JP2011059756A - Power equipment management system - Google Patents

Power equipment management system Download PDF

Info

Publication number
JP2011059756A
JP2011059756A JP2009205531A JP2009205531A JP2011059756A JP 2011059756 A JP2011059756 A JP 2011059756A JP 2009205531 A JP2009205531 A JP 2009205531A JP 2009205531 A JP2009205531 A JP 2009205531A JP 2011059756 A JP2011059756 A JP 2011059756A
Authority
JP
Japan
Prior art keywords
equipment
work
data
construction
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009205531A
Other languages
Japanese (ja)
Inventor
Nobuaki Kanayama
信明 金山
Masaaki Oka
雅明 岡
Etsumichi Tsuchida
悦道 土田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2009205531A priority Critical patent/JP2011059756A/en
Publication of JP2011059756A publication Critical patent/JP2011059756A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a power equipment management system for acquiring the actual states of power equipment for each equipment or work, while utilizing information in association with various work management or expense management. <P>SOLUTION: The power equipment management system is provided with: a construction management part for managing the content of a series of construction from planning to completion of construction of the power equipment by using the names of construction as keys; a maintenance management part for managing actual status of the equipment on the basis of maintenance data on the maintenance of the power equipment; a construction name management part for managing the construction data for each name of the construction; an equipment system management part for managing the equipment data of the power equipment in a hierarchical structure; and a work name management part for managing the construction data of the construction name to be managed by the construction name management part in association with the equipment structured data structured by the equipment system management part or the work content of the maintenance of the equipment to be managed by the maintenance management part for each work. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、電力会社の設備データを管理する電力設備管理システムに関する。   The present invention relates to a power equipment management system that manages equipment data of a power company.

電力会社の設備の管理は、資産の単位や費用の請求・精算の単位での資産費用管理が中心であり、設備の実態に合わせた実態管理はそれぞれ別個に行われている。   Management of facilities of electric power companies is centered on asset cost management in units of assets and billing / settlement units, and actual management according to the actual situation of facilities is performed separately.

図8は、従来の電力設備管理システムの構成図である。電力会社の設備データは設備データ格納部11に格納され、設備を保全した際の保全データは保全データ格納部12に保存されている。保全管理部13は、設備データ格納部11の設備データ及び保全データ格納部12の保全データに基づいて、設備の保全計画、懸案管理、点検管理を管理することになる。   FIG. 8 is a configuration diagram of a conventional power equipment management system. Equipment data of the electric power company is stored in the equipment data storage unit 11, and maintenance data when the equipment is maintained is stored in the maintenance data storage unit 12. The maintenance management unit 13 manages the maintenance plan, pending management, and inspection management of the facility based on the facility data in the facility data storage unit 11 and the maintenance data in the maintenance data storage unit 12.

一方、工事データ格納部14には設備工事の工事データが格納され、工事管理部は工事データ格納部14の工事データに基づいて、設備の工事契約、工事伺書、工事請求などを管理することになる。また、工事件名管理部16は工事件名毎に工事データを管理する。このように、保全管理部13と工事管理部15とは別々のシステムとして構築されている。   On the other hand, the construction data storage unit 14 stores the construction data of the facility construction, and the construction management unit manages the construction contract of the facility, the construction inquiry, the construction request, etc. based on the construction data of the construction data storage unit 14. Become. In addition, the construction subject management unit 16 manages construction data for each construction subject. As described above, the maintenance management unit 13 and the construction management unit 15 are constructed as separate systems.

ここで、設備保有者が設備評価及び補修等を行うものとして、設備管理事業者、設備保有者、設備供給者、及び部品供給者が設備情報や点検情報等を通信手段を介して共有化し、早期に的確な設備の補修方法を見い出して設備の効率的な保全が行えるようにしたものがある(例えば、特許文献1参照)。   Here, the equipment owner, equipment owner, equipment supplier, and parts supplier share equipment information, inspection information, etc. via communication means, as equipment owners perform equipment evaluation and repair, etc. There is one that finds an accurate repair method for equipment at an early stage so that the equipment can be efficiently maintained (see, for example, Patent Document 1).

特開2002−157360号公報JP 2002-157360 A

しかし、特許文献1のものでは設備の効率的な保全を行うものであり、設備主管担当ごとの管理を統一しようとするものではない。電力会社の設備管理は、設備主管担当ごとに管理の運用形態が区々であることが多い。また、設備の属性や仕様を管理するシステムはどこにも存在しているが、縦割り組織の部署ごとの都合で作られることが多く、同じ一つの方針・考えになっていないために、部門全体でみると非効率をもたらしている。   However, the thing of patent document 1 performs the efficient maintenance of an installation, and does not intend to unify management for every charge in charge of an installation. As for facility management of electric power companies, there are many cases in which the operation mode of management is different for each facility supervisor. In addition, there are systems that manage the attributes and specifications of equipment everywhere, but they are often created at the convenience of each department in a vertically-organized organization. In fact, it is inefficient.

例えば、設備の切り口から、建設・運用・保守の経緯、将来の予定や実績,あるいはコストなどを総合的に把握しようとすると、現状では、作業毎に設備の捉え方が異なるため、集約してみることが困難である。また、作業間にデータのつながりがなく、個々の作業毎のデータ分析しかできない。   For example, if you try to comprehensively grasp the background of construction, operation, maintenance, future schedule, actual performance, or cost from the point of view of equipment, the current situation is that the way of capturing equipment differs depending on the work. It is difficult to see. In addition, there is no data connection between operations, and only data analysis for each operation can be performed.

本発明の目的は、電力設備の個別の設備単位や作業単位の実態把握だけでなく、様々な作業管理や費用管理とも連系した情報活用可能な電力設備管理システムを得ることである。   An object of the present invention is to obtain a power equipment management system capable of utilizing information linked to various work management and cost management as well as grasping the actual condition of individual equipment units and work units of power equipment.

本発明の電力設備管理システムは、電力設備の設備工事の計画から完了に至るまでの一連の工事内容を工事件名をキーに管理する工事管理部と、電力設備の保守・保全に関わる保全データに基づいて設備実態を管理する保全管理部と、前記設備工事の工事件名毎に工事データを管理する工事件名管理部と、電力設備の設備データを階層化して体系化して管理する設備体系管理部と、前記設備体系管理部で体系化された設備体系化データに連系させて前記工事件名管理部で管理する工事件名の工事データまたは前記保全管理部で管理する設備の保守・保全の作業内容を作業単位で管理する作業件名管理部とを備えたことを特徴とする。   The power equipment management system of the present invention includes a construction management section that manages a series of construction contents from planning to completion of equipment construction of power equipment using the construction subject as a key, and maintenance data related to maintenance and maintenance of power equipment. A maintenance management unit that manages the actual state of the equipment, a construction subject management unit that manages construction data for each construction subject of the facility construction, and a facility system management unit that systematizes and manages the facility data of power facilities The construction data of the construction subject managed by the construction subject management section linked to the equipment organization data systematized by the equipment construction management section or the maintenance / maintenance work contents of the equipment managed by the maintenance management section It is characterized by having a work title management unit that manages in units of work.

本発明によれば、電力設備の個別の設備単位や作業単位の実態把握だけでなく、様々な作業管理や費用管理とも連系した情報活用可能な電力設備管理システムを得ることができる。   ADVANTAGE OF THE INVENTION According to this invention, the electric power equipment management system which can utilize the information linked | linked with various work management and expense management can be obtained not only the actual condition grasp of the individual equipment unit and work unit of an electric power equipment.

本発明の実施の形態に係わる電力設備管理システムの構成図。The lineblock diagram of the electric power equipment management system concerning an embodiment of the invention. 本発明の実施の形態における設備体系管理部で管理する設備体系化データの一例の説明図。Explanatory drawing of an example of the equipment systematization data managed by the equipment system management part in embodiment of this invention. 本発明の実施の形態における作業件名管理部で管理する作業件名管理データの一例の説明図。Explanatory drawing of an example of the work subject management data managed by the work subject management part in embodiment of this invention. 本発明の実施の形態における作業件名管理部で保全データ格納部に格納された保全データを管理する場合の一例の説明図。Explanatory drawing of an example in the case of managing the maintenance data stored in the maintenance data storage part by the work subject name management part in embodiment of this invention. 本発明の実施の形態における作業件名管理部で保全データ格納部に格納された保全データを管理する場合の他の一例の説明図。Explanatory drawing of another example at the time of managing the maintenance data stored in the maintenance data storage part by the work subject name management part in embodiment of this invention. 本発明の実施の形態における保全管理部で保全データ格納部に格納された保全データを管理する場合の一例の説明図。Explanatory drawing of an example in the case of managing the maintenance data stored in the maintenance data storage part in the maintenance management part in embodiment of this invention. 本発明の実施の形態における作業件名管理部で保全データ格納部に格納された保全データを管理する場合の別の他の一例の説明図。Explanatory drawing of another example in the case of managing the maintenance data stored in the maintenance data storage part by the work subject management part in embodiment of this invention. 従来の電力設備管理システムの構成図。The block diagram of the conventional electric power equipment management system.

以下、本発明の実施の形態を説明する。図1は本発明の実施の形態に係わる電力設備管理システムの構成図である。本発明の電力設備管理システムは、図8に示した従来例に対し、電力設備の設備データを階層化して体系化して管理する設備体系管理部17と、設備体系管理部17で体系化された設備データに連系させて工事件名管理部16で管理する工事件名の工事データまたは保全管理部13で管理する設備の保守・保全の作業内容を作業単位で管理する作業件名管理部18とを追加して設けたものである。図8と同一要素には、同一符号を付し重複する説明は省略する。   Embodiments of the present invention will be described below. FIG. 1 is a configuration diagram of a power equipment management system according to an embodiment of the present invention. The power equipment management system of the present invention is systematized by a facility system management unit 17 and a system management unit 17 that systematize and manage the equipment data of the power equipment in a hierarchical manner compared to the conventional example shown in FIG. A work title management unit 18 that manages the construction data of the construction subject managed by the construction subject management unit 16 linked to the equipment data or the maintenance / maintenance work contents of the equipment managed by the maintenance management unit 13 is added. It is provided. The same elements as those in FIG. 8 are denoted by the same reference numerals, and redundant description is omitted.

図1において、保全管理部13と工事管理部15との間に、設備体系管理部17と作業件名管理部18とを設けることで、保全管理部13と工事管理部15とで取り扱うデータを連系可能としている。   In FIG. 1, an equipment system management unit 17 and a work title management unit 18 are provided between the maintenance management unit 13 and the construction management unit 15, thereby connecting data handled by the maintenance management unit 13 and the construction management unit 15. The system is possible.

設備体系管理部17は、電力設備の設備データを階層化して体系化して管理するものであり、設備データ格納部11に格納された設備データを体系化して管理する。図2は設備体系管理部17で管理する設備体系化データの一例の説明図である。   The equipment system management unit 17 organizes and manages the equipment data of the power equipment in a hierarchical manner, and systematizes and manages the equipment data stored in the equipment data storage unit 11. FIG. 2 is an explanatory diagram of an example of equipment systematization data managed by the equipment system management unit 17.

図2に示すように、設備体系管理部17は設備の構造を管理し易い単位に抽象化し体系化して設備体系化データ19として管理する。設備体系化データ19は、機器が設置される場所に応じて、機器(機種)20、第1階層部位21、第2階層部位22のように体系化されたデータである。すなわち、設備を管理する基本的な単位は、工事計画を立てる時にも基準となる機器20のレベルであるが、その設備を複数の(取り外し可能な)構成要素で管理したい場合は、その下に第1階層部位21を設け、さらに、細かく管理したい場合は、さらに下部に第2階層部位22を増やす形で体系されている。図2では、第2階層部位22まで階層化しているが、さらに細かく階層を体系化することも可能である。   As shown in FIG. 2, the facility system management unit 17 abstracts and systematizes the equipment structure into easy-to-manage units and manages it as equipment systematized data 19. The equipment systematized data 19 is data organized like a device (model) 20, a first layer part 21, and a second layer part 22 according to the place where the device is installed. In other words, the basic unit for managing the equipment is the level of the equipment 20 as a reference when making a construction plan, but if you want to manage the equipment with a plurality of (removable) components, In the case where the first layer portion 21 is provided and further management is desired, the second layer portion 22 is further increased in the lower part. In FIG. 2, the layers up to the second layer portion 22 are hierarchized, but the layers can be further systematized.

例えば、主機器#1はA発電所に設置され、本体#1と装置Aとの構成要素で管理されることを示している。同様に、主機器#2はA発電所に設置され、第1階層部位として、本体#2と装置Bと装置Cとの構成要素で管理され、さらに第2階層部位として、装置Cは装置C1と装置C2との構成要素で管理されることを示している。   For example, the main device # 1 is installed in the A power plant, and is managed by the constituent elements of the main body # 1 and the device A. Similarly, the main device # 2 is installed in the A power plant, and is managed as a first hierarchy part by the constituent elements of the main body # 2, the apparatus B, and the apparatus C. Further, as the second hierarchy part, the apparatus C is the apparatus C1. And managed by the components of the device C2.

次に、作業件名管理部18は、設備体系管理部17で体系化された設備体系化データ19に連系させて工事件名管理部16で管理する工事件名の工事データまたは保全管理部13で管理する設備の保守・保全の作業内容を作業単位で管理するものである。図3は作業件名管理部18で管理する作業件名管理データの一例の説明図である。   Next, the work subject management unit 18 is linked to the equipment systematization data 19 organized by the equipment system management unit 17 and managed by the construction data managed by the construction subject management unit 16 or the maintenance management unit 13. The work contents of maintenance / maintenance of facilities to be managed are managed in units of work. FIG. 3 is an explanatory diagram of an example of work title management data managed by the work title management unit 18.

図3に示すように、作業件名管理データは作業の単位を表わす概念であり、作業を一意に特定するデータ、作業件名23、業者(作業者)24、作業日(日付)25、作業内容26などで構成され、工事件名や設備体系化データ19に連系させてに連系させて管理される。   As shown in FIG. 3, the work subject management data is a concept representing a unit of work. Data for uniquely identifying a work, a work subject 23, a contractor (worker) 24, a work date (date) 25, and a work content 26. And are managed by being linked to the construction subject and the equipment systematized data 19.

例えば、作業名1〜nは、設備体系管理部で管理される設備体系化データ19に関係づけされており、また、作業件名1、2、3は工事件名1として関係付けされている。このように、一緒に行う作業(複数の作業件名1、2、3)をまとめて工事件名1として関係付けし、工事管理部15の実施単位の件名として作業件名管理部18でまとめて管理する。また、作業名2は、主機器#1の装置Aの点検作業の情報であり、設備体系管理部で管理される設備体系化データ19に関係づけされている。   For example, the work names 1 to n are related to the equipment systematization data 19 managed by the equipment system management unit, and the work subject names 1, 2, and 3 are related to the construction subject name 1. In this way, the work to be performed together (a plurality of work subject names 1, 2, and 3) are collectively related as the construction subject name 1 and collectively managed by the work subject management unit 18 as the subject of the execution unit of the construction management unit 15. . The work name 2 is information on the inspection work of the apparatus A of the main device # 1, and is associated with the equipment systematization data 19 managed by the equipment system management unit.

このように、設備体系管理部17と作業件名管理部18とを設けることにより、工事管理部15と保全管理部13との作業は、一つの設備データを共通的に一元的に利用することができる。また、工事件名で各作業の関連付けが必要な場合などは、作業件名側の情報を参照できるようになることから、工事管理部15と保全管理部13との両作業が、それぞれで入力するデータ2重入力や2重管理を排除することができる。また、共有化される一つのマスタデータを皆が利用していくことにより、信頼度の高いデータベースを維持・運用していくことが可能となる。   Thus, by providing the equipment system management unit 17 and the work subject name management unit 18, the work of the construction management unit 15 and the maintenance management unit 13 can use one piece of equipment data in a unified manner. it can. In addition, when the work title needs to be associated with each other, information on the work title side can be referred to. Therefore, both the work management unit 15 and the maintenance management unit 13 input data respectively. Double input and double management can be eliminated. In addition, since everyone uses one shared master data, it is possible to maintain and operate a highly reliable database.

具体的には、新設の設備は工事を担当する人によって形作られ、竣工時に運用開始段階の設備状態となるが、設備を保全するのに適した設備体系管理部17で登録しておくことで、工事担当者と保全担当者との一元的な利用が可能となる。また、その一元的に使用する設備体系管理部17に沿って、補修作業などの作業件名管理部18を立案し、その費用伺いなどをする際には、同じ機器に関連する作業は纏めて工事件名として扱い、仮に計画変更になった場合でも、容易にグルーピングを見直せることから、合理的な計画立案などが行えるようになる。   Specifically, the newly installed equipment is formed by the person in charge of the construction, and when it is completed, it will be in the state of operation at the operation start stage. However, by registering it with the equipment system management unit 17 suitable for maintaining the equipment. Centralized use between the construction staff and the maintenance staff becomes possible. In addition, when planning the work subject management section 18 for repair work, etc. along with the equipment system management section 17 that is used centrally, and inquiring about its costs, the work related to the same equipment is put together. Even if the plan is changed, the grouping can be easily reviewed even if the plan is changed, so that rational planning can be made.

図4は、作業件名管理部18で保全データ格納部12に格納された保全データ27を管理する場合の一例の説明図である。作業件名管理部18は、設備体系化管理部17で階層化して体系化された設備体系化データ19に保全データの作業実績や懸案データを関連づけて、工事件名の作業を管理する。図4では、作業を設備機器の取外し可能な単位で登録し、その機器や部位単位で撤去・流用した場合には、その機器や部位に関連付けされた作業実績や懸案データも流用先に引き継いだ管理を行う場合を示している。   FIG. 4 is an explanatory diagram of an example when the maintenance data 27 stored in the maintenance data storage unit 12 is managed by the work subject name management unit 18. The work subject management unit 18 manages the work of the construction subject by associating the maintenance data work results and the pending data with the equipment systematization data 19 that is hierarchized and systematized by the equipment systematization management unit 17. In Fig. 4, when the work is registered in units that can be removed from the equipment, and removed or diverted in units of the equipment or parts, the work results and pending data associated with the equipment or parts are also transferred to the diversion destination. The case where management is performed is shown.

設備体系管理部17に沿って作られた設備体系化データ19は、同じ機器20であればその構造は同じになることから、実際の主機器や各階層の部位の撤去・流用と同じように、設備体系化データ19の異動も行うことができる。   Since the equipment systematization data 19 created along the equipment system management unit 17 has the same structure if it is the same equipment 20, it is the same as the removal and diversion of the actual main equipment and parts of each layer. The facility systematized data 19 can also be changed.

具体的には、工事件名Aで主機器#1の配下の装置Aを撤去して、工事件名Bで主機器#2の配下の装置Aとして流用配備する場合には、設備体系化データ19として異動が可能となるが、その際には、その装置Aの過去の保安データ27である作業実績2や作業懸案1も同様に、主機器#2側に併せて紐付けすることが可能となる。つまり設備体系化データ19とそれに紐づく実績データとは、セットの形で引き継いで行くことが可能となる。   Specifically, when the apparatus A subordinate to the main equipment # 1 is removed under the construction subject A and the equipment A is subordinated to the equipment A subordinate to the main equipment # 2 under the construction subject B, the equipment systematization data 19 is used. In this case, the work record 2 and the work concern 1 which are the past security data 27 of the device A can be linked to the main device # 2 side in the same manner. . That is, the facility systematized data 19 and the performance data associated therewith can be taken over in the form of a set.

このように設備を取外し可能な単位で登録し管理していくことで、その機器や部位の単位で撤去・流用した場合には、その機器や部位に関連付けされた作業実績や懸案データ(作業履歴情報)も流用先に引継ぐことができる。   By registering and managing the equipment in units that can be removed in this way, if the equipment or part is removed or diverted, the work results and pending data associated with the equipment or part (work history) Information) can also be transferred to the destination.

図5は、作業件名管理部18で保全データ格納部12に格納された保全データ27を管理する場合の他の一例の説明図である。作業件名管理部18は、設備体系化管理部17で階層化して体系化された設備体系化データ19に保全データの作業実績を関連づけて、設備機器の作業履歴一覧を管理する。図5では、設備機器や部位単位で作業内容を登録し、設備機器の作業履歴一覧28を管理する場合を示している。   FIG. 5 is an explanatory diagram of another example when the maintenance data 27 stored in the maintenance data storage unit 12 is managed by the work subject name management unit 18. The work name management unit 18 manages the work history list of the equipment by associating the work results of the maintenance data with the equipment systematization data 19 that is hierarchized and systematized by the equipment systematization management unit 17. FIG. 5 shows a case where work contents are registered in units of equipment and parts and the work history list 28 of the equipment is managed.

具体的には、設備体系管理部17の設備体系化データ19に、保守データ27の作業実績、定期点検、事故、作業懸案等のイベント情報を関連づけする。また、保全データのイベント情報として、日付、種別、作業件名、概要などを共通的に持たせる。従って、設備に関連する作業の実施結果や計画は、その事象毎に設備を特定するキーと、種別、作業件名、概要キーとしてセットで蓄積される。そして、機器単位で、その設備に関するイベント情報を、日付、種別、作業件名、概要などキーにして並べ替えることで、作業履歴一覧28へ展開できる。また、ある設備キーをもってこれらの事象を抽出して横並びで見せることができる。これにより、その機器の誕生から現在に至るまでの履歴・変遷を示すことができ、その設備の履歴や生い立ちがわかる設備カルテ的なことを実現できる。   Specifically, event information such as work results, periodic inspections, accidents, work concerns, etc. of the maintenance data 27 is associated with the equipment systematization data 19 of the equipment system management unit 17. In addition, date, type, work title, summary, etc. are commonly provided as event information of maintenance data. Therefore, the execution results and plans of work related to the equipment are accumulated as a set of a key for identifying the equipment for each event, a type, a work subject, and an outline key. Then, event information relating to the equipment can be rearranged into the work history list 28 by rearranging the event information related to the equipment using keys such as date, type, work subject, and outline. Moreover, these events can be extracted and displayed side by side with a certain equipment key. As a result, it is possible to show the history and transition from the birth of the device to the present, and it is possible to realize a facility chart that shows the history and history of the facility.

図6は、保全管理部13で保全データ格納部12に格納された保全データ27を管理する場合の一例の説明図である。保全管理部13は、設備体系化管理部17で階層化して体系化された設備体系化データ19に保全データの懸案データを関連づけて懸案を管理する。図6では、設備機器や部位単位で作業内容を登録し、その懸案の度合いを指標で示しランク付けして管理する場合を示している。   FIG. 6 is an explanatory diagram of an example when the maintenance data 27 stored in the maintenance data storage unit 12 is managed by the maintenance management unit 13. The maintenance management unit 13 manages the concerns by associating the maintenance data of the maintenance data with the facility systematization data 19 that is hierarchized by the facility systematization management unit 17. FIG. 6 shows a case where work contents are registered in units of equipment and parts, and the degree of concern is indicated by an index and is managed by ranking.

保全管理部13は懸案管理機能を使って機器毎に、巡視・点検で発見された設備の損傷により工事などの対策が必要となった懸案件名29を、設備別や要因別に分類して設備と関連付け、懸案の度合いを示す指標30、対策優先度を示すランク31などを保全データ27上で一元管理する。   The maintenance management unit 13 uses the pending management function to classify the pending project name 29 that requires countermeasures such as construction due to damage to the equipment discovered during inspection and inspection into equipment by equipment and by factor. An index 30 indicating the degree of association and concern, a rank 31 indicating countermeasure priority, and the like are centrally managed on the maintenance data 27.

懸案件名29毎に機器20は特定でき、いくつかの指標30、例えば、機器20の重要度、地域・環境への影響度、経済的効果などといった事項を組合せて評価し、機器20毎に対策順位を判定するランク31を設定している。   The device 20 can be identified for each pending project name 29, and several indicators 30, for example, the importance of the device 20, the degree of influence on the region / environment, the economic effect, etc. are evaluated in combination, and measures are taken for each device 20. Rank 31 for determining the rank is set.

例えば、懸案件名5は主機器#2の本体#2に関連付けて作成されている。懸案件名5の指標30は、○○度は(3)、△△度はBであり、この指標に基づいており評価判定を行い、ランク31のA1の結果を懸案件名5へ反映させる。   For example, the pending project name 5 is created in association with the main body # 2 of the main device # 2. The index 30 of the pending project name 5 is (3) for the XX degree and B for the Δ △ degree. Based on this index, the evaluation judgment is performed, and the result of A1 of rank 31 is reflected in the suspended project name 5.

このようにその懸案の度合いを指標30を使って判定しランク31によりランク付けすることで、その懸案や設備の対策優先度を測ることができる。また、ランク31の内容から判断した優先順位の懸案件名29から点検や工事の計画が効率的に立案できる。   In this way, by determining the degree of the concern using the index 30 and ranking by rank 31, it is possible to measure the priority of countermeasures for the concern and equipment. In addition, inspection and construction plans can be made efficiently from the priority project names 29 determined from the contents of rank 31.

図7は、作業件名管理部18で保全データ格納部12に格納された保全データ27を管理する場合の別の他の一例の説明図である。作業件名管理部18は、設備体系化管理部17で階層化して体系化された設備体系化データ19に保全データの作業実績や懸案データを関連づけて、設備機器や部位単位で作業件名に含まれる個別の作業内容毎に登録し、個別の作業内容の項目をキーとして管理する場合を示している。   FIG. 7 is an explanatory diagram of another example when the maintenance data 27 stored in the maintenance data storage unit 12 is managed by the work subject name management unit 18. The work subject management unit 18 associates maintenance work work results and pending data with the equipment systematization data 19 that is hierarchized by the equipment systematization management unit 17 and is included in the work subject in units of equipment and parts. In this example, registration is performed for each individual work content, and the individual work content items are managed as keys.

作業件名管理部18は、保全計画を策定する最小単位で作業件名管理データを管理する。作業件名管理データは、巡視・点検や懸案を紐付けた修繕工事や改良工事等により作成され、作業を特定するデータ項目である機器20、業者24、作業日25、概算費用32等で構成される。作業件名23の入力情報は、保全管理部13の点検管理機能を使って一元管理を行う。図7に示す作業件名1〜nでは、保全管理部13の懸案管理にて対応が必要と判断された懸案を手動にて作業件名に紐付けし、作業件名管理データの作成時に紐付けた懸案の情報は自動で引き継がれる。また計画期間(点検工事の予定期間)及び実施期間(点検工事の実施期間)を日毎で設定・管理できる。   The work subject management unit 18 manages the work subject management data in a minimum unit for formulating a maintenance plan. Work title management data is created by inspection / inspection and repair work or improvement work linked with concerns, and is composed of data items that specify work, such as equipment 20, contractor 24, work date 25, estimated cost 32, etc. The The input information of the work title 23 is centrally managed by using the inspection management function of the maintenance management unit 13. In the work titles 1 to n shown in FIG. 7, the concerns that are determined to be handled by the problem management of the maintenance management unit 13 are manually linked to the work title, and are linked when the work title management data is created. Information is automatically taken over. In addition, the planning period (scheduled period of inspection work) and the implementation period (implementation period of inspection work) can be set and managed on a daily basis.

一つめの例としては、作業件名23毎に持つ作業日を使って対象データを抽出し、「当該年度設備の作業費」といった形で並べることで、全体の概算費用32や業者24毎の概算費用を集計し、参照できるといった効果をもたらすことができる。   As a first example, by extracting the target data using the work days of each work subject 23 and arranging them in the form of “work expenses of the equipment of the year”, the overall estimated cost 32 and the estimated for each contractor 24 It is possible to bring about an effect that costs can be collected and referred to.

このように点検・工事計画機能により、ある工事の実施伺いをする単位でなく、その工事を構成する作業の作業一つ一つを作業件名管理部18で管理して登録することによって、その工事の詳細内訳を作業件名単位に分割して把握できると共に、個別の作業毎の工程や業者24、概算費用32などを把握することを可能とし、工事件名と対応付けすることで一括の管理も可能である。   In this way, by the inspection / construction planning function, the work subject management unit 18 manages and registers each work of the work, rather than a unit for making an inquiry about the execution of the work, thereby performing the work. It is possible to comprehend the detailed breakdown of the work by dividing it into work subject units, as well as to grasp the process for each individual work, the contractor 24, the approximate cost 32, etc., and it is possible to collectively manage by associating with the work subject It is.

また、二つめの例としては、作業件名23毎に持つ作業日25を使って対象データを抽出し、「作業予定○○○電気所の本日の作業予定」といった形で並べることで、月単位や週単位およびの日単位で機器20毎の業者24や作業概要を参照できるといった効果をもたらすことができる。   As a second example, the target data is extracted using the work day 25 for each work subject 23, and arranged in the form of “work schedule XX today's work schedule”. In addition, it is possible to bring about an effect that the contractor 24 and the work summary for each device 20 can be referred to in units of weeks or days.

このようにある設置箇所の各種の作業毎に、その作業予定や実績日を持たせることができることから、ある設置箇所の管理者は、その作業日25を元に、その場所の本日の作業や、今月の作業などを一見して把握でき、予定に対する実績の状態認識なども即座に行うことができる。   In this way, since the work schedule and the actual date can be given for each type of work at an installation location, the administrator at an installation location can perform today's work at the location based on the work date 25. You can see at a glance this month's work, etc., and you can instantly recognize the status of the results for the schedule.

11…設備データ格納部、12…保全データ格納部、13…保全管理部、14…工事データ格納部、15…工事管理部、16…工事件名管理部、17…設備体系管理部、18…作業件名管理部、19…設備体系化データ、20…機器、21…第1階層部位、22…第2階層部位、23…作業件名、24…業者、25…作業日、26…作業内容、27…保全データ、28…作業履歴一覧、29…懸案件名、30…指標、31…ランク、32…概算費用 DESCRIPTION OF SYMBOLS 11 ... Equipment data storage part, 12 ... Maintenance data storage part, 13 ... Maintenance management part, 14 ... Construction data storage part, 15 ... Construction management part, 16 ... Construction subject management part, 17 ... Equipment system management part, 18 ... Work Subject management unit, 19 ... equipment systematized data, 20 ... equipment, 21 ... first layer part, 22 ... second layer part, 23 ... work subject, 24 ... contractor, 25 ... work day, 26 ... work content, 27 ... Maintenance data, 28 ... Work history list, 29 ... Suspended project name, 30 ... Indicator, 31 ... Rank, 32 ... Estimated cost

Claims (6)

電力設備の設備工事の計画から完了に至るまでの一連の工事内容を工事件名をキーに管理する工事管理部と、電力設備の保守・保全に関わる保全データに基づいて設備実態を管理する保全管理部と、前記設備工事の工事件名毎に工事データを管理する工事件名管理部と、電力設備の設備データを階層化して体系化して管理する設備体系管理部と、
前記設備体系管理部で体系化された設備体系化データに連系させて前記工事件名管理部で管理する工事件名の工事データまたは前記保全管理部で管理する設備の保守・保全の作業内容を作業単位で管理する作業件名管理部とを備えたことを特徴とする電力設備管理システム。
A construction management department that manages a series of construction contents from planning to completion of installation of electric power facilities using the construction subject as a key, and maintenance management that manages the actual conditions of equipment based on maintenance data related to the maintenance and maintenance of electric power equipment A construction subject management unit that manages construction data for each construction subject of the facility construction, a facility system management unit that manages the facility data of power facilities in a hierarchical manner,
Work on the construction data of the construction subject managed by the construction subject management section or the maintenance / maintenance work contents of the equipment managed by the maintenance management section linked to the equipment organization data organized by the equipment construction management section A power equipment management system comprising a work title management unit that manages each unit.
前記作業件名管理部は、前記設備体系化管理部で階層化して体系化された設備体系化データに保全データの作業実績や懸案データを関連づけて、設備機器の取外し可能な単位で登録し、その機器や部位単位で撤去・流用した場合には、その機器や部位に関連付けされた作業実績や懸案データも流用先に引き継いだ管理を行うことを特徴とする請求項1記載の電力設備管理システム。   The work subject management unit associates maintenance data work results and pending data with the facility systematized data organized and organized by the equipment systematization management unit, and registers them in units where the equipment can be removed. 2. The power equipment management system according to claim 1, wherein when the equipment or part is removed or diverted, management is performed by taking over the work results and pending data associated with the equipment or part to the diversion destination. 前記作業件名管理部は、前記設備体系化管理部で階層化して体系化された設備体系化データに保全データの作業実績を関連づけて、設備機器や部位単位で作業内容を登録し、設備機器の作業履歴一覧を管理することを特徴とする請求項1記載の電力設備管理システム。   The work subject management unit associates the work results of maintenance data with the facility systematized data layered and systematized by the facility systematization management unit, registers the work contents in units of equipment and parts, The power equipment management system according to claim 1, wherein the work history list is managed. 前記保全管理部は、前記設備体系化管理部で階層化して体系化された設備体系化データに保全データの懸案データを関連づけて、設備機器や部位単位で作業内容を登録し、その懸案の度合いを指標で示しランク付けして管理することを特徴とする請求項1記載の電力設備管理システム。   The maintenance management unit associates maintenance data pending data with the facility systematized data hierarchically organized by the equipment systematizing management unit, registers the work content in units of equipment and parts, and the degree of the concern The power equipment management system according to claim 1, wherein the power equipment management system is managed by indicating and ranking with an index. 前記作業件名管理部は、前記設備体系化管理部で階層化して体系化された設備体系化データに保全データの作業実績や懸案データを関連づけて、設備機器や部位単位で作業件名に含まれる個別の作業内容毎に登録し、個別の作業内容の項目をキーとして管理することを特徴とする請求項1記載の電力設備管理システム。   The work subject management unit associates the work results and pending data of maintenance data with the equipment systematized data that is hierarchized by the equipment systematization management unit, and is included in the work subject in units of equipment and parts The power equipment management system according to claim 1, wherein each work content is registered and managed with each work content item as a key. 前記個別の作業内容の項目は、業者、作業日、概算費用であることを特徴とする請求項5記載の電力設備管理システム。   6. The power equipment management system according to claim 5, wherein the items of the individual work contents are a trader, a work day, and an approximate cost.
JP2009205531A 2009-09-07 2009-09-07 Power equipment management system Pending JP2011059756A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009205531A JP2011059756A (en) 2009-09-07 2009-09-07 Power equipment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009205531A JP2011059756A (en) 2009-09-07 2009-09-07 Power equipment management system

Publications (1)

Publication Number Publication Date
JP2011059756A true JP2011059756A (en) 2011-03-24

Family

ID=43947346

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009205531A Pending JP2011059756A (en) 2009-09-07 2009-09-07 Power equipment management system

Country Status (1)

Country Link
JP (1) JP2011059756A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014053044A (en) * 2013-12-04 2014-03-20 Hitachi High-Tech Fielding Corp Apparatus maintenance management server, and maintenance optimization method
JP2014092852A (en) * 2012-11-01 2014-05-19 Hitachi Information & Control Solutions Ltd Arithmetic processing apparatus and arithmetic processing program
JP2015046119A (en) * 2013-08-29 2015-03-12 富士フイルム株式会社 Maintenance information management system and method, and maintenance information display device and method
JP2020091615A (en) * 2018-12-05 2020-06-11 株式会社日立製作所 Reinforcement learning support device, maintenance planning device, and reinforcement learning support method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014092852A (en) * 2012-11-01 2014-05-19 Hitachi Information & Control Solutions Ltd Arithmetic processing apparatus and arithmetic processing program
JP2015046119A (en) * 2013-08-29 2015-03-12 富士フイルム株式会社 Maintenance information management system and method, and maintenance information display device and method
JP2014053044A (en) * 2013-12-04 2014-03-20 Hitachi High-Tech Fielding Corp Apparatus maintenance management server, and maintenance optimization method
JP2020091615A (en) * 2018-12-05 2020-06-11 株式会社日立製作所 Reinforcement learning support device, maintenance planning device, and reinforcement learning support method
JP7141320B2 (en) 2018-12-05 2022-09-22 株式会社日立製作所 Reinforcement learning support device, maintenance planning device, and reinforcement learning support method

Similar Documents

Publication Publication Date Title
Zheng et al. Smart spare parts management systems in semiconductor manufacturing
CN108038626A (en) A kind of cigarette machine Life cycle monitoring system and monitoring method
CN107016444A (en) Nuclear power plant&#39;s digital platform
US10592835B2 (en) Method and system for managing an efficient production floor, via the internet of things
JP2016189088A (en) Facility management support system
JP2011059756A (en) Power equipment management system
JP2012133773A (en) Replacement/inspection operation planning support program for equipment and facility
Özkan et al. Identification of common data environment functions during construction phase of BIM-based projects
Love et al. Object oriented modeling: Retrospective systems information model for constructability assessment
JP5557863B2 (en) Plant equipment maintenance management system
JPH08147356A (en) Maintenance management device
JP2016045819A (en) Business result management system and computer program
CN103455865A (en) Achieving method for integrated operation and maintenance
CN102339419A (en) Method and device for realizing reliability, maintainability and supportability (RMS) of military vehicle product
Platfoot Practical analytics for maintenance teams using computerised maintenance management system work history
Ford et al. Product life cycle data management: a cross-sectoral review
Thimm ICT support of environmental compliance—Approaches and future perspectives
Drożdż et al. The use of IT systems in the power industry on the example of the Polish Electricity Distribution System Operator
Harrison et al. Optimisation of Maintenance Operations Involving Three Integrated Departments at a Local Oil Company in Trinidad.
AU2013101267A4 (en) Method and system to ascertain a repair for an asset
US20220383233A1 (en) Work support system, work support method, and work support program
Mahendrawathi et al. A case study on process mining implementation in modeling supply chain business process: a lesson learnt
Morales Peralta et al. Transport Service Optimization Model using Integrated Tools under the Lean Approach-A Peruvian Case Study
JP2017059240A (en) Industrial hygiene management support system, industrial hygiene management support method, and industrial hygiene management support program
JP2007172364A (en) Accident prevention supporting delivery and vehicle allocation method and system