JP2006350690A - Field apparatus - Google Patents

Field apparatus Download PDF

Info

Publication number
JP2006350690A
JP2006350690A JP2005176087A JP2005176087A JP2006350690A JP 2006350690 A JP2006350690 A JP 2006350690A JP 2005176087 A JP2005176087 A JP 2005176087A JP 2005176087 A JP2005176087 A JP 2005176087A JP 2006350690 A JP2006350690 A JP 2006350690A
Authority
JP
Japan
Prior art keywords
maintenance
field device
time
field
calculation means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2005176087A
Other languages
Japanese (ja)
Inventor
Shinya Nakagawa
慎也 中川
Seiichiro Takahashi
誠一郎 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yokogawa Electric Corp
Original Assignee
Yokogawa Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yokogawa Electric Corp filed Critical Yokogawa Electric Corp
Priority to JP2005176087A priority Critical patent/JP2006350690A/en
Publication of JP2006350690A publication Critical patent/JP2006350690A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a field apparatus that can prevent human error of periodical work for the field apparatus. <P>SOLUTION: The apparatus includes: a maintenance timing calculation means, which is arranged in the field apparatus, for calculating a maintenance timing when performing maintenance after the lapse of a predetermined period in the field apparatus installed in a field; a maintenance confirmation display means, which is arranged in the field apparatus, for processing a maintenance confirmation display on the basis of a maintenance signal from the maintenance timing calculation means; and/or a maintenance confirmation display indicator, which is arranged in the field apparatus, for displaying the maintenance confirmation display on the basis of maintenance signal from the maintenance time calculation means. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、伝送器や流量計などのフィールド機器に関するものである。   The present invention relates to a field device such as a transmitter or a flow meter.

フィールド機器に関連する先行技術文献としては次のようなものがある。   Prior art documents related to field devices include the following.

特開2002-008176号公報JP 2002-008176 A

図3は、従来より一般に使用されている従来例の要部構成説明図、図4は図3の要部構成説明図である。   FIG. 3 is a diagram illustrating the configuration of a main part of a conventional example that is generally used, and FIG. 4 is a diagram illustrating the configuration of the main part of FIG.

図において、NO.1〜NO.7はプラント内の温度伝送器である。
NO.1〜NO.7の温度伝送器はフィールドバスで結ばれており、測定値(動作)、警報等の情報がコントロール装置1もしくはハンドヘルドPC10に送られるようになっている。
NO.1〜NO.4の温度伝送器は人間が近づけない高所に設置されていて指示計が付いていない。
In the figure, NO. 1-NO. Reference numeral 7 denotes a temperature transmitter in the plant.
NO. 1-NO. The temperature transmitter 7 is connected by a field bus, and information such as measured values (operations) and alarms is sent to the control device 1 or the handheld PC 10.
NO. 1-NO. The temperature transmitter No. 4 is installed at a high place where humans cannot approach it and does not have an indicator.

NO.5〜NO.7の温度伝送器は地表近くに設置されていて指示計が付いている。
図3において、コントロール装置1の画面もしくはハンドヘルドPCのLCDにて各温度伝送器(NO.1〜NO.7)の測定値、警報の情報を表示することができる。
人間が近づけない高所に設置されているNO.1〜NO.4の温度伝送器もしくは,LCDのついていないフィールド機器の測定値、警報はコントロール装置1もしくはハンドヘルドPCを介して容易に知ることができる。
NO. 5-NO. 7 temperature transmitter is installed near the surface of the earth and has an indicator.
In FIG. 3, the measured value of each temperature transmitter (NO.1-NO.7) and alarm information can be displayed on the screen of the control device 1 or the LCD of the handheld PC.
NO. Installed in a high place where human beings cannot approach. 1-NO. The measured value and alarm of the temperature transmitter 4 or the field device without the LCD can be easily known through the control device 1 or the handheld PC.

地表近くに設置されていて指示計が付いている温度伝送器であるNO.5〜NO.7については、人間が近づいてこれらの温度伝送器の測定値、警報等の情報を確認することが可能である   No. is a temperature transmitter that is installed near the ground surface and has an indicator. 5-NO. As for No. 7, it is possible for humans to approach and confirm information such as measured values and alarms of these temperature transmitters.

ただしこれらの温度伝送器の測定値、警報の経歴等の複雑・詳細な情報を確認するにはこのように指示計が付いているだけでは難しい。
そのような詳細な情報を得るためにはコントロール装置もしくはハンドヘルドPCの操作キーからの各温度伝送器のアドレスを入力することにより各温度伝送器の測定値、警報等の情報を適宜知ることにより達成される。
However, in order to confirm complicated and detailed information such as the measured values of these temperature transmitters and the history of alarms, it is difficult to simply provide an indicator in this way.
In order to obtain such detailed information, it is achieved by inputting the address of each temperature transmitter from the operation key of the control device or the handheld PC, and appropriately knowing information such as measured values and alarms of each temperature transmitter. Is done.

このような装置においては、以下の問題点がある。
フィールド機器は設置や保守の目的で、現場で校正したり調整したりすることが多い。
アナログ機器は直接出力信号を機器から取り出してその信号レベルをモニターしていた1対1の通信であり調整対象の機器が自明であった。
Such an apparatus has the following problems.
Field devices are often calibrated and adjusted on site for installation and maintenance purposes.
The analog device is a one-to-one communication in which an output signal is directly taken out from the device and the signal level is monitored, and the device to be adjusted is obvious.

しかしフィールドバス通信対応の機器11では複数の同じような機器が接続されている環境で調整作業を行うとき、図4に示す如く、機器11の選択はタグ札12の名前やフィールド機器の情報だけが頼りとなる。
実際に目の前にある機器が果たして現場のモニターツールで見ている機器と一致しているかは、機器に取り付けられたタグ札のタグ名とモニターで識別されるタグ名の一致の確認に頼るしかなかった。
However, when the adjustment work is performed in an environment in which a plurality of similar devices are connected in the device 11 compatible with fieldbus communication, as shown in FIG. Can be relied upon.
Whether the device in front of you actually matches the device you are looking at on-site monitoring tools depends on checking the tag name on the tag tag attached to the device and the tag name identified on the monitor. There was only.

タグ名は数値で示されることが多く、識別のミスも起きやすいし、機器に設定される機器タグ名も人為的なミスで間違いが発生する可能性もある。
更に、機器に直付けされているタグ札は劣化により解読が困難な場合がある。
従来機器では保守などの定期的な作業を行う際,その対象となる機器の特定は管理表に基づき行われている。
複数の機器が存在する場合,その対象であるにもかかわらず対象から外れたり,取り間違えて作業されてしまう人的ミスの可能性がある。
The tag name is often indicated by a numerical value, and an identification error is likely to occur, and the device tag name set to the device may be erroneous due to a human error.
Furthermore, the tag tag directly attached to the device may be difficult to decipher due to deterioration.
When performing regular work such as maintenance in conventional equipment, the equipment to be targeted is specified based on a management table.
When there are multiple devices, there is a possibility of a human error that is not the target even though it is the target, or that it is mistakenly operated.

本発明の目的は、フィールド機器に一定時刻になると、一定時刻が到来したことをフィールド機器自身が何らかの表示をする。
あるいは、ハンドヘルドPCや上位システムに対して通知する仕組みを持たせ,フィールド機器に対しての定期的な作業のヒューマンエラーを防止できるフィールド機器を提供することにある。
An object of the present invention is that the field device itself displays some indication that the certain time has arrived at a certain time on the field device.
Another object is to provide a field device capable of providing a mechanism for notifying a handheld PC or a host system and preventing human errors in periodic work on the field device.

このような課題を達成するために、本発明では、請求項1のフィールド機器においては、
フィールドに設置されているフィールド機器において、前記フィールド機器に設けられ所定期間経過後のメンテナンスを実施するメンテナンス時期を演算するメンテナンス時期演算手段と、前記フィールド機器に設けられ前記メンテナンス時期演算手段からのメンテナンス信号に基づきメンテナンス確認表示を処理するメンテナンス確認表示手段及びまたは、前記フィールド機器に設けられ前記メンテナンス時期演算手段からのメンテナンス信号に基づきメンテナンス確認表示を表示するメンテナンス確認表示器とを具備したことを特徴とする。
In order to achieve such a problem, in the present invention, in the field device of claim 1,
In a field device installed in a field, maintenance time calculation means for calculating a maintenance time for performing maintenance after a predetermined period of time provided in the field device, and maintenance from the maintenance time calculation means provided in the field device Maintenance confirmation display means for processing a maintenance confirmation display based on a signal and a maintenance confirmation display provided on the field device and displaying a maintenance confirmation display based on a maintenance signal from the maintenance time calculation means. And

本発明の請求項2のフィールド機器においては、請求項1記載のフィールド機器において、
前記メンテナンス時期演算手段からのメンテナンス信号は、前記フィールド機器をコントロールするコントロール装置にも送付されることを特徴とする。
In the field device according to claim 2 of the present invention, in the field device according to claim 1,
A maintenance signal from the maintenance time calculation means is also sent to a control device that controls the field device.

本発明の請求項3のフィールド機器においては、請求項2記載のフィールド機器において、
前記所定期間の算定は、前記コントロール装置からの時間情報に基づき算定されることを特徴とする。
In the field device according to claim 3 of the present invention, in the field device according to claim 2,
The predetermined period is calculated based on time information from the control device.

本発明の請求項4のフィールド機器においては、請求項1乃至請求項3の何れかに記載のフィールド機器において、
前記所定期間経過時より所定時間前に予報メンテナンス信号を送る予報メンテナンス信号送付手段を具備したことを特徴とする。
In the field device according to claim 4 of the present invention, in the field device according to any one of claims 1 to 3,
A forecast maintenance signal sending means for sending a forecast maintenance signal a predetermined time before the lapse of the predetermined period is provided.

本発明の請求項5のフィールド機器においては、請求項1乃至請求項4の何れかに記載のフィールド機器において、
前記所定期間経過時より所定時間後に経過メンテナンス信号を送る経過メンテナンス信号送付手段を具備したことを特徴とする。
In the field device according to claim 5 of the present invention, in the field device according to any one of claims 1 to 4,
A progress maintenance signal sending means for sending a progress maintenance signal after a predetermined time from when the predetermined period has elapsed is provided.

本発明の請求項1によれば、次のような効果がある。
従来では,フィールド機器に対して,定期的な作業(保守等)が必要な場合,対象を取り間違えたり,作業抜けが発生する。
これに対して、フィールド機器に時期を特定する仕組みをもたせ,指定された時期になると外部(LCDやLED)に対して通知を行うようにすることで,定期的な作業における対象であることを示し,定期的な作業時におけるヒューマンエラー(作業抜け,取り間違い)を防止することができるフィールド機器が得られる。
According to claim 1 of the present invention, there are the following effects.
Conventionally, when periodic work (maintenance, etc.) is required for a field device, the target is mistaken or work is lost.
On the other hand, by providing the field device with a mechanism for specifying the time and notifying the outside (LCD or LED) when the specified time comes, it can be a target for periodic work. As a result, a field device that can prevent human errors (missing work, mistakes) during regular work can be obtained.

本発明の請求項2によれば、次のような効果がある。
メンテナンス時期演算手段からのメンテナンス信号は、フィールド機器をコントロールするコントロール装置にも送付されるので、コントロール装置における、識別に便利なフィールド機器が得られる。
According to claim 2 of the present invention, there are the following effects.
Since the maintenance signal from the maintenance time calculation means is also sent to a control device that controls the field device, a field device that is convenient for identification in the control device can be obtained.

本発明の請求項3によれば、次のような効果がある。
所定期間の算定は、コントロール装置からの時間情報に基づき算定されるので、メンテナンス時期算定の精度がより向上されたフィールド機器が得られる。
また、時間情報を発生する手段をフィールド機器自身が備える必要が無く安価なフィールド機器が得られる。
According to claim 3 of the present invention, there are the following effects.
Since the calculation of the predetermined period is calculated based on time information from the control device, a field device with improved accuracy of the maintenance time calculation can be obtained.
Further, it is not necessary for the field device itself to have means for generating time information, and an inexpensive field device can be obtained.

本発明の請求項4によれば、次のような効果がある。
所定期間経過時より所定時間前に予報メンテナンス信号を送る予報メンテナンス信号送付手段が設けられたので、メンテナンス時期をあらかじめ知ることができるフィールド機器が得られる。
According to claim 4 of the present invention, there are the following effects.
Since the forecast maintenance signal sending means for sending the forecast maintenance signal a predetermined time before the elapse of the predetermined period is provided, a field device that can know the maintenance time in advance can be obtained.

本発明の請求項5によれば、次のような効果がある。
所定期間経過時より所定時間後に経過メンテナンス信号を送る経過メンテナンス信号送付手段が設けられたので、メンテナンス作業の確認が確実にできるフィールド機器が得られる。
According to claim 5 of the present invention, there are the following effects.
Since the progress maintenance signal sending means for sending the progress maintenance signal after a predetermined time from the elapse of the predetermined period is provided, a field device capable of surely confirming the maintenance work is obtained.

以下本発明を図面を用いて詳細に説明する。
図1は本発明の一実施例の要部構成説明図である。
図において、図3と同一記号の構成は同一機能を表す。
以下、図3との相違部分のみ説明する。
Hereinafter, the present invention will be described in detail with reference to the drawings.
FIG. 1 is an explanatory view of the main part configuration of an embodiment of the present invention.
In the figure, configurations with the same symbols as in FIG. 3 represent the same functions.
Only the difference from FIG. 3 will be described below.

図1において、メンテナンス時期演算手段21(図示せず)は、フィールド機器Aに設けられ所定期間経過後のメンテナンスを実施するメンテナンス時期を演算する。
この場合は、フィールド機器内に内蔵されている。
時間の管理は,ある特定された日時の監視や,周期的な時間の監視などで行う。
メンテナンス確認表示手段22は、フィールド機器Aに設けられ、メンテナンス時期演算手段21からのメンテナンス信号に基づき、メンテナンス確認表示を処理する。
In FIG. 1, a maintenance time calculation means 21 (not shown) calculates a maintenance time provided in the field device A and performing maintenance after a predetermined period.
In this case, it is built in the field device.
Time management is performed by monitoring a specific date and time or periodically monitoring time.
The maintenance confirmation display means 22 is provided in the field device A and processes the maintenance confirmation display based on the maintenance signal from the maintenance time calculation means 21.

メンテナンス確認表示手段22からの通知方法は、文字であったり,アイコンであったりする。
この場合は、伝送器のLCD表示パネルの一部に、図1に示す如く、特定のマークBを表示させるようにしてある。
The notification method from the maintenance confirmation display means 22 is a character or an icon.
In this case, a specific mark B is displayed on a part of the LCD display panel of the transmitter as shown in FIG.

メンテナンス確認表示器23は、フィールド機器Aに設けられ、メンテナンス時期演算手段21からのメンテナンス信号に基づきメンテナンス確認表示を表示する。
この場合は、図1に示す如く、LEDが使用されている。
The maintenance confirmation indicator 23 is provided in the field device A, and displays a maintenance confirmation display based on a maintenance signal from the maintenance time calculation means 21.
In this case, LEDs are used as shown in FIG.

なお、LCDでの特定マークの表示とLEDは、そのどちらか一方があっても良いし、また両方があっても良い。
両方があれば明るい炎天下ではLCDの表示が、暗いところではLEDの表示が使えるので条件を問わずに使用できるメリットがある。
Note that either one or both of the specific mark display and the LED on the LCD may be provided.
If both are present, the LCD display can be used under bright heat, and the LED display can be used in dark places.

この結果、従来では,フィールド機器に対して,定期的な作業(保守等)が必要な場合,対象を取り間違えたり,作業抜けが発生する。
これに対して、フィールド機器に時期を特定する仕組みをもたせ,指定された時期になると外部(LCDやLED)に対して通知を行うようにすることで,定期的な作業における対象であることを示し,定期的な作業時におけるヒューマンエラー(作業抜け,取り間違い)を防止することができるフィールド機器が得られる。
As a result, conventionally, when periodic work (maintenance, etc.) is required for a field device, the target is mistaken or work is lost.
On the other hand, by providing the field device with a mechanism to specify the time and notifying the outside (LCD or LED) when the specified time comes, it is a target for periodic work. As a result, a field device that can prevent human errors (missing work, mistakes) during regular work can be obtained.

要するに、フィールド機器内部にインテリジェンスな機能(時間を管理する機能)を持たせ,自らの判断で外部に対して情報を発信するようにしたもので、特に周期的な作業においての作業ミス軽減に役立つフィールド機器が得られる。   In short, an intelligent function (time management function) is provided inside the field device, and information is transmitted to the outside at its own discretion, which is particularly useful for reducing work errors in periodic work. Field equipment is obtained.

図2は、本発明の他の実施例の要部構成説明である。
本実施例においては、メンテナンス時期演算手段21からのメンテナンス信号は、フィールド機器Aをコントロールするコントロール装置31やハンドヘルドPC10にも送付されている。
FIG. 2 is a diagram illustrating the configuration of the main part of another embodiment of the present invention.
In the present embodiment, the maintenance signal from the maintenance time calculation means 21 is also sent to the control device 31 and the handheld PC 10 that control the field device A.

メンテナンス時期演算手段21から通知方法は,あるパラメータの値の変化であったり,アラートであったりする。
また、前記所定期間の算定は、コントロール装置31やハンドヘルドPC10からの時間情報に基づき算定されている。
The notification method from the maintenance time calculation means 21 is a change in the value of a certain parameter or an alert.
The calculation of the predetermined period is calculated based on time information from the control device 31 and the handheld PC 10.

この結果、メンテナンス時期演算手段21からのメンテナンス信号は、フィールド機器Aをコントロールするコントロール装置31やハンドヘルドPC10にも送付されるので、コントロール装置31等における、識別に便利なフィールド機器が得られる。   As a result, since the maintenance signal from the maintenance time calculation means 21 is also sent to the control device 31 and the handheld PC 10 that control the field device A, a field device convenient for identification in the control device 31 and the like can be obtained.

所定期間の算定は、コントロール装置31からの時間情報に基づき算定されるので、メンテナンス時期算定の精度がより向上されたフィールド機器が得られる。
また、時間情報を発生する手段をフィールド機器自身が備える必要が無く、安価なフィールド機器が得られる。
Since the calculation of the predetermined period is calculated based on the time information from the control device 31, a field device with improved accuracy of the maintenance time calculation can be obtained.
Further, it is not necessary for the field device itself to have means for generating time information, and an inexpensive field device can be obtained.

なお、メンテナンス時期の通知には閾値をもうけて,指定された時間に近づいたときや,指定された時間を超過した場合も外部に対しても通知するような仕組みが設けられても良い。
また、LCDのないフィールド機器に対してはLED等を設置し外部に対して通知するようにする。
The maintenance time notification may be provided with a mechanism for notifying the outside when a threshold is set and the specified time is approached or when the specified time is exceeded.
For field devices without an LCD, an LED or the like is installed to notify the outside.

複数のLEDが設置可能な場合は、LEDの色などに意味づけさせることで、さまざまな情報(メンテナンス時期近し,メンテナンス時期,メンテナンス時期超過等)を表現することができる。
限られた数量のLEDの場合はLEDの点灯方法(点滅の有無、点滅の周期、点滅するLEDの組み合わせ)をコントロールすることで、その機能を補うことが出来る。
When a plurality of LEDs can be installed, various information (maintenance time, maintenance time, maintenance time exceeded, etc.) can be expressed by giving meaning to the color of the LED.
In the case of a limited number of LEDs, the function can be supplemented by controlling the LED lighting method (whether blinking, blinking cycle, blinking LED combination).

なお、以上の説明は、本発明の説明および例示を目的として特定の好適な実施例を示したに過ぎない。
したがって本発明は、上記実施例に限定されることなく、その本質から逸脱しない範囲で更に多くの変更、変形をも含むものである。
The above description merely shows a specific preferred embodiment for the purpose of explanation and illustration of the present invention.
Therefore, the present invention is not limited to the above-described embodiments, and includes many changes and modifications without departing from the essence thereof.

本発明の一実施例の要部構成説明図である。It is principal part structure explanatory drawing of one Example of this invention. 本発明の他の実施例の要部構成説明である。It is principal part structure description of the other Example of this invention. 従来より一般に使用されている従来例の構成説明図である。It is structure explanatory drawing of the prior art example generally used conventionally. 図3の要部構成説明図である。It is principal part structure explanatory drawing of FIG.

符号の説明Explanation of symbols

1 コントロール装置
2 防水ケース
3 LCDユニット
4 操作キー
5 切替スイッチ
10 ハンドヘルドPC
11 機器
12 タグ札
21 メンテナンス時期演算手段
22 メンテナンス確認表示手段
23 メンテナンス確認表示器
31 コントロール装置
A フィールド機器
B 特定のマーク

DESCRIPTION OF SYMBOLS 1 Control apparatus 2 Waterproof case 3 LCD unit 4 Operation key 5 Changeover switch 10 Handheld PC
11 Equipment 12 Tag Tag 21 Maintenance Time Calculation Means 22 Maintenance Confirmation Display Means 23 Maintenance Confirmation Indicator 31 Control Device A Field Device B Specific Mark

Claims (5)

フィールドに設置されているフィールド機器において、
前記フィールド機器に設けられ所定期間経過後のメンテナンスを実施するメンテナンス時期を演算するメンテナンス時期演算手段と、
前記フィールド機器に設けられ前記メンテナンス時期演算手段からのメンテナンス信号に基づきメンテナンス確認表示を処理するメンテナンス確認表示手段及びまたは、
前記フィールド機器に設けられ前記メンテナンス時期演算手段からのメンテナンス信号に基づきメンテナンス確認表示を表示するメンテナンス確認表示器と
を具備したことを特徴とするフィールド機器。
In the field equipment installed in the field,
Maintenance time calculation means for calculating a maintenance time for performing maintenance after a predetermined period of time provided in the field device;
Maintenance confirmation display means for processing a maintenance confirmation display based on a maintenance signal from the maintenance time calculation means provided in the field device, or
A field device comprising: a maintenance confirmation indicator provided on the field device and displaying a maintenance confirmation display based on a maintenance signal from the maintenance time calculation means.
前記メンテナンス時期演算手段からのメンテナンス信号は、前記フィールド機器をコントロールするコントロール装置にも送付されること
を特徴とする請求項1記載のフィールド機器。
The field device according to claim 1, wherein the maintenance signal from the maintenance time calculation means is also sent to a control device that controls the field device.
前記所定期間の算定は、前記コントロール装置からの時間情報に基づき算定されること
を特徴とする請求項2記載のフィールド機器。
The field device according to claim 2, wherein the predetermined period is calculated based on time information from the control device.
前記所定期間経過時より所定時間前に予報メンテナンス信号を送る予報メンテナンス信号送付手段
を具備したことを特徴とする請求項1乃至請求項3の何れかに記載のフィールド機器。
The field device according to any one of claims 1 to 3, further comprising: a forecast maintenance signal sending unit that sends a forecast maintenance signal a predetermined time before the predetermined period has elapsed.
前記所定期間経過時より所定時間後に経過メンテナンス信号を送る経過メンテナンス信号送付手段
を具備したことを特徴とする請求項1乃至請求項4の何れかに記載のフィールド機器。

The field device according to any one of claims 1 to 4, further comprising a progress maintenance signal sending unit that sends a progress maintenance signal after a predetermined time from the time when the predetermined period has passed.

JP2005176087A 2005-06-16 2005-06-16 Field apparatus Withdrawn JP2006350690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005176087A JP2006350690A (en) 2005-06-16 2005-06-16 Field apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005176087A JP2006350690A (en) 2005-06-16 2005-06-16 Field apparatus

Publications (1)

Publication Number Publication Date
JP2006350690A true JP2006350690A (en) 2006-12-28

Family

ID=37646458

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005176087A Withdrawn JP2006350690A (en) 2005-06-16 2005-06-16 Field apparatus

Country Status (1)

Country Link
JP (1) JP2006350690A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012027674A (en) * 2010-07-23 2012-02-09 Yokogawa Electric Corp Indicator

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59138979A (en) * 1983-01-31 1984-08-09 Matsushita Electric Works Ltd Master and slave clock device
JPH0313819A (en) * 1989-06-12 1991-01-22 Shigeru Goto Advice apparatus for equipment management
JPH03118131A (en) * 1989-10-02 1991-05-20 Toyo Mach & Metal Co Ltd Injection molding machine
JPH10162253A (en) * 1996-11-29 1998-06-19 Nitsuko Corp Pos system
JPH11125544A (en) * 1997-10-21 1999-05-11 Toshiba Keiso Kk Sensor
JP2001154296A (en) * 1999-11-25 2001-06-08 Fuji Photo Film Co Ltd Device for managing measuring system
JP2002008176A (en) * 2000-06-27 2002-01-11 Yokogawa Electric Corp Field terminal
JP2004049871A (en) * 2002-07-19 2004-02-19 Samsung Electronics Co Ltd Breadmaker and its control method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59138979A (en) * 1983-01-31 1984-08-09 Matsushita Electric Works Ltd Master and slave clock device
JPH0313819A (en) * 1989-06-12 1991-01-22 Shigeru Goto Advice apparatus for equipment management
JPH03118131A (en) * 1989-10-02 1991-05-20 Toyo Mach & Metal Co Ltd Injection molding machine
JPH10162253A (en) * 1996-11-29 1998-06-19 Nitsuko Corp Pos system
JPH11125544A (en) * 1997-10-21 1999-05-11 Toshiba Keiso Kk Sensor
JP2001154296A (en) * 1999-11-25 2001-06-08 Fuji Photo Film Co Ltd Device for managing measuring system
JP2002008176A (en) * 2000-06-27 2002-01-11 Yokogawa Electric Corp Field terminal
JP2004049871A (en) * 2002-07-19 2004-02-19 Samsung Electronics Co Ltd Breadmaker and its control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012027674A (en) * 2010-07-23 2012-02-09 Yokogawa Electric Corp Indicator

Similar Documents

Publication Publication Date Title
CA2983263C (en) Process instrumentation with wireless configuration
KR101895849B1 (en) System for self-controlling and alarming fire of LED signboard based on calibration, transmission and sensing
KR101761022B1 (en) Abnormal operation diagnosis rotating device
CA2286157A1 (en) Analog spectrum display for environmental control
KR101408820B1 (en) Remote monitoring apparatus for distributing board using mobile app and method therof
US8797157B2 (en) System and method for monitoring usage and predicting failure of visual notification appliances
KR101372335B1 (en) Simulation system for ship propulsion control
JP2009139328A (en) Field device search system
EP1686440A2 (en) Numerical control unit
CA2546187A1 (en) Monitoring system and method
CN101354586A (en) Monitoring system and temperature controller
JP3184828U (en) Monitoring equipment for photovoltaic power generation facilities
JP2006350690A (en) Field apparatus
JP2003091316A (en) Remote operation support method
JP6639952B2 (en) Inspection system for alarm using mobile terminal and inspection method using the same
JP4775687B2 (en) Control system
JP2002228753A (en) Radioactive material diffusion estimating system
KR200432487Y1 (en) Wireless Transmitter-Receiver for Measuring Instrument
JP2008533589A (en) Relative diagnostic output visible to the user
JP2008281478A (en) Gas meter
JP2019007735A (en) Sensor-equipped bolt and bolt abnormality detection system
JP4501154B2 (en) Field equipment operation system
JP6096483B2 (en) Concrete quality control equipment
KR20070073156A (en) Applicant History Management System Using Electronic Tag (RFID) and Short Message Service (SMS)
KR20040039657A (en) Load factor indicator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071211

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101101

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110301

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20110421