JP2012051519A - Vehicle operation management method and server - Google Patents

Vehicle operation management method and server Download PDF

Info

Publication number
JP2012051519A
JP2012051519A JP2010197262A JP2010197262A JP2012051519A JP 2012051519 A JP2012051519 A JP 2012051519A JP 2010197262 A JP2010197262 A JP 2010197262A JP 2010197262 A JP2010197262 A JP 2010197262A JP 2012051519 A JP2012051519 A JP 2012051519A
Authority
JP
Japan
Prior art keywords
vehicle
plan
work
change
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010197262A
Other languages
Japanese (ja)
Other versions
JP5746840B2 (en
Inventor
Takashi Wakamiya
崇 若宮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2010197262A priority Critical patent/JP5746840B2/en
Priority to EP11178991.3A priority patent/EP2426027B1/en
Publication of JP2012051519A publication Critical patent/JP2012051519A/en
Application granted granted Critical
Publication of JP5746840B2 publication Critical patent/JP5746840B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L17/00Switching systems for classification yards
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/16Trackside optimisation of vehicle or train operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/57Trackside diagnosis or maintenance, e.g. software upgrades for vehicles or trains, e.g. trackside supervision of train conditions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve a problem that the out-of-service operation may be required when not taking a planned arrival section of a vehicle into account after operation change and the train yard work not needed to be carried out on the day may be required when not taking a train yard work plan into account although vehicle operation is changed when a schedule plan is changed due to vehicle accident or the like so that efficiency of vehicle assignment may be deteriorated.SOLUTION: When a schedule plan or an operation plan/vehicle operation plan is changed, operations are assigned, starting with a vehicle with a lowest work priority (degree of work importance and degree of work urgency). Next, a final arrival section after the vehicle operation plan change is checked. A vehicle for which a final arrival section in information after vehicle operation plan change and scheduled planned arrival section are different from each other, is extracted. The vehicle operation plan is changed for each extracted section so that arrival at the same section as the expected arrival section can be achieved. The processing permits reducing urgent work and out-of-service operation even in a case where the schedule plan is changed on the day.

Description

交通機関での列車ダイヤ、車両運用、構内作業を決定する技術である。特に、当日車両事故等の要因でダイヤ計画が変更された場合、列車ダイヤ、車両運用、構内作業を考慮して、当日の鉄道運行計画の再作成案を作成する技術である。   It is a technology that determines train schedules, vehicle operations, and premises work in transportation. In particular, when the schedule plan is changed due to a vehicle accident or the like on the day, it is a technology for creating a re-creation plan of the railway operation plan for the day in consideration of train schedule, vehicle operation, and on-site work.

現在、運行管理システム、車両運用管理システム、構内作業計画システムにより、当日のダイヤ計画をもとに、運用計画・車両運用計画を行い、構内作業計画を決定するという一連の流れで、鉄道運行計画が行われている。
運行管理システムでは、当日の列車ダイヤ情報を保持し、列車ダイヤ情報をもとに、列車進路制御装置(信号機、転轍機等)を制御することで、車両を列車ダイヤ情報に従って運行させる。
車両運用管理システムでは、運用計画と車両を関連付ける車両運用計画を作成する。運用とは、当日の列車ダイヤ情報から車両が1日に運行すべき列車ダイヤ情報を組み合わせたものを指す。また、車両の入出区時間、及び、検査周期などの車両運用関連情報を保持し、決められた条件(検査周期等)を守りながら、車両運用を決定する機能も備える。
構内作業計画システムでは、当日の構内作業(検査、清掃、構内入替等)の計画情報を保持し、構内作業員が構内作業計画を把握する。
Currently, the operation plan, vehicle operation plan, and operation plan system are used to determine the on-site work plan based on the schedule of the day. Has been done.
In the operation management system, the train schedule information of the day is held, and the vehicle is operated according to the train schedule information by controlling the train route control device (signals, switches, etc.) based on the train schedule information.
The vehicle operation management system creates a vehicle operation plan that associates an operation plan with a vehicle. Operation refers to a combination of train schedule information that should be run on a day from train schedule information for the day. It also has a function of determining vehicle operation while maintaining vehicle operation-related information such as vehicle entry / exit time and inspection cycle, and observing predetermined conditions (such as inspection cycle).
In the on-site work planning system, the on-site work (inspection, cleaning, on-site replacement, etc.) plan information is held, and the on-site worker grasps the on-site work plan.

しかし、このような場合、検査周期が切れそうな車両に関しては、構内作業員が担当区所以外に出向き、検査を行うこともあり、作業量が増大していた。具体的には、変更案作成時に、車両の作業優先度を把握する情報や当日の入区予定区所情報を保持していないため、検査周期が切れるかどうかの判断や当日の入区予定区所がどこであるかの判断を十分にできないまま、各構内にある車両に対して出区指示を出してしまう。そのため、検査周期が切れる車両が予定の担当区所と違う場所で入区してしまい、検査を行うために構内作業員がその場所まで出向く必要が発生してしまう。   However, in such a case, with regard to a vehicle whose inspection cycle is likely to expire, the on-site worker goes to a place other than the responsible ward and inspects it, and the amount of work has increased. Specifically, at the time of drafting the change, because it does not hold the information to grasp the work priority of the vehicle and the scheduled ward information on the day, it can be judged whether the inspection cycle will expire or the scheduled ward on the day Without being able to fully determine where the place is, a departure instruction is issued to the vehicles on each premises. For this reason, a vehicle whose inspection cycle is cut off enters a location different from the planned responsible ward, and it is necessary for the on-site worker to go to that location in order to perform the inspection.

ダイヤ計画や運用計画が変更された場合、予備車両を投入したり、予定と違う車両を用いて車両運用を行う場合があり、その際に、運行管理システム、車両運用管理システム、構内作業計画システムとをオンライン接続し、運用乱れ時において運転整理後のダイヤ情報および車両の検査、清掃作業の進捗情報をお互いに伝送し、当日の車両の検査や清掃作業が終わった車両から運用計画に割り付ける技術がある(特許文献1)。   When a schedule plan or operation plan is changed, a spare vehicle may be inserted or a vehicle may be operated using a vehicle that is different from the schedule. At that time, an operation management system, a vehicle operation management system, a campus work planning system may be used. Is connected online, and when the operation is disrupted, the schedule information after the operation is organized, the vehicle inspection, and the progress information of the cleaning work are transmitted to each other, and the vehicle that has been inspected and cleaned on the day is assigned to the operation plan. (Patent Document 1).

特開平09-226588号公報JP 09-226588 A

しかし、特許文献1では、車両に予定されている全ての検査や作業が終わらないと運用計画に割り当てられないので、作業の期限、優先度については考慮されていない。すなわち、作業完了まで余裕があり、運用に割り当てても問題無い場合であっても検査が済むまで車両を割り当てることができない。   However, in Patent Document 1, since all the inspections and work scheduled for the vehicle are not completed, they are not assigned to the operation plan, so the work deadline and priority are not considered. That is, there is a margin until the work is completed, and even if there is no problem even if it is assigned to the operation, the vehicle cannot be assigned until the inspection is completed.

また、特許文献1は、車両の当日の入区予定区所については、考慮がされておらず、回送運転を減らすことについては考慮されていない。   In Patent Document 1, no consideration is given to the planned entry zone of the vehicle on the day, and no consideration is given to reducing the forward driving.

更に、特許文献1は、構内作業計画については考慮がされておらず、当日作業を行う必要のない構内作業を考えた場合には対処できない。   Further, Patent Document 1 does not take into consideration the work plan on the premises, and cannot cope with the premises work that does not need to be performed on the day.

本発明の目的は、当日にダイヤ計画、運用計画・車両運用計画が変更された場合でも鉄道運行計画変更を行うことで、突発作業や回送運転を減らすことである。   An object of the present invention is to reduce sudden work and forwarding operation by changing a railway operation plan even when a diamond plan, an operation plan, and a vehicle operation plan are changed on the same day.

上記課題を解決するに、ダイヤ計画、運用計画・車両運用計画が変更された場合、作業優先度(作業重要度、作業緊急度)が低い車両から運用に割り付ける。ここで、作業重要度は、作業自体の重要度を判断するための指標である。同じ構内作業でも、重要度が高い作業と低い作業があり、構内作業計画担当に重み付けを行うことを可能にする。作業緊急度は、作業をいつまでにするべきかを判断するための指標である。当日に周期が切れてしまい検査をする必要がある作業と次の日以降に検査をすれば周期が守れる作業があり、構内作業計画担当に重み付けを行うことを可能にする。   In order to solve the above problems, when a diagram plan, an operation plan, or a vehicle operation plan is changed, a vehicle having a low work priority (work importance, work urgency) is assigned to operation. Here, the work importance is an index for determining the importance of the work itself. Even in the same premises work, there are a high importance work and a low importance work, and it is possible to weight the premises work planner. The work urgency is an index for determining how long work should be done. There are operations that need to be inspected because the cycle has expired on the same day, and operations that can be maintained if the inspection is performed on or after the next day, making it possible to weight the person in charge of the on-site work plan.

次に、車両に運用を割り付けた後で、車両運用計画変更後の最終の入区区所を確認する。車両運用計画変更後情報の最終の入区区所と、計画されていた予定入区区所が異なる車両を抽出し、抽出された車両毎に、入区予定区所と同じ区所に入区出来るように車両運用計画変更を行うため、変更可能な車両と変更可能時間を算出し、車両運用計画を変更する。   Next, after assigning the operation to the vehicle, the final entry ward after the vehicle operation plan change is confirmed. After the vehicle operation plan is changed, the final entry ward of the information and the planned entry ward where planned are extracted, so that each extracted vehicle can enter the same ward as the planned entry ward In order to change the vehicle operation plan, the changeable vehicle and changeable time are calculated, and the vehicle operation plan is changed.

そして、区所毎の構内作業制約(作業標準時間、作業標準必須人数、区所施設制約)を考慮して構内作業計画を変更し、鉄道運行計画を確定する。   Then, the premises work plan is changed in consideration of the premises work restrictions (work standard time, work standard required number of people, ward facility restrictions) for each ward, and the railway operation plan is determined.

本発明によれば、当日にダイヤ計画、運用計画・車両運用計画が変更された場合でも鉄道運行計画変更を行うことで、突発作業や回送運転を減らすことができる。   According to the present invention, even when the schedule plan, the operation plan / the vehicle operation plan is changed on the same day, the sudden operation and the forwarding operation can be reduced by changing the railway operation plan.

本実施例のシステム構成図である。It is a system configuration diagram of the present embodiment. 本実施例の動作を示すフローチャート(第1指令)である。It is a flowchart (1st instruction | command) which shows operation | movement of a present Example. 本実施例の動作を示すフローチャート(第2指令)である。It is a flowchart (2nd instruction | command) which shows operation | movement of a present Example. ステップ52の詳細フローチャートである。5 is a detailed flowchart of Step 52. FIG. ステップ53の詳細フローチャートである。5 is a detailed flowchart of Step 53. FIG. 車両の作業優先度を決定するパラメータである。It is a parameter that determines the work priority of the vehicle. 列車ダイヤ情報、運用計画情報である。Train schedule information and operation plan information. 列車ダイヤ情報、運用計画情報である。Train schedule information and operation plan information. 車両計画情報のデータ構成図である。It is a data block diagram of vehicle plan information. 車両運用計画情報のデータ構成図である。It is a data block diagram of vehicle operation plan information. 構内作業計画情報である。On-site work plan information. 構内作業計画情報である。On-site work plan information. 構内制約情報のデータ構成図である。It is a data block diagram of premise restrictions information.

本実施例の構成図を図1に示す。図1において、列車ダイヤ、車両運用、構内作業を考慮した当日の鉄道運行計画再作成システムは、中央指令装置10、運行管理システム(ダイヤ変更端末11)、区所サーバ20、車両運用管理システム(車両運用計画変更端末21)、構内作業計画システム(構内作業計画変更端末22)、車両位置監視サーバ30から構成されている。各装置は、いわゆるコンピュータで実現され記録媒体に格納されたプログラムに従って、CPUなどの処理装置により各処理が実行される。なお、車両位置監視サー座、中央指令装置、区所サーバは、図1に示すような、それぞれが独立した装置である場合のみならず、これら装置を一体化した一つの装置で以下の処理を実行するものであってもよい。   A configuration diagram of this embodiment is shown in FIG. In Fig. 1, the railway operation plan re-creation system on the day considering train schedule, vehicle operation, and on-site work is the central command device 10, the operation management system (diagram change terminal 11), the ward office server 20, the vehicle operation management system ( The vehicle operation plan change terminal 21), the on-site work plan system (on-site work plan change terminal 22), and the vehicle position monitoring server 30 are configured. Each device is executed by a processing device such as a CPU in accordance with a program realized by a so-called computer and stored in a recording medium. It should be noted that the vehicle position monitoring server seat, the central command device, and the ward office server are not only the case where each is an independent device as shown in FIG. 1, but the following processing is performed by one device in which these devices are integrated. It may be executed.

処理の概要を図2、図3に従って説明する。当日車両事故等の何かしらの要因でダイヤ計画や運用計画・車両運用計画が変更された場合、計画されていた平常運転時に鉄道運行計画を戻すための変更案を第1指令、第2指令と分けて段階的に作成する。   An outline of the processing will be described with reference to FIGS. If the schedule plan, operation plan, or vehicle operation plan is changed due to some factor such as a vehicle accident on the day, the proposed change to return the railway operation plan during normal operation was separated from the first and second directives. Create it step by step.

図2に第1指令の処理を示す。列車ダイヤ変更情報をもとに、車両の現在位置を特定し51、その情報をもとに車両運用計画を変更する52。   Fig. 2 shows the processing of the first command. Based on the train schedule change information, the current position of the vehicle is identified51, and the vehicle operation plan is changed based on the information52.

図3に第2指令の処理を示す。第1指令によって作成された車両運用計画から、各構内の構内作業計画を作成する53。第2指令で制約を守った構内作業計画が作成出来ない場合は、第1指令に車両運用計画の再作成を要求する。以下、第1指令の詳細を図2、図4、図6、図7、図8、図9を用いて、第2指令の詳細を図3、図5、図10、図11を用いてについて説明する。   Fig. 3 shows the processing of the second command. A yard work plan for each premises is created from the vehicle operation plan created by the first command53. If the on-site work plan that complies with the restrictions in the second command cannot be created, the first command is requested to recreate the vehicle operation plan. Details of the first command will be described below with reference to FIGS. 2, 4, 6, 7, 8, 8, and 9, and details of the second command will be described with reference to FIGS. 3, 5, 10, and 11. explain.

<第1指令の発明の動作(詳細)>
図2のステップ50において、図1に示す運行管理システムダイヤ変更端末11でダイヤ変更処理部を用いて変更された列車ダイヤ情報を、図1に示す中央指令装置10が検知する。ダイヤ変更処理部は、計画された列車ダイヤを変更する。具体的には、運行管理システムによって変更されたダイヤスジから、運行日付、列番をキーとして発着駅、発時間、着時間を保持する変更したダイヤ計画変更情報を作成し、ダイヤ変更情報を確定させる。
<Operation of the Invention of the First Command (Details)>
In step 50 of FIG. 2, the central command device 10 shown in FIG. 1 detects the train schedule information changed using the diagram change processing unit in the operation management system diagram change terminal 11 shown in FIG. The diagram change processing unit changes the planned train diagram. Specifically, from the schedule changed by the operation management system, the schedule schedule change information that holds the departure / arrival station, departure time, and arrival time is created using the operation date and column number as keys, and the schedule change information is confirmed. .

図2のステップ51において、図1に示す中央指令装置10が車両位置監視サーバ30に車両位置情報を要求し、車両位置監視サーバ30で車両位置情報取得処理部を用いて車両毎の位置情報を取得する。取得した車両位置情報を、図1に示す区所サーバ20に送り、車両運用管理システム車両運用変更端末21に表示する。   In step 51 of FIG. 2, the central command device 10 shown in FIG. 1 requests vehicle position information from the vehicle position monitoring server 30, and the vehicle position monitoring server 30 uses the vehicle position information acquisition processing unit to obtain position information for each vehicle. get. The acquired vehicle position information is sent to the ward office server 20 shown in FIG. 1 and displayed on the vehicle operation management system vehicle operation change terminal 21.

図2のステップ52において、図1に示す車両運用変更端末21で、運用計画変更処理部61、車両運用変更判断処理部62、車両の作業優先度判断処理部63、車両運用計画変更処理部64、当日の入区予定区所判定処理部65を用いて、計画された車両運用計画を変更する。区所毎に変更された車両運用計画は図1に示す区所サーバ20が取得する。ステップ52は、運用計画変更処理部61、車両運用変更判断処理部62、車両の作業優先度判断処理部63、車両運用計画変更処理部64、当日の入区予定区所判定処理部65からなる。以下、ステップ52の処理内容の詳細について、図4を用いて具体的に説明する。   2, at the vehicle operation change terminal 21 shown in FIG. 1, the operation plan change processing unit 61, the vehicle operation change determination processing unit 62, the vehicle work priority determination processing unit 63, the vehicle operation plan change processing unit 64 Then, the planned vehicle operation plan is changed using the scheduled entry determination section 65 on that day. The ward office server 20 shown in FIG. 1 acquires the vehicle operation plan changed for each ward office. Step 52 includes an operation plan change processing unit 61, a vehicle operation change determination processing unit 62, a vehicle work priority determination processing unit 63, a vehicle operation plan change processing unit 64, and a scheduled entry area determination processing unit 65 on that day. . Hereinafter, details of the processing contents of step 52 will be specifically described with reference to FIG.

図4のステップ61において、運用計画変更処理部61が、ダイヤ変更処理部50で変更された列車ダイヤ情報を組み合わせることで、運用計画を変更する。具体的には、変更したダイヤ計画変更情報をもとに、ダイヤ乱れが発生した時刻以降で、乱れた結果として車両運用計画の再作成が必要な区所から出区する運用の中で最初に出区する時刻を抽出する。抽出した時刻以降に運用予定のある運用全てに対して、運用日付と運用番号をキーとして運用に所属している列番を保持する運用計画変更情報を作成する。   In step 61 of FIG. 4, the operation plan change processing unit 61 changes the operation plan by combining the train diagram information changed by the diagram change processing unit 50. Specifically, based on the changed schedule plan change information, after the time when the schedule disruption occurs, the first operation in the operation that departs from the ward where the vehicle operation plan needs to be recreated as a result of the disruption. Extract the departure time. For all operations scheduled to be performed after the extracted time, create operation plan change information that holds the column numbers belonging to the operation with the operation date and operation number as keys.

図4のステップ62において、車両運用変更判断処理部62が、運用変更計画情報と車両位置情報をもとに、区所と時刻から、必要な数の車両が割り当てられるかを判断する。具体的には、運用変更計画情報と合わせて、予定の入出区時刻を把握出来る運用入出区計画情報を作成する。運用入出区計画情報は、運用日付と運用番号をキーとして運用に所属している入出区場所、入出区時刻を保持する情報である。運用入出区計画情報をもとに、車両運用計画が変更された後、出区する予定時刻に必要な車両が揃っているかを全区所で判断する。具体的には、車両運用計画が変更された時間から1日の運用が全て終了する時間までの間に、『運用に割り付けられていない車両数≧出区する運用数』を満たしていない区所が存在しないかを全区所で判断する。また、車両の作業優先度を考慮し、ある一定以上の作業優先度が設定されている車両については、運用に割り付ける対象としない。車両が割り当てられない場合は運用計画変更処理部61に計画の再作成を依頼するような動作を行う。   In step 62 of FIG. 4, the vehicle operation change determination processing unit 62 determines whether or not a necessary number of vehicles are allocated based on the operation change plan information and the vehicle position information from the ward and time. Specifically, together with the operation change plan information, the operation entry / exit plan information that can grasp the scheduled entry / exit time is created. The operation entry / exit plan information is information that holds an entry / exit location and entry / exit time belonging to the operation using the operation date and operation number as keys. Based on the operation entry / exit plan information, after the vehicle operation plan is changed, it is determined in all the wards whether or not the necessary vehicles are available at the scheduled time of departure. Specifically, the districts that do not satisfy "the number of vehicles not allocated to operation ≥ the number of operations to be released" between the time when the vehicle operation plan is changed and the time when all the daily operations are completed It is judged in all wards whether or not there exists. Further, in consideration of the work priority of the vehicle, a vehicle for which a work priority of a certain level or more is set is not a target to be assigned to operation. When the vehicle is not assigned, an operation is performed to request the operation plan change processing unit 61 to recreate the plan.

図4のステップ63において、車両の作業優先度判断処理部63が、車両運用計画の前段階として、車両毎の作業優先度(作業重要度、作業緊急度)を算出するような動作を行う。具体的には、当日施す予定の作業重要度と作業緊急度を掛け合わせた結果を総和したトータル作業優先度を車両毎に算出する。   In step 63 of FIG. 4, the work priority determination processing unit 63 of the vehicle performs an operation to calculate the work priority (work importance level, work urgency level) for each vehicle as a previous stage of the vehicle operation plan. Specifically, the total work priority is calculated for each vehicle by summing up the results of multiplying the work importance level scheduled for the day and the work urgency level.

図4のステップ64において車両運用計画変更処理部64が、車両の作業優先度判断処理部63によって算出された作業優先度を考慮して、作業優先度が低い車両から優先的に運用に割り付けを行い、車両運用計画を作成するような動作を行う。作業優先度が同じ車両が割り付けの候補になった場合は、車両運用計画変更後の最終の入区区所と計画されていた当日の入区予定区所を確認し、一致する車両を運用に割り付ける。具体的には、運用計画変更処理部61によって作成された運用計画変更情報をもとに、車両が割り当てられていない運用の中で、出区時刻が早い運用から、車両の割り当てを行う。車両の割り当てを行う際には、車両の作業優先度判断処理部63によって作成されたトータル作業優先度が1番低い車両を割り当て、車両IDと日付と運用番号をキーとして運用の開始列番を保持する車両運用計画変更後情報を作成する。この処理を車両が割り当てられていない運用がなくなるまで繰り返し行う。   In step 64 of FIG. 4, the vehicle operation plan change processing unit 64 takes into account the work priority calculated by the work priority determination processing unit 63 of the vehicle and assigns priority to the operation from the vehicle with the lower work priority. And perform an operation to create a vehicle operation plan. If a vehicle with the same work priority becomes a candidate for assignment, check the final entry ward after the change of the vehicle operation plan and the planned entry ward on that day, and assign the matching vehicle to operation. . Specifically, based on the operation plan change information created by the operation plan change processing unit 61, the vehicle is assigned from the operation with the earlier departure time in the operation in which no vehicle is assigned. When assigning vehicles, assign the vehicle with the lowest total work priority created by the work priority judgment processing unit 63 of the vehicle, and use the vehicle ID, date, and operation number as the key for the operation start column number. Create post-change vehicle operation plan information to be retained. This process is repeated until there is no operation to which no vehicle is assigned.

図4のステップ65において、当日の入区予定区所判定処理部65が、車両運用計画変更後の最終の入区区所と計画されていた当日の入区予定区所が一致しているかを判断する。一致していない場合は、運用計画を変更する動作を行う。具体的には、入区予定区所と車両運用計画変更後情報の最終の入区区所が異なる場合は、その車両を抽出する。抽出された車両毎に、入区予定区所と同じ区所に入区出来るように変更するため、変更する相手の車両と変更可能時間を算出し、車両運用計画変更後情報を変更する。変更する場合は、車両運用計画変更後情報の開始列番を変更することで運用を分割することも可能である。   In step 65 of FIG. 4, the scheduled entry determination section 65 on the day determines whether the final entry ward after the vehicle operation plan change matches the planned entry ward on the day. To do. If they do not match, the operation plan is changed. Specifically, when the planned entry zone and the final entry zone of the information after the vehicle operation plan change are different, the vehicle is extracted. In order to change for each extracted vehicle so that it can enter the same ward as the ward scheduled ward, the other vehicle to be changed and the changeable time are calculated, and the information after changing the vehicle operation plan is changed. When changing, it is also possible to divide the operation by changing the starting column number of the information after the vehicle operation plan change.

車両運用計画が立てられない場合は、運用計画変更処理部61に計画の再作成を依頼するような動作を行う。   When a vehicle operation plan cannot be established, an operation is performed to request the operation plan change processing unit 61 to recreate the plan.

以下、具体例を用いて上記のステップ52の処理フローを説明する。   Hereinafter, the processing flow of step 52 will be described using a specific example.

運用計画が変更される前の列車ダイヤ情報、運用計画情報を図7(a)、車両計画情報を図8、車両運用計画情報を図9に示す。運用計画が変更されなければ、この列車ダイヤ情報と車両運用計画情報をもとに、鉄道運行計画に関する業務が行われる。現在の計画では、列車ダイヤの102M、1M、10M、13Mから成る101運用、列車ダイヤの2M、5M、8M、11M、16Mから成る102運用、列車ダイヤの3M、6M、7M、14Mから成る103運用、列車ダイヤの101M、4M、9M、12M、15Mから成る104運用の4つの運用計画から成る。これらの運用計画は、それぞれの車両に割り付けられている。101運用は車両1、102運用は車両2、103運用は車両3、104運用は車両4、当日走行しない予備運用は車両5に割り付けられている。   FIG. 7 (a) shows train schedule information and operation plan information before the operation plan is changed, FIG. 8 shows vehicle plan information, and FIG. 9 shows vehicle operation plan information. If the operation plan is not changed, the work related to the railway operation plan is performed based on the train schedule information and the vehicle operation plan information. The current plan is 101 operation consisting of 102M, 1M, 10M and 13M train schedules, 102 operation consisting of 2M, 5M, 8M, 11M and 16M train schedules, 103 consisting of 3M, 6M, 7M and 14M train schedules The operation plan consists of four operation plans of 104 operations consisting of 101M, 4M, 9M, 12M and 15M of train schedules. These operation plans are assigned to each vehicle. 101 operation is assigned to vehicle 1, 102 operation is assigned to vehicle 2, 103 operation is assigned to vehicle 3, 104 operation is assigned to vehicle 4, and spare operation that does not run on the day is assigned to vehicle 5.

ここで、図7(b)に示すように、08:20に1Mが遅延し、B駅到着予定時間がダイヤ変更処理部50によって08:30から09:15に変更されたとする。その影響で、後続の列車である3MのB駅到着予定時間が08:45から09:30に変更され、5MのB駅到着予定時間が09:30から09:45に変更される。   Here, as shown in FIG. 7 (b), it is assumed that 1M is delayed at 08:20, and the estimated arrival time at station B is changed from 08:30 to 09:15 by the diagram change processing unit 50. As a result, the arrival time of 3M B station, the following train, is changed from 08:45 to 09:30, and the estimated arrival time of 5M B station is changed from 09:30 to 09:45.

運用計画情報は、遅延が発生した時刻である08:20以降で、列車ダイヤ情報が変更され、本来入区する予定だったB駅から、出区する必要がある運用の最初に出区する時刻を抽出した後に、運用計画変更処理部61によって、次のように運用計画情報を変更する。
(a)12:30にB駅から出区し10M以降の列車ダイヤを走行する101運用
(b)10:00にB駅から出区し8M以降の列車ダイヤを走行する102運用
(c)09:00にB駅から出区し6M以降の列車ダイヤを走行する103運用
(d)13:30にB駅から出区し12M以降の列車ダイヤを走行する104運用
車両運用変更判断処理部62によって、B駅に留置されている車両よりB駅から出区する運用数が少ないことを判定する。判定の結果、09:00にB駅から出区し6M以降の列車ダイヤを走行する102運用に割り付けることが出来る車両は車両5しかない。しかしながら、車両5の作業優先度は50(図8参照)と一定値(図6参照)を超えており、車両に割り付けることが出来ない。そのため、ダイヤ変更処理部50に6Mの発時刻を09:00から09:15に変更するように依頼する。
The operation plan information is after 08:20, which is the time when the delay occurred, and the time when the train schedule information is changed and it is necessary to leave from the B station that was originally scheduled to enter the operation. Then, the operation plan change processing unit 61 changes the operation plan information as follows.
(a) 101 operation that departs from B station at 12:30 and travels on a train schedule after 10M
(b) 102 operations that depart from station B at 10:00 and travel on a train schedule after 8M
(c) 103 operations that depart from station B at 09:00 and travel on a train schedule after 6M
(d) 104 operations that depart from B station at 13:30 and run on the train schedule of 12M or later By the vehicle operation change judgment processing unit 62, the number of operations that depart from B station from the vehicles detained at B station is Judge that there are few. As a result of the determination, there is only the vehicle 5 that can be assigned to 102 operations that depart from the B station at 09:00 and travel on the train schedule after 6M. However, the work priority of the vehicle 5 is 50 (see FIG. 8), which exceeds a certain value (see FIG. 6), and cannot be assigned to the vehicle. Therefore, the diagram change processing unit 50 is requested to change the departure time of 6M from 09:00 to 09:15.

ダイヤ変更処理部50によって、6Mの発時刻を09:00から09:15に変更しても輸送計画上問題ないかを判断する。問題なしと判断された場合、運用計画変更処理部61によって、「(c)09:15にB駅から出区し6M以降の列車ダイヤを走行する103運用」を再作成する。その後、車両運用変更判断処理部62によって、B駅に留置されている車両よりB駅から出区する運用数が少ないことを判定する。判定の結果、問題なしとなる。   The diagram change processing unit 50 determines whether there is no problem in the transportation plan even if the 6M departure time is changed from 09:00 to 09:15. When it is determined that there is no problem, the operation plan change processing unit 61 re-creates “(c) 103 operation that departs from station B at 09:15 and travels on a train schedule after 6M”. Thereafter, the vehicle operation change determination processing unit 62 determines that the number of operations leaving from the B station is smaller than the vehicles detained at the B station. As a result of the determination, there is no problem.

車両の作業優先度判断処理部63によって、車両1〜車両5の作業優先度を算出する。
(a)車両1:当日が検査リミット日の仕業検査、車内清掃が予定されている。
(b)車両2:当日が検査リミット日前日の仕業検査が予定されている。
(c)車両3:翌日が検査リミット日前日の仕業検査が予定されている。
(d)車両4:翌日が検査リミット日前日の仕業検査が予定されている。
(e)車両5:翌日が検査リミット日前日の交番検査が予定されている。
これらの車両の作業予定から、図6に示す作業重要度、作業優先度をもとに作業優先度を算出すると、以下のようになる。
(1)車両1:作業優先度31
(2)車両2:作業優先度15
(3)車両3:作業優先度15
(4)車両4:作業優先度15
(5)車両5:作業優先度50
車両運用計画変更処理部64によって、運用101〜運用104に車両1〜車両5を割り付ける。出区時間が早い運用から、車両を割り付けていく。
The work priority determination processing unit 63 of the vehicle calculates the work priority of the vehicles 1 to 5.
(a) Vehicle 1: The inspection inspection and cleaning of the inside of the vehicle are scheduled on the day of inspection.
(b) Vehicle 2: A work inspection is scheduled for the day before the inspection limit date.
(c) Vehicle 3: The next day is scheduled for work inspection the day before the inspection limit date.
(d) Vehicle 4: The next day is scheduled for work inspection the day before the inspection limit date.
(e) Vehicle 5: The next day is scheduled for an alternating inspection the day before the inspection limit date.
When the work priority is calculated based on the work importance and work priority shown in FIG. 6 from the work schedules of these vehicles, it is as follows.
(1) Vehicle 1: Work priority 31
(2) Vehicle 2: Work priority 15
(3) Vehicle 3: Work priority 15
(4) Vehicle 4: Work priority 15
(5) Vehicle 5: Work priority 50
The vehicle operation plan change processing unit 64 assigns the vehicles 1 to 5 to the operations 101 to 104. Vehicles will be allocated from operations with early departure times.

(A)「09:15にB駅から出区し6M以降の列車ダイヤを走行する103運用に車両を割り付ける」09:15時点でB駅に留置されている車両は、車両1、車両5である。それぞれの車両の作業優先度は、車両1で31、車両5で50なので、車両1を割り付ける。   (A) `` Vehicles assigned to 103 operations that depart from station B at 09:15 and travel on a train schedule of 6M or later '' Vehicles detained at station B at 09:15 are vehicles 1 and 5 is there. Since the work priority of each vehicle is 31 for vehicle 1 and 50 for vehicle 5, vehicle 1 is assigned.

(B)「10:00にB駅から出区し8M以降の列車ダイヤを走行する102運用に車両を割り付ける」10:00時点でB駅に留置されている車両は、車両2、車両3、車両5である。それぞれの車両の作業優先度は、車両2で15、車両3で15、車両5で50なので、車両2、車両3が割り付け候補となる。このように作業優先度が同じ場合は、車両の入区予定区所と運用の入区区所を比較し、同じものがあれば、その車両を優先的に割り付ける。この具体例の場合、車両2の入区予定区所はA駅、車両3の入区予定区所はA駅で、運用の入区区所はA駅なので、車両2、車両3が割り付け候補となる。車両2、車両3のうち、もとの計画で102運用に割り付けられていた車両である車両2を割り付ける。   (B) `` Depart from B station at 10:00 and assign the vehicle to 102 operation running on the train schedule after 8M '' Vehicles detained at B station at 10:00 are Vehicle 2, Vehicle 3, Vehicle 5; Since the work priority of each vehicle is 15 for vehicle 2, 15 for vehicle 3, and 50 for vehicle 5, vehicle 2 and vehicle 3 are candidates for assignment. In this way, when the work priorities are the same, the planned entry area of the vehicle and the operation entry area are compared, and if there is the same, the vehicle is preferentially assigned. In this specific example, the planned entry zone for vehicle 2 is A station, the planned entry zone for vehicle 3 is A station, and the operational entry district is A station, so vehicle 2 and vehicle 3 are assigned candidates. Become. Of vehicle 2 and vehicle 3, vehicle 2 which is a vehicle that was allocated to 102 operations in the original plan is allocated.

(C)「12:30にB駅から出区し10M以降の列車ダイヤを走行する101運用に車両を割り付ける」12:30時点でB駅に留置されている車両は、車両3、車両4、車両5である。それぞれの車両の作業優先度は、車両3で15、車両4で15、車両5で50なので、車両3、車両4が割り付け候補となる。車両3の入区予定区所はA駅、車両4の入区予定区所はB駅で、運用の入区区所はB駅なので、車両4を割り付ける。   (C) `` Depart from B station at 12:30 and assign the vehicle to 101 operation running on 10M or later train diagram '' Vehicles detained at B station as of 12:30 are vehicle 3, vehicle 4, Vehicle 5; Since the work priority of each vehicle is 15 for vehicle 3, 15 for vehicle 4, and 50 for vehicle 5, vehicle 3 and vehicle 4 are candidates for assignment. The planned entry zone for vehicle 3 is A station, the scheduled entry zone for vehicle 4 is B station, and the operation entry zone is B station.

(D)「13:30にB駅から出区し12M以降の列車ダイヤを走行する104運用に車両を割り付ける」13:30時点でB駅に留置されている車両は、車両3、車両5である。それぞれの車両の作業優先度は、車両3で15、車両5で50なので、車両3を割り付ける。   (D) `` Depart from B station at 13:30 and assign the vehicle to 104 operations running on the train schedule after 12M '' Vehicles detained at B station as of 13:30 are vehicles 3 and 5 is there. Since the work priority of each vehicle is 15 for vehicle 3 and 50 for vehicle 5, vehicle 3 is assigned.

全ての運用に車両が割り当たったため、車両運用計画変更は完了となる。   Since the vehicle is assigned to all operations, the vehicle operation plan change is completed.

当日の入区予定区所判定処理部65によって、車両運用計画変更後の最終の入区区所と計画されていた当日の入区予定区所が一致しているかを判断する。
(a)車両1:予定入区区所(B駅)→車両運用計画変更後の最終の入区区所(A駅)
(b)車両2:予定入区区所(A駅)→車両運用計画変更後の最終の入区区所(A駅)
(c)車両3:予定入区区所(A駅)→車両運用計画変更後の最終の入区区所(B駅)
(d)車両4:予定入区区所(B駅)→車両運用計画変更後の最終の入区区所(B駅)
(e)車両5:予定入区区所(B駅)→車両運用計画変更後の最終の入区区所(B駅)
車両1と車両3の入区区所が一致していないため、この車両の運用変更が出来るタイミングを算出する。算出した結果、12:00〜13:30にB駅に留置されるので、このタイミングで車両運用計画変更を行う。
The scheduled entry determination section 65 on the day determines whether the final entry ward after the vehicle operation plan change matches the planned entry ward on the day.
(a) Vehicle 1: Scheduled entry ward (B station) → Final entry ward after change of vehicle operation plan (A station)
(b) Vehicle 2: Scheduled entry ward (A station) → Final entry ward after change of vehicle operation plan (A station)
(c) Vehicle 3: Planned entry ward (A station) → Final entry ward after change of vehicle operation plan (B station)
(d) Vehicle 4: Scheduled entry ward (B station) → Final entry ward after change of vehicle operation plan (B station)
(e) Vehicle 5: Scheduled entry ward (B station) → Final entry ward after change of vehicle operation plan (B station)
Since the ward districts of the vehicle 1 and the vehicle 3 do not match, the timing at which the operation of the vehicle can be changed is calculated. As a result of the calculation, the vehicle operation plan is changed at this timing because it is detained at B station from 12:00 to 13:30.

運用計画変更処理部61、車両運用計画変更処理部64によって、12:00以降、運用103、運用104に車両1、車両3を再度割り付ける。まず、運用計画変更処理部61によって、12:00を挟んで車両1に割り付けていた運用103を分割し、7Mまでの運用である運用103−1と、14Mからの運用である運用103−2とする。   The operation plan change processing unit 61 and the vehicle operation plan change processing unit 64 reassign the vehicle 1 and the vehicle 3 to the operation 103 and the operation 104 after 12:00. First, the operation plan change processing unit 61 divides the operation 103 assigned to the vehicle 1 across 12:00, and operation 103-1 that is operation up to 7M and operation 103-2 that is operation from 14M. And

車両運用計画変更処理部64によって、分割した運用103−2を車両3に、運用104を車両1に割り付ける。この結果、車両運用計画変更後の最終の入区区所と計画されていた当日の入区予定区所が全て一致し、無駄な回送運転を回避することが出来た。   The divided operation 103-2 is assigned to the vehicle 3 and the operation 104 is assigned to the vehicle 1 by the vehicle operation plan change processing unit 64. As a result, the final ward ward after the vehicle operation plan change and the planned ward ward on the day all coincided, and unnecessary forwarding operation could be avoided.

<第2指令の発明の動作(詳細)>
図3のステップ53において、図1に示す構内作業計画システム構内作業計画変更端末22が区所サーバ20に格納された図9のような車両運用計画情報を取得し、構内作業計画自動変更処理部71、構内作業計画翌日移動処理部72、構内作業計画手動変更処理部73を用いて、計画された構内作業計画を変更する。ステップ53は、構内作業計画自動変更処理部71、構内作業計画翌日移動処理部72、構内作業計画手動変更処理部73からなる。以下、詳細を具体的に記載する。
<Operation of the Invention of the Second Command (Details)>
In step 53 of FIG. 3, the on-site work plan system on-site work plan change terminal 22 shown in FIG. 1 acquires the vehicle operation plan information as shown in FIG. 71. The planned on-site work plan is changed using the on-site work plan next day movement processing unit 72 and the on-site work plan manual change processing unit 73. Step 53 includes a local work plan automatic change processing unit 71, a local work plan next day movement processing unit 72, and a local work plan manual change processing unit 73. Details will be specifically described below.

図5のステップ71において、構内作業計画自動変更処理部71が、図11の区所毎の構内制約(作業標準時間、作業標準必須人数、区所施設制約)を考慮し、構内作業計画を変更する動作を行う。具体的には、区所IDをキーとして作業毎の作業標準時間を保持する作業標準時間情報、区所IDをキーとして作業毎の標準必須人数を保持する作業標準必須人数情報、区所IDをキーとして区所の最大作業可能数を保持する区所施設制約情報の3つの制約情報をもとに構内作業計画情報を作成する。構内作業計画情報とは、区所IDと車両IDをキーとして当日実施予定の作業の作業名、作業開始時間、作業終了時間を保持する情報である。制約情報から外れる場合は、余裕がある時間帯に作業実施時間を移動する動作を行う。   In step 71 of FIG. 5, the on-site work plan automatic change processing unit 71 changes the on-site work plan in consideration of the on-site restrictions (work standard time, work standard required number of persons, and ward facility restrictions) for each ward in FIG. To perform the operation. Specifically, the work standard time information for holding the work standard time for each work using the ward ID as a key, the work standard mandatory number information for holding the standard required number of persons for each work using the ward ID as a key, and the ward ID The on-site work plan information is created based on the three pieces of constraint information of the facility and facility constraint information that holds the maximum work capacity of the city and district as a key. The on-site work plan information is information that holds the work name, work start time, and work end time of work scheduled to be performed on the day using the ward ID and vehicle ID as keys. When it deviates from the constraint information, an operation is performed to move the work execution time in a time zone with a margin.

図5のステップ72において、構内作業計画翌日移動処理部72が、当日、作業が出来なくて、検査周期期限が当日でない場合は、翌日に作業予定を変更する動作を行う。具体的には、車両運用計画が変更になり車両に予定されていた作業が全て実施出来ない場合は、作業優先度が低い作業から翌日の構内作業計画に移動する。   In step 72 in FIG. 5, the on-site work plan next day movement processing unit 72 performs an operation of changing the work schedule on the next day when the work cannot be performed on that day and the inspection period is not on that day. Specifically, when the vehicle operation plan is changed and all the work scheduled for the vehicle cannot be performed, the work moves from the work with the lower work priority to the next day's on-site work plan.

図5のステップ73において構内作業計画手動変更処理部73が、ステップ71、ステップ72で自動計画された構内作業計画を、構内作業計画者が変更出来る動作を行う。具体的には、システムが移動した後は、構内作業計画者が確認し、計画の変更を行うことも可能とする。制約を超えている場合でも、構内作業計画者が作業可能と判断した場合は、作業を追加、修正、削除をすることが出来る。   In step 73 of FIG. 5, the on-site work plan manual change processing unit 73 performs an operation that allows the on-site work planner to change the on-site work plan automatically planned in steps 71 and 72. Specifically, after the system is moved, the on-site work planner can confirm and change the plan. Even if the limit is exceeded, if the on-site work planner determines that the work can be performed, the work can be added, modified, or deleted.

また、構内作業計画が指定の構内制約を超える状態が解決しない場合は、車両運用計画変更処理部64に車両運用計画の再作成を依頼するような動作を行う。   Further, when the state where the on-site work plan exceeds the specified on-site constraint cannot be resolved, an operation is performed to request the vehicle operation plan change processing unit 64 to recreate the vehicle operation plan.

以下、具体例を用いて上記のステップ53の処理フローを説明する。   Hereinafter, the processing flow of step 53 will be described using a specific example.

車両運用計画が変更される前の構内作業計画を図10(a)に示す。車両運用計画が変更されなければ、この計画通りに構内作業に関する業務が行われる。しかし、1Mの遅延に起因するダイヤ計画の変更により、図10(b)のように車両運用計画が変更された。そのため、車両1で08:45から09:45の間に予定されていた仕業検査、16:00から17:30の間に予定されていた車内清掃、車両4で12:15から13:15の間に予定されていた仕業検査が実施出来なくなる。また、この区所の作業員は、10人で、08:30から17:30が勤務時間であるという前提である。   FIG. 10 (a) shows the on-site work plan before the vehicle operation plan is changed. If the vehicle operation plan is not changed, the work related to the on-site work is performed as planned. However, the vehicle operation plan was changed as shown in Fig. 10 (b) due to the change in the diagram plan due to the delay of 1M. Therefore, the work inspection scheduled for 08:45 to 09:45 in vehicle 1, the interior cleaning scheduled for 16:00 to 17:30, and 12:15 to 13:15 in vehicle 4 The scheduled work inspection cannot be performed. It is assumed that there are 10 workers in this ward and that working hours are from 08:30 to 17:30.

そこで、構内作業計画自動変更処理部71によって、B駅の構内制約(図11参照。)をもとに、車両1の仕業検査を11:00から12:00の間に、車両4の仕業検査を16:30から17:30の間に行うように予定を自動で変更する。車両3の仕業検査も車両1の仕業検査の変更のため、13:00から14:00の間に行うように予定を自動で変更する。   Therefore, the in-house work plan automatic change processing unit 71 performs the inspection of vehicle 4 between 11:00 and 12:00 based on the in-house restrictions at station B (see Fig. 11). The schedule is automatically changed so that it is performed between 16:30 and 17:30. The schedule of the inspection of the vehicle 3 is automatically changed so that the inspection of the inspection of the vehicle 3 is performed between 13:00 and 14:00 in order to change the inspection of the vehicle 1.

車両1の車内清掃は作業を実施する時間がないため、構内作業計画翌日移動処理部72によって、翌日の構内作業計画に移動される。   Since the cleaning of the inside of the vehicle 1 does not have time to carry out the work, the on-site work plan next day movement processing unit 72 moves to the next day's on-site work plan.

この構内作業計画は、構内作業計画手動変更処理部73によって変更可能である。   This local work plan can be changed by the local work plan manual change processing unit 73.

10:中央指令装置、11:ダイヤ変更端末、20:区所サーバ、21:車両運用計画変更端末、22:構内計画変更端末、30:車両位置監視サーバ 10: Central command device, 11: Timetable change terminal, 20: Ward office server, 21: Vehicle operation plan change terminal, 22: Campus plan change terminal, 30: Vehicle position monitoring server

Claims (6)

列車ダイヤの変更に伴う鉄道運行計画を再作成する車両運用管理方法であって、
列車ダイヤの変更情報を受信するステップと、
当該変更されたダイヤに関連する列車の車両位置情報を取得するステップと、
前記列車の車両位置情報と前記列車ダイヤの変更情報とから当該車両と前記ダイヤとの紐付けに関する車両運用の変更要否を判断するステップと、
前記変更要否判断が要の場合に、前記車両運用の変更が必要になる区所の情報と、当該区所から出区可能な運用パターンを示す運用情報とから、当該車両についての新たな運用を選択するステップと、
を備える車両運用管理方法。
A vehicle operation management method for re-creating a railway operation plan accompanying a change in train schedule,
Receiving train schedule change information; and
Obtaining vehicle position information of a train related to the changed diamond;
Determining whether or not to change the vehicle operation related to the association between the vehicle and the diamond from the vehicle position information of the train and the change information of the train diagram;
When it is necessary to determine whether or not the change is necessary, a new operation for the vehicle is performed based on the information on the ward where the change of the vehicle operation is required and the operation information indicating the operation pattern that can be departed from the ward. A step of selecting
A vehicle operation management method comprising:
請求項1に記載の車両運用管理方法において、
前記新たな運用を選択するステップでは、複数の前記運用パターンのなかから、当該区所から出区する中で最初に出区する時刻を抽出し、新たな車両運用を作成することを特徴とする車両運用管理方法。
In the vehicle operation management method according to claim 1,
In the step of selecting a new operation, a time when the vehicle first departs from the plurality of operation patterns is extracted and a new vehicle operation is created. Vehicle operation management method.
請求項1又は2に記載の車両運用管理方法において、
前記新たな運用を選択するステップの後に、前記車両の整備に関する構内情報を参照し、当該選択された運用が構内制約を満たしているかを判断するステップを更に備えることを特徴とする車両運用管理方法。
In the vehicle operation management method according to claim 1 or 2,
After the step of selecting the new operation, the vehicle operation management method further comprises a step of referring to the premises information relating to the maintenance of the vehicle and determining whether the selected operation satisfies a premises constraint. .
列車ダイヤの変更に伴う鉄道運行計画を再作成する車両運用管理サーバであって、
列車ダイヤの変更情報を受信する受信部と、
当該変更されたダイヤに関連する列車の車両位置情報を取得する取得部と、
前記列車の車両位置情報と前記列車ダイヤの変更情報とから当該車両と前記ダイヤとの紐付けに関する車両運用の変更要否を判断する判断部と、
前記変更要否判断が要の場合に、前記車両運用の変更が必要になる区所の情報と、当該区所から出区可能な運用パターンを示す運用情報とから、当該車両についての新たな運用を選択する運用設定部と、
を備える車両運用管理サーバ。
A vehicle operation management server that recreates a railway operation plan accompanying a change in train schedule,
A receiver for receiving train schedule change information;
An acquisition unit for acquiring vehicle position information of a train related to the changed diamond;
A determination unit for determining whether or not to change the vehicle operation related to the association between the vehicle and the diamond from the vehicle position information of the train and the change information of the train diagram;
When it is necessary to determine whether or not the change is necessary, a new operation for the vehicle is performed based on the information on the ward where the change of the vehicle operation is required and the operation information indicating the operation pattern that can be departed from the ward. An operation setting section for selecting
A vehicle operation management server comprising:
請求項4に記載の車両運用管理サーバにおいて、
前記運用設定部は、複数の前記運用パターンのなかから、当該区所から出区する中で最初に出区する時刻を抽出し、新たな車両運用を作成することを特徴とする車両運用管理サーバ。
In the vehicle operation management server according to claim 4,
The operation setting unit extracts a time of first departure from a plurality of the operation patterns, and creates a new vehicle operation. .
請求項4又は5に記載の車両運用管理サーバにおいて、
前記車両の整備に関する構内情報を参照し、前記選択された運用が構内制約を満たしているかを判断する構内
ステップを更に備えることを特徴とする車両運用管理サーバ。
In the vehicle operation management server according to claim 4 or 5,
A vehicle operation management server further comprising a premises step of referring to premises information relating to the maintenance of the vehicle and determining whether the selected operation satisfies a premises constraint.
JP2010197262A 2010-09-03 2010-09-03 Vehicle operation management method and server Active JP5746840B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2010197262A JP5746840B2 (en) 2010-09-03 2010-09-03 Vehicle operation management method and server
EP11178991.3A EP2426027B1 (en) 2010-09-03 2011-08-26 Vehicle operation management method and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010197262A JP5746840B2 (en) 2010-09-03 2010-09-03 Vehicle operation management method and server

Publications (2)

Publication Number Publication Date
JP2012051519A true JP2012051519A (en) 2012-03-15
JP5746840B2 JP5746840B2 (en) 2015-07-08

Family

ID=44674332

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010197262A Active JP5746840B2 (en) 2010-09-03 2010-09-03 Vehicle operation management method and server

Country Status (2)

Country Link
EP (1) EP2426027B1 (en)
JP (1) JP5746840B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014151849A (en) * 2013-02-13 2014-08-25 Hitachi Ltd Vehicle allocation candidate extraction method and system
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2016203873A (en) * 2015-04-24 2016-12-08 株式会社日立製作所 Resource application plan support device and resource application plan support method
JP2017081264A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting system for vehicle operation
JP2017081263A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Vehicle utilization business support apparatus and vehicle utilization business support system
JP2017081267A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Vehicle operation business support system and vehicular cleaning plan generation method
JP2017081268A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting device for vehicle operation
JP2017081266A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting apparatus for vehicle operation and business assisting system for vehicle operation
JP2018090136A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application business support system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10352720B2 (en) 2013-08-28 2019-07-16 Here Global B.V. Method and apparatus for assigning vehicles to trips

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04118358A (en) * 1990-09-07 1992-04-20 Toshiba Corp Train operational regulating system
JPH0966833A (en) * 1995-09-04 1997-03-11 Toshiba Transport Eng Kk Train operation managing device
JPH09226588A (en) * 1996-02-23 1997-09-02 Mitsubishi Electric Corp Train operation control system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944986A (en) * 1969-06-05 1976-03-16 Westinghouse Air Brake Company Vehicle movement control system for railroad terminals
CA2420407C (en) * 2000-08-23 2012-04-17 General Electric Company Method and system for servicing a selected piece of equipment having unique system configurations and servicing requirements
US8292172B2 (en) * 2003-07-29 2012-10-23 General Electric Company Enhanced recordation device for rail car inspections
WO2006099387A2 (en) * 2005-03-14 2006-09-21 General Electric Company A system and method for railyard planning

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04118358A (en) * 1990-09-07 1992-04-20 Toshiba Corp Train operational regulating system
JPH0966833A (en) * 1995-09-04 1997-03-11 Toshiba Transport Eng Kk Train operation managing device
JPH09226588A (en) * 1996-02-23 1997-09-02 Mitsubishi Electric Corp Train operation control system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014151849A (en) * 2013-02-13 2014-08-25 Hitachi Ltd Vehicle allocation candidate extraction method and system
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2016203873A (en) * 2015-04-24 2016-12-08 株式会社日立製作所 Resource application plan support device and resource application plan support method
JP2017081264A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting system for vehicle operation
JP2017081263A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Vehicle utilization business support apparatus and vehicle utilization business support system
JP2017081267A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Vehicle operation business support system and vehicular cleaning plan generation method
JP2017081268A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting device for vehicle operation
JP2017081266A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting apparatus for vehicle operation and business assisting system for vehicle operation
JP2018090136A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application business support system

Also Published As

Publication number Publication date
JP5746840B2 (en) 2015-07-08
EP2426027A2 (en) 2012-03-07
EP2426027A3 (en) 2014-03-12
EP2426027B1 (en) 2014-11-05

Similar Documents

Publication Publication Date Title
JP5746840B2 (en) Vehicle operation management method and server
US8082071B2 (en) System and method of multi-generation positive train control system
US7813846B2 (en) System and method for railyard planning
WO2019078025A1 (en) Timetable preparation device and automatic train control system
JP5075577B2 (en) Vehicle operation plan creation apparatus and method
CN101513891B (en) Method for automatic route processing in train running control
EP2873586A1 (en) Method for selecting alternate operating route for train, and system therefor
KR20130012828A (en) Routeinformation providing system of complex public transport using public transportation schedules
JP2008222004A (en) Operation arrangement apparatus in operation management system
JP2010221839A (en) Train operation prediction device
JP7273524B2 (en) Operation management system
JP7022039B2 (en) Vehicle allocation support systems, methods, and programs
JP2018090139A (en) Vehicle application business support system
JP5271139B2 (en) Diamond management method, program, and diamond management apparatus
CN201338637Y (en) Access automatic processing device
JP6788488B2 (en) Vehicle operation business support system
JP2008184032A (en) Diagram preparation device
JP2017154536A (en) Crew operation management system and crew operation management method
JP2018062249A (en) Vehicle operation business assistance system
Pellegrini et al. Real-time railway traffic management optimization and imperfect information: preliminary studies
JP4221254B2 (en) Vehicle base diamond creation device
JP2017213969A (en) Train operation work assisting system
JPH04118358A (en) Train operational regulating system
JP6887281B2 (en) Passenger guidance system and passenger guidance method
Kroon et al. Algorithmic support for disruption management at Netherlands Railways

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20120518

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130204

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140314

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140819

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150414

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150511

R151 Written notification of patent or utility model registration

Ref document number: 5746840

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151