JP2014067231A - Salary calculation system, salary calculation program and salary calculation server - Google Patents

Salary calculation system, salary calculation program and salary calculation server Download PDF

Info

Publication number
JP2014067231A
JP2014067231A JP2012212232A JP2012212232A JP2014067231A JP 2014067231 A JP2014067231 A JP 2014067231A JP 2012212232 A JP2012212232 A JP 2012212232A JP 2012212232 A JP2012212232 A JP 2012212232A JP 2014067231 A JP2014067231 A JP 2014067231A
Authority
JP
Japan
Prior art keywords
salary
payment
information
month
deduction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012212232A
Other languages
Japanese (ja)
Other versions
JP6020000B2 (en
Inventor
Sumio Yamamoto
純夫 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oki Electric Industry Co Ltd
Original Assignee
Oki Electric Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oki Electric Industry Co Ltd filed Critical Oki Electric Industry Co Ltd
Priority to JP2012212232A priority Critical patent/JP6020000B2/en
Publication of JP2014067231A publication Critical patent/JP2014067231A/en
Application granted granted Critical
Publication of JP6020000B2 publication Critical patent/JP6020000B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce a gap from an event occurrence to a payday.SOLUTION: A salary calculation system includes: previous month salary statement storage means 22-1 that stores a previous month salary statement data; current month salary statement storage means 23-1 that creates and stores a current month salary statement data 23 by copying a salary statement data stored in the previous month salary statement storage means 22-1; and salary payment and deduction base information storage means 25 and 26 that store salary payment and deduction base information when a new salary payment and deduction base information occurs after a closing date of the previous month. The present month salary statement data 23 is updated as a night batch by a current month payroll processing closing date 4 on the basis of the salary payment and deduction base information.

Description

本発明は大規模企業における給与計算システムに関するものである。   The present invention relates to a salary calculation system in a large-scale company.

従来、大規模企業における給与計算システムは例えば以下の手順で行われる。図7は従来の給与計算処理の概要フローを示す説明図である。前月分の給与の支払処理の後、所定の事務処理の完了をもって前月分給与処理の完了71となる。その後、当月分の給与の支払処理に反映させるために、前月分の給与処理締切日以降で当月分の給与処理締切日4までに発生した給与支給・控除根拠情報を取り込む人事情報等取込処理72が行われる。この給与支給・控除根拠情報の取込みは給与処理締切日4によって一旦締め切られる。その後、取込んだ給与支給・控除根拠情報に基づいて各個人の支給額・控除額を計算して、当月分の給与の計算を行う給与計算処理73が行われ、次に人事担当によって支払額確認処理74が行われる。その後は、銀行への振込み手続からなる給与支払処理75を経て支給日5となり、当月分給与処理の完了76となる。   Conventionally, a salary calculation system in a large-scale company is performed in the following procedure, for example. FIG. 7 is an explanatory diagram showing an outline flow of conventional salary calculation processing. After the payment processing of the salary for the previous month, the completion of the predetermined paper processing is completed 71 for the previous month's salary processing. After that, in order to reflect the payment processing for the current month's salary, the acquisition process of personnel information etc. that captures the salary payment / deduction basis information that occurred after the previous month's salary processing deadline and until the current salary processing deadline 4 72 is performed. The receipt of the salary payment / deduction basis information is temporarily closed by the salary processing deadline 4. After that, the salary calculation processing 73 is performed to calculate the salary for the current month based on the acquired salary payment / deduction basis information, and to calculate the salary for the current month. A confirmation process 74 is performed. After that, the payment date 75 is obtained through a salary payment process 75 including a bank transfer procedure, and the salary process is completed 76 for the current month.

図8は同じく従来の給与計算処理の詳細を示す説明図である。例えば、9月15日に前月分給与処理の完了71があった後、人事情報等取込処理72が行われる。実際は前月分の締切日(8月21日)以降に発生した給与支給・控除根拠情報が取込まれる。取り込まれた給与支給・控除根拠情報は給与マスタ77に蓄積される。この人事情報等取込処理72は9月20日の給与処理締切日4まで行われる。   FIG. 8 is also an explanatory diagram showing details of the conventional salary calculation processing. For example, after completion of the previous month's salary processing 71 on September 15, personnel information etc. capture processing 72 is performed. Actually, salary payment / deduction basis information generated after the deadline for the previous month (August 21) is taken in. The taken salary supply / deduction basis information is accumulated in the salary master 77. This personnel information fetching process 72 is performed until the salary processing deadline 4 on September 20.

その後、9月21日乃至10月6日において、給与マスタ77に蓄積された各種情報から各個人の支給額・控除額を計算する給与計算処理73が行われる。この間、給与計算、修正及び再修正が行われる。そして、給与マスタ77から給与明細78−1が作成される。その後10月7日までに支払額確認処理74において、給与明細78−2に対して人事担当者の確認が行われ、その後、給与明細78−3のデータをもとに銀行への振込処理が行われ、10月10日に給与支払処理75が行われる。最後に再び10月15日に当月分給与処理の完了76となる。即ち、当月分は、計算期間8月21日乃至9月20日の給与支給・控除根拠情報に基づき、その給与支給が10月10日となり、翌月分は、計算期間が9月21日乃至10月20日で、給与支給が11月10日となる。   Thereafter, from September 21 to October 6, a salary calculation process 73 for calculating the amount of payment and deduction for each individual from various information accumulated in the salary master 77 is performed. During this time, salary calculation, correction and re-correction are performed. Then, a pay statement 78-1 is created from the pay master 77. After that, in October, the payment confirmation process 74 confirms the person in charge of the personnel details for the salary statement 78-2, and then the bank transfer process is performed based on the data of the salary statement 78-3. The salary payment process 75 is performed on October 10th. Finally, the pay processing for the current month is completed 76 on October 15 again. That is, for the current month, based on the salary payment / deduction basis information for the calculation period from August 21 to September 20, the salary payment is October 10, and for the next month, the calculation period is from September 21 to 10 On the 20th of the month, the salary payment will be on the 10th of November.

なお、特開平6−325066号公報(特許文献1)には、給与計算方法及びシステムに関する発明が記載されている。特許文献1によれば、タイムレコーダにより収集された打刻データを用いて就業時間、残業時間等の日勤怠データを演算して、勤怠締め日に基づいて、期間勤怠データを演算する技術が記載されている。   Japanese Patent Laid-Open No. 6-325066 (Patent Document 1) describes an invention relating to a salary calculation method and system. According to Patent Document 1, there is described a technique for calculating daytime attendance data such as working hours and overtime hours using time stamp data collected by a time recorder, and calculating period attendance data based on attendance closing dates. Yes.

特開平6−325066号公報JP-A-6-325066

しかしながら、従来の技術によれば、当月分の給与処理締切日以降に発生した給与支給・控除根拠情報に対する給与支給は、翌月になってしまうのが一般的である。即ち、図8において説明した日程において、翌月分の計算期間9月21日乃至10月20日のうち、例えば9月21日に生じた給与支給・控除根拠情報に対する給与支給は、翌月分としての11月分の支給日(11月10日)に加算して支払うという処理をすることになる。このように事象発生から支給日5までのずれは、最長で約50日、最短で約20日後となり、企業としてはこのずれをなるべく少なくすることが求められている。   However, according to the conventional technique, the salary payment for the salary payment / deduction basis information generated after the salary processing deadline for the current month is generally the next month. That is, in the schedule described in FIG. 8, the salary payment for the salary payment / deduction basis information that occurred on September 21 in the calculation period of September 21 to October 20 for the next month is as the next month. A process of paying in addition to the payment date for November (November 10) is performed. Thus, the deviation from the occurrence of the event to the payment date 5 is about 50 days at the longest and about 20 days after the shortest, and the company is required to reduce this deviation as much as possible.

一方、大勢の社員を擁する大規模企業又は多数の職員を持つ官公庁の場合は、人数が多いため給与の計算処理に時間がかかってしまい、所定の期間内に計算処理を行うことは困難であるという問題があった。   On the other hand, in the case of a large-scale company with a large number of employees or a government office with a large number of employees, it takes time to calculate the salary due to the large number of people, and it is difficult to perform the calculation within a predetermined period. There was a problem.

本発明が解決しようとする課題は、給与処理締切日から給与支給までの期間を可能な限り短期間で行うこととし、かつ、大規模企業(官公庁を含む。以下同じ。)の場合であっても、大勢の社員のための給与の計算処理に負担のかからない給与計算システムを提供することを可能とするものである。   The problem to be solved by the present invention is the case where the period from the salary processing deadline to the salary payment is performed in the shortest possible time, and in the case of a large-scale company (including public offices; the same shall apply hereinafter). It is also possible to provide a salary calculation system that does not burden the calculation process of salary for a large number of employees.

上記課題を解決するために本発明に関する給与計算システムは、締切日までに発生した給与支給・控除根拠情報を取込み、取込んだ前記給与支給・控除根拠情報に基づいて当月分の給与の計算を行う給与計算システムにおいて、前月分の給与明細データを格納する前月分給与明細格納手段と、前記前月分給与明細格納手段に格納した前記給与明細データから当月分の給与明細データを作成して格納する当月分給与明細格納手段と、前月分の前記締切日以降に前記給与支給・控除根拠情報の発生があるとき、前記給与支給・控除根拠情報を格納する給与支給・控除根拠情報格納手段と、前記当月分給与明細格納手段に格納した前記当月分の給与明細データを、前記給与支給・控除根拠情報格納手段に格納した前記給与支給・控除根拠情報に基づいて、前記当月分の前記締切日までに更新する更新手段を有することを特徴とするものである。   In order to solve the above-mentioned problems, the salary calculation system according to the present invention takes in salary payment / deduction basis information generated by the deadline, and calculates the salary for the current month based on the acquired salary payment / deduction basis information. In the payroll calculation system, the previous month salary details storage means for storing the salary details data for the previous month and the salary details data for the current month are created and stored from the salary details data stored in the previous month salary details storage means Salary details storage means for the current month, and when there is occurrence of the salary payment / deduction basis information after the deadline for the previous month, the salary supply / deduction basis information storage means for storing the salary payment / deduction basis information, Based on the salary payment / deduction basis information stored in the salary supply / deduction basis information storage means, the salary detail data for the current month stored in the salary detail storage means for the current month Te, is characterized in that it has a updating means for updating said before the deadline of the current month.

上記構成を有する本発明によれば、前月分給与明細格納手段に格納した前月分の給与明細データから当月分の給与明細データを作成することとしたので、前月分の給与明細データに対し給与支給・控除根拠情報の発生のない社員に関する給与計算は、当月分の給与処理締切日において完了したことになる。   According to the present invention having the above-described configuration, since it is decided to create the salary detail data for the current month from the salary detail data for the previous month stored in the salary detail storage means for the previous month, the salary supply for the salary detail data for the previous month・ The salary calculation for employees who do not generate deduction ground information is completed on the salary processing deadline for the current month.

一方、前記給与支給・控除根拠情報を格納する給与支給・控除根拠情報格納手段を設け、当月分の前記給与処理締切日までに、当月分給与明細格納手段に格納した当月分の給与明細データを前記給与支給・控除根拠情報に基づいて更新することとしたので、前月分給与明細データに対し給与支給・控除根拠情報の発生のある社員に関する給与計算は、当月分の給与処理締切日において完了したことになる。   On the other hand, a salary payment / deduction basis information storage means for storing the salary payment / deduction basis information is provided, and the salary details data for the current month stored in the salary details storage means for the current month is received by the salary processing deadline for the current month. Since it was decided to update based on the above-mentioned salary payment / deduction basis information, the salary calculation for employees who had generated salary payment / deduction basis information for the previous month's salary details data was completed on the salary processing deadline for the current month. It will be.

更に、社員全体について、前月分の給与明細データから当月分の給与明細データの作成はコピーにより行う。そして、当月分の給与明細データの更新は、後述するように夜間バッチにより行う。従って、給与支給・控除根拠情報の発生のある社員もない社員も、給与計算は、当月分の給与処理締切日において完了したことになる。これにより、処理件数の多い大規模企業において、給与計算の負担軽減とすることが可能になる。   Furthermore, for the entire employee, the current month's salary detail data is created by copying from the previous month's salary detail data. The salary detail data for the current month is updated by night batch as described later. Therefore, the salary calculation is completed on the salary processing deadline for the current month for both employees who have no salary payment / deduction basis information. This makes it possible to reduce the burden of payroll calculation in a large-scale company with a large number of processing cases.

また、本発明によれば、当月分の給与処理締切日に当月分の給与計算ができており、給与計算の負担軽減を可能とすることができるので、当月分の給与処理締切日を後ろに移動するよう変更することができる。具体的には、事象の発生から支給日までのずれは、最長で約40日、最短で約10日後に支給となり、従来に比較し約10日間短縮可能となる。これにより給与処理締切日から給与支給までの期間を可能な限り短期間で行うことを可能とし、かつ、給与処理締切日までに発生した給与支給・控除根拠情報に対する給与支給は、可能な限り当月支払いの処理とすることが可能となる。   Further, according to the present invention, the salary calculation for the current month can be performed on the day of the salary processing deadline for the current month, and the burden of the salary calculation can be reduced. Can be changed to move. Specifically, the difference between the occurrence of an event and the date of payment is paid for about 40 days at the longest and about 10 days for the shortest, and can be shortened by about 10 days compared to the conventional case. This enables the period from the salary processing deadline to the salary payment to be as short as possible, and the salary payment for the salary payment / deduction basis information generated by the salary processing deadline is as much as possible in the current month. Payment can be processed.

第1の実施の形態に関する給与計算システムの詳細を示す説明図である。It is explanatory drawing which shows the detail of the salary calculation system regarding 1st Embodiment. 第1の実施の形態に関する給与計算システムの概要フローを示す説明図である。It is explanatory drawing which shows the outline | summary flow of the salary calculation system regarding 1st Embodiment. 第1の実施の形態に関する給与計算システムの構成図である。It is a block diagram of the salary calculation system regarding 1st Embodiment. 第1の実施の形態に関する夜間バッチ処理プログラムの動作を示す説明図である。It is explanatory drawing which shows operation | movement of the nighttime batch processing program regarding 1st Embodiment. 第1の実施の形態に関する夜間バッチ処理の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the nighttime batch process regarding 1st Embodiment. 第1の実施の形態に関する人事情報の夜間バッチ処理における詳細フローを示す説明図である。It is explanatory drawing which shows the detailed flow in the nighttime batch process of the personnel information regarding 1st Embodiment. 第1の実施の形態に関する勤務時間管理の夜間バッチ処理における詳細フローを示す説明図である。It is explanatory drawing which shows the detailed flow in the nighttime batch process of working hours management regarding 1st Embodiment. 第1の実施の形態に関する社会保険情報の夜間バッチ処理における詳細フローを示す説明図である。It is explanatory drawing which shows the detailed flow in the night batch process of the social insurance information regarding 1st Embodiment. 第1の実施の形態に関する社宅情報の夜間バッチ処理における詳細フローを示す説明図である。It is explanatory drawing which shows the detailed flow in the night batch process of the company house information regarding 1st Embodiment. 従来の給与計算処理の概要フローを示す説明図である。It is explanatory drawing which shows the outline | summary flow of the conventional salary calculation process. 同じく従来の給与計算処理の詳細を示す説明図である。It is explanatory drawing which similarly shows the detail of the conventional salary calculation process.

(第1の実施の形態)
以下、本発明の第1の実施の形態について説明する。図2は第1の実施の形態に関する給与計算システムの概要フローを示す説明図である。前月分の給与の支払処理の後、所定の事務処理の完了をもって前月分給与完了処理31となる。その後、当月分の給与の支払処理に反映させるために、前月分の給与処理締切日以降で当月分の給与処理締切日までに発生した給与支給・控除根拠情報を取り込む人事情報等取込処理32が行われる。ここで給与支給・控除根拠情報は、人事情報、勤務情報及び控除情報のうちいずれか一を含む。同時に、取込んだ給与支給・控除根拠情報に基づいて各個人の支給額・控除額を計算し、当月分の給与の計算を行う給与計算処理33が行われる。これらは後述するように夜間バッチ処理で行われる。これらは給与処理締切日4に一旦締め切られる。なお、人事情報とは、異動、採用、昇格昇給等の情報である。勤務情報とは、欠勤、残業等の情報である。控除情報とは、社宅使用料、社会保険料等である。
(First embodiment)
Hereinafter, a first embodiment of the present invention will be described. FIG. 2 is an explanatory diagram showing an outline flow of the salary calculation system according to the first embodiment. After the payment processing for the previous month's salary, the previous month's salary completion processing 31 is performed upon completion of predetermined paperwork. Thereafter, in order to reflect the salary payment process for the current month, the personnel information acquisition process 32 for taking in salary payment / deduction basis information generated after the previous month's salary process deadline date and before the current month's salary process deadline date 32 Is done. Here, the salary supply / deduction basis information includes any one of personnel information, work information, and deduction information. At the same time, a salary calculation process 33 is performed for calculating the salary for each individual based on the acquired salary payment / deduction basis information and calculating the salary for the current month. These are performed by nighttime batch processing as will be described later. These are temporarily closed on the salary processing deadline 4. The personnel information is information such as transfer, recruitment, promotion and salary increase. The work information is information such as absence from work and overtime. The deduction information includes company housing fees, social insurance premiums, etc.

給与処理締切日4の後、人事担当によって支払額確認処理34が行われる。その後は、銀行への振込み手続からなる給与支払処理35を経て支給日5となり、当月分給与完了処理36となる。これにより明らかな通り、前記従来の技術に比較すると、本実施の形態に関する給与処理締切日4は月末であり、給与計算処理33は、給与処理締切日4の前に行われる。   After the salary processing deadline 4, a payment amount confirmation process 34 is performed by the personnel manager. After that, the payment date 35 is obtained through a salary payment process 35 including a bank transfer procedure, and the salary completion process 36 for the current month. As is clear from this, the salary processing deadline 4 relating to the present embodiment is the end of the month, and the salary calculation processing 33 is performed before the salary processing deadline 4 as compared with the conventional technique.

図1は第1の実施の形態に関する給与計算システムの詳細を示す説明図である。例えば、9月15日に前月分給与完了処理31が行われ、その後、人事情報等取込処理32が行われる。この人事情報等取込処理32において考慮されることは、全社員のうち、当月分の給与が前月分の給与と全く変わらない社員がいることと、給与処理締切日4までに発生した各種手当て、控除額の分だけ給与に増減があり、毎月計算が必要な社員がいることである。従って、後者の社員に対して、発生した事象を正確に給与に反映させるために、前月分の給与処理締切日(8月末日)以降に発生した給与支給・控除根拠情報が取込まれる。具体的には、人事情報、勤務情報及び控除情報の各種情報が後述するデータベース20に蓄積される。この人事情報、勤務情報及び控除情報の各種情報は、給与支給・控除根拠情報格納手段25、26としての支給根拠ファイル25及び控除根拠ファイル26に格納される。また、前月分の給与に関するデータである前月分の給与明細データはデータベース20の前月分給与明細格納手段22−1に格納され、当月分の給与に関するデータである当月分の給与明細データ23はデータベース20の当月分給与明細格納手段23−1に格納される。   FIG. 1 is an explanatory diagram showing details of the salary calculation system according to the first embodiment. For example, a salary completion process 31 for the previous month is performed on September 15, and then a personnel information etc. capturing process 32 is performed. What is taken into consideration in this personnel information acquisition process 32 is that there are employees whose salary for the current month is not different from the salary for the previous month, and various payments that have occurred up to the salary processing deadline 4 The salary increases or decreases by the deduction amount, and there are employees who need to calculate monthly. Therefore, for the latter employee, in order to accurately reflect the event that has occurred in the salary, the salary payment / deduction basis information generated after the previous month's salary processing deadline (the end of August) is taken. Specifically, various information such as personnel information, work information, and deduction information is accumulated in the database 20 described later. Various information such as personnel information, work information, and deduction information is stored in a supply basis file 25 and a deduction basis file 26 as salary supply / deduction basis information storage means 25 and 26. Further, the salary detail data for the previous month, which is data relating to the salary for the previous month, is stored in the salary detail storage means 22-1 for the previous month of the database 20, and the salary detail data 23 for the current month, which is data relating to the salary for the current month, is stored in the database. It is stored in the 20 monthly salary details storage means 23-1.

同時に、本実施の形態に関する給与計算システムは、全社員の前月分の給与明細データからコピーすることにより当月分の給与明細データ23を作成する。この作成は夜間バッチ処理によって行われる。ここで当月分の給与が前月分の給与と同じ社員、即ち前月の給与処理締切日4の翌日から当月の給与処理締切日4まで給与支給・控除根拠情報の発生のない社員については、当月分の給与明細データ23を作成した時点で給与計算は完了する。ただし、給与支給・控除根拠情報の発生があるかないかは当月の給与処理締切日4に確定する。   At the same time, the salary calculation system according to the present embodiment creates salary detail data 23 for the current month by copying from the salary detail data for the previous month for all employees. This creation is performed by nighttime batch processing. For employees whose salary for the current month is the same as the salary for the previous month, that is, for employees whose salary payment / deduction basis information does not occur from the day after the salary processing deadline 4 of the previous month until the salary processing deadline 4 of the current month The salary calculation is completed when the salary detail data 23 is created. However, whether salary payment / deduction basis information has occurred or not is determined on the salary processing deadline 4 of the current month.

一方、前月の給与処理締切日4の翌日から当月の給与処理締切日4まで給与支給・控除根拠情報の発生がある社員については、支給根拠ファイル25及び控除根拠ファイル26によって、当月分の給与明細データ23が更新される。この更新は、9月15日の前月分給与完了処理31の以後、9月末日の給与処理締切日4まで日々夜間バッチ処理によって行われる。このようにして、給与支給・控除根拠情報の発生のある社員についての給与計算は当月の給与処理締切日4に完了し、確定する。   On the other hand, for employees who have generated salary payment / deduction basis information from the day after the salary processing deadline 4 of the previous month to the salary processing deadline 4 of the current month, the salary details for the current month are determined by the payment basis file 25 and the deduction basis file 26. Data 23 is updated. This update is performed by nighttime batch processing every day until the salary processing deadline 4 of the end of September after the previous month salary completion processing 31 on September 15th. In this way, the salary calculation for the employee who has generated the salary payment / deduction basis information is completed and fixed on the salary processing deadline 4 of the current month.

当月分の給与処理締切日4の後、10月7日までに支払額確認処理34において、当月分給与明細格納手段23−1に格納された当月分の給与明細データ23に対して人事担当者の確認が行われる。また、社員全体の給与総額の計算、法定調書の作成も行われる。更に、過去分の誤りを精算する遡及処理もここで行われる。そして、10月10日に当月分の給与明細データ23のデータをもとに銀行への振込処理が行われ、給与支払処理35が行われる。最後に再び10月15日に当月分給与完了処理36となる。当月分給与完了処理36の後は、当月分給与明細格納手段23−1に格納された当月分の給与明細データ23から翌月分の図示しない給与明細を作成することになる。即ち、当月分は、計算期間9月1日乃至9月末日の給与支給・控除根拠情報に基づき、給与支給が10月10日となり、翌月分は、計算期間10月1日乃至10月末日で、給与支給が11月10日となる。   Personnel in charge of salary statement data 23 for the current month stored in the salary statement storage means 23-1 for the current month in the payment confirmation process 34 after October 4 of the salary processing deadline 4 for the current month Is confirmed. It also calculates the total salary of all employees and creates legal records. Further, retroactive processing for adjusting past errors is also performed here. Then, on October 10, a transfer process to the bank is performed based on the data of the salary detail data 23 for the current month, and a salary payment process 35 is performed. Finally, salary completion processing 36 for the current month is performed again on October 15. After the current month salary completion process 36, a salary detail (not shown) for the next month is created from the current salary detail data 23 stored in the current salary detail storage means 23-1. That is, for the current month, the salary payment is October 10 based on the salary payment / deduction basis information from September 1 to the end of September, and the next month is from October 1 to the end of October. The salary will be paid on November 10th.

このように、本実施の形態に関する給与計算システムによれば、給与処理締切日4の前に給与計算処理33が行われるので、給与処理締切日4を従来の9月20日(図8)から9月末日まで、10日遅くするよう変更することができる。従って、事象の発生から支給日5までのずれは、最長で約40日、最短で約10日後に支給となり、従来に比較し約10日間短縮可能となる。   Thus, according to the salary calculation system relating to the present embodiment, the salary calculation processing 33 is performed before the salary processing deadline 4, so the salary processing deadline 4 is changed from the conventional September 20 (FIG. 8). You can change it to be 10 days late until the end of September. Therefore, the deviation from the occurrence of the event to the payment date 5 is paid after about 40 days at the longest and about 10 days at the shortest, and can be shortened by about 10 days compared to the conventional case.

図3は第1の実施の形態に関する給与計算システムの構成図である。給与計算システムは、Web/AP(Application)サーバ1及びデータベースサーバ2から構成されている。Web/APサーバ1及びデータベースサーバ2はネットワークを介して接続されており、電子データの授受を行うことが可能である。データベースサーバ2はデータベース20を制御する。Web/APサーバ1は複数のパソコン3とネットワークを介して接続される。従って、パソコン3はWeb/APサーバ1を経由してデータベースサーバ2にアクセスすることができる。ネットワークは、例えば企業内のイントラネット又はインターネット等である。   FIG. 3 is a configuration diagram of the salary calculation system according to the first embodiment. The salary calculation system includes a Web / AP (Application) server 1 and a database server 2. The Web / AP server 1 and the database server 2 are connected via a network and can exchange electronic data. The database server 2 controls the database 20. The Web / AP server 1 is connected to a plurality of personal computers 3 via a network. Accordingly, the personal computer 3 can access the database server 2 via the Web / AP server 1. The network is, for example, a company intranet or the Internet.

データベース20は前月分の給与明細データを格納する前月分給与明細格納手段22−1として機能し、当月分の給与明細データ23を格納する当月分給与明細格納手段23−1としても機能し、支給根拠ファイル25及び控除根拠ファイル26を格納する給与支給・控除根拠情報格納手段25、26としても機能する。更に、後述する科目ファイルとしても機能する。   The database 20 functions as a previous month salary detail storage means 22-1 for storing the salary detail data for the previous month, and also functions as a current month salary detail storage means 23-1 for storing the salary detail data 23 for the current month. It also functions as salary supply / deduction basis information storage means 25 and 26 for storing the basis file 25 and the deduction basis file 26. Furthermore, it functions as a subject file described later.

Web/APサーバ1は人事情報部11、給与情報部12、社会保険情報部13、勤務時間管理部14及び社宅情報部15を有する。人事情報部11、給与情報部12、社会保険情報部13、勤務時間管理部14及び社宅情報部15は、パソコン3からの入力データを受付け、データベースサーバ2を介してデータベース20に入力データを格納する。   The Web / AP server 1 includes a personnel information section 11, a salary information section 12, a social insurance information section 13, a working time management section 14, and a company house information section 15. The personnel information unit 11, salary information unit 12, social insurance information unit 13, working time management unit 14, and company housing information unit 15 accept input data from the personal computer 3 and store the input data in the database 20 via the database server 2. To do.

人事情報部11はパソコン3から入力された社員の移動情報、採用情報及び昇格昇給情報を受付け、データベース20へ支給根拠情報として格納する。社会保険情報部13はパソコン3から入力された社員の社会保険加入者情報等を受付け、データベース20へ控除根拠情報として格納する。   The personnel information section 11 receives employee movement information, recruitment information and promotion / raising information input from the personal computer 3 and stores them in the database 20 as supply basis information. The social insurance information unit 13 accepts employee social insurance subscriber information input from the personal computer 3 and stores it in the database 20 as deduction basis information.

勤務時間管理部14はパソコン3から入力された社員の時間外勤務実績情報を受付け、データベース20へ支給根拠情報として格納する。社宅情報部15はパソコン3から入力された社員の社宅使用料控除情報を受付け、データベース20へ控除根拠情報として格納する。給与情報部12はこれら人事情報部11、社会保険情報部13、勤務時間管理部14及び社宅情報部15が格納した支給根拠情報及び控除根拠情報に基づいて当月分の給与明細データ23を更新する。   The working time management unit 14 accepts employee overtime performance information input from the personal computer 3 and stores it in the database 20 as supply basis information. The company housing information unit 15 accepts employee house usage fee deduction information input from the personal computer 3 and stores it in the database 20 as deduction basis information. The salary information unit 12 updates the salary detail data 23 for the current month based on the supply basis information and the subtraction basis information stored by the personnel information unit 11, social insurance information unit 13, working time management unit 14, and company housing information unit 15. .

夜間バッチ部16は前月分の給与明細データをコピーして当月分の給与明細データ23を作成するとともに、支給根拠ファイル25及び控除根拠ファイル26から給与支給・控除根拠情報の発生がある社員について当月分の給与明細データ23を更新する。記憶部17は各種データを記憶し、I/O制御部18はデータベースサーバ2及び複数のパソコン3との入出力を制御する。そして、制御部10はこれらの各部の動作を制御する。   The nighttime batch unit 16 copies the salary detail data for the previous month to create the salary detail data 23 for the current month, and for employees who have generated salary payment / deduction basis information from the payment basis file 25 and the deduction basis file 26 The salary details data 23 for the minute is updated. The storage unit 17 stores various data, and the I / O control unit 18 controls input / output with the database server 2 and the plurality of personal computers 3. And the control part 10 controls operation | movement of these each part.

図4は第1の実施の形態に関する夜間バッチ処理プログラムの動作を示す説明図である。データベース20は科目ファイルとしての人事ファイル21、社会保険ファイル24及び図示しない勤務時間管理ファイル、社宅ファイルを有し、前月分の給与明細データ及び当月分の給与明細データ23を有する。   FIG. 4 is an explanatory diagram showing the operation of the nighttime batch processing program according to the first embodiment. The database 20 includes a personnel file 21 as a subject file, a social insurance file 24, a working time management file (not shown), and a company housing file, and includes salary detail data for the previous month and salary detail data 23 for the current month.

(1)Web/APサーバ1の人事情報部11は、パソコン3からの異動情報の入力を受付けると、支給根拠としてのデータベース20の人事ファイル21の該当社員A欄に日付(9月17日)及び基本給等の金額を格納する。同様に、社会保険情報部13はパソコン3からの社会保険加入者情報の入力を受付けると、控除根拠としてのデータベース20の社会保険ファイル24の該当社員D欄に日付(9月17日)及び控除金額を格納する。   (1) When the personnel information section 11 of the Web / AP server 1 accepts the input of the transfer information from the personal computer 3, the date is displayed in the corresponding employee A column of the personnel file 21 of the database 20 as a basis for payment (September 17). And the amount of basic salary etc. is stored. Similarly, when the social insurance information section 13 accepts the input of social insurance subscriber information from the personal computer 3, the date (September 17) and the deduction are displayed in the corresponding employee D column of the social insurance file 24 of the database 20 as a deduction basis. Stores the amount.

(2)Web/APサーバ1の夜間バッチ部16は、夜間バッチ処理時において、データベース20の人事ファイル21の該当社員A欄に格納された日付及び基本給の金額を読みに行く。同様に、夜間バッチ部16は夜間バッチ処理時において、データベース20の社会保険ファイル24の該当社員D欄に格納された日付及び控除金額を読みに行く。   (2) The nighttime batch unit 16 of the Web / AP server 1 reads the date and the basic salary amount stored in the corresponding employee A column of the personnel file 21 of the database 20 at the time of nighttime batch processing. Similarly, the nighttime batch unit 16 reads the date and deduction amount stored in the corresponding employee D column of the social insurance file 24 of the database 20 at the time of nighttime batch processing.

(3)その後、夜間バッチ部16は、人事ファイル21の該当社員A欄に格納された日付(9月17日)及び基本給等の金額について社員番号をキーとして、データベース20の当月分給与明細格納手段23−1に書き込み、これを更新する。同様にデータベース20の社会保険ファイル24の該当社員D欄に格納された日付(9月17日)及び控除金額について社員番号をキーとして、当月分給与明細格納手段23−1に書き込み、これを更新する。これにより、当月分の給与明細データ23が更新される。   (3) After that, the nighttime batch unit 16 stores the salary details for the current month in the database 20 using the employee number as a key for the date (September 17) and the basic salary amount stored in the corresponding employee A column of the personnel file 21. Write to means 23-1 and update it. Similarly, the date (September 17) and the deduction amount stored in the corresponding employee D column of the social insurance file 24 of the database 20 are written in the salary details storage means 23-1 for the current month using the employee number as a key and updated. To do. As a result, the salary detail data 23 for the current month is updated.

図5は第1の実施の形態に関する夜間バッチ処理の動作を示すフローチャートである。
S101:9月15日の前月分給与完了処理31の後、Web/APサーバ1の制御部10は夜間バッチ部16に対し、前月分の給与明細データをデータベース20の前月分給与明細格納手段22−1に格納するよう指示する。
FIG. 5 is a flowchart showing the operation of the nighttime batch processing according to the first embodiment.
S 101: After the previous month salary completion processing 31 on September 15, the control unit 10 of the Web / AP server 1 sends the previous month's salary details data to the night batch unit 16, and the previous month's salary details storage unit 22 of the database 20. -1 is instructed to be stored.

S102:制御部10は夜間バッチ部16に対し、前月分の給与明細データをコピーして当月分の給与明細データ23を作成するよう指示する。
S103:制御部10は夜間バッチ部16に対し、当月分の給与明細データ23をデータベース20の当月分給与明細格納手段23−1に格納するよう指示する。
S102: The control unit 10 instructs the nighttime batch unit 16 to copy the salary detail data for the previous month and create the salary detail data 23 for the current month.
S103: The control unit 10 instructs the nighttime batch unit 16 to store the salary detail data 23 for the current month in the current salary detail storage means 23-1 of the database 20.

S104:制御部10は夜間バッチ部16に対し、給与支給・控除根拠情報の発生のあった科目ファイル(人事ファイル21、社会保険ファイル24等)があるかどうかチェックするよう指示する。
S105:制御部10は夜間バッチ部16に対し、科目ファイル毎の給与支給・控除根拠情報をデータベース20に格納し、更に、当月分の給与明細データ23を更新するよう指示する。詳細は次に説明する。
S104: The control unit 10 instructs the nighttime batch unit 16 to check whether there is a subject file (personnel file 21, social insurance file 24, etc.) in which the salary supply / deduction basis information is generated.
S105: The control unit 10 instructs the nighttime batch unit 16 to store the salary supply / deduction basis information for each subject file in the database 20, and to update the salary detail data 23 for the current month. Details will be described next.

図6Aは第1の実施の形態に関する人事情報の夜間バッチ処理における詳細フローを示す説明図である。
S201:パソコン3から社員の移動情報、採用情報及び昇格昇給情報の入力があると、制御部10は人事情報部11に対しこれを受付けるよう指示する。
FIG. 6A is an explanatory diagram showing a detailed flow in nighttime batch processing of personnel information related to the first embodiment.
S201: When employee movement information, recruitment information, and promotion / payment information are input from the personal computer 3, the control unit 10 instructs the personnel information unit 11 to accept them.

S202:そして、制御部10は人事情報部11に対して、データベース20に人事発令情報として格納するよう指示する。
S203:その後、制御部10は夜間バッチ部16に対し、データベース20に格納した人事発令情報をもとに、給与情報部12が夜間バッチでデータベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。更新は社員番号に基づいて更新することである。
S202: The control unit 10 instructs the personnel information unit 11 to store it in the database 20 as personnel announcement information.
S203: Thereafter, the control unit 10 provides the night batch unit 16 with the salary information unit 12 in the night batch based on the personnel announcement information stored in the database 20, and the salary in the monthly salary details storage means 23-1 in the database 20. An instruction is given to update the detailed data 23. Updating is updating based on the employee number.

図6Bは第1の実施の形態に関する勤務時間管理の夜間バッチ処理における詳細フローを示す説明図である。
S301:制御部10は給与情報部12に対し、人事発令情報をもとに、データベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。
FIG. 6B is an explanatory diagram illustrating a detailed flow in nighttime batch processing of work hours management according to the first embodiment.
S301: The control unit 10 instructs the salary information unit 12 to update the salary detail data 23 of the salary detail storage unit 23-1 for the current month in the database 20 based on the personnel announcement information.

S302:制御部10は給与情報部12に対し、データベース20に俸給異動情報として格納するよう指示する。
S303:パソコン3からの操作により、俸給異動情報を参照して、社員の残業等を示す勤務実績月別情報を作成する。
S302: The control unit 10 instructs the salary information unit 12 to store in the database 20 as salary change information.
S303: By referring to the salary change information by the operation from the personal computer 3, the monthly work result information indicating the overtime of the employee is created.

S304:制御部10は勤務時間管理部14に対し、勤務実績月別情報をデータベース20に勤務時間報告情報として格納するよう指示する。
S305:その後、制御部10は夜間バッチ部16に対し、データベース20に格納した勤務時間報告情報をもとに、給与情報部12が夜間バッチでデータベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。
S304: The control unit 10 instructs the work time management unit 14 to store the work performance monthly information in the database 20 as work time report information.
S305: After that, the control unit 10 sends the salary information unit 12 to the nighttime batch unit 16 based on the working time report information stored in the database 20 and stores the salary details storage unit 23-1 for the current month in the database 20 in the nighttime batch. An instruction is given to update the salary detail data 23.

図6Cは第1の実施の形態に関する社会保険情報の夜間バッチ処理における詳細フローを示す説明図である。
S401、S402:制御部10は社会保険情報部13に対し、パソコン3からの操作により、社会保険加入者情報を受付けるよう指示し、これをデータベース20に社会保険情報として格納するよう指示する。
FIG. 6C is an explanatory diagram illustrating a detailed flow in nighttime batch processing of social insurance information according to the first embodiment.
S401, S402: The control unit 10 instructs the social insurance information unit 13 to accept social insurance subscriber information through an operation from the personal computer 3, and instructs the database 20 to store the information as social insurance information.

S403、S404:同じく制御部10は社会保険情報部13に対し、パソコン3からの操作により、雇用保険加入者情報を受け付けるよう指示し、これをデータベース20に雇用保険情報として格納するよう指示する。   S403, S404: Similarly, the control unit 10 instructs the social insurance information unit 13 to accept employment insurance subscriber information by operating from the personal computer 3, and instructs the database 20 to store it as employment insurance information.

S405:その後、制御部10は夜間バッチ部16に対し、データベース20に格納した社会保険情報及び雇用保険情報をもとに、給与情報部12が夜間バッチでデータベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。   S405: Thereafter, the control unit 10 sends the salary information unit 12 to the night batch unit 16 based on the social insurance information and employment insurance information stored in the database 20, and the salary details storage means 23 for the current month in the database 20 in the night batch. -1 is instructed to update the salary detail data 23 of -1.

S406:制御部10は社会保険情報部13に対し、パソコン3からの操作により、保険・貯金・財形貯蓄申込情報をインポートするよう指示する。
S407:制御部10は夜間バッチ部16に対し、社会保険情報部13が夜間バッチで保険・貯金・財形貯蓄控除額を集計することを指示する。
S406: The control unit 10 instructs the social insurance information unit 13 to import insurance / savings / property saving application information through an operation from the personal computer 3.
S407: The control unit 10 instructs the night batch unit 16 that the social insurance information unit 13 totals insurance, savings, and property savings deductions in the night batch.

S408:制御部10は社会保険情報部13に対し、保険・貯金・財形貯蓄申込情報及び保険・貯金・財形貯蓄控除額をデータベース20に保険・貯金。財形情報として格納するよう指示する。
S409:その後、制御部10は夜間バッチ部16に対し、データベース20に格納した保険・貯金・財形情報をもとに、給与情報部12が夜間バッチでデータベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。
S408: The control unit 10 insures and saves the insurance / savings / property saving application information and the insurance / savings / property savings deduction amount to the social insurance information unit 13 in the database 20. Instruct to store as property information.
S409: After that, the control unit 10 makes the salary information unit 12 to the night batch unit 16 based on the insurance / savings / property information stored in the database 20 and the salary information storage means 23- 1 is instructed to update the salary detail data 23 of 1

図6Dは第1の実施の形態に関する社宅情報の夜間バッチ処理における詳細フローを示す説明図である。
S501:制御部10は社宅情報部15に対し、パソコン3からの操作による社宅使用料控除情報のメンテナンスを受付けるよう指示する。
FIG. 6D is an explanatory diagram illustrating a detailed flow in nighttime batch processing of company housing information according to the first embodiment.
S501: The control unit 10 instructs the company house information unit 15 to accept maintenance of company house usage fee deduction information by an operation from the personal computer 3.

S502:制御部10は社宅情報部15に対し、社宅使用料控除情報をデータベース20に社宅使用料情報として格納するよう指示する。
S503:その後、制御部10は夜間バッチ部16に対し、データベース20に格納した社宅使用料情報をもとに、給与情報部12が夜間バッチでデータベース20の当月分給与明細格納手段23−1の給与明細データ23を更新するよう指示する。
S502: The control unit 10 instructs the company house information unit 15 to store company house usage fee deduction information in the database 20 as company house usage fee information.
S503: After that, the control unit 10 sends the salary information unit 12 to the nighttime batch unit 16 based on the company house usage fee information stored in the database 20, and stores the salary details storage unit 23-1 for the current month in the database 20 in the nighttime batch. An instruction is given to update the salary detail data 23.

以上、本発明の第1の実施の形態によれば、当月分の給与処理締切日に当月分の給与計算ができており、給与計算の負担軽減を可能とすることができる。そうすることにより、給与処理締切日を極力遅くできるので、人事情報等の給与支給・控除根拠情報が当月分の給与に極力取り込めることが可能となる。更に、確認のための人手を介する作業を十分確保することができる。   As described above, according to the first embodiment of the present invention, the salary calculation for the current month can be performed on the salary processing deadline for the current month, and the burden of the salary calculation can be reduced. By doing so, the salary processing deadline can be delayed as much as possible, so that salary supply / deduction basis information such as personnel information can be incorporated into salary for the current month as much as possible. In addition, it is possible to ensure a sufficient amount of manual work for confirmation.

1 Web/APサーバ
2 データベースサーバ
3 パソコン
4 給与処理締切日
5 支給日
10 制御部
11 人事情報部
12 給与情報部
13 社会保険情報部
14 勤務時間管理部
15 社宅情報部
16 夜間バッチ部
20 データベース
22−1 前月分給与明細格納手段
23 当月分の給与明細データ
23−1 当月分給与明細格納手段
25 支給根拠ファイル
26 控除根拠ファイル
31 前月分給与完了処理
32 人事情報等取込処理
33 給与計算処理
34 支払額確認処理
35 給与支払処理
36 当月分給与完了処理
DESCRIPTION OF SYMBOLS 1 Web / AP server 2 Database server 3 Personal computer 4 Salary processing deadline 5 Supply date 10 Control part 11 Personnel information part 12 Salary information part 13 Social insurance information part 14 Work time management part 15 Company housing information part 16 Night batch part 20 Database 22 -1 Previous Month Salary Details Storage Unit 23 Current Month Salary Details Data 23-1 Current Month Salary Details Storage Unit 25 Payment Basis File 26 Deduction Basis File 31 Previous Month Salary Completion Processing 32 Personnel Information Capture Processing 33 Salary Calculation Processing 34 Payment confirmation processing 35 Salary payment processing 36 Current month salary completion processing

Claims (10)

締切日までに発生した給与支給・控除根拠情報を取込み、取込んだ前記給与支給・控除根拠情報に基づいて当月分の給与の計算を行う給与計算システムにおいて、
前月分の給与明細データを格納する前月分給与明細格納手段と、
前記前月分給与明細格納手段に格納した前記給与明細データから当月分の給与明細データを作成して格納する当月分給与明細格納手段と、
前月分の前記締切日以降に前記給与支給・控除根拠情報の発生があるとき、前記給与支給・控除根拠情報を格納する給与支給・控除根拠情報格納手段と、
前記当月分給与明細格納手段に格納した前記当月の給与明細データを、前記給与支給・控除根拠情報格納手段に格納した前記給与支給・控除根拠情報に基づいて、前記当月分の前記締切日までに更新する更新手段を有することを特徴とする給与計算システム。
In the salary calculation system that takes in salary payment / deduction basis information generated by the deadline, and calculates the salary for the current month based on the acquired salary payment / deduction basis information,
Previous month salary statement storage means for storing salary statement data for the previous month;
A monthly salary statement storage unit that creates and stores salary statement data for the current month from the salary statement data stored in the previous month salary statement storage unit;
A salary supply / deduction basis information storage means for storing the salary supply / deduction basis information when there is an occurrence of the salary supply / deduction basis information after the deadline for the previous month;
Based on the salary payment / deduction basis information stored in the salary payment / deduction basis information storage means, the monthly salary detail data stored in the current month's salary detail storage means by the deadline date for the current month A salary calculation system comprising an updating means for updating.
前記当月の給与明細データの更新は、夜間バッチで行うことを特徴とする請求項1記載の給与計算システム。   The salary calculation system according to claim 1, wherein the monthly salary detail data is updated in a nightly batch. 給与支給・控除根拠情報は、人事情報、勤務情報及び控除情報のうちいずれか一を含むことを特徴とする請求項1記載の給与計算システム。   The salary calculation system according to claim 1, wherein the salary supply / deduction basis information includes any one of personnel information, work information, and deduction information. 前記給与支給・控除根拠情報の発生とは、前月の前記締切日以降に発生した人事情報、社会保険情報、勤務時間管理情報及び社宅情報のうちいずれか一を含むことを特徴とする請求項1記載の給与計算システム。   The occurrence of the salary payment / deduction basis information includes any one of personnel information, social insurance information, working time management information, and company housing information generated after the deadline of the previous month. The payroll system described. 前記前月分の給与明細データから前記当月分の給与明細の作成は、複写により作成されることを特徴とする請求項1記載の給与計算システム。   2. The salary calculation system according to claim 1, wherein the salary details for the current month are created by copying from the salary details data for the previous month. 締切日までに発生した給与支給・控除根拠情報を取込み、取込んだ前記給与支給・控除根拠情報に基づいて当月分の給与の計算を行う給与計算プログラムにおいて、
前月分の給与明細データを前月分給与明細格納手段に格納する前月分給与明細格納手順と、
前記前月分給与明細格納手段に格納した前記給与明細データから当月分の給与明細データを作成して当月分給与明細格納手段に格納する当月分給与明細格納手順と、
前月分の前記締切日以降に前記給与支給・控除根拠情報の発生があるとき、前記給与支給・控除根拠情報を給与支給・控除根拠情報格納手段に格納する給与支給・控除根拠情報格納手順と、
前記当月分給与明細格納手段に格納された前記当月の給与明細データを、前記給与支給・控除根拠情報格納手段に格納された前記給与支給・控除根拠情報に基づいて、前記当月分の前記締切日までに更新する更新手順とをコンピュータに実行させるための給与計算プログラム。
In the payroll calculation program that takes in the salary payment / deduction basis information generated by the deadline, and calculates the salary for the current month based on the acquired salary payment / deduction basis information,
A previous month salary statement storage procedure for storing the previous month salary statement data in the previous month salary statement storage means;
A monthly salary statement storage procedure for creating salary statement data for the current month from the salary statement data stored in the previous month salary statement storage unit and storing it in the current month salary statement storage unit;
When there is occurrence of the salary payment / deduction basis information after the deadline for the previous month, the salary supply / deduction basis information storage procedure for storing the salary payment / deduction basis information in the salary payment / deduction basis information storage means;
Based on the salary payment / deduction basis information stored in the salary supply / deduction basis information storage means, the deadline date for the current month is stored in the salary detail data stored in the salary detail storage means for the current month. A payroll program that causes a computer to execute an update procedure that is updated by
請求項6記載の給与計算プログラムにおいて、前記更新手順を夜間バッチ処理で行うことを特徴とする給与計算プログラム。   7. The salary calculation program according to claim 6, wherein the update procedure is performed by night batch processing. 請求項6又は7記載の給与計算プログラムを搭載することを特徴とする給与計算サーバ。   A salary calculation server, comprising the salary calculation program according to claim 6 or 7. 締切日までに発生した給与支給・控除根拠情報を取込み、取込んだ前記給与支給・控除根拠情報に基づいて当月分の給与の計算を行う給与計算サーバにおいて、
データベースに接続され、
前月分の給与明細データを前記データベースの前月分給与明細格納手段に格納することを指示し、
前記前月分給与明細格納手段に格納した前記給与明細データから当月分の給与明細データを作成して前記データベースの当月分給与明細格納手段に格納することを指示し、
前月分の前記締切日以降に前記給与支給・控除根拠情報の発生があるとき、前記給与支給・控除根拠情報を前記データベースの給与支給・控除根拠情報格納手段に格納することを指示し、
前記当月分給与明細格納手段に格納した前記当月の給与明細データを、前記給与支給・控除根拠情報格納手段に格納した前記給与支給・控除根拠情報に基づいて、前記当月分の前記締切日までに更新することを指示する制御部を有することを特徴とする給与計算サーバ。
In the payroll server that takes in the salary payment / deduction basis information generated by the deadline, and calculates the salary for the current month based on the acquired salary payment / deduction basis information,
Connected to the database,
Instructing the previous month's salary statement data to be stored in the previous month's salary statement storage means of the database,
Instructing to create salary statement data for the current month from the salary statement data stored in the previous month salary statement storage means and storing it in the current month salary statement storage means of the database,
Instructing storing the salary payment / deduction basis information in the salary payment / deduction basis information storage means of the database when there is an occurrence of the salary payment / deduction basis information after the deadline for the previous month,
Based on the salary payment / deduction basis information stored in the salary payment / deduction basis information storage means, the monthly salary detail data stored in the current month's salary detail storage means by the deadline date for the current month A salary calculation server, characterized by having a control unit that instructs updating.
前記当月の給与明細データの更新は、夜間バッチで行うことを特徴とする請求項9記載の給与計算サーバ。
The salary calculation server according to claim 9, wherein the monthly salary detail data is updated in a nightly batch.
JP2012212232A 2012-09-26 2012-09-26 Payroll system, payroll program and payroll server Expired - Fee Related JP6020000B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012212232A JP6020000B2 (en) 2012-09-26 2012-09-26 Payroll system, payroll program and payroll server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012212232A JP6020000B2 (en) 2012-09-26 2012-09-26 Payroll system, payroll program and payroll server

Publications (2)

Publication Number Publication Date
JP2014067231A true JP2014067231A (en) 2014-04-17
JP6020000B2 JP6020000B2 (en) 2016-11-02

Family

ID=50743566

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012212232A Expired - Fee Related JP6020000B2 (en) 2012-09-26 2012-09-26 Payroll system, payroll program and payroll server

Country Status (1)

Country Link
JP (1) JP6020000B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182794A (en) * 2016-03-25 2017-10-05 株式会社オービック Operation data change checking device, operation data change checking method, and operation data change checking program
JP2021114188A (en) * 2020-01-20 2021-08-05 株式会社オービック Salary processing device, salary processing method, and salary processing program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10312435A (en) * 1997-05-12 1998-11-24 Hitachi Ltd Method and device for calculating and recording amount of payment
JP2000207448A (en) * 1999-01-08 2000-07-28 Toshiba Corp Personnel-salary linkage system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10312435A (en) * 1997-05-12 1998-11-24 Hitachi Ltd Method and device for calculating and recording amount of payment
JP2000207448A (en) * 1999-01-08 2000-07-28 Toshiba Corp Personnel-salary linkage system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182794A (en) * 2016-03-25 2017-10-05 株式会社オービック Operation data change checking device, operation data change checking method, and operation data change checking program
JP2021114188A (en) * 2020-01-20 2021-08-05 株式会社オービック Salary processing device, salary processing method, and salary processing program
JP7352476B2 (en) 2020-01-20 2023-09-28 株式会社オービック Payroll processing device, payroll processing method, and payroll processing program

Also Published As

Publication number Publication date
JP6020000B2 (en) 2016-11-02

Similar Documents

Publication Publication Date Title
CN105243514A (en) Salary management system
JP5032699B1 (en) Overtime wage calculation program and overtime wage calculation system
JP6020000B2 (en) Payroll system, payroll program and payroll server
JP4417394B2 (en) Project management system
US20120271651A1 (en) Systems, Methods, And Media Providing An Integrated Timecard, Quality Assurance, And Claim Submission Service
JP2009026060A (en) Payroll calculation system and payroll calculation server device
TWM546558U (en) Management system of service cases
KR20180059986A (en) office automation
JP2014215787A (en) Budget calculation simulation method
JP5150777B1 (en) Overtime wage simulation program and overtime wage simulation system
JP2017049863A (en) Gcm in-administration operation integral management technology
JP2007328748A (en) Salary advance payment system and its method
KR20220039699A (en) Server for Managing Systematic License Agreement, Systematic License Agreement Managing System and Method Using The Same
JP2016170776A (en) Business management device, business management method, and business management program
US20130041703A1 (en) System and method for managing immigration status
JP4146956B2 (en) Insurance levy storage record update device and insurance levy storage record update program storage medium
KR102669634B1 (en) Human resource management automation device and method
KR20160005882A (en) The method and system for making housekeeping account book
CN108335185B (en) Method and device for accessing latest overdraft limit in night online transaction
JP2006323696A (en) Salary adjustment method, salary adjustment system, salary adjustment device, salary adjustment intermediation device, salary adjustment device control program and salary adjustment intermediation device control program
CN102289746A (en) Method and system for implementing plan, implementation and evaluation management planning and converting experiences
JP2006243922A (en) Medical work processor
JP2011100349A (en) Management system of maintenance management cost of irrigation compensation facility
Seruni et al. Global Outsourcing in Indonesia: Opportunity and Challenge for The Labour
Butler March 28th, 2019 Bill 3 Report Draft# 3

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150515

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160311

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160322

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160523

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160906

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160919

R150 Certificate of patent or registration of utility model

Ref document number: 6020000

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees