JP2012103762A - Groundbreaking-through-transfer guarantee management system and program used therefor - Google Patents

Groundbreaking-through-transfer guarantee management system and program used therefor Download PDF

Info

Publication number
JP2012103762A
JP2012103762A JP2010249242A JP2010249242A JP2012103762A JP 2012103762 A JP2012103762 A JP 2012103762A JP 2010249242 A JP2010249242 A JP 2010249242A JP 2010249242 A JP2010249242 A JP 2010249242A JP 2012103762 A JP2012103762 A JP 2012103762A
Authority
JP
Japan
Prior art keywords
data
guarantee
guaranteed
person
recording
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010249242A
Other languages
Japanese (ja)
Inventor
Katsumi Miyazaki
勝己 宮嵜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2010249242A priority Critical patent/JP2012103762A/en
Publication of JP2012103762A publication Critical patent/JP2012103762A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a guarantee system that avoids risks of a constructor and a person to be guaranteed from groundbreaking until before transfer.SOLUTION: The guarantee management system includes a person to be guaranteed data recording part B1 which records name data, gender data, and birthday data on the person to be guaranteed; a constructor data recording part B2 which records name data and location data on the constructor; contract recording part B3 which records scheduled groundbreaking day data, scheduled transfer day data, and contract amount data determined in a building contract that the person to be guaranteed and contractor made; a warranty fee data generation part B4 which generates warranty fee data based upon the scheduled groundbreaking day data, scheduled transfer day data, and contract amount data; an insurance evaluation result data recording part B5 which records insurance evaluation result data on the person to be guaranteed; a warranty fee reception/non-reception data recording part B6 which records warranty fee reception/non-reception data; a warranty reason data recording part B7 which records warranty reason generation data on the person to be guaranteed; and a paid warranty fee data recording part B8 which records paid warranty fee data based upon the warranty reason generation data.

Description

本発明は、着工−引渡間保証管理システム及びそれに用いられるプログラムに関する。   The present invention relates to a construction-delivery guarantee management system and a program used therefor.

住宅は、業者と施主が契約を締結し、業者が完成させた後施主に引渡される。住宅は非常に高価なものであるため、施主の多くは住宅価格相当の額について金融機関と住宅ローン契約を締結し、金融機関から業者に住宅価格の支払いを行なってもらうのが一般的である。住宅ローンの審査、判定、管理に関連する公知の文献として、例えば下記特許文献1に記載がある。   The housing is delivered to the client after the contractor and client have signed a contract and the contractor has completed it. Since housing is very expensive, it is common for many owners to conclude a mortgage loan with a financial institution for the amount equivalent to the home price, and have the financial institution pay the home price to the contractor. . As a publicly known document related to mortgage examination, judgment, and management, for example, there is a description in Patent Document 1 below.

特許第4475999号明細書Japanese Patent No. 4475999

しかしながら、住宅ローンの融資は住宅の引渡が実行されることによって開始されるため、着工から引渡前の期間は住宅ローンが及ばない。よって、この期間内に、施主(以下「被保証者」という。)に何らかの不都合が生じ、住宅ローンの融資実行がなされないような状況に陥った場合、被保証者がその支払うべき金額を保有していなければ、業者は住宅建築に要した費用の回収及びその報酬を受け取ることができない。この点について現状のところ対応はなされておらず、更には被保証者、業者、保証会社間のデータ管理、保証料データの作成等、情報処理及びその管理についても検討はなされていない。   However, since mortgage lending starts when the house is delivered, the mortgage does not extend from the start of construction to the period before delivery. Therefore, if there is any inconvenience for the owner (hereinafter referred to as “guarantee”) within this period, and the situation where the mortgage loan is not executed, the guaranteed party has the amount to be paid. If not, the contractor will not be able to recover the cost of building construction and receive compensation. At present, no response has been made to this point, and further, information management and management thereof, such as data management between guaranteed persons, contractors, and guarantee companies, and creation of guarantee fee data, have not been studied.

以上、本発明は上記課題を解決し、着工から引渡までの業者及び被保証者のリスクを回避することのできる保証管理システムを実現するための保障管理プログラムを提供することを目的とする。   As described above, an object of the present invention is to provide a security management program for solving the above-described problems and realizing a warranty management system capable of avoiding the risks of contractors and guaranteed persons from the start of construction to delivery.

上記課題を解決する第一の観点に係る着工−引渡間保証管理システムは、被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部と、業者の名称データ、及び所在地データを記録する業者データ記録部と、被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、請負額データを記録する契約データ記録部と、予定引渡日データ及び請負額データに基づき保証料データを作成する保証料データ作成部と、被保証者の保険査定結果データを記録する保険査定結果データ記録部と、保証料収納有無データを記録する保証料収納有無データ記録部と、被保証者の保証事由発生データを記録する保証事由発生データ記録部と、支払保証金データを記録する支払保証金データ記録部と、を有する。   The start-to-delivery guarantee management system according to the first aspect for solving the above-mentioned problem is a guaranteeee data recording unit for recording a guaranteeee's name data, gender data, and date of birth data, and a trader's name. A contractor data recording unit for recording data and location data, a contract data recording unit for recording planned start date data, planned delivery date data, contract amount data determined by a construction contract signed by the guaranteed person and the contractor, Guarantee fee data creation unit that creates guarantee fee data based on scheduled delivery date data and contract amount data, insurance assessment result data recording unit that records the insurance assessment result data of the insured person, and records guarantee fee storage presence / absence data Guarantee charge storage presence / absence data recording part, guarantee reason occurrence data recording part for recording guarantee cause occurrence data of guaranteed person, and payment deposit data recording part for recording payment deposit data It has a.

また、本発明の第二の観点に係る着工−引渡間保証管理プログラムは、コンピュータに、被保証者の氏名データ、性別データ、及び、生年月日データを記録させ、業者の名称データ、及び所在地データを記録させ、被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録させ、予定着工データ、引渡日データ及び請負額データに基づき保証料データを作成させ、被保証者の保険査定結果データを記録させ、保証料収納有無データを記録させ、被保証者の保証事由発生データを記録させ、保証事由発生データに基づく支払保証金データを記録させる。   In addition, the start-to-delivery guarantee management program according to the second aspect of the present invention causes a computer to record name data, gender data, and date of birth data of the insured person, name data of the contractor, and location Record the data and record the planned start date data, planned delivery date data, and contract amount data specified in the construction contract signed by the guaranteed party and the contractor, and based on the planned start date, delivery date data, and contract amount data Create guarantee fee data, record the insurance assessment result data of the insured person, record the guarantee fee storage presence / absence data, record the guarantee reason occurrence data of the insured person, and record payment deposit data based on the guarantee reason occurrence data Let me record.

以上、本発明は、着工から引渡までの業者及び被保証者のリスクを回避する保証システムを実現するための保険管理プログラムとなる。   As described above, the present invention is an insurance management program for realizing a guarantee system that avoids risks of contractors and guaranteed persons from construction to delivery.

本システム全体の概略を示す図である。It is a figure which shows the outline of this whole system. 保証会社の情報処理端末の機能ブロックを示す図である。It is a figure which shows the functional block of the information processing terminal of a guarantee company. 業者の情報処理端末の機能ブロックを示す図である。It is a figure which shows the functional block of the information processing terminal of a trader. 保険会社の情報処理端末の機能ブロックを示す図である。It is a figure which shows the functional block of the information processing terminal of an insurance company. 本システムの処理の流れの例を示す図である。It is a figure which shows the example of the flow of a process of this system.

以下、本発明の実施形態について図面を参照しつつ説明する。ただし、本発明は多くの異なる態様で実施することが可能であり、以下に示す実施形態に限定されるものではない。   Embodiments of the present invention will be described below with reference to the drawings. However, the present invention can be implemented in many different modes and is not limited to the embodiments shown below.

(実施形態1)
図1は、本実施形態に係る着工−引渡間保証管理システム(以下「本システム」という。)Sの概略図である。本システムSは、業者A、保証会社B、保険会社C、被保証者D及びそれぞれが保有する情報処理装置を含んで構成されている。なおこれら情報処理装置はネットワークを介して接続されている。なお本実施形態において、業者Aは、施主(被保証者D)と契約を住宅に関し建築請負契約を締結しており、被保証人に関する各種データ処理は業者Aを介してなされていることを想定する。
(Embodiment 1)
FIG. 1 is a schematic diagram of a construction-delivery guarantee management system (hereinafter referred to as “the present system”) S according to the present embodiment. This system S is configured to include a trader A, a guarantee company B, an insurance company C, a guaranteed person D, and information processing devices owned by each. These information processing apparatuses are connected via a network. In the present embodiment, it is assumed that the contractor A has signed a contract with the owner (guarantee D) for the housing and the contractor A performs various data processing related to the guaranteed person. To do.

本実施形態に係る着工−引渡間保証管理システムにおいて、保証会社Bの情報処理装置は、(1)被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部B1と、(2)業者の名称データ、及び所在地データを記録する業者データ記録部B2と、(3)被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録する契約データ記録部B3と、(4)被保証者の前記氏名データ、性別データ、生年月日データ、予定着工日データ、予定引渡日データ及び請負額データに基づき保証料データを作成する保証料データ作成部B4と、(5)被保証者の保険査定結果データを記録する保険査定結果データ記録部B5と、(6)保証料収納有無データを記録する保証料収納有無データ記録部B6と、(7)被保証者の保証事由発生データを記録する保証事由発生データ記録部B7と、(8)支払保証金データを記録する支払保証金データ記録部B8と、を有する。なお本システムには更に、(9)変更着工日データ、変更引渡日データを記録する変更データ記録部B9も有している。図2は、本システムにおける保証会社Bの情報処理装置の機能ブロックを示す図である。   In the construction-delivery guarantee management system according to the present embodiment, the information processing apparatus of the guarantee company B (1) guaranteeee data record for recording the guaranteeee's name data, gender data, and date of birth data Part B1, (2) Contractor data recording part B2 for recording contractor name data and location data, and (3) Scheduled start date data and planned delivery date determined by the construction contract signed by the guaranteed party and the contractor Contract data recording unit B3 for recording data and contract amount data, and (4) based on the name data, gender data, date of birth data, planned start date data, planned delivery date data, and contract amount data of the guaranteed person Guarantee fee data creation unit B4 for creating guarantee fee data, (5) Insurance assessment result data recording unit B5 for recording the insurance assessment result data of the insured person, and (6) Guarantee fee storage data A guarantee fee storage presence / absence data recording unit B6, (7) a guarantee event occurrence data recording unit B7 for recording guarantee event occurrence data of the guaranteed person, and (8) a payment deposit data recording unit B8 for recording payment deposit data. Have. The system further includes (9) a change data recording unit B9 for recording change start date data and change delivery date data. FIG. 2 is a diagram showing functional blocks of the information processing apparatus of the guarantee company B in this system.

一方、本実施形態に係る本実施形態に係る着工−引渡間保証管理システムにおいて、業者Aの情報処理装置は、(1)被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部A1と、(2)被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録する契約データ記録部A2と、(3)被保証者の保険査定結果データを記録する保険査定結果データ記録部A3と、(4)保証料支払済データを記録する保証料支払済データ記録部A4と、(5)被保証者から受け取った金員に関する受取金データを記録する受取金データ記録部A5と、(6)被保証者の保証事由発生データを記録する保証事由発生データ記録部A6と、を有して構成されている。なお、本実施形態ではさらに、予定着工日データ、予定引渡日データに変更があった場合にそのデータを修正する変更データ記録部A7を有している。図3は、本システムにおける業者Aの情報処理端末の機能ブロックを示す図である。   On the other hand, in the start-to-delivery guarantee management system according to this embodiment, the information processing apparatus of the trader A records (1) name data, gender data, and date of birth data of the guaranteed person. And (2) a contract data recording unit A2 that records planned start date data, planned delivery date data, and contract amount data determined by a construction contract signed by the guaranteed party and the contractor. (3) Insurance assessment result data recording unit A3 for recording the insurance assessment result data of the insured person, (4) Guarantee fee paid data recording unit A4 for recording the guarantee fee paid data, and (5) Warranty A receipt data recording unit A5 for recording the receipt data relating to the money received from the person, and (6) a guarantee reason occurrence data recording unit A6 for recording the guarantee cause occurrence data of the guaranteed person. ing. In addition, in this embodiment, when there is a change in the planned start date data and the planned delivery date data, there is a change data recording unit A7 that corrects the data. FIG. 3 is a diagram showing functional blocks of the information processing terminal of the trader A in this system.

本実施形態に係る本実施形態に係る着工−引渡間保証管理システムにおいて、保険会社Cの情報処理装置は、(1)被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部C1と、(2)業者Aの名称データ、及び所在地データ、保証会社Bの名称データ、及び所在地データを記録する業者保証会社データ記録部C2と、(3)被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録する契約データ記録部C3と、(4)被保証者の保険査定結果データを記録する保険査定結果データ記録部C4と、(5)保険料収納有無データを記録する保険料収納有無データ記録部C5と、(6)被保証者の保証事由発生データを記録する保証事由発生データ記録部C6と、(7)支払保証金データを算出する支払保証金データ作成部C7と、を有する。なお本システムには更に、(8)変更着工日データ、変更引渡日データを記録する変更データ記録部C8も有している。図4は、本システムにおける保証会社Bの情報処理装置の機能ブロックを示す図である。   In the construction-delivery guarantee management system according to this embodiment, the information processing apparatus of insurance company C records (1) name data, gender data, and date of birth data of the insured person. Guarantee data recording unit C1, (2) Name data and location data of trader A, trader guarantee company data recording unit C2 for recording name data and location data of guarantee company B, and (3) Guarantee Contract data recording unit C3 for recording planned start date data, planned delivery date data, and contract amount data determined by a construction contract signed by a contractor and (4) insurance for recording insurance result data of the insured person Assessment result data recording unit C4, (5) Insurance premium storage presence / absence data recording unit C5 for recording premium storage presence / absence data, and (6) Warranty event occurrence data for recording guarantee event occurrence data of the insured person Having a recording unit C6, a payment deposit data creation unit C7 to calculate the (7) Payment deposit data. The system further includes (8) a change data recording unit C8 for recording change start date data and change delivery date data. FIG. 4 is a diagram showing functional blocks of the information processing apparatus of the guarantee company B in this system.

本実施形態において、業者A、保証会社B、保険会社Cの情報処理装置における各部は、上記処理を行うことができる限りにおいて限定されず様々な形態を採用することができるが、例えばいわゆるコンピュータのハードディスクにプログラムを格納し、これを実行させることで上記各部として機能するようにしておくことが簡便であり好ましい。   In this embodiment, each part in the information processing apparatus of the trader A, the guarantee company B, and the insurance company C is not limited as long as the above processing can be performed, and various forms can be adopted. It is convenient and preferable to store the program on the hard disk and to execute the program so as to function as the above-described units.

ここで、本システムSの具体的内容について、以下の処理手順を用いて具体的に説明する。図5は、本手順の一例に関するフローチャートを示す図である。   Here, the specific contents of the system S will be specifically described using the following processing procedure. FIG. 5 is a flowchart illustrating an example of this procedure.

まず、施主Dは、業者Aに対し住宅建築の依頼を申し出る一方、業者Aはこれを承諾し、建築請負契約を締結する。なおこの際、施主Dは必要に応じ、銀行等の金融機関に対し住宅ローンの申請を行い、この申請が認められれば住宅が完成し引渡された場合、住宅ローンが実行されることとなる。   First, the owner D applies to the contractor A for a request for housing construction, while the contractor A accepts the request and concludes a construction contract. At this time, the owner D makes an application for a mortgage to a financial institution such as a bank as necessary, and if the application is approved, the mortgage is executed when the house is completed and delivered.

一方、この契約締結と同時期に、施主Dと業者Aは別途着工から引渡の間の保証についても合意する。具体的には、施主Dは、上記請負額分に関して保証会社に保証を依頼することを業者Aと合意する。なお本実施形態に係る着工−引渡間保証管理システムは、着工から引渡までの間の保証に関する管理であり、業者Aに対して依頼した額(業者Aの請負額)が施主Dに対する債権であると把握することで上記住宅ローンの実行と独立したものとして保証の対象となる。   On the other hand, at the same time as the conclusion of the contract, the owner D and the contractor A agree on a guarantee between the start of construction and delivery. Specifically, the owner D agrees with the trader A to request a guarantee from the guarantee company for the contract amount. Note that the start-to-delivery guarantee management system according to the present embodiment is management related to guarantee from start to delivery, and the amount requested to the contractor A (the contracted amount of the contractor A) is a claim for the client D. As a result, it is guaranteed that it is independent from the execution of the above mortgage.

上記契約後、業者Aの情報処理装置の被保証者データ記録部A1には、オペレータにより、施主(以下「被保証者」という。)の氏名データ、性別データ、及び、生年月日データが記録される。ここで「氏名データ」とは、施主すなわち被保証者の氏名に関するデータをいい、「性別データ」とは、被保証者の性別に関するデータ、具体的には男又は女であるかに関するデータをいい、「生年月日データ」とは、被保証者が生まれた年、月、日に関するデータをいう。なおこの各データは、ネットワークを通じて保証会社Bの情報処理装置に送信される。   After the contract, the operator records the name data, gender data, and date of birth data of the owner (hereinafter referred to as “guarantee”) in the guaranteed data recording unit A1 of the information processing apparatus of the trader A. Is done. Here, “name data” refers to data relating to the name of the owner, that is, the guaranteed person, and “gender data” refers to data relating to the sex of the guaranteed person, specifically, whether the person is a man or a woman. “Birth date data” refers to data relating to the year, month, and day when the guaranteed person was born. Each data is transmitted to the information processing apparatus of the guarantee company B through the network.

保証会社Bの情報処理装置は、上記被保証者の氏名データ、性別データ、及び、生年月日データを業者Aの情報処理装置から受け取った場合、被保証者データ記録部B1にこれら各データを記録する。   When the information processing device of the guarantee company B receives the name data, gender data, and date of birth data of the guaranteeee from the information processing device of the trader A, the information is stored in the guaranteeee data recording unit B1. Record.

そしてこの入力と同時又は前後して、保証会社Bの情報処理装置の業者データ記録部B2には、業者の名称データ、及び所在地データが記録される。これにより保証会社Bは業者Aと被保証者Dとを関連付けて特定することができる。ここで業者の「名称データ」とは、業者の名称を含むデータをいい、「所在地データ」とは、業者の所在地に関するデータをいう。   At the same time or before or after the input, the name data and the location data of the trader are recorded in the trader data recording unit B2 of the information processing apparatus of the guarantee company B. As a result, the guarantee company B can specify the trader A and the guaranteeee D in association with each other. Here, the “name data” of the trader refers to data including the name of the trader, and the “location data” refers to data relating to the location of the trader.

次いで本実施形態に係る保証会社Bの情報処理装置の契約データ記録部B3には、被保証者と業者が締結した建築請負契約にて定めた予定着工日データ、予定引渡日データ、及び請負額データが記録される。「予定着工日データ」とは、業者が実際に工事に着手する日のデータであり、「予定引渡日データ」とは、業者が被保証者に対し住宅を完成させ、引き渡す予定の日のデータをいう。後述のとおり、着工日から引渡日の間が保証の対象期間となる。   Next, in the contract data recording unit B3 of the information processing apparatus of the guarantee company B according to the present embodiment, the planned start date data, the planned delivery date data, and the contract amount determined in the construction contract signed by the guaranteed party and the contractor Data is recorded. “Scheduled start date data” is data on the date when the contractor actually starts construction, and “Schedule delivery date data” is data on the date when the contractor will complete the house and deliver it to the guaranteed person. Say. As will be described later, the warranty period is from the start date to the delivery date.

次いで本実施形態に係る保証会社Bの情報処理装置の保証料データ作成部B4は、被保証者の氏名データ、性別データ、生年月日データ、予定着工日データ、予定引渡日データ及び請負額データに基づき保証料データを作成する。「保証料」とは、被保証者が業者に請負額相当の金員を支払うことができない事由が発生した場合に、保証会社が保証者に対しその不足の金員を支払うことを保証するために、被保証者が保証会社に対して支払う料金をいい、「保証料データ」とは、この額に対するデータをいう。   Next, the guarantee fee data creation unit B4 of the information processing apparatus of the guarantee company B according to the present embodiment includes the name data, gender data, date of birth data, scheduled start date data, scheduled delivery date data, and contract amount data of the insured person Create guarantee fee data based on "Guarantee fee" is to guarantee that the guarantee company will pay the guarantor the insufficient amount of money in the event that the guarantor is unable to pay the contractor the amount equivalent to the contract amount. In addition, it means a fee paid by the guaranteed party to the guarantee company, and “guarantee fee data” means data for this amount.

保証料データの計算は、様々な方法で実現することができるが、例えば以下の方法で算出することができる。まず保証料データ作成部B4は、保証金データを算出する。「保証金」とは、上記のように被保険者が死亡する等の金員の支払いに支障が生ずる保証事由が発生した場合に、被保証者又はその相続人に対して支払う額をいう。請負額がそのまま保証金であれば、請負額データをそのまま保証金データとして使用できるが、契約時において被保険者が業者に対し頭金等既に一部の金員を支払っている場合や、着工時に一時金として更に金員の一部を支払う場合などは、請負額から上記金額を引く、すなわち請負額データから既に支払った又は支払うことが確実な既支払額データを差し引くことで保証金データとすることができる。なおこの既支払額データは、上記業者Aの情報処理装置における契約データ記録部A2、及び保証会社Bの情報処理装置における契約データ記録部B3が記録するデータの一つとして採用することが好ましい。   The guarantee fee data can be calculated by various methods, for example, by the following method. First, the guarantee fee data creation unit B4 calculates deposit data. “Guarantee” refers to the amount to be paid to the guarantor or his / her heir in the event of a guarantee event that hinders the payment of money, such as the death of the insured person as described above. If the contract amount is the deposit as it is, the contract amount data can be used as the deposit data as it is, but if the insured has already paid a part of the deposit, such as a down payment to the contractor at the time of contract, or a lump sum at the start of construction In the case of paying a part of the money, the security deposit data can be obtained by subtracting the above amount from the contract amount, that is, subtracting the already paid amount data that has already been paid or surely paid from the contract amount data. . The paid data is preferably used as one of data recorded by the contract data recording unit A2 in the information processing apparatus of the trader A and the contract data recording unit B3 in the information processing apparatus of the guarantee company B.

次に、予定着工日データと予定引渡日データの差分を取って工事日数データを作成する。   Next, the difference between the planned start date data and the planned delivery date data is taken to create the construction date data.

次に、保証料データ作成部B4は、上記工事日数、基本料率及び保証金を乗じた額に基本料を加え、保証料を算出する。すなわち工事日数データ、保証金データ及び基本料率データを乗じ、更に基本料データを加えて保証料データを作成する。なおここで「基本料金データ」とは工事日数等の変動する値に関係なく保証料に含ませるいわゆる基本料金に関するデータであり、「基本料率データ」とは、保証料を計算するために用いられる係数データであり、定数であっても変数であっても良い。変数の場合は例えば被保険者の年齢データ、性別データ等によって基本料率を定めることができるため、非常に詳細に計算することができるといった利点があり、定数の場合は複雑な条件を必要とすることなく簡便に保証料データを定めることができる点において優れている。なお、変数の場合、別途年齢、性別等の条件を含めたデータテーブルを用いても良いし、年齢や性別を変数として用いる計算式を作成してもよい。なお、被保険者の年齢データを求める場合、生年月日データを基礎とし、現在日時データ(処理時データ)との差を求めるようにすることが好ましい。   Next, the guarantee fee data creation unit B4 calculates the guarantee fee by adding the basic fee to the amount obtained by multiplying the construction days, the basic fee rate, and the deposit. That is, the construction fee data is generated by multiplying the construction day data, the security deposit data, and the basic fee rate data, and further adding the basic fee data. Here, “basic charge data” is data related to the so-called basic charge that is included in the guarantee fee regardless of the fluctuating values such as the construction days, etc., and “basic charge rate data” is used to calculate the guarantee fee. Coefficient data, which may be a constant or a variable. In the case of variables, for example, the basic rate can be determined by the insured's age data, gender data, etc., so there is an advantage that it can be calculated in detail, and in the case of constants, complicated conditions are required It is excellent in that the guarantee fee data can be easily determined without any trouble. In the case of variables, a data table including conditions such as age and sex may be used separately, or a calculation formula using age and sex as variables may be created. In addition, when calculating | requiring age data of an insured person, it is preferable to obtain | require the difference with present date data (data at the time of processing) on the basis of birth date data.

上記保証料の計算と並行して、保証会社Bの情報処理装置は、保険会社Cに対して再保険を依頼する。この場合、保険会社Bの情報処理装置は保険会社Cの情報装置に対し、ネットワークを介して再保険を依頼する情報を含む再保険依頼データを送付する。この再保険依頼データには、上記被保証者の氏名データ、性別データ、生年月日データ、業者の名称データ、所在地データ、予定着工日データ、予定引渡日データ、請負額データを含む。   In parallel with the calculation of the guarantee fee, the information processing apparatus of the guarantee company B requests the insurance company C to reinsurance. In this case, the information processing apparatus of insurance company B sends reinsurance request data including information for requesting reinsurance to the information apparatus of insurance company C via the network. The reinsurance request data includes the insured person's name data, gender data, date of birth data, vendor name data, location data, planned start date data, planned delivery date data, and contract amount data.

次に、保険会社Cの情報処理装置は、上記再保険依頼データを受け取った場合、保険会社Cの情報処理装置の被保証者データ記録部C1に上記被保証者の氏名データ、性別データ、及び、生年月日データを記録し、業者保証会社データ記録部C2に業者の名称データ及び所在地データ、並びに保証会社の名称データ及び所在地データを記録する。また、契約データ記録部C3に、当該契約の予定着工日データ、予定引渡日データ及び請負額データを記録する。   Next, when the information processing apparatus of the insurance company C receives the reinsurance request data, the insured person's name data, gender data, and The date of birth data is recorded, and the name data and location data of the trader and the name data and location data of the guarantee company are recorded in the trader guarantee company data recording unit C2. The contract data recording unit C3 records the planned start date data, the planned delivery date data, and the contract amount data of the contract.

その後、保険会社Cの情報処理装置は、査定処理を行い、保証会社Bを介して受けた被保証者に対する再保険を受けるか否か判断し、保険査定結果データを作成し、保険査定結果データ記録部に記録する。この保険査定結果データには、再保険を受けるか否かの情報が含まれており、具体的には再保険を承諾する場合は査定承諾データを、再保険を承諾しない場合は査定不承諾データを作成し、保証会社Bの情報処理装置に対しネットワークを介して送付する。なお保険会社Cの情報処理装置には、再保険を承諾する場合、別途保険料を算出するための保険料データ生成部を備え、保険査定結果データに含ませても良い。この保険料データ生成部は、上記保障会社Bの情報処理装置が有する保証料データ作成部と同様の処理を行うことができる。ただし、この算出方法は、保険会社C独自の算定により行うことができるため、処理は同様であっても、一般に金額は異なる。   Thereafter, the information processing device of insurance company C performs an assessment process, determines whether or not to obtain reinsurance for the insured person received through guarantee company B, creates insurance assessment result data, and creates insurance assessment result data. Record in the recording unit. This insurance assessment result data includes information on whether or not to receive reinsurance. Specifically, the assessment acceptance data when accepting reinsurance, and the assessment disapproval data when not accepting reinsurance. And is sent to the information processing apparatus of the guarantee company B via the network. The information processing apparatus of insurance company C may be provided with an insurance premium data generation unit for separately calculating insurance premiums when accepting reinsurance, and may be included in the insurance assessment result data. This insurance premium data generation unit can perform the same processing as the guarantee fee data creation unit of the information processing apparatus of the guarantee company B. However, since this calculation method can be performed by calculation unique to insurance company C, the amount of money is generally different even if the processing is the same.

保証会社Bの情報処理装置は、上記保険査定結果データを受けた場合、保険査定結果データ記録部B5に、上記保険査定結果データを記録する。   When the information processing apparatus of the guarantee company B receives the insurance assessment result data, it records the insurance assessment result data in the insurance assessment result data recording unit B5.

次に、保証会社Bの情報処理装置は、保険査定結果データを記録した後、保険会社Cからの保険査定結果データが査定承諾データである場合、上記計算した保証料データに基づき、業者Aに対し保証承諾の連絡とともに保証料を請求する。また、保険査定結果データが査定不承諾の場合、業者Aに対し保証不承諾の連絡を送る。   Next, after the insurance assessment result data is recorded, the information processing device of the guarantee company B, when the insurance assessment result data from the insurance company C is assessment acceptance data, A warranty fee is charged together with the notification of warranty acceptance. Further, when the insurance assessment result data is non-consent to the assessment, a notification that the guarantee is not accepted is sent to the trader A.

業者Aは、保証承諾の連絡を受けた場合、保証会社Bが請求した保証料の振込みを行う。保証不承諾の連絡を受けた場合は、補償を受けることができないため、本保証システムによる管理を終了させることができる。なお、保証料の振込みは被保証者Dが直接行うこととしてもよいが、業者Aが負担することとしてもよい。なお、業者Aは、保証料を支払った後、自己の情報処理装置の保証料支払済データ記録部A4に保証料支払を行った旨のデータすなわち保証料支払済データを記録する。   When the trader A receives a guarantee consent, the trader A transfers the guarantee fee charged by the guarantee company B. If you receive a notification of disapproval of warranty, you will not be able to receive compensation, so you can terminate the management by this warranty system. The guarantee fee may be transferred directly by the guarantee D, but may be borne by the trader A. In addition, after paying the guarantee fee, the trader A records the data indicating that the guarantee fee has been paid, that is, the guarantee fee paid data, in the guarantee fee paid data recording unit A4 of the information processing apparatus.

次に、保証会社Bは上記業者Aからの保証料の振込みを確認した後、保証料収納有無データ記録部B6に保証料収納有無データを記録する。具体的には、所定の期間内に保証料の支払いがあった場合、保証料収納有データを記録し、期間内に保証料の支払いがなかった場合は保証料収納未納データを記録する。保証料収納があった場合保証会社Bはこのデータに基づき保証の管理を行うことができる。なお所定の期間内に支払がなく、更に相当の期間がなかった場合、保証管理を終了させることができる。   Next, the guarantee company B, after confirming the transfer of the guarantee fee from the supplier A, records the guarantee fee storage presence / absence data in the guarantee fee storage presence / absence data recording unit B6. Specifically, the guarantee fee storage data is recorded when the guarantee fee is paid within a predetermined period, and the guarantee fee non-payment data is recorded when the guarantee fee is not paid within the period. If the guarantee fee is stored, the guarantee company B can manage the guarantee based on this data. If there is no payment within a predetermined period and there is no further period, warranty management can be terminated.

そして保証会社Bは、所定の期間が経過し、予定引渡日となり、特に問題なく引渡が完了したと連絡を受け又は判断した場合は、保証を終了させて管理を終える。この際、業者A、保険会社Cに対して、保証完了に関する保証管理終了データ送付することが好ましい。   If the guarantee company B receives or determines that the delivery has been completed without any problem after a predetermined period has passed, the guarantee company terminates the guarantee and ends the management. At this time, it is preferable to send the warranty management end data regarding the completion of the warranty to the trader A and the insurance company C.

一方、被保証者Dに、請負額の支払いをすることができない事由(保証事由)が発生した場合、被保証者D又は業者Aは、保証会社の情報処理装置に対し、保証事由発生データを作成し、送付する。そして保証会社Bの情報処理装置は、保証事由データ記録部B7に保証事由データを記録する。これにより、補償額の支払い処理が開始されることとなる。なお「保証事由発生データ」には、例えば保証金の支払が必要となったという情報、被保証者の死亡等、事故の原因に関する情報、が含まれていることが好ましい。   On the other hand, when a reason (guarantee reason) for which the contracted amount cannot be paid to the guaranteed party D occurs, the guaranteed party D or the contractor A sends the guarantee reason occurrence data to the information processing device of the guarantee company. Create and send. Then, the information processing apparatus of the guarantee company B records guarantee reason data in the guarantee reason data recording unit B7. As a result, the compensation payment process is started. The “guarantee event occurrence data” preferably includes, for example, information that the deposit has been required and information on the cause of the accident such as the death of the guaranteed person.

上記保証事由発生データの入力があった場合、保証会社Bの情報処理装置は保険会社Cの情報処理装置に対しネットワークを介して保証金支払依頼データを送付する。なおこの保証金支払依頼データは保証事由発生データ記録部が行うことが好ましく、保証事由発生データが含まれる。   When the guarantee reason occurrence data is input, the information processing apparatus of the guarantee company B sends the deposit payment request data to the information processing apparatus of the insurance company C via the network. The deposit payment request data is preferably performed by the guarantee event occurrence data recording unit, and includes guarantee event occurrence data.

保険会社Cの情報処理装置は、保障会社Bからの保証金支払依頼データの送付を受けた場合、支払保証金データ作成部により、支払保証金データを作成する。「支払保証金」とは、実際に保険会社Cが被保証者Dに対して支払う保証金をいい、例えば上棟時に追加の金員を支払った場合等により保証料作成当初の保証金とは異なる場合がある。   When the information processing apparatus of the insurance company C receives the deposit payment request data from the guarantee company B, the payment deposit data creation unit creates payment deposit data. “Payment deposit” refers to the deposit paid by insurance company C to insured person D, and may differ from the deposit at the beginning of the creation of the guarantee fee depending on, for example, the payment of additional money at the upper building .

限定されるわけではないが、支払保証金の計算は、基本的には上記保証金データに基づいて定められ、住宅の着工日から保証事由発生日までの間に被保険者Dから業者Aに対して支払われた金員、例えば上棟時等に支払われた金員等がある場合これを差し引き支払保証金データとして作成する。そして保険会社Cは、被保証者に対し上記支払い保証金を支払うとともに、保証会社Cの情報処理装置に対して保証金を支払った旨のデータすなわち保証金支払完了通知データ及び、支払った保証金に関する支払保証金データを送付する。なお、被保証者D(又はその相続人)は、受けた保証金を業者Aに支払うことで、業者Aは請負金額を受けとることができるようになる。   Although it is not limited, the payment guarantee payment is basically determined on the basis of the above-mentioned deposit data. From the start date of the house to the date of the reason for the guarantee, If there is a paid clerk, such as a clerk paid at the time of the upper wing, etc., this is deducted and created as payment deposit data. The insurance company C pays the guarantee deposit to the insured person and also pays a deposit to the information processing device of the guarantee company C, that is, deposit payment completion notification data, and deposit payment data relating to the deposit paid. Will be sent. The guaranteed person D (or his / her heir) pays the received guarantee money to the dealer A so that the dealer A can receive the contract amount.

そして、上記保証金支払完了通知データ及び支払保証金データの送信を受けた保証会社Bの情報処理装置の支払保証金データ記録部B8は、保証事由発生データに基づき処理された支払保証金データを記録し、保証が完了したことを確認し、管理を終了する。   The payment deposit data recording unit B8 of the information processing apparatus of the guarantee company B that has received the deposit payment completion notification data and the payment deposit data records the payment deposit data processed based on the guarantee event occurrence data, Confirm that is completed, and terminate the management.

ここで、本実施形態において、引渡日が予定引渡日と同日であって特に変更がなければ問題はないが、さまざまな事情により着工日、引渡日が当初の予定から変更される場合もある。この場合、保証料の追加等が発生する可能性があるため、本実施形態に係る保証会社Bの情報処理装置には、変更データ記録部B9が設けられている。   Here, in this embodiment, there is no problem if the delivery date is the same as the scheduled delivery date and there is no particular change, but the start date and delivery date may be changed from the original schedule due to various circumstances. In this case, since a guarantee fee may be added, the information processing apparatus of the guarantee company B according to the present embodiment is provided with a change data recording unit B9.

例えば、保証会社Bの情報処理装置は、業者Aの情報処理装置から、変更後の引渡日のデータを含む変更引渡日データが送付されると、変更データ記録部B9にこの変更引渡日データを格納する。   For example, when the information processing apparatus of the guarantee company B receives the changed delivery date data including the changed delivery date data from the information processing apparatus of the trader A, the changed delivery date data is sent to the changed data recording unit B9. Store.

すると、保証会社Bの情報処理装置は、上記の保証料データ作成部B4に改めて作成を行わせ、その保証料データを作成した後、この保証料の計算と並行して、上記と同様、保険会社Cの情報処理装置に対し、再保険を依頼する情報を含む再保険依頼データを送付する。その後、上記処理が同様に繰り返され、引渡しが完了するまで本実施形態に係る管理処理が続くこととなる。これにより、変更が発生した場合でも柔軟に保証管理を行うことができるという利点がある。   Then, the information processing device of the guarantee company B causes the guarantee fee data creation unit B4 to create it again, and after creating the guarantee fee data, in parallel with the calculation of the guarantee fee, Reinsurance request data including information for requesting reinsurance is sent to the information processing apparatus of company C. Thereafter, the above processing is repeated in the same manner, and the management processing according to the present embodiment continues until the delivery is completed. Thereby, there is an advantage that guarantee management can be performed flexibly even when a change occurs.

以上、本実施形態によると、着工から引渡までの業者及び被保証者のリスクを回避する保証システムを実現するための保険管理プログラムとなる。   As described above, according to the present embodiment, the insurance management program for realizing a guarantee system that avoids the risk of the contractor and the guaranteed person from the start of construction to delivery is provided.

なお、本実施形態では、保証会社、保険会社が別途に存在している例を示しているが、保証会社、保険会社を統合し、上記保証会社の各部、保険会社の各部を一の情報処理装置内に備えさせるようにすることも可能である。この場合、重複する処理部は削除する等の適宜の調整が必要である。具体的には、保証会社Bの情報処理装置は、(1)被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部と、(2)業者の名称データ、及び所在地データを記録する業者データ記録部と、(3)被保証者と業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録する契約データ記録部と、(4)被保証者の前記氏名データ、性別データ、生年月日データ、予定着工日データ、予定引渡日データ及び請負額データに基づき保証料データを作成する保証料データ作成部と、(5)被保証者の保険査定結果データを記録する保険査定結果データ記録部と、(6)保証料収納有無データを記録する保証料収納有無データ記録部と、(7)被保証者の保証事由発生データを記録する保証事由発生データ記録部と、(8)支払保証金データを作成する支払保証金データ作成部と、を有する。なおこの場合でも更に、(9)変更着工日データ、変更引渡日データを記録する変更データ記録部B9も有していることが好ましい。   In this embodiment, an example in which a guarantee company and an insurance company exist separately is shown, but the guarantee company and the insurance company are integrated, and each part of the guarantee company and each part of the insurance company are integrated into one information processing. It is also possible to provide it in the apparatus. In this case, it is necessary to make appropriate adjustments such as deleting the overlapping processing units. Specifically, the information processing apparatus of the guarantee company B includes (1) a guaranteeee data recording unit for recording the name data, gender data, and date of birth of the guaranteeee, and (2) the name of the trader. Contractor data recording section for recording data and location data, and (3) Scheduled construction date data, planned delivery date data, and contract amount data specified in the construction contract signed by the guaranteed party and the contractor A recording unit; and (4) a guarantee fee data creation unit that creates guarantee fee data based on the name data, gender data, date of birth data, scheduled start date data, scheduled delivery date data, and contract amount data of the insured person; (5) an insurance assessment result data recording unit for recording the insurance assessment result data of the insured person, (6) a guarantee fee storage presence / absence data recording part for recording guarantee fee storage data, and (7) Warranty reasons occur It has a guaranteed event generating data recording unit for recording over data, and a payment deposit data creation unit that creates a payment deposit data (8). Even in this case, it is preferable to further include (9) a change data recording unit B9 for recording change start date data and change delivery date data.

また、本実施形態では、保証会社Bは、業者からの保証依頼を受けて保証料を計算するとともに保険会社に対し再保険の依頼を行うことしているが、保証料の計算は、保険会社からの査定結果を受けて承認となった場合に初めて算出することとしてもよい。   In this embodiment, the guarantee company B receives a guarantee request from a supplier and calculates a guarantee fee and requests a reinsurance from the insurance company. However, the guarantee fee is calculated from the insurance company. It may be calculated for the first time when approval is received based on the assessment result.

更に、本実施形態では、全てを情報処理装置を通じたネットワークとしているが、すべての手続が情報処理装置を介しなければならないわけではなく、一部を手作業、手入力で行うことを完全に否定するわけではない。   Furthermore, in this embodiment, all are networked through the information processing apparatus, but not all procedures must be performed through the information processing apparatus, and it is completely denied that a part is performed manually or manually. Not to do.

本発明は着工−引渡間保証管理システム、及びそれに用いられる着工−引渡間保証管理プログラムとして産業上の利用可能性がある。   The present invention has industrial applicability as a construction-delivery guarantee management system and a construction-delivery guarantee management program used therefor.

Claims (2)

被保証者の氏名データ、性別データ、及び、生年月日データを記録する被保証者データ記録部と、
業者の名称データ、及び所在地データを記録する業者データ記録部と、
前記被保証者と前記業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録する契約データ記録部と、
前記被保証者の前記予定着工データ、前記予定引渡日データ及び前記請負額データに基づき保証料データを作成する保証料データ作成部と、
前記被保証者の保険査定結果データを記録する保険査定結果データ記録部と、
保証料収納有無データを記録する保証料収納有無データ記録部と、
前記被保証者の保証事由発生データを記録する保証事由発生データ記録部と、
支払保証金データを記録する支払保証金データ記録部と、を有する着工−引渡間保証管理システム。
A guaranteed data recording unit for recording the name data, gender data, and date of birth of the guaranteed person,
A trader data recording unit for recording trader name data and location data;
A contract data recording unit for recording planned start date data, planned delivery date data, and contract amount data set in the construction contract signed by the guaranteed party and the contractor;
A guarantee fee data creating unit for creating guarantee fee data based on the scheduled start data of the guaranteed person, the scheduled delivery date data, and the contract amount data;
An insurance assessment result data recording unit for recording the insurance assessment result data of the insured person,
A guarantee fee storage presence / absence data recording unit for recording guarantee fee storage presence / absence data;
A guarantee event occurrence data recording unit for recording guarantee event occurrence data of the guaranteed person,
A start-to-delivery guarantee management system comprising a payment deposit data recording unit for recording payment deposit data.
コンピュータに、
被保証者の氏名データ、性別データ、及び、生年月日データを記録させ、
業者の名称データ、及び所在地データを記録させ、
前記被保証者と前記業者が締結した建築請負契約にて定める予定着工日データ、予定引渡日データ、及び請負額データを記録させ、
前記予定着工データ、前記予定引渡日データ及び前記請負額データに基づき保証料データを作成させ、
前記被保証者の保険査定結果データを記録させ、
保証料収納有無データを記録させ、
前記被保証者の保証事由発生データを記録させ、
支払保証金データを記録させる、着工−引渡間保証管理プログラム。
On the computer,
Record name data, gender data, and date of birth data of the guaranteed person,
Record vendor name data and location data,
Record the planned start date data, the planned delivery date data, and the contract amount data determined in the construction contract signed by the guaranteed party and the contractor,
Guarantee fee data is created based on the planned start data, the scheduled delivery date data and the contract amount data,
Record the insurance assessment result data of the insured person,
Record warranty storage data,
Record the warranty event occurrence data of the guaranteed person,
Start-to-delivery guarantee management program that records payment deposit data.
JP2010249242A 2010-11-07 2010-11-07 Groundbreaking-through-transfer guarantee management system and program used therefor Pending JP2012103762A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010249242A JP2012103762A (en) 2010-11-07 2010-11-07 Groundbreaking-through-transfer guarantee management system and program used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010249242A JP2012103762A (en) 2010-11-07 2010-11-07 Groundbreaking-through-transfer guarantee management system and program used therefor

Publications (1)

Publication Number Publication Date
JP2012103762A true JP2012103762A (en) 2012-05-31

Family

ID=46394119

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010249242A Pending JP2012103762A (en) 2010-11-07 2010-11-07 Groundbreaking-through-transfer guarantee management system and program used therefor

Country Status (1)

Country Link
JP (1) JP2012103762A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020203886A1 (en) * 2019-03-29 2020-10-08 佐藤 通洋 Data processing system, data processing method, and program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020203886A1 (en) * 2019-03-29 2020-10-08 佐藤 通洋 Data processing system, data processing method, and program
JP7445648B2 (en) 2019-03-29 2024-03-07 通洋 佐藤 Data processing system, data processing method, and program

Similar Documents

Publication Publication Date Title
US20190012665A1 (en) Systems and Methods that Utilize Blockchain Digital Certificates for Data Transactions
US8731962B2 (en) Process for linked healthcare and financial transaction initiation
US11727484B2 (en) Methods and apparatus for mortgage loan securitization based upon mortgage servicing stored on blockchain
US20160328705A1 (en) Mediated conversion of cryptographic currency and other funding sources to gold
WO2018136532A1 (en) Data processing system and method for rules/model-based pre-analysis of data for real-time generation of documents for presentation in an operator interface
JP5139506B2 (en) Wage payment device, wage payment method, and wage payment program
JP4648929B2 (en) Wage payment device, wage payment method, and wage payment program
CN110956453A (en) Circulation payment clearing method and device based on asset digital certificate and medium
JP2015524125A (en) Collateral transaction service method
US20150262294A1 (en) System and method for facilitating the amending of syndicated loans
US20140067430A1 (en) System and method for managing complex insurance claims at account level
KR102178241B1 (en) System for providing platform for peer-to-peer finance, method for management of escrow funds for peer-to-peer finance and computer program for the same
JP2021056649A (en) Identity verification system, identity verification method, and program
CN110610427A (en) Financial management system and method based on real supply chain
WO2021167071A1 (en) Registration assistance device, and registration assistance method
US11087324B2 (en) Pre-authorized secure resource allocation system
JP7391497B2 (en) Loan screening device
JP2012103762A (en) Groundbreaking-through-transfer guarantee management system and program used therefor
JP5089678B2 (en) Fund transfer processing data transmission apparatus, fund transfer processing data transmission program, and fund transfer processing data transmission method
US20130185101A1 (en) System, Method, and Computer Program Product for Underwriting Mortgage Loan Insurance
JP2022033045A (en) Securities trading settlement system
JP7158277B2 (en) Information processing method, information processing device, and program
US20150006434A1 (en) Rules-based escrow systems and methods
JP2008262269A (en) Securities collateral loan management system, its method, and program
JP2008287668A (en) Accepting and ordering point management server, program and accepting and ordering point loan management method