JP2014219970A - 公益企業の植生管理に対する信頼性獲得率を推定するためのシステムおよび方法 - Google Patents
公益企業の植生管理に対する信頼性獲得率を推定するためのシステムおよび方法 Download PDFInfo
- Publication number
- JP2014219970A JP2014219970A JP2014084172A JP2014084172A JP2014219970A JP 2014219970 A JP2014219970 A JP 2014219970A JP 2014084172 A JP2014084172 A JP 2014084172A JP 2014084172 A JP2014084172 A JP 2014084172A JP 2014219970 A JP2014219970 A JP 2014219970A
- Authority
- JP
- Japan
- Prior art keywords
- vegetation
- reliability
- pruning
- service
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
- G06Q10/1097—Task assignment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
【解決手段】植生管理における投資に関係する植生管理効率導出システム48、および送電網と関連する植生の管理に関係する剪定サイクル導出システム46を格納するように構成されたメモリ46を含む。メモリと通信可能に結合され、植生管理効率導出システムおよび剪定サイクル導出システムを利用して、送電網と関連する植生を管理するための投資に対する信頼性獲得率値を導出し、導出された信頼性獲得率値に少なくとも一部基づいて、送電網と関連する植生の剪定サイクルを導出するように構成されたプロセッサ44を含む。剪定サイクルは、送電網と関連する植生を管理する頻度を示す出力を含む。
【選択図】図2
Description
12 公益企業
14 公益企業コントロールセンタ
16 発電所
18 代替発電所
20 水力発電所
22 地熱発電所
24 電力伝送網
26 配電変電所および送電網
30 メータ
32 商業および/または工業消費者
34 家庭消費者
36 植生
38 公益企業分析システム
Claims (20)
- 植生管理における投資に関係する植生管理効率導出システム、および送電網と関連する植生の管理に関係する剪定サイクル導出システムを格納するように構成されたメモリと、
前記メモリと通信可能に結合され、前記植生管理効率導出システムおよび前記剪定サイクル導出システムを利用して、
前記送電網と関連する前記植生を管理するための投資に対する信頼性獲得率値を導出し、
前記導出された信頼性獲得率値に少なくとも一部基づいて、前記送電網と関連する前記植生の剪定サイクルを導出し、前記剪定サイクルが、前記送電網と関連する前記植生が管理される頻度を示す出力を含む
ように構成されたプロセッサと
を含む、公益企業分析システム
を含むシステム。 - 前記プロセッサが、前記送電網の複数のサービスフィーダのそれぞれについての前記投資に対する前記信頼性獲得率値を導出するように構成された、請求項1記載のシステム。
- 前記信頼性獲得率値が、
前記複数のサービスフィーダの1つについての計算された信頼性と、
前記複数のサービスフィーダの前記1つと関連する前記植生の管理に対する年間支出額と
に少なくとも一部基づく限界信頼性獲得率を含む、請求項2記載のシステム。 - 前記メモリがビジネスルールシステムを格納するように構成され、前記プロセッサが前記ビジネスルールシステムを利用して、前記投資に関する無差別点を導出するように構成された、請求項1記載のシステム。
- 前記プロセッサが前記無差別点を使用して前記剪定サイクルを導出するように構成され、前記無差別点が前記信頼性獲得率値を比較する閾値を含む、請求項4記載のシステム。
- 前記プロセッサが、前記信頼性獲得率値が前記無差別点に実質的に等しいように前記剪定サイクルを導出するように構成された、請求項4記載のシステム。
- 前記プロセッサが、
前記信頼性獲得率値を、前記送電網のサービスフィーダと関連する植生を管理するための前記投資に関する無差別点と比較することと、
前記信頼性獲得率値が前記無差別点を下回るか、上回るかに少なくとも一部基づいて、前記サービスフィーダと関連する前記植生の前記剪定サイクルを計算することであって、前記信頼性獲得値が前記無差別点に実質的に等しいように前記サービスフィーダと関連する前記植生を管理するためのアクション間の期間を計算することを含む、剪定サイクルを計算することと
によって前記剪定サイクルを導出するように構成された、請求項1記載のシステム。 - 前記プロセッサが、複数の剪定サイクルを導出するように構成され、各剪定サイクルが、前記送電網の複数のサービスフィーダの異なる1つと関連する植生に対応する、請求項1記載のシステム。
- 前記送電網と関連する前記植生の前記管理が、前記送電網の1つまたは複数のサービスフィーダを実質的に取り囲んでいる、またはこれの近くの植生の剪定、伐採、除去、またはその組合せを含む、請求項1記載のシステム。
- 前記公益企業分析システムが、高度分析および視覚化フレームワーク(AAVF)を含み、前記公益企業分析システムが、停電管理システム(OMS)、配電管理システム(DMS)、地理情報システム(GSI)、顧客情報システム(CIS)、高度メータリングインフラストラクチャ(AMI)、メータデータ管理システム(MDM)、メータデータリポジトリ(MDR)、またはその任意の組合せからの表示を受け取るように構成された、請求項1記載のシステム。
- コンピュータ実行可能コードを格納した非一時的コンピュータ可読媒体であって、前記コードが、
送電網と関連する植生を管理するための投資に対する信頼性獲得率値を導出するための命令と、
前記導出された信頼性獲得率値に少なくとも一部基づいて前記送電網と関連する前記植生の剪定サイクルを導出するための命令であって、前記剪定サイクルが、前記送電網と関連する前記植生が管理される頻度を示す出力を含む、命令と
を含む、非一時的コンピュータ可読媒体。 - 前記コードが、前記送電網の複数のサービスフィーダのそれぞれについての前記投資に対する前記信頼性獲得率値を導出するための命令を含む、請求項11記載の非一時的コンピュータ可読媒体。
- 前記コードが、
前記複数のサービスフィーダの1つについての計算された信頼性と、
前記複数のサービスフィーダの前記1つと関連する前記植生の管理に対する年間支出額と
に少なくとも一部基づいて限界信頼性獲得率を計算することによって前記信頼性獲得率値を導出するための命令を含む、請求項11記載の非一時的コンピュータ可読媒体。 - 前記コードが、少なくとも1つのビジネスルールを使用して前記剪定サイクルを導出するための命令を含み、前記少なくとも1つのビジネスルールが、前記信頼性獲得率値が比較される無差別点を含む、請求項11記載の非一時的コンピュータ可読媒体。
- 前記コードが、前記信頼性獲得率値が前記無差別点に実質的に等しいように前記剪定サイクルを導出するための命令を含む、請求項14記載の非一時的コンピュータ可読媒体。
- 前記コードが、
前記信頼性獲得率値を、前記送電網のサービスフィーダと関連する植生を管理するための前記投資に関する無差別点と比較するための命令と、
前記信頼性獲得率値が前記無差別点を下回るか、上回るかに少なくとも一部基づいて前記サービスフィーダと関連する前記植生の前記剪定サイクルを計算するための命令であって、前記剪定サイクルを計算することが、前記信頼性獲得率値が前記無差別点に実質的に等しいように前記サービスフィーダと関連する前記植生を管理するためのアクション間の期間を計算することを含む、命令と
を含む、請求項11記載の非一時的コンピュータ可読媒体。 - 公益企業分析システムにおいて、電力網と関連する植生によって引き起こされる前記電力網上の停電に対応する電力サービス停止データを受け取るステップと、
前記公益企業分析システムにより、前記電力網の信頼性の表示として前記電力サービス停止データに基づく全停電時間を計算するステップと、
前記公益企業分析システムにより、前記電力網と関連する前記植生を管理するための投資に対する信頼性獲得率を計算するステップと、
前記公益企業分析システムにより、前記信頼性獲得率に少なくとも一部基づいて前記電力網と関連する前記植生の剪定サイクルを計算するステップであって、前記剪定サイクルが、前記電力網と関連する前記植生を管理する頻度を示す出力を含む、ステップと
を含む、方法。 - 前記信頼性獲得率を計算するステップが、前記電力網の複数のサービスフィーダのそれぞれについて限界信頼性獲得率を計算するステップを含み、前記剪定サイクルを計算するステップが、複数の剪定サイクルを計算するステップを含み、前記複数の剪定サイクルの各剪定サイクルが、前記電力網の前記複数のサービスフィーダの異なる1つに対応する、請求項17記載の方法。
- 前記植生を管理するための前記投資に関する無差別点を決定するステップと、
前記信頼性獲得率を前記無差別点と比較するステップと、
前記信頼性獲得率が前記無差別点を下回るか、上回るかに少なくとも一部基づいて前記剪定サイクルを計算するステップであって、前記剪定サイクルが、前記無差別点に実質的に等しい前記信頼性獲得率を提供するように構成された、ステップと
を含む、請求項17記載の方法。 - 前記剪定サイクルと関連する期間を決定することによって前記剪定サイクルを計算するステップを含み、前記期間が、前記植生を管理するための1つまたは複数のアクション間の規定の時間量を含み、前記期間が、前記信頼性獲得率が前記無差別点に実質的に等しいように決定される、請求項17記載の方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/874,149 | 2013-04-30 | ||
US13/874,149 US20140324506A1 (en) | 2013-04-30 | 2013-04-30 | Systems and methods for estimating reliability return on utility vegetation management |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2014219970A true JP2014219970A (ja) | 2014-11-20 |
Family
ID=51790006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014084172A Pending JP2014219970A (ja) | 2013-04-30 | 2014-04-16 | 公益企業の植生管理に対する信頼性獲得率を推定するためのシステムおよび方法 |
Country Status (5)
Country | Link |
---|---|
US (1) | US20140324506A1 (ja) |
JP (1) | JP2014219970A (ja) |
AU (1) | AU2014202202A1 (ja) |
BR (1) | BR102014010249A2 (ja) |
CA (1) | CA2849185A1 (ja) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335903A (zh) * | 2015-11-30 | 2016-02-17 | 广东电网有限责任公司电力调度控制中心 | 智能变电站建模方法 |
EP3616328A4 (en) * | 2017-04-26 | 2020-12-30 | Voltserver, Inc. | PROCEDURE FOR VERIFYING THE INTEGRITY OF A DIGITAL POWER LINE |
CN107491845B (zh) * | 2017-08-28 | 2021-02-12 | 国网能源研究院有限公司 | 一种电网规划建设精准投资方法 |
US10600037B2 (en) * | 2017-09-29 | 2020-03-24 | International Business Machines Corporation | Efficient scheduling of maintenance for power distribution systems |
CN112182916A (zh) * | 2020-11-04 | 2021-01-05 | 国网北京市电力公司 | 一种配电网可靠性边际效益和边际成本分析方法及系统 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002318835A (ja) * | 2001-04-19 | 2002-10-31 | Kansai Electric Power Co Inc:The | 近接樹木の伐採計画管理システム |
JP2003269958A (ja) * | 2002-03-13 | 2003-09-25 | Asia Air Survey Co Ltd | 離隔距離情報提供システム及び離隔距離提供装置 |
US20040236620A1 (en) * | 2003-05-19 | 2004-11-25 | Chauhan S. K. | Automated utility supply management system integrating data sources including geographic information systems (GIS) data |
US20050279069A1 (en) * | 2004-06-16 | 2005-12-22 | Cn Utility Consulting, Llc | Systems, device, and methods for efficient vegetation maintenance at multiple infrastructure sites |
JP2006268569A (ja) * | 2005-03-24 | 2006-10-05 | Chugoku Electric Power Co Inc:The | 伐採工事費用見積支援システム |
JP2006268784A (ja) * | 2005-03-25 | 2006-10-05 | Chugoku Electric Power Co Inc:The | 配電線災害予測システム |
JP2007079716A (ja) * | 2005-09-12 | 2007-03-29 | Sobisha:Kk | 架設設備管理装置、架設設備管理方法及びそのコンピュータプログラム |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7203622B2 (en) * | 2002-12-23 | 2007-04-10 | Abb Research Ltd. | Value-based transmission asset maintenance management of electric power networks |
US8941387B2 (en) * | 2010-10-12 | 2015-01-27 | Howard University | Apparatus and method for fault detection and location determination |
-
2013
- 2013-04-30 US US13/874,149 patent/US20140324506A1/en not_active Abandoned
-
2014
- 2014-04-16 JP JP2014084172A patent/JP2014219970A/ja active Pending
- 2014-04-17 CA CA 2849185 patent/CA2849185A1/en not_active Abandoned
- 2014-04-23 AU AU2014202202A patent/AU2014202202A1/en not_active Abandoned
- 2014-04-29 BR BR102014010249A patent/BR102014010249A2/pt not_active Application Discontinuation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002318835A (ja) * | 2001-04-19 | 2002-10-31 | Kansai Electric Power Co Inc:The | 近接樹木の伐採計画管理システム |
JP2003269958A (ja) * | 2002-03-13 | 2003-09-25 | Asia Air Survey Co Ltd | 離隔距離情報提供システム及び離隔距離提供装置 |
US20040236620A1 (en) * | 2003-05-19 | 2004-11-25 | Chauhan S. K. | Automated utility supply management system integrating data sources including geographic information systems (GIS) data |
US20050279069A1 (en) * | 2004-06-16 | 2005-12-22 | Cn Utility Consulting, Llc | Systems, device, and methods for efficient vegetation maintenance at multiple infrastructure sites |
JP2006268569A (ja) * | 2005-03-24 | 2006-10-05 | Chugoku Electric Power Co Inc:The | 伐採工事費用見積支援システム |
JP2006268784A (ja) * | 2005-03-25 | 2006-10-05 | Chugoku Electric Power Co Inc:The | 配電線災害予測システム |
JP2007079716A (ja) * | 2005-09-12 | 2007-03-29 | Sobisha:Kk | 架設設備管理装置、架設設備管理方法及びそのコンピュータプログラム |
Also Published As
Publication number | Publication date |
---|---|
CA2849185A1 (en) | 2014-10-30 |
AU2014202202A1 (en) | 2014-11-13 |
US20140324506A1 (en) | 2014-10-30 |
BR102014010249A2 (pt) | 2015-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10443577B2 (en) | Systems and methods for improved wind power generation | |
Bhatt et al. | An instrumentation engineer’s review on smart grid: Critical applications and parameters | |
US20150262110A1 (en) | Systems and methods for utility crew forecasting | |
US20100292857A1 (en) | Electrical network command and control system and method of operation | |
Zavoda | Advanced distribution automation (ADA) applications and power quality in Smart Grids | |
Shi et al. | Post-extreme-event restoration using linear topological constraints and DER scheduling to enhance distribution system resilience | |
Haque et al. | Congestion management in smart distribution network | |
JP2014219970A (ja) | 公益企業の植生管理に対する信頼性獲得率を推定するためのシステムおよび方法 | |
Oshevire et al. | Smart Grid Technology and Its Possible Applications to the Nigeria 330 kV Power System. | |
Phan et al. | Big data and monitoring the grid | |
Wu et al. | Preventive control strategy for an island power system that considers system security and economics | |
De Nigris et al. | Smart grids in Latin America and the Caribbean | |
Hartmann et al. | Island mode operation in intelligent microgrid—Extensive analysis of a case study | |
Sakthivel et al. | Design of automatic power consumption control system using smart grid—A review | |
Losi et al. | Distribution control center: New requirements and functionalities | |
Bessone et al. | The PODCAST project–optimizing distribution networks with renewable energy sources | |
Akom et al. | Smart Grid Technology and renewable energy integration in the Ghanaian grid system | |
Biswal et al. | Smart Meter: Impact and Usefulness on smart Grids | |
Hassan et al. | Efficiency Study of Transforming a Conventional Grid to Smart Grid using MATLAB: Outline for upgrading a traditional grid to smart grid in a developing country like Bangladesh | |
Reponen | Coordinated voltage control in real time simulations of distribution network with distributed energy resources | |
Niaki | Asset management in smart grids: A review | |
Ye et al. | A Value-of-Service based Model for Resilient Distribution System Restoration with Microgrids | |
Bhardwaj et al. | Advanced Distribution Management System: An Integrated System | |
Lu et al. | Foundational report series: Advanced distribution management systems for grid modernization, business case calculations for dms | |
Drummond | An analysis of new functionalities enabled by the second generation of smart meters in Sweden |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170407 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180305 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180313 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180608 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20180911 |