JP2009276982A - Project management device, project management method for project management device, and project management program for project management device - Google Patents

Project management device, project management method for project management device, and project management program for project management device

Info

Publication number
JP2009276982A
JP2009276982A JP2008127104A JP2008127104A JP2009276982A JP 2009276982 A JP2009276982 A JP 2009276982A JP 2008127104 A JP2008127104 A JP 2008127104A JP 2008127104 A JP2008127104 A JP 2008127104A JP 2009276982 A JP2009276982 A JP 2009276982A
Authority
JP
Japan
Prior art keywords
risk
unit
project
information
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008127104A
Other languages
Japanese (ja)
Other versions
JP5153448B2 (en
Inventor
Yoichi Takahashi
洋一 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2008127104A priority Critical patent/JP5153448B2/en
Publication of JP2009276982A publication Critical patent/JP2009276982A/en
Application granted granted Critical
Publication of JP5153448B2 publication Critical patent/JP5153448B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a project management device capable of using a probability distribution model corresponding to the level of the risk of an operation in the progress prediction of an operation. <P>SOLUTION: In a project management device 100 which manages operating situations, a plan management part 100a associates the types of risks for each operation and stores them as a project information part 30, and a risk management part 100c associates the type of risk with risk evaluation information for calculating the level of the risk and stores it as a risk information part 31, and a probability distribution database part 100d stores a plurality of probability distribution models preliminarily defined according to the level of the risk, and a plan prediction part 100b acquires the risk evaluation information corresponding to the type of the risk corresponding to an operation acquired from the project information part 30, and calculates the level of the risk on the basis of the risk evaluation information, and creates the probability distribution of the operating situations by using the probability distribution model corresponding to the level of the risk selected from the probability distribution database part 100d. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、プロジェクトの管理を行うプロジェクト管理装置に関するものであり、特に、プロジェクトの予測を行う際に、作業毎に異なる確率分布を用いることができるプロジェクト管理装置に関する。   The present invention relates to a project management apparatus that manages a project, and more particularly to a project management apparatus that can use a probability distribution that differs for each operation when project prediction is performed.

従来のプロジェクト管理装置では、プロジェクトの予測をする場合に、進捗予測に使用する確率分布として、組織として統計的に算出された確率分布(組織の統計的な確率分布)を一つ定義している(特許文献1参照)。ただし、組織の統計的な確率分布は、プロジェクトの作業毎に異なる場合もある。
特開2003−345956号公報
In a conventional project management apparatus, when a project is predicted, one probability distribution (statistical probability distribution of the organization) statistically calculated as an organization is defined as a probability distribution used for progress prediction. (See Patent Document 1). However, the statistical probability distribution of an organization may vary from project to project.
JP 2003-345958 A

従来のプロジェクト管理装置では、組織の統計的な確率分布モデルを用いてプロジェクトの予測をする場合、ソフトウェア開発やハードウェア開発における他プロジェクトの同一の作業と異なるリスクが確率分布モデルに加味されていないため、実情に合わせた予測を行うことが困難であった。組織において複数のプロジェクトが稼働している場合、異なるプロジェクトに対して同一の作業があり得る(例えば、AプロジェクトとBプロジェクトがあり、双方ともシステム開発に係るプロジェクトの場合、同一の作業(システム設計、プログラム開発等)がある)。この場合、たとえ同一の作業であっても、プロジェクトによってリスクが異なる場合があるので、従来のプロジェクト管理装置のように、同一の作業であるからといって同一の確率分布モデルを用いて予測を行ってしまうと実情に合わせた予測を行うことが困難となる。   In conventional project management devices, when a project is predicted using a statistical probability distribution model of an organization, risks different from the same work of other projects in software development and hardware development are not considered in the probability distribution model. For this reason, it is difficult to make predictions according to the actual situation. When multiple projects are operating in an organization, there can be the same work for different projects (for example, there are A project and B project, both of which are related to system development, the same work (system design , Program development, etc.)). In this case, even if the work is the same, the risk may differ depending on the project, so that the same probability distribution model is used for prediction even if the work is the same as in the conventional project management device. If it does, it will be difficult to make predictions that match the actual situation.

この発明は上記のような問題点を解決するためになされたもので、同一の作業における異なるリスクと組織の統計的な確率分布の関係を定義し、実情に合わせた予測を行うことを目的とする。   The present invention was made to solve the above-mentioned problems, and it is intended to define a relationship between different risks in the same work and a statistical probability distribution of the organization and to make a prediction according to the actual situation. To do.

本発明に係るプロジェクト管理装置は、
複数の作業からなるプロジェクトについて上記複数の作業各々ごとに作業状況を管理するプロジェクト管理装置において、
上記複数の作業各々ごとに作業について発生すると予測されるリスクの種別を対応付けてプロジェクト情報として記憶装置に記憶する計画管理部と、
リスクの種別とリスクの大きさを算出するためのリスク評価情報とを対応付けてリスク情報として記憶装置に記憶するリスク管理部と、
リスクの大きさに応じて予め定義された確率分布モデルを複数記憶する確率分布データベース部と、
上記複数の作業各々について、上記計画管理部により記憶された上記プロジェクト情報から当該作業に対応するリスクの種別を取得し、上記リスク管理部により記憶された上記リスク情報から上記リスクの種別に対応するリスク評価情報を取得し、取得した上記リスク評価情報に基づいてリスクの大きさを処理装置により算出し、算出した上記リスクの大きさに応じた確率分布モデルを上記確率分布データベース部から選択して、選択した確率分布モデルを用いて当該作業の作業状況の確率分布を処理装置により生成する計画予測部とを備えることを特徴とする。
The project management apparatus according to the present invention is:
In a project management apparatus that manages a work situation for each of the plurality of works for a project composed of a plurality of works,
A plan management unit that stores in a storage device as project information in association with a type of risk that is predicted to occur for each of the plurality of operations;
A risk management unit that stores risk information in a storage device in association with risk evaluation information for calculating a risk type and a risk magnitude;
A probability distribution database unit for storing a plurality of pre-defined probability distribution models according to the size of the risk;
For each of the plurality of operations, the risk type corresponding to the operation is acquired from the project information stored by the plan management unit, and the risk type is acquired from the risk information stored by the risk management unit. Obtain risk assessment information, calculate a risk magnitude by the processing device based on the obtained risk assessment information, and select a probability distribution model corresponding to the computed risk magnitude from the probability distribution database unit And a plan predicting unit that generates a probability distribution of the work status of the work by the processing device using the selected probability distribution model.

本発明によれば、複数の作業からなるプロジェクトについて複数の作業各々ごとに作業状況を管理するプロジェクト管理装置において、計画管理部が複数の作業各々ごとに作業について発生すると予測されるリスクの種別を対応付けてプロジェクト情報として記憶装置に記憶し、リスク管理部がリスクの種別とリスクの大きさを算出するためのリスク評価情報とを対応付けてリスク情報として記憶装置に記憶し、確率分布データベース部がリスクの大きさに応じて予め定義された確率分布モデルを複数記憶し、計画予測部が複数の作業各々について、プロジェクト情報から当該作業に対応するリスクの種別を取得し、リスク情報からリスクの種別に対応するリスク評価情報を取得し、取得したリスク評価情報に基づいてリスクの大きさを算出し、算出したリスクの大きさに応じた確率分布モデルを確率分布データベース部から選択して、選択した確率分布モデルを用いて当該作業の作業状況の確率分布を生成するので、作業毎にリスクの大きさに連動する組織の統計的な確率分布を選択することが可能となり、実情に合った精度の高い予測を行うことができるという効果を奏する。   According to the present invention, in a project management apparatus that manages a work situation for each of a plurality of works for a project composed of a plurality of works, the plan management unit determines the type of risk that is predicted to occur for each of the plurality of works. Correspondingly stored in the storage device as project information, the risk management unit stores the risk type information and risk evaluation information for calculating the risk magnitude in association with each other and stored in the storage device as a probability distribution database unit Stores a plurality of pre-defined probability distribution models according to the size of the risk, and the plan prediction unit obtains the type of risk corresponding to the work from the project information for each of the plurality of work, and the risk information from the risk information. Obtain risk assessment information corresponding to the type, and calculate the risk size based on the obtained risk assessment information The probability distribution model corresponding to the calculated risk size is selected from the probability distribution database unit, and the probability distribution of the work status of the work is generated using the selected probability distribution model. It is possible to select a statistical probability distribution of the organization that is linked to the depth, and it is possible to perform highly accurate prediction that matches the actual situation.

図1は、実施の形態1に係るプロジェクト管理装置100の外観の一例を示す図である。図1において、プロジェクト管理装置100は、システムユニット910、CRT(Cathode・Ray・Tube)やLCD(液晶)の表示画面を有する表示装置901、キーボード902(Key・Board:K/B)、マウス903、FDD904(Flexible・Disk・ Drive)、コンパクトディスク装置905(CDD)、プリンタ装置906、スキャナ装置907などのハードウェア資源を備え、これらはケーブルや信号線で接続されている。   FIG. 1 is a diagram illustrating an example of an appearance of a project management apparatus 100 according to the first embodiment. In FIG. 1, a project management apparatus 100 includes a system unit 910, a display device 901 having a CRT (Cathode / Ray / Tube) or LCD (liquid crystal) display screen, a keyboard 902 (Key / Board: K / B), and a mouse 903. , FDD904 (Flexible Disk Drive), compact disk device 905 (CDD), printer device 906, scanner device 907, and the like, and these are connected by cables and signal lines.

システムユニット910は、コンピュータであり、ファクシミリ機932、電話器931とケーブルで接続され、また、ローカルエリアネットワーク942(LAN)、ゲートウェイ941を介してインターネット940に接続されている。   The system unit 910 is a computer, and is connected to the facsimile machine 932 and the telephone 931 via a cable, and is connected to the Internet 940 via a local area network 942 (LAN) and a gateway 941.

図2は、以下に述べる実施の形態に係るプロジェクト管理装置100のハードウェア資源の一例を示す図である。   FIG. 2 is a diagram illustrating an example of hardware resources of the project management apparatus 100 according to the embodiment described below.

図2において、プロジェクト管理装置100は、プログラムを実行するCPU911(Central・Processing・Unit、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサともいう)を備えている。CPU911は、バス912を介してROM913、RAM914、通信ボード915(通信装置、送信装置、受信装置の一例)、表示装置901、キーボード902、マウス903、FDD904、CDD905、プリンタ装置906、スキャナ装置907、磁気ディスク装置920と接続され、これらのハードウェアデバイスを制御する。磁気ディスク装置920の代わりに、光ディスク装置、メモリカード読み書き装置などの記憶装置でもよい。   In FIG. 2, the project management apparatus 100 includes a CPU 911 (also referred to as a central processing unit, a central processing unit, a processing unit, a processing unit, a microprocessor, a microcomputer, and a processor) that executes a program. The CPU 911 includes a ROM 913, a RAM 914, a communication board 915 (an example of a communication device, a transmission device, and a reception device), a display device 901, a keyboard 902, a mouse 903, an FDD904, a CDD905, a printer device 906, a scanner device 907, via a bus 912. It is connected to a magnetic disk device 920 and controls these hardware devices. Instead of the magnetic disk device 920, a storage device such as an optical disk device or a memory card read / write device may be used.

RAM914は、揮発性メモリの一例である。ROM913、FDD904、CDD905、磁気ディスク装置920の記憶媒体は、不揮発性メモリの一例である。これらは、記憶装置あるいは記憶部の一例である。   The RAM 914 is an example of a volatile memory. The storage media of the ROM 913, the FDD 904, the CDD 905, and the magnetic disk device 920 are an example of a nonvolatile memory. These are examples of a storage device or a storage unit.

通信ボード915、キーボード902、スキャナ装置907、FDD904などは、入力部、入力装置の一例である。   The communication board 915, the keyboard 902, the scanner device 907, the FDD 904, and the like are examples of an input unit and an input device.

また、通信ボード915、表示装置901、プリンタ装置906などは、出力部、出力装置の一例である。   Further, the communication board 915, the display device 901, the printer device 906, and the like are examples of an output unit and an output device.

通信ボード915は、図示はないが、ファクシミリ機、電話器、LAN等に接続されている。通信ボード915は、LANに限らず、インターネット、ISDN等のWAN(ワイドエリアネットワーク)などに接続されていても構わない。   Although not shown, the communication board 915 is connected to a facsimile machine, a telephone set, a LAN, and the like. The communication board 915 may be connected not only to the LAN but also to a WAN (wide area network) such as the Internet or ISDN.

磁気ディスク装置920には、オペレーティングシステム921(OS)、ウィンドウシステム922、プログラム群923、ファイル群924が記憶されている。プログラム群923のプログラムは、CPU911、オペレーティングシステム921、ウィンドウシステム922により実行される。   The magnetic disk device 920 stores an operating system 921 (OS), a window system 922, a program group 923, and a file group 924. The programs in the program group 923 are executed by the CPU 911, the operating system 921, and the window system 922.

上記プログラム群923には、以下に述べる実施の形態の説明において「〜部」、「〜手段」として説明する機能を実行するプログラムが記憶されている。プログラムは、CPU911により読み出され実行される。   The program group 923 stores programs for executing functions described as “˜unit” and “˜means” in the description of the embodiments described below. The program is read and executed by the CPU 911.

ファイル群924には、以下に述べる実施の形態の説明において、「リスク情報部(リスク情報)」、「プロジェクト情報部(プロジェクト情報)」、「確率分布データベース部」、「プロジェクト予測結果部」等の情報や、「〜の判定結果」、「〜の計算結果」、「〜の処理結果」として説明する情報やデータや信号値や変数値やパラメータが、「〜ファイル」、「〜データベース」、「〜データ」の各項目として記憶されている。「〜ファイル」、「〜データベース」、「〜データ」は、ディスクやメモリなどの記録媒体に記憶される。ディスクやメモリになどの記憶媒体に記憶された情報やデータや信号値や変数値やパラメータは、読み書き回路を介してCPU911によりメインメモリやキャッシュメモリに読み出され、抽出・検索・参照・比較・演算・計算・処理・出力・印刷・表示などのCPUの動作に用いられる。抽出・検索・参照・比較・演算・計算・処理・出力・印刷・表示のCPUの動作の間、情報やデータや信号値や変数値やパラメータは、メインメモリやキャッシュメモリやバッファメモリに一時的に記憶される。   The file group 924 includes “risk information section (risk information)”, “project information section (project information)”, “probability distribution database section”, “project prediction result section”, etc. Information, data, signal values, variable values, and parameters described as “determination results”, “calculation results”, and “processing results of” are “˜file”, “˜database”, It is stored as each item of “˜data”. “˜file”, “˜database”, and “˜data” are stored in a recording medium such as a disk or a memory. Information, data, signal values, variable values, and parameters stored in a storage medium such as a disk or memory are read out to the main memory or cache memory by the CPU 911 via a read / write circuit, and extracted, searched, referenced, compared, Used for CPU operations such as calculation, calculation, processing, output, printing, and display. Information, data, signal values, variable values, and parameters are temporarily stored in the main memory, cache memory, and buffer memory during the CPU operations of extraction, search, reference, comparison, operation, calculation, processing, output, printing, and display. Is remembered.

また、以下に述べる実施の形態の説明において説明するフローチャートの矢印の部分は主としてデータや信号の入出力を示し、データや信号値は、RAM914のメモリ、FDD904のフレキシブルディスク、CDD905のコンパクトディスク、磁気ディスク装置920の磁気ディスク、その他光ディスク、ミニディスク、DVD(Digital・Versatile・Disk)等の記録媒体に記録される。また、データや信号は、バス912や信号線やケーブルその他の伝送媒体によりオンライン伝送される。   In addition, the arrows in the flowcharts described in the following description of the embodiments mainly indicate input / output of data and signals. The data and signal values are the RAM 914 memory, the FDD 904 flexible disk, the CDD 905 compact disk, and the magnetic field. The data is recorded on a recording medium such as a magnetic disk of the disk device 920, another optical disk, a mini disk, or a DVD (Digital Versatile Disk). Data and signals are transmitted online via a bus 912, signal lines, cables, or other transmission media.

また、以下に述べる実施の形態の説明において「計画管理部」、「計画予測部」、「リスク管理部」等の「〜部」として説明するものは、「〜回路」、「〜装置」、「〜機器」、「手段」であってもよく、また、「〜ステップ」、「〜手順」、「〜処理」であってもよい。すなわち、「〜部」として説明するものは、ROM913に記憶されたファームウェアで実現されていても構わない。或いは、ソフトウェアのみ、或いは、素子・デバイス・基板・配線などのハードウェアのみ、或いは、ソフトウェアとハードウェアとの組み合わせ、さらには、ファームウェアとの組み合わせで実施されても構わない。ファームウェアとソフトウェアは、プログラムとして、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等の記録媒体に記憶される。プログラムはCPU911により読み出され、CPU911により実行される。すなわち、プログラムは、以下に述べる「〜部」としてコンピュータを機能させるものである。あるいは、以下に述べる「〜部」の手順や方法をコンピュータに実行させるものである。   Further, in the description of the embodiment described below, what is described as “˜unit” such as “plan management unit”, “plan prediction unit”, “risk management unit”, etc. is “˜circuit”, “˜device”, It may be “˜apparatus” and “means”, and may be “˜step”, “˜procedure”, and “˜processing”. That is, what is described as “˜unit” may be realized by firmware stored in the ROM 913. Alternatively, it may be implemented only by software, only hardware such as elements, devices, substrates, wirings, etc., or a combination of software and hardware, and further a combination of firmware. Firmware and software are stored as programs in a recording medium such as a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, and a DVD. The program is read by the CPU 911 and executed by the CPU 911. That is, the program causes the computer to function as “to part” described below. Alternatively, the procedure or method of “to part” described below is executed by a computer.

実施の形態1.
本実施の形態では、組織におけるプロジェクトであって、複数の作業からなるプロジェクトについて作業の作業状況を管理するプロジェクト管理装置100について説明する。特に、プロジェクト管理装置100が複数の作業各々についてプロジェクトの予測を行う際に、作業ごとに異なる確率分布を用いてプロジェクトの予測をすることができるプロジェクト管理装置100について説明する。
Embodiment 1 FIG.
In the present embodiment, a project management apparatus 100 that manages the work status of a work that is a project in an organization and that is a project composed of a plurality of work will be described. In particular, the project management apparatus 100 that can predict a project using a probability distribution that differs for each work when the project management apparatus 100 predicts a project for each of a plurality of works will be described.

プロジェクト管理(プロジェクトマネジメント)とは、チームに与えられた目標を達成するために、人材・資金・設備・物資・スケジュールなどをバランスよく調整し、全体の進捗状況を管理する手法をいう。プロジェクト管理において、計画を立てる際の手法のひとつとしてWBS(Work・Breakdown・Structure)と呼ばれるプロジェクト全体を細かい作業に分解した構成図が用いられる。ここでは、プロジェクトにおける複数の作業の各々とは、例えば、WBSにおいて定義されたプロジェクトを細かい作業に分解した際の各々の作業を指す。   Project management (project management) refers to a method of managing the overall progress by adjusting human resources, funds, equipment, supplies, and schedules in a balanced manner to achieve the goals given to the team. In project management, as one method for making a plan, a configuration diagram called WBS (Work, Breakdown, Structure), which is an entire project divided into detailed operations, is used. Here, each of the plurality of operations in the project indicates, for example, each operation when a project defined in the WBS is broken down into detailed operations.

プロジェクトの管理とは、例えば、作業の作業状況についての予測を行って、その予測結果に基づいて作業計画に修正を加えながらプロジェクトをより良い方向に進めていくことである。本実施の形態に係るプロジェクト管理装置100は、予測を行う作業の作業状況として、例えば、作業の品質(Q:Quality)、コスト(C:Cost)、工程(納期(D:Date))等について予測をおこなう。   Project management refers to, for example, predicting the work status of a work and proceeding the project in a better direction while modifying the work plan based on the prediction result. The project management apparatus 100 according to the present embodiment, for example, regarding the work status of the work to be predicted, for example, work quality (Q: Quality), cost (C: Cost), process (delivery date (D: Date)), etc. Make a prediction.

プロジェクト管理では、作業状況についての予測を行う際に、確率分布モデルを元にして作業の作業状況の予測を行う方式がとられる。例えば、プロジェクトにおけるA作業が終了する日の予測を行うとは、A作業が終了する日の計画値を確率分布モデルにあてはめて、A作業が終了する日の確率分布を生成することである。確率分布モデルは、プロジェクトが行われている組織の過去のデータ等から統計的に算出されるものを使用する場合もあるし、統計学的に定義されている確率分布(例えば、正規分布)等を使用する場合もある。   In project management, when the work situation is predicted, the work situation is predicted based on the probability distribution model. For example, the prediction of the date when the A work ends in the project is to apply the plan value of the day when the A work ends to the probability distribution model to generate a probability distribution on the day when the A work ends. The probability distribution model may use a statistically calculated one based on the past data of the organization in which the project is conducted, or a statistically defined probability distribution (eg, normal distribution). May be used.

図3は、実施の形態1に係るプロジェクト管理装置100の機能ブロックを示すブロック構成図である。図3におけるブロック構成は、プロジェクト管理装置100における最小単位のブロック構成を示している。図3を用いて、実施の形態1に係るプロジェクト管理装置100の各機能ブロックについて説明する。   FIG. 3 is a block configuration diagram showing functional blocks of the project management apparatus 100 according to the first embodiment. The block configuration in FIG. 3 indicates the minimum unit block configuration in the project management apparatus 100. Each functional block of the project management apparatus 100 according to the first embodiment will be described with reference to FIG.

図3において、プロジェクト管理装置100は、計画管理部100a、計画予測部100b、リスク管理部100cを備える。また、プロジェクト管理装置100は、プロジェクト情報部30と、リスク情報部31と、確率分布データベース部100dと、プロジェクト予測結果部40とを記憶装置に記憶する。   In FIG. 3, the project management apparatus 100 includes a plan management unit 100a, a plan prediction unit 100b, and a risk management unit 100c. In addition, the project management apparatus 100 stores the project information unit 30, the risk information unit 31, the probability distribution database unit 100d, and the project prediction result unit 40 in a storage device.

ここで、計画管理部100aと、計画予測部100bと、リスク管理部100cとは、素子・デバイス・基板・配線などのハードウェアのみで実施されている。あるいは、ROM913に記憶されたファームウェアで実現されていてもよい。あるいは、ソフトウェアとハードウェアとの組み合わせ、さらには、ファームウェアとの組み合わせで実施されても構わない。ファームウェアあるいはソフトウェアの場合は、プログラムとして、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等の記録媒体に記憶されており、プログラムはCPU911により読み出され、CPU911により実行される。   Here, the plan management unit 100a, the plan prediction unit 100b, and the risk management unit 100c are implemented only by hardware such as elements, devices, substrates, and wiring. Alternatively, it may be realized by firmware stored in the ROM 913. Alternatively, a combination of software and hardware, or a combination of firmware may be used. In the case of firmware or software, the program is stored in a recording medium such as a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, and a DVD. The program is read by the CPU 911 and executed by the CPU 911.

確率分布データベース部100dは、リスクの大きさに応じて予め定義された確率分布モデルを複数記憶する。確率分布データベース部100dは、プロジェクト管理装置100の備える記憶装置に記憶されている記憶部である。図3では、プロジェクト情報部30やリスク情報部31が記憶される記憶装置とは異なる記憶装置として示しているが、同一の記憶装置に記憶されてもよい。また、異なる記憶装置であっても構わない。リスクの大きさに応じて予め定義された確率分布モデルとは、リスクの大きさに連動して定義された組織の統計的な確率分布モデルのことである。リスクとは、発生すると考えられる危険性のことである。例えば、作業「設計」に対しては、「人員不足」や「スキル不足」等の発生すると考えられる危険性、すなわちリスクが考えられる。   The probability distribution database unit 100d stores a plurality of probability distribution models defined in advance according to the magnitude of risk. The probability distribution database unit 100d is a storage unit stored in a storage device included in the project management apparatus 100. Although FIG. 3 shows a storage device different from the storage device in which the project information unit 30 and the risk information unit 31 are stored, they may be stored in the same storage device. Also, different storage devices may be used. The probability distribution model defined in advance according to the magnitude of the risk is a statistical probability distribution model of the organization defined in conjunction with the magnitude of the risk. A risk is a danger that is considered to occur. For example, with respect to the work “design”, there is considered a risk of occurrence of “insufficient personnel”, “insufficient skills”, etc., that is, risks.

図4は、実施の形態1に係るリスクの大きさに連動して定義された組織の統計的な確率分布モデルのイメージ201を示す図である。図4を用いて、本実施の形態におけるプロジェクト管理装置100が使用する組織の統計的な確率分布モデルについて説明する。組織の統計的な確率分布モデルとは、プロジェクトを管理する(プロジェクトの属する)組織がプロジェクトの予測に使用する確率分布モデルのことである。上述したように、組織の統計的な確率分布モデルとしては、プロジェクトが属する組織の過去のデータから算出される確率分布モデルの場合もあれば、例えば正規分布のように統計学的に定義された確率分布モデルの場合もある。   FIG. 4 is a diagram showing an image 201 of a statistical probability distribution model of an organization defined in conjunction with the risk magnitude according to the first embodiment. The organization statistical probability distribution model used by the project management apparatus 100 according to the present embodiment will be described with reference to FIG. The statistical probability distribution model of an organization is a probability distribution model used for project prediction by an organization that manages the project (to which the project belongs). As described above, the statistical probability distribution model of the organization may be a probability distribution model calculated from the past data of the organization to which the project belongs, or may be statistically defined as a normal distribution, for example. It may be a probability distribution model.

本実施の形態におけるリスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201では、図4に示すように、リスクの大きさをリスク大・リスク中・リスク小の複数の区分(3段階)で表している。ここでは、リスクの大きさの区分を3段階としているが、リスクの大きさの区分は3段階に限らない。例えば、リスクの大きさの区分を3段階以上(例えば、5段階)に細かく分けることにより、予測の精度がより向上すると考えられる。しかし、リスクの大きさを多段にし過ぎると、確率分布モデルを生成するための統計的な処理をするための元データも膨大になってしまう。したがって、理想的には、リニアな値として元データを処理できるような段階に分けるのが好ましい。   In the image 201 of the statistical probability distribution model of the organization linked to the risk magnitude in the present embodiment, as shown in FIG. 4, the risk magnitude is classified into a plurality of categories (high risk, medium risk, and low risk). (3 levels). Here, the risk magnitude classification is made into three stages, but the risk magnitude classification is not limited to three stages. For example, it is considered that the accuracy of prediction is further improved by dividing the risk category into three or more levels (for example, five levels). However, if the risk level is set too high, the original data for statistical processing for generating the probability distribution model also becomes enormous. Therefore, ideally, it is preferable to divide into stages where the original data can be processed as linear values.

リスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201では、リスク大に対して確率分布モデル20aが対応し、リスク中に対して確率分布モデル20bが対応し、リスク小に対して確率分布モデル20cが対応する。このように、図4に示すリスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201では、リスクが小さい時には一般的なケースから最良や最悪までの偏差が小さくなり、リスクが大きい時には一般的なケースから最良や最悪までの偏差が大きくなることを示している。   In the image 201 of the statistical probability distribution model of the organization linked to the magnitude of the risk, the probability distribution model 20a corresponds to the large risk, the probability distribution model 20b corresponds to the medium risk, and the small risk Corresponds to the probability distribution model 20c. In this way, in the image 201 of the statistical probability distribution model of the organization linked to the magnitude of the risk shown in FIG. 4, when the risk is small, the deviation from the general case to the best or worst becomes small and the risk is large. Sometimes it shows a large deviation from the general case to the best or worst.

また、各確率分布モデル20a,20b,20cにおいて、両脇の縦線は、対応するリスクの大きさにおける最大値と最小値を示す。また、各確率分布モデル20a,20b,20cにおいて、黒い太線部分(黒帯部分)20d,20e,20fは、例えば、各確率分布モデル20a,20b,20cについての全体の99.73%をカバーする正規分布における6σの範囲を示している。ここでは、黒帯部分20d,20e,20fで示す全体におけるカバー率は、正規分布の6σである99.73%としているが、この値は組織の実情あるいは組織の過去の統計的なデータにより任意で決めて構わないものであり、常に6σの99.73%であることを示すものではない。また、図4に示すリスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201では、一般的なケースの値が、リスクの大きさに関係なく、常に同じであることを示したものではない。   Moreover, in each probability distribution model 20a, 20b, 20c, the vertical lines on both sides indicate the maximum value and the minimum value in the magnitude of the corresponding risk. Further, in each probability distribution model 20a, 20b, 20c, black thick line portions (black belt portions) 20d, 20e, 20f cover, for example, 99.73% of the entire probability distribution models 20a, 20b, 20c. The range of 6σ in the normal distribution is shown. Here, the overall coverage shown by the black belt portions 20d, 20e, and 20f is 99.73%, which is 6σ of the normal distribution, but this value is arbitrary depending on the actual state of the organization or the statistical data of the past of the organization. It does not indicate that it is always 99.73% of 6σ. In addition, in the image 201 of the statistical probability distribution model of the organization linked to the risk size shown in FIG. 4, it is shown that the value of the general case is always the same regardless of the risk size. It is not a thing.

リスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201は、リスクが小さい時は一般的なケースから最良や最悪までの偏差が小さく、リスクが大きい時は一般的なケースから最良や最悪までの偏差が大きいため、リスクの大きさを段階的に区分して管理した方が管理しやすいことを示す概念図である。また、リスクの大きさを段階的に区分して管理することにより、プロジェクト管理装置100では、リスクに応じた確率分布モデルを選択することができ、リスクに応じた確率分布モデルを用いて予測を行うことにより、より精度の高い予測を行うことができる。   The image 201 of the statistical probability distribution model of the organization linked to the magnitude of the risk has a small deviation from the general case to the best or worst when the risk is small, and the best from the general case when the risk is large. It is a conceptual diagram showing that it is easier to manage by dividing the magnitude of the risk step by step because the deviation to the worst is large. In addition, by managing the risk size in stages, the project management apparatus 100 can select a probability distribution model corresponding to the risk, and perform prediction using the probability distribution model corresponding to the risk. By performing, it is possible to perform prediction with higher accuracy.

図5は、実施の形態1における確率分布データベース部100dの構成の一例を示す図である。確率分布データベース部100dには、図4のリスクの大きさに連動した組織の統計的な確率分布モデルのイメージ201に示す構成により、リスクの大きさ(リスク大・リスク中・リスク小)に応じた確率分布モデル20a,20b,20cが予め定義され記憶されている。確率分布データベース部100dは、作業毎(例えば、「設計」、「開発」、「試験」毎)にリスクの大きさに対応する確率分布モデル20を記憶していてもよい。あるいは、確率分布データベース部100dは、作業状況を評価するための作業評価情報(品質、コスト、工程)毎にリスクの大きさに対応する確率分布モデル20を記憶していてもよい。あるいは、確率分布データベース部100dは、プロジェクトに対してひとつの確率分布モデル20を記憶していてもよい。   FIG. 5 is a diagram illustrating an example of the configuration of the probability distribution database unit 100d according to the first embodiment. The probability distribution database unit 100d has a configuration shown in the image 201 of the statistical probability distribution model of the organization linked to the risk size in FIG. 4 according to the risk size (large risk, medium risk, small risk). The probability distribution models 20a, 20b, and 20c are defined and stored in advance. The probability distribution database unit 100d may store a probability distribution model 20 corresponding to the magnitude of risk for each work (for example, for each “design”, “development”, and “test”). Alternatively, the probability distribution database unit 100d may store a probability distribution model 20 corresponding to the magnitude of risk for each work evaluation information (quality, cost, process) for evaluating the work situation. Alternatively, the probability distribution database unit 100d may store one probability distribution model 20 for the project.

次に図3に戻り、プロジェクト管理装置100の機能ブロックについて説明を続ける。   Next, returning to FIG. 3, the functional blocks of the project management apparatus 100 will be described.

計画管理部100aは、プロジェクトの複数の作業各々に対して、作業について発生すると予測されるリスクの種別を対応付けてプロジェクト情報部30(プロジェクト情報)として記憶装置に記憶して管理する。計画管理部100aは、プロジェクト全体を細かい作業に分解した構成図であるWBSの各作業と品質(Q)、コスト(C)、工程(納期(D))、リスク(R)を明示的に関連付けたプロジェクト情報部30を管理する。   The plan management unit 100a associates each type of work of a project with a risk type predicted to occur for the work and stores it in the storage device as a project information part 30 (project information) for management. The plan management unit 100a explicitly associates each work of the WBS, which is a configuration diagram obtained by disassembling the entire project into detailed work, quality (Q), cost (C), process (delivery date (D)), and risk (R). The project information unit 30 is managed.

リスク管理部100cは、リスクの種別とそのリスクの大きさを算出するためのリスク評価情報とを対応付けてリスク情報部31として記憶装置に記憶する。リスク管理部100cは、プロジェクト全体を細かい作業に分解したWBSの各作業と明示的に関連付けられたリスク(リスクの種別)を管理するリスク情報部31を管理する。   The risk management unit 100c stores the risk type and the risk evaluation information for calculating the magnitude of the risk in association in the storage device as the risk information unit 31. The risk management unit 100c manages a risk information unit 31 that manages risks (risk types) that are explicitly associated with each work of the WBS that has broken down the entire project into detailed work.

ここで、計画管理部100aが管理するプロジェクト情報部30とリスク情報部31について説明する。図6は、実施の形態1に係る計画管理部100aが管理するプロジェクト情報部30と、リスク管理部100cが管理するリスク情報部31の構成を示す図である。プロジェクト情報部30とリスク情報部31は、プロジェクト管理装置100の備える記憶装置に記憶される。   Here, the project information unit 30 and the risk information unit 31 managed by the plan management unit 100a will be described. FIG. 6 is a diagram illustrating a configuration of the project information unit 30 managed by the plan management unit 100a and the risk information unit 31 managed by the risk management unit 100c according to the first embodiment. The project information unit 30 and the risk information unit 31 are stored in a storage device included in the project management device 100.

図6において、プロジェクト情報部30は、プロジェクトの作業内容を設定する作業項目301と、開始日302と、終了日303とを記憶(定義)する作業内容部30aと、作業内容部30aの実施状況を実績304として記録する実績部30bと、作業内容部30aに示す作業項目301の作業内容(作業項目301に設定される作業の内容であり、以下単に作業ともいう)と品質305(Q)、コスト306(C)、工程307(D)、リスク308(R)(リスクの種別)の関係を記憶(定義)する関連情報部30cとから構成される。   In FIG. 6, the project information unit 30 stores a work item 301 for setting the work content of a project, a start date 302, and an end date 303. The work content unit 30a stores the work content unit 30a. , As the result 304, the work content of the work item 301 shown in the work content part 30a (the work content set in the work item 301, hereinafter also referred to simply as work), the quality 305 (Q), The related information unit 30c stores (defines) the relationship between the cost 306 (C), the step 307 (D), and the risk 308 (R) (risk type).

ここで、関連情報部30cの縦の項目である品質305(Q)、コスト306(C)、工程307(D)は、作業項目301の作業内容を評価するための作業評価情報である。プロジェクト管理装置100では、作業項目301の作業内容毎に、作業評価情報である品質305(Q)、コスト306(C)、工程307(D)について予測を行い、各作業内容を管理する。   Here, quality items 305 (Q), cost 306 (C), and step 307 (D), which are vertical items of the related information section 30 c, are work evaluation information for evaluating the work content of the work item 301. The project management apparatus 100 predicts the quality 305 (Q), the cost 306 (C), and the process 307 (D), which are work evaluation information, for each work content of the work item 301 and manages each work content.

例えば、作業項目301の作業内容「AAAA(プログラム開発)」がプログラム開発作業とする。プログラム開発作業は、プログラムの品質(例えば、バグ発生数等)が作業の評価の対象となり品質に関連するので、関連情報部30cの品質305には「(関連)有り」と設定される。また、作業内容「AAAA(プログラム開発)」における品質の計画値(例えば、「不具合数10」等)を設定してもよい。   For example, the work content “AAAA (program development)” of the work item 301 is the program development work. In the program development work, since the quality of the program (for example, the number of occurrences of bugs) is an object of work evaluation and is related to the quality, the quality 305 of the related information unit 30c is set to “(relevant)”. Also, a planned quality value (for example, “number of defects 10”) in the work content “AAAA (program development)” may be set.

プログラム開発作業は、プログラムのコストが作業の評価の対象となりコストに関連するので、関連情報部30cのコスト306にも「(関連)有り」と設定される。また、作業内容「AAAA(プログラム開発)」におけるコストの計画値(例えば、「個数当たりaaa円」等)を設定してもよい。   In the program development work, since the cost of the program is a target of the work evaluation and is related to the cost, the cost 306 of the related information unit 30c is also set to “(relevant)”. Further, a planned cost value (for example, “aaa circle per piece”) in the work content “AAAA (program development)” may be set.

プログラム開発作業は、プログラムの工程(例えば、完了日の遅れ)が作業の評価の対象となり工程に関連するので、関連情報部30cの工程307には「(関連)有り」と設定される。また、作業内容「AAAA(プログラム開発)」における工程の計画値(例えば、「作業終了日m月n日」等)を設定してもよい。   In the program development work, since the process of the program (for example, the completion date delay) is an object of work evaluation and related to the process, “(related)” is set in the process 307 of the related information section 30c. Further, a planned value of the process in the work content “AAAA (program development)” (for example, “work end date m month n day”) may be set.

また、これらの計画値(品質、コスト、工程)の他に、他の計画値も設定する場合は、計画値として他の項目を作成して計画値を設定してもよい。   In addition to these plan values (quality, cost, process), when setting other plan values, other items may be created as the plan values and set.

図6において、リスク情報部31は、リスクとして検出したリスク内容(リスクの種別)を記録するリスク項目311からなるリスク項目部31aと、リスク項目部31aに設定されたリスク内容(リスク項目311に設定されるリスクの内容であり、以下単にリスクともいう)についての影響312と実際にリスクが具現化するであろう顕在化率313を見積もった結果を記入するリスク評価結果部31bと、リスク評価結果部31bの結果に基づきリスクに対する対策の実施の有無や実施内容を定義した対策314からなるリスク対策定義部31cとから構成される。   In FIG. 6, the risk information part 31 includes a risk item part 31a composed of a risk item 311 for recording the risk contents (risk type) detected as a risk, and the risk contents (in the risk item 311) set in the risk item part 31a. A risk evaluation result section 31b for filling in the result 312 of the effect 312 on the content of the risk to be set (hereinafter also simply referred to as risk) and the actualization rate 313 that the risk will actually be realized; Based on the result of the result section 31b, the risk countermeasure definition section 31c is composed of countermeasures 314 that define the presence / absence and implementation of countermeasures against risks.

プロジェクト情報部30のリスク308に設定されるリスク内容(リスクの種別)と、リスク情報部31のリスク項目部31aに設定されるリスク内容(リスクの種別)とを対応付けることにより、プロジェクト情報部30とリスク情報部31とが関連付けられる。また、プロジェクト情報部30の作業項目301は、上述したWBSのWP(Work・Package)等を想定している。WPとは、WBSにおける最小単位の作業を意味するものである。   By associating the risk content (risk type) set in the risk 308 of the project information unit 30 with the risk content (risk type) set in the risk item unit 31a of the risk information unit 31, the project information unit 30 And the risk information part 31 are associated with each other. In addition, the work item 301 of the project information unit 30 assumes the above-described WBS WP (Work Package) or the like. WP means the minimum unit work in WBS.

ここで、プロジェクト情報部30の作業項目301に設定される作業内容と対応するリスク308に設定されるリスク内容の具体例を以下に示す。
・作業内容「要件定義書のxx章作成」に対して、リスク内容「要件定義期間のxxまでに客先と合意できない可能性がある」、リスク内容「新規分野のため、客先の暗黙知を文書化できない可能性がある」。
・作業内容「方式設計書のxx章作成」に対して、リスク内容「開発者のスキルが足りないため、計画の期間で、設計が終了しない可能性がある」。
・作業内容「方式設計書のxx章レビュー」に対して、リスク内容「新規設計手法のため、従来の品質管理で対応できない可能性がある」。
・作業内容「結合試験のxx試験」に対して、リスク内容「試験機材の手配が試験までに間に合わない可能性がある」。
・作業内容「開発の詳細設計から結合試験まで」に対して、リスク内容「プロジェクト人数が多いため、詳細工程の詳細な把握がリアルタイムに出来ない可能性がある」。
Here, a specific example of the risk content set in the risk 308 corresponding to the work content set in the work item 301 of the project information unit 30 is shown below.
・ For work content “Creating xx chapter of requirement definition document”, risk content “May not be able to agree with customer by xx of requirement definition period”, risk content “implicit knowledge of customer because of new field” May not be documented. "
・ In contrast to the work content “Creation of xx chapters of the system design document”, the risk content “Design may not be completed in the planning period due to lack of developer skills”.
・ In contrast to the work content “Review of the xx chapter of the method design document”, the risk content “Because of the new design method, there is a possibility that it cannot be handled by the conventional quality control”.
・ In contrast to the work content “xx test of combination test”, the risk content “the arrangement of test equipment may not be in time for the test”.
・ In contrast to the work content “From detailed development design to integration test”, the risk content is “There is a large number of projects, so there is a possibility that detailed grasp of the detailed process may not be possible in real time”.

また、リスク情報部31では、リスク項目311のリスク内容に関して、リスクの大きさを算出するためのリスク評価結果部31b(リスク評価情報の一例)を対応付ける。リスク評価結果部31bには、リスクが発生した場合の影響を金額で示す影響312(金額、例えばabc円)とリスクの顕在化率313(発生率、例えばmm%)とが予め定義されて記録される。   Further, the risk information unit 31 associates a risk evaluation result unit 31b (an example of risk evaluation information) for calculating the magnitude of the risk with respect to the risk content of the risk item 311. In the risk evaluation result part 31b, an impact 312 (amount, for example, abc yen) and an actualization rate 313 (occurrence rate, for example, mm%) indicating the impact when a risk occurs are defined and recorded in advance. Is done.

本実施の形態におけるプロジェクト管理装置100において、リスクの大きさを算出する方法として、例えば、計画予測部100bが、このリスク評価結果部31bの情報に基づいて影響312×顕在化率313算出し、その金額を対策314のリスク対策費用とし、リスク対策費用の金額の大きさに基づいてリスクの大きさを判断することが可能である。しかし、リスクの大きさとしては、リスク対策費用だけに限られず、例えば、プロジェクトの依頼額とリスク対策費用の比率等も考えられる。   In the project management apparatus 100 according to the present embodiment, as a method for calculating the magnitude of risk, for example, the plan prediction unit 100b calculates the influence 312 × the actualization rate 313 based on the information of the risk evaluation result unit 31b, The amount of risk is taken as the risk countermeasure cost of the measure 314, and the magnitude of the risk can be determined based on the amount of the risk measure cost. However, the magnitude of the risk is not limited to the risk countermeasure cost. For example, the ratio of the request amount of the project and the risk countermeasure cost can be considered.

計画予測部100bは、作業項目301に設定された複数の作業内容の各々について、計画管理部100aにより記憶されたプロジェクト情報部30から当該作業内容に対応するリスク308のリスク内容(リスクの種別)を取得する。計画予測部100bは、リスク管理部100cにより記憶されたリスク情報部31からリスク内容(リスクの種別)に対応するリスク評価結果部31b(リスク評価情報)を取得し、取得した上記リスク評価結果部31b(リスク評価情報)に基づいて当該作業内容に対応するリスクの大きさを処理装置により算出する。計画予測部100bは、算出した上記リスクの大きさに応じた確率分布モデルを確率分布データベース部100dから選択して、選択した確率分布モデルを用いて当該作業内容の作業状況(品質(Q)、コスト(C)、工程(D))の確率分布を処理装置により生成することにより、プロジェクトの作業状況の予測を行う。   The plan prediction unit 100b, for each of a plurality of work contents set in the work item 301, the risk content (risk type) of the risk 308 corresponding to the work content from the project information unit 30 stored by the plan management unit 100a. To get. The plan prediction unit 100b acquires a risk evaluation result unit 31b (risk evaluation information) corresponding to the risk content (risk type) from the risk information unit 31 stored by the risk management unit 100c, and acquires the acquired risk evaluation result unit Based on 31b (risk evaluation information), the magnitude of the risk corresponding to the work content is calculated by the processing device. The plan prediction unit 100b selects a probability distribution model corresponding to the calculated magnitude of the risk from the probability distribution database unit 100d, and uses the selected probability distribution model to determine the work status (quality (Q), The work status of the project is predicted by generating a probability distribution of cost (C) and process (D) by the processing device.

図7は、実施の形態1に係るプロジェクト管理装置100における計画予測部100bが予測した結果の出力イメージを示した図である。計画予測部100bは、計画予測処理を行い、予測した結果としてプロジェクト予測結果部40を生成して記憶装置に記憶する。   FIG. 7 is a diagram illustrating an output image of a result predicted by the plan prediction unit 100b in the project management apparatus 100 according to the first embodiment. The plan prediction unit 100b performs a plan prediction process, generates a project prediction result unit 40 as a predicted result, and stores it in the storage device.

図7に示すように、作業項目301に設定された作業内容「AAAA」に対して、ひとつのプロジェクト予測結果部40が生成される。計画予測部100bは、作業内容「AAAA」に対応するプロジェクト情報部30に定義されたリスク「xxxx」と「zzzz」に基づき、リスクの大きさを算出する。作業内容「AAAA」に対応するリスクの大きさは、上述したように、リスク情報部31の実際に具現化するであろう顕在化率313を見積もった結果を記入するリスク評価結果部31bより算出する。   As illustrated in FIG. 7, one project prediction result unit 40 is generated for the work content “AAAA” set in the work item 301. The plan prediction unit 100b calculates the magnitude of the risk based on the risks “xxxx” and “zzz” defined in the project information unit 30 corresponding to the work content “AAAA”. As described above, the risk size corresponding to the work content “AAAA” is calculated from the risk evaluation result unit 31b in which the result of estimating the actualization rate 313 that the risk information unit 31 will actually embody is entered. To do.

計画予測部100bは、算出したリスクの大きさに基づいて、確率分布データベース部100dから基準となる確率分布モデルを選択し、プロジェクト予測結果部40の基準の確率分布部40aに設定する。   The plan predicting unit 100b selects a reference probability distribution model from the probability distribution database unit 100d based on the calculated risk size, and sets it as the reference probability distribution unit 40a of the project prediction result unit 40.

計画予測部100bは、プロジェクト予測結果部40の品質分布部40bに、基準の確率分布部40aの分布情報と作業内容部30a及び関連情報部30cの品質(Q)を元に算出した品質分布を設定する。計画予測部100bは、プロジェクト予測結果部40のコスト分布部40cに、基準の確率分布部40aの分布情報と作業内容部30a及び関連情報部30cのコスト(C)を元に算出したコスト分布を設定する。計画予測部100bは、プロジェクト予測結果部40の工程分布部40dに、基準の確率分布部40aの分布情報と作業内容部30a及び関連情報部30cの工程(D)を元に算出した工程分布を設定する。   The plan prediction unit 100b applies the quality distribution calculated based on the distribution information of the reference probability distribution unit 40a and the quality (Q) of the work content unit 30a and the related information unit 30c to the quality distribution unit 40b of the project prediction result unit 40. Set. The plan prediction unit 100b adds the cost distribution calculated based on the distribution information of the reference probability distribution unit 40a and the cost (C) of the work content unit 30a and the related information unit 30c to the cost distribution unit 40c of the project prediction result unit 40. Set. The plan prediction unit 100b adds the process distribution calculated based on the distribution information of the standard probability distribution unit 40a and the process (D) of the work content unit 30a and the related information unit 30c to the process distribution unit 40d of the project prediction result unit 40. Set.

ここでは、プロジェクト予測結果部40にて示す結果は、作業内容部30aの作業項目301の作業内容毎に示されているが、複数の作業内容をまとめてプロジェクト予測結果部40を出力しても構わない。   Here, the result shown in the project prediction result section 40 is shown for each work content of the work item 301 in the work content section 30a. However, even if a plurality of work contents are collected and the project prediction result section 40 is output. I do not care.

図9は、実施の形態1に係るプロジェクト管理装置100のプロジェクト管理方法の処理を示すフロー図である。図9を用いて、実施の形態1に係るプロジェクト管理装置100のプロジェクト管理方法について説明する。   FIG. 9 is a flowchart showing processing of the project management method of the project management apparatus 100 according to the first embodiment. The project management method of the project management apparatus 100 according to the first embodiment will be described with reference to FIG.

<計画管理ステップ:S101>
まず、計画管理部100aは、プロジェクト情報部30に予め定義する情報として、作業項目301及び、開始日302、終了日303からなる作業内容部30aの情報を入力して、プロジェクト情報部30として記憶装置に記憶する。プロジェクト情報部30に予め定義する情報は、例えば、管理者等が入力装置を用いてプロジェクト管理装置100に入力するものである。プロジェクト情報部30の作業項目301及び、開始日302、終了日303からなる作業内容部30aは、プロジェクトを行うためのWBSとして定義されるものである。
<Plan management step: S101>
First, the plan management unit 100a inputs information on the work content unit 30a including the work item 301 and the start date 302 and the end date 303 as information to be defined in advance in the project information unit 30, and stores it as the project information unit 30. Store in the device. The information defined in advance in the project information unit 30 is, for example, input to the project management apparatus 100 by an administrator using an input device. A work item 301 in the project information part 30 and a work content part 30a composed of a start date 302 and an end date 303 are defined as WBS for performing a project.

次に、計画管理部100aは、プロジェクト情報部30に予め定義する情報として、作業項目301に設定した作業内容の品質(Q)、コスト(C)、工程(D)への影響の有無に関する情報を入力して、関連情報部30cの品質(Q)、コスト(C)、工程(D)の項目に影響の有無に関する情報を記憶する(定義する)。また、計画管理部100aは、プロジェクト情報部30に予め定義する情報として、作業項目301に設定した作業内容に影響するリスクを入力して、関連情報部30cのリスク(R)の項目にリスク内容(リスクの種別)を記憶する(定義する)。   Next, the plan management unit 100a, as information defined in advance in the project information unit 30, is information regarding the presence or absence of an influence on the quality (Q), cost (C), and process (D) of the work content set in the work item 301. To store (define) information related to the presence / absence of the influence on the quality (Q), cost (C), and process (D) items of the related information section 30c. In addition, the plan management unit 100a inputs a risk that affects the work content set in the work item 301 as information to be defined in advance in the project information unit 30, and the risk content in the risk (R) item of the related information unit 30c. (Risk type) is stored (defined).

計画管理部100aは、プロジェクト管理者等により予め定義され作成されたプロジェクト情報のファイルを入力して、プロジェクト情報部30として記憶装置に記憶してもよい。   The plan management unit 100a may input a project information file defined and created in advance by a project manager or the like and store the file as the project information unit 30 in a storage device.

<リスク管理ステップ:S102>
次に、リスク管理部100cは、リスク情報部31に予め定義する情報として、リスク項目311からなるリスク項目部31aとリスクの影響213とリスクの顕在化率313からなるリスク評価結果部31b、リスクの対策314からなるリスク対策定義部31cの情報を入力して、リスク情報部31として記憶装置に記憶する。リスク管理部100cは、リスク情報部31のリスク項目311に設定する情報として、管理者等から入力装置を通して入力されたリスク内容を入力し、入力したリスク内容(リスクの種別)をリスク情報部31のリスク項目311に設定する。管理者等から入力装置を通して入力されたリスク内容は、例えば、プロジェクトの実施にあたり、各作業内容について発生する可能性のあるリスクとして、管理者等が検討した結果として入力されるものである。
<Risk management step: S102>
Next, the risk management unit 100c includes, as information predefined in the risk information unit 31, a risk item unit 31a including a risk item 311, a risk effect 213, and a risk evaluation result unit 31b including a risk manifestation rate 313, a risk The information of the risk countermeasure definition unit 31c including the countermeasures 314 is input and stored in the storage device as the risk information unit 31. The risk management unit 100c inputs the risk content input from the administrator or the like through the input device as information to be set in the risk item 311 of the risk information unit 31, and the input risk content (risk type) is input to the risk information unit 31. The risk item 311 is set. The risk content input from the administrator or the like through the input device is, for example, input as a result of examination by the administrator or the like as a risk that may occur for each work content when the project is executed.

リスク管理部100cは、リスクの影響312とリスクの顕在化率313からなるリスク評価結果部31bに設定する情報として、管理者等から入力装置を通して入力されたリスク内容に対応する影響(金額)と顕在化率(%)とを入力し、入力した影響(金額)と顕在化率(%)を、リスク情報部31のリスク評価結果部31bの影響312と顕在化率313に設定する。   The risk management unit 100c includes, as information to be set in the risk evaluation result unit 31b including the risk impact 312 and the risk manifestation rate 313, the impact (amount) corresponding to the risk content input from the administrator or the like through the input device. The actualization rate (%) is input, and the input influence (amount) and the actualization rate (%) are set in the influence 312 and the actualization rate 313 of the risk evaluation result unit 31b of the risk information unit 31.

次に、リスク管理部100cは、リスク情報部31のリスク対策定義部31cに定義する情報として、管理者等から入力装置を通してリスクが具現化した場合における対策の実施の有無や実施内容からなる対策314の情報を入力して、入力した対策314の情報をリスク対策定義部31cに設定(定義)する。   Next, the risk management unit 100c, as information to be defined in the risk countermeasure definition unit 31c of the risk information unit 31, measures that include the presence / absence of countermeasures and the implementation contents when a risk is embodied through an input device from an administrator or the like. The information of 314 is input, and the input information of the countermeasure 314 is set (defined) in the risk countermeasure definition unit 31c.

リスク管理部100cは、プロジェクト管理者等により予め定義され作成されたリスクの情報のファイルを入力して、リスク情報部31として記憶装置に記憶してもよい。   The risk management unit 100c may input a risk information file defined and created in advance by a project manager or the like and store the file as the risk information unit 31 in the storage device.

<リスク関連付けステップ:S103>
S101にて計画管理部100aにより、プロジェクト情報部30の関連情報部30cのリスク(R)の項目にリスク内容(リスクの種別)が記憶(定義)されるとともに、S102にてリスク管理部100cによりリスク情報部31のリスク項目311にリスク内容(リスクの種別)が定義されることにより、リスク情報部30のリスク項目311のリスクが登録してあるプロジェクト情報部30の作業内容部30aのどの作業内容に関連するか、またその影響の関係を定義することができる。
<Risk association step: S103>
In S101, the plan management unit 100a stores (defines) the risk content (risk type) in the risk (R) item of the related information unit 30c of the project information unit 30, and the risk management unit 100c in S102. By defining the risk content (risk type) in the risk item 311 of the risk information part 31, which work of the work content part 30a of the project information part 30 in which the risk of the risk item 311 of the risk information part 30 is registered It is possible to define the relationship between contents and their influence.

<計画予測ステップ:S104>
<確率分布モデル選択ステップ:S1041〜S1044)>
計画予測部100bは、作業項目301のすべての作業内容について処理が完了したかを処理装置により判定する(S1042)。作業項目301のすべての作業内容について処理が完了した場合には(S1042にてYes)、計画予測部100bは、処理を終了する。作業項目301のすべての作業内容について処理が完了していない場合には(S1042にてNo)、計画予測部100bはS1043に処理を移す。
<Planned prediction step: S104>
<Probability distribution model selection step: S1041 to S1044)>
The plan predicting unit 100b determines whether the processing is completed for all the work contents of the work item 301 by the processing device (S1042). When the process is completed for all the work contents of the work item 301 (Yes in S1042), the plan predicting unit 100b ends the process. If the processing has not been completed for all the work contents of the work item 301 (No in S1042), the plan predicting unit 100b moves the process to S1043.

<リスクの大きさ算出ステップ:S1043>
計画予測部100bは、処理対象の作業項目301の作業内容に対応するリスク内容をプロジェクト情報部30から処理装置により取得する。例えば、計画予測部100bは、作業内容「AAAA」に対応するリスク内容「xxxx」と「zzzz」とを取得する。計画予測部100bは、取得したリスク内容(「xxxx」と「zzzz」)に対応するリスク評価結果部31bをリスク情報部31より取得する。計画予測部100bは、取得したリスク評価結果部31bに基づいて、処理対象の作業項目301の作業内容に対応するリスクの大きさを算出する。計画予測部100bは、リスク内容「xxxx」のリスクの大きさとしてabc円×mm%(図6参照)を算出する。また、計画予測部100bは、リスク内容「zzzz」のリスクの大きさとしてghi円×pp%(図6参照)を算出する。
<Risk size calculation step: S1043>
The plan prediction unit 100b acquires the risk content corresponding to the work content of the work item 301 to be processed from the project information unit 30 by the processing device. For example, the plan prediction unit 100b acquires risk contents “xxxx” and “zzz” corresponding to the work contents “AAAA”. The plan prediction unit 100b acquires from the risk information unit 31 a risk evaluation result unit 31b corresponding to the acquired risk contents (“xxxx” and “zzz”). The plan predicting unit 100b calculates the size of the risk corresponding to the work content of the work item 301 to be processed based on the acquired risk evaluation result unit 31b. The plan predicting unit 100b calculates abc circle × mm% (see FIG. 6) as the risk size of the risk content “xxxx”. In addition, the plan prediction unit 100b calculates ghi circle × pp% (see FIG. 6) as the risk magnitude of the risk content “zzz”.

ここで、計画予測部100bが、1つの作業内容に割当てられているリスクが複数ある場合のリスクの大きさを算出する例について説明する。例えば、1つの作業内容に割当てられているリスクが複数ある場合(図6のリスク308に「xxxx」と「zzzz」とが設定されている場合)には、計画予測部100bは、それぞれのリスクの大きさを処理装置により計算する。計画予測部100bは、それぞれのリスクの大きさを単純に加算し、加算した結果を「確率分布データベース」選択時のリスクの大きさとして用いてもよい。この場合、作業内容「AAAA」のリスクの大きさは、(abc円×mm%)+(ghi円×pp%)となる。つまり、一つの作業が複数のリスクに関連した場合、作業自体のリスクの大きさが大きくなるため、確率分布データベース部100dのうち偏差の大きいの確率分布モデル(分布値)を選択することになる。   Here, an example will be described in which the plan prediction unit 100b calculates the magnitude of risk when there are a plurality of risks assigned to one work content. For example, when there are a plurality of risks assigned to one work content (when “xxxx” and “zzz” are set in the risk 308 in FIG. 6), the plan predicting unit 100 b Is calculated by the processing device. The plan prediction unit 100b may simply add the magnitudes of the respective risks, and use the addition result as the risk magnitude when selecting the “probability distribution database”. In this case, the magnitude of the risk of the work content “AAAA” is (abc circle × mm%) + (ghi circle × pp%). That is, when one work is related to a plurality of risks, the risk of the work itself increases, and therefore a probability distribution model (distribution value) having a large deviation is selected from the probability distribution database unit 100d. .

あるいは、1つの作業内容に割当てられているリスクが複数ある場合、作業内容毎にリスクの大きさの比重を定義しておき、各作業に割当てられているリスクの大きさを、比重の割合分のみ加算し、加算した結果を「確率分布データベース」選択時のリスクの大きさとして用いてもよい。この場合は、単純に加算する場合と異なり、リスクの大きさが大きくても、比重が小さい作業は、確率分布データベース部100dのうち偏差の小さい分布値を選択することになる。   Alternatively, when there are multiple risks assigned to one work content, the specific gravity of the risk magnitude is defined for each work content, and the risk magnitude assigned to each work is represented by the ratio of specific gravity. May be added, and the result of the addition may be used as the risk magnitude when selecting the “probability distribution database”. In this case, unlike the case of simple addition, even if the risk is large, an operation with a small specific gravity selects a distribution value with a small deviation from the probability distribution database unit 100d.

<確率分布モデル選択ステップ:S1044>
以上のように算出されたリスクの大きさに基づいて、計画予測部100bは、確率分布データベース部100dから、基準となる確率分布モデルを処理装置により選択する。例えば、図6における作業内容「AAAA」に対応するリスクの大きさが70(リスク大)である場合、計画予測部100bは、図5に示す確率分布データベース部100dに記憶される確率分布モデルからリスクの値が70(リスク大)に対応する確率分布モデル20aを処理装置により選択する。計画予測部100bは、選択した確率分布モデル20aをプロジェクト予測結果部40の基準の確率分布部40aに設定する。
<Probability distribution model selection step: S1044>
Based on the risk magnitude calculated as described above, the plan prediction unit 100b selects a probability distribution model serving as a reference from the probability distribution database unit 100d by the processing device. For example, when the risk size corresponding to the work content “AAAA” in FIG. 6 is 70 (high risk), the plan predicting unit 100b uses the probability distribution model stored in the probability distribution database unit 100d shown in FIG. A probability distribution model 20a corresponding to a risk value of 70 (large risk) is selected by the processing device. The plan prediction unit 100b sets the selected probability distribution model 20a as the reference probability distribution unit 40a of the project prediction result unit 40.

<品質予測ステップ:S1045>
計画予測部100bは、選択した基準の確率分布モデルに対し、処理対象である作業内容の品質の計画値を処理装置によりあてはめて、品質の確率分布を生成する。計画予測部100bは、生成した品質の確率分布をプロジェクト予測結果部40の品質分布部40bに設定する。プロジェクト予測結果部40の品質分布部40bには、処理対象である作業内容のリスクの状態において、コストと工程とを固定した場合の品質の分布状況が設定される。
<Quality prediction step: S1045>
The plan predicting unit 100b applies the plan value of the quality of the work content to be processed to the selected standard probability distribution model by the processing device, and generates a quality probability distribution. The plan prediction unit 100 b sets the generated probability distribution of quality in the quality distribution unit 40 b of the project prediction result unit 40. In the quality distribution unit 40b of the project prediction result unit 40, the distribution state of the quality when the cost and the process are fixed in the state of risk of the work content to be processed is set.

<コスト予測ステップ:S1046>
計画予測部100bは、選択した基準の確率分布モデルに対し、処理対象である作業内容のコストの計画値を処理装置によりあてはめて、コストの確率分布を生成する。計画予測部100bは、生成したコストの確率分布をプロジェクト予測結果部40のコスト分布部40cに設定する。プロジェクト予測結果部40のコスト分布部40cには、処理対象である作業内容のリスクの状態において、品質と工程とを固定した場合のコストの分布状況が設定される。
<Cost prediction step: S1046>
The plan predicting unit 100b applies a plan value of the cost of the work content to be processed to the selected standard probability distribution model by the processing device, and generates a cost probability distribution. The plan prediction unit 100 b sets the generated probability distribution of costs in the cost distribution unit 40 c of the project prediction result unit 40. In the cost distribution unit 40c of the project prediction result unit 40, the distribution state of costs when the quality and the process are fixed in the state of the risk of the work content to be processed is set.

<コスト予測ステップ:S1047>
計画予測部100bは、選択した基準の確率分布モデルに対し、処理対象である作業内容の工程の計画値を処理装置によりあてはめて、工程の確率分布を生成する。計画予測部100bは、生成した工程の確率分布をプロジェクト予測結果部40の工程分布部40dに設定する。プロジェクト予測結果部40の工程分布部40dには、処理対象である作業内容のリスクの状態において、品質とコストとを固定した場合の工程の分布状況が設定される。
<Cost prediction step: S1047>
The plan predicting unit 100b applies a plan value of the process of the work content to be processed to the selected standard probability distribution model by the processing device, and generates a probability distribution of the process. The plan prediction unit 100 b sets the generated probability distribution of the process in the process distribution unit 40 d of the project prediction result unit 40. In the process distribution unit 40d of the project prediction result unit 40, the process distribution state when quality and cost are fixed in the state of risk of the work content to be processed is set.

<プロジェクト予測結果部40の表示処理:S1048>
プロジェクト管理装置100の備える表示部(図2参照)は、計画予測部100bが生成した作業状況の確率分布を表示装置に出力する。あるいは、プロジェクト管理装置100の備える出力部(図2参照)は、計画予測部100bが生成した作業状況の確率分布を出力装置に出力する。
<Display processing of project prediction result unit 40: S1048>
The display part (refer FIG. 2) with which the project management apparatus 100 is provided outputs the probability distribution of the work condition which the plan prediction part 100b produced | generated to a display apparatus. Or the output part (refer FIG. 2) with which the project management apparatus 100 is provided outputs the probability distribution of the work condition which the plan prediction part 100b produced | generated to the output apparatus.

図8は、計画予測部100bが選択した確率分布の分布値を示す図であり、(a)は、プロジェクトの計画値に対してパーセントを乗算して分布範囲を算出する確率分布であり、(b)は、プロジェクトの計画値に対して日数を加算して分布範囲を算出する確率分布を示している。図8を用いて、処理対象である作業内容の作業状況(品質、コスト、工程)の確率分布を生成する処理について説明する。   FIG. 8 is a diagram showing the distribution value of the probability distribution selected by the plan predicting unit 100b. FIG. 8A is a probability distribution in which the distribution range is calculated by multiplying the planned value of the project by a percentage. b) shows a probability distribution for calculating the distribution range by adding the number of days to the planned value of the project. A process of generating a probability distribution of the work status (quality, cost, process) of the work content to be processed will be described with reference to FIG.

例えば、品質の確率分布を生成する場合において、作業内容「AAAA」の品質の計画値が「不具合数10」であった場合、計画予測部100bは、処理装置を用いて、図8(a)に示す確率分布モデル20aにプロジェクトの計画値「不具合数10」をあてはめる。計画予測部100bは、プロジェクトの計画値「不具合数10」に確率分布モデル20aに示されたパーセントを乗算することにより、最大値、最小値、正規分布6σの最大値、正規分布6σの最小値を処理装置により算出して、品質の確率分布を生成する。   For example, in the case of generating a probability distribution of quality, when the planned quality value of the work content “AAAA” is “number of defects 10”, the plan predicting unit 100b uses the processing device, and FIG. The project plan value “number of defects 10” is applied to the probability distribution model 20a shown in FIG. The plan prediction unit 100b multiplies the project plan value “number of defects 10” by the percentage indicated in the probability distribution model 20a, thereby obtaining the maximum value, the minimum value, the maximum value of the normal distribution 6σ, and the minimum value of the normal distribution 6σ. Is calculated by the processing device to generate a probability distribution of quality.

例えば、コストの確率分布を生成する場合において、作業内容「AAAA」のコストの計画値が「個数当たりaaa円」であった場合、計画予測部100bは、処理装置を用いて、図8(a)に示す確率分布モデル20aにプロジェクトの計画値「個数当たりaaa円」をあてはめる。計画予測部100bは、プロジェクトの計画値「個数当たりaaa円」に確率分布モデル20aに示されたパーセントを乗算することにより、最大値、最小値、正規分布6σの最大値、正規分布6σの最小値を処理装置により算出して、コストの確率分布を生成する。   For example, in the case of generating a probability distribution of costs, when the planned value of the cost of the work content “AAAA” is “aaa circle per piece”, the plan predicting unit 100b uses FIG. The project planned value “aaa circle per piece” is assigned to the probability distribution model 20a shown in FIG. The plan prediction unit 100b multiplies the project plan value “aaa circle per piece” by the percentage shown in the probability distribution model 20a, thereby obtaining the maximum value, the minimum value, the maximum value of the normal distribution 6σ, and the minimum value of the normal distribution 6σ. The value is calculated by the processing device to generate a probability distribution of costs.

例えば、工程の確率分布を生成する場合において、作業内容「AAAA」の工程の計画値が「作業終了日m月n日」であった場合、計画予測部100bは、処理装置を用いて、図8(b)に示す確率分布モデル20aにプロジェクトの計画値「作業終了日m月n日」をあてはめる。計画予測部100bは、プロジェクトの計画値「作業終了日m月n日」に確率分布モデル20aにより得られる日数を加算して、最大値(m月n日から10日遅れ)、最小値(m月n日から2日前)、正規分布6σの最大値(m月n日から5日遅れ)、正規分布6σの最小値(m月n日)を処理装置により算出して、工程の確率分布を生成する。   For example, in the case of generating a probability distribution of a process, when the planned value of the process of the work content “AAAA” is “work end date m / month / day”, the plan prediction unit 100b uses a processing device to The project plan value “work end date m month n day” is applied to the probability distribution model 20a shown in FIG. The plan predicting unit 100b adds the number of days obtained by the probability distribution model 20a to the project plan value “work end date m / month / day” to obtain a maximum value (delayed 10 days from m / month n) and a minimum value (m 2 days before the month n), the maximum value of the normal distribution 6σ (5 days after m month n day) and the minimum value of the normal distribution 6σ (m month n day) are calculated by the processing device, and the probability distribution of the process is calculated. Generate.

以上のように、計画予測部100bは、作業項目301に設定されたすべての作業内容について、リスクの大きさを算出し、リスクの大きさに基づいて、作業状況の予測に用いる確率分布モデルを選択し、リスクの大きさに合った確率分布モデルによって、作業状況の確率分布を生成することができるので、より精度の高い作業状況の確率分布を生成することができる。   As described above, the plan predicting unit 100b calculates the risk magnitude for all work contents set in the work item 301, and uses the probability distribution model used for predicting the work situation based on the risk magnitude. Since the probability distribution model of the work situation can be generated by the probability distribution model selected and matched to the magnitude of the risk, the probability distribution of the work situation with higher accuracy can be generated.

以上のように、作業内容に対して、品質(Q)、コスト(C)、工程(D)の分布状況が計算されるため、プロジェクトの全体を見通し、もっともプロジェクトの目的に合った効率の良い、リスク対策を打つことが定量的に判断可能となる。   As described above, since the distribution status of quality (Q), cost (C), and process (D) is calculated with respect to the work content, the entire project is viewed and the efficiency that best suits the purpose of the project is high. It is possible to judge quantitatively to take risk countermeasures.

実施の形態2.
実施の形態1では、プロジェクト管理装置100の機能ブロック構成の最小構成について説明した。プロジェクト管理においては、例えば、プロジェクト管理装置の予測結果に基づき、あるいは、プロジェクトを取り巻く環境の変化等により、プロジェクトの計画を変更する場合がある。このような場合には、プロジェクト管理装置のプロジェクト情報部(WBS)の内容を変更する必要があるが、本実施の形態では、プロジェクト情報部の内容の変更に関する制約条件や変更条件を付加することのできる機能を有するプロジェクト管理装置200について説明する。
Embodiment 2. FIG.
In the first embodiment, the minimum configuration of the functional block configuration of the project management apparatus 100 has been described. In project management, for example, a project plan may be changed based on a prediction result of a project management apparatus or due to a change in the environment surrounding the project. In such a case, it is necessary to change the contents of the project information section (WBS) of the project management apparatus, but in this embodiment, a constraint condition or a change condition regarding the change of the contents of the project information section is added. A project management apparatus 200 having a function capable of performing the above will be described.

図10は、実施の形態2に係るプロジェクト管理装置200の機能ブロック構成図である。図10において、実施の形態1で説明したプロジェクト管理装置100の機能ブロックと同一の機能ブロックについては同一の符号を付し、その説明を省略する。   FIG. 10 is a functional block configuration diagram of the project management apparatus 200 according to the second embodiment. In FIG. 10, the same functional blocks as the functional blocks of the project management apparatus 100 described in the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.

図10に示すプロジェクト管理装置200は、実施の形態1で説明した図3のプロジェクト管理装置100の機能ブロックに加えて、変更条件データベース部200i(変更条件データベース)を定義する変更条件定義部200bと、プロジェクト情報部50とリスク情報部31とを記憶装置に保管する計画保管部200gと、リスクと計画の関連付けを行うリスクと計画の関連付け部200dと、制約条件データベース部200j(制約条件データベース)を生成する制約条件データ生成部200fとを備えたブロック構成である。   The project management apparatus 200 shown in FIG. 10 includes a change condition definition unit 200b that defines a change condition database unit 200i (change condition database) in addition to the functional blocks of the project management apparatus 100 of FIG. 3 described in the first embodiment. A plan storage unit 200g for storing the project information unit 50 and the risk information unit 31 in a storage device, a risk-plan association unit 200d for associating a risk with a plan, and a constraint database unit 200j (a constraint database) The block configuration includes a constraint condition data generation unit 200f to be generated.

ここで、計画管理部100aと、計画予測部100bと、リスク管理部100cと、変更条件定義部200bと、リスクと計画の関連付け部200dと、制約条件データ生成部200fとは、素子・デバイス・基板・配線などのハードウェアのみで実施されている。あるいは、ROM913に記憶されたファームウェアで実現されていてもよい。あるいは、ソフトウェアとハードウェアとの組み合わせ、さらには、ファームウェアとの組み合わせで実施されても構わない。ファームウェアあるいはソフトウェアの場合は、プログラムとして、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等の記録媒体に記憶されており、プログラムはCPU911により読み出され、CPU911により実行される。   Here, the plan management unit 100a, the plan prediction unit 100b, the risk management unit 100c, the change condition definition unit 200b, the risk-plan association unit 200d, and the constraint condition data generation unit 200f include elements, devices, It is implemented only with hardware such as boards and wiring. Alternatively, it may be realized by firmware stored in the ROM 913. Alternatively, a combination of software and hardware, or a combination of firmware may be used. In the case of firmware or software, the program is stored in a recording medium such as a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, and a DVD. The program is read by the CPU 911 and executed by the CPU 911.

計画管理部100aは、WBSと品質(Q)、コスト(C)、工程(D)、リスク(R)を明示的に関連付けたプロジェクト情報部50を管理する。   The plan management unit 100a manages the project information unit 50 that explicitly associates WBS with quality (Q), cost (C), process (D), and risk (R).

変更条件定義部200bは、プロジェクト情報部50の作業を変更する際の変更条件を定義して変更条件データベース部200iとして記憶装置に記憶する。変更条件定義部200bは、計画管理部100aで管理するプロジェクト情報部50に対する変更に対して、作業等の依存性による制約を定義し、変更条件データベース部200iとして記憶装置に保管する。   The change condition definition unit 200b defines a change condition when changing the work of the project information unit 50, and stores it in the storage device as the change condition database unit 200i. The change condition definition unit 200b defines constraints due to dependency of work or the like for changes to the project information unit 50 managed by the plan management unit 100a, and stores them in the storage device as the change condition database unit 200i.

リスク管理部100cは、計画管理部100aで管理するプロジェクト情報部50と明示的に関連付けたリスク(R)を管理する。   The risk management unit 100c manages the risk (R) explicitly associated with the project information unit 50 managed by the plan management unit 100a.

リスクと計画の関連付け部200dは、計画管理部100aで管理するプロジェクト情報部50と明示的にリスク(R)の関連を定義する。   The risk-plan association unit 200d explicitly defines the risk (R) relationship with the project information unit 50 managed by the plan management unit 100a.

計画予測部100bは、計画管理部100aで管理するプロジェクト情報部50と確率分布データベース部100dに記憶されたリスクの大きさに連動した組織の統計的な確率分布とを用いて、プロジェクトの作業状況の予測を行う。   The plan prediction unit 100b uses the project information unit 50 managed by the plan management unit 100a and the statistical probability distribution of the organization linked to the risk size stored in the probability distribution database unit 100d to work the project. Make predictions.

制約条件データ生成部200fは、プロジェクト情報部50の有するリソース等の情報である作業関連情報についての制約条件を定義して制約条件データベース部200jとして記憶装置に記憶する。制約条件データ生成部200fは、計画管理部100aで管理するプロジェクト情報部50に対する変更に対して、リソース等(作業内容を実施するために必要な作業関連情報)の排他情報による制約条件の定義をし、制約条件データベース部200jとして記憶装置に保管する。   The constraint condition data generation unit 200f defines a constraint condition for work-related information, which is information such as resources of the project information unit 50, and stores it in the storage device as a constraint condition database unit 200j. The constraint condition data generation unit 200f defines a constraint condition based on exclusive information such as resources (work-related information necessary for performing the work contents) in response to a change to the project information unit 50 managed by the plan management unit 100a. And stored in the storage device as the constraint condition database unit 200j.

計画保管部200gは、計画管理部100aで管理するプロジェクト情報部50に対してリスクと計画の関連付け部200dで関連付けの完了したプロジェクト情報部50の更新履歴を管理する。   The plan storage unit 200g manages the update history of the project information unit 50 that has been associated with the risk / plan association unit 200d with respect to the project information unit 50 managed by the plan management unit 100a.

確率分布データベース部100dは、リスクの大きさに連動した組織の統計的な確率分布を格納する。   The probability distribution database unit 100d stores a statistical probability distribution of an organization linked to the magnitude of risk.

図11は、実施の形態2に係るプロジェクト管理装置200のプロジェクト情報部50の構成を示す図である。図12は、実施の形態2に係るプロジェクト管理装置200においてプロジェクト情報部50の情報を変更した後のプロジェクト情報部(変更後)60の構成を示す図である。   FIG. 11 is a diagram illustrating a configuration of the project information unit 50 of the project management apparatus 200 according to the second embodiment. FIG. 12 is a diagram illustrating a configuration of the project information unit (after change) 60 after the information in the project information unit 50 is changed in the project management apparatus 200 according to the second embodiment.

図11に示すように、実施の形態2に係るプロジェクト情報部50は、実施の形態1で説明した図6のプロジェクト情報部30に対して、リソース50dと期間50eを追加した構成である。すなわち、プロジェクト情報部50とプロジェクト情報部(変更後)60とは、プロジェクトにおける作業の変更前後のプロジェクト情報部を示したものである。   As shown in FIG. 11, the project information unit 50 according to the second embodiment has a configuration in which a resource 50d and a period 50e are added to the project information unit 30 of FIG. 6 described in the first embodiment. In other words, the project information part 50 and the project information part (after change) 60 show the project information part before and after the change of work in the project.

図11において、プロジェクト情報部50は、プロジェクトの作業内容と開始日、終了日を定義する作業内容部50aと、作業内容部50aの実施状況を記録する実績部50b、作業内容部50aに示す作業と品質(Q)、コスト(C)、工程(D)、リスク(R)の関係を定義する関連情報部50c、作業内容部50aに示す作業と使用リソースの関係を示すリソース50d、作業内容部50aに示す作業と日程の関係を示した期間50eから構成される。ここで、作業内容部50aに示す作業と使用リソースの関係を示すリソース50dと作業内容部50aに示す作業と日程の関係を示した期間50eとは、該当する作業内容を実施するために必要な作業関連情報の一例である。   In FIG. 11, the project information unit 50 includes a work content unit 50a that defines the work content, start date, and end date of the project, a performance unit 50b that records the implementation status of the work content unit 50a, and the work shown in the work content unit 50a. And information (quality) (Q), cost (C), process (D), related information part 50c that defines the relationship of risk (R), resource 50d that shows the relationship between the work shown in the work content part 50a and the resource used, work content part The period 50e shows the relationship between the work shown in 50a and the schedule. Here, the resource 50d indicating the relationship between the work and the resource used in the work content part 50a and the period 50e indicating the relationship between the work and the schedule shown in the work content part 50a are necessary for performing the corresponding work content. It is an example of work related information.

図12において、プロジェクト情報部60は、プロジェクトの作業内容と開始日、終了日を定義する作業内容部60aと、作業内容部60aの実施状況を記録する実績部60b、作業内容部60aに示す作業と品質(Q)、コスト(C)、工程(D)、リスク(R)の関係を定義する関連情報部60c、作業内容部60aに示す作業と使用リソースの関係を示すリソース60d、作業内容部60aに示す作業と日程の関係を示した期間60eから構成される。   In FIG. 12, the project information section 60 includes a work content section 60a that defines the work contents, start date, and end date of the project, a performance section 60b that records the implementation status of the work content section 60a, and the work shown in the work content section 60a. And the relation information part 60c that defines the relationship between the quality (Q), cost (C), process (D), and risk (R), the resource 60d that shows the relation between the work and the resource used in the work content part 60a, and the work content part It is comprised from the period 60e which showed the relationship between the operation | work shown to 60a, and a schedule.

次に、本実施の形態におけるプロジェクト管理装置200についての変更条件データベース部200iの登録方法、制約条件データベース部200jの登録方法、プロジェクト情報部50の計画保管部200gへの登録方法、リスク情報部31の計画保管部200gへの登録方法について説明する。   Next, the registration method of the change condition database unit 200i, the registration method of the constraint database unit 200j, the registration method of the project information unit 50 to the plan storage unit 200g, and the risk information unit 31 for the project management apparatus 200 in the present embodiment. The registration method to the plan storage unit 200g will be described.

図13は、変更条件データベース部200iの一例を示す図である。図13の変更条件データベース部200iは、ソフトウェア開発において、例えば、プロジェクト情報部50に登録済みであって関連のある作業Bと作業Eにおいて、作業Bを作業Eに変更する場合の変更条件の一例を以下のように示している。
(a)作業Bは、作業Cを伴うが作業Fは実施しない。
(b)作業Eは、作業Fを伴うが作業Cは実施しない。
(c)作業Fは、作業Dと同じプロジェクト内にて行わない。
FIG. 13 is a diagram illustrating an example of the change condition database unit 200i. The change condition database unit 200i in FIG. 13 is an example of a change condition when changing the work B to the work E in the work B and the work E that are registered in the project information unit 50 and related in software development. Is shown as follows.
(A) Work B involves work C, but work F is not performed.
(B) Work E is accompanied by work F, but work C is not performed.
(C) Work F is not performed in the same project as work D.

また、図14は、制約条件データベース部200jの一例を示す図である。図14の制約条件データベース部200jは、同様に、例えば、プロジェクト情報部50に登録済みであって関連のある作業Bと作業Eにおいて、作業Bを作業Eに変更する場合におけるリソース等の制約条件の一例を以下のように示している。
(d)作業Bは、リソースXを使用する。
(e)作業Fは、リソースXを使用する。
(f)リソースXは、他のプロジェクトWにて、R〜Sの期間使用している。
FIG. 14 is a diagram illustrating an example of the constraint condition database unit 200j. Similarly, the constraint condition database unit 200j of FIG. 14 similarly, for example, is a constraint condition of resources or the like when the work B is changed to the work E in the related work B and work E registered in the project information unit 50. An example is shown as follows.
(D) Work B uses resource X.
(E) The work F uses the resource X.
(F) The resource X is used in the period of R to S in another project W.

実施の形態2に係るプロジェクト管理装置200における変更条件データベース部200iの登録方法について説明する。まず、プロジェクト管理装置200において、変更条件定義部200bは、変更条件として定義された情報(変更条件(a)と(b)と(c)とを含む)を入力装置から入力して、変更条件データベース部200iとして記憶装置に格納する。すなわち、プロジェクト管理装置200において、変更条件(a)は、管理者により変更条件定義部200bを使い定義され、定義された情報(変更条件)は変更条件定義部200bにより変更条件データベース部200iに格納される。変更条件(b)と(c)も同様に、管理者により変更条件定義部200bを使い定義され、定義された変更条件(情報)は変更条件定義部200bにより変更条件データベース部200iに格納される。   A registration method of the change condition database unit 200i in the project management apparatus 200 according to Embodiment 2 will be described. First, in the project management apparatus 200, the change condition definition unit 200b inputs information (including change conditions (a), (b), and (c)) defined as the change condition from the input device, and the change condition The data is stored in the storage device as the database unit 200i. That is, in the project management apparatus 200, the change condition (a) is defined by the administrator using the change condition definition unit 200b, and the defined information (change condition) is stored in the change condition database unit 200i by the change condition definition unit 200b. Is done. Similarly, the change conditions (b) and (c) are defined by the administrator using the change condition definition unit 200b, and the defined change conditions (information) are stored in the change condition database unit 200i by the change condition definition unit 200b. .

次に、実施の形態2に係るプロジェクト管理装置200における制約条件データベース部200jの登録方法について説明する。プロジェクト管理装置200において、制約条件データ生成部200fは、制約条件として定義された情報(制約条件(d)と(e)とを含む)を入力装置から入力して、制約条件データベース部200jとして記憶装置に格納する。次に、制約条件データ生成部200fは、計画保管部200gに事前に登録済みのプロジェクト情報部50の内容から、格納した制約条件(b)と(e)とに関連するリソース等の制限に関する情報を処理装置により自動的に検索する。制約条件データ生成部200fは、検索した結果に基づいて処理装置により制約条件(f)を自動的に生成して制約条件データベース部200jに登録する。制約条件データ生成部200fは、制約条件データ生成部200fにて処理装置を用いて自動的に検索した結果も格納する。   Next, a registration method of the constraint condition database unit 200j in the project management apparatus 200 according to Embodiment 2 will be described. In the project management apparatus 200, the constraint data generation unit 200f inputs information defined as constraint conditions (including constraint conditions (d) and (e)) from the input device, and stores it as a constraint database unit 200j. Store in the device. Next, the constraint condition data generation unit 200f uses the contents of the project information unit 50 registered in advance in the plan storage unit 200g, and information on limitations on resources and the like related to the stored constraint conditions (b) and (e). Are automatically retrieved by the processing device. The constraint condition data generation unit 200f automatically generates a constraint condition (f) by the processing device based on the searched result and registers it in the constraint condition database unit 200j. The constraint data generation unit 200f also stores the result of automatic search using the processing device by the constraint data generation unit 200f.

すなわち、制約条件(d)「作業Bは、リソースXを使用する」は、管理者等により制約条件データ生成部200fを使い定義され、定義された制約条件(d)(情報)は制約条件データ生成部200fにより制約条件データベース部200jに格納される。また、制約条件(d)「作業Fは、リソースXを使用する」も同様に、管理者等により制約条件データ生成部200fを使い定義され、定義された制約条件(e)(情報)は制約条件データ生成部200fにより制約条件データベース部200jに格納される。   That is, the constraint condition (d) “work B uses resource X” is defined by the administrator or the like using the constraint condition data generation unit 200f, and the defined constraint condition (d) (information) is the constraint condition data. It is stored in the constraint database unit 200j by the generation unit 200f. Similarly, the constraint condition (d) “work F uses resource X” is defined by the administrator using the constraint condition data generation unit 200f, and the defined constraint condition (e) (information) is the constraint. It is stored in the constraint data base 200j by the condition data generator 200f.

次に、制約条件データ生成部200fは、制約条件(d)と(e)とに関連するリソース(リソースX、リソースY)についての制限に関する情報を、処理装置を用いて計画保管部200gに既に登録済みのプロジェクト情報部50の内容から検索する。制約条件データ生成部200fは、検索した結果に基づいて、制約条件(f)「リソースXは、他のプロジェクトWにて、R〜Sの期間使用している」を処理装置により自動的に生成する。制約条件データ生成部200fは、処理装置により自動的に生成した制約条件(f)(リソース等の制限に関連する情報)を制約条件データベース部200jに格納する。   Next, the constraint data generation unit 200f has already sent information related to the restrictions on the resources (resource X, resource Y) related to the constraints (d) and (e) to the plan storage unit 200g using the processing device. Search from the contents of the registered project information section 50. Based on the result of the search, the constraint data generation unit 200f automatically generates a constraint (f) “resource X is being used for another project W during the period R to S” by the processing device. To do. The restriction condition data generation unit 200f stores the restriction condition (f) (information related to resource restrictions) automatically generated by the processing device in the restriction condition database part 200j.

次に、実施の形態2に係るプロジェクト管理装置200におけるプロジェクト情報部50の登録方法について説明する。図11は、実施の形態2に係るプロジェクト情報部50の構成を示す図である。計画管理部100aは、実施の形態1で説明したように、プロジェクト情報部50に定義する情報(プロジェクトを行うためのWBS)として、作業内容部50aの作業項目及び、開始日、終了日を入力して、プロジェクト情報部50に記憶する。また、計画管理部100aは、作業内容部50aの作業項目の入力完了後、関連情報部50cに対して品質(Q)、コスト(C)、工程(D)への影響の有無を定義する情報を入力して、プロジェクト情報部50に記憶する。   Next, a registration method of the project information unit 50 in the project management apparatus 200 according to the second embodiment will be described. FIG. 11 is a diagram showing a configuration of the project information unit 50 according to the second embodiment. As described in the first embodiment, the plan management unit 100a inputs the work item, the start date, and the end date of the work content unit 50a as information defined in the project information unit 50 (WBS for performing a project). And stored in the project information section 50. In addition, the plan management unit 100a defines the presence / absence of the influence on the quality (Q), cost (C), and process (D) with respect to the related information unit 50c after completing the input of the work item in the work content unit 50a. Is stored in the project information unit 50.

実施の形態2では、計画管理部100aは、プロジェクト情報部50のリソース50dに定義する情報として、設定した作業内容部50aの作業項目に必要なリソースの情報を入力して、計画保管部200gのプロジェクト情報部50のリソース50dに記憶する(定義する)。また、計画管理部100aは、プロジェクト情報部50の期間50eに定義する情報として、設定した作業内容部50aの作業と日程の関係を示す情報(例えば、「作業AはP〜Qの期間行う」を示す情報)を入力して、計画保管部200gのプロジェクト情報部50の期間50eに記憶する(定義する)。   In the second embodiment, the plan management unit 100a inputs resource information necessary for the work item of the set work content unit 50a as information to be defined in the resource 50d of the project information unit 50, and the plan storage unit 200g It is stored (defined) in the resource 50d of the project information unit 50. Further, the plan management unit 100a, as information defined in the period 50e of the project information unit 50, is information indicating the relationship between the set work content unit 50a and the schedule (for example, “work A is performed during the period P to Q”). Is stored in the period 50e of the project information unit 50 of the plan storage unit 200g (defined).

実施の形態1と同様に、計画管理部100aが、管理者等により予め定義され生成されたプロジェクト情報の内容のファイルを入力して、プロジェクト情報部50としてプロジェクト管理装置200の計画保管部200gに登録してもよい。   As in the first embodiment, the plan management unit 100a inputs a file of project information content defined and generated in advance by an administrator or the like, and the project information unit 50 is stored in the plan storage unit 200g of the project management apparatus 200. You may register.

次に、リスク情報部31の計画保管部200gへの登録方法について説明する。リスク管理部100cが、リスク情報部31を記憶装置(計画保管部200g)に登録する処理については実施の形態1にて説明したものと同様である。リスク管理部100cは、プロジェクト管理装置200の計画保管部200gにリスク情報部31を登録する。   Next, a method for registering the risk information unit 31 in the planned storage unit 200g will be described. The process in which the risk management unit 100c registers the risk information unit 31 in the storage device (plan storage unit 200g) is the same as that described in the first embodiment. The risk management unit 100 c registers the risk information unit 31 in the plan storage unit 200 g of the project management device 200.

リスクと計画の関連付け部200dは、登録されたリスク情報部31と登録されたプロジェクト情報部50とのリスクと計画の関連付けを処理装置により行う。リスクと計画の関連付け部200dは、リスク情報部31のリスク項目311のリスク内容がプロジェクト情報部50の作業内容部50aのどの内容に関連するかの情報を入力して、入力した情報に基づいて関連情報部50cのリスク(R)に関係を定義する。すなわち、リスクと計画の関連付け部200dは、プロジェクト情報部50の関連情報部50cのリスク(R)の欄に、作業項目に対応するリスク内容を記憶する。   The risk and plan associating unit 200d associates the risk and the plan between the registered risk information unit 31 and the registered project information unit 50 by the processing device. The risk and plan associating unit 200d inputs information about which content of the work content unit 50a of the project information unit 50 the risk content of the risk item 311 of the risk information unit 31 relates to, and based on the input information A relationship is defined for the risk (R) of the related information part 50c. That is, the risk and plan associating unit 200d stores the risk content corresponding to the work item in the risk (R) column of the related information unit 50c of the project information unit 50.

次に、図13に示す変更条件データベース部200iと図14に示す制約条件データベース部200jとに基づいて、プロジェクト情報部50に登録済みであって関連のある作業Bと作業Eにおいて、作業Bを作業Eに変更する場合のプロジェクト情報部変更方法について説明する。以下に、本実施の形態におけるプロジェクト管理装置200において、計画保管部200gに格納してあるプロジェクト情報部50に対して、変更を行う場合についてのプロジェクト管理装置200の動作を示す。   Next, based on the change condition database part 200i shown in FIG. 13 and the constraint condition database part 200j shown in FIG. 14, the work B is registered in the project information part 50 and related work B and work E. A method for changing the project information section when changing to work E will be described. Hereinafter, in the project management apparatus 200 according to the present embodiment, an operation of the project management apparatus 200 when the project information unit 50 stored in the plan storage unit 200g is changed will be described.

ここでは、管理者等がプロジェクト管理装置200の入力装置(例えば、キーボード)等により、計画保管部200gに格納されているプロジェクト情報部50の作業Bを作業Eに変更する処理を行う。この場合、プロジェクト情報部50を管理する計画管理部100aは、管理者等から入力装置により入力された作業Bを作業Eに変更する内容の変更情報を入力して、入力した変更情報に基づいて、変更条件データベース部200i及び制約条件データベース部200jを処理装置により参照し、プロジェクト情報部50の変更処理を処理装置により実行する。   Here, the administrator or the like performs a process of changing the work B of the project information unit 50 stored in the plan storage unit 200g to the work E by an input device (for example, a keyboard) of the project management apparatus 200. In this case, the plan management unit 100a that manages the project information unit 50 inputs change information for changing the work B input from the administrator or the like by the input device to the work E, and based on the input change information. The change condition database unit 200i and the constraint condition database unit 200j are referred to by the processing device, and the change processing of the project information unit 50 is executed by the processing device.

計画管理部100aは、プロジェクト情報部50の作業Bを作業Eに変更する変更情報を入力すると、計画保管部200gに格納されたプロジェクト情報部50の内容を記憶装置より取り出す。計画管理部100aは、取り出したプロジェクト情報部50の作業Bの内容を作業Eに変更する場合、まず、変更条件データベース部200iに登録されている変更条件のうち作業Bに関連する変更条件を処理装置により検索(参照)する。計画管理部100aは、検索した結果、変更条件データベース部200iに登録された情報より作業Bに関連する関連変更条件(図13の1(a))を処理装置により取得して、「(a)作業Bは、作業Cを伴うが作業Fは実施しない」との関連変更条件を取得する。また、計画管理部100aは、変更条件データベース部200iに登録された情報より作業Eに関連する条件(図13の1(b))を処理装置により取得して、「(b)作業Eは、作業Fを伴うが作業Cは実施しない」との関連変更条件を取得する。   When the plan management unit 100a inputs change information for changing the work B of the project information unit 50 to the work E, the plan management unit 100a retrieves the contents of the project information unit 50 stored in the plan storage unit 200g from the storage device. When changing the content of the work B of the extracted project information unit 50 to the work E, the plan management unit 100a first processes the change condition related to the work B among the change conditions registered in the change condition database unit 200i. Search (reference) by device. As a result of the search, the plan management unit 100a obtains the related change condition (1 (a) in FIG. 13) related to the work B from the information registered in the change condition database unit 200i by using the processing device. The operation B acquires the related change condition that “the operation B is accompanied by the operation C but the operation F is not performed”. Moreover, the plan management unit 100a acquires the condition (1 (b) in FIG. 13) related to the work E from the information registered in the change condition database unit 200i by the processing device, and “(b) the work E is The related change condition “Accomplishing operation F but not executing operation C” is acquired.

計画管理部200aは、変更条件データベース部200iに登録された関連変更条件(a)と(b)に基づいて、処理装置を用いて、「作業Bと作業C」を「作業Eと作業F」に置き換える。また、さらに、計画管理部100aは、新たに関連することになった作業Fに関連する変更条件を処理装置により変更条件データベース部200iに登録された情報より取得する。すなわち、計画管理部100aは、作業Fに関連する条件(図13の1(c))を処理装置により取得して、「(c)作業Fは、作業Dと同じプロジェクト内にて行わない」との関連変更条件を取得する。計画管理部100aは、変更条件データベース部200iに登録された関連変更条件(c)に基づいて、処理装置によりプロジェクト情報部50から作業Dを削除する。   The plan management unit 200a uses the processing device to change “work B and work C” to “work E and work F” based on the related change conditions (a) and (b) registered in the change condition database unit 200i. Replace with Furthermore, the plan management unit 100a obtains the change condition related to the work F that is newly related from the information registered in the change condition database unit 200i by the processing device. That is, the plan management unit 100a acquires the condition related to the work F (1 (c) in FIG. 13) by the processing device, and “(c) the work F is not performed in the same project as the work D”. Get the related change condition with. The plan management unit 100a deletes the work D from the project information unit 50 by the processing device based on the related change condition (c) registered in the change condition database unit 200i.

次に、計画管理部100aが、制約条件データベース部200jの内容に基づいて、プロジェクト情報部50の内容を更新する処理について説明する。   Next, a process in which the plan management unit 100a updates the content of the project information unit 50 based on the content of the constraint condition database unit 200j will be described.

上述したように、計画管理部100aは、変更条件データベース部200iの内容に基づいて、「作業Bと作業C」を「作業Eと作業F」に置き換えた。すなわち、計画管理部100aは、作業Bを作業Eに変更する変更情報を入力して、計画保管部200gに記憶されているプロジェクト情報部50の作業Bの内容(作業内容部50a、関連情報部50c、リソース50d、期間50e)を作業Eの内容に(作業内容部50a、関連情報部50c、リソース50d、期間50e)変更するとともに、作業Cの内容を作業Fの内容に変更した。さらに、計画管理部100aは、作業Dの内容を削除した。   As described above, the plan management unit 100a replaces “work B and work C” with “work E and work F” based on the contents of the change condition database unit 200i. That is, the plan management unit 100a inputs change information for changing the work B to the work E, and the contents of the work B (the work content part 50a and the related information part) of the project information part 50 stored in the plan storage part 200g. 50c, resource 50d, period 50e) are changed to the contents of work E (work contents part 50a, related information part 50c, resource 50d, period 50e), and the contents of work C are changed to the contents of work F. Furthermore, the plan management unit 100a deletes the contents of the work D.

ここで、計画管理部100aは、新たに加えられた作業Eについて、制約条件データベース部200jに登録された情報より、作業Eに関連する制約条件(情報)を処理装置により検索する。同様に、作業Fについても、関連する制約条件(情報)を処理装置により検索する。   Here, for the newly added work E, the plan management unit 100a searches the processing device for constraint conditions (information) related to the work E from information registered in the constraint condition database unit 200j. Similarly, for the operation F, the related constraint condition (information) is searched by the processing device.

作業Fについては、関連(e)にて定義されている情報にて、リソースXを使用することにプロジェクト情報部60のリソース60dを自動的に更新する。そして、プロジェクト情報部60の作業内容部60aの開始日と終了日についても、制約条件データベース部200jに登録された情報より、作業Eに関連する情報を検索する。同様に、作業Fについても、関連する情報を検索する。作業Fについては、関連(f)にて定義されている情報にて、リソースXを他のプロジェクトWにてRとSの期間使用していることが定義されているため、プロジェクト情報部60の作業内容部60aの開始日と終了日を自動的に空いている期間に更新する。   For the work F, the resource 60d of the project information unit 60 is automatically updated to use the resource X with the information defined in the relation (e). And also regarding the start date and end date of the work content part 60a of the project information part 60, information related to the work E is searched from the information registered in the constraint database part 200j. Similarly, for work F, related information is searched. For the work F, the information defined in the relation (f) defines that the resource X is used in the period R and S in another project W. The start date and the end date of the work content part 60a are automatically updated in a vacant period.

図12は、実施の形態2に係るプロジェクト管理装置200においてプロジェクト情報部50を変更した後のプロジェクト情報部(変更後)60の内容を示す図である。   FIG. 12 is a diagram showing the contents of the project information part (after change) 60 after the project information part 50 is changed in the project management apparatus 200 according to the second embodiment.

以上のように、計画管理部100aは、作業Bを作業Eに変更する変更情報を入力して、計画保管部200gに記憶されているプロジェクト情報部50の作業Bの作業内容部50a、関連情報部50c、リソース50dの内容を作業Eの内容に変更する。結果として、プロジェクト情報部50は、プロジェクト情報部(変更後)60の作業内容部60a、関連情報部60c、リソース60dの内容に更新される。   As described above, the plan management unit 100a inputs the change information for changing the work B to the work E, the work content part 50a of the work B of the project information part 50 stored in the plan storage part 200g, and related information. The contents of the part 50c and the resource 50d are changed to the contents of the work E. As a result, the project information part 50 is updated to the contents of the work content part 60a, the related information part 60c, and the resource 60d of the project information part (after change) 60.

このように、実施の形態2に係るプロジェクト管理装置200によれば、変更条件データベース部200iと制約条件データベース部200jとにプロジェクトに関連する変更条件、制約条件を登録することができる。また、実施の形態2に係るプロジェクト管理装置200は、管理者等によるプロジェクトの変更が発生した際に、変更条件データベース部200iと制約条件データベース部200jとに登録された変更条件、制約条件に基づいて、プロジェクト情報部50の変更を行うので、他プロジェクトとのリソース等の調整や必要な作業抜けを防止することが可能となる。   As described above, according to the project management apparatus 200 according to the second embodiment, it is possible to register change conditions and constraint conditions related to a project in the change condition database unit 200i and the constraint condition database unit 200j. In addition, the project management apparatus 200 according to the second embodiment is based on the change conditions and the constraint conditions registered in the change condition database unit 200i and the constraint condition database unit 200j when a project change by an administrator or the like occurs. Since the project information unit 50 is changed, it is possible to prevent adjustment of resources and other work with other projects and necessary work omission.

実施の形態3.
本実施の形態では、確率分布データベース部100dに記憶されたリスクの大きさに連動した組織の統計的な確率分布モデルの情報を更新する機能を付加した構成のプロジェクト管理装置300について説明する。
Embodiment 3 FIG.
In the present embodiment, a description will be given of a project management apparatus 300 having a configuration to which a function for updating the statistical probability distribution model information of an organization linked to the magnitude of risk stored in the probability distribution database unit 100d is added.

図15は、実施の形態3係るプロジェクト管理装置300の機能ブロックの構成を示す機能ブロック構成図である。図15は、実施の形態1に示したプロジェクト管理装置100の最小単位のブロック構成に、収集したプロジェクト情報(プロジェクト情報部50)を基にリスクの大きさに連動した組織の統計的な確率分布モデルの情報を更新する機能を付加したシステム構成図(機能ブロック構成図)である。   FIG. 15 is a functional block configuration diagram showing a functional block configuration of the project management apparatus 300 according to the third embodiment. FIG. 15 shows the statistical probability distribution of the organization linked to the magnitude of the risk based on the collected project information (project information section 50) in the minimum unit block configuration of the project management apparatus 100 shown in the first embodiment. It is a system block diagram (functional block block diagram) to which a function for updating model information is added.

本実施の形態の説明では、図15において、実施の形態1あるいは実施の形態2で説明した機能ブロックと同一の機能を有する機能ブロックについては、同一の符号を付し、その説明を省略する。   In the description of the present embodiment, in FIG. 15, functional blocks having the same functions as the functional blocks described in the first or second embodiment are denoted by the same reference numerals, and the description thereof is omitted.

プロジェクト管理装置300は、実施の形態1あるいは実施の形態2で説明したように、WBSと品質(Q)、コスト(C)、工程(D)、リスク(R)を明示的に関連付けたプロジェクト情報部50を管理する計画管理部100aと、プロジェクト情報部50と確率分布データベース部100dに記憶された統計的な確率分布モデル20を用いて予測を行う計画予測部100bと、WBSと明示的に関連付けたリスク(R)をリスク情報部31として管理するリスク管理部100cと、計画管理部100aで管理するプロジェクト情報部50に対してリスクとの関連付けの完了したプロジェクト情報の更新履歴を管理する計画保管部200gと、リスクの大きさに連動した組織の統計的な確率分布モデル20を格納している確率分布データベース部100dとを備える。   As described in the first or second embodiment, the project management apparatus 300 explicitly projects the WBS and the quality (Q), the cost (C), the process (D), and the risk (R). The plan management unit 100a that manages the unit 50, the plan prediction unit 100b that performs prediction using the statistical probability distribution model 20 stored in the project information unit 50 and the probability distribution database unit 100d, and explicitly associated with the WBS The risk management unit 100c that manages the risk (R) as the risk information unit 31 and the plan storage that manages the update history of the project information that has been associated with the risk for the project information unit 50 that is managed by the plan management unit 100a 200g and probability distribution data storing the statistical probability distribution model 20 of the organization linked to the magnitude of the risk And an over scan portion 100d.

ここで、計画管理部100aと、計画予測部100bと、リスク管理部100cと、確率分布データベス更新部300fとは、素子・デバイス・基板・配線などのハードウェアのみで実施されている。あるいは、ROM913に記憶されたファームウェアで実現されていてもよい。あるいは、ソフトウェアとハードウェアとの組み合わせ、さらには、ファームウェアとの組み合わせで実施されても構わない。   Here, the plan management unit 100a, the plan prediction unit 100b, the risk management unit 100c, and the probability distribution database update unit 300f are implemented only by hardware such as elements, devices, substrates, and wirings. Alternatively, it may be realized by firmware stored in the ROM 913. Alternatively, a combination of software and hardware, or a combination of firmware may be used.

本実施の形態では、さらに、作業が終了した際の当該作業の実績を示す実績値が記録されたプロジェクト情報部50(すなわち、作業が完了した情報を収集したプロジェクト情報部50)のデータを基に、確率分布データベース部100dに記憶されたリスクの大きさに連動した組織の統計的な確率分布モデル20の情報を更新する確率分布データベース更新部300fを備える。   In the present embodiment, further, based on the data of the project information unit 50 (that is, the project information unit 50 that collects information on completion of the work) in which the actual value indicating the actual result of the work when the work is completed is recorded. In addition, a probability distribution database update unit 300f that updates information on the statistical probability distribution model 20 of the organization linked to the magnitude of the risk stored in the probability distribution database unit 100d is provided.

計画管理部100aは、作業項目ごとに、当該作業が終了した際の当該作業の実績を示す実績値をプロジェクト情報部50の一部として記憶する。   The plan management unit 100a stores, for each work item, a result value indicating a result of the work when the work is completed as a part of the project information unit 50.

確率分布データベース更新部300fは、計画管理部100aが記憶したプロジェクト情報部50の実績値に基づいて、確率分布データベース部100dの確率分布モデルを更新する。   The probability distribution database update unit 300f updates the probability distribution model of the probability distribution database unit 100d based on the actual value of the project information unit 50 stored by the plan management unit 100a.

例えば、確率分布データベース更新部300fは、プロジェクト情報部50の作業内容部50aに設定された終了日(実績値の一例)あるいは実績部50bの記録内容(実績値の一例)から、必要なデータを収集して統計的な処理を実施し、確率分布データベース部100dの更新を行う。すなわち、確率分布データベース更新部300fは、作業項目301に設定された作業内容毎に、関連情報部50cに基づいて、作業内容部50aに設定された終了日(実績値の一例)あるいは実績部50bの記録内容(実績値の一例)から「作業の計画における、終了時点でのリスクの大きさと終了したか否」あるいは「作業の実際に終了した時点における、リスクの大きさと計画とのズレ」等の視点のデータ(コスト、工程、品質について)を収集し、統計的な処理を実施して確率分布データベースの更新を行う。   For example, the probability distribution database update unit 300f obtains necessary data from the end date (an example of the actual value) set in the work content unit 50a of the project information unit 50 or the recorded content (an example of the actual value) of the actual unit 50b. The collected statistical processing is performed, and the probability distribution database unit 100d is updated. That is, the probability distribution database update unit 300f sets, for each work content set in the work item 301, the end date (an example of the actual value) set in the work content unit 50a or the performance unit 50b based on the related information unit 50c. From the recorded contents (an example of the actual value), "Risk size at the end of work plan and whether it was finished" or "Difference between risk magnitude and plan at the actual end of work", etc. Collect data (cost, process, quality) from the viewpoint, and perform statistical processing to update the probability distribution database.

実施の形態3のプロジェクト管理装置300は、例えば、組織が決めた確率分布データベース部100dの更新時期に、集積した各プロジェクトのプロジェクト情報の値(すなわち、上述した視点から求めた各プロジェクトの実績値)について、統計的な処理を行い確率分布データベース部100dの更新を行う。しかし、例えば、各プロジェクトの作業毎の終了時点で、確率分布データベース部100dの更新をするようにしてもよい。   The project management apparatus 300 according to the third embodiment, for example, at the update time of the probability distribution database unit 100d determined by the organization, the value of the project information of each project accumulated (that is, the actual value of each project obtained from the above viewpoint). ) Is statistically processed to update the probability distribution database unit 100d. However, for example, the probability distribution database unit 100d may be updated at the end of each project operation.

次に、プロジェクト管理装置300の確率分布データベース更新部300fの確率分布データベース更新処理の動作について説明する。   Next, the operation of the probability distribution database update process of the probability distribution database update unit 300f of the project management apparatus 300 will be described.

まず、前提として、プロジェクト管理装置300におけるプロジェクト情報部50の登録処理からプロジェクトの計画予測処理までの大きな流れを以下に示す。プロジェクト情報部50の登録処理及びプロジェクトの計画予測処理については、実施の形態1及び実施の形態2にて説明したものと同様であるため、簡単に説明する。プロジェクト管理装置300には、定義したプロジェクト情報を計画管理部100aから計画保管部200gにプロジェクト情報部50として登録する。そして、別途定義したリスクの情報(リスク情報部31)は、リスク管理部100cから計画保管部200gにリスク情報部31として登録する。登録したリスクの情報(リスク情報31)は、例えば、リスクと計画の関連付け部200dにより登録してあるプロジェクト情報部50の作業項目の作業内容とリスク(R)との関係を定義し、プロジェクト情報部50を更新して計画保管部300dに格納する。そして、計画予測部100bは、プロジェクト情報部50とリスク情報部31との関連付けが完了した時点で、確率分布データベース部100dに記憶されている確率分布モデルを用いて、プロジェクト情報部50の各作業項目に対する予測分布を生成(算出)する。   First, as a premise, a large flow from the registration process of the project information unit 50 to the project plan prediction process in the project management apparatus 300 is shown below. Since the registration process of the project information unit 50 and the project plan prediction process are the same as those described in the first embodiment and the second embodiment, they will be briefly described. In the project management apparatus 300, the defined project information is registered as the project information unit 50 from the plan management unit 100a to the plan storage unit 200g. Then, risk information (risk information unit 31) defined separately is registered as the risk information unit 31 from the risk management unit 100c to the plan storage unit 200g. The registered risk information (risk information 31) defines, for example, the relationship between the work content of the work item of the project information unit 50 registered by the risk and plan association unit 200d and the risk (R), and the project information The unit 50 is updated and stored in the plan storage unit 300d. Then, the plan prediction unit 100b uses the probability distribution model stored in the probability distribution database unit 100d at the time when the association between the project information unit 50 and the risk information unit 31 is completed. Generate (calculate) a predicted distribution for the item.

図16は、実施の形態3に係るプロジェクト管理装置300の確率分布データベース更新処理の流れを示すフロー図である。図16を用いて、実施の形態3に係るプロジェクト管理装置300の確率分布データベース更新処理について説明する。   FIG. 16 is a flowchart showing the flow of the probability distribution database update process of the project management apparatus 300 according to the third embodiment. The probability distribution database update process of the project management apparatus 300 according to the third embodiment will be described with reference to FIG.

まず、ここで、確率分布データベース更新部300fによる確率分布データベース更新処理は、以下の処理を行うことにより確率分布データベース部100dを更新することを前提とする。
(a)リスクの大きさは、3つの区分に分類する。
(b)分類した各リスクの区分に対し、最大値を求める。
(c)分類した各リスクの区分に対し、最小値を求める。
(d)分類した各リスクの区分に対し、99.73%をカバーする6σに収まる範囲を求める。
(e)分類した各リスクの区分に対し、平均値を求める。
(f)分類した各リスクの区分に対し、平均値にて実現可能な確率を求める。
First, here, the probability distribution database update processing by the probability distribution database update unit 300f is premised on updating the probability distribution database unit 100d by performing the following processing.
(A) The risk magnitude is classified into three categories.
(B) The maximum value is obtained for each classified risk category.
(C) Find the minimum value for each classified risk category.
(D) For each classified risk category, a range within 6σ covering 99.73% is obtained.
(E) An average value is obtained for each classified risk category.
(F) For each classified risk category, obtain a probability that can be realized with an average value.

確率分布データベース更新部300fは、計画保管部300dに登録されたプロジェクト情報部50の情報を処理装置により分析して、処理(a)から処理(f)の情報を算出する。確率分布データベース更新部300fは、算出した処理(a)から処理(f)の情報を確率分布データベース部100dに格納することにより、確率分布データベース部100dの内容を更新する。   The probability distribution database update unit 300f analyzes the information of the project information unit 50 registered in the plan storage unit 300d by the processing device, and calculates the information of the processing (f) from the processing (a). The probability distribution database update unit 300f updates the contents of the probability distribution database unit 100d by storing the calculated process (a) to process (f) information in the probability distribution database unit 100d.

<リスクの区分設定処理:S1001>
まず、確率分布データベース更新部300fは、1階層目のリスクの区分を処理対象のリスクの区分として設定する。ここで、リスクの区分とは、図5で示すように、確率分布データベース部100dのリスクの大きさ(高さ方向)を3つに分けた場合におけるリスクの大きさの範囲を意味する。リスクの区分の一例として、例えば、図5に示すように、「1階層目のリスクの区分⇒リスクの大きさ小/例えば、リスクの大きさ0以上30未満」、「2階層目のリスクの区分⇒リスクの大きさ中/例えば、リスクの大きさ30以上60未満」、「3階層目のリスクの区分⇒リスクの大きさ大/例えば、リスクの大きさ60以上」のように設定することができる。
<Risk category setting process: S1001>
First, the probability distribution database update unit 300f sets the risk category of the first hierarchy as the risk category to be processed. Here, the risk classification means a range of risk magnitudes when the risk magnitude (height direction) of the probability distribution database unit 100d is divided into three as shown in FIG. As an example of risk classification, for example, as shown in FIG. 5, “Risk classification in the first hierarchy ⇒ Risk magnitude small / eg, risk magnitude 0 or more and less than 30”, “Risk risk classification in the second hierarchy Category⇒Risk size medium / for example, risk size 30 to less than 60 ”,“ Level 3 risk category⇒Risk size / for example, risk size 60 or more ” Can do.

図16に戻り、確率分布データベース更新部300fによる確率分布データベース更新処理の説明を続ける。   Returning to FIG. 16, the description of the probability distribution database update processing by the probability distribution database update unit 300f is continued.

<更新データ格納処理:S1004〜S1009>
確率分布データベース更新部300fは、計画保管部200gに登録されているプロジェクト情報部50の作業項目301に設定されている複数の作業内容のうち、既に作業が終了した作業内容のデータについて、リスクの大きさを処理装置により算出する。リスクの大きさの算出方法は、実施の形態1で説明した通りである。確率分布データベース更新部300fは、リスクの大きさが処理対象のリスクの区分に対応する作業内容のデータを処理装置により集計して、開発フェーズと作業項目毎に、最大値を処理装置により算出して確率分布データベース部100dに格納する(最大値格納処理:S1004)。また、確率分布データベース更新部300fは、同様に、開発フェーズと作業項目毎に、最小値を処理装置により算出して確率分布データベース部100dに格納する(最小値格納処理:S1005)。
<Update data storage processing: S1004 to S1009>
The probability distribution database update unit 300f performs risk assessment on the work content data that has already been completed among a plurality of work content set in the work item 301 of the project information unit 50 registered in the plan storage unit 200g. The size is calculated by the processing device. The method for calculating the magnitude of risk is as described in the first embodiment. The probability distribution database update unit 300f aggregates data of work contents whose risk magnitude corresponds to the risk category to be processed by the processing device, and calculates the maximum value for each development phase and work item by the processing device. And stored in the probability distribution database unit 100d (maximum value storage processing: S1004). Similarly, the probability distribution database update unit 300f calculates the minimum value for each development phase and work item by the processing device and stores it in the probability distribution database unit 100d (minimum value storage processing: S1005).

確率分布データベース更新部300fは、リスクの大きさが処理対象のリスクの区分に対応する作業内容のデータを処理装置により集計して、開発フェーズと作業項目毎に、標準偏差を処理装置により算出する(標準偏差算出処理:S1006)。確率分布データベース更新部300fは、算出した標準偏差に基づいて、開発フェーズと作業項目毎に、正規分布の6σの範囲を処理装置により算出して確率分布データベース部100dに格納する(6σの値格納処理:S1007)。   The probability distribution database update unit 300f aggregates work content data whose magnitude of risk corresponds to the risk category to be processed by the processing device, and calculates a standard deviation for each development phase and work item by the processing device. (Standard deviation calculation processing: S1006). Based on the calculated standard deviation, the probability distribution database update unit 300f calculates the 6σ range of the normal distribution for each development phase and work item by the processing device and stores it in the probability distribution database unit 100d (6σ value storage) Processing: S1007).

確率分布データベース更新部300fは、リスクの大きさが処理対象のリスクの区分に対応する作業内容のデータを処理装置により集計して、開発フェーズと作業項目毎に、平均値を処理装置により算出して確率分布データベース部100dに格納する(平均値格納処理:S1008)。   The probability distribution database update unit 300f aggregates data of work contents whose magnitude of risk corresponds to the risk category to be processed by the processing device, and calculates an average value for each development phase and work item by the processing device. And stored in the probability distribution database unit 100d (average value storage processing: S1008).

確率分布データベース更新部300fは、平均値を算出する際に集計したリスクの大きさが処理対象のリスクの区分に対応する作業内容のデータと、算出した平均値とに基づいて、該当する開発フェーズと作業項目毎に、平均値にて実現可能な確率を処理装置により算出し確率分布データベース部100dに格納する(平均値にて実現可能な確率を格納処理:S1009)。   The probability distribution database update unit 300f calculates the corresponding development phase based on the data of the work content corresponding to the risk category to be processed whose risk magnitude is aggregated when calculating the average value and the calculated average value. For each work item, the probability that can be realized by the average value is calculated by the processing device and stored in the probability distribution database unit 100d (the probability that can be realized by the average value is stored: S1009).

確率分布データベース更新部300fは、リスクの区分すべてについてS1004からS1009までの処理を行う。   The probability distribution database update unit 300f performs the processing from S1004 to S1009 for all risk categories.

<格納値の確認処理(S1010)>
格納値の確認処理(S1010)では、確率分布データベース更新部300fは、S1004からS1009までの処理をすべてのリスクの区分について行い、確率分布データベース部100dに格納した値を確認すると共に、組織として使用可能な値としての調整を行う。例えば、プロジェクト管理装置300は、確率分布データベース部100dの確率分布モデルが組織として使用可能であるか否かを判断するための条件を、確認条件情報として記憶装置に記憶しておく。確率分布データベース更新部300fは、記憶装置に記憶された確認条件情報に基づいて、組織として使用可能な値であるか否かを処理装置により判断して、格納した値の調整(すなわち、確率分布モデルの調整)を行う。
<Storage Value Confirmation Process (S1010)>
In the stored value confirmation processing (S1010), the probability distribution database update unit 300f performs the processing from S1004 to S1009 for all risk categories, confirms the values stored in the probability distribution database unit 100d, and uses them as an organization. Make adjustments as possible values. For example, the project management apparatus 300 stores conditions for determining whether or not the probability distribution model of the probability distribution database unit 100d can be used as an organization as confirmation condition information in a storage device. Based on the confirmation condition information stored in the storage device, the probability distribution database update unit 300f determines whether or not the value is usable as an organization, and adjusts the stored value (that is, the probability distribution) Model adjustment).

以上のように、確率分布データベース更新部300fが、計画保管部300dに登録されているプロジェクト情報部50のデータに基づき、リスクの大きさに連動した組織の統計的な確率分布モデル201の生成に必要なデータを算出して格納することにより、確率分布データベース部100dの更新を行うことが可能となるので、よりプロジェクトの実情に合った確率分布モデルを使用することができ、予測の精度を向上させることができる。   As described above, the probability distribution database update unit 300f generates the statistical probability distribution model 201 of the organization linked to the magnitude of the risk based on the data of the project information unit 50 registered in the plan storage unit 300d. By calculating and storing the necessary data, it is possible to update the probability distribution database unit 100d, so that a probability distribution model more suitable for the actual situation of the project can be used, and the accuracy of prediction is improved. Can be made.

実施の形態1〜3において、以下のような特徴を有するプロジェクト管理装置について説明した。   In the first to third embodiments, the project management apparatus having the following features has been described.

実施の形態1に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、見積もりや計画の進捗予測に使用する組織の統計的な確率分布モデルに、リスクの大きさに連動する組織の統計的な確率分布モデルを使用することを特徴とする。   The project management apparatus according to the first embodiment uses a statistical probability distribution model of an organization used for estimation of progress of estimation and plan in project management of software development and hardware development. It is characterized by using a statistical probability distribution model.

実施の形態1に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、WBSと品質(Q)、コスト(C)、工程(D)、リスク(R)を明示的に関連付け、QCDRを統合したプロジェクト情報として管理することを特徴とする。   The project management apparatus according to Embodiment 1 explicitly associates WBS with quality (Q), cost (C), process (D), and risk (R) in software development and hardware development project management. Is managed as integrated project information.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画管理部のプロジェクト情報に対する変更時、プロジェクト内外の計画変更時の制約や依存性の情報のリストとその条件内容を定義する変更条件定義部を有する。   The project management apparatus according to the second embodiment includes a list of constraints and dependency information and the conditions when changing the project information of the plan management unit and when changing the plan inside and outside the project in software development and hardware development project management. It has a change condition definition section for defining the contents.

実施の形態1に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画管理部のプロジェクト情報を基に、全体の達成しうる確率分布や、コスト(C)と工程(D)を固定した場合の品質(Q)の達成しうる確率分布、品質(Q)と工程(D)を固定した場合のコスト(C)の達成しうる確率分布、品質(Q)とコスト(C)を固定した場合の工程(D)の達成しうる確率分布を算出することを特徴とした計画予測部を有する。   The project management apparatus according to the first embodiment, in software development and hardware development project management, based on the project information of the plan management unit, the overall probability distribution, cost (C) and process (D) that can be achieved. Probability distribution of quality (Q) when quality is fixed, probability distribution of cost (C) when quality (Q) and process (D) are fixed, quality (Q) and cost (C) A plan predicting section characterized by calculating a probability distribution that can be achieved in the step (D) in the case of fixing.

実施の形態1に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画予測部の計算時に使用する確率分布のデータとして、計画管理部のプロジェクト情報と関連付けが可能な確率分布データベース部を有する。   The project management apparatus according to the first embodiment is a probability distribution database that can be associated with project information of the plan management unit as probability distribution data used in calculation of the plan prediction unit in project management of software development and hardware development. Part.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、リスクの大きさに連動する組織の統計的な確率分布データを用い、WBSと品質(Q)、コスト(C)、工程(D)、リスク(R)を明示的に関連付けたプロジェクト情報のデータを、必要に応じ格納したり取り出したりできる計画保管部を有する。   The project management apparatus according to the second embodiment uses the statistical probability distribution data of the organization linked to the magnitude of risk in the project management of software development and hardware development, and uses WBS, quality (Q), cost (C ), A plan storage unit that can store and retrieve project information data that explicitly associates the process (D) and the risk (R) as necessary.

実施の形態1に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、WBSと明示的に関連付けるリスク(R)について、計画管理部と関連付けられる情報としてリスク(R)を管理しているリスク管理部を有する。   The project management apparatus according to the first embodiment manages risk (R) as information associated with the plan management unit for risk (R) explicitly associated with WBS in software development and hardware development project management. Has a risk management department.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、WBSと明示的に関連付けるリスク(R)を管理しているリスク管理部のリスク情報と、計画管理部のプロジェクト情報との関連付けを設定可能なリスクと計画の関連付け部を有する。   The project management apparatus according to the second embodiment includes risk information of a risk management unit that manages a risk (R) that is explicitly associated with a WBS in project management of software development and hardware development, and a project of the plan management unit It has a risk and plan associating unit capable of setting association with information.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画管理部のプロジェクト情報に対する変更時、プロジェクト内外の計画変更時に対してプロジェクトの作業への制約となる情報のリストとその条件の定義内容を保管し、計算時に使用可能な変更条件データベース部を有する。   In the project management apparatus according to the second embodiment, in the project management of software development and hardware development, when the project information of the plan management unit is changed, the information that becomes a constraint on the work of the project when the plan is changed inside or outside the project The definition contents of the list and its conditions are stored, and a change condition database part that can be used at the time of calculation is provided.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画管理部のプロジェクト情報を計画予測部にて計算時、プロジェクト内外の排他的に扱う必要のある情報のリストとその制約を定義してある制約条件データベース部を有する。   The project management apparatus according to the second embodiment is a list of information that must be handled exclusively inside and outside the project when calculating the project information of the plan management unit in the project prediction unit in the project management of software development or hardware development. And a constraint condition database section in which the constraints are defined.

実施の形態2に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、計画管理部のプロジェクト情報を計画予測部にて計算時に使用する制約条件データベースを作成若しくは更新するために、計画保管部に集積したプロジェクト情報を基に、計画管理部で使用可能な制約条件データベース部のデータ生成が可能な制約条件データ生成部を有する。   The project management apparatus according to the second embodiment uses a plan in order to create or update a constraint database used when calculating project information in the plan management unit in the project management of software development or hardware development. Based on the project information accumulated in the storage unit, there is a constraint data generation unit capable of generating data of a constraint database unit that can be used by the plan management unit.

実施の形態3に係るプロジェクト管理装置は、ソフトウェア開発やハードウェア開発のプロジェクト管理において、見積もりや計画の進捗予測に使用する組織の統計的な確率分布を作成若しくは更新するために、計画保管部に集積したプロジェクト情報を基に、計画管理部との関連付けができ、計画予測部で使用可能な確率分布データベース部のデータ生成が可能な確率分布データベース更新部を有する。   The project management apparatus according to the third embodiment includes a plan storage unit for creating or updating a statistical probability distribution of an organization used for estimation and progress prediction of a plan in project management of software development and hardware development. A probability distribution database updating unit that can be associated with the plan management unit based on the accumulated project information and can generate data of the probability distribution database unit that can be used by the plan prediction unit.

以上、実施の形態1〜3について説明したが、これらのうち、2つ以上の実施の形態を組み合わせて実施しても構わない。あるいは、これらのうち、1つの実施の形態を部分的に実施しても構わない。あるいは、これらのうち、2つ以上の実施の形態を部分的に組み合わせて実施しても構わない。   Although the first to third embodiments have been described above, two or more of these embodiments may be combined. Alternatively, one of these embodiments may be partially implemented. Or you may implement combining two or more embodiment among these partially.

また、実施の形態1〜3の説明において、計画管理部100aと、計画予測部100bと、リスク管理部100cと、変更条件定義部200bと、制約条件データ生成部200fと、リスクと計画の関連付け部200dと、確率分布データベース更新部300fとはそれぞれ独立した機能ブロックとして構成されているが、ひとつの機能ブロックとしてもよい。また、これらの機能ブロックを、他のどのような組み合わせで構成しても構わない。   In the description of the first to third embodiments, the plan management unit 100a, the plan prediction unit 100b, the risk management unit 100c, the change condition definition unit 200b, the constraint condition data generation unit 200f, and the association between the risk and the plan. The unit 200d and the probability distribution database update unit 300f are configured as independent functional blocks, but may be a single functional block. Further, these functional blocks may be configured in any other combination.

実施の形態1に係るプロジェクト管理装置及びプロジェクト管理装置のプロジェクト管理方法は、CPU(処理装置)、記憶装置等のハードウェアが用いられており、ソフトウェアによる情報処理がハードウェアを用いて具体的に実現されたものである。すなわち、上述した実施の形態1〜3のプロジェクト管理装置及びプロジェクト管理装置のプロジェクト管理方法は、自然法則を利用したハードウェアの動作によりプロジェクト管理装置及びプロジェクト管理装置のプロジェクト管理方法の実現を図っているものであり、自然法則を利用した技術的創作に該当するものである。   The project management device and the project management method of the project management device according to the first embodiment use hardware such as a CPU (processing device) and a storage device, and information processing by software is specifically performed using hardware. It has been realized. That is, the project management apparatus and the project management method of the project management apparatus according to the first to third embodiments described above aim to realize the project management apparatus and the project management method of the project management apparatus by the operation of the hardware using the natural law. It corresponds to technical creation using the laws of nature.

実施の形態に係るプロジェクト管理装置100の外観の一例を示す図。The figure which shows an example of the external appearance of the project management apparatus 100 which concerns on embodiment. 実施の形態に係るプロジェクト管理装置100のハードウェア資源の一例を示す図。The figure which shows an example of the hardware resource of the project management apparatus 100 which concerns on embodiment. 実施の形態1に係るプロジェクト管理装置100の機能ブロックを示すブロック構成図。FIG. 3 is a block configuration diagram showing functional blocks of the project management apparatus 100 according to the first embodiment. 実施の形態1に係るリスクの大きさに連動して定義された組織の統計的な確率分布モデルのイメージ201を示す図。The figure which shows the image 201 of the statistical probability distribution model of the structure | tissue defined according to the magnitude | size of the risk which concerns on Embodiment 1. FIG. 実施の形態1における確率分布データベース部100dの構成の一例を示す図。FIG. 3 is a diagram illustrating an example of a configuration of a probability distribution database unit 100d according to the first embodiment. 実施の形態1に係るプロジェクト管理装置100におけるプロジェクト情報部50とリスク情報部31の構成を示す図。The figure which shows the structure of the project information part 50 and the risk information part 31 in the project management apparatus 100 which concerns on Embodiment 1. FIG. 実施の形態1に係るプロジェクト管理装置100における計画予測部100bが予測した結果の出力イメージを示した図。The figure which showed the output image of the result which the plan prediction part 100b in the project management apparatus 100 which concerns on Embodiment 1 estimated. 計画予測部100bが選択した確率分布モデルの分布値の例を示す図であり、(a)はプロジェクトの計画値に対してパーセントを乗算して分布範囲を算出する確率分布モデルであり、(b)は、プロジェクトの計画値に対して日数を加算して分布範囲を算出する確率分布モデルを示す図。It is a figure which shows the example of the distribution value of the probability distribution model which the plan prediction part 100b selected, (a) is a probability distribution model which calculates a distribution range by multiplying the plan value of a project with a percentage, (b ) Is a diagram showing a probability distribution model for calculating the distribution range by adding days to the planned value of the project. 実施の形態1に係るプロジェクト管理装置100のプロジェクト管理方法の処理を示すフロー図。FIG. 3 is a flowchart showing a process of a project management method of the project management apparatus 100 according to the first embodiment. 実施の形態2に係るプロジェクト管理装置200の機能ブロックを示すブロック構成図。The block block diagram which shows the functional block of the project management apparatus 200 which concerns on Embodiment 2. FIG. 実施の形態2に係るプロジェクト管理装置200のプロジェクト情報部50の構成を示す図。The figure which shows the structure of the project information part 50 of the project management apparatus 200 which concerns on Embodiment 2. FIG. 実施の形態2に係るプロジェクト管理装置200においてプロジェクト情報部50を変更した後のプロジェクト情報部(変更後)60の内容を示す図。The figure which shows the content of the project information part (after change) 60 after changing the project information part 50 in the project management apparatus 200 concerning Embodiment 2. FIG. 実施の形態2に係るプロジェクト管理装置200の変更条件データベース部200iの一例を示す図。The figure which shows an example of the change condition database part 200i of the project management apparatus 200 which concerns on Embodiment 2. FIG. 実施の形態2に係るプロジェクト管理装置200の制約条件データベース部200jの一例を示す図。The figure which shows an example of the constraint condition database part 200j of the project management apparatus 200 concerning Embodiment 2. FIG. 実施の形態3に係るプロジェクト管理装置300の機能ブロックの構成を示すブロック構成図。FIG. 10 is a block configuration diagram showing a functional block configuration of a project management apparatus 300 according to a third embodiment. 実施の形態3に係るプロジェクト管理装置300の確率分布データベース更新処理の流れを示すフロー図。FIG. 10 is a flowchart showing a flow of probability distribution database update processing of the project management apparatus 300 according to the third embodiment.

符号の説明Explanation of symbols

20,20a,20b,20c 確率分布モデル、30 プロジェクト情報部、30a 作業内容部、30b 実績部、30c 関連情報部、31 リスク情報部、31a リスク項目部、31b リスク評価結果部、31c リスク対策定義部、40 プロジェクト予測結果部、40a 基準の確率分布部、40b 品質分布部、40c コスト分布部、40d 工程分布部、50 プロジェクト情報部、50a 作業内容部、50b 実績部、50c 関連情報部、50d リソース、50e 期間、60 プロジェクト情報部(変更後)、60a 作業内容部、60b 実績部、60c 関連情報部、60d リソース、60e 期間、100 プロジェクト管理装置、100a 計画管理部、100b 計画予測部、100c リスク管理部、100d 確率分布データベース部、200 プロジェクト管理装置、200b 変更条件定義部、200d リスクと計画の関連付け部、200f 制約条件データ生成部、200g 計画保管部、200i 変更条件データベース部、200j 制約条件データベース部、201 リスクの大きさに連動した組織の統計的な確率分布モデルのイメージ、300 プロジェクト管理装置、300f 確率分布データベース更新部、301 作業項目、302 開始日、303 終了日、304 実績、305 品質、306 コスト、307 工程、308 リスク、311 リスク項目、312 影響、313 顕在化率、314 対策、901 表示装置、902 キーボード、903 マウス、904 FDD、905 CDD、906 プリンタ装置、907 スキャナ装置、910 システムユニット、911 CPU、912 バス、913 ROM、914 RAM、915 通信ボード、920 磁気ディスク装置、921 OS、922 ウィンドウシステム、923 プログラム群、924 ファイル群、931 電話器、932 ファクシミリ機、942 LAN、940 インターネット、941 ゲートウェイ。   20, 20a, 20b, 20c Probability distribution model, 30 Project information section, 30a Work content section, 30b Performance section, 30c Related information section, 31 Risk information section, 31a Risk item section, 31b Risk evaluation result section, 31c Risk countermeasure definition Part, 40 project prediction result part, 40a standard probability distribution part, 40b quality distribution part, 40c cost distribution part, 40d process distribution part, 50 project information part, 50a work content part, 50b performance part, 50c related information part, 50d Resource, 50e period, 60 Project information section (after change), 60a Work content section, 60b Performance section, 60c Related information section, 60d Resource, 60e period, 100 Project management device, 100a Plan management section, 100b Plan prediction section, 100c Risk management department, 100d Rate distribution database unit, 200 project management device, 200b change condition definition unit, 200d risk and plan association unit, 200f constraint condition data generation unit, 200g plan storage unit, 200i change condition database unit, 200j constraint condition database unit, 201 risk Statistical probability distribution model image of the organization linked to the size of, 300 project management device, 300f probability distribution database update unit, 301 work item, 302 start date, 303 end date, 304 results, 305 quality, 306 cost, 307 process, 308 risk, 311 risk item, 312 effect, 313 exposure rate, 314 countermeasure, 901 display device, 902 keyboard, 903 mouse, 904 FDD, 905 CDD, 906 printer device, 907 scan 920 system unit, 911 CPU, 912 bus, 913 ROM, 914 RAM, 915 communication board, 920 magnetic disk device, 921 OS, 922 window system, 923 program group, 924 file group, 931 telephone, 932 facsimile Machine, 942 LAN, 940 Internet, 941 gateway.

Claims (9)

複数の作業からなるプロジェクトについて上記複数の作業各々ごとに作業状況を管理するプロジェクト管理装置において、
上記複数の作業各々ごとに作業について発生すると予測されるリスクの種別を対応付けてプロジェクト情報として記憶装置に記憶する計画管理部と、
リスクの種別とリスクの大きさを算出するためのリスク評価情報とを対応付けてリスク情報として記憶装置に記憶するリスク管理部と、
リスクの大きさに応じて予め定義された確率分布モデルを複数記憶する確率分布データベース部と、
上記複数の作業各々について、上記計画管理部により記憶された上記プロジェクト情報から当該作業に対応するリスクの種別を取得し、上記リスク管理部により記憶された上記リスク情報から上記リスクの種別に対応するリスク評価情報を取得し、取得した上記リスク評価情報に基づいてリスクの大きさを処理装置により算出し、算出した上記リスクの大きさに応じた確率分布モデルを上記確率分布データベース部から選択して、選択した確率分布モデルを用いて当該作業の作業状況の確率分布を処理装置により生成する計画予測部と
を備えることを特徴とするプロジェクト管理装置。
In a project management apparatus that manages a work situation for each of the plurality of works for a project composed of a plurality of works,
A plan management unit that stores in a storage device as project information in association with a type of risk that is predicted to occur for each of the plurality of operations;
A risk management unit that stores risk information in a storage device in association with risk evaluation information for calculating a risk type and a risk magnitude;
A probability distribution database unit for storing a plurality of pre-defined probability distribution models according to the size of the risk;
For each of the plurality of operations, the risk type corresponding to the operation is acquired from the project information stored by the plan management unit, and the risk type is acquired from the risk information stored by the risk management unit. Obtain risk assessment information, calculate a risk magnitude by the processing device based on the obtained risk assessment information, and select a probability distribution model corresponding to the computed risk magnitude from the probability distribution database unit A project management apparatus comprising: a plan prediction unit that generates a probability distribution of a work situation of the work using the selected probability distribution model by a processing device.
上記計画管理部は、
上記複数の作業各々ごとに、予め設定された作業状況の計画値をプロジェクト情報の一部として記憶し、
上記計画予測部は、
上記作業状況の計画値を上記選択した確率分布モデルにあてはめることにより、上記作業状況の確率分布を生成する
ことを特徴とする請求項1に記載のプロジェクト管理装置。
The plan management department
For each of the plurality of operations, a preset work situation plan value is stored as part of the project information,
The plan forecasting unit
The project management apparatus according to claim 1, wherein the work situation probability distribution is generated by applying the plan value of the work situation to the selected probability distribution model.
上記計画管理部は、
上記複数の作業各々ごとに、当該作業の作業状況を評価するための複数の作業評価情報各々について、上記作業状況の計画値をプロジェクト情報の一部として記憶するとともに、当該作業と上記複数の作業評価情報各々との関連を示す関連情報をプロジェクト情報の一部として記憶し、
上記計画予測部は、
上記計画管理部が記憶するプロジェクト情報の関連情報に基づいて、上記複数の作業評価情報から当該作業が関連する作業評価情報を取得し、取得した作業評価情報についての上記作業状況の計画値を上記選択した確率分布モデルにあてはめることにより、上記取得した作業評価情報についての上記作業状況の確率分布を生成する
ことを特徴とする請求項2に記載のプロジェクト管理装置。
The plan management department
For each of the plurality of work evaluation information for evaluating the work situation of the work, the plan value of the work situation is stored as part of the project information, and the work and the plurality of works Relevant information indicating the relationship with each evaluation information is stored as part of the project information,
The plan forecasting unit
Based on the related information of the project information stored in the plan management unit, the work evaluation information related to the work is acquired from the plurality of work evaluation information, and the plan value of the work status for the acquired work evaluation information The project management apparatus according to claim 2, wherein a probability distribution of the work situation for the acquired work evaluation information is generated by applying the selected probability distribution model.
上記複数の作業評価情報は、
作業における成果物の品質を示す品質情報と、作業にかかるコストを示すコスト情報と、作業の進捗状況を示す工程情報とを含むことを特徴とする請求項3に記載のプロジェクト管理装置。
The plurality of work evaluation information is
The project management apparatus according to claim 3, comprising quality information indicating a quality of the deliverable in the work, cost information indicating the cost for the work, and process information indicating the progress of the work.
上記計画管理部は、
上記複数の作業各々ごとに、当該作業が終了した際の当該作業の実績を示す実績値をプロジェクト情報の一部として記憶し、
上記プロジェクト管理装置は、さらに、
上記計画管理部が記憶した上記プロジェクト情報の実績値に基づいて、上記確率分布データベース部の確率分布モデルを更新する確率分布データベース更新部を備えることを特徴とする請求項1〜4のいずれかに記載のプロジェクト管理装置。
The plan management department
For each of the plurality of operations, an actual value indicating the actual result of the operation when the operation is completed is stored as a part of the project information.
The project management device further includes:
The probability distribution database update part which updates the probability distribution model of the said probability distribution database part based on the actual value of the said project information which the said plan management part memorize | stored is provided. The project management device described.
上記計画管理部は、
上記複数の作業各々ごとに、当該作業を実施するために必要な情報である作業関連情報をプロジェクト情報の一部として記憶し、
上記プロジェクト管理装置は、さらに、
上記プロジェクト情報の作業を変更する際の変更条件を定義して変更条件データベースとして記憶装置に記憶する変更条件定義部と、
上記プロジェクト情報の有する上記作業関連情報についての制約条件を定義して制約条件データベースとして記憶装置に記憶する制約条件データ生成部と
を備えることを特徴とする請求項1に記載のプロジェクト管理装置。
The plan management department
For each of the plurality of tasks, work-related information that is information necessary for performing the task is stored as part of the project information.
The project management device further includes:
A change condition definition unit that defines a change condition when changing the work of the project information and stores it in a storage device as a change condition database;
The project management apparatus according to claim 1, further comprising: a constraint condition data generation unit that defines a constraint condition for the work related information included in the project information and stores the constraint condition in a storage device as a constraint condition database.
上記計画管理部は、
上記変更条件定義部により定義された上記変更条件データベースと上記制約条件データ生成部により定義された上記制約条件データベースとに基づいて、上記プロジェクト情報の作業を変更することを特徴とする請求項6に記載のプロジェクト管理装置。
The plan management department
The work of the project information is changed based on the change condition database defined by the change condition definition unit and the constraint condition database defined by the constraint condition data generation unit. The project management device described.
複数の作業からなるプロジェクトについて上記複数の作業各々ごとに作業状況を管理するプロジェクト管理装置のプロジェクト管理方法において、
計画管理部が、上記複数の作業各々ごとに作業について発生すると予測されるリスクの種別を対応付けてプロジェクト情報として記憶装置に記憶する計画管理ステップと、
リスク管理部が、リスクの種別とリスクの大きさを算出するためのリスク評価情報とを対応付けてリスク情報として記憶装置に記憶するリスク管理部と、
確率分布データベース部が、リスクの大きさに応じて予め定義された確率分布モデルを複数記憶する確率分布データベース記憶ステップと、
計画予測部が、上記複数の作業各々について、上記計画管理ステップにより記憶された上記プロジェクト情報から当該作業に対応するリスクの種別を取得し、上記リスク管理ステップにより記憶された上記リスク情報から上記リスクの種別に対応するリスク評価情報を取得し、取得した上記リスク評価情報に基づいてリスクの大きさを処理装置により算出し、算出した上記リスクの大きさに応じた確率分布モデルを上記確率分布データベース部から選択して、選択した確率分布モデルを用いて当該作業の作業状況の確率分布を処理装置により生成する計画予測ステップと
を備えることを特徴とするプロジェクト管理装置のプロジェクト管理方法。
In the project management method of the project management apparatus for managing the work status for each of the plurality of works for a project comprising a plurality of works,
A plan management step in which the plan management unit associates a type of risk that is predicted to occur for each of the plurality of tasks and stores it in the storage device as project information;
A risk management unit that associates risk evaluation information for calculating a risk type and a risk magnitude and stores the risk information in a storage device as risk information;
A probability distribution database unit, a probability distribution database storage step for storing a plurality of predefined probability distribution models according to the magnitude of risk;
For each of the plurality of operations, the plan prediction unit obtains a risk type corresponding to the operation from the project information stored in the plan management step, and the risk information is stored in the risk information stored in the risk management step. The risk evaluation information corresponding to the type of the risk is acquired, the magnitude of the risk is calculated by the processing device based on the acquired risk evaluation information, and the probability distribution model corresponding to the calculated risk magnitude is the probability distribution database. A project management method for a project management apparatus, comprising: a plan prediction step selected from a section and generating a probability distribution of a work situation of the work by a processing device using the selected probability distribution model.
請求項8記載のプロジェクト管理装置のプロジェクト管理方法をコンピュータに実行させることを特徴とするプロジェクト管理プログラム。   A project management program for causing a computer to execute the project management method of the project management apparatus according to claim 8.
JP2008127104A 2008-05-14 2008-05-14 Project management apparatus, project management method for project management apparatus, and project management program for project management apparatus Expired - Fee Related JP5153448B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008127104A JP5153448B2 (en) 2008-05-14 2008-05-14 Project management apparatus, project management method for project management apparatus, and project management program for project management apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008127104A JP5153448B2 (en) 2008-05-14 2008-05-14 Project management apparatus, project management method for project management apparatus, and project management program for project management apparatus

Publications (2)

Publication Number Publication Date
JP2009276982A true JP2009276982A (en) 2009-11-26
JP5153448B2 JP5153448B2 (en) 2013-02-27

Family

ID=41442361

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008127104A Expired - Fee Related JP5153448B2 (en) 2008-05-14 2008-05-14 Project management apparatus, project management method for project management apparatus, and project management program for project management apparatus

Country Status (1)

Country Link
JP (1) JP5153448B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016208005A1 (en) * 2015-06-24 2016-12-29 三菱電機株式会社 Risk management device and risk management program
JP2018206181A (en) * 2017-06-07 2018-12-27 株式会社日立製作所 Business management system
CN114692724A (en) * 2022-03-03 2022-07-01 支付宝(杭州)信息技术有限公司 Training method of data classification model, data classification method and device
CN115860679A (en) * 2022-12-15 2023-03-28 青岛思科万方经济信息咨询有限公司 Enterprise project data management system and method based on big data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000250989A (en) * 1999-03-01 2000-09-14 Mitsubishi Electric Corp Worker allocation system, worker allocating method and storage medium readable by computer in which worker allocation program is recorded
JP2001014296A (en) * 1999-07-01 2001-01-19 Japan Science & Technology Corp Car allocation and delivery planning method, computer- readable recording medium recording car allocation and delivery planning program, and car allocation and delivery planning device
JP2004145491A (en) * 2002-10-22 2004-05-20 Univ Waseda Real estate price estimation method and system therefor, estimation server, and program
JP2004192109A (en) * 2002-12-09 2004-07-08 Hitachi Ltd Project evaluation system and method
JP2005092827A (en) * 2003-09-22 2005-04-07 Mitsubishi Electric Corp Scheduling system and program for making computer perform scheduling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000250989A (en) * 1999-03-01 2000-09-14 Mitsubishi Electric Corp Worker allocation system, worker allocating method and storage medium readable by computer in which worker allocation program is recorded
JP2001014296A (en) * 1999-07-01 2001-01-19 Japan Science & Technology Corp Car allocation and delivery planning method, computer- readable recording medium recording car allocation and delivery planning program, and car allocation and delivery planning device
JP2004145491A (en) * 2002-10-22 2004-05-20 Univ Waseda Real estate price estimation method and system therefor, estimation server, and program
JP2004192109A (en) * 2002-12-09 2004-07-08 Hitachi Ltd Project evaluation system and method
JP2005092827A (en) * 2003-09-22 2005-04-07 Mitsubishi Electric Corp Scheduling system and program for making computer perform scheduling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016208005A1 (en) * 2015-06-24 2016-12-29 三菱電機株式会社 Risk management device and risk management program
JP2018206181A (en) * 2017-06-07 2018-12-27 株式会社日立製作所 Business management system
CN114692724A (en) * 2022-03-03 2022-07-01 支付宝(杭州)信息技术有限公司 Training method of data classification model, data classification method and device
CN114692724B (en) * 2022-03-03 2023-03-28 支付宝(杭州)信息技术有限公司 Training method of data classification model, data classification method and device
CN115860679A (en) * 2022-12-15 2023-03-28 青岛思科万方经济信息咨询有限公司 Enterprise project data management system and method based on big data
CN115860679B (en) * 2022-12-15 2023-05-30 青岛思科万方经济信息咨询有限公司 Enterprise project data management system and method based on big data

Also Published As

Publication number Publication date
JP5153448B2 (en) 2013-02-27

Similar Documents

Publication Publication Date Title
US10157052B2 (en) Software change management
US10372593B2 (en) System and method for resource modeling and simulation in test planning
US10282281B2 (en) Software testing platform and method
US9183124B2 (en) Automation controller for next generation testing system
US20080010543A1 (en) Test planning assistance apparatus, test planning assistance method, and recording medium having test planning assistance program recorded therein
US20090006147A1 (en) Method and system for defining and managing information technology projects based on conceptual models
US20080010542A1 (en) Test case selection apparatus and method, and recording medium
US20040098300A1 (en) Method, system, and storage medium for optimizing project management and quality assurance processes for a project
US20190294428A1 (en) Automated software release distribution
US20130275085A1 (en) Performance management and quantitative modeling of it service processes using mashup patterns
JP5643307B2 (en) Method and system for optimizing license usage
US9747188B2 (en) Determining importance of an artifact in a software development environment
Pillai et al. Implementing integrated Lean Six Sigma for software development: a flexibility framework for managing the continuity: change dichotomy
JP2007316905A (en) Computer system and method for monitoring application program
JP5153448B2 (en) Project management apparatus, project management method for project management apparatus, and project management program for project management apparatus
JP5652047B2 (en) Information processing apparatus and information processing program
US20150254584A1 (en) Estimates using historical analysis
JP2012181739A (en) Man-hour estimation device, man-hour estimation method, and man-hour estimation program
CN111639025B (en) Software testing method and device, electronic equipment and storage medium
US10324821B2 (en) Oracle cemli analysis tool
Hammad et al. Predicting the critical path changes using sensitivity analysis: a delay analysis approach
Njoku Obilor et al. Constructive cost model II metrics for estimating cost of indigenous software
JP2018190187A (en) Work schedule calculating program, work schedule calculating method and information processing device
US20100250326A1 (en) Service evolution approach in soa
TWI804386B (en) Compliance risk management for data in computing systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110404

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121025

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121204

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151214

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees