JP2010196310A - Method for installing top-railed sliding door - Google Patents

Method for installing top-railed sliding door Download PDF

Info

Publication number
JP2010196310A
JP2010196310A JP2009040662A JP2009040662A JP2010196310A JP 2010196310 A JP2010196310 A JP 2010196310A JP 2009040662 A JP2009040662 A JP 2009040662A JP 2009040662 A JP2009040662 A JP 2009040662A JP 2010196310 A JP2010196310 A JP 2010196310A
Authority
JP
Japan
Prior art keywords
existing
pillar
column
fence
door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009040662A
Other languages
Japanese (ja)
Other versions
JP4400932B1 (en
Inventor
Yuichi Ogura
勇一 小倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kuki E & T Kk
Original Assignee
Kuki E & T Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuki E & T Kk filed Critical Kuki E & T Kk
Priority to JP2009040662A priority Critical patent/JP4400932B1/en
Application granted granted Critical
Publication of JP4400932B1 publication Critical patent/JP4400932B1/en
Publication of JP2010196310A publication Critical patent/JP2010196310A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for installing a top-railed sliding door, which enables easy installation and stable support of the top-railed sliding door. <P>SOLUTION: Firstly, in a first step, a fence 106 and the like are removed from between first and second existing columns 101 and 102. In a second step, newly-installed columns 11 and 12 are installed on the first and second existing columns 101 and 102, respectively. More specifically, the leading end side of a supporting portion 40 is connected to upper ends 111 and 112 of the first and second existing columns 101 and 102, and the other end 22 of a column body 20 abuts on an installation surface 120. In a third step, a hanging rail 90 is fixed to the supporting portion 40 of each of the newly-installed columns 11 and 12 which are fixed to the respective existing columns 101 and 102. In a fourth step, the top-railed sliding door 80 is hung from the hanging rail 90. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、既存のフェンスに吊り戸を設置するための吊り戸の設置方法に関する。   The present invention relates to a method for installing a suspension door for installing a suspension door on an existing fence.

変電所や配電所、送電所には、安全のためにフェンスが設けられている。フェンスは、通常、その支持柱がコンクリートで地中に埋設されているため、フェンスの改修作業は面倒なものであった。そこで、かかる問題を解決すべく、特許文献1に記載のフェンスの改修方法が考えられている。   Substations, distribution stations, and power transmission stations are fenced for safety. Fences are usually troublesome to repair because the supporting pillars are usually buried in the ground with concrete. Therefore, in order to solve such a problem, a method for repairing a fence described in Patent Document 1 has been considered.

特許文献1に記載のフェンスの改修方法では、まず、既設支柱を残して、既設支柱間に設けられているフェンス本体が除去される。次に、外周面にネジ孔が形成された筒状の新設支柱が既設支柱の外周を覆うように配置され、新設支柱が既設支柱にボルトで固定される。そして、この新設支柱に新設フェンス本体が固定される。この改修方法によれば、既設支柱を除去して改めて支柱を埋設する必要がないため、フェンスの改修作業を容易に行うことができる。また、老朽化した既設支柱が新設支柱に覆われるので、フェンスの美観を向上させることができる。   In the method for repairing a fence described in Patent Document 1, first, the fence body provided between the existing columns is removed, leaving the existing columns. Next, a cylindrical new column having a screw hole formed on the outer peripheral surface is disposed so as to cover the outer periphery of the existing column, and the new column is fixed to the existing column with a bolt. Then, the new fence main body is fixed to the new support column. According to this repair method, it is not necessary to remove the existing struts and embed the struts again, so that the fence repair work can be easily performed. Moreover, since the aging existing support | pillar is covered with a new installation support | pillar, the aesthetics of a fence can be improved.

特開平11−200667号公報Japanese Patent Application Laid-Open No. 11-200667

ところで、特許文献1に記載のフェンスの改修方法によれば、新設支柱が既設支柱を覆うように配置されるため、既設支柱及び新設支柱が一体となって1本の支柱を構成することとなる。この構成では、フェンスを改修する代わりに支柱間に戸を設置しようとした場合、支柱と支柱間に配置される戸とが同一平面上に配置されることになるので、開き戸であれば設置できるが、吊り戸を設置することは困難であった。   By the way, according to the method for repairing a fence described in Patent Document 1, since the new support column is arranged so as to cover the existing support column, the existing support column and the new support column constitute a single support column. . In this configuration, when installing a door between the columns instead of renovating the fence, the doors arranged between the columns and the columns are arranged on the same plane. However, it was difficult to install a hanging door.

それ故に、本発明の目的は、既設フェンスに吊り戸を容易に設置することができる吊り戸の設置方法を提供することである。   Therefore, an object of the present invention is to provide a suspension door installation method that can easily install a suspension door on an existing fence.

上記課題を解決するために、本発明の一局面は、第1既設柱及び第2既設柱の間のフェンスを除去して吊り戸を設置するための吊り戸の設置方法である。第1工程では、フェンスを除去する。第2工程では、柱状の柱本体、及び柱本体の一端から柱本体と交差する方向へ延出された支持部を具備してなる新設柱を、支持部の先端側を各既設柱の上端部に連結させると共に柱本体の他端を設置面に当接させることによって、第1既設柱及び第2既設柱のそれぞれに設置する。第3工程では、第1既設柱及び第2既設柱に固定された各新設柱の支持部に吊りレールを固定する。第4工程では、吊りレールに吊り戸を吊り下げる。   In order to solve the above problem, one aspect of the present invention is a suspension door installation method for removing a fence between a first existing pillar and a second existing pillar and installing a suspension door. In the first step, the fence is removed. In the second step, a new column comprising a columnar column main body and a support portion extending in a direction intersecting the column main body from one end of the column main body is used, and the tip end side of the support portion is the upper end portion of each existing column. And the other end of the column main body is brought into contact with the installation surface to be installed on each of the first existing column and the second existing column. In the third step, the suspension rail is fixed to the support portion of each new pillar fixed to the first existing pillar and the second existing pillar. In the fourth step, the suspension door is suspended from the suspension rail.

上記構成によれば、支持部が第1既設柱及び第2既設柱によって形成される平面と交差するように連結されることで、吊りレールを介して支持部に支持される吊り戸が、上記平面から離れた位置に上記平面と平行に配置される。このため、既設フェンスに吊り戸を設置することが可能となる。また、吊り戸の設置に際して、第1既設柱及び第2既設柱を除去する必要がないので、吊り戸の設置は容易である。   According to the above configuration, the supporting part is connected so as to intersect the plane formed by the first existing pillar and the second existing pillar, so that the suspension door supported by the supporting part via the suspension rail is It arrange | positions in parallel with the said plane in the position away from the plane. For this reason, it becomes possible to install a suspension door on the existing fence. Moreover, since it is not necessary to remove a 1st existing pillar and a 2nd existing pillar in the case of installation of a suspension door, installation of a suspension door is easy.

他の局面では、第1既設柱と第2既設柱との間には、第1既設柱と共にフェンスを支持する第3既設柱と、第2既設柱又は第3既設柱を軸として回動可能な開き戸とが設けられている。この場合、第1工程では、フェンス、第3既設柱、及び開き戸を除去する。   In another aspect, between the first existing column and the second existing column, the third existing column that supports the fence together with the first existing column, and the second existing column or the third existing column can be rotated as an axis. A hinged door is provided. In this case, in the first step, the fence, the third existing pillar, and the hinged door are removed.

開き戸の開口幅は、第2既設柱と第3既設柱との間隔とほぼ等しい。フェンス、第3既設柱、及び開き戸が除去されるので、戸の開口幅が第1既設柱と第2既設柱との間隔まで広げられる。また、第1既設柱と第2既設柱との間には、開き戸に代えて吊り戸が設置されるので、戸が開閉時に障害物に接触することが防止される。   The opening width of the hinged door is substantially equal to the interval between the second existing pillar and the third existing pillar. Since the fence, the third existing pillar, and the hinged door are removed, the opening width of the door is expanded to the interval between the first existing pillar and the second existing pillar. Moreover, since a hanging door is installed instead of the hinged door between the first existing pillar and the second existing pillar, the door is prevented from contacting an obstacle when opening and closing.

他の局面では、第2既設柱に対して第1既設柱の反対側に第4既設柱が設けられており、吊りレールの長さは、第1既設柱と第4既設柱との間隔以上に設定されている。この場合、第2工程では、第1既設柱及び第2既設柱に加えて、第4既設柱に新設柱を設置する。第3工程では、第1既設柱、第2既設柱、及び第4既設柱に設置された各新設柱の支持部に吊りレールを固定する。   In another aspect, the fourth existing column is provided on the opposite side of the first existing column with respect to the second existing column, and the length of the suspension rail is equal to or greater than the distance between the first existing column and the fourth existing column. Is set to In this case, in the second step, a new pillar is installed on the fourth existing pillar in addition to the first existing pillar and the second existing pillar. In a 3rd process, a suspension rail is fixed to the support part of each new pillar installed in the 1st existing pillar, the 2nd existing pillar, and the 4th existing pillar.

他の局面では、支持部の先端は、各既設柱の上端部に対して嵌合可能に形成されている。   In another aspect, the tip of the support portion is formed so as to be fitted to the upper end portion of each existing column.

上記構成により、既設柱の上端部と新設柱の支持部との連結が、例えば溶接で行われる場合に比べて容易となる。   By the said structure, the connection of the upper end part of an existing pillar and the support part of a new pillar becomes easy compared with the case where it is performed, for example by welding.

他の局面では、第1既設柱及び第2既設柱は、設置面に対して垂直に立設されている。柱本体は、柱本体の他端から支持部の基端までの長さが、新設柱が設置される既設柱の上端の設置面からの高さと等しい。支持部は、柱本体の長手方向と直交する方向に延出されている。   In another aspect, the first existing pillar and the second existing pillar are erected vertically to the installation surface. In the column main body, the length from the other end of the column main body to the base end of the support portion is equal to the height from the installation surface at the upper end of the existing column on which the new column is installed. The support portion extends in a direction orthogonal to the longitudinal direction of the column main body.

上記構成により、吊り戸がより安定的に支持される。   With the above configuration, the suspension door is supported more stably.

本発明によれば、吊りレールを介して支持部に支持される吊り戸が第1既設柱及び第2既設柱によって形成される平面から離れた位置にこの平面と平行に配置されるので、既設フェンスに吊り戸を設置することができる。また、第1既設柱及び第2既設柱を除去する必要がないので、吊り戸の設置は容易である。   According to the present invention, the suspension door supported by the support portion via the suspension rail is disposed in parallel to this plane at a position away from the plane formed by the first existing pillar and the second existing pillar. Suspension doors can be installed on the fence. Moreover, since it is not necessary to remove the first existing pillar and the second existing pillar, the suspension door can be easily installed.

既設フェンス100を示す図The figure which shows the existing fence 100 吊り戸80が設置された既設フェンス100を示す図The figure which shows the existing fence 100 in which the hanging door 80 was installed. 吊り戸80が設置された既設フェンス100を示す図The figure which shows the existing fence 100 in which the hanging door 80 was installed. 図2における矢印IVの方向から見た既設フェンス100を示す図The figure which shows the existing fence 100 seen from the direction of arrow IV in FIG. 新設柱11を示す図The figure which shows the new pillar 11 図5における矢印VIの方向から見た新設柱11を示す図The figure which shows the new pillar 11 seen from the direction of arrow VI in FIG. 柱本体20の他端部22の拡大図Enlarged view of the other end 22 of the column body 20 支持部40の拡大図Enlarged view of support 40 吊りレール90の構成を示す図The figure which shows the structure of the suspension rail 90 ランナー81の構造を示す図The figure which shows the structure of the runner 81 吊り戸80の構造を示す図The figure which shows the structure of the suspension door 80 第1工程後の既設フェンス100を示す図The figure which shows the existing fence 100 after a 1st process 第2工程後の既設フェンス100を示す図The figure which shows the existing fence 100 after a 2nd process. 上方から見た第2工程後の既設フェンス100の模式図Schematic diagram of the existing fence 100 after the second step as seen from above 新設柱11の連結部42が第1既設柱101の上端部111に連結される様子を示す図The figure which shows a mode that the connection part 42 of the new pillar 11 is connected with the upper end part 111 of the 1st existing pillar 101. FIG. 第2工程後の柱本体20及び第1既設柱101の構造を示す図The figure which shows the structure of the pillar main body 20 and the 1st existing pillar 101 after a 2nd process. 吊りレール90が設置された既設フェンス100を示す図The figure which shows the existing fence 100 in which the suspension rail 90 was installed 図17に示す既設フェンス100を上から見た図The figure which looked at the existing fence 100 shown in FIG. 17 from the top 図17における矢印XIXの方向から見た支持部40周辺の拡大図FIG. 17 is an enlarged view of the periphery of the support portion 40 as viewed from the direction of the arrow XIX. 吊りレール90に吊り戸80が吊り下げられた状態を示す図The figure which shows the state by which the suspension door 80 was suspended by the suspension rail 90.

以下、適宜図面を参照しつつ本発明の一実施形態について説明する。図1は、吊り戸80が設置される前の既設フェンス100の正面図である。図2は、吊り戸80が設置された既設フェンス100の正面図であり、吊り戸80が閉じられた状態を示す。図3は、吊り戸80が設置された既設フェンス100の正面図であり、吊り戸80が開かれた状態を示す。図4は、図2における矢印IVの方向から見た既設フェンス100の側面図である。なお、図2以降では、説明の便宜上、フェンス107の一部が省略されている。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings as appropriate. FIG. 1 is a front view of the existing fence 100 before the suspension door 80 is installed. FIG. 2 is a front view of the existing fence 100 in which the suspension door 80 is installed, and shows a state in which the suspension door 80 is closed. FIG. 3 is a front view of the existing fence 100 in which the suspension door 80 is installed, and shows a state in which the suspension door 80 is opened. FIG. 4 is a side view of the existing fence 100 as viewed from the direction of arrow IV in FIG. In FIG. 2 and subsequent figures, a part of the fence 107 is omitted for convenience of explanation.

図1〜図4に示されるように、本実施形態に係る吊り戸80の設置方法は、第1既設柱101、第2既設柱102、第4既設柱104、及びフェンス107を残したまま、フェンス106、第3既設柱103、及び開き戸110を除去して吊り戸80を設置するための方法である。言い換えれば、本実施形態に係る吊り戸80の設置方法は、開き戸110を吊り戸80に変更するための方法である。なお、本実施形態では、第1既設柱101と第2既設柱102との間に開き戸110が設けられている場合について説明するが、本発明に係る吊り戸80の設置方法は、開き戸110を有しない既設フェンス100にも適用可能である。   As shown in FIG. 1 to FIG. 4, the installation method of the hanging door 80 according to the present embodiment leaves the first existing pillar 101, the second existing pillar 102, the fourth existing pillar 104, and the fence 107, This is a method for installing the suspension door 80 by removing the fence 106, the third existing pillar 103, and the hinged door 110. In other words, the installation method of the suspension door 80 according to the present embodiment is a method for changing the hinged door 110 to the suspension door 80. In addition, although this embodiment demonstrates the case where the hinged door 110 is provided between the 1st existing pillar 101 and the 2nd existing pillar 102, the installation method of the suspension door 80 which concerns on this invention is the hinged door 110. The present invention can also be applied to an existing fence 100 that does not have.

まず、本実施形態に係る吊り戸80の設置方法が適用される前の既設フェンス100の構成について説明する。図1に示されるように、既設フェンス100は、主として第1既設柱101、フェンス106、第3既設柱103、開き戸110、第2既設柱102、フェンス107、及び第4既設柱104によって構成されている。第1既設柱101、第3既設柱103、第2既設柱102、及び第4既設柱104は、一直線上に並んで配置されている。既設柱101〜104は、設置面120に対して垂直に立設されている。これらの既設柱101〜104は、本実施形態では、いずれも円筒形状の鋼管であり、同じ大きさのものである。既設柱101〜104は、設置面120からの上端の高さが互いに等しくなるよう、それぞれ下端部が埋設されている(図1参照)。   First, the structure of the existing fence 100 before the installation method of the suspension door 80 which concerns on this embodiment is applied is demonstrated. As shown in FIG. 1, the existing fence 100 is mainly composed of a first existing column 101, a fence 106, a third existing column 103, a hinged door 110, a second existing column 102, a fence 107, and a fourth existing column 104. ing. The first existing pillar 101, the third existing pillar 103, the second existing pillar 102, and the fourth existing pillar 104 are arranged in a straight line. The existing pillars 101 to 104 are erected vertically to the installation surface 120. In the present embodiment, these existing pillars 101 to 104 are all cylindrical steel pipes and have the same size. The existing pillars 101 to 104 have their lower ends embedded so that the heights of the upper ends from the installation surface 120 are equal to each other (see FIG. 1).

第1既設柱101及び第2既設柱102は、所定の間隔d1(図1参照)を隔てて立設されている。第1既設柱101と第2既設柱102との間には、第3既設柱103が設けられている。第3既設柱103は、本実施形態では、第2既設柱102と所定の間隔d2を隔てて立設されている。この第3既設柱103は、第1既設柱101と共にフェンス106を支持するものである。すなわち、フェンス106は、その両側が第1既設柱101及び第3既設柱103に連結されている。第3既設柱103と第2既設柱102との間には、開き戸110が設けられている。この開き戸110は、第2既設柱102に回動可能に設けられているが、第3既設柱103に回動可能に設けられていてもよい。   The first existing pillar 101 and the second existing pillar 102 are erected with a predetermined distance d1 (see FIG. 1). A third existing pillar 103 is provided between the first existing pillar 101 and the second existing pillar 102. In the present embodiment, the third existing pillar 103 is erected with a predetermined distance d2 from the second existing pillar 102. The third existing pillar 103 supports the fence 106 together with the first existing pillar 101. That is, both sides of the fence 106 are connected to the first existing pillar 101 and the third existing pillar 103. A hinged door 110 is provided between the third existing pillar 103 and the second existing pillar 102. The hinged door 110 is rotatably provided on the second existing pillar 102, but may be rotatably provided on the third existing pillar 103.

第2既設柱102に対して第1既設柱101の反対側には、第4既設柱104が設けられている。この第4既設柱104は、第2既設柱102と共にフェンス107を支持するものである。すなわち、フェンス107は、その両側が第2既設柱102及び第4既設柱104に連結されている。なお、フェンス106,107は、連結具、ボルト、及びナットを用いて既設柱101〜104に連結されているが、これらの部材は既知のものであるため、本実施形態ではその説明を省略する。   A fourth existing column 104 is provided on the opposite side of the first existing column 101 with respect to the second existing column 102. The fourth existing pillar 104 supports the fence 107 together with the second existing pillar 102. That is, the fence 107 is connected to the second existing pillar 102 and the fourth existing pillar 104 on both sides thereof. The fences 106 and 107 are connected to the existing pillars 101 to 104 using connecting tools, bolts, and nuts. However, since these members are already known, description thereof is omitted in this embodiment. .

次に、本実施形態に係る吊り戸80の設置方法で使用される各部材について説明する。本実施形態では、吊り戸80を設置するために、3つの新設柱11,12,14が使用される。以下、新設柱11を例にその構造について説明する。   Next, each member used with the installation method of the hanging door 80 which concerns on this embodiment is demonstrated. In the present embodiment, three new pillars 11, 12, and 14 are used to install the hanging door 80. Hereinafter, the structure of the new pillar 11 will be described as an example.

図5は、新設柱11の一側面図である。図6は、図5における矢印VIの方向から見た新設柱11の側面図である。   FIG. 5 is a side view of the new pillar 11. FIG. 6 is a side view of the new pillar 11 viewed from the direction of the arrow VI in FIG.

図5,6に示される新設柱11は、第1既設柱101と共に吊りレール90(図3及び図19参照)を支持するものである。新設柱11は、柱本体20及び支持部40を具備している。柱本体20は、本実施形態では、長手方向(図5,6における上下方向)と直交する方向の断面形状が正方形である柱状の鋼管である(図16(C)参照)。なお、柱本体20の断面形状は特に限定されるものではなく、長方形や円形、三角形や楕円形などのその他の形状であってもよい。柱本体20の長さは、既設柱(ここでは第1既設柱101)と並んで設置面120に設置された場合に、一端21が第1既設柱101の上端と略同じ高さとなるように設定されている。言い換えれば、柱本体20は、柱本体20の他端22から支持部40の基端までの長さが、新設柱11が設置される第1既設柱101の上端の設置面120からの高さと略等しく設定されている。   The new pillar 11 shown in FIGS. 5 and 6 supports the suspension rail 90 (see FIGS. 3 and 19) together with the first existing pillar 101. The new pillar 11 includes a pillar body 20 and a support portion 40. In this embodiment, the column main body 20 is a columnar steel pipe whose cross-sectional shape in a direction orthogonal to the longitudinal direction (vertical direction in FIGS. 5 and 6) is a square (see FIG. 16C). The cross-sectional shape of the column main body 20 is not particularly limited, and may be other shapes such as a rectangle, a circle, a triangle, and an ellipse. The length of the column main body 20 is set so that one end 21 is substantially the same height as the upper end of the first existing column 101 when installed on the installation surface 120 along with the existing column (here, the first existing column 101). Is set. In other words, the length of the column main body 20 from the other end 22 of the column main body 20 to the base end of the support portion 40 is the height from the installation surface 120 at the upper end of the first existing column 101 where the new column 11 is installed. It is set approximately equal.

図7は、柱本体20の他端部22の拡大図であり、(A)は図5と同じ方向から見た他端部22を示し、(B)は、図5における矢印VIの方向から見た他端22を示す。図7に示されるように、柱本体20の他端22には、支持プレート24が設けられている。支持プレート24は、設置面120に当接されるものである。支持プレート24は、本実施形態では、平面視が長方形の鋼板であり、柱本体22に溶接によって固定されている(図7及び図16(C)参照)。この支持プレート24には、厚み方向に貫通する4つの孔25が形成されている。これらの孔25は、後述するアンカーボルト23(図16参照)を挿通させるためのものである。支持プレート24の上面(図7における上側の面)には、軸受け26が設けられている。軸受け26は、ローラ28(図16参照)を配置するための空間を隔てて、2つの板状部材が平行に配置されたものである。これらの板状部材には、ローラ28の回転軸を挿通させるための孔が形成されている。   FIG. 7 is an enlarged view of the other end portion 22 of the column main body 20, (A) shows the other end portion 22 viewed from the same direction as FIG. 5, and (B) is from the direction of arrow VI in FIG. 5. The other end 22 seen is shown. As shown in FIG. 7, a support plate 24 is provided on the other end 22 of the column main body 20. The support plate 24 is in contact with the installation surface 120. In the present embodiment, the support plate 24 is a steel plate that is rectangular in plan view, and is fixed to the column body 22 by welding (see FIGS. 7 and 16C). The support plate 24 is formed with four holes 25 penetrating in the thickness direction. These holes 25 are for inserting an anchor bolt 23 (see FIG. 16) described later. A bearing 26 is provided on the upper surface of the support plate 24 (the upper surface in FIG. 7). The bearing 26 has two plate-like members arranged in parallel with a space for arranging the rollers 28 (see FIG. 16) therebetween. These plate-like members are formed with holes through which the rotation shaft of the roller 28 is inserted.

柱本体20の他端22の側面には、軸受け27が設けられている。軸受け27は、ローラ29(図16参照)を配置するための空間を隔てて、2つの板状部材が平行に配置されたものである。これらの板状部材は、柱本体20の側面から軸受け26の直上へ向けて突出するように設けられており、ローラ29の回転軸を挿通させるための孔が形成されている。   A bearing 27 is provided on the side surface of the other end 22 of the column body 20. The bearing 27 has two plate-like members arranged in parallel with a space for arranging a roller 29 (see FIG. 16) therebetween. These plate-like members are provided so as to protrude from the side surface of the column main body 20 directly above the bearing 26, and a hole through which the rotation shaft of the roller 29 is inserted is formed.

柱本体20の他端22側の側面には、ストッパ30が設けられている(図5及び図6参照)。ストッパ30は、後述する吊り戸80の移動を規制するためのものである。また、このストッパ30は、新設柱11の柱本体20の他端22側と、第1既設柱101とを連結するためのものであり、後述する支持部40と平行に配置されている(図5参照)。ストッパ30は、本実施形態では、その長手方向と直交する方向の断面がL字形状となるように形成されている(図6参照)。このストッパ30の先端側には、ボルト16(図16参照)を挿通させるための孔31が形成されている。   A stopper 30 is provided on the side surface of the column body 20 on the other end 22 side (see FIGS. 5 and 6). The stopper 30 is for restricting the movement of the suspension door 80 described later. Moreover, this stopper 30 is for connecting the other end 22 side of the column main body 20 of the newly installed column 11 and the first existing column 101, and is arranged in parallel with the support portion 40 described later (FIG. 5). In the present embodiment, the stopper 30 is formed so that the cross section in the direction orthogonal to the longitudinal direction has an L shape (see FIG. 6). A hole 31 through which the bolt 16 (see FIG. 16) is inserted is formed at the distal end side of the stopper 30.

図8は、支持部40の拡大図であり、(A)は図5と同じ方向から見た支持部40を示し、(B)は上方から見た支持部40を示す。   FIG. 8 is an enlarged view of the support part 40, (A) shows the support part 40 seen from the same direction as FIG. 5, and (B) shows the support part 40 seen from above.

柱本体20の一端21には、支持部40が設けられている。この支持部40は、後述する吊りレール90(図9参照)を上から支持する支持部本体41と、既設柱(ここでは第1既設柱101)の上端部111(図15参照)に連結される連結部42とを有している。支持部本体41は、本実施形態では溶接により柱本体20に固定されているが、柱本体20と別部材で構成されていてもよい。支持部本体41は、柱本体20の一端21側から柱本体20の長手方向と直交する方向へ延出されている(図8(A)参照)。   A support portion 40 is provided at one end 21 of the column body 20. The support portion 40 is connected to a support portion main body 41 that supports a suspension rail 90 (see FIG. 9), which will be described later, and an upper end portion 111 (see FIG. 15) of an existing column (here, the first existing column 101). Connecting portion 42. Although the support part main body 41 is being fixed to the column main body 20 by welding in this embodiment, you may be comprised by the column main body 20 and another member. The support part main body 41 is extended in the direction orthogonal to the longitudinal direction of the column main body 20 from the one end 21 side of the column main body 20 (refer FIG. 8 (A)).

支持部本体41の上側の中央部には、ポール43が立設されている。このポール43は、後述するフェンス98(図3参照)を支持するものである。支持部本体41の下側の中央部には、吊り具44が設けられている。この吊り具44は、吊りレール90を係止するためのものである(図19参照)。この吊り具44は、本実施形態ではボルト45及びナット46の螺合によって支持部本体41に固定されているが、例えば溶接によって支持部本体41に固定されていてもよい。   A pole 43 is erected in the central portion on the upper side of the support portion main body 41. The pole 43 supports a fence 98 (see FIG. 3) described later. A hanging tool 44 is provided at the lower central portion of the support body 41. The hanger 44 is for locking the hanger rail 90 (see FIG. 19). In this embodiment, the lifting tool 44 is fixed to the support body 41 by screwing the bolt 45 and the nut 46, but may be fixed to the support body 41 by welding, for example.

支持部本体41の先端(図8における右端)には、連結部42が設けられている。連結部42は、柱本体20の長手方向(図8(A)における上下方向)を軸方向とする円筒形状の鋼管である。この連結部42は、その上面に底47を有し、下側に向けて開口している。後述するが、連結部42には、この開口部分から第1既設柱101の上端部111が挿入される(図15及び図19参照)。このため、連結部42の柱本体20の長手方向と直交する方向の断面内形は、第1既設柱101の断面外形に合わせて円形となっている。また、連結部42の内径は、第1既設柱101の上端部111の外径よりも若干大きく設定されている。このように、連結部42は、第1既設柱101の上端部111と嵌合可能に形成されている。また、連結部42の深さは、第1既設柱101の上端部111が連結部42内に挿入されて底47に当接した状態で、連結部42が上端部111から容易に外れない程度の深さに設定されている。   A connecting portion 42 is provided at the tip of the support portion main body 41 (the right end in FIG. 8). The connection part 42 is a cylindrical steel pipe whose axial direction is the longitudinal direction (vertical direction in FIG. 8A) of the column main body 20. The connecting portion 42 has a bottom 47 on its upper surface and opens downward. As will be described later, the upper end portion 111 of the first existing pillar 101 is inserted into the connecting portion 42 from this opening portion (see FIGS. 15 and 19). For this reason, the cross-sectional inner shape of the connection part 42 in the direction orthogonal to the longitudinal direction of the column main body 20 is circular according to the cross-sectional outer shape of the first existing column 101. Further, the inner diameter of the connecting portion 42 is set to be slightly larger than the outer diameter of the upper end portion 111 of the first existing column 101. Thus, the connection part 42 is formed so that the upper end part 111 of the 1st existing pillar 101 can be fitted. Further, the depth of the connecting portion 42 is such that the connecting portion 42 is not easily detached from the upper end portion 111 in a state where the upper end portion 111 of the first existing column 101 is inserted into the connecting portion 42 and is in contact with the bottom 47. Set to a depth of.

連結部42の側壁には、雌ネジを有するネジ孔48が形成されている(図8(B)参照)。ネジ孔48は、連結部42の側壁の周方向に等間隔に3つ形成されている。連結部42に第1既設柱101の上端部111が挿入された状態で、ネジ孔48にボルト49(図19参照)が螺合される。ボルト49の先端によって第1既設柱101の上端部111の側面が押圧されることにより、第1既設柱101に連結部42が固定される。すなわち、新設柱11が第1既設柱101の上端に連結される。   A screw hole 48 having a female screw is formed in the side wall of the connecting portion 42 (see FIG. 8B). Three screw holes 48 are formed at equal intervals in the circumferential direction of the side wall of the connecting portion 42. A bolt 49 (see FIG. 19) is screwed into the screw hole 48 in a state where the upper end portion 111 of the first existing pillar 101 is inserted into the connecting portion 42. The connecting portion 42 is fixed to the first existing column 101 by pressing the side surface of the upper end portion 111 of the first existing column 101 by the tip of the bolt 49. That is, the new pillar 11 is connected to the upper end of the first existing pillar 101.

後述するが、以上説明した新設柱11は、第1既設柱101の上端部111に連結される。これと同様に、新設柱12が第2既設柱102の上端部112に連結され、新設柱14が第4既設柱104の上端部114に連結される(図12及び図13参照)。新設柱12は、ストッパ30を有していない点を除いて、新設柱11と同様に構成されている。新設柱14は、ストッパ30及びポール43を有していない点を除いて、新設柱11と同様に構成されている。したがって、ここでは、新設柱12,14の詳細な説明を省略する。   As will be described later, the new pillar 11 described above is connected to the upper end portion 111 of the first existing pillar 101. Similarly, the new pillar 12 is connected to the upper end 112 of the second existing pillar 102, and the new pillar 14 is connected to the upper end 114 of the fourth existing pillar 104 (see FIGS. 12 and 13). The new pillar 12 is configured similarly to the new pillar 11 except that the new pillar 12 does not have the stopper 30. The new column 14 is configured in the same manner as the new column 11 except that the new column 14 does not have the stopper 30 and the pole 43. Therefore, detailed description of the new pillars 12 and 14 is omitted here.

図9は、吊りレール90の外観構成を示す図である。図9に示される吊りレール90は、上壁91と、上壁91の両側から直角に曲折された側壁92と、側壁92から吊りレール90の内側へ直角に曲折された下壁93と、下壁93から上壁91へ向けて直角に曲折された内壁94とを有している。この吊りレール90は、後述するランナー81(図10参照)を支持するためのものである。このため、吊りレール90の各壁91〜94の寸法は、ランナー81の大きさに応じて適宜設定される。   FIG. 9 is a diagram illustrating an external configuration of the suspension rail 90. The suspension rail 90 shown in FIG. 9 includes an upper wall 91, a side wall 92 bent at right angles from both sides of the upper wall 91, a lower wall 93 bent at right angles from the side wall 92 to the inside of the suspension rail 90, and And an inner wall 94 bent at a right angle from the wall 93 toward the upper wall 91. This suspension rail 90 is for supporting the runner 81 (refer FIG. 10) mentioned later. For this reason, the dimensions of the walls 91 to 94 of the suspension rail 90 are appropriately set according to the size of the runner 81.

吊りレール90は、新設柱11,12,14のそれぞれの吊り具44によって係止される。このため、吊りレール90の長さは、第1既設柱101と第4既設柱104との間隔d3(図1参照)以上に設定されている。   The suspension rail 90 is locked by the suspension tool 44 of each of the newly installed columns 11, 12, and 14. For this reason, the length of the suspension rail 90 is set to be not less than the distance d3 (see FIG. 1) between the first existing pillar 101 and the fourth existing pillar 104.

図10は、ランナー81の構造を示す図であり、(A)はランナー81の正面を示し、(B)はランナー81の側面を示し、(C)はランナー81の上面を示す。図10に示されるランナー81は、吊りレール90に吊り戸80を吊り下げるためのものである。本実施形態では、吊り戸80を吊り下げるために3つのランナー81が使用される。ランナー81は、ランナー本体82と、軸部83と、ダブルローラ84とを有している。ランナー本体82には、2つのダブルローラ84が回転自在に設けられている。軸部83は、ランナー本体82から延出された円柱形状の棒状部材であり、外周面に雄ネジが形成されている。   10A and 10B are diagrams showing the structure of the runner 81, where FIG. 10A shows the front of the runner 81, FIG. 10B shows the side of the runner 81, and FIG. The runner 81 shown in FIG. 10 is for hanging the suspension door 80 on the suspension rail 90. In the present embodiment, three runners 81 are used to suspend the suspension door 80. The runner 81 has a runner body 82, a shaft portion 83, and a double roller 84. Two double rollers 84 are rotatably provided on the runner body 82. The shaft portion 83 is a columnar rod-like member extended from the runner body 82, and has an external thread on the outer peripheral surface.

図11は、吊り戸80の構造を示す図であり、(A)は吊り戸80の正面を示し、(B)は吊り戸80の上面を示す。図11に示される吊り戸80は、高さ方向よりも幅方向に長いフレーム86の内側にフェンス87が設けられたものである。フレーム86を構成する上枠88には、3つのプレート89が設けられている。これらのプレート89は、上枠88の両端及び中央部に例えば溶接により固定されている。各プレート89には、雌ネジを有するネジ孔が形成されている(図11(B)参照)。また、上枠88における各プレート89のネジ孔と対応する位置には、ランナー81の軸83を挿通するための孔が形成されている。プレート89にランナー81の軸部83を螺合させることにより、吊り戸80にランナー81が固定される(図20参照)。   11A and 11B are diagrams showing the structure of the hanging door 80, where FIG. 11A shows the front of the hanging door 80 and FIG. 11B shows the upper surface of the hanging door 80. FIG. The suspension door 80 shown in FIG. 11 is provided with a fence 87 inside a frame 86 that is longer in the width direction than in the height direction. Three plates 89 are provided on the upper frame 88 constituting the frame 86. These plates 89 are fixed to both ends and the center of the upper frame 88 by welding, for example. Each plate 89 is formed with a screw hole having a female screw (see FIG. 11B). A hole for inserting the shaft 83 of the runner 81 is formed at a position corresponding to the screw hole of each plate 89 in the upper frame 88. The runner 81 is fixed to the suspension door 80 by screwing the shaft portion 83 of the runner 81 to the plate 89 (see FIG. 20).

以下、本実施形態に係る吊り戸80の設置方法について説明する。図12は、第1工程後の既設フェンス100の正面図である。   Hereinafter, the installation method of the hanging door 80 which concerns on this embodiment is demonstrated. FIG. 12 is a front view of the existing fence 100 after the first step.

まず、第1工程では、図1及び図12に示されるように、第1既設柱101と第2既設柱102との間から、開き戸110、フェンス106、及び第3既設柱103を除去する。具体的には、第2既設柱102から開き戸110を取り外した後、第1既設柱101及び第3既設柱103からフェンス106を取り外す。そして、残った第3既設柱103を、地中に設置された部分を残して切断する。これにより、図12に示されるように、既設フェンス100には、第1既設柱101、第2既設柱102、第4既設柱104、及びフェンス107が残される。   First, in the first step, as shown in FIGS. 1 and 12, the hinged door 110, the fence 106, and the third existing pillar 103 are removed from between the first existing pillar 101 and the second existing pillar 102. Specifically, after removing the hinged door 110 from the second existing pillar 102, the fence 106 is removed from the first existing pillar 101 and the third existing pillar 103. Then, the remaining third existing pillar 103 is cut leaving a portion installed in the ground. As a result, as shown in FIG. 12, the first existing pillar 101, the second existing pillar 102, the fourth existing pillar 104, and the fence 107 remain in the existing fence 100.

図13は、第2工程後の既設フェンス100を示す図である。図14は、上方から見た第2工程後の既設フェンス100の模式図である。図15は、新設柱11の連結部42が第1既設柱101の上端部111に連結される様子を示す図である。図16は、第2工程後の柱本体20及び第1既設柱101の構造を示す図であり、(A)は図4と同じ方向から見た柱本体20及び第1既設柱101を示し、(B)は(A)における矢印71の方向から見た柱本体20及び第1既設柱101を示し、(C)は矢印72の方向から見た柱本体20及び第1既設柱101を示す。なお、図14では、フェンス107が模式的に示されており、図16(C)では、新設柱11の一端21側が省略されている。   FIG. 13 is a diagram showing the existing fence 100 after the second step. FIG. 14 is a schematic diagram of the existing fence 100 after the second step as viewed from above. FIG. 15 is a diagram illustrating a state in which the connecting portion 42 of the new pillar 11 is connected to the upper end portion 111 of the first existing pillar 101. FIG. 16 is a diagram showing the structure of the column main body 20 and the first existing column 101 after the second step, and (A) shows the column main body 20 and the first existing column 101 viewed from the same direction as FIG. (B) shows the column main body 20 and the first existing column 101 viewed from the direction of the arrow 71 in (A), and (C) shows the column main body 20 and the first existing column 101 viewed from the direction of the arrow 72. 14 schematically shows the fence 107, and in FIG. 16C, the one end 21 side of the new pillar 11 is omitted.

第2工程では、第1既設柱101に対して新設柱11を設置し、第2既設柱102に対して新設柱12を設置し、第4既設柱104に対して新設柱14を設置する。以下、第1既設柱101に新設柱11を設置する作業について具体的に説明する。まず、設置面120において、新設柱11の支持プレート24の孔25が配置される位置に、アンカーボルト23を打ち込む。支持プレート24には4つの孔25が設けられているので、設置面120に対して4本のアンカーボルト23が打ち込まれる。   In the second step, the new pillar 11 is installed on the first existing pillar 101, the new pillar 12 is installed on the second existing pillar 102, and the new pillar 14 is installed on the fourth existing pillar 104. Hereinafter, the operation of installing the new pillar 11 on the first existing pillar 101 will be specifically described. First, on the installation surface 120, the anchor bolt 23 is driven into a position where the hole 25 of the support plate 24 of the new pillar 11 is disposed. Since four holes 25 are provided in the support plate 24, four anchor bolts 23 are driven into the installation surface 120.

次に、連結部42が第1既設柱101の上端部111の直上に位置するように新設柱11を配置し(図15参照)、新設柱11をそのまま下方へ移動させる。これにより、第1既設柱101の上端部111が連結部42の内部に挿入される。なお、上述のように、柱本体20の長さは、設置面120から第1既設柱101の上端までの距離と略等しく設定されている。このため、連結部42内に第1既設柱101の上端部111が挿入された状態では、新設柱11の支持プレート24が設置面120に当接する。その際、支持プレート24の各孔25にアンカーボルト23を挿通させる。これにより、新設柱11は、鉛直方向上向き以外の方向への移動が規制される。そして、第1既設柱101におけるストッパ30の孔31と対応する位置にボルト挿通孔を形成し、ボルト16及びナット17を螺合させる(図16(B)参照)。これにより、ストッパ30が第1既設柱101に固定される。このように、第1既設柱101に新設柱11が設置されると、新設柱11の支持部40は、第1既設柱101及び第2既設柱102によって形成される平面70と交差(本実施形態では直交)した状態となる(図14参照)。   Next, the new pillar 11 is arranged so that the connecting portion 42 is located immediately above the upper end 111 of the first existing pillar 101 (see FIG. 15), and the new pillar 11 is moved downward as it is. As a result, the upper end portion 111 of the first existing pillar 101 is inserted into the connecting portion 42. As described above, the length of the column main body 20 is set to be approximately equal to the distance from the installation surface 120 to the upper end of the first existing column 101. For this reason, in a state where the upper end portion 111 of the first existing column 101 is inserted into the connecting portion 42, the support plate 24 of the new column 11 contacts the installation surface 120. At that time, the anchor bolts 23 are inserted into the holes 25 of the support plate 24. Thereby, the new pillar 11 is restricted from moving in a direction other than the upward direction in the vertical direction. Then, a bolt insertion hole is formed at a position corresponding to the hole 31 of the stopper 30 in the first existing pillar 101, and the bolt 16 and the nut 17 are screwed together (see FIG. 16B). Thereby, the stopper 30 is fixed to the first existing pillar 101. As described above, when the new pillar 11 is installed on the first existing pillar 101, the support portion 40 of the new pillar 11 intersects the plane 70 formed by the first existing pillar 101 and the second existing pillar 102 (this implementation). It is in a state of being orthogonal) (see FIG. 14).

続いて、図16に示されるように、新設柱11の柱本体20の軸受け27にローラ29を回転可能に取り付け、支持プレート24の軸受け26にローラ28を回転可能に取り付ける。そして、ローラ29及びローラ32が、吊り戸80が進入する空間を隔てて対向するように、回転可能なローラ32を備える軸受け33を第1既設柱101に固定する。なお、この軸受け33は、第1既設柱101に貫通孔を形成し、ボルト及びナットを用いて第1既設柱101に固定されるが、例えば溶接などの他の方法で第1既設柱101に固定されてもよい。   Subsequently, as shown in FIG. 16, the roller 29 is rotatably attached to the bearing 27 of the pillar body 20 of the newly installed pillar 11, and the roller 28 is rotatably attached to the bearing 26 of the support plate 24. And the bearing 33 provided with the roller 32 which can rotate is fixed to the 1st existing pillar 101 so that the roller 29 and the roller 32 may face each other across the space where the suspension door 80 enters. The bearing 33 forms a through hole in the first existing column 101 and is fixed to the first existing column 101 using a bolt and a nut. For example, the bearing 33 is formed in the first existing column 101 by other methods such as welding. It may be fixed.

ここまで、第1既設柱101に対して新設柱11を設置する作業について説明したが、これと同じ要領で、第2既設柱102に対して新設柱12を設置し、第4既設柱104に対して新設柱14を設置する。   Up to this point, the work of installing the new pillar 11 with respect to the first existing pillar 101 has been described, but in the same manner, the new pillar 12 is installed with respect to the second existing pillar 102 and the fourth existing pillar 104 is provided. On the other hand, a new pillar 14 is installed.

なお、新設柱11,12,14を設置する順序は上述の順序に限定されるものではない。すなわち、例えば、第2既設柱102に対して新設柱12を設置してから第1既設柱101に対して新設柱11を設置し、その後、第4既設柱104に対して新設柱14を設置するようにしてもよい。   In addition, the order which installs the new pillars 11, 12, and 14 is not limited to the above-mentioned order. That is, for example, the new pillar 12 is installed on the first existing pillar 101 after the new pillar 12 is installed on the second existing pillar 102, and then the new pillar 14 is installed on the fourth existing pillar 104. You may make it do.

図17は、第3工程後の既設フェンス100の正面図である。図18は、図17に示す既設フェンス100を上から見た図である。図19は、図17における矢印XIXの方向から見た支持部40周辺の拡大図である。   FIG. 17 is a front view of the existing fence 100 after the third step. FIG. 18 is a view of the existing fence 100 shown in FIG. 17 as viewed from above. FIG. 19 is an enlarged view of the periphery of the support portion 40 as viewed from the direction of the arrow XIX in FIG.

第3工程では、図13、図17〜図19に示されるように、新設柱11、新設柱12、及び新設柱14に吊りレール90を固定する。具体的には、吊りレール90を、新設柱14の吊り具44に係止させてから新設柱12の吊り具44に係止させ、さらに新設柱11の吊り具44に係止させる。これにより、吊りレール90が新設柱11,12,14と既設柱101,102,104との両方によって安定的に支持される。なお、吊りレール90は、平面70から離れた位置に、平面70と平行に配置される(図18参照)。   In the third step, as shown in FIGS. 13 and 17 to 19, the suspension rail 90 is fixed to the new pillar 11, the new pillar 12, and the new pillar 14. Specifically, the suspension rail 90 is locked to the lifting tool 44 of the newly installed column 14 after being locked to the lifting tool 44 of the newly installed column 14, and is further locked to the lifting tool 44 of the newly installed column 11. As a result, the suspension rail 90 is stably supported by both the new pillars 11, 12, 14 and the existing pillars 101, 102, 104. In addition, the suspension rail 90 is arrange | positioned in the position away from the plane 70 in parallel with the plane 70 (refer FIG. 18).

図20は、吊りレール90に吊り戸80が吊り下げられた状態を示す図である。   FIG. 20 is a diagram illustrating a state in which the suspension door 80 is suspended from the suspension rail 90.

第4工程では、図20に示されるように、吊り戸80を吊りレール90に吊り下げる。具体的には、吊り戸80の上枠88に固定された3つのランナー81のダブルローラ84を吊りレール90の下壁93に引っ掛ける。これにより、吊りレール90に対して吊り戸80がスライド可能に支持される(図2及び図3参照)。   In the fourth step, the suspension door 80 is suspended from the suspension rail 90 as shown in FIG. Specifically, the double rollers 84 of the three runners 81 fixed to the upper frame 88 of the suspension door 80 are hooked on the lower wall 93 of the suspension rail 90. Thereby, the suspension door 80 is slidably supported with respect to the suspension rail 90 (refer FIG.2 and FIG.3).

ところで、支持部40は、その長手方向の略中央に吊り具44が固定されている。この支持部40は、第1既設柱101及び第2既設柱102によって形成される平面70に対して直交するように配置される(図14参照)。これにより、支持部40の長手方向における連結部42と吊り具44との間隔に相当する距離だけ、吊り具44が平面70から離隔した位置に配置されることとなる(図4参照)。その結果、吊り戸80が平面70と平行に配置される。   By the way, as for the support part 40, the hanging tool 44 is being fixed to the approximate center of the longitudinal direction. This support part 40 is arrange | positioned so that it may orthogonally cross with respect to the plane 70 formed with the 1st existing pillar 101 and the 2nd existing pillar 102 (refer FIG. 14). As a result, the lifting tool 44 is disposed at a position separated from the plane 70 by a distance corresponding to the distance between the connecting part 42 and the lifting tool 44 in the longitudinal direction of the support part 40 (see FIG. 4). As a result, the hanging door 80 is arranged in parallel with the plane 70.

第5工程では、3つの嵩上げ用フェンスを設置する。具体的には、第1既設柱101及び第2既設柱102のポール43に嵩上げ用のフェンス98を固定する(図2参照)。また、図には示されていないが、フェンス107の上にも嵩上げ用のフェンスを設置する。具体的には、新設柱12及び新設柱14の連結部42の上にポール43と同様のポールを設置する。そして、これら2つのポールに嵩上げ用のフェンスを固定する。なお、このフェンスは、2つのポールの間に設置された状態で、その上端部がフェンス98の上端部とほぼ同じ高さとなるものである。ところで、図には示されていないが、第1既設柱101に対して第2既設柱102とは反対側の位置に、第4既設柱104及びフェンス107と同様の既設柱及びフェンスが設けられている。この既設柱と第1既設柱101との間にも、フェンス107上に設置されるものと同様のフェンスが同じ要領で設置される。このように3つの嵩上げ用フェンスが設置されることで、侵入者がフェンスを越えることがより効果的に防止されることとなる。   In the fifth step, three raising fences are installed. Specifically, the raising fence 98 is fixed to the poles 43 of the first existing pillar 101 and the second existing pillar 102 (see FIG. 2). Although not shown in the figure, a raising fence is also installed on the fence 107. Specifically, a pole similar to the pole 43 is installed on the connecting portion 42 of the new pillar 12 and the new pillar 14. And the fence for raising is fixed to these two poles. In addition, this fence is installed between two poles, and its upper end is approximately the same height as the upper end of the fence 98. By the way, although not shown in the drawing, an existing column and fence similar to the fourth existing column 104 and the fence 107 are provided at a position opposite to the second existing column 102 with respect to the first existing column 101. ing. A fence similar to that installed on the fence 107 is also installed between the existing pillar and the first existing pillar 101 in the same manner. By installing the three raising fences in this way, it is more effectively prevented that an intruder crosses the fence.

最後に、全てのボルト及びナットの締め付け作業を行う。まず、新設柱11の連結部42のネジ孔48にボルト49を螺合させて、支持部40を第1既設柱101の先端部111に固定する。そして、新設柱11の支持プレート24の各孔25から支持プレート24の上側に突出しているアンカーボルト23にナット35を螺合させる。これにより、新設柱11の支持部40が第1既設柱101の上端部111に固定されると共に、新設柱11の柱本体20の他端22が設置面120に固定される。この一連の締め付け作業は、新設柱12,14に対しても同様に行われる。なお、この第5工程での作業は、上述の第2工程で行ってもよいが、全ての部材をバランスよく組み付けるためには、第4工程の後に行うのがよい。   Finally, tighten all bolts and nuts. First, a bolt 49 is screwed into the screw hole 48 of the connecting portion 42 of the new pillar 11 to fix the support portion 40 to the tip portion 111 of the first existing pillar 101. Then, the nuts 35 are screwed into the anchor bolts 23 protruding above the support plate 24 from the holes 25 of the support plate 24 of the new pillar 11. Thereby, the support portion 40 of the new pillar 11 is fixed to the upper end portion 111 of the first existing pillar 101, and the other end 22 of the column main body 20 of the new pillar 11 is fixed to the installation surface 120. This series of tightening operations is similarly performed on the new columns 12 and 14. The work in the fifth step may be performed in the second step described above. However, in order to assemble all members in a balanced manner, the work may be performed after the fourth step.

以上説明したように、本実施形態に係る吊り戸の設置方法によれば、支持部40が第1既設柱101及び第2既設柱102によって形成される平面70と直交するように各既設柱101,102,104に連結されるので、吊り戸80がこの平面70と平行に配置される。すなわち、吊り戸80が第1既設柱101及び第2既設柱102と同一平面上に位置しないように配置される。このため、既設フェンス100に吊り戸80を設置することができる。また、吊り戸80の設置に際して第1既設柱101及び第2既設柱102を除去する必要がないので、吊り戸80の設置は容易である。   As described above, according to the suspension door installation method according to the present embodiment, each of the existing columns 101 so that the support portion 40 is orthogonal to the plane 70 formed by the first existing column 101 and the second existing column 102. , 102, 104, the suspension door 80 is arranged in parallel with the plane 70. That is, the suspension door 80 is arranged so as not to be located on the same plane as the first existing pillar 101 and the second existing pillar 102. For this reason, the suspension door 80 can be installed on the existing fence 100. Further, since it is not necessary to remove the first existing pillar 101 and the second existing pillar 102 when installing the suspension door 80, the installation of the suspension door 80 is easy.

また、開き戸110に代えて吊り戸80が設置されることで、戸の開口幅が第3既設柱103と第2既設柱102との間隔d2から、第1既設柱101と第2既設柱102との間隔d1まで広げられる(図1及び図2参照)。仮に、間隔d1が車両の幅よりも広ければ、吊り戸80を全開にすることで車両の通行が可能となる。また、開き戸110に代えて吊り戸80が設置されるので、戸が開閉時に障害物に接触することはない。   Further, by installing the suspension door 80 instead of the hinged door 110, the opening width of the door is determined from the distance d2 between the third existing pillar 103 and the second existing pillar 102, so that the first existing pillar 101 and the second existing pillar 102 are provided. (See FIGS. 1 and 2). If the distance d1 is wider than the width of the vehicle, the vehicle can be passed by fully opening the suspension door 80. Moreover, since the hanging door 80 is installed instead of the hinged door 110, the door does not come in contact with an obstacle when opening and closing.

なお、本実施形態では、第1既設柱101と第2既設柱102との間にフェンス106、第3既設柱103、及び開き戸110が設けられている場合について説明したが、第1既設柱101と第2既設柱102との間にフェンスのみが設けられていてもよい。この場合、本発明の第2工程では、このフェンスのみを除去すればよい。   In addition, although this embodiment demonstrated the case where the fence 106, the 3rd existing pillar 103, and the hinged door 110 were provided between the 1st existing pillar 101 and the 2nd existing pillar 102, the 1st existing pillar 101 was demonstrated. Only the fence may be provided between the second existing pillar 102 and the second existing pillar 102. In this case, it is only necessary to remove this fence in the second step of the present invention.

また、本実施形態では、連結部42が既設柱101,102,104の上端部111,112,114に嵌合されることによって支持部40が既設柱101,102,104に連結される場合について説明したが、支持部40と既設柱101,102,104の上端部111,112,114との連結は、例えばボルト及びナットの螺合、溶接などの他の方法によるものであってもよい。   In the present embodiment, the connecting portion 42 is fitted to the upper ends 111, 112, 114 of the existing pillars 101, 102, 104 to connect the support portion 40 to the existing pillars 101, 102, 104. As described above, the connection between the support portion 40 and the upper end portions 111, 112, and 114 of the existing columns 101, 102, and 104 may be performed by other methods such as screwing and welding of bolts and nuts.

また、第2既設柱102、第3既設柱103、フェンス106,107、及び開き戸110を除去して、第1既設柱101と第4既設柱104との間に吊り戸を設置するようにしてもよい。この場合、本発明における第2既設柱が第4既設柱104に相当する。   Further, the second existing pillar 102, the third existing pillar 103, the fences 106 and 107, and the hinged door 110 are removed, and a suspension door is installed between the first existing pillar 101 and the fourth existing pillar 104. Also good. In this case, the second existing pillar in the present invention corresponds to the fourth existing pillar 104.

本発明の吊り戸の設置方法は、フェンスを除去して吊り戸を設置する場合等に適用可能である。   The method for installing a suspension door according to the present invention is applicable to a case where a fence is removed and a suspension door is installed.

11,12,14 新設柱
20 柱本体
21 一端
22 他端
40 支持部
42 連結部
80 吊り戸
90 吊りレール
101 第1既設柱
102 第2既設柱
103 第3既設柱
104 第4既設柱
106 フェンス
110 開き戸
120 設置面
11, 12, 14 New column 20 Column body 21 One end 22 The other end 40 Support portion 42 Connection portion 80 Suspension door 90 Suspension rail 101 First existing column 102 Second existing column 103 Third existing column 104 Fourth existing column 106 Fence 110 Sliding door 120 Installation surface

Claims (5)

第1既設柱及び第2既設柱の間のフェンスを除去して吊り戸を設置するための吊り戸の設置方法であって、
前記フェンスを除去する第1工程と、
柱状の柱本体、及び前記柱本体の一端から当該柱本体と交差する方向へ延出された支持部を具備してなる新設柱を、前記支持部の先端側を前記各既設柱の上端部に連結させると共に前記柱本体の他端を設置面に当接させることによって、前記第1既設柱及び前記第2既設柱のそれぞれに設置する第2工程と、
前記第1既設柱及び前記第2既設柱に固定された前記各新設柱の支持部に吊りレールを固定する第3工程と、
前記吊りレールに吊り戸を吊り下げる第4工程とを含んでなる、吊り戸の設置方法。
A suspension door installation method for removing a fence between a first existing pillar and a second existing pillar and installing a suspension door,
A first step of removing the fence;
A new column comprising a columnar column main body and a support portion extending in a direction intersecting with the column main body from one end of the column main body, and a tip end side of the support portion at an upper end portion of each existing column A second step of installing each of the first existing column and the second existing column by connecting and bringing the other end of the column main body into contact with the installation surface;
A third step of fixing a suspension rail to a support portion of each of the new pillars fixed to the first existing pillar and the second existing pillar;
A method for installing a suspension door, comprising a fourth step of suspending the suspension door on the suspension rail.
前記第1既設柱と前記第2既設柱との間には、前記第1既設柱と共に前記フェンスを支持する第3既設柱と、前記第2既設柱又は前記第3既設柱を軸として回動可能な開き戸とが設けられており、
前記第1工程は、前記フェンス、前記第3既設柱、及び前記開き戸を除去するものである、請求項1に記載の吊り戸の設置方法。
Between the first existing column and the second existing column, a third existing column that supports the fence together with the first existing column, and the second existing column or the third existing column is rotated as an axis. There are possible hinged doors,
The said 1st process is the installation method of the suspension door of Claim 1 which removes the said fence, the said 3rd existing pillar, and the said hinged door.
前記第2既設柱に対して前記第1既設柱の反対側に第4既設柱が設けられており、
前記吊りレールの長さは、前記第1既設柱と前記第4既設柱との間隔以上に設定されており、
前記第2工程は、前記第1既設柱及び前記第2既設柱に加えて、前記第4既設柱に前記新設柱を設置するものであり、
前記第3工程は、前記第1既設柱、前記第2既設柱、及び前記第4既設柱に設置された前記各新設柱の支持部に前記吊りレールを固定するものである、請求項1又は2に記載の吊り戸の設置方法。
A fourth existing pillar is provided on the opposite side of the first existing pillar with respect to the second existing pillar;
The length of the suspension rail is set to be equal to or greater than the distance between the first existing column and the fourth existing column,
The second step is to install the new pillar on the fourth existing pillar in addition to the first existing pillar and the second existing pillar,
The said 3rd process fixes the said suspension rail to the support part of each said new pillar installed in the said 1st existing pillar, the said 2nd existing pillar, and the said 4th existing pillar. The installation method of the hanging door of 2.
前記支持部の先端は、前記各既設柱の上端部に対して嵌合可能に形成されている、請求項1から3のいずれかに記載の吊り戸の設置方法。   The suspension door installation method according to any one of claims 1 to 3, wherein a tip of the support portion is formed to be fitted to an upper end portion of each of the existing columns. 前記第1既設柱及び前記第2既設柱は、前記設置面に対して垂直に立設されており、
前記柱本体は、当該柱本体の他端から前記支持部の基端までの長さが、前記新設柱が設置される既設柱の上端の前記設置面からの高さと等しく、
前記支持部は、前記柱本体の長手方向と直交する方向に延出されている、請求項1から4のいずれかに記載の吊り戸の設置方法。
The first existing pillar and the second existing pillar are erected vertically to the installation surface,
The length of the column main body from the other end of the column main body to the base end of the support portion is equal to the height from the installation surface of the existing column where the new column is installed,
The said support part is the installation method of the suspension door in any one of Claim 1 to 4 extended in the direction orthogonal to the longitudinal direction of the said column main body.
JP2009040662A 2009-02-24 2009-02-24 How to install a hanging door Expired - Fee Related JP4400932B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009040662A JP4400932B1 (en) 2009-02-24 2009-02-24 How to install a hanging door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009040662A JP4400932B1 (en) 2009-02-24 2009-02-24 How to install a hanging door

Publications (2)

Publication Number Publication Date
JP4400932B1 JP4400932B1 (en) 2010-01-20
JP2010196310A true JP2010196310A (en) 2010-09-09

Family

ID=41706552

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009040662A Expired - Fee Related JP4400932B1 (en) 2009-02-24 2009-02-24 How to install a hanging door

Country Status (1)

Country Link
JP (1) JP4400932B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016176247A (en) * 2015-03-20 2016-10-06 株式会社岡村製作所 Partition device
CN107217912A (en) * 2017-06-01 2017-09-29 中铁城建集团第二工程有限公司 It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912384A (en) * 2015-05-09 2015-09-16 浙江元森态木塑科技有限公司 Installing method of fence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016176247A (en) * 2015-03-20 2016-10-06 株式会社岡村製作所 Partition device
CN107217912A (en) * 2017-06-01 2017-09-29 中铁城建集团第二工程有限公司 It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction
CN107217912B (en) * 2017-06-01 2019-06-14 中铁城建集团第二工程有限公司 A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction

Also Published As

Publication number Publication date
JP4400932B1 (en) 2010-01-20

Similar Documents

Publication Publication Date Title
CN102808509A (en) Assembled concrete prefabricated outer hanging wall plate anchoring component and pouring construction method thereof
JP4400932B1 (en) How to install a hanging door
JP6120119B1 (en) Wall fittings
JP2016205614A (en) Pipe support metal fitting
JP6230297B2 (en) fence
CN103306476B (en) A kind of fast dismantling removing template system and method for operating thereof
EP3329051B1 (en) Supporting post improvements
KR101636216B1 (en) Foundation structure for pillar
JP6348403B2 (en) Construction method of soundproof wall for elevated
KR101474736B1 (en) A roadlamp post fixing apparatus
JP6946230B2 (en) Prop fixing device and fence using this
JP6901429B2 (en) Prop fixing device and fence using this
KR100856482B1 (en) A cable tray assembly in a building
KR20050103871A (en) Assembly fence
KR100840295B1 (en) A cable tray assembly in a building
JP3198433U (en) Piping support bracket
KR100771232B1 (en) Space sustenance unit for mold
JP2004316076A (en) Three-dimensional structure
JP3205169U (en) Pole standing structure
CN216276930U (en) Steel structure supporting base for building engineering
CN218758664U (en) Wall connecting assembly
KR102460931B1 (en) Precast-concrete structure fixed full thread bolt
KR200420412Y1 (en) Fixing tool for prefabricated panel
JP2018071331A (en) Anchor guide method of two-by-four construction building
KR200412751Y1 (en) Space sustenance unit for mold

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091022

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091026

R150 Certificate of patent or registration of utility model

Ref document number: 4400932

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121106

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131106

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees