JP2012518215A - システムの実時間処理能力の解析方法 - Google Patents
システムの実時間処理能力の解析方法 Download PDFInfo
- Publication number
- JP2012518215A JP2012518215A JP2011549577A JP2011549577A JP2012518215A JP 2012518215 A JP2012518215 A JP 2012518215A JP 2011549577 A JP2011549577 A JP 2011549577A JP 2011549577 A JP2011549577 A JP 2011549577A JP 2012518215 A JP2012518215 A JP 2012518215A
- Authority
- JP
- Japan
- Prior art keywords
- event
- task
- limited
- event stream
- tasks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
- G06F9/4887—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues involving deadlines, e.g. rate based, periodic
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/5055—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering software capabilities, i.e. software resources associated or available to the machine
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15282809P | 2009-02-16 | 2009-02-16 | |
| US61/152,828 | 2009-02-16 | ||
| PCT/EP2010/051783 WO2010092146A1 (en) | 2009-02-16 | 2010-02-12 | Method for analysing the real-time capability of a system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2012518215A true JP2012518215A (ja) | 2012-08-09 |
| JP2012518215A5 JP2012518215A5 (enExample) | 2013-04-04 |
Family
ID=42201299
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2011549577A Pending JP2012518215A (ja) | 2009-02-16 | 2010-02-12 | システムの実時間処理能力の解析方法 |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US8533727B2 (enExample) |
| EP (1) | EP2396725A1 (enExample) |
| JP (1) | JP2012518215A (enExample) |
| KR (1) | KR20110124309A (enExample) |
| CN (1) | CN102317915B (enExample) |
| CA (1) | CA2752806C (enExample) |
| IL (1) | IL214694A0 (enExample) |
| WO (1) | WO2010092146A1 (enExample) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9477537B2 (en) | 2010-12-13 | 2016-10-25 | Microsoft Technology Licensing, Llc | Reactive coincidence |
| KR101383225B1 (ko) * | 2012-09-03 | 2014-04-09 | 서울대학교산학협력단 | 하나 이상의 실행 유닛에 대한 성능 분석 방법, 성능 분석 장치 및 성능 분석 방법을 수행하는 프로그램을 기록한 컴퓨터 판독가능 기록매체 |
| US10311384B2 (en) | 2015-07-29 | 2019-06-04 | Microsoft Technology Licensing, Llc | Automatic creation and maintenance of a taskline |
| GB2545507B (en) * | 2015-12-18 | 2019-07-17 | Imagination Tech Ltd | Controlling scheduling of a GPU |
| US10552205B2 (en) * | 2016-04-02 | 2020-02-04 | Intel Corporation | Work conserving, load balancing, and scheduling |
| CN109828838A (zh) * | 2018-12-18 | 2019-05-31 | 深圳先进技术研究院 | 一种资源分配和任务调度多目标协同处理方法 |
| FR3093579B1 (fr) * | 2019-03-07 | 2021-07-30 | Thales Sa | Ordonnanceur d'evenements pour microprocesseur |
| CN112787970B (zh) * | 2019-11-01 | 2024-04-16 | 华为技术有限公司 | 用于订阅事件流的方法和装置 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11232148A (ja) * | 1998-02-18 | 1999-08-27 | Toyota Motor Corp | 計算機の負荷率計測方法及び計測システム |
| JP2008532150A (ja) * | 2005-03-04 | 2008-08-14 | インヒロン ゲーエムベーハー | システムのリアルタイム分析のための方法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8306784B2 (en) | 2006-07-03 | 2012-11-06 | Inchron Gmbh | Real-time analysis of a computer system |
| GB2443277B (en) * | 2006-10-24 | 2011-05-18 | Advanced Risc Mach Ltd | Performing diagnostics operations upon an asymmetric multiprocessor apparatus |
| US7770183B2 (en) * | 2007-01-30 | 2010-08-03 | Microsoft Corporation | Indirect event stream correlation |
-
2010
- 2010-02-12 CN CN201080008079.2A patent/CN102317915B/zh active Active
- 2010-02-12 US US13/201,301 patent/US8533727B2/en not_active Expired - Fee Related
- 2010-02-12 CA CA2752806A patent/CA2752806C/en active Active
- 2010-02-12 WO PCT/EP2010/051783 patent/WO2010092146A1/en not_active Ceased
- 2010-02-12 KR KR1020117021553A patent/KR20110124309A/ko not_active Abandoned
- 2010-02-12 JP JP2011549577A patent/JP2012518215A/ja active Pending
- 2010-02-12 EP EP10712022A patent/EP2396725A1/en not_active Withdrawn
-
2011
- 2011-08-16 IL IL214694A patent/IL214694A0/en active IP Right Grant
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11232148A (ja) * | 1998-02-18 | 1999-08-27 | Toyota Motor Corp | 計算機の負荷率計測方法及び計測システム |
| JP2008532150A (ja) * | 2005-03-04 | 2008-08-14 | インヒロン ゲーエムベーハー | システムのリアルタイム分析のための方法 |
Non-Patent Citations (1)
| Title |
|---|
| JPN5012007325; FRANK BODMANN: 'ANALYZING THE TIMING CHARACTERISTICS OF TASK ACTIVATIONS' INTERNATIONAL SYMPOSIUM ON INDUSTRIAL EMBEDDED SYSTEMS, 2006 (IES '06) , 20061001, P1-8, IEEE * |
Also Published As
| Publication number | Publication date |
|---|---|
| US20120036510A1 (en) | 2012-02-09 |
| CA2752806C (en) | 2018-07-17 |
| IL214694A0 (en) | 2011-11-30 |
| US8533727B2 (en) | 2013-09-10 |
| CA2752806A1 (en) | 2010-08-19 |
| CN102317915A (zh) | 2012-01-11 |
| EP2396725A1 (en) | 2011-12-21 |
| CN102317915B (zh) | 2014-03-26 |
| WO2010092146A1 (en) | 2010-08-19 |
| KR20110124309A (ko) | 2011-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Palencia et al. | Exploiting precedence relations in the schedulability analysis of distributed real-time systems | |
| Palencia et al. | Offset-based response time analysis of distributed systems scheduled under EDF | |
| JP2012518215A (ja) | システムの実時間処理能力の解析方法 | |
| Isovic et al. | Efficient scheduling of sporadic, aperiodic, and periodic tasks with complex constraints | |
| Fonseca et al. | A multi-dag model for real-time parallel applications with conditional execution | |
| Maia et al. | A closer look into the AER Model | |
| Schranzhofer et al. | Worst-case response time analysis of resource access models in multi-core systems | |
| CN114327829A (zh) | 一种多核实时任务调度分析与仿真系统及方法 | |
| Mraidha et al. | Optimum: a marte-based methodology for schedulability analysis at early design stages | |
| Günzel et al. | Compositional timing analysis of asynchronized distributed cause-effect chains | |
| Klaus et al. | Data propagation delay constraints in multi-rate systems: Deadlines vs. job-level dependencies | |
| Wasly et al. | Bundled scheduling of parallel real-time tasks | |
| Ueter et al. | Parallel path progression DAG scheduling | |
| Skalistis et al. | Near-optimal deployment of dataflow applications on many-core platforms with real-time guarantees | |
| Kodase et al. | Improving scalability of task allocation and scheduling in large distributed real-time systems using shared buffers | |
| Palencia et al. | Response time analysis of EDF distributed real-time systems | |
| Pathan | Improving the schedulability and quality of service for federated scheduling of parallel mixed-criticality tasks on multiprocessors | |
| Shin et al. | Synthesis of optimal interfaces for hierarchical scheduling with resources | |
| She et al. | Scheduling constrained-deadline tasks in precise mixed-criticality systems on a varying-speed processor | |
| Sun et al. | Toward parametric timed interfaces for real-time components | |
| Slim et al. | Probabilistic schedulability analysis for precedence constrained tasks on partitioned multi-core | |
| Tran et al. | Efficient contention-aware scheduling of SDF graphs on shared multi-bank memory | |
| Handa et al. | An integrated online scheduling and placement methodology | |
| Rivas et al. | Optimized Deadline Assignment and Schedulability Analysis for Distributed Real-Time Systems with Local EDF Scheduling. | |
| Lei et al. | Worst-case response time analysis for osek/vdx compliant real-time distributed control systems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130208 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130208 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20131127 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20131224 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140324 |
|
| A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140331 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140424 |
|
| A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140502 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140526 |
|
| A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140602 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20140819 |