JP2011134287A - Construction performance rating simulation system - Google Patents
Construction performance rating simulation system Download PDFInfo
- Publication number
- JP2011134287A JP2011134287A JP2009299566A JP2009299566A JP2011134287A JP 2011134287 A JP2011134287 A JP 2011134287A JP 2009299566 A JP2009299566 A JP 2009299566A JP 2009299566 A JP2009299566 A JP 2009299566A JP 2011134287 A JP2011134287 A JP 2011134287A
- Authority
- JP
- Japan
- Prior art keywords
- construction
- item
- evaluation
- construction performance
- user terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本発明は、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものである。 The present invention enables the contractor (user) to simulate the current status and target of the construction results before construction or during construction so that the contractor (user) can achieve high evaluation of the construction results, and can also provide related consulting services in the simulation. It relates to the construction performance rating simulation system.
工事成績評定とは、公共機関が工事完成後に請負業者に対して、当該工事の評価をするもので、施工会社の適正な選定及び指導育成に資することを目的として実施されている。国より「公共工事の入札及び契約の適正化の促進に関する法律(平成12年11月27日付け法律第127号)」(以下「適化法」という)が、平成13年4月1日より施行されいる。その主な目的は、「公共工事の入札・契約の適正化の促進」「公共工事に対する国民の信頼の確保」「建設業の健全な発達」を図ることにある。この法律による公共工事においては、一括下請負が全面的に禁止となり、また、公共工事の発注者は工事現場の施工体制を適正なものとするため、点検その他の必要な措置を講じるように義務付けられている。 The construction performance evaluation is carried out for the purpose of contributing to the appropriate selection and instruction training of the construction company, where the public institution evaluates the contractor after the completion of the construction. From April 1, 2001, the “Law Concerning Promotion of Public Construction Bidding and Contract Optimization (Law No. 127, dated November 27, 2000)” (hereinafter referred to as the “Adaptation Law”) It is enforced. Its main purpose is to “promote the appropriateness of tenders and contracts for public works”, “ensure public confidence in public works” and “sound development of construction industry”. In public works under this law, lump-sum subcontracting is completely prohibited, and public works contractors are obliged to take inspections and other necessary measures to ensure that the construction system at the construction site is appropriate. It has been.
これにともない、国土交通省でも各都道府県において新しく「請負工事成績評定要領」を制定し「適化法」への対応を行ってきている。また、平成17年には、「公共工事の品質確保の促進に関する法律」が施行され、その施策として「総合評価落札方式」による入札が広く普及してきた。総合評価落札方式における評価項目の一つに、過去の工事成績評定があり、この工事成績評定の重みが、単なる表彰対象の選定から、次の仕事を受注するための重要な要素へと変化し注目を集めている。 In line with this, the Ministry of Land, Infrastructure, Transport and Tourism has newly established the “Contract Construction Performance Rating Guidelines” in each prefecture to respond to the “Adaptation Law”. In 2005, the “Act on Promotion of Public Works Quality Assurance” was enacted, and as a measure for this, bidding by the “Comprehensive Evaluation Bidding Method” has become widespread. One of the evaluation items in the overall evaluation bidding method is the past construction performance rating, and the weight of this construction performance rating changes from simply selecting the award object to an important factor for receiving the next job. It attracts attention.
現場技術者の業務は、一般に「品質管理」「原価管理」「工程管理」「安全管理」「環境管理」と言われるが、この工事成績評定には「原価管理」以外の要素が含まれている事から、工事成績評定をベースとしたマネジメント体制が築ければ、技術力の高い建設会社によって、より良質な社会資本を整備できる事が期待される。 The work of site engineers is generally called “quality control”, “cost control”, “process control”, “safety control”, and “environmental control”, but this construction performance evaluation includes elements other than “cost control”. Therefore, if a management system based on construction performance evaluation is established, it is expected that high-quality social capital can be improved by a construction company with high technical capabilities.
先行特許文献1には、「複数の端末機器を通信回線により相互に接続して構築されるネットワークを介して、企業会員が、公的機関の発注に係る入札予報情報、落札結果情報、入札に参加する建設業許可業者の企業情報を検索・閲覧できる入落札情報提供システムにおいて、前記入落札情報に加えて、入札に参加する建設業許可業者を除く他の建設業許可業者の企業情報と、民間建設に係る建設着工情報や建設計画情報及び建設確認申請情報と、公的機関の発注に係る入落札、及び、建設業に関する新聞記事情報と、建設関連資料情報とが検索・閲覧できるように構成し、企業会員の必要とされる入落札情報を提供するようにした入落札情報提供システム」が記載されている。 The
そして、段落「0016」には「・・・図8のNO・1〜nをクリックすることで、図9に示す落札結果情報詳細が表示されて、発注機関名、・・・工事成績評点が閲覧できる」旨説明されている。 In the paragraph “0016”, “... NO. 1 to n in FIG. 8 is clicked to display the details of the successful bid result information shown in FIG. It can be read ".
したがって、この先行特許文献1は「入落札情報提供システム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。 Therefore, this
また、先行特許文献2には「各評価項目に対する点数が固定点か流動点かの区別を、ユーザに入力させる手段と、自社の複数の流動点と自社の固定点と他社の複数の流動点と他社の固定点と他社の入札金額とに基づいて、自社の最高額を自社の流動点毎にかつ他社の流動点毎に算出する自社最高額算出手段と、自社の最高の流動点と他社の最高の流動点とに対する自社最高額と、自社の最低の流動点と他社の最高の流動点とに対する自社最高額とを、表示する自社最高額表示手段と、を有する入札シミュレーション装置及びプログラム」が記載されている。 In addition, the
したがって、この先行特許文献2は「入札シミュレーション装置及びプログラム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。 Therefore, this
また、先行特許文献3には「DB1に記憶された入札に関する各種データを基に、分析部2が所定の分析を行い、当該分析の結果を適切な視覚情報として表示させるように分析結果を表示する画面を生成して表示させるようにした入札監視システム」が記載されている。 Further, in the prior patent document 3, “
そして、段落「0040」には「・・・分析部2は、ある業者について、総合評価方式における工事成績と落札率とを参照し、平均落札率が所定のしきい値より低いにもかかわらず工事成績の平均点のしきい値より高い業者を抽出する。・・・」旨説明されている。 In the paragraph “0040”, “... The
したがって、この先行特許文献3は「入札監視システム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。 Therefore, this prior patent document 3 relates to a “bid monitoring system”, and the contractor (user) himself / herself achieves a high evaluation of the construction performance by himself / herself before and during the construction work. It is not related to a construction performance rating simulation system that can simulate target points and also provide related consulting services in simulation.
さらに、市販の工事成績評定システムが多くあるが、すべてが官公庁向けのものであり、官公庁である発注者側が工事成績評定を行う目的の工事成績評定システムであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。 Furthermore, there are many commercially available construction performance rating systems, all of which are for public offices. The construction performance rating system is for the purpose of the construction performance evaluation by the ordering party, which is a government office, and the contractor (user) It does not relate to a construction performance rating simulation system that can simulate the current status and target of construction results before and during construction in order to achieve high evaluation of construction results by itself, and also provide related consulting services in simulation. .
先行特許文献1 特開2005−346529号
先行特許文献2 特開2008−250461号
先行特許文献3 特開2009−032103号
本発明は、請負業者(利用者)が自ら工事成績の高評価を達成するために、工事前や工事途中において、工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーション中において、マネージメント必要情報であるチェックポイントを表示する関連コンサルティングサービスが行えるとともに、実施事項記録・確認、工事資料(文書・図面・写真)、工事成績予測一覧表等の参考資料の保存・表示も行えるようにした工事成績評定シミュレーションシステムを提供するものである。 In the present invention, in order for a contractor (user) to achieve a high evaluation of the construction result, the current point of the construction result and the target point of the construction result can be simulated before or during the construction, and management is necessary during the simulation. Work that enables related consulting services to display checkpoints that are information, as well as save and display reference materials such as record / confirmation of work items, construction materials (documents, drawings, photos), construction performance prediction lists, etc. A grade evaluation simulation system is provided.
請求項1の発明は、少なくとも利用者端末において、成績評価対象項目における各考査項目及び各細別に履行状況を入力する手段と、管理者サーバにおいてこの入力により各考査項目及び各細別における各考査官毎の現状点と達成目標点とを演算して保存する手段と、利用者端末において演算された各考査項目及び各細別における各考査官毎の現状点と達成目標点とを比較考察するための採点表を表示する手段とを具備した工事成績評定シミュレーションシステムを提供するものである。 The invention of
この発明においては、請負業者(利用者)において工事成績評定をシミュレーションすることにより、工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できると共に、次の工事入札の際に有利に競争が行える効果が期待できる。また請負業者の担当者にとって、実行予算管理だけでなく、その他の評価項目の管理も客観的に評価できるようになり、より納得性の高い人事考課を行うことが可能となる。さらに、自主的に評価項目の評価を行うことにより、発注者から自己評価と大きく異なる工事成績評定点が出されても、それに対し具体的な異議申し立てを行うことができる。 In this invention, by simulating the construction performance rating at the contractor (user), the construction performance rating can be used as an achievement target management item, and it can be expected to lead to higher score acquisition. It can be expected to have an advantageous effect of competitive competition during construction bidding. In addition, the contractor's person in charge can objectively evaluate not only the execution budget management but also the management of other evaluation items, and it is possible to perform a highly satisfactory personnel evaluation. Furthermore, by independently evaluating the evaluation items, even if the ordering person gives a construction performance rating point that is significantly different from the self-evaluation, a specific objection can be filed.
請求項2の発明は、利用者端末において、工事終了後に発注者から提供される評定点を入力する手段と、この入力された評定点を各考査項目及び各細別における各考査官毎の工事成績採点をレビュー画面に表示する手段とを具備する請求項1記載の工事成績評定シミュレーションシステムを提供するものである。 The invention of
この発明においては、請負業者(利用者)において工事成績評定採点表をレビューすることにより、常に工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できると共に、次の工事入札の際に有利に競争が行える効果が期待される。 In this invention, by reviewing the construction performance rating scoring table at the contractor (user), the construction performance rating can always be used as an achievement target management item, and it can be expected to lead to higher score acquisition. It is expected that there will be an advantageous competitive advantage in the next construction bid.
請求項3の発明は、コンサルタント端末において各考査項目及び各細別に対応してマネージメント必要情報であるチェックポイントを入力保存する手段と、このチェックポイントを新規に更新して保存する手段と、利用者端末において選択された各考査項目及び各細別における前記チェックポイントを工事成績評定シミュレーション中に表示する手段と具備する請求項1及び2のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。 The invention of claim 3 is a means for inputting and storing a checkpoint which is management necessary information corresponding to each examination item and each detail in the consultant terminal, a means for newly updating and storing this checkpoint, and a user 3. A construction performance rating simulation system according to
この発明においては、各考査項目に対応してマネージメント必要情報であるチェックポイントを工事成績評定シミュレーション中に表示することにより、これらチェックポイントを工事成績評定を達成目標管理に参照することができ、これにより高い得点獲得に確実に結び付くことが期待される。 In this invention, by displaying checkpoints, which are management-required information corresponding to each evaluation item, during the construction performance evaluation simulation, these checkpoints can be referred to the construction performance evaluation for achievement target management. It is expected that this will lead to higher scores.
請求項4の発明は、各考査項目における現状工事の実施事項記録をデータベースに蓄積する実施事項記録保存手段と、工事成績評定シミュレーション中に前記実施事項記録を確認する実施事項記録表示手段とを具備する請求項1乃至3のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。 The invention of claim 4 comprises execution item record storage means for accumulating the execution item records of the current construction for each examination item in a database, and execution item record display means for confirming the execution item records during the construction performance evaluation simulation. The construction result rating simulation system according to any one of
この発明においては、全現場の達成目標点を共有することにより、達成意欲を向上されることが期待される。また、管理部門・経営層・他の現場からの各現場の実施状況が見えることにより、全体的な考察が行える環境が提供でき、PDCA(Plan Do Check Act)のマネージメントサイクルを確実に得られることが期待される。経営層では、将来の点数が予測でき、入札準備等の対応に生かすことができる。 In this invention, it is expected that the willingness to achieve is improved by sharing the achievement target points of all the sites. In addition, by seeing the implementation status of each site from the management department, management layer, and other sites, it is possible to provide an environment in which overall consideration can be made, and a PDCA (Plan Do Check Act) management cycle can be reliably obtained. There is expected. The management can predict future points and use them for bid preparation.
請求項5の発明は、利用者端末において前記実施事項記録データベースに保存された実施事項記録が参考になったかどうかの評価を入力する手段と、この評価の高順位から低順位に実施事項記録を並び換えて表示する手段とを具備する請求項1乃至4のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。 According to a fifth aspect of the present invention, there is provided means for inputting an evaluation as to whether or not the implementation item record stored in the implementation item record database has been used as a reference at the user terminal, and the implementation item record is recorded from a high rank to a low rank. 5. A construction performance rating simulation system according to
この発明においては、発注者の評価は費用をかければ上げられるものもあるが、社内では費用対効果を考慮する必要がある。良い点数を取ることと、原価を下げるという相反する目的を実現するために、発注者の評価ばかりでなく社内評価を知る意義があるが、このような社内評価を知ることができる。 In the present invention, the evaluation of the orderer can be raised if it is expensive, but it is necessary to consider the cost effectiveness in the company. In order to achieve the conflicting purpose of taking a good score and lowering the cost, it is meaningful to know not only the orderer's evaluation but also the internal evaluation, but such internal evaluation can be known.
請求項6の発明は、各考査項目及び各細別に対応する工事資料を管理サーバのデータベースに保存する手段と、利用者において前記データベースへリンクしてこの資料を利用者端末で閲覧表示する手段とを具備する請求項1乃至5のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。 The invention of claim 6 is a means for storing construction items corresponding to each examination item and each detail in a database of the management server, a means for linking to the database at the user and browsing and displaying the material on a user terminal; The construction performance rating simulation system according to any one of
この発明においては、各考査項目毎の実施事項と、それに関連する文書・図面・写真等のドキュメントも合わせて管理できるので、過去の工事における技術の承継が図れるようになり、他社との差別化が期待できる。 In this invention, since it is possible to manage the implementation items for each examination item and the documents such as documents, drawings, photographs, etc., it is possible to succeed the technology in the past construction, and differentiate from other companies. Can be expected.
請求項7の発明は、利用者端末において工事成績評定予測管理一覧を管理サーバのデータベースに記録する手段と、利用者端末において前記工事成績評定予測管理一覧の各工事における現状点及び達成目標点を表示する手段とを具備する請求項1乃至6のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。The invention according to claim 7 is a means for recording a construction result rating prediction management list in a database of a management server at a user terminal, and a current point and an achievement target point in each construction of the construction result rating prediction management list at a user terminal. A construction performance rating simulation system according to any one of
この発明においては、工事成績評定自己考査に関する工事成績評定予測管理一覧をデータベースに管理して、常時利用者端末において各工事の予測した現状点及び達成目標点を確認することができる。 In the present invention, the construction performance rating prediction management list regarding the construction performance rating self-assessment can be managed in the database, and the current status point and the achievement target point predicted for each construction can be confirmed at the user terminal at all times.
以下に本発明の一実施形態を図面に基づき説明する。先ず、本願明細書において使用する工事成績評定に関する用語について説明する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. First, terms relating to construction performance evaluation used in this specification will be described.
さて、図1は、本発明の一実施例を示すWebシステム構成図である。管理サーバA1には、各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを換算する演算装置Fが設けられている。そして、利用者端末Cにおいて、成績評価工事における各考査項目及び各細別に履行状況を入力すると、この入力により各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを換算して工事成績評定点DB1に保存する。そして、利用者端末Cにおいて換算された各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを比較考察するための後述する採点表に表示するようにして工事成績評定シミュレーションを行うようにしている。 FIG. 1 is a Web system configuration diagram showing an embodiment of the present invention. The management server A1 is provided with an arithmetic device F for converting the current point and the achievement target points (maximum points / predicted points) for each examination item and each examiner in each subdivision. Then, when the user terminal C inputs the performance status for each assessment item and each detail in the grade evaluation work, the current status and the achievement target point (maximum / (Predicted point) is converted and stored in the construction grade rating point DB1. And it displays on the scoring table which will be described later for comparing and examining the current status point and the achievement target point (maximum score / expected score) for each examiner in each subdivision and each examination item converted in the user terminal C The construction performance evaluation simulation is performed.
また、管理サーバA1には、利用者端末Cにおいて、工事終了後に発注者から提供される評定点を入力されると、この入力された評定点を工事成績評定点DB1に保存し、後述する各考査項目及び各細別における各考査官毎の工事成績採点表に表示して工事成績採点をレビューできるようにしている。 In addition, when a grade point provided by the orderer after completion of construction is input to the management server A1 at the user terminal C, the entered grade point is stored in the construction grade
また、管理サーバA1には、コンサルタント端末Bにおいて入力された各考査項目及び各細別に対応してマネージメント必要情報であるチェックポイントを保存し、このチェックポイントを新規に更新して保存するチェックポイントDB2が設けられている。そして、利用者端末Cにおいて各考査項目及び各細別における前記チェックポイントを工事成績評定シミュレーション中に表示するようにしている。 The management server A1 stores a checkpoint which is management necessary information corresponding to each examination item and each detail inputted in the consultant terminal B, and a checkpoint DB2 which newly updates and stores this checkpoint. Is provided. And in the user terminal C, each check item and the said check point in each subdivision are displayed during construction performance evaluation simulation.
また、管理サーバA1には、各考査項目における現状工事の実施事項記録を蓄積するデータベースDB3を設けており、利用者端末において工事成績評定シミュレーション中に前記実施事項記録を確認できるようにしている。 In addition, the management server A1 is provided with a database DB3 for accumulating records of implementation items of the current construction for each examination item so that the implementation items can be confirmed during the construction performance evaluation simulation at the user terminal.
また、管理サーバA1は、利用者端末において前記データベースに保存された実施事項記録が参考になったかどうかの評価を入力すると、この評価の高順位から低順位に実施事項記録を並び換える。 In addition, when the management server A1 inputs an evaluation as to whether or not the implementation item record stored in the database has been used as a reference at the user terminal, the management server A1 rearranges the implementation item record from the highest ranking to the lowest ranking.
サーバA2には、各考査項目及び各細別において関係する工事資料を保存する文書データベースDB4,図面データベースDB5,写真データベースDB6が設けられており、利用者において前記各データベースDB4〜6へリンクしてこの資料を利用者端末に閲覧表示できるようにしている。 The server A2 is provided with a document database DB4, a drawing database DB5, and a photo database DB6 for storing construction items related to each examination item and each subdivision. Documents can be browsed and displayed on user terminals.
さらに、利用者端末において工事成績評定予測管理一覧を管理サーバの工事成績評定点DB1に記録するようにし、利用者端末において前記工事成績評定予測管理一覧の各工事の現状点及び達成目標点を表示するようにしている。 Further, the construction result rating prediction management list is recorded in the construction result
次に、上記図1のWebシステム構成図に示した工事成績評定シミュレーション機能の具体的操作について説明する。図2は工事成績評定シミュレーション機能フローチャートであり、先ず、図4に示す工事成績評定シミュレーション画面01を表示する。考査官リストボックス02より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス03より、考査項目を選択する。細別リストボックス04より、細別を選択する。この3つの選択により、評価対象項目の一覧05が表示される。考査官、考査項目、細別と評価対象項目一覧の関係は図3に示す通りである。 Next, a specific operation of the construction performance rating simulation function shown in the Web system configuration diagram of FIG. 1 will be described. FIG. 2 is a flowchart of the construction performance rating simulation function. First, the construction performance rating simulation screen 01 shown in FIG. 4 is displayed. From the
評価対象項目毎に、履行状況を、履行状況リストボックス06より選択する。この時に、履行状況が、履行中の場合は、履行中状況が確実か、不確実かを履行中状況リストボックス07より選択する。この作業は評価対象項目毎に行う。この作業を行った結果を最大点・予想点・現状点08として演算して表示する。最大点・予想点・現状点の計算ロジックは用語解説に示す通りとする。この作業を、細別数分、考査項目数分、考査官種類分繰り返して行い、結果確認ボタン09をクリックすると、図5の採点表10を表示するす。 For each evaluation target item, a performance status is selected from the performance
図6は、工事成績評定レビュー機能フローチャートであり、先ず、図7の工事成績レビュー画面11を表示する。評定点入力ボックス12に発注者から受け取った評定点を入力する。レビュー実行ボタン13をクリックする。この時システムはシステム内部に格納されている図8に示す換算表14と照会し、同一パターンがあるかどうかをチェックする。尚、換算表14では、考査官毎・細別毎に定めらている加減点パターンと持ち点比率により、合計点数からそれぞれの考査官毎の点数を割り出せるようにしている。同一パターンがひとつの場合は、点数を表示20する。同一パターンが複数ある場合は、パターン選択ボタン15を表示します。パターン選択ボタン15をクリックすると、図9のパターン選択ダイアログ画面16を表示する。パターンをラジオボタン17から選択し、OKボタン18をクリックすると点数を表示20する。 FIG. 6 is a flowchart of the construction performance rating review function. First, the construction
図10は、評価対象項目毎のチェックポイントコンサルティング機能フローチャートであり、コンサツタント用チェックポイント入力機能は、先ず、図11のコンサル用メンテナンス画面21を表示する。考査官リストボックス22より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス23より、考査項目を選択する。細別リストボックス24より、細別を選択する。この3つの選択により、評価対象項目の一覧25が表示される。評価対象項目ラジオボタン26で、評価対象項目を選択する。チェックポイント27が表示される。チェックポイント27を入力し、更新ボタン28をクリックする。 FIG. 10 is a flowchart of the checkpoint consulting function for each evaluation target item. The consultant checkpoint input function first displays the consult
また、ユーザ用チェックポイント確認機能は、先ず、図12の工事成績シミュレーション画面31を表示する。考査官リストボックス32より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス33より、考査項目を選択する。細別リストボックス34より、細別を選択する。この3つの選択により、評価対象項目の一覧35が表示される。チェックポイントボタン36をクリックすると、図13のチェックポイント37を表示される。 Further, the user checkpoint confirmation function first displays the construction result simulation screen 31 of FIG. From the
図14は評価対象項目毎の実施事項蓄積フローチャートであり、先ず、図16の工事成績シミュレーション画面41を表示する。考査官リストボックス42より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス43より、考査項目を選択する。細別リストボックス44より、細別を選択する。この3つの選択により、評価対象項目の一覧45が表示される。評価対象項目ラジオボタン46を選択し、作業記録タイトルボックス47に、作業記録タイトルを入力し、作業内容ボックス48に作業内容を入力する。入力が完了したら、保存ボタン49をクリックし、保存を実行する。 FIG. 14 is an execution item accumulation flowchart for each evaluation target item. First, the construction
図15は過去の実施記録確認フローチャートであり、図16の工事成績評定シミュレーション画面41を表示する。考査官リストボックス42より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス43より、考査項目を選択する。細別リストボックス44より、細別を選択する。この3つの選択により、評価対象項目の一覧45が表示される。評価対象項目ラジオボタン46を選択し、過去記録ボタン51をクリックすると、図17の過去の実施記録画面52が表示される。作業記録ラジオボタン53をクリックすると、作業内容54が表示される。過去の実施記録画面では、作業記録タイトル、工事名、獲得評点、社内評価順位にて、並び替えが行える。 FIG. 15 is a past execution record confirmation flowchart, which displays the construction result
図18は評価対象項目毎の実施事項の社内評価機能フローチャートであり、先ず図19の過去の実施記録画面61を表示する。作業記録ラジオボタン62より作業記録タイトルを選択すると、作業記録内容63が表示される。社内評価リストボックス64より、「参考になった」もしくは「参考にならなかった」を選択する。評価ボタン65をクリックすると、集計が行われ社内評価順位66に反映され順位が表示される。 FIG. 18 is a flowchart of the in-house evaluation function for items to be evaluated for each evaluation target item. First, the past
図20は評価対象項目毎の関連文書リンク機能フローチャートであり、先ず、図21の工事成績評定シミュレーション画面71を表示する。考査官リストボックス72より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス73より、考査項目を選択する。細別リストボックス74より、細別を選択する。この3つの選択により、評価対象項目の一覧75が表示される。評価対象項目ラジオボタン76を選択し、新規リンクの追加ボタン77をクリックすると、図22の外部リンク作成画面78が表示される。リンクタイトル79、リンク先URL80を入力し、OKボタン81をクリックすると、図21の工事成績シミュレーション画面71を再表示し、リンクタイトル名82が表示される。 FIG. 20 is a flowchart of the related document link function for each evaluation target item. First, the construction result
図23は、工事成績評定一覧管理機能フローチャートであり、先ず、図24のログイン画面91を表示し、ユーザID92、パスワード93を入力する。図25に示すように、システム内で管理されている管理情報(工事単位のデータ)が表示される。表示された管理情報一覧画面94では、各管理情報の最高点、予想点、現状点を確認する事ができる。 FIG. 23 is a flowchart of the construction performance rating list management function. First, the
上記の如く本発明においては、請負業者(利用者)において工事成績評定をシミュレーションすることにより、工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できて結果的に次の工事入札の際に有利に競争が行える効果が期待できる。また請負業の担当者にとって、実行予算管理だけでなく、その他の評価項目の管理も客観的に評価できるようになり、より納得性の高い人事考課を行うことが可能となる。さらに、自主的に評価項目の評価を行うことにより、発注者から自己評価と大きく異なる工事成績評定点が出されても、それに対し具体的な異議申し立てを行うことができる。 As described above, in the present invention, the construction performance evaluation can be used as an achievement target management item by simulating the construction performance evaluation at the contractor (user), and it can be expected to lead to higher score acquisition. As a result, it can be expected that there will be an advantageous competition in the next construction bid. In addition, it becomes possible for the contract person in charge to objectively evaluate not only the execution budget management but also the management of other evaluation items, and it becomes possible to perform personnel evaluation with higher convincingness. Furthermore, by independently evaluating the evaluation items, even if the ordering person gives a construction performance rating point that is significantly different from the self-evaluation, a specific objection can be filed.
また、請負業者(利用者)において工事成績評定採点表をレビューすることにより、常に工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付かせることが期待でき、結果的に次の工事入札の際に有利に競争が行える効果が期待できる。 In addition, by reviewing the construction performance rating scoring chart at the contractor (user), the construction performance rating can always be used as an achievement target management item, which can be expected to lead to higher score acquisition. Therefore, it can be expected that there will be an advantageous competition in the next construction bid.
また、各考査項目に対応してマネージメント必要情報であるチェックポイントを工事成績評定シミュレーション中に表示することにより、これらチェックポイントを工事成績評定を達成目標管理において参照することができ、これにより高い得点獲得に確実に結び付かせることが期待できる。 In addition, by displaying checkpoints, which are management-required information corresponding to each evaluation item, during the construction performance evaluation simulation, these checkpoints can be referred to in the achievement target management, thereby achieving a high score. It can be expected to be linked to acquisition.
また、全現場の達成目標点を共有することにより、達成意欲を向上されることが期待される。また、管理部門・経営層・他の現場からの各現場の実施状況が見えることにより、全体的な考察を行うことのできる環境が提供でき、PDCA(Plan Do Check Act)のマネージメントサイクルを確実に得ることが期待される。経営層では、将来の点数が予測でき、入札準備等の対応に生かすことができる。 Moreover, it is expected that the willingness to achieve will be improved by sharing the achievement target points of all the sites. In addition, by seeing the implementation status of each site from the management department, management layer, and other sites, it is possible to provide an environment where the entire study can be performed, and the management cycle of PDCA (Plan Do Check Act) is ensured. Expected to get. The management can predict future points and use them for bid preparation.
また、発注者の評価は費用をかければ上げられるものもあるが、社内では費用対効果を考慮する必要がある。良い点数を取ることと、原価を下げるという相反する目的を実現するために、発注者の評価ばかりでなく社内評価を得る意義があるが、このような社内評価を知ることができる。 In addition, there are some cases where the evaluation of the orderer can be raised if it costs more, but it is necessary to consider the cost effectiveness within the company. In order to achieve the conflicting purpose of taking a good score and lowering the cost, it is meaningful to obtain an internal evaluation as well as the orderer's evaluation, but it is possible to know such an internal evaluation.
また、各考査項目毎の実施事項と、それに関連する文書・図面・写真等のドキュメントも合わせて管理できるので、過去の工事技術の継承が図れるようになり、他社との差別化強化が期待できる。 In addition, since the implementation items for each assessment item and related documents such as documents, drawings, and photos can be managed together, it will be possible to inherit past construction technology, and it can be expected to strengthen differentiation from other companies. .
さらに、工事成績評定自己考査に関する工事成績評定予測管理一覧をデータベースに管理して、常時利用者端末において各工事の予測した現状点及び達成目標点を確認することができる。 Furthermore, the construction performance rating prediction management list regarding the construction performance rating self-assessment can be managed in a database, and the current status and the target goal achieved for each construction can be confirmed at the user terminal at all times.
A サーバ
B コンサルタント端末
C 利用者端末」
F 演算装置
DB1 工事成績評定点データベース
DB2 チェックポイントデータベース
DB3 工事実施事項記録蓄積データベース
DB4 文書データベース
DB5 図面データベース,
DB6 写真データベース
01 工事成績評定シミュレーション画面(シミュレーション用画面)
02 考査官リストボックス(シミュレーション用画面)
03 考査項目リストボックス(シミュレーション用画面)
04 細別リストボックス(シミュレーション用画面)
05 評価対象項目の一覧(シミュレーション用画面)
06 履行状況リストボックス(シミュレーション用画面)
07 履行中状況リストボックス(シミュレーション用画面)
08 最大点・予想点・現状点
09 結果確認ボタン
10 採点表
11 工事成績レビュー画面
12 評定点入力ボックス
13 レビュー実行ボタン
14 換算表
15 パターン選択ボタン
16 パターン選択ダイアログ画面
17 パターンラジオボタン
18 OKボタン
20 点数表示
21 コンサル用メンテナンス画面
22 考査官リストボックス
23 考査項目リストボックス
24 細別リストボックス
25 評価対象項目一覧
26 評価対象項目ラジオボタン
27 チェックポイント
29 更新ボタン
31 工事成績評定シミュレーション画面(チェックポイント用画面)
32 考査官リストボックス(チェックポイント用画面)
33 考査項目リストボックス(チェックポイント用画面)
34 細別リストボックス(チェックポイント用画面)
35 評価対象項目の一覧
36 チェックポイントボタン
37 チェックポイント
41 工事成績シミュレーション両面(過去の実施事項確認用画面)
42 考査官リストボックス(過去の実施事項確認用画面)
43 考査項目リストボックス(過去の実施事項確認用画面)
44 細別リストボックス(過去の実施事項確認用画面)
45 評価対象項目の一覧(過去の実施事項確認用画面)
46 評価対象項目ラジオボタン(過去の実施事項確認用画面)
47 作業記録タイトルボックス
48 作業内容ボックス
49 保存ボタン
51 過去記録ボタン
52 過去の実施記録画面
53 作業記録ラジオボタン
54 作業内容
61 過去の実施記録画面画面
62 作業記録ラジオボタン
63 作業記録内容
64 社内評価リストボックス
65 評価ボタン
66 社内評価順位
71 工事成績評定シミュレーション画面(関連文書リンク用画面)
72 考査官リストボックス(関連文書リンク用画面)
73 考査項目リストボックス(関連文書リンク用画面)
74 細別リストボックス(関連文書リンク用画面)
75 評価対象項目の一覧(関連文書リンク用画面)
76 評価対象項目ラジオボタン(関連文書リンク用画面)
77 新規リンクの追加ボタン
78 外部リンク作成画面
79 リンクタイトル
80 リンク先URL
81 OKボタン
82 リンクタイトル名
91 ログイン画面
92 ユーザID
93 パスワード
94 管理情報一覧画面A Server B Consultant terminal C User terminal "
F arithmetic unit DB1 construction grade rating database DB2 checkpoint database DB3 construction execution item record accumulation database DB4 document database DB5 drawing database,
DB6 Photo database 01 Construction grade evaluation simulation screen (simulation screen)
02 Examiner list box (screen for simulation)
03 Examination item list box (screen for simulation)
04 Detailed list box (simulation screen)
05 List of evaluation items (screen for simulation)
06 Implementation status list box (simulation screen)
07 Status list box (simulation screen)
08 Maximum point / Predicted point /
32 Examiner list box (screen for checkpoints)
33 Examination Item List Box (Checkpoint Screen)
34 Detailed list box (screen for checkpoints)
35 List of
42 Examiner list box (screen for confirming past implementation items)
43 Examination Item List Box (Past Screen for Confirming Past Items)
44 Detailed List Box (Past Action Confirmation Screen)
45 List of items to be evaluated (screen for confirming past implementation items)
46 Evaluation Target Item Radio Button (Past Action Items Confirmation Screen)
47 Work
72 Examiner List Box (Related Document Link Screen)
73 Examination Item List Box (Related Document Link Screen)
74 Detailed List Box (Related Document Link Screen)
75 List of Evaluation Target Items (Related Document Link Screen)
76 Evaluation Target Item Radio Button (Related Document Link Screen)
77 Add
81
93
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009299566A JP2011134287A (en) | 2009-12-24 | 2009-12-24 | Construction performance rating simulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009299566A JP2011134287A (en) | 2009-12-24 | 2009-12-24 | Construction performance rating simulation system |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2011134287A true JP2011134287A (en) | 2011-07-07 |
Family
ID=44346904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009299566A Pending JP2011134287A (en) | 2009-12-24 | 2009-12-24 | Construction performance rating simulation system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2011134287A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200083256A (en) * | 2018-12-28 | 2020-07-08 | 장효수 | Construction management system for real-time construction inspection and evaluation |
-
2009
- 2009-12-24 JP JP2009299566A patent/JP2011134287A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200083256A (en) * | 2018-12-28 | 2020-07-08 | 장효수 | Construction management system for real-time construction inspection and evaluation |
KR102209809B1 (en) * | 2018-12-28 | 2021-01-29 | 장효수 | Construction management system for real-time construction inspection and evaluation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Karakhan et al. | Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach | |
Abdirad | Metric-based BIM implementation assessment: a review of research and practice | |
Karimi et al. | Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance | |
Tsai et al. | Developing critical success factors for the assessment of BIM technology adoption: part I. Methodology and survey | |
Ahiaga-Dagbui et al. | Rethinking construction cost overruns: cognition, learning and estimation | |
Tribelsky et al. | An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures | |
Doloi | Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects | |
Poghosyan et al. | A web-based design for occupational safety and health capability maturity indicator | |
Haponava et al. | Proposed system for measuring project performance using process-based key performance indicators | |
Li et al. | Effects of digital technology adoption on sustainability performance in construction projects: The mediating role of stakeholder collaboration | |
Azam Haron et al. | Quality function deployment modelling to enhance industrialised building system adoption in housing projects | |
Othman | An international index for customer satisfaction in the construction industry | |
Yu et al. | Factors affecting the utilization of big data in construction projects | |
CN111178705A (en) | Item evaluation method, item evaluation device, item evaluation apparatus, and storage medium | |
Liu et al. | BIM cloud score: Building information model and modeling performance benchmarking | |
Ducq* et al. | Definition and aggregation of a performance measurement system in three aeronautical workshops using the ECOGRAI method | |
Lhee et al. | Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks | |
Farzad Moosavi et al. | Review of detailed schedules in building construction | |
Horta et al. | Design of performance assessment system for selection of contractors in construction industry e-marketplaces | |
Fakhruddin et al. | Harnessing risk-informed data for disaster and climate resilience | |
Hannouf et al. | Cause-effect chains in S-LCA based on DPSIR framework using Markov healthcare model: an application to “working hours” in Canada | |
Naji et al. | The effect of change-order management factors on construction project success: a structural equation modeling approach | |
Jelodar et al. | Designing for construction procurement: an integrated decision support system for building information modelling | |
Ezzeddine et al. | CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion | |
Lin et al. | Performance evaluation management model to accelerate the development of e-government in China |