JP2011080196A - Panel lifting implement and method for transferring panel - Google Patents

Panel lifting implement and method for transferring panel Download PDF

Info

Publication number
JP2011080196A
JP2011080196A JP2009230933A JP2009230933A JP2011080196A JP 2011080196 A JP2011080196 A JP 2011080196A JP 2009230933 A JP2009230933 A JP 2009230933A JP 2009230933 A JP2009230933 A JP 2009230933A JP 2011080196 A JP2011080196 A JP 2011080196A
Authority
JP
Japan
Prior art keywords
panel
panels
sling
support bar
end surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009230933A
Other languages
Japanese (ja)
Other versions
JP5280980B2 (en
Inventor
Tomohiro Enomoto
知宏 榎本
Akashi Yoshida
証 吉田
Arihiro Iwatani
有祐 岩谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2009230933A priority Critical patent/JP5280980B2/en
Publication of JP2011080196A publication Critical patent/JP2011080196A/en
Application granted granted Critical
Publication of JP5280980B2 publication Critical patent/JP5280980B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a panel lifting implement which enables the arbitrary number of panels to be lifted and transferred in the state of being wound with a sling by a simple and safe method, in the operation of transferring the panel mainly composed an ALC panel and provided with a groove such as a tooled joint, and also to provide a method for transferring the panel. <P>SOLUTION: The panel lifting implement B makes a panel 1 lifted so that a lifting sling 53 is wound around the panels 1 stacked in such a manner that a surface formed with the plurality of linear grooves 2 from one end surface to the other end surface facing it is directed downward. The panel lifting implement B consists of: a horizontal arm 10, the central portion of which is equipped with: an annular hooking piece 12 for hooking a hook 52 etc.; a pair of suspended arm 20, the lower end of which is equipped with an almost horizontal panel supporting rod insertion hole 23 and suspended from the horizontal arm 10; and a panel supporting rod 40 which has a shape corresponding to a shape of the groove 2 of the panel 1, which is inserted through the panel supporting rod insertion hole 23 of the suspended arm 20, and which is inserted into the groove 2 from the end surface of the panel 1. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、ALC等のコンクリート製のパネルの積み下ろし作業を行う際に用いるパネル浮かし治具及びパネルの移動方法に関するものである。   The present invention relates to a panel floating jig used when loading and unloading a concrete panel such as ALC and a panel moving method.

従来より、建物の外壁として使用されるALC(軽量気泡コンクリート)等のコンクリート製のパネルには、意匠性を向上させるための化粧目地(溝)が形成されことが多い。   Conventionally, decorative joints (grooves) for improving design are often formed on concrete panels such as ALC (lightweight cellular concrete) used as the outer wall of a building.

一方、ALC等のコンクリート製のパネルの積み下ろし作業を行う際には、枕木の上にパネルを積み重ねられたパネルに、枕木によって形成された空間を利用してナイロン等の化学繊維からなるスリング(両端部がリング状に加工された帯状の吊り上げ用治具)を巻きつけ、揚重機等で吊り上げる、あるいはパレットの上にパネルを積み重ねてパレットごと吊り上げるという方法が主流であった。   On the other hand, when a concrete panel such as ALC is loaded and unloaded, a sling made of chemical fibers such as nylon (both ends) is formed on the panel stacked on the sleeper using the space formed by the sleeper. The mainstream method is to wrap a belt-shaped lifting jig whose portion is processed into a ring shape and lift it with a lifting machine or the like, or stack panels on a pallet and lift the whole pallet.

このような方法の場合、パネルの吊り上げ枚数は枕木あるはパレットの上に積み重ねられたパネルの数に限定されてしまい、任意の枚数を吊り上げることが困難であった。   In such a method, the number of panels to be lifted is limited to the number of sleepers or panels stacked on a pallet, and it is difficult to lift an arbitrary number of panels.

特許文献1には、PC床版の中空孔に充填されたモルタルによって固着された係止具を利用してPC床版を揚重する技術が開示されている。この技術によれば、積み重ねられた複数枚のパネルうち任意の枚数のパネルを吊り上げることが可能である。   Patent Document 1 discloses a technique for lifting a PC floor slab using a locking tool fixed by a mortar filled in a hollow hole of the PC floor slab. According to this technique, it is possible to lift an arbitrary number of panels among a plurality of stacked panels.

特開2007−113193号公報JP 2007-113193 A

しかし、ALCパネルはPCパネルと比較して脆弱であり、上記特許文献1に記載されたような加工を施して複数のパネルを吊り上げた場合、その重量によって中空孔付近が破損する虞がある。また、中空孔の加工、モルタルの充填、モルタルの養生、モルタルで固着された係止具の取り外し等が必要となり手間や時間を要するという問題もあった。   However, the ALC panel is more fragile than the PC panel, and when a plurality of panels are lifted by processing as described in Patent Document 1, the vicinity of the hollow hole may be damaged by the weight. In addition, processing of the hollow hole, filling of the mortar, curing of the mortar, removal of the locking tool fixed with the mortar, etc. are required, and there is a problem that it takes time and effort.

本発明は、このような従来技術の有する課題を解決し、主としてALCからなり化粧目地等の溝が形成されたパネルの移動作業において、簡易かつ安全な方法で任意の枚数のパネルにスリングを巻き付けて吊り上げ、移動させることができるパネル浮かし治具及びパネルの移動方法を提供することを目的とするものである。   The present invention solves such problems of the prior art, and wraps a sling around an arbitrary number of panels in a simple and safe manner during the movement of a panel mainly made of ALC and formed with grooves such as decorative joints. It is an object of the present invention to provide a panel floating jig that can be lifted and moved and a method for moving the panel.

上記課題を解決する為に、本発明に係るパネル浮かし治具の構成は、一方の端面から対向する他方の端面にかけて直線状の複数の溝が形成された面を下向きにして積み重ねられたパネルに対し吊り上げ用のスリングを巻きつけるために、該パネルを浮かすパネル浮かし治具であって、フック等を引っ掛けるための環状の引っ掛け片を中心部に備えた水平アームと、下端に略水平方向の挿通孔を備え、水平アームから垂下する一対の垂下アームと、
パネルの溝形状に対応した形状を有し、垂下アームの挿通孔に挿通されるとともにパネルの端面から溝に挿し込まれるパネル支持棒と、からなることを特徴としている。
In order to solve the above problems, the configuration of the panel floating jig according to the present invention is a panel stacked with a plurality of straight grooves formed downward from one end face to the other facing end face. A panel floating jig for floating the sling for lifting the panel, a horizontal arm having an annular hook piece for hooking a hook or the like at the center, and a substantially horizontal insertion at the lower end A pair of hanging arms with holes and hanging from a horizontal arm;
It has a shape corresponding to the groove shape of the panel, and is characterized by comprising a panel support rod that is inserted into the insertion hole of the hanging arm and is inserted into the groove from the end face of the panel.

上記構成において、一対の垂下アームの間隔がパネルの幅寸法に対応して調整自在に装着されるのが好ましい。   In the above configuration, it is preferable that the interval between the pair of hanging arms is mounted so as to be adjustable in accordance with the width dimension of the panel.

また、本発明に係るパネルの移動方法は、下記工程を有することを特徴としている。
(1)一方の側端面から対向する他方の側端面にかけて直線状の複数の溝が形成された複数のパネルを、溝が形成された面が下向きになるように所定場所に積み重ねる工程。
(2)前記複数のパネルのうち上から所定枚数目のパネルの溝にパネル支持棒を挿し込み、該パネル支持棒を上昇させて、所定枚数のパネルからなるパネル群の長さ方向の一端側を浮かす工程。
(3)前記パネル群を浮かした状態で、前記パネル群下方の隙間を利用して前期パネル群にスリングを巻きつける工程。
(4)前記パネル支持棒を降下させ浮かした前記パネル群を前記スリングが巻きついた状態で当初の位置に戻す工程。
(5)前記パネル支持棒を抜き取る工程。
(6)前記スリングを揚重機のフックに引っ掛けて前記パネル群を吊り上げ、所定位置まで水平移動させたのち、前記パネル群を着地させる工程。
Moreover, the moving method of the panel which concerns on this invention has the following processes.
(1) A step of stacking a plurality of panels in which a plurality of linear grooves are formed from one side end surface to the opposite side end surface in a predetermined place so that the surface on which the grooves are formed faces downward.
(2) A panel support bar is inserted into a groove of a predetermined number of panels from the top of the plurality of panels, and the panel support bar is lifted to end one end side in the length direction of a panel group consisting of the predetermined number of panels The process of floating.
(3) A step of winding a sling around the panel group using the gap below the panel group with the panel group floating.
(4) A step of returning the panel group, which is floated by lowering the panel support bar, to the initial position in a state where the sling is wound.
(5) A step of extracting the panel support bar.
(6) A step of hanging the sling on a hook of a hoist to lift the panel group, horizontally moving it to a predetermined position, and then landing the panel group.

本発明に係るパネル浮かし治具及びパネルの移動方法によれば、パネルの表面の溝にパネル支持棒を挿し込み、パネル支持棒を上昇させることによってパネル群を浮かせるので、ALC等の比較的脆弱な材質からなるパネルであっても、パネルの強度上の問題を有することなく、任意の枚数のパネル群を一時的に安全に浮かしてその下方に隙間をつくって、スリングを巻きつけ、該スリングを揚重機等で引き上げることによってパネル群を移動させることができる。特に、表面に化粧目地が形成された壁パネルの場合、化粧目地がそのまま利用できるので、余計な手間やコストが発生しない。   According to the panel floating jig and the panel moving method according to the present invention, the panel group is floated by inserting the panel support bar into the groove on the surface of the panel and raising the panel support bar. Even if the panel is made of a different material, any number of panel groups can be temporarily lifted safely to create a gap below the sling without having any problems with the strength of the panel. The panel group can be moved by pulling up with a lifting machine or the like. In particular, in the case of a wall panel having a makeup joint formed on the surface, the makeup joint can be used as it is, so that unnecessary labor and cost do not occur.

また、着脱が容易であり、積み下ろし作業に要する時間の短縮を図ることができる。 In addition, it is easy to attach and detach, and the time required for the loading and unloading work can be shortened.

パネルの構成を示す図である。It is a figure which shows the structure of a panel. パネル浮かし治具の構成を示す図である。It is a figure which shows the structure of a panel floating jig | tool. パネルの移動方法を示す図である。It is a figure which shows the moving method of a panel. パネルの移動方法を示す図である。It is a figure which shows the moving method of a panel. パネルの移動方法を示す図である。It is a figure which shows the moving method of a panel. パネルの移動方法を示す図である。It is a figure which shows the moving method of a panel.

以下に、図を参照しながら本発明の一実施形態について説明する。本実施例において対象となるパネル1は、305mmの平面モジュールを有する鉄骨造工業化住宅の外壁として使用されるALCからなるものである。   An embodiment of the present invention will be described below with reference to the drawings. The target panel 1 in this embodiment is made of ALC used as an outer wall of a steel-frame industrial housing having a flat module of 305 mm.

図1に示すパネル1は、厚みが75mmであり、主として使用されるパネル1の幅寸法は610mmと305mmである。(図1では代表して610mmのパネルを示している。)パネル1の表側の面には、一方の側端面から対向する他方の側端面に到達する直線状の複数の横化粧目地(溝)2、及び、上端面から下端面に達する縦化粧目地3が、所定のピッチでパネル表面を切削加工することにより形成されている。   The panel 1 shown in FIG. 1 has a thickness of 75 mm, and the width dimensions of the panel 1 mainly used are 610 mm and 305 mm. (In FIG. 1, a 610 mm panel is shown as a representative.) On the front side surface of the panel 1, a plurality of linear decorative joints (grooves) that reach from one side end surface to the other side end surface facing each other. 2 and a vertical decorative joint 3 reaching from the upper end surface to the lower end surface is formed by cutting the panel surface at a predetermined pitch.

図2に示すパネル浮かし治具Bは、水平アーム10、水平アーム10から垂下する一対の垂下アーム20、水平アーム10に垂下アーム20を固定する固定具30、及び水平アーム10下端に装着されるパネル支持棒40からなる。   The panel floating jig B shown in FIG. 2 is attached to the horizontal arm 10, a pair of hanging arms 20 that hang from the horizontal arm 10, a fixture 30 that fixes the hanging arm 20 to the horizontal arm 10, and a lower end of the horizontal arm 10. It consists of a panel support bar 40.

水平アーム10は、本体11がパイプ状の鋼材からなり、本体10中心部の上面には揚重機のフック等を引っ掛けるための環状の引っ掛け片12が溶接されている。また、水平アーム10には、垂下アームを20パネルの幅に対応させて固定する際の目安となる目盛13が刻まれている。   In the horizontal arm 10, the main body 11 is made of a pipe-shaped steel material, and an annular hook piece 12 for hooking a hook or the like of a lifting machine is welded to the upper surface of the central portion of the main body 10. Further, the horizontal arm 10 is engraved with a scale 13 that serves as a guide for fixing the hanging arm in correspondence with the width of the 20 panel.

垂下アーム20は、水平アーム10から左右対称に垂下する一対の部材であり、本体21は鋼材からなるフラットバーで構成され、その上端には水平アームを挿通するための水平アーム挿通孔22が穿設され、下端にはパネル支持棒を挿通するための筒状のパネル支持棒挿通部23を備えている。   The drooping arm 20 is a pair of members that hang symmetrically from the horizontal arm 10, the main body 21 is formed of a flat bar made of steel, and a horizontal arm insertion hole 22 for inserting the horizontal arm is formed at the upper end thereof. A cylindrical panel support bar insertion portion 23 for inserting the panel support bar is provided at the lower end.

垂下アーム20は、水平アーム10に対して2つのリング状の固定具30で挟持され固定される。固定具30にはネジ孔が穿設されており、該ネジ孔に蝶ネジ31を捻じ込みその先端を水平アーム10に押し付けることで固定具30が所定位置に固定される。垂下アーム20の長さはパネル1の厚みや同時に浮かせる(=スリングで吊り上げる)パネル1の枚数(本実施例では5枚)に応じて適宜設定される。   The drooping arm 20 is clamped and fixed to the horizontal arm 10 by two ring-shaped fixtures 30. The fixing tool 30 has a screw hole, and the fixing tool 30 is fixed at a predetermined position by screwing a thumbscrew 31 into the screw hole and pressing the tip of the thumb screw 31 against the horizontal arm 10. The length of the hanging arm 20 is appropriately set according to the thickness of the panel 1 and the number of panels 1 that are simultaneously floated (= lifted by a sling) (5 in this embodiment).

パネル支持棒40は、パネル1が平坦な面に載置された状態でパネル1の端面から横化粧目地2に差し込むことができる径を有する円形断面の鋼材からなる。なお、単純な形状であれば横化粧目地2の形状に合致する断面形状としてもよい。(この場合、横化粧目地2に接する面積が増えパネル1の損傷の可能性を軽減することができる。)   The panel support bar 40 is made of a steel material having a circular cross section having a diameter that can be inserted into the horizontal decorative joint 2 from the end face of the panel 1 in a state where the panel 1 is placed on a flat surface. In addition, if it is a simple shape, it is good also as a cross-sectional shape which corresponds to the shape of the horizontal decorative joint 2. (In this case, the area in contact with the horizontal decorative joint 2 increases, and the possibility of damage to the panel 1 can be reduced.)

本実施例では、2本の垂下アーム20のパネル支持棒挿通部23の夫々に比較的短いパネル支持棒40を挿通する構成であるが、1本のパネル支持棒40を2本の垂下アーム20のパネル支持棒挿通部23に挿通する構成としてもよい。前者は作業性や携帯性に優れる。一方、後者はパネル1をより安定して保持することができ、縦化粧目地2に接する面積が増え損傷もより少なくすることができる。   In this embodiment, a relatively short panel support bar 40 is inserted into each of the panel support bar insertion portions 23 of the two hanging arms 20, but one panel support bar 40 is inserted into the two hanging arms 20. It is good also as a structure inserted in the panel support rod insertion part 23 of this. The former is excellent in workability and portability. On the other hand, the latter can hold the panel 1 more stably, and the area in contact with the vertical decorative joint 2 can be increased and the damage can be reduced.

パネル支持棒40を2本で構成する場合、パネル支持棒挿通部23とパネル支持棒40との間の「遊び」やパネル支持棒挿通部23の長さに応じて、パネル支持棒40の先端が垂れ下がるので、この垂れ下がりを考慮してパネル支持棒挿通部23の軸の方向を設定する(若干上向きの設計とする)のが好ましい。   When the panel support bar 40 is composed of two pieces, the tip of the panel support bar 40 depends on “play” between the panel support bar insertion part 23 and the panel support bar 40 or the length of the panel support bar insertion part 23. Therefore, it is preferable to set the direction of the axis of the panel support bar insertion portion 23 in consideration of the sag (with a slightly upward design).

次に、図3〜図6を参照して、パネル浮かし治具Bを用いたパネル1の移動方法について説明する。本実施例は、トラックの荷台50に積み込まれた複数のパネル1を建築現場に搬送して、所定枚数のパネル1からなるパネル群Aをトラックの荷台50から建築現場の所定位置に揚重機を用いて降ろす場合を想定したものであり、以下の手順で行われる。   Next, a method of moving the panel 1 using the panel floating jig B will be described with reference to FIGS. In the present embodiment, a plurality of panels 1 loaded on a truck bed 50 are transported to a building site, and a panel group A consisting of a predetermined number of panels 1 is moved from the truck bed 50 to a predetermined position on the building site. It is assumed to be used and lowered, and is performed according to the following procedure.

(1)トラックの荷台50に枕木51を並べ、枕木の上にパネル1の表側(化粧目地の面)を下向きにして積み重ねる。   (1) The sleepers 51 are arranged on the truck bed 50 and stacked on the sleepers with the front side of the panel 1 (the face of the joint) facing downward.

(2)揚重機のフック52を水平アーム10の引っ掛け片12に引っ掛けてパネル支持棒40が未装着の状態のパネル浮かし治具Bを吊り上げ、パネル1の所定位置(長さ方向の一方の端部寄りの横化粧目地2の位置)付近まで水平移動させ、更にパネル浮かし治具Bを2本の垂下アーム20でパネル1を挟み込むような状態で降下させる。   (2) The hook 52 of the lifting machine is hooked on the hooking piece 12 of the horizontal arm 10 to lift the panel floating jig B with the panel support bar 40 not attached, and a predetermined position (one end in the length direction) of the panel 1 is lifted. Next, the panel is moved horizontally to the vicinity of the side makeup joint 2 near the part), and the panel lifting jig B is lowered with the two hanging arms 20 sandwiching the panel 1.

(3)垂下アーム20のパネル支持棒挿通部23の位置を、上から所定枚数目(例えば5枚のパネルを吊り上げるのであれば上から5枚目)のパネル1の横化粧目地2の位置に合わせ、パネル支持棒40をパネル支持棒挿通部23に挿通するとともに、横化粧目地2に挿し込む(以上図3を参照)。   (3) The position of the panel support rod insertion portion 23 of the hanging arm 20 is set to the position of the horizontal decorative joint 2 of the panel 1 of a predetermined number from the top (for example, the fifth from the top if five panels are lifted). In addition, the panel support bar 40 is inserted into the panel support bar insertion portion 23 and also inserted into the side decorative joint 2 (see FIG. 3 above).

(4)パネル浮かし治具B(パネル支持棒40)を揚重機で上昇させて、所定枚数のパネル1(パネル群A)の長さ方向の一端をスリング53が巻きつけられる程度に浮かす。   (4) The panel floating jig B (panel support bar 40) is lifted by a lifting machine, and one end in the length direction of a predetermined number of panels 1 (panel group A) is floated to the extent that the sling 53 is wound.

(5)パネル群Aを浮かした状態で、パネル群A下方の隙間を利用してパネル群Aにスリング53を巻きつけて、スリング53の一方の端部を他方の端部の環の中に挿通しておく。なお、スリング53はパネル群Aを吊り上げた際に略水平となるように、パネル群Aの両端部からほぼ等しい位置2箇所に巻きつける(以上図4を参照)。   (5) With the panel group A floating, the sling 53 is wound around the panel group A using the gap below the panel group A, and one end of the sling 53 is placed in the ring at the other end. Insert it. The sling 53 is wound around two substantially equal positions from both ends of the panel group A so as to be substantially horizontal when the panel group A is lifted (see FIG. 4 above).

(6)スリング53が巻きついた状態でパネル浮かし治具B(パネル支持棒40)を降下させ、パネル群Aを再度荷台50に残るパネル1の上に積み重ねる(以上図5を参照)。   (6) The panel floating jig B (panel support bar 40) is lowered while the sling 53 is wound, and the panel group A is stacked again on the panel 1 remaining on the loading platform 50 (see FIG. 5 above).

(7)パネル支持棒40を抜き取り、パネル浮かし治具Bを上昇させて外す。 (7) Pull out the panel support bar 40 and lift the panel lifting jig B to remove it.

(8)スリング53を揚重機のフック52に引っ掛け、フック52を上昇させてパネル群Aを吊り上げ、予め枕木が並べられた建築現場の所定位置まで水平移動させる(以上図6を参照)。 (8) The sling 53 is hooked on the hook 52 of the hoist, the hook 52 is raised, the panel group A is lifted, and horizontally moved to a predetermined position on the construction site where sleepers are arranged in advance (see FIG. 6 above).

(9)パネル群Aを枕木を介して所定位置に着地させる (9) Land the panel group A at a predetermined position through the sleepers.

(10)スリング53をフック52から外し抜き取る。 (10) Remove the sling 53 from the hook 52 and remove it.

上記構成によれば、パネル1の意匠性を向上させるために形成された表面の横化粧目地(溝)2を利用してパネル支持棒40を挿し込み、パネル支持棒40を上昇させるパネル群Aを浮かせることによって、比較的脆弱なALCからなるパネル1を強度上の問題を有することなく、また、余計な手間やコストを発生させることなく、任意の枚数のパネル群Aを一時的に浮かせてその下方に隙間をつくってスリング53を巻きつけ、スリング53を揚重機で引き上げることによってパネル群Aを移動させることができる。また、着脱が容易であり、積み下ろし作業に要する時間の短縮を図ることができる。   According to the said structure, the panel group A which inserts the panel support bar 40 using the horizontal decorative joint (groove) 2 of the surface formed in order to improve the designability of the panel 1, and raises the panel support bar 40 The panel 1 made of relatively fragile ALC can be floated temporarily without causing any problems in strength, without generating extra time and cost. The panel group A can be moved by winding the sling 53 with a gap below it and lifting the sling 53 with a lifting machine. In addition, it is easy to attach and detach, and the time required for the loading and unloading work can be shortened.

上記実施例では、スリング53を用いているが、上記浮かし治具Bを2セット用いて、或いは、パネル群Bを所定の間隔を有して2点で支持し得るような治具を用いて、パネル群Aにスリング53を巻きつける過程を経ることなく、パネル群Bを直接吊り上げ移動させることも可能である。   In the above embodiment, the sling 53 is used. However, two sets of the floating jig B are used, or a jig that can support the panel group B at two points with a predetermined interval is used. The panel group B can be directly lifted and moved without going through the process of winding the sling 53 around the panel group A.

また、通常溝が形成されない床用パネルであっても、下面に溝を形成しておくことで、同様の手順で吊り上げ移動させることができる。   Moreover, even if it is a floor panel in which a groove | channel is not normally formed, it can be lifted and moved in the same procedure by forming a groove | channel in the lower surface.

本発明はALCパネルに好適であるが、PCパネル等の他のパネル状建築材料にも適用が可能である。   The present invention is suitable for ALC panels, but can also be applied to other panel-shaped building materials such as PC panels.

A パネル群
B□パネル浮かし治具
1 パネル
2 横化粧目地(溝)
3 縦化粧目地
10 水平アーム
11 本体
12 引っ掛け片
13 目盛
20 垂下アーム
21 本体
22 水平アーム挿通孔
23 パネル支持棒挿通部
30 固定具
31 蝶ネジ
40 パネル支持棒
50 荷台
51 枕木
52 揚重機のフック
53 スリング
A Panel group B □ Panel floating jig 1 Panel 2 Horizontal decorative joint (groove)
3 Vertical decorative joint 10 Horizontal arm 11 Body 12 Hook 13 Scale 20 Drooping arm 21 Body 22 Horizontal arm insertion hole 23 Panel support bar insertion part 30 Fixing tool 31 Thumb screw 40 Panel support bar 50 Loading platform 51 Sleeper 52 Hook 53 Sling

Claims (3)

一方の端面から対向する他方の端面にかけて直線状の複数の溝が形成された面を下向きにして積み重ねられたパネルに対し吊り上げ用のスリングを巻きつけるために、該パネルを浮かすパネル浮かし治具であって、
フック等を引っ掛けるための環状の引っ掛け片を中心部に備えた水平アームと、
下端に略水平方向の挿通孔を備え、水平アームから垂下する一対の垂下アームと、
パネルの溝形状に対応した形状を有し、垂下アームの挿通孔に挿通されるとともにパネルの端面から溝に挿し込まれるパネル支持棒と、からなることを特徴とするパネル浮かし治具。
In order to wrap a sling for lifting a panel that is stacked with the surface on which a plurality of linear grooves are formed facing downward from one end surface to the other end surface, a panel floating jig for floating the panel is used. There,
A horizontal arm with an annular hook piece at the center for hooking, etc .;
A pair of drooping arms that have a substantially horizontal insertion hole at the lower end and hang from the horizontal arm;
A panel floating jig having a shape corresponding to the groove shape of the panel, and a panel support rod inserted into the insertion hole of the hanging arm and inserted into the groove from the end surface of the panel.
前記一対の垂下アームの間隔がパネルの幅寸法に対応して調整自在に装着されたことを特徴とする請求項1に記載したパネル浮かし治具。   The panel floating jig according to claim 1, wherein an interval between the pair of hanging arms is mounted so as to be adjustable in accordance with a width dimension of the panel. 下記工程を有することを特徴とするパネルの移動方法。
(1)一方の側端面から対向する他方の側端面にかけて直線状の複数の溝が形成された複数のパネルを、溝が形成された面が下向きになるように所定場所に積み重ねる工程。
(2)前記複数のパネルのうち上から所定枚数目のパネルの溝にパネル支持棒を挿し込み、該パネル支持棒を上昇させて、所定枚数のパネルからなるパネル群の長さ方向の一端側を浮かす工程。
(3)前記パネル群を浮かした状態で、パネル群下方の隙間を利用してパネル群にスリングを巻きつける工程。
パネル支持棒を降下させ浮かしたパネル群をスリングが巻きついた状態で当初の位置に戻す工程。
(4)パネル支持棒を抜き取る工程。
(5)スリングを揚重機のフックに引っ掛けてパネル群を吊り上げ、所定位置まで水平移動させたのち、パネル群を着地させる工程。
A method for moving a panel, comprising the following steps.
(1) A step of stacking a plurality of panels in which a plurality of linear grooves are formed from one side end surface to the opposite side end surface in a predetermined place so that the surface on which the grooves are formed faces downward.
(2) A panel support bar is inserted into a groove of a predetermined number of panels from the top of the plurality of panels, and the panel support bar is lifted to end one end side in the length direction of a panel group consisting of the predetermined number of panels The process of floating.
(3) A step of winding a sling around the panel group using a gap below the panel group with the panel group floating.
The process of returning the panel group, which has been lifted by lowering the panel support bar, to the original position with the sling wrapped around.
(4) A step of removing the panel support bar.
(5) A step of hanging the sling on the hook of the hoist to lift the panel group, horizontally moving it to a predetermined position, and then landing the panel group.
JP2009230933A 2009-10-02 2009-10-02 Panel floating jig and panel moving method Active JP5280980B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009230933A JP5280980B2 (en) 2009-10-02 2009-10-02 Panel floating jig and panel moving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009230933A JP5280980B2 (en) 2009-10-02 2009-10-02 Panel floating jig and panel moving method

Publications (2)

Publication Number Publication Date
JP2011080196A true JP2011080196A (en) 2011-04-21
JP5280980B2 JP5280980B2 (en) 2013-09-04

Family

ID=44074503

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009230933A Active JP5280980B2 (en) 2009-10-02 2009-10-02 Panel floating jig and panel moving method

Country Status (1)

Country Link
JP (1) JP5280980B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763158A (en) * 2015-04-16 2015-07-08 中天建设集团有限公司天津分公司 Joggle joint type lightweight aggregate interlocking block construction method
JP2015229886A (en) * 2014-06-06 2015-12-21 大和ハウス工業株式会社 Gap widening device
WO2017011860A1 (en) * 2015-07-17 2017-01-26 Csr Building Products Limited Method of lifting panel with inserts
WO2017011859A1 (en) * 2015-07-17 2017-01-26 Csr Building Products Limited Lifting tool

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0558753U (en) * 1992-01-21 1993-08-03 小野田エー・エル・シー株式会社 Lifting equipment for lightweight cellular concrete panels
JPH0628109U (en) * 1992-09-07 1994-04-15 積水ハウス株式会社 Concrete board carrier
JP2007113193A (en) * 2005-10-18 2007-05-10 Shimizu Corp Lifting method for pc floor slab and hanging tool used therein

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0558753U (en) * 1992-01-21 1993-08-03 小野田エー・エル・シー株式会社 Lifting equipment for lightweight cellular concrete panels
JPH0628109U (en) * 1992-09-07 1994-04-15 積水ハウス株式会社 Concrete board carrier
JP2007113193A (en) * 2005-10-18 2007-05-10 Shimizu Corp Lifting method for pc floor slab and hanging tool used therein

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015229886A (en) * 2014-06-06 2015-12-21 大和ハウス工業株式会社 Gap widening device
CN104763158A (en) * 2015-04-16 2015-07-08 中天建设集团有限公司天津分公司 Joggle joint type lightweight aggregate interlocking block construction method
WO2017011860A1 (en) * 2015-07-17 2017-01-26 Csr Building Products Limited Method of lifting panel with inserts
WO2017011859A1 (en) * 2015-07-17 2017-01-26 Csr Building Products Limited Lifting tool

Also Published As

Publication number Publication date
JP5280980B2 (en) 2013-09-04

Similar Documents

Publication Publication Date Title
JP5280980B2 (en) Panel floating jig and panel moving method
JP6503716B2 (en) Demolition system and demolition method
JP5213381B2 (en) Demolition and construction method of blast furnace hot stove
JP2019210109A (en) Lifting device of heavy load and lifting and conveying method
JP6839681B2 (en) How to dismantle a tower-supported chimney
JP4559313B2 (en) Demolition method of steel tower supported chimney
JP4984493B2 (en) Blast furnace demolition method and blast furnace construction method
CN113526327B (en) Assembled concrete laminated slab floor slab hoisting structure and construction process
CN112193984B (en) Steel reinforcement cage lifting and fixing device and steel reinforcement cage lifting method
CN215516349U (en) Light wallboard lifting device
JP6751298B2 (en) Turbine casing rotating device
TW201413094A (en) Building method of cylindrical tank
JP2011149163A (en) Overhaul facility for steel tower support structure and method for overhauling the same
KR101201215B1 (en) Moving tool for mold of concrete building
JP2016050413A (en) Raising tool and raising method
JP7489108B2 (en) Formwork hanging jig
CN215047956U (en) Novel hanging bracket for quick loading
JP2010018974A (en) Implement for placing of reinforcement
CN117816875A (en) Cage type steel bar processing equipment and processing method thereof
JP2018084101A (en) Stacking device and stacking method
JP4354365B2 (en) Main reinforcing bar connection method
JP2006057317A (en) Construction method for columnar structure, and hanging implement
JP2010089926A (en) Heavy load carrying device in power generation facility and its carrying method
JP2024044263A (en) How to move sling aids and long objects
JP6366184B2 (en) Construction method of cylindrical tank

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120813

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20120813

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130426

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130523

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5280980

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile