JP2007146402A - Sash window - Google Patents

Sash window Download PDF

Info

Publication number
JP2007146402A
JP2007146402A JP2005339283A JP2005339283A JP2007146402A JP 2007146402 A JP2007146402 A JP 2007146402A JP 2005339283 A JP2005339283 A JP 2005339283A JP 2005339283 A JP2005339283 A JP 2005339283A JP 2007146402 A JP2007146402 A JP 2007146402A
Authority
JP
Japan
Prior art keywords
fixed
frame
shoji
fixing means
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005339283A
Other languages
Japanese (ja)
Other versions
JP4568678B2 (en
Inventor
Satoshi Nakagawa
智 中川
Masaki Okabe
政紀 岡部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YKK AP Inc
Original Assignee
YKK AP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YKK AP Inc filed Critical YKK AP Inc
Priority to JP2005339283A priority Critical patent/JP4568678B2/en
Publication of JP2007146402A publication Critical patent/JP2007146402A/en
Application granted granted Critical
Publication of JP4568678B2 publication Critical patent/JP4568678B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)
  • Wing Frames And Configurations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a sash window which is superior in the designability of an interior appearance, and which can sufficiently reduce the number of sash mounting components and labor for mounting work. <P>SOLUTION: A fixing device 30 for fixing a fixed sash 20A to a window frame 14 (a mullion 16 and a jamb) is concealed with the indoor-side lateral surfaces of the mullion 16 and the jamb, and an interior finishing material; and an operation hole 231 is also closed with a closing member 36. Thus, since the fixing device 30 cannot be seen from an indoor side, the designability of the interior appearance of the sash window 10 can be improved. In the attachment/detachment of a fixed sash 20A, the fixed sash 20A can be fixed to the mullion 16 and the jamb only by detaching the closing member 36 so as to operate an operation part 33, and moving an engaging pin 32 to an engaging position so as to engage it with a retainer member 35; and the fixed sash 20A can be detached by moving the engaging pin 32 to a disengaging position. This enables work for attaching/detaching the fixed sash 20A to be performed with ease. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、サッシ窓に関し、詳しくは、外壁開口部に固定される枠体と、この枠体内部に固定される固定障子とを備えたサッシ窓に関する。   The present invention relates to a sash window, and more particularly, to a sash window including a frame fixed to an opening of an outer wall and a fixed shoji fixed to the inside of the frame.

窓枠の内部に固定障子を固定して構成される嵌め殺し窓において、窓縦枠と障子の縦框とのビス止めを省略することで、部品点数や取付作業手間が削減可能かつ内観意匠性向上を目指した固定障子の取付構造が提案されている(例えば、特許文献1参照)。
特許文献1に記載された固定障子の取付構造は、窓下枠に固定障子の下框を位置決めし、窓上枠に固定した板ばね等からなる係合部材に固定障子の上框を係合させるとともに、係合部材の係合位置からの移動をビスや規制部材などで規制することで、窓枠に対して移動不能に固定障子を取り付けることができるようになっている。
By eliminating the screwing between the vertical window frame and the vertical shovel of the sliding window, it is possible to reduce the number of parts and installation work, and to improve the interior design. A fixed shoji mounting structure that aims to improve has been proposed (see, for example, Patent Document 1).
The mounting structure of the fixed shoji described in Patent Document 1 is such that the lower arm of the fixed shoji is positioned in the lower frame of the window, and the upper arm of the fixed shoji is engaged with an engaging member made of a leaf spring or the like fixed to the upper frame of the window. In addition, by restricting the movement of the engagement member from the engagement position with a screw or a restriction member, the fixed shoji can be attached to the window frame so as not to move.

特開2004−52313号公報JP 2004-52313 A

しかしながら、前記特許文献1に記載の固定障子の取付構造では、係合部材の移動を規制するビスや規制部材などが窓上枠の室内側に露出し、室内側から見えるため、内観の意匠性を必ずしも十分に向上させることができないという問題がある。
また、ビスや規制部材などが室内側から操作可能になっているため、通常使用時において利用者がビスや規制部材を操作して固定障子の固定を解除してしまわないように、これらのビスや規制部材を操作不能にするカバー材や解除防止機構等を別途に設ける必要があり、部品点数が増加してしまったり、障子の着脱の作業が繁雑になってしまったりという不都合が生じることがある。
However, in the fixed shoji mounting structure described in Patent Document 1, a screw or a regulating member that regulates the movement of the engaging member is exposed to the indoor side of the window upper frame and is visible from the indoor side. There is a problem that it cannot always be improved sufficiently.
In addition, since the screws and regulating members can be operated from the indoor side, these screws can be used to prevent the user from operating the screws or regulating members to release the fixed shoji during normal use. It is necessary to separately provide a cover material and a release prevention mechanism that make the operation of the restricting member inconvenient, resulting in inconveniences such as an increase in the number of parts and complicated removal / removal of shoji. is there.

本発明の目的は、内観の意匠性に優れ、障子取付用部品点数および取付作業手間を十分に削減可能なサッシ窓を提供することにある。   The objective of this invention is providing the sash window which is excellent in the design of an interior view, and can fully reduce the number of parts for a shoji attachment, and an installation work effort.

本発明のサッシ窓は、外壁開口部に固定される枠体と、この枠体内部に固定される固定障子とを備えたサッシ窓であって、前記固定障子は、上框、下框、および左右の縦框と、これら上下左右の各框材で囲まれた内部に支持された面材とを有して構成され、前記枠体および前記固定障子の框材のいずれか一方には、他方に設けられた受け部に係合して当該固定障子の移動を規制する固定手段が、当該枠体および框材の少なくとも一方によって室内側から隠蔽された位置において、前記受け部に係合する係合位置と係合しない非係合位置との間を移動自在に設けられ、前記枠体および框材のいずれかの室内露出面には、通常使用時において閉塞部材で塞がれた操作孔が形成され、前記固定障子の着脱時において前記閉塞部材を取り外すことで、前記操作孔を介して前記固定手段が係合位置または非係合位置に移動操作可能に構成されていることを特徴とする。   The sash window of the present invention is a sash window including a frame body fixed to the outer wall opening, and a fixed shoji fixed to the inside of the frame body. It is configured to have left and right vertical rods and a face material supported inside surrounded by the vertical, horizontal, and horizontal rods, and either one of the frame and the fixed shoji frame has the other The engaging means that engages with the receiving portion provided on the door and restricts the movement of the fixed shoji is engaged with the receiving portion at a position concealed from the indoor side by at least one of the frame and the saddle member. An operation hole that is freely movable between a mating position and a non-engaging position that is not engaged, and that is closed by a closing member during normal use, is provided on the indoor exposed surface of either the frame or the saddle member. Formed, by removing the blocking member at the time of attachment and detachment of the fixed shoji, The fixing means through the serial operation hole is characterized in that it is moved operably configured to engaged position or disengaged position.

このような本発明によれば、受け部に係合して固定障子を枠体に固定する固定手段を、室内側から操作孔を介してでなければ操作できない隠蔽された位置に設けたので、固定手段が室内側から見えずサッシ窓の内観意匠性を向上させることができる。
さらに、通常使用時において、操作孔を閉塞部材で塞いで固定手段を操作不能にしたことで、利用者が誤って固定手段を操作して固定障子を外してしまうようなことが防止できる。一方、固定障子の着脱時において、閉塞部材を取り外して固定手段を係合位置に移動させ、受け部に係合させるだけで固定障子を枠体に固定し、非係合位置に移動させることで固定障子を取り外すことができ、固定障子の取り付けや取り外しの作業を容易に実施することができる。そして、閉塞部材は、操作孔を塞ぐだけの簡単な構造でよいため、複雑な構造の部品や機構を別途設ける必要がなく、少ない部品点数にて上述のような効果を奏することができる。
According to the present invention, since the fixing means for engaging the receiving portion and fixing the fixed shoji to the frame is provided at a concealed position that can only be operated from the indoor side through the operation hole, The interior design of the sash window can be improved because the fixing means is not visible from the indoor side.
Furthermore, during normal use, the operation hole is closed with a blocking member to make the fixing means inoperable, thereby preventing the user from accidentally operating the fixing means and removing the fixed shoji. On the other hand, at the time of attaching / detaching the fixed shoji, by removing the closing member, moving the fixing means to the engaging position, and fixing the fixed shoji to the frame simply by engaging with the receiving portion, and moving it to the non-engaging position. The fixed shoji can be removed, and the operation of attaching and removing the fixed shoji can be easily performed. Since the closing member may have a simple structure that only blocks the operation hole, it is not necessary to separately provide components and mechanisms having complicated structures, and the above-described effects can be achieved with a small number of components.

この際、本発明のサッシ窓では、前記固定手段は、前記固定障子の框材に沿ってスライド自在に支持されたスライド部材と、このスライド部材に固定されて前記受け部に係合可能な少なくとも1つの係合ピンと、前記スライド部材をスライド操作可能に前記操作孔の近傍位置に設けられた操作部とを有して構成され、前記受け部は、前記固定手段が設けられた框材と対向する前記枠体に設けられていることが好ましい。
このような構成によれば、スライド部材、係合ピンおよび操作部を有して固定手段を構成したことで、スライド部材の長さ、つまり操作部と係合ピンとの間の距離を適宜設定することができ、例えば、操作部の近傍に設けられる操作孔を目立たない位置に設けるとともに、係合ピンおよび受け部を障子の固定に適した位置に設けるなど、各部の機能に応じて適切な部材配置が可能になる。この際、スライド部材に固定する係合ピンの数は、固定障子の大きさ等に応じて適宜設定可能であり、1つのスライド部材に対して2つ以上の係合ピンを固定した場合でも、これらの係合ピンをスライド部材で連動させて一度の操作で移動させることができ、障子の着脱作業が煩雑になることが防止できる。
In this case, in the sash window of the present invention, the fixing means includes at least a slide member that is slidably supported along the saddle member of the fixed shoji, and at least engageable with the receiving portion by being fixed to the slide member. One engaging pin and an operation part provided in the vicinity of the operation hole so that the slide member can be slidably operated are configured, and the receiving part is opposed to the collar member provided with the fixing means. It is preferable that the frame body is provided.
According to such a configuration, since the fixing means is configured by including the slide member, the engagement pin, and the operation portion, the length of the slide member, that is, the distance between the operation portion and the engagement pin is appropriately set. For example, an operation hole provided in the vicinity of the operation unit is provided at an inconspicuous position, and an engagement pin and a receiving unit are provided at a position suitable for fixing the shoji. Placement becomes possible. At this time, the number of engagement pins to be fixed to the slide member can be appropriately set according to the size of the fixed shoji, etc., and even when two or more engagement pins are fixed to one slide member, These engagement pins can be moved by a single operation in conjunction with a slide member, and the operation of attaching and removing the shoji can be prevented from becoming complicated.

さらに、本発明のサッシ窓では、前記固定手段の操作部は、前記スライド部材に固定されて前記操作孔側に延びる突片から構成され、前記閉塞部材は、前記操作孔に貫入される貫入部を有して形成され、前記固定手段が係合位置にない状態において、前記貫入部が前記操作部に当接して当該閉塞部材が前記操作孔を閉塞不能に構成され、前記貫入部には、前記固定手段が係合位置にある状態において、前記操作部に当接して当該固定手段の非係合位置への移動を規制する規制部が設けられていることが好ましい。
このような構成によれば、固定手段が係合位置にない状態、すなわち係合ピンと受け部とが係合せずに固定障子が固定されていない状態では、操作孔を塞ぐ位置(閉塞位置)まで閉塞部材の貫入部が貫入できないようになっているので、固定障子が非固定であることが容易に判別でき、固定手段が室内側から隠蔽されていても取付作業を確実に実施することができる。一方、固定手段が係合位置にあれば、貫入部を閉塞位置まで貫入することができ、この状態において、規制部が操作部である突片に当接することで固定手段の移動を規制することで、係合ピンと受け部との係合が外れることを防止して固定障子の取付状態が良好に維持できる。
Furthermore, in the sash window of the present invention, the operation portion of the fixing means is constituted by a projecting piece that is fixed to the slide member and extends toward the operation hole side, and the blocking member is a penetration portion that penetrates into the operation hole. In the state where the fixing means is not in the engagement position, the penetrating portion abuts on the operation portion, and the closing member is configured not to close the operation hole. In a state where the fixing means is in the engaged position, it is preferable that a restricting portion is provided that contacts the operation portion and restricts the movement of the fixing means to the non-engaged position.
According to such a configuration, in a state where the fixing means is not in the engaged position, that is, in a state where the engaging pin and the receiving portion are not engaged and the fixed shoji is not fixed, the position until the operation hole is closed (closed position) is reached. Since the penetration portion of the blocking member cannot be penetrated, it can be easily determined that the fixed shoji is not fixed, and the mounting operation can be reliably performed even if the fixing means is hidden from the indoor side. . On the other hand, if the fixing means is in the engaging position, the penetration portion can be penetrated to the closing position, and in this state, the movement of the fixing means is restricted by the contact of the restricting portion with the projecting piece that is the operating portion. Therefore, it is possible to prevent the engagement pin and the receiving portion from being disengaged and to maintain the fixed state of the fixed shoji satisfactorily.

また、本発明のサッシ窓では、前記固定手段の操作部は、前記スライド部材に固定された第1部材と、この第1部材に回動自在に連結された第2部材とを有して構成され、前記第2部材は、一端が前記第1部材に連結される連結片部と、この連結片部の他端に連続して折れ曲がって前記操作孔から室内空間に突出可能な操作片部とを有して形成され、前記第2部材の操作片部を前記操作孔に押し込むことで、前記第1部材を介して前記スライド部材がスライドされて前記係合ピンが前記受け部に係合され、この係合位置において、前記操作片部が前記枠体または框材に当接することで、当該固定手段が係合位置に維持されるとともに、前記操作片部を前記操作孔から室内側に引き出すことで、当該固定手段が非係合位置へ移動可能に構成されていてもよい。
このような構成によれば、固定手段の操作部を構成する第2部材の操作片部を操作孔に押し込むことで、固定手段を係合位置に移動させることができるとともに、操作片部を操作孔から引き出すことで固定手段を非係合位置に移動させることができ、固定障子の固定作業または固定解除作業を容易に実施することができる。さらに、固定手段が係合位置にある状態において、第2部材の操作片部が枠体または框材に当接することで、固定手段を係合位置に維持することができ、係合ピンと受け部との係合が外れることを防止して固定障子の取付状態が良好に維持できる。
In the sash window according to the present invention, the operation portion of the fixing means includes a first member fixed to the slide member and a second member rotatably connected to the first member. The second member includes a connection piece portion whose one end is connected to the first member, and an operation piece portion that is continuously bent to the other end of the connection piece portion and can protrude into the indoor space from the operation hole. By pushing the operation piece portion of the second member into the operation hole, the slide member is slid through the first member and the engagement pin is engaged with the receiving portion. In this engagement position, the operation piece portion comes into contact with the frame body or the saddle member, so that the fixing means is maintained in the engagement position, and the operation piece portion is pulled out from the operation hole to the indoor side. The fixing means is configured to be movable to the non-engagement position. It can have.
According to such a configuration, by pushing the operation piece portion of the second member constituting the operation portion of the fixing means into the operation hole, the fixing means can be moved to the engagement position and the operation piece portion can be operated. By pulling out from the hole, the fixing means can be moved to the non-engagement position, and the fixing operation or fixing release operation of the fixed shoji can be easily performed. Furthermore, in a state where the fixing means is in the engagement position, the fixing means can be maintained in the engagement position by the operation piece portion of the second member coming into contact with the frame body or the saddle member. It is possible to prevent the disengagement from being disengaged, and to maintain the attachment state of the fixed shoji favorably.

さらに、本発明のサッシ窓では、前記固定手段の操作部は、前記枠体または框材に固定された第1部材と、この第1部材に回動自在に支持されて一端部が前記スライド部材に連結され他端部が前記操作孔側に延びる第2部材とを有して構成され、前記第1部材および第2部材は、いずれか一方に設けられた支軸を他方に設けられた軸孔に挿通することで連結され、これらの支軸および軸孔には、当該固定手段が係合位置に位置した状態で前記第2部材の回動を規制する規制部が形成され、前記他端部を操作して前記第2部材を回動させることで、当該第2部材の一端部を介して前記スライド部材がスライドされて前記係合ピンが前記受け部に係合され、この係合位置において、前記第1部材および第2部材における支軸および軸孔の規制部が当該第2部材の回動を規制することで、当該固定手段が係合位置に維持されるとともに、前記規制部の規制を解除することで、前記第2部材の回動規制が解除されて当該固定手段が非係合位置へ移動可能に構成されていてもよい。
このような構成によれば、固定手段の操作部を構成する第2部材の他端部を操作して第2部材を回動させることで、固定手段を係合位置に移動させることができるとともに、この状態において支軸および軸孔の規制部で第2部材の回動を規制することで、固定手段を係合位置に維持することができ、係合ピンと受け部との係合が外れることを防止して固定障子の取付状態が良好に維持できる。さらに、支軸および軸孔の規制部による規制を解除することで、固定手段を非係合位置に移動させることができる。
Furthermore, in the sash window of the present invention, the operation portion of the fixing means includes a first member fixed to the frame body or the saddle member, and one end portion of the slide member that is rotatably supported by the first member. And the other end of the second member extends toward the operation hole. The first member and the second member have a shaft provided on one of them and a shaft provided on the other. The support shaft and the shaft hole are connected by being inserted into the hole, and a restricting portion for restricting the rotation of the second member is formed in a state where the fixing means is located at the engagement position. When the second member is rotated by operating the part, the slide member is slid through one end of the second member, and the engagement pin is engaged with the receiving part. In the first member and the second member, the support shaft and the shaft hole restricting portion are By restricting the rotation of the second member, the fixing means is maintained in the engaged position, and by releasing the restriction of the restricting portion, the rotation restriction of the second member is released and the The fixing means may be configured to be movable to the non-engagement position.
According to such a configuration, the fixing means can be moved to the engaging position by operating the other end of the second member constituting the operation portion of the fixing means and rotating the second member. In this state, by restricting the rotation of the second member by the restriction portion of the support shaft and the shaft hole, the fixing means can be maintained at the engagement position, and the engagement between the engagement pin and the receiving portion is released. This prevents the fixed shoji from being attached. Furthermore, the fixing means can be moved to the non-engagement position by releasing the restriction by the restriction part of the support shaft and the shaft hole.

また、本発明のサッシ窓では、前記操作孔は、前記固定障子の縦框下端部に形成され、前記閉塞部材は、前記縦框に沿って流れ落ちた結露水が室内側に流れることを防止する結露水受け部を有して構成されていることが好ましい。
このような構成によれば、内観上、目立たない位置である縦框下端部に操作孔を形成し、この操作孔を閉塞部材で塞ぐことで、さらにサッシ窓の意匠性を向上させることができる。また、閉塞部材に結露水受け部を設ける、つまり結露受け部材と兼用することで、結露水受け部材を別体で設ける場合と比較して、部品点数をより一層削減することができる。さらに、結露水受け部を設けたことで、結露水が室内側に流れないようにでき、結露水による汚れの付着等を防止してサッシ窓の美観を維持することができる。
Further, in the sash window of the present invention, the operation hole is formed at a lower end portion of the vertical shaft of the fixed shoji, and the blocking member prevents the condensed water that has flowed down along the vertical shaft from flowing into the indoor side. It is preferable to have a condensed water receiver.
According to such a configuration, it is possible to further improve the design of the sash window by forming the operation hole in the lower end portion of the vertical hook that is inconspicuous from the inside and closing the operation hole with the closing member. . Further, by providing the dew condensation water receiving portion on the closing member, that is, also serving as the dew condensation receiving member, the number of parts can be further reduced as compared with the case where the dew condensation water receiving member is provided separately. Furthermore, by providing the dew condensation water receiving portion, it is possible to prevent the dew condensation water from flowing into the indoor side, and it is possible to prevent adhesion of dirt due to the dew condensation water and maintain the appearance of the sash window.

また、本発明のサッシ窓では、前記枠体は、上枠、下枠、および左右の縦枠を有した窓枠と、この窓枠の内部を上下および/または左右に仕切る横仕切り材および縦仕切り材のうち少なくとも一方とを有して構成されており、これらの仕切り材で仕切った枠体内部の区画のうちの少なくとも1つに前記固定障子が配置され、前記固定障子は、前記上框および下框が前記上枠、下枠および横仕切り材のうちの互いに対向する二辺に位置決めされるとともに、前記左右の縦框に設けた前記固定手段が前記左右の縦枠および前記縦仕切り材のうちの互いに対向する二辺に設けた前記受け部に係合されて前記区画内に固定されていることが好ましい。
このような構成によれば、固定障子の上框および下框を位置決めした状態で左右の縦框を固定手段および受け部で固定することで、固定障子の四周全てが枠体に支持されるため強固に固定することができる。さらに、固定障子の取り付け時および取り外し時において、固定手段を受け部に係合していなくても、上框および下框が枠体に位置決めされているので、固定障子を作業者が支持しておく必要がなく、取り付けや取り外しの作業性を一層向上させることができる。
Further, in the sash window of the present invention, the frame body includes a window frame having an upper frame, a lower frame, and left and right vertical frames, and a horizontal partition member and a vertical partition that divide the inside of the window frame into upper and lower and / or left and right. At least one of the partition members is configured, and the fixed shoji is disposed in at least one of the compartments inside the frame body partitioned by these partition members. And the lower rod are positioned on two opposite sides of the upper frame, the lower frame, and the horizontal partition member, and the fixing means provided on the left and right vertical rods includes the left and right vertical frames and the vertical partition member. It is preferable to be engaged with the receiving portions provided on two sides facing each other and fixed in the compartment.
According to such a configuration, by fixing the left and right vertical hooks with the fixing means and the receiving portion in a state where the upper and lower hooks of the fixed shoji are positioned, all four turns of the fixed shoji are supported by the frame. It can be firmly fixed. Furthermore, when attaching and removing the fixed shoji, even if the fixing means is not engaged with the receiving portion, the upper and lower eyelids are positioned on the frame, so that the operator supports the fixed shoji. Therefore, the workability of attachment and removal can be further improved.

この際、本発明のサッシ窓では、前記枠体内部の区画のうち少なくとも1つの区画には、前記固定障子が配置されずに当該枠体に対して開閉自在に支持された可動障子が配置され、前記可動障子は、前記固定障子の上下左右の各框材と共通の框材を有して構成されるとともに、閉鎖状態において前記固定障子と略同一の見込み位置に取り付けられていることが好ましい。
このような構成によれば、枠体内部の区画ごとに固定障子および可動障子を選択的に配置してサッシ窓を構成する場合に、固定障子と可動障子とで框材を共通化し、かつ略同一見込み位置に配置したことで、部品点数の削減を一層促進させることができるとともに、サッシ窓の意匠性をより一層良好にすることができる。そして、このように固定障子および可動障子で框材を共通化した場合において、前述のような固定手段と受け部とを有した固定障子の固定構造を採用したことで、框材や枠体に対する加工を必要最小限にすることができ、サッシ窓の製造コストを抑えつつ、意匠性や取付作業性を向上させることができる。
At this time, in the sash window of the present invention, at least one of the compartments inside the frame body is provided with a movable shoddle supported so as to be openable and closable with respect to the frame body without the fixed shoji. In addition, it is preferable that the movable shoji is configured to have a common saddle material for the upper, lower, left, and right saddle members of the fixed shoji, and is attached to a position approximately the same as the fixed shoji in the closed state. .
According to such a configuration, when the sash window is configured by selectively disposing fixed and movable shojis for each section inside the frame body, the fixed material and the movable shoji are made common to the saddle material, and substantially By arranging at the same prospective position, the reduction in the number of parts can be further promoted, and the design of the sash window can be further improved. And in the case where the saddle material is shared by the fixed shoddle and the movable shoji in this way, by adopting the fixing structure of the fixed shodder having the fixing means and the receiving portion as described above, it is possible for the saddle material and the frame body. Processing can be minimized, and design and mounting workability can be improved while suppressing the manufacturing cost of the sash window.

以下、本発明の各実施形態を図面に基づいて説明する。
なお、第2実施形態以降において、次の第1実施形態で説明する構成部材と同じ構成部材、および同様な機能を有する構成部材には、第1実施形態の構成部材と同じ符号を付し、それらの説明を省略または簡略化する。また、各図においては、主要構成部品の断面を示すハッチングを省略する場合がある。
Hereinafter, each embodiment of the present invention will be described with reference to the drawings.
In the second and subsequent embodiments, the same constituent members as those described in the first embodiment and the constituent members having the same functions are denoted by the same reference numerals as those in the first embodiment. Those descriptions are omitted or simplified. Moreover, in each figure, the hatching which shows the cross section of main components may be abbreviate | omitted.

〔第1実施形態〕
図1は、本発明の第1実施形態に係るサッシ窓10が設けられた建物の外壁1の開口部を示す縦断面図である。図2は、外壁1の開口部を示す横断面図である。
図1、2において、建物の外壁1は、外壁躯体としての木造軸組み工法による軸組み材2と、この軸組み材2の室外面に設けられた外壁仕上げ材である吹付けモルタル3と、軸組み材2の室内面に設けられた内壁材である石膏ボード4とを有して構成されている。そして、外壁1の開口部室内側には、開口端縁に沿って内装仕上げ材である木製の額縁材(ケーシング)5が四周連続して取り付けられている。
なお、外壁躯体としては、木造の軸組み材2に限らず、2×4工法における壁パネルや鉄筋コンクリート造の壁であってもよく、また、外壁仕上げ材は、吹付けモルタル3に限らず、予め板状に成形したセメント成形板や窯業系サイディング等を外壁躯体の室外面に取り付けたものでもよい。
[First Embodiment]
FIG. 1 is a longitudinal sectional view showing an opening of an outer wall 1 of a building provided with a sash window 10 according to the first embodiment of the present invention. FIG. 2 is a cross-sectional view showing the opening of the outer wall 1.
1 and 2, the outer wall 1 of the building includes a wooden frame construction method 2 as a wooden frame construction method as an outer wall frame, and a sprayed mortar 3 that is an outer wall finishing material provided on the outdoor surface of the shaft construction material 2. It has a gypsum board 4 that is an inner wall material provided on the interior surface of the shaft assembly 2. And the wooden frame material (casing) 5 which is an interior finishing material is attached to the opening room indoor side of the outer wall 1 continuously four times along the opening edge.
The outer wall frame is not limited to the wooden frame member 2 but may be a wall panel or a reinforced concrete wall in the 2 × 4 method, and the outer wall finishing material is not limited to the sprayed mortar 3, A cement molded plate or ceramic siding formed in advance in a plate shape may be attached to the outdoor surface of the outer wall frame.

サッシ窓10は、外壁1の開口部に固定された上枠11、下枠12、および左右の縦枠13からなる窓枠14と、この窓枠14の内部を上下左右に仕切る仕切り材としての無目(横仕切り材)15および方立(縦仕切り材)16とからなる枠体を備え、これらの無目15および方立16で仕切った窓枠14内部の区画ごとに障子20が設けられて構成されている。また、無目15および方立16の室内側側面には、それぞれ下地材151,161が固定されており、これらの下地材151,161に前述の額縁材5と同様の額縁材152,162が固定されている。このようにサッシ窓10では、その上枠11、下枠12、縦枠13の室内側側面と、無目15および方立16の室内側側面とが、それぞれ額縁材5と額縁材152,162とで覆われ(隠蔽され)て室内側から見えないようになっている。   The sash window 10 is a window frame 14 composed of an upper frame 11, a lower frame 12, and left and right vertical frames 13 fixed to the opening of the outer wall 1, and a partition material that partitions the inside of the window frame 14 in the vertical and horizontal directions. A shoji 20 is provided for each section inside the window frame 14 partitioned by the intangible 15 and the vertical 16, and provided with a frame composed of the invisible (horizontal partition) 15 and the vertical (vertical partition) 16. Configured. In addition, base materials 151 and 161 are fixed to the interior side surfaces of the intangible 15 and the vertical 16, respectively. Frame materials 152 and 162 similar to the frame material 5 described above are attached to the base materials 151 and 161, respectively. It is fixed. As described above, in the sash window 10, the interior side surfaces of the upper frame 11, the lower frame 12, and the vertical frame 13, and the interior side surfaces of the intangible 15 and the vertical 16 are respectively the frame material 5 and the frame materials 152 and 162. It is covered with (and concealed) so that it cannot be seen from the indoor side.

障子20は、窓枠14の区画に固定された固定障子20Aと、窓枠14の区画に開閉可能に支持された可動障子(外開き障子)20Bとが、それぞれ仕切られた窓枠14内部の区画ごとに選択的に配置され、可動障子20Bの室内側には、収納式の網戸17が設けられている。そして、固定障子20Aおよび可動障子20Bは、それぞれ共通化された構成部材である上框21、下框22、左右の縦框23と、これら上下左右の框材21,22,23の内部に嵌め込んだガラスパネル24とを有して形成されている。また、固定障子20Aおよび閉鎖状態の可動障子20Bは、それぞれ窓枠14に対して略同一の見込み位置に取り付けられている。このような固定障子20Aおよび可動障子20Bの上框21、下框22、および縦框23は、上枠11、下枠12、縦枠13、無目15、方立16のいずれかの見込み方向室外側に重なって配置され、額縁材5や額縁材152,162によって室内側から隠蔽された隠し框となっている。   The shoji 20 includes a stationary shoji 20A fixed to the section of the window frame 14 and a movable shoji 20B that is supported by the section of the window frame 14 so as to be openable and closable (outside opening shoji) 20B. A retractable screen door 17 is provided on the indoor side of the movable shoji 20B. The fixed shoddle 20A and the movable shoddle 20B are fitted into the upper and lower saddles 22, 22 and left and right vertical rods 23, and the upper, lower, left and right vertical members 21, 22, and 23, which are common components. And a glass panel 24 embedded therein. Further, the fixed shoji 20A and the closed movable shoji 20B are respectively attached to the window frame 14 at substantially the same expected position. Such an upper arm 21, a lower arm 22, and a vertical arm 23 of the fixed shoddle 20A and the movable shoji 20B are in the prospective direction of any one of the upper frame 11, the lower frame 12, the vertical frame 13, the blank 15, and the vertical 16 It is arranged so as to overlap the outdoor side, and is a concealed cover concealed from the indoor side by the frame material 5 and the frame materials 152 and 162.

固定障子20Aは、その下框22に固定したセッティングブロック221を下枠12(または無目15)上面に位置決めするとともに、無目15(または上枠11)に取り付けた板ばね211に上框21を係止することで、窓枠14内部の区画に建て込まれる。さらに、固定障子20Aは、後述する固定装置(固定手段)30を構成する係合ピン32が、方立16(または縦枠13)に固定した受け材(受け部)35に係合することで、窓枠14、無目15および方立16に対して移動不能に固定されるようになっている。このような固定障子20Aの上框21を無目15(または上枠11)に設けた気密材153,154(または気密材111,112)に当接させ、下框22を下枠12(または無目15)に設けた気密材121,122(または気密材153,154)に当接させ、縦框23を方立16(または縦枠13)に設けた気密材163,164(または気密材131,132)に当接させることで、固定障子20Aにおける気密性および水密性が確保できるようになっている。   In the fixed shoji 20A, the setting block 221 fixed to the lower collar 22 is positioned on the upper surface of the lower frame 12 (or the no-frame 15), and the upper collar 21 is attached to the leaf spring 211 attached to the no-frame 15 (or the upper frame 11). Is built in the compartment inside the window frame 14. Further, in the fixed shoji 20A, an engagement pin 32 constituting a fixing device (fixing means) 30 described later is engaged with a receiving material (receiving portion) 35 fixed to the vertical 16 (or the vertical frame 13). The window frame 14, the mesh 15, and the vertical 16 are fixed so as not to move. The upper lid 21 of the fixed shoji 20A is brought into contact with the airtight materials 153 and 154 (or the airtight materials 111 and 112) provided on the seamless frame 15 (or the upper frame 11), and the lower collar 22 is moved to the lower frame 12 (or The airtight materials 121 and 122 (or airtight materials 153 and 154) provided in the mesh 15) are brought into contact with the airtight materials 163 and 164 (or airtight materials) provided with the vertical rod 23 in the vertical 16 (or the vertical frame 13). 131, 132), the airtightness and watertightness of the fixed shoji 20A can be secured.

一方、可動障子20Bは、その上框21が上枠11(または無目15)にヒンジ212を介して連結されるとともに、下框22が無目15(または下枠12)にヒンジ222を介して連結されることで、開閉自在に支持されている。そして、可動障子20Bの一方の縦框23に設けたハンドル233を操作することで、室外側に向かって開放可能かつ閉じた状態で施錠可能になっている。このような可動障子20Bを閉じた状態において、その上框21を上枠11(または無目15)に設けた気密材111,112(または気密材153,154)に当接させ、下框22を無目15(または下枠12)に設けた気密材153,154(または気密材121,122)に当接させ、縦框23を縦枠13および方立16に設けた気密材131,132,163,164に当接させることで、可動障子20Bにおける気密性および水密性が確保できるようになっている。   On the other hand, in the movable shoji 20B, the upper collar 21 is connected to the upper frame 11 (or the mesh 15) via the hinge 212, and the lower collar 22 is coupled to the mesh 15 (or the lower frame 12) via the hinge 222. Are connected to each other so that they can be opened and closed. And by operating the handle 233 provided on one vertical rod 23 of the movable shoji 20B, it can be opened toward the outdoor side and locked in a closed state. In such a state that the movable shoji 20B is closed, the upper lid 21 is brought into contact with the airtight members 111 and 112 (or the airtight members 153 and 154) provided on the upper frame 11 (or the mesh 15), and the lower lid 22 Are in contact with the airtight members 153 and 154 (or the airtight members 121 and 122) provided on the seamless frame 15 (or the lower frame 12), and the airtight members 131 and 132 provided with the vertical rod 23 on the vertical frame 13 and the vertical frame 16 are provided. , 163, and 164, the airtightness and watertightness of the movable shoji 20B can be secured.

次に、図3〜図7も参照してサッシ窓10における固定障子20Aの固定構造および取付方法について詳しく説明する。
図3は、固定障子20Aの縦框23および方立16を拡大して示す横断面図である。図4は、固定障子20Aの固定装置30を示す斜視図である。図5および図6は、それぞれ固定障子20Aの建て込み手順を示す縦断面図である。図7(A)〜(C)は、固定障子20Aの固定方法を示す縦断面図である。
図3、4に示すように、固定障子20Aの固定装置30は、縦框23に沿って上下スライド自在に支持されたスライド部材31と、このスライド部材31に固定されて縦框23の見付け方向外側に突出した係合ピン32と、スライド部材31の下部に固定されて縦框23の見付け方向内側(操作孔231側)に延びる操作部としての突片33とを有して構成されている。また、固定装置30の縦框23に対向する方立16(または縦枠13)の側面には、係合ピン32と係合可能な受け材35が固定されている。そして、縦框23の見付け方向内側面の下端部には、固定装置30の突片33を操作するための操作孔231が形成されており、この操作孔231(図4参照)は、通常使用時において閉塞部材36で塞がれるようになっている。
Next, with reference to FIGS. 3 to 7 as well, the fixing structure and mounting method of the fixed shoji 20A in the sash window 10 will be described in detail.
FIG. 3 is an enlarged cross-sectional view showing the vertical fence 23 and the vertical 16 of the fixed shoji 20A. FIG. 4 is a perspective view showing the fixing device 30 of the fixed shoji 20A. FIG. 5 and FIG. 6 are longitudinal sectional views showing a procedure for installing the fixed shoji 20A. 7A to 7C are longitudinal sectional views showing a method of fixing the fixed shoji 20A.
As shown in FIGS. 3 and 4, the fixing device 30 of the fixed shoji 20 </ b> A includes a slide member 31 that is supported so as to be vertically slidable along the vertical rod 23, and a direction in which the vertical rod 23 is located by being fixed to the slide member 31. The engaging pin 32 protrudes to the outside, and the protruding piece 33 is fixed to the lower portion of the slide member 31 and extends as an operation portion extending inwardly in the direction of finding the vertical rod 23 (on the operation hole 231 side). . A receiving member 35 that can engage with the engaging pin 32 is fixed to the side surface of the vertical 16 (or the vertical frame 13) facing the vertical rod 23 of the fixing device 30. And the operation hole 231 for operating the protrusion 33 of the fixing device 30 is formed in the lower end part of the inner side surface of the vertical rod 23 in the finding direction, and this operation hole 231 (see FIG. 4) is used normally. At this time, the closing member 36 is closed.

固定装置30のスライド部材31は、金属板材から長尺状に形成され、固定障子20Aの縦框23に保持されている。係合ピン32は、スライド部材31における所定位置、すなわち固定障子20Aの高さ略中央の1箇所、あるいは固定障子20Aの高さを三分割した2箇所等、固定障子20Aの大きさに応じた適宜な位置に設けられている。そして、受け材35は、係合ピン32に対応した方立16(または縦枠13)の高さ位置に設けられている。なお、係合ピン32に係合する受け部としては、方立16や縦枠13と別体に形成された受け材35に限らず、方立16や縦枠13と一体の突出片から構成されていてもよい。また、突片33は、金属板材から凹溝部を有して形成されており、閉塞部材36を取り外した操作孔231を介して挿入したドライバー等の工具Tを凹溝部に引っ掛けて突片33を上下操作することで、係合ピン32が受け材35に係合する係合位置と係合しない非係合位置との間をスライド部材31および係合ピン32が上下移動できるようになっている。以上のスライド部材31、係合ピン32、突片33および受け材35は、方立16(または縦枠13)の室内側側面部165で隠蔽され室内側から見えないようになっている。   The slide member 31 of the fixing device 30 is formed in a long shape from a metal plate material, and is held by the vertical rod 23 of the fixed shoji 20A. The engagement pin 32 corresponds to the size of the fixed shoddle 20A, such as a predetermined position on the slide member 31, that is, one place approximately at the center of the fixed shoddle 20A, or two places obtained by dividing the height of the fixed shoddle 20A into three parts. It is provided at an appropriate position. The receiving member 35 is provided at a height position of the vertical 16 (or the vertical frame 13) corresponding to the engagement pin 32. The receiving portion that engages with the engaging pin 32 is not limited to the receiving member 35 that is formed separately from the vertical 16 and the vertical frame 13, but includes a protruding piece that is integral with the vertical 16 and the vertical frame 13. May be. Further, the projecting piece 33 is formed with a concave groove portion from a metal plate material, and a tool T such as a screwdriver inserted through the operation hole 231 from which the closing member 36 is removed is hooked on the concave groove portion, and the projecting piece 33 is formed. By operating up and down, the slide member 31 and the engagement pin 32 can move up and down between an engagement position where the engagement pin 32 engages with the receiving member 35 and a non-engagement position where the engagement pin 32 does not engage. . The slide member 31, the engaging pin 32, the protruding piece 33, and the receiving member 35 are concealed by the indoor side surface portion 165 of the vertical 16 (or the vertical frame 13) so that they cannot be seen from the indoor side.

閉塞部材36は、樹脂製の一体成形部品であって、操作孔231に貫入される貫入部361と、この貫入部361を操作孔231に貫入した状態で縦框23の側面に密接する結露水受け部362とを有して形成されている。結露水受け部362は、室外側に向かって下がる傾斜面を有して形成され、縦框23に沿って流れ落ちた結露水を受けて室外側に流し、結露水が室内側に流れることを防止できるようになっている。また、閉塞部材36は、スライド部材31、係合ピン32、突片33が係合位置よりも下がった状態で操作孔231に貫入部361を貫入しようとした場合には、貫入部361の先端が突片33の側面に当接するとともに、スライド部材31、係合ピン32、突片33が係合位置にある状態で貫入部361を貫入すれば、貫入部361の上面が突片33の下面に当接するようになっている。すなわち、貫入部361の上面には、規制部363が形成されており、この規制部363が突片33に当接することによって、スライド部材31、係合ピン32、突片33の下方(非係合位置)への移動が規制され、係合ピン32と受け材35との係合状態が維持できるようになっている。   The closing member 36 is an integrally molded part made of resin, and includes a penetration portion 361 that penetrates the operation hole 231, and condensed water that is in close contact with the side surface of the vertical rod 23 while the penetration portion 361 penetrates the operation hole 231. And a receiving portion 362. The dew condensation water receiving part 362 is formed with an inclined surface that descends toward the outdoor side, receives the dew condensation water that has flowed down along the vertical rod 23, flows to the outdoor side, and prevents the dew condensation water from flowing into the indoor side. It can be done. In addition, when the slide member 31, the engagement pin 32, and the projecting piece 33 are lowered from the engagement position, the closing member 36 has a distal end of the penetration portion 361 when the penetration portion 361 is to penetrate the operation hole 231. If the penetrating portion 361 penetrates while the slide member 31, the engaging pin 32, and the projecting piece 33 are in the engaged position, the upper surface of the penetrating portion 361 becomes the lower surface of the projecting piece 33. It comes to contact with. That is, a restricting portion 363 is formed on the upper surface of the penetrating portion 361, and when the restricting portion 363 comes into contact with the projecting piece 33, the slide member 31, the engaging pin 32, and the projecting piece 33 are below (not engaged). The movement of the engaging pin 32 and the receiving member 35 can be maintained.

次に、固定障子20Aの取付手順について説明する。
先ず、固定障子20Aの下框22にセッティングブロック221を固定し、無目15(または上枠11)に板ばね211を固定しておき、図5に示すように、室外側からセッティングブロック221の突起を下枠12(または無目15)の上面の位置決め孔(不図示)に挿入して下框22の位置決めを行う。これに続いて、セッティングブロック221を中心にして固定障子20Aの上框21を室内側に回動させ、図6に示すように、板ばね211に係止させて上框21の位置決めを行う。このように上框21および下框22を、それぞれ無目15(または上枠11)および下框12(または無目15)に位置決めした状態で、固定障子20Aの左右の縦框23を縦枠13および方立16(または左右の方立16)に固定装置30を用いて固定する。
Next, a procedure for attaching the fixed shoji 20A will be described.
First, the setting block 221 is fixed to the lower arm 22 of the fixed shoji 20A, and the leaf spring 211 is fixed to the mesh 15 (or the upper frame 11). As shown in FIG. The protrusion 22 is inserted into a positioning hole (not shown) on the upper surface of the lower frame 12 (or the mesh 15) to position the lower collar 22. Following this, the upper collar 21 of the fixed shoji 20A is rotated indoors around the setting block 221, and the upper collar 21 is positioned by being engaged with the leaf spring 211 as shown in FIG. In this manner, the left and right vertical rods 23 of the fixed shoji 20A are vertically framed in a state where the upper rod 21 and the lower rod 22 are positioned at the blank 15 (or the upper frame 11) and the lower rod 12 (or the blank 15), respectively. 13 and the vertical 16 (or the left and right vertical 16) using the fixing device 30.

固定障子20Aの縦框23の固定は、具体的には、図7(A)〜(C)に示す手順で行う。
すなわち、先ず、図7(A)に示すように、スライド部材31、係合ピン32、突片33が下方に下がった非係合位置にある状態で、閉塞部材36を取り外した操作孔231に工具Tを挿入し、突片33の凹溝部に工具Tを引っ掛けてスライド部材31、係合ピン32、突片33を上方に押し上げる。
次に、図7(B)に示すように、係合ピン32が受け材35に係合し始める位置までスライド部材31を押し上げても、さらに押し上げ作業を続行する。つまり、図7(B)に示す状態では、係合ピン32と受け材35との係合が不十分であるため、この状態で押し上げ作業を止めて閉塞部材36の貫入部361を操作孔231に貫入しようとしても、貫入部361の先端が突片33の側面に当接し、閉塞部材36が所定の閉塞位置(結露水受け部362が縦框23の側面に密接する位置)まで押し込めないようになっている。
次に、図7(C)に示すように、係合ピン32が受け材35に係合する係合位置までスライド部材31を押し上げた状態において、閉塞部材36の貫入部361を操作孔231に貫入すると、貫入部361が突片33の下方に挿入され、貫入部361の上面と突片33の下面とが当接し、スライド部材31、係合ピン32、突片33の下方への移動が規制されるようになっている。
Specifically, the vertical shovel 23 of the fixed shoji 20A is fixed by the procedure shown in FIGS.
That is, first, as shown in FIG. 7A, the slide member 31, the engagement pin 32, and the protruding piece 33 are in the disengaged position where the slide member 31, the projecting piece 33 is lowered, and the operation hole 231 from which the blocking member 36 is removed is formed. The tool T is inserted, the tool T is hooked in the concave groove portion of the projecting piece 33, and the slide member 31, the engaging pin 32, and the projecting piece 33 are pushed upward.
Next, as shown in FIG. 7B, even if the slide member 31 is pushed up to a position where the engagement pin 32 starts to engage with the receiving member 35, the push-up operation is continued. That is, in the state shown in FIG. 7B, the engagement between the engagement pin 32 and the receiving member 35 is insufficient, and in this state, the push-up operation is stopped and the penetration portion 361 of the closing member 36 is moved to the operation hole 231. Even if it tries to penetrate, the tip of the penetration part 361 abuts on the side surface of the projecting piece 33 so that the closing member 36 cannot be pushed to a predetermined closing position (position where the condensed water receiving part 362 is in close contact with the side surface of the vertical rod 23). It has become.
Next, as shown in FIG. 7C, in the state where the slide member 31 is pushed up to the engagement position where the engagement pin 32 engages with the receiving member 35, the penetration portion 361 of the closing member 36 is inserted into the operation hole 231. When penetrating, the penetrating part 361 is inserted below the projecting piece 33, the upper surface of the penetrating part 361 and the lower surface of the projecting piece 33 abut, and the slide member 31, the engaging pin 32, and the projecting piece 33 are moved downward. Being regulated.

以上のように係合ピン32と受け材35との係合状態を維持することで、固定障子20Aが窓枠14に対して移動不能に固定されることとなる。
一方、固定障子20Aを窓枠14から取り外す場合には、上述の手順とは逆に、閉塞部材36を操作孔231から取り外してから、工具Tを突片33に引っ掛けてスライド部材31を下方に押し下げ、係合ピン32と受け材35との係合を外す。次に、上框21に工具等を差し入れて板ばね211を押し上げ、上框21の係止を外すことで、固定障子20Aを室外側に取り外すことができるようになっている。
By maintaining the engagement state between the engagement pin 32 and the receiving member 35 as described above, the fixed shoji 20A is fixed to the window frame 14 so as not to move.
On the other hand, when removing the fixed shoji 20A from the window frame 14, contrary to the above procedure, after removing the closing member 36 from the operation hole 231, the tool T is hooked on the protruding piece 33 and the slide member 31 is moved downward. Push down to disengage the engagement pin 32 and the receiving member 35. Next, the fixed shoji 20A can be removed to the outdoor side by inserting a tool or the like into the upper collar 21, pushing up the leaf spring 211, and releasing the locking of the upper collar 21.

このような本実施形態によれば、以下のような効果がある。
(1)すなわち、固定障子20Aを窓枠14の縦枠13や方立16に固定する固定装置30が方立16(または縦枠13)の室内側側面部165および額縁材162で隠蔽されているとともに、操作孔231も閉塞部材36で塞がれているので、固定装置30が室内側から見えずサッシ窓10の内観意匠性を向上させることができる。
According to this embodiment, there are the following effects.
(1) That is, the fixing device 30 for fixing the fixed shoji 20A to the vertical frame 13 or the vertical frame 16 of the window frame 14 is concealed by the indoor side surface portion 165 and the frame material 162 of the vertical frame 16 (or the vertical frame 13). In addition, since the operation hole 231 is also closed by the closing member 36, the fixing device 30 is not visible from the indoor side, and the interior design of the sash window 10 can be improved.

(2)そして、通常使用時において、操作孔231が閉塞部材36で塞がれ、固定装置30の突片33が操作不能になっているので、利用者が誤って突片33を操作して固定障子20Aを外してしまうようなことが防止できる。一方、固定障子20Aの着脱時において、閉塞部材36を取り外して突片33を操作し、係合ピン32を係合位置に移動させて受け材35に係合させるだけで、固定障子20Aを縦枠13や方立16に固定することができるとともに、非係合位置に移動させることで固定障子20Aを取り外すことができ、固定障子20Aの取り付けや取り外しの作業を容易に実施することができる。 (2) During normal use, the operating hole 231 is blocked by the closing member 36, and the protruding piece 33 of the fixing device 30 is inoperable, so that the user accidentally operates the protruding piece 33. It is possible to prevent the fixed shoji 20A from being removed. On the other hand, when the fixed shoji 20A is attached or detached, the fixed shoji 20A can be moved vertically only by removing the closing member 36 and operating the projecting piece 33 to move the engaging pin 32 to the engaging position and engage the receiving member 35. While being able to fix to the frame 13 or the stand 16, the fixed shoji 20A can be removed by moving to a non-engagement position, and the operation | work of attachment and removal of the fixed shoji 20A can be implemented easily.

(3)また、スライド部材31、係合ピン32および突片33を有して固定装置30が構成されているので、スライド部材31の長さ寸法、つまり係合ピン32の固定位置と突片33との距離を適宜設定することができ、適切な部材配置が可能になる。さらに、長尺状に形成されたスライド部材31に複数の係合ピン32を固定すれば、スライド部材31下部の突片33を操作するだけで、複数の係合ピン32を連動させることができる。 (3) Since the fixing device 30 is configured to include the slide member 31, the engaging pin 32, and the protruding piece 33, the length dimension of the sliding member 31, that is, the fixing position of the engaging pin 32 and the protruding piece. The distance to 33 can be set as appropriate, and appropriate member arrangement becomes possible. Furthermore, if the plurality of engagement pins 32 are fixed to the elongated slide member 31, the plurality of engagement pins 32 can be interlocked only by operating the projecting piece 33 below the slide member 31. .

(4)また、係合ピン32が受け材35に係合していない状態では、突片33の側面に貫入部361が当接して閉塞部材36が閉塞位置まで貫入できないようになっているので、係合ピン32が非係合(固定障子20Aが非固定)であることが容易に判別でき、取付作業を確実に実施することができる。一方、係合ピン32が受け材35に係合していれば、閉塞部材36を閉塞位置まで貫入することができるとともに、貫入した貫入部361の規制部363によってスライド部材31、係合ピン32および突片33の下方への移動を規制することで、係合ピン32と受け材35との係合が外れることを防止して固定障子20Aの取付状態が良好に維持できる。 (4) Further, when the engaging pin 32 is not engaged with the receiving member 35, the penetrating portion 361 abuts against the side surface of the projecting piece 33 so that the closing member 36 cannot penetrate to the closing position. , It can be easily determined that the engagement pin 32 is not engaged (the fixed shoji 20A is not fixed), and the mounting operation can be performed reliably. On the other hand, if the engagement pin 32 is engaged with the receiving member 35, the closing member 36 can be penetrated to the closing position, and the slide member 31 and the engagement pin 32 are controlled by the restricting portion 363 of the penetrated penetration portion 361. Further, by restricting the downward movement of the projecting piece 33, it is possible to prevent the engagement pin 32 and the receiving member 35 from being disengaged, and to maintain a good mounting state of the fixed shoji 20A.

(5)さらに、閉塞部材36に結露水受け部362が設けられているので、結露水受け部材を別体で設ける場合と比較して、部品点数を削減することができるとともに、結露水受け部363によって縦框23を流れ落ちた結露水が室内側に流れないようにでき、結露水による汚れの付着等を防止してサッシ窓10の美観を維持することができる。 (5) Furthermore, since the dew condensation water receiving part 362 is provided on the closing member 36, the number of parts can be reduced and the dew condensation water receiving part can be reduced as compared with the case where the dew condensation water receiving member is provided separately. It is possible to prevent the dew condensation water that has flowed down the downpipe 23 from flowing into the room indoors by 363, and to prevent the adhesion of dirt due to the dew condensation water, etc., and maintain the beauty of the sash window 10.

(6)また、固定障子20Aの上框21が板ばね211に位置決めされ、下框22がセッティングブロック221によって位置決めされた状態で、左右の縦框23が固定装置30で固定されているので、四周全てが窓枠14や無目15、方立16に支持されて固定障子20Aを固定強度を高めることができる。さらに、固定障子20Aの取り付け時および取り外し時において、係合ピン32が受け材35から外れていても、上框21および下框22が位置決めされているので、固定障子20Aを作業者が支持しておく必要がなく、取り付けや取り外しの作業性を一層向上させることができる。 (6) In addition, the left and right vertical rods 23 are fixed by the fixing device 30 in a state where the upper rod 21 of the fixed shoji 20A is positioned by the leaf spring 211 and the lower rod 22 is positioned by the setting block 221. All the four circumferences are supported by the window frame 14, the mesh 15, and the vertical 16, and the fixing strength of the fixed shoji 20 </ b> A can be increased. Furthermore, even when the fixed shoji 20A is attached and removed, even if the engaging pin 32 is detached from the receiving member 35, the upper saddle 21 and the lower saddle 22 are positioned so that the operator supports the fixed shoji 20A. It is not necessary to keep it, and the workability of attachment and removal can be further improved.

(7)また、固定障子20Aと可動障子20Bとで框材21,22,23が共通化され、かつ固定障子20Aおよび可動障子20Bが略同一見込み位置に配置されているので、部品点数の削減を一層促進させることができるとともに、サッシ窓10の意匠性をより一層良好にすることができる。さらに、固定障子20Aおよび可動障子20Bの框材21,22,23が額縁材5,152,162で隠蔽される隠し框となっているので、室内側からサッシ窓10を見た場合に、金属製の框材21,22,23が目立たず、格子状の額縁材5,152,162とガラスパネル24とから構成されたような高級感のある内観を得ることができる。 (7) Since the fixed shoji 20A and the movable shoji 20B share the saddle members 21, 22, and 23, and the fixed shoji 20A and the movable shoji 20B are arranged at substantially the same expected positions, the number of parts can be reduced. Can be further promoted, and the design of the sash window 10 can be further improved. Furthermore, since the collars 21, 22, and 23 of the fixed shoddle 20A and the movable shoddle 20B are concealed caskets concealed by the frame members 5, 152, 162, when the sash window 10 is viewed from the indoor side, The made glazing materials 21, 22, and 23 are not conspicuous, and a high-class interior such as that constituted by the lattice-like frame materials 5, 152, 162 and the glass panel 24 can be obtained.

〔第2実施形態〕
次に、本発明の第2実施形態について、図8および図9に基づいて説明する。
図8(A),(B)は、本発明の第2実施形態に係るサッシ窓における固定障子20Aの固定装置30Aを示す横断面図および側面図である。図9(A)〜(D)は、固定障子20Aの固定方法および固定解除方法を示す縦断面図である。
第2実施形態において、サッシ窓の構成は、前記第1実施形態と略同様であり、固定装置30Aの構成、特に操作部37の構成が前記第1実施形態の固定装置30と相違している。以下、相違点について詳しく説明する。
[Second Embodiment]
Next, a second embodiment of the present invention will be described with reference to FIGS.
FIGS. 8A and 8B are a cross-sectional view and a side view showing the fixing device 30A for the fixed shoji 20A in the sash window according to the second embodiment of the present invention. 9A to 9D are longitudinal sectional views showing a fixing method and a fixing release method of the fixed shoji 20A.
In the second embodiment, the configuration of the sash window is substantially the same as that of the first embodiment, and the configuration of the fixing device 30A, particularly the configuration of the operation unit 37, is different from the fixing device 30 of the first embodiment. . Hereinafter, the differences will be described in detail.

固定装置30Aは、固定障子20Aの縦框23にスライド自在に支持されたスライド部材31と、スライド部材31に固定された係合ピン32と、縦框23の操作孔231の近傍位置に設けられた操作部37とを有して構成されている。操作部37は、スライド部材の下端部に固定されて操作孔側に延びた第1部材371と、この第1部材371に回動自在に連結された第2部材372とを有して構成されている。そして、第2部材372は、一端が第1部材371に連結される連結片部373と、この連結片部373の他端に連続して折れ曲がった操作片部374とから全体L字形に形成されている。この第2部材372は、その連結片部373の一端部が第1部材371に設けられた連結孔375に係止されることで、第1部材371に対して回動自在に連結されている。また、第2部材372の操作片部374は、操作孔231から室内空間に突出可能になっているとともに、通常使用時には、閉塞部材36で覆われて室内側から隠蔽されている。   The fixing device 30A is provided at a position in the vicinity of the slide member 31 slidably supported by the vertical rod 23 of the fixed shoji 20A, the engagement pin 32 fixed to the slide member 31, and the operation hole 231 of the vertical rod 23. And an operation unit 37. The operation portion 37 includes a first member 371 that is fixed to the lower end portion of the slide member and extends toward the operation hole, and a second member 372 that is rotatably connected to the first member 371. ing. The second member 372 is formed in an overall L-shape from a connecting piece portion 373 whose one end is connected to the first member 371 and an operation piece portion 374 that is continuously bent to the other end of the connecting piece portion 373. ing. The second member 372 is rotatably connected to the first member 371 by engaging one end of the connecting piece 373 with a connecting hole 375 provided in the first member 371. . Further, the operation piece 374 of the second member 372 can project into the indoor space from the operation hole 231 and is covered with the closing member 36 and concealed from the indoor side during normal use.

以上の固定装置30Aの動作としては、図9(A)に示すように、先ず、固定装置30Aが非係合位置にある状態では、操作片部374が操作孔231から室内空間に突出しており、この状態で操作片部374を下方に回動操作することで、第2部材372の折曲り部が下框22に当接し、この位置を支点として梃子の作用により連結片部373の一端側が上方に移動する。そして、操作片部374を操作孔231に押し込むようにして回動操作を継続することで、図9(B)に示すように、連結片部373が略垂直に立ち上がり、この連結片部373に連結された第1部材371およびスライド部材31が上方にスライド移動される。これにより、係合ピン32が受け材35に係合され、固定装置30Aが係合位置に移動されたこととなって固定障子20Aが窓枠14に固定される。この状態において、第2部材372の操作片部374が下框22の上面に当接することで、第1部材371およびスライド部材31の下方(非係合位置)への移動が規制され、固定障子20Aの固定状態が維持される。   As the operation of the fixing device 30A described above, as shown in FIG. 9A, first, when the fixing device 30A is in the disengaged position, the operation piece portion 374 protrudes from the operation hole 231 into the indoor space. In this state, the operation piece 374 is rotated downward so that the bent portion of the second member 372 contacts the lower rod 22, and the one end side of the connection piece 373 is moved by the lever action with this position as a fulcrum. Move upward. Then, by continuing the rotation operation by pushing the operation piece portion 374 into the operation hole 231, the connection piece portion 373 rises substantially vertically as shown in FIG. The connected first member 371 and slide member 31 are slid upward. As a result, the engaging pin 32 is engaged with the receiving member 35, and the fixing device 30 </ b> A is moved to the engaging position, so that the fixed shoji 20 </ b> A is fixed to the window frame 14. In this state, the operation piece portion 374 of the second member 372 abuts on the upper surface of the lower rod 22, so that the downward movement (non-engagement position) of the first member 371 and the slide member 31 is restricted, and the fixed shoji The fixed state of 20A is maintained.

次に、固定障子20Aの固定を解除する場合には、図9(C)に示すように、第2部材372の操作片部374を操作孔231から室内側に引き出す方向かつ上方に回動操作することで、第1部材371およびスライド部材31の下方への移動規制が外れ、固定装置30Aが非係合位置へ移動可能となる。この際、スライド部材31が自重で下方にスライドする、あるいは第2部材372を下方に押し下げることで、図9(D)に示すように、固定装置30Aが非係合位置へ移動され、係合ピン32と受け材35との係合が外れ、固定障子20Aの固定が解除されるようになっている。   Next, when the fixed shoji 20A is unlocked, as shown in FIG. 9C, the operation piece 374 of the second member 372 is rotated upward in the direction of pulling out from the operation hole 231 to the indoor side. By doing so, the downward movement restriction of the first member 371 and the slide member 31 is removed, and the fixing device 30A can move to the non-engagement position. At this time, as the slide member 31 slides downward under its own weight, or the second member 372 is pushed down, the fixing device 30A is moved to the non-engagement position as shown in FIG. The pin 32 and the receiving member 35 are disengaged from each other, and the fixed shoji 20A is released.

このような本実施形態によれば、前述の(1)〜(3)、(5)〜(7)と同様の効果に加えて以下のような効果がある。
(8)すなわち、第2部材372の操作片部374を操作孔231に押し込むように回動操作することで、固定装置30Aを係合位置に移動させることができるとともに、操作片部374を操作孔231から引き出すように回動操作することで、固定装置30Aを非係合位置に移動させることができ、固定障子20Aの固定作業または固定解除作業を容易に実施することができる。さらに、固定装置30Aが係合位置にある状態において、第2部材372の操作片部374が下框22の上面に当接することで、固定装置30Aを係合位置に維持することができ、係合ピン32と受け材35との係合が外れることを防止して固定障子20Aの取付状態が良好に維持できる。
According to this embodiment, in addition to the same effects as the above-described (1) to (3) and (5) to (7), there are the following effects.
(8) That is, by rotating the operation piece 374 of the second member 372 so as to be pushed into the operation hole 231, the fixing device 30A can be moved to the engagement position, and the operation piece 374 can be operated. By performing the rotation operation so as to be pulled out from the hole 231, the fixing device 30A can be moved to the non-engagement position, and the fixing operation or the fixing release operation of the fixed shoji 20A can be easily performed. Further, in a state where the fixing device 30A is in the engaged position, the operation piece portion 374 of the second member 372 abuts on the upper surface of the lower collar 22, so that the fixing device 30A can be maintained in the engaged position. The engagement between the fixed pin 32 and the receiving member 35 can be prevented from being disengaged, and the mounting state of the fixed shoji 20A can be maintained well.

〔第3実施形態〕
次に、本発明の第2実施形態について、図10および図11に基づいて説明する。
図10(A),(B)は、本発明の第3実施形態に係るサッシ窓における固定障子20Aの固定装置30Bを示す横断面図および側面図である。図11(A)〜(C)は、固定障子20Aの固定方法を示す縦断面図である。
第3実施形態において、サッシ窓の構成は、前記第1、2実施形態と略同様であり、固定装置30Bの構成、特に操作部38の構成が前記第1、2実施形態の固定装置30,30Aと相違している。以下、相違点について詳しく説明する。
[Third Embodiment]
Next, 2nd Embodiment of this invention is described based on FIG. 10 and FIG.
FIGS. 10A and 10B are a cross-sectional view and a side view showing the fixing device 30B of the fixed shoji 20A in the sash window according to the third embodiment of the present invention. FIGS. 11A to 11C are longitudinal sectional views showing a method of fixing the fixed shoji 20A.
In the third embodiment, the configuration of the sash window is substantially the same as that of the first and second embodiments, and the configuration of the fixing device 30B, particularly the configuration of the operation unit 38, is the fixing device 30 of the first and second embodiments. It is different from 30A. Hereinafter, the differences will be described in detail.

固定装置30Bは、固定障子20Aの縦框23にスライド自在に支持されたスライド部材31と、スライド部材31に固定された係合ピン32と、縦框23の操作孔231の近傍位置に設けられた操作部38とを有して構成されている。操作部38は、縦框23に固定された第1部材381と、この第1部材381に支持されて一端部(図10(A)の上端部、図11の左端部)がスライド部材31の切欠き311に連結され他端部が操作孔231側に延びる第2部材382とを有して構成されている。第1部材381には、第2部材を軸支する支軸383が設けられ、第2部材382には、支軸383に挿通される軸孔384が形成されており、第2部材382は、支軸383を中心に回動自在に支持されている。そして、軸孔384には、図11(B),(C)に示すように、第2部材382の一端部が上方に回動した状態で支軸383に係合可能、かつ支軸383に係合することで第2部材382の回動を規制する規制部としての拡径部385が形成されている。   The fixing device 30B is provided in the vicinity of the slide member 31 slidably supported by the vertical rod 23 of the fixed shoji 20A, the engagement pin 32 fixed to the slide member 31, and the operation hole 231 of the vertical rod 23. And an operation unit 38. The operation unit 38 is supported by the first member 381 fixed to the vertical shaft 23 and is supported by the first member 381, and one end portion (the upper end portion in FIG. 10A and the left end portion in FIG. 11) of the slide member 31. The second member 382 is connected to the notch 311 and has the other end extending to the operation hole 231 side. The first member 381 is provided with a support shaft 383 that supports the second member, the second member 382 is formed with a shaft hole 384 inserted through the support shaft 383, and the second member 382 includes: The support shaft 383 is supported so as to be rotatable. Then, as shown in FIGS. 11B and 11C, the shaft hole 384 can be engaged with the support shaft 383 with one end of the second member 382 rotated upward, and the support shaft 383 can be engaged with the support shaft 383. An enlarged diameter portion 385 is formed as a restricting portion that restricts the rotation of the second member 382 by engaging.

以上の固定装置30Bの動作としては、図11(A)に示すように、先ず、固定装置30Bが非係合位置にある状態では、第2部材382の一端部が下方に位置しており、この状態で操作孔231から挿入した工具で第2部材382の他端部を下方に回動操作することで、第2部材382の一端部が上方に移動する。そして、第2部材382の回動操作を継続することで、図11(B)に示すように、第2部材382の一端部に連結されたスライド部材31が上方にスライド移動される。そして、軸孔384の拡径部385が第1部材381の支軸383上方に位置するまで第2部材382が回動操作される、すなわち固定装置30Bが係合位置まで移動されると、図11(C)に示すように、拡径部385が支軸383に嵌って第2部材382が若干下方に落下し、拡径部385と支軸383とが係合することとなる。この状態において、固定障子20Aが窓枠14に固定されるとともに、第2部材382の回動が規制され、固定障子20Aの固定状態が維持されるようになっている。一方、固定障子20Aの固定を解除する場合には、操作孔231から挿入した工具で第2部材382の他端部を上方に押し上げることで、拡径部385と支軸383との係合が外れ、第2部材382が回動可能になって、スライド部材31が自重で下方にスライドする、あるいは第2部材382の他端部を上方に押し上げて回動操作することで、固定装置30Bが非係合位置へ移動され、固定障子20Aの固定が解除されるようになっている。   As the operation of the fixing device 30B described above, as shown in FIG. 11A, first, in a state where the fixing device 30B is in the non-engagement position, one end portion of the second member 382 is positioned below, In this state, by rotating the other end portion of the second member 382 downward with a tool inserted from the operation hole 231, one end portion of the second member 382 moves upward. Then, by continuing the rotation operation of the second member 382, the slide member 31 connected to one end of the second member 382 is slid upward as shown in FIG. Then, when the second member 382 is rotated until the enlarged diameter portion 385 of the shaft hole 384 is positioned above the support shaft 383 of the first member 381, that is, when the fixing device 30B is moved to the engagement position, FIG. 11 (C), the enlarged diameter portion 385 fits on the support shaft 383, the second member 382 falls slightly downward, and the enlarged diameter portion 385 and the support shaft 383 are engaged. In this state, the fixed shoji 20A is fixed to the window frame 14, and the rotation of the second member 382 is restricted, and the fixed state of the fixed shoji 20A is maintained. On the other hand, when releasing the fixing of the fixed shoji 20A, the other end portion of the second member 382 is pushed upward with a tool inserted from the operation hole 231 so that the enlarged diameter portion 385 and the support shaft 383 are engaged. The second member 382 can be turned and the slide member 31 slides downward by its own weight, or the other end portion of the second member 382 is pushed upward to perform the turning operation, whereby the fixing device 30B is moved. It moves to a non-engagement position, and fixation of the fixed shoji 20A is cancelled | released.

このような本実施形態によれば、前述の(1)〜(3)、(5)〜(7)と同様の効果に加えて以下のような効果がある。
(9)すなわち、第2部材382の他端部を操作して第2部材382を回動させることで、固定装置30Bを係合位置に移動させることができるとともに、この状態において軸孔384の拡径部385が第1部材381の支軸383に係合して第2部材382の回動が規制されることで、固定装置30Bを係合位置に維持することができ、固定障子20Aの取付状態が良好に維持できる。さらに、拡径部385と支軸383との係合を外して第2部材382の回動規制を解除することで、固定装置30Bを非係合位置に移動させて固定障子20Aの固定を解除することができる。
According to this embodiment, in addition to the same effects as the above-described (1) to (3) and (5) to (7), there are the following effects.
(9) That is, by operating the other end of the second member 382 and rotating the second member 382, the fixing device 30B can be moved to the engagement position, and in this state, the shaft hole 384 Since the enlarged diameter portion 385 engages with the support shaft 383 of the first member 381 and the rotation of the second member 382 is restricted, the fixing device 30B can be maintained in the engaged position, and the fixed shoji 20A can be maintained. The mounting state can be maintained well. Further, by disengaging the enlarged diameter portion 385 and the support shaft 383 and releasing the rotation restriction of the second member 382, the fixing device 30B is moved to the non-engagement position and the fixing of the fixed shoji 20A is released. can do.

なお、本発明は、前記実施形態に限定されるものではなく、本発明の目的を達成できる他の構成等を含み、以下に示すような変形等も本発明に含まれる。
例えば、前記実施形態のサッシ窓10では、窓枠14内部を無目15および方立16によって上下左右に仕切って枠体を構成したが、これに限らず、方立を省略して無目15により窓枠14内部を上下に仕切るだけでもよく、また無目を省略して方立16により窓枠14内部を左右に仕切るだけでもよい。
また、無目15や方立16で仕切った窓枠14内部の各区画に設ける可動障子としては、開き形式のものに限らず、縦(横)辷り出し形式や突き出し形式、内(外)倒し形式等、任意の開閉形式の障子が採用可能である。さらに、1つの区画内に複数の可動障子を設けてもよく、例えば、2枚の障子を左右スライド自在に支持させて引違い窓を区画内に構成したり、障子を上下スライド自在に支持させて上げ下げ窓を区画内に構成したりすることも可能である。
In addition, this invention is not limited to the said embodiment, Including other structures etc. which can achieve the objective of this invention, the deformation | transformation etc. which are shown below are also contained in this invention.
For example, in the sash window 10 of the above-described embodiment, the inside of the window frame 14 is divided into upper and lower and right and left by the invisible 15 and the upright 16, but the frame body is not limited thereto. Thus, the interior of the window frame 14 may be simply divided up and down, or the interior of the window frame 14 may be simply divided into the left and right sides by the stand 16 without using the eyes.
In addition, the movable shoji provided in each section inside the window frame 14 partitioned by the invisible 15 and the vertical 16 is not limited to the open type, but the vertical (horizontal) protruding type, the protruding type, and the internal (outside) tilt. Any kind of open / close type shoji can be used. In addition, a plurality of movable shojis may be provided in one section. For example, two sliding doors are supported so as to be slidable to the left and right, a sliding window is configured in the section, and a shoji is supported so as to be slidable up and down. It is also possible to construct a raising and lowering window in the compartment.

また、前記実施形態では、固定障子20Aの縦框23に沿って上下スライド自在に固定装置30のスライド部材31、係合ピン32および突片33が支持されていたが、これに限らず、スライド部材31、係合ピン32および突片33が上框21や下框22に沿って左右にスライド自在に設けられていてもよい。さらに、スライド部材および係合ピンは、框材に交差する方向に移動可能に支持されていてもよく、例えば、係合ピンが框材から枠体に向かって突出する方向に突没自在に支持されていてもよい。また、操作孔231は、縦框23の下端部に設けたものに限らず、方立16や縦枠13に設けられていてもよい。
さらに、前記実施形態では、固定装置30のスライド部材31、係合ピン32および操作部33,37,38が固定障子20A側に設けられ、受け材35が方立16や縦枠13側に設けられていたが、これに限らず、スライド部材31、係合ピン32および操作部33,37,38を方立16や無目15、窓枠14側に設け、受け材35を固定障子20A側に設けてもよい。
また、前記実施形態では、閉塞部材36を樹脂製の一体成形部品としたが、閉塞部材は、樹脂製に限らず、アルミ合金等の金属製でもよく、また複数部材を組み合わせて形成された部材であってもよい。
Moreover, in the said embodiment, although the slide member 31, the engagement pin 32, and the protrusion 33 of the fixing device 30 were supported so that it could slide up and down along the vertical arm 23 of the fixed shoji 20A, not only this but a slide The member 31, the engagement pin 32, and the projecting piece 33 may be provided so as to be slidable left and right along the upper collar 21 and the lower collar 22. Furthermore, the slide member and the engagement pin may be supported so as to be movable in a direction crossing the saddle material. For example, the slide pin and the engagement pin are supported so as to protrude and retract in a direction in which the engagement pin projects from the saddle material toward the frame. May be. Further, the operation hole 231 is not limited to the one provided at the lower end portion of the vertical rod 23 but may be provided in the vertical 16 or the vertical frame 13.
Furthermore, in the said embodiment, the slide member 31, the engaging pin 32, and operation part 33,37,38 of the fixing device 30 are provided in the fixed shoji 20A side, and the receiving material 35 is provided in the vertical 16 or the vertical frame 13 side. However, the present invention is not limited to this, and the slide member 31, the engagement pin 32, and the operation portions 33, 37, and 38 are provided on the side 16 or the side 15 and the window frame 14 side, and the receiving member 35 is provided on the fixed shoji 20A side. May be provided.
In the above embodiment, the closing member 36 is an integrally molded part made of resin. However, the closing member is not limited to resin, but may be made of metal such as an aluminum alloy, or a member formed by combining a plurality of members. It may be.

また、前記実施形態では、固定障子20Aの上框21を係止する板ばね211が無目15や上枠11に設けられ、下框22のセッティングブロック221を先ず下枠12や無目15に位置決めしてから上框21を位置決めするような建て込み手順が採用されていたが、図12に示すような建て込み手順で固定障子20Aを取り付けてもよい。すなわち、固定障子20Aの上框21に係止片213を設けておき、この係止片213を無目15や上枠11の挿通孔(不図示)に挿入して室外側への移動を規制してから、固定障子20A全体を若干上方に持ち上げながら下框22のセッティングブロック221を下枠12や無目15の上面に載置するような、上下けんどん式の建て込み手順が採用可能である。このような建て込み手順は、固定障子20Aの全体寸法が大きい場合や重量が重い場合等に好適である。   Further, in the above-described embodiment, the leaf spring 211 that locks the upper collar 21 of the fixed shoji 20A is provided on the invisible line 15 and the upper frame 11, and the setting block 221 of the lower collar 22 is first attached to the lower frame 12 and the unlined area 15. Although the erection procedure for positioning the upper collar 21 after the positioning has been adopted, the fixed shoji 20A may be attached by the erection procedure as shown in FIG. That is, a locking piece 213 is provided on the upper collar 21 of the fixed shoji 20A, and the locking piece 213 is inserted into the insertion hole 15 (not shown) of the eyepiece 15 or the upper frame 11 to restrict the movement to the outdoor side. After that, it is possible to adopt an up-and-down ergonomic installation procedure in which the setting block 221 of the lower lid 22 is placed on the upper surface of the lower frame 12 or the seamless frame 15 while lifting the entire fixed shoji 20A slightly upward. is there. Such an installation procedure is suitable when the overall size of the fixed shoji 20A is large or heavy.

その他、本発明を実施するための最良の構成、方法などは、以上の記載で開示されているが、本発明は、これに限定されるものではない。すなわち、本発明は、主に特定の実施形態に関して特に図示され、かつ説明されているが、本発明の技術的思想および目的の範囲から逸脱することなく、以上述べた実施形態に対し、形状、材質、数量、その他の詳細な構成において、当業者が様々な変形を加えることができるものである。
従って、上記に開示した形状、材質などを限定した記載は、本発明の理解を容易にするために例示的に記載したものであり、本発明を限定するものではないから、それらの形状、材質などの限定の一部もしくは全部の限定を外した部材の名称での記載は、本発明に含まれるものである。
In addition, the best configuration, method and the like for carrying out the present invention have been disclosed in the above description, but the present invention is not limited to this. That is, the invention has been illustrated and described with particular reference to certain specific embodiments, but without departing from the spirit and scope of the invention, Various modifications can be made by those skilled in the art in terms of material, quantity, and other detailed configurations.
Therefore, the description limiting the shape, material, etc. disclosed above is an example for easy understanding of the present invention, and does not limit the present invention. The description by the name of the member which remove | excluded the limitation of one part or all of such restrictions is included in this invention.

本発明の第1実施形態に係るサッシ窓を示す縦断面図である。It is a longitudinal section showing a sash window concerning a 1st embodiment of the present invention. 前記サッシ窓を示す横断面図である。It is a cross-sectional view showing the sash window. 前記サッシ窓における固定障子の固定構造を示す横断面図である。It is a cross-sectional view showing the fixing structure of the fixed shoji in the sash window. 前記固定障子の固定手段を示す斜視図である。It is a perspective view which shows the fixing means of the said fixed shoji. 前記固定障子の建て込み手順を示す縦断面図である。It is a longitudinal cross-sectional view which shows the installation procedure of the said fixed shoji. 前記固定障子の建て込み手順を示す縦断面図である。It is a longitudinal cross-sectional view which shows the installation procedure of the said fixed shoji. (A)〜(C)は、前記固定障子の固定方法を示す縦断面図である。(A)-(C) are longitudinal cross-sectional views which show the fixing method of the said fixed shoji. (A),(B)は、本発明の第2実施形態に係るサッシ窓における固定障子の固定構造を示す横断面図および側面図である。(A), (B) is the cross-sectional view and side view which show the fixing structure of the fixed shoji in the sash window based on 2nd Embodiment of this invention. (A)〜(D)は、前記固定障子の固定方法および固定解除方法を示す縦断面図である。(A)-(D) are the longitudinal cross-sectional views which show the fixing method and fixing release method of the said fixed shoji. (A),(B)は、本発明の第3実施形態に係るサッシ窓における固定障子の固定構造を示す横断面図および側面図である。(A), (B) is the cross-sectional view and side view which show the fixing structure of the fixed shoji in the sash window based on 3rd Embodiment of this invention. (A)〜(C)は、前記固定障子の固定方法を示す縦断面図である。(A)-(C) are longitudinal cross-sectional views which show the fixing method of the said fixed shoji. 本発明の変形例に係る固定障子の建て込み手順を示す縦断面図である。It is a longitudinal cross-sectional view which shows the installation procedure of the fixed shoji which concerns on the modification of this invention.

符号の説明Explanation of symbols

1…外壁、10…サッシ窓、11…上枠、12…下枠、13…縦枠、14…窓枠、15…横仕切り材である無目、16…縦仕切り材である方立、20…障子、20A…固定障子、20B…可動障子、21…上框、22…下框、23…縦框、24…面材であるガラスパネル、30,30A,30B…固定手段である固定装置、31…スライド部材、32…係合ピン、33…操作部である突片、35…受け部である受け材、36…閉塞部材、37,38…操作部、231…操作孔、361…貫入部、362…結露水受け部、363…規制部、371…第1部材、372…第2部材、373…連結片部、374…操作片部、381…第1部材、382…第2部材、383…支軸、384…軸孔、385…規制部である拡径部。   DESCRIPTION OF SYMBOLS 1 ... Outer wall, 10 ... Sash window, 11 ... Upper frame, 12 ... Lower frame, 13 ... Vertical frame, 14 ... Window frame, 15 ... Plainness which is horizontal partition material, 16 ... Standing which is vertical partition material, 20 ... shoji, 20A ... fixed shoji, 20B ... movable shoji, 21 ... upper arm, 22 ... lower arm, 23 ... vertical arm, 24 ... glass panel which is a face material, 30, 30A, 30B ... fixing device which is a fixing means, DESCRIPTION OF SYMBOLS 31 ... Slide member, 32 ... Engagement pin, 33 ... Projection piece which is operation part, 35 ... Receiving material which is receiving part, 36 ... Closure member, 37, 38 ... Operation part, 231 ... Operation hole, 361 ... Penetration part , 362 ... Condensation water receiving part, 363 ... Restriction part, 371 ... First member, 372 ... Second member, 373 ... Connection piece part, 374 ... Operation piece part, 381 ... First member, 382 ... Second member, 383 ... support shaft, 384 ... shaft hole, 385 ... expanded diameter portion which is a restricting portion.

Claims (8)

外壁開口部に固定される枠体と、この枠体内部に固定される固定障子とを備えたサッシ窓であって、
前記固定障子は、上框、下框、および左右の縦框と、これら上下左右の各框材で囲まれた内部に支持された面材とを有して構成され、
前記枠体および前記固定障子の框材のいずれか一方には、他方に設けられた受け部に係合して当該固定障子の移動を規制する固定手段が、当該枠体および框材の少なくとも一方によって室内側から隠蔽された位置において、前記受け部に係合する係合位置と係合しない非係合位置との間を移動自在に設けられ、
前記枠体および框材のいずれかの室内露出面には、通常使用時において閉塞部材で塞がれた操作孔が形成され、前記固定障子の着脱時において前記閉塞部材を取り外すことで、前記操作孔を介して前記固定手段が係合位置または非係合位置に移動操作可能に構成されたサッシ窓。
A sash window provided with a frame fixed to the outer wall opening and a fixed shoji fixed inside the frame,
The fixed shoji is composed of an upper arm, a lower arm, and left and right vertical hooks, and a face material supported inside the vertical, left, and right vertical bars,
Either one of the frame and the saddle member of the fixed shoji includes at least one of the frame and the saddle member, and a fixing means that engages with a receiving portion provided on the other and restricts movement of the fixed shoji. At a position concealed from the indoor side by an engagement position that engages with the receiving portion and a non-engagement position that does not engage,
An operation hole that is closed with a closing member during normal use is formed on the indoor exposed surface of either the frame or the saddle member, and the operation is performed by removing the closing member when the fixed shoji is attached or detached. A sash window configured such that the fixing means can be moved to an engaged position or a non-engaged position through a hole.
前記固定手段は、前記固定障子の框材に沿ってスライド自在に支持されたスライド部材と、このスライド部材に固定されて前記受け部に係合可能な少なくとも1つの係合ピンと、前記スライド部材をスライド操作可能に前記操作孔の近傍位置に設けられた操作部とを有して構成され、
前記受け部は、前記固定手段が設けられた框材と対向する前記枠体に設けられている請求項1に記載のサッシ窓。
The fixing means includes a slide member that is slidably supported along the saddle member of the fixed shoji, at least one engagement pin fixed to the slide member and engageable with the receiving portion, and the slide member. And an operation portion provided in the vicinity of the operation hole so as to be slidable.
2. The sash window according to claim 1, wherein the receiving portion is provided on the frame body facing the brazing material provided with the fixing means.
前記固定手段の操作部は、前記スライド部材に固定されて前記操作孔側に延びる突片から構成され、
前記閉塞部材は、前記操作孔に貫入される貫入部を有して形成され、前記固定手段が係合位置にない状態において、前記貫入部が前記操作部に当接して当該閉塞部材が前記操作孔を閉塞不能に構成され、
前記貫入部には、前記固定手段が係合位置にある状態において、前記操作部に当接して当該固定手段の非係合位置への移動を規制する規制部が設けられている請求項2に記載のサッシ窓。
The operation part of the fixing means is composed of a projecting piece that is fixed to the slide member and extends to the operation hole side,
The closing member is formed to have a penetrating portion penetrating into the operation hole. When the fixing means is not in the engagement position, the penetrating portion abuts on the operating portion and the closing member The hole is made incapable of blocking,
3. The restricting portion is provided in the penetrating portion, wherein the restricting portion abuts on the operation portion and restricts the movement of the fixing means to the non-engaging position in a state where the fixing means is in the engaging position. Sash window as described.
前記固定手段の操作部は、前記スライド部材に固定された第1部材と、この第1部材に回動自在に連結された第2部材とを有して構成され、
前記第2部材は、一端が前記第1部材に連結される連結片部と、この連結片部の他端に連続して折れ曲がって前記操作孔から室内空間に突出可能な操作片部とを有して形成され、
前記第2部材の操作片部を前記操作孔に押し込むことで、前記第1部材を介して前記スライド部材がスライドされて前記係合ピンが前記受け部に係合され、この係合位置において、前記操作片部が前記枠体または框材に当接することで、当該固定手段が係合位置に維持されるとともに、前記操作片部を前記操作孔から室内側に引き出すことで、当該固定手段が非係合位置へ移動可能に構成された請求項2に記載のサッシ窓。
The operation portion of the fixing means includes a first member fixed to the slide member, and a second member rotatably connected to the first member,
The second member has a connection piece portion whose one end is connected to the first member, and an operation piece portion that is continuously bent to the other end of the connection piece portion and can protrude into the indoor space from the operation hole. Formed,
By pushing the operation piece portion of the second member into the operation hole, the slide member is slid through the first member and the engagement pin is engaged with the receiving portion. The fixing means is maintained in the engagement position by the operation piece portion coming into contact with the frame body or the saddle member, and the fixing means is pulled out from the operation hole to the indoor side. The sash window of Claim 2 comprised so that a movement to the non-engagement position was possible.
前記固定手段の操作部は、前記枠体または框材に固定された第1部材と、この第1部材に回動自在に支持されて一端部が前記スライド部材に連結され他端部が前記操作孔側に延びる第2部材とを有して構成され、
前記第1部材および第2部材は、いずれか一方に設けられた支軸を他方に設けられた軸孔に挿通することで連結され、これらの支軸および軸孔には、当該固定手段が係合位置に位置した状態で前記第2部材の回動を規制する規制部が形成され、
前記他端部を操作して前記第2部材を回動させることで、当該第2部材の一端部を介して前記スライド部材がスライドされて前記係合ピンが前記受け部に係合され、この係合位置において、前記第1部材および第2部材における支軸および軸孔の規制部が当該第2部材の回動を規制することで、当該固定手段が係合位置に維持されるとともに、前記規制部の規制を解除することで、前記第2部材の回動規制が解除されて当該固定手段が非係合位置へ移動可能に構成された請求項2に記載のサッシ窓。
The operation portion of the fixing means includes a first member fixed to the frame body or the saddle member, and is rotatably supported by the first member, and one end portion is connected to the slide member, and the other end portion is the operation member. A second member extending toward the hole side,
The first member and the second member are connected by inserting a support shaft provided in one of them into a shaft hole provided in the other, and the fixing means is engaged with the support shaft and the shaft hole. A restricting portion that restricts the rotation of the second member in a state of being located at the joint position is formed,
By operating the other end and rotating the second member, the slide member is slid through the one end of the second member and the engagement pin is engaged with the receiving portion. In the engaged position, the support portion and the shaft hole restricting portion in the first member and the second member restrict the rotation of the second member, so that the fixing means is maintained in the engaged position. The sash window according to claim 2, wherein by releasing the restriction of the restriction portion, the rotation restriction of the second member is released, and the fixing means is configured to be movable to the non-engagement position.
前記操作孔は、前記固定障子の縦框下端部に形成され、前記閉塞部材は、前記縦框に沿って流れ落ちた結露水が室内側に流れることを防止する結露水受け部を有して構成されている請求項1から請求項5のいずれかに記載のサッシ窓。   The operation hole is formed in a lower end portion of the vertical shaft of the fixed shoji, and the blocking member includes a condensed water receiving portion that prevents the condensed water flowing down along the vertical shaft from flowing into the indoor side. The sash window according to any one of claims 1 to 5. 前記枠体は、上枠、下枠、および左右の縦枠を有した窓枠と、この窓枠の内部を上下および/または左右に仕切る横仕切り材および縦仕切り材のうち少なくとも一方とを有して構成されており、これらの仕切り材で仕切った枠体内部の区画のうちの少なくとも1つに前記固定障子が配置され、
前記固定障子は、前記上框および下框が前記上枠、下枠および横仕切り材のうちの互いに対向する二辺に位置決めされるとともに、前記左右の縦框に設けた前記固定手段が前記左右の縦枠および前記縦仕切り材のうちの互いに対向する二辺に設けた前記受け部に係合されて前記区画内に固定されている請求項1から請求項6のいずれかに記載のサッシ窓。
The frame includes a window frame having an upper frame, a lower frame, and left and right vertical frames, and at least one of a horizontal partition material and a vertical partition material that partitions the interior of the window frame in the vertical and / or horizontal direction. The fixed shoji is arranged in at least one of the compartments inside the frame body partitioned by these partition materials,
In the fixed shoji, the upper arm and the lower arm are positioned on two opposite sides of the upper frame, the lower frame and the lateral partition material, and the fixing means provided on the left and right vertical rods The sash window according to any one of claims 1 to 6, wherein the sash window is engaged with the receiving portion provided on two opposite sides of the vertical frame and the vertical partition member and fixed in the section. .
前記枠体内部の区画のうち少なくとも1つの区画には、前記固定障子が配置されずに当該枠体に対して開閉自在に支持された可動障子が配置され、
前記可動障子は、前記固定障子の上下左右の各框材と共通の框材を有して構成されるとともに、閉鎖状態において前記固定障子と略同一の見込み位置に取り付けられている請求項7に記載のサッシ窓。
At least one of the compartments inside the frame body is provided with a movable shoji that is supported so as to be openable and closable with respect to the frame body without the stationary shoji being placed.
8. The movable shoji is configured to have a common saddle material for the upper, lower, left, and right saddle members of the fixed shoji, and is attached at substantially the same expected position as the fixed shoji in a closed state. Sash window as described.
JP2005339283A 2005-11-24 2005-11-24 Sash window Expired - Fee Related JP4568678B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005339283A JP4568678B2 (en) 2005-11-24 2005-11-24 Sash window

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005339283A JP4568678B2 (en) 2005-11-24 2005-11-24 Sash window

Publications (2)

Publication Number Publication Date
JP2007146402A true JP2007146402A (en) 2007-06-14
JP4568678B2 JP4568678B2 (en) 2010-10-27

Family

ID=38208128

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005339283A Expired - Fee Related JP4568678B2 (en) 2005-11-24 2005-11-24 Sash window

Country Status (1)

Country Link
JP (1) JP4568678B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040453A (en) * 2013-08-23 2015-03-02 Ykk Ap株式会社 Fitting
JP2015196972A (en) * 2014-03-31 2015-11-09 株式会社Lixil Lock structure of composite fitting
JP2017048631A (en) * 2015-09-03 2017-03-09 株式会社Lixil Double-hung window
JP2018040152A (en) * 2016-09-07 2018-03-15 三協立山株式会社 Fixed sash window
CN108868458A (en) * 2018-07-22 2018-11-23 陈建明 A kind of Split sliding rail profile door and window
CN108868458B (en) * 2018-07-22 2024-06-11 山西惠丰型材有限公司 Split type sliding rail section bar door and window

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0610586U (en) * 1992-07-10 1994-02-10 ワイケイケイアーキテクチュラルプロダクツ株式会社 Cosmetic cap for shoji frame tool insertion holes
JPH0651475U (en) * 1992-12-24 1994-07-15 立山アルミニウム工業株式会社 Shoji screen mounting structure
JPH08338176A (en) * 1995-06-14 1996-12-24 Ykk Architect Prod Kk Fitting structure of opening part unit
JPH0932425A (en) * 1995-07-18 1997-02-04 Runeizumu:Kk Inner window fitting structure
JPH09184366A (en) * 1996-01-08 1997-07-15 Tateyama Alum Ind Co Ltd Sash mounting structure in fireless sashing work
JP2004124355A (en) * 2002-07-30 2004-04-22 Sankyo Alum Ind Co Ltd Sash body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0610586U (en) * 1992-07-10 1994-02-10 ワイケイケイアーキテクチュラルプロダクツ株式会社 Cosmetic cap for shoji frame tool insertion holes
JPH0651475U (en) * 1992-12-24 1994-07-15 立山アルミニウム工業株式会社 Shoji screen mounting structure
JPH08338176A (en) * 1995-06-14 1996-12-24 Ykk Architect Prod Kk Fitting structure of opening part unit
JPH0932425A (en) * 1995-07-18 1997-02-04 Runeizumu:Kk Inner window fitting structure
JPH09184366A (en) * 1996-01-08 1997-07-15 Tateyama Alum Ind Co Ltd Sash mounting structure in fireless sashing work
JP2004124355A (en) * 2002-07-30 2004-04-22 Sankyo Alum Ind Co Ltd Sash body

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040453A (en) * 2013-08-23 2015-03-02 Ykk Ap株式会社 Fitting
JP2015196972A (en) * 2014-03-31 2015-11-09 株式会社Lixil Lock structure of composite fitting
JP2017048631A (en) * 2015-09-03 2017-03-09 株式会社Lixil Double-hung window
JP2018040152A (en) * 2016-09-07 2018-03-15 三協立山株式会社 Fixed sash window
CN108868458A (en) * 2018-07-22 2018-11-23 陈建明 A kind of Split sliding rail profile door and window
CN108868458B (en) * 2018-07-22 2024-06-11 山西惠丰型材有限公司 Split type sliding rail section bar door and window

Also Published As

Publication number Publication date
JP4568678B2 (en) 2010-10-27

Similar Documents

Publication Publication Date Title
JP4690210B2 (en) Joinery
JP4749826B2 (en) Joinery
JP4875953B2 (en) Opening device provided with opening and closing means
JP4568678B2 (en) Sash window
JP4810448B2 (en) Joinery
JP4939805B2 (en) Opening device
JP2009084785A (en) Lock device and fittings
JP5424409B2 (en) Sash with screen door
JP4755620B2 (en) Locking device and joinery
JP5361048B2 (en) Screen door fixing device and screen door, sash
JP6126422B2 (en) Joinery
JP2016176226A (en) Window device with net screen self-sliding prevention device
JP4601588B2 (en) Sash with sub-block
JP2009046867A (en) Window device
JP2019085821A (en) Fixture
JP4082685B2 (en) sash
JP4088580B2 (en) Pulling device with locking mechanism and sash window provided with the same
JP2009133088A (en) Fittings
JPH0427981Y2 (en)
JP2009019456A (en) Lock device, fitting, and curtain wall
JP2007107341A (en) Fittings
JP2019085820A (en) Fitting
JP4392368B2 (en) Joinery
JP4690295B2 (en) Raising / lowering window set and raising / lowering window construction method
JP6433833B2 (en) Locking device and joinery

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070704

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070809

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100803

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100809

R150 Certificate of patent or registration of utility model

Ref document number: 4568678

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130813

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees