JP2007004688A - Project batch management system - Google Patents

Project batch management system Download PDF

Info

Publication number
JP2007004688A
JP2007004688A JP2005186783A JP2005186783A JP2007004688A JP 2007004688 A JP2007004688 A JP 2007004688A JP 2005186783 A JP2005186783 A JP 2005186783A JP 2005186783 A JP2005186783 A JP 2005186783A JP 2007004688 A JP2007004688 A JP 2007004688A
Authority
JP
Japan
Prior art keywords
project
work
information
employee
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005186783A
Other languages
Japanese (ja)
Inventor
Kiyozumi Tanaka
清純 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Software Engineering Co Ltd
Original Assignee
Hitachi Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Software Engineering Co Ltd filed Critical Hitachi Software Engineering Co Ltd
Priority to JP2005186783A priority Critical patent/JP2007004688A/en
Publication of JP2007004688A publication Critical patent/JP2007004688A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a project batch management system which facilitates the whole progress management of a project; and can avoid a human risk of the project and the occurrence of overtime about employees involved in many projects. <P>SOLUTION: The project batch management system has a projecting information management device 101, an employee work information management device 102, a work regulation data management device 103 and a project progress information operating device 104, and the project information management device 101 manages information inherent in the project. The employee work information management device 102 manages a belonging department, a real work result, a work schedule, or the like. The work regulation data management device 103 manages a reference value inherent to the project. The project progress information operating device 104 secures personnel necessary for each task and displays a message when an overload occurs. A project leader browses the entire project progress state display and easily grasps the work state of the employees and a load. When an employee with the occurrence of a load occurs and a message is displayed, a task requiring a load and a period are estimated, a schedule is adjusted, and personnel is secured so that the project can be smoothly progressed. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、プロジェクト一括管理システムに関し、特に、プロジェクトの計画と進捗状況と従業員の作業状態を一括して管理するプロジェクト一括管理システムに関する。   The present invention relates to a project batch management system, and more particularly, to a project batch management system that collectively manages project plans and progress, and the work status of employees.

従来、プロジェクト進捗管理に関する技術として、例えば下記の特許文献1および特許文献2に開示された技術が知られている。特許文献1に開示された技術は、プロジェクトに携わる従業員の身体的特徴を予め記録しておき、日々の測定値との比較することものである。これにより、プロジェクトを管理するプロジェクトリーダが、従業員の日々の健康への配慮する際の助けとし、プロジェクト全体の安全性を高めることができる。   Conventionally, for example, techniques disclosed in Patent Document 1 and Patent Document 2 below are known as techniques related to project progress management. The technique disclosed in Patent Document 1 is to record in advance physical characteristics of employees engaged in a project and compare them with daily measurement values. This helps the project leader who manages the project to consider the day-to-day health of the employees and increase the overall safety of the project.

また、特許文献2に開示された技術は、プロジェクトの全タスクの情報共有化を行い、透明性を高め、複数プロジェクトの管理を同時に行う群管理により、複数プロジェクト間での資源(人的、物的、金銭、その他情報など)を共有することができ、効率的運用および最適化を可能とするものである。   In addition, the technology disclosed in Patent Document 2 shares information on all tasks of a project, improves transparency, and performs group management to manage multiple projects at the same time. , Money, other information, etc.) and enable efficient operation and optimization.

特開2001−282975号公報JP 2001-282975 A 特開2004−310563号公報JP 2004-310563 A

しかしながら、上記特許文献1に記載の技術は、従業員個人個人の健康に配慮することができるものの、あくまでも日々の測定値を元に考慮するため、プロジェクト計画ではなく、日々の業務管理を主眼としており、プロジェクトの計画時にどのような問題が発生するかを予期することは不可能である。また、実際に従業員に健康の問題が発生した場合でも、それがプロジェクト全体にどのように影響するかを把握することは容易ではない。   However, although the technique described in Patent Document 1 can give consideration to the health of individual employees, it focuses on daily work management, not project planning, because it is based on daily measurements. It is impossible to predict what problems will occur when planning a project. Also, even if an employee actually has a health problem, it is not easy to understand how it affects the entire project.

また、特許文献2に記載の技術は、複数プロジェクトの情報共有化を行いプロジェクト間での資源を共有することはできるものの、従業員個人個人の健康に関しては、病歴などの健康状態を登録することはできるとの記載のみであり、具体的な活用方法に関する記載がない。従って、従業員個人個人の健康状態に配慮するという観点での開示はなく、従業員の過労を見過ごしかねないといった問題がある。   In addition, although the technology described in Patent Document 2 can share information among multiple projects and share resources between projects, the health status such as medical history can be registered for the health of individual employees. There is no description about how to use it. Accordingly, there is no disclosure from the viewpoint of considering the health status of individual employees, and there is a problem that overwork of employees may be overlooked.

また、既存のプロジェクト進捗管理システムでは、プロジェクト毎に従業員の稼動状況を管理しているため、プロジェクトに新たに追加された従業員や複数プロジェクトを掛け持ちしている従業員について、プロジェクトリーダは、彼らの従前のプロジェクトや他のプロジェクトでの勤務状況について配慮する必要があるという煩わしさがあり、時には、従業員の過労を見過ごす可能性もあった。   In addition, because the existing project progress management system manages the operational status of employees for each project, the project leader for employees newly added to the project or those who have multiple projects, There was the annoyance of having to consider their work in previous projects and other projects, and sometimes overworked employees.

本発明の目的は、プロジェクト全体の進捗管理を容易にすることである。
また、多数のプロジェクトに携わる従業員について、プロジェクトの人的なリスクや超過勤務の発生を回避することができるプロジェクト一括管理システムを提供することにある。
An object of the present invention is to facilitate the progress management of the entire project.
Another object of the present invention is to provide a project collective management system capable of avoiding human risk and overtime for employees involved in a large number of projects.

本発明の一観点によれば、プロジェクト内容に関するプロジェクト情報を管理するプロジェクト情報管理装置と、従業員の作業情報を管理する従業員作業情報管理装置と、プロジェクト特有の作業規定を管理する作業規定データ管理装置と、前記プロジェクト情報、作業情報及び作業規定に基づいて作成されるプロジェクトの進捗状況に関する従業員毎の一覧表示を参照して、プロジェクトに含まれる各タスクへの必要な人員及び/又は日程の再調整を行う操作を受け付けるプロジェクト進捗状況操作装置とを有するプロジェクト一括管理システムが提供される。   According to one aspect of the present invention, a project information management device that manages project information related to project contents, an employee work information management device that manages work information of employees, and work specification data that manages project-specific work rules Referring to the management device and the list display for each employee regarding the progress status of the project created based on the project information, work information and work rules, the necessary personnel and / or schedule for each task included in the project A project batch management system is provided that includes a project progress status operating device that receives an operation for performing readjustment.

また、複数のプロジェクト内容に関するプロジェクト情報を管理するプロジェクト情報管理装置と、従業員の作業情報を管理する従業員作業情報管理装置と、それぞれのプロジェクト特有の作業規定を管理する作業規定データ管理装置と、前記プロジェクト情報、作業情報及び作業規定に基づいて作成される複数のプロジェクトに関する進捗状況に関するプロジェクト毎、従業員毎の一覧表示を参照して、各プロジェクトに含まれる各タスクへの必要な人員及び/又は日程の再調整を行う操作を受け付けるプロジェクト進捗状況操作装置とを有するプロジェクト一括管理システムが提供される。   In addition, a project information management device that manages project information regarding a plurality of project contents, an employee work information management device that manages employee work information, and a work rule data management device that manages work rules unique to each project, , By referring to the list display for each project and each employee regarding the progress of a plurality of projects created based on the project information, work information and work rules, the necessary personnel for each task included in each project, and A project collective management system is provided that includes a project progress status operation device that accepts an operation for performing readjustment of schedules.

前記プロジェクト情報、作業情報は、将来の予定を含み、前記プロジェクト進捗状況操作装置は、将来のプロジェクトの状況を前記将来の予定に基づいて推測し、プロジェクトに含まれる各タスクへの必要な人員及び/又は日程を予め調整する操作を受け付けることを特徴とする。また、前記プロジェクト進捗状況操作装置への操作による人員及び/又は日程の再調整に基づいて、前記プロジェクト情報及び前記作業情報のうち少なくとも一方が変更されることを特徴とする。   The project information and work information include a future schedule, and the project progress status operating device estimates a future project status based on the future schedule, and the necessary personnel for each task included in the project and An operation for adjusting the schedule in advance is accepted. In addition, at least one of the project information and the work information is changed based on readjustment of personnel and / or schedules by operating the project progress status operating device.

過負荷が発生している場合にはメッセージを表示することもできる。プロジェクトリーダは、プロジェクト進捗状況表示の全体を閲覧し、従業員の作業状況、負荷を容易に把握する。また、負荷が発生している従業員が発生しメッセージが表示された場合、又は発生しそうな状況であると判断した場合に、負荷のかかるタスク、期間を推測し、日程調整や人員の確保を行うことによりプロジェクトを円滑に進めることが可能となる。   A message can also be displayed if an overload has occurred. The project leader browses the entire project progress status display and easily grasps the work status and load of the employee. In addition, when an employee with a load occurs and a message is displayed, or when it is determined that the situation is likely to occur, it is possible to estimate the task and period when the load is applied, and to adjust the schedule and secure personnel By doing so, it is possible to proceed smoothly with the project.

プロジェクトを構成する各工程のみを管理の対象とする場合にはわからなかった各工程に携わる複数の従業員個人個人までを管理の対象とすることにより、各工程に潜在している従業員個人個人のリスクや負荷を明らかにすることができる。これにより、残業時間や年休行使日数状況を一元管理することにより、労務上の無理がないかをリーダが容易に検査でき、プロジェクトの計画変更のためにフィードバックされる。   Individual employees who are latent in each process by managing multiple individual employees involved in each process that were not known when only the processes that make up the project were to be managed. Can clarify the risks and burdens. In this way, the leader can easily check whether there is any unreasonable labor by managing the overtime hours and the number of days of annual leave exercised in a unified manner, and feedback is provided for changing the project plan.

本発明によれば、プロジェクトにおける人的なリスクや超過勤務の発生を回避することができる。   According to the present invention, it is possible to avoid human risk and overtime in a project.

また、過負荷が発生又は発生しそうな場合には、フォロー要員を確保することができ、プロジェクトの日程を遅らせることなく、プロジェクトの納期を遵守することが可能となる。   In addition, when overload occurs or is likely to occur, follow-up personnel can be secured, and the project delivery date can be observed without delaying the project schedule.

また、現在進行中であるプロジェクトや、他の計画段階のプロジェクトを一覧表示でき、計画段階で無理のある場合には、プロジェクト日程の調整や、人員の確保等により計画を無理なく作成することが可能となる。   In addition, projects that are currently in progress or projects at other planning stages can be displayed in a list, and if it is impossible at the planning stage, a plan can be created without difficulty by adjusting the project schedule or securing personnel. It becomes possible.

更に、作業タスクをプロジェクト毎、従業員毎に一覧表示可能なため、リーダは従業員の従事している複数のプロジェクトの作業状況の把握、管理が容易になる。   Furthermore, since the work tasks can be displayed in a list for each project and each employee, the leader can easily grasp and manage the work status of a plurality of projects in which the employee is engaged.

以下、本発明を一実施の形態によるプロジェクト一括管理システムについて図面を参照して具体的に説明する。尚、本発明は様々な分野において利用できるが、以下においては、ソフトウェア開発におけるプロジェクト計画、進捗管理に適用した場合を例にして説明する。   Hereinafter, a project collective management system according to an embodiment of the present invention will be specifically described with reference to the drawings. Although the present invention can be used in various fields, a case where the present invention is applied to project planning and progress management in software development will be described below as an example.

図1は、本実施の形態によるプロジェクト一括管理システムの一構成例を示す図である。図1に示すように、本実施の形態によるプロジェクト一括管理システムは、プロジェクト情報管理装置101と、従業員作業情報管理装置102と、作業規定データ管理装置103と、プロジェクト進捗情報操作装置104と、を有している。   FIG. 1 is a diagram showing a configuration example of a project batch management system according to the present embodiment. As shown in FIG. 1, the project batch management system according to the present embodiment includes a project information management device 101, an employee work information management device 102, a work regulation data management device 103, a project progress information operation device 104, have.

プロジェクト情報管理装置101は、そのプロジェクト特有の情報、例えば、予定生成物、予定期間、予定人員、予定スキル、詳細日程等を管理する。プロジェクト情報は、プロジェクト計画の作成時、プロジェクト計画の変更時に更新されるようになっている。   The project information management apparatus 101 manages information unique to the project, such as a planned product, a planned period, a planned personnel, a planned skill, a detailed schedule, and the like. The project information is updated when the project plan is created or when the project plan is changed.

従業員作業情報管理装置102は、所属部署、作業実績、年休取得実績、残業実績、作業予定、年休取得予定、残業予定、スキル、コスト等を管理しており、その内容は、例えば日々更新される。   The employee work information management apparatus 102 manages departments, work results, annual leave acquisition results, overtime results, work schedules, annual leave acquisition schedules, overtime schedules, skills, costs, etc. Updated.

作業規定データ管理装置103は、プロジェクトの人員や派遣会社との契約、労使協定等から、残業の制限値、一定期間内の年休数、休日出勤制限等のプロジェクト特有の基準値を管理する。   The work regulation data management device 103 manages project-specific reference values such as overtime limit values, number of annual holidays within a certain period, and holiday attendance limits, based on contracts with personnel and dispatching companies of the project, labor-management agreements, and the like.

プロジェクト進捗状況操作装置104は、プロジェクト毎、従業員毎での一覧表示に基づいてプロジェクトの進捗状況を操作し、各タスクへの必要な人員確保と人員についての作業時間と残業時間を管理・操作し、過負荷が発生している場合にはメッセージを表示する。例えば、プロジェクトリーダは、プロジェクト進捗状況表示の全体を閲覧し、従業員の作業状況、負荷を容易に把握する。また、負荷が発生している従業員が発生しメッセージが表示された場合、又は発生しそうな状況であると判断した場合に、負荷のかかるタスク、期間を推測し、日程調整や人員の確保を行うことによりプロジェクトを円滑に進めることが可能となる。   The project progress status operating device 104 operates the project progress status based on the list display for each project and for each employee, and manages and operates the required personnel for each task and the working time and overtime hours for the personnel. If an overload occurs, a message is displayed. For example, the project leader browses the entire project progress status display and easily grasps the work status and load of the employee. In addition, when an employee with a load occurs and a message is displayed, or when it is determined that the situation is likely to occur, it is possible to estimate the task and period when the load is applied, and to adjust the schedule and secure personnel By doing so, it is possible to proceed smoothly with the project.

図2は、プロジェクト情報管理装置101で管理されるプロジェクト情報のガントチャート図である。符号201はプロジェクト名を、符号202は予定タスク名を、符号203は予定スキル名を、符号204は予定期間を示す。また、符号201のプロジェクト名に基づいて、そのプロジェクトに特有の情報を表示させることも可能である。   FIG. 2 is a Gantt chart diagram of project information managed by the project information management apparatus 101. Reference numeral 201 denotes a project name, reference numeral 202 denotes a scheduled task name, reference numeral 203 denotes a scheduled skill name, and reference numeral 204 denotes a scheduled period. Further, based on the project name denoted by reference numeral 201, information specific to the project can be displayed.

例えば、Aプロジェクトでは、設計・開発・テストのタスクが含まれる。それぞれのスキルは、レベル1、2、3である。工程としては、2004年11月が設計、12月が開発、1月の前半がテストというように表示されている。Bプロジェクトのプロジェクト情報を閲覧したい場合には、PC上でBプロジェクトのタブをクリックすれば良い。   For example, the A project includes design, development, and test tasks. Each skill is level 1, 2, and 3. As processes, November 2004 is designed, December is developed, and the first half of January is tested. In order to view the project information of the B project, it is only necessary to click the B project tab on the PC.

図3は、従業員情報管理装置102において管理される情報のガントチャート図である。符号301は従業員名、符号302は従業員の持つスキル、符号303は従業員の作業状況(実線)、符号304は従業員の作業予定状況(破線)、符号305は2005年2月までの従業員の残業時間を示している。尚、符号305の残業時間は、2005年2月までの予定残業時間も含まれている。予定残業時間を含むことにより、従業員の将来にわたる負荷も推測することができる。従って、従業員の疲労度を予測し、例えば交代要員を予め確保しておくことも可能である。   FIG. 3 is a Gantt chart of information managed by the employee information management apparatus 102. Reference numeral 301 is an employee name, reference numeral 302 is an employee's skill, reference numeral 303 is an employee's work situation (solid line), reference numeral 304 is an employee's scheduled work situation (dashed line), reference numeral 305 is up to February 2005 Indicates overtime hours of employees. Note that the overtime hours indicated by reference numeral 305 include the planned overtime hours until February 2005. By including the planned overtime hours, the future load of the employee can also be estimated. Therefore, it is possible to predict the fatigue level of an employee, for example, to reserve a substitute person in advance.

図4は、プロジェクト情報管理装置101(図1)で管理されるプロジェクト情報のガントチャート図であり、図2に示すプロジェクト情報に、それぞれ担当者を選出し、設定したものである。   FIG. 4 is a Gantt chart of project information managed by the project information management apparatus 101 (FIG. 1). Persons in charge are selected and set for the project information shown in FIG.

符号401はプロジェクト名であり、符号402はタスク、符号403は担当、符号404は担当期間を示している。プロジェクト情報管理装置101で管理されるプロジェクト情報のガントチャート図によれば、例えばA〜Dまでのぞれぞれのプロジェクト毎(中図)、又は、従業員(担当:下図)毎での一覧表示が可能である。   Reference numeral 401 denotes a project name, reference numeral 402 denotes a task, reference numeral 403 denotes a charge, and reference numeral 404 denotes a charge period. According to the Gantt chart of project information managed by the project information management apparatus 101, for example, a list for each project (middle diagram) from A to D or for each employee (charge: the following diagram) Display is possible.

また、符号405は負荷のかかっているタスク、期間を示しており、この場合、担当従業員Iに対し、プロジェクトCの11月に負荷がかかっていることを示している。従って、プロジェクトリーダは、何らかの改善をしなければ、従業員Iの健康が損なわれ、プロジェクトの進捗に著しい問題が発生する恐れがあることを知ることができる。尚、負荷がかかっている場合には、何らかのメッセージが表示され、プロジェクトリーダは、日程調整、人員確保を行う必要があることを知ることができる。図4の中図に示すように、プロジェクト毎に、各プロジェクトのタスクと担当との工程と負荷のかかり具合を知ることができるとともに、図4下図のように、各担当毎に、担当しているプロジェクトとタスクとに関連して工程と負荷のかかり具合を間単に知ることができるため、様々な角度からプロジェクトを分析することができる。   Reference numeral 405 indicates a task and a period in which a load is applied. In this case, a charge is applied to the employee I in charge in November of the project C. Therefore, the project leader can know that unless some improvement is made, the health of the employee I may be impaired and a significant problem may occur in the progress of the project. When a load is applied, some message is displayed, and the project leader can know that it is necessary to adjust the schedule and secure personnel. As shown in the middle diagram of Fig. 4, the process and load of each project task and charge can be known for each project, and each charge is assigned to each project as shown in the lower figure of Fig. 4. It is possible to analyze the project from various angles because the process and load can be easily known in relation to the existing project and task.

図5は、プロジェクトが進行中に、風邪等で体調を崩した従業員がいる場合に、それをカバーするフォロー要員を選出する際に、参照することができる従業員情報管理装置内の従業員情報のガントチャート図である。符号501は体調を崩した従業員名(又はID)、符号502は体調を崩した従業員の担当していたプロジェクト名、符号503は体調を崩した従業員の担当していたプロジェクトにおけるタスク、符号504は体調を崩した従業員の作業予定期間を示している。また、符号505はフォロー要員として選出された従業員(担当)名、符号506はフォロー要員として選出された従業員(担当)の現在の作業期間や予定の作業期間を示している。   Fig. 5 shows the employees in the employee information management device that can be referred to when selecting follow-up personnel who cover a physical condition caused by a cold while the project is in progress. It is a Gantt chart figure of information. Reference numeral 501 is the name of the employee (or ID) who has lost his / her physical condition, reference numeral 502 is the name of the project that the employee who has lost his / her physical condition is in charge, and reference numeral 503 is the task in the project that has been in charge of the employee who has lost his / her physical condition, Reference numeral 504 indicates the scheduled work period of an employee who has lost physical condition. Reference numeral 505 indicates the name of the employee (in charge) selected as the follower, and reference numeral 506 indicates the current work period or the scheduled work period of the employee (charge) selected as the follower.

以上の説明を踏まえて、本形態によるプロジェクト計画・進捗管理処理の流れについて、図6のフローチャート図を参照して説明する。適宜図1から5までを参照して説明する。   Based on the above description, the flow of the project plan / progress management process according to this embodiment will be described with reference to the flowchart of FIG. This will be described with reference to FIGS.

プロジェクトリーダがプロジェクトを新規に計画する際、または、プロジェクトに変更があり、プロジェクトを再計画する際に、プロジェクト進捗情報操作装置104のプロジェクト進捗管理画面から(スタート)、プロジェクト情報管理装置101にアクセスし、プロジェクトを新規に計画する場合は、プロジェクト情報を作成し、プロジェクトの計画を変更する場合はプロジェクト情報を取得する(ステップS1)。   When the project leader plans a new project or when there is a change in the project and the project is re-planned, the project information management apparatus 101 is accessed from the project progress management screen of the project progress information operation apparatus 104 (start). When planning a new project, project information is created, and when changing the project plan, the project information is acquired (step S1).

次に、プロジェクトの計画が新規か変更かに関する計画の状態を判断し、新規か変更かにより後続の処理を変える(ステップS2)。   Next, the status of the plan relating to whether the project plan is new or changed is determined, and the subsequent processing is changed depending on whether the plan is new or changed (step S2).

ステップS2において、プロジェクト計画を新規に作成する場合は、プロジェクトを複数の詳細なタスクに分割し、タスク毎に、タスクの性質、環境を考慮し、タスク遂行に必要と思われるスキルを設定する(ステップS3)。   In step S2, when creating a new project plan, the project is divided into a plurality of detailed tasks, and for each task, the nature of the task and the environment are considered, and skills that are considered necessary for task execution are set ( Step S3).

次に、従業員作業情報管理装置102と連携して、従業員作業情報管理装置102内の従業員情報から、従業員のスキルレベル302と作業状況303と作業予定304とを含む情報を参照し、各タスクに適切と思われる人員を選出し、各タスクに割り振る(ステップS4)。   Next, in cooperation with the employee work information management apparatus 102, information including the skill level 302, work status 303, and work schedule 304 of the employee is referred to from the employee information in the employee work information management apparatus 102. A person who is considered appropriate for each task is selected and assigned to each task (step S4).

プロジェクトの計画を変更する場合は、プロジェクトのタスクと、タスク遂行に必要とされるスキルレベルと、の見直しを行い、再設定を行う(ステップS5)。次に、人員の調整が必要であるか否かを判断し(ステップS6)、人員の調整が必要である場合には(YES)、従業員作業情報管理装置102と連携して、人員の調整を行う(ステップS7)。人員の調整が必要ない場合(NO)又は、ステップS4からは、従業員作業情報管理装置102からタスク毎に選出された人員の作業量を取得する(ステップS8)。その際、作業量と共に、残業時間、休日出勤の回数を取得する。   When the project plan is changed, the task of the project and the skill level required for performing the task are reviewed and reset (step S5). Next, it is determined whether or not personnel adjustment is necessary (step S6). If personnel adjustment is necessary (YES), the personnel adjustment is performed in cooperation with the employee work information management apparatus 102. (Step S7). When the adjustment of personnel is not necessary (NO), or from step S4, the work amount of the personnel selected for each task is acquired from the employee work information management apparatus 102 (step S8). At that time, along with the amount of work, the overtime hours and the number of days of holiday work are acquired.

次に、作業規定データ管理装置103に記憶される社内規定や労使協定を参照して、残業制限値、休日出勤限値、年休取得状況等の就業規則に関連する情報を取得する(ステップS9)。次に、タスク毎の人員、日程を調整する(ステップS10)。次に、ステップS11において、プロジェクトに関わる人員の作業時間等の妥当性を判定し、残業制限等をオーバーして作業を行う人員、タスク、期間があれば(NO)、ステップS14において、図4の点線405などでわかるように表示するとともに、メッセージを報知し、ステップS10に戻り、人員、日程の再調整を行う。   Next, with reference to in-house rules and labor-management agreements stored in the work rule data management apparatus 103, information related to the work rules such as overtime limit value, holiday attendance limit value, annual leave acquisition status, etc. is acquired (step S9). ). Next, the personnel and schedule for each task are adjusted (step S10). Next, in step S11, the validity of the work time of the personnel involved in the project is determined, and if there is a person, task, or period that works over the overtime limit or the like (NO), in step S14, FIG. As shown by the dotted line 405 or the like, a message is notified and the process returns to step S10 to readjust the personnel and schedule.

また、ステップS11の判定において、残業制限値等の値をオーバーしていない場合には(YES)、プロジェクト情報管理装置101と従業員作業情報管理装置102へ計画したプロジェクトの情報を反映する(ステップS12、S13)。   If it is determined in step S11 that the overtime limit value or the like is not exceeded (YES), the planned project information is reflected in the project information management apparatus 101 and the employee work information management apparatus 102 (step S11). S12, S13).

次に、従業員がオーバーワークの場合における、フォロー要員を選出する処理の流れを図7のフローチャート図を参照して説明する。   Next, the flow of processing for selecting follow-up personnel when the employee is overworked will be described with reference to the flowchart of FIG.

まず、プロジェクト進捗情報操作装置104のプロジェクト進捗管理画面から、プロジェクト情報管理装置101にアクセスし、プロジェクト情報を取得する(ステップS21)。   First, the project information management apparatus 101 is accessed from the project progress management screen of the project progress information operation apparatus 104, and project information is acquired (step S21).

次に、従業員Iを休職とする(ステップS22)。次に、従業員作業情報管理装置102と連携し、従業員作業情報管理装置102内の従業員情報から、従業員Iのタスク、期間等の情報を参考に、各タスクに適切と思われる人員を選出し、割り振る(ステップS23)。次に、従業員作業情報管理装置102からタスク毎に選出された人員の作業量を取得する(ステップS24)。その際、作業量とともに、残業時間、休出回数を取得する。   Next, employee I is suspended (step S22). Next, in cooperation with the employee work information management apparatus 102, referring to information on the task, period, etc. of the employee I from the employee information in the employee work information management apparatus 102, personnel who are considered appropriate for each task Are selected and allocated (step S23). Next, the work amount of the personnel selected for each task is acquired from the employee work information management apparatus 102 (step S24). At that time, along with the work amount, the overtime hours and the number of leave times are acquired.

次に、作業規定データ管理装置103から社内規定や労使協定から、残業制限値、休出制限値、年休取得頻度の情報を取得する(ステップS25)。   Next, information on the overtime limit value, the leave limit value, and the annual leave acquisition frequency is acquired from the work rule data management device 103 from the in-house rules and the labor-management agreement (step S25).

次に、ステップS23において選出されたフォロー要員の作業時間等の妥当性を判定する(ステップS26)。ステップS26の判定で残業制限値等をオーバーした場合(NO)、ステップS30において、プロジェクトの日程、スキルレベルの調整を行う。
また、ステップS26の判定で残業制限値等の値をオーバーしていない場合は(YES)、プロジェクト情報管理装置101と従業員作業情報管理装置102へ計画したプロジェクトの情報を反映させる(ステップS28、S29)。
Next, the validity of the work time and the like of the follower selected in step S23 is determined (step S26). If the overtime limit value or the like is exceeded in the determination in step S26 (NO), the project schedule and skill level are adjusted in step S30.
Further, if the overtime limit value or the like is not exceeded in the determination in step S26 (YES), the planned project information is reflected in the project information management apparatus 101 and the employee work information management apparatus 102 (step S28, S29).

以上に説明したように、本発明の実施の形態によるプロジェクト一括管理システムによれば、プロジェクトの各タスクに人員を割り当て、作業時間、残業時間、年休行使日数を管理し、従業員個人個人に着目し、各人の作業状況を把握し、精神的ストレスや身体的ストレス等を未然にチェックし、過負荷が発生している人員がいる場合にはメッセージを出力し、人的なリスクや超過勤務の発生を回避することができる。   As described above, according to the project collective management system according to the embodiment of the present invention, personnel are assigned to each task of the project, work hours, overtime hours, annual leave days are managed, and individual employees are managed. Pay attention, understand the work status of each person, check mental stress and physical stress, etc., and output a message if there is an overloaded person, human risk or excess Occurrence of work can be avoided.

また、過負荷が発生している人員のフォロー要員を確保する作業が容易になり、プロジェクトの日程を遅らせることなく、プロジェクトの納期を遵守することが可能となる。   In addition, it becomes easy to secure follow-up personnel for the overloaded personnel, and it becomes possible to comply with the project delivery date without delaying the project schedule.

また、計画当初に、現在進行中であるプロジェクトや、他の計画段階のプロジェクトを一覧表示できるため、計画段階で無理のあることが判明した場合には、プロジェクト日程の調整や、人員の確保等により計画を無理なく作成することが可能となる。   In addition, since projects that are currently in progress or projects at other planning stages can be displayed in a list at the beginning of the planning, adjustment of the project schedule, securing of personnel, etc. should be made if it is found impossible at the planning stage. This makes it possible to create a plan without difficulty.

さらに、作業タスクをプロジェクト毎、従業員毎に一覧表示可能なため、リーダは従業員の従事している複数のプロジェクトにおける作業状況の把握、管理が容易になる。   Furthermore, since the work tasks can be displayed in a list for each project and each employee, the leader can easily grasp and manage the work status in a plurality of projects in which the employee is engaged.

また、複数プロジェクトをタスク単位で管理するため、従来は難しかった他のプロジェクトに従事している人員を、トラブルの発生している又は発生しそうなプロジェクトのフォロー要員として確保することが可能となる。そのため、複数のプロジェクトを並行して進行することが可能となり、作業の効率化が可能となり、また、管理も容易となる。   In addition, since a plurality of projects are managed in units of tasks, it is possible to secure personnel who are engaged in other projects that have been difficult in the past as follow-up personnel for projects in which trouble has occurred or is likely to occur. Therefore, it is possible to proceed with a plurality of projects in parallel, work efficiency can be improved, and management becomes easy.

本発明は、プロジェクトの管理システムとして利用可能である。   The present invention can be used as a project management system.

本発明の一実施の形態によるプロジェクト一括管理システムの概略構成例を示すシステム図である。1 is a system diagram showing a schematic configuration example of a project batch management system according to an embodiment of the present invention. 本実施の形態によるプロジェクト情報管理装置内で管理されるプロジェクト情報のガントチャート図である。It is a Gantt chart figure of the project information managed in the project information management device by this embodiment. 本実施の形態による従業員作業情報管理装置内で管理される従業員情報のガントチャート図である。It is a Gantt chart figure of employee information managed in the employee work information management device by this embodiment. 本実施の形態によるプロジェクト情報管理装置内で管理される、担当者情報が設定されたプロジェクト情報のガントチャート図である。It is a Gantt chart figure of the project information set in the person-in-charge information managed in the project information management apparatus by this Embodiment. 本実施の形態によるプロジェクトを担当する従業員がダウンした場合に、フォロー要員を選出するためのガントチャート図である。It is a Gantt chart figure for selecting a follow person when the employee in charge of the project by this embodiment goes down. 本実施の形態によるプロジェクト計画の新規作成、変更時の処理手順を示すフローチャート図である。It is a flowchart figure which shows the process sequence at the time of the new creation of a project plan by this Embodiment, and a change. 本実施の形態によるプロジェクトを担当する従業員がダウンした場合に、フォロー要員を選出する処理手順を示すフローチャート図である。It is a flowchart figure which shows the process sequence which elects a follow personnel when the employee in charge of the project by this Embodiment goes down.

符号の説明Explanation of symbols

101…プロジェクト情報管理装置、102…従業員作業情報管理装置、103…作業規定データ管理装置、104…プロジェクト進捗情報操作装置。   DESCRIPTION OF SYMBOLS 101 ... Project information management apparatus, 102 ... Employee work information management apparatus, 103 ... Work regulation data management apparatus, 104 ... Project progress information operation apparatus.

Claims (4)

プロジェクト内容に関するプロジェクト情報を管理するプロジェクト情報管理装置と、
従業員の作業情報を管理する従業員作業情報管理装置と、
プロジェクト特有の作業規定を管理する作業規定データ管理装置と、
前記プロジェクト情報、作業情報及び作業規定に基づいて作成されるプロジェクトの進捗状況に関する従業員毎の一覧表示を参照して、プロジェクトに含まれる各タスクへの必要な人員及び/又は日程の再調整を行う操作を受け付けるプロジェクト進捗状況操作装置と
を有するプロジェクト一括管理システム。
A project information management device for managing project information related to the project contents;
An employee work information management device for managing employee work information;
A work regulation data management device for managing project-specific work regulations;
Refer to the list of each employee regarding the progress of the project created based on the project information, work information and work rules, and readjust the necessary personnel and / or schedule for each task included in the project. A project batch management system having a project progress status operating device that receives operations to be performed.
複数のプロジェクト内容に関するプロジェクト情報を管理するプロジェクト情報管理装置と、
従業員の作業情報を管理する従業員作業情報管理装置と、
それぞれのプロジェクト特有の作業規定を管理する作業規定データ管理装置と、
前記プロジェクト情報、作業情報及び作業規定に基づいて作成される複数のプロジェクトの進捗状況に関するプロジェクト毎、従業員毎の一覧表示を参照して、各プロジェクトに含まれる各タスクへの必要な人員及び/又は日程の再調整を行う操作を受け付けるプロジェクト進捗状況操作装置と
を有するプロジェクト一括管理システム。
A project information management device for managing project information on a plurality of project contents;
An employee work information management device for managing employee work information;
A work regulation data management device for managing the work regulations specific to each project;
With reference to the list display for each project and each employee regarding the progress of a plurality of projects created based on the project information, work information and work rules, the necessary personnel for each task included in each project and / or Alternatively, a project collective management system having a project progress status operating device that accepts an operation for readjusting the schedule.
前記プロジェクト情報、作業情報は、将来の予定を含み、前記プロジェクト進捗状況操作装置は、将来のプロジェクトの状況を前記将来の予定に基づいて推測し、プロジェクトに含まれる各タスクへの必要な人員及び/又は日程を予め調整する操作を受け付けることを特徴とする請求項1又は2に記載のプロジェクト一括管理システム。   The project information and work information include a future schedule, and the project progress status operating device estimates a future project status based on the future schedule, and the necessary personnel for each task included in the project and 3. The project batch management system according to claim 1, wherein an operation for adjusting the schedule in advance is accepted. 前記プロジェクト進捗状況操作装置への操作による人員及び/又は日程の再調整に基づいて、前記プロジェクト情報及び前記作業情報のうち少なくとも一方が変更されることを特徴とする請求項1から3までのいずれか1項に記載のプロジェクト一括管理システム。   4. The method according to claim 1, wherein at least one of the project information and the work information is changed based on readjustment of personnel and / or schedules by operating the project progress status operating device. The project collective management system according to item 1.
JP2005186783A 2005-06-27 2005-06-27 Project batch management system Pending JP2007004688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005186783A JP2007004688A (en) 2005-06-27 2005-06-27 Project batch management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005186783A JP2007004688A (en) 2005-06-27 2005-06-27 Project batch management system

Publications (1)

Publication Number Publication Date
JP2007004688A true JP2007004688A (en) 2007-01-11

Family

ID=37690217

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005186783A Pending JP2007004688A (en) 2005-06-27 2005-06-27 Project batch management system

Country Status (1)

Country Link
JP (1) JP2007004688A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700177A (en) * 2013-12-09 2015-06-10 广州市科秀电子科技有限公司 Collaborative work platform
JP2016042245A (en) * 2014-08-14 2016-03-31 インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation System, method, and program for managing projects
JP2017021794A (en) * 2015-07-09 2017-01-26 ゼネラル・エレクトリック・カンパニイ Method and system for managing personnel work disruption in safety critical industries
JP2020067758A (en) * 2018-10-23 2020-04-30 株式会社シンプルウェイ Program, information processing apparatus, and information processing method
JP2021124769A (en) * 2020-01-31 2021-08-30 株式会社パトライト Work efficiency support system, work efficiency support method, work efficiency support server, and computer program

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700177A (en) * 2013-12-09 2015-06-10 广州市科秀电子科技有限公司 Collaborative work platform
JP2016042245A (en) * 2014-08-14 2016-03-31 インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation System, method, and program for managing projects
JP2017021794A (en) * 2015-07-09 2017-01-26 ゼネラル・エレクトリック・カンパニイ Method and system for managing personnel work disruption in safety critical industries
JP2020067758A (en) * 2018-10-23 2020-04-30 株式会社シンプルウェイ Program, information processing apparatus, and information processing method
JP2021124769A (en) * 2020-01-31 2021-08-30 株式会社パトライト Work efficiency support system, work efficiency support method, work efficiency support server, and computer program

Similar Documents

Publication Publication Date Title
Abdalkareem et al. Healthcare scheduling in optimization context: a review
Maenhout et al. An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems
Vijayakumar et al. A dual bin-packing approach to scheduling surgical cases at a publicly-funded hospital
Stolletz et al. Fair optimization of fortnightly physician schedules with flexible shifts
Hendriks et al. Human resource allocation in a multi-project R&D environment: resource capacity allocation and project portfolio planning in practice
Al-Turki et al. Integrated maintenance planning
Silvestro et al. An evaluation of nurse rostering practices in the National Health Service
Ang et al. Nurse workforce scheduling in the emergency department: a sequential decision support system considering multiple objectives
US20120173253A1 (en) System, method, and computer program product for reducing the burden on scheduling systems by forecasting a demand for medical resources
Gross et al. Online rescheduling of physicians in hospitals
US20150242782A1 (en) Interactive Planning Method And Tool
Sperandio et al. An intelligent decision support system for the operating theater: A case study
Altner et al. A two-stage stochastic program for multi-shift, multi-analyst, workforce optimization with multiple on-call options
JP2007004688A (en) Project batch management system
Doebbeling et al. Optimizing perioperative decision making: improved information for clinical workflow planning
JP2021144756A (en) Project plan formulation system
Aktunc et al. Nurse scheduling with shift preferences in a surgical suite using goal programming
Van Huele et al. Operating theatre modelling: integrating social measures
Di Martinelly Proposition of a framework to reengineer and evaluate the hospital supply chain
Fitzpatrick Using science to improve the art of staffing
Steenweg et al. Evaluating shift patterns considering heterogeneous skills and uncertain workforce availability
Simić et al. A novel fuzzy metaheuristic approach in nurse rerostering problem
Souza et al. Application of heijunka for surgical production leveling
Rooms Fairness in physician scheduling problem in emergency rooms
Niveditha Re-engineering the outpatient process flow of a multi-speciality hospital