JP2008026376A - Implement for processing surplus length of optical cable, and method for processing surplus length of optical cable - Google Patents

Implement for processing surplus length of optical cable, and method for processing surplus length of optical cable Download PDF

Info

Publication number
JP2008026376A
JP2008026376A JP2006195513A JP2006195513A JP2008026376A JP 2008026376 A JP2008026376 A JP 2008026376A JP 2006195513 A JP2006195513 A JP 2006195513A JP 2006195513 A JP2006195513 A JP 2006195513A JP 2008026376 A JP2008026376 A JP 2008026376A
Authority
JP
Japan
Prior art keywords
optical cable
surplus length
length
extra
hardware
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006195513A
Other languages
Japanese (ja)
Other versions
JP4536039B2 (en
Inventor
Hirofumi Sakka
博典 属
Yukinori Ishihara
征典 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006195513A priority Critical patent/JP4536039B2/en
Publication of JP2008026376A publication Critical patent/JP2008026376A/en
Application granted granted Critical
Publication of JP4536039B2 publication Critical patent/JP4536039B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an implement for a surplus length of an optical and a method therefor by which the efficiency of an optical cable surplus length ordering job can be increased. <P>SOLUTION: The optical cable surplus length processing implement 10 for ordering a surplus length part 2 of an optical cable 1 in a supporter when laying the optical cable 1 comprises: support hardware 11; U-shaped surplus length processing hardware 20 constituted of a metal bar attached to the support hardware 11 and bent in a U-shape; and first and second surplus length receiving parts 30<SB>1</SB>, 30<SB>2</SB>attached to the U-shaped surplus length processing hardware 20 at an equal distance from the support hardware 11. The first and second surplus length receiving parts 30<SB>1</SB>, 30<SB>2</SB>are provided with respective ring parts each having a through-hole formed for making the U-shaped surplus length processing hardware 20 pass therethrough and second main bodies 31<SB>1</SB>, 31<SB>2</SB>each being constituted of a bar-like part bent so that the tip looks upward. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、光ケーブル余長処理具および光ケーブル余長処理方法に関し、特に、光ケーブルを敷設する際に電柱などの支持物において光ケーブルの余長部を整理するのに好適な光ケーブル余長処理具および光ケーブル余長処理方法に関する。   The present invention relates to an optical cable surplus length processing tool and an optical cable surplus length processing method, and more particularly to an optical cable surplus length processing tool and an optical cable suitable for arranging the surplus length of an optical cable in a support such as a utility pole when laying the optical cable. The present invention relates to a surplus length processing method.

光ケーブルを敷設する際には、将来の電柱移設などに対応するために、一定の距離ごとに約10m程度の余長を設けるようにしている。このような光ケーブルの余長部を整理するために、下記の非特許文献1に記載されているような各種の余長収容金物が使用されているが、余長ケーブルを環状に束ねて荷重を分散させることができる3点支持のJ型余長収容金物が主に使用されている。   When laying an optical cable, an extra length of about 10 m is provided for every fixed distance in order to cope with future utility pole relocation. In order to sort out the extra length part of such an optical cable, various extra length accommodation hardware as described in the following Non-Patent Document 1 is used. A three-point supported J-type extra-length housing hardware that can be dispersed is mainly used.

なお、下記の特許文献1には、光ファイバ心線の余長処理を容易に行うことができるようにするために、光ケーブル接続部収納装置を電柱の内部に収めた収納構造が開示されている。この心線接続部収納装置では、余長収容部は、個々に前後に移動可能に横方向に並べられて仕切板に支持された心線接続部収納箱および光ファイバ心線余長収容空間を具え、光ファイバ心線は心線余長収容空間で相互に接続されて心線接続部収納箱に収容される。心線接続部収納箱は、光ファイバ心線を収容する複数の溝、溝の中心部に設けられた光ファイバ心線接続部を収容する空所、心線押さえ部材および心線接続部押さえ部材を具備する。
電気協同研究、第48巻、第5号、164頁 特開平9−127387号公報
In addition, the following Patent Document 1 discloses a storage structure in which an optical cable connecting portion storage device is housed inside a utility pole so that extra length processing of an optical fiber core wire can be easily performed. . In this core wire connecting portion storage device, the extra length accommodating portion includes a core wire connecting portion storage box and an optical fiber core wire extra length accommodating space that are individually arranged in a lateral direction so as to be movable back and forth and supported by a partition plate. In addition, the optical fiber core wires are connected to each other in the extra wire length accommodating space and are accommodated in the core wire connection portion storage box. A core wire connection portion storage box includes a plurality of grooves for storing optical fiber core wires, a space for storing an optical fiber core wire connection portion provided at the center of the groove, a core wire pressing member, and a core wire connection portion pressing member. It comprises.
Electric Cooperative Research, Vol. 48, No. 5, 164 JP-A-9-127387

しかしながら、J型余長収容金物を使用して光ケーブルの余長部を整理する際には、作業者は、光ケーブルの余長部をJ型余長収容金物の径に合わせて輪状に巻いたのちにJ型余長収容金物に固定するため、以下に示すような問題があった。
(1)輪状に巻いた光ケーブルの余長部の径がJ型余長収容金物の径に合わずに光ケーブルの余長部を巻き直すことがあった。
(2)重量のある光ケーブルの余長部を作業者は手で巻いていくため、労力と時間とがかかっていた。
(3)電柱移設などで光ケーブルの余長部を繰り出した際に、移設後の電柱で光ケーブルの余長の長さが変わった場合には、光ケーブルの余長部を整理し直す作業が困難であった。
However, when the extra length portion of the optical cable is arranged using the J-type extra length accommodation hardware, the operator winds the extra length portion of the optical cable in a ring shape according to the diameter of the J type extra length accommodation hardware. In order to fix to the J type extra length accommodation hardware, there existed the following problems.
(1) The extra length portion of the optical cable may be rewound without the diameter of the extra length portion of the optical cable wound in a ring shape matching the diameter of the J-type extra length accommodation hardware.
(2) Since the operator winds the extra length of the heavy optical cable by hand, it takes labor and time.
(3) If the extra length of the optical cable is changed in the utility pole after relocation, the work of rearranging the extra length of the optical cable is difficult. there were.

本発明の目的は、光ケーブル余長整理作業の効率化を図ることができる光ケーブル余長処理具および光ケーブル余長処理方法を提供することにある。   An object of the present invention is to provide an optical cable surplus length processing tool and an optical cable surplus length processing method capable of improving the efficiency of the optical cable surplus length organizing work.

本発明の光ケーブル余長処理具は、光ケーブル(1)を敷設する際に支持物(3)において該光ケーブルの余長部を整理するための光ケーブル余長処理具(10)であって、支持金物(11)と、該支持金物に取り付けられた余長処理金物(20)と、該余長処理金物に前記支持金物から等距離に取り付けられた第1および第2の余長受け部(301,302)とを具備し、前記第1および第2の余長受け部が、前記余長処理金物を貫通させるための貫通孔が形成された環状部および末端が該環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部から構成された第1および第2の本体(311,312)をそれぞれ備えることを特徴とする。
ここで、前記余長処理金物が、U字状に曲げられた金属棒から構成されたU字型余長処理金物(20)であり、該U字型余長処理金物の両端部と底部との間に第1および第2の高さ調整用ネジ溝(211,212)がそれぞれ形成されており、前記第1および第2の余長受け部が、前記U字型余長処理金物の前記第1および第2の高さ調整用ネジ溝が形成された部分に移動可能に取り付けられていてもよい。
前記第1および第2の余長受け部が、該第1および第2の余長受け部の棒状部が互いに反対方向を向くように、前記余長処理金物に取り付けられていてもよい。
末端部分が前記支持物に取り付けられた腕金(12)をさらに具備し、前記支持金物が、前記腕金と互いに直交するように該腕金の先端部分に固定されていてもよい。
前記支持金物の長さ方向が前記光ケーブルの敷設方向に沿うように、前記腕金の末端部分が前記支持物に固定されていてもよい。
The optical cable surplus length processing tool of the present invention is an optical cable surplus length processing tool (10) for organizing the surplus length portion of the optical cable in the support (3) when the optical cable (1) is laid. and (11), said the extra length handling hardware attached to the support hardware (20), first and second surplus length receiving portion mounted equidistant from the support hardware to該余length handling hardware (30 1 , 30 2 ), and the first and second surplus length receiving portions are formed with an annular portion in which a through hole for penetrating the surplus length processing hardware is formed, and the end is fixed to the side surface of the annular portion And first and second main bodies (31 1 , 31 2 ) each composed of a rod-shaped portion bent so that the tip faces upward.
Here, the surplus length treated hardware is a U-shaped surplus length treated hardware (20) composed of a metal rod bent into a U-shape, and both ends and bottom portions of the U-shaped surplus length treated hardware. Are formed with first and second height adjusting screw grooves (21 1 , 21 2 ), respectively, and the first and second surplus length receiving portions are the U-shaped surplus length processing hardware. The first and second height adjusting screw grooves may be attached to be movable.
The first and second surplus length receiving portions may be attached to the surplus length processing hardware such that the rod-shaped portions of the first and second surplus length receiving portions face in opposite directions.
An end portion may further include a brace (12) attached to the support, and the support brace may be fixed to a tip portion of the brace so as to be orthogonal to the brace.
The end portion of the arm metal may be fixed to the support so that the length direction of the support metal is along the laying direction of the optical cable.

本発明の光ケーブル余長処理方法は、光ケーブル(1)を敷設する際に支持物(3)において該光ケーブルの余長部(2)を整理するための光ケーブル余長処理方法であって、支持金物(11)と、該支持金物に取り付けられた余長処理金物(20)と、該余長処理金物に前記支持金物から等距離に取り付けられた第1および第2の余長受け部(301,302)とを具備し、かつ、前記第1および第2の余長受け部が、前記余長処理金物を貫通させるための貫通孔が形成された環状部および末端が該環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部から構成された第1および第2の本体(311,312)をそれぞれ備える光ケーブル余長処理具(10)を用い、前記支持金物が前記光ケーブルの敷設方向に沿うように、前記光ケーブル余長処理具を前記支持物に取り付け、前記第1および第2の余長受け部の棒状部に前記光ケーブルの余長部を引っ掛けながら該光ケーブルの余長部を巻いていくことを特徴とする。
ここで、前記光ケーブルの余長部を巻いていく際には、前記第1および第2の余長受け部の棒状部を前記光ケーブルの敷設方向と直角でかつ互いに同じ方向を向くようにし、前記光ケーブルの余長部を巻き終えると、該巻いた光ケーブルの余長部を前記第1の余長受け部の棒状部に掛けたまま前記第2の余長受け部の棒状部から取り外したのちに、該第2の余長受け部の棒状部を180度回して、該第1および第2の余長受け部の棒状部が互いに反対方向を向くようにし、前記取り外した光ケーブルの余長部を前記第2の余長受け部の棒状部に掛けてもよい。
前記余長処理金物が、U字状に曲げられた金属棒から構成されたU字型余長処理金物(20)であり、該U字型余長処理金物の両端部と底部との間に第1および第2の高さ調整用ネジ溝(211,212)がそれぞれ形成されており、前記第1および第2の余長受け部が、前記U字型余長処理金物の前記第1および第2の高さ調整用ネジ溝が形成された部分に移動可能に取り付けられていてもよい。
前記光ケーブルの余長部を前記第1および第2の余長受け部の棒状部に掛けるとともに該光ケーブルの余長部の下側の中央部を前記U字型余長処理金物の底部に置いて、該光ケーブルの余長部を該第1および第2の余長受け部と該U字型余長処理金物の底部とで3点支持してもよい。
The optical cable surplus length processing method of the present invention is an optical cable surplus length processing method for arranging the surplus length portion (2) of the optical cable in the support (3) when the optical cable (1) is laid. and (11), said the extra length handling hardware attached to the support hardware (20), first and second surplus length receiving portion mounted equidistant from the support hardware to該余length handling hardware (30 1 , 30 2 ), and the first and second surplus length receiving portions are formed with an annular portion in which a through hole for penetrating the surplus length processing hardware is formed, and the end is a side surface of the annular portion. And an optical cable surplus length processing tool (10) provided with first and second main bodies (31 1 , 31 2 ) each composed of a rod-shaped portion that is fixed to the tip and bent so that the tip faces upward, Support hardware along the laying direction of the optical cable As described above, the optical cable surplus length processing tool is attached to the support, and the surplus length portion of the optical cable is wound while the surplus length portion of the optical cable is hooked on the rod-shaped portion of the first and second surplus length receiving portions. It is characterized by that.
Here, when winding the surplus length portion of the optical cable, the rod-shaped portions of the first and second surplus length receiving portions are perpendicular to the laying direction of the optical cable and face the same direction, When the extra length portion of the optical cable has been wound, the extra length portion of the wound optical cable is hung on the rod-like portion of the first extra-length receiving portion and then removed from the rod-like portion of the second extra-length receiving portion. The rod-shaped portion of the second surplus length receiving portion is rotated 180 degrees so that the rod-shaped portions of the first and second surplus length receiving portions face in opposite directions, and the surplus length portion of the removed optical cable is It may be hung on the rod-shaped part of the second extra length receiving part.
The surplus length treated hardware is a U-shaped surplus length treated hardware (20) composed of a metal bar bent in a U-shape, and between the both ends and the bottom of the U-shaped surplus length treated hardware. First and second height adjusting screw grooves (21 1 , 21 2 ) are respectively formed, and the first and second surplus length receiving portions are the first of the U-shaped surplus length processing hardware. The first and second height adjusting screw grooves may be movably attached.
The extra length portion of the optical cable is hung on the rod-like portion of the first and second extra length receiving portions, and the lower central portion of the extra length portion of the optical cable is placed on the bottom of the U-shaped extra length processing hardware. The surplus length of the optical cable may be supported at three points by the first and second surplus length receiving portions and the bottom of the U-shaped surplus length processing hardware.

本発明の光ケーブル余長処理具および光ケーブル余長処理方法は、以下に示す効果を奏する。
(1)第1および第2の余長受け部の棒状部に光ケーブルの余長部を引っ掛けながら光ケーブルの余長部を巻けるので、光ケーブルの余長部を巻く作業を効率的に行うことができるとともに、光ケーブルの余長部の径の調整を容易に行うことができる。
(2)第1および第2の余長受け部は余長処理金物に移動可能に取り付けられているので、電柱移設などによる光ケーブルの余長繰出しなどで光ケーブルの余長部の長さが変わっても、第1および第2の余長受け部の位置を変えることにより容易に対応することができる。
(3)光ケーブルの余長処理の作業時間を短縮することができる。
The optical cable surplus length processing tool and the optical cable surplus length processing method of the present invention have the following effects.
(1) Since the extra length portion of the optical cable can be wound while the extra length portion of the optical cable is hooked on the rod-like portion of the first and second extra length receiving portions, the work of winding the extra length portion of the optical cable can be performed efficiently. At the same time, the diameter of the extra length of the optical cable can be easily adjusted.
(2) Since the first and second surplus length receiving portions are movably attached to the surplus length processing hardware, the length of the extra length portion of the optical cable changes due to the extra length extension of the optical cable by moving the utility pole, etc. Also, it can be easily handled by changing the positions of the first and second extra length receiving portions.
(3) The working time for the extra length processing of the optical cable can be shortened.

上記の目的を、余長処理金物を貫通させるための貫通孔が形成された環状部および末端が環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部から構成された第1および第2の本体をそれぞれ備える第1および第2の余長受け部を、余長処理金物を支持するための支持金物から等距離に余長処理金物に取り付けることにより実現した。   For the above purpose, it is composed of an annular part in which a through hole for penetrating the extra length treated metal is formed and a rod-like part whose end is fixed to the side surface of the annular part and the tip is bent upward. The first and second surplus length receiving portions provided with the first and second main bodies, respectively, are realized by attaching the surplus length processing hardware at an equal distance from the supporting hardware for supporting the surplus length processing hardware.

以下、本発明の光ケーブル余長処理具および光ケーブル余長処理方法の実施例について、図面を参照して説明する。
本発明の一実施例による光ケーブル余長処理具10は、図1(a),(b)に示すように、支持金物11と、腕金12と、サポート金物13と、第1および第2のボルト151,152と、第1および第2のナット161,162と、第1乃至第4の取付ナット171〜174と、U字型余長処理金物20と、第1および第2の余長受け部301,302とを具備する。
Embodiments of the optical cable surplus length processing tool and the optical cable surplus length processing method of the present invention will be described below with reference to the drawings.
As shown in FIGS. 1A and 1B, an optical cable surplus length processing tool 10 according to an embodiment of the present invention includes a support metal 11, an arm metal 12, a support metal 13, and first and second components. Bolts 15 1 and 15 2 , first and second nuts 16 1 and 16 2 , first to fourth mounting nuts 17 1 to 17 4 , U-shaped extra length processing hardware 20, first and second Second extra length receiving portions 30 1 and 30 2 are provided.

ここで、支持金物11は、U字型余長処理金物20を支持するためのものであり、L字状の横断面形状を有する。
2本の電柱3(支持物)の間に敷設された光ケーブル1に沿ってかつ電柱3から一定の距離を置いてU字型余長処理金物20を取り付けるために、腕金12の末端部分は、図3に示すように、自在バンド4を用いて電柱3に取り付けられており、また、腕金12の先端部分に、支持金物11が腕金12と互いに直交するように固定されている。なお、支持金物11は、支持金物11の末端部分の底面とサポート金物13との間に腕金12を通し、第1および第2のボルト151,152と第1および第2のナット161,162とによって腕金12を締め付けることにより、腕金12の先端部分に固定されている。
Here, the support hardware 11 is for supporting the U-shaped surplus length processing hardware 20 and has an L-shaped cross-sectional shape.
In order to attach the U-shaped extra length treatment hardware 20 along the optical cable 1 laid between the two utility poles 3 (supports) and at a certain distance from the utility pole 3, the end portion of the arm metal 12 is As shown in FIG. 3, it is attached to the utility pole 3 by using the universal band 4, and the support metal 11 is fixed to the end of the arm metal 12 so as to be orthogonal to the arm metal 12. Note that the support metal 11 passes the arm metal 12 between the bottom surface of the end portion of the support metal 11 and the support metal 13, and the first and second bolts 15 1 and 15 2 and the first and second nuts 16. The arm metal 12 is fastened to the distal end portion of the arm metal 12 by tightening the arm metal 12 with 1 and 16 2 .

U字型余長処理金物20は、U字状に曲げられた金属棒から構成されており、金属棒の底部には水抜き穴21が形成されている。
また、U字型余長処理金物20の両端部にはネジ溝が刻まれており、第1および第2の取付ナット171,172によってU字型余長処理金物20の一端部を支持金物11の底面に固定するとともに、第3および第4の取付ナット173,174によってU字型余長処理金物20の他端部を支持金物11の底面に固定することによって、U字型余長処理金物20は支持金物11に取り付けられている。
The U-shaped surplus length processing hardware 20 is composed of a metal bar bent into a U-shape, and a drain hole 21 is formed at the bottom of the metal bar.
Further, both ends of the U-shaped surplus length processing hardware 20 are engraved with screw grooves, and one end of the U-shaped surplus length processing hardware 20 is supported by the first and second mounting nuts 17 1 and 17 2 . By fixing the other end of the U-shaped surplus length processing hardware 20 to the bottom surface of the supporting hardware 11 while fixing to the bottom surface of the hardware 11 and the third and fourth mounting nuts 17 3 and 17 4 , the U-shaped The extra length processing hardware 20 is attached to the support metal 11.

さらに、U字型余長処理金物20の両端部と底部との間には第1および第2の高さ調整用ネジ溝211,212がそれぞれ形成されており、第1および第2の高さ調整用ネジ溝211,212が形成された部分に第1および第2の余長受け部301,302がそれぞれ取り付けられている。 Further, first and second height adjusting screw grooves 21 1 and 21 2 are formed between the both ends and the bottom of the U-shaped surplus length processing hardware 20, respectively. First and second extra length receiving portions 30 1 and 30 2 are attached to the portions where the height adjusting screw grooves 21 1 and 21 2 are formed, respectively.

すなわち、第1の余長受け部301は、図2に示すように、第1の本体311と、第1および第2の支持用ナット3211,3212とから構成されている。ここで、第1の本体311は、U字型余長処理金物20を貫通させるための貫通孔が形成された環状部と、末端が環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部とから構成されている。第1の余長受け部301は、第1の本体311の環状部を第1および第2の支持用ナット3211,3212で上下から締め付けることにより、U字型余長処理金物20の第1の高さ調整用ネジ溝211が形成された部分に取り付けられている。
第2の余長受け部302についても、同様である。
That is, as shown in FIG. 2, the first extra length receiving portion 30 1 includes a first main body 31 1 and first and second supporting nuts 32 11 and 32 12 . Here, the first body 31 1, faces an annular portion with a through hole for passing the U-shaped extra length handling fittings 20 are formed, the tip with end is fixed to the side surface of the annular portion of the upper It is comprised from the rod-shaped part bent so. The first surplus length receiving portion 30 1 is formed by tightening the annular portion of the first main body 31 1 from above and below with the first and second support nuts 32 11 and 32 12 , whereby the U-shaped surplus length processing hardware 20. The first height adjusting screw groove 21 1 is attached to the portion.
The same applies to the second extra length receiving portion 30 2 .

第1および第2の余長受け部301,302は、図3(a),(b)に示すように、棒状部が2本の電柱3間に敷設された光ケーブル1の敷設方向と直角でかつ互いに反対方向を向くように、U字型余長処理金物20に取り付けられている。
これにより、輪状に巻かれた光ケーブル1の余長部2の上方部分を第1および第2の余長受け部301,302の棒状部に掛けるとともに光ケーブル1の余長部2の下側の中央部をU字型余長処理金物20の底部に置くと、光ケーブル1の余長部2を第1および第2の余長受け部301,302とU字型余長処理金物20の底部とで3点支持することができる。
As shown in FIGS. 3 (a) and 3 (b), the first and second surplus length receiving portions 30 1 and 30 2 are arranged in the direction in which the optical cable 1 in which the rod-shaped portion is laid between the two utility poles 3 is provided. It is attached to the U-shaped surplus length processing hardware 20 so as to be perpendicular to each other and in opposite directions.
Thus, the upper portion of the extra length portion 2 of the optical cable 1 wound in a ring shape is hung on the rod-like portions of the first and second extra length receiving portions 30 1 , 30 2 , and the lower side of the extra length portion 2 of the optical cable 1. Is placed on the bottom of the U-shaped surplus length processing hardware 20, the surplus length 2 of the optical cable 1 is connected to the first and second surplus length receiving portions 30 1 , 30 2 and the U-shaped surplus length processing hardware 20. 3 points can be supported at the bottom of

次に、本実施例による光ケーブル余長処理具10を用いて光ケーブル1の余長処理を行う方法(本発明の一実施例による光ケーブル余長処理方法)について、図3および図4を参照して説明する。
作業者は、図3(a)に示すように、光ケーブル余長処理具10の支持金物11が2本の電柱3間に敷設された光ケーブル1の敷設方向に沿うように、自在バンド4を用いて光ケーブル余長処理具10を電柱3に取り付ける。
Next, with reference to FIG. 3 and FIG. 4, a method for performing extra length processing of the optical cable 1 using the optical cable extra length processing tool 10 according to the present embodiment (optical cable extra length processing method according to an embodiment of the present invention) will be described. explain.
As shown in FIG. 3A, the operator uses the flexible band 4 so that the support metal 11 of the optical cable extra length processing tool 10 is along the laying direction of the optical cable 1 laid between the two utility poles 3. Then, the optical cable extra length processing tool 10 is attached to the utility pole 3.

その後、作業者は、光ケーブル1の余長部2の長さに合わせて第1および第2の余長受け部301,302の高さを調整したのち、第1および第2の本体311,312の環状部を第1乃至第4の支持用ナット3211,3212,3221,3222で上下から軽く締め付ける。
このとき、作業者は、図4に示すように、第1および第2の余長受け部301,302の棒状部が光ケーブル1の敷設方向と直角でかつ同じ方向を向くようにする。
Thereafter, the operator adjusts the heights of the first and second surplus length receiving portions 30 1 and 30 2 in accordance with the length of the surplus length portion 2 of the optical cable 1, and then the first and second main bodies 31. 1, 31 2 of the annular portion of the first to fourth supporting nut 32 11, 32 12, 32 21, 32 22 tightened lightly down.
At this time, as shown in FIG. 4, the worker makes the rod-like portions of the first and second extra length receiving portions 30 1 and 30 2 perpendicular to the laying direction of the optical cable 1 and face the same direction.

その後、作業者は、光ケーブル1の余長部2を第1および第2の余長受け部301,302の棒状部に引っ掛けながら光ケーブル1の余長部2を巻いていく。このとき、作業者は、巻いた光ケーブル1の余長部2の下方部分がU字型余長処理金物20の底部に付くように、光ケーブル1の余長部2を巻いていく。 Thereafter, the operator winds the extra length portion 2 of the optical cable 1 while hooking the extra length portion 2 of the optical cable 1 on the rod-shaped portions of the first and second extra length receiving portions 30 1 and 30 2 . At this time, the operator winds the surplus length portion 2 of the optical cable 1 so that the lower portion of the surplus length portion 2 of the wound optical cable 1 is attached to the bottom of the U-shaped surplus length processing hardware 20.

その後、作業者は、巻いた光ケーブル1の余長部2を第1の余長受け部301の棒状部に掛けたまま第2の余長受け部302の棒状部から取り外したのち、第2の余長受け部302を180度回して、第1および第2の余長受け部301,302の棒状部が図3(b)に示すように互いに反対方向を向くようにする。 Thereafter, the operator removes the extra length portion 2 of the wound optical cable 1 from the rod-like portion of the second extra-length receiving portion 30 2 while hanging on the rod-like portion of the first extra-length receiving portion 301, and then The two extra length receiving portions 30 2 are rotated 180 degrees so that the rod-like portions of the first and second extra length receiving portions 30 1 , 30 2 face in opposite directions as shown in FIG. .

その後、作業者は、取り外した光ケーブル1の余長部2を第2の余長受け部302の棒状部に掛けたのち、第1および第2の本体311,312の環状部を第1乃至第4の支持用ナット3211,3212,3221,3222で上下から強く締め付けて、第1および第2の余長受け部301,302が回らないようにU字型余長処理金物20に取り付ける。 Thereafter, the operator hangs the extra length portion 2 of the removed optical cable 1 on the rod-like portion of the second extra length receiving portion 30 2 , and then attaches the annular portions of the first and second main bodies 31 1 and 31 2 to the first portion. first to fourth supporting nut 32 11, 32 12, 32 21, 32 22 and tightened from above and below, the first and second surplus length receiving portion 30 1, 30 2 is U-shaped extra so not rotate Attached to the long-processed hardware 20.

これにより、光ケーブル1の余長部2の上方部分を第1および第2の余長受け部301,302の棒状部に掛けるとともにその下側の中央部をU字型余長処理金物20の底部に置いて、光ケーブル1の余長部2を第1および第2の余長受け部301,302とU字型余長処理金物20の底部とで3点支持することができる。 As a result, the upper portion of the surplus length portion 2 of the optical cable 1 is hung on the rod-like portions of the first and second surplus length receiving portions 30 1 and 30 2 , and the lower central portion is U-shaped surplus length processing hardware 20. The extra length portion 2 of the optical cable 1 can be supported at three points by the first and second extra length receiving portions 30 1 and 30 2 and the bottom portion of the U-shaped extra length processing hardware 20.

以上の説明では、U字状に曲げられた金属棒から構成されたU字型余長処理金物20を用いたが、U字型余長処理金物20の第1の余長受け部301と底部との間を切った余長処理金物、または、U字型余長処理金物20の第2の余長受け部302と底部との間を切った余長処理金物を用いてもよい。ただし、U字型余長処理金物20の方が強度的には有利である。 In the above description has used a U-shaped extra length processing hardware 20, which is constructed from a metal rod bent into a U-shape, a first extra length receiving portion 30 1 of the U-shaped extra length handling hardware 20 extra length handling hardware cut between the bottom or, may be used extra length handling hardware which cut between the second extra length receiving portion 30 2 and the bottom of the U-shaped extra length processing hardware 20. However, the U-shaped extra length treated hardware 20 is advantageous in terms of strength.

本発明の一実施例による光ケーブル余長処理具10の構成を示す図である。It is a figure which shows the structure of the optical cable surplus length processing tool 10 by one Example of this invention. 図1に示した第1の余長受け部301の構成を示す図である。Is a diagram illustrating a first extra length of the receiving part 30 1 of the configuration shown in FIG. 図1に示した光ケーブル余長処理具10を用いて光ケーブル1の余長処理をした状態を示す図である。It is a figure which shows the state which performed the extra length process of the optical cable 1 using the optical cable extra length processing tool 10 shown in FIG. 図1に示した光ケーブル余長処理具10を用いて光ケーブル1の余長処理をする方法について説明するための図である。It is a figure for demonstrating the method to perform the extra length process of the optical cable 1 using the optical cable extra length processing tool 10 shown in FIG.

符号の説明Explanation of symbols

1 光ケーブル
2 余長部
3 電柱
4 自在バンド
10 光ケーブル余長処理具
11 支持金物
12 腕金
13 サポート金物
151,152 第1および第2のボルト
161,162 第1および第2のナット
171〜174 第1乃至第4の取付ナット
20 U字型余長処理金物
21 水抜き穴
301,302 第1および第2の余長受け部
311,312 第1および第2の本体
3211,3212,3221,3222,第1乃至第4の支持用ナット
DESCRIPTION OF SYMBOLS 1 Optical cable 2 Extra length part 3 Electric pole 4 Free band 10 Optical cable extra length processing tool 11 Support metal 12 Arm metal 13 Support metal 15 1 , 15 2 1st and 2nd bolts 16 1 , 16 2 1st and 2nd nut 17 1-17 4 first through fourth mounting nut 20 U-shaped extra length handling hardware 21 weep holes 30 1, 30 2 first and second surplus length receiving portion 31 1, 31 2 first and second Main body 32 11 , 32 12 , 32 21 , 32 22 , first to fourth support nuts

Claims (9)

光ケーブル(1)を敷設する際に支持物(3)において該光ケーブルの余長部(2)を整理するための光ケーブル余長処理具(10)であって、
支持金物(11)と、
該支持金物に取り付けられた余長処理金物(20)と、
該余長処理金物に前記支持金物から等距離に取り付けられた第1および第2の余長受け部(301,302)と、
を具備し、
前記第1および第2の余長受け部が、前記余長処理金物を貫通させるための貫通孔が形成された環状部および末端が該環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部から構成された第1および第2の本体(311,312)をそれぞれ備える、
ことを特徴とする、光ケーブル余長処理具。
An optical cable surplus length processing tool (10) for arranging the surplus length part (2) of the optical cable in the support (3) when laying the optical cable (1),
Support hardware (11),
Extra length treated hardware (20) attached to the support hardware;
First and second surplus length receiving portions (30 1 , 30 2 ) attached to the surplus length processing hardware at an equal distance from the support hardware;
Comprising
The first and second surplus length receiving portions have an annular portion in which a through-hole for penetrating the surplus length processing hardware is formed and an end thereof is fixed to a side surface of the annular portion, and a tip thereof faces upward. Comprising first and second main bodies (31 1 , 31 2 ) each composed of a bar-shaped portion bent into
An optical cable surplus length processing tool.
前記余長処理金物が、U字状に曲げられた金属棒から構成されたU字型余長処理金物(20)であり、
該U字型余長処理金物の両端部と底部との間に第1および第2の高さ調整用ネジ溝(211,212)がそれぞれ形成されており、
前記第1および第2の余長受け部が、前記U字型余長処理金物の前記第1および第2の高さ調整用ネジ溝が形成された部分に移動可能に取り付けられている、
ことを特徴とする、請求項1記載の光ケーブル余長処理具。
The extra length treated hardware is a U-shaped surplus length treated hardware (20) composed of a metal bar bent into a U-shape,
First and second height adjusting screw grooves (21 1 , 21 2 ) are formed between both ends and bottom of the U-shaped surplus length processing hardware,
The first and second surplus length receiving portions are movably attached to portions where the first and second height adjusting screw grooves are formed in the U-shaped surplus length processing hardware.
The optical cable surplus length processing tool according to claim 1.
前記第1および第2の余長受け部が、該第1および第2の余長受け部の棒状部が互いに反対方向を向くように、前記余長処理金物に取り付けられていることを特徴とする、請求項1または2記載の光ケーブル余長処理具。   The first and second surplus length receiving portions are attached to the surplus length processing hardware such that the rod-shaped portions of the first and second surplus length receiving portions are directed in opposite directions to each other. The optical cable surplus length processing tool according to claim 1 or 2. 末端部分が前記支持物に取り付けられた腕金(12)をさらに具備し、
前記支持金物が、前記腕金と互いに直交するように該腕金の先端部分に固定されていることを特徴とする、請求項1乃至3いずれかに記載の光ケーブル余長処理具。
A brace (12) with an end portion attached to the support;
The optical cable surplus length processing tool according to any one of claims 1 to 3, wherein the support hardware is fixed to a tip portion of the arm metal so as to be orthogonal to the arm metal.
前記支持金物の長さ方向が前記光ケーブルの敷設方向に沿うように、前記腕金の末端部分が前記支持物に固定されていることを特徴とする、請求項1乃至4いずれかに記載の光ケーブル余長処理具。   5. The optical cable according to claim 1, wherein an end portion of the arm metal is fixed to the support so that a length direction of the support metal follows a laying direction of the optical cable. Extra length processing tool. 光ケーブル(1)を敷設する際に支持物(3)において該光ケーブルの余長部(2)を整理するための光ケーブル余長処理方法であって、
支持金物(11)と、該支持金物に取り付けられた余長処理金物(20)と、該余長処理金物に前記支持金物から等距離に取り付けられた第1および第2の余長受け部(301,302)とを具備し、かつ、前記第1および第2の余長受け部が、前記余長処理金物を貫通させるための貫通孔が形成された環状部および末端が該環状部の側面に固定されるとともに先端が上方を向くように曲げられた棒状部から構成された第1および第2の本体(311,312)をそれぞれ備える光ケーブル余長処理具(10)を用い、
前記支持金物が前記光ケーブルの敷設方向に沿うように、前記光ケーブル余長処理具を前記支持物に取り付け、
前記第1および第2の余長受け部の棒状部に前記光ケーブルの余長部を引っ掛けながら該光ケーブルの余長部を巻いていく、
ことを特徴とする、光ケーブル余長処理方法。
An optical cable surplus length processing method for arranging the extra length portion (2) of the optical cable in the support (3) when laying the optical cable (1),
Support metal (11), extra-length processed metal (20) attached to the support metal, and first and second extra-length receiving parts (equal to the extra-treated metal from the support metal) 30 1 , 30 2 ), and the first and second surplus length receiving portions have an annular portion in which a through hole for penetrating the surplus length processing hardware is formed, and the end is the annular portion An optical cable surplus length processing tool (10) provided with first and second main bodies (31 1 , 31 2 ) each composed of a rod-like portion that is fixed to the side surface and bent so that the front end faces upward is used. ,
Attaching the optical cable surplus length processing tool to the support so that the support metal is along the laying direction of the optical cable,
Winding the extra length portion of the optical cable while hooking the extra length portion of the optical cable on the rod-like portion of the first and second extra length receiving portions;
An optical cable surplus length processing method.
前記光ケーブルの余長部を巻いていく際には、前記第1および第2の余長受け部の棒状部を前記光ケーブルの敷設方向と直角でかつ同じ方向を向くようにし、
前記光ケーブルの余長部を巻き終えると、該巻いた光ケーブルの余長部を前記第1の余長受け部の棒状部に掛けたまま前記第2の余長受け部の棒状部から取り外したのちに、該第2の余長受け部の棒状部を180度回して、該第1および第2の余長受け部の棒状部が互いに反対方向を向くようにし、
前記取り外した光ケーブルの余長部を前記第2の余長受け部の棒状部に掛ける、
ことを特徴とする、請求項6記載の光ケーブル余長処理方法。
When winding the extra length portion of the optical cable, the rod-like portions of the first and second extra length receiving portions are perpendicular to the laying direction of the optical cable and face the same direction,
When the extra length portion of the optical cable is finished winding, the extra length portion of the wound optical cable is removed from the rod-like portion of the second extra-length receiving portion while being hung on the rod-like portion of the first extra-length receiving portion. Further, the rod-shaped portion of the second surplus length receiving portion is rotated by 180 degrees so that the rod-shaped portions of the first and second surplus length receiving portions face in opposite directions,
Hang the extra length portion of the removed optical cable on the rod-like portion of the second extra length receiving portion,
The optical cable surplus length processing method according to claim 6.
前記余長処理金物が、U字状に曲げられた金属棒から構成されたU字型余長処理金物(20)であり、
該U字型余長処理金物の両端部と底部との間に第1および第2の高さ調整用ネジ溝(211,212)がそれぞれ形成されており、
前記第1および第2の余長受け部が、前記U字型余長処理金物の前記第1および第2の高さ調整用ネジ溝が形成された部分に移動可能に取り付けられている、
ことを特徴とする、請求項6または7記載の光ケーブル余長処理方法。
The extra length treated hardware is a U-shaped surplus length treated hardware (20) composed of a metal bar bent into a U-shape,
First and second height adjusting screw grooves (21 1 , 21 2 ) are formed between both ends and bottom of the U-shaped surplus length processing hardware,
The first and second surplus length receiving portions are movably attached to portions where the first and second height adjusting screw grooves are formed in the U-shaped surplus length processing hardware.
The optical cable surplus length processing method according to claim 6 or 7, wherein
前記光ケーブルの余長部を前記第1および第2の余長受け部の棒状部に掛けるとともに該光ケーブルの余長部の下側の中央部を前記U字型余長処理金物の底部に置いて、該光ケーブルの余長部を該第1および第2の余長受け部と該U字型余長処理金物の底部とで3点支持することを特徴とする、請求項8記載の光ケーブル余長処理方法。   The extra length portion of the optical cable is hung on the rod-like portion of the first and second extra length receiving portions, and the lower central portion of the extra length portion of the optical cable is placed on the bottom of the U-shaped extra length processing hardware. 9. The optical cable surplus length according to claim 8, wherein the surplus length portion of the optical cable is supported at three points by the first and second surplus length receiving portions and the bottom of the U-shaped surplus length processing hardware. Processing method.
JP2006195513A 2006-07-18 2006-07-18 Optical cable surplus length processing tool and optical cable surplus length processing method Expired - Fee Related JP4536039B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006195513A JP4536039B2 (en) 2006-07-18 2006-07-18 Optical cable surplus length processing tool and optical cable surplus length processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006195513A JP4536039B2 (en) 2006-07-18 2006-07-18 Optical cable surplus length processing tool and optical cable surplus length processing method

Publications (2)

Publication Number Publication Date
JP2008026376A true JP2008026376A (en) 2008-02-07
JP4536039B2 JP4536039B2 (en) 2010-09-01

Family

ID=39117110

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006195513A Expired - Fee Related JP4536039B2 (en) 2006-07-18 2006-07-18 Optical cable surplus length processing tool and optical cable surplus length processing method

Country Status (1)

Country Link
JP (1) JP4536039B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011221399A (en) * 2010-04-13 2011-11-04 Chugoku Electric Power Co Inc:The Excessive cable length processing device and method for processing excess cable length portion
JP2016082439A (en) * 2014-10-17 2016-05-16 日本電信電話株式会社 Construction method for bypass optical line, and bypass optical line system
CN112332346A (en) * 2020-10-28 2021-02-05 江苏亿致通信科技有限公司 Mounting structure of 5G communication cable

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449602Y2 (en) * 1985-08-14 1992-11-24
JPH0521206U (en) * 1991-09-04 1993-03-19 富士通株式会社 Optical cable extra length processing structure
JPH0596805U (en) * 1991-10-29 1993-12-27 イワブチ株式会社 Pillar device for extra length of optical fiber cable
JPH11326647A (en) * 1998-05-11 1999-11-26 Mitsubishi Cable Ind Ltd Excessive-length housing metal fitting for optical fiber cable
JP2000009945A (en) * 1998-06-18 2000-01-14 Fujitsu I-Network Systems Ltd Optical cable holder
JP2002107592A (en) * 2000-09-27 2002-04-10 Uchida Tanko Kk Aerial wiring support for optical cable
JP2002311315A (en) * 2001-04-10 2002-10-23 Kyushu Uchida Tanko Kk Metal fitting for supporting surplus length part of optical fiber cable

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449602Y2 (en) * 1985-08-14 1992-11-24
JPH0521206U (en) * 1991-09-04 1993-03-19 富士通株式会社 Optical cable extra length processing structure
JPH0596805U (en) * 1991-10-29 1993-12-27 イワブチ株式会社 Pillar device for extra length of optical fiber cable
JPH11326647A (en) * 1998-05-11 1999-11-26 Mitsubishi Cable Ind Ltd Excessive-length housing metal fitting for optical fiber cable
JP2000009945A (en) * 1998-06-18 2000-01-14 Fujitsu I-Network Systems Ltd Optical cable holder
JP2002107592A (en) * 2000-09-27 2002-04-10 Uchida Tanko Kk Aerial wiring support for optical cable
JP2002311315A (en) * 2001-04-10 2002-10-23 Kyushu Uchida Tanko Kk Metal fitting for supporting surplus length part of optical fiber cable

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011221399A (en) * 2010-04-13 2011-11-04 Chugoku Electric Power Co Inc:The Excessive cable length processing device and method for processing excess cable length portion
JP2016082439A (en) * 2014-10-17 2016-05-16 日本電信電話株式会社 Construction method for bypass optical line, and bypass optical line system
CN112332346A (en) * 2020-10-28 2021-02-05 江苏亿致通信科技有限公司 Mounting structure of 5G communication cable

Also Published As

Publication number Publication date
JP4536039B2 (en) 2010-09-01

Similar Documents

Publication Publication Date Title
JP2011182704A (en) Mounting device of bird damage preventing device and method for mounting bird damage preventing device
JP4536039B2 (en) Optical cable surplus length processing tool and optical cable surplus length processing method
CN207748631U (en) A kind of electrician&#39;s wire barrow
JP2002107592A (en) Aerial wiring support for optical cable
JP6001002B2 (en) Cable support
CN103779813A (en) Cable fixing device for power distribution cabinet
JP2018085939A (en) Nest building prevention tool
KR101448725B1 (en) Horizontal Supporting of an overhead electric power line
JP2002311315A (en) Metal fitting for supporting surplus length part of optical fiber cable
JP2017038468A (en) Branch-side wire supporting method
CN219885366U (en) Paying-off device for electrical construction
KR200458155Y1 (en) power cable hanger
JP2670300B2 (en) Workbench for overhead line connection
JP2016103870A (en) Wiring fitting exchange and extension tool for overhead ground wire
JP4767077B2 (en) Communication cable suspension arm and communication cable suspension method
JP4637552B2 (en) Bird damage prevention tool temporary support and indirect hot wire method using the same
JP5805528B2 (en) Cable spacing device
CN213536806U (en) Shaft type pay-off rack convenient to adjust
JP2009165260A (en) Cable joint hardware for utility pole
CN215011858U (en) Plant growth equipment frame and plant growth equipment
JP5247266B2 (en) Optical drop cable extra length processing tool
CN211034646U (en) Novel bobbin holder
JP7318307B2 (en) Bird damage prevention tool
KR200449121Y1 (en) a cabel dream
CN116424969A (en) Paying-off device for electrical construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090513

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100428

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100519

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100609

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100615

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4536039

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees