JP2015036828A - Print system, print server, printer, and printing method - Google Patents

Print system, print server, printer, and printing method Download PDF

Info

Publication number
JP2015036828A
JP2015036828A JP2013167272A JP2013167272A JP2015036828A JP 2015036828 A JP2015036828 A JP 2015036828A JP 2013167272 A JP2013167272 A JP 2013167272A JP 2013167272 A JP2013167272 A JP 2013167272A JP 2015036828 A JP2015036828 A JP 2015036828A
Authority
JP
Japan
Prior art keywords
print
print job
job
information processing
processing apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013167272A
Other languages
Japanese (ja)
Other versions
JP6119500B2 (en
Inventor
敏伸 山口
Toshinobu Yamaguchi
敏伸 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konica Minolta Inc
Original Assignee
Konica Minolta Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konica Minolta Inc filed Critical Konica Minolta Inc
Priority to JP2013167272A priority Critical patent/JP6119500B2/en
Publication of JP2015036828A publication Critical patent/JP2015036828A/en
Application granted granted Critical
Publication of JP6119500B2 publication Critical patent/JP6119500B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Accessory Devices And Overall Control Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a print system and the like which have more satisfactory convenience by reducing a stand-by time of a user which can occur in pull-print.SOLUTION: When a user performs print job issue processing on an information processor (P11), the information processor starts transmitting a print job to a server, and the server starts storing the print job (P12). Then, when the user inputs an execution instruction of the print job on a printer (P13), the printer requests the print job to the server, and the server confirms the reception of the print job (P14). If the reception is incomplete, the server creates instruction information to cause the information processor to stop the transmission of the job to its own device and to cause the print job to be directly transmitted by the printer, and transmits it to the information processor (P15). The information processor stops the transmission of the print job to the server on the basis of the instruction information and directly transmits the print job to the printer (P16).

Description

本発明は、プリントシステム、プリントサーバー、印刷装置及び印刷方法に関し、特にプリントサーバーに蓄積された印刷ジョブをプルプリントするための技術に関する。   The present invention relates to a print system, a print server, a printing apparatus, and a printing method, and more particularly to a technique for pull-printing a print job stored in a print server.

一般的なオフィスなどにおいては、複数の印刷装置と複数のコンピュータとがネットワークを介して通信可能に接続されている場合が多い。そのような場合、プリントサーバーによって印刷ジョブの集中管理を行うことがある。   In a general office or the like, a plurality of printing apparatuses and a plurality of computers are often connected to be communicable via a network. In such a case, centralized management of print jobs may be performed by the print server.

プリントサーバーは、コンピュータから送信される印刷ジョブを各印刷装置に振り分けたり、印刷順序を整えたりするものである。このようなプリントサーバーは、印刷ジョブを記憶しておくことができる構成である。そのため、ユーザーは、コンピュータを操作することによって印刷ジョブを一旦プリントサーバーにアップロードして記憶させておくことができる。その後、ユーザーは、印刷装置の設置場所まで移動して印刷装置に対する操作を行うことにより、印刷装置からプリントサーバーへアクセスし、プリントサーバーに記憶されている印刷ジョブを取得(ダウンロード)して印刷出力を行うことが可能である。このような出力形態は一般に「プルプリント」と呼ばれている。   The print server distributes a print job transmitted from a computer to each printing apparatus and arranges a printing order. Such a print server is configured to store a print job. Therefore, the user can once upload the print job to the print server and store it by operating the computer. After that, the user moves to the installation location of the printing device and operates the printing device to access the print server from the printing device, obtain (download) the print job stored in the print server, and print it out. Can be done. Such an output form is generally called “pull print”.

このように、プルプリントシステムにおいては、印刷ジョブはプリントサーバーで一括管理される。そのため、複数のユーザーが同時にプルプリントを行っている場合は、プリントサーバーに負荷がかかり、コンピュータからプリントサーバーに印刷ジョブをアップロードするのに時間がかかる。また、データ量の大きい印刷ジョブをアップロードする場合も同様に印刷ジョブのアップロードに時間がかかる。   In this way, in the pull print system, print jobs are collectively managed by the print server. For this reason, when a plurality of users are simultaneously performing pull printing, a load is applied to the print server, and it takes time to upload a print job from the computer to the print server. Similarly, when a print job with a large amount of data is uploaded, it takes time to upload the print job.

この種のプリントサーバーは、コンピュータから送信される印刷ジョブの受信が完了していないときには、印刷装置から該印刷ジョブの要求があっても直ぐには送信処理を開始することができない。そのため、コンピュータからプリントサーバーに印刷ジョブをアップロードするのに時間がかかると、ユーザーが任意の印刷装置に対する印刷指示を行っても、印刷装置がプリントサーバーからすぐに印刷ジョブをダウンロードできない場合が生じる。この場合、ユーザーは、コンピュータからプリントサーバーに印刷ジョブがアップロードされ、かつ、プリントサーバーから印刷装置にその印刷ジョブがダウンロードされるまで待機しなければならない。   When this type of print server has not received a print job transmitted from a computer, it cannot immediately start a transmission process even if a request for the print job is received from the printing apparatus. For this reason, if it takes time to upload a print job from the computer to the print server, the print device may not be able to download the print job immediately from the print server even if the user gives a print instruction to an arbitrary print device. In this case, the user must wait until the print job is uploaded from the computer to the print server and the print job is downloaded from the print server to the printing apparatus.

なお、下記特許文献1には、外部端末から認証プリントジョブのデータを受信し、当該認証プリントジョブを実行するためのユーザーによる認証要求を受け付け、認証が成功すると当該認証プリントジョブを実行する画像形成装置において、認証プリントジョブの受信完了までに認証が成功すると、画像形成装置の操作パネルに、受信中の認証プリントジョブの受信完了時間を表示する技術が開示されている。しかし、当該技術では、ユーザーの待機時間を低減することはできない。   Japanese Patent Laid-Open Publication No. 2003-259259 discloses an image formation that receives authentication print job data from an external terminal, accepts an authentication request from a user for executing the authentication print job, and executes the authentication print job when the authentication is successful. A technique is disclosed in which when the authentication is successful before the reception of the authentication print job is completed in the apparatus, the reception completion time of the authentication print job being received is displayed on the operation panel of the image forming apparatus. However, this technique cannot reduce the waiting time of the user.

特開2012−132984号公報JP 2012-132984 A

本発明は、上記問題点に鑑みてなされたものであり、プルプリント時に発生し得るユーザーの待機時間を低減することにより、より良好な利便性を有するプリントシステム、プリントサーバー、印刷装置及び印刷方法を提供することを目的とする。   SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has a printing system, a print server, a printing apparatus, and a printing method that have better convenience by reducing the waiting time of a user that can occur during pull printing. The purpose is to provide.

前記目的を達成するため、請求項1に記載の発明は、情報処理装置とプリントサーバーと印刷装置とが相互に通信可能であり、前記情報処理装置が前記プリントサーバーに印刷ジョブを送信し、前記プリントサーバーが前記印刷装置からのジョブ要求に応じて印刷ジョブを前記印刷装置に送信することにより印刷出力を行うプリントシステムであって、前記プリントサーバーは、印刷ジョブを記憶する記憶手段と、前記情報処理装置から送信される印刷ジョブを受信して前記記憶手段に格納するジョブ受信手段と、前記印刷装置からジョブ要求を受けたとき、前記ジョブ受信手段において当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する判断手段と、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記情報処理装置に印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるための指示情報が前記情報処理装置に対して送信されるように制御するジョブ制御手段と、を備え、前記情報処理装置は、印刷ジョブを送信する送信手段と、前記指示情報を受信することに伴い、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を中止させると共に、当該印刷ジョブの送信先を前記印刷装置に変更させて当該印刷ジョブの送信処理を行わせる送信制御手段と、を備えることを特徴とするものである。   In order to achieve the object, according to the first aspect of the present invention, an information processing apparatus, a print server, and a printing apparatus can communicate with each other, the information processing apparatus transmits a print job to the print server, and A print system in which a print server performs print output by transmitting a print job to the printing apparatus in response to a job request from the printing apparatus, wherein the print server stores storage means for storing the print job, and the information A job receiving means for receiving a print job transmitted from the processing apparatus and storing it in the storage means; and when receiving a job request from the printing apparatus, the job receiving means receives a print job corresponding to the job request. Determining means for determining whether or not the print job has been received, and determining that reception of the print job has not been completed by the determining means; Job control for controlling the information processing apparatus to transmit to the information processing apparatus instruction information for causing the information processing apparatus to stop transmission processing of the print job and directly transmitting the print job to the printing apparatus. And the information processing apparatus, in response to receiving the instruction information, stops transmission processing of the print job to the print server by the transmission unit, Transmission control means for changing the transmission destination of the print job to the printing apparatus and performing transmission processing of the print job.

請求項2に記載の発明は、請求項1に記載のプリントシステムにおいて、前記ジョブ制御手段は、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段を備えることを特徴とするものである。   According to a second aspect of the present invention, in the print system according to the first aspect, the job control unit generates the instruction information when the determination unit determines that the reception of the print job is not completed. Transmission destination changing means for switching a transmission destination of a print job transmitted by the information processing apparatus to the printing apparatus by transmitting to the information processing apparatus.

請求項3に記載の発明は、請求項1に記載のプリントシステムにおいて、前記ジョブ制御手段は、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記印刷装置に対し、前記ジョブ要求に対する応答として前記情報処理装置に関する送信元情報を送信することにより、前記印刷装置に前記指示情報を送信させるものであり、前記印刷装置は、前記送信元情報を受信することに伴い、前記指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段を備えることを特徴とするものである。   According to a third aspect of the present invention, in the print system according to the first aspect, when the job control unit determines that the reception of the print job is not completed by the determination unit, the job control unit By transmitting transmission source information related to the information processing apparatus as a response to the job request, the instruction information is transmitted to the printing apparatus, and the printing apparatus receives the transmission source information. And a transmission destination changing unit that switches a transmission destination of a print job transmitted by the information processing apparatus to the printing apparatus by generating the instruction information and transmitting the instruction information to the information processing apparatus. .

請求項4に記載の発明は、請求項2又は3に記載のプリントシステムにおいて、前記送信先変更手段は、前記情報処理装置による前記プリントサーバーへの印刷ジョブの送信処理を継続させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第1の受信完了時間が所定時間よりも長い場合に、前記指示情報を生成して前記情報処理装置に送信することを特徴とするものである。   According to a fourth aspect of the present invention, in the print system according to the second or third aspect, the transmission destination changing unit is configured to perform the transmission processing of the print job to the print server by the information processing apparatus. The instruction information is generated and transmitted to the information processing apparatus when a first reception completion time required for the printing apparatus to complete reception of the print job is longer than a predetermined time. is there.

請求項5に記載の発明は、請求項4に記載のプリントシステムにおいて、前記所定時間は、前記情報処理装置による前記プリントサーバーへの印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第2の受信完了時間であることを特徴とするものである。   According to a fifth aspect of the present invention, in the print system according to the fourth aspect, during the predetermined time, the information processing apparatus stops a print job transmission process to the print server, and the print job is transferred to the printing apparatus. This is a second reception completion time required for the printing apparatus to complete the reception of the print job when directly transmitting to the printer.

請求項6に記載の発明は、請求項5に記載のプリントシステムにおいて、前記第2の受信完了時間には、前記情報処理装置が印刷ジョブの送信先を前記印刷装置に切り替えるために要する切替時間が含まれることを特徴とするものである。   According to a sixth aspect of the present invention, in the print system according to the fifth aspect, the second reception completion time includes a switching time required for the information processing apparatus to switch the transmission destination of the print job to the printing apparatus. Is included.

請求項7に記載の発明は、請求項6に記載のプリントシステムにおいて、前記切替時間は、ユーザーによって予め定められた時間であることを特徴とするものである。   According to a seventh aspect of the present invention, in the print system according to the sixth aspect, the switching time is a time predetermined by a user.

請求項8に記載の発明は、請求項4乃至7のいずれかに記載のプリントシステムにおいて、前記送信先変更手段は、前記プリントサーバーが前記情報処理装置から受信中である印刷ジョブの全データサイズと、受信開始時刻と、受信済みデータサイズとを取得し、前記受信開始時刻からの経過時間に基づいて前記プリントサーバーが残りデータを受信完了させるまでに要する時間を算出すると共に、前記プリントサーバーが残りデータを受信完了してから前記印刷装置に当該印刷ジョブの送信を完了させるのに要する時間を算出することにより、前記第1の受信完了時間を取得することを特徴とするものである。   According to an eighth aspect of the present invention, in the print system according to any one of the fourth to seventh aspects, the transmission destination changing unit includes a total data size of a print job that the print server is receiving from the information processing apparatus. And the reception start time and the received data size, calculate the time required for the print server to complete the reception of the remaining data based on the elapsed time from the reception start time, and the print server The first reception completion time is obtained by calculating a time required for the printing apparatus to complete transmission of the print job after reception of the remaining data is completed.

請求項9に記載の発明は、請求項2乃至8のいずれかに記載のプリントシステムにおいて、前記送信先変更手段は、前記指示情報を前記情報処理装置に送信する前に、前記情報処理装置による印刷ジョブの送信先を前記印刷装置に変更するか否かをユーザーに問い合わせ、該ユーザーから送信先の変更が指示された場合に、前記指示情報を前記情報処理装置に送信することを特徴とするものである。   According to a ninth aspect of the present invention, in the print system according to any one of the second to eighth aspects, the transmission destination changing unit is configured to use the information processing apparatus before transmitting the instruction information to the information processing apparatus. An inquiry is made to the user as to whether or not to change the transmission destination of the print job to the printing apparatus, and the instruction information is transmitted to the information processing apparatus when the user instructs to change the transmission destination. Is.

請求項10に記載の発明は、請求項1乃至3のいずれかに記載のプリントシステムにおいて、前記送信制御手段は、前記指示情報を受信することに伴い、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を継続させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第1の受信完了時間が所定時間よりも長いか否かを判定し、前記第1の受信完了時間が前記所定時間よりも長い場合に、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を中止させると共に、当該印刷ジョブの送信先を前記印刷装置に変更させて当該印刷ジョブの送信処理を行わせることを特徴とするものである。   According to a tenth aspect of the present invention, in the print system according to any one of the first to third aspects, the transmission control means receives the instruction information and prints to the print server by the transmission means. When the job transmission process is continued, it is determined whether or not a first reception completion time required for the printing apparatus to complete reception of the print job is longer than a predetermined time, and the first reception completion When the time is longer than the predetermined time, the transmission unit stops the transmission process of the print job to the print server, and changes the transmission destination of the print job to the printing apparatus, thereby transmitting the print job. It is characterized by making it perform.

請求項11に記載の発明は、請求項1乃至10のいずれかに記載のプリントシステムにおいて、前記印刷装置は、前記情報処理装置から送信される印刷ジョブを受信するとき、前記情報処理装置との通信禁止設定が行われていれば、当該通信禁止設定を解除することを特徴とするものである。   According to an eleventh aspect of the present invention, in the print system according to any one of the first to tenth aspects, when the printing apparatus receives a print job transmitted from the information processing apparatus, If the communication prohibition setting is performed, the communication prohibition setting is canceled.

請求項12に記載の発明は、情報処理装置及び印刷装置と相互に通信可能であり、前記情報処理装置が送信される印刷ジョブを受信して蓄積し、前記印刷装置からのジョブ要求に応じて印刷ジョブを前記印刷装置に送信するプリントサーバーであって、印刷ジョブを記憶する記憶手段と、前記情報処理装置から送信される印刷ジョブを受信して前記記憶手段に格納するジョブ受信手段と、前記印刷装置からジョブ要求を受けたとき、前記ジョブ受信手段において当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する判断手段と、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記情報処理装置に印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるための指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段と、を備えることを特徴とするプリントサーバーである。   According to a twelfth aspect of the present invention, the information processing apparatus and the printing apparatus can communicate with each other, and the information processing apparatus receives and stores a print job to be transmitted, and responds to a job request from the printing apparatus. A print server that transmits a print job to the printing apparatus, a storage unit that stores the print job, a job reception unit that receives the print job transmitted from the information processing apparatus and stores the print job in the storage unit, and When the job request is received from the printing apparatus, the job receiving unit determines whether the reception of the print job corresponding to the job request is completed, and the determination unit completes the reception of the print job. When the information processing apparatus determines that the information processing apparatus does not transmit the print job, the print apparatus transmits the print job directly to the printing apparatus. A print server comprising: transmission destination changing means for switching a transmission destination of a print job transmitted by the information processing apparatus to the printing apparatus by generating display information and transmitting the information to the information processing apparatus It is.

請求項13に記載の発明は、印刷ジョブを蓄積するプリントサーバーから印刷ジョブを取得して印刷出力を行う印刷装置であって、前記プリントサーバーに対して印刷ジョブを要求するためのジョブ要求を送信するジョブ要求手段と、前記プリントサーバーから、前記ジョブ要求に対する応答として、前記ジョブ要求に対応する印刷ジョブを送信中である情報処理装置の送信元情報を受信することに伴い、前記情報処理装置に前記プリントサーバーへの印刷ジョブの送信処理を中止させて当該印刷ジョブを当該印刷装置に直接送信させるための指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を当該印刷装置に切り替える送信先変更手段と、を備えることを特徴とする印刷装置である。   According to a thirteenth aspect of the present invention, there is provided a printing apparatus that obtains a print job from a print server that stores the print job and performs print output, and transmits a job request for requesting the print job to the print server. In response to receiving the transmission source information of the information processing apparatus that is transmitting the print job corresponding to the job request from the print server as a response to the job request, Sent by the information processing apparatus by generating instruction information for stopping the transmission processing of the print job to the print server and transmitting the print job directly to the printing apparatus and transmitting the instruction information to the information processing apparatus. Transmission destination changing means for switching the transmission destination of the print job to the printing apparatus. It is a device.

請求項14に記載の発明は、情報処理装置とプリントサーバーと印刷装置とが相互に通信可能であり、前記情報処理装置が前記プリントサーバーに印刷ジョブを送信し、前記印刷装置が前記プリントサーバーにジョブ要求を送信することにより印刷ジョブを取得して印刷出力を行う印刷方法であって、前記プリントサーバーが前記情報処理装置から送信される印刷ジョブを受信して所定の記憶手段に格納していくステップと、前記プリントサーバーが前記印刷装置からジョブ要求を受けたとき、当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断するステップと、ジョブ要求に対応する印刷ジョブの受信が完了していないとき、前記情報処理装置に当該印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるステップと、を有することを特徴とする印刷方法である。   According to a fourteenth aspect of the present invention, the information processing apparatus, the print server, and the printing apparatus can communicate with each other, the information processing apparatus transmits a print job to the print server, and the printing apparatus transmits to the print server. A printing method for acquiring a print job by transmitting a job request and performing print output, wherein the print server receives the print job transmitted from the information processing apparatus and stores it in a predetermined storage unit A step of determining whether or not reception of a print job corresponding to the job request is completed when the print server receives a job request from the printing apparatus; and reception of a print job corresponding to the job request When the print job is not completed, the information processing apparatus stops the transmission process of the print job and sends the print job to the printing apparatus. A step of transmitting directly a printing method characterized by having a.

本発明によれば、プリントサーバーが情報処理装置から送信される印刷ジョブを受信して所定の記憶手段に格納していき、プリントサーバーが印刷装置からジョブ要求を受けたとき、当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する。そして、該受信が完了していないときには、情報処理装置に当該印刷ジョブの送信処理を中止させて当該印刷ジョブを印刷装置に直接送信させる。   According to the present invention, when the print server receives a print job transmitted from the information processing apparatus and stores it in a predetermined storage unit, the print server responds to the job request when receiving a job request from the printing apparatus. It is determined whether reception of the print job to be completed is completed. Then, when the reception is not completed, the information processing apparatus stops the transmission process of the print job and directly transmits the print job to the printing apparatus.

これにより、プリントサーバーが印刷ジョブの受信を完了していない場合でも、プリントサーバーに印刷ジョブの受信を引き続き行わせ印刷装置には該プリントサーバーから印刷ジョブを受信させる従来の構成に比して、印刷装置が印刷ジョブをより早く受信できる場合が生じ得る。この場合、前記従来の構成に比して、印刷出力が完了するまでのユーザーの待機時間を低減することができる。これにより、プリントシステムの利便性を向上することができる。   As a result, even when the print server has not received the print job, the print server continues to receive the print job and the printing apparatus receives the print job from the print server. It may happen that the printing device can receive the print job sooner. In this case, it is possible to reduce the waiting time of the user until the print output is completed, as compared with the conventional configuration. Thereby, the convenience of the printing system can be improved.

プリントシステムの全体構成例を示す図である。1 is a diagram illustrating an example of the overall configuration of a print system. プルプリントの概念を示す図である。It is a figure which shows the concept of a pull print. 情報処理装置の構成例を示す図である。It is a figure which shows the structural example of information processing apparatus. 印刷装置の構成例を示す図である。It is a figure which shows the structural example of a printing apparatus. プリントサーバーの構成例を示す図である。FIG. 3 is a diagram illustrating a configuration example of a print server. プリントサーバー、情報処理装置及び印刷装置で行われる処理手順を示すプロセス図である。FIG. 6 is a process diagram illustrating a processing procedure performed by the print server, the information processing apparatus, and the printing apparatus. 第2の実施形態に係るプリントサーバーの構成例を示す図である。It is a figure which shows the structural example of the print server which concerns on 2nd Embodiment. 第2の実施形態における印刷装置の構成例を示す図である。It is a figure which shows the structural example of the printing apparatus in 2nd Embodiment. 第2の実施形態におけるプリントサーバー、情報処理装置及び印刷装置で行われる処理手順を示すプロセス図である。FIG. 10 is a process diagram illustrating a processing procedure performed by a print server, an information processing apparatus, and a printing apparatus according to a second embodiment. 第3の実施形態に係るプリントサーバーの構成例を示す図である。It is a figure which shows the structural example of the print server which concerns on 3rd Embodiment. 第3の実施形態における印刷装置の構成例を示す図である。It is a figure which shows the structural example of the printing apparatus in 3rd Embodiment. 第3の実施形態におけるプリントサーバー、情報処理装置及び印刷装置で行われる処理手順を示すプロセス図である。FIG. 10 is a process diagram illustrating a processing procedure performed by a print server, an information processing apparatus, and a printing apparatus according to a third embodiment. 問い合わせ画面の一例を示す図である。It is a figure which shows an example of an inquiry screen. 第4の実施形態に係る印刷装置の構成例を示す図である。It is a figure which shows the structural example of the printing apparatus which concerns on 4th Embodiment. 第4の実施形態におけるプリントサーバー、情報処理装置及び印刷装置で行われる処理手順を示すプロセス図である。It is a process figure which shows the process sequence performed with the print server in 4th Embodiment, an information processing apparatus, and a printing apparatus. 第5の実施形態におけるプリントサーバー、情報処理装置及び印刷装置間の通信に要する時間を示す図である。It is a figure which shows the time which communication for the print server in 5th Embodiment, information processing apparatus, and a printing apparatus requires.

以下、本発明に関する好ましい実施形態について図面を参照しつつ詳細に説明する。なお、以下に説明する実施形態において互いに共通する部材には同一符号を付しており、それらについての重複する説明は省略する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings. In addition, in embodiment described below, the same code | symbol is attached | subjected to the member which is mutually common, and the overlapping description about them is abbreviate | omitted.

(第1の実施形態)
図1は、本発明の一実施形態であるプリントシステム1の全体構成例を示す図である。図1に示すように、プリントシステム1は、プリントサーバー2と、印刷ジョブを生成する情報処理装置3(3a〜3c)と、印刷装置4(4a〜4c)とが通信ネットワーク5を介して相互に通信が可能な構成である。通信ネットワーク5は、例えば、一般的なオフィス内に構築されるLAN(Local Area Network)である。但し、これに限定されず通信ネットワーク5は、WAN(Wide Area Network)などの広域的な通信網を含む複合的な通信ネットワークであってもよい。また、情報処理装置3及び印刷装置4は、少なくとも1台ずつ用意されていれば良く、図示されている数に限られない。
(First embodiment)
FIG. 1 is a diagram illustrating an example of the overall configuration of a print system 1 according to an embodiment of the present invention. As shown in FIG. 1, a print system 1 includes a print server 2, an information processing device 3 (3 a to 3 c) that generates a print job, and a printing device 4 (4 a to 4 c) via a communication network 5. In this configuration, communication is possible. The communication network 5 is, for example, a LAN (Local Area Network) constructed in a general office. However, the communication network 5 is not limited to this, and may be a complex communication network including a wide area communication network such as a WAN (Wide Area Network). Moreover, the information processing apparatus 3 and the printing apparatus 4 should just be prepared at least 1 each, and are not restricted to the number shown in figure.

プリントサーバー2は、プルプリントを行うことが可能に構成されるプリントサーバーであり、情報処理装置3から送信される印刷ジョブを蓄積して記憶し、印刷装置4からの要求に応じて蓄積した印刷ジョブを印刷装置4に送信する機能を有している。図2は、プルプリントの概念を示す図である。図2に示すように、プリントサーバー2は、情報処理装置3から送信される印刷ジョブJを受付けて記憶することにより印刷ジョブJを登録する。その後、プリントサーバー2は、何れかの印刷装置4から印刷ジョブ送信要求を受けると、その印刷ジョブ送信要求で指定された印刷ジョブJをその印刷装置4に送信する。そして、印刷装置4は、プリントサーバー2から受信する印刷ジョブJに基づいて印刷出力を行う。   The print server 2 is a print server configured to be able to perform pull printing. The print server 2 accumulates and stores print jobs transmitted from the information processing apparatus 3, and prints accumulated in response to a request from the printing apparatus 4. It has a function of transmitting a job to the printing apparatus 4. FIG. 2 is a diagram illustrating the concept of pull printing. As illustrated in FIG. 2, the print server 2 registers the print job J by receiving and storing the print job J transmitted from the information processing apparatus 3. Thereafter, when the print server 2 receives a print job transmission request from any of the printing apparatuses 4, the print server 2 transmits the print job J designated by the print job transmission request to the printing apparatus 4. The printing apparatus 4 performs print output based on the print job J received from the print server 2.

したがって、ユーザーは、情報処理装置3を操作することによって印刷ジョブJの送信を指示した後、印刷装置4の設置場所まで移動して該印刷装置4に対する直接の操作を行うことにより、プリントサーバー2に登録されている印刷ジョブJを該印刷装置4に取り込んで印刷出力を行わせることができる。このような出力形態によると、ユーザーは、第三者に印刷物を読まれてしまうことなく安全に印刷物を取得することができるようになる。つまり、プルプリントは、秘密情報などの漏洩を未然に防止するためのセキュリティの高い印刷方法として利用される。また、プリントサーバー2に印刷ジョブJを記憶させておくことで、ユーザーにとっては複数の印刷装置4a〜4cの何れからでもその印刷ジョブJに基づく印刷出力を行わせることができるので、利便性が良いというメリットもある。   Therefore, the user instructs the transmission of the print job J by operating the information processing device 3, then moves to the installation location of the printing device 4 and performs a direct operation on the printing device 4. Can be loaded into the printing apparatus 4 and printed out. According to such an output form, the user can obtain the printed material safely without the third party reading the printed material. That is, pull printing is used as a high-security printing method for preventing leakage of secret information and the like. In addition, storing the print job J in the print server 2 allows the user to perform print output based on the print job J from any of the plurality of printing devices 4a to 4c, which is convenient. There is also a merit that it is good.

情報処理装置3は、例えば一般的なパーソナルコンピュータである。情報処理装置3は、ユーザーによる操作指示に基づいて印刷ジョブJを生成し、プルプリントを行う場合は、その印刷ジョブJは、プリントサーバー2の所定の記憶領域に送信(アップロード)される。   The information processing apparatus 3 is, for example, a general personal computer. When the information processing apparatus 3 generates a print job J based on an operation instruction by the user and performs pull printing, the print job J is transmitted (uploaded) to a predetermined storage area of the print server 2.

印刷装置4は、例えば一般的な複合機であり、印刷機能の他、スキャン機能など各種機能を備えている。また、印刷装置4は、ユーザーによる指示操作に基づきプリントサーバー2に記憶されている印刷ジョブJの送信要求をプリントサーバー2に対して行い、そのプリントサーバー2から送信される印刷ジョブJを受付けて印刷出力を行うように構成される。   The printing apparatus 4 is, for example, a general multifunction machine, and includes various functions such as a scanning function in addition to a printing function. Further, the printing apparatus 4 makes a transmission request for the print job J stored in the print server 2 to the print server 2 based on an instruction operation by the user, and accepts the print job J transmitted from the print server 2. It is configured to perform print output.

図3は、情報処理装置3の構成例を示す図である。図3に示すように、情報処理装置3は、各種情報を表示する表示部31と、ユーザーから操作入力を受け付ける操作部32とを備えている。操作部32は、例えばキーボードやマウスの他、表示部31の画面上に配置されるタッチパネルセンサーなどで構成される。また、情報処理装置3は、ネットワークを介して他の通信機器と通信を行うための通信インタフェース(I/F)部33と、ハードディスクドライブ(HDD)やソリッドステートドライブ(SSD)等の不揮発性記憶手段で構成される記憶部34と、CPU及びメモリを有する制御部35とを備えている。そして、情報処理装置3は、これらの構成要素31〜35がデータバスDB1を介して相互にデータの入出力を行うことができる構成とされている。   FIG. 3 is a diagram illustrating a configuration example of the information processing apparatus 3. As illustrated in FIG. 3, the information processing apparatus 3 includes a display unit 31 that displays various types of information and an operation unit 32 that receives an operation input from a user. The operation unit 32 includes, for example, a touch panel sensor disposed on the screen of the display unit 31 in addition to a keyboard and a mouse. The information processing apparatus 3 includes a communication interface (I / F) unit 33 for communicating with other communication devices via a network, and a nonvolatile storage such as a hard disk drive (HDD) or a solid state drive (SSD). A storage unit 34 composed of means and a control unit 35 having a CPU and a memory are provided. The information processing apparatus 3 is configured such that these constituent elements 31 to 35 can input and output data mutually via the data bus DB1.

制御部35は、CPUがメモリに記憶されているプログラムを実行することにより、操作部32を介してユーザーによって指示された印刷ジョブJを生成する。また制御部35は、印刷ジョブJを生成すると、送信制御部351として機能する。この送信制御部351は、ユーザーによる指示に基づいて生成された印刷ジョブJの送信制御を行うものであり、通信インタフェース部33を介して印刷ジョブJをプリントサーバー2に送信する。   The control unit 35 generates a print job J instructed by the user via the operation unit 32 when the CPU executes a program stored in the memory. Further, when generating the print job J, the control unit 35 functions as a transmission control unit 351. The transmission control unit 351 performs transmission control of the print job J generated based on an instruction from the user, and transmits the print job J to the print server 2 via the communication interface unit 33.

図4は、印刷装置4の構成例を示す図である。図4に示すように、印刷装置4は、画像読取部41、画像形成部42及び操作パネル43を備えている。また、印刷装置4は、通信ネットワーク5を介して他の通信機器と通信を行うための通信インタフェース(I/F)部44と、ハードディスクドライブ(HDD)やソリッドステートドライブ(SSD)等の不揮発性記憶手段で構成される記憶部45と、CPU及びメモリを有する制御部46とを備えている。そして、印刷装置4は、これらの構成要素41〜46がデータバスDB2を介して相互にデータの入出力を行うことができる構成とされている。   FIG. 4 is a diagram illustrating a configuration example of the printing apparatus 4. As shown in FIG. 4, the printing apparatus 4 includes an image reading unit 41, an image forming unit 42, and an operation panel 43. In addition, the printing apparatus 4 includes a communication interface (I / F) unit 44 for communicating with other communication devices via the communication network 5, and a non-volatile device such as a hard disk drive (HDD) or a solid state drive (SSD). A storage unit 45 including storage means and a control unit 46 having a CPU and a memory are provided. The printing apparatus 4 is configured such that these components 41 to 46 can input / output data to / from each other via the data bus DB2.

操作パネル43は、表示部431と操作部432とを備えており、操作パネル43を操作するユーザーに対して各種情報を表示したり、ユーザーからの各種操作入力を受け付けたりすることができるようになっている。   The operation panel 43 includes a display unit 431 and an operation unit 432 so that various information can be displayed to a user who operates the operation panel 43 and various operation inputs from the user can be received. It has become.

制御部46は、CPUがメモリに記憶されているプログラムを実行することにより、各部の動作を制御するものである。例えば通信ネットワーク5を介して印刷ジョブJを受信した場合、制御部46は、その印刷ジョブJに基づいて画像形成部42を制御することにより、該印刷ジョブJに基づく印刷出力の動作を制御する。   The control unit 46 controls the operation of each unit by the CPU executing a program stored in the memory. For example, when the print job J is received via the communication network 5, the control unit 46 controls the operation of the print output based on the print job J by controlling the image forming unit 42 based on the print job J. .

またユーザーが操作パネル43に対してプルプリントの指示操作を行うと、制御部46は、ジョブ要求部461として機能する。ジョブ要求部461は、プルプリントの指示操作を行ったユーザーがプルプリント可能なジョブリストをプリントサーバー2から取得し、表示部431に表示する。そしてジョブリストの中からユーザーによって指定された印刷ジョブをプリントサーバー2に要求する。すなわち、ジョブ要求部461は、ユーザーによる指示操作に基づき、プリントサーバー2に対して印刷ジョブを要求するためのジョブ要求を送信する処理部である。   When the user performs pull print instruction operation on the operation panel 43, the control unit 46 functions as a job request unit 461. The job request unit 461 acquires a job list that can be pulled by the user who has performed the pull print instruction operation from the print server 2 and displays the job list on the display unit 431. Then, it requests the print server 2 for a print job designated by the user from the job list. That is, the job request unit 461 is a processing unit that transmits a job request for requesting a print job to the print server 2 based on an instruction operation by the user.

図5は、プリントサーバー2の構成例を示す図である。図5に示すように、プリントサーバー2は、通信ネットワーク5を介して情報処理装置3及び印刷装置4と通信を行うための通信インタフェース(I/F)部21と、各種情報を記憶する記憶部22と、プリントサーバー2の動作を制御する制御部23とを備え、それらがデータバスDB3を介して接続されることにより相互に通信可能に構成される。   FIG. 5 is a diagram illustrating a configuration example of the print server 2. As illustrated in FIG. 5, the print server 2 includes a communication interface (I / F) unit 21 for communicating with the information processing device 3 and the printing device 4 via the communication network 5, and a storage unit that stores various types of information. 22 and a control unit 23 that controls the operation of the print server 2 and are connected to each other via the data bus DB3 so that they can communicate with each other.

通信インタフェース部21は、制御部23を通信ネットワーク5に接続するためのものである。これにより、制御部23は、この通信インタフェース部21を介して、情報処理装置3と印刷装置4とに通信可能に接続される。尚、通信インタフェース部21は、通信ネットワーク5に対して有線接続されるものであっても良いし、無線接続されるものであっても良い。   The communication interface unit 21 is for connecting the control unit 23 to the communication network 5. As a result, the control unit 23 is communicably connected to the information processing device 3 and the printing device 4 via the communication interface unit 21. The communication interface unit 21 may be wired to the communication network 5 or may be wirelessly connected.

記憶部22は、例えばハードディスクドライブ(HDD)などで構成される。また、記憶部22は、印刷ジョブを記憶する記憶領域として印刷ジョブ記憶部221を備えている。すなわち、情報処理装置3から出力される印刷ジョブJは、印刷ジョブ記憶部221に記憶される。   The storage unit 22 is configured by, for example, a hard disk drive (HDD). The storage unit 22 includes a print job storage unit 221 as a storage area for storing print jobs. That is, the print job J output from the information processing apparatus 3 is stored in the print job storage unit 221.

制御部23は、CPUとメモリとを備えており、各部の動作を制御するものである。CPUは、記憶部22に記憶されている各種プログラムを適宜読み出して実行する。メモリは、CPUがプログラムを実行することに伴う一時的なデータなどを記憶するものである。制御部23は、CPUがプログラムを実行することにより、ジョブ受信部231、ジョブ送信部232、判断部233及びジョブ制御部234として機能する。   The control unit 23 includes a CPU and a memory, and controls the operation of each unit. The CPU reads and executes various programs stored in the storage unit 22 as appropriate. The memory stores temporary data associated with the execution of the program by the CPU. The control unit 23 functions as a job reception unit 231, a job transmission unit 232, a determination unit 233, and a job control unit 234 when the CPU executes a program.

ジョブ受信部231は、情報処理装置3から送信される印刷ジョブJを受信して印刷ジョブ記憶部221に格納する。ジョブ受信部231は、情報処理装置3から印刷ジョブJの受信を開始すると、そのジョブのヘッダー情報に基づき印刷ジョブJを登録し、印刷ジョブ記憶部221への格納を開始する。尚、印刷ジョブJの登録は、印刷ジョブJの受信が完了し、印刷ジョブ記憶部221への格納処理が終了することにより完了する。   The job receiving unit 231 receives the print job J transmitted from the information processing apparatus 3 and stores it in the print job storage unit 221. When the job reception unit 231 starts receiving the print job J from the information processing apparatus 3, the job reception unit 231 registers the print job J based on the header information of the job and starts storing the print job J in the print job storage unit 221. The registration of the print job J is completed when the reception of the print job J is completed and the storing process in the print job storage unit 221 is completed.

ジョブ送信部232は、印刷装置4から印刷ジョブの要求を受信した場合に機能し、その要求によって指定された印刷ジョブJの送信を行うものである。すなわち、ジョブ送信部232は、印刷ジョブの要求に基づいて印刷ジョブ記憶部221に記憶されている印刷ジョブの中から送信対象となる印刷ジョブJを特定し、その印刷ジョブJをその印刷装置4に対して送信するものである。ただし、このジョブ送信部232は、印刷ジョブ記憶部221への格納処理が完了していない印刷ジョブJについては、直ちに送信処理を開始することができない。そのような場合、ジョブ送信部232は、印刷ジョブJの受信が完了して印刷ジョブ記憶部221への格納処理が終了した後に当該印刷ジョブJの送信処理を開始することが可能になる。   The job transmission unit 232 functions when a print job request is received from the printing apparatus 4 and transmits the print job J specified by the request. That is, the job transmission unit 232 specifies a print job J to be transmitted from print jobs stored in the print job storage unit 221 based on the request for the print job, and designates the print job J as the printing apparatus 4. To send to. However, the job transmission unit 232 cannot immediately start transmission processing for a print job J for which storage processing in the print job storage unit 221 has not been completed. In such a case, the job transmission unit 232 can start the transmission process of the print job J after the reception of the print job J is completed and the storage process in the print job storage unit 221 is completed.

判断部233は、印刷装置4からジョブ要求を受けたとき、ジョブ受信部231において当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断するものである。例えば、判断部233は、印刷ジョブ記憶部221に記録される印刷ジョブJのヘッダー情報に基づき、ジョブ要求で指定された印刷ジョブJを特定し、その特定した印刷ジョブJの受信が完了しているか否かを判断する。   When receiving a job request from the printing apparatus 4, the determination unit 233 determines whether the job reception unit 231 has received a print job corresponding to the job request. For example, the determination unit 233 specifies the print job J specified in the job request based on the header information of the print job J recorded in the print job storage unit 221, and the reception of the specified print job J is completed. Determine whether or not.

ジョブ制御部234は、印刷装置4から、該印刷装置4を操作しているユーザーがプルプリント可能なジョブリストの要求を受けると、該ユーザーの識別情報などに基づいてジョブリストを作成し、印刷装置4へ送信する。またジョブ制御部234は、ジョブリストの送信後、印刷装置4からジョブ要求を受けたとき、そのジョブ要求によって指定された印刷ジョブJの受信が既に完了している場合には、上述したジョブ送信部232を機能させ、該印刷ジョブJの送信処理を行わせる。さらにジョブ制御部234は、ジョブ要求を受けたとき、上記判断部233において印刷ジョブJの受信が完了していないと判断された場合、情報処理装置3において行われている印刷ジョブJの送信処理を中止させる制御を行う。そして、ジョブ制御部234は、当該印刷ジョブJを印刷装置4に直接送信させるための指示情報が情報処理装置3に対して送信されるように制御する。   When the job control unit 234 receives a request for a job list from which the user operating the printing device 4 can perform pull printing from the printing device 4, the job control unit 234 creates a job list based on the identification information of the user and prints the job list. Transmit to device 4. In addition, when the job control unit 234 receives a job request from the printing apparatus 4 after transmitting the job list, and the reception of the print job J specified by the job request has already been completed, the job transmission described above. The unit 232 is caused to function so that the print job J is transmitted. Further, when the job control unit 234 receives the job request and the determination unit 233 determines that the reception of the print job J is not completed, the transmission processing of the print job J performed in the information processing apparatus 3 is performed. Control to stop Then, the job control unit 234 performs control so that instruction information for directly transmitting the print job J to the printing apparatus 4 is transmitted to the information processing apparatus 3.

本実施形態では、判断部233において印刷ジョブの受信が完了していないと判断された場合、ジョブ制御部234は、送信先変更部235として機能する。この送信先変更部235は、プリントサーバー2において受信が完了していない印刷ジョブJを印刷装置4に直接送信させるための指示情報を生成して情報処理装置3に送信するものである。情報処理装置3は、そのような指示情報を受信すると、プリントサーバー2に対する印刷ジョブJの送信処理を中止し、指示情報に基づいて該印刷ジョブJの送信先を印刷装置4に切り替える。このような送信先変更部235がプリントサーバー2において機能することにより、プリントサーバー2は、印刷装置4からジョブ要求を受けたタイミングで、情報処理装置3によって送信される印刷ジョブJの送信先を、該印刷装置4に変更することができる。   In this embodiment, when the determination unit 233 determines that the reception of the print job has not been completed, the job control unit 234 functions as the transmission destination change unit 235. The transmission destination changing unit 235 generates instruction information for directly transmitting the print job J that has not been received by the print server 2 to the printing apparatus 4 and transmits the instruction information to the information processing apparatus 3. When receiving such instruction information, the information processing apparatus 3 stops the transmission process of the print job J to the print server 2 and switches the transmission destination of the print job J to the printing apparatus 4 based on the instruction information. When the transmission destination changing unit 235 functions in the print server 2, the print server 2 determines the transmission destination of the print job J transmitted by the information processing apparatus 3 at the timing when the job request is received from the printing apparatus 4. The printing apparatus 4 can be changed.

図6は、プリントサーバー2、情報処理装置3及び印刷装置4で行われる処理手順を示すプロセス図である。図6に示すように、ユーザーが、情報処理装置3において印刷ジョブの生成指示を行うと(プロセスP11)、情報処理装置3の送信制御部351が機能し、プリントサーバー2への印刷ジョブの送信処理(アップロード)が開始する。これにより、プリントサーバー2は、該印刷ジョブの受信を開始し、印刷ジョブ記憶部221への印刷ジョブの格納を開始する(プロセスP12)。尚、印刷ジョブのデータ量が大きい場合、或いは、通信ネットワーク5の負荷が大きい場合には、印刷ジョブのアップロードが完了するまでに長時間を要する。   FIG. 6 is a process diagram illustrating a processing procedure performed in the print server 2, the information processing apparatus 3, and the printing apparatus 4. As illustrated in FIG. 6, when the user issues a print job generation instruction in the information processing apparatus 3 (process P11), the transmission control unit 351 of the information processing apparatus 3 functions to transmit the print job to the print server 2. Processing (upload) starts. Accordingly, the print server 2 starts receiving the print job and starts storing the print job in the print job storage unit 221 (process P12). When the amount of print job data is large or when the load on the communication network 5 is large, it takes a long time to complete the upload of the print job.

その後、ユーザーが、印刷装置4の設置場所まで移動し、該印刷装置4において当該印刷ジョブの実行指示を入力すると(プロセスP13)、印刷装置4のジョブ要求部461は、プリントサーバー2に対して該印刷ジョブの要求を送信する。   After that, when the user moves to the installation location of the printing apparatus 4 and inputs an instruction to execute the print job in the printing apparatus 4 (process P13), the job request unit 461 of the printing apparatus 4 sends the print server 2 to the print server 2. A request for the print job is transmitted.

プリントサーバー2の判断部233は、印刷装置4から要求された印刷ジョブの受信が完了しているか否かの受信確認を行う(プロセスP14)。その結果、印刷ジョブの受信が完了していない場合、プリントサーバー2の送信先変更部235は、情報処理装置3に自機への当該印刷ジョブの送信処理を中止させて当該印刷ジョブを当該印刷装置4に直接送信させる指示情報を作成し情報処理装置3に送信する(プロセスP15)。このとき生成される指示情報には、印刷ジョブの送信処理を中止させる命令と、印刷ジョブ要求の送信元である印刷装置4のアドレスとが含まれる。   The determination unit 233 of the print server 2 performs reception confirmation as to whether or not reception of the print job requested from the printing apparatus 4 has been completed (process P14). As a result, when the reception of the print job is not completed, the transmission destination changing unit 235 of the print server 2 causes the information processing apparatus 3 to stop the transmission process of the print job to the own apparatus and print the print job. Instruction information to be transmitted directly to the apparatus 4 is created and transmitted to the information processing apparatus 3 (process P15). The instruction information generated at this time includes a command to stop the print job transmission process and the address of the printing apparatus 4 that is the transmission source of the print job request.

情報処理装置3の送信制御部351は、この指示情報をプリントサーバー2から受信すると、プリントサーバー2への当該印刷ジョブの送信処理を中止するとともに、当該印刷ジョブの送信先をプリントサーバー2から印刷装置4に切り替える。その結果、情報処理装置3は、当該印刷ジョブをはじめから印刷装置4に対して直接送信するようになる(プロセスP16)。そして印刷装置4は、情報処理装置3から当該印刷ジョブの受信を完了すると、該印刷ジョブに基づいて印刷出力を行う(プロセスP17)。   When receiving the instruction information from the print server 2, the transmission control unit 351 of the information processing apparatus 3 stops the transmission process of the print job to the print server 2 and prints the transmission destination of the print job from the print server 2. Switch to device 4. As a result, the information processing apparatus 3 directly transmits the print job to the printing apparatus 4 from the beginning (process P16). When the printing apparatus 4 completes reception of the print job from the information processing apparatus 3, the printing apparatus 4 performs print output based on the print job (process P17).

尚、上記のような処理が行われると、プリントサーバー2においては受信途中の印刷ジョブがその後受信されなくなる。そのため、ジョブ受信部231は、印刷ジョブを受信しなくなることに伴い、印刷ジョブ記憶部221に逐次格納していたデータを削除するようにしても良い。   When the above processing is performed, the print server 2 does not receive a print job that is being received. For this reason, the job receiving unit 231 may delete the data sequentially stored in the print job storage unit 221 when the print job is not received.

以上のように、本実施形態では、プリントサーバー2が情報処理装置3から送信される印刷ジョブを受信して記憶部22(印刷ジョブ記憶部221)に格納していき、プリントサーバー2が印刷装置4からジョブ要求を受けたとき、当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する。そして、該受信が完了していないときには、プリントサーバー2への当該印刷ジョブの送信処理を情報処理装置3に中止させて印刷装置4に直接送信させる。そのため、プリントサーバー2が印刷ジョブに含まれる残りのデータの受信を完了してから、該印刷ジョブを印刷装置4に対して送信開始するよりも、早期に印刷装置4への送信処理を開始することができる。そして印刷装置4は、プリントサーバー2経由で印刷ジョブを受信するよりも、情報処理装置3から直接送信される印刷ジョブを受信する方が早期に印刷ジョブの受信が完了するため、ユーザーの待機時間を短縮することができる。これにより、プリントシステム1の利便性を向上することができる。   As described above, in this embodiment, the print server 2 receives a print job transmitted from the information processing apparatus 3 and stores it in the storage unit 22 (print job storage unit 221). When a job request is received from 4, a determination is made as to whether or not reception of a print job corresponding to the job request has been completed. When the reception is not completed, the information processing apparatus 3 stops the transmission process of the print job to the print server 2 and directly transmits it to the printing apparatus 4. For this reason, after the print server 2 completes reception of the remaining data included in the print job, transmission processing to the printing apparatus 4 is started earlier than transmission of the print job to the printing apparatus 4 is started. be able to. Since the printing apparatus 4 completes receiving the print job earlier than receiving the print job transmitted directly from the information processing apparatus 3 rather than receiving the print job via the print server 2, the waiting time of the user Can be shortened. Thereby, the convenience of the printing system 1 can be improved.

ところで、上述したプリントシステム1は、プリントサーバー2において印刷ジョブの一元管理を行えるようにするために、印刷装置4が情報処理装置3と直接通信することを禁止していることがある。この場合、印刷装置4に対して予め情報処理装置3との通信禁止設定が行われており、情報処理装置3から直接送信される印刷ジョブを印刷装置4が受信できない。そこで、そのような場合、プリントサーバー2は、情報処理装置3に対して指示情報を送信するとき、印刷装置4に対して情報処理装置3との直接通信を禁止する通信禁止設定を解除するように指示する。これにより、印刷装置4は、通信禁止設定を解除し、情報処理装置3から直接送信される印刷ジョブを受信することができるようなる。なお、このような通信禁止設定の解除は一時的であることが好ましい。   By the way, the print system 1 described above may prohibit the printing apparatus 4 from directly communicating with the information processing apparatus 3 so that the print server 2 can perform unified management of print jobs. In this case, the prohibition of communication with the information processing apparatus 3 is set in advance for the printing apparatus 4, and the printing apparatus 4 cannot receive a print job directly transmitted from the information processing apparatus 3. Therefore, in such a case, when the print server 2 transmits the instruction information to the information processing device 3, the print server 2 cancels the communication prohibition setting that prohibits the printing device 4 from directly communicating with the information processing device 3. To instruct. As a result, the printing apparatus 4 can cancel the communication prohibition setting and receive a print job directly transmitted from the information processing apparatus 3. It should be noted that such cancellation of the communication prohibition setting is preferably temporary.

(第2の実施形態)
第1の実施形態では、プリントサーバー2が、上記指示情報を生成して情報処理装置3に送信することにより、情報処理装置3によって送信される印刷ジョブの送信先を当該印刷装置4に切り替える。
(Second Embodiment)
In the first embodiment, the print server 2 generates the instruction information and transmits it to the information processing apparatus 3, thereby switching the transmission destination of the print job transmitted by the information processing apparatus 3 to the printing apparatus 4.

これに対し、第2の実施形態では、印刷装置4が、上記指示情報を生成して情報処理装置3に送信することにより、情報処理装置3によって送信される印刷ジョブの送信先を当該印刷装置4に切り替えるようにしたものである。   On the other hand, in the second embodiment, the printing apparatus 4 generates the instruction information and transmits the instruction information to the information processing apparatus 3, so that the transmission destination of the print job transmitted by the information processing apparatus 3 is the printing apparatus. 4 is switched.

図7は、第2の実施形態に係るプリントサーバー2の構成例を示す図である。図7に示すように、本実施形態におけるプリントサーバー2は、ジョブ制御部234が送信先変更部235に代えて送信元情報送信部236として機能する点が第1の実施形態と相違する。   FIG. 7 is a diagram illustrating a configuration example of the print server 2 according to the second embodiment. As shown in FIG. 7, the print server 2 according to this embodiment is different from the first embodiment in that the job control unit 234 functions as a transmission source information transmission unit 236 instead of the transmission destination change unit 235.

送信元情報送信部236は、判断部233において印刷ジョブの受信が完了していないと判断された場合に、ジョブ要求に対する応答として、指定された印刷ジョブの受信が完了していないことを印刷装置4に通知する。このとき、送信元情報送信部236は、該印刷ジョブを送信してきている情報処理装置3のアドレスなどを含む送信元情報を生成し、該送信元情報を印刷装置4に送信する。   When the determination unit 233 determines that the reception of the print job is not completed, the transmission source information transmission unit 236 determines that the reception of the specified print job is not completed as a response to the job request. 4 is notified. At this time, the transmission source information transmission unit 236 generates transmission source information including the address of the information processing apparatus 3 that has transmitted the print job, and transmits the transmission source information to the printing apparatus 4.

図8は、第2の実施形態における印刷装置4の構成例を示す図である。図8に示すように、印刷装置4は、図4に示す各部に加えて、送信先変更部462を備える点が第1の実施形態と相違する。送信先変更部462は、プリントサーバー2から送信元情報を受信することに伴い、情報処理装置3に印刷ジョブの送信処理を中止させる。また送信先変更部462は、当該印刷ジョブを印刷装置4に直接送信させる指示情報を作成し、受信した送信元情報に基づいて該指示情報を情報処理装置3に送信する。このとき生成される指示情報には、印刷ジョブの送信処理を中止させる命令と、印刷装置4のアドレスとが含まれる。これにより、情報処理装置3によって送信される印刷ジョブの送信先を印刷装置4に切り替えることができる。   FIG. 8 is a diagram illustrating a configuration example of the printing apparatus 4 according to the second embodiment. As shown in FIG. 8, the printing apparatus 4 is different from the first embodiment in that it includes a transmission destination changing unit 462 in addition to the units shown in FIG. The transmission destination changing unit 462 causes the information processing apparatus 3 to stop the print job transmission process in response to receiving the transmission source information from the print server 2. In addition, the transmission destination changing unit 462 creates instruction information for directly transmitting the print job to the printing apparatus 4 and transmits the instruction information to the information processing apparatus 3 based on the received transmission source information. The instruction information generated at this time includes an instruction to stop the print job transmission process and the address of the printing apparatus 4. Thereby, the transmission destination of the print job transmitted by the information processing apparatus 3 can be switched to the printing apparatus 4.

図9は、第2の実施形態におけるプリントサーバー2、情報処理装置3及び印刷装置4で行われる処理手順を示すプロセス図である。図9に示すように、第1の実施形態のプロセスP11〜P13と同様のプロセスP21〜P23を経て印刷装置4のジョブ要求部461が、プリントサーバー2に対して印刷ジョブを要求すると、プリントサーバー2の判断部233は、印刷装置4から要求された印刷ジョブの受信が完了しているか否かの受信確認を行う(プロセスP24)。その結果、印刷ジョブの受信が完了していない場合、プリントサーバー2の送信元情報送信部236は、その旨を印刷装置4に通知(ジョブ受信未完了通知)するとともに、印刷装置4に対し、ジョブ要求に対する応答として情報処理装置3に関する送信元情報を送信する。   FIG. 9 is a process diagram illustrating a processing procedure performed by the print server 2, the information processing device 3, and the printing device 4 according to the second embodiment. As shown in FIG. 9, when the job request unit 461 of the printing apparatus 4 requests a print job from the print server 2 through processes P21 to P23 similar to the processes P11 to P13 of the first embodiment, the print server 2 2 determination unit 233 performs reception confirmation as to whether or not reception of the print job requested from the printing apparatus 4 has been completed (process P24). As a result, when the reception of the print job is not completed, the transmission source information transmission unit 236 of the print server 2 notifies the printing apparatus 4 to that effect (job reception incomplete notification) and Source information regarding the information processing apparatus 3 is transmitted as a response to the job request.

印刷装置4の送信先変更部235は、プリントサーバー2から送信元情報を受信すると、プリントサーバー2への当該印刷ジョブの送信処理を情報処理装置3に中止させて自機に直接送信させる指示情報を作成し、受信した送信元情報に基づいて該指示情報を情報処理装置3に送信する(プロセスP25)。   When receiving the transmission source information from the print server 2, the transmission destination changing unit 235 of the printing apparatus 4 instructs the information processing apparatus 3 to stop the transmission processing of the print job to the print server 2 and directly transmits it to the own apparatus. And transmits the instruction information to the information processing device 3 based on the received transmission source information (process P25).

情報処理装置3の送信制御部351は、この指示情報をプリントサーバー2から受信すると、プリントサーバー2への当該印刷ジョブの送信処理を中止するとともに、当該印刷ジョブの送信先をプリントサーバー2から印刷装置4に切り替え、当該印刷ジョブを該印刷装置4に直接送信する(プロセスP26)。これにより、印刷装置4は、情報処理装置3から当該印刷ジョブを直接受信するようになり、当該印刷ジョブの受信が完了すると、該印刷ジョブに基づいて印刷出力を行う(プロセスP27)。   When receiving the instruction information from the print server 2, the transmission control unit 351 of the information processing apparatus 3 stops the transmission process of the print job to the print server 2 and prints the transmission destination of the print job from the print server 2. The apparatus is switched to the apparatus 4 and the print job is directly transmitted to the printing apparatus 4 (process P26). As a result, the printing apparatus 4 directly receives the print job from the information processing apparatus 3. When the reception of the print job is completed, the printing apparatus 4 performs print output based on the print job (process P27).

以上のように、本実施形態では、プリントサーバー2が、印刷装置4からのジョブ要求に対応する印刷ジョブの受信を完了していないときには、その旨及び情報処理装置3に関する送信元情報を印刷装置4に通知し、印刷装置4が、指示情報を作成し、該指示情報を情報処理装置3に送信する。そして、情報処理装置3が、その指示情報に基づいて、当該印刷ジョブの送信処理を中止し当該印刷ジョブを印刷装置4に直接送信する。   As described above, in the present embodiment, when the print server 2 has not received a print job corresponding to the job request from the printing apparatus 4, the printing apparatus 2 displays that fact and transmission source information regarding the information processing apparatus 3. 4, the printing apparatus 4 creates instruction information and transmits the instruction information to the information processing apparatus 3. Then, based on the instruction information, the information processing apparatus 3 stops the print job transmission process and directly transmits the print job to the printing apparatus 4.

これにより、第1の実施形態と同様、プリントサーバー2が印刷ジョブに含まれる残りのデータの受信を完了してから、該印刷ジョブを印刷装置4に対して送信開始するよりも、早期に印刷装置4への送信処理を開始することができる。そして印刷装置4は、プリントサーバー2経由で印刷ジョブを受信するよりも、情報処理装置3から直接送信される印刷ジョブを受信する方が早期に印刷ジョブの受信が完了するため、ユーザーの待機時間を短縮することができる。特に、本実施形態では、プリントサーバー2は情報処理装置3への指示情報の送信を行わないので、その分、プリントサーバー2の負荷を低減することができる。   Thus, as in the first embodiment, after the print server 2 completes reception of the remaining data included in the print job, the print job is printed earlier than the transmission of the print job to the printing apparatus 4 is started. Transmission processing to the device 4 can be started. Since the printing apparatus 4 completes receiving the print job earlier than receiving the print job transmitted directly from the information processing apparatus 3 rather than receiving the print job via the print server 2, the waiting time of the user Can be shortened. In particular, in the present embodiment, since the print server 2 does not transmit instruction information to the information processing apparatus 3, the load on the print server 2 can be reduced accordingly.

また本実施形態においても、印刷装置4において予め情報処理装置3との通信禁止設定が行われている場合、印刷装置4は、指示情報を情報処理装置3へ送信するときに、その通信禁止設定を解除しておく。これにより、印刷装置4は、情報処理装置3から直接送信される印刷ジョブを受信することができるようなる。   Also in the present embodiment, if the prohibition of communication with the information processing device 3 is set in advance in the printing device 4, the printing device 4 transmits the instruction prohibition setting when transmitting the instruction information to the information processing device 3. Cancel. As a result, the printing apparatus 4 can receive a print job directly transmitted from the information processing apparatus 3.

また上記実施形態において印刷装置4が情報処理装置3に指示情報を送信するときには、通信ネットワーク5を介して情報処理装置3に対して直接送信する場合を例示した。しかし、これに限られるものではなく、プリントサーバー2を介して送信するようにしても良い。   Further, in the above embodiment, when the printing apparatus 4 transmits the instruction information to the information processing apparatus 3, the case of directly transmitting to the information processing apparatus 3 via the communication network 5 is illustrated. However, the present invention is not limited to this, and transmission may be performed via the print server 2.

(第3の実施形態)
第1の実施形態では、プリントサーバー2が、自らの判断で上記指示情報を生成して情報処理装置3に送信することにより、情報処理装置3によって送信される印刷ジョブの送信先を当該印刷装置4に切り替える。
(Third embodiment)
In the first embodiment, the print server 2 generates the instruction information based on its own determination and transmits the instruction information to the information processing apparatus 3, thereby specifying the transmission destination of the print job transmitted by the information processing apparatus 3. Switch to 4.

これに対し、第3の実施形態では、プリントサーバー2は、印刷装置4からの指示に従って指示情報を生成し情報処理装置3に送信することにより、情報処理装置3によって送信される印刷ジョブの送信先を当該印刷装置4に切り替えるようにしたものである。   In contrast, in the third embodiment, the print server 2 generates instruction information in accordance with an instruction from the printing apparatus 4 and transmits the instruction information to the information processing apparatus 3, thereby transmitting a print job transmitted by the information processing apparatus 3. The destination is switched to the printing apparatus 4.

図10は、第3の実施形態に係るプリントサーバー2の構成例を示す図である。図10に示すように、本実施形態におけるプリントサーバー2は、ジョブ制御部234が、送信先変更部235に加えて、通知部237として機能する点が第1の実施形態と相違する。通知部237は、判断部233において印刷ジョブの受信が完了していないと判断されたとき、その旨を印刷装置4に通知する。   FIG. 10 is a diagram illustrating a configuration example of the print server 2 according to the third embodiment. As shown in FIG. 10, the print server 2 according to the present embodiment is different from the first embodiment in that the job control unit 234 functions as a notification unit 237 in addition to the transmission destination changing unit 235. When the determination unit 233 determines that the reception of the print job is not completed, the notification unit 237 notifies the printing apparatus 4 to that effect.

図11は、第3の実施形態における印刷装置4の構成例を示す図である。図11に示すように、印刷装置4は、図4に示す各部に加えて、指示情報作成指示部463と、画面表示制御部464とを備える点が第1の実施形態と相違する。画面表示制御部464は、印刷ジョブの受信が完了していない旨の通知を印刷装置4から受信することに伴い、ユーザーに対して印刷ジョブの送信先を切り替えるか否かを問い合わせる画面を表示部431に表示するものである。指示情報作成指示部463は、画面表示制御部464によって印刷ジョブの送信先を切り替えるか否かを問い合わせる画面が表示されたとき、ユーザーによる指示操作に基づいて、指示情報を生成する指示及び情報処理装置3に送信する指示を生成してプリントサーバー2に送信する。   FIG. 11 is a diagram illustrating a configuration example of the printing apparatus 4 according to the third embodiment. As shown in FIG. 11, the printing apparatus 4 is different from the first embodiment in that it includes an instruction information creation instruction unit 463 and a screen display control unit 464 in addition to the units shown in FIG. 4. The screen display control unit 464 displays a screen asking the user whether or not to switch the transmission destination of the print job in response to receiving a notification that the reception of the print job is not completed from the printing apparatus 4. 431 is displayed. When the screen display control unit 464 displays a screen asking whether or not to switch the transmission destination of the print job, the instruction information creation instruction unit 463 generates an instruction information and information processing based on an instruction operation by the user. An instruction to be transmitted to the apparatus 3 is generated and transmitted to the print server 2.

プリントサーバー2の送信先変更部235は、印刷装置4から指示情報の作成が指示されると、当該印刷ジョブを印刷装置4に直接送信させるための指示情報を生成して情報処理装置3に送信する。このとき生成される指示情報は、第1及び第2の実施形態で説明したものと同様である。これにより、情報処理装置3による印刷ジョブの送信処理を中止させて、その印刷ジョブの送信先を当該印刷装置4に切り替えることができる。   When the destination change unit 235 of the print server 2 is instructed to create instruction information from the printing apparatus 4, the transmission destination changing section 235 generates instruction information for directly sending the print job to the printing apparatus 4 and transmits the instruction information to the information processing apparatus 3. To do. The instruction information generated at this time is the same as that described in the first and second embodiments. Accordingly, the print job transmission process by the information processing apparatus 3 can be stopped, and the transmission destination of the print job can be switched to the printing apparatus 4.

図12は、第3の実施形態におけるプリントサーバー2、情報処理装置3及び印刷装置4で行われる処理手順を示すプロセス図である。図12に示すように、第1の実施形態のプロセスP11〜P13と同様のプロセスP31〜P33を経て印刷装置4のジョブ要求部461が、プリントサーバー2に該印刷ジョブを要求すると、プリントサーバー2の判断部233は、印刷装置4から要求された印刷ジョブの受信が完了しているか否かの受信確認を行う(プロセスP34)。その結果、印刷ジョブの受信が完了していない場合、プリントサーバー2の通知部237は、その旨を印刷装置4に通知(ジョブ受信未完了通知)する。   FIG. 12 is a process diagram illustrating a processing procedure performed by the print server 2, the information processing apparatus 3, and the printing apparatus 4 according to the third embodiment. As shown in FIG. 12, when the job request unit 461 of the printing apparatus 4 requests the print server 2 for the print job through the processes P31 to P33 similar to the processes P11 to P13 of the first embodiment, the print server 2 The determination unit 233 confirms whether or not reception of the print job requested from the printing apparatus 4 has been completed (process P34). As a result, when reception of the print job is not completed, the notification unit 237 of the print server 2 notifies the printing apparatus 4 to that effect (notification of job reception incomplete).

印刷装置4の画面表示制御部464は、この通知を印刷装置4から受信することに伴い、操作パネル43の表示部431にプリントサーバー2が受信中であることを表示する。このとき、操作パネル43の表示部431には、例えば図13に示すような画面Gが表示される。この問い合わせ画面Gには、例えば「サーバーからのダウンロードを続行すると時間がかかります。PCから印刷ジョブを直接ダウンロードしますか。」とのメッセージMと、「YES」ボタンB1及び「NO」ボタンB2とが表示される。指示情報作成指示部463は、ユーザーによって「YES」ボタンB1が操作され、当該印刷ジョブを情報処理装置3から直接受信することが指示されると、指示情報を生成する指示及び情報処理装置3に送信する指示をプリントサーバー2に送信する(プロセスP35)。   The screen display control unit 464 of the printing apparatus 4 displays that the print server 2 is receiving on the display unit 431 of the operation panel 43 as the notification is received from the printing apparatus 4. At this time, a screen G as shown in FIG. 13 is displayed on the display unit 431 of the operation panel 43, for example. In this inquiry screen G, for example, a message M “It will take time to continue downloading from the server. Do you want to download the print job directly from the PC?”, “YES” button B1 and “NO” button B2 Is displayed. When the user operates the “YES” button B1 to instruct to directly receive the print job from the information processing apparatus 3, the instruction information creation instruction unit 463 instructs the information processing apparatus 3 to generate an instruction information. An instruction to transmit is transmitted to the print server 2 (process P35).

プリントサーバー2の送信先変更部235は、印刷装置4から指示情報の作成が指示されると、印刷装置4のアドレスを含む指示情報を生成して情報処理装置3に送信する(プロセスP36)。   When the destination change unit 235 of the print server 2 is instructed to create the instruction information from the printing apparatus 4, the instruction information including the address of the printing apparatus 4 is generated and transmitted to the information processing apparatus 3 (process P36).

情報処理装置3の送信制御部351は、指示情報をプリントサーバー2から受信すると、プリントサーバー2への当該印刷ジョブの送信処理を中止するとともに、当該印刷ジョブの送信先をプリントサーバー2から印刷装置4に切り替え、当該印刷ジョブをはじめから該印刷装置4に直接送信する(プロセスP37)。これにより、印刷装置4は、情報処理装置3から当該印刷ジョブを直接受信するようになり、当該印刷ジョブの受信が完了すると、該印刷ジョブに基づいて印刷出力を行う(プロセスP38)。   When the transmission control unit 351 of the information processing apparatus 3 receives the instruction information from the print server 2, the transmission control unit 351 stops the transmission process of the print job to the print server 2 and sets the transmission destination of the print job from the print server 2 to the printing apparatus. 4 to directly transmit the print job to the printing apparatus 4 from the beginning (process P37). As a result, the printing apparatus 4 directly receives the print job from the information processing apparatus 3. When the reception of the print job is completed, the printing apparatus 4 performs print output based on the print job (process P38).

以上のように、本実施形態では、プリントサーバー2が、印刷装置4からのジョブ要求に対応する印刷ジョブの受信を完了していないときには、その旨を印刷装置4に通知する。そのため、印刷装置4を操作しているユーザーは、当該印刷ジョブを情報処理装置3から印刷装置4に直接ダウンロードするか否かを選択することができる。そしてユーザーによって直接ダウンロードすることが指定されると、印刷装置4が、指示情報を生成する指示及び情報処理装置3に送信する指示をプリントサーバー2に送信する。そして、情報処理装置3が、プリントサーバー2から受信する指示情報に基づいて、当該印刷ジョブの送信処理を中止し当該印刷ジョブを印刷装置4に直接送信する。   As described above, in the present embodiment, when the print server 2 has not received a print job corresponding to the job request from the printing apparatus 4, the print server 4 is notified of this fact. Therefore, the user operating the printing apparatus 4 can select whether or not to directly download the print job from the information processing apparatus 3 to the printing apparatus 4. When the user designates direct download, the printing apparatus 4 transmits an instruction to generate instruction information and an instruction to transmit to the information processing apparatus 3 to the print server 2. Then, based on the instruction information received from the print server 2, the information processing apparatus 3 stops the print job transmission process and directly transmits the print job to the printing apparatus 4.

これにより、第1、第2の実施形態と同様、プリントサーバー2が印刷ジョブに含まれる残りのデータの受信を完了してから、該印刷ジョブを印刷装置4に対して送信開始するよりも、早期に印刷装置4への送信処理を開始することができる。そして印刷装置4は、プリントサーバー2経由で印刷ジョブを受信するよりも、情報処理装置3から直接送信される印刷ジョブを受信する方が早期に印刷ジョブの受信が完了するため、ユーザーの待機時間を短縮することができる。   As a result, as in the first and second embodiments, after the print server 2 completes reception of the remaining data included in the print job, the transmission of the print job to the printing apparatus 4 is started. Transmission processing to the printing apparatus 4 can be started at an early stage. Since the printing apparatus 4 completes receiving the print job earlier than receiving the print job transmitted directly from the information processing apparatus 3 rather than receiving the print job via the print server 2, the waiting time of the user Can be shortened.

特に本実施形態では、情報処理装置3から印刷装置4への直接送信をユーザーが指示可能であるため、プリントシステム1の利便性をより一層向上させることができる。   In particular, in this embodiment, since the user can instruct direct transmission from the information processing apparatus 3 to the printing apparatus 4, the convenience of the printing system 1 can be further improved.

(第4の実施形態)
第4の実施形態では、情報処理装置3から印刷装置4への直接送信をユーザーに問い合わせる手法を第2の実施形態に適用する場合を例示する。
(Fourth embodiment)
The fourth embodiment exemplifies a case where a technique for inquiring a user about direct transmission from the information processing apparatus 3 to the printing apparatus 4 is applied to the second embodiment.

図14は、第4の実施形態に係る印刷装置4の構成例を示す図である。図14に示すように、第4の実施形態における印刷装置4は、図8に示す各部に加えて、画面表示制御部464を備える点が第2の実施形態と相違する。画面表示制御部464は、プリントサーバー2から印刷ジョブの受信が完了していない旨の通知を受信することに伴い、図14に示すように、情報処理装置3による印刷ジョブの送信先を印刷装置4に変更するか否かをユーザーに問い合わせるために図13と同様の問い合わせ画面Gを表示部431に表示させる。   FIG. 14 is a diagram illustrating a configuration example of the printing apparatus 4 according to the fourth embodiment. As shown in FIG. 14, the printing apparatus 4 in the fourth embodiment is different from the second embodiment in that a screen display control unit 464 is provided in addition to the units shown in FIG. 8. As the screen display control unit 464 receives a notification from the print server 2 that the reception of the print job has not been completed, as shown in FIG. In order to make an inquiry to the user as to whether or not to change to 4, an inquiry screen G similar to that shown in FIG.

送信先変更部462は、ユーザーにより「YES」ボタンB1が操作された場合、第2の実施形態と同様、指示情報を生成して情報処理装置3に送信する。一方、「NO」ボタンB2が操作された場合、引き続き、プリントサーバー2に情報処理装置3からの印刷ジョブを受信させる。   When the “YES” button B1 is operated by the user, the transmission destination changing unit 462 generates instruction information and transmits the instruction information to the information processing apparatus 3 as in the second embodiment. On the other hand, when the “NO” button B2 is operated, the print server 2 continuously receives a print job from the information processing apparatus 3.

図15は、第4の実施形態におけるプリントサーバー2、情報処理装置3及び印刷装置4で行われる処理手順を示すプロセス図である。図15に示すように、第2の実施形態のプロセスP21〜P24と同様のプロセスP41〜P44を経て、プリントサーバー2の判断部233が、印刷装置4から要求された印刷ジョブの受信が完了していないと判断すると、画面表示制御部464は、図13に示すような問い合わせ画面Gを表示部431に表示させる(プロセスP45)。   FIG. 15 is a process diagram illustrating a processing procedure performed by the print server 2, the information processing apparatus 3, and the printing apparatus 4 according to the fourth embodiment. As illustrated in FIG. 15, through processes P41 to P44 similar to the processes P21 to P24 of the second embodiment, the determination unit 233 of the print server 2 completes reception of the print job requested from the printing apparatus 4. If not, the screen display control unit 464 displays an inquiry screen G as shown in FIG. 13 on the display unit 431 (process P45).

送信先変更部462は、「YES」ボタンB1が操作された場合、第2の実施形態と同様、情報処理装置3にプリントサーバー2への当該印刷ジョブの送信処理を中止させて当該印刷ジョブを自機に直接送信させる指示情報を生成して情報処理装置3に送信する(プロセスP46)。一方、「NO」ボタンB2が操作された場合、送信先変更部462は、引き続き、プリントサーバー2に情報処理装置3からの印刷ジョブを受信させる。   When the “YES” button B1 is operated, the transmission destination changing unit 462 causes the information processing apparatus 3 to stop the transmission process of the print job to the print server 2 and to execute the print job, as in the second embodiment. Instruction information to be directly transmitted to the own device is generated and transmitted to the information processing apparatus 3 (process P46). On the other hand, when the “NO” button B <b> 2 is operated, the transmission destination changing unit 462 causes the print server 2 to continuously receive a print job from the information processing apparatus 3.

情報処理装置3の送信制御部351は、指示情報をプリントサーバー2から受信すると、プリントサーバー2への当該印刷ジョブの送信処理を中止するとともに、当該印刷ジョブの送信先をプリントサーバー2から印刷装置4に切り替え、当該印刷ジョブをはじめから該印刷装置4に直接送信する(プロセスP47)。これにより、印刷装置4は、情報処理装置3から当該印刷ジョブを直接受信するようになり、当該印刷ジョブの受信が完了すると、該印刷ジョブに基づいて印刷出力を行う(プロセスP48)。   When the transmission control unit 351 of the information processing apparatus 3 receives the instruction information from the print server 2, the transmission control unit 351 stops the transmission process of the print job to the print server 2 and sets the transmission destination of the print job from the print server 2 to the printing apparatus. 4 to directly transmit the print job to the printing apparatus 4 from the beginning (process P47). As a result, the printing apparatus 4 directly receives the print job from the information processing apparatus 3. When the reception of the print job is completed, the printing apparatus 4 performs print output based on the print job (process P48).

以上のように、本実施形態においても、印刷装置4が指示情報を情報処理装置3に送信する前に、情報処理装置3による印刷ジョブの送信先を印刷装置4に変更するか否かをユーザーに問い合わせる。そのため、印刷装置4への印刷ジョブの送信ルートを変更するか否かについてのユーザーの判断を反映させることができる。   As described above, also in this embodiment, before the printing apparatus 4 transmits the instruction information to the information processing apparatus 3, the user determines whether to change the transmission destination of the print job by the information processing apparatus 3 to the printing apparatus 4. Contact Therefore, it is possible to reflect the user's judgment as to whether or not to change the transmission route of the print job to the printing apparatus 4.

(第5の実施形態)
第1及び第2の実施形態においては、プリントサーバー2が印刷装置4からジョブ要求を受けたときに、当該ジョブ要求に対応する印刷ジョブの受信が完了していない場合は、情報処理装置3に当該印刷ジョブの送信処理を中止させて当該印刷ジョブを印刷装置4に直接送信させる。
(Fifth embodiment)
In the first and second embodiments, when the print server 2 receives a job request from the printing apparatus 4, if the reception of the print job corresponding to the job request is not completed, the information processing apparatus 3 is informed. The transmission process of the print job is stopped and the print job is directly transmitted to the printing apparatus 4.

しかし、プリントサーバー2に情報処理装置3からの印刷ジョブを引き続き受信させた方が、印刷ジョブの送信先を印刷装置4に切り替えるよりも印刷装置4が印刷ジョブをより早く受け取ることができる場合もあり得る。   However, if the print server 2 continues to receive a print job from the information processing apparatus 3, the printing apparatus 4 may receive the print job earlier than switching the print job transmission destination to the printing apparatus 4. possible.

そこで、本実施形態においては、印刷ジョブの送信先の切替えをより適切に行うため、プリントサーバー2に情報処理装置3からの印刷ジョブを引き続き受信させる場合に印刷装置4が当該印刷ジョブの受信を完了するまでに要する時間(第1の受信完了時間T1)と、印刷ジョブの送信先を切り替えて情報処理装置3から印刷装置4に直接送信させる場合に印刷装置4が当該印刷ジョブの受信を完了するまでに要する時間(第2の受信完了時間T2)とに基づく切替条件を判断するようにした例を説明する。なお、ここでは第1の実施形態にその追加の切替条件を設定した実施形態を説明するが、第2,第3の実施形態に該切替条件を設定することも可能である。   Therefore, in this embodiment, in order to more appropriately switch the transmission destination of the print job, when the print server 2 continues to receive the print job from the information processing apparatus 3, the printing apparatus 4 receives the print job. When the time required for completion (first reception completion time T1) and the transmission destination of the print job are switched and transmitted directly from the information processing apparatus 3 to the printing apparatus 4, the printing apparatus 4 completes reception of the print job. A description will be given of an example in which the switching condition is determined based on the time required for the transmission (second reception completion time T2). Here, although an embodiment in which the additional switching condition is set in the first embodiment will be described, the switching condition may be set in the second and third embodiments.

図16は、第5の実施形態におけるプリントサーバー2、情報処理装置3及び印刷装置4間の通信に要する時間を示す図である。プリントサーバー2の送信先変更部235は、印刷ジョブのヘッダー情報などに基づきプリントサーバー2が情報処理装置3から受信中である印刷ジョブの全データサイズを取得する。また送信先変更部235は、受信開始時刻と、受信済みデータのデータサイズとを取得する。そして送信先変更部235は、受信開始時刻からの経過時間に基づいてプリントサーバー2が残りデータを受信完了させるまでに要する残データ送信時間t1を算出する。また、送信先変更部235は、プリントサーバー2が残りデータを受信完了してから印刷装置4に当該印刷ジョブの送信を完了させるのに要する印刷ジョブ送信時間t2を算出する。そして、送信先変更部235は、これらの算出した時間の和(t1+t2)を第1の受信完了時間T1として取得する。   FIG. 16 is a diagram illustrating the time required for communication among the print server 2, the information processing device 3, and the printing device 4 in the fifth embodiment. The transmission destination changing unit 235 of the print server 2 acquires the entire data size of the print job that the print server 2 is receiving from the information processing apparatus 3 based on the header information of the print job. Further, the transmission destination changing unit 235 acquires the reception start time and the data size of the received data. Then, the transmission destination changing unit 235 calculates the remaining data transmission time t1 required for the print server 2 to complete the reception of the remaining data based on the elapsed time from the reception start time. Further, the transmission destination changing unit 235 calculates a print job transmission time t2 required for the printing apparatus 4 to complete the transmission of the print job after the print server 2 has received the remaining data. Then, the transmission destination changing unit 235 obtains the sum (t1 + t2) of these calculated times as the first reception completion time T1.

また、送信先変更部235は、情報処理装置3から印刷装置4への印刷ジョブの送信に要する印刷ジョブ送信時間t3を算出する。さらに、本実施形態では、送信先変更部235は、情報処理装置3が印刷ジョブの送信先を印刷装置4に切り替えるために要する切替時間t4を取得する。この切替時間t4は、事前の設計により定めた固定値や計算値でもよいが、本実施形態では、例えば管理ユーザーや個々のユーザーによって予め定められた時間とされている。そして、送信先変更部235は、これらの算出した時間の和(t3+t4)を第2の受信完了時間T2として取得する。   Further, the transmission destination changing unit 235 calculates a print job transmission time t <b> 3 required for transmitting a print job from the information processing apparatus 3 to the printing apparatus 4. Further, in the present embodiment, the transmission destination changing unit 235 acquires a switching time t4 required for the information processing apparatus 3 to switch the transmission destination of the print job to the printing apparatus 4. The switching time t4 may be a fixed value or a calculated value determined by a prior design. In the present embodiment, for example, the switching time t4 is a time determined in advance by a management user or individual users. Then, the transmission destination changing unit 235 obtains the sum (t3 + t4) of these calculated times as the second reception completion time T2.

このように、送信先変更部235は、第1,第2の受信完了時間T1,T2を算出すると、これらの時間T1,T2の大小を比較し、第1の受信完了時間T1が第2の受信完了時間T2よりも長いという切替条件を具備する場合に、指示情報を生成して情報処理装置3に送信する。   As described above, when the transmission destination changing unit 235 calculates the first and second reception completion times T1 and T2, the transmission destination changing unit 235 compares the times T1 and T2, and the first reception completion time T1 is the second reception completion time T1. When the switching condition is longer than the reception completion time T2, the instruction information is generated and transmitted to the information processing device 3.

このような処理により、プリントサーバー2に情報処理装置3からの印刷ジョブを引き続き受信させた方が、情報処理装置3から印刷装置4に直接送信させる場合よりも印刷装置4が印刷ジョブをより早く受け取ることができる場合は、プリントサーバー2に情報処理装置3からの印刷ジョブを引き続き受信させ、そうでない場合に、情報処理装置3による印刷ジョブの送信先を印刷装置4に切り替えるというように、印刷ジョブの送信先の切替えをより適切に行うことができる。   As a result of such processing, when the print server 2 continues to receive a print job from the information processing apparatus 3, the printing apparatus 4 makes the print job faster than when the information processing apparatus 3 transmits the print job directly to the printing apparatus 4. If the print job can be received, the print server 2 continues to receive the print job from the information processing device 3, and if not, the print job transmission destination by the information processing device 3 is switched to the print device 4. Job transmission destinations can be switched more appropriately.

なお、第2の実施形態にこの追加の切替条件を設定する場合、印刷装置4の送信先変更部462は、第1の受信完了時間T1を算出するに際し、プリントサーバー2が情報処理装置3から受信中である印刷ジョブの全データサイズと、受信開始時刻と、受信済みデータサイズとをプリントサーバー2から取得して、残データ送信時間t1を算出するとよい。また、第2の受信完了時間T2を算出するに際し、送信先変更部462は、プリントサーバー2を介して切替時間t4の情報を情報処理装置3から取得するとよい。   When the additional switching condition is set in the second embodiment, the transmission destination changing unit 462 of the printing apparatus 4 calculates the first reception completion time T1 from the information processing apparatus 3 by the print server 2. The total data size, the reception start time, and the received data size of the print job being received may be acquired from the print server 2 to calculate the remaining data transmission time t1. Further, when calculating the second reception completion time T2, the transmission destination changing unit 462 may acquire information on the switching time t4 from the information processing device 3 via the print server 2.

また本実施形態では、プリントサーバー2(送信先変更部235)が、第1、第2の受信完了時間T1,T2を算出し、これらの時間T1,T2に基づいて送信先の切替の要否を判断する場合を例示した。しかし、このような判断を情報処理装置3において行うように構成することも可能である。その場合、プリントサーバー2は、印刷装置4から印刷ジョブの要求を受けたときに該印刷ジョブを受信中であれば、第1の受信完了時間T1及び第2の受信完了時間T2を算出することなく、指示情報を情報処理装置3に出力する。そして情報処理装置3の送信制御部351は、指示情報を受信することに伴い、通信インタフェース部33によるプリントサーバー2への印刷ジョブの送信処理を継続させた場合に印刷装置4が当該印刷ジョブの受信を完了するまでに要する第1の受信完了時間T1が第2の受信完了時間T2よりも長いか否かを判定し、第1の受信完了時間T1が第2の受信完了時間T2よりも長い場合に、通信インタフェース部33によるプリントサーバー2への印刷ジョブの送信処理を中止させると共に、当該印刷ジョブの送信先を印刷装置4に変更させて当該印刷ジョブの送信処理を行わせる。これにより、第1、第2の受信完了時間T1,T2の算出及び大小比較をプリントサーバー2で行わない分、プリントサーバー2の負荷を軽減することができる。   In the present embodiment, the print server 2 (transmission destination changing unit 235) calculates the first and second reception completion times T1 and T2, and whether or not to switch the transmission destination based on these times T1 and T2. The case of judging is exemplified. However, the information processing apparatus 3 can be configured to make such a determination. In that case, the print server 2 calculates the first reception completion time T1 and the second reception completion time T2 if the print job is being received when the print job request is received from the printing apparatus 4. Instead, the instruction information is output to the information processing device 3. When the transmission control unit 351 of the information processing apparatus 3 receives the instruction information and the print interface 4 continues the transmission process of the print job to the print server 2 by the communication interface unit 33, the printing apparatus 4 receives the instruction for the print job. It is determined whether or not the first reception completion time T1 required to complete the reception is longer than the second reception completion time T2, and the first reception completion time T1 is longer than the second reception completion time T2. In this case, the transmission process of the print job to the print server 2 by the communication interface unit 33 is stopped, and the transmission destination of the print job is changed to the printing apparatus 4 to perform the transmission process of the print job. As a result, the load on the print server 2 can be reduced because the first and second reception completion times T1 and T2 are not calculated and compared in magnitude.

(変形例)
以上、本発明に関する好ましい実施形態について説明したが、本発明は上述した内容のものに限られるものではなく、種々の変形例が適用可能である。以下、いくつかの変形例について説明する。
(Modification)
As mentioned above, although preferred embodiment regarding this invention was described, this invention is not restricted to the thing of the content mentioned above, A various modification is applicable. Hereinafter, some modified examples will be described.

例えば上記実施形態では、印刷装置が複合機である場合を例示したが、印刷装置は必ずしも複合機に限られず、プリント機能のみを備えた単機能装置であっても構わない。   For example, in the above-described embodiment, the case where the printing apparatus is a multifunction peripheral is illustrated, but the printing apparatus is not necessarily limited to the multifunction peripheral, and may be a single function apparatus having only a printing function.

また上記第5の実施形態では、第1,第2の受信完了時間T1,T2の大小比較に基づいて、情報処理装置3による印刷ジョブの送信先の切替要否を判断するようにしたが、残データ送信時間t1に基づいて判断するようにしてもよい。すなわち、残データ送信時間t1が所定時間より長い場合に、情報処理装置3による印刷ジョブの送信先を切替えるというように、残データ送信時間t1と所定時間との大小比較に基づいて、情報処理装置3による印刷ジョブの送信先の切替要否を判断するようにしてもよい。   In the fifth embodiment, whether or not the information processing apparatus 3 needs to switch the transmission destination of the print job is determined based on the size comparison between the first and second reception completion times T1 and T2. The determination may be made based on the remaining data transmission time t1. In other words, when the remaining data transmission time t1 is longer than the predetermined time, the information processing apparatus 3 switches the transmission destination of the print job by the information processing apparatus 3 based on the size comparison between the remaining data transmission time t1 and the predetermined time. It may be determined whether or not the transmission destination of the print job according to 3 is necessary.

さらにプリントシステム1における何れかの印刷装置4に、上述したプリントサーバー2としての機能を持たせても良い。   Further, any one of the printing apparatuses 4 in the printing system 1 may have the function as the print server 2 described above.

1 プリントシステム
2 プリントサーバー
221 印刷ジョブ記憶部(記憶手段)
231 ジョブ受信部(ジョブ受信手段)
233 判断部(判断手段)
234 ジョブ制御部(ジョブ制御手段)
235 送信先変更部(送信先変更手段)
3 情報処理装置
33 通信インタフェース部(送信手段)
351 送信制御部(送信制御手段)
4 印刷装置
461 ジョブ要求部(ジョブ要求手段)
462 送信先変更部(送信先変更手段)
DESCRIPTION OF SYMBOLS 1 Print system 2 Print server 221 Print job memory | storage part (memory | storage means)
231 Job receiving unit (job receiving means)
233 determination unit (determination means)
234 Job control unit (job control means)
235 Transmission destination changing unit (transmission destination changing means)
3 Information processing device 33 Communication interface section (transmission means)
351 Transmission control unit (transmission control means)
4 Printing device 461 Job request section (job request means)
462 Transmission destination changing unit (transmission destination changing means)

Claims (14)

情報処理装置とプリントサーバーと印刷装置とが相互に通信可能であり、前記情報処理装置が前記プリントサーバーに印刷ジョブを送信し、前記プリントサーバーが前記印刷装置からのジョブ要求に応じて印刷ジョブを前記印刷装置に送信することにより印刷出力を行うプリントシステムであって、
前記プリントサーバーは、
印刷ジョブを記憶する記憶手段と、
前記情報処理装置から送信される印刷ジョブを受信して前記記憶手段に格納するジョブ受信手段と、
前記印刷装置からジョブ要求を受けたとき、前記ジョブ受信手段において当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する判断手段と、
前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記情報処理装置に印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるための指示情報が前記情報処理装置に対して送信されるように制御するジョブ制御手段と、
を備え、
前記情報処理装置は、
印刷ジョブを送信する送信手段と、
前記指示情報を受信することに伴い、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を中止させると共に、当該印刷ジョブの送信先を前記印刷装置に変更させて当該印刷ジョブの送信処理を行わせる送信制御手段と、
を備えることを特徴とするプリントシステム。
An information processing device, a print server, and a printing device can communicate with each other, the information processing device transmits a print job to the print server, and the print server sends a print job in response to a job request from the printing device. A printing system for performing print output by transmitting to the printing apparatus,
The print server
Storage means for storing print jobs;
Job receiving means for receiving a print job transmitted from the information processing apparatus and storing it in the storage means;
A determination unit that determines whether or not reception of a print job corresponding to the job request is completed in the job reception unit when a job request is received from the printing apparatus;
When the determination means determines that the reception of the print job is not completed, the instruction information for causing the information processing apparatus to stop the print job transmission process and directly transmitting the print job to the printing apparatus is provided. Job control means for controlling to be transmitted to the information processing apparatus;
With
The information processing apparatus includes:
A transmission means for transmitting a print job;
Along with receiving the instruction information, the transmission unit stops the transmission process of the print job to the print server, and changes the transmission destination of the print job to the printing apparatus to perform the transmission process of the print job. Transmission control means to perform,
A printing system comprising:
前記ジョブ制御手段は、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段を備えることを特徴とする請求項1に記載のプリントシステム。   The job control unit is transmitted by the information processing apparatus by generating the instruction information and transmitting the instruction information to the information processing apparatus when the determination unit determines that the reception of the print job is not completed. The printing system according to claim 1, further comprising a transmission destination changing unit that switches a transmission destination of a print job to the printing apparatus. 前記ジョブ制御手段は、前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記印刷装置に対し、前記ジョブ要求に対する応答として前記情報処理装置に関する送信元情報を送信することにより、前記印刷装置に前記指示情報を送信させるものであり、
前記印刷装置は、
前記送信元情報を受信することに伴い、前記指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段を備えることを特徴とする請求項1に記載のプリントシステム。
When the determination unit determines that reception of the print job is not completed, the job control unit transmits transmission source information regarding the information processing apparatus to the printing apparatus as a response to the job request. , Causing the printing apparatus to transmit the instruction information,
The printing apparatus includes:
A transmission destination change for switching a transmission destination of a print job transmitted by the information processing apparatus to the printing apparatus by generating the instruction information and transmitting the instruction information to the information processing apparatus in response to receiving the transmission source information The printing system according to claim 1, further comprising: means.
前記送信先変更手段は、前記情報処理装置による前記プリントサーバーへの印刷ジョブの送信処理を継続させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第1の受信完了時間が所定時間よりも長い場合に、前記指示情報を生成して前記情報処理装置に送信することを特徴とする請求項2又は3に記載のプリントシステム。   The transmission destination changing unit includes a first reception completion time required for the printing apparatus to complete reception of the print job when the information processing apparatus continues the transmission process of the print job to the print server. 4. The print system according to claim 2, wherein the instruction information is generated and transmitted to the information processing apparatus when longer than a predetermined time. 前記所定時間は、前記情報処理装置による前記プリントサーバーへの印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第2の受信完了時間であることを特徴とする請求項4に記載のプリントシステム。   The printing apparatus completes reception of the print job when the information processing apparatus stops the transmission process of the print job to the print server and directly transmits the print job to the printing apparatus. The print system according to claim 4, wherein a second reception completion time required until the time is reached. 前記第2の受信完了時間には、前記情報処理装置が印刷ジョブの送信先を前記印刷装置に切り替えるために要する切替時間が含まれることを特徴とする請求項5に記載のプリントシステム。   6. The printing system according to claim 5, wherein the second reception completion time includes a switching time required for the information processing apparatus to switch a transmission destination of a print job to the printing apparatus. 前記切替時間は、ユーザーによって予め定められた時間であることを特徴とする請求項6に記載のプリントシステム。   The print system according to claim 6, wherein the switching time is a time predetermined by a user. 前記送信先変更手段は、前記プリントサーバーが前記情報処理装置から受信中である印刷ジョブの全データサイズと、受信開始時刻と、受信済みデータサイズとを取得し、前記受信開始時刻からの経過時間に基づいて前記プリントサーバーが残りデータを受信完了させるまでに要する時間を算出すると共に、前記プリントサーバーが残りデータを受信完了してから前記印刷装置に当該印刷ジョブの送信を完了させるのに要する時間を算出することにより、前記第1の受信完了時間を取得することを特徴とする請求項4乃至7のいずれかに記載のプリントシステム。   The transmission destination changing unit obtains the total data size, reception start time, and received data size of a print job that the print server is receiving from the information processing apparatus, and an elapsed time from the reception start time. And the time required for the print server to complete the transmission of the print job after the print server has completed the reception of the remaining data. The printing system according to claim 4, wherein the first reception completion time is obtained by calculating the first reception completion time. 前記送信先変更手段は、前記指示情報を前記情報処理装置に送信する前に、前記情報処理装置による印刷ジョブの送信先を前記印刷装置に変更するか否かをユーザーに問い合わせ、該ユーザーから送信先の変更が指示された場合に、前記指示情報を前記情報処理装置に送信することを特徴とする請求項2乃至8のいずれかに記載のプリントシステム。   The transmission destination changing means inquires of the user whether or not to change the transmission destination of the print job by the information processing apparatus to the printing apparatus before transmitting the instruction information to the information processing apparatus, and transmits from the user 9. The printing system according to claim 2, wherein when the previous change is instructed, the instruction information is transmitted to the information processing apparatus. 前記送信制御手段は、前記指示情報を受信することに伴い、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を継続させた場合に前記印刷装置が当該印刷ジョブの受信を完了するまでに要する第1の受信完了時間が所定時間よりも長いか否かを判定し、前記第1の受信完了時間が前記所定時間よりも長い場合に、前記送信手段による前記プリントサーバーへの印刷ジョブの送信処理を中止させると共に、当該印刷ジョブの送信先を前記印刷装置に変更させて当該印刷ジョブの送信処理を行わせることを特徴とする請求項1乃至3のいずれかに記載のプリントシステム。   When the transmission control unit continues the transmission process of the print job to the print server by the transmission unit in accordance with the reception of the instruction information, the transmission apparatus completes the reception of the print job. It is determined whether the required first reception completion time is longer than a predetermined time, and when the first reception completion time is longer than the predetermined time, the transmission unit transmits a print job to the print server. 4. The printing system according to claim 1, wherein the printing system is configured to stop the processing and change the transmission destination of the print job to the printing apparatus to perform the transmission processing of the print job. 5. 前記印刷装置は、前記情報処理装置から送信される印刷ジョブを受信するとき、前記情報処理装置との通信禁止設定が行われていれば、当該通信禁止設定を解除することを特徴とする請求項1乃至10のいずれかに記載のプリントシステム。   The said printing apparatus cancels the said communication prohibition setting, when the communication prohibition setting with the said information processing apparatus is performed when the print job transmitted from the said information processing apparatus is received. The printing system according to any one of 1 to 10. 情報処理装置及び印刷装置と相互に通信可能であり、前記情報処理装置が送信される印刷ジョブを受信して蓄積し、前記印刷装置からのジョブ要求に応じて印刷ジョブを前記印刷装置に送信するプリントサーバーであって、
印刷ジョブを記憶する記憶手段と、
前記情報処理装置から送信される印刷ジョブを受信して前記記憶手段に格納するジョブ受信手段と、
前記印刷装置からジョブ要求を受けたとき、前記ジョブ受信手段において当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断する判断手段と、
前記判断手段において印刷ジョブの受信が完了していないと判断されたとき、前記情報処理装置に印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるための指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を前記印刷装置に切り替える送信先変更手段と、
を備えることを特徴とするプリントサーバー。
The information processing apparatus and the printing apparatus can communicate with each other. The information processing apparatus receives and stores a print job to be transmitted, and transmits the print job to the printing apparatus in response to a job request from the printing apparatus. A print server,
Storage means for storing print jobs;
Job receiving means for receiving a print job transmitted from the information processing apparatus and storing it in the storage means;
A determination unit that determines whether or not reception of a print job corresponding to the job request is completed in the job reception unit when a job request is received from the printing apparatus;
When the determination unit determines that the reception of the print job has not been completed, generates instruction information for causing the information processing apparatus to stop the print job transmission process and to directly transmit the print job to the printing apparatus. Transmission destination changing means for switching the transmission destination of the print job transmitted by the information processing apparatus to the printing apparatus by transmitting to the information processing apparatus,
A print server comprising:
印刷ジョブを蓄積するプリントサーバーから印刷ジョブを取得して印刷出力を行う印刷装置であって、
前記プリントサーバーに対して印刷ジョブを要求するためのジョブ要求を送信するジョブ要求手段と、
前記プリントサーバーから、前記ジョブ要求に対する応答として、前記ジョブ要求に対応する印刷ジョブを送信中である情報処理装置の送信元情報を受信することに伴い、前記情報処理装置に前記プリントサーバーへの印刷ジョブの送信処理を中止させて当該印刷ジョブを当該印刷装置に直接送信させるための指示情報を生成して前記情報処理装置に送信することにより、前記情報処理装置によって送信される印刷ジョブの送信先を当該印刷装置に切り替える送信先変更手段と、
を備えることを特徴とする印刷装置。
A printing apparatus that obtains a print job from a print server that accumulates print jobs and performs print output,
Job request means for transmitting a job request for requesting a print job to the print server;
As a response to the job request from the print server, printing on the print server is performed on the information processing apparatus by receiving transmission source information of the information processing apparatus that is transmitting the print job corresponding to the job request. The destination of the print job transmitted by the information processing apparatus by generating instruction information for stopping the job transmission process and transmitting the print job directly to the printing apparatus and transmitting the instruction information to the information processing apparatus A destination changing means for switching to the printing device,
A printing apparatus comprising:
情報処理装置とプリントサーバーと印刷装置とが相互に通信可能であり、前記情報処理装置が前記プリントサーバーに印刷ジョブを送信し、前記印刷装置が前記プリントサーバーにジョブ要求を送信することにより印刷ジョブを取得して印刷出力を行う印刷方法であって、
前記プリントサーバーが前記情報処理装置から送信される印刷ジョブを受信して所定の記憶手段に格納していくステップと、
前記プリントサーバーが前記印刷装置からジョブ要求を受けたとき、当該ジョブ要求に対応する印刷ジョブの受信が完了しているか否かを判断するステップと、
ジョブ要求に対応する印刷ジョブの受信が完了していないとき、前記情報処理装置に当該印刷ジョブの送信処理を中止させて当該印刷ジョブを前記印刷装置に直接送信させるステップと、
を有することを特徴とする印刷方法。
An information processing apparatus, a print server, and a printing apparatus can communicate with each other, the information processing apparatus transmits a print job to the print server, and the printing apparatus transmits a job request to the print server. Is a printing method that performs print output by acquiring
The print server receiving a print job transmitted from the information processing apparatus and storing it in a predetermined storage means;
Determining whether or not reception of a print job corresponding to the job request is completed when the print server receives a job request from the printing apparatus;
When reception of a print job corresponding to a job request has not been completed, causing the information processing apparatus to stop transmission processing of the print job and directly transmitting the print job to the printing apparatus;
A printing method characterized by comprising:
JP2013167272A 2013-08-12 2013-08-12 Print system, print server, printing apparatus and printing method Expired - Fee Related JP6119500B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013167272A JP6119500B2 (en) 2013-08-12 2013-08-12 Print system, print server, printing apparatus and printing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013167272A JP6119500B2 (en) 2013-08-12 2013-08-12 Print system, print server, printing apparatus and printing method

Publications (2)

Publication Number Publication Date
JP2015036828A true JP2015036828A (en) 2015-02-23
JP6119500B2 JP6119500B2 (en) 2017-04-26

Family

ID=52687315

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013167272A Expired - Fee Related JP6119500B2 (en) 2013-08-12 2013-08-12 Print system, print server, printing apparatus and printing method

Country Status (1)

Country Link
JP (1) JP6119500B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002229756A (en) * 2001-01-31 2002-08-16 Ricoh Co Ltd Data processing system and its control method
JP2011237854A (en) * 2010-05-06 2011-11-24 Ricoh Co Ltd Print control unit, print control system, print control method, print control program and recording medium where the program is recorded
JP2012198826A (en) * 2011-03-23 2012-10-18 Konica Minolta Business Technologies Inc Print system, image forming device, pull-print method, and pull-print program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002229756A (en) * 2001-01-31 2002-08-16 Ricoh Co Ltd Data processing system and its control method
JP2011237854A (en) * 2010-05-06 2011-11-24 Ricoh Co Ltd Print control unit, print control system, print control method, print control program and recording medium where the program is recorded
JP2012198826A (en) * 2011-03-23 2012-10-18 Konica Minolta Business Technologies Inc Print system, image forming device, pull-print method, and pull-print program

Also Published As

Publication number Publication date
JP6119500B2 (en) 2017-04-26

Similar Documents

Publication Publication Date Title
JP5743671B2 (en) Information processing apparatus and control method thereof
JP6214177B2 (en) COMMUNICATION DEVICE, COMMUNICATION DEVICE CONTROL METHOD, AND PROGRAM
JP5747877B2 (en) Image processing linkage system, image processing linkage method, portable information device, image processing device, and linkage program
JP2006202028A (en) Program management system, its control method, and storage medium
JP6136802B2 (en) Information processing program and terminal device
JP6874732B2 (en) Image formation system and image formation method
JP6534519B2 (en) Electronic device having firmware update function
JP2014172394A (en) Printer, program and printing system
JP2013141161A (en) Processing device
JP6455376B2 (en) Image processing apparatus and terminal device
JP6119500B2 (en) Print system, print server, printing apparatus and printing method
JP2014045461A (en) Upload program, image reading device, and image forming apparatus
JP2017094507A (en) Printing device, printing device controlling method and program
JP6531590B2 (en) Image processing device
JP6136911B2 (en) Information processing program and terminal device
JP6614987B2 (en) Management system, management apparatus and control method thereof
JP2008040839A (en) Data output control method, output management server, and data output system
JP6460029B2 (en) Job reservation system and job reservation method
JP2014216817A (en) Information terminal management system
JP2011164876A (en) Task processing device, task processing method, and program
JP6962148B2 (en) Information processing device, image processing device, control method of information processing device, control method of image processing device, program and information distribution system
JP6191243B2 (en) Image processing apparatus and image processing system
JP5072371B2 (en) Document processing device
JP2011108047A (en) Image processing apparatus, and method for controlling the same
JP2016201058A (en) Information processing device, control method of the same, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160419

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170228

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170313

R150 Certificate of patent or registration of utility model

Ref document number: 6119500

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees