JP2009181204A - Worker management system - Google Patents

Worker management system Download PDF

Info

Publication number
JP2009181204A
JP2009181204A JP2008017951A JP2008017951A JP2009181204A JP 2009181204 A JP2009181204 A JP 2009181204A JP 2008017951 A JP2008017951 A JP 2008017951A JP 2008017951 A JP2008017951 A JP 2008017951A JP 2009181204 A JP2009181204 A JP 2009181204A
Authority
JP
Japan
Prior art keywords
worker
information
construction machine
mail
terminal device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008017951A
Other languages
Japanese (ja)
Inventor
Hiroshi Ogura
弘 小倉
Shigeomi Nishigaki
重臣 西垣
Katsutoshi Saihara
勝敏 才原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KICK KK
Hitachi Construction Machinery Co Ltd
Original Assignee
KICK KK
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KICK KK, Hitachi Construction Machinery Co Ltd filed Critical KICK KK
Priority to JP2008017951A priority Critical patent/JP2009181204A/en
Publication of JP2009181204A publication Critical patent/JP2009181204A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a proper attendance management system in a construction job site. <P>SOLUTION: A current location is detected by portable telephone sets 6 and 7 carried by a worker 8 or an operator 10, and electronic mail including the information of the detected current location is transmitted to a server 3 when the worker arrives at a workplace. The server 3 compares the information of the current location included in the transmitted electronic mail with information related with the working area of the worker 8 or the operator 10 on a construction schedule database. When determining that the electronic mail has been transmitted from the proper working area, the server 3 determines the reception time (or transmission time) of the electronic mail as an attendance (entry) time, and registers the entry time in an attendance management database. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、施工現場等において作業員を管理する技術に関する。   The present invention relates to a technique for managing workers at a construction site or the like.

建設、建築の施工現場では、作業員の入出場記録や出退勤記録をとる必要があるが、タイムレコーダやICカード読み取り機を利用する方法では、タイムレコーダやICカード読み取り機を設置しなければならず、施工現場の運用上適切ではなかった。そこで、携帯電話を利用して、ゲートなどの設置が不要な出退勤管理システムが提案されている(特許文献1参照)。   In construction and construction work sites, it is necessary to record the entry / exit records and attendance records of workers, but in the method using a time recorder or IC card reader, a time recorder or IC card reader must be installed. It was not appropriate for operation at the construction site. In view of this, a work attendance management system that uses a mobile phone and does not require installation of a gate or the like has been proposed (see Patent Document 1).

特開2006−65649号公報JP 2006-65649 A

上述した携帯電話を利用する出退勤管理システムでは、撮影機能付きの携帯電話機で撮影して得られる、あらかじめ指定された場所の映像と撮影時刻の情報を利用して出退勤時刻を管理している。しかし、施工現場の場合には、地形や作業場所が頻繁に変わるため、上述した携帯電話を利用する出退勤管理システムを利用した場合には、撮影すべき場所の指定が困難である。   In the above-mentioned attendance and attendance management system using a mobile phone, attendance and attendance times are managed using video of a predetermined location obtained by photographing with a mobile phone with a photographing function and information on photographing times. However, in the case of a construction site, the terrain and the work place frequently change, so when using the above-mentioned attendance / exit management system using a mobile phone, it is difficult to specify a place to be photographed.

(1) 請求項1の発明による作業員管理システムは、少なくとも作業員の配置予定位置に関する情報を格納しており、施工計画を管理する施工管理サーバと、作業員に携帯されていて検出した位置の情報とともに電子メールを送信する端末装置、から受信した電子メールに基づいて、端末装置を携帯する作業員を識別する作業員識別手段と、受信した端末装置の位置の情報と、作業員識別手段で識別した端末装置を携帯する作業員についての情報とに基づいて、作業員の位置を特定し、特定した作業員の位置と、施工管理サーバに格納されている作業員の配置予定位置に関する情報とを比較して、作業員が正しい配置予定位置に配置されたか否かを判断する配置判断手段と、配置判断手段で正しい配置予定位置に配置されたと判断された作業員の携帯する端末装置には作業内容に関する情報を電子メールで送信し、配置判断手段で正しい配置予定位置に配置されていないと判断された作業員の携帯する端末装置には正しい配置予定位置の情報を電子メールで送信する施工支援手段と、端末装置から送信された電子メールの送信時刻または受信時刻に基づいて、端末装置を携帯する作業員の出退勤を管理する勤怠管理手段とを備えることを特徴とする。
(2) 請求項2の発明は、請求項1に記載の作業員管理システムにおいて、建設機械の稼働位置に関する情報を取得する建設機械稼働位置情報取得手段をさらに備え、作業員には建設機械のオペレータも含まれ、端末装置は建設機械のオペレータにも携帯され、作業員識別手段は、端末装置から送信された電子メールに基づいて、端末装置を携帯する建設機械のオペレータを識別し、配置判断手段は、端末装置から受信した端末装置の位置の情報と、端末装置を携帯する建設機械のオペレータについての情報とに基づいて、建設機械のオペレータの位置を特定し、特定した建設機械のオペレータの位置と、建設機械稼働位置情報取得手段で取得した建設機械の稼働位置に関する情報とを比較して、建設機械のオペレータが建設機械の近傍にいるか否かを判断し、勤怠管理手段は、配置判断手段で建設機械のオペレータが建設機械の近傍にいると判断されると、端末装置から送信された電子メールの送信時刻または受信時刻に基づいて、端末装置を携帯する建設機械のオペレータの出退勤時刻を記録することを特徴とする。
(3) 請求項3の発明は、請求項1または請求項2に記載の作業員管理システムにおいて、端末装置から受信した端末装置の位置の情報と、端末装置を携帯する作業員についての情報とに基づいて、所定のエリア内に位置すると判断される作業員を特定して、所定のエリア内に位置すると判断された作業員の携帯する端末装置に所定の内容の電子メールを一斉送信する電子メール一斉送信制御手段をさらに備えることを特徴とする。
(1) The worker management system according to the invention of claim 1 stores at least information related to the planned placement position of the worker, a construction management server for managing the construction plan, and a position detected by being carried by the worker. Based on the e-mail received from the terminal device that transmits the e-mail together with the information, the worker identifying means for identifying the worker carrying the terminal device, the received position information of the terminal device, and the worker identifying means The position of the worker is identified based on the information about the worker who carries the terminal device identified in step 1, and the information regarding the position of the identified worker and the planned placement position of the worker stored in the construction management server And the position determination means for determining whether or not the worker is placed at the correct planned placement position, and the work determined by the placement judgment means as being placed at the correct planned placement position The terminal device carried by the worker transmits information on the work contents by e-mail, and the terminal device carried by the worker who is determined not to be placed at the correct planned placement position by the placement judging means has the correct planned placement position. Construction support means for transmitting information by e-mail, and attendance management means for managing the attendance and departure of workers carrying the terminal apparatus based on the transmission time or reception time of the e-mail transmitted from the terminal apparatus Features.
(2) The invention of claim 2 is the worker management system according to claim 1, further comprising construction machine operating position information acquisition means for acquiring information related to the operating position of the construction machine, An operator is also included, the terminal device is also carried by the operator of the construction machine, and the worker identification means identifies the operator of the construction machine carrying the terminal device based on the e-mail transmitted from the terminal device, and determines the arrangement The means specifies the position of the operator of the construction machine based on the information on the position of the terminal device received from the terminal device and the information on the operator of the construction machine carrying the terminal device. The position of the construction machine operator is compared with the information on the construction machine operating position acquired by the construction machine operating position information acquisition means. The attendance management means determines whether the operator of the construction machine is in the vicinity of the construction machine or not based on the transmission time or the reception time of the e-mail sent from the terminal device. Thus, the attendance time of the operator of the construction machine carrying the terminal device is recorded.
(3) The invention of claim 3 is the worker management system according to claim 1 or claim 2, wherein information on the position of the terminal device received from the terminal device, information on a worker carrying the terminal device, and An electronic device that identifies a worker who is determined to be located within a predetermined area based on the information and transmits an e-mail having a predetermined content to a terminal device carried by the worker determined to be located within the predetermined area. It further comprises mail simultaneous transmission control means.

本発明によれば、施工現場における適切な出退勤管理システムを実現できる。   ADVANTAGE OF THE INVENTION According to this invention, the appropriate attendance management system in a construction site is realizable.

−−−第1の実施の形態−−−
図1〜7を参照して、本発明による作業員管理システムの第1の実施の形態を説明する。図1は、本発明による作業員管理システムの全体構成を示す図である。1はインターネット網であり、2はデータセンタであり、4は施工現場の現場事務所である。8は施工現場で作業する作業員であり、9は建設機械であり、10は建設機械9のオペレータである。6は作業員8が携帯する携帯電話機であり、7はオペレータ10が携帯する携帯電話機である。
--- First embodiment ---
With reference to FIGS. 1-7, 1st Embodiment of the worker management system by this invention is described. FIG. 1 is a diagram showing the overall configuration of a worker management system according to the present invention. 1 is an Internet network, 2 is a data center, and 4 is a construction site office. Reference numeral 8 denotes a worker who works on the construction site, 9 denotes a construction machine, and 10 denotes an operator of the construction machine 9. 6 is a mobile phone carried by the worker 8, and 7 is a mobile phone carried by the operator 10.

データセンタ2は主に作業員8やオペレータ10の出退勤や施工に関して管理するためのセンタであり、サーバ3が設置されている。サーバ3は、施工現場の位置などの情報や、作業員8やオペレータ10、建設機械9の配置予定位置などを含む施工計画、作業員8やオペレータ10の出退勤に関する情報など、施工に関する情報などを記録装置(ハードディスクドライブ装置)で記録している。サーバ3は、インターネット網1に接続されている。なお、サーバ3はメールサーバとしても機能し、後述するように、携帯電話機6,7との間で電子メールの送受信を行う。   The data center 2 is a center for mainly managing the attendance and work of workers 8 and operators 10, and the server 3 is installed. The server 3 provides information on construction, such as information on the location of the construction site, construction plans including the planned placement positions of the workers 8, operators 10, and the construction machines 9, and information on the attendance and departure of the workers 8 and operators 10. Recording is performed by a recording device (hard disk drive device). The server 3 is connected to the Internet network 1. The server 3 also functions as a mail server, and transmits and receives electronic mail to and from the mobile phones 6 and 7, as will be described later.

現場事務所4は施工現場内や施工現場の近傍に設けられる事務所であり、パーソナルコンピュータ(PC)5が設置されている。PC5はインターネット網1に接続されている。携帯電話機6,7は、通話機能の他、図示しない携帯電話会社の通信網およびインターネット網1を介した電子メールの送受信機能と、たとえばGPS衛星からのGPS信号を受信して現在位置を検出する機能とを有する。なお、携帯電話機6,7では、検出した現在位置の情報を電子メールに添付して外部に送信することができる。   The site office 4 is an office provided in the construction site or in the vicinity of the construction site, and a personal computer (PC) 5 is installed. The PC 5 is connected to the Internet network 1. The mobile telephones 6 and 7 detect a current position by receiving a GPS signal from, for example, a GPS satellite and a function for transmitting and receiving e-mails via a communication network of a mobile phone company (not shown) and the Internet network 1 in addition to a call function. With functions. The mobile phones 6 and 7 can transmit the detected current position information to the outside by attaching it to an e-mail.

図2は、データセンタ2に設置されるサーバ3および現場事務所4に設置されるPC5の構成を示す図である。サーバ3は、各種の演算および制御を行うCPU3aと、CPU3aの作業エリアであるRAM3bと、データの記録装置であるハードディスクドライブ装置(HDD)3cとを備えている。サーバ3は、モニタ3gに表示を行うための表示インターフェース(表示I/F)3dと、キーボード3hなどの各種入力装置を接続するための入力インターフェース(入力I/F)3eと、インターネット網1に接続するための通信インターフェース(通信I/F)3fとを備えている。   FIG. 2 is a diagram showing the configuration of the server 3 installed in the data center 2 and the PC 5 installed in the field office 4. The server 3 includes a CPU 3a that performs various calculations and controls, a RAM 3b that is a work area of the CPU 3a, and a hard disk drive (HDD) 3c that is a data recording device. The server 3 includes a display interface (display I / F) 3d for displaying on the monitor 3g, an input interface (input I / F) 3e for connecting various input devices such as a keyboard 3h, and the Internet 1 And a communication interface (communication I / F) 3f for connection.

同様に、PC5は、各種の演算および制御を行うCPU5aと、CPU5aの作業エリアであるRAM5bと、データの記録装置であるハードディスクドライブ装置(HDD)5cとを備えている。PC5は、モニタ5gに表示を行うための表示インターフェース(表示I/F)5dと、キーボード5hなどの各種入力装置を接続するための入力インターフェース(入力I/F)5eと、インターネット網1に接続するための通信インターフェース(通信I/F)5fとを備えている。   Similarly, the PC 5 includes a CPU 5a that performs various calculations and controls, a RAM 5b that is a work area of the CPU 5a, and a hard disk drive (HDD) 5c that is a data recording device. The PC 5 is connected to a display interface (display I / F) 5d for displaying on the monitor 5g, an input interface (input I / F) 5e for connecting various input devices such as a keyboard 5h, and the Internet network 1. Communication interface (communication I / F) 5f.

−−−サーバ3に構築されたデータベースについて−−−
本実施の形態の作業員管理システムでは、サーバ3内に、次のようなデータベースが構築されている。図3は、作業員データベースのデータテーブル(作業員データテーブル)20の一例を示す図である。作業員データテーブル20には、作業員ID欄20aと、種別欄20bと、氏名欄20cとメールアドレス欄20dと、入退場フラグ欄20eとが、作業員ID毎に設けられている。作業員ID欄20aは、作業員8やオペレータ10を識別する識別子(作業員ID)が格納される欄である。種別欄20bは、作業員8であるのか、オペレータ10であるのかというような、作業員8(オペレータ10)の属性を表すデータが格納される欄である。
--- About the database built in server 3 ---
In the worker management system of the present embodiment, the following database is constructed in the server 3. FIG. 3 is a diagram illustrating an example of the data table (worker data table) 20 of the worker database. In the worker data table 20, a worker ID column 20a, a type column 20b, a name column 20c, a mail address column 20d, and an entrance / exit flag column 20e are provided for each worker ID. The worker ID column 20a is a column in which an identifier (worker ID) for identifying the worker 8 or the operator 10 is stored. The type column 20b is a column in which data representing the attribute of the worker 8 (operator 10) such as whether the worker 8 or the operator 10 is stored.

氏名欄20cは、作業員8やオペレータ10の氏名のデータが格納される欄である。メールアドレス欄20dは、作業員8やオペレータ10が携帯する携帯電話機6,7から送信される電子メールの差出人のメールアドレスのデータが格納される欄である。入退場フラグ欄20eは、施工現場に入場しているか否か、すなわち、作業員8やオペレータ10が出勤しているか否かを示すフラグ(入退場フラグ)が格納される欄である。   The name column 20c is a column in which data of names of the worker 8 and the operator 10 are stored. The email address column 20d is a column in which the email address data of the sender of the email transmitted from the cellular phones 6 and 7 carried by the worker 8 or the operator 10 is stored. The entry / exit flag column 20e is a column in which a flag (entrance / exit flag) indicating whether or not the worker 8 or the operator 10 is working is entered.

図4は、作業エリアデータベースのデータテーブル(作業エリアデータテーブル)30の一例を示す図である。作業エリアデータテーブル30は、施工現場における作業エリアを特定するためのデータが記録されているデータテーブルである。作業エリアデータテーブル30には、作業エリアID欄21aと、座標A欄21b〜座標D欄21eとが、作業エリアID毎に設けられている。作業エリアID欄21aは、作業エリアを識別する識別子(作業エリアID)が格納される欄である。   FIG. 4 is a diagram illustrating an example of a data table (work area data table) 30 of the work area database. The work area data table 30 is a data table in which data for specifying a work area at a construction site is recorded. In the work area data table 30, a work area ID column 21a and a coordinate A column 21b to a coordinate D column 21e are provided for each work area ID. The work area ID column 21a is a column in which an identifier (work area ID) for identifying a work area is stored.

座標A欄21b〜座標D欄21eは、作業エリアを矩形状に区切った際の頂点の位置の座標が格納される欄である。すなわち、各作業エリアは、座標A欄21b〜座標D欄21eに格納されている座標で示される座標点を頂点とする矩形状のエリアとして定められている。なお、各作業アリアの形状は矩形でなくてもよく、その場合には、作業エリアを特定できるように作業エリア境界上の座標を適宜格納するように作業エリアデータテーブル30を構成すればよい。   The coordinate A column 21b to the coordinate D column 21e are columns in which coordinates of vertex positions when the work area is divided into rectangles are stored. That is, each work area is defined as a rectangular area whose apex is the coordinate point indicated by the coordinates stored in the coordinate A column 21b to the coordinate D column 21e. Note that the shape of each work area does not have to be rectangular. In this case, the work area data table 30 may be configured to appropriately store coordinates on the work area boundary so that the work area can be specified.

図5は、施工計画データベースのデータテーブル(施工計画データテーブル)22の一例を示す図である。施工計画データテーブル22には、日付欄22aと、作業内容欄22bと、エリア欄22cと、担当欄22dとが、日付毎に設けられている。日付欄22aは、施工を行う日付(施工日)のデータが格納される欄である。作業内容欄22bは、施工内容に関するデータが格納される欄である。   FIG. 5 is a diagram illustrating an example of a data table (construction plan data table) 22 of the construction plan database. In the construction plan data table 22, a date column 22a, a work content column 22b, an area column 22c, and a charge column 22d are provided for each date. The date column 22a is a column in which data of a construction date (construction date) is stored. The work content column 22b is a column in which data relating to construction content is stored.

エリア欄22cは、日付欄22aに格納された施工日に作業が行われる作業エリアの作業アリアIDが格納される欄である。担当欄22dは、日付欄22aに格納された施工日に、エリア欄22cに格納された作業エリアにおいて作業を行う作業員8やオペレータ10の作業員IDを格納する欄である。したがって、施工計画データテーブル22には、いつ、どの作業内容を、どの作業エリアで、誰が作業を行うように予定されているのか、という施工計画(施工管理)に関する情報が格納されている。このように、本実施の形態の作業員管理システムでは、作業員8やオペレータ10と作業エリアとが紐付けられている。   The area column 22c is a column in which the work area ID of the work area where the work is performed on the construction date stored in the date column 22a is stored. The charge column 22d is a column for storing the worker ID of the worker 8 or the operator 10 who performs work in the work area stored in the area column 22c on the construction date stored in the date column 22a. Therefore, the construction plan data table 22 stores information on construction plans (construction management) such as when, what work content, in which work area, and who is scheduled to work. Thus, in the worker management system according to the present embodiment, the worker 8 and the operator 10 are associated with the work area.

図6は、出退勤管理データベースのデータテーブル(出退勤管理データテーブル)23の一例を示す図である。出退勤管理データテーブル23は、作業員ID欄23aと、入場時刻欄23bと、退場時刻欄23cと、就業時間欄23dとが、作業員ID毎に設けられている。作業員ID欄23aは、作業員8やオペレータ10の作業員IDが格納される欄である。入場時刻欄23bは、後述するように、作業員8やオペレータ10が作業エリアに入場した時刻とされた時刻のデータが格納される欄である。退場時刻欄23cは、後述するように、作業員8やオペレータ10が作業エリアから出場(退場)した時刻とされた時刻のデータが格納される欄である。就業時間欄23dは、作業員8やオペレータ10の就業している時間が格納される欄であり、たとえば、入場時刻欄23bに格納されている入場時刻から、退場時刻欄23cに格納されている退場時刻までの経過時間から、昼食等の休憩時間を差し引いた時間が格納される。   FIG. 6 is a diagram showing an example of a data table (attendance / attendance management data table) 23 of the attendance / attendance management database. In the attendance / leaving management data table 23, a worker ID column 23a, an entry time column 23b, an exit time column 23c, and a working time column 23d are provided for each worker ID. The worker ID column 23a is a column in which worker IDs of the worker 8 and the operator 10 are stored. As will be described later, the entry time column 23b is a column in which data on the time when the worker 8 or the operator 10 enters the work area is stored. As will be described later, the exit time column 23c is a column in which data on the time when the worker 8 or the operator 10 enters (exits) from the work area is stored. The working time column 23d is a column in which the working hours of the worker 8 and the operator 10 are stored. For example, the entry time stored in the entry time column 23b is stored in the exit time column 23c. The time obtained by subtracting the break time such as lunch from the elapsed time until the exit time is stored.

−−−作業員管理システムにおける出退勤管理について−−−
このように構成される作業員管理システムでは、次のようにして作業員8やオペレータの出退勤を管理する。作業員8やオペレータ10は、出勤して施工現場に到着した段階で、携帯している携帯電話機6,7が検出した現在位置の情報を添付して、電子メールを携帯電話機6,7からサーバ3に宛てて送信する。なお、施工現場がいくつかのエリアに区切られている場合には、その複数のエリアの内、その作業員8やオペレータ10がその日に作業をすべきエリア内から電子メールを送信することとする。
--- About attendance and attendance management in the worker management system ---
In the worker management system configured as described above, the attendance of the worker 8 and the operator is managed as follows. When the worker 8 or the operator 10 arrives at the construction site after attending work, he / she attaches information on the current position detected by the mobile telephones 6 and 7 and sends an e-mail from the mobile telephones 6 and 7 to the server. 3 is sent to. In addition, when the construction site is divided into several areas, an e-mail is transmitted from the area where the worker 8 or the operator 10 should work on the day. .

サーバ3のCPU3aは、携帯電話機6,7から送信された、現在位置の情報が添付された電子メールの受信をトリガとして、以下の処理を行う。この処理を、図7に示すフローチャートを参照ながら説明する。図7は、サーバ3における出退勤管理の動作を示すフローチャートである。携帯電話機6,7から送信された、現在位置の情報が添付された電子メールを受信すると、図7に示す処理を行うプログラムが起動され、CPU3aで実行される。携帯電話機6,7から送信された、現在位置の情報が添付された電子メールを受信すると、受信した電子メールの差出人のメールアドレスを読み込んで、図3に示す作業員データテーブル20のメールアドレス欄20dに格納されたメールアドレスと照合して、作業員IDを特定する(ステップS101)。   The CPU 3a of the server 3 performs the following processing with the reception of an e-mail attached with information on the current position transmitted from the mobile phones 6 and 7 as a trigger. This process will be described with reference to the flowchart shown in FIG. FIG. 7 is a flowchart showing the operation of attendance / leaving management in the server 3. When an e-mail attached with information on the current position transmitted from the cellular phones 6 and 7 is received, a program for performing the process shown in FIG. 7 is started and executed by the CPU 3a. When an e-mail attached with information on the current position transmitted from the cellular phones 6 and 7 is received, the e-mail address of the sender of the received e-mail is read, and the e-mail address field of the worker data table 20 shown in FIG. The worker ID is identified by collating with the mail address stored in 20d (step S101).

次にCPU3aは、特定した作業員IDについての入退場フラグを作業員データテーブル20の入退場フラグ欄20eから読み込んで、当該特定した作業員IDが付された作業員が就業中であるか否かを判断する(ステップS103)。なお、入退場フラグが0であれば、作業員8またはオペレータ10が出勤前(退勤後)であることを示し、入退場フラグが1であれば、作業員8またはオペレータ10が出勤後(就業中)であることを示す。   Next, the CPU 3a reads the entry / exit flag for the identified worker ID from the entry / exit flag column 20e of the worker data table 20, and whether or not the worker with the identified worker ID is working. Is determined (step S103). If the entrance / exit flag is 0, it indicates that the worker 8 or the operator 10 is before work (after work), and if the entrance / exit flag is 1, the worker 8 or the operator 10 is after work (work) Middle).

−−−入退場フラグが0であった場合−−−
ここでCPU3aは、入退場フラグが0であれば(ステップS103否定判断)、受信した電子メールが、作業員8(またはオペレータ10)が正しい作業エリアに到着した後に送信されたものであるか否か、すなわち、電子メールを送信した作業員8(またはオペレータ10)が正しい位置(作業エリア)にいるか否かを判断する(ステップS111)。具体的には、CPU3aは、図5に示す施工計画データテーブル22から、その日(すなわち電子メール受信日)についてのエリア欄22cと担当欄22dから、当該作業員IDが付された作業員8(またはオペレータ10)が作業をすべき作業エリアを特定する。次にCPU3aは、特定した作業エリアの位置(範囲)を図4に示す作業エリアデータテーブル21に格納されている作業エリアIDと座標データから特定する。そして、CPU3aは、特定した作業エリアの範囲内から電子メールが送信されたか否かを、受信した電子メールに添付されている現在位置の情報に基づいて判断する。
--- When the entrance / exit flag is 0 ---
Here, if the entrance / exit flag is 0 (No at Step S103), the CPU 3a determines whether or not the received e-mail is transmitted after the worker 8 (or the operator 10) arrives at the correct work area. That is, it is determined whether or not the worker 8 (or operator 10) who sent the e-mail is at the correct position (work area) (step S111). Specifically, the CPU 3a, from the construction plan data table 22 shown in FIG. 5, from the area column 22c and the charge column 22d for the day (that is, the email reception date), the worker 8 ( Alternatively, the operator 10) specifies a work area where the work should be performed. Next, the CPU 3a specifies the position (range) of the specified work area from the work area ID and the coordinate data stored in the work area data table 21 shown in FIG. Then, the CPU 3a determines whether or not an e-mail has been transmitted from the range of the specified work area based on the information on the current position attached to the received e-mail.

特定した作業エリアの範囲内から電子メールが送信されたと判断されると(ステップS111肯定判断)、CPU3aは、電子メールを受信した時刻(または電子メールの送信時刻)を始業時刻(入場時刻)であるとみなして、図6の出退勤管理データテーブル23の当該作業員IDについての入場時刻欄23bに、電子メールを受信した時刻(または電子メールの送信時刻)のデータを格納する(ステップS113)。次いでCPU3aは、図3の作業員データテーブル20の当該作業員IDについての入退場フラグを1として入退場フラグ欄20eに格納する(ステップS115)。これにより、電子メールを送信した作業員8(またはオペレータ10)が出勤したものとして扱われる。   When it is determined that an e-mail has been transmitted from within the specified work area (Yes in step S111), the CPU 3a sets the time when the e-mail is received (or the e-mail transmission time) as the start time (entry time). Assuming that there is data, the entry time column 23b for the worker ID in the attendance / attendance management data table 23 of FIG. 6 stores the data of the time when the e-mail was received (or the e-mail transmission time) (step S113). Next, the CPU 3a stores the entry / exit flag for the worker ID in the worker data table 20 of FIG. 3 as 1 in the entry / exit flag column 20e (step S115). As a result, the worker 8 (or operator 10) who sent the e-mail is treated as having gone to work.

そしてCPU3aは、その日の作業内容に関する情報を電子メールで返信する(ステップS117)。具体的には、CPU3aは、図5に示す施工計画データテーブル22から、その日(すなわち電子メール受信日)についての作業内容欄22bおよび担当欄22dから、当該作業員IDが付された作業員8(またはオペレータ10)が作業をすべき作業内容を特定する。そして、CPU3aは、特定した作業内容についての情報などを含む電子メールを生成して、受信した電子メールの発信元である携帯電話機6,7へ返信する。   And CPU3a returns the information regarding the work content of the day with an email (step S117). Specifically, the CPU 3a, from the construction plan data table 22 shown in FIG. 5, the worker 8 to which the worker ID is assigned from the work content column 22b and the charge column 22d for that day (that is, the e-mail reception date). (Or operator 10) specifies the work content to be worked on. Then, the CPU 3a generates an e-mail including information about the identified work content and sends it back to the mobile phones 6 and 7 that are the sender of the received e-mail.

なお、特定した作業エリアの範囲外から電子メールが送信されたと判断されると(ステップS111否定判断)、CPU3aは、正しい作業エリアについての情報を電子メールで返信する(ステップS121)。具体的には、CPU3aは、図5に示す施工計画データテーブル22から、その日(すなわち電子メール受信日)についてのエリア欄22cと担当欄22dから、当該作業員IDが付された作業員8(またはオペレータ10)が作業をすべき作業エリアを特定する。次にCPU3aは、特定した作業エリアの位置(範囲)を図4に示す作業エリアデータテーブル21に格納されている座標データから特定する。そして、CPU3aは、特定した作業エリアの位置(範囲)についての情報を含む電子メールを生成して、受信した電子メールの発信元である携帯電話機6,7へ返信する。   If it is determined that an e-mail has been transmitted from outside the specified work area (No at step S111), the CPU 3a returns information about the correct work area by e-mail (step S121). Specifically, the CPU 3a, from the construction plan data table 22 shown in FIG. 5, from the area column 22c and the charge column 22d for the day (that is, the email reception date), the worker 8 ( Alternatively, the operator 10) specifies a work area where the work should be performed. Next, the CPU 3a specifies the position (range) of the specified work area from the coordinate data stored in the work area data table 21 shown in FIG. Then, the CPU 3a generates an e-mail including information about the position (range) of the specified work area, and sends it back to the mobile phones 6 and 7 that are the sender of the received e-mail.

−−−入退場フラグが1であった場合−−−
上述したステップS103において、入退場フラグが1であれば(ステップS103肯定判断)、CPU3aは、電子メールを受信した時刻(または電子メールの送信時刻)を終業時刻(退場時刻)であるとみなして、図6の出退勤管理データテーブル23の当該作業員IDについての退場時刻欄23cに、電子メールを受信した時刻(または電子メールの送信時刻)のデータを格納する(ステップS105)。また、CPU3aは、入場時刻と退場時刻とに基づいて当該作業員IDについての就業時間を算出して、就業時間欄23dに格納する。
--- When the entrance / exit flag is 1 ---
If the entrance / exit flag is 1 in step S103 described above (Yes determination in step S103), the CPU 3a regards the time when the e-mail is received (or the e-mail transmission time) as the end time (exit time). The data of the time when the e-mail is received (or the e-mail transmission time) is stored in the leaving time column 23c for the worker ID in the attendance / leaving management data table 23 of FIG. 6 (step S105). Further, the CPU 3a calculates a working time for the worker ID based on the entrance time and the leaving time, and stores the calculated working time in the working time column 23d.

次いでCPU3aは、図3の作業員データテーブル20の当該作業員IDについての入退場フラグを0として入退場フラグ欄20eに格納する(ステップS107)。これにより、電子メールを送信した作業員8(またはオペレータ10)が退場(帰宅)したものとして扱われる。そしてCPU3aは、次の施工日の作業内容や作業エリアなどに関する情報を電子メールで返信する(ステップS109)。具体的には、CPU3aは、図5に示す施工計画データテーブル22から、次の施工日(すなわち電子メール受信日の次の施工日)についての作業内容欄22b、エリア欄22cおよび担当欄22dから、当該作業員IDが付された作業員8(またはオペレータ10)が作業をすべき作業内容と作業エリアを特定する。次にCPU3aは、特定した作業エリアの位置(範囲)を図4に示す作業エリアデータテーブル21に格納されている座標データから特定する。そして、CPU3aは、次の施工日、作業内容、特定した作業エリアの位置(範囲)についての情報などを含む電子メールを生成して、受信した電子メールの発信元である携帯電話機6,7へ返信する。   Next, the CPU 3a stores the entry / exit flag for the worker ID in the worker data table 20 of FIG. 3 as 0 in the entry / exit flag column 20e (step S107). Thereby, the worker 8 (or the operator 10) who transmitted the electronic mail is treated as having left (returned home). And CPU3a returns the information regarding the work content of a next construction day, a work area, etc. with an email (step S109). Specifically, the CPU 3a, from the construction plan data table 22 shown in FIG. 5, from the work content column 22b, the area column 22c, and the charge column 22d for the next construction date (that is, the next construction date on the e-mail reception date). The worker 8 (or the operator 10) to whom the worker ID is assigned identifies the work content and work area to be worked. Next, the CPU 3a specifies the position (range) of the specified work area from the coordinate data stored in the work area data table 21 shown in FIG. Then, the CPU 3a generates an e-mail including information on the next construction date, work contents, the position (range) of the specified work area, and the like to the mobile phones 6 and 7 that are the sender of the received e-mail. Send back.

−−−サーバ3における電子メール送信機能について−−−
上述したように、サーバ3は電子メールを送信する機能を有するが、サーバ3側または現場事務所4のPC5側から指定された様々な条件に基づいて、種々の電子メールを送信できる。たとえば、電子メールの送信相手先として、図3に示す作業員データテーブル20や、図5に示す施工計画データテーブル22に格納された情報を参照して、特定の作業員IDが割り当てられたメールアドレスを指定することができる。たとえば、電子メールの送信相手先として、作業員8であるのかオペレータ10であるのかというような作業員8(オペレータ10)の任意の属性に属する全てのメールアドレスを指定することもできる。たとえば、電子メールの送信相手先として、特定の作業エリアを担当することとされている全ての作業員IDについてのメールアドレスを指定することができる。
--- About the e-mail transmission function in the server 3 ---
As described above, the server 3 has a function of transmitting an electronic mail, but can transmit various electronic mails based on various conditions designated from the server 3 side or the PC 5 side of the field office 4. For example, referring to the information stored in the worker data table 20 shown in FIG. 3 or the construction plan data table 22 shown in FIG. 5 as an email destination, a mail assigned with a specific worker ID. An address can be specified. For example, all e-mail addresses belonging to any attribute of the worker 8 (operator 10) such as whether the worker 8 or the operator 10 can be designated as the transmission destination of the e-mail. For example, as e-mail transmission destinations, e-mail addresses for all worker IDs that are supposed to be in charge of a specific work area can be designated.

なお、電子メールの送信内容は、任意の内容とすることができる。また、あらかじめ定められた定型文を電子メールで送信するようにしてもよい。一例を挙げると、たとえば天候が急変したような場合に、特定の作業エリアの特定の作業内容に従事する作業員8やオペレータ10に対して、または、全ての作業エリアの全ての作業員8やオペレータ10に対して作業の一時中止を連絡する場合に、上述したサーバ3の電子メール送信機能を利用することができる。   In addition, the transmission content of an electronic mail can be made into arbitrary content. Further, a predetermined fixed sentence may be transmitted by e-mail. For example, when the weather changes suddenly, for example, the worker 8 or the operator 10 engaged in a specific work content in a specific work area, or all the workers 8 in all the work areas When notifying the operator 10 of the suspension of work, the above-described e-mail transmission function of the server 3 can be used.

−−−現場事務所4のPC5における処理−−−
現場事務所4のPC5は、インターネット網1を介してデータセンタ2のサーバ3にアクセスして、サーバ3内のデータベースから必要な情報を読み込むことができる。たとえば、PC5は、サーバ3内のデータベースから、図3に示す作業員データテーブル20を読み込んでモニタ5gに表示させることができる。また、PC5は、サーバ3内のデータベースから、図6に示す出退勤管理データテーブル23を読み込んでモニタ5gに表示させることができる。これにより、現場事務所4の監督者は、作業員8やオペレータ10の出退勤状況を確認できる。
--- Processing at PC 5 in the field office 4 ---
The PC 5 in the field office 4 can access the server 3 in the data center 2 via the Internet network 1 and read necessary information from the database in the server 3. For example, the PC 5 can read the worker data table 20 shown in FIG. 3 from the database in the server 3 and display it on the monitor 5g. Further, the PC 5 can read the attendance and attendance management data table 23 shown in FIG. 6 from the database in the server 3 and display it on the monitor 5g. Thereby, the supervisor of the field office 4 can confirm the attendance / leaving status of the worker 8 and the operator 10.

図4に示す作業エリアデータテーブル21に格納されるデータについては、サーバ3側でキーボード3h等の入力装置を用いることで入力できるが、PC5側で入力してもよい。すなわち、PC5側で、キーボード5h等の入力装置を用いることで作業エリアデータテーブル21の作成や修正を行って、インターネット網1を介してサーバ3に転送するようにしてもよい。   The data stored in the work area data table 21 shown in FIG. 4 can be input by using an input device such as a keyboard 3h on the server 3 side, but may be input on the PC 5 side. In other words, the work area data table 21 may be created or modified on the PC 5 side by using an input device such as a keyboard 5 h and transferred to the server 3 via the Internet network 1.

また、図5に示す施工計画データテーブル22に格納されるデータについては、サーバ3側でキーボード3h等の入力装置を用いることで入力できるが、PC5側で入力してもよい。すなわち、PC5側で、キーボード5h等の入力装置を用いることで施工計画データテーブル22の作成や修正を行って、インターネット網1を介してサーバ3に転送するようにしてもよい。   The data stored in the construction plan data table 22 shown in FIG. 5 can be input on the server 3 side by using an input device such as a keyboard 3h, but may be input on the PC 5 side. That is, on the PC 5 side, the construction plan data table 22 may be created or modified by using an input device such as a keyboard 5 h and transferred to the server 3 via the Internet network 1.

PC5は、上述したように、サーバ3側から送信する電子メールに関して種々の条件を設定できる。なお、上述したサーバ3の電子メール送信機能と同等の機能をPC5側で持たせるようにしてもよい。   As described above, the PC 5 can set various conditions regarding the electronic mail transmitted from the server 3 side. In addition, you may make it give the function equivalent to the electronic mail transmission function of the server 3 mentioned above on the PC5 side.

上述した第1の実施の形態の作業員管理システムでは、次の作用効果を奏する。
(1) 作業員8やオペレータ10が携帯する携帯電話機6,7で現在位置を検出し、検出した現在位置の情報を含む電子メールを出勤時および退勤時にサーバ3に送信させることで、作業員8やオペレータ10の出勤や退勤を管理するように構成した。したがって、施工現場の場合のように、地形や作業場所が頻繁に変わる場所であっても、ゲートなどの設置や監視員の配置が不要であり、適切な出退勤管理システムを実現できる。これにより、施工現場における出退勤管理を効率化できる。
The worker management system according to the first embodiment described above has the following effects.
(1) The current position is detected by the cellular phones 6 and 7 carried by the worker 8 or the operator 10, and an e-mail including information on the detected current position is transmitted to the server 3 at the time of going to work or leaving work, thereby 8 and operator 10 attendance and leaving work are configured to be managed. Therefore, even in places where the terrain and work place frequently change, as in the case of construction sites, it is not necessary to install a gate or the like and to place an observer, so that an appropriate attendance management system can be realized. Thereby, the attendance and attendance management at the construction site can be made efficient.

(2) 作業員8やオペレータ10が出勤時に施工計画で定められた作業エリア外から携帯電話機6,7で電子メールを送信すると、サーバ3から正しい作業エリアについての情報を電子メールで返信するように構成した。これにより、到着場所を誤ってしまった作業員8やオペレータ10を本来到着すべき正しい作業エリアに導くことができ、作業効率の悪化を防止できる。 (2) When the worker 8 or the operator 10 sends an e-mail from the outside of the work area determined in the construction plan at the time of work by using the mobile phones 6 and 7, the server 3 sends back information on the correct work area by e-mail. Configured. Thereby, it is possible to guide the worker 8 and the operator 10 who have mistakenly arrived to the correct work area where they should originally arrive, and to prevent deterioration of work efficiency.

(3) 作業員8やオペレータ10が出勤時に施工計画で定められた作業エリア内から携帯電話機6,7で電子メールを送信すると、サーバ3からその日の作業内容についての情報を電子メールで返信するように構成した。これにより、作業員8やオペレータ10にその日の作業内容を再確認させることができ、作業効率の向上に資する。 (3) When the worker 8 or the operator 10 sends an e-mail from the work area determined in the construction plan at the time of work to the mobile phone 6 or 7, the server 3 sends back information on the work contents of the day by e-mail. It was configured as follows. Thereby, the worker 8 and the operator 10 can reconfirm the work contents of the day, which contributes to improvement of work efficiency.

(4) 作業員8やオペレータ10が退勤時に携帯電話機6,7で電子メールを送信すると、サーバ3から次の施工日の作業内容や作業エリアなどに関する情報を電子メールで返信するように構成した。これにより、作業員8やオペレータ10に次の施工日(次の出勤日)の作業内容や作業エリアを通知でき、作業効率の向上に資する。 (4) The configuration is such that when the worker 8 or the operator 10 sends an e-mail with the mobile phones 6 and 7 when leaving the office, the server 3 sends back information on the work content, work area, etc. of the next construction day by e-mail. . Thereby, the work content and work area of the next construction day (next work day) can be notified to the worker 8 or the operator 10, which contributes to improvement of work efficiency.

(5) サーバ3における電子メールを受信した時刻、または、携帯電話機6,7で電子メールを送信した時刻を入場時刻や退場時刻であるとみなして、その時刻のデータを図6の出退勤管理データテーブル23の入場時刻欄23bや退場時刻欄23cに格納するように構成した。これにより、作業員8やオペレータ10の入場時刻や退場時刻の管理を容易化できる。 (5) The time when the e-mail is received at the server 3 or the time when the e-mail is transmitted by the mobile telephones 6 and 7 is regarded as the entrance time and the exit time. The table 23 is configured to be stored in the entry time column 23b and the exit time column 23c. Thereby, management of the entrance time and exit time of the worker 8 and the operator 10 can be facilitated.

(6) いわゆるGPS機能を搭載した携帯電話機6,7によってGPS衛星からのGPS信号を利用して検出した現在位置の情報をサーバ3で受信するように構成した。これにより、作業員8やオペレータ10が所定の作業エリアに出勤してきたことを簡単な構成で精度よく検出できるので、作業員管理システム構築のコスト増を抑制できる。また、作業員8やオペレータ10が出勤していないにもかかわらず出勤したように装うような不正行為を抑制でき、作業員8やオペレータ10の勤務状態を良好に保てる。 (6) The server 3 receives information on the current position detected by using the GPS signals from the GPS satellites by the mobile phones 6 and 7 equipped with a so-called GPS function. As a result, it is possible to accurately detect that the worker 8 or the operator 10 has gone to work in a predetermined work area with a simple configuration, and thus it is possible to suppress an increase in the cost of building a worker management system. In addition, it is possible to suppress fraudulent acts that appear as if the worker 8 or the operator 10 is not working, and the working state of the worker 8 or the operator 10 can be kept good.

(7) サーバ3内に構築されたデータベースを利用して、サーバ3側または現場事務所4のPC5側から指定された様々な条件に基づいて、種々の電子メールを送信できるように構成した。これにより、電子メールによって連絡すべき相手を適切に選択して、電子メールを送信できるので、作業員8やオペレータ10に対して効率的、効果的に情報を伝達できる。 (7) Using the database constructed in the server 3, various e-mails can be transmitted based on various conditions designated from the server 3 side or the PC 5 side of the field office 4. As a result, it is possible to appropriately select a partner to be contacted by e-mail and transmit the e-mail, so that information can be efficiently and effectively transmitted to the worker 8 and the operator 10.

−−−第2の実施の形態−−−
図8〜11を参照して、本発明による作業員管理システムの第2の実施の形態を説明する。以下の説明では、第1の実施の形態と同じ構成要素には同じ符号を付して相違点を主に説明する。特に説明しない点については、第1の実施の形態と同じである。本実施の形態では、主に、施工現場における建設機械9から得られる情報を利用する点で、第1の実施の形態と異なる。
--- Second embodiment ---
With reference to FIGS. 8-11, 2nd Embodiment of the worker management system by this invention is described. In the following description, the same components as those in the first embodiment are denoted by the same reference numerals, and different points will be mainly described. Points that are not particularly described are the same as those in the first embodiment. This embodiment is different from the first embodiment in that information obtained from the construction machine 9 at the construction site is mainly used.

すなわち、第1の実施の形態では、作業員8やオペレータ10と作業エリアとが紐付けられているところ、第2の実施の形態の作業員管理システムでは、作業員8やオペレータ10と建設機械9とを紐付けて管理する。以下詳述する。図8は、第2の実施の形態の作業員管理システムの全体構成を示す図である。11は通信衛星であり、12は建設機械9から送信される各種情報を受信する重機データセンタであり、13は重機データセンタ12に設けられるサーバである。   That is, in the first embodiment, the worker 8 or the operator 10 and the work area are associated with each other. In the worker management system of the second embodiment, the worker 8 or the operator 10 and the construction machine are connected. 9 is managed by linking. This will be described in detail below. FIG. 8 is a diagram illustrating an overall configuration of the worker management system according to the second embodiment. 11 is a communication satellite, 12 is a heavy equipment data center for receiving various information transmitted from the construction machine 9, and 13 is a server provided in the heavy equipment data center 12.

建設機械9の不図示の制御装置が収集した建設機械9の各種情報は、通信衛星11を介して、重機データセンタ12のサーバ13に送信される。なお、たとえば建設機械9が油圧ショベルである場合、油圧ショベルからサーバ13へ送信されるデータとしては、たとえば次のようなデータが挙げられる。たとえば、日報データとして、油圧ショベルの位置の情報、エンジンキースイッチのオン時刻やオフ時刻、エンジン始動時刻、エンジン停止時刻、アワメータの計測値、走行操作時間、旋回操作時間、フロント操作時間、エンジン稼動時間分布などがある。   Various information of the construction machine 9 collected by a control device (not shown) of the construction machine 9 is transmitted to the server 13 of the heavy equipment data center 12 via the communication satellite 11. For example, when the construction machine 9 is a hydraulic excavator, examples of data transmitted from the hydraulic excavator to the server 13 include the following data. For example, as daily report data, hydraulic excavator position information, engine key switch on / off time, engine start time, engine stop time, hour meter measurement value, travel operation time, turning operation time, front operation time, engine operation There is a time distribution.

また、日報データとして、走行負荷頻度分布、掘削稼動時間分布あるいは燃料消費量(単位時間あたり、稼働分、無負荷分など)などがある。警報データとして、エンジンオイルレベル、エンジン冷却水温度、エンジンオイル温度、エアフィルタ目詰まり、作動油フィルタ、バッテリ電圧、エンジンオイル圧力、燃料残量、作動油温度などがある。故障データとして、エンジン回転数異常、油圧ポンプ吐出圧異常などがある。   Daily report data includes travel load frequency distribution, excavation operation time distribution or fuel consumption (per unit time, operation, no load, etc.). The alarm data includes engine oil level, engine coolant temperature, engine oil temperature, air filter clogging, hydraulic oil filter, battery voltage, engine oil pressure, fuel remaining amount, hydraulic oil temperature, and the like. Fault data includes abnormal engine speed, abnormal discharge pressure of the hydraulic pump, and the like.

重機データセンタ12には、上述したようにサーバ13が設けられている。サーバ13は、通信衛星11を介して建設機械9から送信される各種情報を受信して、不図示の記録装置に記録する。サーバ13は、インターネット網1に接続されている。   The heavy equipment data center 12 is provided with the server 13 as described above. The server 13 receives various information transmitted from the construction machine 9 via the communication satellite 11 and records it in a recording device (not shown). The server 13 is connected to the Internet network 1.

データセンタ2のサーバ3や現場事務所のPC5では、インターネット網1を介して重機データセンタ12のサーバ13に接続することで、建設機械9の各種情報を得ることができる。サーバ3は、建設機械9の位置の情報を得ると、図9に示すような、建設機械データベースのデータテーブル(建設機械データテーブル)24を作成する。   The server 3 of the data center 2 and the PC 5 of the field office can obtain various information of the construction machine 9 by connecting to the server 13 of the heavy equipment data center 12 via the Internet network 1. When the server 3 obtains information on the position of the construction machine 9, the server 3 creates a construction machine database data table (construction machine data table) 24 as shown in FIG.

建設機械データテーブル24には、建設機械ID欄24aと、緯度欄24bと、経度欄24cとが建設機械ID毎に設けられている。建設機械ID欄24aは、個々の建設機械9を識別する識別子(建設機械ID)が格納される欄である。緯度欄24bおよび経度欄24cは、それぞれ建設機械9の位置の情報から得られた建設機械9の緯度および経度の情報が格納される欄である。   In the construction machine data table 24, a construction machine ID column 24a, a latitude column 24b, and a longitude column 24c are provided for each construction machine ID. The construction machine ID column 24a is a column in which an identifier (construction machine ID) for identifying each construction machine 9 is stored. The latitude column 24b and the longitude column 24c are columns in which the latitude and longitude information of the construction machine 9 obtained from the position information of the construction machine 9 is stored.

また、サーバ3は、図10に示すような施工計画データベースの施工計画データテーブル25を作成する。施工計画データテーブル25には、日付欄25aと、作業内容欄25bと、建設機械ID欄25cと、担当欄25dとが、日付毎に設けられている。日付欄25aは、施工を行う日付(施工日)のデータが格納される欄である。作業内容欄25bは、施工内容に関するデータが格納される欄である。   Moreover, the server 3 creates the construction plan data table 25 of the construction plan database as shown in FIG. In the construction plan data table 25, a date column 25a, a work content column 25b, a construction machine ID column 25c, and a charge column 25d are provided for each date. The date column 25a is a column in which data of construction date (construction date) is stored. The work content column 25b is a column in which data related to construction content is stored.

建設機械ID欄25cは、日付欄25aに格納された施工日に作業を行う建設機械9の建設機械IDが格納される欄である。担当欄25dは、日付欄25aに格納された施工日に、建設機械ID欄25cに格納された建設機械IDが付された建設機械9とともに、または、当該建設機械9の周囲で作業を行う作業員8やオペレータ10の作業員IDを格納する欄である。したがって、施工計画データテーブル22には、いつ、どの作業内容を、どの建設機械9で、誰が作業を行うように予定されているのか、という施工計画(施工管理)に関する情報が格納されている。このように、本実施の形態の作業員管理システムでは、作業員8やオペレータ10と建設機械とが紐付けられている。   The construction machine ID column 25c is a column in which the construction machine ID of the construction machine 9 that performs the work on the construction date stored in the date column 25a is stored. The work column 25d is a work for performing work on or around the construction machine 9 with the construction machine ID stored in the construction machine ID column 25c on the construction date stored in the date field 25a. This is a column for storing the worker ID of the worker 8 or the operator 10. Therefore, the construction plan data table 22 stores information on construction plans (construction management), which work contents, which construction machines 9 and who are scheduled to work. Thus, in the worker management system of the present embodiment, the worker 8 or the operator 10 and the construction machine are linked.

−−−作業員管理システムにおける出退勤管理について−−−
このように構成される作業員管理システムでは、次のようにして作業員8やオペレータの出退勤を管理する。作業員8やオペレータ10は、出勤して施工現場に到着した段階で、携帯している携帯電話機6,7が検出した現在位置の情報を添付して電子メールを携帯電話機6,7からサーバ3に宛てて送信する。なお、施工現場がいくつかのエリアに区切られている場合には、その複数のエリアの内、その作業員8やオペレータ10がその日に作業をすべきエリア内から電子メールを送信することとする。
--- About attendance and attendance management in the worker management system ---
In the worker management system configured as described above, the attendance of the worker 8 and the operator is managed as follows. When the worker 8 or the operator 10 arrives at the construction site after coming to work, an e-mail is attached from the mobile phones 6 and 7 to the server 3 with information on the current position detected by the mobile phones 6 and 7 being carried. Send to. In addition, when the construction site is divided into several areas, an e-mail is transmitted from the area where the worker 8 or the operator 10 should work on the day. .

サーバ3のCPU3aは、携帯電話機6,7から送信された、現在位置の情報が添付された電子メールの受信をトリガとして、以下の処理を行う。この処理を、図11に示すフローチャートを参照ながら説明する。図11は、サーバ3における出退勤管理の動作を示すフローチャートである。携帯電話機6,7から送信された、現在位置の情報が添付された電子メールを受信すると、図11に示す処理を行うプログラムが起動され、CPU3aで実行される。携帯電話機6,7から送信された、現在位置の情報が添付された電子メールを受信すると、受信した電子メールの差出人のメールアドレスを読み込んで、図3に示す作業員データテーブル20のメールアドレス欄20dに格納されたメールアドレスと照合して、作業員IDを特定する(ステップS101)。   The CPU 3a of the server 3 performs the following processing with the reception of an e-mail attached with information on the current position transmitted from the mobile phones 6 and 7 as a trigger. This process will be described with reference to the flowchart shown in FIG. FIG. 11 is a flowchart showing the operation of attendance / leaving management in the server 3. When an e-mail attached with information on the current position transmitted from the cellular phones 6 and 7 is received, a program for performing the processing shown in FIG. 11 is started and executed by the CPU 3a. When an e-mail attached with information on the current position transmitted from the cellular phones 6 and 7 is received, the e-mail address of the sender of the received e-mail is read, and the e-mail address field of the worker data table 20 shown in FIG. The worker ID is identified by collating with the mail address stored in 20d (step S101).

次にCPU3aは、特定した作業員IDについての入退場フラグを作業員データテーブル20から読み込んで、当該特定した作業員IDが付された作業員が就業中であるか否かを判断する(ステップS103)。なお、ステップS101およびステップS103で実行される処理内容は、第1の実施の形態の図7におけるステップS101およびステップS103で実行される処理内容と同じである。   Next, the CPU 3a reads the entrance / exit flag for the specified worker ID from the worker data table 20, and determines whether or not the worker with the specified worker ID is working (step). S103). Note that the processing content executed in step S101 and step S103 is the same as the processing content executed in step S101 and step S103 in FIG. 7 of the first embodiment.

−−−入退場フラグが0であった場合−−−
ここでCPU3aは、入退場フラグが0であれば(ステップS103否定判断)、受信した電子メールが、作業員8(またはオペレータ10)が正しい作業エリアに到着した後に送信されたものであるか否か、すなわち、電子メールを送信した作業員8(またはオペレータ10)が正しい位置(作業エリア)にいるか否かを判断する(ステップS131)。具体的には、CPU3aは、図10に示す施工計画データテーブル25から、その日(すなわち電子メール受信日)についての建設機械ID欄25cと担当欄25dから、当該作業員IDが付された作業員8(またはオペレータ10)がともに作業をすべき建設機械9を特定する。次にCPU3aは、特定した建設機械の所在位置を図9に示す建設機械データテーブル24に格納されている緯度および経度のデータから特定する。そして、CPU3aは、特定した建設機械9の所在位置を中心とする所定の範囲内から電子メールが送信されたか否かを、受信した電子メールに添付されている現在位置の情報に基づいて判断する。
--- When the entrance / exit flag is 0 ---
Here, if the entrance / exit flag is 0 (No at Step S103), the CPU 3a determines whether or not the received e-mail is transmitted after the worker 8 (or the operator 10) arrives at the correct work area. That is, it is determined whether or not the worker 8 (or operator 10) who transmitted the e-mail is in the correct position (work area) (step S131). Specifically, the CPU 3a, from the construction plan data table 25 shown in FIG. 10, the worker assigned the worker ID from the construction machine ID column 25c and the responsible column 25d for that day (that is, the e-mail reception date). 8 (or operator 10) specifies the construction machine 9 with which work should be performed. Next, the CPU 3a specifies the location of the specified construction machine from the latitude and longitude data stored in the construction machine data table 24 shown in FIG. Then, the CPU 3a determines whether or not an e-mail has been transmitted from a predetermined range centered on the specified location of the construction machine 9, based on the information on the current position attached to the received e-mail. .

特定した建設機械9の所在位置を中心とする所定の範囲内から電子メールが送信されたと判断されると(ステップS131肯定判断)、CPU3aは、電子メールを受信した時刻(または電子メールの送信時刻)を始業時刻(入場時刻)であるとみなして、図6の出退勤管理データテーブル23の当該作業員IDについての入場時刻欄23bに、電子メールを受信した時刻(または電子メールの送信時刻)のデータを格納する(ステップS113)。以降、ステップS115およびステップS117の動作については第1の実施の形態における図7のステップS115およびステップS117の動作と同じであるので、詳細な説明を省略する。   When it is determined that an e-mail has been transmitted from within a predetermined range centered on the specified location of the construction machine 9 (Yes in step S131), the CPU 3a receives the e-mail (or e-mail transmission time). ) Is regarded as the start time (entrance time), and the entry time column 23b for the worker ID in the attendance management data table 23 in FIG. Data is stored (step S113). Henceforth, since operation | movement of step S115 and step S117 is the same as operation | movement of step S115 and step S117 of FIG. 7 in 1st Embodiment, detailed description is abbreviate | omitted.

なお、特定した建設機械9の所在位置を中心とする所定の範囲外から電子メールが送信されたと判断されると(ステップS131否定判断)、CPU3aは、正しい作業エリアについての情報を電子メールで返信する(ステップS141)。具体的には、CPU3aは、図10に示す施工計画データテーブル25から、その日(すなわち電子メール受信日)についての建設機械ID欄25cと担当欄25dから、当該作業員IDが付された作業員8(またはオペレータ10)がともに作業をすべき建設機械9を特定する。次にCPU3aは、特定した建設機械の所在位置を図9に示す建設機械データテーブル24に格納されている緯度および経度のデータから特定する。そして、CPU3aは、特定した建設機械の所在位置についての情報を含む電子メールを生成して、受信した電子メールの発信元である携帯電話機6,7へ返信する。   If it is determined that an e-mail has been transmitted from outside the predetermined range centered on the location of the specified construction machine 9 (No in step S131), the CPU 3a returns an e-mail with information on the correct work area. (Step S141). Specifically, the CPU 3a, from the construction plan data table 25 shown in FIG. 10, the worker assigned the worker ID from the construction machine ID column 25c and the responsible column 25d for that day (that is, the e-mail reception date). 8 (or operator 10) specifies the construction machine 9 with which work should be performed. Next, the CPU 3a specifies the location of the specified construction machine from the latitude and longitude data stored in the construction machine data table 24 shown in FIG. And CPU3a produces | generates the electronic mail containing the information about the location of the specified construction machine, and returns it to the mobile telephones 6 and 7 which are the transmission origin of the received electronic mail.

−−−入退場フラグが1であった場合−−−
上述したステップS103において、入退場フラグが1であれば(ステップS103肯定判断)、CPU3aはステップS105以降の示す処理を行う。なお、ステップS105およびステップS107の動作については第1の実施の形態における図7のステップS105およびステップS107の動作と同じであるので、詳細な説明を省略する。
--- When the entrance / exit flag is 1 ---
In step S103 described above, if the entrance / exit flag is 1 (Yes determination in step S103), the CPU 3a performs the processing shown in and after step S105. Note that the operations in step S105 and step S107 are the same as the operations in step S105 and step S107 in FIG. 7 in the first embodiment, and thus detailed description thereof is omitted.

ステップS107を実行すると、CPU3aは、次の施工日の作業内容や作業エリアなどに関する情報を電子メールで返信する(ステップS159)。具体的には、CPU3aは、図10に示す施工計画データテーブル25から、次の施工日(すなわち電子メール受信日の次の施工日)についての作業内容欄25b、建設機械ID欄25cおよび担当欄25dから、当該作業員IDが付された作業員8(またはオペレータ10)が作業をすべき作業内容と、ともに作業をすべき建設機械9を特定する。次にCPU3aは、特定した建設機械の所在位置を図9に示す建設機械データテーブル24に格納されている緯度および経度のデータから特定する。そして、CPU3aは、次の施工日、作業内容、特定した建設機械の所在位置についての情報などを含む電子メールを生成して、受信した電子メールの発信元である携帯電話機6,7へ返信する。   If step S107 is performed, CPU3a will reply with the information regarding the work content of a next construction day, a work area, etc. with an email (step S159). Specifically, the CPU 3a determines from the construction plan data table 25 shown in FIG. 10 a work content column 25b, a construction machine ID column 25c, and a responsible column for the next construction date (that is, the next construction date on the e-mail reception date). From 25d, the worker 8 (or the operator 10) to whom the worker ID is assigned specifies the work content to be worked on and the construction machine 9 to be worked on together. Next, the CPU 3a specifies the location of the specified construction machine from the latitude and longitude data stored in the construction machine data table 24 shown in FIG. And CPU3a produces | generates an email containing the information regarding the next construction date, work content, the location position of the specified construction machine, etc., and replies to the mobile telephones 6 and 7 which are the transmission origin of the received email. .

なお、上述したように、ステップS159において、次の施工日の作業エリアに関する情報を電子メールで返信するためには、当該電子メールの作成時点で建設機械9が、次の施工日の作業エリアに移動していることが必要である。なお、当該電子メールの作成時点で建設機械9が、次の施工日の作業エリアに移動していないことが考えられる場合には、ステップS159において、返信する電子メールに次の施工日の作業エリアに関する情報を含まないようにすることが望ましい。   In addition, as mentioned above, in order to return the information regarding the work area of the next construction date by e-mail in step S159, the construction machine 9 becomes the work area of the next construction date at the time of creation of the e-mail. It is necessary to move. If it is considered that the construction machine 9 has not moved to the work area on the next construction date at the time of creation of the e-mail, the work area on the next construction date is sent to the reply e-mail in step S159. It is desirable not to include information about.

上述した第2の実施の形態の作業員管理システムでは、第1の実施の形態の作用効果に加えて、次の作用効果を奏する。
(1) 第1の実施の形態における作業エリアの位置(範囲)の情報に代えて、建設機械9の所在位置を利用するように構成した。これにより、作業エリアのデータの入力の手間を省くことができ、施工現場における出退勤管理を効率化できる。
In the worker management system of the second embodiment described above, the following operational effects are obtained in addition to the operational effects of the first embodiment.
(1) Instead of information on the position (range) of the work area in the first embodiment, the location of the construction machine 9 is used. As a result, it is possible to save the trouble of inputting data in the work area, and it is possible to improve the work attendance management at the construction site.

−−−変形例−−−
(1) 上述の説明では、作業員8やオペレータ10が出勤時および退勤時に携帯電話機6,7から現在位置の情報を含む電子メールを送信するように構成しているが、本発明はこれに限定されない。たとえば、作業員8やオペレータ10が就業中に持ち場から勝手に離れることを防止するため、昼休みの前後や、午前、午後の休憩時などにも同様に現在位置の情報を含む電子メールを送信させるようにしてもよい。
---- Modification ---
(1) In the above description, the worker 8 and the operator 10 are configured to transmit an e-mail including information on the current position from the mobile phones 6 and 7 when going to work and leaving work. It is not limited. For example, in order to prevent the worker 8 and the operator 10 from leaving the office without permission during work, an e-mail including information on the current position is also sent before and after lunch break, and in the morning and afternoon breaks. You may do it.

(2) 上述の説明では、作業員8やオペレータ10が携帯電話機6,7から電子メールを送信する操作を行っているが、本発明はこれに限定されない。たとえば、データセンタ2のサーバ3が各携帯電話機6,7に現在位置の問い合わせを行うと、各携帯電話機6,7が自動的に現在位置を検出して、検出結果をサーバ3に返信するように構成してもよい。 (2) In the above description, the worker 8 and the operator 10 perform an operation of transmitting an e-mail from the mobile phones 6 and 7, but the present invention is not limited to this. For example, when the server 3 of the data center 2 inquires each mobile phone 6, 7 about the current position, each mobile phone 6, 7 automatically detects the current position and returns the detection result to the server 3. You may comprise.

(3) 上述した第2の実施の形態では、作業員8やオペレータ10が携帯する携帯電話機6,7から電子メールが送信されると、CPU3aが図9に示す建設機械データテーブル24に格納されている緯度および経度のデータから建設機械9の所在位置を特定するように構成しているが、本発明はこれに限定されない。たとえば、作業員8やオペレータ10が携帯する携帯電話機6,7から電子メールが送信されると、データセンタ2のサーバ3が重機データセンタ12のサーバ13に建設機械9の所在位置を問い合わせるように構成してもよい。 (3) In the second embodiment described above, when an e-mail is transmitted from the mobile phone 6 or 7 carried by the worker 8 or the operator 10, the CPU 3a is stored in the construction machine data table 24 shown in FIG. Although the location of the construction machine 9 is specified from the latitude and longitude data, the present invention is not limited to this. For example, when an e-mail is transmitted from the mobile phones 6 and 7 carried by the worker 8 or the operator 10, the server 3 of the data center 2 inquires the server 13 of the heavy equipment data center 12 about the location of the construction machine 9. It may be configured.

(4) 上述した第2の実施の形態では、作業員8やオペレータ10が携帯する携帯電話機6,7から電子メールが送信されると、CPU3aが図9に示す建設機械データテーブル24に格納されている緯度および経度のデータから建設機械9の所在位置を特定するように構成しているが、本発明はこれに限定されない。たとえば、建設機械9のメインスイッチがオンされていないと建設機械9が自身の所在位置の情報を重機データセンタ12のサーバ13に送信しないように構成されており、作業員8やオペレータ10が携帯する携帯電話機6,7から電子メールが送信された後に建設機械9のメインスイッチがオンされて建設機械9から所在位置の情報が送信された場合には、データセンタ2のサーバ3が建設機械9の所在位置の情報を取得した時点で作業員8やオペレータ10の所在位置の適否を事後的に判断するようにしてもよい。 (4) In the second embodiment described above, when an e-mail is transmitted from the mobile phone 6 or 7 carried by the worker 8 or the operator 10, the CPU 3a is stored in the construction machine data table 24 shown in FIG. Although the location of the construction machine 9 is specified from the latitude and longitude data, the present invention is not limited to this. For example, when the main switch of the construction machine 9 is not turned on, the construction machine 9 is configured not to transmit its location information to the server 13 of the heavy equipment data center 12. When the main switch of the construction machine 9 is turned on after the e-mail is transmitted from the mobile phones 6 and 7 and information on the location is transmitted from the construction machine 9, the server 3 of the data center 2 When the information on the location of the operator 8 is acquired, the suitability of the location of the worker 8 or the operator 10 may be determined after the fact.

(5) 上述した第2の実施の形態では、建設機械9の所在位置の適否を判断していないが、データセンタ2のサーバ3で、重機データセンタ12のサーバ13から取得した建設機械9の所在位置の情報と、施工計画上の建設機械9の配置計画とを比較することで、建設機械9の所在位置の適否を判断するように構成してもよい。 (5) In the second embodiment described above, whether or not the location of the construction machine 9 is appropriate is not determined. However, the server 3 of the data center 2 uses the construction machine 9 acquired from the server 13 of the heavy equipment data center 12. You may comprise so that the suitability of the location position of the construction machine 9 may be judged by comparing the information on a location position with the arrangement plan of the construction machine 9 on a construction plan.

(6) 上述の説明では、データセンタ2のサーバ3がメールサーバとしても機能するように構成したが、本発明はこれに限定されない。たとえば、外部の業者であるインターネットサービスプロバイダが提供するメールサービスを利用するなど、メールサーバが本発明による作業員管理システムの外部に設けられていてもよい。 (6) In the above description, the server 3 of the data center 2 is configured to function as a mail server, but the present invention is not limited to this. For example, a mail server may be provided outside the worker management system according to the present invention, for example, using a mail service provided by an Internet service provider that is an external supplier.

(7) 上述の説明では、正しい作業エリアに到着した作業員8やオペレータ10が携帯する携帯電話機6,7に対して、その日の作業内容に関する情報を電子メールで返信する(図7,11のステップS117)ように構成したが、本発明はこれに限定されず、その日の作業内容に関する情報を電子メールで返信することは必須ではない。 (7) In the above description, information on the work contents of the day is returned by e-mail to the mobile phones 6 and 7 carried by the worker 8 and the operator 10 arriving at the correct work area (see FIGS. 7 and 11). Although configured as step S117), the present invention is not limited to this, and it is not indispensable to return information on the work contents of the day by e-mail.

(8) 上述の説明では、携帯電話機6,7のいわゆるGPS機能を利用して検出した現在位置の情報をサーバ3で受信することで、作業員8やオペレータ10が正しい作業エリアに到着したか否かを判断するように構成したが、本発明はこれに限定されない。たとえば、GPS衛星からの電波を受信して現在位置を検出する代わりに、あらかじめ登録されている無線LAN通信機器(アクセスポイント)からの電波を受信することで現在位置を検出する技術(たとえばPlaceEngine(登録商標))など、現在位置を検出する他の技術を利用してもよい。 (8) In the above description, whether the worker 8 or the operator 10 has arrived at the correct work area by receiving the current position information detected by using the so-called GPS function of the mobile phones 6 and 7 at the server 3. Although it was configured to determine whether or not, the present invention is not limited to this. For example, instead of receiving a radio wave from a GPS satellite and detecting a current position, a technique for detecting a current position by receiving a radio wave from a wireless LAN communication device (access point) registered in advance (for example, PlaceEngine ( Other techniques for detecting the current position, such as registered trademark)) may be used.

(9) 上述した第1の実施の形態では、作業員8やオペレータ10が正しい作業エリアに到着しているか否かについては、作業員8やオペレータ10と紐付けられた作業エリアの近傍に到着しているか否かによって判断するように構成した。また、上述した第2の実施の形態では、作業員8やオペレータ10が正しい作業エリアに到着しているか否かについては、作業員8やオペレータ10と紐付けられた作業機械9の近傍に到着しているか否かによって判断するように構成した。しかし、本発明はこれに限定されない。たとえば、作業員8が正しい作業エリアに到着しているか否かについては、作業員8と紐付けられた作業エリアの近傍に到着しているか否かによって判断し、オペレータ10が正しい作業エリアに到着しているか否かについては、オペレータ10と紐付けられた作業機械9の近傍に到着しているか否かによって判断するように構成してもよい。 (9) In the first embodiment described above, whether the worker 8 or the operator 10 has arrived at the correct work area has arrived in the vicinity of the work area associated with the worker 8 or the operator 10. It was configured to judge based on whether or not In the second embodiment described above, whether the worker 8 or the operator 10 has arrived at the correct work area has arrived in the vicinity of the work machine 9 associated with the worker 8 or the operator 10. It was configured to judge based on whether or not However, the present invention is not limited to this. For example, whether or not the worker 8 has arrived at the correct work area is determined based on whether or not the worker 8 has arrived in the vicinity of the work area associated with the worker 8, and the operator 10 has arrived at the correct work area. It may be configured to determine whether or not it has arrived in the vicinity of the work machine 9 associated with the operator 10.

(10) 上述の説明では、作業員8やオペレータ10の退勤時には、正しい作業エリア内から電子メールが送信されたか否かを判断していないが、退勤時にも、電子メールが正しい作業エリアから送信されたものであるか否かを判断するように構成してもよい。たとえば、退勤時に正しい作業エリアから電子メールが送信されたのであれば、終業時刻まで作業を行ったものとして、電子メールを受信した時刻(または電子メールの送信時刻)を退場時刻とみなすようにしてもよい。また、退勤時に正しい作業エリアから電子メールが送信されたのでなければ、終業時刻前に作業エリアを離れたものとして、たとえば早退扱いにするようにしてもよい。
(11) 上述した各実施の形態および変形例は、それぞれ組み合わせてもよい。
(10) In the above description, when the worker 8 or the operator 10 leaves the office, it is not determined whether or not an email is transmitted from the correct work area. However, even when the worker leaves the office, the email is transmitted from the correct work area. You may comprise so that it may be judged whether it is what was done. For example, if an e-mail is sent from the correct work area at the time of leaving work, it is assumed that the work has been done until the end time, and the time when the e-mail is received (or the e-mail transmission time) is regarded as the exit time. Also good. Further, if the e-mail is not transmitted from the correct work area at the time of leaving work, it may be assumed that the work area has been left before the closing time, for example, that it is treated as early leave.
(11) Each embodiment and modification described above may be combined.

上述の実施の形態およびその変形例において、たとえば、施工管理サーバ、作業員識別手段、配置判断手段、施工支援手段、勤怠管理手段、建設機械稼働位置情報取得手段、および電子メール一斉送信制御手段は、サーバ3と、サーバ3のCPU3aで実行されるプログラムとによって実現される。なお、以上の説明はあくまで一例であり、発明を解釈する際、上記の実施形態の記載事項と特許請求の範囲の記載事項の対応関係になんら限定も拘束もされない。   In the above-described embodiment and its modifications, for example, the construction management server, worker identification means, placement determination means, construction support means, attendance management means, construction machine operation position information acquisition means, and e-mail simultaneous transmission control means include: The server 3 and a program executed by the CPU 3a of the server 3 are realized. The above description is merely an example, and when interpreting the invention, there is no limitation or restriction on the correspondence between the items described in the above embodiment and the items described in the claims.

第1の実施の形態の作業員管理システムの全体構成を示す図である。It is a figure showing the whole worker management system composition of a 1st embodiment. データセンタ2に設置されるサーバ3および現場事務所4に設置されるPC5の構成を示す図である。FIG. 2 is a diagram showing the configuration of a server 3 installed in a data center 2 and a PC 5 installed in a field office 4. 作業員データベースのデータテーブル(作業員データテーブル)20の一例を示す図である。It is a figure which shows an example of the data table (worker data table) 20 of a worker database. 作業エリアデータベースのデータテーブル(作業エリアデータテーブル)30の一例を示す図である。It is a figure which shows an example of the data table (work area data table) 30 of a work area database. 施工計画データベースのデータテーブル(施工計画データテーブル)22の一例を示す図である。It is a figure which shows an example of the data table (construction plan data table) 22 of a construction plan database. 出退勤管理データベースのデータテーブル(出退勤管理データテーブル)23の一例を示す図である。It is a figure which shows an example of the data table (attendance / exit management data table) 23 of the attendance / exit management database. サーバ3における出退勤管理の動作を示すフローチャートである。4 is a flowchart showing an operation of attendance / leaving management in the server 3. 第2の実施の形態の作業員管理システムの全体構成を示す図である。It is a figure which shows the whole structure of the worker management system of 2nd Embodiment. 建設機械データベースのデータテーブル(建設機械データテーブル)24の一例を示す図である。It is a figure which shows an example of the data table (construction machine data table) 24 of a construction machine database. 施工計画データベースのデータテーブル(施工計画データテーブル)25の一例を示す図である。It is a figure which shows an example of the data table (construction plan data table) 25 of a construction plan database. サーバ3における出退勤管理の動作を示すフローチャートである。4 is a flowchart showing an operation of attendance / leaving management in the server 3.

符号の説明Explanation of symbols

1 インターネット網 2 データセンタ
3,13 サーバ 4 現場事務所
5 パーソナルコンピュータ(PC) 6,7 携帯電話機
9 建設機械 12 重機データセンタ
DESCRIPTION OF SYMBOLS 1 Internet network 2 Data center 3,13 Server 4 Field office 5 Personal computer (PC) 6,7 Mobile telephone 9 Construction machine 12 Heavy equipment data center

Claims (3)

少なくとも作業員の配置予定位置に関する情報を格納しており、施工計画を管理する施工管理サーバと、
作業員に携帯されていて検出した位置の情報とともに電子メールを送信する端末装置から受信した電子メールに基づいて、前記端末装置を携帯する作業員を識別する作業員識別手段と、
前記端末装置から受信した前記端末装置の位置の情報と、前記端末装置を携帯する作業員についての情報とに基づいて、前記作業員の位置を特定し、特定した前記作業員の位置と、前記施工管理サーバに格納されている作業員の配置予定位置に関する情報とを比較して、前記作業員が正しい配置予定位置に配置されたか否かを判断する配置判断手段と、
前記配置判断手段で正しい配置予定位置に配置されたと判断された作業員の携帯する前記端末装置には作業内容に関する情報を電子メールで送信し、前記配置判断手段で正しい配置予定位置に配置されていないと判断された作業員の携帯する前記端末装置には正しい配置予定位置の情報を電子メールで送信する施工支援手段と、
前記端末装置から送信された電子メールの送信時刻または受信時刻に基づいて、前記端末装置を携帯する作業員の出退勤を管理する勤怠管理手段とを備えることを特徴とする作業員管理システム。
Stores at least information related to the planned placement positions of workers, and a construction management server that manages the construction plan,
Worker identification means for identifying a worker carrying the terminal device based on an e-mail received from a terminal device that sends an e-mail together with information on a position detected by the worker;
Based on the information on the position of the terminal device received from the terminal device and the information on the worker carrying the terminal device, the position of the worker is identified, and the position of the identified worker, An arrangement determining means for comparing the information on the planned placement position of the worker stored in the construction management server and determining whether or not the worker is placed at the correct planned placement position;
The terminal device carried by the worker determined to have been placed at the correct planned position by the placement determining means is sent by e-mail to the terminal device carried by the worker, and is placed at the correct planned position by the placement determining means. Construction support means for sending information on the correct placement planned position by e-mail to the terminal device carried by the worker determined to be not,
A worker management system comprising: attendance management means for managing the attendance and departure of a worker carrying the terminal device based on a transmission time or a reception time of an e-mail transmitted from the terminal device.
請求項1に記載の作業員管理システムにおいて、
建設機械の稼働位置に関する情報を取得する建設機械稼働位置情報取得手段をさらに備え、
前記作業員には建設機械のオペレータも含まれ、
前記端末装置は建設機械のオペレータにも携帯され、
前記作業員識別手段は、前記端末装置から送信された電子メールに基づいて、前記端末装置を携帯する建設機械のオペレータを識別し、
前記配置判断手段は、前記端末装置から受信した前記端末装置の位置の情報と、前記端末装置を携帯する建設機械のオペレータについての情報とに基づいて、前記建設機械のオペレータの位置を特定し、特定した前記建設機械のオペレータの位置と、前記建設機械稼働位置情報取得手段で取得した建設機械の稼働位置に関する情報とを比較して、前記建設機械のオペレータが建設機械の近傍にいるか否かを判断し、
前記勤怠管理手段は、前記配置判断手段で建設機械のオペレータが建設機械の近傍にいると判断されると、前記端末装置から送信された電子メールの送信時刻または受信時刻に基づいて、前記端末装置を携帯する建設機械のオペレータの出退勤時刻を記録することを特徴とする作業員管理システム。
In the worker management system according to claim 1,
It further comprises a construction machine operating position information acquisition means for acquiring information on the operating position of the construction machine,
The workers include construction machine operators,
The terminal device is also carried by an operator of a construction machine,
The worker identification means identifies an operator of a construction machine that carries the terminal device based on the email transmitted from the terminal device,
The arrangement determining means specifies the position of the operator of the construction machine based on the information on the position of the terminal apparatus received from the terminal apparatus and the information on the operator of the construction machine carrying the terminal apparatus, Whether the operator of the construction machine is in the vicinity of the construction machine by comparing the identified position of the operator of the construction machine with the information on the operation position of the construction machine acquired by the construction machine operating position information acquisition unit. Judgment
When the arrangement determination unit determines that the operator of the construction machine is in the vicinity of the construction machine, the attendance management unit determines whether the terminal device is based on the transmission time or reception time of the email transmitted from the terminal device. A worker management system for recording the attendance and attendance time of an operator of a construction machine that carries a bag.
請求項1または請求項2に記載の作業員管理システムにおいて、
前記端末装置から受信した前記端末装置の位置の情報と、前記端末装置を携帯する作業員についての情報とに基づいて、所定のエリア内に位置すると判断される作業員を特定して、所定のエリア内に位置すると判断された作業員の携帯する前記端末装置に所定の内容の電子メールを一斉送信する電子メール一斉送信制御手段をさらに備えることを特徴とする作業員管理システム。
In the worker management system according to claim 1 or 2,
Based on the information on the position of the terminal device received from the terminal device and the information on the worker carrying the terminal device, the worker determined to be located in the predetermined area A worker management system, further comprising: an e-mail simultaneous transmission control means for simultaneously transmitting an e-mail having a predetermined content to the terminal device carried by a worker determined to be located in an area.
JP2008017951A 2008-01-29 2008-01-29 Worker management system Pending JP2009181204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008017951A JP2009181204A (en) 2008-01-29 2008-01-29 Worker management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008017951A JP2009181204A (en) 2008-01-29 2008-01-29 Worker management system

Publications (1)

Publication Number Publication Date
JP2009181204A true JP2009181204A (en) 2009-08-13

Family

ID=41035169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008017951A Pending JP2009181204A (en) 2008-01-29 2008-01-29 Worker management system

Country Status (1)

Country Link
JP (1) JP2009181204A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150112317A (en) * 2014-03-27 2015-10-07 주식회사 아이온커뮤니케이션즈 Mobile system for serving work by using mail program
CN105139110A (en) * 2015-08-10 2015-12-09 杭州班博科技有限公司 Construction enterprise field labor service information synchronization method and system
CN108573311A (en) * 2017-03-09 2018-09-25 株式会社日立大厦系统 Location information management device and positional information managing method
JP2018200687A (en) * 2017-05-26 2018-12-20 ネイバー コーポレーションNAVER Corporation Attendance management method, computer program, and system using messenger
JP2020149087A (en) * 2019-03-11 2020-09-17 ソフトバンク株式会社 Control apparatus, control method and program
JP2020161051A (en) * 2019-03-28 2020-10-01 Kddi株式会社 Notification device and notification method
JP2021005303A (en) * 2019-06-27 2021-01-14 住友重機械工業株式会社 Telecommunication system of construction machine, control apparatus of construction machine, and portable terminal
CN112675449A (en) * 2019-10-17 2021-04-20 黄炜皓 Safety shackle and fall protection system
JP2022518193A (en) * 2019-01-10 2022-03-14 ポジション パートナーズ プロプリエタリー リミテッド Civil engineering construction site management system and how to use it

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150112317A (en) * 2014-03-27 2015-10-07 주식회사 아이온커뮤니케이션즈 Mobile system for serving work by using mail program
KR101630842B1 (en) * 2014-03-27 2016-06-15 주식회사 아이온커뮤니케이션즈 Mobile system for serving work by using mail program
CN105139110A (en) * 2015-08-10 2015-12-09 杭州班博科技有限公司 Construction enterprise field labor service information synchronization method and system
CN108573311A (en) * 2017-03-09 2018-09-25 株式会社日立大厦系统 Location information management device and positional information managing method
JP2018200687A (en) * 2017-05-26 2018-12-20 ネイバー コーポレーションNAVER Corporation Attendance management method, computer program, and system using messenger
JP2022518193A (en) * 2019-01-10 2022-03-14 ポジション パートナーズ プロプリエタリー リミテッド Civil engineering construction site management system and how to use it
JP7495413B2 (en) 2019-01-10 2024-06-04 アプテッラ プロプリエタリー リミテッド Civil engineering construction site management system and its usage method
JP2020149087A (en) * 2019-03-11 2020-09-17 ソフトバンク株式会社 Control apparatus, control method and program
JP2020161051A (en) * 2019-03-28 2020-10-01 Kddi株式会社 Notification device and notification method
JP2021005303A (en) * 2019-06-27 2021-01-14 住友重機械工業株式会社 Telecommunication system of construction machine, control apparatus of construction machine, and portable terminal
CN112675449A (en) * 2019-10-17 2021-04-20 黄炜皓 Safety shackle and fall protection system

Similar Documents

Publication Publication Date Title
JP2009181204A (en) Worker management system
US8370054B2 (en) User location driven identification of service vehicles
US8972179B2 (en) Method and apparatus to analyze GPS data to determine if a vehicle has adhered to a predetermined route
EP1178458B1 (en) Device for presenting information to mobile
US20070015518A1 (en) Mobile resource location-based customer contact systems
KR20080099311A (en) Mobile station, server and operation method of a navigation system
US20060111955A1 (en) System and method for mobile resource management with customer confirmation
EP2480434A2 (en) Asset systems and methods
CN109426869B (en) Server and method for adjusting consumable maintenance schedule information of construction machine
JP2004171127A (en) Field work support method, system therefor and recording medium
US10686924B2 (en) Method for managing a call journal, device, computer program, and software product for this purpose
KR101955527B1 (en) Method and system for providing delivery service using application running in delivery driver terminal
CN101799893A (en) Environment-friendly mobile law enforcement system
US20040083050A1 (en) System and method for obtaining driving directions
US20030149607A1 (en) Information processing technique associated with snow removal
JP2008087893A (en) Elevator remote monitoring system
US20070232333A1 (en) Method and system for providing work related information in a mobile environment
US20160179909A1 (en) Method and system for tracking tools
JP2010026907A (en) Meter reading system
JP5290002B2 (en) Visit management device, visited device, call management device, visit management method, and program
JP4911339B2 (en) POSITION INFORMATION MONITORING SYSTEM, POSITION INFORMATION MONITORING METHOD, SERVER DEVICE FOR THE SAME, AND SERVER DEVICE PROGRAM
US20220147933A1 (en) Systems and methods for characterizing work by working eqiupment based on proximity to a worker&#39;s computing device
JP2002281542A (en) Position information providing system, operating device for position information providing system, position information providing device, program for operating device and program for position information providing device
EP3579210B1 (en) Security system
JP5591983B1 (en) Inspection time notification system