JP2011134287A - Construction performance rating simulation system - Google Patents

Construction performance rating simulation system Download PDF

Info

Publication number
JP2011134287A
JP2011134287A JP2009299566A JP2009299566A JP2011134287A JP 2011134287 A JP2011134287 A JP 2011134287A JP 2009299566 A JP2009299566 A JP 2009299566A JP 2009299566 A JP2009299566 A JP 2009299566A JP 2011134287 A JP2011134287 A JP 2011134287A
Authority
JP
Japan
Prior art keywords
construction
item
evaluation
construction performance
user terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009299566A
Other languages
Japanese (ja)
Inventor
Toshikazu Kurahashi
利一 倉橋
Kenichi Maeda
憲一 前田
Shinichi Fukutome
進一 福留
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GENBA SUPPORT CO Ltd
INTERWAVE CO Ltd
Original Assignee
GENBA SUPPORT CO Ltd
INTERWAVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GENBA SUPPORT CO Ltd, INTERWAVE CO Ltd filed Critical GENBA SUPPORT CO Ltd
Priority to JP2009299566A priority Critical patent/JP2011134287A/en
Publication of JP2011134287A publication Critical patent/JP2011134287A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To enable a contractor (user) to perform simulation of a current point and an achievement target point of construction performance before and in the middle of construction in order to achieve high evaluation of construction performance and also enable relevant consulting services in the simulation to be performed. <P>SOLUTION: A construction performance rating simulation system includes: a means which inputs matters required to be executed, to respective check items and details in performance evaluation construction; a means which, in a manager server, calculates current points and achievement target points per checker in respective check items and details by these inputs and holds them; a means which, in a user terminal, displays a rating table for comparative consideration of the calculated current points and achievement target points per checker in respective check items and details; and a means which displays check points being management essential information, during construction performance rating simulation. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

発明の詳細な説明Detailed Description of the Invention

本発明は、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものである。  The present invention enables the contractor (user) to simulate the current status and target of the construction results before construction or during construction so that the contractor (user) can achieve high evaluation of the construction results, and can also provide related consulting services in the simulation. It relates to the construction performance rating simulation system.

工事成績評定とは、公共機関が工事完成後に請負業者に対して、当該工事の評価をするもので、施工会社の適正な選定及び指導育成に資することを目的として実施されている。国より「公共工事の入札及び契約の適正化の促進に関する法律(平成12年11月27日付け法律第127号)」(以下「適化法」という)が、平成13年4月1日より施行されいる。その主な目的は、「公共工事の入札・契約の適正化の促進」「公共工事に対する国民の信頼の確保」「建設業の健全な発達」を図ることにある。この法律による公共工事においては、一括下請負が全面的に禁止となり、また、公共工事の発注者は工事現場の施工体制を適正なものとするため、点検その他の必要な措置を講じるように義務付けられている。  The construction performance evaluation is carried out for the purpose of contributing to the appropriate selection and instruction training of the construction company, where the public institution evaluates the contractor after the completion of the construction. From April 1, 2001, the “Law Concerning Promotion of Public Construction Bidding and Contract Optimization (Law No. 127, dated November 27, 2000)” (hereinafter referred to as the “Adaptation Law”) It is enforced. Its main purpose is to “promote the appropriateness of tenders and contracts for public works”, “ensure public confidence in public works” and “sound development of construction industry”. In public works under this law, lump-sum subcontracting is completely prohibited, and public works contractors are obliged to take inspections and other necessary measures to ensure that the construction system at the construction site is appropriate. It has been.

これにともない、国土交通省でも各都道府県において新しく「請負工事成績評定要領」を制定し「適化法」への対応を行ってきている。また、平成17年には、「公共工事の品質確保の促進に関する法律」が施行され、その施策として「総合評価落札方式」による入札が広く普及してきた。総合評価落札方式における評価項目の一つに、過去の工事成績評定があり、この工事成績評定の重みが、単なる表彰対象の選定から、次の仕事を受注するための重要な要素へと変化し注目を集めている。  In line with this, the Ministry of Land, Infrastructure, Transport and Tourism has newly established the “Contract Construction Performance Rating Guidelines” in each prefecture to respond to the “Adaptation Law”. In 2005, the “Act on Promotion of Public Works Quality Assurance” was enacted, and as a measure for this, bidding by the “Comprehensive Evaluation Bidding Method” has become widespread. One of the evaluation items in the overall evaluation bidding method is the past construction performance rating, and the weight of this construction performance rating changes from simply selecting the award object to an important factor for receiving the next job. It attracts attention.

現場技術者の業務は、一般に「品質管理」「原価管理」「工程管理」「安全管理」「環境管理」と言われるが、この工事成績評定には「原価管理」以外の要素が含まれている事から、工事成績評定をベースとしたマネジメント体制が築ければ、技術力の高い建設会社によって、より良質な社会資本を整備できる事が期待される。  The work of site engineers is generally called “quality control”, “cost control”, “process control”, “safety control”, and “environmental control”, but this construction performance evaluation includes elements other than “cost control”. Therefore, if a management system based on construction performance evaluation is established, it is expected that high-quality social capital can be improved by a construction company with high technical capabilities.

先行特許文献1には、「複数の端末機器を通信回線により相互に接続して構築されるネットワークを介して、企業会員が、公的機関の発注に係る入札予報情報、落札結果情報、入札に参加する建設業許可業者の企業情報を検索・閲覧できる入落札情報提供システムにおいて、前記入落札情報に加えて、入札に参加する建設業許可業者を除く他の建設業許可業者の企業情報と、民間建設に係る建設着工情報や建設計画情報及び建設確認申請情報と、公的機関の発注に係る入落札、及び、建設業に関する新聞記事情報と、建設関連資料情報とが検索・閲覧できるように構成し、企業会員の必要とされる入落札情報を提供するようにした入落札情報提供システム」が記載されている。  The prior patent document 1 states that “a company member uses a network constructed by connecting a plurality of terminal devices to each other via a communication line, so that a corporate member can provide bidding forecast information, bidding result information, and bidding related to an order from a public institution. In the winning bid information providing system that can search and browse the company information of participating construction industry licensed companies, in addition to the winning bid information, the company information of other construction licensed companies other than the construction licensed companies participating in bidding, Search and browse construction start information, construction plan information and construction confirmation application information related to private construction, winning bids related to orders from public institutions, newspaper article information related to the construction industry, and construction related material information A winning bid information providing system configured to provide winning bid information required by a corporate member is described.

そして、段落「0016」には「・・・図8のNO・1〜nをクリックすることで、図9に示す落札結果情報詳細が表示されて、発注機関名、・・・工事成績評点が閲覧できる」旨説明されている。  In the paragraph “0016”, “... NO. 1 to n in FIG. 8 is clicked to display the details of the successful bid result information shown in FIG. It can be read ".

したがって、この先行特許文献1は「入落札情報提供システム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。  Therefore, this prior patent document 1 relates to a “successful bid information providing system”, and the contractor (user) himself / herself achieves a high evaluation of the construction results by himself / herself before the construction or during the construction. It is not related to a construction performance rating simulation system that can simulate the target goal and provide related consulting services in simulation.

また、先行特許文献2には「各評価項目に対する点数が固定点か流動点かの区別を、ユーザに入力させる手段と、自社の複数の流動点と自社の固定点と他社の複数の流動点と他社の固定点と他社の入札金額とに基づいて、自社の最高額を自社の流動点毎にかつ他社の流動点毎に算出する自社最高額算出手段と、自社の最高の流動点と他社の最高の流動点とに対する自社最高額と、自社の最低の流動点と他社の最高の流動点とに対する自社最高額とを、表示する自社最高額表示手段と、を有する入札シミュレーション装置及びプログラム」が記載されている。  In addition, the prior patent document 2 states that “a means for allowing the user to input whether the score for each evaluation item is a fixed point or a pour point, a plurality of pour points of the company, a fixed point of the company, and a plurality of pour points of other companies. Based on the fixed points of other companies and bids of other companies, the company's maximum amount calculation method for calculating the company's maximum amount for each company's pour point and each company's pour point, A bidding simulation apparatus and program having an in-house maximum amount display means for displaying the in-house maximum amount for the highest pour point of the company and the in-house maximum amount for the lowest pour point of the company and the highest pour point of another company. Is described.

したがって、この先行特許文献2は「入札シミュレーション装置及びプログラム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。  Therefore, this prior patent document 2 relates to a “bidding simulation apparatus and program”, and the contractor (user) himself / herself achieved the high evaluation of the construction performance by himself / herself before the construction or during the construction. It is not related to a construction performance rating simulation system that can simulate the target goal and provide related consulting services in simulation.

また、先行特許文献3には「DB1に記憶された入札に関する各種データを基に、分析部2が所定の分析を行い、当該分析の結果を適切な視覚情報として表示させるように分析結果を表示する画面を生成して表示させるようにした入札監視システム」が記載されている。  Further, in the prior patent document 3, “analysis unit 2 performs a predetermined analysis based on various data relating to bids stored in DB 1 and displays the analysis result so that the result of the analysis is displayed as appropriate visual information. A bid monitoring system that generates and displays a screen to be displayed is described.

そして、段落「0040」には「・・・分析部2は、ある業者について、総合評価方式における工事成績と落札率とを参照し、平均落札率が所定のしきい値より低いにもかかわらず工事成績の平均点のしきい値より高い業者を抽出する。・・・」旨説明されている。  In the paragraph “0040”, “... The analysis unit 2 refers to the construction results and the successful bid rate in the comprehensive evaluation method for a certain supplier, even though the average successful bid rate is lower than a predetermined threshold. “The contractor higher than the threshold value of the average score of construction results is extracted.

したがって、この先行特許文献3は「入札監視システム」に関するものであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。  Therefore, this prior patent document 3 relates to a “bid monitoring system”, and the contractor (user) himself / herself achieves a high evaluation of the construction performance by himself / herself before and during the construction work. It is not related to a construction performance rating simulation system that can simulate target points and also provide related consulting services in simulation.

さらに、市販の工事成績評定システムが多くあるが、すべてが官公庁向けのものであり、官公庁である発注者側が工事成績評定を行う目的の工事成績評定システムであって、請負業者(利用者)が自ら工事成績の高評価を達成するために工事前や工事途中において工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーションにおける関連コンサルティングサービスも行えるようにした工事成績評定シミュレーションシステムに関するものではない。  Furthermore, there are many commercially available construction performance rating systems, all of which are for public offices. The construction performance rating system is for the purpose of the construction performance evaluation by the ordering party, which is a government office, and the contractor (user) It does not relate to a construction performance rating simulation system that can simulate the current status and target of construction results before and during construction in order to achieve high evaluation of construction results by itself, and also provide related consulting services in simulation. .

先行特許文献1 特開2005−346529号
先行特許文献2 特開2008−250461号
先行特許文献3 特開2009−032103号
Prior Patent Literature 1 Japanese Patent Laid-Open No. 2005-346529 Prior Patent Literature 2 Japanese Patent Laid-Open No. 2008-250461 Prior Patent Literature 3 Japanese Patent Laid-Open No. 2009-032103

発明が解決しようとする課題Problems to be solved by the invention

本発明は、請負業者(利用者)が自ら工事成績の高評価を達成するために、工事前や工事途中において、工事成績の現状点と達成目標点をシミュレーションできると共に、シミュレーション中において、マネージメント必要情報であるチェックポイントを表示する関連コンサルティングサービスが行えるとともに、実施事項記録・確認、工事資料(文書・図面・写真)、工事成績予測一覧表等の参考資料の保存・表示も行えるようにした工事成績評定シミュレーションシステムを提供するものである。  In the present invention, in order for a contractor (user) to achieve a high evaluation of the construction result, the current point of the construction result and the target point of the construction result can be simulated before or during the construction, and management is necessary during the simulation. Work that enables related consulting services to display checkpoints that are information, as well as save and display reference materials such as record / confirmation of work items, construction materials (documents, drawings, photos), construction performance prediction lists, etc. A grade evaluation simulation system is provided.

課題を解決する手段Means to solve the problem

請求項1の発明は、少なくとも利用者端末において、成績評価対象項目における各考査項目及び各細別に履行状況を入力する手段と、管理者サーバにおいてこの入力により各考査項目及び各細別における各考査官毎の現状点と達成目標点とを演算して保存する手段と、利用者端末において演算された各考査項目及び各細別における各考査官毎の現状点と達成目標点とを比較考察するための採点表を表示する手段とを具備した工事成績評定シミュレーションシステムを提供するものである。  The invention of claim 1 is a means for inputting at each user terminal at each evaluation item in each grade evaluation target item and the performance status separately at each user terminal, and at each administrator item by each input by the administrator server by this input. For calculating and storing the current point and achievement target point for each, and comparing and considering the current state point and achievement target point for each examiner and each examiner calculated in the user terminal The present invention provides a construction performance rating simulation system comprising means for displaying a scoring table.

この発明においては、請負業者(利用者)において工事成績評定をシミュレーションすることにより、工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できると共に、次の工事入札の際に有利に競争が行える効果が期待できる。また請負業者の担当者にとって、実行予算管理だけでなく、その他の評価項目の管理も客観的に評価できるようになり、より納得性の高い人事考課を行うことが可能となる。さらに、自主的に評価項目の評価を行うことにより、発注者から自己評価と大きく異なる工事成績評定点が出されても、それに対し具体的な異議申し立てを行うことができる。  In this invention, by simulating the construction performance rating at the contractor (user), the construction performance rating can be used as an achievement target management item, and it can be expected to lead to higher score acquisition. It can be expected to have an advantageous effect of competitive competition during construction bidding. In addition, the contractor's person in charge can objectively evaluate not only the execution budget management but also the management of other evaluation items, and it is possible to perform a highly satisfactory personnel evaluation. Furthermore, by independently evaluating the evaluation items, even if the ordering person gives a construction performance rating point that is significantly different from the self-evaluation, a specific objection can be filed.

請求項2の発明は、利用者端末において、工事終了後に発注者から提供される評定点を入力する手段と、この入力された評定点を各考査項目及び各細別における各考査官毎の工事成績採点をレビュー画面に表示する手段とを具備する請求項1記載の工事成績評定シミュレーションシステムを提供するものである。  The invention of claim 2 is a means for inputting a rating score provided by the orderer after completion of construction at the user terminal, and the entered rating score for each assessment item and each grader's construction performance for each subdivision. The construction result rating simulation system according to claim 1, further comprising means for displaying a score on a review screen.

この発明においては、請負業者(利用者)において工事成績評定採点表をレビューすることにより、常に工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できると共に、次の工事入札の際に有利に競争が行える効果が期待される。  In this invention, by reviewing the construction performance rating scoring table at the contractor (user), the construction performance rating can always be used as an achievement target management item, and it can be expected to lead to higher score acquisition. It is expected that there will be an advantageous competitive advantage in the next construction bid.

請求項3の発明は、コンサルタント端末において各考査項目及び各細別に対応してマネージメント必要情報であるチェックポイントを入力保存する手段と、このチェックポイントを新規に更新して保存する手段と、利用者端末において選択された各考査項目及び各細別における前記チェックポイントを工事成績評定シミュレーション中に表示する手段と具備する請求項1及び2のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。  The invention of claim 3 is a means for inputting and storing a checkpoint which is management necessary information corresponding to each examination item and each detail in the consultant terminal, a means for newly updating and storing this checkpoint, and a user 3. A construction performance rating simulation system according to claim 1, further comprising means for displaying each check item selected in the terminal and the check points in each subdivision during the construction performance rating simulation. .

この発明においては、各考査項目に対応してマネージメント必要情報であるチェックポイントを工事成績評定シミュレーション中に表示することにより、これらチェックポイントを工事成績評定を達成目標管理に参照することができ、これにより高い得点獲得に確実に結び付くことが期待される。  In this invention, by displaying checkpoints, which are management-required information corresponding to each evaluation item, during the construction performance evaluation simulation, these checkpoints can be referred to the construction performance evaluation for achievement target management. It is expected that this will lead to higher scores.

請求項4の発明は、各考査項目における現状工事の実施事項記録をデータベースに蓄積する実施事項記録保存手段と、工事成績評定シミュレーション中に前記実施事項記録を確認する実施事項記録表示手段とを具備する請求項1乃至3のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。  The invention of claim 4 comprises execution item record storage means for accumulating the execution item records of the current construction for each examination item in a database, and execution item record display means for confirming the execution item records during the construction performance evaluation simulation. The construction result rating simulation system according to any one of claims 1 to 3 is provided.

この発明においては、全現場の達成目標点を共有することにより、達成意欲を向上されることが期待される。また、管理部門・経営層・他の現場からの各現場の実施状況が見えることにより、全体的な考察が行える環境が提供でき、PDCA(Plan Do Check Act)のマネージメントサイクルを確実に得られることが期待される。経営層では、将来の点数が予測でき、入札準備等の対応に生かすことができる。  In this invention, it is expected that the willingness to achieve is improved by sharing the achievement target points of all the sites. In addition, by seeing the implementation status of each site from the management department, management layer, and other sites, it is possible to provide an environment in which overall consideration can be made, and a PDCA (Plan Do Check Act) management cycle can be reliably obtained. There is expected. The management can predict future points and use them for bid preparation.

請求項5の発明は、利用者端末において前記実施事項記録データベースに保存された実施事項記録が参考になったかどうかの評価を入力する手段と、この評価の高順位から低順位に実施事項記録を並び換えて表示する手段とを具備する請求項1乃至4のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。  According to a fifth aspect of the present invention, there is provided means for inputting an evaluation as to whether or not the implementation item record stored in the implementation item record database has been used as a reference at the user terminal, and the implementation item record is recorded from a high rank to a low rank. 5. A construction performance rating simulation system according to claim 1, further comprising means for rearranging and displaying.

この発明においては、発注者の評価は費用をかければ上げられるものもあるが、社内では費用対効果を考慮する必要がある。良い点数を取ることと、原価を下げるという相反する目的を実現するために、発注者の評価ばかりでなく社内評価を知る意義があるが、このような社内評価を知ることができる。  In the present invention, the evaluation of the orderer can be raised if it is expensive, but it is necessary to consider the cost effectiveness in the company. In order to achieve the conflicting purpose of taking a good score and lowering the cost, it is meaningful to know not only the orderer's evaluation but also the internal evaluation, but such internal evaluation can be known.

請求項6の発明は、各考査項目及び各細別に対応する工事資料を管理サーバのデータベースに保存する手段と、利用者において前記データベースへリンクしてこの資料を利用者端末で閲覧表示する手段とを具備する請求項1乃至5のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。  The invention of claim 6 is a means for storing construction items corresponding to each examination item and each detail in a database of the management server, a means for linking to the database at the user and browsing and displaying the material on a user terminal; The construction performance rating simulation system according to any one of claims 1 to 5 is provided.

この発明においては、各考査項目毎の実施事項と、それに関連する文書・図面・写真等のドキュメントも合わせて管理できるので、過去の工事における技術の承継が図れるようになり、他社との差別化が期待できる。  In this invention, since it is possible to manage the implementation items for each examination item and the documents such as documents, drawings, photographs, etc., it is possible to succeed the technology in the past construction, and differentiate from other companies. Can be expected.

請求項7の発明は、利用者端末において工事成績評定予測管理一覧を管理サーバのデータベースに記録する手段と、利用者端末において前記工事成績評定予測管理一覧の各工事における現状点及び達成目標点を表示する手段とを具備する請求項1乃至6のいずれかに記載の工事成績評定シミュレーションシステムを提供するものである。The invention according to claim 7 is a means for recording a construction result rating prediction management list in a database of a management server at a user terminal, and a current point and an achievement target point in each construction of the construction result rating prediction management list at a user terminal. A construction performance rating simulation system according to any one of claims 1 to 6, further comprising a display means.

この発明においては、工事成績評定自己考査に関する工事成績評定予測管理一覧をデータベースに管理して、常時利用者端末において各工事の予測した現状点及び達成目標点を確認することができる。  In the present invention, the construction performance rating prediction management list regarding the construction performance rating self-assessment can be managed in the database, and the current status point and the achievement target point predicted for each construction can be confirmed at the user terminal at all times.

以下に本発明の一実施形態を図面に基づき説明する。先ず、本願明細書において使用する工事成績評定に関する用語について説明する。

Figure 2011134287
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. First, terms relating to construction performance evaluation used in this specification will be described.
Figure 2011134287

さて、図1は、本発明の一実施例を示すWebシステム構成図である。管理サーバA1には、各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを換算する演算装置Fが設けられている。そして、利用者端末Cにおいて、成績評価工事における各考査項目及び各細別に履行状況を入力すると、この入力により各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを換算して工事成績評定点DB1に保存する。そして、利用者端末Cにおいて換算された各考査項目及び各細別における各考査官毎の現状点と達成目標点(最大点・予想点)とを比較考察するための後述する採点表に表示するようにして工事成績評定シミュレーションを行うようにしている。  FIG. 1 is a Web system configuration diagram showing an embodiment of the present invention. The management server A1 is provided with an arithmetic device F for converting the current point and the achievement target points (maximum points / predicted points) for each examination item and each examiner in each subdivision. Then, when the user terminal C inputs the performance status for each assessment item and each detail in the grade evaluation work, the current status and the achievement target point (maximum / (Predicted point) is converted and stored in the construction grade rating point DB1. And it displays on the scoring table which will be described later for comparing and examining the current status point and the achievement target point (maximum score / expected score) for each examiner in each subdivision and each examination item converted in the user terminal C The construction performance evaluation simulation is performed.

また、管理サーバA1には、利用者端末Cにおいて、工事終了後に発注者から提供される評定点を入力されると、この入力された評定点を工事成績評定点DB1に保存し、後述する各考査項目及び各細別における各考査官毎の工事成績採点表に表示して工事成績採点をレビューできるようにしている。  In addition, when a grade point provided by the orderer after completion of construction is input to the management server A1 at the user terminal C, the entered grade point is stored in the construction grade grade point DB 1 and is described later. It is displayed on the construction performance scoring table for each examiner in each examination item and each subdivision so that construction performance scoring can be reviewed.

また、管理サーバA1には、コンサルタント端末Bにおいて入力された各考査項目及び各細別に対応してマネージメント必要情報であるチェックポイントを保存し、このチェックポイントを新規に更新して保存するチェックポイントDB2が設けられている。そして、利用者端末Cにおいて各考査項目及び各細別における前記チェックポイントを工事成績評定シミュレーション中に表示するようにしている。  The management server A1 stores a checkpoint which is management necessary information corresponding to each examination item and each detail inputted in the consultant terminal B, and a checkpoint DB2 which newly updates and stores this checkpoint. Is provided. And in the user terminal C, each check item and the said check point in each subdivision are displayed during construction performance evaluation simulation.

また、管理サーバA1には、各考査項目における現状工事の実施事項記録を蓄積するデータベースDB3を設けており、利用者端末において工事成績評定シミュレーション中に前記実施事項記録を確認できるようにしている。  In addition, the management server A1 is provided with a database DB3 for accumulating records of implementation items of the current construction for each examination item so that the implementation items can be confirmed during the construction performance evaluation simulation at the user terminal.

また、管理サーバA1は、利用者端末において前記データベースに保存された実施事項記録が参考になったかどうかの評価を入力すると、この評価の高順位から低順位に実施事項記録を並び換える。  In addition, when the management server A1 inputs an evaluation as to whether or not the implementation item record stored in the database has been used as a reference at the user terminal, the management server A1 rearranges the implementation item record from the highest ranking to the lowest ranking.

サーバA2には、各考査項目及び各細別において関係する工事資料を保存する文書データベースDB4,図面データベースDB5,写真データベースDB6が設けられており、利用者において前記各データベースDB4〜6へリンクしてこの資料を利用者端末に閲覧表示できるようにしている。  The server A2 is provided with a document database DB4, a drawing database DB5, and a photo database DB6 for storing construction items related to each examination item and each subdivision. Documents can be browsed and displayed on user terminals.

さらに、利用者端末において工事成績評定予測管理一覧を管理サーバの工事成績評定点DB1に記録するようにし、利用者端末において前記工事成績評定予測管理一覧の各工事の現状点及び達成目標点を表示するようにしている。  Further, the construction result rating prediction management list is recorded in the construction result rating point DB 1 of the management server at the user terminal, and the current status and the achievement target point of each construction in the construction grade assessment prediction management list are displayed at the user terminal. Like to do.

次に、上記図1のWebシステム構成図に示した工事成績評定シミュレーション機能の具体的操作について説明する。図2は工事成績評定シミュレーション機能フローチャートであり、先ず、図4に示す工事成績評定シミュレーション画面01を表示する。考査官リストボックス02より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス03より、考査項目を選択する。細別リストボックス04より、細別を選択する。この3つの選択により、評価対象項目の一覧05が表示される。考査官、考査項目、細別と評価対象項目一覧の関係は図3に示す通りである。  Next, a specific operation of the construction performance rating simulation function shown in the Web system configuration diagram of FIG. 1 will be described. FIG. 2 is a flowchart of the construction performance rating simulation function. First, the construction performance rating simulation screen 01 shown in FIG. 4 is displayed. From the examiner list box 02, one of the chief technical evaluator, the general technical evaluator, and the technical inspector is selected. An examination item is selected from the examination item list box 03. A subdivision is selected from the subdivision list box 04. By these three selections, a list 05 of evaluation target items is displayed. The relationship between the examiner, the examination item, subdivision, and the evaluation target item list is as shown in FIG.

評価対象項目毎に、履行状況を、履行状況リストボックス06より選択する。この時に、履行状況が、履行中の場合は、履行中状況が確実か、不確実かを履行中状況リストボックス07より選択する。この作業は評価対象項目毎に行う。この作業を行った結果を最大点・予想点・現状点08として演算して表示する。最大点・予想点・現状点の計算ロジックは用語解説に示す通りとする。この作業を、細別数分、考査項目数分、考査官種類分繰り返して行い、結果確認ボタン09をクリックすると、図5の採点表10を表示するす。  For each evaluation target item, a performance status is selected from the performance status list box 06. At this time, if the performance status is being executed, whether the current status is certain or uncertain is selected from the performance status list box 07. This operation is performed for each item to be evaluated. The result of this operation is calculated and displayed as the maximum point, the predicted point, and the current point 08. The calculation logic for the maximum, expected, and current points is as shown in the glossary. This operation is repeated for the number of subdivisions, the number of examination items, and the types of examiners. When the result confirmation button 09 is clicked, the scoring table 10 of FIG. 5 is displayed.

図6は、工事成績評定レビュー機能フローチャートであり、先ず、図7の工事成績レビュー画面11を表示する。評定点入力ボックス12に発注者から受け取った評定点を入力する。レビュー実行ボタン13をクリックする。この時システムはシステム内部に格納されている図8に示す換算表14と照会し、同一パターンがあるかどうかをチェックする。尚、換算表14では、考査官毎・細別毎に定めらている加減点パターンと持ち点比率により、合計点数からそれぞれの考査官毎の点数を割り出せるようにしている。同一パターンがひとつの場合は、点数を表示20する。同一パターンが複数ある場合は、パターン選択ボタン15を表示します。パターン選択ボタン15をクリックすると、図9のパターン選択ダイアログ画面16を表示する。パターンをラジオボタン17から選択し、OKボタン18をクリックすると点数を表示20する。  FIG. 6 is a flowchart of the construction performance rating review function. First, the construction performance review screen 11 of FIG. 7 is displayed. The grade point received from the orderer is entered in the grade point input box 12. Click the review execution button 13. At this time, the system inquires with the conversion table 14 shown in FIG. 8 stored in the system and checks whether there is the same pattern. In the conversion table 14, the score for each examiner can be calculated from the total score based on the addition / subtraction pattern and score ratio determined for each examiner and each subdivision. If there is one identical pattern, the score is displayed 20. When there are multiple identical patterns, the pattern selection button 15 is displayed. When the pattern selection button 15 is clicked, the pattern selection dialog screen 16 of FIG. 9 is displayed. When a pattern is selected from the radio buttons 17 and the OK button 18 is clicked, the score is displayed 20.

図10は、評価対象項目毎のチェックポイントコンサルティング機能フローチャートであり、コンサツタント用チェックポイント入力機能は、先ず、図11のコンサル用メンテナンス画面21を表示する。考査官リストボックス22より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス23より、考査項目を選択する。細別リストボックス24より、細別を選択する。この3つの選択により、評価対象項目の一覧25が表示される。評価対象項目ラジオボタン26で、評価対象項目を選択する。チェックポイント27が表示される。チェックポイント27を入力し、更新ボタン28をクリックする。  FIG. 10 is a flowchart of the checkpoint consulting function for each evaluation target item. The consultant checkpoint input function first displays the consult maintenance screen 21 shown in FIG. From the examiner list box 22, one of a chief technical evaluator, a general technical evaluator, and a technical inspector is selected. An examination item is selected from the examination item list box 23. A subdivision is selected from the subdivision list box 24. With these three selections, a list 25 of evaluation target items is displayed. With the evaluation object item radio button 26, an evaluation object item is selected. A checkpoint 27 is displayed. Enter a checkpoint 27 and click the update button 28.

また、ユーザ用チェックポイント確認機能は、先ず、図12の工事成績シミュレーション画面31を表示する。考査官リストボックス32より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス33より、考査項目を選択する。細別リストボックス34より、細別を選択する。この3つの選択により、評価対象項目の一覧35が表示される。チェックポイントボタン36をクリックすると、図13のチェックポイント37を表示される。  Further, the user checkpoint confirmation function first displays the construction result simulation screen 31 of FIG. From the examiner list box 32, one of the chief technical evaluator, the general technical evaluator, and the technical inspector is selected. An examination item is selected from the examination item list box 33. A subdivision is selected from the subdivision list box 34. By these three selections, a list 35 of evaluation target items is displayed. When the check point button 36 is clicked, a check point 37 in FIG. 13 is displayed.

図14は評価対象項目毎の実施事項蓄積フローチャートであり、先ず、図16の工事成績シミュレーション画面41を表示する。考査官リストボックス42より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス43より、考査項目を選択する。細別リストボックス44より、細別を選択する。この3つの選択により、評価対象項目の一覧45が表示される。評価対象項目ラジオボタン46を選択し、作業記録タイトルボックス47に、作業記録タイトルを入力し、作業内容ボックス48に作業内容を入力する。入力が完了したら、保存ボタン49をクリックし、保存を実行する。  FIG. 14 is an execution item accumulation flowchart for each evaluation target item. First, the construction result simulation screen 41 of FIG. 16 is displayed. From the examiner list box 42, one of the chief technical evaluator, the general technical evaluator, and the technical inspector is selected. An examination item is selected from the examination item list box 43. A subdivision is selected from the subdivision list box 44. By these three selections, a list 45 of evaluation target items is displayed. The evaluation item radio button 46 is selected, a work record title is input in the work record title box 47, and a work content is input in the work content box 48. When the input is completed, the save button 49 is clicked to save.

図15は過去の実施記録確認フローチャートであり、図16の工事成績評定シミュレーション画面41を表示する。考査官リストボックス42より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス43より、考査項目を選択する。細別リストボックス44より、細別を選択する。この3つの選択により、評価対象項目の一覧45が表示される。評価対象項目ラジオボタン46を選択し、過去記録ボタン51をクリックすると、図17の過去の実施記録画面52が表示される。作業記録ラジオボタン53をクリックすると、作業内容54が表示される。過去の実施記録画面では、作業記録タイトル、工事名、獲得評点、社内評価順位にて、並び替えが行える。  FIG. 15 is a past execution record confirmation flowchart, which displays the construction result rating simulation screen 41 of FIG. From the examiner list box 42, one of the chief technical evaluator, the general technical evaluator, and the technical inspector is selected. An examination item is selected from the examination item list box 43. A subdivision is selected from the subdivision list box 44. By these three selections, a list 45 of evaluation target items is displayed. When the evaluation object item radio button 46 is selected and the past record button 51 is clicked, the past execution record screen 52 of FIG. 17 is displayed. When the work record radio button 53 is clicked, the work content 54 is displayed. In the past execution record screen, the work record title, construction name, acquired score, and in-house evaluation rank can be sorted.

図18は評価対象項目毎の実施事項の社内評価機能フローチャートであり、先ず図19の過去の実施記録画面61を表示する。作業記録ラジオボタン62より作業記録タイトルを選択すると、作業記録内容63が表示される。社内評価リストボックス64より、「参考になった」もしくは「参考にならなかった」を選択する。評価ボタン65をクリックすると、集計が行われ社内評価順位66に反映され順位が表示される。  FIG. 18 is a flowchart of the in-house evaluation function for items to be evaluated for each evaluation target item. First, the past execution record screen 61 of FIG. 19 is displayed. When a work record title is selected from the work record radio button 62, a work record content 63 is displayed. From the in-house evaluation list box 64, select “referenced” or “not helpful”. When the evaluation button 65 is clicked, the total is performed and reflected in the in-house evaluation rank 66, and the rank is displayed.

図20は評価対象項目毎の関連文書リンク機能フローチャートであり、先ず、図21の工事成績評定シミュレーション画面71を表示する。考査官リストボックス72より、主任技術評価官、総括技術評価官、技術検査官の何れかを選択する。考査項目リストボックス73より、考査項目を選択する。細別リストボックス74より、細別を選択する。この3つの選択により、評価対象項目の一覧75が表示される。評価対象項目ラジオボタン76を選択し、新規リンクの追加ボタン77をクリックすると、図22の外部リンク作成画面78が表示される。リンクタイトル79、リンク先URL80を入力し、OKボタン81をクリックすると、図21の工事成績シミュレーション画面71を再表示し、リンクタイトル名82が表示される。  FIG. 20 is a flowchart of the related document link function for each evaluation target item. First, the construction result rating simulation screen 71 of FIG. 21 is displayed. From the examiner list box 72, one of the chief technical evaluator, the general technical evaluator, and the technical inspector is selected. An examination item is selected from the examination item list box 73. A subdivision is selected from the subdivision list box 74. A list 75 of evaluation target items is displayed by these three selections. When the evaluation target item radio button 76 is selected and an add new link button 77 is clicked, an external link creation screen 78 of FIG. 22 is displayed. When the link title 79 and the link destination URL 80 are input and the OK button 81 is clicked, the construction result simulation screen 71 of FIG. 21 is displayed again, and the link title name 82 is displayed.

図23は、工事成績評定一覧管理機能フローチャートであり、先ず、図24のログイン画面91を表示し、ユーザID92、パスワード93を入力する。図25に示すように、システム内で管理されている管理情報(工事単位のデータ)が表示される。表示された管理情報一覧画面94では、各管理情報の最高点、予想点、現状点を確認する事ができる。  FIG. 23 is a flowchart of the construction performance rating list management function. First, the login screen 91 of FIG. 24 is displayed, and the user ID 92 and password 93 are input. As shown in FIG. 25, management information (construction unit data) managed in the system is displayed. On the displayed management information list screen 94, the highest point, expected point, and current point of each piece of management information can be confirmed.

発明の効果The invention's effect

上記の如く本発明においては、請負業者(利用者)において工事成績評定をシミュレーションすることにより、工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付くことが期待できて結果的に次の工事入札の際に有利に競争が行える効果が期待できる。また請負業の担当者にとって、実行予算管理だけでなく、その他の評価項目の管理も客観的に評価できるようになり、より納得性の高い人事考課を行うことが可能となる。さらに、自主的に評価項目の評価を行うことにより、発注者から自己評価と大きく異なる工事成績評定点が出されても、それに対し具体的な異議申し立てを行うことができる。  As described above, in the present invention, the construction performance evaluation can be used as an achievement target management item by simulating the construction performance evaluation at the contractor (user), and it can be expected to lead to higher score acquisition. As a result, it can be expected that there will be an advantageous competition in the next construction bid. In addition, it becomes possible for the contract person in charge to objectively evaluate not only the execution budget management but also the management of other evaluation items, and it becomes possible to perform personnel evaluation with higher convincingness. Furthermore, by independently evaluating the evaluation items, even if the ordering person gives a construction performance rating point that is significantly different from the self-evaluation, a specific objection can be filed.

また、請負業者(利用者)において工事成績評定採点表をレビューすることにより、常に工事成績評定を達成目標管理項目として利用することができ、より高い得点獲得に結び付かせることが期待でき、結果的に次の工事入札の際に有利に競争が行える効果が期待できる。  In addition, by reviewing the construction performance rating scoring chart at the contractor (user), the construction performance rating can always be used as an achievement target management item, which can be expected to lead to higher score acquisition. Therefore, it can be expected that there will be an advantageous competition in the next construction bid.

また、各考査項目に対応してマネージメント必要情報であるチェックポイントを工事成績評定シミュレーション中に表示することにより、これらチェックポイントを工事成績評定を達成目標管理において参照することができ、これにより高い得点獲得に確実に結び付かせることが期待できる。  In addition, by displaying checkpoints, which are management-required information corresponding to each evaluation item, during the construction performance evaluation simulation, these checkpoints can be referred to in the achievement target management, thereby achieving a high score. It can be expected to be linked to acquisition.

また、全現場の達成目標点を共有することにより、達成意欲を向上されることが期待される。また、管理部門・経営層・他の現場からの各現場の実施状況が見えることにより、全体的な考察を行うことのできる環境が提供でき、PDCA(Plan Do Check Act)のマネージメントサイクルを確実に得ることが期待される。経営層では、将来の点数が予測でき、入札準備等の対応に生かすことができる。  Moreover, it is expected that the willingness to achieve will be improved by sharing the achievement target points of all the sites. In addition, by seeing the implementation status of each site from the management department, management layer, and other sites, it is possible to provide an environment where the entire study can be performed, and the management cycle of PDCA (Plan Do Check Act) is ensured. Expected to get. The management can predict future points and use them for bid preparation.

また、発注者の評価は費用をかければ上げられるものもあるが、社内では費用対効果を考慮する必要がある。良い点数を取ることと、原価を下げるという相反する目的を実現するために、発注者の評価ばかりでなく社内評価を得る意義があるが、このような社内評価を知ることができる。  In addition, there are some cases where the evaluation of the orderer can be raised if it costs more, but it is necessary to consider the cost effectiveness within the company. In order to achieve the conflicting purpose of taking a good score and lowering the cost, it is meaningful to obtain an internal evaluation as well as the orderer's evaluation, but it is possible to know such an internal evaluation.

また、各考査項目毎の実施事項と、それに関連する文書・図面・写真等のドキュメントも合わせて管理できるので、過去の工事技術の継承が図れるようになり、他社との差別化強化が期待できる。  In addition, since the implementation items for each assessment item and related documents such as documents, drawings, and photos can be managed together, it will be possible to inherit past construction technology, and it can be expected to strengthen differentiation from other companies. .

さらに、工事成績評定自己考査に関する工事成績評定予測管理一覧をデータベースに管理して、常時利用者端末において各工事の予測した現状点及び達成目標点を確認することができる。  Furthermore, the construction performance rating prediction management list regarding the construction performance rating self-assessment can be managed in a database, and the current status and the target goal achieved for each construction can be confirmed at the user terminal at all times.

システム構成図  System Configuration 工事成績評定シミュレーション機能フローチャート  Construction performance evaluation simulation flowchart 各考査項目・各細別・各考査官を示す関係説明図  Relationship explanatory diagram showing each examination item, each subdivision, each examiner 工事成績評定シミュレーション画面  Construction grade evaluation simulation screen 工事成績評定点換算結果確認画面  Construction result rating point conversion result confirmation screen 工事成績評定レビュー機能フローチャート  Construction performance rating review function flowchart 工事成績評定レビュー画面  Construction grade evaluation review screen 工事成績評定点換算表  Construction grade rating point conversion table パターン選択ダイアログ  Pattern selection dialog チェックポイントコンサルティング機能フローチャート  Checkpoint consulting function flowchart コンサルタント用メンテナンス画面  Maintenance screen for consultants 工事成績評定シミュレーション画面(チェックポイント用)  Construction grade evaluation simulation screen (for checkpoints) チェックポイント表示画面(ユーザ用)  Checkpoint display screen (for users) 実施事項蓄積フローチャート  Action item accumulation flowchart 過去の実施記録確認フローチャート  Past implementation record confirmation flowchart 工事成績評定シミュレーション画面(過去の実施事項確認用)  Construction grade evaluation simulation screen (for confirming past implementation items) 過去の実施記録表示画面  Past execution record display screen 評価対象項目毎の実施事項の社内評価機能フローチャート  Internal evaluation function flow chart for implementation items for each evaluation target item 過去の実施記録表示画面(評価順位表示)  Past implementation record display screen (evaluation order display) 評価対象項目毎の関連文書リンク機能フローチャート  Related document link function flowchart for each evaluation target item 工事成績評定シミュレーション画面(関連文書リンク用)  Construction grade evaluation simulation screen (for related document link) 外部リンク作成画面  External link creation screen 工事成績評定予測一覧管理機能フローチャート  Construction performance rating list management function flowchart 工事成績評定予測一覧ログイン画面  Construction results grade prediction list login screen 工事成績評定予測一覧画面  Construction performance rating forecast list screen

A サーバ
B コンサルタント端末
C 利用者端末」
F 演算装置
DB1 工事成績評定点データベース
DB2 チェックポイントデータベース
DB3 工事実施事項記録蓄積データベース
DB4 文書データベース
DB5 図面データベース,
DB6 写真データベース
01 工事成績評定シミュレーション画面(シミュレーション用画面)
02 考査官リストボックス(シミュレーション用画面)
03 考査項目リストボックス(シミュレーション用画面)
04 細別リストボックス(シミュレーション用画面)
05 評価対象項目の一覧(シミュレーション用画面)
06 履行状況リストボックス(シミュレーション用画面)
07 履行中状況リストボックス(シミュレーション用画面)
08 最大点・予想点・現状点
09 結果確認ボタン
10 採点表
11 工事成績レビュー画面
12 評定点入力ボックス
13 レビュー実行ボタン
14 換算表
15 パターン選択ボタン
16 パターン選択ダイアログ画面
17 パターンラジオボタン
18 OKボタン
20 点数表示
21 コンサル用メンテナンス画面
22 考査官リストボックス
23 考査項目リストボックス
24 細別リストボックス
25 評価対象項目一覧
26 評価対象項目ラジオボタン
27 チェックポイント
29 更新ボタン
31 工事成績評定シミュレーション画面(チェックポイント用画面)
32 考査官リストボックス(チェックポイント用画面)
33 考査項目リストボックス(チェックポイント用画面)
34 細別リストボックス(チェックポイント用画面)
35 評価対象項目の一覧
36 チェックポイントボタン
37 チェックポイント
41 工事成績シミュレーション両面(過去の実施事項確認用画面)
42 考査官リストボックス(過去の実施事項確認用画面)
43 考査項目リストボックス(過去の実施事項確認用画面)
44 細別リストボックス(過去の実施事項確認用画面)
45 評価対象項目の一覧(過去の実施事項確認用画面)
46 評価対象項目ラジオボタン(過去の実施事項確認用画面)
47 作業記録タイトルボックス
48 作業内容ボックス
49 保存ボタン
51 過去記録ボタン
52 過去の実施記録画面
53 作業記録ラジオボタン
54 作業内容
61 過去の実施記録画面画面
62 作業記録ラジオボタン
63 作業記録内容
64 社内評価リストボックス
65 評価ボタン
66 社内評価順位
71 工事成績評定シミュレーション画面(関連文書リンク用画面)
72 考査官リストボックス(関連文書リンク用画面)
73 考査項目リストボックス(関連文書リンク用画面)
74 細別リストボックス(関連文書リンク用画面)
75 評価対象項目の一覧(関連文書リンク用画面)
76 評価対象項目ラジオボタン(関連文書リンク用画面)
77 新規リンクの追加ボタン
78 外部リンク作成画面
79 リンクタイトル
80 リンク先URL
81 OKボタン
82 リンクタイトル名
91 ログイン画面
92 ユーザID
93 パスワード
94 管理情報一覧画面
A Server B Consultant terminal C User terminal "
F arithmetic unit DB1 construction grade rating database DB2 checkpoint database DB3 construction execution item record accumulation database DB4 document database DB5 drawing database,
DB6 Photo database 01 Construction grade evaluation simulation screen (simulation screen)
02 Examiner list box (screen for simulation)
03 Examination item list box (screen for simulation)
04 Detailed list box (simulation screen)
05 List of evaluation items (screen for simulation)
06 Implementation status list box (simulation screen)
07 Status list box (simulation screen)
08 Maximum point / Predicted point / Current point 09 Result confirmation button 10 Scoring table 11 Construction result review screen 12 Evaluation point input box 13 Review execution button 14 Conversion table 15 Pattern selection button 16 Pattern selection dialog screen 17 Pattern radio button 18 OK button 20 Score display 21 Consultation maintenance screen 22 Examiner list box 23 Examination item list box 24 Detailed list box 25 Evaluation target item list 26 Evaluation target item radio button 27 Check point 29 Update button 31 Construction grade evaluation simulation screen (check point screen)
32 Examiner list box (screen for checkpoints)
33 Examination Item List Box (Checkpoint Screen)
34 Detailed list box (screen for checkpoints)
35 List of Evaluation Target Items 36 Check Point Button 37 Check Point 41 Construction Result Simulation Both Sides (Past Execution Items Confirmation Screen)
42 Examiner list box (screen for confirming past implementation items)
43 Examination Item List Box (Past Screen for Confirming Past Items)
44 Detailed List Box (Past Action Confirmation Screen)
45 List of items to be evaluated (screen for confirming past implementation items)
46 Evaluation Target Item Radio Button (Past Action Items Confirmation Screen)
47 Work record title box 48 Work content box 49 Save button 51 Past record button 52 Past execution record screen 53 Work record radio button 54 Work content 61 Past execution record screen screen 62 Work record radio button 63 Work record content 64 Internal evaluation list Box 65 Evaluation button 66 Internal evaluation ranking 71 Construction result rating simulation screen (Related document link screen)
72 Examiner List Box (Related Document Link Screen)
73 Examination Item List Box (Related Document Link Screen)
74 Detailed List Box (Related Document Link Screen)
75 List of Evaluation Target Items (Related Document Link Screen)
76 Evaluation Target Item Radio Button (Related Document Link Screen)
77 Add new link button 78 External link creation screen 79 Link title 80 Link destination URL
81 OK button 82 Link title name 91 Login screen 92 User ID
93 Password 94 Management information list screen

Claims (7)

少なくとも利用者端末において、成績評価対象項目における各考査項目及び各細別に履行状況を入力する手段と、管理者サーバにおいてこの入力により各考査項目及び各細別における各考査官毎の現状点と達成目標点とを演算して保存する手段と、利用者端末において演算された各考査項目及び各細別における各考査官毎の現状点と達成目標点とを比較考察するための採点表を表示する手段とを具備した工事成績評定シミュレーションシステム。At least at the user terminal, a means for inputting each assessment item and performance status for each item to be evaluated, and an entry on the administrator server for each assessment item and each surveyor's current status and achievement target Means for calculating and storing points, and means for displaying a scoring table for comparing and examining each examination item computed at the user terminal and the current point and achievement goal for each examiner in each subdivision Construction performance rating simulation system equipped with 利用者端末において、工事終了後に発注者から提供される評定点を入力する手段と、この入力された評定点を各考査項目及び各細別における各考査官毎の工事成績採点をレビュー画面に表示する手段とを具備する請求項1記載の工事成績評定シミュレーションシステム。On the user terminal, a means for inputting the grade score provided by the orderer after the construction is completed, and the grade score that has been entered is displayed on the review screen for each assessment item and each examiner for each subdivision. The construction performance rating simulation system according to claim 1, further comprising: means. コンサルタント端末において各考査項目及び各細別に対応してマネージメント必要情報であるチェックポイントを入力保存する手段と、このチェックポイントを新規に更新して保存する手段と、利用者端末において選択された各考査項目及び各細別における前記チェックポイントを工事成績評定シミュレーション中に表示する手段と具備する請求項1及び2のいずれかに記載の工事成績評定シミュレーションシステム。A means for inputting and saving checkpoints, which are management-required information corresponding to each examination item and each detail in the consultant terminal, a means for newly updating and saving this checkpoint, and each examination selected in the user terminal The construction performance rating simulation system according to claim 1, further comprising means for displaying the check points in each item and each subdivision during the construction performance rating simulation. 各考査項目における現状工事の実施事項記録をデータベースに蓄積する実施事項記録保存手段と、工事成績評定シミュレーション中に前記実施事項記録を確認する実施事項記録表示手段とを具備する請求項1乃至3のいずれかに記載の工事成績評定シミュレーションシステム。The execution item record storage means for accumulating in the database the execution item record of the current construction for each examination item, and the execution item record display means for confirming the execution item record during the construction performance evaluation simulation. A construction performance rating simulation system described in any of the above. 利用者端末において前記データベースに保存された実施事項記録が参考になったかどうかの評価を入力する手段と、この評価の高順位から低順位に実施事項記録を並び換えて表示する手段とを具備する請求項1乃至4のいずれかに記載の工事成績評定シミュレーションシステム。Means for inputting an evaluation as to whether or not the action item record stored in the database is helpful in the user terminal; and means for rearranging and displaying the action item record from the highest to the lowest of the evaluation. The construction performance rating simulation system according to any one of claims 1 to 4. 各考査項目及び各細別に対応する工事資料を管理サーバのデータベースに保存する手段と、利用者において前記データベースへリンクしてこの資料を利用者端末で閲覧表示する手段とを具備する請求項1乃至5のいずれかに記載の工事成績評定シミュレーションシステム。A means for storing construction items corresponding to each examination item and each sub-item in a database of a management server, and means for linking to the database and browsing and displaying the materials on a user terminal by a user. 5. The construction performance rating simulation system described in any one of 5 above. 利用者端末において工事成績評定予測管理一覧を管理サーバのデータベースに記録する手段と、利用者端末において前記工事成績評定予測管理一覧の各工事における現状点及び達成目標点を表示する手段とを具備する請求項1乃至6のいずれかに記載の工事成績評定シミュレーションシステム。Means for recording a construction result rating prediction management list in the database of the management server at the user terminal, and means for displaying a current point and an achievement target point in each construction of the construction result rating prediction management list at the user terminal. The construction performance rating simulation system according to any one of claims 1 to 6.
JP2009299566A 2009-12-24 2009-12-24 Construction performance rating simulation system Pending JP2011134287A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009299566A JP2011134287A (en) 2009-12-24 2009-12-24 Construction performance rating simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009299566A JP2011134287A (en) 2009-12-24 2009-12-24 Construction performance rating simulation system

Publications (1)

Publication Number Publication Date
JP2011134287A true JP2011134287A (en) 2011-07-07

Family

ID=44346904

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009299566A Pending JP2011134287A (en) 2009-12-24 2009-12-24 Construction performance rating simulation system

Country Status (1)

Country Link
JP (1) JP2011134287A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200083256A (en) * 2018-12-28 2020-07-08 장효수 Construction management system for real-time construction inspection and evaluation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200083256A (en) * 2018-12-28 2020-07-08 장효수 Construction management system for real-time construction inspection and evaluation
KR102209809B1 (en) * 2018-12-28 2021-01-29 장효수 Construction management system for real-time construction inspection and evaluation

Similar Documents

Publication Publication Date Title
Karakhan et al. Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach
Abdirad Metric-based BIM implementation assessment: a review of research and practice
Karimi et al. Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance
Tsai et al. Developing critical success factors for the assessment of BIM technology adoption: part I. Methodology and survey
Ahiaga-Dagbui et al. Rethinking construction cost overruns: cognition, learning and estimation
Tribelsky et al. An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures
Doloi Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects
Poghosyan et al. A web-based design for occupational safety and health capability maturity indicator
Haponava et al. Proposed system for measuring project performance using process-based key performance indicators
Li et al. Effects of digital technology adoption on sustainability performance in construction projects: The mediating role of stakeholder collaboration
Azam Haron et al. Quality function deployment modelling to enhance industrialised building system adoption in housing projects
Othman An international index for customer satisfaction in the construction industry
Yu et al. Factors affecting the utilization of big data in construction projects
CN111178705A (en) Item evaluation method, item evaluation device, item evaluation apparatus, and storage medium
Liu et al. BIM cloud score: Building information model and modeling performance benchmarking
Ducq* et al. Definition and aggregation of a performance measurement system in three aeronautical workshops using the ECOGRAI method
Lhee et al. Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks
Farzad Moosavi et al. Review of detailed schedules in building construction
Horta et al. Design of performance assessment system for selection of contractors in construction industry e-marketplaces
Fakhruddin et al. Harnessing risk-informed data for disaster and climate resilience
Hannouf et al. Cause-effect chains in S-LCA based on DPSIR framework using Markov healthcare model: an application to “working hours” in Canada
Naji et al. The effect of change-order management factors on construction project success: a structural equation modeling approach
Jelodar et al. Designing for construction procurement: an integrated decision support system for building information modelling
Ezzeddine et al. CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion
Lin et al. Performance evaluation management model to accelerate the development of e-government in China