JP2013528731A - 成熟ガス産地または成熟石油産地の生産を向上させる方法 - Google Patents
成熟ガス産地または成熟石油産地の生産を向上させる方法 Download PDFInfo
- Publication number
- JP2013528731A JP2013528731A JP2013514707A JP2013514707A JP2013528731A JP 2013528731 A JP2013528731 A JP 2013528731A JP 2013514707 A JP2013514707 A JP 2013514707A JP 2013514707 A JP2013514707 A JP 2013514707A JP 2013528731 A JP2013528731 A JP 2013528731A
- Authority
- JP
- Japan
- Prior art keywords
- well
- production
- new
- area
- wells
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 112
- 238000000034 method Methods 0.000 claims abstract description 43
- 238000005457 optimization Methods 0.000 claims description 10
- 238000002347 injection Methods 0.000 claims description 7
- 239000007924 injection Substances 0.000 claims description 7
- 230000001186 cumulative effect Effects 0.000 claims description 4
- 230000004044 response Effects 0.000 claims description 4
- 238000005553 drilling Methods 0.000 description 7
- 239000010410 layer Substances 0.000 description 7
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 4
- 239000007789 gas Substances 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000003345 natural gas Substances 0.000 description 3
- 239000003208 petroleum Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 239000002356 single layer Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 238000009419 refurbishment Methods 0.000 description 1
- 238000002922 simulated annealing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Housings And Mounting Of Transformers (AREA)
- Cosmetics (AREA)
Abstract
【選択図】図4
Description
上記既存の坑井の生産パラメータと、場合によっては1つ以上の新たな坑井の位置および生産パラメータとを含むデータの集合である所定のシナリオに応じて上記産地の生産を坑井ごとに予測可能な産地シミュレータを設けることと、
上記産地シミュレータを用いて上記既存の坑井の排油エリア(drainage area)を決定することと、
新たな坑井の候補の上記産地シミュレータを用いて決定される排油エリアが上記既存の坑井の排油エリアと重ならないように、上記新たな坑井の候補の位置を決定することと、
それぞれが上記既存の坑井と上記新たな坑井の候補の中から選択された新たな坑井とを含む複数の坑井集合から、上記産地の生産に依存する利得関数(gain function)の値を最適化する坑井集合を決定することにより、上記利得関数の値を最適化することと、
を含む。
{Wi}は、当該シナリオについての坑井集合であって、既存の坑井および新たな坑井を含み、
Biは、坑井集合{Wi}の生産パラメータであり、
Piは、坑井Wiについての石油生産(産地シミュレータを用いて算出される)を示し、
nは、坑井集合{Wi}における坑井の数であり、
Sは、税引き後の純石油販売価格を示し、
dは、割引率を示し、
Iijは、j年中に坑井Wiに費やされた投資額である。
(COP)i=ΦiSihi(1−Swi−Sor)i
となるように定めることができ、ここで、
(COP)iは、産地シミュレータにより予測される、坑井Wiによる5年先までの累積石油生産量であり、
Φiは、坑井Wi周辺の平均孔隙率であり、
Swiは、不流動水飽和率であり、
Sorは、残留油飽和率である。
新たな坑井の候補が、それらの累積石油生産量(上述したように、排油エリアを決定するための産地シミュレータによって決定される)に応じてランク付けされ、上位の候補のみ、例えば、上位50%が事前選択される。これにより、十分多数の坑井を確保することが可能になる、というのも、坑井間の潜在的な相互作用によって、坑井のランキングが、新たな坑井が単独で、すなわち、競合する他の新たな坑井がない状態で生産を行うと仮定した場合の上述の初期のランキングから変更される可能性があるからである。
水平坑井の向きについては、一般地質学的な優先方向を考慮する。新たな水平坑井の候補は、それらの向きと地質学的優先方向との差に応じて、事前選択されるか、または除外される。例えば、新たな水平坑井の候補は、それらの向きと地質学的優先方向との差が15°を越えない場合に事前選択される。その他の新たな水平坑井の候補は除外される。
新たな水平坑井の候補は、既存の坑井2、2’の1つに、例えば、坑井同士の距離の0.1倍よりも接近する場合に除外される。
S1=50USDについて、{Wi}1={既存の坑井,W1,W2’}
S2=65USDについて、{Wi}2={既存の坑井,W1,W2,W3}
S3=80USDについて、{Wi}3={既存の坑井,W1,W2’,W3,W4}
ここで、W1、W2、W2’、W3、W4は、それぞれのシナリオについての新たな坑井であり、W2とW4の排油エリアは重なっている。W1、W2、W3が掘削され、その後石油の価格が80USDに上昇したならば、坑井W4が坑井W2と対立することになる。
Claims (11)
- 複数の既存の坑井を備える成熟ガス産地または成熟石油産地の生産を向上させる方法であって、
前記既存の坑井の生産パラメータと、場合によっては1つ以上の新たな坑井の位置および生産パラメータとを含むデータの集合である所定のシナリオに応じて前記産地の生産を坑井ごとに予測可能な産地シミュレータを設けることと、
前記産地シミュレータを用いて前記既存の坑井の排油エリアを決定することと、
新たな坑井の候補の前記産地シミュレータを用いて決定される排油エリアが前記既存の坑井の排油エリアと重ならないように、前記新たな坑井の候補の位置を決定することと、
それぞれが前記既存の坑井と前記新たな坑井の候補の中から選択された新たな坑井とを含む複数の坑井集合から、前記産地の生産に依存する利得関数の値を最適化する坑井集合を決定することにより、前記利得関数の値を最適化することと、
を含む方法。 - 少なくとも1つの発見的規則を適用することによって、新たな坑井の候補を事前選択する、または除外する発見的ステップを含む方法であって、前記複数の坑井集合はそれぞれ、前記既存の坑井と、事前選択された前記新たな坑井の候補の中から選択された新たな坑井とからなる、請求項1に記載の方法。
- 前記発見的規則は、新たな水平坑井の候補の向きに応じて、当該新たな水平坑井の候補の事前選択および除外を行うことを含む、請求項2に記載の方法。
- 前記発見的規則は、新たな坑井の候補の前記既存の坑井からの距離に応じて、当該新たな坑井の候補の事前選択および除外を行うことを含む、請求項2に記載の方法。
- 前記発見的規則は、新たな坑井の候補の前記産地シミュレータによって決定される累積石油生産量に応じて、当該新たな坑井の候補の事前選択および除外を行うことを含む、請求項2に記載の方法。
- 利得関数の値を最適化することは、決定性または非決定性の最適化方法を適用することによって、所定の坑井集合について最適な生産パラメータを決定することを含む、請求項1に記載の方法。
- 利得関数の値を最適化することは、非決定性の最適化方法を適用することによって、最適な所定の坑井集合を決定することを含む、請求項1に記載の方法。
- 前記利得関数の値を最適化することは、前記利得関数の値を最適化する注入井の集合を決定することを含む、請求項1に記載の方法。
- 前記坑井の少なくとも1つは、多層地質を有し、前記産地シミュレータは、前記産地の生産を、坑井ごと、および層または層のグループごとに予測可能である、請求項1に記載の方法。
- 前記利得関数の値を最適化する前記坑井集合が満たすべき制約条件を定めるステップを含む、請求項1に記載の方法。
- 前記最適な生産パラメータが満たすべき制約条件を定めるステップを含む、請求項6に記載の方法。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/816,915 | 2010-06-16 | ||
US12/816,915 US8532968B2 (en) | 2010-06-16 | 2010-06-16 | Method of improving the production of a mature gas or oil field |
PCT/EP2011/059966 WO2011157763A2 (en) | 2010-06-16 | 2011-06-15 | Method of improving the production of a mature gas or oil field |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2013528731A true JP2013528731A (ja) | 2013-07-11 |
JP5889885B2 JP5889885B2 (ja) | 2016-03-22 |
Family
ID=44627018
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013514707A Active JP5889885B2 (ja) | 2010-06-16 | 2011-06-15 | 成熟ガス産地または成熟石油産地の生産を向上させる方法 |
Country Status (15)
Country | Link |
---|---|
US (1) | US8532968B2 (ja) |
EP (1) | EP2582911B1 (ja) |
JP (1) | JP5889885B2 (ja) |
CN (1) | CN103003522B (ja) |
AU (1) | AU2011267038B2 (ja) |
BR (1) | BR112012032161B1 (ja) |
CA (1) | CA2801803C (ja) |
CO (1) | CO6620011A2 (ja) |
DK (1) | DK2582911T3 (ja) |
EA (1) | EA030434B1 (ja) |
ES (1) | ES2525577T3 (ja) |
MX (1) | MX2012014570A (ja) |
MY (1) | MY161357A (ja) |
PL (1) | PL2582911T3 (ja) |
WO (1) | WO2011157763A2 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101657890B1 (ko) * | 2015-04-06 | 2016-09-20 | 서울대학교산학협력단 | 다목적 유전 알고리즘과 실물옵션에 기반한 저류층의 생산성 평가 방법 |
JP2018055524A (ja) * | 2016-09-30 | 2018-04-05 | 株式会社日立製作所 | 資源開発支援システム、資源開発支援方法、及び資源開発支援プログラム |
JP2019528392A (ja) * | 2016-08-25 | 2019-10-10 | ドリリング・インフォ・インコーポレイテッド | 炭化水素生産値を割り振るためのシステムおよび方法 |
US11263370B2 (en) | 2016-08-25 | 2022-03-01 | Enverus, Inc. | Systems and methods for allocating hydrocarbon production values |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8412501B2 (en) * | 2010-06-16 | 2013-04-02 | Foroil | Production simulator for simulating a mature hydrocarbon field |
US20120143577A1 (en) * | 2010-12-02 | 2012-06-07 | Matthew Szyndel | Prioritizing well drilling propositions |
US9618639B2 (en) | 2012-03-01 | 2017-04-11 | Drilling Info, Inc. | Method and system for image-guided fault extraction from a fault-enhanced seismic image |
US9182511B2 (en) | 2012-11-04 | 2015-11-10 | Drilling Info, Inc. | System and method for reproducibly extracting consistent horizons from seismic images |
US10577895B2 (en) * | 2012-11-20 | 2020-03-03 | Drilling Info, Inc. | Energy deposit discovery system and method |
US10853893B2 (en) | 2013-04-17 | 2020-12-01 | Drilling Info, Inc. | System and method for automatically correlating geologic tops |
US10459098B2 (en) | 2013-04-17 | 2019-10-29 | Drilling Info, Inc. | System and method for automatically correlating geologic tops |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
CN104747161B (zh) * | 2013-12-25 | 2017-07-07 | 中国石油化工股份有限公司 | 油田井网自动化部署方法及装置 |
CN104951842B (zh) * | 2014-03-27 | 2018-11-30 | 中国石油化工股份有限公司 | 一种新的油田产量预测方法 |
US9957781B2 (en) | 2014-03-31 | 2018-05-01 | Hitachi, Ltd. | Oil and gas rig data aggregation and modeling system |
CN105629906A (zh) * | 2014-10-31 | 2016-06-01 | 上海工程技术大学 | 一种深海采油装置模拟器数据监控系统 |
US9911210B1 (en) | 2014-12-03 | 2018-03-06 | Drilling Info, Inc. | Raster log digitization system and method |
US20170002630A1 (en) * | 2015-07-02 | 2017-01-05 | Schlumberger Technology Corporation | Method of performing additional oilfield operations on existing wells |
WO2017044105A1 (en) * | 2015-09-10 | 2017-03-16 | Hitachi, Ltd. | Method and apparatus for well spudding scheduling |
US10908316B2 (en) | 2015-10-15 | 2021-02-02 | Drilling Info, Inc. | Raster log digitization system and method |
US10167703B2 (en) | 2016-03-31 | 2019-01-01 | Saudi Arabian Oil Company | Optimal well placement under constraints |
CN106600440B (zh) * | 2016-12-02 | 2020-09-15 | 中国石油大学(北京) | 一种低渗透油藏调剖堵水动态指标选井的方法 |
CN109872007A (zh) * | 2019-03-12 | 2019-06-11 | 中国地质大学(北京) | 基于支持向量机代理模型的油藏注采参数多目标优化方法 |
CN111784016B (zh) * | 2019-04-03 | 2024-03-19 | 中国石油化工股份有限公司 | 一种求取区块sec储量极值的计算方法 |
US11802475B2 (en) | 2019-09-27 | 2023-10-31 | Baker Hughes Oilfield Operations Llc | Real time monitoring of fracture driven interference |
CN112464448A (zh) * | 2020-11-13 | 2021-03-09 | 中国海洋石油集团有限公司 | 一种海上油田复杂井控的有限状态模拟方法及系统 |
CN114718512B (zh) * | 2021-01-05 | 2023-08-22 | 中国石油天然气股份有限公司 | 煤层气降压排采模拟实验装置和方法 |
US11725506B2 (en) | 2021-01-14 | 2023-08-15 | Baker Hughes Oilfield Operations Llc | Automatic well control based on detection of fracture driven interference |
CN113537706A (zh) * | 2021-06-08 | 2021-10-22 | 中海油能源发展股份有限公司 | 一种基于智能集成的油田增产措施优选方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08312282A (ja) * | 1995-05-22 | 1996-11-26 | Sekiyu Kodan | 坑跡決定処理方法および処理装置 |
WO2001063092A1 (fr) * | 2000-02-23 | 2001-08-30 | Japan Oil Development Co., Ltd. | Procede de production de petrole |
JP2003524245A (ja) * | 2000-02-22 | 2003-08-12 | シュラムバーガー・テクノロジー・コーポレイション | 統合リザーバの最適化 |
US20040254734A1 (en) * | 2003-06-02 | 2004-12-16 | Isabelle Zabalza-Mezghani | Method for optimizing production of an oil reservoir in the presence of uncertainties |
JP2009510605A (ja) * | 2005-09-30 | 2009-03-12 | シーメンス エナジー アンド オートメーション インコーポレイテッド | 石油・ガス生産プロジェクトの分析方法 |
US20090260880A1 (en) * | 2008-04-18 | 2009-10-22 | Thambynayagam R K | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2450941A1 (fr) * | 1979-03-07 | 1980-10-03 | Neftegazovy Inst | Procede d'extraction thermominiere du petrole par puits et caloporteur |
US5838634A (en) * | 1996-04-04 | 1998-11-17 | Exxon Production Research Company | Method of generating 3-D geologic models incorporating geologic and geophysical constraints |
US6002985A (en) * | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
US6997518B2 (en) * | 2001-04-24 | 2006-02-14 | Shell Oil Company | In situ thermal processing and solution mining of an oil shale formation |
CA2538577C (en) * | 2003-09-30 | 2010-08-03 | Exxonmobil Upstream Research Company | Characterizing connectivity in reservoir models using paths of least resistance |
MX2007006993A (es) * | 2004-12-14 | 2007-08-07 | Schlumberger Technology Bv | Optimizacion geometrica de trayectorias de pozos multiples. |
US7657494B2 (en) * | 2006-09-20 | 2010-02-02 | Chevron U.S.A. Inc. | Method for forecasting the production of a petroleum reservoir utilizing genetic programming |
CA2664409C (en) * | 2006-10-31 | 2016-08-23 | Exxonmobil Upstream Research Company | Modeling and management of reservoir systems with material balance groups |
US8005658B2 (en) * | 2007-05-31 | 2011-08-23 | Schlumberger Technology Corporation | Automated field development planning of well and drainage locations |
US8121971B2 (en) * | 2007-10-30 | 2012-02-21 | Bp Corporation North America Inc. | Intelligent drilling advisor |
WO2009142873A1 (en) * | 2008-05-22 | 2009-11-26 | Schlumberger Canada Limited | Downhole measurement of formation characteristics while drilling |
WO2010021786A1 (en) * | 2008-08-19 | 2010-02-25 | Exxonmobil Upstream Research Company | Fluid injection completion techniques |
US8485251B2 (en) * | 2008-08-20 | 2013-07-16 | Lockheed Martin Corporation | Electromagnetic based system and method for enhancing subsurface recovery of fluid within a permeable formation |
CA2737205A1 (en) * | 2008-09-19 | 2010-03-25 | Chevron U.S.A. Inc. | Method for optimizing well production in reservoirs having flow barriers |
US8892412B2 (en) * | 2009-03-11 | 2014-11-18 | Exxonmobil Upstream Research Company | Adjoint-based conditioning of process-based geologic models |
-
2010
- 2010-06-16 US US12/816,915 patent/US8532968B2/en active Active
-
2011
- 2011-06-15 CN CN201180029368.5A patent/CN103003522B/zh not_active Expired - Fee Related
- 2011-06-15 EP EP11725459.9A patent/EP2582911B1/en active Active
- 2011-06-15 PL PL11725459T patent/PL2582911T3/pl unknown
- 2011-06-15 AU AU2011267038A patent/AU2011267038B2/en not_active Ceased
- 2011-06-15 MY MYPI2012701156A patent/MY161357A/en unknown
- 2011-06-15 DK DK11725459.9T patent/DK2582911T3/en active
- 2011-06-15 ES ES11725459.9T patent/ES2525577T3/es active Active
- 2011-06-15 WO PCT/EP2011/059966 patent/WO2011157763A2/en active Application Filing
- 2011-06-15 BR BR112012032161-7A patent/BR112012032161B1/pt not_active IP Right Cessation
- 2011-06-15 JP JP2013514707A patent/JP5889885B2/ja active Active
- 2011-06-15 MX MX2012014570A patent/MX2012014570A/es active IP Right Grant
- 2011-06-15 CA CA2801803A patent/CA2801803C/en active Active
- 2011-06-15 EA EA201291173A patent/EA030434B1/ru not_active IP Right Cessation
-
2012
- 2012-12-14 CO CO12227053A patent/CO6620011A2/es active IP Right Grant
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08312282A (ja) * | 1995-05-22 | 1996-11-26 | Sekiyu Kodan | 坑跡決定処理方法および処理装置 |
JP2003524245A (ja) * | 2000-02-22 | 2003-08-12 | シュラムバーガー・テクノロジー・コーポレイション | 統合リザーバの最適化 |
WO2001063092A1 (fr) * | 2000-02-23 | 2001-08-30 | Japan Oil Development Co., Ltd. | Procede de production de petrole |
US20040254734A1 (en) * | 2003-06-02 | 2004-12-16 | Isabelle Zabalza-Mezghani | Method for optimizing production of an oil reservoir in the presence of uncertainties |
JP2009510605A (ja) * | 2005-09-30 | 2009-03-12 | シーメンス エナジー アンド オートメーション インコーポレイテッド | 石油・ガス生産プロジェクトの分析方法 |
US20090260880A1 (en) * | 2008-04-18 | 2009-10-22 | Thambynayagam R K | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101657890B1 (ko) * | 2015-04-06 | 2016-09-20 | 서울대학교산학협력단 | 다목적 유전 알고리즘과 실물옵션에 기반한 저류층의 생산성 평가 방법 |
JP2019528392A (ja) * | 2016-08-25 | 2019-10-10 | ドリリング・インフォ・インコーポレイテッド | 炭化水素生産値を割り振るためのシステムおよび方法 |
US11263370B2 (en) | 2016-08-25 | 2022-03-01 | Enverus, Inc. | Systems and methods for allocating hydrocarbon production values |
US11379631B2 (en) | 2016-08-25 | 2022-07-05 | Enverus, Inc. | Systems and methods for allocating hydrocarbon production values |
JP7175894B2 (ja) | 2016-08-25 | 2022-11-21 | エンバラス・インコーポレイテッド | 炭化水素生産値を割り振るためのシステムおよび方法 |
US11928405B2 (en) | 2016-08-25 | 2024-03-12 | Enverus, Inc. | Systems and methods for allocating hydrocarbon production values |
JP2018055524A (ja) * | 2016-09-30 | 2018-04-05 | 株式会社日立製作所 | 資源開発支援システム、資源開発支援方法、及び資源開発支援プログラム |
Also Published As
Publication number | Publication date |
---|---|
EA201291173A1 (ru) | 2013-06-28 |
WO2011157763A2 (en) | 2011-12-22 |
CA2801803A1 (en) | 2011-12-22 |
WO2011157763A3 (en) | 2012-12-27 |
EP2582911A2 (en) | 2013-04-24 |
AU2011267038A1 (en) | 2013-01-10 |
MY161357A (en) | 2017-04-14 |
AU2011267038B2 (en) | 2016-07-14 |
CA2801803C (en) | 2018-10-16 |
MX2012014570A (es) | 2013-05-06 |
EP2582911B1 (en) | 2014-09-17 |
US20110313743A1 (en) | 2011-12-22 |
PL2582911T3 (pl) | 2015-03-31 |
BR112012032161B1 (pt) | 2020-05-12 |
BR112012032161A2 (pt) | 2016-11-16 |
US8532968B2 (en) | 2013-09-10 |
CN103003522A (zh) | 2013-03-27 |
JP5889885B2 (ja) | 2016-03-22 |
ES2525577T3 (es) | 2014-12-26 |
DK2582911T3 (en) | 2014-11-24 |
EA030434B1 (ru) | 2018-08-31 |
CN103003522B (zh) | 2015-12-02 |
CO6620011A2 (es) | 2013-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5889885B2 (ja) | 成熟ガス産地または成熟石油産地の生産を向上させる方法 | |
CN101617101B (zh) | 井和泄流位置的自动化油田开发方案 | |
EP2948618B1 (en) | Constrained optimization for well placement planning | |
CA2852953C (en) | Systems and methods for subsurface oil recovery optimization | |
US20160326846A1 (en) | Oilfield management method and system | |
CA2937221C (en) | Total asset modeling with integrated asset models and persistent asset models | |
CN105247546A (zh) | 确定用于井动态优化的井参数 | |
EP2291799A2 (en) | Stochastic programming-based decision support tool for reservoir development planning | |
MX2014005012A (es) | Metodos y sistemas para planeacion de pozo basada en un modelo de fractura compleja. | |
Bansal et al. | Forecasting well performance in a discontinuous tight oil reservoir using artificial neural networks | |
CN106062311A (zh) | 在页岩区块当中将钻凿位置分级 | |
Khosravanian et al. | Optimization of casing string placement in the presence of geological uncertainty in oil wells: offshore oilfield case studies | |
CA2937223C (en) | Total asset modeling with integrated asset models and persistent asset models | |
Castiñeira et al. | Automated identification of optimal deviated and horizontal well targets | |
Sifuentes et al. | Samarang Integrated Operations (IO): Integrated Asset Modeling-An Innovative Approach For Long Term Production Planning Focused On Enhance Oil Recovery | |
Dagogo et al. | Economic Viability of Infil Drilling Program for Marginal Oil Field Development: A Case Study of Sango Field in Nigeria | |
US20230351527A1 (en) | Integrated development optimization platform for well sequencing and unconventional reservoir management | |
Magizov et al. | Multivariant well placement and well drilling parameters optimization methodology. Case study from yamal gas field | |
Buchinskiy et al. | Conceptual approach for gas field clusters development in terms of synergy effect | |
Bansal et al. | Mapping Completion Design Trends in a Compartmentalized Tight Oil Reservoir for Rapid Evaluation Using Artificial Neural Networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130912 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140325 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150415 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150512 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20150811 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20150911 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20151009 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160202 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20160217 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5889885 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |