JP2010079703A - Audit trail management system - Google Patents

Audit trail management system Download PDF

Info

Publication number
JP2010079703A
JP2010079703A JP2008248729A JP2008248729A JP2010079703A JP 2010079703 A JP2010079703 A JP 2010079703A JP 2008248729 A JP2008248729 A JP 2008248729A JP 2008248729 A JP2008248729 A JP 2008248729A JP 2010079703 A JP2010079703 A JP 2010079703A
Authority
JP
Japan
Prior art keywords
store
business process
audit
trail
trails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008248729A
Other languages
Japanese (ja)
Other versions
JP5131124B2 (en
Inventor
Yuji Oda
祐治 小田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oki Electric Industry Co Ltd
Original Assignee
Oki Electric Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oki Electric Industry Co Ltd filed Critical Oki Electric Industry Co Ltd
Priority to JP2008248729A priority Critical patent/JP5131124B2/en
Publication of JP2010079703A publication Critical patent/JP2010079703A/en
Application granted granted Critical
Publication of JP5131124B2 publication Critical patent/JP5131124B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a means for improving the efficiency of audit trail collection in evaluating an operation state. <P>SOLUTION: A store terminal 2 includes a means for receiving input of audit trail information and a means for transmitting the received audit trail information to an audit trail management server 1. The audit trail management server 1 includes: an audit trail information database 8 storing preset audit planning condition data; a means for receiving audit trail information from the store terminal 2; a means for forming tabulation accumulation data obtained by calculating the total number of accumulated audit trail information for each store and for each business process; a means for determining a business process priority order P in which a total accumulated number Gd of tabulation data for each business process are arranged in ascending order; a means for determining a store priority order T in which the number of business process counts Gc for each store of tabulation data are arranged in ascending order; and a means for forming audit planning data by setting the number of audit trails to be audited for each store and for each business process based on the audit planning condition data in order from the business process at the of the business process priority order P and in order from the store at the top of the store priority order T in the business process. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、内部監査等において、多数の店舗から業務プロセス別に複数の証跡を収集する際の監査計画の作成等に用いる証跡管理システムに関する。   The present invention relates to a trail management system used for creating an audit plan when collecting a plurality of trails for each business process from a large number of stores in an internal audit or the like.

従来の証跡管理システムは、各部門のネットワークシステムから入力された証跡を証跡管理サーバで時系列に並べて集中管理し、特定の事象に関する証跡を解析する場合に、蓄積されている証跡から当該事象に該当する複数の証跡を抽出して出力している(例えば、特許文献1参照。)。
特開2007−26207号公報(主に、段落0040−0043、第1図、第6図)
In the conventional trail management system, when the trail input from each department's network system is centrally managed in chronological order by the trail management server, and the trail related to a specific event is analyzed, it is changed from the accumulated trail to the event. A plurality of corresponding trails are extracted and output (for example, refer to Patent Document 1).
JP 2007-26207 A (mainly paragraphs 0040-0043, FIGS. 1 and 6)

近年、企業のコンプライアンス体制については、米国にてSOX(Sarbanes−Oxley)法が施行される等により厳格化され、社会的に企業責任の重要性が高まってきている。
日本においても、金融商品取引法が制定され、2008年度から都市銀行や地方銀行、保険会社、消費者金融会社等の金融機関やその他の企業等の上場企業を対象として内部統制報告書の提示義務が課せられることになり、有価証券報告書の信頼性に関して、より注意を払うことが求められている。
In recent years, corporate compliance systems have been tightened by the enforcement of the SOX (Sarbanes-Oxley) law in the United States, and the importance of corporate responsibility has increased socially.
In Japan, the Financial Instruments and Exchange Act was enacted, and from 2008, obligations to present internal control reports for listed companies such as financial institutions such as city banks, regional banks, insurance companies, consumer finance companies, and other companies. As a result, there is a need to pay more attention to the reliability of securities reports.

内部統制報告書は、財務報告と同様に提示期限が定められており、期限を厳守する必要がある。
金融機関においては、同種業務を遂行する多数の支社や支店等の店舗に対し、マニュアルに記された通りに業務が実施されているか否かを、監査側が伝票等の取引書類をチェックすることで運用状況を評価しており、評価の高効率化が求められている。
The internal control report has a deadline for presentation similar to financial reports, and the deadline must be strictly observed.
In a financial institution, the audit side checks the transaction documents such as slips to check whether or not the operations are being carried out as described in the manual for a large number of branches and branches that carry out similar business. The operation status is being evaluated, and high efficiency of the evaluation is required.

金融機関の運用状況の評価においては、業務プロセス別に一定数以上の証跡が必要とされるため、監査側が多数の店舗から業務プロセス別に複数の証跡を収集する際の計画(監査計画という。)を作成して継続的な評価を遂行している。
しかしながら、上述した従来の技術においては、各部門のネットワークシステムにおける多数の証跡を証跡管理サーバに蓄積して集中管理しているものの、監査計画を作成する際には、各部門が管理している証跡を証跡管理サーバから部門別に抽出し、これを人手で業務プロセス別に仕分け、各部門から収集する業務プロセス別の証跡数を決定して監査計画を作成することが必要になり、監査計画の作成に時間を要し、運用状況の評価における証跡収集の効率化を図ることが困難になるという問題がある。
When evaluating the operational status of a financial institution, a certain number of trails are required for each business process, so a plan for the audit side to collect multiple trails for each business process from a large number of stores (referred to as an audit plan). Create and carry out continuous evaluation.
However, in the conventional technology described above, a large number of trails in the network system of each department are accumulated and managed in the trail management server, but each department manages when creating an audit plan. It is necessary to extract a trail by department from the trail management server, manually sort it by business process, determine the number of trails to be collected from each department, and create an audit plan. Time is required, and it is difficult to improve the efficiency of trail collection in the evaluation of operation status.

本発明は、上記の問題点を解決するためになされたもので、運用状況の評価における証跡収集の効率を向上させる手段を提供することを目的とする。   The present invention has been made to solve the above problems, and an object of the present invention is to provide means for improving the efficiency of trail collection in the evaluation of operation status.

本発明は、上記課題を解決するために、複数の店舗に設置された店舗端末と、前記店舗端末に接続する証跡管理サーバと、を備えた証跡管理システムであって、前記店舗端末は、
証跡情報の入力を受付ける手段と、前記証跡管理サーバへ、受付けた前記証跡情報を送信する手段を備え、前記証跡管理サーバは、予め設定された監査計画作成条件データを格納する手段と、前記店舗端末から前記証跡情報を受信する手段と、受信した前記証跡情報を基に、証跡情報の蓄積数を店舗別および業務プロセス別に集計した集計蓄積データを作成する手段と、前記集計蓄積データの、1つの業務プロセスについて店舗別の証跡情報の蓄積数を合計した蓄積合計数を、少ない順に並べて、業務プロセス優先順位を決定する手段と、前記集計蓄積データの、1つの店舗について証跡情報の存在する業務プロセスをカウントした業務プロセスカウント数を、少ない順に並べて、店舗優先順位を決定する手段と、前記業務プロセス優先順位の上位の業務プロセスから順に、当該業務プロセスにおける店舗優先順位の上位の店舗の順に、前記監査計画作成条件データを基に、店舗別および業務プロセス別に監査対象証跡数を設定した監査計画データを作成する手段と、作成した前記監査計画データを格納する手段と、を備えることを特徴とする。
In order to solve the above problems, the present invention is a trail management system including a store terminal installed in a plurality of stores, and a trail management server connected to the store terminal, wherein the store terminal is
Means for accepting input of trail information; means for transmitting the accepted trail information to the trail management server; the trail management server storing preset audit plan creation condition data; and the store Means for receiving the trail information from a terminal, means for creating aggregate accumulation data in which the accumulation number of trail information is aggregated by store and business process based on the received trail information, and 1 of the aggregate accumulation data Means for determining the business process priority by arranging the total number of stored totals of the number of stored trail information for each business process for one business process, and the business for which there is trail information for one store of the aggregated accumulated data Means for arranging the business process counts obtained by counting processes in ascending order and determining store priority, and the business process priority Create audit plan data in which the number of trails to be audited is set for each store and for each business process based on the audit plan creation condition data in order from the top business process, in the order of stores with the highest store priority in the business process. Means and means for storing the created audit plan data.

これにより、本発明は、監査対象となる業務プロセスが片寄っている店舗や、監査対象となる証跡数が少ない業務プロセスが存在した場合においても、その店舗や業務プロセスを優先的に監査対象として設定することができ、運用状況の評価時に監査対象とする店舗別の業務プロセス数や業務プロセス別の証跡数の均一化を図ることができると共に、監査側の担当者による店舗の訪問時に必要な数の証跡を確実に得ることができ、運用状況の評価における証跡収集の効率を向上させることができるという効果が得られる。   As a result, the present invention preferentially sets a store or a business process as an audit target even if there is a store where the business process to be audited is offset or a business process with a small number of trails to be audited exists. The number of business processes for each store to be audited and the number of trails for each business process can be equalized during the evaluation of operational status, and the number required when the person in charge of the audit visits the store. Thus, it is possible to reliably obtain the trail and improve the efficiency of trail collection in the evaluation of the operation status.

以下に、図面を参照して本発明による証跡管理システムの実施例について説明する。   Embodiments of a trail management system according to the present invention will be described below with reference to the drawings.

図1は実施例の証跡管理システムの構成を示す説明図、図2、図3は実施例の監査計画作成処理を示すフローチャートである。
図1において、1は証跡管理サーバであり、都市銀行や地方銀行、保険会社、消費者金融会社等の金融機関の内部監査室等の本部に設置され、金融機関の支社や支店等の店舗に設置された店舗端末2と、専用回線や電話回線等のネットワーク3を介して接続しており、証跡情報の蓄積状況の集計する機能や、蓄積された証跡情報を基に監査計画を作成する機能を有している。
FIG. 1 is an explanatory diagram showing the configuration of the trail management system of the embodiment, and FIGS. 2 and 3 are flowcharts showing the audit plan creation processing of the embodiment.
In FIG. 1, 1 is a trail management server, which is installed at the headquarters of an internal audit room of a financial institution such as a city bank, a regional bank, an insurance company, or a consumer finance company, and is installed at a branch office or branch office of the financial institution. Connected to the installed store terminal 2 via a network 3 such as a dedicated line or a telephone line, and a function for counting the accumulation status of trail information and a function for creating an audit plan based on the accumulated trail information have.

店舗端末2は、LCD等の表示画面や、伝票類(例えば、入金伝票)等の取引書類等からなる証跡の画像データを入力するスキャナ、その業務プロセス種別(例えば、入金プロセス)を示すプロセス種別コードや、取引実施した店舗の店舗名を示す店舗コード、取引書類の種別を示す書類コード等の付帯情報の入力を行うキーボードやマウス等を備えており、担当者等による証跡の画像データや付帯情報等からなる証跡情報の入力を受付け、これを証跡管理サーバ1へ送信する機能を有している。   The store terminal 2 includes a display screen such as an LCD, a scanner for inputting image data of a trail including transaction documents such as slips (for example, a deposit slip), and a process type indicating the business process type (for example, a deposit process). It includes a keyboard, mouse, etc. for entering incidental information such as codes, store codes that indicate the names of stores where transactions were conducted, and document codes that indicate the types of transaction documents. It has a function of receiving input of trail information including information and transmitting it to the trail management server 1.

4はパーソナルコンピュータ等の表示端末であり、金融機関の本部に設置され、LAN等を介して証跡管理サーバ1と接続しており、証跡管理サーバ1から送信された監査計画等を受信して、LCD等の表示画面に表示する機能、キーボード等による入力を受付ける機能等を有している。
なお、証跡管理サーバ1の設置場所は、複数の店舗端末2を一括して管理することが可能な設置場所であれば、どのような場所であってもよい。
4 is a display terminal such as a personal computer, which is installed at the headquarters of a financial institution and connected to the trail management server 1 via a LAN or the like, receives an audit plan or the like transmitted from the trail management server 1, It has a function of displaying on a display screen such as an LCD, a function of accepting input from a keyboard, and the like.
The installation location of the trail management server 1 may be any location as long as it can manage the plurality of store terminals 2 at once.

また、表示端末4の設置場所は、証跡管理サーバ1の設置場所と同じ場所である必要はなく、ネットワーク3を介して接続可能な設置場所であれば、どのような場所であってもよい。
5は証跡管理サーバ1の制御部であり、通信部6によってネットワーク3を介して店舗端末2に接続しており、証跡管理サーバ1内の各部を制御して、証跡情報の集計処理や監査計画作成処理等を実行する機能を有している。
Further, the installation location of the display terminal 4 does not have to be the same location as the installation location of the trail management server 1, and may be any location as long as it can be connected via the network 3.
A control unit 5 of the trail management server 1 is connected to the store terminal 2 via the network 3 by the communication unit 6, and controls each unit in the trail management server 1 to collect trail information and an audit plan. It has a function of executing creation processing and the like.

通信部6は、証跡管理サーバ1と店舗端末2との間を、その通信言語変換機能等によりネットワーク3を介して相互通信可能に接続する機能等を有している。
7は証跡管理サーバ1の入力部であり、キーボードやマウス等を備えており、担当者等からの監査計画作成条件データ等の各種の入力を受付ける機能を有している。
8は証跡情報データベースであり、証跡管理サーバ1に内蔵または外付けされたハードディスク装置等の記憶装置に構築されたデータベースであって、予め設定された監査計画作成条件データ、および証跡管理サーバ1が作成した監査計画データが格納される他、店舗別端末2から送信された証跡情報を格納して蓄積する証跡情報蓄積エリア、集計蓄積データを格納する集計蓄積データ格納エリアが確保されている。
The communication unit 6 has a function of connecting the trail management server 1 and the store terminal 2 so as to be able to communicate with each other via the network 3 by its communication language conversion function.
An input unit 7 of the trail management server 1 includes a keyboard and a mouse and has a function of receiving various inputs such as audit plan creation condition data from a person in charge.
Reference numeral 8 denotes a trail information database, which is a database built in a storage device such as a hard disk device built in or externally attached to the trail management server 1, and includes audit plan creation condition data set in advance and the trail management server 1. In addition to storing the created audit plan data, a trail information storage area for storing and storing trail information transmitted from the terminal 2 for each store, and a total storage data storage area for storing total storage data are secured.

10は証跡管理サーバ1の内部メモリ等の記憶部であり、制御部5が実行するプログラムやそれに用いる各種のデータおよび制御部5による処理結果等が格納される。
本実施例の証跡管理サーバ1の記憶部10には、後述する証跡情報集計処理を行う機能や、図2、図3を用いて説明する監査計画作成処理を行う機能を有するアプリケーションプログラム等を備えた管理処理実行プログラムが予め格納されており、制御部5が実行する管理処理実行プログラムのステップにより本実施例の証跡管理サーバ1のハードウェアとしての各機能手段が形成される。
A storage unit 10 such as an internal memory of the trail management server 1 stores a program executed by the control unit 5, various data used for the program, processing results by the control unit 5, and the like.
The storage unit 10 of the trail management server 1 according to the present embodiment includes an application program having a function of performing a trail information totaling process to be described later and a function of performing an audit plan creation process described with reference to FIGS. The management process execution program is stored in advance, and each function unit as hardware of the trail management server 1 of this embodiment is formed by the steps of the management process execution program executed by the control unit 5.

また、記憶部10には、監査計画データの作成時に、証跡情報データベース8から読出した監査計画作成条件データを一時保存するための監査計画作成条件データ一時保存エリア11、監査計画データの作成時に、証跡情報データベース8から読出した集計蓄積データを一時保存するための集計蓄積データ一時保存エリア12、監査計画データの作成時に、作成中の監査計画データを一時保存するための監査計画データ一時保存エリア13が確保される他、プロセス種別コードと業務プロセス種別との対応、および店舗コードと店舗名との対応を記したコード対照表等が格納されている。   The storage unit 10 includes an audit plan creation condition data temporary storage area 11 for temporarily storing audit plan creation condition data read from the trail information database 8 when creating the audit plan data, and when creating the audit plan data. Total storage data temporary storage area 12 for temporarily storing the total storage data read from the trail information database 8, and audit plan data temporary storage area 13 for temporarily storing the audit plan data being created at the time of creation of the audit plan data Is stored, a code comparison table describing correspondence between process type codes and business process types, and correspondence between store codes and store names is stored.

監査計画の作成においては、事前に外部監査法人との合意や各種の法令等に基づいて、監査対象とする業務プロセスの総数である業務プロセス総数Ap(本実施例では、6つ)とそれらの業務プロセス種別(図4に示す業務プロセス1〜6)、および監査対象とする店舗の総数である店舗総数At(本実施例では、全店舗数(6店舗))とそれらの店舗名(図4に示す店舗A〜F)が設定される。   In preparing the audit plan, based on agreements with external audit corporations and various laws and regulations in advance, the total number of business processes Ap (six in this embodiment), which is the total number of business processes to be audited, and their The business process type (business processes 1 to 6 shown in FIG. 4), the total number of stores At which is the total number of stores to be audited (in this embodiment, the total number of stores (6 stores)) and their store names (FIG. 4) Stores A to F) are set.

また、監査計画作成条件としては、監査対象とする各店舗における、監査対象とする証跡の数(監査対象証跡数Kという。)を均一化することを基本方針として、
(A)1つの業務プロセスにおける店舗別の監査対象証跡数Kの合計数(監査対象証跡合計数Gkという。)の目標値である証跡合計数目標値Mg(本実施例では、6証跡/業務プロセス)、
(B)1つの店舗における、1つの業務プロセスについての監査対象証跡数Kの目標値である証跡数目標値Mk(本実施例では、2証跡/業務プロセス)、
(C)1つの店舗における、1以上の監査対象証跡数Kが存在する業務プロセスをカウントしたカウント数である業務プロセス数Gpの目標値である業務プロセス数目標値Mp(本実施例では、3業務プロセス/店舗)、
からなる3つの条件が予め設定される。
In addition, as a basic policy for preparing the audit plan, the basic policy is to equalize the number of trails to be audited (called the number of trails to be audited K) in each store to be audited.
(A) Total number of trails target value Mg (in this embodiment, 6 trails / businesses) which is the target value of the total number of auditable trails K for each store in one business process (referred to as the total number of auditable trails Gk) process),
(B) Trail number target value Mk (in this example, 2 trails / business process), which is the target value of the number of audit target trails K for one business process in one store,
(C) Business process number target value Mp which is a target value of business process number Gp, which is a count number obtained by counting business processes having one or more audit target trail numbers K in one store (in this embodiment, 3 Business process / store),
Three conditions consisting of are preset.

このため、上記の証跡情報データベース8には、これらの監査計画作成条件を基に、監査計画を作成するために必要となる、業務プロセス総数Apとその業務プロセス種別、店舗総数Atとその店舗名、および証跡合計数目標値Mg、証跡数目標値Mk、業務プロセス数目標値Mpからなる監査計画作成条件データが、証跡管理サーバ1の入力部7によって予め入力され格納されている。   Therefore, in the trail information database 8 described above, the total number of business processes Ap and their business process types, the total number of shops At, and their shop names, which are necessary for creating an audit plan based on these audit plan creation conditions. , And the audit plan creation condition data including the trail total number target value Mg, the trail number target value Mk, and the business process number target value Mp are input and stored in advance by the input unit 7 of the trail management server 1.

なお、業務プロセス数目標値Mpは、
監査対象とする証跡の総数は、監査対象とする業務プロセス総数Ap(6業務プロセス)×証跡合計数目標値Mg(6証跡/業務プロセス)より36証跡、1店舗当りの平均証跡数は、監査対象とする証跡の総数(36証跡)÷ 監査対象とする店舗総数At(6店舗)より6証跡/店舗であり、1つの店舗における1つの業務プロセスにおける証跡数目標値Mkは2証跡/業務プロセスであるので、
業務プロセス数目標値Mp=6証跡/店舗 ÷ 2証跡/業務プロセス
=3業務プロセス/店舗
として算出された値である。
The target number of business processes Mp is
The total number of trails to be audited is the total number of business processes to be audited Ap (6 business processes) x the total number of trails target value Mg (6 trails / business processes), and the average number of trails per store is audited. Total number of target trails (36 trails) ÷ 6 trails / stores based on the total number of audited stores At (6 stores), and the target number Mk for one business process at one store is 2 trails / business process So
Target number of business processes Mp = 6 trails / store ÷ 2 trails / business process
= 3 Value calculated as business process / store.

上記の証跡情報データベース8の集計蓄積データ格納エリアには、図4に示す蓄積データ集計表を構成する各データからなる集計蓄積データを格納するために、業務プロセス種別と店舗名に対応させて証跡情報の蓄積数Dを格納するための業務プロセス総数Ap×店舗総数Atの蓄積数格納エリア、各業務プロセスにおける店舗別の蓄積数Dの合計数である蓄積合計数Gdをそれぞれ格納するため蓄積合計数格納エリア、各店舗における、1以上の蓄積数Dが存在する業務プロセスをカウントした業務プロセスカウント数Gcをそれぞれ格納するための業務プロセスカウント数格納エリアが設定されており、各格納エリアの初期値は「0」とされている。   In the total storage data storage area of the trail information database 8 described above, in order to store the total storage data composed of each data constituting the storage data totaling table shown in FIG. 4, a trail corresponding to the business process type and the store name is stored. Total number of storages for storing the total number of business processes Ap for storing the total number of stored information Ap × the total number of stores for store At, and the total number of stored G for each business process. A business process count number storage area for storing a business process count number Gc obtained by counting a business process having an accumulated number D of 1 or more in each store is set. The value is “0”.

以下に、本実施例の証跡情報集計処理について説明する。
金融機関の店舗の担当者は、証跡として保管する取引書類が、マニュアルに記された通りに処理され、その処理が終了したときに、店舗端末2によって、その取引書類の画像データを入力すると共に、業務プロセス種別のプロセス種別コードや、当該店舗の店舗コード、取引書類の書類コード等の付帯情報を入力する。
Below, the trail information totaling process of a present Example is demonstrated.
The person in charge at the store of the financial institution inputs the image data of the transaction document by the store terminal 2 when the transaction document stored as a trail is processed as described in the manual and the processing is completed. Attached information such as the process type code of the business process type, the store code of the store, and the document code of the transaction document is input.

この入力を受付けた店舗端末2は、入力された証跡(取引書類)の画像データと付帯情報とからなる証跡情報を、ネットワーク3を介して証跡管理サーバ1へ送信する。
また、担当者は証跡情報の送信後に、証跡となる当該取引書類をマニュアルで定められた所定の保管場所に保管する。
一方、金融機関の本部に設置された証跡管理サーバ1の制御部5は、記憶部10に格納されている管理処理実行プログラムにより、店舗端末2からの証跡情報の着信を待って待機しており、店舗端末2からの証跡情報を受信したときに証跡情報集計処理を実行する。
The store terminal 2 that has received this input transmits trail information including image data and incidental information of the input trail (transaction document) to the trail management server 1 via the network 3.
In addition, after sending the trail information, the person in charge stores the transaction document serving as a trail in a predetermined storage location defined in the manual.
On the other hand, the control unit 5 of the trail management server 1 installed at the headquarters of the financial institution waits for the arrival of trail information from the store terminal 2 by the management processing execution program stored in the storage unit 10. When the trail information from the store terminal 2 is received, the trail information totaling process is executed.

証跡情報集計処理において、制御部5は、受信した証跡情報の付帯情報に含まれるプロセス種別コードおよび店舗コードを基に、記憶部10に格納されているコード対照表を参照して、当該証跡情報の業務プロセス種別と店舗名を特定し、証跡情報データベース8に格納されている集計蓄積データ(図4参照)の該当する店舗名の該当する業務プロセス種別の蓄積数格納エリアに記憶されている蓄積数Dに「1」を加えて、その蓄積数Dを更新し、当該業務プロセスの蓄積合計数格納エリアの蓄積合計数Gdを更新すると共に、当該店舗の1以上の蓄積数Dが存在する業務プロセスが増加した場合は業務プロセスカウント数格納エリアの業務プロセスカウント数Gcを更新し、これらの更新後に、証跡の画像データを含む証跡情報を証跡情報データベース8の証跡情報蓄積エリアに格納する。   In the trail information totaling process, the control unit 5 refers to the code comparison table stored in the storage unit 10 based on the process type code and the store code included in the accompanying information of the received trail information, and the trail information Is stored in the storage number storage area of the corresponding business process type of the corresponding store name of the total storage data (see FIG. 4) stored in the trail information database 8. “1” is added to the number D, the accumulated number D is updated, the accumulated total number Gd of the accumulated total number storage area of the business process is updated, and at least one accumulated number D of the store exists. When the number of processes increases, the business process count number Gc in the business process count number storage area is updated, and after the update, the trail information including the image data of the trail is converted into the trail information. And stores the trail information storage area of the database 8.

このようにして、証跡情報データベース8上に、随時に送信される証跡情報を基に、証跡情報の蓄積数Dを店舗別および業務プロセス別に集計し、業務プロセス別の蓄積合計数Gd、および店舗別の業務プロセスカウント数Gcを集計した集計蓄積データが、制御部5により作成される。
以下に、図2にSで、図3にSXで示すステップに従って、本実施例の監査計画作成処理について説明する。
In this way, based on the trail information transmitted as needed on the trail information database 8, the accumulated number D of trail information is totaled for each store and each business process, and the total number Gd stored for each business process, and the store Aggregated accumulated data obtained by aggregating another business process count number Gc is created by the control unit 5.
In the following, the audit plan creation process of this embodiment will be described in accordance with the steps indicated by S in FIG. 2 and SX in FIG.

本部に設置された証跡管理サーバ1の制御部5は、定期的に、または入力部7により本部の担当者からの必要に応じた指示入力により、もしくは表示端末4から送信された監査計画作成要求を受信したときに、監査計画作成処理を実行する。
S1、管理処理実行プログラムにより監査計画作成処理を開始した制御部5は、証跡情報データベース8に格納されている現在までに集計された集計蓄積データを読出して、記憶部10の集計蓄積データ一時保存エリア12に、証跡情報データベース8と同様の格納形式で一時保存する。
The control unit 5 of the trail management server 1 installed in the headquarters sends an audit plan creation request transmitted from the display terminal 4 periodically or by an instruction input from the person in charge of the headquarters through the input unit 7 as necessary. Audit plan creation processing is executed when a message is received.
S 1, the control unit 5 that has started the audit plan creation process by the management process execution program reads the accumulated data accumulated so far stored in the trail information database 8, and temporarily stores the accumulated data stored in the storage unit 10. The area 12 is temporarily stored in the same storage format as the trail information database 8.

本実施例では、図5に示す蓄積データ集計表の各欄に記載された、店舗A〜店舗Fの6つの店舗別、業務プロセス1〜業務プロセス6の6つの業務プロセス別に集計された証跡情報の蓄積数Dおよび、業務プロセス別の蓄積合計数Gd、店舗別の業務プロセスカウント数Gcが各格納エリアに一時保存される。
また、制御部5は、証跡情報データベース8に格納されている業務プロセス総数Apとその業務プロセス種別、店舗総数Atとその店舗名、証跡合計数目標値Mg、証跡数目標値Mk、業務プロセス数目標値Mpからなる監査計画作成条件データを読出して、記憶部10の監査計画作成条件データ一時保存エリア11に一時保存する。
In this embodiment, the trail information that is listed in each column of the accumulated data totaling table shown in FIG. , The accumulated total number Gd for each business process, and the business process count number Gc for each store are temporarily stored in each storage area.
The control unit 5 also stores the total number of business processes Ap stored in the trail information database 8 and their business process types, the total number of stores At and their store names, the total number of trails target value Mg, the target number of trails Mk, and the number of business processes. The audit plan creation condition data including the target value Mp is read out and temporarily stored in the audit plan creation condition data temporary storage area 11 of the storage unit 10.

S2、監査計画データ作成目標値を読出した制御部5は、図6から図11に示す表形式にした監査計画を構成する各データからなる監査計画データを作成するために、業務プロセス種別と店舗名とに対応させて監査対象証跡数Kを書込むための業務プロセス総数Ap×店舗総数Atの監査対象証跡数書込エリア、業務プロセス別に設定された業務プロセス優先順位Pをそれぞれ書込むための業務プロセス優先順位書込エリア、店舗別に設定された店舗優先順位Tをそれぞれ書込むための店舗優先順位書込エリア、各業務プロセスにおける店舗別の監査対象証跡数Kの合計数である監査対象証跡合計数Gkをそれぞれ書込むための監査対象証跡合計数書込エリア、各店舗における1以上の監査対象証跡数Kが存在する業務プロセスをカウントした業務プロセス数Gpをそれぞれ書込むための業務プロセス数書込エリアを、監査計画データ一時保存エリア13に設定する。   S2, the control unit 5 that has read out the audit plan data creation target value creates a business plan type and a store in order to create audit plan data composed of the data constituting the audit plan in the table format shown in FIGS. For writing the audit process number write area of the total number of business processes Ap × total number of stores At for writing the audit trail number K in correspondence with the name, and the business process priority P set for each business process Business process priority order writing area, store priority order writing area for writing store priority order T set for each store, and audit target trail that is the total number of audit target trails K for each store in each business process Total number of auditable trail writing area for writing the total number Gk, and the number of business processes with one or more auditable trail numbers K in each store are counted. The business processes number write area for writing each document business processes number Gp, sets the audit planning data temporary storage area 13.

そして、監査対象証跡数書込エリアおよび業務プロセス優先順位書込エリア、店舗優先順位書込エリアをクリアし、業務プロセス数書込エリアおよび監査対象証跡合計数書込エリアの初期値を「0」にして、図6に示す監査計画の監査計画データの各書込エリアを初期化する。
S3、監査計画データの初期化を終えた制御部5は、集計蓄積データ一時保存エリア12の各蓄積合計数格納エリアに格納されている各業務プロセスの蓄積合計数Gdを、少ない順に並べて業務プロセス優先順位Pを決定し、決定した業務プロセス優先順位Pを、監査計画データ一時保存エリア13の業務プロセス別の業務プロセス優先順位書込エリアに書込む。
Then, the audit trail number writing area, the business process priority order writing area, and the store priority order writing area are cleared, and the initial values of the business process number writing area and the audit trail total number writing area are set to “0”. Thus, each writing area of the audit plan data of the audit plan shown in FIG. 6 is initialized.
S3, the control unit 5 having completed the initialization of the audit plan data arranges the accumulated total number Gd of each business process stored in each accumulated total number storage area of the total accumulated data temporary storage area 12 in ascending order. The priority order P is determined, and the determined business process priority order P is written in the business process priority order writing area for each business process in the audit plan data temporary storage area 13.

S4、また、制御部5は、集計蓄積データ一時保存エリア12の各業務プロセスカウント数格納エリアに格納されている各店舗の業務プロセスカウント数Gcを、少ない順に並べて店舗優先順位Tを決定し、決定した店舗優先順位Tを、監査計画データ一時保存エリア13の店舗別の店舗優先順位書込エリアに書込む。
この場合に、業務プロセスカウント数Gcが同数の店舗が存在するときは、店舗名のアルファベット順に優先順位を決定する。
S4, the control unit 5 also determines the store priority T by arranging the business process count Gc of each store stored in each business process count number storage area of the total accumulated data temporary storage area 12 in ascending order, The determined store priority order T is written in the store priority order writing area for each store in the audit plan data temporary storage area 13.
In this case, when there are stores with the same number of business process counts Gc, priority is determined in alphabetical order of store names.

本実施例では、図5に示す集計蓄積データの蓄積合計数Gd、業務プロセスカウント数Gcを基に、図7に示す業務プロセス優先順位Pおよび店舗優先順位Tが決定される。
S5、業務プロセス優先順位Pおよび店舗優先順位Tを決定した制御部5は、業務プロセス優先順位Pの上位の業務プロセスから順に監査計画データを作成するために、業務プロセス優先順位Pの初期値を「0」に設定する。
In the present embodiment, the business process priority P and the store priority T shown in FIG. 7 are determined based on the accumulated total number Gd and the business process count number Gc of the total accumulated data shown in FIG.
In S5, the control unit 5 that has determined the business process priority P and the store priority T sets the initial value of the business process priority P in order to create the audit plan data in order from the business process higher in the business process priority P. Set to “0”.

S6、業務プロセス優先順位Pを初期化した制御部5は、業務プロセス優先順位Pに「1」を加えて、監査計画データを作成する業務プロセスの優先順位を設定する。
S7、業務プロセス優先順位Pを設定した制御部5は、当該業務プロセスにおける店舗優先順位Tの上位の店舗から順に監査計画データの監査対象証跡数Kを設定するために、店舗優先順位Tの初期値を「0」に設定する。
In S6, the control unit 5 that has initialized the business process priority P adds “1” to the business process priority P and sets the priority of the business process for creating the audit plan data.
S7, the control unit 5 having set the business process priority P, sets the number of trails K to be audited in the audit plan data in order from the store having the highest priority of the store priority T in the business process. Set the value to “0”.

S8、店舗優先順位Tを初期化した制御部5は、店舗優先順位Tに「1」を加えて、監査対象証跡数Kを設定する店舗の優先順位を設定する。
そして、監査計画データを作成する業務プロセスおよび当該業務プロセスにおける監査対象証跡数Kを設定する店舗を設定した制御部5は、上記した監査計画作成条件データを基に、店舗別、業務プロセス別の監査対象証跡数Kを、以下に示す手順に従って設定する。
In S8, the control unit 5 that has initialized the store priority T adds “1” to the store priority T, and sets the priority of the store for which the number K of audit trails is set.
And the control part 5 which set the business process which creates audit plan data, and the store which sets the audit target trail number K in the said business process, for each store and each business process based on the above audit plan creation condition data. The audit trail number K is set according to the following procedure.

S9、監査対象証跡数Kを設定する店舗優先順位Tを設定した制御部5は、設定された店舗優先順位Tの店舗の現段階の業務プロセス数Gpを監査計画データ一時保存エリア13の当該業務プロセス数書込エリアから、業務プロセス数目標値Mpを監査計画作成条件データ一時保存エリア11から読出してこれらを比較し、業務プロセス数Gpが業務プロセス数目標値Mp未満の場合は、ステップS12へ移行する。   S9, the control unit 5 having set the store priority T for setting the audit trail number K, sets the current number of business processes Gp of the set store priority T in the audit plan data temporary storage area 13 The business process number target value Mp is read from the audit plan creation condition data temporary storage area 11 from the process number writing area and compared, and if the business process number Gp is less than the business process number target value Mp, the process proceeds to step S12. Transition.

業務プロセス数Gpが業務プロセス数目標値Mp以上の場合は、ステップS10へ移行する。
S10、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上と判定した制御部5は、現段階の店舗別の業務プロセス数Gpを各業務プロセス数書込エリアから読出し、読出した店舗の中で当該店舗より店舗優先順位が下位の店舗の中に業務プロセス数目標値Mp未満の店舗が存在する場合は、当該店舗への監査対象証跡数Kの設定を不要と判定してステップS14へ移行する。
If the business process number Gp is equal to or greater than the business process number target value Mp, the process proceeds to step S10.
In S10, the control unit 5 that has determined that the number of business processes Gp of the store is equal to or greater than the business process number target value Mp reads the number of business processes Gp for each store at the current stage from each business process number write area. In the case where there is a store having the business process number target value Mp less than the store priority order of the store, it is determined that the setting of the audit target trail number K in the store is unnecessary, and the process proceeds to step S14. Transition.

業務プロセス数目標値Mp未満の店舗が存在しない場合、つまり全ての店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上の場合は、ステップS11へ移行する。
S11、現段階の業務プロセス数Gpが業務プロセス数目標値Mp未満の店舗が存在しないことを判定した制御部5は、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mpとなっている場合、つまりGp=Mpとなっている場合は、ステップS12へ移行する。
If there is no store below the business process number target value Mp, that is, if the business process number Gp of all stores is greater than or equal to the business process number target value Mp, the process proceeds to step S11.
S11, the control unit 5 having determined that there is no store where the current number of business processes Gp is less than the business process number target value Mp, the business process number Gp of the store is the business process number target value Mp That is, if Gp = Mp, the process proceeds to step S12.

当該店舗の業務プロセス数Gpが業務プロセス数目標値Mpを超えている場合は、当該店舗への監査対象証跡数Kの設定を不要と判定してステップS14へ移行する。
S12、制御部5は、当該業務プロセスの現段階の監査対象証跡合計数Gkを、監査計画データ一時保存エリア13の当該監査対象証跡合計数書込エリアから、証跡合計数目標値Mgを監査計画作成条件データ一時保存エリア11から読出して、これらを比較し、監査対象証跡合計数Gkが証跡合計数目標値Mg以上の場合は、当該店舗への監査対象証跡数Kの設定を不要と判定してステップS14へ移行する。
If the business process number Gp of the store exceeds the business process number target value Mp, it is determined that setting of the audit trail number K in the store is unnecessary, and the process proceeds to step S14.
S 12, the control unit 5 audits the total number of audit target trails Gk at the current stage of the business process from the total number of audit target trails writing area of the audit plan data temporary storage area 13 as the audit total number target value Mg. Reading from the creation condition data temporary storage area 11 and comparing them, if the total number of audit target trails Gk is equal to or greater than the total number of trail target value Mg, it is determined that setting the number of audit target trails K to the store is unnecessary. Then, the process proceeds to step S14.

監査対象証跡合計数Gkが証跡合計数目標値Mg未満の場合は、当該店舗への監査対象証跡数Kの設定が必要と判定してステップS13へ移行する。
S13、当該店舗への監査対象証跡数Kの設定が必要と判定した制御部5は、集計蓄積データ一時保存エリア12の蓄積数格納エリアから、当該業務プロセスにおける当該店舗の蓄積数Dを読出し、蓄積数Dが「0」を超えている場合は、当該店舗に当該業務プロセスの証跡が存在する、つまり証跡が保管されていると判定してステップS15へ移行する。
If the audit trail total number Gk is less than the trail total count target value Mg, it is determined that it is necessary to set the audit trail number K for the store, and the process proceeds to step S13.
S13, the control unit 5 having determined that the setting of the audit trail number K to the store is necessary, reads the stored number D of the store in the business process from the stored number storage area of the total storage data temporary storage area 12, If the accumulated number D exceeds “0”, it is determined that the business process trail exists in the store, that is, the trail is stored, and the process proceeds to step S15.

蓄積数Dが「0」以下の場合は、当該店舗に当該業務プロセスの証跡が存在しないために監査対象証跡数Kの設定を不要と判定してステップS14へ移行する。
S14、当該店舗への監査対象証跡数Kの設定を不要と判定した制御部5は、当該店舗の当該業務プロセスの監査対象証跡数Kを「0」に設定し、当該店舗が保管するまたは当該店舗に存在しない証跡を、当該業務プロセスにおける監査対象とはしないことに設定してステップS20へ移行する。
If the accumulated number D is “0” or less, since there is no trail of the business process in the store, it is determined that setting of the audit target trail number K is unnecessary, and the process proceeds to step S14.
S14, the control unit 5 that has determined that setting the number of audit target trails K to the store is unnecessary sets the audit target trail number K of the business process of the store to “0”, and the store stores or The trail that does not exist in the store is set not to be an audit target in the business process, and the process proceeds to step S20.

S15、当該店舗に当該業務プロセスの証跡が存在することを判定した制御部5は、監査計画作成条件データ一時保存エリア11から証跡数目標値Mkを読出して、これを当該業務プロセスにおける当該店舗の蓄積数Dと比較し、蓄積数Dが証跡数目標値Mk未満の場合は、ステップS16へ移行する。
蓄積数Dが証跡数目標値Mk以上の場合は、ステップS17へ移行する。
S15, the control unit 5 having determined that the trail of the business process exists in the store, reads the trail number target value Mk from the audit plan creation condition data temporary storage area 11, and this is read of the store in the business process If the accumulated number D is less than the trail number target value Mk as compared with the accumulated number D, the process proceeds to step S16.
If the accumulated number D is equal to or greater than the trail number target value Mk, the process proceeds to step S17.

S16、蓄積数Dが証跡数目標値Mk未満と判定した制御部5は、当該業務プロセスの当該店舗における証跡の保管数を超えないように、当該店舗の監査対象証跡数Kを蓄積数Dに設定してステップS20へ移行する。
S17、蓄積数Dが証跡数目標値Mk以上と判定した制御部5は、証跡合計数目標値Mgから現段階の監査対象証跡合計数Gkを減じた差を算出し、この差が証跡数目標値Mk未満の場合は、ステップS18へ移行する。
S16, the control unit 5 having determined that the accumulated number D is less than the trail number target value Mk, sets the audit target trail number K of the store to the accumulated number D so as not to exceed the number of stored trails in the store of the business process. Set and proceed to step S20.
In S17, the control unit 5 that has determined that the accumulated number D is equal to or greater than the trail number target value Mk calculates a difference obtained by subtracting the current audit total number of trails Gk from the trail total number target value Mg, and this difference is the trail number target. If it is less than the value Mk, the process proceeds to step S18.

当該差が、証跡数目標値Mk以上の場合は、ステップS19へ移行する。
S18、当該差が、証跡数目標値Mk未満と判定した制御部5は、当該業務プロセスの監査対象証跡合計数Gkが証跡合計数目標値Mgを超えないように、当該店舗の監査対象証跡数Kを、証跡合計数目標値Mgから現段階の監査対象証跡合計数Gkを減じた数に設定してステップS20へ移行する。
If the difference is greater than or equal to the trail number target value Mk, the process proceeds to step S19.
S18, the control unit 5 having determined that the difference is less than the trail number target value Mk, the audit target trail number of the store so that the audit trail total number Gk of the business process does not exceed the trail total number target value Mg. K is set to a value obtained by subtracting the total number of audit target trails Gk at the current stage from the total trail target value Mg, and the process proceeds to step S20.

S19、当該差が、証跡数目標値Mk以上と判定した制御部5は、当該店舗の監査対象証跡数Kが証跡数目標値Mkを超えないように、監査対象証跡数Kを証跡数目標値Mkに設定してステップS20へ移行する。
S20、当該業務プロセスにおける当該店舗への監査対象証跡数Kの設定を終えた制御部5は、監査計画データ一時保存エリア13の該当する監査対象証跡数書込エリアに、設定された監査対象証跡数Kを書込むと共に、当該業務プロセスの監査対象証跡合計数Gkおよび当該店舗の業務プロセス数Gpを更新する。
S19, the control unit 5 that has determined that the difference is equal to or greater than the target number of trails Mk, the audit trail number K is set to the target number of trails so that the auditable trail number K of the store does not exceed the target number of trails Mk. Set to Mk and proceed to step S20.
In S20, the control unit 5 that has finished setting the audit target trail number K for the store in the business process, sets the audit target trail set in the audit target trail number writing area of the audit plan data temporary storage area 13 The number K is written, and the audit trail total number Gk of the business process and the business process number Gp of the store are updated.

S21、監査対象証跡数Kの書込、監査対象証跡合計数Gkおよび業務プロセス数Gpの更新を終えた制御部5は、現段階の店舗優先順位Tが店舗総数At未満の場合、つまり最下位の店舗の監査対象証跡数Kの設定を終えていない場合は、ステップS8へ戻って、次の店舗優先順位Tの店舗について、監査対象証跡数Kの設定を継続する。
現段階の店舗優先順位Tが店舗総数At以上の場合は、当該業務プロセスにおける全ての店舗への監査対象証跡数Kの設定を終えたと判定して、ステップS22へ移行する。
S21, the writing of the audit target trail number K, the update of the audit target trail total number Gk and the number of business processes Gp, the control unit 5 is the case where the current store priority T is less than the total store number At, that is, the lowest If the setting of the audit target trail number K for the other store is not completed, the process returns to step S8, and the setting of the audit target trail number K is continued for the store of the next store priority order T.
When the store priority T at the current stage is equal to or greater than the store total At, it is determined that the audit trail number K has been set for all stores in the business process, and the process proceeds to step S22.

S22、当該業務プロセスにおける全ての店舗への監査対象証跡数Kの設定を終えた制御部5は、更新された監査対象証跡合計数Gkと証跡合計数目標値Mgとを比較し、監査対象証跡合計数Gkが証跡合計数目標値Mg未満の場合、つまり監査対象証跡合計数Gkが不足の場合は、ステップS23へ移行する。
監査対象証跡合計数Gkが証跡合計数目標値Mg以上の場合は、当該業務プロセスにおける店舗別の監査対象証跡数Kの設定を終えたと判定して、ステップS24へ移行する。
S22, the control unit 5 that has set the audit trail number K for all stores in the business process compares the updated audit trail total number Gk with the trail total target number Mg, and the audit trail When the total number Gk is less than the trail total number target value Mg, that is, when the audit target trail total number Gk is insufficient, the process proceeds to step S23.
If the audit trail total number Gk is equal to or greater than the trail total count target value Mg, it is determined that the setting of the audit trail number K for each store in the business process is completed, and the process proceeds to step S24.

なお、本実施例では、監査対象証跡合計数Gkが証跡合計数目標値Mgを超えないように監査対象証跡数Kを設定しているので、監査対象証跡合計数Gkが証跡合計数目標値Mgを超える場合は存在せず、Gk=Mgの場合にステップS24へ移行する。
S23、当該業務プロセスにおける各店舗への監査対象証跡数Kの設定後に、監査対象証跡合計数Gkが不足していることを判定した制御部5は、集計蓄積データ一時保存エリア12の蓄積合計数格納エリアから当該業務プロセスの蓄積合計数Gdを読出して、これを監査対象証跡合計数Gkと比較し、蓄積合計数Gdが監査対象証跡合計数Gkを超えている場合は、当該業務プロセスにおける監査対象証跡数Kの設定の継続を可能と判定し、接続子Xを介して図3のステップSX1へ移行する。
In this embodiment, since the audit trail number K is set so that the audit trail total number Gk does not exceed the trail total target value Mg, the audit trail total number Gk is equal to the trail total target value Mg. If Gk = Mg, the process proceeds to step S24.
In S23, after setting the number of audit target trails K for each store in the business process, the control unit 5 having determined that the total number of audit target trails Gk is insufficient is the total storage number of the total storage data temporary storage area 12 The accumulated total number Gd of the business process is read from the storage area and compared with the audit trail total number Gk. If the accumulated total number Gd exceeds the audit trail total number Gk, the audit in the business process is audited. It is determined that setting of the target trail number K can be continued, and the process proceeds to step SX1 in FIG.

蓄積合計数Gdが監査対象証跡合計数Gk以下の場合は、当該業務プロセスにおける監査対象証跡数Kの設定の継続を不可能と判定してステップS24へ移行する。
なお、本実施例では、監査対象証跡数Kが蓄積数Dを超えないように監査対象証跡数Kを設定しているので、蓄積合計数Gdが監査対象証跡合計数Gk未満の場合は存在せず、Gd=Gkの場合にステップS24へ移行する。
If the accumulated total number Gd is equal to or less than the audit trail total number Gk, it is determined that it is impossible to continue setting the audit trail number K in the business process, and the process proceeds to step S24.
In this embodiment, since the audit trail number K is set so that the audit trail number K does not exceed the accumulated number D, it does not exist when the accumulated total number Gd is less than the audit trail total number Gk. If Gd = Gk, the process proceeds to step S24.

SX1(図3)、当該業務プロセスにおける監査対象証跡数Kの設定の継続を可能と判定した制御部5は、当該業務プロセスにおける店舗優先順位Tの上位の店舗から順に、再度、監査対象証跡数Kを設定するために、店舗優先順位Tの初期値を「0」に設定する。
SX2、店舗優先順位Tを初期化した制御部5は、店舗優先順位Tに「1」を加えて、監査対象証跡数Kを設定する店舗の優先順位を設定する。
SX1 (FIG. 3), the control unit 5 that has determined that the setting of the audit target trail number K in the business process can be continued, starts again from the store with the highest priority of the store priority T in the business process. In order to set K, the initial value of the store priority T is set to “0”.
SX2, the control unit 5 that has initialized the store priority T adds “1” to the store priority T, and sets the priority of the store for which the number of audit target trails K is set.

SX3、監査対象証跡数Kを設定する店舗優先順位Tを設定した制御部5は、当該業務プロセスの、設定された店舗優先順位Tの店舗の監査対象証跡数Kを監査計画データ一時保存エリア13の当該監査対象証跡数書込エリアから読出し、読出した監査対象証跡数Kが「0」以下の場合、つまり前回の設定におけるステップS14において監査対象証跡数Kを「0」に設定し、当該店舗が保管する証跡等を当該業務プロセスにおける監査対象としないことに設定した店舗の場合は、ステップSX4へ移行する。   SX3, the control unit 5 having set the store priority T for setting the number of audit target trails K sets the audit target trail number K of the stores having the set store priority T in the business process to the audit plan data temporary storage area 13 When the number of audit target trails K read out from the audit target trail number writing area is “0” or less, that is, the audit target trail number K is set to “0” in step S14 in the previous setting, and the store In the case of a store that is set not to be audited in the business process, the process proceeds to step SX4.

読出した監査対象証跡数Kが「0」を超えている場合、つまり前回の設定において既に1以上の監査対象証跡数Kが設定されている店舗の場合は、監査対象証跡数Kの再度の設定を不要と判定してステップSX13へ移行する。
SX4、読出した監査対象証跡数Kが「0」以下と判定した制御部5は、上記ステップS9(図2)と同様にして、当該店舗の現段階の業務プロセス数Gpと業務プロセス数目標値Mpとを読出してこれら比較し、業務プロセス数Gpが業務プロセス数目標値Mp以下の場合は、監査対象証跡数Kの再度の設定を可能と判定してステップSX5へ移行する。
If the read audit trail number K exceeds “0”, that is, if the store has already been set with an audit trail number K of 1 or more in the previous setting, the audit trail number K is set again. Is determined to be unnecessary, and the process proceeds to step SX13.
SX4, the control unit 5 that has determined that the number of audit target trails K read “0” or less is the same as step S9 (FIG. 2), and the current number of business processes Gp and the target number of business processes for the store. Mp is read and compared. If the number of business processes Gp is equal to or less than the business process number target value Mp, it is determined that the number of audit target trails K can be set again, and the process proceeds to step SX5.

業務プロセス数Gpが業務プロセス数目標値Mpを超えている場合は、監査対象証跡数Kの再度の設定を不要と判定してステップSX13へ移行する。
SX5、監査対象証跡数Kの再度の設定を可能と判定した制御部5は、上記ステップS13(図2)と同様にして、当該業務プロセスにおける当該店舗の蓄積数Dを読出し、蓄積数Dが「0」を超えている場合は、当該店舗に当該業務プロセスの証跡が存在すると判定して、ステップSX6へ移行する。
If the business process number Gp exceeds the business process number target value Mp, it is determined that the setting of the audit trail number K is unnecessary, and the process proceeds to step SX13.
SX5, the control unit 5 that has determined that the number of audit target trails K can be set again reads the stored number D of the store in the business process in the same manner as in step S13 (FIG. 2). If it exceeds “0”, it is determined that there is a trail of the business process in the store, and the process proceeds to step SX6.

蓄積数Dが「0」以下の場合は、当該店舗に当該業務プロセスの証跡が存在しないために監査対象証跡数Kの再度の設定を不要と判定してステップSX13へ移行する。
その後のステップSX6〜SX11の作動は、上記ステップS15〜S20の作動と同様であるので、その説明を省略する。
SX12、新たに設定された監査対象証跡数Kの書込、監査対象証跡合計数Gkおよび業務プロセス数Gpの更新を終えた制御部5は、更新された監査対象証跡合計数Gkと証跡合計数目標値Mgとを比較し、監査対象証跡合計数Gkが証跡合計数目標値Mg未満の場合、つまり監査対象証跡合計数Gkが不足の場合は、ステップSX13へ移行する。
When the accumulated number D is “0” or less, since there is no trail of the business process in the store, it is determined that the setting of the audit target trail number K is unnecessary, and the process proceeds to Step SX13.
Subsequent operations of Steps SX6 to SX11 are the same as the operations of Steps S15 to S20 described above, and a description thereof will be omitted.
SX12, the control unit 5 having finished the writing of the newly set audit target trail number K and the update of the audit target trail number Gk and the business process number Gp, the updated total number of audit target trails Gk and the total number of trails The target value Mg is compared, and if the total number of audit target trails Gk is less than the total number of trail target values Mg, that is, if the total number of audit target trails Gk is insufficient, the process proceeds to step SX13.

監査対象証跡合計数Gkが証跡合計数目標値Mg以上(本実施例では、一致)の場合は、当該業務プロセスにおける店舗別の監査対象証跡数Kの設定を終えたと判定して、接続子Yを介して図2のステップS24へ移行する。
SX13、監査対象証跡合計数Gkが不足していることを判定した制御部5は、現段階の店舗優先順位Tが店舗総数At未満の場合は、ステップSX2へ戻って、次の店舗優先順位Tの店舗について、上記と同様にして監査対象証跡数Kの再設定を実行する。
If the total number of audit target trails Gk is equal to or greater than the total number of trail target value Mg (match in this embodiment), it is determined that the setting of the audit target trail number K for each store in the business process has been completed, and the connector Y Then, the process proceeds to step S24 in FIG.
SX13, the control unit 5 having determined that the audit trail total number Gk is insufficient, if the store priority T at the current stage is less than the total store number At, returns to step SX2 and the next store priority T The number of audit trails K is reset in the same manner as described above.

現段階の店舗優先順位Tが店舗総数At以上の場合は、当該業務プロセスにおける全ての店舗への監査対象証跡数Kの再設定を終えたと判定して、接続子Yを介して、図2のステップS24へ移行する。
なお、本ステップにおいて、監査対象証跡数Kの再設定を終えたときに、証跡情報の蓄積数Dが非常に少ない等の理由により、監査対象証跡合計数Gkが証跡合計数目標値Mgに達しない場合が存在するが、この場合は、監査対象証跡数Kの再設定は不可能であるので、監査対象証跡合計数Gkを証跡合計数目標値Mg未満のままとして、当該業務プロセスにおける全ての店舗への監査対象証跡数Kの再設定の終了を判定して図2のステップS24へ移行する。
If the store priority T at the current stage is equal to or greater than the total number of stores At, it is determined that the number of audit trails K for all stores in the business process has been reset, and the connector Y of FIG. Control goes to step S24.
In this step, when the resetting of the audit trail number K is completed, the audit trail total count Gk reaches the trail total count target value Mg because the trail information accumulation count D is very small. However, in this case, the audit trail number K cannot be reset, so the audit trail total number Gk remains below the total trail target value Mg, and all of the business processes The end of resetting the number of audit target trails K in the store is determined, and the process proceeds to step S24 in FIG.

S24(図2)、当該業務プロセスにおける店舗別の監査対象証跡数Kの設定を終えたと判定した制御部5は、現段階の業務プロセス優先順位Pが業務プロセス総数Ap未満の場合、つまり最下位の業務プロセスの店舗別の監査対象証跡数Kの設定を終えていない場合は、ステップS6へ戻って、次の業務プロセス優先順位Pについて、上記と同様にして監査対象証跡数Kの設定を実行する。   S24 (FIG. 2), the control unit 5 that has determined that the setting of the number of audit trails K for each store in the business process has been completed, the business process priority P at the current stage is less than the total number of business processes Ap, that is, the lowest If the setting of the number of auditable trails K for each store of the business process has not been completed, the process returns to step S6 to set the number of auditable trails K for the next business process priority P in the same manner as described above. To do.

現段階の業務プロセス優先順位Pが業務プロセス総数Ap以上の場合は、店舗別および業務プロセス別に監査対象証跡数Kを設定した監査計画データの作成を終えたと判定して、ステップS25へ移行する。
S25、監査計画データの作成を終えた制御部5は、作成した監査計画データを証跡情報データベース8に格納して、本実施例の監査計画作成処理を終了させる。
If the business process priority P at the current stage is equal to or greater than the total number of business processes Ap, it is determined that the creation of the audit plan data in which the number of audit trails K is set for each store and business process is completed, and the process proceeds to step S25.
In S25, the controller 5 that has completed the creation of the audit plan data stores the created audit plan data in the trail information database 8, and ends the audit plan creation process of the present embodiment.

上記したステップS12〜S20(図2)によって、当該店舗の当該業務プロセスに、当該業務プロセスの証跡合計数目標値Mg以下の範囲で、集計蓄積データの蓄積数Dおよび証跡数目標値Mkを超えない最大数を、監査対象証跡数Kとして設定する本実施例の監査対象証跡数設定手段が形成される。
また、上記のステップS8、S9、S21(図2)によって、上記監査対象証跡数設定手段を実行する店舗が、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp未満のときは、当該店舗に設定される。
By the steps S12 to S20 (FIG. 2) described above, the business process in the store exceeds the total number D of accumulated accumulated data and the target number Mk of trails within the range of the total number target value Mg of the business process. The audit trail number setting means of the present embodiment for setting the maximum number not to be used as the audit trail number K is formed.
In addition, if the store executing the audit trail number setting means in the above steps S8, S9, and S21 (FIG. 2) has the business process number Gp of the store less than the business process number target value Mp, Set to

更に、上記のステップS8、S9、S10、S11、S21(図2)によって、上記監査対象証跡数設定手段を実行する店舗が、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上のときに、店舗優先順位Tが当該店舗より下位の店舗に、業務プロセス数目標値Mp未満の店舗が存在する場合は、その店舗の中で店舗優先順位Tが最上位の店舗に設定される。   Furthermore, when the store executing the audit trail number setting means has the business process number Gp of the store equal to or greater than the business process number target value Mp in steps S8, S9, S10, S11, and S21 (FIG. 2). In addition, when there is a store with the store priority T lower than the target number of business processes Mp at a store lower than the store, the store priority T is set to the highest store among the stores.

更に、上記のステップS8、S9、S10、S14、S21(図2)によって、上記監査対象証跡数設定手段を実行する店舗が、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上のときに、店舗優先順位Tが当該店舗より下位の店舗に、業務プロセス数目標値Mp未満の店舗が存在しない場合は、業務プロセス数Gpが前記業務プロセス数目標値Mpとなっている店舗の中で、店舗優先順位Tが最上位の店舗に設定される。   Furthermore, when the store executing the audit trail number setting means has the business process number Gp of the store equal to or greater than the business process number target value Mp in steps S8, S9, S10, S14, and S21 (FIG. 2). If the store priority order T is lower than the store, and there is no store with the business process number target value Mp less than the store, the business process number Gp is the store with the business process number target value Mp. The store priority T is set to the highest store.

更に、上記のステップS22、S23(図2)およびSX1〜SX13(図13)によって、当該業務プロセスにおける全ての店舗への監査対象証跡数の設定を終えたときに、当該業務プロセスにおける店舗別の監査対象証跡数Kの合計数Gkが、証跡合計数目標値Mg未満であり、かつ蓄積合計数Gdが証跡合計数目標値Gkを超えている場合は、監査対象証跡数Kが設定されておらず、業務プロセス数Gpが業務プロセス数目標値Mp以下の店舗の中で、店舗優先順位Tが最上位の店舗に対して、上記監査対象証跡数設定手段、つまり当該店舗の当該業務プロセスに、当該業務プロセスの証跡合計数目標値Mg以下の範囲で、集計蓄積データの蓄積数Dおよび証跡数目標値Mkを超えない最大数を、監査対象証跡数Kとして設定する手段が実行される。   Furthermore, when the setting of the number of trails to be audited for all stores in the business process is completed by the above steps S22, S23 (FIG. 2) and SX1 to SX13 (FIG. 13), When the total number Gk of the audit target trail numbers K is less than the total trail target value Mg, and the accumulated total number Gd exceeds the total trail target value Gk, the audit target trail number K is not set. First, among the stores where the business process number Gp is equal to or less than the business process number target value Mp, the above-mentioned audit target trail number setting means, that is, the business process of the store, Means for setting the maximum number that does not exceed the accumulated number D of accumulated accumulated data and the target number of trails Mk within the range of the total number of trails target value Mg of the business process as the audit target trail number K It is executed.

以下に、上記の業務プロセス別、店舗別の監査対象証跡数Kの設定手順について、図5から図11を用いて、具体的に説明する。
なお、括弧内は、上記した監査計画作成処理のステップ名および/もしくはそのステップにおける判定結果を示す。
また、図2のステップS1に示すように、監査計画作成条件データは、業務プロセス総数Ap=6、店舗総数At=6、証跡合計数目標値Mg=6、証跡数目標値Mk=2、業務プロセス数目標値Mp=3に設定されている。
Hereinafter, the procedure for setting the number of audit target trails K for each business process and each store will be described in detail with reference to FIGS.
Note that the parentheses indicate the step name of the audit plan creation process and / or the determination result at that step.
As shown in step S1 of FIG. 2, the audit plan creation condition data includes the total number of business processes Ap = 6, the total number of stores At = 6, the total number of trails target value Mg = 6, the number of trails target value Mk = 2, The process number target value Mp = 3 is set.

業務プロセス優先順位Pの決定(S3)および店舗優先順位Tを決定(S4)後に、最初に監査対象証跡数Kを設定する業務プロセスを、図7に太枠で示す業務プロセス優先順位Pが第1位の「業務プロセス6」に設定(S6)し、店舗優先順位Tが第1位の店舗Fから順に監査対象証跡数Kを設定していく(S8〜S21)。
すなわち、店舗優先順位Tが第1位の店舗Fについては(S8)、その業務プロセス数Gpは、現段階では図6に示すように「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S12のNO)、図5に示す蓄積数Dは「0」(S13のNO)であるので、監査対象証跡数K=0に設定する(S14)。
After the determination of the business process priority P (S3) and the store priority T (S4), the business process for first setting the number of audit trails K is the business process priority P shown in bold in FIG. The first business task 6 is set (S6), and the audit trail number K is set in order from the first store F with the store priority T (S8 to S21).
That is, for the store F having the first store priority T (S8), the number of business processes Gp is “0” (YES in S9) as shown in FIG. Since the target trail total number Gk is “0” (NO in S12) and the accumulated number D shown in FIG. 5 is “0” (NO in S13), the audit trail number K is set to 0 (S14).

店舗優先順位Tが第2位の店舗Bについては(S21、S8)、その業務プロセス数Gpは現段階では「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S12のNO)、蓄積数Dは「0」(S13のNO)であるので、監査対象証跡数K=0に設定する(S14)。
店舗優先順位Tが第3位の店舗Cについては(S21、S8)、その業務プロセス数Gpは現段階では「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S12のNO)、蓄積数Dは「1」(S13のYES、S15のNO)であるので、監査対象証跡数K=D=1に設定する(S16)。
For the store B having the second store priority T (S21, S8), the number of business processes Gp is “0” (YES in S9) at this stage, and the total number of audit trails Gk at that time is “ Since “0” (NO in S12) and the accumulated number D are “0” (NO in S13), the number of audit trails K = 0 is set (S14).
For the store C having the third store priority T (S21, S8), the business process number Gp is “0” (YES in S9) at this stage, and the audit trail total number Gk at that time is “ Since “0” (NO in S12) and the accumulated number D are “1” (YES in S13, NO in S15), the number of audit target trails K = D = 1 is set (S16).

店舗優先順位Tが第4位の店舗Aについては(S21、S8)、その業務プロセス数Gpは現段階では「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「1」(S20、S12のNO)、蓄積数Dは「1」(S13のYES、S15のNO)であるので、監査対象証跡数K=D=1に設定する。
店舗優先順位Tが第5位の店舗Dについては(S21、S8)、その業務プロセス数Gpは現段階では「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「2」(S20、S12のNO)、蓄積数Dは「2」(S13のYES、S15のYES)、Mg−Gk=4>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。
For the store A having the fourth store priority T (S21, S8), the business process number Gp is “0” (YES in S9) at this stage, and the audit trail total number Gk at that time is “ Since “1” (NO in S20 and S12) and the accumulated number D are “1” (YES in S13 and NO in S15), the number of audit trails K = D = 1 is set.
For the store D having the fifth store priority T (S21, S8), the number of business processes Gp is currently “0” (YES in S9), and the audit trail total number Gk at that time is “ 2 ”(NO in S20, S12), the accumulated number D is“ 2 ”(YES in S13, YES in S15), and Mg−Gk = 4> 2 (YES in S17), so the number of audit target trails K = Mk = 2 is set (S19).

店舗優先順位Tが第6位の店舗Eについては(S21、S8)、その業務プロセス数Gpは現段階では「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「4」(S20、S12のNO)、蓄積数Dは「1」(S13のYES、S15のNO)であるので、監査対象証跡数K=D=1に設定する。
そして、「業務プロセス6」の6つの店舗について、店舗別に監査対象証跡数Kの設定を終えた(S21)後に、更新された監査対象証跡合計数Gkは「5」(S20、S22のYES)となっており、図5に示す蓄積合計数Gdは「5」(S23のYES)であるので、ステップS24、S6によって、業務プロセス優先順位Pが次の順位の第2位の「業務プロセス2」について、店舗Fの場合と同様にして、店舗別の監査対象証跡数Kの設定を行う。
For the store E having the sixth store priority T (S21, S8), the business process number Gp is “0” (YES in S9) at this stage, and the audit trail total number Gk at that time is “ 4 ”(NO in S20, S12) and the accumulated number D is“ 1 ”(YES in S13, NO in S15), so the number of audit target trails K = D = 1 is set.
After the setting of the audit trail number K for each store for the six stores of “business process 6” is completed (S21), the updated audit trail total number Gk is “5” (YES in S20 and S22). Since the accumulated total number Gd shown in FIG. 5 is “5” (YES in S23), the “business process 2” is the second highest business process priority P in steps S24 and S6. In the same manner as in the case of the store F, the number of audit trails K for each store is set.

この場合に、店舗優先順位Tが第2位の店舗Bについては(S21、S8)、その業務プロセス数Gpは、現段階では図7に示すように「0」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S20、S12のNO)、蓄積数Dは「5」(S13のYES、S15のYES、)、Mg−Gk=6>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。   In this case, for the store B having the second store priority T (S21, S8), the number of business processes Gp is “0” (YES in S9) as shown in FIG. The audit trail total number Gk at that time is “0” (NO in S20, S12), the accumulated number D is “5” (YES in S13, YES in S15), and Mg−Gk = 6> 2 (YES in S17). Therefore, the audit trail number K = Mk = 2 is set (S19).

また、店舗優先順位Tが第6位の店舗Eについては(S21、S8)、その業務プロセス数Gpは、現段階では図7に示すように「1」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「5」(S20、S12のNO)、蓄積数Dは「2」(S13のYES、S15のYES)、Mg−Gk=1<2(S17のNO)であるので、監査対象証跡数K=Mg−Gk=1に設定する(S18)。   Further, for the store E having the sixth store priority T (S21, S8), the business process number Gp is “1” (YES in S9) as shown in FIG. The audit trail total number Gk is “5” (NO in S20 and S12), the accumulated number D is “2” (YES in S13, YES in S15), and Mg−Gk = 1 <2 (NO in S17). Therefore, the audit trail number K = Mg−Gk = 1 is set (S18).

上記と同様にして、業務プロセス優先順位Pが第3位の「業務プロセス5」、業務プロセス優先順位Pが第4位の「業務プロセス4」について(S24、S6)、店舗別の監査対象証跡数Kの設定を行うと、図8に示す監査対象証跡数Kが店舗別に設定される。
次いで、業務プロセス優先順位Pが第5位の「業務プロセス4」について、店舗別の監査対象証跡数Kの設定を行う。
In the same manner as described above, for each “business process 5” having the third highest business process priority P and “business process 4” having the fourth highest business process priority P (S24, S6), the auditable trails for each store When the number K is set, the audit trail number K shown in FIG. 8 is set for each store.
Next, for the “business process 4” having the fifth highest business process priority P, the number of audit target trails K for each store is set.

すなわち、店舗優先順位Tが第1位の店舗Fについては(S8)、その業務プロセス数Gpは、現段階では図8に示すように「1」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S12のNO)、蓄積数Dは「1」(S13のYES、S15のNO)であるので、監査対象証跡数K=D=1に設定する(S16)。
店舗優先順位Tが第2位の店舗Bについては(S21、S8)、その業務プロセス数Gpは現段階では図8に示すように「3」(S9のNO)であり、店舗Bより下位の店舗に業務プロセス数Gp未満の店舗D、店舗Eが存在する(S10のYES)ので、監査対象証跡数K=0に設定する(S14)。
That is, for the store F having the first store priority T (S8), the number of business processes Gp is “1” (YES in S9) as shown in FIG. Since the target trail total number Gk is “0” (NO in S12) and the accumulated number D is “1” (YES in S13, NO in S15), the audit target trail number K = D = 1 is set (S16). .
For the store B with the second store priority T (S21, S8), the number of business processes Gp is “3” (NO in S9) as shown in FIG. Since there are stores D and stores E with less than the number of business processes Gp in the stores (YES in S10), the number of audit trails K is set to 0 (S14).

店舗優先順位Tが第3位の店舗C、店舗優先順位Tが第4位の店舗Aについても、店舗Bの場合と同様に、それら業務プロセス数Gpは現段階では「3」(S9のNO)であり、当該店舗より下位の店舗に業務プロセス数Gp未満の店舗が存在する(S10のYES)ので、監査対象証跡数K=0に設定する(S14)。
店舗優先順位Tが第5位の店舗Dについては(S21、S8)、その業務プロセス数Gpは現段階では「2」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「1」(S20、S12のNO)、蓄積数Dは「21」(S13のYES、S15のYES)、Mg−Gk=5>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。
For store C with store priority T 3rd and store A with store priority T 4th, as in store B, the number of business processes Gp is “3” (NO in S9). ), And there are stores less than the number of business processes Gp in the stores lower than the store (YES in S10), the audit trail number K = 0 is set (S14).
For the store D having the fifth store priority T (S21, S8), the number of business processes Gp is “2” (YES in S9) at this stage, and the audit trail total number Gk at that time is “ 1 ”(NO in S20, S12), the accumulated number D is“ 21 ”(YES in S13, YES in S15), and Mg−Gk = 5> 2 (YES in S17), so the number of audit target trails K = Mk = 2 is set (S19).

店舗優先順位Tが第6位の店舗Eについては(S21、S8)、その業務プロセス数Gpは現段階では「2」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「3」(S20、S12のNO)、蓄積数Dは「11」(S13のYES、S15のYES)、Mg−Gk=3>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。   For the store E having the sixth store priority T (S21, S8), the number of business processes Gp is “2” (YES in S9) at this stage, and the total number of auditable trails Gk at that time is “ 3 ”(NO in S20, S12), the accumulated number D is“ 11 ”(YES in S13, YES in S15), and Mg−Gk = 3> 2 (YES in S17), so the number of audit target trails K = Mk = 2 is set (S19).

そして、「業務プロセス4」の6つの店舗について、店舗別に監査対象証跡数Kの設定を終えた(S21)後に、更新された監査対象証跡合計数Gkは「5」(S20、S22のYES)となっており、図5に示す蓄積合計数Gdは「108」(S23のNO)であるので、ステップSX1(図3)へ移行して、業務プロセス優先順位Pが第5位の「業務プロセス4」について、店舗別の監査対象証跡数Kの再設定を行う。   Then, after the setting of the audit target trail number K for each of the six stores of “business process 4” is completed (S21), the updated total number of audit target trails Gk is “5” (YES in S20 and S22). Since the accumulated total number Gd shown in FIG. 5 is “108” (NO in S23), the process shifts to step SX1 (FIG. 3), and “business process with P5 as the business process priority P” For “4”, the number of audit trails K for each store is reset.

すなわち、店舗優先順位Tが第1位の店舗Fについては(SX2)、その監査対象証跡数Kは、図9に示すように「1」(SX3のNO)であるので、監査対象証跡数Kの再設定をスキップする。
店舗優先順位Tが第2位の店舗Bについては(SX13、SX2)、その監査対象証跡数Kは、図9に示すように「0」(SX3のYES)であり、現段階の業務プロセス数Gpは「3」(SX4のNO)、蓄積数Dは「31」(SX5のYES、SX6のYES)、Mg−Gk=1<2(SX8のNO)であるので、図10に示すように監査対象証跡数K=Mg−Gk=1に再設定する(SX9)。
That is, for the store F having the first store priority T (SX2), the audit trail number K is “1” (NO in SX3) as shown in FIG. Skip resetting.
For the store B having the second store priority T (SX13, SX2), the audit trail number K is “0” (YES in SX3) as shown in FIG. Since Gp is “3” (NO in SX4), the accumulation number D is “31” (YES in SX5, YES in SX6), and Mg−Gk = 1 <2 (NO in SX8), as shown in FIG. The number of audit trails K = Mg−Gk = 1 is reset (SX9).

また、ステップSX11において、更新された監査対象証跡合計数Gkは「6」になる(SX12のYES)ので、監査対象証跡数Kの再設定を終了する。
そして、「業務プロセス4」について、監査対象証跡数Kの再設定を終えた(S21)後に、更新された監査対象証跡合計数Gkは「6」(SX11、S22のNO)となっているので、ステップS24、S6によって、業務プロセス優先順位Pが第6位の「業務プロセス3」について、店舗別の監査対象証跡数Kの設定を行う。
In step SX11, the updated total number of audit target trails Gk becomes “6” (YES in SX12), so the resetting of the audit target trail number K is finished.
Then, for the “business process 4”, after the resetting of the audit trail number K is completed (S21), the updated audit trail total number Gk is “6” (NO in SX11 and S22). In steps S24 and S6, the number of audit target trails K for each store is set for “business process 3” having the sixth business process priority P.

すなわち、店舗優先順位Tが第1位の店舗Fについては(S8)、その業務プロセス数Gpは、現段階では図10に示すように「2」(S9のYES)であり、そのときの監査対象証跡合計数Gkは「0」(S12のNO)、蓄積数Dは「2」(S13のYES、S15のYES)、Mg−Gk=6>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。   That is, for the store F having the first store priority T (S8), the number of business processes Gp is “2” (YES in S9) as shown in FIG. The total number of target trails Gk is “0” (NO in S12), the accumulated number D is “2” (YES in S13, YES in S15), and Mg−Gk = 6> 2 (YES in S17). The number of trails K = Mk = 2 is set (S19).

店舗優先順位Tが第2位の店舗Bについては(S21、S8)、その業務プロセス数Gpは現段階では図10に示すように「4」(S9のNO)であり、店舗Fの業務プロセス数Gpが前記の設定で「3」になっている(S20)ため、業務プロセス数Gpが「3」未満の店舗はなく(S10のNO)、業務プロセス数Gpが「3」を超えている(S11のNO)ので、監査対象証跡数K=0に設定する(S14)。   For the store B with the second store priority T (S21, S8), the business process number Gp is “4” (NO in S9) as shown in FIG. Since the number Gp is “3” in the above setting (S20), there is no store where the number of business processes Gp is less than “3” (NO in S10), and the number of business processes Gp exceeds “3”. (NO in S11), the audit trail number K is set to 0 (S14).

店舗優先順位Tが第3位の店舗Cについては(S21、S8)、その業務プロセス数Gpは現段階では図10に示すように「3」(S9のNO)であり、業務プロセス数Gpが「3」未満の店舗はなく(S20、S10のNO)、業務プロセス数Gpが「3」であり(S20、S11のYES)、監査対象証跡合計数Gkは現段階で「2」(S20、S12のNO)、蓄積数Dは「31」(S13のYES、S15のYES)、Mg−Gk=4>2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。   For the store C with the third store priority T (S21, S8), the business process number Gp is “3” (NO in S9) as shown in FIG. 10 at this stage, and the business process number Gp is There are no stores less than “3” (NO in S20 and S10), the number of business processes Gp is “3” (YES in S20 and S11), and the audit trail total number Gk is “2” (S20, S20, Since the accumulated number D is “31” (YES in S13, YES in S15) and Mg−Gk = 4> 2 (YES in S17), the number of audit target trails K = Mk = 2 is set. (S19).

店舗優先順位Tが第4位の店舗Aについては(S21、S8)、その業務プロセス数Gpは現段階では「3」(S9のNO)であり、業務プロセス数Gpが「3」未満の店舗はなく(S20、S10のNO)、業務プロセス数Gpが「3」であり(S20、S11のYES)、監査対象証跡合計数Gkは現段階で「4」(S20、S12のNO)、蓄積数Dは「35」(S13のYES、S15のYES)、Mg−Gk=2=2(S17のYES)であるので、監査対象証跡数K=Mk=2に設定する(S19)。   For store A with store priority T 4th (S21, S8), the number of business processes Gp is currently “3” (NO in S9), and the number of business processes Gp is less than “3”. There is no (NO in S20, S10), the number of business processes Gp is “3” (YES in S20, S11), and the total number of audit target trails Gk is “4” (NO in S20, S12). Since the number D is “35” (YES in S13, YES in S15) and Mg−Gk = 2 = 2 (YES in S17), the number of audit target trails K = Mk = 2 is set (S19).

店舗優先順位Tが第5位の店舗Dについては(S21、S8)、その業務プロセス数Gpは現段階では「3」(S9のNO)であり、業務プロセス数Gpが「3」未満の店舗はなく(S20、S10のNO)、業務プロセス数Gpが「3」であり(S20、S11のYES)、監査対象証跡合計数Gkは現段階で「6」(S20、S12のYES)であるので、監査対象証跡数K=0に設定する(S14)。   For the store D with the store priority T of 5th (S21, S8), the number of business processes Gp is currently “3” (NO in S9), and the number of business processes Gp is less than “3”. There is no (NO in S20, S10), the number of business processes Gp is “3” (YES in S20, S11), and the audit trail total number Gk is “6” (YES in S20, S12) at this stage. Therefore, the number of audit trails K = 0 is set (S14).

店舗優先順位Tが第6位の店舗Eについても、店舗Dの場合と同様の手順で、監査対象証跡数K=0に設定する(S14)。
このようにして、図11に示す各データからなる監査計画データが、監査計画データ一時保存エリアの各書込エリアに書込まれ、この監査計画データは証跡情報データベース8に格納される。
For the store E having the sixth store priority T, the audit trail number K = 0 is set in the same procedure as in the case of the store D (S14).
In this way, the audit plan data composed of each data shown in FIG. 11 is written into each write area of the audit plan data temporary storage area, and this audit plan data is stored in the trail information database 8.

監査計画データの証跡情報データベース8への格納後に、制御部5は、定期的に、または本部の監査側の担当者による必要に応じた指示入力によって表示端末4から送信された監査計画送信要求を受信したときに、証跡情報データベース8から読出した監査計画データを基に、図11に示す表形式に編集した監査計画を作成し、これを表示端末4へ送信する。   After the audit plan data is stored in the trail information database 8, the control unit 5 sends an audit plan transmission request transmitted from the display terminal 4 periodically or by an instruction input as required by a person in charge at the headquarters on the auditing side. When received, based on the audit plan data read from the trail information database 8, an audit plan edited in the table format shown in FIG. 11 is created and transmitted to the display terminal 4.

これを受信した表示端末4は、受信した監査計画を表示画面に表示して、本部の監査側の担当者等に提供する。
そして、監査側の担当者は、表示端末4が表示した監査計画の確認後に、これを印刷等により携帯可能にし、監査計画で監査対象に設定された店舗への訪問時に、持参した監査計画に基づいて、その店舗に設定された監査対象の業務プロセスについて該当する証跡の提示を求め、店舗の担当者は、監査対象集証跡数Kに相当する数の証跡を、所定の保管場所からランダムに抽出して提示する。
The display terminal 4 that has received this displays the received audit plan on the display screen and provides it to the person in charge at the auditing side of the headquarters.
Then, after confirming the audit plan displayed on the display terminal 4, the person in charge on the audit side makes it portable by printing or the like, and when he visits the store set as the audit target in the audit plan, Based on the audited business process set for the store, the person in charge of the store randomly selects the number of trails corresponding to the number K of audited collection trails from a predetermined storage location. Extract and present.

このようにして、本実施例の証跡管理サーバ1により作成された監査計画による運用状況の評価が行われる。
上記のように、本実施例の監査計画作成処理においては、蓄積された証跡情報の数を集計した集計蓄積データを基に、監査計画を作成するので、監査側の担当者による店舗の訪問時に、必要な数の証跡を確実に得ることができ、運用状況の評価を着実に実行することができると共に、運用状況の評価における証跡収集の効率を向上させることができる。
In this way, the operation status is evaluated based on the audit plan created by the trail management server 1 of this embodiment.
As described above, in the audit plan creation process of the present embodiment, the audit plan is created based on the accumulated accumulation data obtained by counting the number of accumulated trail information. Thus, the necessary number of trails can be reliably obtained, the operation status can be evaluated steadily, and the efficiency of trail collection in the operation status evaluation can be improved.

また、店舗優先順位Tを業務プロセスカウント数Gcの少ない順に、業務プロセス優先順位Pを蓄積合計数Gdの少ない順に決定するので、監査対象となる業務プロセスが片寄っている店舗や、監査対象となる証跡数が少ない業務プロセスが存在した場合においても、その店舗や業務プロセスを優先的に監査対象として設定することができ、運用状況の評価時に、監査対象とする店舗別の業務プロセス数や、業務プロセス別の証跡数の均一化を図ることができる。   In addition, since the store priority T is determined in ascending order of the business process count number Gc, and the business process priority P is determined in the order of decreasing the accumulated total number Gd, the store where the business process to be audited is offset or the audit target. Even when there are business processes with a small number of trails, the stores and business processes can be preferentially set as audit targets, and the number of business processes for each audit target store and The number of trails by process can be made uniform.

更に、優先順位に従って監査対象証跡数Kを設定する場合に、当該店舗の当該業務プロセスに、当該業務プロセスの証跡合計数目標値Mg以下の範囲で、集計蓄積データの蓄積数Dおよび証跡数目標値Mkを超えない最大数を、監査対象証跡数Kとして設定するので、当該店舗の当該業務プロセスに設定する監査対象証跡数Kを、証跡数目標値Mk以下に制限して、運用状況の評価時に、監査対象とする業務プロセスにおける各店舗の証跡数を均一化することができ、1つの業務プロセスについての監査を、より多くの店舗によって実行することができる。   Further, when the number of trails to be audited K is set according to the priority order, the accumulated number D of accumulated accumulated data and the number of trail targets are set in the business process of the store within the range of the total number target value Mg of the business process. Since the maximum number that does not exceed the value Mk is set as the audit trail number K, the audit trail number K set in the business process of the store is limited to the trail number target value Mk or less to evaluate the operation status Sometimes, the number of trails of each store in the business process to be audited can be made uniform, and the audit for one business process can be executed by more stores.

更に、優先順位に従って監査対象証跡数Kを設定する場合に、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp未満のときは、当該店舗に監査対象証跡数Kを設定しておき、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上になったときに、店舗優先順位Tが当該店舗より下位の店舗に、業務プロセス数目標値Mp未満の店舗が存在する場合は、その店舗の中で店舗優先順位Tが最上位の店舗に監査対象証跡数Kを設定し、店舗優先順位Tが当該店舗より下位の店舗に、業務プロセス数目標値Mp未満の店舗が存在しない場合は、業務プロセス数Gpが業務プロセス数目標値Mpとなっている店舗の中で、店舗優先順位Tが最上位の店舗に監査対象証跡数Kを設定するので、業務プロセス数Gpが業務プロセス数目標値Mpに満たない店舗に、優先的に監査対象証跡数Kを設定することができ、運用状況の評価時に、監査対象とする店舗別の業務プロセス数を均一化することができる。   Furthermore, when setting the number of audit target trails K according to the priority order, if the number of business processes Gp of the store is less than the target number of business processes Mp, the number of audit target trails K is set for the store, When the number of business processes Gp in a store is equal to or greater than the business process number target value Mp, if there is a store whose business priority T is lower than the business process number target value Mp, The audit trail number K is set for the store with the highest priority in the store T and the store priority T is lower than the store with no business process number target value Mp. Among the stores whose business process number Gp is the business process number target value Mp, the audit trail number K is set for the store with the highest store priority T, so the business process number Gp is the number of business processes. The store less than a value Mp, preferentially can set the audit trail number K, when evaluating the operational status, it is possible to equalize the number of different business processes shops are to be audited.

更に、当該業務プロセスにおける全ての店舗への監査対象証跡数の設定を終えたときに、当該業務プロセスにおける店舗別の監査対象証跡合計数Gkが、証跡合計数目標値Mg未満であり、かつ蓄積合計数Gdが証跡合計数目標値Gkを超えている場合は、監査対象証跡数Kが設定されておらず、業務プロセス数Gpが業務プロセス数目標値Mp以下の店舗の中で、店舗優先順位Tが最上位の店舗に監査対象証跡数Kを設定するので、運用状況の評価時に、監査対象とする業務プロセス別の証跡数を均一化することができる。   Furthermore, when the setting of the number of auditable trails for all the stores in the business process is completed, the total number of auditable trails Gk for each store in the business process is less than the total number of trails target value Mg and is accumulated. When the total number Gd exceeds the trail total number target value Gk, the audit trail number K is not set, and the store priority order among the stores whose business process number Gp is equal to or less than the business process number target value Mp. Since the number of audit target trails K is set in the store having the highest T, it is possible to equalize the number of trails for each business process to be audited when evaluating the operation status.

以上説明したように、本実施例では、証跡管理システムの店舗端末は、証跡情報の入力を受付ける手段と、証跡管理サーバへ、受付けた証跡情報を送信する手段を備え、証跡管理システムの証跡管理サーバは、予め設定された監査計画作成条件データを格納する手段と、店舗端末から証跡情報を受信する手段と、受信した証跡情報を基に証跡情報の蓄積数を店舗別および業務プロセス別に集計した集計蓄積データを作成する手段と、集計蓄積データの1つの業務プロセスについて店舗別の証跡情報の蓄積数Dを合計した蓄積合計数Gdを、少ない順に並べて業務プロセス優先順位Pを決定する手段と、集計蓄積データの1つの店舗について証跡情報の存在する業務プロセスをカウントした業務プロセスカウント数Gcを、少ない順に並べて店舗優先順位Tを決定する手段と、業務プロセス優先順位Pの上位の業務プロセスから順に、当該業務プロセスにおける店舗優先順位Tの上位の店舗の順に、監査計画作成条件データを基に、店舗別および業務プロセス別に監査対象証跡数Kを設定した監査計画データを作成する手段と、作成した監査計画データを格納する手段とを備えるようにしたことによって、監査対象となる業務プロセスが片寄っている店舗や、監査対象となる証跡数が少ない業務プロセスが存在した場合においても、その店舗や業務プロセスを優先的に監査対象として設定することができ、運用状況の評価時に、監査対象とする店舗別の業務プロセス数や、業務プロセス別の証跡数の均一化を図ることができると共に、監査側の担当者による店舗の訪問時に、必要な数の証跡を確実に得ることができ、運用状況の評価における証跡収集の効率を向上させることができる。   As described above, in this embodiment, the store terminal of the trail management system includes means for receiving input of trail information and means for transmitting the received trail information to the trail management server, and the trail management of the trail management system. The server aggregates the number of trail information stored by store and business process based on the means for storing preset audit plan creation condition data, the means for receiving trail information from the store terminal, and the received trail information. Means for creating total accumulation data, means for determining the business process priority P by arranging the total accumulation number Gd obtained by summing the accumulation number D of the trail information for each store for one business process of the total accumulation data, in ascending order; Store the business process count number Gc, which counts the business processes for which trail information exists, for a single store of aggregated accumulated data in ascending order. By means of determining the priority T and the business process higher in the business process priority P, in the order of the store higher in the store priority T in the business process, based on the audit plan creation condition data, and by store By providing means for creating audit plan data in which the number of audit target trails K is set for each process and means for storing the created audit plan data, stores where the business process to be audited is offset, Even if there is a business process with a small number of trails to be audited, that store or business process can be preferentially set as an audit target, and the operational process for each store to be audited when evaluating the operational status And the number of trails by business process can be made uniform, and the number required when the person in charge of audit visits the store It is possible to reliably obtain a trail, it is possible to improve the efficiency of the trail collecting in the assessment of the operation status.

なお、上記実施例においては、当該店舗の業務プロセス数Gpが業務プロセス数目標値Mp以上のときに、店舗優先順位Tが当該店舗より下位の店舗に、業務プロセス数目標値Mp未満の店舗が存在しない場合は、業務プロセス数Gpが業務プロセス数目標値Mpとなっている店舗の中で、店舗優先順位Tが「最上位」の店舗に監査対象証跡数Kを設定するとして説明したが、業務プロセス数Gpが業務プロセス数目標値Mpとなっている店舗の中で、店舗優先順位Tが「最下位」の店舗に監査対象証跡数Kを設定するようにしてもよい。   In the above-described embodiment, when the business process number Gp of the store is equal to or greater than the business process number target value Mp, a store with a store priority T lower than the store has a store with a business process number target value Mp less than the store. In the case where the business process number Gp is the business process number target value Mp, the audit trail number K is described as being set in the store having the store priority T of “top” among the stores where the business process number Gp does not exist. Among the stores where the business process number Gp is the business process number target value Mp, the audit trail number K may be set in the store having the store priority T of “lowest”.

また、上記実施例においては、監査計画作成条件は(A)〜(C)の3条件であるとして説明したが、監査対象期間を条件として加えるようにしてもよく、監査対象とする店舗や業務プロセスを増加または減少させて設定するようにしてもよい。
更に、上記実施例においては、現在の集計蓄積データを基に監査計画を作成するとして説明したが、監査対象とする店舗に必要な証跡が全て揃っていると仮定して、予め監査計画を作成しておき、証跡情報の蓄積状況に応じて監査計画を修正し、監査計画の精度を高めるようにしてもよい。
In the above embodiment, the audit plan creation conditions are described as the three conditions (A) to (C). However, the audit period may be added as a condition. You may make it set by increasing or decreasing a process.
Furthermore, in the above-described embodiment, it has been described that the audit plan is created based on the current aggregated accumulated data. However, the audit plan is prepared in advance assuming that all necessary trails are prepared in the store to be audited. In addition, the audit plan may be modified in accordance with the accumulation status of the trail information to improve the accuracy of the audit plan.

実施例の証跡管理システムの構成を示す説明図Explanatory drawing which shows the structure of the trail management system of an Example 実施例の監査計画作成処理を示すフローチャートFlow chart showing the audit plan creation process of the embodiment 実施例の監査計画作成処理を示すフローチャートFlow chart showing the audit plan creation process of the embodiment 実施例の蓄積データ集計表の初期状態を示す説明図Explanatory drawing which shows the initial state of the accumulation | storage data total table of an Example 実施例の蓄積データ集計表を示す説明図Explanatory drawing which shows the accumulation data summary table of execution example 実施例の表形式にした監査計画の初期状態を示す説明図Explanatory diagram showing the initial state of the audit plan in the table format of the embodiment 実施例の監査計画データの作成手順を示す説明図Explanatory drawing which shows the creation procedure of the audit plan data of the embodiment 実施例の監査計画データの作成手順を示す説明図Explanatory drawing which shows the creation procedure of the audit plan data of the embodiment 実施例の監査計画データの作成手順を示す説明図Explanatory drawing which shows the creation procedure of the audit plan data of the embodiment 実施例の監査計画データの作成手順を示す説明図Explanatory drawing which shows the creation procedure of the audit plan data of the embodiment 実施例の表形式にした監査計画を示す説明図Explanatory diagram showing the audit plan in the table format of the example

符号の説明Explanation of symbols

1 証跡管理サーバ
2 店舗端末
3 ネットワーク
4 表示端末
5 制御部
6 通信部
7 入力部
8 証跡情報データベース
10 記憶部
11 監査計画作成条件データ一時保存エリア
12 集計蓄積データ一時保存エリア
13 監査計画データ一時保存エリア
DESCRIPTION OF SYMBOLS 1 Trail management server 2 Store terminal 3 Network 4 Display terminal 5 Control part 6 Communication part 7 Input part 8 Trail information database 10 Storage part 11 Audit plan creation condition data temporary storage area 12 Total storage data temporary storage area 13 Audit plan data temporary storage area

Claims (4)

複数の店舗に設置された店舗端末と、前記店舗端末に接続する証跡管理サーバと、を備えた証跡管理システムであって、
前記店舗端末は、
証跡情報の入力を受付ける手段と、
前記証跡管理サーバへ、受付けた前記証跡情報を送信する手段を備え、
前記証跡管理サーバは、
予め設定された監査計画作成条件データを格納する手段と、
前記店舗端末から前記証跡情報を受信する手段と、
受信した前記証跡情報を基に、証跡情報の蓄積数を店舗別および業務プロセス別に集計した集計蓄積データを作成する手段と、
前記集計蓄積データの、1つの業務プロセスについて店舗別の証跡情報の蓄積数を合計した蓄積合計数を、少ない順に並べて、業務プロセス優先順位を決定する手段と、
前記集計蓄積データの、1つの店舗について証跡情報の存在する業務プロセスをカウントした業務プロセスカウント数を、少ない順に並べて、店舗優先順位を決定する手段と、
前記業務プロセス優先順位の上位の業務プロセスから順に、当該業務プロセスにおける店舗優先順位の上位の店舗の順に、前記監査計画作成条件データを基に、店舗別および業務プロセス別に監査対象証跡数を設定した監査計画データを作成する手段と、
作成した前記監査計画データを格納する手段と、を備えることを特徴とする証跡管理システム。
A trail management system comprising a store terminal installed in a plurality of stores, and a trail management server connected to the store terminal,
The store terminal
Means for accepting input of trail information;
Means for transmitting the accepted trail information to the trail management server;
The trail management server
Means for storing preset audit plan creation condition data;
Means for receiving the trail information from the store terminal;
Based on the received trail information, a means for creating aggregate accumulation data in which the accumulation number of trail information is aggregated by store and business process;
Means for determining the business process priority by arranging the total number of accumulated totals of the number of stored trail information for each store for one business process in the aggregated accumulated data;
Means for determining store priorities by arranging the business process counts obtained by counting the business processes in which the trail information exists for one store in the aggregated accumulation data in ascending order;
Based on the audit plan creation condition data, the number of trails to be audited is set for each store and each business process in order from the top business process in the business process priority to the top store in the store priority in the business process. A means to create audit plan data;
And a means for storing the created audit plan data.
請求項1において、
前記監査計画作成条件データは、
1つの業務プロセスにおける店舗別の監査対象証跡数の合計数の目標値である証跡合計数目標値と、
1つの店舗における、1つの業務プロセスについての監査対象証跡数の目標値である証跡数目標値と、
1つの店舗における、1以上の監査対象証跡数が存在する業務プロセスをカウントした業務プロセス数の目標値である業務プロセス数目標値と、からなり、
前記証跡管理サーバは、
前記業務プロセス優先順位の上位の業務プロセスから順に、当該業務プロセスにおける店舗優先順位の上位の店舗の順に前記監査対象証跡数を設定する場合に、
(1)当該店舗の当該業務プロセスに、当該業務プロセスの前記証跡合計数目標値以下の範囲で、前記集計蓄積データの蓄積数および前記証跡数目標値を超えない最大数を、監査対象証跡数として設定する手段と、
(2)当該店舗の前記業務プロセス数が、前記業務プロセス数目標値未満のときは、当該店舗に対して、前記(1)の手段を実行する手段と、
(3)当該店舗の前記業務プロセス数が、前記業務プロセス数目標値以上のときに、前記店舗優先順位が当該店舗より下位の店舗に、前記業務プロセス数目標値未満の店舗が存在する場合は、その店舗の中で前記店舗優先順位が最上位の店舗に対して、前記(1)の手段を実行する手段と、
(4)当該店舗の前記業務プロセス数が、前記業務プロセス数目標値以上のときに、前記店舗優先順位が当該店舗より下位の店舗に、前記業務プロセス数目標値未満の店舗が存在しない場合は、前記業務プロセス数が前記業務プロセス数目標値となっている店舗の中で、前記店舗優先順位が最上位の店舗に対して、前記(1)の手段を実行する手段と、
(5)当該業務プロセスにおける全ての店舗への監査対象証跡数の設定を終えたときに、当該業務プロセスにおける店舗別の前記監査対象証跡数の合計数が前記証跡合計数目標値未満であり、かつ前記蓄積合計数が前記証跡合計数目標値を超えている場合は、監査対象証跡数が設定されておらず、前記業務プロセス数が業務プロセス数目標値以下の店舗の中で、前記店舗優先順位が最上位の店舗に対して、前記(1)の手段を実行する手段と、を備えることを特徴とする証跡管理システム。
In claim 1,
The audit plan creation condition data is
A trail total number target value that is a target value of the total number of auditable trails by store in one business process;
The target number of trails, which is the target value of the number of auditable trails for one business process in one store,
And a business process number target value that is a target value of the number of business processes in which one or more audit trails in one store are counted.
The trail management server
When setting the number of trails to be audited in order from the higher-order business process of the business process priority, in the order of the store of the higher priority of the store in the business process,
(1) The number of audit target trails is set in the business process of the store within the range equal to or less than the target total number of trails of the business process, and the maximum number not exceeding the target number of accumulated data and the number of trails. Means to set as
(2) When the number of business processes in the store is less than the business process number target value, means for executing the means (1) for the store;
(3) When the number of the business processes in the store is equal to or greater than the business process number target value, and there is a store with the store priority lower than the store in the store lower than the business process number target value , Means for executing the means (1) for the store having the highest store priority among the stores;
(4) When the number of business processes in the store is equal to or greater than the business process number target value, and there is no store with the store priority lower than the store in the store lower than the business process number target value Among the stores where the number of business processes is the business process number target value, means for executing the means (1) for the store with the highest store priority,
(5) When the setting of the number of audit target trails for all stores in the business process is completed, the total number of the audit target trails for each store in the business process is less than the target value for the total number of trails, And when the accumulated total number exceeds the trail total number target value, the number of trails to be audited is not set, and among the stores whose business process number is equal to or less than the business process number target value, the store priority A trail management system comprising: means for executing the means (1) with respect to a store having the highest rank.
請求項2において、
前記(4)の手段を、当該業務プロセスにおける当該店舗の、前記業務プロセス数が前記業務プロセス数目標値以上のときに、前記店舗優先順位が当該店舗より下位の店舗に、前記業務プロセス数目標値未満の店舗が存在しない場合は、前記業務プロセス数が前記業務プロセス数目標値となっている店舗の中で、前記店舗優先順位が最下位の店舗に対して、前記(1)の手段を実行する手段と、したことを特徴とする証跡管理システム。
In claim 2,
When the means of (4) is such that when the number of business processes of the store in the business process is equal to or greater than the business process number target value, the store priority is set to a store lower than the store. When there is no store less than the value, among the stores where the number of business processes is the target value for the number of business processes, the means of (1) is applied to the store with the lowest store priority. A trail management system characterized by means for performing and what has been done.
請求項1ないし請求項3のいずれか一項において、
前記証跡管理サーバに接続する表示端末を設け、
前記証跡管理サーバは、
格納した前記監査計画データを基に、監査計画を作成する手段と、
作成した前記監査計画を、前記表示端末へ送信する手段と、を備え、
前記表示端末は、
前記証跡管理サーバから受信した監査計画を表示する手段を備えることを特徴とする証跡管理システム。
In any one of Claims 1 to 3,
Provide a display terminal connected to the trail management server,
The trail management server
Means for creating an audit plan based on the stored audit plan data;
Means for transmitting the created audit plan to the display terminal;
The display terminal is
A trail management system comprising means for displaying an audit plan received from the trail management server.
JP2008248729A 2008-09-26 2008-09-26 Trail management system Active JP5131124B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008248729A JP5131124B2 (en) 2008-09-26 2008-09-26 Trail management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008248729A JP5131124B2 (en) 2008-09-26 2008-09-26 Trail management system

Publications (2)

Publication Number Publication Date
JP2010079703A true JP2010079703A (en) 2010-04-08
JP5131124B2 JP5131124B2 (en) 2013-01-30

Family

ID=42210054

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008248729A Active JP5131124B2 (en) 2008-09-26 2008-09-26 Trail management system

Country Status (1)

Country Link
JP (1) JP5131124B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9372857B2 (en) 2012-09-04 2016-06-21 Fuji Xerox Co., Ltd. Information processing apparatus, trail collection system, information processing method, and non-transitory computer readable medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008090759A (en) * 2006-10-04 2008-04-17 Fuji Xerox Co Ltd Information processing system and information processing program

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008090759A (en) * 2006-10-04 2008-04-17 Fuji Xerox Co Ltd Information processing system and information processing program

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
CSNB200800759001; 鈴木  輝夫: 実務詳解  内部統制の文書化マニュアル 第1版, 20070420, pp.301-319, (株)中央経済社  山本  時男 *
JPN6012052318; 鈴木  輝夫: 実務詳解  内部統制の文書化マニュアル 第1版, 20070420, pp.301-319, (株)中央経済社  山本  時男 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9372857B2 (en) 2012-09-04 2016-06-21 Fuji Xerox Co., Ltd. Information processing apparatus, trail collection system, information processing method, and non-transitory computer readable medium

Also Published As

Publication number Publication date
JP5131124B2 (en) 2013-01-30

Similar Documents

Publication Publication Date Title
US11068978B1 (en) Decentralized systems and methods for managing loans and securities
Judge et al. Antecedents of shareholder activism in target firms: evidence from a multi‐country study
US20090037323A1 (en) Method and apparatus system for modeling consumer capacity for future incremental debt in credit scoring
US20070265957A1 (en) System and method for automated flexible person-to-person lending
JP2019057160A (en) Account managing apparatus, account managing method, and account managing program
JP5149671B2 (en) Individual project risk management device
JP2016110610A (en) Management support program
CN110163733A (en) For providing the system and method for computer adjust automatically entry
JP2009301236A (en) Mediation device for credit information organization
WO2021257545A1 (en) Financial risk assessment
JP5131124B2 (en) Trail management system
CN107430744B (en) Modified cash ledger basis for accounting systems and processes
JP2003036346A (en) Method for evaluating operational risk and its system
JP2009157443A (en) Device, program, and method for generating journalizing data
JP2009301235A (en) Mediation device for credit information organization
JP5862144B2 (en) Server apparatus and program
JP2003036343A (en) Method of operational risk management and its system
JP2013178669A (en) Tabulation device and tabulation program
JP6542941B1 (en) Real currency lending method, system and program utilizing blockchain
JP2009301233A (en) Mediation device for credit information organization and credit information management system
JPWO2008078385A1 (en) Detailed data storage device, detailed data storage program, and detailed data storage method
JP6426573B2 (en) Payment agent support system and payment agent support method
US20220391974A1 (en) Resident data management system and method
JP2024013637A (en) Cost management system, cost management method, and cost management program
Arntz et al. Weather‐related Employment Subsidies as a Remedy for Seasonal Unemployment? Evidence from Germany

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110519

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121009

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121022

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151116

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5131124

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150