JP2010026765A - System and method for checking for notification for power plant works - Google Patents

System and method for checking for notification for power plant works Download PDF

Info

Publication number
JP2010026765A
JP2010026765A JP2008187114A JP2008187114A JP2010026765A JP 2010026765 A JP2010026765 A JP 2010026765A JP 2008187114 A JP2008187114 A JP 2008187114A JP 2008187114 A JP2008187114 A JP 2008187114A JP 2010026765 A JP2010026765 A JP 2010026765A
Authority
JP
Japan
Prior art keywords
construction
notification
database
information
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008187114A
Other languages
Japanese (ja)
Inventor
Keiji Wakidokoro
啓治 脇所
Kiyoshi Watabe
清 渡部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2008187114A priority Critical patent/JP2010026765A/en
Publication of JP2010026765A publication Critical patent/JP2010026765A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reduce notification omissions by human errors, save the task of preparing and circulating forms such as notification checklists, and promptly check whether or not to submit notifications and applications about works. <P>SOLUTION: A system for checking for notifications for power plant works includes a notification database 1 for storing notification information about legally obligatory types of notification in association with corresponding acts according to past work drafts and plans, a work object/work description database 2 for storing work object/work description information on object names and concrete descriptions of works conceivable from acts at work drafting or planning in association with the acts, and a notification necessity determination means for determining necessary notifications by reference to the notification database 1 and work object/work description database 2 in accordance with an object name and concrete description of works input by a work information input means. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、工事作業に必要な各種法令に基づく届出書を確認する技術に係り、特に発電所の工事の立案時・計画時に、関連官公庁へ届出書、申請書を提出する要否を確認することができる発電所工事における届出書確認システム及びその届出書確認方法に関する。   The present invention relates to a technique for confirming a notification form based on various laws and regulations necessary for construction work, and in particular, confirms the necessity of submitting a notification form and application form to the relevant government offices when planning or planning the construction of a power plant. The present invention relates to a notification confirmation system and a notification confirmation method for power plant construction.

従来から、発電所に関する工事においては、各種法令に基づいて関係官公庁へ届出書、申請書を提出する必要がある。例えば、電気事業法では、「工事計画(変更)届出書」、「電気工作物使用方法変更届出書」、「溶接安全管理審査」を国又は都道府県に提出する。また、消防法では、「火気使用設備等の設置届」、「変電・発電・蓄電池設備設置届」、「製造所設備等の変更許可申請」、「消防用設備等の着工届」を消防署へ提出する。   Conventionally, in construction related to power plants, it is necessary to submit a notification form and application form to the relevant government agencies based on various laws and regulations. For example, in the Electricity Business Law, a “construction plan (change) notification form”, “electric work usage change notification form”, and “welding safety management review” are submitted to the country or prefecture. In addition, the Fire Service Act provides “Fire Use Equipment Installation Notification”, “Substation / Power Generation / Storage Battery Equipment Installation Notification”, “Manufacturing Equipment Change Change Application”, and “Fire Equipment Installation Start Notification” to the fire department. hand in.

図4の届出チェック表に示すように、発電所における工事作業の担当者は、工事の立案又は計画時に届出チェック表51を作成し、この届出チェック表51を用いて、簡易な判断基準を参考に届出の要否を判断している。この届出チェック表51は、「設備・修繕・除却工事 届出チェック表」で、上覧から工事名、工事期間52が記載され、その下に届出の名称として、届出・申請書名称、提出時期、届出・申請先、提出者名53が記載されている。その次に、届出の要否判断基準54が記載されている。   As shown in the notification check table in FIG. 4, the person in charge of the construction work at the power plant creates a notification check table 51 at the time of planning or planning the construction, and uses this notification check table 51 as a reference for simple judgment criteria. The necessity of notification is determined. This notification check table 51 is “Equipment / Repair / Removal Work Notification Check Table”. The construction name and construction period 52 are listed from the above, and the notification name, application name, submission time, The notification / application destination and the submitter name 53 are described. Next, notification necessity judgment criteria 54 are described.

届出の要否判断基準54には、図5の届出チェック表51の拡大図に示すように、届出の種類55として、左欄に関係法令、例えば電気事業法と記載され、その右欄に届出書名称が、「工事計画(変更)届出書」、「電気工作物使用方法変更届出書」、「溶接安全管理審査」と記載されている。それぞれの届出書に対応して、届出の判断基準56として、工事の対象とその内容が記載されている。「工事計画(変更)届出書」では、施行規則第65条に基づく、対象として電気工作物(ボイラー、タービン、電気設備等)、ばい煙発生施設(ボイラー、所内ボイラー、ガスタービン、非常用DG)、ばい煙処理施設(DNの設置工事、改造追加工事)が記載されている。その工事内容として、出力、能力、構造、仕様、排出変更がされている。右端欄に「要・否」と記載された届出の要否欄57がある。   As shown in the enlarged view of the notification check table 51 in FIG. 5, the notification necessity judgment criterion 54 describes the type of notification 55 in the left column as related laws and regulations, such as the Electricity Business Law, and the notification in the right column. The names of the documents are “Construction plan (change) notification form”, “Electric work piece usage change notification form”, and “Welding safety management review”. Corresponding to each notification form, the object of construction and its contents are described as a judgment criterion 56 for notification. In the “Construction Plan (Change) Notification Form”, the target is electrical works (boilers, turbines, electrical equipment, etc.), smoke generation facilities (boilers, in-house boilers, gas turbines, emergency DG) based on Article 65 of the Enforcement Regulations. , Smoke treatment facilities (DN installation work, remodeling addition work) are described. The contents of the construction include output, capacity, structure, specifications, and emission changes. In the right end column, there is a notification necessity column 57 in which “Necessary / Necessary” is written.

工事作業の担当者は、この届出チェック表51を用いて、工事の対象物、その工事内容を検討し、関連する法令内容を勘案しながら、届出書又は申請書を提出する必要がある工事かどうかを判断する。その際に、届出チェック表51に記載された、工事対象名と工事内容の判断基準56ごとに判断、確認する。   Whether the person in charge of the construction work needs to submit a notification form or application form using this notification checklist 51, considering the object of construction and the contents of the construction, and taking into account the relevant laws and regulations. Judge whether. At that time, judgment and confirmation are made for each construction object name and construction content judgment standard 56 described in the notification check table 51.

上述したような届出チェック表51による判定は、担当者や管理者の経験や知識を補う効果は期待できる。その一方で、届出の判断基準56のチェック項目の見落としや、知識、経験不足によるチェック漏れが発生する恐れがあった。例えば、同じような工事項目でも条件が異なれば、届出が必要になる場合、逆に不要になる場合もある。そこで、多数の担当者に届出チェック表51等の帳票作成を依頼し、その回覧により判断を行なっていた。そのために多くの担当者に煩雑な作業を強いるという問題を有していた。   The determination based on the notification check table 51 as described above can be expected to supplement the experience and knowledge of the person in charge and the manager. On the other hand, there is a possibility that check items of the notification criterion 56 may be overlooked and check omissions may occur due to lack of knowledge and experience. For example, if the conditions are different even for similar construction items, notification may be necessary or conversely unnecessary. Therefore, a large number of persons in charge are requested to create a report such as a notification check table 51 and the like, and judgment is made based on the circulation. Therefore, it has a problem of forcing many persons in charge to perform complicated work.

因みに、公共機関への申請届出を漏れなく行なうことができ、これに必要な帳票や情報等を簡単に取得することができる技術は種々提案されている。例えば、特許文献1の特開2004−70485公報「申請届出システム」に示すように、公共機関への申請または届出を伴う事案が発生した場合、漏れなく申請または届出を行なうことができ、必要な帳票や情報等を簡単に取得することができる申請届出システムが提案されている。
特開2004−70485公報
Incidentally, various techniques have been proposed that can perform application notification to a public institution without omission and can easily obtain forms and information necessary for this. For example, as shown in Japanese Patent Application Laid-Open No. 2004-70485 “Application Notification System” of Patent Document 1, when a case involving an application or notification to a public institution occurs, the application or notification can be performed without omission and necessary. An application notification system that can easily obtain forms and information has been proposed.
JP 2004-70485 A

また、特許文献2の特開2004−178310公報「自動届出申請システム」に示すように、企業や官公庁,市役所,区役所,県庁等に対する各種の届出申請や証明書等の発行申請を行うための届出申請システムに関し、特に、発生したある事象により申請すべき届出を、申請者の判断によることなく自動的に漏れなく作成し、かつ、各届出に係る情報のうち複数届出間で共通する情報を一元化し、重複情報の入力や登録等の無駄を排除して効率的な処理を実現する自動届出申請システムが提案されている。
特開2004−178310公報
In addition, as shown in Japanese Patent Application Laid-Open Publication No. 2004-178310 “Automatic Notification Application System” of Patent Document 2, notifications for making various notification applications and certificate issuance applications to companies, government offices, city halls, ward offices, prefectural offices, etc. With regard to the application system, in particular, notifications that should be applied for due to certain events that occur should be automatically created without omissions based on the judgment of the applicant, and information common to multiple notifications must be unified among the information related to each notification. In addition, there has been proposed an automatic notification application system that realizes efficient processing by eliminating waste such as input and registration of duplicate information.
JP 2004-178310 A

これらの特許文献1の「人材派遣システム」、特許文献2の「自動届出申請システム」は、官公庁への届出申請や証明書等の発行申請を行うもので、工事作業、特に発電所における任意の工事から、各種法令に基づき必要となる届出等を判断するシステムはなかった。   These “Temporary Staffing System” in Patent Literature 1 and “Automatic Notification Application System” in Patent Literature 2 apply for notification to government offices and issue certificates, etc. There was no system for judging necessary reports based on various laws and regulations.

本発明は、かかる問題点を解決するために創案されたものである。すなわち、本発明の目的は、人為的なミスによる届出漏れを低減でき、届出チェック表等の帳票作成及び回覧に伴う業務を省略でき、遅滞なく工事に関する届出書、申請書の提出の要否を確認することができる届出書確認システム及び届出書確認方法を提供することにある。   The present invention has been developed to solve such problems. In other words, the purpose of the present invention is to reduce the omission of notification due to human error, to omit the work associated with the creation and circulation of reports such as a notification checklist, and the necessity of submitting notification forms and application forms for construction without delay. It is to provide a notification form confirmation system and a notification form confirmation method that can be confirmed.

本発明の届出書確認システムによれば、発電所の工事の立案又は計画時に、その工事について関連官公庁へ届出書・申請書を提出する要否を確認する発電所工事における届出書確認システムであって、法令で届出が義務付けられている届出の種類に関する届出情報を、過去の工事立案書、計画書に基づき該当法令と関連付けて格納した届出データベース(1)と、工事の立案又は計画時に法令から想定される工事の対象名と具体的内容に関する工事対象・工事内容情報を、各法令と関連づけて格納した工事対象・工事内容データベース(2)と、工事立案書、計画書に基づき工事の対象名と具体的内容に関する情報を入力する工事情報入力手段と、前記届出データベース(1)及び工事対象・工事内容データベース(2)とを参照し、前記工事情報入力手段により入力された工事の対象名と具体的内容に対応して、必要となる届出の要否を判断する届出要否判断手段と、を備えた、ことを特徴とする発電所工事における届出書確認システムが提供される。
前記届出データベース(1)は、届出の種類に関連する法令毎に分類して構築されている、ことが好ましい。
According to the notification form confirmation system of the present invention, it is a notification form confirmation system for power plant construction that confirms the necessity of submitting a notification form / application form to the relevant government offices when planning or planning the construction of a power plant. In addition, a notification database (1) that stores information related to the types of notifications that are required by the law in association with relevant laws and regulations based on past construction plans and plans, and the laws and regulations at the time of construction planning or planning. Name of the target of the construction based on the construction target / construction content database (2), the construction target / construction information related to each law and the construction target / construction content information related to the assumed construction target name and specific contents With reference to the construction information input means for inputting information on the concrete content and the notification database (1) and the construction object / construction content database (2). In the construction of a power plant characterized by comprising a notification necessity judgment means for judging whether or not a necessary notification is necessary in correspondence with a target name and specific contents of the construction inputted by the information input means A notification form confirmation system is provided.
It is preferable that the notification database (1) is constructed by classifying according to laws and regulations related to the type of notification.

本発明の届出書確認方法によれば、発電所の工事の立案又は計画時に、その工事について関連官公庁へ届出書・申請書を提出する要否を確認する発電所工事における届出確認方法であって、各工事について法令で届出が義務付けられている届出の種類に関する情報について、過去の工事立案書、計画書に基づき該当法令と関連付けた届出情報を、データベース(1)に登録し、保存し、届出について該当法令と工事の対象名と具体的内容と関連づけた工事の対象・内容に関する工事対象・工事内容情報を、データベース(2)に登録し、保存し、次に、前記データベース(1,2)に蓄積した届出情報及び工事対象・工事内容情報とを照合し、立案者・工事計画者が立案又は計画した工事が、関連官公庁への届出が必要又は不要であるかの別を判定し、提出の可能性がある届出については、更に工事対象・工事内容の個々の判断基準を絞り込み処理して届出書を作成する、ことを特徴とする発電所工事における届出書確認方法が提供される。
前記届出書を作成した際の判定結果の情報については、これを立案者に連絡する、ことが好ましい。
According to the notification form confirmation method of the present invention, at the time of planning or planning the construction of a power plant, it is a notification confirmation method in power plant construction for confirming the necessity of submitting a notification form / application to the relevant government office for the construction. , For information on the types of notifications that are required to be reported by law for each construction, register the report information associated with the relevant laws and regulations based on past construction plans and plans in the database (1), save, and report Register and save the construction object / construction content information related to the object and contents of the construction in relation to the applicable laws and regulations, the construction object name and the concrete contents in the database (2), and then to the database (1, 2) Whether the construction planned or planned by the planner / construction planner is necessary or unnecessary to collate the report information accumulated in the site and the construction object / construction content information. For notifications that may be judged and submitted, a notification form confirmation method for power plant construction is provided, which further narrows down the individual judgment criteria of the construction object and construction contents and creates a notification form Is done.
About the information of the determination result at the time of preparing the said notification form, it is preferable to notify this to the planner.

上記構成のシステムでは、法令で届出が義務付けられている工事に関する届出情報を、過去の工事立案書、計画書に基づき該当法令と関連付けて格納した届出データベース(1)と、立案又は計画時に法令から想定される工事の対象名と具体的内容に関する工事対象・工事内容情報を、各法令と関連づけて格納した工事対象・工事内容データベース(2)とを備えているため、工事立案書、計画書に基づき工事の対象名と具体的内容の情報を入力すると、届出の要否が出力される。従って、不慣れな担当者であっても、人為的なミスによる届出漏れを防止することができ、必要な届出書、申請書を容易かつ確実に作成することができる。   In the system with the above configuration, the report information (1) that stores the report information related to the work that is required to be reported by law in association with the relevant law based on the past work plan and plan, and the law when planning or planning. Because it is equipped with the construction object / construction content database (2) that stores the construction object / construction information related to the assumed construction target name and specific contents in association with each law, it is included in the construction plan and plan. Based on the construction target name and specific content information, the necessity of notification is output. Therefore, even an inexperienced person in charge can prevent omission of notification due to human error and can easily and surely create a necessary notification form and application form.

上記管理方法では、データベース(1,2)に蓄積した工事届出情報及び工事対象・工事内容情報とを照合し、立案者・工事計画者が立案又は計画した工事が関連官公庁への届出が必要又は不要であるかの別を判定し、提出の可能性がある届出については、更に工事対象・工事内容の個々の判断基準を絞り込み処理して届出書を作成することができるので、従来の届出チェック表等の帳票作成及び回覧に伴う業務を省略できる。   In the above management method, the construction notification information accumulated in the database (1, 2) and the construction target / construction content information are collated, and the construction planned or planned by the planner / construction planer needs to be reported to the relevant government offices or Since it is possible to determine whether it is unnecessary and to submit a notification that may be submitted, it is possible to create a notification form by further narrowing down the individual judgment criteria for the object of construction and the contents of the construction. Work related to the creation and circulation of forms such as tables can be omitted.

本発明の届出書確認システムは、発電所の工事の立案又は計画時に、その工事について関連官公庁へ届出書・申請書を提出する要否を確認するシステムである。   The notification form confirmation system of the present invention is a system for confirming the necessity of submitting a notification form / application form to a relevant government office for the construction of a power plant when planning or planning the construction.

以下、本発明の好ましい実施の形態を図面を参照して説明する。
図1は本発明の届出書確認システムの一例を示す概念図である。図2は本発明の届出書確認方法を実施する届出書確認装置のブロック図である。
本発明の届出確認システムは、届出データベース1と、工事対象・工事内容データベース2と、工事情報入力手段と、届出要否判断手段とを備えたシステムである。この届出書確認システムは、例えば会社の過去の工事作業に関する資料、工事作業に必要な各種法令に基づく届出書を多数保存している管理部門が管理するシステムである。工事担当者は、発電所の工事の立案又は計画する際に、その工事について関連官公庁へ届出書・申請書を提出する要否を、この届出書確認システムを用いて確認する。
Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a conceptual diagram showing an example of a notification confirmation system according to the present invention. FIG. 2 is a block diagram of a notification form confirmation apparatus for carrying out the notification form confirmation method of the present invention.
The notification confirmation system of the present invention is a system including a notification database 1, a construction object / construction content database 2, construction information input means, and notification necessity judgment means. This notification form confirmation system is a system managed by a management department that stores a large number of notification forms based on various laws and regulations necessary for construction work, for example, past work work of a company. When planning or planning the construction of the power plant, the person in charge of construction confirms the necessity of submitting a notification form / application for the construction to the relevant government office using this notification form confirmation system.

届出書確認装置3を構成する届出データベース1は、法令で届出が義務付けられている届出の種類に関する届出情報を、過去の工事立案書、計画書に基づき該当法令と関連付けて格納したデータベースである。例えば電気事業法に基づく届出であれば、「工事計画(変更)届出書」、「電気工作物使用方法変更届出書」、「溶接安全管理審査」等に関する情報を格納しておく。それぞれのキーワードとその必要な届出を格納しておく。   The notification database 1 constituting the notification confirmation device 3 is a database that stores notification information related to the types of notifications required to be notified by law in association with the relevant laws and regulations based on past construction plans and plans. For example, in the case of a notification based on the Electricity Business Law, information related to “construction plan (change) notification form”, “electric work usage change notification form”, “welding safety management examination”, and the like are stored. Store each keyword and its required notifications.

工事対象・工事内容データベース2は、立案又は計画時に法令から想定される工事の対象名と、その工事の具体的な内容に関する工事対象・工事内容情報を、各法令と関連づけて格納したデータベースである。例えば、工事の対象名としては、「工事計画(変更)届出書」では、施行規則第65条に基づくき、対象として電気工作物(ボイラー、タービン、電気設備等)、ばい煙発生施設(ボイラー、所内ボイラー、ガスタービン、非常用DG)、ばい煙処理施設(DNの設置工事、改造追加工事)を格納しておく。工事内容としては、出力、能力、構造、仕様、排出変更を格納しておく。即ち、それぞれの工事対象名、工事内容に関するキーワードを格納しておく。   The construction object / construction content database 2 is a database in which the construction target name assumed by the law at the time of planning or planning and the construction object / construction content information related to the specific contents of the construction are stored in association with each law. . For example, in the “construction plan (change) notification form” as the target name of the construction, the target is an electric work (boiler, turbine, electrical equipment, etc.), smoke generation facility (boiler, Stores in-house boiler, gas turbine, emergency DG) and soot treatment facility (DN installation work, modification work). As construction contents, output, capacity, structure, specifications, and emission changes are stored. That is, each construction object name and keywords related to construction contents are stored.

工事情報入力手段は、工事立案書、計画書に基づき工事の対象名と、その工事の具体的な内容に関する情報を入力する入力装置4であり、直接入力し、又はインターネットなどのネットワークを利用して入力する。例えば、工事立案書、計画書の語句と、上述したデータベース1,2のキーワードを入力する。
企業内のサイトに設けられた複数の端末装置はイントラネットを介して、管理者が運営する届出書確認システムにアクセスできるように構築されている。グループ企業であればインターネットを利用してアクセスする。
The construction information input means is an input device 4 for inputting a name of a construction target and information on the concrete contents of the construction based on the construction plan and plan, and is directly inputted or using a network such as the Internet. Enter. For example, the words of the construction plan and plan, and the keywords of the databases 1 and 2 are input.
A plurality of terminal devices provided on a site in a company are constructed so as to be able to access a notification form confirmation system operated by an administrator via an intranet. If it is a group company, it will be accessed using the Internet.

届出要否判断手段は、届出データベース1及び工事対象・工事内容データベース2とを参照し、工事情報入力手段(入書力装置3)により入力された工事の対象名と、その工事の具体的な内容に対応して、必要となる届出の要否を判断する手段である。   The notification necessity judgment means refers to the notification database 1 and the construction object / construction content database 2, and refers to the construction target name inputted by the construction information input means (input power input device 3) and the specific construction. It is a means for judging whether or not necessary notification is necessary according to the contents.

本発明の届出書確認方法を実施するための届出書確認装置3は、図2のブロック図に示すように、演算処理装置11、データベース12、入力装置4、入力処理部13、判定処理部14、出力処理部15とから構成されたものである。データベース12は、上述した届出データベース1、工事対象・工事内容データベース2及びその他工事に関するデータ16等のデータとから成る。   As shown in the block diagram of FIG. 2, the notification form confirmation apparatus 3 for implementing the notification form confirmation method of the present invention includes an arithmetic processing unit 11, a database 12, an input unit 4, an input processing unit 13, and a determination processing unit 14. , And the output processing unit 15. The database 12 includes data such as the notification database 1, the construction object / construction content database 2, and other construction-related data 16 described above.

演算処理装置11は、入力装置4からキーワード等を手入力された、工事名と具体的な工事内容、その他の条件等に基づき各種の演算処理を実行するものであり、入力処理を行う入力処理部13、届出データベース1、工事対象・工事内容データベース2及びその他工事に関するデータ16に基づいて判定する判定処理部14、その判定の結果、届出の必要性について、出力装置17に出力し、モニターに表示し、必要に応じてプリントアウトする出力処理部15を備える。   The arithmetic processing unit 11 executes various arithmetic processes based on a construction name, a specific construction content, other conditions, and the like, which are manually input from the input unit 4, and performs input processing. Section 13, notification database 1, determination processing section 14 for determining based on the construction object / construction content database 2 and other construction-related data 16, and the result of the determination, the necessity of notification, is output to the output device 17 for monitoring An output processing unit 15 for displaying and printing out as necessary is provided.

判定結果については、出力装置17に出力すると共に、担当者へメール送信して連絡する。それにより、届出が不要な場合には、すぐに工事に着工できるという利益がある。   The determination result is output to the output device 17 and sent to the person in charge by email. As a result, when notification is unnecessary, there is an advantage that construction can be started immediately.

図3は本発明の発電所工事における届出書確認方法のフローチャートである。
上述したように、各工事の対象と内容から該当する法令で届出が義務付けられている工事に関する情報について、過去の工事立案書、計画書に基づき該当法令と関連付けた届出情報を、データベース2に登録し、保存し、届出について該当法令と工事の対象と内容と関連づけた工事の対象・内容て格納した工事対象・工事内容情報を、データベース3に登録し、保存する。次に、届出書確認装置3におけるデータベース2,3に蓄積した工事届出情報及び工事対象・工事内容情報とを照合し、立案者・工事計画者が立案又は計画した工事が、関連官公庁への届出が必要又は不要であるかの別を判定する。
FIG. 3 is a flowchart of the notification confirmation method in the power plant construction of the present invention.
As described above, register information related to the relevant laws and regulations based on past construction plans and plans for the information on constructions that are required to be reported under the relevant laws and regulations based on the target and content of each construction. The construction object / construction content information stored as the object / content of the construction associated with the applicable laws and regulations, construction object and contents of the notification is registered in the database 3 and saved. Next, the construction notification information stored in the databases 2 and 3 in the notification form confirmation device 3 and the construction target / construction content information are collated, and the construction planned or planned by the planner / construction plan is reported to the relevant government offices. Determines whether or not is necessary or unnecessary.

提出の可能性がある届出については、更に工事対象・工事内容の個々の判断基準を絞り込み処理して届出書を作成する。図3に示すように、先ず、判断基準の工事対象名に該当するどうかについて判定する。「YES」のときは、そのまま必要な届出を出力装置17に表示する。「NO」のときは、次の工事内容の判定基準に行く。   For notifications that may be submitted, create a notification form by further narrowing down the individual criteria for the work and the content of the work. As shown in FIG. 3, first, it is determined whether or not the construction target name of the determination criterion is met. If “YES”, the necessary notification is displayed on the output device 17 as it is. If "NO", go to the criteria for judging the next construction.

次に、判断基準の工事対象名に該当するどうかについての判定は「NO」であるが、判断基準の工事内容は判断基準に該当するどうかについての判定では「YES」のときは、必要な届出を出力装置17に表示する。「NO」のときは、届出の必要はないと判定する。この届出書を作成した際の判定結果の情報については、立案者に連絡する。   Next, the judgment about whether or not it falls under the construction object name of the judgment standard is “NO”, but if the judgment about whether or not the construction content of the judgment standard falls under the judgment standard is “YES”, the required notification Is displayed on the output device 17. If “NO”, it is determined that notification is not necessary. Contact the planner for information on the results of the determination when this notification form was created.

このように、本発明の届出書確認方法では、単に立案又は計画した工事が関連官公庁への届出が必要又は不要であるかの別の可能性のみの結果ではなく、更に工事対象・工事内容の個々の判断基準を絞り込み処理して届出書を作成する。そこで、不慣れな担当者であっても、人為的なミスによる届出漏れを防止することができる。その際に従来のように届出チェック表51等の帳票作成及び回覧する必要がなくなり、必要な届出書・申請書を容易かつ確実に作成することができる。   As described above, the notification confirmation method of the present invention is not merely a result of another possibility of whether the planned or planned construction requires or is not required to be reported to the relevant government offices. Narrow down the individual criteria to create a notification form. Therefore, even an inexperienced person in charge can prevent omission of notification due to human error. At that time, it is no longer necessary to create and circulate a form such as the notification check table 51 as in the prior art, and a necessary notification form / application can be easily and reliably created.

なお、本発明は、人為的なミスによる届出漏れを低減でき、届出チェック表51等の帳票作成および回覧に伴う業務を省略でき、遅滞なく工事に関する届出書の提出の要否を確認することができれば、上述した発明の実施の形態に限定されず、本発明の要旨を逸脱しない範囲で種々変更できることは勿論である。   In addition, the present invention can reduce the omission of notification due to human error, can omit the work associated with the creation and circulation of the forms such as the notification check table 51, etc., and can confirm the necessity of submitting a notification form regarding construction without delay. If possible, the present invention is not limited to the above-described embodiments, and various modifications can be made without departing from the scope of the present invention.

本発明の発電所工事における届出書確認システム及びその届出書確認方法は、電力会社以外の工事作業に関する業務にも利用することができる。   The notification form confirmation system and the notification form confirmation method in power plant construction of the present invention can be used for work related to construction work other than the electric power company.

本発明の届出書確認システムの一例を示す概念図である。It is a conceptual diagram which shows an example of the notification form confirmation system of this invention. 本発明の届出書確認方法を実施する届出書確認装置のブロック図である。It is a block diagram of the notification form confirmation apparatus which enforces the notification form confirmation method of this invention. 本発明の発電所工事における届出書確認方法のフローチャートである。It is a flowchart of the notification form confirmation method in the power plant construction of this invention. 従来の届出チェック表の一例を示す表面図である。It is a surface view which shows an example of the conventional report check table. 従来の届出チェック表の一部拡大図である。It is a partial enlarged view of the conventional report check list.

符号の説明Explanation of symbols

1 届出データベース
2 工事対象・工事内容データベース
3 届出書確認装置
1 Notification Database 2 Construction Target / Construction Database 3 Notification Form Confirmation Device

Claims (4)

発電所の工事の立案又は計画時に、その工事について関連官公庁へ届出書・申請書を提出する要否を確認する発電所工事における届出書確認システムであって、
法令で届出が義務付けられている届出の種類に関する届出情報を、過去の工事立案書、計画書に基づき該当法令と関連付けて格納した届出データベース(1)と、
工事の立案又は計画時に法令から想定される工事の対象名と具体的内容に関する工事対象・工事内容情報を、各法令と関連づけて格納した工事対象・工事内容データベース(2)と、
工事立案書、計画書に基づき工事の対象名と具体的内容に関する情報を入力する工事情報入力手段と、
前記届出データベース(1)及び工事対象・工事内容データベース(2)とを参照し、前記工事情報入力手段により入力された工事の対象名と具体的内容に対応して、必要となる届出の要否を判断する届出要否判断手段と、を備えた、ことを特徴とする発電所工事における届出書確認システム。
A notification form confirmation system for power plant construction that confirms the necessity of submitting a notification form / application form to the relevant government office for the construction or planning of the power plant construction,
A notification database (1) that stores notification information related to the types of notifications that are required by the law in association with relevant laws and regulations based on past construction plans and plans;
Construction object / construction content database (2) that stores construction object / construction content information related to the name and specific contents of the construction assumed by the law when planning or planning construction,
A construction information input means for inputting information on a construction target name and specific contents based on a construction plan, a plan;
Referring to the notification database (1) and the construction object / construction content database (2), whether or not necessary notification is necessary corresponding to the construction target name and specific contents input by the construction information input means A notification confirmation system for power plant construction, comprising: a notification necessity determination means for determining
前記届出データベース(1)は、届出の種類に関連する法令毎に分類して構築されている、ことを特徴とする請求項1の発電所工事における届出書確認システム。   2. The notification form confirmation system for power plant construction according to claim 1, wherein the notification database (1) is constructed by classification for each law related to the type of notification. 発電所の工事の立案又は計画時に、その工事について関連官公庁へ届出書・申請書を提出する要否を確認する発電所工事における届出確認方法であって、
各工事について法令で届出が義務付けられている届出の種類に関する情報について、過去の工事立案書、計画書に基づき該当法令と関連付けた届出情報を、データベース(1)に登録し、保存し、
届出について該当法令と工事の対象名と具体的内容と関連づけた工事の対象・内容に関する工事対象・工事内容情報を、データベース(2)に登録し、保存し、
次に、前記データベース(1,2)に蓄積した届出情報及び工事対象・工事内容情報とを照合し、立案者・工事計画者が立案又は計画した工事が、関連官公庁への届出が必要又は不要であるかの別を判定し、
提出の可能性がある届出については、更に工事対象・工事内容の個々の判断基準を絞り込み処理して届出書を作成する、ことを特徴とする発電所工事における届出書確認方法。
A notification confirmation method for power plant construction that confirms the necessity of submitting a notification form / application form to the relevant government office for the construction or planning of the power plant construction,
Register and store in the database (1) the notification information associated with the relevant laws and regulations based on past construction plans and plans for information on the types of notifications that are required by law for each construction.
Register and store in the database (2) the construction target / construction content information related to the target / content of the construction related to the relevant laws and regulations and the specific contents of the notification,
Next, the notification information accumulated in the database (1, 2) and the construction object / construction content information are collated, and the construction planned or planned by the planner / construction plan requires or is not required to be reported to the relevant government offices. To determine whether it is
For notifications that may be submitted, a notification form confirmation method for power plant construction, in which individual judgment criteria for the construction object and construction content are further narrowed down to create a notification form.
前記届出書を作成した際の判定結果の情報については、これを立案者に連絡する、ことを特徴とする請求項3の発電所工事における届出書確認方法。   4. The notification form confirmation method for power plant construction according to claim 3, wherein information on a determination result when the notification form is created is notified to a planner.
JP2008187114A 2008-07-18 2008-07-18 System and method for checking for notification for power plant works Pending JP2010026765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008187114A JP2010026765A (en) 2008-07-18 2008-07-18 System and method for checking for notification for power plant works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008187114A JP2010026765A (en) 2008-07-18 2008-07-18 System and method for checking for notification for power plant works

Publications (1)

Publication Number Publication Date
JP2010026765A true JP2010026765A (en) 2010-02-04

Family

ID=41732548

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008187114A Pending JP2010026765A (en) 2008-07-18 2008-07-18 System and method for checking for notification for power plant works

Country Status (1)

Country Link
JP (1) JP2010026765A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104678960A (en) * 2015-01-29 2015-06-03 国网浙江省电力公司嘉兴供电公司 Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104678960A (en) * 2015-01-29 2015-06-03 国网浙江省电力公司嘉兴供电公司 Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training
CN104678960B (en) * 2015-01-29 2018-05-11 国网浙江省电力公司嘉兴供电公司 It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method

Similar Documents

Publication Publication Date Title
Olanrewaju et al. Building maintenance management in a Malaysian university campuses: a case study
Tan et al. Enabling an effective knowledge and information flow between the phases of building construction and facilities management
Hassan Health, safety and environmental practices in the construction sector of Pakistan
KR20160008781A (en) Apparatus and method for greenhouse gases and energy integration management
O'Malley et al. Governmental conditions for the economization of uncertainty: Fire insurance, regulation and insurance actuarialism
Kpamma et al. Construction permits and flow of projects within the Sunyani Municipality, Ghana
JP2010026765A (en) System and method for checking for notification for power plant works
JP2016038852A (en) Soundness diagnosis support server system
Szydlik Identifying and overcoming the barriers to sustainable construction
Keaveney et al. Impacts on One-off Housing Arising from Amended Building Control Regulations in Ireland
Smith Nuclear licensing in the United States: enhancing public confidence in the regulatory process
Shafiea et al. Urban metabolism: a research methodology in urban planning and environmental assessment
Janssen et al. Towards guidance in assessing and communicating uncertainties
Hopkin et al. Investigating the impact of defects on key stakeholders in the UK new housing sector
Inoguchi et al. Clarifying the transition of workload for victims life reconstruction support programs in affected local governments using the victims master database—Comparison between the 2007 Chuetsu-oki earthquake and the 2016 Kumamoto Earthquake
JP6795334B2 (en) Data structure of data management system and master data table
Bakti et al. Understanding the Terms of the Building Approval Document for Small Commercial Buildings in Samarinda, following Government Regulations
Brambley et al. Beyond commissioning: the role of automation
Nasri A Study on Ohsas 18001: 2007 Implementation in TL Offshore SDN BHD
DASUKI et al. Managing Quality Management Processes In A Naval Ship Construction Company: A Qualitative Case Analysis
Hukelmann et al. Environmental statement 2021 2020 results: consolidated version
Labaran et al. Exploring the carbon footprint of Nigeria's construction sector: a quantitative insight
Hickman et al. Bill C-69 and the Offshore: Uncertainty Is Certain
Denney Social-Performance Indicators and Maintaining Corporate Social Responsibility
Meade et al. Project Number 568-18-102 Upgrade N&FS HVAC system