JP2006238324A - Method and apparatus to input and output information - Google Patents

Method and apparatus to input and output information Download PDF

Info

Publication number
JP2006238324A
JP2006238324A JP2005053345A JP2005053345A JP2006238324A JP 2006238324 A JP2006238324 A JP 2006238324A JP 2005053345 A JP2005053345 A JP 2005053345A JP 2005053345 A JP2005053345 A JP 2005053345A JP 2006238324 A JP2006238324 A JP 2006238324A
Authority
JP
Japan
Prior art keywords
job
resource
information input
image processing
resource acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2005053345A
Other languages
Japanese (ja)
Inventor
康弘 ▲高▼橋
Yasuhiro Takahashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canon Inc
Original Assignee
Canon Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canon Inc filed Critical Canon Inc
Priority to JP2005053345A priority Critical patent/JP2006238324A/en
Publication of JP2006238324A publication Critical patent/JP2006238324A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method and apparatus to input and output information for warranting real-time by inquiring about whether or not a resource can be acquired for a job calling for real-time as a requirement before performance of the job and permitting performance of the job when it is discriminated that the resource can be acquired for the job. <P>SOLUTION: The method is characterized by including: a hardware image processing step of image processing by use of hardware; a software image processing step of image processing by use of software; an image data storage step of storing image data; a job resource management step of managing requests of use of resources from jobs; a resource acquisition inquiry step of inquiring about whether or not a resource required for a job can be acquired before start of the job; a resource acquisition discrimination step of discriminating whether or not the resource requested in the resource acquisition inquiry step can be acquired on the basis of job information and resource information managed in the job resource management step; and a resource acquisition notice step of informing the job about a result of the discrimination by the resource acquisition discrimination step. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、メモリや画像処理デバイスなどのジョブの実行に対し必要な資源を、投入された複数のジョブ間で排他を行いながら実行するマルチファンクションの複写機に係る情報入出力方法および情報入出力装置に関するものである。   The present invention relates to an information input / output method and information input / output related to a multi-function copier that executes resources such as a memory and an image processing device while exchanging resources necessary for the execution of the job among a plurality of input jobs. It relates to the device.

マルチファンクションの複写機においては、メモリや画像処理デバイスといった資源をコピーやFAX、PDLプリントなどの複数のジョブで共有し、資源の排他を行いながらジョブを実行することで、省資源化を行っている。   In multi-function copiers, resources such as memory and image processing devices are shared by multiple jobs such as copying, faxing, and PDL printing, and resources are saved by executing jobs while excluding resources. Yes.

また一方で、画像形成システムにおいて、複数のアプリケーション間での両面装置の使用権に関するバッティングの発生率を低減させる提案がされている(例えば、特許文献1参照)。
特開平7−107230号公報
On the other hand, in an image forming system, a proposal has been made to reduce the occurrence rate of batting relating to the right to use a double-sided device between a plurality of applications (see, for example, Patent Document 1).
JP-A-7-107230

しかしながら、上述した従来の手順では、ひとつのジョブで長い時間資源占有がある場合に、実時間性が要求されるジョブ(例えばFAX手動送信)を後から投入すると、先のジョブ終了を待たなければならず、実時間性を保証できなくなってしまう。特にFax手動送信の場合は発呼後に資源の獲得ができないという状態になると、「回線接続のまま送信できない」ということになってしまう。   However, in the above-described conventional procedure, when a job occupies a long time, if a job requiring real-time characteristics (for example, FAX manual transmission) is submitted later, the end of the previous job must be waited. In other words, real-time performance cannot be guaranteed. In particular, in the case of Fax manual transmission, if a resource cannot be acquired after a call is made, it means that “transmission cannot be performed while the line is connected”.

また、特許文献1では、資源が取れなかった場合は、開放されてから再度獲得要求をだすというものであり、ジョブ種に応じて、応答の仕方を切り替えるということはしていない。   Further, in Patent Document 1, when resources are not available, the acquisition request is issued again after being released, and the response method is not switched according to the job type.

本発明は、以上の点に着目して成されたもので、FAX手動送信のように実時間性が要求されるジョブに対し、実時間性を保証することが可能となる情報入出力方法および情報入出力装置を提供することを目的とする。   The present invention has been made paying attention to the above points. An information input / output method capable of guaranteeing real-time performance for a job that requires real-time performance, such as FAX manual transmission, and the like. An object is to provide an information input / output device.

上述した課題を解決するために、本発明は、
ハードウェアによる画像処理のためのハード画像処理手段と、ソフトウェアによる画像処理のためのソフト画像処理手段と、画像データを蓄積するための画像データ蓄積手段と、ジョブからの資源に対する使用要求を管理するジョブ資源管理手段と、ジョブ開始前に必要な資源を獲得できるか問い合わせを行う資源獲得問い合わせ手段と、前記ジョブ資源管理手段により、管理されているジョブ情報と資源情報から、前記資源問い合わせ手段により要求のあった資源を獲得可能か判断する資源獲得判断手段と、前記資源獲得判断手段による判断結果を前記ジョブに通知する資源獲得通知手段、を持つことを特徴とする。
In order to solve the problems described above, the present invention provides:
Managing hardware image processing means for image processing by hardware, software image processing means for image processing by software, image data storage means for storing image data, and usage requests for resources from jobs Requested by the resource inquiry means from the job information and resource information managed by the job resource management means, the resource acquisition inquiry means for inquiring whether necessary resources can be acquired before starting the job, and the job resource management means Resource acquisition determination means for determining whether or not the acquired resource can be acquired, and resource acquisition notification means for notifying the job of the determination result by the resource acquisition determination means.

また、前記資源獲得通知手段は、前記ジョブ種に応じて通知方法を変更することを特徴とする。   The resource acquisition notifying unit may change a notification method according to the job type.

また、前記資源獲得通知手段は、前記ジョブの実行に対し、実時間性が要求されるか、一定時間までは開始を待たせることが可能か、開始時間に制限がないかを判断し、前記資源獲得判断手段の結果を、前記ジョブに通知することを特徴とする。   Further, the resource acquisition notifying means determines whether real time property is required for the execution of the job, whether the start of the job can be waited until a predetermined time, or whether the start time is not limited, and The result of the resource acquisition determining means is notified to the job.

また、前記資源獲得通知手段から、資源の獲得が不可能であると判断された場合に、前記ジョブの投入を禁止するジョブ投入禁止手段を持つことを特徴とする。   In addition, when the resource acquisition notifying unit determines that the resource acquisition is impossible, the job acquisition prohibiting unit prohibits the job input.

また、前記ジョブを開始するためのジョブ開始ボタンを有し、前記ジョブ投入禁止手段は前記開始ボタンを操作できなくさせることを特徴とする。   In addition, a job start button for starting the job is provided, and the job submission prohibiting unit prevents the start button from being operated.

本発明の情報入出力方法および情報入出力装置によれば、資源の獲得が可能かどうかをジョブ投入前に問い合わせを行い、獲得可能であると判断された場合に、ジョブ投入を許可することで、FAX手動送信のように実時間性が要求されるジョブに対し、実時間性を保証することが可能となる。   According to the information input / output method and information input / output apparatus of the present invention, an inquiry is made before a job is submitted as to whether or not resources can be acquired, and if it is determined that acquisition is possible, job submission is permitted. Thus, it is possible to guarantee the real time property for a job that requires real time property such as FAX manual transmission.

以下本発明の一実施の形態を図面に基づき説明する。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

図1は、本発明の第1の実施形態に係る情報入出力装置のシステム概略構成を示すブロック図である。   FIG. 1 is a block diagram showing a schematic system configuration of an information input / output device according to the first embodiment of the present invention.

図1の内容について説明する。本実施例による情報入出力装置101は、ローカルエリアネットワーク(LAN)102に接続され、同時に、公衆電話網(PSTN)103にも接続されている。LAN102には、複数のワークステーション(情報処理端末)104が接続されている。また、公衆電話網103には、インターネット接続サービスを提供するプロバイダ106や、インターネットファクシミリ装置105、ファクシミリ装置105などが接続されている。   The contents of FIG. 1 will be described. The information input / output device 101 according to the present embodiment is connected to a local area network (LAN) 102 and is also connected to a public telephone network (PSTN) 103 at the same time. A plurality of workstations (information processing terminals) 104 are connected to the LAN 102. The public telephone network 103 is connected to a provider 106 that provides an Internet connection service, an Internet facsimile machine 105, a facsimile machine 105, and the like.

図2は、本発明の情報入出力装置の構成を説明するブロック図である。図2の各構成部は、システムバス201及び画像バス210に接続されている。ROM202はブートROMであり、システムのブートプログラムが格納されている。また本発明の各手段を実現するシステムソフトウェアはROM202または、蓄積メモリ205に記憶されており、CPU203で実行される。RAM204は、CPU203がソフトウェアを実行するためのシステムワークメモリエリアであり、画像データを一時記憶するための画像メモリでもある。   FIG. 2 is a block diagram illustrating the configuration of the information input / output device of the present invention. Each component in FIG. 2 is connected to a system bus 201 and an image bus 210. A ROM 202 is a boot ROM, and stores a system boot program. Further, system software for realizing each means of the present invention is stored in the ROM 202 or the storage memory 205 and is executed by the CPU 203. A RAM 204 is a system work memory area for the CPU 203 to execute software, and is also an image memory for temporarily storing image data.

蓄積メモリ205は、ファクシミリ符号データや、画像データ、システムソフトウェアなどが記憶される。LAN(ローカルエリアネットワーク)I/F部206は、LANと接続するためのI/F部でありLANに接続された各機器との情報の入出力を行う。回線I/F部207は、ISDNや公衆電話網に接続され、ROM202内の通信制御プログラムにより制御され、ISDNI/Fやモデム、NCU(ネットワーク・コントロール・ユニット)を介して遠隔の端末にデータを送受信する機能が搭載されている。   The storage memory 205 stores facsimile code data, image data, system software, and the like. A LAN (local area network) I / F unit 206 is an I / F unit for connecting to a LAN, and performs input / output of information with each device connected to the LAN. The line I / F unit 207 is connected to an ISDN or a public telephone network, is controlled by a communication control program in the ROM 202, and transmits data to a remote terminal via the ISDNI / F, a modem, and an NCU (network control unit). The function to send and receive is installed.

以上のデバイスがシステムバス201上に配置される。IO制御A部209は、システムバス201と画像データを高速で転送する画像バス210を接続し、システムバス201データ構造を変換するバスブリッジである。画像バス210は、PCIバスまたはIEEE1394で構成される。画像バス210上には以下のデバイスが配置される。画像入出力デバイスである読み取り部214やプリンタ部213と制御ユニット216を接続し、画像データの同期系/非同期系の変換を行う。   The above devices are arranged on the system bus 201. The IO control A unit 209 is a bus bridge that connects the system bus 201 and the image bus 210 that transfers image data at high speed and converts the data structure of the system bus 201. The image bus 210 is configured by a PCI bus or IEEE1394. The following devices are arranged on the image bus 210. The control unit 216 is connected to the reading unit 214 or the printer unit 213 which is an image input / output device, and performs synchronous / asynchronous conversion of image data.

画像処理部211は、入力及び出力画像データに対し補正、加工、編集を行う。画像変換部212は画像データの回転、圧縮伸長、2値多値間の変換、画像密度変換、JPEG、JBIG、MR、MMRなどの圧縮伸張処理を行う。IO制御B部208は、操作部(UI=User Interface)215とのインターフェース部で、操作部215に表示する画像データを操作部215に対して出力する。また、操作部215から本システム使用者が入力した情報を、CPU203に伝える役割をする。表示装置やキーパッド装置を搭載する操作部215をソフトウェアが制御するためのI/F部である。   The image processing unit 211 corrects, processes, and edits input and output image data. The image conversion unit 212 performs compression / decompression processing such as rotation, compression / decompression of binary image data, conversion between binary and multi-values, image density conversion, JPEG, JBIG, MR, MMR, and the like. The IO control B unit 208 is an interface unit with the operation unit (UI = User Interface) 215, and outputs image data to be displayed on the operation unit 215 to the operation unit 215. Further, it plays a role of transmitting information input by the system user from the operation unit 215 to the CPU 203. This is an I / F unit for software to control an operation unit 215 equipped with a display device and a keypad device.

尚、本発明の情報入出力方法を実現するジョブ資源管理手段、資源獲得問い合わせ手段、資源獲得判断手段、資源獲得通知手段といった処理プログラムは、ROM202および/または蓄積メモリ205に格納され、CPU203によって実行される。また、ハード画像処理工程は、画像変換部212によって実行され、ソフト画像処理工程は、CPU203によって実行される。   Processing programs such as job resource management means, resource acquisition inquiry means, resource acquisition determination means, and resource acquisition notification means for realizing the information input / output method of the present invention are stored in the ROM 202 and / or the storage memory 205 and executed by the CPU 203. Is done. Further, the hard image processing step is executed by the image conversion unit 212, and the soft image processing step is executed by the CPU 203.

図3は、本発明の情報入出力装置を制御するソフトウェア構成の概要を説明するブロック図である。情報入出力装置のソフト構成概要を示す図である。ジョブ管理部301では、コピー、スキャン、プリント、PDLプリント、インターネットファクス、ファクスといったユーザからのジョブを受け付け、キューを形成し、実行順序や実行状況などを管理する部位である。内部的には、コピージョブ管理部302、スキャンジョブ管理部303、プリントジョブ管理部304、PDLジョブ管理部305、IFAXジョブ管理部306、FAXジョブ管理部307に分かれ、それぞれのジョブのキューとジョブ実行状況を管理する。   FIG. 3 is a block diagram for explaining the outline of the software configuration for controlling the information input / output device of the present invention. It is a figure which shows the software structure outline | summary of an information input / output device. The job management unit 301 is a part that receives jobs from users such as copy, scan, print, PDL print, Internet fax, and fax, forms a queue, and manages the execution order and execution status. Internally, it is divided into a copy job management unit 302, a scan job management unit 303, a print job management unit 304, a PDL job management unit 305, an IFAX job management unit 306, and a FAX job management unit 307. Manage execution status.

次に、各ジョブをページ単位で処理する処理部がある。スキャンページ処理部308、PDLページ処理部309、IFAXページ処理部310、FAXページ処理部311、プリントページ処理部312は、それぞれスキャンデバイス317、プリントデバイス327、PDLデバイス318、ネットワークデバイス328、FAXデバイス326を制御し、メモリ上に画像データをおいて、画像ページ処理部313に必要な画像処理を依頼する。画像ページ処理部313では、上位の各種ページ処理部からの画像処理要求に従って、画像処理に必要なメモリ量や資源数を計算し、資源管理部314に資源の割り当てを要求し、画像処理を実行する。資源管理部314では内部的に、画像変換デバイス319を管理し、デバイスの割り当ての優先順位を管理するデバイス管理部315および、メモリデバイス325の面数や割り当ての優先順位を管理するメモリ管理部316に分かれる。   Next, there is a processing unit that processes each job in units of pages. The scan page processing unit 308, the PDL page processing unit 309, the IFAX page processing unit 310, the FAX page processing unit 311, and the print page processing unit 312 are respectively a scan device 317, a print device 327, a PDL device 318, a network device 328, and a FAX device. 326 controls the image data in the memory and requests the image page processing unit 313 to perform necessary image processing. The image page processing unit 313 calculates the amount of memory and the number of resources required for image processing in accordance with image processing requests from various upper page processing units, requests the resource management unit 314 to allocate resources, and executes image processing. To do. The resource management unit 314 internally manages the image conversion device 319 and manages a device allocation priority, and a memory management unit 316 manages the number of memory devices 325 and the allocation priority. Divided into

また、ハードディスクにアクセスする場合には、画像処理部313から、文書管理部329に読み出しや書き込みの要求を行う。画像管理部329では、画像サイズや向きといった画像にまつわる諸情報をSRAMデバイス331にアクセスして読み出し/保存し、画像データをHDDデバイス330に対して読み出し/保存する。   When accessing the hard disk, the image processing unit 313 makes a read / write request to the document management unit 329. The image management unit 329 accesses the SRAM device 331 to read / save various information about the image such as the image size and orientation, and reads / saves the image data to / from the HDD device 330.

また画像変換デバイス319は、内部的に画像変換の種別に応じたAPI(アプリケーションプログラムインタフェース)320および画像変換API320からの処理を、受けて各デバイスに処理を振り分ける画像変換処理部321と、ソフト変換処理を実現するソフト変換仮想デバイス管理部322、符合/復号/回転を実現する符合/復号/回転デバイスを管理する符合/復号/回転デバイス管理部323、変倍を実現する変倍デバイスを管理する変倍デバイス管理部324からなる。ソフト変換仮想デバイスには、CG(キャラクタジェネレータ)デバイスや、全面白の画像を作るホワイトデバイスや、ソフト符号化デバイス、ソフト復号化デバイス、ソフト回転デバイス、ソフト変倍デバイスなどが含まれる。   The image conversion device 319 internally receives an image conversion processing unit 321 that receives processing from an API (Application Program Interface) 320 and an image conversion API 320 according to the type of image conversion, and distributes the processing to each device. A software conversion virtual device management unit 322 that realizes processing, a code / decoding / rotation device management unit 323 that manages code / decoding / rotation devices that realize encoding / decoding / rotation, and a scaling device that realizes scaling A zooming device management unit 324 is provided. The soft conversion virtual device includes a CG (character generator) device, a white device that creates an entirely white image, a soft encoding device, a soft decoding device, a soft rotation device, a soft scaling device, and the like.

以下にコピージョブの流れを例にとって動作を説明する。   The operation will be described below by taking a copy job flow as an example.

ユーザから要求されたコピージョブはコピージョブ管理部302によって受け付けられ、待機状態となる。ここでジョブ開始前にコピージョブ管理部302は資源管理部314に対して、後述する資源の予約を実行する。ここでコピーに必要な資源が予約できれば、コピー動作を開始する。コピージョブ管理部では、スキャンページ処理部308に依頼し、スキャナデバイス317を動作させ、同時にスキャンページ処理部308では画像ページ処理部313に依頼して、スキャンに必要な資源(縮小や回転といった画像処理デバイス323/324と、画像データを蓄積するメモリデバイス325)を計算し、資源管理部314に依頼する。   The copy job requested by the user is accepted by the copy job management unit 302 and enters a standby state. Here, before the job starts, the copy job management unit 302 executes resource reservation, which will be described later, with respect to the resource management unit 314. If resources necessary for copying can be reserved here, the copying operation is started. The copy job management unit requests the scan page processing unit 308 to operate the scanner device 317, and at the same time the scan page processing unit 308 requests the image page processing unit 313 to request the resources necessary for scanning (images such as reduction and rotation). The processing device 323/324 and the memory device 325) for storing the image data are calculated and requested to the resource management unit 314.

資源管理部314では、要求された資源の中で画像変換デバイスに関連するものは、デバイス管理部315に依頼し、メモリデバイスに関連するものは、メモリ管理部316に依頼する。デバイス管理部315では、管理対象のデバイスの空きを確認し、空いているデバイス群319があれば、ここから獲得して利用を許可する。   The resource management unit 314 requests the device management unit 315 to request the resource related to the image conversion device among the requested resources, and requests the memory management unit 316 to relate to the memory device. The device management unit 315 confirms the availability of a device to be managed, and if there is an available device group 319, obtains it from here and permits its use.

またメモリ管理部316においても同様に要求されたメモリの種別を判定し、管理対象のメモリデバイスの空きを確認し、空いているメモリデバイス群325があれば、これを獲得して利用を許可する。デバイス管理部でもメモリ管理部でも空きがなければ、獲得待ちキューを形成して、空き次第獲得させる。こうして資源を獲得すると、スキャンページ処理部308と、画像ページ処理部313において、原稿をスキャンしてメモリ上に蓄積し、画像処理を実行する。   Similarly, the memory management unit 316 also determines the type of the requested memory, confirms the availability of the memory device to be managed, and if there is an available memory device group 325, acquires it and permits its use. . If there is no space in either the device management unit or the memory management unit, an acquisition waiting queue is formed and acquired as soon as it is available. When resources are acquired in this way, the scan page processing unit 308 and the image page processing unit 313 scan the original and store it in the memory, and execute image processing.

次にジョブ管理部301では、プリントページ処理部312に依頼し、プリンタデバイス327を動作させ、同時にプリンタページ処理部312では画像ページ処理部313に依頼して、プリントに必要な資源(縮小や回転といった画像処理デバイス323/324と、画像データを蓄積するメモリデバイス325)を計算し、資源管理部314に依頼する。資源管理部314では、スキャンと同様に資源を獲得する。その後、画像ページ処理部313とプリントページ処理部312において、メモリ上画像データに画像処理を施し、原稿にプリントして出力する。   Next, the job management unit 301 requests the print page processing unit 312 to operate the printer device 327, and at the same time, the printer page processing unit 312 requests the image page processing unit 313 to request resources necessary for printing (reduction and rotation). The image processing device 323/324 and the memory device 325 for storing the image data are calculated and requested to the resource management unit 314. The resource management unit 314 acquires resources in the same manner as the scan. Thereafter, the image page processing unit 313 and the print page processing unit 312 perform image processing on the image data in the memory, print the document, and output the document.

次に、資源獲得に対し実時間性が特に要求されるFAX手動送信を例に、資源獲得について図4、図5、図6を用いて説明する。   Next, resource acquisition will be described with reference to FIGS. 4, 5, and 6 by taking as an example a FAX manual transmission that requires real-time characteristics for resource acquisition.

図4は、本発明の情報入出力装置を制御するソフトウェアの資源管理部に関する概要シーケンスを示す図ある。図3で説明した通り、ジョブ管理部301において、ジョブ開始前にジョブ実行中に排他的に使用する資源の予約問い合わせ401を行い、ジョブを実行するか、待機させるかを決定する。例えばFAX手動送信の場合、資源予約問い合わせ401のタイミングは、フックアップしたタイミングである。ジョブ資源が獲得できる場合は、ジョブを実行し、画像ページ処理部313において、そのページを処理中に排他的に使用する資源の予約問い合わせ402を行う。この予約順に、リソース管理部314では、実際の資源獲得の優先順位を決定している。   FIG. 4 is a diagram showing an outline sequence relating to a resource management unit of software for controlling the information input / output device of the present invention. As described with reference to FIG. 3, the job management unit 301 makes a reservation inquiry 401 for resources used exclusively during job execution before starting the job, and determines whether to execute the job or wait. For example, in the case of FAX manual transmission, the timing of the resource reservation inquiry 401 is the hook-up timing. If the job resource can be acquired, the job is executed, and the image page processing unit 313 issues a reservation inquiry 402 for a resource to be used exclusively during the processing of the page. In this order of reservation, the resource management unit 314 determines the actual resource acquisition priority.

次に画像ページ処理部313から、資源管理部314に対して、資源の獲得を要求403する。資源管理部では、前述の通り、内部のデバイス管理部315およびメモリ管理部316に要求し、資源が獲得できたか否かの応答404をする。画像ページ処理部313ではこれらの資源を使用して、後述する各種画像処理を行い、資源を使い終えると、資源解放要求405を行う。これに対し、資源管理部314では資源解放応答406を通知する。次に画像ページ処理部313においては、402で行った資源排他的使用予約を解除407する。最後にジョブ管理部301では、ジョブの終了時に、401で行った資源予約を解除408する。   Next, the image page processing unit 313 sends a resource acquisition request 403 to the resource management unit 314. As described above, the resource management unit makes a request to the internal device management unit 315 and the memory management unit 316 and sends a response 404 as to whether the resource has been acquired. The image page processing unit 313 uses these resources to perform various image processing to be described later. When the resources are used up, a resource release request 405 is issued. In response to this, the resource management unit 314 notifies the resource release response 406. Next, the image page processing unit 313 cancels 407 the resource exclusive use reservation made in 402. Finally, the job management unit 301 cancels 408 the resource reservation made at 401 when the job ends.

図5は、本発明の情報入出力装置を制御するソフトウェアの資源管理部の資源予約判定に関するフローチャートである。ジョブ資源予約401が呼ばれると、資源管理部314では、ステップ501において要求された資源リストの中にメモリ資源があるか否か判定する。ここで要求された資源リスト中にメモリ資源が無ければステップ504に進む。またメモリ資源が含まれている場合は、ステップ502に進み、メモリ管理部にメモリ予約を要求する。メモリ管理部では、要求元ジョブの種別と要求ジョブの内容から、ジョブを完了するのに必要なメモリデバイスの種別と面数を判定し、管理しているメモリのなかから空きメモリを探す。   FIG. 5 is a flowchart relating to the resource reservation determination of the resource management unit of the software that controls the information input / output device of the present invention. When the job resource reservation 401 is called, the resource management unit 314 determines whether there is a memory resource in the resource list requested in step 501. If there is no memory resource in the requested resource list, the process proceeds to step 504. If memory resources are included, the process proceeds to step 502, and a memory reservation is requested to the memory management unit. The memory management unit determines the type of memory device and the number of files required to complete the job from the type of request source job and the content of the requested job, and searches for free memory from the managed memory.

ここでステップ503に進み、メモリが予約できれば、ステップ504へ、メモリが予約できなければ、ステップ509に進む。次にステップ504では、要求された資源リストにデバイスがあるか判定する。ここで、資源リストにデバイスがなければ、予約しにきたジョブ情報を登録するステップ508へ進み、その後ジョブ資源予約OKを返す(ステップ509)。また、資源リストにデバイスが含まれる場合は、ステップ505に進む。ステップ505では、デバイス管理部にデバイス予約を要求し、デバイス管理部において、要求された資源が管理している資源リストの中で予約可能か否かを判定する。   If the memory can be reserved, the process proceeds to step 504. If the memory cannot be reserved, the process proceeds to step 509. Next, in step 504, it is determined whether there is a device in the requested resource list. Here, if there is no device in the resource list, the process proceeds to step 508 for registering the job information to be reserved, and then the job resource reservation OK is returned (step 509). If the device is included in the resource list, the process proceeds to step 505. In step 505, the device management unit is requested to make a device reservation, and the device management unit determines whether or not the requested resource can be reserved in the managed resource list.

ステップ506においてデバイスの予約が可能である場合は、ステップ507へ進む。一方予約できなかった場合は、ステップ509へ進む。ステップ509では、資源予約をおこなったジョブ種別から、実時間性が要求されるジョブであるのか、そうでないかを判断し、実時間性が要求されるジョブであればステップ510へと進み、ジョブ予約できなかったとしてNGを返す。FAX手動送信においてジョブ予約がNGである場合は、応答を受けたFAXジョブ管理部307は、ジョブ管理部301を介して、操作部215のユーザによるスタートキー操作を無効にすることで、ジョブ投入を禁止し、操作部215の表示部に「FAX手動送信を行う場合は、現在動作中のジョブの終了をお待ちください」などのメッセージを表示する。一方実時間性が要求されない場合は、ステップ511へと進み、再び401から処理をやり直すために予約待ちキューにジョブ予約情報を登録する。   If the device can be reserved in step 506, the process proceeds to step 507. On the other hand, if the reservation cannot be made, the process proceeds to step 509. In step 509, it is determined from the job type for which resource reservation has been made whether the job requires real-time characteristics or not. If the job requires real-time characteristics, the process proceeds to step 510, and the job NG is returned because the reservation could not be made. When the job reservation is NG in the manual FAX transmission, the FAX job management unit 307 that has received the response invalidates the start key operation by the user of the operation unit 215 via the job management unit 301, thereby submitting the job. Is displayed, and a message such as “Wait for the end of the currently active job when performing manual FAX transmission” is displayed on the display unit of the operation unit 215. On the other hand, if the real-time property is not required, the process proceeds to step 511, and the job reservation information is registered in the reservation waiting queue in order to restart the process from 401.

ここで予約待ちキューに登録されたジョブ予約は、先行しているジョブのジョブ資源予約解除408をきっかけに、401から処理をやり直す。ただし、実時間性は要求しないものの、ある一定時間内にジョブ予約結果を応答しなければならないジョブに対しては、一定時間内は予約待ちキューによるジョブ予約のリトライを行うが、一定時間経過後は予約待ちキューからジョブ情報を削除し、ジョブ予約できなかったとしてNGを返す。   The job reservation registered in the reservation waiting queue is processed again from 401, triggered by the job resource reservation cancellation 408 of the preceding job. However, for jobs that do not require real-time performance, but need to respond to job reservation results within a certain period of time, job reservation retries are performed in the reservation wait queue within a certain period of time. Deletes the job information from the reservation queue and returns NG because the job could not be reserved.

図6は、本発明の情報入出力装置を制御するソフトウェアの資源管理部の資源獲得処理に関するフローチャートである。   FIG. 6 is a flowchart relating to the resource acquisition processing of the resource management unit of the software that controls the information input / output device of the present invention.

資源獲得403が呼ばれると、資源管理部314では、ステップ601において要求された資源リストの中にメモリ資源があるか、否かを判定する。ここでメモリ資源があれば、ステップ602においてメモリ管理部経由でメモリ資源を獲得する。次にステップ603でメモリ資源が獲得できるか、またステップ601においてメモリ資源がなければ、ステップ604に進み、デバイス資源の獲得を開始する。ステップ603においてメモリが獲得できなかったと判断されれば、ステップ608に進む。   When the resource acquisition 403 is called, the resource management unit 314 determines whether there is a memory resource in the resource list requested in step 601. If there is a memory resource, the memory resource is acquired via the memory management unit in step 602. Next, if the memory resource can be acquired in step 603, or if there is no memory resource in step 601, the process proceeds to step 604 to start acquiring the device resource. If it is determined in step 603 that the memory could not be acquired, the process proceeds to step 608.

ステップ604では、要求された資源リストの中にデバイスがあるか、否かを判定する。ここで、デバイスがあれば、ステップ605において、デバイス管理部経由でデバイスを獲得する。次にステップ606でデバイスが獲得できたと判断されるか、またステップ604においてデバイス資源がなければ、ステップ607へと進み、資源獲得要求に対しOKを返す。   In step 604, it is determined whether there is a device in the requested resource list. If there is a device, in step 605, the device is acquired via the device management unit. Next, if it is determined in step 606 that the device has been acquired, or if there is no device resource in step 604, the process proceeds to step 607, and OK is returned in response to the resource acquisition request.

一方、ステップ606においてデバイスが獲得できないと判断された場合は、ステップ608へと進む。ステップ608では、再びステップ403より資源獲得を開始するために、資源獲得待ちキューへ獲得要求情報を登録し、終了する(ステップ609)。資源獲得待ちキューへ登録された獲得要求は、先行しているページのページ資源予約解除407をきっかけに、ステップ403から獲得処理をリトライする。   On the other hand, if it is determined in step 606 that the device cannot be acquired, the process proceeds to step 608. In step 608, in order to start resource acquisition again from step 403, the acquisition request information is registered in the resource acquisition waiting queue, and the process ends (step 609). The acquisition request registered in the resource acquisition queue is retried from step 403 with the page resource reservation release 407 of the preceding page as a trigger.

情報入出力装置のシステムの全体構成を示す図The figure which shows the whole system configuration of the information input / output device 情報入出力装置の全体構成を示す図Diagram showing the overall configuration of the information input / output device 情報入出力装置のソフト構成概要を示す図The figure which shows the software composition outline of the information input / output device 情報入出力装置の資源管理部に関するシーケンスを示す図The figure which shows the sequence regarding the resource management part of an information input / output device 情報入出力装置の資源管理部の資源予約判定に関するフローチャートFlow chart relating to resource reservation determination of resource management unit of information input / output device 情報入出力装置の資源管理部の資源獲得処理に関するフローチャートFlow chart regarding resource acquisition processing of resource management unit of information input / output device

Claims (10)

情報入出力装置により情報を入出力する情報入出力方法であって、
ハードウェアによる画像処理のためのハード画像処理工程と、
ソフトウェアによる画像処理のためのソフト画像処理工程と、
画像データを蓄積するための画像データ蓄積工程と、
ジョブからの資源に対する使用要求を管理するジョブ資源管理工程と、
ジョブ開始前に必要な資源を獲得できるか問い合わせを行う資源獲得問い合わせ工程と、
前記ジョブ資源管理工程により、管理されているジョブ情報と資源情報から、前記資源問い合わせ工程により要求のあった資源を獲得可能か判断する資源獲得判断工程と、
前記資源獲得判断工程による判断結果を前記ジョブに通知する資源獲得通知工程と、
を持つことを特徴とする情報入出力方法。
An information input / output method for inputting / outputting information by an information input / output device,
Hardware image processing steps for hardware image processing;
A software image processing step for software image processing;
An image data storage step for storing image data;
A job resource management process for managing use requests for resources from jobs;
A resource acquisition inquiry process for inquiring whether necessary resources can be acquired before starting the job;
A resource acquisition determination step of determining whether the resource requested by the resource inquiry step can be acquired from the job information and resource information managed by the job resource management step;
A resource acquisition notification step of notifying the job of a determination result by the resource acquisition determination step;
An information input / output method characterized by having
前記資源獲得通知工程は、前記ジョブ種に応じて通知方法を変更することを特徴とする請求項1に記載の情報入出力方法。   The information input / output method according to claim 1, wherein the resource acquisition notification step changes a notification method according to the job type. 前記資源獲得通知工程は、前記ジョブの実行に対し、実時間性が要求されるか、一定時間までは開始を待たせることが可能か、開始時間に制限がないかを判断し、前記資源獲得判断工程の結果を、前記ジョブに通知することを特徴とする請求項1に記載の情報入出力方法。   The resource acquisition notifying step determines whether real-time property is required for execution of the job, whether the start of the job can be waited until a predetermined time, or whether there is no limit on the start time, and acquires the resource The information input / output method according to claim 1, wherein a result of the determination step is notified to the job. 前記資源獲得通知工程から、資源の獲得が不可能であると判断された場合に、前記ジョブの投入を禁止するジョブ投入禁止工程を持つことを特徴とする請求項1、2、3のいずれかに記載の情報入出力方法。   4. The method according to claim 1, further comprising a job submission prohibiting step for prohibiting the submission of the job when it is determined from the resource acquisition notifying step that acquisition of the resource is impossible. Information input / output method described in 1. 前記ジョブを開始するためのジョブ開始ボタンを有し、
前記ジョブ投入禁止工程は前記開始ボタンを操作できなくさせることを特徴とする請求項4に記載の情報入出力方法。
A job start button for starting the job;
5. The information input / output method according to claim 4, wherein the job submission prohibiting step prevents the start button from being operated.
情報を入出力する情報入出力装置であって、
ハードウェアによる画像処理のためのハード画像処理手段と、
ソフトウェアによる画像処理のためのソフト画像処理手段と、
画像データを蓄積するための画像データ蓄積手段と、
ジョブからの資源に対する使用要求を管理するジョブ資源管理手段と、
ジョブ開始前に必要な資源を獲得できるか問い合わせを行う資源獲得問い合わせ手段と、
前記ジョブ資源管理手段により、管理されているジョブ情報と資源情報から、前記資源問い合わせ手段により要求のあった資源を獲得可能か判断する資源獲得判断手段と、
前記資源獲得判断手段による判断結果を前記ジョブに通知する資源獲得通知手段と、
を持つことを特徴とする情報入出力装置。
An information input / output device for inputting / outputting information,
Hardware image processing means for image processing by hardware;
Software image processing means for image processing by software;
Image data storage means for storing image data;
Job resource management means for managing use requests for resources from jobs;
A resource acquisition inquiry means for inquiring whether necessary resources can be acquired before starting the job;
Resource acquisition determination means for determining whether the resource requested by the resource inquiry means can be acquired from the job information and resource information managed by the job resource management means;
Resource acquisition notification means for notifying the job of a determination result by the resource acquisition determination means;
An information input / output device characterized by having.
前記資源獲得通知手段は、前記ジョブ種に応じて通知方法を変更することを特徴とする請求項6に記載の情報入出力装置。   The information input / output apparatus according to claim 6, wherein the resource acquisition notification unit changes a notification method according to the job type. 前記資源獲得通知手段は、前記ジョブの実行に対し、実時間性が要求されるか、一定時間までは開始を待たせることが可能か、開始時間に制限がないかを判断し、前記資源獲得判断手段の結果を、前記ジョブに通知することを特徴とする請求項6に記載の情報入出力装置。   The resource acquisition notifying means determines whether real-time performance is required for execution of the job, whether the start of the job can be waited until a predetermined time, and whether the start time is not limited, and acquires the resource The information input / output apparatus according to claim 6, wherein the job is notified of a result of the determination unit. 前記資源獲得通知手段から、資源の獲得が不可能であると判断された場合に、前記ジョブの投入を禁止するジョブ投入禁止手段を持つことを特徴とする請求項6、7、8のいずれかに記載の情報入出力装置。   9. The job submission prohibiting unit for prohibiting the submission of the job when it is determined from the resource acquisition notifying unit that it is impossible to acquire the resource. The information input / output device described in 1. 前記ジョブを開始するためのジョブ開始ボタンを有し、
前記ジョブ投入禁止手段は前記開始ボタンを操作できなくさせることを特徴とする請求項9に記載の情報入出力装置。
A job start button for starting the job;
The information input / output apparatus according to claim 9, wherein the job submission prohibiting unit disables operation of the start button.
JP2005053345A 2005-02-28 2005-02-28 Method and apparatus to input and output information Withdrawn JP2006238324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005053345A JP2006238324A (en) 2005-02-28 2005-02-28 Method and apparatus to input and output information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005053345A JP2006238324A (en) 2005-02-28 2005-02-28 Method and apparatus to input and output information

Publications (1)

Publication Number Publication Date
JP2006238324A true JP2006238324A (en) 2006-09-07

Family

ID=37045449

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005053345A Withdrawn JP2006238324A (en) 2005-02-28 2005-02-28 Method and apparatus to input and output information

Country Status (1)

Country Link
JP (1) JP2006238324A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008236610A (en) * 2007-03-23 2008-10-02 Kyocera Mita Corp Image forming apparatus, image forming method, and application program
JP2008257448A (en) * 2007-04-04 2008-10-23 Fuji Xerox Co Ltd Information processor and program
US8314962B2 (en) 2007-03-23 2012-11-20 Kyocera Mita Corporation Image forming apparatus that discriminates an operation of a service requested and constructs a job corresponding to the operation by selecting a job scenario prepared in advance
JP2018046551A (en) * 2016-09-08 2018-03-22 株式会社リコー Image processing device, image processing program and computer readable storage medium storing image processing program

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008236610A (en) * 2007-03-23 2008-10-02 Kyocera Mita Corp Image forming apparatus, image forming method, and application program
US8314962B2 (en) 2007-03-23 2012-11-20 Kyocera Mita Corporation Image forming apparatus that discriminates an operation of a service requested and constructs a job corresponding to the operation by selecting a job scenario prepared in advance
JP2008257448A (en) * 2007-04-04 2008-10-23 Fuji Xerox Co Ltd Information processor and program
JP2018046551A (en) * 2016-09-08 2018-03-22 株式会社リコー Image processing device, image processing program and computer readable storage medium storing image processing program

Similar Documents

Publication Publication Date Title
JP2001027986A (en) Data processor and processing part selecting method
JP4752480B2 (en) Image processing program, image processing apparatus, and image processing system
JP2007166177A (en) Image processing program, image processing method, image processing apparatus, and image processing system
US11457117B2 (en) Image processing apparatus capable of shifting to power saving mode, control method for the image processing apparatus, and program
JP5928498B2 (en) Information device, computer program, and memory sharing method
JP5828357B2 (en) Image forming apparatus, image forming method, and program
US9026576B2 (en) Image processing device, job processing method, and program
JP5498134B2 (en) Image reading apparatus, method, and program
JP4340120B2 (en) Image forming apparatus and storage area acquisition method
JP2004030601A (en) Device and method of making application start judgment by resource information
JP2004005612A (en) System and method for obtaining resource information
JP2006238324A (en) Method and apparatus to input and output information
JP2009037611A (en) Program for controlling launch
JP2008271164A (en) Image processor
JP2000115277A (en) Coding/decoding device and image formation system
JP2004118313A (en) Network printer
JP2009140069A (en) Printing system
JP2004088596A (en) Information input/output apparatus and information input/output method
JP2007074101A (en) Communication terminal device
JP2005287042A (en) Apparatus, method and program for image formation
JP2020028008A (en) Image processing device and program
JP2005173816A (en) Image forming apparatus and authenticating method
JP2005277938A (en) Data processor, data processing method, and computer program
KR100299960B1 (en) Method for managing edition of data in combiner
JP2005277935A (en) Data processing apparatus, data processing method, and computer program

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20080513