JP2010146058A - Plant operation monitor control system and plant operation monitor control method - Google Patents
Plant operation monitor control system and plant operation monitor control method Download PDFInfo
- Publication number
- JP2010146058A JP2010146058A JP2008319391A JP2008319391A JP2010146058A JP 2010146058 A JP2010146058 A JP 2010146058A JP 2008319391 A JP2008319391 A JP 2008319391A JP 2008319391 A JP2008319391 A JP 2008319391A JP 2010146058 A JP2010146058 A JP 2010146058A
- Authority
- JP
- Japan
- Prior art keywords
- operation screen
- monitoring
- screen data
- plant
- data management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Selective Calling Equipment (AREA)
Abstract
Description
本発明は、効率的かつ容易に監視装置の運転画面の割付けを変更可能なプラント運転監視制御システムおよびプラント運転監視制御方法に関する。 The present invention relates to a plant operation monitoring control system and a plant operation monitoring control method capable of changing the operation screen allocation of a monitoring device efficiently and easily.
原子力プラントや産業用プラントの運転監視制御を目的として適用されるプラント運転監視制御システムは、CRT等のディスプレイに画面表示してプラントの稼動状態監視および運転操作を集中的に行うことができる監視装置と、プラントの制御を行う制御装置とを、制御データを伝送するローカルなネットワーク(LAN)にて接続して構成したシステムである。プラント運転監視制御システムでは、複数の監視装置により集中的にプラントの運転操作および監視が行われている。各監視装置にはそれぞれ運転操作および監視を行う工程あるいは系統が割り振られており、換言すれば、各監視装置には監視対象である工程分の運転画面が割付けられている。 A plant operation monitoring and control system applied for the purpose of operation monitoring and control of a nuclear power plant or an industrial plant is a monitoring device that can display a screen on a display such as a CRT to centrally monitor the operation state and operation of the plant. And a control device for controlling the plant via a local network (LAN) for transmitting control data. In the plant operation monitoring and control system, the operation and monitoring of the plant are intensively performed by a plurality of monitoring devices. Each monitoring device is assigned with a process or a system for performing a driving operation and monitoring. In other words, each monitoring device is assigned an operation screen for a process to be monitored.
上述した従来のプラント運転監視制御システムおよびプラント運転監視制御方法の一例としては、例えば、特開2001−290530号公報(特許文献1)や特開2001−290533号公報(特許文献2)に記載されるプラント運転監視制御システムおよびプラント運転監視制御方法がある。
上述した従来のプラント運転監視制御システムおよびプラント運転監視制御方法では、例えば、プラント定期点検期間における施設の改造及び動作確認時などに、プラント内の特定の工程について通常運転時より多くの監視装置での監視要求が発生した場合や、監視装置のリプレースや故障時に監視装置が不足する場合がある。 In the above-described conventional plant operation monitoring control system and plant operation monitoring control method, for example, when a facility is remodeled and the operation is confirmed during a periodic plant inspection period, more monitoring devices are used for a specific process in the plant than during normal operation. There may be a shortage of monitoring devices when a monitoring request is generated, or when a monitoring device is replaced or failed.
このような場合、監視装置の運転画面の割付けを迅速かつ容易に変更することができれば、運転監視機能を維持しつつ、運転員の削減や監視工程を容易に見直すことができ、非常に有益であるが、従来のプラント運転監視制御システムおよびプラント運転監視制御方法では、監視装置の運転画面の割付けを迅速かつ容易に変更したいユーザの要請に応えられずにいた。 In such a case, if the operation screen assignment of the monitoring device can be changed quickly and easily, it is possible to easily review the reduction of operators and the monitoring process while maintaining the operation monitoring function. However, in the conventional plant operation monitoring control system and the plant operation monitoring control method, it has been impossible to respond to a user's request to change the operation screen assignment of the monitoring device quickly and easily.
従来のプラント運転監視制御システムで採用される運転画面割付変更方法には、二つの方法があり、第1の方法は、プラント運転監視制御システムが運転監視制御対象とする工程の全てについて運転画面グラフィックデータおよび運転画面システムデータ(以下、両者を併せて「運転画面データ」と称する。)を予め全ての監視装置に登録しておき、運転画面割付変更の度に各監視装置に運転監視制御対象とする工程を振り分けて設定する方法である。第2の方法は、プラント運転監視制御システムが運転監視制御対象とする全工程のうち、監視装置毎に運転監視制御する工程を先に振り分け、振り分けた工程の運転画面データを各監視装置に持たせておき、原則的には運転画面割付変更の度に各監視装置の運転画面データを書き換える方法である。 There are two methods for changing the operation screen assignment adopted in the conventional plant operation monitoring control system. The first method is an operation screen graphic for all the processes to be operated and controlled by the plant operation monitoring control system. Data and operation screen system data (hereinafter collectively referred to as “operation screen data”) are registered in advance in all monitoring devices, and each time the operation screen assignment is changed, each monitoring device is assigned an operation monitoring control target. This is a method of assigning and setting the processes to be performed. In the second method, among all the processes to be controlled by the plant operation monitoring control system, the process for operation monitoring control is assigned to each monitoring device first, and the operation screen data of the assigned process is held in each monitoring device. In principle, this is a method of rewriting the operation screen data of each monitoring device every time the operation screen assignment is changed.
第1の方法を採用して原子力再処理プラントのように多数の監視装置や運転画面枚数を擁するプラント運転監視制御システムが構築されている場合、運転画面の仕様が変更される度に全ての監視装置に登録されている運転画面データを更新する必要がある。また、実際には一部の工程分の運転画面データしか利用しないにも関わらず、監視装置毎に全工程分の運転画面データを保有するため、各監視装置は、利用しない無駄なデータを有することに伴うデータ量の増大に起因してデータ処理の負荷が必要以上にかかり、非効率的であった。 When the first method is adopted and a plant operation monitoring control system with many monitoring devices and operation screen numbers is constructed like a nuclear reprocessing plant, every monitoring is changed every time the operation screen specifications are changed. It is necessary to update the operation screen data registered in the device. In addition, although the operation screen data for only a part of the processes is actually used, the operation screen data for all the processes is held for each monitoring device, so that each monitoring device has useless data that is not used. Due to the increase in the amount of data, the data processing load is more than necessary, which is inefficient.
すなわち、第1の方法を採用したプラント運転監視制御システムでは、監視装置の運転画面割付変更は、必要最小限に留めるのが通常であり、第1の方法を採用したプラント運転監視制御システムにおいて、監視装置の運転画面割付変更を頻繁に行うことは実用的ではない。 That is, in the plant operation monitoring and control system adopting the first method, the operation screen allocation change of the monitoring device is usually kept to the minimum necessary. In the plant operation monitoring and control system adopting the first method, It is not practical to frequently change the operation screen assignment of the monitoring device.
一方、第2の方法を採用してプラント運転監視制御システムが構築されている場合、現在の運転監視制御対象の工程に合わせて運転画面データが登録されているため、運転画面割付を変更すると、変更後の運転監視制御対象に係る工程の運転画面データは未登録であることが通常である。そうすると、原則として、運転画面割付変更の度に、既存の運転画面データを新たな運転画面データに変更する必要がある。しかしながら、運転画面データの変更には、専用の装置や専門の技術員による作業が発生し、また、設備改造としての諸手続が必要になることから、相応の手間と時間が必要であった。 On the other hand, when the plant operation monitoring control system is constructed by adopting the second method, since the operation screen data is registered according to the current operation monitoring control target process, when the operation screen allocation is changed, The operation screen data of the process related to the operation monitoring control target after the change is usually unregistered. Then, in principle, it is necessary to change the existing operation screen data to new operation screen data every time the operation screen assignment is changed. However, changing the operation screen data requires work by dedicated equipment and specialized technicians, and also requires various procedures for equipment modification, which requires considerable effort and time.
本発明は、上述した課題を解決するためになされたものであり、プラント運転監視制御システムにおける監視装置の運転画面割付変更を従来装置又は従来方法よりも効率的かつ容易に変更できるプラント運転監視制御システムおよびプラント運転監視制御方法を得ることを目的とする。 The present invention has been made to solve the above-described problems, and is capable of changing the operation screen assignment of the monitoring device in the plant operation monitoring control system more efficiently and easily than the conventional device or the conventional method. An object is to obtain a system and a plant operation monitoring control method.
本発明に係るプラント運転監視制御システムは、上述した課題を解決するため、プラントの運転操作および監視を行う少なくとも1つの監視装置と、前記プラントの制御を行う少なくとも1つの制御装置と、前記プラントの運転操作および監視を行う際に前記監視装置に表示する必要がある全ての運転画面データを一括して格納した運転画面データ管理装置を具備し、前記運転画面データ管理装置と前記各監視装置とは、前記監視装置から運転画面の割付変更要求を前記運転画面データ管理装置が受信可能、かつ、前記運転画面データ管理装置に格納される運転画面データから前記各監視装置が必要とする運転画面データを取得可能に接続されており、前記各監視装置は、自己が運転操作および監視を行う際の表示に必要な運転画面データを前記運転画面データ管理装置から取得して格納することを特徴とする。 In order to solve the above-described problems, a plant operation monitoring and control system according to the present invention includes at least one monitoring device that performs plant operation and monitoring, at least one control device that controls the plant, It comprises an operation screen data management device that collectively stores all operation screen data that need to be displayed on the monitoring device when performing operation and monitoring, and the operation screen data management device and each of the monitoring devices are The operation screen data management device can receive the operation screen assignment change request from the monitoring device, and the operation screen data required by each monitoring device from the operation screen data stored in the operation screen data management device. Each monitoring device is connected so as to be able to obtain the operation screen data necessary for display when it performs the operation and monitoring by itself. And storing, by obtaining from the serial operation screen data managing device.
本発明に係るプラント運転監視制御方法は、上述した課題を解決するため、少なくとも1つの監視装置でプラントの運転操作および監視を行い、少なくとも1つの制御装置で前記プラントの制御を行うプラント運転監視制御方法において、前記プラントの運転操作および監視を行う際に前記監視装置に表示する必要がある全ての運転画面データを運転画面データ管理装置に一括して格納し、前記運転画面データ管理装置が前記監視装置から運転画面の割付変更要求を受信し、前記各監視装置が自己の運転操作および監視を行う際の表示に必要な運転画面データを前記運転画面データ管理装置から取得して格納することを特徴とする。 In order to solve the above-described problems, a plant operation monitoring and control method according to the present invention performs plant operation and monitoring with at least one monitoring device, and controls the plant with at least one control device. In the method, all operation screen data that need to be displayed on the monitoring device when operating and monitoring the plant are collectively stored in the operation screen data management device, and the operation screen data management device is configured to perform the monitoring. The operation screen allocation change request is received from the device, and the operation screen data necessary for display when each of the monitoring devices performs its own operation and monitoring is acquired from the operation screen data management device and stored. And
本発明によれば、プラント運転監視制御システムの各監視装置に表示させることが必要な全運転画面データを格納した運転画面データ管理装置を具備し、運転画面データ管理装置から各監視装置が必要な運転画面データを取得して現在の運転画面データを自在に変更又は更新することができるので、従来のプラント運転監視制御システム又はプラント運転監視制御方法と比較して効率的かつ容易に運転画面の割付を変更可能なプラント運転監視制御システムを提供することができる。 According to the present invention, the operation screen data management device that stores all operation screen data that needs to be displayed on each monitoring device of the plant operation monitoring control system is provided, and each monitoring device is required from the operation screen data management device. Since operation screen data can be acquired and the current operation screen data can be freely changed or updated, operation screen allocation can be performed more efficiently and easily compared to conventional plant operation monitoring control systems or plant operation monitoring control methods. Can be provided.
以下、本発明に係るプラント運転監視制御システムおよびプラント運転監視制御方法について、添付の図面を参照して説明する。 Hereinafter, a plant operation monitoring control system and a plant operation monitoring control method according to the present invention will be described with reference to the accompanying drawings.
図1は、本発明に係るプラント運転監視制御システムの一実施例であるプラント運転監視制御システム10の基本構成を示す概略図である。 FIG. 1 is a schematic diagram showing a basic configuration of a plant operation monitoring control system 10 which is an embodiment of a plant operation monitoring control system according to the present invention.
図1に示されるプラント運転監視制御システム10は、プラントの一部又は全部の運転を監視し制御するシステムであり、運転監視制御対象の運転状態を監視する例えば三台等の少なくとも一台の監視装置11〜13および運転監視制御対象の運転状態を制御する例えば三台等の少なくとも一台の制御装置17〜19が、監視装置11〜13および制御装置17〜19の運転監視制御単位であるフィールド21〜23に区分けして監視する。
A plant operation monitoring control system 10 shown in FIG. 1 is a system that monitors and controls the operation of part or all of a plant, and monitors at least one monitoring unit such as three units that monitors the operation state of the operation monitoring control target. A field in which at least one
尚、図1に示される運転監視制御システム10において、監視装置11〜13および制御装置17〜19の台数や、各監視装置11〜13および各制御装置17〜19が運転監視制御するフィールド21〜23の数は一例であり、図1に示される数に限定されるものではない。また、図1に示される運転監視制御システム10では監視装置11〜13と制御装置17〜19の台数が1:1対応であるが、必ずしも1:1対応であることを要しない。
In the operation monitoring control system 10 shown in FIG. 1, the number of the monitoring devices 11 to 13 and the
各監視装置11〜13と各制御装置17〜19、第1の制御装置17とフィールド21、第2の制御装置18とフィールド22、および、第3の制御装置19とフィールド23とは、運転監視制御のオペレーションを実行する際に必要となる情報(以下、「制御情報」と称する。)を相互に伝送可能な制御情報ネットワーク25で接続されており、図1に示されるプラント運転監視制御システム10では、第1の監視装置11および第1の制御装置17がフィールド21の運転監視制御を、第2の監視装置12および第2の制御装置18がフィールド22の運転監視制御を、第3の監視装置13および第3の制御装置19がフィールド23の運転監視制御を行うことができる。
The monitoring devices 11 to 13 and the
また、プラント運転監視制御システム10では、上述した監視装置11〜13および制御装置17〜19に加え、フィールド21〜23の運転操作および監視を行う際に監視装置11〜13に表示する必要がある全ての画面データ(以下、「運転画面データ」と称する。)を一括して格納した運転画面データ管理装置30をさらに具備しており、運転画面データ管理装置30と各監視装置11〜13は、主に運転管理上必要なデータを運転画面データ管理装置30から各監視装置11〜13へ伝送するためのネットワーク32で接続される。
Moreover, in the plant operation monitoring control system 10, in addition to the monitoring devices 11 to 13 and the
プラント運転監視制御システム10の第1の監視装置11は、マン−マシンインターフェイスとしての入力機能および出力機能を有し、運転や運転画面割付変更等に係る操作および状態表示を行う入出力部34と、入出力部34から運転操作の内容を示す情報(以下、「運転操作情報」と称する。)を受信し、受信した運転操作情報に基づく運転操作内容に対応した制御指令情報を生成して第1の制御装置17へ送信する一方、第1の制御装置17からフィールド21の状態を示す情報(以下、「状態情報」と称する。)を受信し、受信した状態情報に基づく状態を入出力部34に表示するための状態表示情報を生成して入出力部34へ送信する監視制御情報送受信部35を備える。
The first monitoring device 11 of the plant operation monitoring control system 10 has an input function and an output function as a man-machine interface, and an input /
第1の監視装置11は、電子情報を記憶する記憶部(図1において省略)を内蔵しており、当該記憶部には監視対象となるフィールド21の運転状態表示に使用する運転画面データを含む運転監視テーブル37が格納される。運転監視テーブル37は、運転操作情報と制御指令情報、および、状態情報と状態表示情報とが対応付けられており、監視制御情報送受信部35が運転監視テーブル37を参照することで、入出力部34から受信した運転操作情報に基づいて制御指令情報を生成したり、第1の制御装置17から受信した状態情報に基づいて状態表示情報を生成したりすることができる。
The first monitoring device 11 has a built-in storage unit (not shown in FIG. 1) for storing electronic information, and the storage unit includes operation screen data used for displaying the operation state of the
尚、第2の監視装置12および第3の監視装置13は、それぞれ第1の監視装置11と実質的に同等の構成および機能を有する。すなわち、第1の監視装置11の説明は、そのまま、第2の監視装置12および第3の監視装置13の説明に代えることができるので、第2の監視装置12および第3の監視装置13の詳細については説明を省略する。
The
プラント運転監視制御システム10の第1の制御装置17は、第1の監視装置11から受け取った制御指令情報に基づいてフィールド21を制御するプラント制御信号を生成し、生成したプラント制御信号をフィールド21に送る一方、フィールド21から受け取ったプラントの状態を示すプラント状態信号に基づいて状態情報を生成し、生成した状態情報を第1の監視装置11へ送る。
The
第1の制御装置17は、電子情報を記憶する記憶部(図1において省略)を内蔵しており、当該記憶部に監視対象となるフィールド21の制御を行うプログラムを実行可能に備えた制御テーブル39を格納する。第1の制御装置17は、制御テーブル39を参照してフィールド21の制御を行うプログラムを実行することで、監視制御情報送受信部35から受け取った制御指令情報に基づきプラント制御信号を生成してフィールド21へ送る一方、フィールド21から受け取ったプラント状態信号に基づき状態情報を生成して第1の監視装置11へ送ることができる。
The
尚、第2の制御装置18および第3の制御装置19は、それぞれ第1の制御装置17と実質的に同等の構成および機能を有する。すなわち、第1の制御装置17の説明は、そのまま、第2の制御装置18および第3の制御装置19の説明に代えることができるので、第2の制御装置18および第3の制御装置19の詳細については説明を省略する。
The
次に、図1に示されるプラント運転監視制御システム10の運転監視制御について説明する。 Next, operation monitoring control of the plant operation monitoring control system 10 shown in FIG. 1 will be described.
第1の監視装置11から運転監視制御対象となるフィールド21に対して運転操作を行う場合、運転操作を行う運転員は、第1の監視装置11の入出力部34からプラント制御機器の起動や連続運転の開始等の操作(入力)を行う。入出力部34は操作の入力を認識すると、入力された当該操作に対応した運転操作情報を生成する。生成された運転操作情報は、入出力部34から監視制御情報送受信部35へ送られる。続いて、監視制御情報送受信部35は運転操作情報を受信すると、受信した運転操作情報に対応した制御指令情報を生成する。生成された制御指令情報は、監視制御情報送受信部35から制御情報ネットワーク25を経由して第1の制御部17へ送信される。
When performing a driving operation from the first monitoring device 11 to the
第1の制御部17は、第1の監視装置11の監視制御情報送受信部35から制御指令情報を受け取ると、受け取った制御指令情報に基づき運転状態を変化させようとする当該制御指令を適用してもフィールド21に異常が発生する等の問題ないかの妥当性を判断し、妥当と判断した場合、当該制御指令に対応するプラント制御信号を生成する。生成されたプラント制御信号は、第1の制御部17から制御情報ネットワーク25を経由してフィールド21へ送られる。
When the
一方、フィールド21のプロセス情報を第1の監視装置11で監視する場合、例えば、図1に示されるフィールド21において、当該フィールド21のポンプの起動状態や弁の開状態等の機器状態やこれらの機器によって変化する貯槽の液位や配管内の圧力などのプロセス情報がフィールド21からプラント状態信号として出力される。第1の制御装置17は、フィールド21から制御情報ネットワーク25を経由してプラント状態信号を受信する。
On the other hand, when the process information in the
第1の制御装置17では、受信したプラント状態信号に基づき、機器の応答状態による状態監視や連続運転時の次ステップへの移行などの制御判定を行うと共に、当該プラント状態信号に対応する状態情報を生成する。生成された状態情報は、制御情報ネットワーク25を介して第1の監視装置11へ送信される。
Based on the received plant state signal, the
第1の監視装置11は、第1の制御装置17から状態情報を監視制御情報送受信部35で受け取ると、監視制御情報送受信部35が受け取った状態情報に基づいて、機器状態や異常発生などを入出力部34に表示するための状態表示情報を生成する。生成された状態表示情報は、監視制御情報送受信部35から入出力部34へ送られる。入出力部34は、監視制御情報送受信部35から受け取った状態表示情報に基づき、フィールド21の機器状態や異常発生などの情報を表示する。
When the first monitoring device 11 receives the status information from the
上述したプラント運転監視制御システム10の運転監視制御は、以下に説明する各実施形態に係る運転監視制御システムの一実施例としての第1の運転監視制御システム10A〜第3の運転監視制御システム10Cのいずれにおいても共通する。
The operation monitoring control of the plant operation monitoring control system 10 described above is performed as a first operation
次に、図1に示されるプラント運転監視制御システム10で実行される運転画面割付変更処理手順について概説する。 Next, an outline of the operation screen assignment change process executed by the plant operation monitoring control system 10 shown in FIG.
プラント運転監視制御システム10における運転画面割付変更処理手順とは、プラント運転監視制御システム10の監視装置11〜13で運転監視制御の対象を変更する場合に必要となる運転監視画面の割付の変更を行う処理手順であって、運転監視制御対象を変更する監視装置に格納される運転監視テーブル37の運転画面データを、ネットワーク32を介して運転画面データ管理装置30から取得し、これを変更又は更新するものである。
The operation screen allocation change processing procedure in the plant operation monitoring control system 10 is a change in the operation monitoring screen allocation required when the monitoring devices 11 to 13 of the plant operation monitoring control system 10 change the operation monitoring control target. The operation screen data of the operation monitoring table 37 stored in the monitoring device that changes the operation monitoring control target is acquired from the operation screen
プラント運転監視制御システム10では、このような運転画面割付変更処理手順を実行することにより、従来のプラント運転監視制御システム又はプラント運転監視制御方法のように、予め監視装置毎に監視対象の工程を設定することに伴う保存および処理データ量が増大する、又は、運転画面の割付変更の都度、専用装置若しくは専門技術員による作業のよる監視装置11〜13の改造が必要で多大な手間と時間を要する、といった課題を解決することができる。 In the plant operation monitoring control system 10, by executing such an operation screen allocation change processing procedure, the process to be monitored is previously determined for each monitoring device as in the conventional plant operation monitoring control system or the plant operation monitoring control method. The amount of storage and processing data that accompanies the setting increases, or each time the operation screen assignment is changed, it is necessary to modify the monitoring devices 11 to 13 by work by dedicated devices or specialists, which requires a lot of time and effort. The above-mentioned problems can be solved.
本発明に係るプラント運転監視制御システムでは、幾つかの異なる運転画面割付変更処理手順を実行できるように、幾つかの異なる実施形態がある。そこで、本発明の各実施形態に係る運転監視制御システム10A〜10Cおよび当該運転監視制御システム10A〜10Cで実行される運転画面割付変更処理手順について詳細を説明する。
In the plant operation monitoring control system according to the present invention, there are several different embodiments so that several different operation screen assignment change processing procedures can be executed. Then, the operation | movement
[第1の実施形態]
図2は、本発明の第1の実施形態に係るプラント運転監視制御システムの一実施例である第1のプラント運転監視制御システム10Aのシステム構成およびプラント運転監視制御システム10Aで実行される運転画面割付変更処理手順(以下、「第1の運転画面割付変更処理手順」と称する。)を示した説明図である。
[First Embodiment]
FIG. 2 shows the system configuration of the first plant operation
尚、図2に示される第1のプラント運転監視制御システム10Aは、図1に示されるプラント運転監視制御システム10と基本的な構成要素は実質的に同様である(但し、図2,3,7では、例えば、第2の制御装置18、第3の制御装置19、フィールド22,23、監視制御情報送受信部35、および、制御テーブル39等の図1に示される一部構成要素を図面作成および説明の便宜上の観点から省略している)。
The first plant operation
また、各実施形態の説明では、各実施形態に特有の事項、すなわち、各実施形態に係る運転画面割付変更処理手順および当該運転画面割付変更処理手順の実行に関わる構成要素に焦点を当てて説明するものとし、各実施形態において共通する構成要素については、図1に示されるプラント運転監視制御システム10において対応する構成要素と同じ番号を付してその説明を省略する。 Also, in the description of each embodiment, the explanation is focused on matters specific to each embodiment, that is, the operation screen assignment change processing procedure according to each embodiment and the components related to the execution of the operation screen assignment change processing procedure. In addition, about the component which is common in each embodiment, the same number as the component corresponding in the plant operation | movement monitoring control system 10 shown by FIG. 1 is attached | subjected, and the description is abbreviate | omitted.
図2に示される第1のプラント運転監視制御システム10Aは、例えば三台の監視装置11A〜13Aと、監視装置11A〜13Aで表示する全運転画面データを有する運転画面データ管理装置30Aとを具備し、各監視装置11A〜13Aと運転画面データ管理装置30Aとはネットワーク32を介して接続される。
A first plant operation
第1のプラント運転監視制御システム10Aの第1の監視装置11Aは、運転画面割付変更を要求する操作を受け付ける入出力部34と、入出力部34が受け付けた運転画面割付変更を要求する操作に基づいて運転画面割付変更指令を生成し運転画面データ管理装置30Aへ送信する一方、運転画面割付変更後の運転画面データを運転画面データ管理装置30Aから受信し、現在の運転画面データを受信した運転画面データに更新又は変更する運転画面割付変更更新部41Aを備える。第1の監視装置11Aの記憶部には、運転監視テーブル37が格納されており、運転監視テーブル37は、運転画面割付変更更新部41Aが第1の運転画面割付変更処理手順を実行する際に参照される。
The
運転画面データ管理装置30Aは、監視装置11A〜13Aの運転画面割付変更更新部41Aから送信される運転画面割付変更指令に基づき、要求する運転画面データを運転画面割付変更指令送信元の監視装置11A〜13Aへ送信する運転画面データ提供部45を備える。また、運転画面データ管理装置30Aは、運転画面データ提供部45がアクセス可能な情報として、監視装置11A〜13Aで表示する全運転画面データを有し、運転画面割付変更指令と各運転画面データとが対応付けられた運転画面データテーブル46と、運転画面データ管理装置30Aで実行された処理ステップ(例えば、どの監視装置にどの工程の運転画面データをいつ送信した等)を動作履歴として記録する動作履歴テーブル47Aとを格納する。
The operation screen
尚、第1のプラント運転監視制御システム10Aにおいて、運転画面データ管理装置30Aに格納される動作履歴テーブル47Aは、監視装置11A〜13Aの運転画面割付変更処理手順を実行するに際して、必ずしも必要な情報ではない。
In the first plant operation
次に、第1のプラント運転監視制御システム10Aが実行する第1の運転画面割付変更処理手順について説明する。
Next, the first operation screen assignment change processing procedure executed by the first plant operation
第1の運転画面割付変更処理手順は、図2に矢印で示される経路で各種情報の授受が行われる。運転員等のユーザが、何れかの監視装置(図2に示す例では第1のプラント監視装置11A)の運転画面の割付を変更するために、当該監視装置11Aの運転画面割付変更要求を入出力部34から入力すると、第1の運転画面割付変更処理手順をスタートし、まず、入出力部34が入力された操作内容に対応する運転画面割付変更操作情報を生成し、運転画面割付変更更新部41Aへ送る。
In the first operation screen assignment change processing procedure, various kinds of information are exchanged along a route indicated by an arrow in FIG. A user such as an operator inputs an operation screen assignment change request for the
運転画面割付変更更新部41Aは、入出力部34から運転画面割付変更操作情報を受け取ると、運転監視テーブル37を参照して、運転画面割付変更操作情報に対応する運転画面割付変更指令を生成する。そして、運転画面割付変更更新部41Aは、生成した運転画面割付変更指令を、ネットワーク32を介して伝送可能に接続された運転画面データ管理装置30Aへ送る。
When the operation screen assignment
運転画面データ管理装置30Aにおいて、運転画面割付変更更新部41Aから送られた運転画面割付変更指令は、運転画面データ提供部45が受信する。運転画面データ提供部45が運転画面割付変更更新部41Aからの運転画面割付変更指令を受信すると、運転画面データテーブル46を参照して、受信した運転画面割付変更指令に対応する運転画面データを取得し、取得した運転画面データを運転画面割付変更指令の送信元である第1の監視装置11Aへ送信する。この時、運転画面データ提供部45は、受信した運転画面割付変更指令に対応する運転画面データを運転画面割付変更指令の送信元である第1の監視装置11Aへ送信した処理ステップを動作履歴として動作履歴テーブル47Aに記録する。
In the operation screen
続いて、第1の監視装置11Aの運転画面割付変更更新部41Aが、運転画面データ管理装置30Aからネットワーク32を介して送られた運転画面割付変更指令に対応する運転画面データを受信すると、現在運転監視テーブル37に格納されている運転画面データを、受信した運転画面データに変更又は更新する。そして、運転画面割付変更指令の送信元である第1の監視装置11Aにおける運転画面の割付を変更した結果を入出力部34に出力する。
Subsequently, when the operation screen assignment
運転画面割付変更指令の送信元である第1の監視装置11Aの入出力部34に運転画面の割付を変更した結果が出力されると、第1の運転画面割付変更処理手順は、全ての処理ステップを終了する。このように、第1のプラント運転監視制御システム10Aは、上述した処理ステップを備える第1の運転画面割付変更処理手順を実行することによって、運転画面割付変更指令の送信元である監視装置(図2に示す例では第1の監視装置11A)の運転画面の割付変更を効率的かつ容易に実現することができる。
When the result of changing the operation screen assignment is output to the input /
第1のプラント運転監視制御システム10Aおよび第1の運転画面割付変更処理手順によれば、監視装置11A〜13Aから運転員が運転画面の割付変更を入力操作して要求することによって、監視装置11A〜13Aに任意の工程の運転画面を割り付けることができ、従来の運転監視制御システムおよび運転画面割付変更方法と比べて効率的かつ容易に運転画面の割付けを変更できる。
According to the first plant operation
また、従来の運転監視制御システムおよび運転画面割付変更方法と比べて監視装置11A〜13Aの運転画面の割付変更が効率的かつ容易に行えるため、運転監視機能を維持しつつ運転員を効率的に配置することができ、この結果、従来の運転監視制御システムに対して運転員を削減でき、運転効率を向上させることができる。
Further, since the operation screen assignment of the
さらに、監視装置11A〜13Aの運転画面データの改造要求が発生した場合であっても、まず、運転画面データ管理装置30Aに格納されている運転画面データとしての運転画面データテーブル46を改造しておけば、その後、必要な監視装置11A〜13Aにおいて、それぞれ必要な運転画面データを運転画面データ管理装置30Aから取得して書き換えることができるので、効率的に監視装置11A〜13Aの運転画面データを改造することができる。
Further, even when a request for remodeling the operation screen data of the
さらにまた、監視装置11A〜13Aに格納された運転画面データが何らかの理由で破壊した場合にも、運転員が必要な運転画面データを運転画面データ管理装置30Aから取得することによって、専用の装置や専門の技術員による作業を介在させることなく破壊していた運転画面データを修復することができる。
Furthermore, even when the operation screen data stored in the
また、監視装置11A〜13Aには必要最小限の運転画面データを格納するだけで良いので、監視装置内のデータ容量を最小限に抑えることができ、データ処理負荷が必要以上に増大する事態を回避できる。
Moreover, since it is only necessary to store the minimum necessary operation screen data in the
[第2の実施形態]
図3は、本発明の第2の実施形態に係るプラント運転監視制御システムの一実施例である第2のプラント運転監視制御システム10Bのシステム構成およびプラント運転監視制御システム10Bで実行される運転画面割付変更処理手順(以下、「第2の運転画面割付変更処理手順」と称する。)を示した説明図である。
[Second Embodiment]
FIG. 3 shows a system configuration of a second plant operation monitoring control system 10B, which is an example of a plant operation monitoring control system according to the second embodiment of the present invention, and an operation screen executed by the plant operation monitoring control system 10B. It is explanatory drawing which showed the allocation change process procedure (henceforth "the 2nd driving | operation screen allocation change process procedure").
図3に示される第2のプラント運転監視制御システム10Bは、図2に示される第1のプラント運転監視制御システム10Aに対して、監視装置11B〜13Bから運転画面の割付変更要求があった場合に、当該運転画面割付変更を許可するか否かを判定する機能を付加したプラント運転監視制御システムである。
When the second plant operation monitoring control system 10B shown in FIG. 3 receives an operation screen assignment change request from the monitoring devices 11B to 13B to the first plant operation
第2のプラント運転監視制御システム10Bは、図2に示される第1のプラント運転監視制御システム10Aの監視装置11A〜13Aおよび運転画面データ管理装置30Aの代わりに、監視装置11B〜13Bおよび運転画面データ管理装置30Bを具備する点で第1のプラント運転監視制御システム10Aと相違するが、他の構成要素については実質的に相違しない。そこで、本実施形態では、第1のプラント運転監視制御システム10Aと実質的に相違しない構成要素については同じ符号を付して説明を省略する。
The second plant operation monitoring control system 10B includes monitoring devices 11B to 13B and an operation screen instead of the
図3に示される第2のプラント運転監視制御システム10Bは、例えば三台の監視装置11B〜13Bと、監視装置11B〜13Bで表示する全運転画面データを有する運転画面データ管理装置30Bとを具備し、各監視装置11B〜13Bと運転画面データ管理装置30Bとはネットワーク32を介して接続される。
The second plant operation monitoring control system 10B shown in FIG. 3 includes, for example, three monitoring devices 11B to 13B and an operation screen
第2のプラント運転監視制御システム10Bの第1の監視装置11Bは、入出力部34と、運転画面割付変更更新部41Aの機能に、運転画面データ管理装置30Bで行われた運転画面割付変更を許可するか否かの判定結果を運転画面データ管理装置30Bから受信する機能および運転画面データ管理装置30Bから受信した運転画面割付変更可否判定結果を入出力部34へ出力する機能をさらに付加した運転画面割付変更更新部41Bと、を備える。尚、第2の監視装置12Bおよび第3の監視装置13Bは、第1の監視装置11Bと実質的に同じ構成なので、詳細な説明は省略する。
The first monitoring device 11B of the second plant operation monitoring control system 10B changes the operation screen allocation change performed by the operation screen
運転画面データ管理装置30Bは、運転画面データ管理装置30Aに対して、監視装置11B〜13Bから送られた運転画面割付変更指令に基づいて、運転画面の割付変更を許可するか否かを判定する運転画面割付変更可否判定部51をさらに備え、運転画面割付変更可否判定部51がアクセス可能な情報として、運転監視制御対象となる工程を安全上の重要度に応じて分類した工程重要度分類情報を有する工程重要度分類テーブル52(詳細は後述の図4に示す)と、第2の運転監視制御システム10Bに属する各監視装置11B〜13Bが、運転画面割付変更指令を受け取った時に何の工程を監視対象としているかを示す監視対象工程情報を有する監視装置監視対象工程テーブル53(詳細は後述の図5に示す)とをさらに格納する。
The operation screen
図4は運転画面データ管理装置30Bの運転画面割付変更可否判定部51が参照する工程重要度分類テーブル52の一例を示す説明図であり、図5は運転画面データ管理装置30Bの運転画面割付変更可否判定部51が参照する監視装置監視対象工程テーブル53の一例を示す説明図である。
FIG. 4 is an explanatory diagram showing an example of the process importance level classification table 52 referred to by the operation screen assignment change permission determination unit 51 of the operation screen
工程重要度分類テーブル52は、図4に示されるように、工程名称と重要度の情報とを関連付けて有する。ここで、重要度とは、第2のプラント運転監視制御システム10Bの運転監視制御対象となる工程を安全上の重要度が高いものから順に「高」と「低」の2つに分類した情報である。運転画面割付変更可否判定部51は、図4に示される工程重要度分類テーブル52を参照することで、第1の工程の重要度は高、第2の工程の重要度は低、第3の工程の重要度は高、第4の工程の重要度が低、と判定できる。 As shown in FIG. 4, the process importance level classification table 52 has a process name and importance level information associated with each other. Here, the importance level is information obtained by classifying the processes to be the operation monitoring control target of the second plant operation monitoring control system 10B into two, “high” and “low” in descending order of safety importance. It is. The operation screen assignment change possibility determination unit 51 refers to the process importance level classification table 52 shown in FIG. 4 so that the importance of the first process is high, the importance of the second process is low, and the third It can be determined that the importance of the process is high and the importance of the fourth process is low.
監視装置監視対象工程テーブル53は、図5に示されるように、監視装置名称と運転監視制御対象となる工程(監視対象工程)とを関連付けて有する。従って、運転画面割付変更可否判定部51は、図5に示される監視装置監視対象工程テーブル53を参照することで、第1の監視装置11Bの監視対象工程は、第1の工程と第2の工程第と第3の工程であり、第2の監視装置12Bの監視対象工程は、第1の工程と第4の工程第と第5の工程であり、第3の監視装置13Bの監視対象工程は、第4の工程と第6の工程第と第7の工程である、と判定できる。
As shown in FIG. 5, the monitoring device monitoring target process table 53 has a monitoring device name and a process (monitoring target process) that is an operation monitoring control target in association with each other. Therefore, the operation screen assignment change permission determination unit 51 refers to the monitoring device monitoring target process table 53 shown in FIG. 5, so that the monitoring target process of the first monitoring device 11B is the first process and the second process. The process is the first and third processes, and the monitoring target process of the
運転画面割付変更可否判定部51は、上記判定結果に基づき、運転監視制御対象から外れる工程の重要度や運転監視制御対象から外れる工程を何れか監視装置11B〜13Bで監視制御しているか等を考慮して、運転監視制御対象となるプラントの安全な運転監視制御が維持できるか否かを判定することによって、運転画面の割付変更の可否を決定する。 Based on the determination result, the operation screen assignment change possibility determination unit 51 determines whether the monitoring devices 11B to 13B monitor and control the importance of the process that is not included in the operation monitoring control target or the process that is excluded from the operation monitoring control target. Considering whether or not the safe operation monitoring control of the plant to be the operation monitoring control target can be maintained, whether or not the allocation change of the operation screen can be determined is determined.
図6は、運転画面割付変更可否判定部51が実行する運転画面割付変更可否判定処理手順の処理フロー図である。尚、図6に示される運転画面割付変更可否判定処理手順は、図3に示される第1の監視装置11Bから当該監視装置11Bの運転画面の割付変更を要求した場合の例を説明したものである。 FIG. 6 is a process flow diagram of an operation screen assignment change permission determination processing procedure executed by the operation screen assignment change permission determination unit 51. The procedure for determining whether or not the operation screen assignment can be changed shown in FIG. 6 is an example in which the first monitoring device 11B shown in FIG. 3 requests a change in the operation screen assignment of the monitoring device 11B. is there.
運転画面割付変更可否判定部51は、監視装置11B〜13Bから運転画面割付変更指令を受信すると、運転画面割付変更可否判定処理手順(ステップS1〜ステップS7)の実行を開始(START)する。運転画面割付変更可否判定処理手順は、まず、ステップS1で運転画面割付変更指令に基づいて運転画面の割付を変更した場合に当該変更によって運転監視制御の対象から外れる工程が重要度「高」であるか否か判定される。ステップS1では、運転画面割付変更可否判定部51が工程重要度分類テーブル52を参照し、運転監視制御の対象から外れる工程の重要度「高」又は「低」を取得して判定する。 When the operation screen assignment change permission determination unit 51 receives the operation screen assignment change instruction from the monitoring devices 11B to 13B, the operation screen assignment change permission determination unit 51 starts (START) execution of the operation screen assignment change permission determination processing procedure (step S1 to step S7). The operation screen assignment change permission / inhibition judgment processing procedure is as follows. First, when the assignment of the operation screen is changed based on the operation screen assignment change command in step S1, the process that is excluded from the operation monitoring control target due to the change is high. It is determined whether or not there is. In step S <b> 1, the operation screen assignment change permission determination unit 51 refers to the process importance level classification table 52 to acquire and determine the importance “high” or “low” of the process that is excluded from the operation monitoring control target.
運転監視制御の対象から外れる工程が重要度「高」である場合(ステップS1でYESの場合)、続くステップS2で、運転監視制御の対象から外れる工程を、運転画面割付変更指令の送信元である第1の監視装置11B以外の監視装置12B,13Bで運転制御監視しているか否かが判定される。ステップS2では、運転画面割付変更可否判定部51が監視装置監視対象工程テーブル53を参照し、第2の監視装置12Bの監視対象工程および第3の監視装置13Bの監視対象工程の中に外れる工程が存在するか否かを判定する。
If a process that is not subject to operation monitoring control is of high importance (in the case of YES in step S1), a process that is not subject to operation monitoring control in the subsequent step S2 is the transmission source of the operation screen assignment change command. It is determined whether or not the operation control monitoring is performed by the
監視装置12B,13Bが運転制御監視対象とする監視対象工程の中に外れる工程がない場合(ステップS2でNOの場合)、続くステップS3で、運転画面割付変更可否判定部51が、運転画面の割付変更を許可しないと判定し、運転画面割付変更可否判定処理手順を終了する(END)。これは、外れる工程が安全上の重要度が高いにも拘らず、他の監視装置12B,13Bでも外れる工程を運転制御監視対象としていないとすれば、安全な運転監視制御を維持する観点から好ましくないからである。
When the
一方、監視装置12B,13Bが運転制御監視対象とする監視対象工程の中に外れる工程がある場合(ステップS2でYESの場合)、ステップS4に進み、ステップS4で運転画面の割付変更を要求する第1の監視装置11Bへ当該工程を運転制御監視対象から外して良いかが確認される。ステップS4が実行されると、運転画面割付変更可否判定部51から第1の監視装置11B(運転画面割付変更更新部41B)へ当該工程を運転制御監視対象から外して良いかを確認する旨の情報が送信され、第1の監視装置11Bの入出力部34に運転制御監視対象から外して良いかを確認する旨が表示される。
On the other hand, when there is a process that is out of the monitoring target processes that are monitored by the
運転員は、入出力部34に運転制御監視対象から外して良いかを確認する旨の表示を見て、外して良い(YES)又は外してはいけない(NO)を入出力部34に入力することができる。そして、入出力部34が運転員の確認結果を受け取ると、入力された確認結果を示す操作情報を運転画面割付変更更新部41Bへ送信し、運転画面割付変更更新部41Bが受信した操作情報に基づき、外して良い(YES)又は外してはいけない(NO)を指示する操作指令を生成して運転画面データ管理装置30Bへ送信する。
The operator sees a display on the input /
運転画面データ管理装置30Bの運転画面割付変更可否判定部51が、第1の監視装置11Bからの操作指令を受け取ると、ステップS4に続いてステップS5が実行される。ステップS5で運転画面割付変更可否判定部51が受け取った操作指令が「外して良い」を示すものであった場合(ステップS5でYESの場合)、続くステップS6で運転画面割付変更可否判定部51が運転画面の割付変更を許可して運転画面割付変更可否判定処理手順を終了する(END)。
When the operation screen assignment change possibility determination unit 51 of the operation screen
また、ステップS5で運転画面割付変更可否判定部51が受け取った操作指令が「外してはいけない」を示すものであった場合(ステップS5でNOの場合)、ステップS3に進み、ステップS3の処理ステップが実行される。上述したように、ステップS3の処理ステップが完了すると運転画面割付変更可否判定処理手順は終了する(END)。 If the operation command received by the operation screen assignment change permission determination unit 51 in step S5 indicates "Do not remove" (NO in step S5), the process proceeds to step S3, and the process of step S3 A step is executed. As described above, when the processing step of step S3 is completed, the operation screen assignment change permission determination processing procedure ends (END).
一方、ステップS1において、運転監視制御の対象から外れる工程が重要度「低」である場合(ステップS1でNOの場合)、ステップS7に進み、ステップS7で運転画面の割付変更の前後で運転監視制御対象から外れる工程を、他の監視装置12B,13Bで監視しているか否かが判断される。
On the other hand, if the process that is excluded from the operation monitoring control target is “low” in step S1 (NO in step S1), the process proceeds to step S7, and the operation monitoring is performed before and after the change of the operation screen assignment in step S7. It is determined whether or not the process deviating from the control target is monitored by the
運転画面の割付変更の前後で運転監視制御対象から外れる工程を、他の監視装置12B,13Bで監視している場合(ステップS7でYESの場合)、ステップS6に進み、ステップS6の処理ステップが実行される。上述したように、ステップS6の処理ステップが完了すると運転画面割付変更可否判定処理手順は終了する(END)。逆に、運転画面の割付変更の前後で運転監視制御対象から外れる工程を、他の監視装置12B,13Bで監視していない場合(ステップS7でNOの場合)、ステップS4に進み、ステップS4以降の処理ステップが実行される。
When the
次に、図3に戻って、第2のプラント運転監視制御システム10Bが実行する第2の運転画面割付変更処理手順について説明する。 Next, returning to FIG. 3, the second operation screen assignment change processing procedure executed by the second plant operation monitoring control system 10 </ b> B will be described.
第2の運転画面割付変更処理手順は、図3に矢印で示される経路で各種情報の授受が行われ、運転画面の割付を変更したい監視装置(図3に示す例では第1のプラント監視装置11B)から運転画面割付変更指令を、ネットワーク32を介して伝送可能に接続された運転画面データ管理装置30Bへ送るまでの処理ステップは、第1の運転画面割付変更処理手順と同様である。
The second operation screen assignment change processing procedure is a monitoring device (in the example shown in FIG. 3, the first plant monitoring device) in which various information is exchanged along the route indicated by the arrow in FIG. 3 and the operation screen assignment is to be changed. The processing steps from 11B) to sending the operation screen allocation change command to the operation screen
続いて、運転画面データ管理装置30Bにおいて、第1の監視装置11Bの運転画面割付変更更新部41Bから送られた運転画面割付変更指令は、まず、運転画面割付変更可否判定部51が受信し、工程重要度分類テーブル52および監視装置監視対象工程テーブル53を参照して運転画面割付変更指令を許可するか否かを判定する処理手順(図6に示される運転画面割付変更可否判定処理手順)を実行する。
Subsequently, in the operation screen
また、運転画面割付変更可否判定部51は、運転画面割付変更の可否判定処理ステップの実行に関する履歴(例えば、どの監視装置からどの工程の運転画面割付変更の要求があったか、可否判定処理ステップの実行時刻、および判定結果等)を動作履歴として動作履歴テーブル47Bに記録する。尚、運転画面データ管理装置30Bに格納される動作履歴テーブル47Bは、監視装置11B〜13Bの運転画面割付変更処理手順を実行するに際して、必ずしも必要な情報ではない。
Further, the operation screen assignment change availability determination unit 51 performs a history of execution of the operation screen assignment change availability determination processing step (for example, which monitoring device has requested a change in the operation screen assignment of the process, execution of the availability determination processing step). Time, determination result, etc.) are recorded in the operation history table 47B as an operation history. The operation history table 47B stored in the operation screen
運転画面割付変更可否判定部51が運転画面割付変更を許可する場合、運転画面割付変更指令が運転画面割付変更可否判定部51から運転画面データ提供部45へ送信され、運転画面データ提供部45が運転画面の割付を変更するために必要とする運転画面データを取得して第1の監視装置11Bへ送ると共に動作履歴を動作履歴テーブル47Bに記録する。また、運転画面データ提供部45は、運転画面割付変更後における監視装置11B〜13Bの監視対象工程の情報を監視装置監視対象工程テーブル53に反映する。すなわち、監視装置監視対象工程テーブル53が有する監視対象工程情報を新しい状態に書き換える。
When the operation screen assignment change enable / disable determination unit 51 permits the operation screen assignment change, the operation screen assignment change instruction is transmitted from the operation screen assignment change enable / disable determination unit 51 to the operation screen
第1の監視装置11Bが運転画面データ管理装置30Bからネットワーク32を介して送られた運転画面割付変更指令に対応する運転画面データを受信する以降の処理ステップについては、第1の運転画面割付変更処理手順において、第1の監視装置11Aの運転画面割付変更更新部41Aが行う処理ステップと同様である。
For the processing steps after the first monitoring device 11B receives the operation screen data corresponding to the operation screen assignment change command sent from the operation screen
一方、運転画面割付変更可否判定部51が運転画面割付変更を許可しない場合、その判定結果は、画面データ管理装置30B(運転画面割付変更可否判定部51)からネットワーク32を介して第1の監視装置11Bへ送られる。第1の監視装置11Bでは、運転画面割付変更更新部41Bが、運転画面割付変更可否判定結果を受け取り、運転画面割付変更更新部41Bが、送られた運転画面割付変更可否判定結果を入出力部34に出力する。
On the other hand, when the operation screen assignment change permission determination unit 51 does not permit the operation screen assignment change, the determination result is first monitored via the
第2のプラント運転監視制御システム10Bおよび第2の運転画面割付変更処理手順によれば、第1のプラント運転監視制御システム10Aおよび第1の運転画面割付変更処理手順が奏する効果に加えて、監視装置11B〜13Bの運転画面の割付を変更するにあたって安全上重要度の高い設備を含む工程については少なくとも一つの監視装置11B〜13Bで監視するよう制限を設けることによって、運転監視制御対象となるプラントの安全監視機能を保つことができる。
According to the second plant operation monitoring control system 10B and the second operation screen allocation change processing procedure, in addition to the effects of the first plant operation
[第3の実施形態]
図7は、本発明の第3の実施形態に係るプラント運転監視制御システムの一実施例である第3のプラント運転監視制御システム10Cのシステム構成およびプラント運転監視制御システム10Cで実行される運転画面割付変更処理手順(以下、「第3の運転画面割付変更処理手順」と称する。)を示した説明図である。
[Third Embodiment]
FIG. 7 shows a system configuration of a third plant operation monitoring control system 10C, which is an example of a plant operation monitoring control system according to the third embodiment of the present invention, and an operation screen executed by the plant operation monitoring control system 10C. It is explanatory drawing which showed the allocation change process procedure (henceforth a "3rd driving | operation screen allocation change process procedure").
図7に示される第3のプラント運転監視制御システム10Cは、図2に示される第1のプラント運転監視制御システム10Aに対して、監視装置11C〜13Cから運転員が運転画面の割付変更を要求する場合に、当該運転員の操作権限に基づいて運転画面の割付変更操作を許可するか否かを判定する機能、いわば、運転員の認証機能を付加したプラント運転監視制御システムである。
The third plant operation monitoring control system 10C shown in FIG. 7 requests the first plant operation
図7に示される第3のプラント運転監視制御システム10Cは、図2に示される第1のプラント運転監視制御システム10Aに対して、監視装置11A〜13Aおよび運転画面データ管理装置30Aの代わりに、監視装置11C〜13Cおよび運転画面データ管理装置30Cを具備する点で相違するが、他の構成要素については実質的に相違しない。そこで、本実施形態では、第1のプラント運転監視制御システム10Aと実質的に相違しない構成要素については同じ符号を付して説明を省略する。
The third plant operation monitoring control system 10C shown in FIG. 7 is different from the first plant operation
図7に示される第3のプラント運転監視制御システム10Cは、例えば三台の監視装置11C〜13Cと、監視装置11C〜13Cで表示する全運転画面データを有する運転画面データ管理装置30Cとを具備し、各監視装置11C〜13Cと運転画面データ管理装置30Cとはネットワーク32を介して接続される。
A third plant operation monitoring control system 10C shown in FIG. 7 includes, for example, three monitoring devices 11C to 13C and an operation screen data management device 30C having all operation screen data displayed by the monitoring devices 11C to 13C. The monitoring apparatuses 11C to 13C and the operation screen data management apparatus 30C are connected via the
第3のプラント運転監視制御システム10Cの第1の監視装置11Cは、マン−マシンインターフェイスとしての入力機能および出力機能を有する入出力部34と、運転画面割付変更更新部41Aの機能に対して運転員の認証機能をさらに付加した運転画面割付変更更新部41Cとを備える。
The first monitoring device 11C of the third plant operation monitoring control system 10C operates with respect to the functions of the input /
入出力部34は、運転画面割付変更を要求する操作に加え、例えば、ユーザIDおよびパスワード等の運転員に固有の情報(以下、「運転員ID情報」と称する。)の入力操作を受け付ける機能と、受け付けた操作を示す情報を運転画面割付変更更新部41Cへ送る機能と、運転員の認証結果を表示する機能とを有する。
The input /
運転画面割付変更更新部41Cは、運転画面割付変更更新部41Aの機能に、運転画面データ管理装置30Cからの運転員ID情報送信要求を受信する機能、運転員ID情報送信要求に基づき運転員ID情報の入力を要求する表示情報を入出力部34へ送る機能、運転員ID情報を示す操作情報を入出力部34から受け付けて当該運転員の認証要求を生成し運転画面データ管理装置30Cへ出力する機能、運転画面データ管理装置30Cで行われた運転員の運転画面の割付変更操作の可否判定結果(運転員の認証結果)を運転画面データ管理装置30Cから受信する機能、および、運転画面データ管理装置30Cから受信した運転員の認証結果を入出力部34へ送る機能をさらに付加して構成される。尚、第2の監視装置12Cおよび第3の監視装置13Cは、第1の監視装置11Cと実質的に同じ構成なので、詳細な説明は省略する。
The operation screen allocation change update unit 41C has a function of receiving the operator ID information transmission request from the operation screen data management device 30C, the operator ID information transmission request, in the function of the operation screen allocation
運転画面データ管理装置30Cは、前記監視装置から運転画面の割付変更要求を受信した際に、前記運転画面の割付変更要求の送信元となる監視装置へ当該運転画面の割付変更を要求する運転員ID情報の送信を要求すると共に、当該要求に従って監視装置11C〜13Cから送信された運転員ID情報を受け取ると、運転画面データ管理装置30Aに対して、監視装置11C〜13Cから送られた認証要求に基づいて、運転画面の割付変更操作を行った運転員の当該操作を許可するか否かを判定する操作可否判定部55をさらに備え、操作可否判定部55がアクセス可能な情報として、運転画面の割付変更操作を許可する運転員ID情報を有する操作権限情報テーブル56をさらに格納する。
When the operation screen data management device 30C receives the operation screen assignment change request from the monitoring device, the operation screen data management device 30C requests the monitoring device that is the transmission source of the operation screen assignment change request to change the operation screen assignment. When requesting the transmission of the ID information and receiving the operator ID information transmitted from the monitoring devices 11C to 13C according to the request, the authentication request transmitted from the monitoring devices 11C to 13C to the operation screen
次に、第3のプラント運転監視制御システム10Cが実行する第3の運転画面割付変更処理手順について説明する。 Next, a third operation screen assignment change processing procedure executed by the third plant operation monitoring control system 10C will be described.
第3の運転画面割付変更処理手順は、図7に矢印で示される経路で各種情報の授受が行われ、まず、運転員からの運転画面の割付変更の入力操作を受け付ける先立ち、入出力部34が運転員ID情報を受け付ける。入出力部34が運転員ID情報を受け付けると、ネットワーク32を介して伝送可能に接続された運転画面データ管理装置30Cへ受け付けた運転員ID情報を送信する。
In the third operation screen assignment change processing procedure, various kinds of information are exchanged along the route indicated by the arrow in FIG. 7. First, the input /
続いて、運転画面データ管理装置30Cの操作可否判定部55が運転員ID情報を受信すると、操作可否判定部55は、操作権限情報テーブル56を参照し、運転画面の割付変更の操作をしようとする運転員の固有情報と運転画面の割付変更の操作が許可されている運転員の固有情報とが一致しているか、すなわち、当該運転員に運転画面の割付変更の操作権限が付与されているかを判定する。
Subsequently, when the operation
そして、操作可否判定部55は、操作可否判定処理ステップの実行に関する履歴(例えば、どの監視装置からどの運転員から運転画面の割付変更操作の要求があったか、可否判定処理ステップの実行時刻、および判定結果等)を動作履歴として動作履歴テーブル47Cに記録する。尚、運転画面データ管理装置30Cに格納される動作履歴テーブル47Cは、監視装置11C〜13Cの運転画面割付変更処理手順を実行するに際して、必ずしも必要な情報ではない。
Then, the operation
操作可否判定部55が運転画面の割付変更の操作をしようとする運転員に運転画面の割付変更の操作権限が付与されていると判定した場合、操作可否判定部55から第1の監視装置11C(運転画面割付変更更新部41C)へ運転画面の割付変更の操作を許可する旨の情報が送られ、第1の監視装置11Cの入出力部34に運転画面の割付変更の操作を許可する旨が表示される。その後は、上述した第1の運転画面割付変更処理手順と同様である。
When it is determined that the operation
一方、操作可否判定部55が運転画面の割付変更の操作をしようとする運転員に運転画面の割付変更の操作権限が付与されていないと判定した場合、操作可否判定部55から第1の監視装置11C(運転画面割付変更更新部41C)へ運転画面の割付変更の操作を許可しない旨の情報が送られ、第1の監視装置11Cの入出力部34に運転画面の割付変更の操作を許可しない旨が表示される。
On the other hand, when the operation
第3のプラント運転監視制御システム10Cおよび第3の運転画面割付変更処理手順によれば、第1のプラント運転監視制御システム10Aおよび第1の運転画面割付変更処理手順が奏する効果に加えて、操作権限を付与された者のみ運転画面の割付変更を実施することができる。従って、第1のプラント運転監視制御システム10Aおよび第1の運転画面割付変更処理手順と比較して、セキュリティ性の向上を図ることができる。
According to the third plant operation monitoring control system 10C and the third operation screen assignment change processing procedure, in addition to the effects of the first plant operation
以上、本発明に係るプラント運転監視制御システムおよび運転画面割付変更処理手順(運転画面割付変更方法)によれば、監視装置11〜13から運転員が運転画面の割付変更を入力操作して要求することによって、監視装置11〜13に任意の工程の運転画面を割り付けることができ、従来の運転監視制御システムおよび運転画面割付変更方法と比べて効率的かつ容易に運転画面の割付けを変更できる。 As described above, according to the plant operation monitoring control system and the operation screen assignment change processing procedure (operation screen assignment change method) according to the present invention, the operator inputs and requests the operation screen assignment change from the monitoring devices 11 to 13. Thus, the operation screens of arbitrary processes can be assigned to the monitoring devices 11 to 13, and the assignment of the operation screens can be changed efficiently and easily as compared with the conventional operation monitoring control system and the operation screen assignment change method.
また、従来の運転監視制御システムおよび運転画面割付変更方法と比べて監視装置11〜13の運転画面の割付変更が効率的かつ容易に行えるため、運転監視機能を維持しつつ運転員を効率的に配置することができ、この結果、従来の運転監視制御システムに対して運転員を削減でき、運転効率を向上させることができる。 In addition, since the operation screen assignment of the monitoring devices 11 to 13 can be changed efficiently and easily compared with the conventional operation monitoring control system and operation screen assignment changing method, the operator can be efficiently operated while maintaining the operation monitoring function. As a result, the number of operators can be reduced with respect to the conventional operation monitoring control system, and the operation efficiency can be improved.
さらに、監視装置11〜13の運転画面データの改造要求が発生した場合であっても、まず、運転画面データ管理装置30に格納されている運転画面データとしての運転画面データテーブル46を改造しておけば、その後、必要な監視装置11〜13において、それぞれ必要な運転画面データを運転画面データ管理装置30から取得して書き換えることができるので、効率的に監視装置11〜13の運転画面データを改造することができる。
Further, even when a request for remodeling the operation screen data of the monitoring devices 11 to 13 is generated, the operation screen data table 46 as the operation screen data stored in the operation screen
さらにまた、監視装置11〜13に格納された運転画面データが何らかの理由で破壊した場合にも、運転員が必要な運転画面データを運転画面データ管理装置30から取得することによって、専用の装置や専門の技術員による作業を介在させることなく破壊していた運転画面データを修復することができる。
Furthermore, even when the operation screen data stored in the monitoring devices 11 to 13 is destroyed for some reason, the operation screen data required by the operator is acquired from the operation screen
また、監視装置11〜13には必要最小限の運転画面データを格納するだけで良いので、監視装置内のデータ容量を最小限に抑えることができ、データ処理負荷が必要以上に増大する事態を回避できる。 Moreover, since it is only necessary to store the minimum necessary operation screen data in the monitoring devices 11 to 13, the data capacity in the monitoring device can be minimized and the data processing load increases more than necessary. Can be avoided.
一方、第2のプラント運転監視制御システム10Bおよび第2の運転画面割付変更処理手順によれば、監視装置11B〜13Bの運転画面の割付を変更するにあたって安全上重要度の高い設備を含む工程については少なくとも一つの監視装置11B〜13Bで監視するよう制限を設けることによって、運転監視制御対象となるプラントの安全監視機能を保つことができる。 On the other hand, according to the 2nd plant operation monitoring control system 10B and the 2nd operation screen allocation change processing procedure, about the process including equipment with high safety importance in changing the allocation of the operation screen of monitoring devices 11B-13B By providing a restriction to monitor with at least one monitoring device 11B to 13B, it is possible to maintain the safety monitoring function of the plant that is the operation monitoring control target.
また、第3のプラント運転監視制御システム10Cおよび第3の運転画面割付変更処理手順によれば、操作権限を付与された者のみに運転画面の割付変更の実施を制限することができ、第1のプラント運転監視制御システム10Aおよび第1の運転画面割付変更処理手順と比較してセキュリティ性をさらに向上させることができる。
In addition, according to the third plant operation monitoring control system 10C and the third operation screen allocation change processing procedure, it is possible to limit the execution of the operation screen allocation change to only those who have been given the operation authority. Compared with the plant operation
尚、本発明は上記の各実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化しても良い。また、上記の各実施形態に開示されている複数の構成要素の適宜な組み合わせにより、種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除しても良い。さらに、異なる実施形態にわたる構成要素を適宜組み合わせても良い。 Note that the present invention is not limited to the above-described embodiments as they are, and may be embodied by modifying constituent elements without departing from the scope of the invention in the implementation stage. In addition, various inventions can be formed by appropriately combining a plurality of constituent elements disclosed in the above embodiments. For example, you may delete some components from all the components shown by embodiment. Furthermore, the constituent elements over different embodiments may be appropriately combined.
10(10A,10B,10C) 運転監視制御システム
11(11A,11B,11C) 第1の監視装置
12(12A,12B,12C) 第2の監視装置
13(13A,13B,13C) 第3の監視装置
17 第1の制御装置
18 第2の制御装置
19 第3の制御装置
21 フィールド
22 フィールド
23 フィールド
25 制御情報ネットワーク
30 運転画面データ管理装置
32 ネットワーク
34 入出力部
35 監視制御情報送受信部
37 運転監視テーブル
39 制御テーブル
41A,41B,41C 運転画面割付変更更新部
45 運転画面データ提供部
46 運転画面テーブル
47A,47B,47C 動作履歴テーブル
51 運転画面割付変更可否判定部
52 工程重要度分類テーブル
53 監視装置監視対象工程テーブル
55 操作可否判定部
56 操作権限情報テーブル
10 (10A, 10B, 10C) Operation monitoring control system 11 (11A, 11B, 11C) First monitoring device 12 (12A, 12B, 12C) Second monitoring device 13 (13A, 13B, 13C)
Claims (7)
前記プラントの制御を行う少なくとも1つの制御装置と、
前記プラントの運転操作および監視を行う際に前記監視装置に表示する必要がある全ての運転画面データを一括して格納した運転画面データ管理装置を具備し、
前記運転画面データ管理装置と前記各監視装置とは、前記監視装置から運転画面の割付変更要求を前記運転画面データ管理装置が受信可能、かつ、前記運転画面データ管理装置に格納される運転画面データから前記各監視装置が必要とする運転画面データを取得可能に接続されており、
前記各監視装置は、自己が運転操作および監視を行う際の表示に必要な運転画面データを前記運転画面データ管理装置から取得して格納することを特徴とするプラント運転監視制御システム。 At least one monitoring device for operating and monitoring the plant;
At least one control device for controlling the plant;
An operation screen data management device that collectively stores all operation screen data that need to be displayed on the monitoring device when performing operation and monitoring of the plant;
The operation screen data management device and each monitoring device are such that the operation screen data management device can receive an operation screen assignment change request from the monitoring device and is stored in the operation screen data management device. Connected to be able to acquire the operation screen data required by each of the monitoring devices,
Each said monitoring apparatus acquires the operation screen data required for the display at the time of self performing operation operation and monitoring from the said operation screen data management apparatus, The plant operation monitoring control system characterized by the above-mentioned.
前記入力部が受け付けた操作に基づき運転画面割付変更指令を生成し前記運転画面データ管理装置へ送ると共に、運転画面割付変更後の運転画面データを前記運転画面データ管理装置から受信し、現在の運転画面データを受信した運転画面データに変更する運転画面割付変更更新部と、
運転画面割付変更更新部が前記運転画面データ管理装置から受信した運転画面データに基づく運転画面割付変更後の運転画面を表示する出力部と、を備え、
前記運転画面データ管理装置は、前記監視装置の運転画面割付変更更新部から送信される運転画面割付変更指令に基づき、要求する運転画面データを運転画面割付変更指令送信元の監視装置へ送信する運転画面データ提供部を備えることを特徴とする請求項1記載のプラント運転監視制御システム。 The monitoring device includes an input unit that receives an operation for requesting an operation screen layout change;
Based on the operation received by the input unit, an operation screen assignment change command is generated and sent to the operation screen data management device, and operation screen data after the operation screen assignment change is received from the operation screen data management device, An operation screen assignment change update unit that changes the screen data to the operation screen data received;
An operation unit for displaying an operation screen after the operation screen allocation change based on the operation screen data received from the operation screen data management device by the operation screen allocation change update unit,
The operation screen data management device, based on the operation screen allocation change command transmitted from the operation screen allocation change update unit of the monitoring device, transmits the requested operation screen data to the monitoring device of the operation screen allocation change command transmission source. The plant operation monitoring control system according to claim 1, further comprising a screen data providing unit.
前記運転画面割付変更更新部は、運転員に固有の情報を示す操作情報を入力部から受け付けて当該運転員の認証要求を生成し前記運転画面データ管理装置へ出力する機能と、
前記運転画面データ管理装置で行われた運転員の認証結果を前記運転画面データ管理装置から受信する機能と、
前記運転画面データ管理装置から受信した運転員の認証結果を前記出力部へ送る機能と、をさらに有し、
前記出力部は、前記運転画面割付変更更新部から受け取った運転員の認証結果を表示する機能をさらに有し、
前記運転画面データ管理装置は、前記監視装置から運転画面の割付変更要求を受信した際に、前記運転画面の割付変更要求の送信元となる監視装置へ当該運転画面の割付変更を要求する運転員の固有の情報の送信を要求すると共に、当該要求に従って前記監視装置から送信された運転員の固有の情報を受け取ると、受け取った運転員の固有の情報が、前記運転画面割付変更を許可する運転員の固有の情報と合致するかを判断して、前記運転画面割付変更を許可する否かを判定する操作可否判定部をさらに備えることを特徴とする請求項3記載のプラント運転監視制御システム。 The previous input unit further has a function of accepting an input operation of information unique to an operator such as a user ID and a password, and a function of sending information indicating the accepted operation to the operation screen allocation change update unit,
The operation screen allocation change update unit receives operation information indicating information specific to the operator from the input unit, generates an authentication request for the operator, and outputs the operation request to the operation screen data management device,
A function of receiving an authentication result of the operator performed by the operation screen data management device from the operation screen data management device;
A function of sending the authentication result of the operator received from the operation screen data management device to the output unit;
The output unit further has a function of displaying the authentication result of the operator received from the operation screen allocation change update unit,
When the operation screen data management device receives an operation screen assignment change request from the monitoring device, the operation screen data management device requests an operation change of the operation screen to the monitoring device that is a transmission source of the operation screen assignment change request. When the operator's unique information transmitted from the monitoring device is received according to the request, the received operator's unique information permits the operation screen allocation change to be performed. The plant operation monitoring control system according to claim 3, further comprising an operation availability determination unit that determines whether or not the operation screen allocation change is permitted by determining whether the information matches the information unique to the worker.
前記プラントの運転操作および監視を行う際に前記監視装置に表示する必要がある全ての運転画面データを運転画面データ管理装置に一括して格納し、
前記運転画面データ管理装置が前記監視装置から運転画面の割付変更要求を受信し、
前記各監視装置が自己の運転操作および監視を行う際の表示に必要な運転画面データを前記運転画面データ管理装置から取得して格納することを特徴とするプラント運転監視制御方法。 In a plant operation monitoring and control method for performing plant operation and monitoring with at least one monitoring device and controlling the plant with at least one control device,
All the operation screen data that needs to be displayed on the monitoring device when performing operation and monitoring of the plant is collectively stored in the operation screen data management device,
The operation screen data management device receives an operation screen assignment change request from the monitoring device,
A plant operation monitoring control method, wherein operation screen data necessary for display when each of the monitoring devices performs its own operation and monitoring is acquired from the operation screen data management device and stored.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008319391A JP5208710B2 (en) | 2008-12-16 | 2008-12-16 | Plant operation monitoring control system and plant operation monitoring control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008319391A JP5208710B2 (en) | 2008-12-16 | 2008-12-16 | Plant operation monitoring control system and plant operation monitoring control method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010146058A true JP2010146058A (en) | 2010-07-01 |
JP5208710B2 JP5208710B2 (en) | 2013-06-12 |
Family
ID=42566484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008319391A Expired - Fee Related JP5208710B2 (en) | 2008-12-16 | 2008-12-16 | Plant operation monitoring control system and plant operation monitoring control method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5208710B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013152612A (en) * | 2012-01-25 | 2013-08-08 | Toshiba Corp | Plant monitoring control system and plant monitoring control method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11109933A (en) * | 1997-09-30 | 1999-04-23 | Fuji Electric Co Ltd | Monitoring and controlling system |
JP2001202108A (en) * | 2000-01-20 | 2001-07-27 | Keyence Corp | Display method and device, method and device for generating picture data and recording medium |
JP2004227215A (en) * | 2003-01-22 | 2004-08-12 | Mitsubishi Heavy Ind Ltd | Remote monitoring system of plant and web server |
-
2008
- 2008-12-16 JP JP2008319391A patent/JP5208710B2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11109933A (en) * | 1997-09-30 | 1999-04-23 | Fuji Electric Co Ltd | Monitoring and controlling system |
JP2001202108A (en) * | 2000-01-20 | 2001-07-27 | Keyence Corp | Display method and device, method and device for generating picture data and recording medium |
JP2004227215A (en) * | 2003-01-22 | 2004-08-12 | Mitsubishi Heavy Ind Ltd | Remote monitoring system of plant and web server |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013152612A (en) * | 2012-01-25 | 2013-08-08 | Toshiba Corp | Plant monitoring control system and plant monitoring control method |
Also Published As
Publication number | Publication date |
---|---|
JP5208710B2 (en) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11163870B2 (en) | Plant-specific, automated certificate management | |
WO2015040763A1 (en) | Work machine, management system for work machine, and management method for work machine | |
JP2011193307A (en) | Field communication system and field communication method | |
JP2017124917A (en) | Elevator maintenance system | |
JP5208710B2 (en) | Plant operation monitoring control system and plant operation monitoring control method | |
JP6243733B2 (en) | Equipment management system and method | |
JP2008087894A (en) | Function variable type remote monitoring system, function variable type remote monitoring method, and function variable type remote monitoring program | |
JP2006318102A (en) | Field equipment management device and field equipment management method | |
KR20180026550A (en) | Programmable Indicators and Control Systems | |
JP5444739B2 (en) | Management device, management system, and management program | |
JP2007193615A (en) | Display management method and display management apparatus utilizing the same, display management system | |
JP5814753B2 (en) | Power system monitoring and control system | |
JP6054008B1 (en) | Data management apparatus, data management method, and data management program | |
JP2007039206A (en) | Elevator control system | |
KR101545232B1 (en) | Integrated monitoring and control system using distributed computing | |
KR20140045002A (en) | Human machine interface system with remote control function | |
CN105122163B (en) | Error processing system | |
JP2008108022A (en) | Operation maintenance management device | |
JP2004070586A (en) | Manufacturing/inspection device operation system | |
JP2007026122A (en) | Plant monitoring control system | |
WO2009110069A1 (en) | Controller and control program | |
JP2016031545A (en) | Plant monitoring system, plant monitoring method, and operation management device | |
JP2013077092A (en) | Plant monitoring control device | |
CN113728286B (en) | Picture data generating system, picture data generating method, and recording medium | |
CN114244828B (en) | Data transmission method and vehicle-mounted dynamic data management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20100424 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110210 |
|
RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20111217 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120411 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120417 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120613 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120904 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121018 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130129 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130220 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160301 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160301 Year of fee payment: 3 |
|
LAPS | Cancellation because of no payment of annual fees |