JP2009174731A - Controller device - Google Patents

Controller device Download PDF

Info

Publication number
JP2009174731A
JP2009174731A JP2008011395A JP2008011395A JP2009174731A JP 2009174731 A JP2009174731 A JP 2009174731A JP 2008011395 A JP2008011395 A JP 2008011395A JP 2008011395 A JP2008011395 A JP 2008011395A JP 2009174731 A JP2009174731 A JP 2009174731A
Authority
JP
Japan
Prior art keywords
channel
key
operation key
control target
keys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008011395A
Other languages
Japanese (ja)
Other versions
JP5090189B2 (en
Inventor
Satoru Yamagishi
覚 山岸
Takashi Watanabe
隆 渡辺
Tetsuya Yamada
哲也 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP2008011395A priority Critical patent/JP5090189B2/en
Publication of JP2009174731A publication Critical patent/JP2009174731A/en
Application granted granted Critical
Publication of JP5090189B2 publication Critical patent/JP5090189B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Central Heating Systems (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
  • Selective Calling Equipment (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a controller device capable of obtaining a product for 1-channel and a product for 2-channel while combining reduction of costs and improvement of operability. <P>SOLUTION: An operation panel portion 17 is provided with a group of operation keys A capable of changing allocation of operating functions between 2-channel of which control targets are both of a first control target apparatus 2b and a second control target apparatus 2a, and one-channel of which a control target is only the first control target apparatus 2b. With respect to the allocation of the operating functions, the group of operation keys are allocated to be composed of the first operation key for executing the main operation including at least one of the driving operation to the first control target apparatus and the second control target apparatus, a temperature setting operation and a timer driving operation by pressing a single operation key, and the second operation key for executing the operations excluding the main operation by pressing two or more operation keys in a case of 2-channel, and the group of operation keys is allocated to be composed of a third operation key for executing the operation to the first control target apparatus by pressing a prescribed operation key. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、第1の制御対象機器、第2の制御対象機器を操作するコントローラ装置に関する。   The present invention relates to a controller device that operates a first control target device and a second control target device.

室内の床面を暖める床暖房装置では、1室の床下に発熱体を据付けて、コントローラ装置で制御したり、隣接する2部屋にそれぞれ発熱体を据付けて、これらを1台のコントローラ装置で独立して制御したりすることが行われている。
このように床暖房の形態が異なると、それに対応した専用のコントローラ装置が必要となる。具体的には、1室の発熱体を制御するときは、制御対象が1つの1チャンネル用のコントローラ装置が求められ、2室の発熱体を1台のコントローラ装置で独立して制御するときは、制御対象が2つの2チャンネル用のコントローラ装置が求められる。
In the floor heating system that warms the floor in the room, a heating element is installed under the floor of one room and controlled by a controller device, or each heating element is installed in two adjacent rooms, and these are independently controlled by a single controller device. It has been done to control.
Thus, if the form of floor heating differs, the dedicated controller apparatus corresponding to it will be needed. Specifically, when controlling a heating element in one room, a controller device for one channel is required to be controlled, and when the heating elements in two rooms are controlled independently by one controller apparatus, Therefore, a controller device for two channels to be controlled is required.

こうした1チャンネル用と2チャンネル用を使い分けるためには、従来、1チャンネル用のコントローラ装置、2チャンネル用のコントローラ装置は、それぞれ機能に合わせた操作キー配置を独自に設計して、製造していた。
しかしながら、こうした2種類のコントローラ装置の操作構造は、1チャンネルの操作に適した入力機器を用いたり、それとは異なる2チャンネルの操作に適した入力機器を用いたりしないと対応できないことが多い。そのため、共通化が難しいとされ、コスト的な負担が強いられやすい。
In order to use one channel and two channels separately, conventionally, the controller device for 1 channel and the controller device for 2 channel have been designed and manufactured by independently designing the operation key arrangements according to their functions. .
However, the operation structures of these two types of controller devices often cannot be handled unless an input device suitable for one-channel operation is used or an input device suitable for two-channel operation is used. For this reason, it is difficult to make common, and cost burden is likely to be imposed.

そこで、床暖房用のコントローラ装置では、特許文献1に開示されているようにコントローラ本体の操作面部に、1台分の発熱体の運転を制御する操作系と、発熱体の運転を選択するための切換スイッチとを設けた構造を採用して、切換スイッチの切換動作で、1つの発熱体から複数の発熱体までの運転を1台で行えるようにしたコントローラ装置が提案されている。
特開平4−251130号公報
Therefore, in the controller device for floor heating, as disclosed in Patent Document 1, an operation system for controlling the operation of one heating element and an operation of the heating element are selected on the operation surface portion of the controller body. There is proposed a controller device that employs a structure provided with a changeover switch, so that the operation from one heating element to a plurality of heating elements can be performed by one operation by the changeover operation of the changeover switch.
JP-A-4-251130

ところで、床暖房用コントローラ装置においては通常、床暖房運転をオンオフする運転操作や、床温度の設定を変える温度設定操作や、タイマー運転をオンさせるタイマー運転操作は、それ以外の操作に比べ、頻繁に用いられる。
こうした利用頻度の高い操作は、子供から年配の人のだれでもが容易に行えるよう1アクションの操作で行えることが望まれる。
By the way, in the controller device for floor heating, the operation operation for turning on / off the floor heating operation, the temperature setting operation for changing the setting of the floor temperature, and the timer operation operation for turning on the timer operation are usually performed more frequently than the other operations. Used for.
It is desirable that such frequently used operations can be performed with one action so that anyone from children to elderly people can easily perform the operations.

特許文献1のようなコントローラ装置は確かに、1台のコントローラ装置で複数の発熱体を制御できるため、共用化により、製造コストの低減化は図れる。しかし、反面、制御する発熱体を選択するという操作が強いられるために、複数の発熱体を操作するにあたって、その都度、選択操作を行わないと、所望の操作が行えない。このため、利用頻度の高い操作を面倒にしてしまう問題がある。   Since the controller device as in Patent Document 1 can surely control a plurality of heating elements with a single controller device, the production cost can be reduced by sharing. However, on the other hand, since an operation of selecting a heating element to be controlled is forced, a desired operation cannot be performed unless a selection operation is performed each time a plurality of heating elements are operated. For this reason, there exists a problem which makes troublesome operation frequently used.

そこで、本発明の目的は、コストの低減と操作性の向上の両立を図った1チャンネル用の製品と2チャンネル用の製品が得られるコントローラ装置を提供することにある。   SUMMARY OF THE INVENTION An object of the present invention is to provide a controller device capable of obtaining a product for one channel and a product for two channels that achieve both cost reduction and improvement in operability.

請求項1に記載の発明は、上記目的を達成するために、コントローラ本体の操作面部に、第1の制御対象機器と第2の制御対象機器との双方が制御対象の2チャンネルのときと、第1の制御対象機器のみが制御対象の1チャンネルのときとで操作機能の割付けを変更可能とした操作キー群を設け、操作機能の割付けは、2チャンネルのときは、第1の制御対象機器および第2の制御対象機器に対する運転操作、温度設定操作、タイマー運転操作、すなわち利用頻度の高い操作のうち少なくとも1つを含む主操作が単一の操作キーを押操作することで実行される第1の操作キーと、主操作以外の操作、すなわち利用頻度が低いと判断された操作が2以上の操作キーを押操作することで実行される第2の操作キーとからなるように操作キー群に対し割付けが行われ、1チャンネルのときは、第1の制御対象機器に対する操作が、所定の操作キーを押操作することで実行される第3の操作キーとなるように操作キー群に対し割付けが行われるようにした。   In order to achieve the above object, the first aspect of the present invention provides the operation surface portion of the controller main body, when both the first control target device and the second control target device are two channels to be controlled, An operation key group is provided that allows the assignment of operation functions to be changed when only the first control target device is the one channel to be controlled. When the operation function assignment is two channels, the first control target device is provided. And a main operation including at least one of a driving operation, a temperature setting operation, a timer driving operation, that is, a frequently used operation on the second control target device, is executed by pressing a single operation key. A group of operation keys such that one operation key and an operation other than the main operation, that is, an operation determined to be less frequently used, includes a second operation key executed by pressing two or more operation keys. Vs. In the case of 1 channel, the operation key group is assigned so that the operation on the first control target device becomes a third operation key executed by pressing a predetermined operation key. To be done.

同構成によると、操作キー群を共通部品として、2チャンネル専用のコントローラ装置と、1チャンネル専用のコントローラ装置とが構成される。しかも、2チャンネル用のコントローラ装置や1チャンネル用のコントローラ装置はいずれも、利用頻度の高い操作が単一の操作キーを押操作するだけの1アクションで行えるので、いずれのコントローラ装置とした場合であっても扱いやすいという利点がある。なお、実用上はどのような操作を利用頻度の高いものとして扱うかは設計時に適宜判断すれば良い。   According to this configuration, a controller device dedicated to two channels and a controller device dedicated to one channel are configured using the operation key group as a common component. Moreover, both the 2-channel controller device and the 1-channel controller device can perform frequently used operations with a single action of pressing a single operation key. Even if there is, there is an advantage that it is easy to handle. In practice, what kind of operation should be treated as having a high frequency of use may be appropriately determined at the time of design.

請求項2に記載の発明は、さらに1チャンネル用に構成されたコントローラ装置を使いやすくするために、操作面部の操作キー群のうち、右寄りに配置されている操作キーに、運転操作、温度設定操作、タイマー運転操作のうち少なくとも1つの操作、すなわち利用頻度の高い操作を割付け、一般に多い右利きの人に対応させた。
請求項3に記載の発明は、さらに、2チャンネル用や1チャンネル用のコントローラ装置の操作性を高めるよう、操作面部には、2チャンネル用に割付けた第1,2の操作キー、あるいは1チャンネル用に割付けた第3の操作キーだけを操作面部の表面に表わす表面シートを設けた。
According to the second aspect of the present invention, in order to make it easier to use the controller device configured for one channel, the operation key arranged on the right side of the operation key group of the operation surface portion is set to the driving operation and the temperature setting. At least one of the operations and the timer driving operation, that is, a frequently used operation was assigned to correspond to a general right-handed person.
According to the third aspect of the present invention, in order to improve the operability of the controller device for two channels or one channel, the operation surface portion is provided with first and second operation keys assigned for two channels, or one channel. A top sheet was provided that represented only the third operation key assigned for the purpose on the surface of the operation surface portion.

請求項1の発明によれば、操作キー群を共通部品として、2チャンネル用のコントローラ装置から、1チャンネル用のコントローラ装置を派生させることができる。しかも、2チャンネル用や1チャンネル用のコントローラ装置は、いずれでも利用頻度の高い操作が、単一の操作キーを押操作するだけの1アクションで行える構造なので、1チャンネルでも2チャンネルでも扱いやすい。   According to the first aspect of the present invention, the controller device for one channel can be derived from the controller device for two channels using the operation key group as a common component. Moreover, the controller device for two channels or one channel is easy to handle with either one channel or two channels because the frequently used operation can be performed with one action by pressing a single operation key.

それ故、コストの低減を図り、さらには操作性の向上も図った2チャンネル用コントローラ装置と1チャンネル用コントローラ装置を得ることができる。
請求項2の発明によれば、さらに2チャンネル用から派生した1チャンネル用のコントローラ装置が、多くの利用者で使いやすくなる。
請求項3の発明によれば、表面シートにより、それぞれ2チャンネル用に割付けた第1、第2の操作キーや、1チャンネル用に割付けた第3の操作キーの操作機能を利用者に明確に認識させたり、使用しなかった操作キーを隠せたりするので、一層、双方のコントローラ装置の操作性を高めることができる。
Therefore, it is possible to obtain a two-channel controller device and a one-channel controller device that reduce costs and improve operability.
According to the second aspect of the present invention, the controller device for one channel derived from the two-channel device can be easily used by many users.
According to the invention of claim 3, the operation functions of the first and second operation keys assigned for the two channels and the third operation key assigned for the one channel are clearly indicated to the user by the surface sheet. Since the operation keys that have not been used can be recognized or hidden, the operability of both controller devices can be further improved.

以下、本発明を図1〜図3に示す一実施形態にもとづいて説明する。
図1は、例えばリビングルームαと同リビングルームαに隣接するダイニングルームβといった家屋の2ルーム(各ルームをゾーンと称する)をそれぞれ別個に床暖房する2チャンネル式の床暖房装置を示していて、図中2a,2bは、リビングルームαとダイニングルームβの床下にそれぞれに設置された2つのパネルヒータ(発熱体:本願の第1、第2の制御対象機器に相当)、3は、制御対象となる2つのパネルヒータ2a,2bを1台で操作する2チャンネル用のコントローラ装置を示している。2チャンネル用のコントローラ装置3は、例えば両ルームα、βの境界となる壁部4に設置させて、電源ケーブル9aやヒータケーブル9bと接続させてある。これにより、電源ケーブル9aからの電力を、コントローラ装置3に内蔵されたパネルヒータ通電部8を介してパネルヒータ2aまたは2bへと供給することで、パネルヒータ2aまたは2bの発熱を行い、各ルームα,βが暖められるようにしている。
Hereinafter, the present invention will be described based on an embodiment shown in FIGS.
FIG. 1 shows a two-channel type floor heating apparatus that separately heats two rooms of a house (each room is called a zone) such as a living room α and a dining room β adjacent to the living room α. In the figure, 2a and 2b are two panel heaters installed under the floors of the living room α and the dining room β (heating elements: corresponding to the first and second controlled devices of the present application), and 3 is a control A controller device for two channels for operating two target panel heaters 2a and 2b by one unit is shown. The controller device 3 for two channels is installed on, for example, a wall portion 4 that is a boundary between the two rooms α and β, and is connected to the power cable 9a and the heater cable 9b. As a result, the power from the power cable 9a is supplied to the panel heater 2a or 2b via the panel heater energization unit 8 built in the controller device 3, thereby generating heat in the panel heater 2a or 2b. α and β are heated.

図2は、上記とは異なる家屋の1ルーム、例えばダイニングルームβだけを床暖房する1チャンネル式の床暖房装置を示していて、図中2bは、ダイニングルームβの床下に設置された1つのパネルヒータ(発熱体:本願の第1の制御機器のいずれかに相当)、6は、制御対象となる1つのパネルヒータ2bのみを操作する1チャンネル用のコントローラ装置(1台)を示している。1チャンネル用のコントローラ装置6は、例えばダイニングルームβの壁部7に設置させて、電源ケーブル14aやヒータケーブル14bと接続させてある。これにより、電源ケーブル9aからの電力を、コントローラ装置6に内蔵されたパネルヒータ通電部8を介してパネルヒータ2bへと供給することで、パネルヒータ2bの発熱を行い、ダイニングルームβが暖められるようにしている。   FIG. 2 shows a one-channel type floor heating apparatus that heats only one room of a house different from the above, for example, the dining room β. In FIG. 2, reference numeral 2 b denotes a single room installed under the floor of the dining room β. A panel heater (heating element: corresponding to one of the first control devices of the present application), 6 indicates a one-channel controller device (one unit) that operates only one panel heater 2b to be controlled. . The controller device 6 for 1 channel is installed, for example, on the wall 7 of the dining room β and connected to the power cable 14a and the heater cable 14b. As a result, the power from the power cable 9a is supplied to the panel heater 2b via the panel heater energizing section 8 built in the controller device 6, so that the panel heater 2b generates heat and the dining room β is warmed. I am doing so.

これら2チャンネル用(制御対象が2つ)のコントローラ装置3と、上記1チャンネル用(制御対象が1つ)のコントローラ装置6は、いずれも図3に示されるようにパネルヒータ通電部8を除いた、ほとんどの部分を共通にした構造が用いられている。
図3には、こうした2チャンネル用、1チャンネル用のコントローラ装置3,6の構造が分解斜視図で示されている。
The controller device 3 for these two channels (two control objects) and the controller device 6 for the above-mentioned one channel (one control object) exclude the panel heater energizing section 8 as shown in FIG. In addition, a structure in which most parts are common is used.
FIG. 3 is an exploded perspective view showing the structure of the controller devices 3 and 6 for two channels and one channel.

図3を参照してコントローラ装置3,6の構造を説明すると、図3中10はケーシングである。
ケーシング10は、例えば、箱形のハウジング部11(壁部4,7に埋め込まれる部分)と、同ハウジング部11の壁外側の開口端に形成されたフランジ部11a(壁部3,7の壁面に配置される部分)と、同フランジ部11aの外周端と嵌合する表面パネル部12(フランジ部11aと共に、壁部4,7の壁面に配置される部分)とを組み合わせた筐体から構成してある。
The structure of the controller devices 3 and 6 will be described with reference to FIG. 3. In FIG. 3, reference numeral 10 denotes a casing.
The casing 10 includes, for example, a box-shaped housing portion 11 (portions embedded in the wall portions 4 and 7) and a flange portion 11 a (wall surfaces of the wall portions 3 and 7) formed at the opening end outside the wall of the housing portion 11. And a surface panel portion 12 (a portion disposed on the wall surfaces of the wall portions 4 and 7 together with the flange portion 11a) that fits with the outer peripheral end of the flange portion 11a. It is.

このうちハウジング部11内には、各チャンネル用の通電ボードが収められる。具体的には、2チャンネル用であれば、2系統(リビングルームα、ダイニングルームβ)の電源端子(図示しない)やヒータ端子(図示しない)や通電回路を搭載した通電ボード13aが収められる。1チャンネル用であれば、1系統の電源端子(図示しない)やヒータ端子(図示しない)や通電回路を搭載した通電ボード13bが収められ、各チャンネル用のパネルヒータ通電部8を構成する。   Among these, in the housing part 11, the electricity supply board for each channel is stored. Specifically, in the case of two channels, a power supply terminal (not shown), a heater terminal (not shown) of two systems (living room α and dining room β), and an energization board 13a mounted with an energization circuit are accommodated. For one channel, an energization board 13b equipped with a single power supply terminal (not shown), a heater terminal (not shown), and an energization circuit is housed to constitute a panel heater energization unit 8 for each channel.

そして、表面パネル部12を含んだ前面側の筐体部分から、2チャンネル用と1チャンネル用とに共通な構造のコントローラ本体13を構成している。
この共通構造部を説明すると、コントローラ本体13をなす表面パネル部12は、前面壁の上側に、表示窓12aが形成され、その表示窓12aの下側の前面壁部分に平坦な操作面部17が形成された構造となっている。表面パネル部12の内側には、例えば、時計機能が付いた制御回路部18aと、室温センサー18bと、液晶表示式の表示モジュール部18cと、多数、例えば10個のキーモジュール部19a〜19jとが搭載された表示ボード20が収められている。キーモジュール部19a〜19jは、凸形のキーオンオフ部20a〜20jを有していて、これらキーオンオフ部から、各種の操作情報が制御回路部18aへ入力される。なお、表示ボード20は、通電ボード13aや通電ボード13bと接続されるものである。さらに述べれば、表示モジュール部18cは、表示ボード20の上側に配置され、操作キーオンオフ部20a〜20jは、表示モジュール部18cの下側で、横方向に等間隔で5個ずつ直線状に2列に配置させてある。なお、表示ボード20の前面の全体は、透視部材で形成された保護カバー22で覆われる構造にしてある。
A controller main body 13 having a structure common to the two-channel and the one-channel is formed from the front-side casing portion including the front panel portion 12.
Explaining this common structure portion, the front panel portion 12 constituting the controller body 13 has a display window 12a formed on the upper side of the front wall, and a flat operation surface portion 17 on the lower front wall portion of the display window 12a. It has a formed structure. Inside the front panel unit 12, for example, a control circuit unit 18a with a clock function, a room temperature sensor 18b, a liquid crystal display type display module unit 18c, and a large number of, for example, ten key module units 19a to 19j Is mounted. The key module sections 19a to 19j have convex key on / off sections 20a to 20j, and various operation information is input to the control circuit section 18a from these key on / off sections. The display board 20 is connected to the energization board 13a and the energization board 13b. More specifically, the display module unit 18c is arranged on the upper side of the display board 20, and the operation key on / off units 20a to 20j are arranged in a straight line by five pieces at equal intervals in the lateral direction on the lower side of the display module unit 18c. Arranged in a row. Note that the entire front surface of the display board 20 is covered with a protective cover 22 formed of a see-through member.

このうち表示モジュール部18cの前面に形成されている液晶表示部18dは、保護カバー22を介して、表示パネル部12の表示窓12aに臨み、操作面部17の上側に、温度設定レベル表示や時刻表示やヒータ通電中の表示やタイマー運転表示などの情報表示を行う表示部25を形成している。多数の操作キーオンオフ部20a〜20jは、保護カバー22の前面壁に形成された通孔22aを通じて、操作面部17に形成されている通孔26a〜26j内に挿通され、操作面部17上に、床暖房運転の操作に求められる多くの操作キー、すなわち操作キー群Aを構成する。   Among these, the liquid crystal display unit 18d formed on the front surface of the display module unit 18c faces the display window 12a of the display panel unit 12 through the protective cover 22, and displays the temperature setting level display and time on the upper side of the operation surface unit 17. A display unit 25 is formed to display information such as display, heater energization display, and timer operation display. A large number of operation key on / off portions 20 a to 20 j are inserted into the through holes 26 a to 26 j formed in the operation surface portion 17 through the through holes 22 a formed in the front wall of the protective cover 22. Many operation keys required for the operation of the floor heating operation, that is, the operation key group A is configured.

この操作キー群Aは、「2チャンネル」用と「1チャンネル」用とで、操作機能の割付けが変更可能となっている。ここで操作機能の割付けとは、操作キーオンオフ部20a〜20jのうち所定の1つを操作したときにコントローラ装置3,6がいかなる処理を行うかを定義することを指す。この構造には、例えば、当初、制御回路部18aに対し、「2チャンネル」で用いられる操作機能の割付けと、「1チャンネル」で用いられる操作機能の割付けといった2種類を設定しておき、さらに表示ボード20にこれら2種類の操作機能の割付けのうち、いずれを適用するかを選択する選択スイッチ(図示しない)を設けて、選択スイッチの操作により、「2チャンネル」や「1チャンネル」の操作機能の割付けを選択する構造が用いられている。むろん、制御回路部18aには、この他、割付けられた操作キーで設定される「2チャンネル」や「1チャンネル」の設定温度(床温度)にしたがい、室温センサー18bで検出される室温に基づき、ヒータパネル2a,2b(2チャンネル)やヒータパネル2b(1チャンネル)を制御したり、同制御内容を表示させたりするなどの機能も設定してある。   In this operation key group A, the assignment of operation functions can be changed between “2 channel” and “1 channel”. Here, the assignment of the operation function refers to defining what processing the controller devices 3 and 6 perform when a predetermined one of the operation key on / off units 20a to 20j is operated. In this structure, for example, two types are initially set for the control circuit unit 18a, that is, an operation function assigned to “2 channels” and an operation function assigned to “1 channel”. The display board 20 is provided with a selection switch (not shown) for selecting which of the two types of operation functions is applied, and “2 channel” or “1 channel” is operated by operating the selection switch. A structure for selecting the assignment of functions is used. Of course, the control circuit unit 18a is also based on the room temperature detected by the room temperature sensor 18b according to the set temperature (floor temperature) of “2 channels” or “1 channel” set by the assigned operation keys. Functions such as controlling the heater panels 2a and 2b (2 channels) and the heater panel 2b (1 channel) and displaying the contents of the control are also set.

操作キー群Aは、この割付け変更構造を用いて、図1に示されるような2チャンネル用の操作機能の割付け、あるいは図2に示されるような1チャンネル用の操作機能の割付けが行われる。
これら操作機能の割付けによって、限られた数量の操作キーオンオフ部20a〜20jを効果的に利用して、使いやすくすることが可能である。
The operation key group A is assigned the operation function for two channels as shown in FIG. 1 or the operation function for one channel as shown in FIG. 2 by using this assignment changing structure.
By assigning these operation functions, it is possible to use the limited number of operation key on / off units 20a to 20j effectively and make it easy to use.

すなわち、図1に示される「2チャンネル」の床暖房運転のときは、リビングルームαの床暖房に必要な操作として、リビングルームαの床暖房運転をオンオフする運転操作や、同じくリビングルームαの床温度を調整する温度設定操作や、同じくタイマー床暖房運転をオンオフするタイマー運転操作がある。ダイニングルームβの床暖房に必要な操作としても、ダイニングルームβの床暖房運転をオンオフする運転操作や、同じくダイニングルームβの床温度を調整する温度設定操作や、同じくタイマー床暖房運転をオンオフするタイマー運転操作がある。この他、リビングルームαやダイニングルームβの床暖房のタイマー時刻設定を行うためのタイマー設定操作や、現在時刻の調整を行うための時計操作などがある。   That is, in the “2-channel” floor heating operation shown in FIG. 1, as an operation necessary for floor heating of the living room α, an operation operation for turning on / off the floor heating operation of the living room α, There are a temperature setting operation for adjusting the floor temperature and a timer operation operation for turning on and off the timer floor heating operation. As operations necessary for floor heating of the dining room β, an operation for turning on / off the floor heating operation of the dining room β, a temperature setting operation for adjusting the floor temperature of the dining room β, and also turning on / off the timer floor heating operation. There is a timer operation. In addition, there are a timer setting operation for setting a timer time for floor heating in the living room α and the dining room β, a clock operation for adjusting the current time, and the like.

これら操作のうち、運転操作や温度設定操作やタイマー運転といった主操作は、日常の利用頻度が高く、それ以外のタイマー設定操作や時計操作は、比較的利用頻度が低い傾向にある。
限られた数量の操作キーオンオフ部20a〜20jには、「2チャンネル」の全ての操作機能を割り当てることができない。そのため、そのうちの利用頻度の高い主操作を、1キーの押操作で実行する操作キーとして定義し、その他の利用頻度の低い操作を、2以上の操作キーを併用した操作で実行するように定義する操作機能の割付けが用いてある。
Among these operations, main operations such as driving operation, temperature setting operation, and timer operation have a high daily usage frequency, and other timer setting operations and clock operations have a relatively low usage frequency.
All the operation functions of “2 channels” cannot be assigned to the limited number of operation key on / off units 20a to 20j. Therefore, the main operation that is frequently used is defined as an operation key that is executed by pressing one key, and the other operation that is not used frequently is defined as an operation that uses two or more operation keys. The assignment of operation functions to be used is used.

続いて、具体的な操作機能の割付けの例を示す。
図3に示されるように「2チャンネル」のときは、操作キー群Aのうち、最も左側に配置される上下2個の操作キーオンオフ部20a、20bと、最も右側に配置される上下2個の操作キーオンオフ部20i,20jを操作することにより、それぞれ2つのゾーン(リビングルームα/ダイニングルームβ)における床温度調整のための温度設定操作が行われるように定義する(本願の第1の操作キーに相当)。これらの操作キーオンオフ部は、コントローラ装置を組立てた状態では温度設定操作キー30,40にそれぞれ対応する。同様に、それら操作キーオンオフ部に対して内側かつ下側に設けられた2個の操作キーオンオフ部20d,20hに対しては、それぞれ2つのゾーンにおける床暖房運転用の運転操作キー31,41(本願の第1の操作キーに相当)として定義し、同じく上側の2個の操作キーオンオフ部20c,20gに対しては、それぞれ2つのゾーンにおけるタイマー運転操作用のタイマー運転操作キー32,42(本願の第1の操作キーに相当)として定義する設定がなされる。つまり、利用頻度の高い主操作キー(第1の操作キー)は、1回の押操作で所定の動作が実行される操作キーとして割付けられる設定としてある。なお、これら利用頻度の高い操作キーについてはいずれのゾーンにおける床暖房を操作するものかの判別をしやすくするため、左右両側(ゾーンと対応する側)に寄ったキー割付けを行うことがより好ましい。
Next, specific examples of assigning operation functions will be shown.
As shown in FIG. 3, in the case of “two channels”, in the operation key group A, the upper and lower two operation key on / off portions 20a and 20b arranged on the leftmost side and the upper and lower two arranged on the rightmost side. By operating the operation key on / off portions 20i and 20j, it is defined that the temperature setting operation for adjusting the floor temperature in each of the two zones (living room α / dining room β) is performed (the first of the present application). Equivalent to operation keys). These operation key on / off portions correspond to the temperature setting operation keys 30 and 40, respectively, when the controller device is assembled. Similarly, with respect to the two operation key on / off portions 20d and 20h provided inside and below the operation key on / off portions, operation operation keys 31 and 41 for floor heating operation in two zones, respectively. It is defined as (corresponding to the first operation key of the present application), and the timer operation operation keys 32 and 42 for timer operation operation in two zones respectively for the upper two operation key on / off portions 20c and 20g. The setting defined as (corresponding to the first operation key of the present application) is made. That is, the frequently used main operation key (first operation key) is set to be assigned as an operation key for executing a predetermined operation with a single pressing operation. In order to make it easy to determine in which zone the floor heating is to be operated for these frequently used operation keys, it is more preferable to perform key assignments on both the left and right sides (sides corresponding to the zones). .

残る、中央上側に配置される操作キーオンオフ部20eは、各ゾーンにおいて共用されるタイマー設定操作キー36(本願の第2の操作キーに相当)として定義し、さらに中央下側に配置される操作キーオンオフ部20fは、時計操作キー38(本願の第2の操作キーに相当)として定義する。このとき、タイマー設定操作キー36を押操作すると、タイマー運転操作キー32,42がゾーン選択用のキーとして機能するようになるとともに、温度設定操作キー30,40が床温度を設定する調整キーとして機能するようになる。時計操作キー38は、押操作することにより温度設定操作キー30,40が「時」や「分」を調整する調整キーとして機能するようになるための操作キーとして機能する。これにより、タイマー設定操作キー36や時計操作キー38は、主操作キー以外の操作キーが2以上の操作キーを押操作することで実行される操作キーとなる。つまり、タイマー設定操作キー36や時計操作キー38(第2の操作キー;利用頻度の低い操作キー)は、これらの操作キーを操作した後、他の所定の操作キーを併用することで、当該所定の操作キーに従来定義されていた機能とは異なる機能が実行されるようにするための操作キーとなる。   The remaining operation key on / off unit 20e arranged at the center upper side is defined as a timer setting operation key 36 (corresponding to the second operation key of the present application) shared in each zone, and further arranged at the center lower side. The key on / off unit 20f is defined as a clock operation key 38 (corresponding to the second operation key of the present application). At this time, when the timer setting operation key 36 is pressed, the timer operation operation keys 32 and 42 function as zone selection keys, and the temperature setting operation keys 30 and 40 serve as adjustment keys for setting the floor temperature. Become functional. The clock operation key 38 functions as an operation key for the temperature setting operation keys 30 and 40 to function as adjustment keys for adjusting “hour” and “minute” when pressed. Thus, the timer setting operation key 36 and the clock operation key 38 become operation keys that are executed when an operation key other than the main operation key presses two or more operation keys. That is, the timer setting operation key 36 and the clock operation key 38 (second operation key; an operation key with low usage frequency) are operated by using these operation keys and then using other predetermined operation keys together. This is an operation key for executing a function different from the function conventionally defined for the predetermined operation key.

続いて、図2に示される「1チャンネル」用の操作機能の割付けを説明すると、「1チャンネル」の床暖房運転のときは、「2チャンネル」とは異なり、操作が必要となるのはダイニングルームβの1室だけである。このため「1チャンネル」の床暖房運転のときは、ダイニングルームβの床暖房運転をオンオフする運転操作や、同じく床温度を調整する温度設定操作や、同じくタイマー床暖房運転をオンオフするタイマー運転操作や、同じくタイマー時刻設定を行うタイマー設定操作や、現在時刻の調整を行うための時計操作などを行えるよう各操作キーオンオフ部に対する操作機能を定義すれば良い。   Next, the assignment of the operation function for “1 channel” shown in FIG. 2 will be described. In the case of “1 channel” floor heating operation, unlike “2 channel”, the operation is required for dining. There is only one room, room β. For this reason, during the “one channel” floor heating operation, the operation for turning on / off the floor heating operation of the dining room β, the temperature setting operation for adjusting the floor temperature, and the timer operation operation for similarly turning on / off the timer floor heating operation are performed. In addition, an operation function for each operation key on / off unit may be defined so that a timer setting operation for setting the timer time and a clock operation for adjusting the current time can be performed.

これら操作も「2チャンネル」のときと同様、運転操作や温度設定操作やタイマー運転は、利用頻度が高く、それ以外のタイマー設定操作や時計操作は、比較的利用頻度が低い。
「1チャンネル」における操作機能の割付けには、「2チャンネル」の割付けを共用したうえで、利用頻度を考慮した割付けが用いられている。
As in the case of “2-channel”, these operations are frequently used for the operation operation, the temperature setting operation, and the timer operation, and the other timer setting operations and clock operations are relatively less frequently used.
For the assignment of operation functions in “1 channel”, the assignment in consideration of the use frequency is used after sharing the assignment of “2 channels”.

具体的には、図2に示されるように「1チャンネル」のときは、操作キー群Aのうち、最も右側に配置される上下2個の操作キーオンオフ部20i、20jを床温度調整用の温度設定操作キー50(本願の第3の操作キーに相当)として定義し、操作キーオンオフ部20jの内側の操作キーオンオフ部20hを、床暖房運転用の運転操作キー51(本願の第3の操作キーに相当)として定義し、同じく上側の操作キーオンオフ部20gを、タイマー運転操作用のタイマー運転操作キー52(本願の第3の操作キーに相当)として定義する。これで、利用頻度の高い主操作は、所定の操作キーの1押操作によって実行される操作キーとして定義される。   Specifically, as shown in FIG. 2, when “1 channel” is selected, the upper and lower two operation key on / off units 20i and 20j arranged on the rightmost side of the operation key group A are used for adjusting the floor temperature. It is defined as a temperature setting operation key 50 (corresponding to the third operation key of the present application), and an operation key on / off section 20h inside the operation key on / off section 20j is replaced with an operation operation key 51 for floor heating operation (the third operation key of the present application). Similarly, the upper operation key on / off portion 20g is defined as a timer operation key 52 for timer operation (corresponding to the third operation key of the present application). Thus, a main operation that is frequently used is defined as an operation key that is executed by pressing one predetermined operation key.

中央上側に配置される操作キーオンオフ部20eは、タイマー設定操作キー56(第4の操作キー)として定義し、さらに中央下側に配置される操作キーオンオフ部20fは、時計操作キー58(第4の操作キー)として定義する。このときタイマー設定操作キー56は、押操作をすることでタイマー運転のオンオフを切り替えるとともに、最も左側に配置される上下2個の操作キーオンオフ部20a,20bが「時」を調整する時調整キー57として機能するようになり、また、温度設定操作キー50が「分」を調整する分調整キーとして機能するようになる。同様に、時計操作キー58を押操作すると左側の操作キーオンオフ部20a,20bが「時」を調整する時調整キー57として機能するようになり、温度設定操作キー50が「分」を調整する分調整キーとして機能するようになる。つまり、「1チャンネル」の操作キーの割付けは、「2チャンネル」の操作キーの割付けから、片側の機能、ここではリビングルームαの操作機能を除いた割付けへ変更されるように定めてある。   The operation key on / off unit 20e arranged at the center upper side is defined as a timer setting operation key 56 (fourth operation key), and the operation key on / off unit 20f arranged at the center lower side is a clock operation key 58 (first operation key). 4 operation keys). At this time, the timer setting operation key 56 is pressed to switch on / off of the timer operation, and the upper and lower two operation key on / off units 20a, 20b arranged on the leftmost side adjust the “hour”. 57, and the temperature setting operation key 50 functions as a minute adjustment key for adjusting “minute”. Similarly, when the clock operation key 58 is pressed, the left operation key on / off portions 20a and 20b function as an adjustment key 57 for adjusting “hour”, and the temperature setting operation key 50 adjusts “minute”. Functions as a minute adjustment key. That is, the assignment of the “1-channel” operation key is determined to be changed from the assignment of the “2-channel” operation key to the assignment excluding the function on one side, here, the operation function of the living room α.

こうした割付けにより、利用頻度の高い操作キーを、操作面部17の右寄りの地点に割付け、他の比較的利用頻度の低い操作キーをその左側に配置させている。
そうすると、「2チャンネル」の製品のときは、選択スイッチ20(図示しない)の選択操作によって、「2チャンネル」用のキー割付けの設定を選ぶことにより、「2チャンネル」用のコントローラ本体13が構成できる。また「1チャンネル」の製品のときは、選択スイッチ(図示しない)の選択操作によって、「1チャンネル」用のキー割付けの設定を選ぶことにより、「1チャンネル」用のコントローラ本体13が構成できる。
By such assignment, operation keys with high use frequency are assigned to points on the right side of the operation surface portion 17, and other operation keys with relatively low use frequency are arranged on the left side thereof.
Then, in the case of a “2-channel” product, the controller body 13 for “2-channel” is configured by selecting the key assignment setting for “2-channel” by selecting the selection switch 20 (not shown). it can. In the case of a “1-channel” product, a “1-channel” controller main body 13 can be configured by selecting a key assignment setting for “1-channel” by selecting a selection switch (not shown).

そして、「2チャンネル」用のコントローラ本体13の操作面部17上に、図3に示されるように、割付けされた各種操作キーの操作機能を表示した「2チャンネル」用の表面シート60を貼り付ければ、図1に示されるように「2チャンネル」の床暖房運転の制御に求められる操作キーが操作面部17上で明示され、良好な外観をもつ「2チャンネル」用の床暖房用のコントローラ装置3の製品ができあがる。   Then, as shown in FIG. 3, a “2-channel” topsheet 60 displaying the operation functions of the assigned operation keys can be pasted on the operation surface portion 17 of the “2-channel” controller main body 13. For example, as shown in FIG. 1, an operation key required for controlling the "2 channel" floor heating operation is clearly indicated on the operation surface unit 17, and the controller for floor heating for "2 channel" having a good appearance is provided. Three products are completed.

また「1チャンネル」用のコントローラ本体13の操作面部17上に、図3に示されるように、割付けされた各種操作キーの操作機能を表示した「1チャンネル」用の表面シート62を貼り付ければ、図2に示されるように必要ない部分がブランク部として化粧されて、「1チャンネル」の床暖房運転の制御に求められる操作キーだけが明示され、同様に、良好な外観をもつ「1チャンネル」用の床暖房用のコントローラ装置6の製品ができあがる。   Further, as shown in FIG. 3, a “1-channel” topsheet 62 displaying the operation functions of various assigned operation keys is pasted on the operation surface portion 17 of the “1-channel” controller main body 13. As shown in FIG. 2, the unnecessary part is decorated as a blank part, and only the operation keys required for controlling the floor heating operation of “1 channel” are clearly shown. Similarly, “1 channel” having a good appearance The product of the controller device 6 for floor heating for "is completed.

したがって、操作機能の割付けが変えられる操作キー群Aを用いて、「2チャンネル」と「1チャンネル」とで操作機能の割付けを変える構造の採用により、大部分の部品を共通にしたまま、それぞれに適したコントローラ装置、すなわち「2チャンネル」用のコントローラ装置3、「1チャンネル」用のコントローラ装置6を構成することができる。特に「2チャンネル」用のキー割付けから「1チャンネル」用のキー割付けへの変更は、一方の操作機能の割付けを削除するだけでよいので(「2チャンネル」からの派生)、操作キー群Aへの割付けも簡単であるうえ、確実である。しかも、操作機能の割付けは、利用頻度の高い操作が、所定の操作キーを押操作するだけの1アクションで行える割付けとしてあるので、利用頻度の多い日常の操作は「2チャンネル」でも「1チャンネル」でも、面倒な操作はなく扱いやすい。   Therefore, by using the operation key group A that can change the operation function assignment and adopting a structure that changes the operation function assignment between “2 channel” and “1 channel”, most of the parts are kept in common. In other words, a controller device suitable for the above-mentioned, that is, a controller device 3 for “2 channels” and a controller device 6 for “1 channel” can be configured. In particular, when changing the key assignment for “2-channel” to the key assignment for “1-channel”, it is only necessary to delete the assignment of one operation function (derived from “2-channel”). Assignment to is easy and reliable. In addition, since the operation functions are assigned in such a manner that frequently used operations can be performed with one action by simply pressing a predetermined operation key, daily operations with a high use frequency can be “2 channels” or “1 channel”. "But it's easy to handle without any cumbersome operations."

それ故、コストの低減化と操作性の向上とを両立した各チャンネル用の製品、すなわち「2チャンネル」用のコントローラ装置3と、「1チャンネル」用のコントローラ装置6とを得ることができる。特に「1チャンネル」用や「2チャンネル」用の使い分けが要望される床暖房用のコントローラ装置3,6には有効である。しかも、「1チャンネル」用を考慮して、操作キー群Aのうちの右寄りに配置されている操作キーを、特に利用頻度の高い制御を行う操作、例えば床温度調整の温度設定キーとして割付けると、一般に多い右利きの人に対応できるので、多くの利用者が扱いやすくなる。   Therefore, it is possible to obtain a product for each channel that achieves both cost reduction and improvement in operability, that is, the controller device 3 for “2 channels” and the controller device 6 for “1 channel”. In particular, this is effective for the controller devices 3 and 6 for floor heating, for which separate use for “1 channel” or “2 channels” is desired. In addition, in consideration of “one channel”, the operation key arranged on the right side of the operation key group A is assigned as an operation for performing particularly frequently used control, for example, a temperature setting key for floor temperature adjustment. It is easy to handle many users because it can handle many right-handed people in general.

そのうえ、操作面部17に表面シート60,62を設けると、割付けた操作機能を利用者に明確に認識させたり、使用しなかった操作キーを隠せたりするので、さらに「2チャンネル」用や「1チャンネル」用のコントローラ装置3,6の操作性を高めることができる。
なお、本発明は上述した一実施形態に限定されるものではなく、本発明の主旨を逸脱しない範囲内で種々変更して実施しても構わない。例えば一実施形態の2チャンネル用のコントローラ装置では、運転操作、温度設定操作、タイマー運転操作の全てを単一の操作キーの押操作で実行される例を挙げたが、これに限らず、運転操作、温度設定装置、タイマー運転操作のうちの少なくとも1つを含む主操作を単一の操作キーの押操作で実行されるようにしてもよい。1チャンネルのコントローラ装置についても、操作面部の右寄りに配置されている操作キーに、運転操作、温度設定操作、タイマー運転操作の全てが割付けられる例を挙げたが、これに限らず、運転操作、温度設定装置、タイマー運転操作のうちの少なくとも1つの操作を割付けてもよい。また一実施形態では、制御回路部に予め「2チャンネル」用の操作機能の割付けと「1チャンネル」用の操作機能の割付けとの設定を格納しておき、どちらかを選択して、操作キーの割付けを変える構造を用いたが、これに限らず、例えば制御回路部に設けた通信部を通じて、「2チャンネル」用の操作キーの割付け、あるいは「1チャンネル」用の操作キー割付けの設定を入力させて、「2チャンネル」、「1チャンネル」のどちらかの操作機能の割付けとするよう構成してもよく、また、操作機能の割付けの変更の仕方は上述したような選択スイッチによるものでなくとも、どのような構造でもよい。また、1つのヒータケーブルから接続されるパネルヒータは1つに限らず、例えば1つのゾーンにおいて小型のパネルヒータを複数設置し、1つのヒータケーブルに対し当該複数のパネルヒータを接続するよう構成しても良いし、パネルヒータを用いた電気式床暖房に限らず、例えば床下に温水を流す配管を行い、温水の熱により室内を暖める温水式床暖房のような別の形態であってもよい。また一実施形態においては本発明を床暖房用のコントローラ装置に適用したが、それ以外の「1チャンネル」用,「2チャンネル」用の使い分けが求められる制御対象機器のコントローラ装置にも本発明を適用しても構わない。
In addition, when the surface sheets 60 and 62 are provided on the operation surface portion 17, the assigned operation function can be clearly recognized by the user, or the operation keys that have not been used can be hidden. The operability of the controller devices 3 and 6 for “channel” can be improved.
The present invention is not limited to the above-described embodiment, and various modifications may be made without departing from the spirit of the present invention. For example, in the controller device for two channels of one embodiment, an example is given in which all of the driving operation, the temperature setting operation, and the timer driving operation are performed by pressing a single operation key. The main operation including at least one of the operation, the temperature setting device, and the timer operation may be executed by pressing the single operation key. For the controller device of 1 channel, an example in which all of the operation operation, the temperature setting operation, and the timer operation operation are assigned to the operation keys arranged on the right side of the operation surface portion is not limited to this. At least one operation of the temperature setting device and the timer operation may be assigned. In one embodiment, the setting of the operation function assignment for “2-channel” and the operation function assignment for “1-channel” is stored in the control circuit unit in advance, and either one is selected and the operation key is selected. However, the present invention is not limited to this. For example, the operation key assignment for “2-channel” or the operation key assignment for “1-channel” is set through the communication section provided in the control circuit section. It may be configured so that either “2 channel” or “1 channel” operation function is assigned and the operation function assignment is changed by the selection switch as described above. Any structure may be used. Further, the number of panel heaters connected from one heater cable is not limited to one. For example, a plurality of small panel heaters are installed in one zone, and the plurality of panel heaters are connected to one heater cable. It is not limited to electric floor heating using a panel heater, and may be another form such as hot water type floor heating in which piping for flowing warm water under the floor is used and the room is heated by the heat of hot water. . Further, in one embodiment, the present invention is applied to a controller device for floor heating, but the present invention is also applied to a controller device of a control target device that is required to be separately used for “1 channel” and “2 channel”. You may apply.

本発明の第1の実施形態に係る「2チャンネル」用のコントローラ装置を、床暖房装置部と共に示す斜視図。The perspective view which shows the controller apparatus for "2 channels" concerning the 1st Embodiment of this invention with a floor heating apparatus part. 同じく「1チャンネル」用のコントローラ装置を、床暖房装置部と共に示す斜視図。The perspective view which similarly shows the controller apparatus for "1 channel" with a floor heating apparatus part. 「2チャンネル」用のコントローラ装置と、「1チャンネル」用のコントローラ装置が、多くの共通部品で構成されることを説明するための分解斜視図。The exploded perspective view for demonstrating that the controller apparatus for "2 channels" and the controller apparatus for "1 channel" are comprised with many common components.

符号の説明Explanation of symbols

2a,2b パネルヒータ(制御対象機器)
3 2チャンネル用の床暖房用コントローラ装置
6 1チャンネル用の床暖房用コントローラ装置
13 コントローラ本体
17 操作面部
30,31,32,40,41,42 温度設定操作キー,運転操作キー,タイマー運転操作キー(第1の操作キー)
36,38 タイマー設定操作キー,時計操作キー(第2の操作キー)
50,51,52 温度設定操作キー,運転操作キー,タイマー運転操作キー(第3の操作キー)
A 操作キー群
2a, 2b Panel heater (control target equipment)
3 Controller device for floor heating for 2 channels 6 Controller device for floor heating for 1 channel 13 Controller body 17 Operation surface section 30, 31, 32, 40, 41, 42 Temperature setting operation key, operation operation key, timer operation operation key (First operation key)
36, 38 Timer setting operation key, clock operation key (second operation key)
50, 51, 52 Temperature setting operation key, operation operation key, timer operation operation key (third operation key)
A Operation keys

Claims (3)

第1の制御対象機器と、第2の制御対象機器とを操作可能なコントローラ本体と、
前記コントローラ本体に設けられた操作面部と、
前記操作面部に設けられ、前記第1の制御対象機器と第2の制御対象機器との双方を制御対象とする2チャンネルのときと、前記第1の制御対象機器のみを制御対象とする1チャンネルのときとで、操作機能の割付けを変更可能とした操作キー群とを備え、
前記操作機能の割付けは、
前記2チャンネルのときは、前記第1の制御対象機器および前記第2の制御対象機器に対する運転操作、温度設定操作、タイマー運転操作のうち少なくとも1つを含む主操作が単一の操作キーを押操作することで実行される第1の操作キーと、前記主操作以外の操作が2以上の操作キーを押操作することで実行される第2の操作キーとからなるように前記操作キー群に対し割付けが行われ、
前記1チャンネルのときは、前記第1の制御対象機器に対する操作が、所定の操作キーを押操作することで実行される第3の操作キーとなるように前記操作キー群に対し割付けが行われるものである
ことを特徴とするコントローラ装置。
A controller main body capable of operating the first control target device and the second control target device;
An operation surface provided in the controller body;
2 channels provided on the operation surface unit and controlling both the first control target device and the second control target device, and one channel targeting only the first control target device And a group of operation keys that can change the assignment of operation functions.
The assignment of the operation function is as follows:
In the case of the two channels, a main operation including at least one of a driving operation, a temperature setting operation, and a timer driving operation for the first control target device and the second control target device presses a single operation key. The operation key group includes a first operation key that is executed by an operation and a second operation key that is an operation other than the main operation that is executed by pressing two or more operation keys. Is assigned to
In the case of the first channel, the operation key group is assigned so that the operation on the first control target device becomes a third operation key executed by pressing a predetermined operation key. A controller device characterized by being a thing.
前記第3の操作キーは、前記操作面部の操作キー群のうち、右寄りに配置されている操作キーに、運転操作、温度設定操作、タイマー運転操作のうち少なくとも1つの操作が割付けられることを特徴とする請求項1に記載のコントローラ装置。   In the third operation key, at least one of a driving operation, a temperature setting operation, and a timer driving operation is assigned to an operation key arranged on the right side of the operation key group of the operation surface portion. The controller device according to claim 1. 前記操作面部には、前記2チャンネルのときは前記第1,2の操作キーだけを表わす表面シートが設けられるとともに、前記1チャンネルのときは前記第3の操作キーだけを表わす表面シートが設けられることを特徴とする請求項1または請求項2に記載のコントローラ装置。   The operation surface portion is provided with a surface sheet representing only the first and second operation keys in the case of the 2 channel, and a surface sheet representing only the third operation key in the case of the 1 channel. The controller device according to claim 1 or 2, wherein
JP2008011395A 2008-01-22 2008-01-22 Controller for floor heating Active JP5090189B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008011395A JP5090189B2 (en) 2008-01-22 2008-01-22 Controller for floor heating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008011395A JP5090189B2 (en) 2008-01-22 2008-01-22 Controller for floor heating

Publications (2)

Publication Number Publication Date
JP2009174731A true JP2009174731A (en) 2009-08-06
JP5090189B2 JP5090189B2 (en) 2012-12-05

Family

ID=41030011

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008011395A Active JP5090189B2 (en) 2008-01-22 2008-01-22 Controller for floor heating

Country Status (1)

Country Link
JP (1) JP5090189B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009186111A (en) * 2008-02-07 2009-08-20 Yamatake Corp Wall surface installation type controller device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63161348A (en) * 1986-12-24 1988-07-05 Toshiba Corp Air conditioner
JPS6460985A (en) * 1987-08-31 1989-03-08 Matsushita Electric Ind Co Ltd Floor heating device
JPH10304478A (en) * 1997-04-23 1998-11-13 Funai Electric Co Ltd Remote controller
JP2006292320A (en) * 2005-04-14 2006-10-26 Mitsubishi Electric Corp Remote control for bath water heater
JP2007071449A (en) * 2005-09-07 2007-03-22 Matsushita Electric Ind Co Ltd Remote controller for water heater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63161348A (en) * 1986-12-24 1988-07-05 Toshiba Corp Air conditioner
JPS6460985A (en) * 1987-08-31 1989-03-08 Matsushita Electric Ind Co Ltd Floor heating device
JPH10304478A (en) * 1997-04-23 1998-11-13 Funai Electric Co Ltd Remote controller
JP2006292320A (en) * 2005-04-14 2006-10-26 Mitsubishi Electric Corp Remote control for bath water heater
JP2007071449A (en) * 2005-09-07 2007-03-22 Matsushita Electric Ind Co Ltd Remote controller for water heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009186111A (en) * 2008-02-07 2009-08-20 Yamatake Corp Wall surface installation type controller device

Also Published As

Publication number Publication date
JP5090189B2 (en) 2012-12-05

Similar Documents

Publication Publication Date Title
AU2008231206B2 (en) Convection preheat system and method for radiant baking
Van Hoof et al. Thermal comfort and the integrated design of homes for older people with dementia
USD651464S1 (en) Gas cooktop and/or grate thereof
CA2970684C (en) Tamper resistant thermostat having hidden limit adjustment capabilities
SI1505350T1 (en) Device and method for controlling of a cooking system
WO2007095087A3 (en) Programmable temperature control system for pools and spas
WO2006049905A3 (en) Method and apparatus for targeted event networking
WO2007000532A3 (en) Glass-ceramic plate and method for the production thereof
KR20160070869A (en) Heating panel for vehicle
CA2518636A1 (en) Room heating system
US9971322B2 (en) Lock-out operation for appliances
CN101375106A (en) Method of controlling cooker
JP5090189B2 (en) Controller for floor heating
US20040188415A1 (en) Control device for an infrared ray sauna facility
JP2007192418A (en) Environmental temperature control device, system and method
US20190307603A1 (en) Multi-layer Heating Mat for Providing Therapeutic Heat to an Area of the Body
KR101067638B1 (en) The electric mat with separate heating province
JP2009093851A (en) Heating cooking device
JP3140280U (en) Hot bath equipment
KR200280721Y1 (en) a simple frame sauna
KR101839341B1 (en) Electric Rice Cooker Controller
CN203122047U (en) Electric cooking appliance with display unit
KR102250653B1 (en) Heating device including hood
USD469304S1 (en) Combination glass cooktop and plastic peripheral frame for a cooking appliance
JP2010060269A (en) Floor heating carpet

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100826

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120613

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120620

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120816

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120905

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120912

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150921

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5090189

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150