example of an existing plan arrow diagram formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図10は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のガントチャートの一例を示す図である。FIG. 10 is a diagram showing an example of a Gantt chart of an existing plan formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図11は、本発明の第1の実施の形態に係る生産管理装置における計画部が立案した代替計画のガントチャートの一例を示す図である。FIG. 11 is a diagram illustrating an example of a Gantt chart of an alternative plan prepared by the planning unit in the production management apparatus according to the first embodiment of the present invention. 図12は、本発明の実施の形態に係る生産管理装置における計画部が代替計画のメリットの判断に用いる数値の算出の一例を示す図である。FIG. 12 is a diagram illustrating an example of calculation of numerical values used by the planning unit in the production management apparatus according to the embodiment of the present invention to determine the merit of the alternative plan. 図13は、本発明の第1の実施の形態に係る電力消費管理システムにおける消費電力量の削減処理のシーケンスの一例を示す図である。FIG. 13 is a diagram illustrating an example of a sequence of power consumption reduction processing in the power consumption management system according to the first embodiment of the present invention. 図14は、本発明の第2の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 14 is a diagram showing a configuration of a power consumption management system according to the second embodiment of the present invention. 図15は、本発明の第2の実施の形態に係る電力消費管理装置の構成を示す図である。FIG. 15 is a diagram illustrating a configuration of a power consumption management apparatus according to the second embodiment of the present invention. 図16は、本発明の第2の実施の形態に係る生産管理装置の構成を示す図である。FIG. 16 is a diagram showing a configuration of a production management apparatus according to the second embodiment of the present invention. 図17は、本発明の第2の実施の形態に係る電力消費管理システムにおける消費電力量の削減処理のシーケンスの一例を示す図である。FIG. 17 is a diagram illustrating an example of a sequence of power consumption reduction processing in the power consumption management system according to the second embodiment of the present invention.

最初に、本発明の実施の形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る生産管理装置は、電力需要施設における生産計画を作成する生産管理装置であって、前記電力需要施設における電力消費に関する指示情報を取得する指示取得部と、前記指示取得部によって取得された前記指示情報に基づいて前記生産計画の変更に関する判断を行う計画部とを備える。   (1) A production management apparatus according to an embodiment of the present invention is a production management apparatus that creates a production plan in a power demand facility, an instruction acquisition unit that acquires instruction information relating to power consumption in the power demand facility; A planning unit that makes a determination on the change of the production plan based on the instruction information acquired by the instruction acquisition unit.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(2)好ましくは、前記指示取得部は、さらに、前記電力需要施設における電力消費の削減の対価を示す対価情報を取得し、前記計画部は、前記指示取得部によって取得された前記指示情報および前記対価情報に基づいて前記生産計画の変更に関する判断を行う。   (2) Preferably, the instruction acquisition unit further acquires consideration information indicating a consideration for reduction of power consumption in the power demand facility, and the planning unit includes the instruction information acquired by the instruction acquisition unit and Judgment regarding the change of the production plan is performed based on the consideration information.

このような構成により、たとえば、立案した新たな生産計画に従って各生産工程を実施した場合に、どの程度の金銭的なメリットがあるかを把握した上で、生産計画の変更に関する判断を行うことができる。   With such a configuration, for example, when each production process is carried out according to a new production plan that has been planned, it is possible to make a judgment on the change of the production plan after grasping how much money there is. it can.

(3)好ましくは、前記計画部は、前記生産計画の変更に関する判断において、生産の遅れを許容した前記生産計画を作成可能である。   (3) Preferably, the said planning part can produce the said production plan which permitted the delay of production in the judgment regarding the change of the said production plan.

このような構成により、納期を変更しない範囲での通常の生産計画の変更では指示情報の示す電力消費の目標を達成できない場合に、当該目標を達成可能な生産計画を立案することができる。   With such a configuration, when a normal production plan change without changing the delivery date cannot achieve the power consumption target indicated by the instruction information, a production plan that can achieve the target can be formulated.

(4)好ましくは、前記生産管理装置は、さらに、前記計画部の判断結果に基づいて、前記指示情報の示す目標の達成可否を判断する達成判断部を備える。   (4) Preferably, the said production management apparatus is further provided with the achievement judgment part which judges the achievement of the target which the said instruction information shows based on the judgment result of the said plan part.

このような構成により、たとえば、新たな生産計画を立案した上で、実際に上記目標を達成すべきか否かを判断できるため、たとえば生産計画を変更することによるメリットが小さい場合に既存の生産計画を維持することができる。   With such a configuration, for example, it is possible to determine whether or not the above target should be actually achieved after creating a new production plan. For example, when the merit of changing the production plan is small, the existing production plan Can be maintained.

(5)本発明の実施の形態に係る電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得する消費情報取得部と、前記消費情報取得部によって取得された前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成する指示作成部と、前記指示作成部によって作成された前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知する指示通知部とを備える。   (5) The power consumption management apparatus according to the embodiment of the present invention includes a consumption information acquisition unit that acquires power consumption information related to power consumption from the power system side, and the power consumption information acquired by the consumption information acquisition unit. An instruction creating unit that creates instruction information related to power consumption in a power demand facility, and an instruction for notifying the instruction information created by the instruction creating unit to a production management device that creates a production plan in the power demand facility A notification unit.

このように、指示情報を生産管理装置へ通知する構成により、生産管理装置が、指示情報に基づいて、電力需要施設における新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   As described above, the configuration in which the instruction information is notified to the production management apparatus enables the production management apparatus to make a new production plan in the power demand facility based on the instruction information. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(6)本発明の実施の形態に係る電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備え、前記電力消費管理装置は、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する。   (6) A power consumption management system according to an embodiment of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a production management device that creates a production plan in the power demand facility, The power consumption management device transmits instruction information related to power consumption at the power demand facility to the production management device, the production management device receives the instruction information from the power consumption management device, and receives the received instruction information. Based on the determination, the production plan is changed, and information based on the determination result is transmitted to the power consumption management apparatus.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(7)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の削減の対価を示す対価情報を前記生産管理装置に送信し、前記生産管理装置は、前記指示情報および前記対価情報を前記生産管理装置から受信し、受信した前記指示情報および前記対価情報に基づいて、前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する。   (7) Preferably, the power consumption management device further transmits consideration information indicating a consideration for reduction of power consumption in the power demand facility to the production management device, and the production management device includes the instruction information and the Compensation information is received from the production management device, a determination is made regarding the change of the production plan based on the received instruction information and the compensation information, and information based on the determination result is transmitted to the power consumption management device.

このような構成により、たとえば、立案した新たな生産計画に従って各生産工程を実施した場合に、どの程度の金銭的なメリットがあるかを把握した上で、生産計画の変更に関する判断を行うことができる。   With such a configuration, for example, when each production process is carried out according to a new production plan that has been planned, it is possible to make a judgment on the change of the production plan after grasping how much money there is. it can.

(8)本発明の実施の形態に係る電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設から前記電力需要施設における生産計画を取得し、取得した前記生産計画の変更に関する判断を行う生産管理装置とを備え、前記電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記判断を行う。   (8) A power consumption management system according to an embodiment of the present invention acquires a power consumption management device that manages power consumption in a power demand facility, and a production plan in the power demand facility from the power demand facility A production management device that makes a determination regarding the change of the production plan, the power consumption management device acquires power consumption information related to power consumption from a power system side, and based on the acquired power consumption information, the power demand Instruction information relating to power consumption in the facility is transmitted to the production management apparatus, and the production management apparatus receives the instruction information from the power consumption management apparatus and makes the determination based on the received instruction information.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(9)本発明の実施の形態に係る生産管理方法は、電力需要施設における生産計画を作成する生産管理装置、における生産管理方法であって、前記電力需要施設における電力消費に関する指示情報を取得するステップと、取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを含む。   (9) A production management method according to an embodiment of the present invention is a production management method in a production management device that creates a production plan in a power demand facility, and acquires instruction information relating to power consumption in the power demand facility. And a step of making a determination on the change of the production plan based on the acquired instruction information.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(10)本発明の実施の形態に係る電力消費管理方法は、電力消費管理装置における電力消費管理方法であって、電力系統側から電力消費に関する電力消費情報を取得するステップと、取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを含む。   (10) A power consumption management method according to an embodiment of the present invention is a power consumption management method in a power consumption management apparatus, the step of acquiring power consumption information related to power consumption from the power system side, and the acquired power The method includes the steps of creating instruction information relating to power consumption in a power demand facility based on the consumption information, and notifying the created instruction information to a production management device that creates a production plan in the power demand facility.

このように、指示情報を生産管理装置へ通知する構成により、生産管理装置が、指示情報に基づいて、電力需要施設における新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   As described above, the configuration in which the instruction information is notified to the production management apparatus enables the production management apparatus to make a new production plan in the power demand facility based on the instruction information. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(11)本発明の実施の形態に係る電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを含む。   (11) A power consumption management method according to an embodiment of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a production management device that creates a production plan in the power demand facility. A power consumption management method in a management system, wherein the power consumption management device transmits instruction information regarding power consumption in the power demand facility to the production management device; and the production management device transmits the instruction information to the production management device. Receiving from the power consumption management device, making a determination on the change of the production plan based on the received instruction information, and transmitting information based on the determination result to the power consumption management device.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(12)本発明の実施の形態に係る電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを含む。   (12) A power consumption management method according to an embodiment of the present invention is a power consumption management method in a power consumption management system including a power consumption management device that manages power consumption in a power demand facility and a production management device. The production management device acquires a production plan in the power demand facility from the power demand facility; and the power consumption management device obtains power consumption information related to power consumption from the power system side and acquires the acquired power. Based on consumption information, transmitting the instruction information regarding power consumption in the power demand facility to the production management device; and the production management device receives the instruction information from the power consumption management device and receives the instruction information. And a step of making a determination on the change of the acquired production plan based on the instruction information.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(13)本発明の実施の形態に係る生産管理プログラムは、電力需要施設における生産計画を作成する生産管理装置、において用いられる生産管理プログラムであって、コンピュータに、前記電力需要施設における電力消費に関する指示情報を取得するステップと、取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを実行させるためのプログラムである。   (13) A production management program according to an embodiment of the present invention is a production management program used in a production management apparatus that creates a production plan in a power demand facility, and relates to power consumption in the power demand facility in a computer. It is a program for executing a step of acquiring instruction information and a step of making a determination regarding the change of the production plan based on the acquired instruction information.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(14)本発明の実施の形態に係る電力消費管理プログラムは、電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、電力系統側から電力消費に関する電力消費情報を取得するステップと、取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを実行させるためのプログラムである。   (14) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a power consumption management apparatus, and acquiring power consumption information related to power consumption from a power system side to a computer; A step of creating instruction information relating to power consumption in a power demand facility based on the acquired power consumption information, and a step of notifying the created instruction information to a production management device that creates a production plan in the power demand facility Is a program for executing

このように、指示情報を生産管理装置へ通知する構成により、生産管理装置が、指示情報に基づいて、電力需要施設における新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   As described above, the configuration in which the instruction information is notified to the production management apparatus enables the production management apparatus to make a new production plan in the power demand facility based on the instruction information. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(15)本発明の実施の形態に係る電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを実行させるためのプログラムである。   (15) A power consumption management program according to an embodiment of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a production management device that creates a production plan in the power demand facility. A power consumption management program used in a management system, wherein the power consumption management device transmits instruction information regarding power consumption in the power demand facility to the production management device, and the production management device, Receiving the instruction information from the power consumption management device, performing a determination on the change of the production plan based on the received instruction information, and transmitting information based on the determination result to the power consumption management device. It is a program for.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

(16)本発明の実施の形態に係る電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを実行させるためのプログラムである。   (16) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a power consumption management system including a power consumption management device that manages power consumption in a power demand facility and a production management device. The production management device acquires a production plan in the power demand facility from the power demand facility, and the power consumption management device obtains power consumption information related to power consumption from the power system side. A step of transmitting instruction information relating to power consumption at the power demand facility to the production management device based on the acquired power consumption information; and the production management device receives the instruction information from the power consumption management device. Then, based on the received instruction information, a step for making a determination regarding the change of the acquired production plan. Is a program for executing a flop.

このような構成により、たとえば、電力需要施設が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。したがって、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   With such a configuration, for example, when the power demand facility performs each production process according to a production plan that has already been created, it can be determined whether or not the power consumption target indicated by the instruction information can be achieved. it can. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up. Therefore, a flexible production plan considering power saving can be made in a power demand facility such as a factory.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

<第1の実施の形態>
[構成および基本動作]
図1は、本発明の第1の実施の形態に係る電力消費管理システムの概要を説明するための図である。
<First Embodiment>
[Configuration and basic operation]
FIG. 1 is a diagram for explaining the outline of the power consumption management system according to the first embodiment of the present invention.

図1を参照して、電力会社または系統運用会社等である電力系統側5は、たとえば電力需給の逼迫が予想される期間を対象として、アグリゲータ6に対して節電要請を行う。アグリゲータ6は、電力系統側5からの節電要請を受けて、複数の電力需要施設7に、たとえば当該期間を対象として節電要請を行う。   Referring to FIG. 1, the power system side 5, which is an electric power company, a system operating company, or the like, makes a power saving request to the aggregator 6 for a period in which, for example, a tight power supply and demand is expected. The aggregator 6 receives a power saving request from the power system side 5 and makes a power saving request to the plurality of power demanding facilities 7 for the period, for example.

各電力需要施設7においてアグリゲータ6からの節電要請に従った節電が行われることにより、電力需要施設7は、アグリゲータ6へネガワットすなわち削減された消費電力を提供する。アグリゲータ6は、各電力需要施設7から提供されたネガワットを卸電力市場8において販売することにより、ネガワットの代金を得る。   By performing power saving in accordance with the power saving request from the aggregator 6 in each power demand facility 7, the power demand facility 7 provides negative power, that is, reduced power consumption to the aggregator 6. The aggregator 6 obtains the price of negawatt by selling the negawatt provided from each power demand facility 7 in the wholesale power market 8.

また、電力系統側5は、節電に対するインセンティブすなわち節電要請の対象期間において節電が行われたことに対する報酬をアグリゲータ6へ支払う。   Further, the power system side 5 pays the aggregator 6 an incentive for power saving, that is, a reward for power saving during the target period of the power saving request.

アグリゲータ6は、卸電力市場8から得たネガワットの代金および電力系統側5から得た節電の報酬を電力需要施設7に分配する。   The aggregator 6 distributes the negawatt price obtained from the wholesale power market 8 and the power saving reward obtained from the power system side 5 to the power demand facility 7.

図2は、本発明の第1の実施の形態に係る電力消費管理システムの構成を示す図である。   FIG. 2 is a diagram showing the configuration of the power consumption management system according to the first embodiment of the present invention.

図2を参照して、電力消費管理システム1は、系統側管理装置101と、電力消費管理装置201と、複数の需要家装置301と、複数の生産管理装置302と、複数の生産設備303と、取引市場装置401とを備える。   Referring to FIG. 2, the power consumption management system 1 includes a system side management device 101, a power consumption management device 201, a plurality of customer devices 301, a plurality of production management devices 302, and a plurality of production facilities 303. The transaction market apparatus 401 is provided.

需要家装置301、生産管理装置302、および複数の生産設備303は、たとえば工場である各電力需要施設7に設けられる。生産管理装置302は、たとえば、自己の設置された電力需要施設7における生産管理計画を作成する。   The consumer device 301, the production management device 302, and the plurality of production facilities 303 are provided in each power demand facility 7 which is a factory, for example. For example, the production management apparatus 302 creates a production management plan in the power demand facility 7 in which the production management apparatus 302 is installed.

需要家装置301は、電力需要施設における生産設備等の動作を制御することによって消費電力の削減を図るためのFEMS(Factory Energy Management System)等のシステムにおいて用いられる装置であり、たとえばアグリゲータ6によって導入される。需要家装置301は、たとえば、生産管理装置302により作成された生産計画に従って各生産設備303を制御する。   The consumer device 301 is a device used in a system such as FEMS (Factor Energy Management System) for reducing power consumption by controlling the operation of production facilities and the like in a power demand facility. Is done. The consumer device 301 controls each production facility 303 according to the production plan created by the production management device 302, for example.

電力消費管理装置201は、たとえばアグリゲータ6によって運用され、複数の電力需要施設7における需要家装置301と通信を行なうことにより、各需要家装置301が設置された電力需要施設7における電力消費を管理する。   The power consumption management device 201 is operated by, for example, the aggregator 6 and manages power consumption in the power demand facility 7 in which each consumer device 301 is installed by communicating with the consumer device 301 in the plurality of power demand facilities 7. To do.

系統側管理装置101は、電力系統側5によって運用され、電力消費に関する情報である電力消費情報を電力消費管理装置201へ送信する。電力消費情報は、たとえば、アグリゲータ6が参加可能な節電イベントの内容を示す。   The system side management apparatus 101 is operated by the power system side 5 and transmits power consumption information, which is information regarding power consumption, to the power consumption management apparatus 201. The power consumption information indicates, for example, the content of a power saving event in which the aggregator 6 can participate.

具体的には、電力消費情報は、節電イベントの内容として、アグリゲータ6が配下の電力需要施設7に消費電力の削減を行わせるべき期間である要請期間、および要請期間において、配下の電力需要施設7が削減すべき消費電力の目標である要請目標を示す。アグリゲータ6は、たとえば、要請目標を達成できると判断した場合、節電イベントに参加する。   Specifically, the power consumption information includes, as the content of the power saving event, a request period in which the aggregator 6 should cause the subordinate power demand facility 7 to reduce power consumption, and a subordinate power demand facility in the request period. Reference numeral 7 indicates a required target which is a target of power consumption to be reduced. For example, when the aggregator 6 determines that the requested target can be achieved, the aggregator 6 participates in the power saving event.

なお、電力消費情報は、さらに、時間ごとの電力料金の単価を示してもよい。また、要請目標は、電力需要施設7が削減すべき消費電力の目標に限らず、たとえば削減率または削減割合であってもよいし、消費電力量の上限値等であってもよい。   Note that the power consumption information may further indicate the unit price of the power charge for each hour. Further, the requested target is not limited to the target of power consumption that should be reduced by the power demand facility 7, but may be, for example, a reduction rate or a reduction ratio, or an upper limit value of power consumption.

電力消費管理装置201は、系統側管理装置101から受信した電力消費情報に基づいて、電力需要施設7における電力消費に関する指示情報を作成し、作成した指示情報を1または複数の電力需要施設7における生産管理装置302へ送信する。   The power consumption management device 201 creates instruction information related to power consumption in the power demand facility 7 based on the power consumption information received from the system side management device 101, and uses the created instruction information in one or more power demand facilities 7. This is transmitted to the production management apparatus 302.

指示情報は、たとえば、電力需要施設7が参加可能な節電イベントの内容を示す。具体的には、指示情報は、電力需要施設7において消費電力を削減すべき期間である節電期間、および当該節電期間において削減すべき消費電力量の目標である節電目標を示す。   The instruction information indicates, for example, the content of a power saving event in which the power demand facility 7 can participate. Specifically, the instruction information indicates a power saving period that is a period in which power consumption should be reduced in the power demand facility 7, and a power saving target that is a target of the power consumption to be reduced in the power saving period.

なお、指示情報は、さらに、時間ごとの電気料金の単価を示してもよい。また、節電目標は、削減すべき消費電力量に限らず、たとえば削減率または削減割合であってもよいし、消費電力量の上限値等であってもよい。   Note that the instruction information may further indicate a unit price of the electricity bill for each hour. The power saving target is not limited to the power consumption to be reduced, and may be, for example, a reduction rate or a reduction ratio, or an upper limit value of the power consumption.

電力系統側5は、アグリゲータ6が節電イベントに参加した場合、たとえばアグリゲータ6が削減させた消費電力に応じてアグリゲータ6にインセンティブを支払う。電力消費管理装置201は、インセンティブの内容を示すインセンティブ情報を系統側管理装置101から取得する。   When the aggregator 6 participates in a power saving event, the power system side 5 pays incentives to the aggregator 6 according to, for example, power consumption reduced by the aggregator 6. The power consumption management apparatus 201 acquires incentive information indicating the content of the incentive from the system side management apparatus 101.

また、電力消費管理装置201は、たとえば、卸電力市場8におけるサーバーたとえば卸電力取引所に設置されたサーバーである取引市場装置401から、卸電力市場8におけるネガワットの取引価格を示す取引価格情報を取得する。   In addition, the power consumption management apparatus 201 obtains transaction price information indicating the transaction price of negative watts in the wholesale power market 8 from the trade market apparatus 401 which is a server in the wholesale power market 8, for example, a server installed in the wholesale power exchange. get.

電力消費管理装置201は、系統側管理装置101からのインセンティブ情報、および取引市場装置401からの取引価格情報に基づいて、電力需要施設7における電力消費の削減の対価を示す対価情報を作成し、指示情報の送信先である生産管理装置302へ送信する。   Based on the incentive information from the grid-side management device 101 and the transaction price information from the transaction market device 401, the power consumption management device 201 creates consideration information indicating the consideration for reducing power consumption in the power demand facility 7, The instruction information is transmitted to the production management apparatus 302 that is the transmission destination.

対価情報は、たとえば、電力需要施設7が節電イベントに参加した場合に、たとえば電力需要施設7において削減された消費電力量に応じて、当該電力需要施設7に提供される消費電力の削減の対価を示す。   For example, when the power demand facility 7 participates in a power saving event, the consideration information includes, for example, compensation for reducing the power consumption provided to the power demand facility 7 according to the amount of power consumed in the power demand facility 7. Indicates.

生産管理装置302は、電力消費管理装置201から受信した指示情報に基づいて、既存の生産計画(以下、既存計画とも称する。)に従って生産を行うと節電目標を達成することができないと判断した場合、たとえば節電目標を達成可能な新たな生産計画(以下、代替計画とも称する)を立案する。   When the production management device 302 determines based on the instruction information received from the power consumption management device 201 that production cannot be achieved if production is performed according to an existing production plan (hereinafter also referred to as an existing plan). For example, a new production plan (hereinafter also referred to as an alternative plan) capable of achieving a power saving target is created.

そして、生産管理装置302は、生産計画を既存計画から代替計画に変更して節電目標を達成できるか否か、たとえば、既存の計画を変更してまで指示情報の示す節電イベントに電力需要施設7が参加すべきか否かを判断し、判断結果を示す指示応答情報を電力消費管理装置201に送信する。つまり、指示応答情報は、電力需要施設7が節電イベントに参加するか否かを示す。   Then, the production management device 302 determines whether the production plan can be changed from the existing plan to the alternative plan to achieve the power saving target, for example, in the power saving event indicated by the instruction information until the existing plan is changed. Determines whether or not to participate, and transmits instruction response information indicating the determination result to the power consumption management apparatus 201. That is, the instruction response information indicates whether or not the power demand facility 7 participates in the power saving event.

生産管理装置302は、節電イベントに参加する旨の指示応答情報を送信する際、節電期間において自己の電力需要施設7で削減される予定の電力量を示す削減量情報を指示応答情報に含めて送信する。   When the production management apparatus 302 transmits the instruction response information indicating that it participates in the power saving event, the production management apparatus 302 includes the reduction amount information indicating the amount of power scheduled to be reduced at its own power demand facility 7 during the power saving period in the instruction response information. Send.

電力消費管理装置201は、各生産管理装置302から受信した指示応答情報に基づいて、アグリゲータ6が電力消費情報の示す節電イベントに参加するか否かを判断する。具体的には、たとえば、電力消費管理装置201は、各指示応答情報の含む削減量情報に基づいて、要請目標を達成できると判断した場合に、節電イベントに参加すると判断する。   The power consumption management device 201 determines whether or not the aggregator 6 participates in the power saving event indicated by the power consumption information based on the instruction response information received from each production management device 302. Specifically, for example, when the power consumption management apparatus 201 determines that the requested target can be achieved based on the reduction amount information included in each instruction response information, the power consumption management apparatus 201 determines to participate in the power saving event.

また、電力消費管理装置201は、アグリゲータ6が節電イベントへ参加するか否かを示す要請応答情報を系統側管理装置101へ送信する。電力消費管理装置201は、節電イベントに参加する旨の要請応答情報を系統側管理装置101へ送信する際、各電力需要施設7において削減される予定の消費電力量の合計値を示す削減量合計情報を当該要請応答情報に含めて送信する。   In addition, the power consumption management apparatus 201 transmits request response information indicating whether or not the aggregator 6 participates in the power saving event to the system side management apparatus 101. When the power consumption management apparatus 201 transmits request response information indicating that it participates in a power saving event to the grid-side management apparatus 101, the total reduction amount indicating the total power consumption amount scheduled to be reduced in each power demand facility 7 Information is included in the request response information and transmitted.

ここで、電力需要施設7が節電イベントに参加できるのは、たとえば、当該電力需要施設7の生産管理装置302が節電イベントに参加すると判断し、かつアグリゲータ6における電力消費管理装置201が節電イベントに参加すると判断した場合である。   Here, the power demand facility 7 can participate in the power saving event. For example, it is determined that the production management device 302 of the power demand facility 7 participates in the power saving event, and the power consumption management device 201 in the aggregator 6 becomes the power saving event. This is when it is decided to participate.

たとえば、生産管理装置302が節電イベントに参加すると判断した場合であっても、電力消費管理装置201が節電イベントに参加しないと判断した場合、当該生産管理装置302の設置された電力需要施設7は節電イベントに参加できない。   For example, even when the production management device 302 determines to participate in the power saving event, if the power consumption management device 201 determines not to participate in the power saving event, the power demand facility 7 in which the production management device 302 is installed is I cannot participate in a power saving event.

なお、電力消費管理装置201は、系統側管理装置101、各生産管理装置302および取引市場装置401と直接接続される構成に限らず、他の装置を介して接続される構成であってもよい。   The power consumption management device 201 is not limited to the configuration directly connected to the system management device 101, each production management device 302, and the transaction market device 401, and may be configured to be connected via another device. .

図3は、本発明の第1の実施の形態に係る電力消費管理装置の構成を示す図である。   FIG. 3 is a diagram showing a configuration of the power consumption management apparatus according to the first embodiment of the present invention.

図3を参照して、電力消費管理装置201は、要請応答通知部51と、参加判断部52と、指示応答取得部53と、消費情報取得部54と、指示作成部55と、指示通知部56と、報酬情報取得部57と、対価情報作成部58と、市場情報取得部59と、対価情報通知部60と、参加通知部61とを含む。   Referring to FIG. 3, power consumption management apparatus 201 includes request response notification unit 51, participation determination unit 52, instruction response acquisition unit 53, consumption information acquisition unit 54, instruction creation unit 55, and instruction notification unit. 56, a reward information acquisition unit 57, a consideration information creation unit 58, a market information acquisition unit 59, a consideration information notification unit 60, and a participation notification unit 61.

消費情報取得部54は、電力系統側5から電力消費に関する電力消費情報を取得する。具体的には、消費情報取得部54は、系統側管理装置101から送信された電力消費情報を受信して指示作成部55および参加判断部52へ出力する。   The consumption information acquisition unit 54 acquires power consumption information related to power consumption from the power system side 5. Specifically, the consumption information acquisition unit 54 receives the power consumption information transmitted from the system side management apparatus 101 and outputs it to the instruction creation unit 55 and the participation determination unit 52.

指示作成部55は、消費情報取得部54から受けた電力消費情報に基づいて、電力需要施設7における電力消費に関する指示情報を作成し、指示通知部56へ出力する。   The instruction creating unit 55 creates instruction information related to power consumption in the power demand facility 7 based on the power consumption information received from the consumption information acquiring unit 54 and outputs the instruction information to the instruction notifying unit 56.

指示通知部56は、指示作成部55から受けた指示情報を電力需要施設7における生産計画を作成する生産管理装置302へ送信する。なお、各生産管理装置302へ送信される指示情報の内容は、同じであってもよいし、異なってもよい。   The instruction notification unit 56 transmits the instruction information received from the instruction creation unit 55 to the production management apparatus 302 that creates a production plan in the power demand facility 7. Note that the content of the instruction information transmitted to each production management apparatus 302 may be the same or different.

報酬情報取得部57は、系統側管理装置101からインセンティブ情報を受信して対価情報作成部58へ出力する。   The reward information acquisition unit 57 receives incentive information from the system side management apparatus 101 and outputs it to the consideration information creation unit 58.

市場情報取得部59は、取引市場装置401から取引価格情報を受信して対価情報作成部58へ出力する。たとえば、市場情報取得部59は、定期的または不定期に取引市場装置401から取引価格情報を受信して対価情報作成部58へ出力する。   The market information acquisition unit 59 receives the transaction price information from the transaction market device 401 and outputs it to the consideration information creation unit 58. For example, the market information acquisition unit 59 receives the transaction price information from the transaction market device 401 regularly or irregularly and outputs it to the consideration information creation unit 58.

対価情報作成部58は、報酬情報取得部57から受けたインセンティブ情報および市場情報取得部59から受けた取引価格情報に基づいて、対価情報を作成し、対価情報通知部60へ出力する。対価情報作成部58は、たとえば、市場情報取得部59から新たな取引価格情報を受けるたびに対価情報を更新し、更新後の対価情報を対価情報通知部60へ出力する。   The consideration information creation unit 58 creates compensation information based on the incentive information received from the reward information acquisition unit 57 and the transaction price information received from the market information acquisition unit 59 and outputs the consideration information to the consideration information notification unit 60. For example, the consideration information creation unit 58 updates the consideration information every time new transaction price information is received from the market information acquisition unit 59, and outputs the updated consideration information to the consideration information notification unit 60.

対価情報通知部60は、指示情報の送信先の需要家装置301を示す情報を指示通知部56から取得する。そして、対価情報通知部60は、対価情報作成部58から受けた対価情報を、指示通知部56が指示情報を送信した需要家装置301へ送信する。   The consideration information notification unit 60 acquires information indicating the customer device 301 that is the transmission destination of the instruction information from the instruction notification unit 56. Then, the consideration information notification unit 60 transmits the consideration information received from the consideration information creation unit 58 to the consumer device 301 to which the instruction notification unit 56 has transmitted the instruction information.

指示応答取得部53は、指示情報の送信先の各需要家装置301から指示応答情報を受信して参加判断部52へ出力する。   The instruction response acquisition unit 53 receives the instruction response information from each consumer device 301 that is the transmission destination of the instruction information, and outputs the instruction response information to the participation determination unit 52.

参加判断部52は、自己のアグリゲータ6が節電イベントに参加するか否かを判断する。具体的には、参加判断部52は、消費情報取得部54から受けた電力消費情報および指示応答取得部53から受けた各指示応答情報に基づいて、電力消費情報の示す節電イベントに参加するか否か判断する。   The participation determination unit 52 determines whether or not the own aggregator 6 participates in the power saving event. Specifically, whether participation determination unit 52 participates in the power saving event indicated by the power consumption information based on the power consumption information received from consumption information acquisition unit 54 and each instruction response information received from instruction response acquisition unit 53. Judge whether or not.

より具体的には、参加判断部52は、たとえば、各指示応答情報に含まれる削減量情報に基づいて、要請期間において各電力需要施設7で削減される予定の消費電力量の合計値を求め、当該合計値が要請目標を満たす場合に、節電イベントに参加すると判断する。   More specifically, for example, the participation determination unit 52 obtains a total value of power consumption scheduled to be reduced at each power demand facility 7 during the request period based on the reduction amount information included in each instruction response information. When the total value satisfies the requested target, it is determined that the user participates in the power saving event.

また、参加判断部52は、アグリゲータ6が節電イベントへ参加するか否かを示す要請応答情報を作成して要請応答通知部51へ出力する。参加判断部52は、節電イベントに参加する旨の要請応答情報を要請応答通知部51へ出力する場合、当該要請応答情報に削減量合計情報を含めて出力する。   In addition, the participation determination unit 52 creates request response information indicating whether or not the aggregator 6 participates in the power saving event, and outputs the request response information to the request response notification unit 51. When the participation determination unit 52 outputs request response information indicating participation in the power saving event to the request response notification unit 51, the participation determination unit 52 outputs the request response information including the reduction amount total information.

また、参加判断部52は、節電イベントに参加すると判断した場合、アグリゲータ6が節電イベントに参加する旨を示すアグリゲータ参加情報を参加通知部61へ出力する。   In addition, when the participation determination unit 52 determines to participate in the power saving event, the participation determination unit 52 outputs aggregator participation information indicating that the aggregator 6 participates in the power saving event to the participation notification unit 61.

要請応答通知部51は、参加判断部52から受けた要請応答情報を系統側管理装置101へ送信する。   The request response notifying unit 51 transmits the request response information received from the participation determining unit 52 to the system side management apparatus 101.

参加通知部61は、参加判断部52から受けたアグリゲータ参加情報を、節電イベントに参加する電力需要施設7、に設けられた生産管理装置302へ送信する。   The participation notifying unit 61 transmits the aggregator participation information received from the participation determining unit 52 to the production management device 302 provided in the power demand facility 7 participating in the power saving event.

図4は、本発明の第1の実施の形態に係る生産管理装置の構成を示す図である。   FIG. 4 is a diagram showing the configuration of the production management apparatus according to the first embodiment of the present invention.

図4を参照して、生産管理装置302は、指示取得部41と、計画部42と、達成判断部43と、参加情報取得部44と、記憶部45と、制御情報作成部46とを備える。   With reference to FIG. 4, the production management apparatus 302 includes an instruction acquisition unit 41, a planning unit 42, an achievement determination unit 43, a participation information acquisition unit 44, a storage unit 45, and a control information creation unit 46. .

計画部42は、たとえば記憶部45に記憶された各種情報に基づいて、電力需要施設7における生産計画を作成する。   The planning unit 42 creates a production plan in the power demand facility 7 based on various information stored in the storage unit 45, for example.

記憶部45は、たとえば、設備情報、生産要求情報、生産手順情報および既存計画等の生産計画の作成に必要な各種情報を記憶する。設備情報は、たとえば、電力需要施設7に設置されている生産設備303の種類、数および消費電力等を示す情報である。生産要求情報は、たとえば、生産すべき製品の種類、数量および納期を示す情報である。生産手順情報は、たとえば、製品の製造工程および各工程において使用する生産設備303の種類等を示す情報である。   The storage unit 45 stores, for example, various pieces of information necessary for creating a production plan such as facility information, production request information, production procedure information, and existing plan. The facility information is information indicating, for example, the type and number of production facilities 303 installed in the power demand facility 7 and the power consumption. The production request information is information indicating the type, quantity, and delivery date of the product to be produced, for example. The production procedure information is information indicating, for example, the product manufacturing process and the type of production equipment 303 used in each process.

指示取得部41は、電力需要施設7における電力消費に関する指示情報を取得する。具体的には、指示取得部41は、電力消費管理装置201から送信された指示情報を取得して計画部42および達成判断部43へ出力する。   The instruction acquisition unit 41 acquires instruction information regarding power consumption in the power demand facility 7. Specifically, the instruction acquisition unit 41 acquires instruction information transmitted from the power consumption management apparatus 201 and outputs the instruction information to the planning unit 42 and the achievement determination unit 43.

また、指示取得部41は、電力消費管理装置201から送信された電力需要施設7における電力消費の削減の対価を示す対価情報を取得して計画部42へ出力する。   In addition, the instruction acquisition unit 41 acquires consideration information indicating the consideration for reducing power consumption in the power demand facility 7 transmitted from the power consumption management apparatus 201 and outputs the consideration information to the planning unit 42.

計画部42は、指示取得部41から受けた指示情報、および記憶部45に記憶された各種情報に基づいて、生産計画の変更に関する判断を行う。   The planning unit 42 makes a determination regarding the change of the production plan based on the instruction information received from the instruction acquisition unit 41 and various information stored in the storage unit 45.

具体的には、たとえば、計画部42は、既存計画に従って生産を行った場合でも節電目標を達成することができるか否かを判断する。計画部42は、既存計画に従って生産を行うと節電目標を達成することができないと判断した場合、節電目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて代替計画を立案する。   Specifically, for example, the planning unit 42 determines whether or not the power saving target can be achieved even when production is performed according to the existing plan. When it is determined that the power saving target cannot be achieved if production is performed according to the existing plan, the planning unit 42 determines the production process and period to be executed so that the power saving target can be achieved, and the determination result. Develop alternative plans based on

さらに、計画部42は、たとえば、指示情報、対価情報および記憶部45に記憶された各種情報に基づいて、生産計画の変更に関する判断を行う。具体的には、たとえば、計画部42は、立案した代替計画に従って生産を行った場合に、どの程度メリットがあるかを判断する。当該判断は、たとえば、生産計画を既存計画から代替計画へ変更することによる電力需要施設7における電気料金の増減および節電イベントに参加することにより取得する節電の対価等に基づいて行われる。   Furthermore, the planning unit 42 makes a determination regarding the change of the production plan based on, for example, the instruction information, the consideration information, and various information stored in the storage unit 45. Specifically, for example, the planning unit 42 determines how much a merit is obtained when production is performed according to the planned alternative plan. The determination is made based on, for example, the increase or decrease in the electricity rate at the power demand facility 7 by changing the production plan from the existing plan to the alternative plan, and the power saving consideration acquired by participating in the power saving event.

[具体例1]
図5は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のアローダイアグラムの一例を示す図である。図6は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のガントチャートの一例を示す図である。
[Specific Example 1]
FIG. 5 is a diagram showing an example of an existing plan arrow diagram formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. FIG. 6 is a diagram illustrating an example of a Gantt chart of an existing plan formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention.

図5を参照して、矢印a〜gは、それぞれ工程a〜gを表している。数字10,20,30,40,50,60,70は、工程と工程との区切りを表している。長方形の枠内の数字は、各工程に要する時間を表し、当該枠内の大文字のアルファベットは、各工程において使用する生産設備303を表している。たとえば、「A」は生産設備303Aを表し、「B」は生産設備303Bを表している。   Referring to FIG. 5, arrows a to g represent steps a to g, respectively. Numbers 10, 20, 30, 40, 50, 60, and 70 represent separation between processes. The numbers in the rectangular frame represent the time required for each process, and the capital letters in the frame represent the production equipment 303 used in each process. For example, “A” represents the production facility 303A, and “B” represents the production facility 303B.

図5は、たとえば、工程aの成果物を、工程b,c,dおよび工程e,f,gにおいて互いに異なる物に加工し、工程dの成果物と工程gの成果物とを用いて製品を完成させることを示している。   FIG. 5 shows, for example, processing the product of step a into products different from each other in steps b, c, d and steps e, f, g, and using the product of step d and the product of step g. To complete.

太い矢印で表された工程a,e,f,gのルートは、クリティカルパスを表している。また、細い矢印で表された工程b,c,dのルートは、クリティカルパス以外のルートを表している。つまり、工程b,c,dのルートは、クリティカルパスに含まれる工程e,f,gのルートに比べて時間的な余裕がある。   The routes of processes a, e, f, and g represented by thick arrows represent critical paths. In addition, the routes of steps b, c, and d represented by thin arrows represent routes other than the critical path. That is, the routes of the processes b, c, and d have a time margin as compared with the routes of the processes e, f, and g included in the critical path.

具体的には、工程b,c,dに掛かる時間が3時間+3時間+3時間=9時間であるのに対して、工程e,f,gにかかる時間は5時間+8時間+9時間=19時間である。   Specifically, the time taken for the steps b, c, d is 3 hours + 3 hours + 3 hours = 9 hours, whereas the time taken for the steps e, f, g is 5 hours + 8 hours + 9 hours = 19 hours. It is.

このことから、工程e,f,gが終了するまでの時刻に工程b,c,dを終了させることができれば、たとえば、工程b,c,dを実施する期間を遅らせたとしても、工程全体には遅延が生じない。   From this, if the steps b, c, d can be completed at the time until the steps e, f, g are completed, for example, even if the period for performing the steps b, c, d is delayed, the entire process There is no delay.

したがって、たとえば、工程b,c,dを指示情報の示す節電期間以外の期間に実施することにより、節電期間における電力需要施設7の消費電力を削減することができる。   Therefore, for example, by performing steps b, c, d during a period other than the power saving period indicated by the instruction information, the power consumption of the power demand facility 7 during the power saving period can be reduced.

図6を参照して、テーブルB1は、既存計画において、図5に示す各工程が実施される期間、使用する生産設備303、および生産設備303の消費電力を示す。   Referring to FIG. 6, table B <b> 1 shows the power consumption of production facility 303 to be used and production facility 303 during the period in which each step shown in FIG. 5 is performed in the existing plan.

生産設備303Aの使用する電力は10kWであり、生産設備303Bの使用する電力は20kWであり、生産設備303Cの使用する電力は30kWであり、生産設備303Dの使用する電力は10kWであり、生産設備303Eの使用する電力は40kWであり、生産設備303Fの使用する電力は50kWであり、生産設備303Gの使用する電力は10kWである。   The power used by the production facility 303A is 10 kW, the power used by the production facility 303B is 20 kW, the power used by the production facility 303C is 30 kW, and the power used by the production facility 303D is 10 kW. The electric power used by 303E is 40 kW, the electric power used by the production facility 303F is 50 kW, and the electric power used by the production facility 303G is 10 kW.

既存計画では、クリティカルパスにおける工程として、0時から5時までの間に生産設備303Aを用いて工程aを実施し、5時から10時までの間に生産設備303Eを用いて工程eを実施し、10時から18時までの間に生産設備303Fを用いて工程fを実施し、18時から24時までの間に生産設備301Gを用いて工程gを実施する。   In the existing plan, as a process in the critical path, the process a is performed using the production facility 303A from 0:00 to 5:00, and the process e is performed using the production facility 303E from 5:00 to 10:00. Then, the process f is performed using the production facility 303F from 10:00 to 18:00, and the process g is performed using the production facility 301G from 18:00 to 24:00.

また、既存計画では、クリティカルパス以外のルートにおける工程として、5時から8時までの間に生産設備303Bを用いて工程bを実施し、8時から11時までの間に生産設備303Cを用いて工程cを実施し、11時から14時までの間に生産設備303Dを用いて工程dを実施する。   In the existing plan, as a process in a route other than the critical path, the process b is performed using the production facility 303B from 5 o'clock to 8 o'clock, and the production facility 303C is used from 8 o'clock to 11 o'clock. Step c is carried out, and step d is carried out using the production equipment 303D between 11:00 and 14:00.

図7は、本発明の第1の実施の形態に係る生産管理装置における計画部が立案した代替計画のガントチャートの一例を示す図である。   FIG. 7 is a diagram illustrating an example of a Gantt chart of an alternative plan prepared by the planning unit in the production management apparatus according to the first embodiment of the present invention.

図7を参照して、テーブルB2は、代替計画において、図5に示す各工程が実施される期間、使用する生産設備303、および生産設備303の消費電力を示す。8時から13時までの間は、節電期間である。   Referring to FIG. 7, table B <b> 2 shows the period during which each step shown in FIG. 5 is performed in the alternative plan, the production facility 303 to be used, and the power consumption of production facility 303. The period from 8:00 to 13:00 is a power saving period.

計画部42は、指示情報および記憶部45に記憶された各種情報に基づいて、図7に示す代替計画を立案する。代替計画では、クリティカルパス以外のルートにおける工程である工程b,c,dは、節電期間である8時から13時までの間実施されない。   The planning unit 42 formulates an alternative plan shown in FIG. 7 based on the instruction information and various types of information stored in the storage unit 45. In the alternative plan, processes b, c, and d, which are processes on routes other than the critical path, are not performed from 8 o'clock to 13 o'clock, which is a power saving period.

具体的には、代替計画では、15時から18時までの間に生産設備303Bを用いて工程bを実施し、18時から21時までの間に生産設備303Cを用いて工程cを実施し、21時から24時までの間に生産設備303Dを用いて工程dを実施する。   Specifically, in the alternative plan, the process b is performed using the production facility 303B from 15:00 to 18:00, and the process c is performed using the production facility 303C from 18:00 to 21:00. The process d is performed using the production equipment 303D between 21:00 and 24:00.

なお、計画部42は、工程b,c,dを連続的に行わない代替計画を立案してもよい。具体的には、たとえば、計画部42は、工程bを5時から7時までの間に実施し、工程c13時から16時までの間に実施し、工程dを19時から22時までの間に実施する代替計画を立案してもよい。   Note that the planning unit 42 may make an alternative plan that does not continuously perform the steps b, c, and d. Specifically, for example, the planning unit 42 performs the process b from 5 o'clock to 7 o'clock, the process c from 13 o'clock to 16 o'clock, and the process d from 19 o'clock to 22 o'clock An alternative plan to be implemented in between may be drawn up.

計画部42は、代替計画を立案すると、次に、生産計画を既存計画から代替計画へ変更した場合に、どの程度のメリットがあるかを判断する。具体的には、たとえば、計画部42は、どの程度の金銭的なメリットがあるかを判断する。   When planning the alternative plan, the planning unit 42 determines how much merit is obtained when the production plan is changed from the existing plan to the alternative plan. Specifically, for example, the planning unit 42 determines how much financial merit there is.

図8は、本発明の実施の形態に係る生産管理装置における計画部が代替計画のメリットの判断に用いる数値の算出の一例を示す図である。   FIG. 8 is a diagram illustrating an example of calculation of numerical values used by the planning unit in the production management apparatus according to the embodiment of the present invention to determine the merit of the alternative plan.

図8を参照して、テーブルB3は、既存計画すなわち図6に示すテーブルB1に従って各工程を実施した場合における1時間ごとの消費電力である消費電力P1、および代替計画すなわち図7に示すテーブルB2に従って各工程を実施した場合における1時間ごとの消費電力である消費電力P2を示す。   Referring to FIG. 8, table B3 includes power consumption P1 that is power consumption per hour when each process is performed according to the existing plan, ie, table B1 shown in FIG. 6, and alternative plan, ie, table B2 shown in FIG. The power consumption P2 which is the power consumption for every hour when each process is implemented is shown.

また、テーブルB3は、1時間ごとの電気料金の単価である電気単価U、既存計画に従って各工程を実施した場合に掛かる1時間ごとの電気料金である電気料金M1、および代替計画に従って各工程を実施した場合に掛かる1時間ごとの電気料金である電気料金M2を示す。   Further, the table B3 shows the unit price of electricity per hour U which is the unit price of electricity charges, the electricity rate M1 which is the hourly electricity charge when each process is performed according to the existing plan, and the process according to the alternative plan. An electricity bill M2 which is an hourly electricity bill when implemented is shown.

電気料金M1は、消費電力P1と電気単価Uとの積により求められる。電気料金M2は、消費電力P2と電気単価Uとの積により求められる。   The electricity bill M1 is obtained by the product of the power consumption P1 and the electricity unit price U. The electricity bill M2 is obtained by the product of the power consumption P2 and the electricity unit price U.

また、テーブルB3は、1時間ごとの、生産計画を既存計画から代替計画へ変更した場合に削減される消費電力量である削減電力量D、対価情報において示される節電の対価の単価である対価単価Q、および代替計画に従って生産を行った場合に取得することができる節電の対価である節電対価Tを示す。   Further, the table B3 shows a reduction power amount D that is a power consumption amount that is reduced when the production plan is changed from the existing plan to the alternative plan for every hour, and a consideration that is a unit price of the power saving consideration indicated in the consideration information. The unit price Q and the power saving consideration T, which is the power saving consideration that can be obtained when production is performed according to the alternative plan, are shown.

8時から12時までの間は節電期間である。ここでは、節電期間において、節電の対価が発生し、節電期間以外の期間において、節電の対価が発生しないとする。すなわち、節電期間においては、対価単価Qが設定される。削減電力量Dは、消費電力P1と消費電力P2との差により求められる。節電対価Tは、削減電力量Dと対価単価Qとの積により求められる。   From 8 o'clock to 12 o'clock is a power saving period. Here, it is assumed that power saving consideration occurs during the power saving period, and power saving consideration does not occur during a period other than the power saving period. That is, the consideration unit price Q is set in the power saving period. The reduced power amount D is obtained from the difference between the power consumption P1 and the power consumption P2. The power saving consideration T is obtained by the product of the reduced electric energy D and the consideration unit price Q.

また、テーブルB3は、0時から24時までの、消費電力P1の合計値、消費電力P2の合計値、電気料金M1の合計値、電気料金M2の合計値および節電対価Tの合計値を示す。   The table B3 indicates the total value of the power consumption P1, the total value of the power consumption P2, the total value of the electricity rate M1, the total value of the electricity rate M2, and the total value of the power saving consideration T from 0:00 to 24:00. .

計画部42は、電気料金M1の合計値、電気料金M2の合計値および節電対価Tの合計値に基づいて、代替計画のメリットを判断する。   The planning unit 42 determines the merit of the alternative plan based on the total value of the electricity rate M1, the total value of the electricity rate M2, and the total value of the power saving consideration T.

たとえば、計画部42は、電気料金M2の合計値と節電対価Tの合計値との差から、代替計画に従って各工程を実施した場合に掛かる実質的な電気料金Ma2を求める。具体的には、電気料金Ma2=10620円−4300円=6320円である。   For example, the planning unit 42 obtains a substantial electricity charge Ma2 when each process is performed according to the alternative plan from the difference between the total value of the electricity charge M2 and the total value of the power saving consideration T. Specifically, the electricity bill Ma2 = 10620 yen-4300 yen = 6320 yen.

そして、計画部42は、電気料金M1の合計値と電気料金Ma2との差から生産計画を既存計画から代替計画に変更した場合に削減できるコストである削減コストCtを算出する。具体的には、削減コストCt=10830円−6320円=4510円である。   Then, the planning unit 42 calculates a reduction cost Ct that is a cost that can be reduced when the production plan is changed from the existing plan to the alternative plan from the difference between the total value of the electricity rate M1 and the electricity rate Ma2. Specifically, the reduction cost Ct = 10830 yen-6320 yen = 4510 yen.

[具体例2]
図9は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のアローダイアグラムの一例を示す図である。図10は、本発明の第1の実施の形態に係る生産管理装置における計画部が策定した既存計画のガントチャートの一例を示す図である。
[Specific Example 2]
FIG. 9 is a diagram showing an example of an existing plan arrow diagram formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention. FIG. 10 is a diagram showing an example of a Gantt chart of an existing plan formulated by the planning unit in the production management apparatus according to the first embodiment of the present invention.

図9を参照して、矢印m〜pは、それぞれ工程m〜pを表している。数字10,20,30,40,50は、工程と工程との区切りを表している。長方形の枠内の数字は、各工程に要する時間を表し、当該枠内の大文字のアルファベットは、各工程において使用する生産設備303を表している。たとえば、「A」は生産設備303Aを表し、「B」は生産設備303Bを表している。   Referring to FIG. 9, arrows m to p represent steps m to p, respectively. Numbers 10, 20, 30, 40, and 50 represent a separation between processes. The numbers in the rectangular frame represent the time required for each process, and the capital letters in the frame represent the production equipment 303 used in each process. For example, “A” represents the production facility 303A, and “B” represents the production facility 303B.

ここで、図9に示す一連の工程は、クリティカルパスを表している。したがって、全部の工程において終了する時刻を遅らせることができない。   Here, a series of steps shown in FIG. 9 represents a critical path. Therefore, it is not possible to delay the end time in all processes.

図10を参照して、テーブルB11は、既存計画において、図9に示す各工程が実施される期間、使用する生産設備303、および生産設備303の消費電力を示す。   With reference to FIG. 10, table B11 shows the power consumption of production equipment 303 to be used and the production equipment 303 during the period when each step shown in FIG.

生産設備303Aの使用する電力は10kWであり、生産設備303Bの使用する電力は20kWであり、生産設備303Cの使用する電力は30kWであり、生産設備303Dの使用する電力は10kWであり、生産設備303Eの使用する電力は50kWであり、生産設備303Fの使用する電力は60kWである。   The power used by the production facility 303A is 10 kW, the power used by the production facility 303B is 20 kW, the power used by the production facility 303C is 30 kW, and the power used by the production facility 303D is 10 kW. The electric power used by 303E is 50 kW, and the electric power used by the production facility 303F is 60 kW.

既存計画では、クリティカルパスにおける工程として、0時から5時までの間に生産設備303Aを用いて工程mを実施し、5時から10時までの間に生産設備303Bを用いて工程nを実施し、10時から18時までの間に生産設備303Cを用いて工程oを実施し、18時から24時までの間に生産設備303Dを用いて工程pを実施する。   In the existing plan, as the process in the critical path, the process m is performed using the production facility 303A from 0:00 to 5:00, and the process n is performed using the production facility 303B from 5:00 to 10:00. Then, the process o is performed using the production facility 303C from 10:00 to 18:00, and the process p is performed using the production facility 303D from 18:00 to 24:00.

図11は、本発明の第1の実施の形態に係る生産管理装置における計画部が立案した代替計画のガントチャートの一例を示す図である。   FIG. 11 is a diagram illustrating an example of a Gantt chart of an alternative plan prepared by the planning unit in the production management apparatus according to the first embodiment of the present invention.

図11を参照して、テーブルB12は、代替計画において、図9に示す各工程が実施される期間、使用する生産設備303、および生産設備303の消費電力を示す。8時から12時までの間は、節電期間である。   Referring to FIG. 11, table B12 shows the period during which each step shown in FIG. 9 is carried out in the alternative plan, the production facility 303 to be used, and the power consumption of production facility 303. From 8 o'clock to 12 o'clock is a power saving period.

計画部42は、指示情報および記憶部45に記憶された各種情報に基づいて、図11に示す代替計画を立案する。代替計画では、節電期間である8時から13時までの間、工程を実施しない。   The planning unit 42 formulates an alternative plan shown in FIG. 11 based on the instruction information and various information stored in the storage unit 45. In the alternative plan, the process is not carried out during the power saving period from 8:00 to 13:00.

具体的には、代替計画では、0時から5時までの間に生産設備303Aを用いて工程mを実施し、5時から8時までの間に生産設備303Bを用いて工程n1を実施し、6時から8時までの間に生産設備303Eを用いて工程n2を実施する。   Specifically, in the alternative plan, the process m is performed using the production facility 303A from 0:00 to 5:00, and the process n1 is performed using the production facility 303B from 5:00 to 8:00. The process n2 is performed using the production equipment 303E between 6:00 and 8:00.

工程n1および工程n2は、図10に示す既存計画における工程nに対応する。具体的には、工程n1は、既存計画の工程nにおける5時から8時までの工程に対応する。また、工程n2は、既存計画の工程nにおける8時から10時までの工程に対応する。   Step n1 and step n2 correspond to step n in the existing plan shown in FIG. Specifically, the process n1 corresponds to the process from 5:00 to 8:00 in the existing process n. The process n2 corresponds to the process from 8:00 to 10:00 in the process n of the existing plan.

また、代替計画では、13時から18時までの間に生産設備303Cを用いて工程o1を実施し、13時から16時までの間に生産設備303Fを用いて工程o2を実施し、18時から24時までの間に生産設備303Dを用いて工程pを実施する。   In the alternative plan, the process o1 is performed using the production facility 303C from 13:00 to 18:00, the process o2 is performed using the production facility 303F from 13:00 to 16:00, and 18:00 To 24 o'clock, the process p is performed using the production facility 303D.

工程o1および工程o2は、図10に示す既存計画における工程oに対応する。具体的には、工程o1は、既存計画の工程oにおける10時から15時までの工程に対応し、工程o2は、既存計画の工程oにおける15時から18時までの工程に対応する。   Step o1 and step o2 correspond to step o in the existing plan shown in FIG. Specifically, the process o1 corresponds to the process from 10:00 to 15:00 in the process o of the existing plan, and the process o2 corresponds to the process from 15:00 to 18:00 in the process o of the existing plan.

このように、代替計画では、節電期間である8時から13時の間において、生産設備303を使用しないことにより、電力需要施設7における消費電力を削減する。   In this way, in the alternative plan, the power consumption in the power demand facility 7 is reduced by not using the production facility 303 during the power saving period from 8:00 to 13:00.

計画部42は、代替計画を立案すると、次に、生産計画を既存計画から代替計画へ変更した場合に、どの程度のメリットがあるかを判断する。具体的には、たとえば計画部42は、どの程度の金銭的なメリットがあるかを判断する。   When planning the alternative plan, the planning unit 42 determines how much merit is obtained when the production plan is changed from the existing plan to the alternative plan. Specifically, for example, the planning unit 42 determines how much financial merit there is.

図12は、本発明の実施の形態に係る生産管理装置における計画部が代替計画のメリットの判断に用いる数値の算出の一例を示す図である。   FIG. 12 is a diagram illustrating an example of calculation of numerical values used by the planning unit in the production management apparatus according to the embodiment of the present invention to determine the merit of the alternative plan.

図12を参照して、テーブルB13は、既存計画すなわち図10に示すテーブルB11に従って各工程を実施した場合における1時間ごとの消費電力である消費電力P11、および代替計画すなわち図11に示すテーブルB2に従って各工程を実施した場合における1時間ごとの消費電力である消費電力P12を示す。   Referring to FIG. 12, table B13 includes power consumption P11 that is power consumption per hour when each process is performed according to the existing plan, that is, table B11 shown in FIG. 10, and alternative plan, that is, table B2 shown in FIG. The power consumption P12 which is the power consumption for every hour when each process is implemented is shown.

また、テーブルB13は、1時間ごとの電気料金の単価である電気単価U1、既存計画に従って各工程を実施した場合に掛かる1時間ごとの電気料金である電気料金M11、および代替計画に従って各工程を実施した場合に掛かる1時間ごとの電気料金である電気料金M12を示す。   Further, the table B13 shows the unit price of electricity per hour U1 that is the unit price of electricity charges per hour, the electricity rate M11 that is the hourly electricity charge when each process is performed according to the existing plan, and the process according to the alternative plan. An electricity charge M12, which is an hourly electricity charge when implemented, is shown.

電気料金M11は、消費電力P11と電気単価U1との積により求められる。電気料金M12は、消費電力P12と電気単価U1との積により求められる。   The electricity bill M11 is obtained by the product of the power consumption P11 and the electricity unit price U1. The electricity bill M12 is obtained by the product of the power consumption P12 and the electricity unit price U1.

また、テーブルB13は、1時間ごとの、生産計画を既存計画から代替計画へ変更した場合に削減される消費電力量である削減電力量D1、対価情報において示される節電の対価の単価である対価単価Q1、および代替計画に従って生産を行った場合に取得することができる節電の対価である節電対価T1を示す。   Further, the table B13 includes a reduction power amount D1 that is a power consumption amount that is reduced when the production plan is changed from the existing plan to the alternative plan, and a consideration that is a unit price of the power saving consideration indicated in the consideration information. The unit price Q1 and the power saving consideration T1, which is the power saving consideration that can be acquired when production is performed according to the alternative plan, are shown.

8時から13時までの間は節電期間である。ここでは、節電期間において、節電の対価が発生し、節電期間以外の期間において、節電の対価が発生しないとする。すなわち、節電期間においては、対価単価Q1が設定される。削減電力量D1は、消費電力P11と消費電力P12との差により求められる。節電対価T1は、削減電力量D1と対価単価Q1との積により求められる。   The period from 8:00 to 13:00 is a power saving period. Here, it is assumed that power saving consideration occurs during the power saving period, and power saving consideration does not occur during a period other than the power saving period. That is, the consideration unit price Q1 is set in the power saving period. The reduced power amount D1 is obtained from the difference between the power consumption P11 and the power consumption P12. The power saving consideration T1 is obtained by the product of the reduced power amount D1 and the consideration unit price Q1.

また、テーブルB13は、0時から24時までの消費電力P11の合計値、消費電力P12の合計値、電気料金M11の合計値、電気料金M12の合計値および節電対価T1の合計値を示す。   Table B13 shows the total value of power consumption P11 from 0 o'clock to 24:00, the total value of power consumption P12, the total value of electricity bill M11, the total value of electricity bill M12, and the total value of power saving consideration T1.

計画部42は、電気料金M11の合計値、電気料金M12の合計値および節電対価T1の合計値等に基づいて、代替計画のメリットを判断する。   The planning unit 42 determines the merit of the alternative plan based on the total value of the electricity rate M11, the total value of the electricity rate M12, the total value of the power saving consideration T1, and the like.

ここで、代替計画に従って生産を行うことにより生じる経費、たとえば、通常稼働させていない生産設備303Eおよび生産設備303Fを稼働させることにより生じる経費R1を2000円とする。   Here, an expense caused by performing production according to the alternative plan, for example, an expense R1 caused by operating the production facility 303E and the production facility 303F that are not normally operated is set to 2000 yen.

計画部42は、たとえば、電気料金M12の合計値と節電対価T1の合計値との差に経費R1を加えることにより、代替計画に従って各工程を実施した場合に掛かる実質的な電気料金Ma12を求める。具体的には、電気料金Ma12=7430円−5000円+2000円=4430円である。   For example, the planning unit 42 adds the cost R1 to the difference between the total value of the electricity charge M12 and the total value of the power saving consideration T1, thereby obtaining a substantial electricity charge Ma12 when each process is performed according to the alternative plan. . Specifically, the electricity bill Ma12 = 7430 yen-5000 yen + 2000 yen = 4430 yen.

そして、計画部42は、電気料金M11の合計値と電気料金Ma12との差から生産計画を既存計画から代替計画に変更した場合に削減できるコストである削減コストCtを算出する。具体的には、削減コストCt=5420円−4430円=990円である。   Then, the planning unit 42 calculates a reduction cost Ct that is a cost that can be reduced when the production plan is changed from the existing plan to the alternative plan from the difference between the total value of the electricity rate M11 and the electricity rate Ma12. Specifically, the reduction cost Ct = 5420 yen-4430 yen = 990 yen.

計画部42は、たとえば削減コストCtがプラスの場合に、既存計画に比べて代替計画の方がメリットがあると判断する。   For example, when the reduction cost Ct is positive, the planning unit 42 determines that the alternative plan is more advantageous than the existing plan.

なお、計画部42は、生産計画の変更に関する判断において、生産の遅れを許容した代替計画を作成可能である。たとえば、計画部42は、図10のテーブルB11に示す工程pを24時以降の時刻に終了するような代替計画を立案することができる。   Note that the planning unit 42 can create an alternative plan that allows a delay in production in the determination regarding the change of the production plan. For example, the planning unit 42 can make an alternative plan that ends the process p shown in the table B11 of FIG. 10 at a time after 24:00.

この場合、計画部42は、工程全体の終了が既存計画に比べて遅延することにより生じるコストも考慮して削減コストCtを算出する。   In this case, the planning unit 42 calculates the reduction cost Ct in consideration of the cost caused by the end of the entire process being delayed compared to the existing plan.

再び図4を参照して、計画部42は、生産計画の変更に関する上記の判断の結果を示す情報を達成判断部43へ出力する。また、計画部42は、代替計画の内容を示す代替計画情報を制御情報作成部46へ出力する。   Referring to FIG. 4 again, the planning unit 42 outputs information indicating the result of the above determination regarding the change of the production plan to the achievement determining unit 43. The planning unit 42 also outputs alternative plan information indicating the contents of the alternative plan to the control information creating unit 46.

達成判断部43は、計画部42から生産計画の変更に関する判断の結果を示す情報を受けて、当該情報に基づいて指示情報の示す目標の達成可否を判断する。たとえば、達成判断部43は、削減コストCtに基づいて、生産計画を既存計画から代替計画に変更して節電目標を達成するか否かを判断する。   The achievement determination unit 43 receives information indicating the result of the determination regarding the change of the production plan from the planning unit 42, and determines whether or not the target indicated by the instruction information is achieved based on the information. For example, the achievement determination unit 43 determines whether or not to achieve the power saving target by changing the production plan from the existing plan to the alternative plan based on the reduction cost Ct.

具体的には、たとえば、達成判断部43は、削減コストCtが所定の閾値を下回った場合に、生産計画を変更してまで節電目標を達成する必要はないと判断する。   Specifically, for example, when the reduction cost Ct falls below a predetermined threshold, the achievement determination unit 43 determines that it is not necessary to achieve the power saving target until the production plan is changed.

達成判断部43は、節電目標を達成することはできないと判断した場合、指示情報の示す節電イベントに参加しない旨の指示応答情報を電力消費管理装置201へ送信する。   If the achievement determination unit 43 determines that the power saving target cannot be achieved, the achievement determination unit 43 transmits to the power consumption management apparatus 201 instruction response information indicating that it does not participate in the power saving event indicated by the instruction information.

一方、達成判断部43は、たとえば、削減コストCtが当該所定の閾値以上であった場合、生産計画を変更して節電目標を達成できると判断する。   On the other hand, for example, when the reduction cost Ct is equal to or greater than the predetermined threshold, the achievement determination unit 43 determines that the power saving target can be achieved by changing the production plan.

達成判断部43は、節電目標を達成できると判断した場合、指示情報の示す節電イベントに参加する旨の指示応答情報を電力消費管理装置201へ送信する。また、達成判断部43は、節電イベントに参加する旨の指示応答情報を送信する際、節電期間において電力需要施設7で削減される予定の電力量を示す削減量情報を当該指示応答情報に含めて送信する。   If the achievement determining unit 43 determines that the power saving target can be achieved, the achievement determining unit 43 transmits instruction response information indicating participation in the power saving event indicated by the instruction information to the power consumption management apparatus 201. In addition, when transmitting the instruction response information to participate in the power saving event, the achievement determining unit 43 includes the reduction amount information indicating the amount of power scheduled to be reduced at the power demand facility 7 in the power saving period in the instruction response information. To send.

参加情報取得部44は、電力消費管理装置201からアグリゲータ参加情報を受信すると、当該アグリゲータ参加情報を制御情報作成部46へ出力する。   When the participation information acquisition unit 44 receives the aggregator participation information from the power consumption management apparatus 201, the participation information acquisition unit 44 outputs the aggregator participation information to the control information creation unit 46.

制御情報作成部46は、参加情報取得部44からアグリゲータ参加情報を受けると、計画部42から受けた代替計画情報の内容に従って各生産設備303を制御する。   Upon receiving the aggregator participation information from the participation information acquisition unit 44, the control information creation unit 46 controls each production facility 303 according to the contents of the alternative plan information received from the planning unit 42.

具体的には、制御情報作成部46は、代替計画情報に基づいて、各生産設備303を制御するための代替制御情報を作成し、需要家装置301へ送信する。需要家装置301は、制御情報作成部46から受信した代替制御情報に基づいて各生産設備303を制御する。   Specifically, the control information creation unit 46 creates substitute control information for controlling each production facility 303 based on the substitute plan information, and transmits the substitute control information to the consumer device 301. The consumer device 301 controls each production facility 303 based on the alternative control information received from the control information creation unit 46.

[動作]
次に、本発明の第1の実施の形態に係る電力消費管理システムが消費電力量の削減処理を行う際の動作について説明する。
[Operation]
Next, an operation when the power consumption management system according to the first exemplary embodiment of the present invention performs a power consumption reduction process will be described.

電力消費管理システムにおける各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のフローチャートおよびシーケンスの各ステップの一部または全部を含むプログラムを図示しないメモリから読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。   Each device in the power consumption management system includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including a part or all of each step of the following flowcharts and sequences from a memory (not shown). Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図13は、本発明の第1の実施の形態に係る電力消費管理システムにおける消費電力量の削減処理のシーケンスの一例を示す図である。   FIG. 13 is a diagram illustrating an example of a sequence of power consumption reduction processing in the power consumption management system according to the first embodiment of the present invention.

図13を参照して、まず、系統側管理装置101は、たとえば翌日の電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行なうべきであると判断する(ステップS10)。   Referring to FIG. 13, firstly, system side management apparatus 101 predicts, for example, power demand on the next day, and determines that power consumption should be suppressed when there is a high possibility that power supply and demand will be tight (step) S10).

より詳細には、系統側管理装置101は、たとえば、既知の需要予測技術を用いて、具体的にはニューラルネットワークまたは自己回帰分析等の技術を用いて、全体的な電力需要を予測する。あるいは、系統側管理装置101は、たとえば、過去X日分の消費電力量のデータから、特異日を除いたY日分の消費電力量の平均値を算出する。   More specifically, the system-side management apparatus 101 predicts the overall power demand using, for example, a known demand prediction technique, specifically using a technique such as a neural network or autoregressive analysis. Or the system side management apparatus 101 calculates the average value of the power consumption for Y days except the special day from the data of the power consumption for the past X days, for example.

次に、系統側管理装置101は、電力消費情報およびインセンティブ情報を電力消費管理装置201へ送信する(ステップS11)。   Next, the system side management apparatus 101 transmits power consumption information and incentive information to the power consumption management apparatus 201 (step S11).

次に、取引市場装置401は、電力消費管理装置201へ取引価格情報を送信する(ステップS12)。   Next, the transaction market apparatus 401 transmits transaction price information to the power consumption management apparatus 201 (step S12).

次に、電力消費管理装置201は、系統側管理装置101から受信した電力消費情報に基づいて、電力需要施設7の電力消費に関する指示情報を作成する。また、電力消費管理装置201は、系統側管理装置101から受信したインセンティブ情報および取引市場装置401から受信した取引価格情報に基づいて、電力需要施設7における電力消費の削減の対価を示す対価情報を作成する。そして、電力消費管理装置201は、作成した指示情報および対価情報を生産管理装置302へ送信する。   Next, the power consumption management device 201 creates instruction information related to the power consumption of the power demand facility 7 based on the power consumption information received from the system side management device 101. In addition, the power consumption management device 201 displays compensation information indicating the compensation for reducing power consumption in the power demand facility 7 based on the incentive information received from the system side management device 101 and the transaction price information received from the transaction market device 401. create. Then, the power consumption management apparatus 201 transmits the created instruction information and consideration information to the production management apparatus 302.

ここでは、電力消費管理装置201は、電力需要施設7Aにおける生産管理装置302である生産管理装置302A、および電力需要施設7Bにおける生産管理装置302である生産管理装置302Bへ指示情報および対価情報を送信する(ステップS13およびステップS14)。   Here, the power consumption management device 201 transmits instruction information and consideration information to the production management device 302A that is the production management device 302 in the power demand facility 7A and the production management device 302B that is the production management device 302 in the power demand facility 7B. (Step S13 and Step S14).

なお、電力消費管理装置201が生産管理装置302Aへ送信する指示情報の内容と生産管理装置302Bへ送信する指示情報の内容とは同じであってもよいし、異なってもよい。また、電力消費管理装置201が生産管理装置302Aへ送信する対価情報の内容と生産管理装置302Bへ送信する対価情報の内容とは同じであってもよいし、異なってもよい。   Note that the content of the instruction information transmitted from the power consumption management apparatus 201 to the production management apparatus 302A and the content of the instruction information transmitted to the production management apparatus 302B may be the same or different. Further, the content of the consideration information transmitted from the power consumption management apparatus 201 to the production management apparatus 302A and the content of the consideration information transmitted to the production management apparatus 302B may be the same or different.

また、電力消費管理装置201は、取引市場装置401から定期的または不定期に最新の取引価格情報を取得し、取得した取引価格情報に基づいて対価情報を更新し、更新するたびに更新後の対価情報、すなわち最新の対価情報を生産管理装置302Aおよび生産管理装置302Bへ送信してもよい。   Moreover, the power consumption management apparatus 201 acquires the latest transaction price information from the transaction market apparatus 401 regularly or irregularly, and updates the consideration information based on the acquired transaction price information. Consideration information, that is, latest compensation information may be transmitted to the production management apparatus 302A and the production management apparatus 302B.

次に、生産管理装置302Aは、電力消費管理装置201から指示情報および対価情報を受信して、受信した指示情報および対価情報に基づいて生産計画の変更に関する判断を行う(ステップS15)。   Next, the production management apparatus 302A receives the instruction information and the consideration information from the power consumption management apparatus 201, and makes a determination on the change of the production plan based on the received instruction information and the consideration information (Step S15).

たとえば、生産管理装置302Aは、電力需要施設7Aが既存計画に従って生産を行った場合でも指示情報の示す節電目標を達成することができるか否かを判断する。   For example, the production management apparatus 302A determines whether or not the power saving target indicated by the instruction information can be achieved even when the power demand facility 7A performs production according to the existing plan.

生産管理装置302Aは、既存計画に従って生産を行うと節電目標を達成することができないと判断した場合、たとえば、自己の記憶部45に記憶された各種情報に基づいて、代替計画を立案する。   If the production management apparatus 302A determines that the power saving target cannot be achieved if production is performed in accordance with the existing plan, for example, the production management device 302A creates an alternative plan based on various information stored in its own storage unit 45.

生産管理装置302Aは、立案した代替計画に従って生産を行うことにより節電目標を達成可能か否かを判断する。なお、生産管理装置302Aは、代替計画が節電目標を達成可能な生産計画となるように、代替計画に含める工程の種類および期間等を決定してもよい。   The production management apparatus 302A determines whether or not the power saving target can be achieved by performing production according to the planned alternative plan. Note that the production management apparatus 302A may determine the types and periods of processes included in the alternative plan so that the alternative plan becomes a production plan that can achieve the power saving target.

また、生産管理装置302Aは、立案した代替計画に従って生産を行った場合に、どの程度メリットがあるかを判断する。具体的には、たとえば、生産管理装置302Aは、立案した代替計画に従って生産を行った場合における削減コストCtに基づいて金銭的なメリットを判断する。   In addition, the production management apparatus 302A determines how much merit is obtained when production is performed according to the planned alternative plan. Specifically, for example, the production management apparatus 302A determines a monetary merit based on the reduction cost Ct when production is performed according to the planned alternative plan.

次に、生産管理装置302Aは、上記の各判断の結果に基づいて、指示情報の示す目標の達成可否、たとえば生産計画を既存計画から代替計画に変更して節電目標を達成するか否かを判断する(ステップS16)。   Next, based on the results of each of the above determinations, the production management apparatus 302A determines whether or not the target indicated by the instruction information can be achieved, for example, whether or not the production plan is changed from the existing plan to the alternative plan to achieve the power saving target. Judgment is made (step S16).

ここでは、生産管理装置302Aは、生産計画を既存計画から代替計画に変更して節電目標を達成できると判断し、指示情報の示す節電イベントに参加する旨の指示応答情報を電力消費管理装置201へ送信する(ステップS17)。指示応答情報は、たとえば、ステップS15における生産計画の変更に関する判断結果に基づく情報である。   Here, the production management apparatus 302A determines that the power saving target can be achieved by changing the production plan from the existing plan to the alternative plan, and gives the instruction response information indicating that it participates in the power saving event indicated by the instruction information. (Step S17). The instruction response information is, for example, information based on the determination result regarding the production plan change in step S15.

一方、生産管理装置302Bは、電力消費管理装置201から指示情報および対価情報を受信して、受信した指示情報および対価情報に基づいて、生産管理装置302Aと同様に生産計画の変更に関する判断を行う(ステップS18)。   On the other hand, the production management apparatus 302B receives the instruction information and the consideration information from the power consumption management apparatus 201, and makes a determination regarding the change of the production plan based on the received instruction information and the consideration information, similarly to the production management apparatus 302A. (Step S18).

次に、生産管理装置302Bは、生産管理装置302Aと同様に、指示情報の示す目標の達成可否、たとえば生産計画を既存計画から代替計画に変更して節電目標を達成するか否かを判断する(ステップS19)。   Next, similarly to the production management apparatus 302A, the production management apparatus 302B determines whether or not the target indicated by the instruction information can be achieved, for example, whether or not the production plan is changed from the existing plan to the alternative plan to achieve the power saving target. (Step S19).

ここでは、生産管理装置302Bは、生産計画を既存計画から代替計画に変更してまで節電目標を達成する必要はないと判断し、指示情報の示す節電イベントに参加しない旨の指示応答情報を電力消費管理装置201へ送信する(ステップS20)。   Here, the production management apparatus 302B determines that it is not necessary to achieve the power saving target until the production plan is changed from the existing plan to the alternative plan, and displays the instruction response information indicating that it does not participate in the power saving event indicated by the instruction information. It transmits to the consumption management apparatus 201 (step S20).

次に、電力消費管理装置201は、生産管理装置302Aおよび生産管理装置302Bから指示応答情報を受信して、電力消費情報の示す節電イベントにアグリゲータ6が参加するか否かを判断する(ステップS21)。具体的には、電力消費管理装置201は、受信した指示応答情報の含む削減量情報に基づいて、電力消費情報の示す要請目標を達成可能か否かを判断する。   Next, the power consumption management device 201 receives the instruction response information from the production management device 302A and the production management device 302B, and determines whether or not the aggregator 6 participates in the power saving event indicated by the power consumption information (step S21). ). Specifically, the power consumption management apparatus 201 determines whether or not the requested target indicated by the power consumption information can be achieved based on the reduction amount information included in the received instruction response information.

電力消費管理装置201は、要請目標を達成可能であると判断した場合、系統側管理装置101へ電力消費情報の示す節電イベントに参加する旨の要請応答情報を送信する(ステップS22)。   When the power consumption management apparatus 201 determines that the requested target can be achieved, the power consumption management apparatus 201 transmits request response information indicating that it participates in the power saving event indicated by the power consumption information to the grid side management apparatus 101 (step S22).

たとえば、電力消費管理装置201は、当該判断を電力消費情報の示す要請期間が始まる所定時間前の時刻に行う。   For example, the power consumption management apparatus 201 makes the determination at a time before a predetermined time when the request period indicated by the power consumption information starts.

なお、生産管理装置302は、当該時刻の到来までの間、自己の電力需要施設7が節電イベントに参加するか否かの判断を変更することができる。たとえば、電力消費管理装置201が定期的または不定期に最新の対価情報を生産管理装置302へ送信する場合、生産管理装置302は、受信した最新の対価情報に基づいて、参加または不参加の判断を見直すことができる。この場合、生産管理装置302は、内容を変更した指示応答情報を電力消費管理装置201へ送信する。   Note that the production management apparatus 302 can change the determination as to whether or not its own power demand facility 7 participates in the power saving event until the time comes. For example, when the power consumption management apparatus 201 transmits the latest consideration information to the production management apparatus 302 regularly or irregularly, the production management apparatus 302 determines whether to participate or not participate based on the received latest consideration information. You can review it. In this case, the production management apparatus 302 transmits instruction response information whose contents have been changed to the power consumption management apparatus 201.

電力消費管理装置201は、受信した指示応答情報の含む削減量情報に基づいて、要請された消費電力の削減量を確保することができたと判断した時点において、系統側管理装置101へ節電イベントに参加する旨の要請応答情報を送信してもよい。   When the power consumption management device 201 determines that the requested power consumption reduction amount has been secured based on the reduction amount information included in the received instruction response information, the power consumption management device 201 sends a power saving event to the system side management device 101. Request response information for participation may be transmitted.

また、電力消費管理装置201は、節電イベントに参加すると判断した場合、自己へ節電イベントに参加する旨の指示応答情報を送信した生産管理装置302である生産管理装置302Aへアグリゲータ参加情報を送信する(ステップS23)。   Further, when the power consumption management apparatus 201 determines to participate in the power saving event, the power consumption management apparatus 201 transmits aggregator participation information to the production management apparatus 302A that is the production management apparatus 302 that has transmitted instruction response information to participate in the power saving event to itself. (Step S23).

生産管理装置302Aは、電力消費管理装置201からアグリゲータ参加情報を受信して、代替計画に基づいて、生産設備303を制御するための代替制御情報を作成し、電力需要施設7Aにおける需要家装置301Aへ送信する(ステップS24)。   The production management apparatus 302A receives the aggregator participation information from the power consumption management apparatus 201, creates substitution control information for controlling the production facility 303 based on the substitution plan, and the consumer apparatus 301A in the power demand facility 7A. (Step S24).

需要家装置301Aは、生産管理装置302Aから代替制御情報を受信して、受信した代替制御情報に基づいて電力需要施設7Aにおける生産設備303を制御する(ステップS25)。   The consumer device 301A receives the substitute control information from the production management device 302A, and controls the production facility 303 in the power demand facility 7A based on the received substitute control information (step S25).

ところで、工場等においては策定した生産計画に従って各生産工程が行われるため、電力需給の逼迫が予想される場合でも節電を行うことが困難な場合がある。   By the way, since each production process is performed in a factory or the like in accordance with the established production plan, it may be difficult to save power even when power supply and demand are expected to be tight.

これに対して、本発明の第1の実施の形態に係る電力消費管理システムでは、電力消費管理装置201は、電力需要施設7における電力消費を管理する。生産管理装置302は、電力需要施設7における生産計画を作成する。電力消費管理装置201は、電力需要施設7における電力消費に関する指示情報を生産管理装置302に送信する。生産管理装置302は、指示情報を電力消費管理装置201から受信し、受信した指示情報に基づいて生産計画の変更に関する判断を行い、判断結果に基づく情報である指示応答情報を電力消費管理装置201に送信する。   On the other hand, in the power consumption management system according to the first embodiment of the present invention, the power consumption management device 201 manages the power consumption in the power demand facility 7. The production management device 302 creates a production plan in the power demand facility 7. The power consumption management apparatus 201 transmits instruction information regarding power consumption in the power demand facility 7 to the production management apparatus 302. The production management apparatus 302 receives the instruction information from the power consumption management apparatus 201, makes a determination regarding the change of the production plan based on the received instruction information, and receives the instruction response information that is information based on the determination result. Send to.

また、本発明の実施の第1の形態に係る生産管理装置では、指示取得部41は、電力需要施設7における電力消費に関する指示情報を取得する。計画部42は、指示取得部41によって取得された指示情報に基づいて生産計画の変更に関する判断を行う。   Moreover, in the production management apparatus according to the first embodiment of the present invention, the instruction acquisition unit 41 acquires instruction information related to power consumption in the power demand facility 7. The planning unit 42 makes a determination regarding a change in the production plan based on the instruction information acquired by the instruction acquisition unit 41.

このような構成により、たとえば、電力需要施設7が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。   With such a configuration, for example, when the power demand facility 7 performs each production process according to a production plan that has already been created, it is determined whether or not the power consumption target indicated by the instruction information can be achieved. Can do. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up.

したがって、本発明の実施の第1の形態に係る電力消費管理システムおよび生産管理装置では、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   Therefore, in the power consumption management system and the production management apparatus according to the first embodiment of the present invention, it is possible to make a flexible production plan in consideration of power saving in a power demand facility such as a factory.

また、本発明の第1の実施の形態に係る電力消費管理システムでは、電力消費管理装置201は、さらに、電力需要施設7における電力消費の削減の対価を示す対価情報を生産管理装置302に送信する。生産管理装置302は、指示情報および対価情報を生産管理装置302から受信し、受信した指示情報および対価情報に基づいて、生産計画の変更に関する判断を行い、判断結果に基づく情報である指示応答情報を電力消費管理装置201に送信する。   Further, in the power consumption management system according to the first embodiment of the present invention, the power consumption management apparatus 201 further transmits to the production management apparatus 302 consideration information indicating a price for reducing power consumption in the power demand facility 7. To do. The production management device 302 receives the instruction information and the consideration information from the production management device 302, makes a determination on the change of the production plan based on the received instruction information and the consideration information, and the instruction response information that is information based on the determination result. Is transmitted to the power consumption management apparatus 201.

また、本発明の実施の第1の形態に係る生産管理装置では、指示取得部41は、さらに、電力需要施設7における電力消費の削減の対価を示す対価情報を取得する。計画部42は、指示取得部41によって取得された指示情報および対価情報に基づいて生産計画の変更に関する判断を行う。   Moreover, in the production management apparatus according to the first embodiment of the present invention, the instruction acquisition unit 41 further acquires consideration information indicating consideration for reducing power consumption in the power demand facility 7. The planning unit 42 makes a determination regarding a change in the production plan based on the instruction information and the consideration information acquired by the instruction acquisition unit 41.

このような構成により、たとえば、立案した新たな生産計画に従って各生産工程を実施した場合に、どの程度の金銭的なメリットがあるかを把握した上で、生産計画の変更に関する判断を行うことができる。   With such a configuration, for example, when each production process is carried out according to a new production plan that has been planned, it is possible to make a judgment on the change of the production plan after grasping how much money there is. it can.

また、本発明の実施の第1の形態に係る生産管理装置では、計画部42は、生産計画の変更に関する判断において、生産の遅れを許容した生産計画を作成可能である。   Moreover, in the production management apparatus according to the first embodiment of the present invention, the planning unit 42 can create a production plan that allows production delay in the determination regarding the change of the production plan.

このような構成により、納期を変更しない範囲での通常の生産計画の変更では指示情報の示す電力消費の目標を達成できない場合に、当該目標を達成可能な生産計画を立案することができる。   With such a configuration, when a normal production plan change without changing the delivery date cannot achieve the power consumption target indicated by the instruction information, a production plan that can achieve the target can be formulated.

また、本発明の実施の第1の形態に係る生産管理装置では、達成判断部43は、計画部42の判断結果に基づいて、指示情報の示す目標の達成可否を判断する。   In the production management apparatus according to the first embodiment of the present invention, the achievement determination unit 43 determines whether or not the goal indicated by the instruction information can be achieved based on the determination result of the planning unit 42.

このような構成により、たとえば、新たな生産計画を立案した上で、実際に上記目標を達成すべきか否かを判断できるため、たとえば生産計画を変更することによるメリットが小さい場合に既存の生産計画を維持することができる。   With such a configuration, for example, it is possible to determine whether or not the above target should be actually achieved after creating a new production plan. For example, when the merit of changing the production plan is small, the existing production plan Can be maintained.

また、本発明の実施の第1の形態に係る電力消費管理装置では、消費情報取得部54は、電力系統側5から電力消費に関する電力消費情報を取得する。指示作成部55は、消費情報取得部54によって取得された電力消費情報に基づいて、電力需要施設7における電力消費に関する指示情報を作成する。指示通知部56は、指示作成部55によって作成された指示情報を、電力需要施設7における生産計画を作成する生産管理装置302に通知する。   In the power consumption management device according to the first embodiment of the present invention, the consumption information acquisition unit 54 acquires power consumption information related to power consumption from the power system side 5. The instruction creation unit 55 creates instruction information related to power consumption in the power demand facility 7 based on the power consumption information acquired by the consumption information acquisition unit 54. The instruction notifying unit 56 notifies the instruction information created by the instruction creating unit 55 to the production management apparatus 302 that creates a production plan in the power demand facility 7.

このように、指示情報を生産管理装置302へ通知する構成により、生産管理装置302が、指示情報に基づいて、電力需要施設7における新たな生産計画を立案することができる。   In this way, the configuration in which the instruction information is notified to the production management apparatus 302 allows the production management apparatus 302 to make a new production plan in the power demand facility 7 based on the instruction information.

したがって、本発明の実施の第1の形態に係る電力消費管理装置では、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   Therefore, in the power consumption management apparatus according to the first embodiment of the present invention, it is possible to make a flexible production plan in consideration of power saving in a power demand facility such as a factory.

次に、本発明の他の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。   Next, another embodiment of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated.

<第2の実施の形態>
本実施の形態は、第1の実施の形態に係る電力消費管理システムと比べて、生産管理装置が複数の電力需要施設7における生産計画を管理する電力消費管理システムに関する。以下で説明する内容以外は第1の実施の形態に係る電力消費管理システムと同一である。
<Second Embodiment>
The present embodiment relates to a power consumption management system in which a production management apparatus manages production plans in a plurality of power demand facilities 7 as compared with the power consumption management system according to the first embodiment. The contents other than those described below are the same as those of the power consumption management system according to the first embodiment.

[構成および基本動作]
図14は、本発明の第2の実施の形態に係る電力消費管理システムの構成を示す図である。
[Configuration and basic operation]
FIG. 14 is a diagram showing a configuration of a power consumption management system according to the second embodiment of the present invention.

図14を参照して、電力消費管理システム2は、系統側管理装置101と、電力消費管理装置201と、生産管理装置202と、複数の需要家装置301と、複数の生産設備303と、取引市場装置401とを備える。   Referring to FIG. 14, the power consumption management system 2 includes a grid-side management device 101, a power consumption management device 201, a production management device 202, a plurality of customer devices 301, a plurality of production facilities 303, a transaction Market device 401.

需要家装置301および複数の生産設備303は、たとえば工場である各電力需要施設7に設けられる。   The consumer device 301 and the plurality of production facilities 303 are provided in each power demand facility 7 which is a factory, for example.

需要家装置301は、たとえば自己の電力需要施設7において策定された既存計画の内容を示す既存計画情報を電力消費管理装置201経由で生産管理装置202へ送信する。たとえば、需要家装置301は、最新の既存計画情報を定期的または不定期に生産管理装置202へ送信する。   The customer apparatus 301 transmits, for example, existing plan information indicating the contents of an existing plan formulated in its own power demand facility 7 to the production management apparatus 202 via the power consumption management apparatus 201. For example, the customer apparatus 301 transmits the latest existing plan information to the production management apparatus 202 regularly or irregularly.

また、需要家装置301は、生産管理装置202から各生産設備303を制御するための代替制御情報を電力消費管理装置201経由で受信し、受信した代替制御情報に基づいて、各生産設備303を制御する。   In addition, the customer apparatus 301 receives, via the power consumption management apparatus 201, alternative control information for controlling each production facility 303 from the production management apparatus 202, and sets each production facility 303 based on the received alternative control information. Control.

系統側管理装置101は、電力系統側5によって運用され、電力消費に関する電力消費情報を電力消費管理装置201へ送信する。電力消費情報は、たとえば、アグリゲータ6が参加可能な節電イベントの内容を示す。   The system side management apparatus 101 is operated by the power system side 5 and transmits power consumption information regarding power consumption to the power consumption management apparatus 201. The power consumption information indicates, for example, the content of a power saving event in which the aggregator 6 can participate.

電力消費管理装置201および生産管理装置202は、たとえばアグリゲータ6によって運用される。電力消費管理装置201は、電力系統側5から電力消費に関する電力消費情報を取得する。具体的には、電力消費管理装置201は、系統側管理装置101から電力消費情報を受信する。   The power consumption management device 201 and the production management device 202 are operated by the aggregator 6, for example. The power consumption management apparatus 201 acquires power consumption information related to power consumption from the power system side 5. Specifically, the power consumption management apparatus 201 receives power consumption information from the system side management apparatus 101.

電力消費管理装置201は、受信した電力消費情報に基づいて、各電力需要施設7における電力消費に関する指示情報を作成し、作成した指示情報を生産管理装置202へ送信する。電力消費管理装置201は、たとえば、各電力需要施設7における電力消費に関する指示情報を生産管理装置202へ送信することにより、各電力需要施設7における電力消費を管理する。   Based on the received power consumption information, the power consumption management apparatus 201 creates instruction information regarding power consumption at each power demand facility 7 and transmits the created instruction information to the production management apparatus 202. The power consumption management device 201 manages the power consumption in each power demand facility 7 by transmitting, for example, instruction information regarding power consumption in each power demand facility 7 to the production management device 202.

指示情報は、たとえば、各電力需要施設7が参加可能な節電イベントの内容を示す。具体的には、指示情報は、電力需要施設7ごとの、消費電力を削減すべき期間である節電期間、および電力需要施設7ごとの、節電期間において削減すべき消費電力量の目標である節電目標を示す。なお、指示情報が示す各電力需要施設7の節電期間は、同じであってもよいし、異なってもよい。また、指示情報が示す各電力需要施設7の節電目標は、同じであってもよいし、異なってもよい。   The instruction information indicates, for example, the content of a power saving event in which each power demand facility 7 can participate. Specifically, the instruction information includes, for each power demand facility 7, a power saving period that is a period during which power consumption should be reduced, and a power saving target that is a target of the power consumption that should be reduced during the power saving period for each power demand facility 7. Show goals. The power saving period of each power demand facility 7 indicated by the instruction information may be the same or different. Further, the power saving target of each power demand facility 7 indicated by the instruction information may be the same or different.

電力系統側5は、アグリゲータ6が節電イベントに参加した場合、たとえばアグリゲータ6が削減させた消費電力量に応じてアグリゲータ6にインセンティブを支払う。電力消費管理装置201は、インセンティブの内容を示すインセンティブ情報を系統側管理装置101から取得する。   When the aggregator 6 participates in a power saving event, the power system side 5 pays incentives to the aggregator 6 according to, for example, the power consumption reduced by the aggregator 6. The power consumption management apparatus 201 acquires incentive information indicating the content of the incentive from the system side management apparatus 101.

また、電力消費管理装置201は、たとえば、卸電力市場8におけるサーバーたとえば卸電力取引所に設置されたサーバーである取引市場装置401から、卸電力市場8におけるネガワットの取引価格を示す取引価格情報を取得する。   In addition, the power consumption management apparatus 201 obtains transaction price information indicating the transaction price of negative watts in the wholesale power market 8 from the trade market apparatus 401 which is a server in the wholesale power market 8, for example, a server installed in the wholesale power exchange. get.

電力消費管理装置201は、系統側管理装置101からのインセンティブ情報、および取引市場装置401からの取引価格情報に基づいて、各電力需要施設7における電力消費の削減の対価を示す対価情報を作成し、生産管理装置202へ送信する。   Based on the incentive information from the grid-side management apparatus 101 and the transaction price information from the transaction market apparatus 401, the power consumption management apparatus 201 creates consideration information indicating the price for reducing power consumption at each power demand facility 7. To the production management device 202.

対価情報は、たとえば、電力需要施設7が節電イベントに参加した場合に、たとえば電力需要施設7において削減された消費電力量に応じて当該電力需要施設7に提供される消費電力の削減の対価を示す。具体的には、対価情報は、電力需要施設7ごとの消費電力の削減の対価を示す。なお、対価情報が示す各電力需要施設7の対価は、同じであってもよいし、異なってもよい。   For example, when the power demand facility 7 participates in a power saving event, the consideration information includes a consideration for reducing the power consumption provided to the power demand facility 7 according to the amount of power consumed by the power demand facility 7, for example. Show. Specifically, the consideration information indicates consideration for reducing power consumption for each power demand facility 7. In addition, the consideration of each electric power demand facility 7 which consideration information shows may be the same, and may differ.

生産管理装置202は、電力需要施設7から当該電力需要施設7における既存計画を取得する。具体的には、生産管理装置202は、各電力需要施設7における需要家装置301から既存計画を受信して、たとえば自己の記憶部45に保存する。   The production management device 202 acquires an existing plan in the power demand facility 7 from the power demand facility 7. Specifically, the production management device 202 receives an existing plan from the customer device 301 in each power demand facility 7 and stores it in, for example, its own storage unit 45.

また、生産管理装置202は、電力消費管理装置201から受信した指示情報および対価情報に基づいて、各電力需要施設7における生産計画の変更に関する判断を行う。たとえば、生産管理装置202は、各電力需要施設7が、節電目標の達成のために生産計画を変更する必要があるか否かを判断する。また、生産管理装置202は、生産計画を変更する必要がある電力需要施設7についての代替計画を立案する。   In addition, the production management device 202 makes a determination on the change of the production plan in each power demand facility 7 based on the instruction information and the consideration information received from the power consumption management device 201. For example, the production management device 202 determines whether each power demand facility 7 needs to change the production plan in order to achieve the power saving target. In addition, the production management apparatus 202 creates an alternative plan for the power demand facility 7 that needs to change the production plan.

そして、生産管理装置202は、各電力需要施設7の中から、たとえば、代替計画に従って生産を行った場合であっても負担の少ない1または複数の電力需要施設7を選択する。具体的には、生産管理装置202は、たとえば、各電力需要施設7が、代替計画に従って生産を行った場合に、各電力需要施設7がどの程度のメリットを享受するかを判断し、享受するメリットの大きい電力需要施設7を負担の少ない電力需要施設7として選択する。   Then, the production management device 202 selects one or a plurality of power demanding facilities 7 having a small burden even when the production is performed according to the alternative plan, for example, from among the respective power demanding facilities 7. Specifically, for example, when each power demand facility 7 performs production according to the alternative plan, the production management device 202 determines and enjoys what degree each power demand facility 7 enjoys. The power demand facility 7 having a large merit is selected as the power demand facility 7 having a small burden.

生産管理装置202は、選択した1または複数の電力需要施設7に対応の代替計画を通知する。具体的には、生産管理装置202は、選択した1または複数の電力需要施設7へ代替計画の内容を示す代替計画情報を電力消費管理装置201経由で送信する。代替計画情報は、電力需要施設7における生産計画の変更に関する判断の結果に基づく情報である。なお、代替計画は、電力需要施設7ごとに異なってもよいし、同じでもよい。   The production management apparatus 202 notifies the corresponding alternative plan to the selected one or more power demanding facilities 7. Specifically, the production management apparatus 202 transmits the alternative plan information indicating the contents of the alternative plan to the selected one or more power demand facilities 7 via the power consumption management apparatus 201. The alternative plan information is information based on the result of the determination regarding the change of the production plan in the power demand facility 7. In addition, an alternative plan may differ for every electric power demand facility 7, and may be the same.

また、生産管理装置202は、選択した電力需要施設7に一斉に代替計画を通知する構成に限らず、たとえば、対価情報の示す節電の対価が小さい電力需要施設7から順番に代替計画を通知してもよい。   Further, the production management device 202 is not limited to the configuration in which the alternative plan is notified all at once to the selected power demand facility 7, but, for example, the alternative plan is notified in order from the power demand facility 7 in which the price for power saving indicated by the price information is small. May be.

各需要家装置301は、生産管理装置202から電力消費管理装置201経由で代替計画情報を受信する。そして、需要家装置301は、受信した代替計画情報の内容を承諾するか否か、すなわち自己の設けられた電力需要施設7が節電イベントに参加するか否かを示す計画応答情報を電力消費管理装置201経由で生産管理装置202へ送信する。なお、節電イベントに参加するか否かの判断は、需要家装置301があらかじめ設定された内容に従って自動で行ってもよいし、需要家装置301のユーザーが行ってもよい。   Each consumer device 301 receives the alternative plan information from the production management device 202 via the power consumption management device 201. Then, the consumer apparatus 301 displays plan response information indicating whether or not to accept the contents of the received alternative plan information, that is, whether or not the power demand facility 7 provided therein participates in the power saving event. The data is transmitted to the production management apparatus 202 via the apparatus 201. Whether or not to participate in the power saving event may be automatically determined according to the contents set in advance by the consumer device 301 or may be performed by the user of the consumer device 301.

生産管理装置202は、各需要家装置301からの計画応答情報に基づいて、電力消費情報の示す要請目標を達成できるか否かを判断し、判断結果を示す要請達成情報を電力消費管理装置201へ送信する。   The production management device 202 determines whether or not the request target indicated by the power consumption information can be achieved based on the plan response information from each consumer device 301, and sends the request achievement information indicating the determination result to the power consumption management device 201. Send to.

なお、電力消費管理装置201は、系統側管理装置101、生産管理装置202、各需要家装置301および取引市場装置401と直接接続される構成に限らず、他の装置を介して接続される構成であってもよい。また、生産管理装置202は、電力消費管理装置201経由で需要家装置301と情報の送受信を行う構成に限らず、直接情報の送受信を行う構成であってもよいし、他の装置経由で情報の送受信を行う構成であってもよい。   The power consumption management device 201 is not limited to a configuration that is directly connected to the grid-side management device 101, the production management device 202, each consumer device 301, and the transaction market device 401, but is configured to be connected via another device. It may be. In addition, the production management device 202 is not limited to a configuration that transmits and receives information to and from the consumer device 301 via the power consumption management device 201, and may be configured to directly transmit and receive information, or information may be transmitted via other devices. The structure which transmits / receives may be sufficient.

図15は、本発明の第2の実施の形態に係る電力消費管理装置の構成を示す図である。   FIG. 15 is a diagram illustrating a configuration of a power consumption management apparatus according to the second embodiment of the present invention.

図15を参照して、電力消費管理装置201は、要請応答通知部51と、消費情報取得部54と、指示作成部55と、指示通知部56と、報酬情報取得部57と、対価情報作成部58と、市場情報取得部59と、対価情報通知部60と、通信部65と、達成情報取得部66と、要請目標通知部67とを含む。   Referring to FIG. 15, the power consumption management device 201 includes a request / response notification unit 51, a consumption information acquisition unit 54, an instruction creation unit 55, an instruction notification unit 56, a reward information acquisition unit 57, and compensation information creation. Unit 58, market information acquisition unit 59, consideration information notification unit 60, communication unit 65, achievement information acquisition unit 66, and requested target notification unit 67.

消費情報取得部54は、系統側管理装置101から送信された電力消費情報を取得して指示作成部55へ出力する。また、消費情報取得部54は、受信した電力消費情報から要請目標を抽出し、要請目標を示す要請目標情報を作成して要請目標通知部67へ出力する。   The consumption information acquisition unit 54 acquires the power consumption information transmitted from the system side management apparatus 101 and outputs it to the instruction creation unit 55. In addition, the consumption information acquisition unit 54 extracts a request target from the received power consumption information, creates request target information indicating the request target, and outputs the request target information to the request target notification unit 67.

指示作成部55は、消費情報取得部54から受けた電力消費情報に基づいて、各電力需要施設における電力消費に関する指示情報を作成し、指示通知部56へ出力する。   The instruction creating unit 55 creates instruction information related to power consumption at each power demand facility based on the power consumption information received from the consumption information acquiring unit 54 and outputs the instruction information to the instruction notifying unit 56.

指示通知部56は、指示作成部55から受けた指示情報を、電力需要施設7における代替計画を作成する生産管理装置202へ送信する。   The instruction notifying unit 56 transmits the instruction information received from the instruction creating unit 55 to the production management apparatus 202 that creates an alternative plan in the power demand facility 7.

要請目標通知部67は、消費情報取得部54から受けた要請目標情報を生産管理装置202へ送信する。   The request target notification unit 67 transmits the request target information received from the consumption information acquisition unit 54 to the production management apparatus 202.

報酬情報取得部57は、系統側管理装置101からインセンティブ情報を受信して対価情報作成部58へ出力する。   The reward information acquisition unit 57 receives incentive information from the system side management apparatus 101 and outputs it to the consideration information creation unit 58.

市場情報取得部59は、取引市場装置401から取引価格情報を受信して対価情報作成部58へ出力する。具体的には、たとえば、市場情報取得部59は、定期的または不定期に取引市場装置401から最新の取引価格情報を受信して対価情報作成部58へ出力する。   The market information acquisition unit 59 receives the transaction price information from the transaction market device 401 and outputs it to the consideration information creation unit 58. Specifically, for example, the market information acquisition unit 59 receives the latest transaction price information from the transaction market device 401 regularly or irregularly and outputs it to the consideration information creation unit 58.

対価情報作成部58は、報酬情報取得部57から受けたインセンティブ情報および市場情報取得部59から受けた取引価格情報に基づいて、各需要家装置301の対価情報を作成し、対価情報通知部60へ出力する。対価情報作成部58は、たとえば、市場情報取得部59から新たな取引価格情報を受けるたびに対価情報を更新し、更新後の対価情報を対価情報通知部60へ出力する。   The consideration information creation unit 58 creates compensation information for each consumer device 301 based on the incentive information received from the reward information acquisition unit 57 and the transaction price information received from the market information acquisition unit 59, and the consideration information notification unit 60 Output to. For example, the consideration information creation unit 58 updates the consideration information every time new transaction price information is received from the market information acquisition unit 59, and outputs the updated consideration information to the consideration information notification unit 60.

対価情報通知部60は、対価情報作成部58から受けた対価情報を生産管理装置202へ送信する。   The consideration information notification unit 60 transmits the consideration information received from the consideration information creation unit 58 to the production management apparatus 202.

達成情報取得部66は、生産管理装置202から要請達成情報を受信して要請応答通知部51へ出力する。   The achievement information acquisition unit 66 receives the request achievement information from the production management apparatus 202 and outputs it to the request response notification unit 51.

要請応答通知部51は、達成情報取得部66から要請目標を達成できる旨の要請達成情報を受信すると、電力消費情報の示す節電イベントに参加する旨の要請応答情報を作成して系統側管理装置101へ送信する。   When the request response notification unit 51 receives the request achievement information indicating that the request target can be achieved from the achievement information acquisition unit 66, the request response notification unit 51 creates request response information indicating that it participates in the power saving event indicated by the power consumption information, and the system side management device 101.

通信部65は、生産管理装置202から需要家装置301を宛先として送信された情報の中継を行う。具体的には、通信部65は、生産管理装置202から代替計画情報を受信して、宛先の需要家装置301へ送信する。また、通信部65は、生産管理装置202から代替制御情報を受信して、宛先の需要家装置301へ送信する。   The communication unit 65 relays information transmitted from the production management device 202 to the customer device 301 as a destination. Specifically, the communication unit 65 receives the alternative plan information from the production management apparatus 202 and transmits it to the destination customer apparatus 301. Further, the communication unit 65 receives the substitution control information from the production management apparatus 202 and transmits it to the destination customer apparatus 301.

また、通信部65は、需要家装置301から生産管理装置202を宛先として送信された情報の中継を行う。具体的には、通信部65は、需要家装置301から既存計画情報を
受信して生産管理装置202へ送信する。また、通信部65は、需要家装置301から計画応答情報を受信して生産管理装置202へ送信する。
Further, the communication unit 65 relays information transmitted from the consumer device 301 to the production management device 202 as a destination. Specifically, the communication unit 65 receives the existing plan information from the consumer device 301 and transmits it to the production management device 202. Further, the communication unit 65 receives the plan response information from the customer device 301 and transmits it to the production management device 202.

図16は、本発明の第2の実施の形態に係る生産管理装置の構成を示す図である。   FIG. 16 is a diagram showing a configuration of a production management apparatus according to the second embodiment of the present invention.

図16を参照して、生産管理装置202は、指示取得部41と、計画部42と、記憶部45と、制御情報作成部46と、代替計画送信部71と、既存計画取得部72と、計画応答取得部73と、要請目標取得部74と、要請判断部75と、達成情報送信部76とを備える。   Referring to FIG. 16, the production management apparatus 202 includes an instruction acquisition unit 41, a plan unit 42, a storage unit 45, a control information creation unit 46, an alternative plan transmission unit 71, an existing plan acquisition unit 72, A plan response acquisition unit 73, a request target acquisition unit 74, a request determination unit 75, and an achievement information transmission unit 76 are provided.

既存計画取得部72は、電力消費管理装置201から各電力需要施設7の既存計画情報を受信し、記憶部45に記憶させる。   The existing plan acquisition unit 72 receives the existing plan information of each power demand facility 7 from the power consumption management device 201 and stores it in the storage unit 45.

指示取得部41は、電力消費管理装置201から各電力需要施設7の電力消費に関する指示情報を取得し、計画部42へ出力する。また、指示取得部41は、電力消費管理装置201から各電力需要施設7における電力消費の削減の対価を示す対価情報を取得し、計画部42へ出力する。   The instruction acquisition unit 41 acquires instruction information regarding the power consumption of each power demand facility 7 from the power consumption management device 201 and outputs the instruction information to the planning unit 42. In addition, the instruction acquisition unit 41 acquires price information indicating the price for reducing power consumption in each power demand facility 7 from the power consumption management apparatus 201 and outputs it to the planning unit 42.

記憶部45は、たとえば、設備情報、生産要求情報、生産手順情報および既存計画等の生産計画の作成に必要な各種情報を記憶する。設備情報は、たとえば、電力需要施設7に設置されている生産設備303の種類、数および消費電力等を示す情報である。生産要求情報は、たとえば、生産すべき製品の種類、数量および納期を示す情報である。生産手順情報は、たとえば、製品の製造工程および各工程において使用する生産設備303の種類等を示す情報である。   The storage unit 45 stores, for example, various pieces of information necessary for creating a production plan such as facility information, production request information, production procedure information, and existing plan. The facility information is information indicating, for example, the type and number of production facilities 303 installed in the power demand facility 7 and the power consumption. The production request information is information indicating the type, quantity, and delivery date of the product to be produced, for example. The production procedure information is information indicating, for example, the product manufacturing process and the type of production equipment 303 used in each process.

計画部42は、指示取得部41から受けた指示情報、および記憶部45に記憶された各種情報に基づいて、生産計画の変更に関する判断を行う。   The planning unit 42 makes a determination regarding the change of the production plan based on the instruction information received from the instruction acquisition unit 41 and various information stored in the storage unit 45.

具体的には、たとえば、計画部42は、各電力需要施設7が対応の既存計画に従って生産を行った場合でも対応の節電目標を達成することができるか否かを判断する。計画部42は、電力需要施設7が既存計画に従って生産を行うと節電目標を達成することができないと判断した場合、節電目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて代替計画を立案する。なお、計画部42は、電力需要施設7における生産の遅れを許容した代替計画を作成可能である。   Specifically, for example, the planning unit 42 determines whether or not the corresponding power saving target can be achieved even when each power demand facility 7 performs production according to the corresponding existing plan. When it is determined that the power demand facility 7 cannot achieve the power saving target when the power demand facility 7 performs the production according to the existing plan, the planning unit 42 determines the production process and period to be executed so that the power saving target can be achieved. Judge and formulate an alternative plan based on the decision. The planning unit 42 can create an alternative plan that allows production delays in the power demand facility 7.

さらに、計画部42は、たとえば、指示情報、対価情報および記憶部45に記憶された各種情報に基づいて、生産計画の変更に関する判断を行う。具体的には、計画部42は、たとえば、各電力需要施設7が、代替計画に従って生産を行った場合に、どの程度メリットを享受するかを判断する。そして、計画部42は、享受するメリットの大きい電力需要施設7を選択する。   Furthermore, the planning unit 42 makes a determination regarding the change of the production plan based on, for example, the instruction information, the consideration information, and various information stored in the storage unit 45. Specifically, the planning unit 42 determines, for example, how much merit the power demanding facilities 7 will receive when production is performed according to the alternative plan. And the plan part 42 selects the electric power demand facility 7 with a big merit to enjoy.

より具体的には、計画部42は、たとえば、各電力需要施設7における生産計画を既存計画から代替計画に変更した場合に削減できるコストである削減コストCtを、電力需要施設7ごとに算出する。そして、計画部42は、各電力需要施設7の中から、算出した削減コストCtが所定の閾値より大きい電力需要施設7を選択する。   More specifically, the planning unit 42 calculates, for each power demand facility 7, a reduction cost Ct that is a cost that can be reduced when the production plan in each power demand facility 7 is changed from an existing plan to an alternative plan, for example. . Then, the planning unit 42 selects, from each power demand facility 7, a power demand facility 7 whose calculated reduction cost Ct is larger than a predetermined threshold value.

計画部42は、選択した各電力需要施設7に対応の代替計画を通知する。具体的には、計画部42は、選択した電力需要施設7の代替計画の内容を示す代替計画情報を代替計画送信部71へ出力する。   The planning unit 42 notifies a corresponding alternative plan to each selected power demand facility 7. Specifically, the planning unit 42 outputs alternative plan information indicating the content of the alternative plan for the selected power demand facility 7 to the alternative plan transmission unit 71.

代替計画送信部71は、計画部42から受けた代替計画情報を電力消費管理装置201経由で対応の需要家装置301へ送信する。   The alternative plan transmission unit 71 transmits the alternative plan information received from the planning unit 42 to the corresponding customer device 301 via the power consumption management device 201.

また、計画部42は、選択した電力需要施設7の代替計画の内容を示す代替計画情報を要請判断部75および制御情報作成部46へ出力する。   The planning unit 42 also outputs alternative plan information indicating the content of the alternative plan for the selected power demand facility 7 to the request determination unit 75 and the control information creation unit 46.

要請目標取得部74は、電力消費管理装置201から要請目標情報を受信して要請判断部75へ出力する。   The requested target acquisition unit 74 receives the requested target information from the power consumption management apparatus 201 and outputs it to the request determination unit 75.

計画応答取得部73は、各需要家装置301から送信された計画応答情報を電力消費管理装置201経由で受信して要請判断部75へ出力する。また、計画応答取得部73は、節電イベントに参加する旨の計画応答情報を自己へ送信した需要家装置301のID等の情報である参加ID情報を制御情報作成部46へ出力する。   The plan response acquisition unit 73 receives the plan response information transmitted from each consumer device 301 via the power consumption management device 201 and outputs it to the request determination unit 75. In addition, the plan response acquisition unit 73 outputs participation ID information, which is information such as the ID of the customer device 301 that has transmitted the plan response information to participate in the power saving event, to the control information creation unit 46.

要請判断部75は、計画部42からの代替計画情報および計画応答取得部73からの計画応答情報に基づいて、要請目標取得部74から受けた要請目標情報の示す要請目標を達成可能か否かを判断する。   Based on the alternative plan information from the plan unit 42 and the plan response information from the plan response acquisition unit 73, the request determination unit 75 determines whether or not the request target indicated by the request target information received from the request target acquisition unit 74 can be achieved. Judging.

そして、要請判断部75は、要請目標を達成可能か否かの判断結果を示す要請達成情報を制御情報作成部46および達成情報送信部76へ出力する。   Then, the request determination unit 75 outputs request achievement information indicating a determination result as to whether or not the request target can be achieved, to the control information creation unit 46 and the achievement information transmission unit 76.

達成情報送信部76は、要請判断部75から受けた要請達成情報を電力消費管理装置201へ送信する。   The achievement information transmission unit 76 transmits the request achievement information received from the request determination unit 75 to the power consumption management apparatus 201.

制御情報作成部46は、要請判断部75から要請目標を達成可能である旨の要請達成情報を受けた場合、計画部42からの代替計画情報に基づいて、電力需要施設7における生産設備303を制御するための代替制御情報を作成する。   When the control information creation unit 46 receives the request achievement information indicating that the request target can be achieved from the request determination unit 75, the control information creation unit 46 determines the production facility 303 in the power demand facility 7 based on the alternative plan information from the planning unit 42. Create alternative control information for control.

具体的には、制御情報作成部46は、計画応答取得部73から受けた参加ID情報の示す需要家装置301、の設置された電力需要施設7における生産設備303を制御するための代替制御情報を作成する。   Specifically, the control information creation unit 46 controls the production equipment 303 in the power demand facility 7 in which the customer apparatus 301 indicated by the participation ID information received from the plan response acquisition unit 73 is installed. Create

そして、制御情報作成部46は、作成した代替制御情報を電力消費管理装置201経由で対応の需要家装置301へ送信する。   Then, the control information creation unit 46 transmits the created substitute control information to the corresponding customer device 301 via the power consumption management device 201.

[動作]
次に、本発明の第2の実施の形態に係る電力消費管理システムが消費電力量の削減処理を行う際の動作について説明する。
[Operation]
Next, an operation when the power consumption management system according to the second exemplary embodiment of the present invention performs a power consumption reduction process will be described.

電力消費管理システムにおける各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のフローチャートおよびシーケンスの各ステップの一部または全部を含むプログラムを図示しないメモリから読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。   Each device in the power consumption management system includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including a part or all of each step of the following flowcharts and sequences from a memory (not shown). Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図17は、本発明の第2の実施の形態に係る電力消費管理システムにおける消費電力量の削減処理のシーケンスの一例を示す図である。   FIG. 17 is a diagram illustrating an example of a sequence of power consumption reduction processing in the power consumption management system according to the second embodiment of the present invention.

図17を参照して、まず、電力需要施設7Aに設置された需要家装置301Aおよび電力需要施設7Bに設置された需要家装置301Bは、自己の電力需要施設7における既存計画を示す既存計画情報を、定期的または不定期に生産管理装置202へ送信する(ステップS41およびステップS42)。   Referring to FIG. 17, first, customer device 301 </ b> A installed in power demand facility 7 </ b> A and customer device 301 </ b> B installed in power demand facility 7 </ b> B have existing plan information indicating an existing plan in its own power demand facility 7. Is transmitted to the production management apparatus 202 regularly or irregularly (step S41 and step S42).

次に、系統側管理装置101は、たとえば翌日の電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行なうべきであると判断する(ステップS43)。   Next, the system side management apparatus 101 predicts the power demand for the next day, for example, and when there is a high possibility that the power supply and demand will be tight, it determines that the power consumption should be suppressed (step S43).

より詳細には、系統側管理装置101は、たとえば、既知の需要予測技術を用いて、具体的にはニューラルネットワークまたは自己回帰分析等の技術を用いて、全体的な電力需要を予測する。あるいは、系統側管理装置101は、たとえば、過去X日分の消費電力量のデータから、特異日を除いたY日分の消費電力量の平均値を算出する。   More specifically, the system-side management apparatus 101 predicts the overall power demand using, for example, a known demand prediction technique, specifically using a technique such as a neural network or autoregressive analysis. Or the system side management apparatus 101 calculates the average value of the power consumption for Y days except the special day from the data of the power consumption for the past X days, for example.

次に、系統側管理装置101は、電力消費情報およびインセンティブ情報を電力消費管理装置201へ送信する(ステップS44)。   Next, the system side management apparatus 101 transmits power consumption information and incentive information to the power consumption management apparatus 201 (step S44).

次に、取引市場装置401は、電力消費管理装置201へ取引価格情報を送信する(ステップS45)。   Next, the transaction market device 401 transmits transaction price information to the power consumption management device 201 (step S45).

次に、電力消費管理装置201は、系統側管理装置101から受信した電力消費情報に基づいて、各電力需要施設7の電力消費に関する指示情報を作成する。また、電力消費管理装置201は、系統側管理装置101から受信したインセンティブ情報および取引市場装置401から受信した取引価格情報に基づいて、各電力需要施設7における電力消費の削減の対価を示す対価情報を作成する。そして、電力消費管理装置201は、作成した指示情報および対価情報を生産管理装置202へ送信する(ステップS46)。   Next, the power consumption management device 201 creates instruction information related to the power consumption of each power demand facility 7 based on the power consumption information received from the system side management device 101. In addition, the power consumption management apparatus 201 is price information indicating a price for reducing power consumption in each power demand facility 7 based on the incentive information received from the grid side management apparatus 101 and the transaction price information received from the transaction market apparatus 401. Create Then, the power consumption management apparatus 201 transmits the created instruction information and consideration information to the production management apparatus 202 (step S46).

また、電力消費管理装置201は、系統側管理装置101から受信した電力消費情報の示す要請目標、を示す要請目標情報を生産管理装置202へ送信する(ステップS47)。   In addition, the power consumption management apparatus 201 transmits request target information indicating the request target indicated by the power consumption information received from the system side management apparatus 101 to the production management apparatus 202 (step S47).

次に、生産管理装置202は、電力消費管理装置201から指示情報、対価情報および要請目標情報を受信して、受信した各情報のうち、指示情報および対価情報に基づいて生産計画の変更に関する判断を行う(ステップS48)。   Next, the production management apparatus 202 receives the instruction information, the consideration information, and the requested target information from the power consumption management apparatus 201, and among the received pieces of information, the determination regarding the change of the production plan is performed based on the instruction information and the consideration information. Is performed (step S48).

具体的には、たとえば、生産管理装置202は、各電力需要施設7が対応の既存計画に従って生産を行った場合でも対応の節電目標を達成することができるか否かを判断する。生産管理装置202は、電力需要施設7が既存計画に従って生産を行うと対応の節電目標を達成することができないと判断した場合、節電目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて代替計画を立案する。   Specifically, for example, the production management device 202 determines whether or not the corresponding power saving target can be achieved even when each power demand facility 7 performs production according to the corresponding existing plan. When the power management facility 202 determines that the corresponding power saving target cannot be achieved if the power demand facility 7 performs the production according to the existing plan, the production management device 202 and the production process to be performed are set so that the power saving target can be achieved. Judge the period and make an alternative plan based on the decision.

さらに、生産管理装置202は、たとえば、指示情報および対価情報に基づいて、生産計画の変更に関する判断を行う。具体的には、たとえば、生産管理装置202は、各電力需要施設7が、代替計画に従って生産を行った場合に、各電力需要施設7がどの程度のメリットを享受するかを判断し、享受するメリットの大きい電力需要施設7を選択する。   Furthermore, the production management apparatus 202 makes a determination regarding the change of the production plan based on the instruction information and the consideration information, for example. Specifically, for example, the production management device 202 determines and enjoys how much each power demand facility 7 enjoys when each power demand facility 7 performs production according to the alternative plan. The power demand facility 7 having a large merit is selected.

より具体的には、生産管理装置202は、たとえば、各電力需要施設7における生産計画を既存計画から代替計画に変更した場合に削減できるコストである削減コストCtを、電力需要施設7ごとに算出する。そして、計画部42は、算出した削減コストCtが所定の閾値より大きい電力需要施設7を選択する。   More specifically, the production management device 202 calculates, for each power demand facility 7, a reduction cost Ct that is a cost that can be reduced when the production plan in each power demand facility 7 is changed from an existing plan to an alternative plan, for example. To do. Then, the planning unit 42 selects the power demand facility 7 in which the calculated reduction cost Ct is larger than a predetermined threshold.

生産管理装置202は、選択した各電力需要施設7に対応の代替計画を通知する。具体的には、生産管理装置202は、選択した各電力需要施設7へ対応の代替計画の内容を示す代替計画情報を電力消費管理装置201経由で送信する。ここでは、生産管理装置202は、需要家装置301Aおよび需要家装置301Bへ代替計画情報を送信する(ステップS49およびステップS50)。   The production management device 202 notifies each selected power demand facility 7 of a corresponding alternative plan. Specifically, the production management device 202 transmits, via the power consumption management device 201, substitution plan information indicating the contents of the substitution plan corresponding to each selected power demand facility 7. Here, the production management device 202 transmits the alternative plan information to the customer device 301A and the customer device 301B (step S49 and step S50).

次に、需要家装置301Aは、生産管理装置202から代替計画情報を受信して、受信した代替計画情報の内容を承諾するか否か、すなわち電力需要施設7Aが節電イベントに参加するか否かを示す計画応答情報を電力消費管理装置201経由で生産管理装置202へ送信する。ここでは、需要家装置301Aは、節電イベントに参加する旨の計画応答情報を生産管理装置202へ送信する(ステップS51)。   Next, the consumer device 301A receives the alternative plan information from the production management device 202 and accepts the content of the received alternative plan information, that is, whether or not the power demand facility 7A participates in the power saving event. Is sent to the production management apparatus 202 via the power consumption management apparatus 201. Here, the customer apparatus 301A transmits plan response information indicating that it participates in the power saving event to the production management apparatus 202 (step S51).

一方、需要家装置301Bは、生産管理装置202から代替計画情報を受信して、電力需要施設7Bが節電イベントに参加しない旨の計画応答情報を電力消費管理装置201経由で生産管理装置202へ送信する(ステップS52)。   On the other hand, the consumer device 301B receives the alternative plan information from the production management device 202, and transmits plan response information to the effect that the power demand facility 7B does not participate in the power saving event to the production management device 202 via the power consumption management device 201. (Step S52).

次に、生産管理装置202は、需要家装置301Aおよび需要家装置301Bから計画応答情報を受信して、電力消費管理装置201から受けた要請目標情報の示す要請目標を達成可能か否かを判断する。そして、生産管理装置202は、判断結果を示す要請達成情報を電力消費管理装置201へ送信する。ここでは、生産管理装置202は、要請目標を達成可能である旨の要請達成情報を電力消費管理装置201へ送信する(ステップS53)。   Next, the production management apparatus 202 receives the plan response information from the consumer apparatus 301A and the consumer apparatus 301B, and determines whether or not the requested target indicated by the requested target information received from the power consumption management apparatus 201 can be achieved. To do. Then, the production management apparatus 202 transmits request achievement information indicating the determination result to the power consumption management apparatus 201. Here, the production management apparatus 202 transmits request achievement information indicating that the requested target can be achieved to the power consumption management apparatus 201 (step S53).

次に、電力消費管理装置201は、生産管理装置202から要請達成情報を受信し、受信した要請達成情報に基づいて、電力消費情報の示す節電イベントに参加するか否かを示す要請応答情報を作成して系統側管理装置101へ送信する。ここでは、電力消費管理装置201は、系統側管理装置101へ節電イベントに参加する旨の要請応答情報を送信する(ステップS54)。   Next, the power consumption management device 201 receives the request achievement information from the production management device 202 and, based on the received request achievement information, requests response information indicating whether or not to participate in the power saving event indicated by the power consumption information. It is created and transmitted to the system side management apparatus 101. Here, the power consumption management apparatus 201 transmits request response information indicating participation in the power saving event to the grid side management apparatus 101 (step S54).

次に、生産管理装置202は、節電イベントに参加する旨の計画応答情報を自己へ送信した需要家装置301Aへ、対応の代替制御情報を電力消費管理装置201経由で送信する(ステップS55)。   Next, the production management apparatus 202 transmits corresponding alternative control information via the power consumption management apparatus 201 to the customer apparatus 301A that has transmitted the plan response information to participate in the power saving event to itself (step S55).

需要家装置301は、生産管理装置202から代替制御情報を受信して、受信した代替制御情報に基づいて、自己の電力需要施設7における生産設備303を制御する(ステップS56)。   The customer apparatus 301 receives the substitute control information from the production management apparatus 202, and controls the production facility 303 in its own power demand facility 7 based on the received substitute control information (step S56).

以上のように、本発明の第2の実施の形態に係る電力消費管理システムでは、電力消費管理装置201は、電力需要施設7における電力消費を管理する。生産管理装置202は、電力需要施設7から電力需要施設7における生産計画を取得し、取得した生産計画の変更に関する判断を行う。電力消費管理装置201は、電力系統側5から電力消費に関する電力消費情報を取得し、取得した電力消費情報に基づいて、電力需要施設7における電力消費に関する指示情報を生産管理装置202に送信する。生産管理装置202は、指示情報を電力消費管理装置201から受信し、受信した指示情報に基づいて上記判断を行う。   As described above, in the power consumption management system according to the second embodiment of the present invention, the power consumption management device 201 manages the power consumption in the power demand facility 7. The production management device 202 acquires a production plan in the power demand facility 7 from the power demand facility 7, and makes a determination regarding a change in the acquired production plan. The power consumption management device 201 acquires power consumption information related to power consumption from the power system side 5 and transmits instruction information related to power consumption in the power demand facility 7 to the production management device 202 based on the acquired power consumption information. The production management apparatus 202 receives the instruction information from the power consumption management apparatus 201 and makes the above determination based on the received instruction information.

このような構成により、たとえば、電力需要施設7が既に作成された生産計画に従って各生産工程を実施した場合に、指示情報の示す電力消費の目標を達成することができるか否かを判断することができる。そして、既に作成された生産計画では当該目標を達成することができないと判断した場合、当該目標を達成することができるように、実施すべき生産工程および期間等を判断し、判断結果に基づいて新たな生産計画を立案することができる。   With such a configuration, for example, when the power demand facility 7 performs each production process according to a production plan that has already been created, it is determined whether or not the power consumption target indicated by the instruction information can be achieved. Can do. When it is determined that the target cannot be achieved with the production plan that has already been created, the production process and the period to be implemented are determined so that the target can be achieved. New production plans can be drawn up.

したがって、本発明の第2の実施の形態に係る電力消費管理システムでは、工場等の電力需要施設における、節電を考慮した柔軟な生産計画を立案することができる。   Therefore, in the power consumption management system according to the second embodiment of the present invention, it is possible to make a flexible production plan in consideration of power saving in a power demand facility such as a factory.

その他の構成および動作は第1の実施の形態に係る電力消費管理システムと同様であるため、ここでは詳細な説明を繰り返さない。   Since other configurations and operations are the same as those of the power consumption management system according to the first embodiment, detailed description thereof will not be repeated here.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
電力需要施設における生産計画を作成する生産管理装置であって、
前記電力需要施設における電力消費に関する指示情報、および前記電力需要施設における電力消費の削減の対価を示す対価情報を取得する指示取得部と、
前記指示取得部によって取得された前記指示情報および前記対価情報に基づいて前記生産計画の変更に関する判断を行う計画部とを備え、
前記対価情報は、卸電力市場におけるネガワットの取引価格に基づいて作成された情報である、生産管理装置。
[Appendix 1]
A production management device for creating a production plan in a power demand facility,
An instruction acquisition unit that acquires instruction information regarding power consumption in the power demand facility, and consideration information indicating a price for reducing power consumption in the power demand facility;
A planning unit that makes a determination on the change of the production plan based on the instruction information and the consideration information acquired by the instruction acquisition unit,
The consideration information is a production management device, which is information created based on a negawatt transaction price in the wholesale power market.

[付記2]
電力系統側から電力消費に関する電力消費情報を取得する消費情報取得部と、
前記消費情報取得部によって取得された前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成する指示作成部と、
前記指示作成部によって作成された前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知する指示通知部と、
卸電力市場におけるネガワットの取引価格を示す取引価格情報を取得する市場情報取得部と、
前記市場情報取得部によって取得された前記取引価格情報に基づいて、前記電力需要施設における電力消費の削減の対価を示す対価情報を作成する対価情報作成部と、
前記対価情報作成部によって作成された前記対価情報を前記生産管理装置に通知する対価情報通知部とを備える、電力消費管理装置。
[Appendix 2]
A consumption information acquisition unit for acquiring power consumption information related to power consumption from the power system side;
Based on the power consumption information acquired by the consumption information acquisition unit, an instruction creation unit that creates instruction information regarding power consumption in a power demand facility;
An instruction notifying unit for notifying the instruction information created by the instruction creating unit to a production management device that creates a production plan in the power demand facility;
A market information acquisition unit for acquiring transaction price information indicating the transaction price of Negawatt in the wholesale power market;
Based on the transaction price information acquired by the market information acquisition unit, a consideration information creation unit that creates compensation information indicating compensation for reduction of power consumption in the power demand facility;
A power consumption management device comprising: a price information notification unit that notifies the price management created by the price information creation unit to the production management device.

[付記3]
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設における生産計画を作成する生産管理装置とを備え、
前記電力消費管理装置は、卸電力市場におけるネガワットの取引価格に基づいて、前記電力需要施設における電力消費の削減の対価を示す対価情報を作成し、
前記電力消費管理装置は、前記電力需要施設における電力消費に関する指示情報、および前記対価情報を前記生産管理装置に送信し、
前記生産管理装置は、前記指示情報および前記対価情報を前記電力消費管理装置から受信し、受信した前記指示情報および前記対価情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する、電力消費管理システム。
[Appendix 3]
A power consumption management device for managing power consumption in a power demand facility;
A production management device for creating a production plan in the power demand facility;
The power consumption management device creates price information indicating a price for reducing power consumption at the power demand facility based on a negawatt transaction price in the wholesale power market,
The power consumption management device transmits instruction information regarding power consumption in the power demand facility, and the consideration information to the production management device,
The production management device receives the instruction information and the consideration information from the power consumption management device, makes a determination on the change of the production plan based on the received instruction information and the consideration information, and information based on the determination result Is transmitted to the power consumption management device.

[付記4]
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設から前記電力需要施設における生産計画を取得し、取得した前記生産計画の変更に関する判断を行う生産管理装置とを備え、
前記電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、
前記電力消費管理装置は、卸電力市場におけるネガワットの取引価格を示す取引価格情報を取得し、取得した前記取引価格情報に基づいて、前記電力需要施設における電力消費の削減の対価を示す対価情報を前記生産管理装置に送信し、
前記生産管理装置は、前記指示情報および前記対価情報を前記電力消費管理装置から受信し、受信した前記指示情報および前記対価情報に基づいて前記判断を行う、電力消費管理システム。
[Appendix 4]
A power consumption management device for managing power consumption in a power demand facility;
A production management device that obtains a production plan in the power demand facility from the power demand facility and makes a determination regarding a change in the obtained production plan, and
The power consumption management device acquires power consumption information related to power consumption from the power system side, based on the acquired power consumption information, transmits instruction information related to power consumption in the power demand facility to the production management device,
The power consumption management device acquires transaction price information indicating a transaction price of negative watts in a wholesale power market, and based on the acquired transaction price information, consideration information indicating a price for reducing power consumption in the power demand facility. Sent to the production management device,
The production management apparatus receives the instruction information and the consideration information from the power consumption management apparatus, and makes the determination based on the received instruction information and the consideration information.

1,2 電力消費管理システム
5 電力系統側
6 アグリゲータ
7 電力需要施設
8 卸電力市場
41 指示取得部
42 計画部
43 達成判断部
44 参加情報取得部
45 記憶部
46 制御情報作成部
51 要請応答通知部
52 参加判断部
53 指示応答取得部
54 消費情報取得部
55 指示作成部
56 指示通知部
57 報酬情報取得部
58 対価情報作成部
59 市場情報取得部
60 対価情報通知部
61 参加通知部
65 通信部
66 達成情報取得部
67 要請目標通知部
71 代替計画送信部
72 既存計画取得部
73 計画応答取得部
74 要請目標取得部
75 要請判断部
76 達成情報送信部
101 系統側管理装置
201 電力消費管理装置
202,302 生産管理装置
301 需要家装置
303 生産設備
401 取引市場装置
DESCRIPTION OF SYMBOLS 1, 2 Power consumption management system 5 Power system side 6 Aggregator 7 Electricity demand facility 8 Wholesale electric power market 41 Instruction acquisition part 42 Planning part 43 Achievement judgment part 44 Participation information acquisition part 45 Storage part 46 Control information creation part 51 Request response notification part 52 Participation Judgment Unit 53 Instruction Response Acquisition Unit 54 Consumption Information Acquisition Unit 55 Instruction Creation Unit 56 Instruction Notification Unit 57 Reward Information Acquisition Unit 58 Price Information Creation Unit 59 Market Information Acquisition Unit 60 Price Information Notification Unit 61 Participation Notification Unit 65 Communication Unit 66 Achievement information acquisition part 67 Request target notification part 71 Alternative plan transmission part 72 Existing plan acquisition part 73 Plan response acquisition part 74 Request target acquisition part 75 Request judgment part 76 Achievement information transmission part 101 System side management apparatus 201 Power consumption management apparatus 202, 302 Production Management Equipment 301 Consumer Equipment 303 Production Equipment 401 Transaction Market Equipment

Claims (16)

電力需要施設における生産計画を作成する生産管理装置であって、
前記電力需要施設における電力消費に関する指示情報を取得する指示取得部と、
前記指示取得部によって取得された前記指示情報に基づいて前記生産計画の変更に関する判断を行う計画部とを備える、生産管理装置。
A production management device for creating a production plan in a power demand facility,
An instruction acquisition unit for acquiring instruction information regarding power consumption in the power demand facility;
A production management apparatus comprising: a planning unit that makes a determination on the change of the production plan based on the instruction information acquired by the instruction acquisition unit.
前記指示取得部は、さらに、前記電力需要施設における電力消費の削減の対価を示す対価情報を取得し、
前記計画部は、前記指示取得部によって取得された前記指示情報および前記対価情報に基づいて前記生産計画の変更に関する判断を行う、請求項1に記載の生産管理装置。
The instruction acquisition unit further acquires consideration information indicating consideration for reduction of power consumption in the power demand facility,
The production management apparatus according to claim 1, wherein the planning unit makes a determination regarding the change of the production plan based on the instruction information and the consideration information acquired by the instruction acquisition unit.
前記計画部は、前記生産計画の変更に関する判断において、生産の遅れを許容した前記生産計画を作成可能である、請求項1または請求項2に記載の生産管理装置。   The production management apparatus according to claim 1, wherein the planning unit is capable of creating the production plan that allows a delay in production in the determination regarding the change of the production plan. 前記生産管理装置は、さらに、
前記計画部の判断結果に基づいて、前記指示情報の示す目標の達成可否を判断する達成判断部を備える、請求項1から請求項3のいずれか1項に記載の生産管理装置。
The production management device further includes:
The production management apparatus according to any one of claims 1 to 3, further comprising an achievement determination unit that determines whether or not the target indicated by the instruction information can be achieved based on a determination result of the planning unit.
電力系統側から電力消費に関する電力消費情報を取得する消費情報取得部と、
前記消費情報取得部によって取得された前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成する指示作成部と、
前記指示作成部によって作成された前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知する指示通知部とを備える、電力消費管理装置。
A consumption information acquisition unit for acquiring power consumption information related to power consumption from the power system side;
Based on the power consumption information acquired by the consumption information acquisition unit, an instruction creation unit that creates instruction information regarding power consumption in a power demand facility;
A power consumption management device comprising: an instruction notification unit that notifies the production management device that creates a production plan in the power demand facility of the instruction information created by the instruction creation unit.
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設における生産計画を作成する生産管理装置とを備え、
前記電力消費管理装置は、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、
前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する、電力消費管理システム。
A power consumption management device for managing power consumption in a power demand facility;
A production management device for creating a production plan in the power demand facility;
The power consumption management device transmits instruction information regarding power consumption at the power demand facility to the production management device,
The production management device receives the instruction information from the power consumption management device, makes a determination on the change of the production plan based on the received instruction information, and transmits information based on the determination result to the power consumption management device A power consumption management system.
前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の削減の対価を示す対価情報を前記生産管理装置に送信し、
前記生産管理装置は、前記指示情報および前記対価情報を前記生産管理装置から受信し、受信した前記指示情報および前記対価情報に基づいて、前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信する、請求項6に記載の電力消費管理システム。
The power consumption management device further transmits to the production management device consideration information indicating a consideration for reducing power consumption in the power demand facility,
The production management device receives the instruction information and the consideration information from the production management device, makes a determination on the change of the production plan based on the received instruction information and the consideration information, and information based on the determination result The power consumption management system according to claim 6, wherein the power consumption management device is transmitted to the power consumption management device.
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設から前記電力需要施設における生産計画を取得し、取得した前記生産計画の変更に関する判断を行う生産管理装置とを備え、
前記電力消費管理装置は、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信し、
前記生産管理装置は、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記判断を行う、電力消費管理システム。
A power consumption management device for managing power consumption in a power demand facility;
A production management device that obtains a production plan in the power demand facility from the power demand facility and makes a determination regarding a change in the obtained production plan, and
The power consumption management device acquires power consumption information related to power consumption from the power system side, based on the acquired power consumption information, transmits instruction information related to power consumption in the power demand facility to the production management device,
The production management apparatus receives the instruction information from the power consumption management apparatus and makes the determination based on the received instruction information.
電力需要施設における生産計画を作成する生産管理装置、における生産管理方法であって、
前記電力需要施設における電力消費に関する指示情報を取得するステップと、
取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを含む、生産管理方法。
A production management method in a production management device for creating a production plan in a power demand facility,
Obtaining instruction information regarding power consumption in the power demand facility;
And a step of making a determination on the change of the production plan based on the acquired instruction information.
電力消費管理装置における電力消費管理方法であって、
電力系統側から電力消費に関する電力消費情報を取得するステップと、
取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、
作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを含む、電力消費管理方法。
A power consumption management method in a power consumption management device,
Obtaining power consumption information related to power consumption from the power system side;
Based on the acquired power consumption information, creating instruction information related to power consumption in a power demand facility;
And notifying the created instruction information to a production management device that creates a production plan in the power demand facility.
電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、
前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、
前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを含む、電力消費管理方法。
A power consumption management method in a power consumption management system comprising: a power consumption management device that manages power consumption in a power demand facility; and a production management device that creates a production plan in the power demand facility,
The power consumption management device transmitting instruction information regarding power consumption in the power demand facility to the production management device;
The production management apparatus receives the instruction information from the power consumption management apparatus, makes a determination regarding the change of the production plan based on the received instruction information, and transmits information based on the determination result to the power consumption management apparatus And a power consumption management method.
電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおける電力消費管理方法であって、
前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、
前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、
前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを含む、電力消費管理方法。
A power consumption management method in a power consumption management system comprising a power consumption management device for managing power consumption in a power demand facility and a production management device,
The production management device obtaining a production plan in the power demand facility from the power demand facility;
The power consumption management device acquires power consumption information regarding power consumption from the power system side, and transmits instruction information regarding power consumption at the power demand facility to the production management device based on the acquired power consumption information. When,
The production management device includes a step of receiving the instruction information from the power consumption management device and making a determination on the change of the acquired production plan based on the received instruction information.
電力需要施設における生産計画を作成する生産管理装置、において用いられる生産管理プログラムであって、コンピュータに、
前記電力需要施設における電力消費に関する指示情報を取得するステップと、
取得した前記指示情報に基づいて前記生産計画の変更に関する判断を行うステップとを実行させるための、生産管理プログラム。
A production management program used in a production management device for creating a production plan in a power demand facility,
Obtaining instruction information regarding power consumption in the power demand facility;
A production management program for executing a step of making a determination on change of the production plan based on the acquired instruction information.
電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、
電力系統側から電力消費に関する電力消費情報を取得するステップと、
取得した前記電力消費情報に基づいて、電力需要施設における電力消費に関する指示情報を作成するステップと、
作成した前記指示情報を、前記電力需要施設における生産計画を作成する生産管理装置に通知するステップとを実行させるための、電力消費管理プログラム。
A power consumption management program for use in a power consumption management device, comprising:
Obtaining power consumption information related to power consumption from the power system side;
Based on the acquired power consumption information, creating instruction information related to power consumption in a power demand facility;
A power consumption management program for executing the step of notifying the created instruction information to a production management apparatus that creates a production plan in the power demand facility.
電力需要施設における電力消費を管理する電力消費管理装置と、前記電力需要施設における生産計画を作成する生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、
前記電力消費管理装置が、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、
前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信し、受信した前記指示情報に基づいて前記生産計画の変更に関する判断を行い、判断結果に基づく情報を前記電力消費管理装置に送信するステップとを実行させるための、電力消費管理プログラム。
A power consumption management program used in a power consumption management system comprising a power consumption management device that manages power consumption in a power demand facility and a production management device that creates a production plan in the power demand facility, the computer comprising:
The power consumption management device transmitting instruction information regarding power consumption in the power demand facility to the production management device;
The production management apparatus receives the instruction information from the power consumption management apparatus, makes a determination regarding the change of the production plan based on the received instruction information, and transmits information based on the determination result to the power consumption management apparatus A power consumption management program for executing
電力需要施設における電力消費を管理する電力消費管理装置と、生産管理装置とを備える電力消費管理システムにおいて用いられる電力消費管理プログラムであって、コンピュータに、
前記生産管理装置が、前記電力需要施設から前記電力需要施設における生産計画を取得するステップと、
前記電力消費管理装置が、電力系統側から電力消費に関する電力消費情報を取得し、取得した前記電力消費情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記生産管理装置に送信するステップと、
前記生産管理装置が、前記指示情報を前記電力消費管理装置から受信して、受信した前記指示情報に基づいて、取得した前記生産計画の変更に関する判断を行うステップとを実行させるための、電力消費管理プログラム。
A power consumption management program for use in a power consumption management system comprising a power consumption management device for managing power consumption in a power demand facility and a production management device, comprising:
The production management device obtaining a production plan in the power demand facility from the power demand facility;
The power consumption management device acquires power consumption information regarding power consumption from the power system side, and transmits instruction information regarding power consumption at the power demand facility to the production management device based on the acquired power consumption information. When,
Power consumption for causing the production management device to execute the step of receiving the instruction information from the power consumption management device and making a determination on the change of the acquired production plan based on the received instruction information. Management program.
JP2014114085A 2014-06-02 2014-06-02 Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program Active JP6519990B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014114085A JP6519990B2 (en) 2014-06-02 2014-06-02 Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014114085A JP6519990B2 (en) 2014-06-02 2014-06-02 Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program

Publications (2)

Publication Number Publication Date
JP2015228166A true JP2015228166A (en) 2015-12-17
JP6519990B2 JP6519990B2 (en) 2019-05-29

Family

ID=54885591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014114085A Active JP6519990B2 (en) 2014-06-02 2014-06-02 Production management apparatus, power consumption management apparatus, power consumption management system, production management method, power consumption management method, production management program, and power consumption management program

Country Status (1)

Country Link
JP (1) JP6519990B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002252924A (en) * 2001-02-26 2002-09-06 Toshiba Corp Power transaction system and method
JP2012147546A (en) * 2011-01-11 2012-08-02 Toshiba Corp Electric power demand-supply adjusting reservation capacity trading system and electric power demand-supply adjusting reservation capacity trading method
JP2013230051A (en) * 2012-04-26 2013-11-07 Ntt Facilities Inc Power saving support processing system, power saving support processing device, power management terminal, power management server, power saving support method, and program
JP2014081774A (en) * 2012-10-16 2014-05-08 Hitachi Ltd Power rate plan selection support apparatus, method and program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002252924A (en) * 2001-02-26 2002-09-06 Toshiba Corp Power transaction system and method
JP2012147546A (en) * 2011-01-11 2012-08-02 Toshiba Corp Electric power demand-supply adjusting reservation capacity trading system and electric power demand-supply adjusting reservation capacity trading method
JP2013230051A (en) * 2012-04-26 2013-11-07 Ntt Facilities Inc Power saving support processing system, power saving support processing device, power management terminal, power management server, power saving support method, and program
JP2014081774A (en) * 2012-10-16 2014-05-08 Hitachi Ltd Power rate plan selection support apparatus, method and program

Also Published As

Publication number Publication date
JP6519990B2 (en) 2019-05-29

Similar Documents

Publication Publication Date Title
Alam et al. An optimal P2P energy trading model for smart homes in the smart grid
Mahmoudi et al. A bottom-up approach for demand response aggregators’ participation in electricity markets
Nguyen et al. Dynamic pricing design for demand response integration in power distribution networks
Ghazvini et al. A multi-objective model for scheduling of short-term incentive-based demand response programs offered by electricity retailers
Wen et al. Strategic bidding for electricity supply in a day-ahead energy market
Khodaei et al. SCUC with hourly demand response considering intertemporal load characteristics
Ketter et al. Power TAC: A competitive economic simulation of the smart grid
Zhang et al. Fair electricity transfer price and unit capacity selection for microgrids
Nunna et al. Multi-agent based demand response management system for combined operation of smart microgrids
Wang et al. Stochastic optimization for energy management in power systems with multiple microgrids
Ströhle et al. Local matching of flexible load in smart grids
Salah et al. Morphological analysis of energy services: Paving the way to quality differentiation in the power sector
Monacchi et al. Assisted energy management in smart microgrids
US9870569B2 (en) Flexible energy use offers
Ilic et al. Distributed electric power systems of the future: Institutional and technological drivers for near-optimal performance
Kefayati et al. Energy delivery transaction pricing for flexible electrical loads
Leo et al. Stochastic short-term integrated electricity procurement and production scheduling for a large consumer
Subramanian et al. A data-driven methodology for dynamic pricing and demand response in electric power networks
Ahmadi et al. A novel two-stage stochastic programming model for uncertainty characterization in short-term optimal strategy for a distribution company
Chouikhi et al. Energy consumption scheduling as a fog computing service in smart grid
Fatras et al. Process-to-market matrix mapping: A multi-criteria evaluation framework for industrial processes’ electricity market participation feasibility
JP7366124B2 (en) Connection method and system applied to power generation/power consumption balance in two-tier market
Nikolaev et al. An optimization algorithm for simulating smart-grid means for distribution grid balancing
Celik et al. Analysis of demand response for datacenter energy management using GA and time-of-use prices
Zois et al. Integrated platform for automated sustainable demand response in smart grids

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180313

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180320

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180510

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180612

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180802

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20190108

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190307

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20190315

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190402

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190415

R150 Certificate of patent or registration of utility model

Ref document number: 6519990

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250