JP2006227852A - Use plan value calculation method and computer system - Google Patents

Use plan value calculation method and computer system Download PDF

Info

Publication number
JP2006227852A
JP2006227852A JP2005039986A JP2005039986A JP2006227852A JP 2006227852 A JP2006227852 A JP 2006227852A JP 2005039986 A JP2005039986 A JP 2005039986A JP 2005039986 A JP2005039986 A JP 2005039986A JP 2006227852 A JP2006227852 A JP 2006227852A
Authority
JP
Japan
Prior art keywords
value
data storage
storage unit
unit
unit time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005039986A
Other languages
Japanese (ja)
Inventor
Michio Sato
美智夫 佐藤
Tatsuya Yuki
達也 結城
Yuji Sato
祐司 佐藤
Yoshihiro Ueno
善弘 上野
Kazuyuki Takane
和之 高根
Takeshi Haida
武史 灰田
Tetsuji Shibatani
哲司 柴谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Company Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2005039986A priority Critical patent/JP2006227852A/en
Publication of JP2006227852A publication Critical patent/JP2006227852A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To facilitate countermeasures to such a case that the result quantity of the object of consignment to be supplied from a consignment client to the consignment network of a consignment undertaker. <P>SOLUTION: This method may be applied when a penalty is imposed on a consignment client based on an error between the use result quantity of the object of consignment (power, gas or the like) by a customer and the use plan value of the customer. This computer system is configured to acquire the use result quantity of the object of consignment in every first unit time for the customer from the consignment undertaker computer, and to calculate the prediction plan value of the object of consignment of the customer in every first unit time according to a specific calculation method, and to calculate a correction value for the prediction plan value in every first unit time for reducing a penalty based on a cumulative error between the use result quantity and the use plan value in the second unit time, and for minimizing the penalty based on the error between the use result quantity and the use plan value in the first unit time, and to calculate the use plan value in every first unit time from the correction value and the prediction plan value. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、電力、ガス、その他のエネルギー又は資源を託送事業者の託送ネットワークを介して顧客の施設に供給する場合に実行される情報処理技術に関する。   The present invention relates to an information processing technique executed when electric power, gas, or other energy or resources are supplied to a customer's facility via a consignment network of a consignment company.

例えば、託送依頼者を甲、託送事業者を乙、託送対象をガスとすると、図1に示すように、甲からのガスは、流量調整弁、受入計量器、乙ネットワーク、そして払出計量器とを介して託送依頼者の顧客の施設に供給される。なお、託送を行う際には、甲のガス供給量と顧客のガス消費量が同一となるように同時同量制御を行うため、甲側の流量調整弁を制御する。もし、甲のガス供給量と顧客のガス消費量との差が所定閾値以上となると、甲は乙にペナルティ料金を支払う必要がある。   For example, if the consignment requester is A, the consignment carrier is B, and the object of consignment is gas, as shown in Fig. 1, the gas from A is the flow control valve, receiving meter, B network, and dispensing meter. To the customer's facility of the consignment client. When carrying out consignment, the flow control valve on the side A is controlled in order to perform simultaneous and same amount control so that the gas supply amount of the customer A and the gas consumption of the customer are the same. If the difference between the gas supply amount of the customer and the gas consumption amount of the customer exceeds a predetermined threshold value, the customer must pay a penalty fee to the customer.

このような考え方に基づく従来技術には、特開2004−178478号公報がある。具体的には、契約者ガス要求量を1時間単位で管理するときは、契約者ガス要求量の1時間積算量の信号と市中導管払出ガス量の1時間積算量の信号とを比較部で比較させる。契約者ガス要求量に対し払出ガス量が少ないとか多過ぎるとかの差があると、補正演算部で、1時間の残り時間に差を解消するに必要なガス量の瞬時量を求めて、その補正信号を上記契約者ガス要求量の信号に加算部で加え、これを設定値として現在払出されているガス量の信号と払出制御部で対比させ、差に応じて市中導管の流量調整弁を調整することにより払出ガス量が調整される。   Japanese Patent Application Laid-Open No. 2004-178478 is known as a prior art based on such a concept. More specifically, when managing the contractor gas request amount in units of one hour, the comparison unit compares the signal of the one-hour integrated amount of the contractor gas request amount and the signal of the one-hour integrated amount of the city conduit discharge gas amount. Let's compare. If there is a difference in the amount of gas to be discharged or too much with respect to the contractor gas request amount, the correction calculation unit obtains the instantaneous amount of gas necessary to eliminate the difference in the remaining time of 1 hour, and The correction signal is added to the above-mentioned contractor gas request amount signal at the adding unit, and this is compared with the currently discharged gas amount signal as the set value by the dispensing control unit, and the flow control valve of the commercial conduit is selected according to the difference. The amount of discharged gas is adjusted by adjusting.

また、特開2002−230640号公報には、接続供給者にかかる費用を低減し、ユーティリティ(可燃性ガス、電力、水)供給網を容易に利用できるようにするための技術が開示されている。具体的には、受入設備に設けられる受入側流量計で測定された受入量と、払出設備に設けられる払出側流量計で測定された払出量とをデータ収集記憶手段に収集記憶し、それらの受入量と払出量とに基づき、託送事業者において、接続供給者および需要家それぞれの必要な料金を演算する。そして、接続供給者には、接続供給者用通知手段により、受入量と払出量、ならびに、接続供給者および需要家の料金を通信回線を介して通知し、一方、需要家には、需要家用通知手段により、払出量と需要家の料金とを通信回線を介して通知する。
特開2004−178478号公報 特開2002−230640号公報
Japanese Patent Application Laid-Open No. 2002-230640 discloses a technique for reducing the cost for a connection supplier and making it easy to use a utility (combustible gas, power, water) supply network. . Specifically, the received amount measured by the receiving-side flow meter provided in the receiving facility and the paid-out amount measured by the dispensing-side flow meter provided in the paying facility are collected and stored in the data collection storage means, and these are stored. Based on the received amount and the paid-out amount, the consignment company calculates the necessary charges for each of the connected supplier and the customer. Then, the connected supplier is notified of the received amount and the paid-out amount and the charges of the connected supplier and the customer via the communication line by the notification means for the connected supplier. The notification means notifies the payout amount and the customer's fee via a communication line.
JP 2004-178478 A Japanese Patent Laid-Open No. 2002-230640

しかしながら、常に図1に示すような状況で託送が行われるわけではない。すなわち、図2に示すように、甲及び乙のガスが混在する場合、受入計量器では甲及び乙の流量を合わせて計量することになるため、甲からの供給量が実測されない場合もある。このような場合には、払出計量器により計測される顧客のガス消費量と甲のガス供給量とが同一となるような制御は不可能である。   However, the consignment is not always performed in the situation shown in FIG. That is, as shown in FIG. 2, when the gas of A and B is mixed, since the receiving meter measures the flow of A and B together, the supplied amount from the A may not be actually measured. In such a case, it is impossible to control such that the customer's gas consumption measured by the payout meter is the same as the gas supply amount of the former.

従って本発明の目的は、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量が特定されない場合において必要となるコンピュータ・システムを提供することである。   Accordingly, an object of the present invention is to provide a computer system that is required when the actual amount of the object of consignment supplied to the consignment network of the consignor is not specified by the consignor requester.

また、本発明の他の目的は、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量が特定されない場合において必要となるデータである顧客の利用計画値を適切に算出する技術を提供することである。   Another object of the present invention is to appropriately set the customer's use plan value, which is data required when the actual amount of the target of consignment supplied to the consignment network of the consignment carrier is not specified by the consignment requester. It is to provide a technique for calculating.

本発明の第1の態様に係るコンピュータ・システムは、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量を特定することなく託送依頼者の顧客による託送対象(電力、ガス、その他のエネルギー及び資源)の利用実績量と当該顧客の利用計画値(実施の形態における計画値)との誤差に基づきペナルティが課される場合において用いられる、託送依頼者向けのコンピュータ・システムである。本コンピュータ・システムは、託送事業者のコンピュータから顧客について第1の単位時間(例えば1時間)毎の託送対象の利用実績量のデータを取得し、実績量データ格納部に格納する手段と、実績量データ格納部に格納されたデータを用いて、顧客の託送対象の予測計画値を特定のアルゴリズムに従って第1の単位時間毎に算出し、予測計画値データ格納部に格納する手段と、実績量データ格納部に格納されたデータを用いて、第1の単位時間より長い第2の単位時間(例えば3ヶ月)における、利用実績量と利用計画値との累積誤差に基づくペナルティを減少させつつ、第1の単位時間における、利用実績量と利用計画値との誤差に基づくペナルティを最小化するための、予測計画値に対する補正値を第1の単位時間毎に算出し、補正値データ格納部に格納する手段と、予測計画値データ格納部と補正値データ格納部とに格納されたデータを用いて、第1の単位時間毎の利用計画値を算出し、利用計画値データ格納部に格納する手段とを有する。   The computer system according to the first aspect of the present invention provides a consignment target (power) by a consignment requester's customer without specifying the actual amount of the consignment target supplied to the consignment carrier's consignment network by the consignment requester. , Gas, other energy and resources), a computer for consignees used when a penalty is imposed based on the error between the actual usage amount of the customer and the planned usage value of the customer (planned value in the embodiment) System. The computer system obtains data on the actual usage amount to be entrusted for each first unit time (for example, 1 hour) from the computer of the consignment carrier and stores it in the actual amount data storage unit. Means for calculating a predicted plan value of a customer's consignment target for each first unit time using the data stored in the quantity data storage unit according to a specific algorithm, and storing it in the predicted plan value data storage unit; Using the data stored in the data storage unit, while reducing the penalty based on the accumulated error between the actual usage amount and the usage plan value in the second unit time (for example, three months) longer than the first unit time, A correction value for the predicted plan value for minimizing a penalty based on an error between the actual usage amount and the usage plan value in the first unit time is calculated and corrected every first unit time. Using the data stored in the data storage unit, the predicted plan value data storage unit, and the data stored in the correction value data storage unit, the usage plan value for each first unit time is calculated, and the usage plan value data is stored. Means for storing in the unit.

このように利用計画値を算出すれば、託送依頼者が託送事業者に支払うペナルティを最小限に抑えることができるようになる。なお、上で述べたように長期的なペナルティ及び短期的なペナルティを考慮した上で補正値が算出されるため、顧客の単なる需要予測とは異なり、例えば第1の単位時間についての予測からは多少ずれても第2の単位時間についてのペナルティを減少させるように利用計画値を設定する場合もある。   If the utilization plan value is calculated in this way, the penalty paid by the consignment requester to the consignment company can be minimized. As mentioned above, since the correction value is calculated after taking into account long-term and short-term penalties, for example, unlike the simple demand forecast of the customer, for example, from the forecast for the first unit time, In some cases, the usage plan value is set so as to reduce the penalty for the second unit time even if there is a slight deviation.

また、本発明の第2の態様に係る利用計画値算出方法は、託送事業者の託送ネットワークに接続された、託送依頼者の顧客の施設に供給される託送対象について顧客の利用計画値を、処理部及びデータ格納部を有するコンピュータにより算出する方法である。そして本方法は、処理部により、顧客の託送対象の利用実績量を第1の単位時間(例えば1時間)毎に格納する実績量データ格納部に格納されたデータを用いて、顧客の託送対象の予測計画値を特定のアルゴリズムに従って第1の単位時間毎に算出し、予測計画値データ格納部に格納するステップと、処理部により、実績量データ格納部に格納されたデータを用いて、第1の単位時間より長い第2の単位時間(例えば3ヶ月)における、利用実績量と利用計画値との累積誤差を減少させるためであって第1の単位時間より長く第2の単位時間より短い第3の単位時間(例えば日)における第1の補正値を算出し、第1補正値データ格納部に格納する第1補正値算出ステップと、処理部により、実績量データ格納部と第1補正量データ格納部とに格納されたデータを用いて、第3の単位時間における第1の補正値を満たしつつ、第1の単位時間における利用実績量と利用計画値との誤差に基づくペナルティを最小化するように、第3の単位時間内の第1の単位時間毎に第2の補正値を算出し、第2補正値データ格納部に格納するステップと、処理部により、予測計画値データ格納部と第2補正値データ格納部とに格納されたデータを用いて、第3の単位時間内における第1の単位時間毎に予測計画値と第2の補正値との和である利用計画値を算出し、利用計画値データ格納部に格納するステップとを含む。   In addition, the utilization plan value calculation method according to the second aspect of the present invention includes the customer's utilization plan value for the consignment target supplied to the customer's facility of the consignment requester connected to the consignment company's consignment network, This is a method of calculation by a computer having a processing unit and a data storage unit. In this method, the processing unit uses the data stored in the actual amount data storage unit that stores the usage amount of the customer's consignment target every first unit time (for example, one hour), and uses the data stored in the actual amount data storage unit. The predicted plan value is calculated for each first unit time according to a specific algorithm, stored in the predicted plan value data storage unit, and the processing unit uses the data stored in the actual amount data storage unit, This is to reduce the accumulated error between the actual usage amount and the usage plan value in a second unit time (for example, three months) longer than one unit time, and is longer than the first unit time and shorter than the second unit time. A first correction value calculation step for calculating a first correction value in a third unit time (for example, a day) and storing the first correction value in the first correction value data storage unit; Quantity data storage and Using the stored data, the first correction value in the third unit time is satisfied, and the penalty based on the error between the actual usage amount and the usage plan value in the first unit time is minimized. The second correction value is calculated every first unit time within the unit time of 3 and stored in the second correction value data storage unit, and the predicted planned value data storage unit and the second correction value are processed by the processing unit. Using the data stored in the data storage unit, a usage plan value that is the sum of the predicted plan value and the second correction value is calculated for each first unit time within the third unit time, and the usage plan is calculated. Storing in the value data storage unit.

このように長期的なペナルティを考慮した、第3の単位時間における第1の補正値を算出した上で、当該第1の補正値を満たしつつ短期的なペナルティを最小化するように第1の単位時間毎に第2の補正値が算出されるので、適切に予測計画値が修正されるようになる。   In this way, after calculating the first correction value in the third unit time in consideration of the long-term penalty, the first correction value is satisfied so as to minimize the short-term penalty while satisfying the first correction value. Since the second correction value is calculated for each unit time, the predicted plan value is appropriately corrected.

なお、上で述べた第1補正値算出ステップが、処理部により、第1の補正値の候補値を特定するステップと、処理部により、第2の単位時間における、利用実績量と利用計画値との累積誤差に対するペナルティ関数の元となるパラメタデータを格納するペナルティ関数データ格納部と実績量データ格納部と過去の予測計画値をも格納する予測計画値データ格納部とに格納されたデータを用いて、第1の補正値の候補値に対応して、第3の単位時間における、利用実績量と予測計画値との累積予測誤差についての確率密度関数のデータと、第2の単位時間における、ペナルティ関数のデータとを算出する第1ステップと、処理部により、確率密度関数のデータとペナルティ関数のデータとからペナルティの期待値を算出する第2ステップと、処理部により、第1の補正値の異なる候補値について第1及び第2ステップを実行して、ペナルティの期待値が最小となる第1の補正値を特定するステップとを含むようにしてもよい。より適切な第1の補正値を算出することができるようになる。   Note that the first correction value calculation step described above includes the step of specifying a candidate value of the first correction value by the processing unit, and the actual usage amount and the usage plan value in the second unit time by the processing unit. The data stored in the penalty function data storage unit that stores the parameter data that is the basis of the penalty function for the cumulative error, the actual amount data storage unit, and the predicted plan value data storage unit that also stores past predicted plan values And corresponding to the candidate value of the first correction value, the data of the probability density function for the cumulative prediction error between the actual usage amount and the predicted plan value in the third unit time, and the second unit time A first step of calculating penalty function data; a second step of calculating an expected value of penalty from the probability density function data and penalty function data by the processing unit; The parts for different candidate values of the first correction value by performing the first and second step, may include the steps of expected value of penalty identifying a first correction value becomes minimum. A more appropriate first correction value can be calculated.

また、上で述べた第1補正値算出ステップが、処理部により、実績量データ格納部と過去の利用計画値をも格納している利用計画値データ格納部とに格納されたデータを用いて、第2の単位時間において現在までに発生している利用実績量と利用計画値との累積誤差を算出するステップと、累積誤差を第2の単位時間における残りの第3の単位時間数でキャンセルするための補正値を第1の補正値として算出するステップとを含むようにしてもよい。例えば、第2の単位時間末まで遠い場合にはこのようにして第1の補正値を算出するようにしても良い。   In addition, the first correction value calculation step described above uses the data stored by the processing unit in the actual amount data storage unit and the usage plan value data storage unit that also stores past usage plan values. , A step of calculating a cumulative error between the actual usage amount generated so far in the second unit time and the planned use value, and canceling the cumulative error with the remaining third unit time in the second unit time Calculating a correction value to be used as the first correction value. For example, the first correction value may be calculated in this way when it is far from the end of the second unit time.

さらに、上で述べた第2補正値算出ステップが、処理部により、第1の単位時間ついての特定の単位時間における補正候補値を特定するステップと、処理部により、第1の単位時間における、利用実績量と利用計画値との誤差に対するペナルティ関数の元となるパラメタデータを格納するペナルティ関数データ格納部と実績量データ格納部と過去の予測計画値をも格納している予測計画値データ格納部とに格納されたデータを用いて、補正候補値に対応して、特定の単位時間における、利用実績量と予測計画値との予測誤差についての確率密度関数のデータと、特定の単位時間におけるペナルティ関数のデータとを算出する第1ステップと、処理部により、確率密度関数のデータとペナルティ関数のデータとからペナルティの期待値を算出する第2ステップと、処理部により、第3の単位時間内の全ての第1の単位時間について複数の補正候補値に対して第1及び第2ステップを実行して、第3の単位時間についての第1の補正値を満たしつつ第3の単位時間内の各第1の単位時間についてペナルティの期待値が最小となる第2の補正値を特定するステップとを含むようにしてもよい。このようにすればより適切な第2の補正値を算出することができる。   Furthermore, the second correction value calculating step described above includes a step of specifying a correction candidate value in a specific unit time for the first unit time by the processing unit, and a step in the first unit time by the processing unit. Penalty function data storage that stores the parameter data that is the basis of the penalty function for the error between the actual usage amount and the usage plan value, the actual amount data storage unit, and the predicted plan value data storage that also stores past forecast plan values Data corresponding to the correction candidate value, the probability density function data on the prediction error between the actual usage amount and the predicted plan value in a specific unit time, and the specific unit time. The first step of calculating the penalty function data and the processing unit calculate the expected value of the penalty from the probability density function data and the penalty function data. The second step and the processing unit execute the first and second steps on the plurality of correction candidate values for all the first unit times within the third unit time, and for the third unit time. A step of specifying a second correction value that minimizes the expected value of the penalty for each first unit time within the third unit time while satisfying the first correction value may be included. In this way, a more appropriate second correction value can be calculated.

また、託送対象のコストと販売単価との少なくともいずれかの変動に応じてパラメタデータを変更する処理を実施し、ペナルティ関数データ格納部に格納するステップをさらに含むようにしても良い。これにより状況に応じたペナルティを見積もることができるようになる。   In addition, it may further include a step of executing a process of changing the parameter data in accordance with at least one of the cost to be consigned and the selling unit price, and storing the parameter data in the penalty function data storage unit. This makes it possible to estimate the penalty according to the situation.

本発明の第3の態様に係るコンピュータ・システムは、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量を特定することなく託送依頼者の顧客による託送対象の利用実績量と当該顧客の利用計画値との誤差に基づきペナルティが課される場合において用いられる、託送依頼者向けのコンピュータ・システムである。そして本コンピュータ・システムは、託送事業者のコンピュータから顧客について単位時間毎の託送対象の利用実績量のデータを取得し、実績量データ格納部に格納する手段と、実績量データ格納部に格納されたデータを用いて、顧客の託送対象の予測計画値を特定のアルゴリズムに従って単位時間毎に算出し、過去の予測計画値をも格納する予測計画値データ格納部に格納する手段と、実績量データ格納部と予測計画値データ格納部とに格納されたデータを用いて、単位時間毎に、当該単位時間における、利用実績量と予測計画値との予測誤差の統計量を算出し、当該統計量に基づき、予測計画値に対する補正値を単位時間毎に算出し、補正値データ格納部に格納する手段と、予測計画値データ格納部と補正値データ格納部とに格納されたデータを用いて、単位時間毎の利用計画値を算出し、利用計画値データ格納部に格納する手段とを有する。簡易的には上で述べたように単純な予測ではなく統計的なデータを用いて補正値を算出して予測を修正するようにしても、適切な利用計画値を得ることができるようになる。   The computer system according to the third aspect of the present invention uses the consignment target by the consignee client without specifying the actual amount of consignment target supplied to the consignment network of the consignor by the consignment requester. This is a computer system for a consignment requester that is used when a penalty is imposed based on an error between the actual amount and the usage plan value of the customer. And this computer system acquires the data of the use amount of the usage object of the consignment object for every unit time about the customer from the computer of the consignment carrier, and stores it in the actual amount data storage unit and the actual amount data storage unit. Means for calculating the predicted plan value of the customer's consignment target for each unit time according to a specific algorithm and storing it in the predicted plan value data storage unit for storing the past predicted plan value, and the actual amount data Using the data stored in the storage unit and the predicted plan value data storage unit, for each unit time, calculate the statistic of the prediction error between the actual usage amount and the predicted plan value in the unit time, and the statistic Based on the above, the correction value for the predicted plan value is calculated every unit time, and stored in the correction value data storage unit, the predicted plan value data storage unit, and the correction value data storage unit Using chromatography data, calculates a utilization plan value per unit time, and means for storing a utilization plan value data storage unit. As described above, an appropriate usage plan value can be obtained even if a correction value is calculated using statistical data instead of simple prediction as described above and the prediction is corrected. .

本発明に係る方法をコンピュータに実行させるためのプログラムを作成することも可能であり、当該プログラムは、例えばフレキシブル・ディスク、CD−ROM、光磁気ディスク、半導体メモリ、ハードディスク等の記憶媒体又は記憶装置に格納される。また、ネットワークを介してディジタル信号にて頒布される場合もある。なお、処理途中のデータについては、コンピュータのメモリ等の記憶装置に一時保管される。   It is also possible to create a program for causing a computer to execute the method according to the present invention. The program is, for example, a storage medium or a storage device such as a flexible disk, a CD-ROM, a magneto-optical disk, a semiconductor memory, and a hard disk. Stored in In some cases, digital signals are distributed over a network. Note that data being processed is temporarily stored in a storage device such as a computer memory.

本発明によれば、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量が特定されない場合において必要となるコンピュータ・システムを提供することができる。   According to the present invention, it is possible to provide a computer system that is required when the actual volume of the object of consignment supplied to the consignment network of the consignment carrier is not specified by the consignment requester.

また本発明の他の側面として、託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量が特定されない場合において必要となるデータである顧客の利用計画値を適切に算出することができる。   Further, as another aspect of the present invention, the customer's use plan value, which is data necessary when the actual amount of the target of consignment supplied to the consignment carrier's consignment network is not specified by the consignment requester, is appropriately calculated. can do.

図3に本発明の一実施の形態の形態に係るシステム概要図を示す。例えばインターネットであるネットワーク1には、託送事業者コンピュータ7と、顧客コンピュータ9と、気象データ配信サーバ5と、本実施の形態における主要な処理を実施する託送計画システム3とが接続されている。託送計画システム3は、実績値データ取得部301と、顧客計画値データ取得部302と、気象データ取得部303と、実績値データ格納部304と、顧客計画値データ格納部305と、気象データ格納部306と、消費予測値算出部307と、消費予測値データ格納部309と、計画値データ格納部310と、補正値算出部312と、補正値データ格納部313と、計画値算出部314と、計画値データ送信部315とを有する。   FIG. 3 shows a system outline diagram according to an embodiment of the present invention. For example, a network 1 that is the Internet is connected to a consignment company computer 7, a customer computer 9, a weather data distribution server 5, and a consignment planning system 3 that performs main processing in the present embodiment. The consignment planning system 3 includes an actual value data acquisition unit 301, a customer planned value data acquisition unit 302, a weather data acquisition unit 303, an actual value data storage unit 304, a customer planned value data storage unit 305, and a weather data storage. Unit 306, predicted consumption value calculation unit 307, predicted consumption value data storage unit 309, planned value data storage unit 310, correction value calculation unit 312, correction value data storage unit 313, planned value calculation unit 314, And a plan value data transmission unit 315.

実績値データ取得部301は、ネットワーク1を介して託送事業者コンピュータ7から前日における顧客の消費実績値のデータ(例えば1時間毎のデータ)を取得し、実績値データ格納部304に格納する。顧客計画値データ取得部302は、ネットワーク1を介して顧客コンピュータ9から翌日の顧客計画値のデータ(例えば1時間毎のデータ)を取得し、顧客計画値データ格納部305に格納する。気象データ取得部303は、ネットワーク1を介して気象データ配信サーバ5から気象データを取得し、気象データ格納部306に格納する。消費予測値算出部307は、実績値データ格納部304と顧客計画値データ格納部305と気象データ格納部306とに格納されたデータを用いて、予測手法指定308に応じて、指定された種別の予測手法にて消費予測値を算出し、消費予測値データ格納部309に格納する。補正値算出部312は、消費予測値データ格納部309と計画値データ格納部310と実績値データ格納部304とに格納されたデータを用いて、補正手法指定311に応じて、指定された種別の補正手法にて補正値を算出し、補正値データ格納部313に格納する。計画値算出部314は、補正値データ格納部313と消費予測値データ格納部309とに格納されたデータとに格納されたデータを用いて計画値を算出し、計画値データ格納部310に格納する。計画値データ送信部315は、計画値データ格納部310から翌日の計画値データを読み出し、ネットワーク1を介して託送事業者コンピュータ7に送信する。   The actual value data acquisition unit 301 acquires the customer's consumption actual value data (for example, hourly data) of the previous day from the consignment company computer 7 via the network 1 and stores the acquired data in the actual value data storage unit 304. The customer plan value data acquisition unit 302 acquires the next day's customer plan value data (for example, hourly data) from the customer computer 9 via the network 1 and stores the data in the customer plan value data storage unit 305. The meteorological data acquisition unit 303 acquires meteorological data from the meteorological data distribution server 5 via the network 1 and stores it in the meteorological data storage unit 306. The consumption predicted value calculation unit 307 uses the data stored in the actual value data storage unit 304, the customer plan value data storage unit 305, and the weather data storage unit 306 to specify the type specified according to the prediction method specification 308. The consumption prediction value is calculated by the prediction method and stored in the consumption prediction value data storage unit 309. The correction value calculation unit 312 uses the data stored in the consumption predicted value data storage unit 309, the plan value data storage unit 310, and the actual value data storage unit 304, and the type specified according to the correction method specification 311. The correction value is calculated by the correction method and stored in the correction value data storage unit 313. The plan value calculation unit 314 calculates a plan value using data stored in the correction value data storage unit 313 and the consumption prediction value data storage unit 309 and stores the plan value in the plan value data storage unit 310. To do. The plan value data transmission unit 315 reads the next day's plan value data from the plan value data storage unit 310 and transmits it to the consignment company computer 7 via the network 1.

なお、託送計画システム3は、1台のパーソナルコンピュータであってもよい。その場合には、例えば各データ格納部に格納されたデータをユーザの指示に応じて表示装置に表示する表示処理部を有する。また、託送計画システム3は、サーバであってもよく、その場合には、託送依頼者の社内ネットワークなどを介して接続されたクライアント端末からの要求に応じて、例えば各データ格納部に格納されたデータから生成された例えばHTMLデータを要求元のクライアント端末に送信し、クライアント端末の表示装置にクライアント・アプリケーション・プログラム(例えばWebブラウザ)により表示させる。   The consignment planning system 3 may be a single personal computer. In that case, for example, a display processing unit that displays data stored in each data storage unit on a display device according to a user instruction is provided. In addition, the consignment planning system 3 may be a server. In that case, the consignment planning system 3 is stored in, for example, each data storage unit in response to a request from a client terminal connected via the in-house network of the consignor requester. For example, HTML data generated from the received data is transmitted to the requesting client terminal, and displayed on the display device of the client terminal by a client application program (for example, a Web browser).

図4に、補正値算出部312の詳細な機能ブロック図を示す。補正値算出部312は、パラメタデータ格納部3124と、ペナルティ関数生成部3123と、ペナルティ関数データ格納部3122と、日補正量算出部3121と、日補正量データ格納部3125と、同時同量補正値算出部3126と、予測誤差分布データ格納部3127とを含む。パラメタデータ格納部3124は、託送依頼者が託送事業者に支払うことになるペナルティ料金の算定のためのペナルティ関数を決定するためのデータ(例えば託送依頼者側の販売単価、コストなど)のパラメタデータを格納している。ペナルティ関数データ格納部3122は、託送事業者の約款等に規定されているペナルティ関数の基本データ及び現在使用すべきペナルティ関数のデータを格納している。ペナルティ関数生成部3123は、パラメタデータ格納部3124とペナルティ関数データ格納部3122とに格納されたデータから現在使用すべきペナルティ曲線のデータを生成し、ペナルティ関数データ格納部3122に格納する。日補正量算出部3121は、ペナルティ関数データ格納部3122と実績値データ格納部304と消費予測値データ格納部309と計画値データ格納部310とに格納されたデータを用いて、補正手法指定311に応じて、指定された種別の補正手法にて日単位の日補正量を算出し、日補正量データ格納部3125に格納する。なお、この際予測誤差分布データ格納部3127に日単位の予測誤差(=消費予測値−実績値)の分布データ(確率密度関数データ)を格納する。同時同量補正値算出部3126は、実績値データ格納部304と消費予測値データ格納部309と日補正量データ格納部3125とペナルティ関数データ格納部3122とに格納されたデータを用いて、毎時の補正値である同時同量補正値を算出し、補正値データ格納部313に格納する。なお、この際予測誤差分布データ格納部3127に1時間毎の予測誤差の分布データを格納する。   FIG. 4 shows a detailed functional block diagram of the correction value calculation unit 312. The correction value calculation unit 312 includes a parameter data storage unit 3124, a penalty function generation unit 3123, a penalty function data storage unit 3122, a daily correction amount calculation unit 3121, a daily correction amount data storage unit 3125, and a simultaneous same amount correction. A value calculation unit 3126 and a prediction error distribution data storage unit 3127 are included. The parameter data storage unit 3124 is parameter data of data for determining a penalty function for calculating a penalty fee that the consignment requester will pay to the consignment company (for example, sales unit price and cost on the consignment requester side). Is stored. The penalty function data storage unit 3122 stores the penalty function basic data defined in the contractor's contract and the like and the penalty function data to be currently used. The penalty function generation unit 3123 generates penalty curve data to be used from the data stored in the parameter data storage unit 3124 and the penalty function data storage unit 3122 and stores the penalty curve data in the penalty function data storage unit 3122. The daily correction amount calculation unit 3121 uses the data stored in the penalty function data storage unit 3122, the actual value data storage unit 304, the predicted consumption data storage unit 309, and the planned value data storage unit 310 to specify a correction method specification 311. Accordingly, the daily correction amount is calculated by the specified type of correction method and stored in the daily correction amount data storage unit 3125. At this time, the distribution data (probability density function data) of the daily prediction error (= consumption prediction value−actual value) is stored in the prediction error distribution data storage unit 3127. The simultaneous same amount correction value calculation unit 3126 uses the data stored in the actual value data storage unit 304, the predicted consumption data storage unit 309, the daily correction amount data storage unit 3125, and the penalty function data storage unit 3122 every hour. Are calculated at the same time, and are stored in the correction value data storage unit 313. At this time, prediction error distribution data storage unit 3127 stores prediction error distribution data for each hour.

次に、図5乃至図26を用いて図3に示したシステムの処理フローを説明する。例えば以下の処理フローは、託送計画システム3により、翌日の計画値データを託送事業者コンピュータ7に送信するまでに実行される。まず、実績値データ取得部301は、ネットワーク1を介して託送事業者コンピュータ7から前日の顧客の消費実績量のデータ(1時間毎のデータ)を取得し、累積的に実績値データ格納部304に格納する(ステップS1)。なお、託送計画システム3のユーザが、顧客の消費実績量のデータを実績値データ取得部301に対して入力するようにしても良い。例えば、実績値データ格納部304に格納されるデータのフォーマット例を図6に示す。図6の例では、顧客IDと、年月日と、時刻と、消費実績量とが登録されるようになっている。   Next, the processing flow of the system shown in FIG. 3 will be described with reference to FIGS. For example, the following processing flow is executed by the consignment planning system 3 until the next day's plan value data is transmitted to the consignment company computer 7. First, the actual value data acquisition unit 301 acquires the consumption data amount of the customer of the previous day (data for every hour) from the consignment company computer 7 via the network 1 and cumulatively stores the actual value data storage unit 304. (Step S1). Note that the user of the consignment planning system 3 may input data on the actual consumption amount of the customer to the actual value data acquisition unit 301. For example, a format example of data stored in the actual value data storage unit 304 is shown in FIG. In the example of FIG. 6, the customer ID, date, time, and actual consumption amount are registered.

また、顧客計画値データ取得部302は、ネットワーク1を介して顧客コンピュータ9から翌日の顧客計画値データを取得し、累積的に顧客計画値データ格納部305に格納する(ステップS3)。なお、託送計画システム3のユーザが、翌日の顧客の顧客計画値のデータを顧客計画値データ取得部302に対して入力するようにしても良い。顧客計画値データ格納部305に格納されるデータのフォーマット例を図7に示す。図7の例では、顧客IDと、年月日と、時刻と、顧客計画値と、特異日フラグとが登録されるようになっている。なお、特異日については、過去の消費実績量などを参考にできないような特別な事情がある日である。   Further, the customer plan value data acquisition unit 302 acquires the customer plan value data of the next day from the customer computer 9 via the network 1, and stores it in the customer plan value data storage unit 305 cumulatively (step S3). Note that the user of the consignment planning system 3 may input the customer plan value data of the customer of the next day to the customer plan value data acquisition unit 302. A format example of data stored in the customer plan value data storage unit 305 is shown in FIG. In the example of FIG. 7, the customer ID, date, time, customer plan value, and singular date flag are registered. In addition, a special day is a day with special circumstances that cannot refer to past consumption results.

さらに、気象データ取得部303は、ネットワーク1を介して気象データ配信サーバ5から翌日の気象予報データ及び前日の実績気象データなどを取得し、気象データ格納部306に格納する(ステップS5)。気象データ格納部306に格納されるデータのフォーマット例を図8及び図9に示す。図8の例は実績気象データを示しており、地点名又はコードと、年月日と、時刻と、気温とが登録されるようになっている。実績気象データは、累積的に格納される。また、図9の例は気象予報データを示しており、地点名又はコードと、年月日と、最高気温と、最低気温とが登録されるようになっている。   Further, the weather data acquisition unit 303 acquires the next day's weather forecast data and the previous day's actual weather data from the weather data distribution server 5 via the network 1, and stores them in the weather data storage unit 306 (step S5). An example format of data stored in the weather data storage unit 306 is shown in FIGS. The example in FIG. 8 shows actual weather data, and a location name or code, date, time, and temperature are registered. Actual weather data is stored cumulatively. Further, the example of FIG. 9 shows weather forecast data, and a location name or code, a date, a maximum temperature, and a minimum temperature are registered.

次に、消費予測値算出部307は、予測手法指定308などから、消費量予測手法を特定する(ステップS7)。例えば、(1)自己回帰モデル、(2)類似日予測モデル、(3)回帰モデル、(4)顧客計画値補正モデル、(5)その他の中から、1の手法(モデル)が託送計画システム3のユーザから指定される。又は、予め適切な手法(モデル)が設定されており、当該設定に従うようにしてもよい。   Next, the predicted consumption value calculation unit 307 specifies a consumption amount prediction method from the prediction method designation 308 or the like (step S7). For example, one method (model) is (1) autoregressive model, (2) similar day prediction model, (3) regression model, (4) customer plan value correction model, (5) others, and the consignment planning system 3 users are designated. Alternatively, an appropriate method (model) may be set in advance, and the setting may be followed.

そして、消費予測値算出部307は、実績値データ格納部304と顧客計画値データ格納部305と気象データ格納部306とに格納されたデータを用いて、ステップS7で特定された消費量予測手法に従った消費予測値(1時間毎の消費予測値)を算出し、消費予測値データ格納部309に格納する(ステップS9)。以下各手法について概説する。   Then, the consumption predicted value calculation unit 307 uses the data stored in the actual value data storage unit 304, the customer plan value data storage unit 305, and the weather data storage unit 306, and uses the consumption prediction method specified in step S7. The consumption predicted value (consumption predicted value for every hour) is calculated and stored in the consumption predicted value data storage unit 309 (step S9). Each method is outlined below.

(1)自己回帰モデル(AR(Autoregressive Model)モデル)
消費予測値W(t)=a0+a1×Y(t-1)+・・・+an×Y(t-n)
この式に従って消費予測値を算出する。なお、a0,a1,a2...anはモデル定数であり、Y(t)は消費実績値、tは時間(1時間又は1日などの単位時間)である。モデル定数については、例えばnを定めて、過去所定日数分の消費実績値から算出する。また、AIC(赤池情報量。時系列モデルの最適次数決定に使用される情報量の一つ)基準で過去所定日数分の消費実績値から最適なn及びモデル係数を算出する。
(1) Autoregressive model (AR (Autoregressive Model) model)
Consumption predicted value W (t) = a0 + a1 * Y (t-1) + ... + an * Y (tn)
A predicted consumption value is calculated according to this equation. A0, a1, a2,. . . an is a model constant, Y (t) is a consumption actual value, and t is a time (unit time such as one hour or one day). About a model constant, n is defined, for example, and it calculates from the consumption performance value for the past predetermined number of days. Further, the optimal n and model coefficient are calculated from the actual consumption values for the past predetermined number of days on the basis of AIC (Akaike information amount, one of information amounts used for determining the optimal order of the time series model).

(2)類似日予測モデル
予測日と類似日と想定される日の消費実績値を比例修正又は偏差加算することにより、消費予測値を生成するものである。
例えば、消費予測値W(t)=α×類似日の実績値A(t)(比例修正)
また、例えば消費予測値W(t)=β+類似日の実績値A(t)(偏差加算)
α及びβについては、顧客の消費動向、気候条件などにより統計的又は経験的に算出する。
(2) Similarity Date Prediction Model A consumption prediction value is generated by proportionally correcting or adding a deviation between the predicted date and the actual consumption value on the date assumed to be a similar date.
For example, predicted consumption value W (t) = α × actual value A (t) on similar days (proportional correction)
Also, for example, consumption forecast value W (t) = β + actual value A (t) on similar days (deviation addition)
α and β are calculated statistically or empirically according to customer consumption trends, climate conditions, and the like.

(3)回帰モデル
過去の消費実績値、気温(過去実績、予測)、曜日、特異日など消費量に関係するパラメータを使用して消費予測値を算出する。
例えば消費予測値W(t)=a0+a1×Z1(t-1)+・・・+an×Zn(t-n)
なお、Ziは、説明変数(消費実績値、気温、曜日など)である。なお、回帰モデルで用いた説明変数を用いてニューラルネットワークなどの手法で予測することも可能である。
(3) Regression model A consumption forecast value is calculated using parameters related to consumption, such as past consumption record, temperature (past record, forecast), day of the week, and specific days.
For example, predicted consumption value W (t) = a0 + a1 × Z1 (t−1) +... + An × Zn (tn)
Zi is an explanatory variable (consumption actual value, temperature, day of the week, etc.). It is also possible to make predictions using a neural network or the like using the explanatory variables used in the regression model.

(4)顧客計画値補正モデル
顧客計画値と実績値の関係を統計的に分析し、顧客計画値を補正することにより消費予測値を算出する。
例えば、消費予測値W(t)=顧客計画値P(t)+f(μ,σ)
ここではf(μ,σ)は、顧客計画値と実績値の誤差分布θ(μ,σ)を小さくするための関数である。
また、例えば消費予測値W(t)=α×顧客計画値が類似した日の実績値P(t)+β
例えば、顧客計画値の類似日は1日の平方誤差が最も小さいといった条件などで検索する。その類似日における実績値と顧客計画値の関連やその他要因からα及びβを算出しておく。
(4) Customer planned value correction model The relationship between the customer planned value and the actual value is statistically analyzed, and the consumption predicted value is calculated by correcting the customer planned value.
For example, consumption forecast value W (t) = customer plan value P (t) + f (μ, σ)
Here, f (μ, σ) is a function for reducing the error distribution θ (μ, σ) between the customer plan value and the actual value.
In addition, for example, consumption forecast value W (t) = α × actual value P (t) + β on a day with a similar customer plan value
For example, the similar date of the customer plan value is searched under such a condition that the square error of the day is the smallest. Α and β are calculated from the relationship between the actual value on the similar date and the customer plan value and other factors.

(5)その他
例えば類似日モデルや顧客計画値補正モデルのα及びβの算出に自己回帰モデルを使用するなどの方式が含まれる。
(5) Others For example, a method of using an autoregressive model for calculating α and β of a similar date model or a customer plan value correction model is included.

なお上で述べた方式(モデル)は、周知技術であるから、これ以上の説明は省略する。また、全ての方式(モデル)について予測誤差の標準偏差や平方和が最も小さいものを最適な方式(モデル)として自動的に選択するようにしても良い。顧客毎、日毎、時間毎に最も当てはまりの良い方式を選択するようにしても良い。   Since the method (model) described above is a well-known technique, further explanation is omitted. In addition, for all methods (models), the one with the smallest standard deviation or sum of squares of prediction errors may be automatically selected as the optimum method (model). You may make it select the method with the best fit for every customer, every day, and every time.

ステップS9において算出された消費予測値のデータは、例えば図10に示すデータフォーマットで消費予測値データ格納部309に格納される。すなわち、図10の例では、顧客IDと、年月日と、時刻と、消費予測値とが登録されるようになっている。   The consumption predicted value data calculated in step S9 is stored in the consumption predicted value data storage unit 309, for example, in the data format shown in FIG. That is, in the example of FIG. 10, the customer ID, date, time, and consumption predicted value are registered.

図5の説明に戻り、日補正量算出部3121は、実績値データ格納部304と消費予測値データ格納部309と計画値データ格納部310とペナルティ関数データ格納部3122とに格納されたデータを用いて、補正手法指定311に応じて、指定された種別の手法に従って、予測計画値に対する日単位の補正値を算出し、日補正量データ格納部3125に格納する(ステップS11)。このステップの処理については、以下に詳しく述べる。   Returning to the description of FIG. 5, the daily correction amount calculation unit 3121 uses the data stored in the actual value data storage unit 304, the predicted consumption data storage unit 309, the planned value data storage unit 310, and the penalty function data storage unit 3122. Then, according to the correction method specification 311, the daily correction value for the predicted plan value is calculated according to the specified type of method, and stored in the daily correction amount data storage unit 3125 (step S 11). The processing of this step will be described in detail below.

なお、最初に補正の前提となるペナルティについて説明しておく。本実施の形態では、第1に、例えば1時間毎に実績値と計画値とを比較してその誤差が許容値を超えている場合には予め約款などに定められたペナルティを支払うことになっている。このペナルティを説明するためのグラフを図11に示す。図11において横軸は時刻、縦軸は消費量又は計画値を表す。そして、実線Aは計画値の時間変化を表し、太線Bは消費量の時間変化を表し、点線Cは計画値から所定の許容値(例えば+10%)だけオフセットさせたペナルティ発生の閾値を表す曲線を表す。図11の例では、Dの部分だけ太線Bが点線Cを上回っており、この部分についてペナルティが発生する。   First, a penalty that is a premise for correction will be described. In the present embodiment, first, for example, when the actual value and the planned value are compared every hour and the error exceeds the allowable value, a penalty determined in advance in the terms and conditions is paid. ing. A graph for explaining this penalty is shown in FIG. In FIG. 11, the horizontal axis represents time, and the vertical axis represents consumption or planned value. The solid line A represents the time change of the planned value, the thick line B represents the time change of the consumption amount, and the dotted line C represents a penalty occurrence threshold offset from the plan value by a predetermined allowable value (for example, + 10%). Represents. In the example of FIG. 11, the thick line B exceeds the dotted line C only in the portion D, and a penalty occurs for this portion.

また、本実施の形態においては上で述べた短期的なペナルティだけではなく、長期的なペナルティも規定されているものとする。本実施の形態では、3ヶ月を判定期間として、累積誤差=(累積計画値−累積実績値)の値に応じたペナルティが規定されているものとする。図12には、累積誤差の時間変化を表すグラフを示す。図12では、横軸は時間(4月から7月)を表し、縦軸は累積誤差を表す。累積誤差は、毎時発生するため、それを積みかさねるとケース1のように最初は累積誤差が0よりも多かったがその後負の値となる場合や、ケース2のように最初は累積誤差が0よりも多かったがその後負の値に一旦なってその後正の値になるなど、様々なパターンが発生しうる。但し、どのような経路をとろうとも、判定期間の終期において累積誤差の絶対値E又はFに応じたペナルティが発生する。   In the present embodiment, not only the short-term penalty described above but also a long-term penalty is defined. In the present embodiment, it is assumed that a penalty corresponding to the value of cumulative error = (cumulative plan value−cumulative actual value) is defined with a determination period of three months. FIG. 12 shows a graph representing the change in accumulated error over time. In FIG. 12, the horizontal axis represents time (from April to July), and the vertical axis represents cumulative error. Since an accumulated error occurs every hour, if accumulated, the accumulated error was initially greater than 0 as in Case 1, but then becomes a negative value, or the accumulated error is initially 0 as in Case 2. However, various patterns may occur, such as once becoming a negative value and then becoming a positive value. However, no matter what route is taken, a penalty corresponding to the absolute value E or F of the accumulated error occurs at the end of the determination period.

なお、本実施の形態では1時間毎の実績値と計画値との誤差hに対して発生するペナルティを同時同量ペナルティL(h)とする。この同時同量ペナルティL(h)は、図13に示すような値となる。すなわち、計画値の−10%以上の誤差が発生すると、その誤差の量に応じて第1の傾きを有する直線に沿って同時同量ペナルティL(h)が増加する。また、計画値が+10%以上の誤差が発生すると、その誤差の量に応じて第2の傾きを有する直線に沿って同時同量ペナルティL(h)が増加する。図13の例では、第2の傾きの方が第1の傾きより大きい。すなわち顧客が計画値より少なく消費すると、計画値より多く消費する場合よりも多くペナルティが発生する。   In the present embodiment, a penalty that occurs with respect to an error h between the actual value and the planned value every hour is defined as a simultaneous equal amount penalty L (h). This simultaneous equal amount penalty L (h) is a value as shown in FIG. That is, when an error of −10% or more of the planned value occurs, the simultaneous equal amount penalty L (h) increases along the straight line having the first slope according to the amount of the error. Further, when an error of the planned value of + 10% or more occurs, the simultaneous equal amount penalty L (h) increases along a straight line having the second slope according to the amount of the error. In the example of FIG. 13, the second slope is larger than the first slope. That is, if the customer consumes less than the planned value, more penalty is generated than if the customer consumes more than the planned value.

また、本実施の形態では3ヶ月毎の実績値と計画値との累積誤差uに対して発生するペナルティを累積ペナルティR(u)とする。この累積ペナルティR(u)は、図14に示すような値となる。すなわち、累積計画値の+3%までの累積誤差については第1の傾きを有する直線に沿って累積ペナルティR(u)が発生する。例えば、本実施の形態では、第1の傾きは、託送依頼者の販売単価と託送事業者の買い取り単価の差である。また、累積計画値の+3%以上の累積誤差については第2の傾きを有する直線に沿って累積ペナルティR(u)が発生する。例えば、本実施の形態では、第2の傾きは、託送依頼者のコスト単価となる。一方、累積計画値に対して負の累積誤差(累積計画値を上回る消費が行われて託送事業者が補填した場合)については、第3の傾きを有する直線に沿って累積ペナルティR(u)が発生する。例えば、本実施の形態では、第3の傾きは、託送事業者の販売単価と託送依頼者の販売単価との差となる。   In this embodiment, a penalty that occurs with respect to the cumulative error u between the actual value and the planned value every three months is defined as a cumulative penalty R (u). This cumulative penalty R (u) has a value as shown in FIG. In other words, for a cumulative error up to + 3% of the cumulative planned value, a cumulative penalty R (u) occurs along the straight line having the first slope. For example, in the present embodiment, the first slope is the difference between the sales unit price of the consignment requester and the purchase unit price of the consignment company. For an accumulated error of + 3% or more of the accumulated planned value, an accumulated penalty R (u) occurs along a straight line having the second slope. For example, in the present embodiment, the second slope is the cost unit price of the consignment requester. On the other hand, for negative cumulative errors (when consumption exceeding the cumulative planned value is made and the consignment company compensates for the cumulative planned value), the cumulative penalty R (u) along the straight line having the third slope Occurs. For example, in the present embodiment, the third inclination is the difference between the sales unit price of the consignment carrier and the sales unit price of the consignment requester.

このようなペナルティが定義されていれば、累積誤差による累積ペナルティR(u)を減少させつつ、1時間毎の誤差による同時同量ペナルティL(h)を発生させないように(減少させるように)、計画値を決定することができる。このような計画値は、以下で説明する補正値を適切に決定することにより得られる。   If such a penalty is defined, the cumulative penalty R (u) due to the cumulative error is reduced and the simultaneous equal amount penalty L (h) due to the error every hour is not generated (so as to be reduced). Plan values can be determined. Such a planned value is obtained by appropriately determining a correction value described below.

本実施の形態では、2段階で補正値を算出する。すなわち、日毎(翌日)の補正値と、当該日における1時間毎の補正値である。ステップS11では、前者の補正値を算出する。この処理については、図15を用いて説明する。まず、ペナルティ関数生成部3123は、パラメタデータ格納部3124に格納されたコスト及び販売単価のデータとペナルティ関数データ格納部3122に格納されたデータを用いて、コスト及び販売単価の変動に応じて最新の累積ペナルティ関数のデータを生成し、ペナルティ関数データ格納部3122に格納する(ステップS21)。図14に示すように、本実施の形態では、累積ペナルティR(u)は、託送依頼者の販売単価及びコスト単価に依存するため、燃料価格などが上下すれば販売単価及びコスト単価も変化する。従って、パラメタデータ格納部3124に格納されるデータを適宜更新しておき、ペナルティ関数生成部3123により傾きのデータを更新する。なお、図14の例では、販売単価及びコスト単価の変化が傾きに影響を与える例が示されているが、その他のパラメータに影響を与える場合には当該パラメータを更新する。より具体的には、図14の例では、範囲(例えば0から3%、3%以上、0%未満など)についてのデータをペナルティ関数データ格納部3122から取得し、コストなどをパラメタデータ格納部3124から取得し、例えば0から3%までの第1の傾きと、3%以上における第2の傾きを算出する。   In the present embodiment, the correction value is calculated in two stages. That is, the correction value for each day (next day) and the correction value for each hour on the day. In step S11, the former correction value is calculated. This process will be described with reference to FIG. First, the penalty function generation unit 3123 uses the cost and sales unit price data stored in the parameter data storage unit 3124 and the data stored in the penalty function data storage unit 3122 to update the latest according to the change in the cost and the sales unit price. Is generated and stored in the penalty function data storage unit 3122 (step S21). As shown in FIG. 14, in the present embodiment, the accumulated penalty R (u) depends on the sales unit price and cost unit price of the consignment requester. . Therefore, the data stored in the parameter data storage unit 3124 is updated as appropriate, and the penalty function generation unit 3123 updates the slope data. In the example of FIG. 14, an example in which changes in the sales unit price and the cost unit price affect the inclination is shown, but when other parameters are affected, the parameters are updated. More specifically, in the example of FIG. 14, data about a range (for example, 0 to 3%, 3% or more, less than 0%, etc.) is acquired from the penalty function data storage unit 3122, and the cost is stored in the parameter data storage unit. For example, the first inclination from 0 to 3% and the second inclination at 3% or more are calculated.

次に、日補正量算出部3121は、実績値データ格納部304に格納された最新の実績値データ及び消費予測値データ格納部309内の対応する消費予測値データを用いて、日毎の予測誤差分布データを生成し、予測誤差分布データ格納部3127に格納する(ステップS23)。本ステップでは、日単位の予測誤差(=消費予測値−実績値)につき予測誤差分布データ(確率密度関数)P(u)(uは日単位の補正値(日補正量))を算出する。なお、例えば予測誤差の平均と標準偏差を算出し、当該予測誤差の平均及び標準偏差に従った正規分布を仮定して予測誤差分布関数を特定するようにしても良い。また、実際に得られる予測誤差分布をそのまま用いるようにしても良いし、正規分布ではなく他の分布に当てはめるようにしても良い。   Next, the daily correction amount calculation unit 3121 uses the latest actual value data stored in the actual value data storage unit 304 and the corresponding predicted consumption value data in the predicted consumption value data storage unit 309 to predict daily errors. Distribution data is generated and stored in the prediction error distribution data storage unit 3127 (step S23). In this step, prediction error distribution data (probability density function) P (u) (u is a daily correction value (day correction amount)) is calculated for a daily prediction error (= consumption prediction value−actual value). For example, the prediction error distribution function may be specified by calculating the average and standard deviation of the prediction error and assuming a normal distribution according to the average and standard deviation of the prediction error. Moreover, the prediction error distribution actually obtained may be used as it is, or may be applied to another distribution instead of the normal distribution.

本ステップ以降の処理をわかりやすくするため、以下のような具体例を仮定する。すなわち、12月30日に31日の計画値を算出するものとする。ここで、30日及び31日の消費予測値がそれぞれ1000であり、30日時点において29日までの実績値が存在している。また、29日までの累積予測計画値が30000、累積実績値が30400、予測誤差累計が400である。また、29日までの予測誤差分布については、平均が0であり、標準偏差が70の正規分布を仮定する。なお、予測結果が不確定な日が2日間(30日及び31日)なので、標準偏差σ=20.5×70=100を用いる。なお、このように正規分布の場合不確定な日数の平方根倍で標準偏差が広がることが分かっているので、この法則を使用している。そうすると、平均0で標準偏差100の正規分布となり、図16のような予測誤差分布が得られる。図16において、縦軸は発生確率を、横軸は予測誤差を表す。 In order to make the processing after this step easier to understand, the following specific example is assumed. That is, the planned value for 31 days is calculated on December 30. Here, the predicted consumption values on the 30th and 31st are 1000 respectively, and there are actual values up to the 29th as of the 30th. Further, the cumulative prediction plan value up to 29th is 30000, the cumulative actual value is 30400, and the cumulative prediction error is 400. As for the prediction error distribution up to the 29th, a normal distribution with an average of 0 and a standard deviation of 70 is assumed. Since the days with uncertain prediction results are two days (30 days and 31 days), the standard deviation σ = 2 0.5 × 70 = 100 is used. In addition, since it is known that the standard deviation spreads by the square root multiple of the uncertain number of days in the case of the normal distribution in this way, this law is used. Then, a normal distribution with an average of 0 and a standard deviation of 100 is obtained, and a prediction error distribution as shown in FIG. 16 is obtained. In FIG. 16, the vertical axis represents the occurrence probability, and the horizontal axis represents the prediction error.

次に、日補正量算出部3121は、日補正量uの仮設定を行う(ステップS25)。例えばu=0とする。また、日補正量算出部3121は、予測誤差分布データ格納部3127からデータを読み出し、日補正量uから当該日補正量uに対する予測誤差分布P(u)を設定し、予測誤差分布データ格納部3127に格納する(ステップS27)。本ステップでは、日補正量uだけ、ステップS23で生成した予測誤差分布を移動させる。ここではu=0であるから、図16と変わりない。   Next, the daily correction amount calculation unit 3121 temporarily sets the daily correction amount u (step S25). For example, u = 0. The daily correction amount calculation unit 3121 reads data from the prediction error distribution data storage unit 3127, sets the prediction error distribution P (u) for the daily correction amount u from the daily correction amount u, and the prediction error distribution data storage unit. It stores in 3127 (step S27). In this step, the prediction error distribution generated in step S23 is moved by the daily correction amount u. Here, since u = 0, it is not different from FIG.

さらに、日補正量算出部3121は、ペナルティ関数データ格納部3122に格納されたデータを用いて、日補正量uなどから累積ペナルティ関数R(u)を設定し、ペナルティ関数データ格納部3122に格納する(ステップS29)。例えば、累積ペナルティ関数R(u)が図14に示すように、計画値累計に対する累積誤差の割合(%)で規定されている場合には、累積誤差の実際の値を算出する必要がある。上で述べた例では、31日24時までの予測計画値累計は32400(=30000+1000+(1000+400))(=29日までの予測計画値累計+30日及び31日の予測計画値−累積予測誤差)である。ここでは、29日までの累積予測誤差をキャンセルするため、予測計画値に対して補正を行う。このように、図14のような累積ペナルティ関数R(u)の3%は、972=(32400×0.03)となる。これにて図14の場合には累積ペナルティ関数R(u)が確定することになる。   Further, the daily correction amount calculation unit 3121 sets the cumulative penalty function R (u) from the daily correction amount u using the data stored in the penalty function data storage unit 3122, and stores it in the penalty function data storage unit 3122. (Step S29). For example, when the cumulative penalty function R (u) is defined by the ratio (%) of the cumulative error to the cumulative plan value as shown in FIG. 14, it is necessary to calculate the actual value of the cumulative error. In the example described above, the predicted plan value cumulative up to 24:00 on the 31st is 32400 (= 30000 + 1000 + (1000 + 400)) (= total predicted plan value up to the 29th + 30th and 31st predicted plan value−cumulative forecast error) It is. Here, in order to cancel the cumulative prediction error up to the 29th, correction is made to the predicted plan value. Thus, 3% of the cumulative penalty function R (u) as shown in FIG. 14 is 972 = (32400 × 0.03). Thus, in the case of FIG. 14, the cumulative penalty function R (u) is determined.

そして、日補正量算出部3121は、損失期待値を算出し、メインメモリ等の記憶装置に格納する(ステップS31)。損失期待値E(u)は以下の式で算出される。   Then, the daily correction amount calculation unit 3121 calculates the expected loss value and stores it in a storage device such as a main memory (step S31). The expected loss value E (u) is calculated by the following equation.

Figure 2006227852
Figure 2006227852

ステップS29の後の累積ペナルティ関数R(u)と図16に示した予測誤差分布関数P(u)との積の結果は、図17に示すようになる。図17では、縦軸はペナルティ×発生確率を示し、横軸は予測誤差を示す。損失期待値E(u)は、全ての累積予測誤差についてペナルティ×発生確率を加算した値となる。   The result of the product of the cumulative penalty function R (u) after step S29 and the prediction error distribution function P (u) shown in FIG. 16 is as shown in FIG. In FIG. 17, the vertical axis represents penalty × occurrence probability, and the horizontal axis represents prediction error. The expected loss value E (u) is a value obtained by adding penalty × occurrence probability for all cumulative prediction errors.

日補正量算出部3121は、ステップS31で算出された損失期待値が最小であるか判断する(ステップS33)。最小でないと判断される場合には、日補正量uの調整を行う(ステップS35)。そしてステップS27に戻る。これらのステップは、例えばニュートン法などの最適解を算出する際の処理と同様であるからここでは詳細な説明は省略する。   The daily correction amount calculation unit 3121 determines whether the expected loss value calculated in step S31 is the minimum (step S33). If it is determined that it is not the minimum, the daily correction amount u is adjusted (step S35). Then, the process returns to step S27. Since these steps are the same as the processing for calculating the optimum solution such as Newton's method, detailed description thereof is omitted here.

一方、損失期待値が最小であると判断された場合には、日補正量算出部3121は、当該最小損失期待値に対応する日補正量uと予測誤差累計(予測誤差累計をキャンセルするための値。上の例では400。)の和を、最終的な日補正量として日補正量データ格納部3125に格納する(ステップS37)。例えば、日補正量データ格納部3125には、図18に示すようなデータフォーマットでデータが格納される。すなわち、顧客IDと、年月日と、日補正量とが格納される。そして元の処理に戻る。   On the other hand, when it is determined that the expected loss value is the minimum, the daily correction amount calculation unit 3121 selects the daily correction amount u corresponding to the minimum expected loss value and the prediction error total (for canceling the prediction error total). The sum of the values (400 in the above example) is stored in the daily correction amount data storage unit 3125 as the final daily correction amount (step S37). For example, the daily correction amount data storage unit 3125 stores data in a data format as shown in FIG. That is, the customer ID, date, and date correction amount are stored. Then, the process returns to the original process.

上で述べた具体例において、例えば日補正量uを200とする。そうすると、ステップS27において予測誤差分布P(u)は、図16の分布を右に200ずらした分布、すなわち図19に示すような分布となる。さらに、ペナルティ関数P(u)は、予測計画値累計が31260(=32400+200)となるため、3%は978となる。なお、最終的な日補正量は600(=400+200)となる。   In the specific example described above, for example, the daily correction amount u is set to 200. Then, in step S27, the prediction error distribution P (u) becomes a distribution obtained by shifting the distribution of FIG. 16 to the right by 200, that is, a distribution as shown in FIG. Furthermore, the penalty function P (u) has a predicted plan total value of 31260 (= 32400 + 200), so 3% is 978. The final daily correction amount is 600 (= 400 + 200).

従って、ペナルティ関数R(u)と予測誤差分布との積は図20に示すようになる。図17と比較すると、2つある山のうち左側の山の高さが大幅に減少し、右側の山の高さが若干上昇している。従って、損失期待値E(u)は、全ての予測誤差についてペナルティ×発生確率を加算した値であるから、図17の場合に比して減少していることが分かる。   Accordingly, the product of the penalty function R (u) and the prediction error distribution is as shown in FIG. Compared to FIG. 17, the height of the left mountain of the two peaks is significantly reduced, and the height of the right mountain is slightly increased. Therefore, it can be seen that the expected loss value E (u) is a value obtained by adding penalty × occurrence probability for all prediction errors, and thus is reduced as compared with the case of FIG.

損失期待値E(u)と補正値の関係をまとめると例えば図21のようになる。図21の例では、縦軸は損失期待値、横軸は補正値を表す。最初に説明した場合補正値は0であったので、図21のグラフでは点Gにプロットされる。一方、補正値200とした場合、図21のグラフでは点Hにプロットされる。その他の場合について計算してみると、図21のようなグラフが構成され、点Hの場合に損失期待値が最低となる。このような損失期待値を最小とする補正値については上で述べたようにニュートン法などによって求める。なお、網羅的に損失期待値を算出してその中から最低のケースを特定しても良い。   The relationship between the expected loss value E (u) and the correction value is summarized as shown in FIG. In the example of FIG. 21, the vertical axis represents the expected loss value, and the horizontal axis represents the correction value. Since the correction value is 0 in the case described first, it is plotted at the point G in the graph of FIG. On the other hand, when the correction value is 200, it is plotted at the point H in the graph of FIG. When calculation is performed for the other cases, a graph as shown in FIG. 21 is formed, and in the case of point H, the expected loss value is the lowest. Such a correction value that minimizes the expected loss value is obtained by the Newton method as described above. Note that the expected loss value may be calculated comprehensively and the lowest case may be identified.

なお、図15のような処理を行わずに簡易的に日補正量を算出するようにしても良い。上で述べたような手法を用いるか簡易手法を用いるかは、例えば補正手法指定311に従う。例えば、計画値データ格納部310と実績値データ格納部304に格納されている過去のデータから累積誤差(=計画値累計−実績値累計)を算出し、当該累積誤差を累積ペナルティの判定期間の残日数で除した値を日補正量とする。すなわち、判定期間の残りの日で累積誤差を同じように徐々に解消させるというものである。   Note that the daily correction amount may be simply calculated without performing the processing shown in FIG. Whether the method as described above or the simple method is used depends on, for example, the correction method designation 311. For example, a cumulative error (= plan value cumulative-actual value cumulative) is calculated from past data stored in the plan value data storage unit 310 and the actual value data storage unit 304, and the cumulative error is calculated for the cumulative penalty determination period. The value divided by the remaining days is used as the daily correction amount. That is, the cumulative error is gradually eliminated in the same manner on the remaining days of the determination period.

図5の処理フローの説明に戻って、次に、同時同量補正値算出部3126は、実績値データ格納部304と消費予測値データ格納部309とペナルティ関数データ格納部3122と日補正量データ格納部3125とに格納されたデータを用いて、日補正量に従って1時間毎の補正値(同時同量補正値)を同時同量ペナルティL(h)を最小化するように算出し、補正値データ格納部313に格納する(ステップS13)。この処理は基本的にはステップS11と同様である。   Returning to the description of the processing flow in FIG. 5, the simultaneous equal amount correction value calculation unit 3126 then includes the actual value data storage unit 304, the predicted consumption data storage unit 309, the penalty function data storage unit 3122, and the daily correction amount data. Using the data stored in the storage unit 3125, the correction value for each hour (simultaneous same amount correction value) is calculated according to the daily correction amount so as to minimize the simultaneous same amount penalty L (h), and the correction value The data is stored in the data storage unit 313 (step S13). This process is basically the same as step S11.

すなわち、同時同量ペナルティ関数L(hi)がコスト単価や販売単価に影響される場合には、ペナルティ関数生成部3123は、ペナルティ関数データ格納部3122とパラメタデータ格納部3124とに格納されたデータを用いて、同時同量ペナルティ関数L(hi)のベースデータを算出する。また、同時同量補正値算出部3126は、最新の実績値データ及び対応する予測計画値データを用いて翌日の1時間毎の予測誤差分布データを生成する。予測誤差分布データについては予測誤差分布データ格納部3127に格納する。そして、各時間につき同時同量補正値hiを仮設定し、当該同時同量補正値hiに対応する予測誤差分布P(hi)及び同時同量ペナルティ関数L(hi)を具体的に設定する。そして、各時間につき以下の式に従って損失期待値を算出する。   That is, when the simultaneous equal amount penalty function L (hi) is affected by the cost unit price or the sales unit price, the penalty function generation unit 3123 stores the data stored in the penalty function data storage unit 3122 and the parameter data storage unit 3124. Is used to calculate the base data of the simultaneous equal amount penalty function L (hi). The simultaneous same amount correction value calculation unit 3126 generates prediction error distribution data for every hour of the next day using the latest actual value data and the corresponding predicted plan value data. The prediction error distribution data is stored in the prediction error distribution data storage unit 3127. Then, the simultaneous equal amount correction value hi is temporarily set for each time, and the prediction error distribution P (hi) and the simultaneous equal amount penalty function L (hi) corresponding to the simultaneous equal amount correction value hi are specifically set. Then, an expected loss value is calculated for each time according to the following formula.

Figure 2006227852
Figure 2006227852

なお、図15に示した処理とは異なり、(a)翌日の全補正量Σhi=翌日の日補正量u、及び(b)1時間毎の消費予測値fi+補正値hi≧0(計画値が負ということはあり得ないため)という制約条件を満たしつつ、(c)損失期待値が最小となる、各時間についての補正値hiを、例えばニュートン法などに従って算出する。   Unlike the processing shown in FIG. 15, (a) next day total correction amount Σhi = next day daily correction amount u, and (b) hourly consumption predicted value fi + correction value hi ≧ 0 (the planned value is (C) The correction value hi for each time at which the expected loss value is minimized is calculated according to the Newton method, for example, while satisfying the constraint condition (because it cannot be negative).

ここで説明をわかりやすくするため具体例を示す。例えば、日補正量uを−300、0時から8時までの各時間の消費予測値を30、8時から22時までの各時間の消費予測値を50、23及び24時の各時間の消費予測値を30とする。なお、日単位の消費予測値は合計1000である。   Here, a specific example is shown for easy understanding. For example, the daily correction amount u is set to −300, the consumption predicted value for each hour from 0 o'clock to 8 o'clock is set to 30, the predicted consumption value for each hour from 8 o'clock to 22 o'clock is set to 50, 23 and 24 o'clock for each hour The predicted consumption value is 30. The daily consumption forecast value is 1000 in total.

このような場合、各時間について、消費予測値データ格納部309に格納された消費予測値と実績値データ格納部304に格納された実績値とから予測誤差分布データを生成する。ここでは例えば平均0で標準偏差が5と算出された場合、これを正規分布に適用するものとする。   In such a case, prediction error distribution data is generated from the predicted consumption value stored in the predicted consumption value data storage unit 309 and the actual value stored in the actual value data storage unit 304 for each time. Here, for example, when the average is 0 and the standard deviation is calculated as 5, this is applied to the normal distribution.

また、例えば1時を例にすると予測値は30であり、当該時間の同時同量補正値h1を0とすると、同時同量ペナルティの10%点(図13参照)は3となり、同時同量ペナルティ関数L(hi)が確定される。なお、同時同量補正値h1を他の値にする場合には、消費予測値fi+同時同量補正値hiについて10%を計算する。   For example, when 1 o'clock is taken as an example, the predicted value is 30, and when the simultaneous equal amount correction value h1 for the time is set to 0, the 10% point of the simultaneous equal amount penalty (see FIG. 13) is 3, and the simultaneous same amount A penalty function L (hi) is determined. When the simultaneous same amount correction value h1 is set to another value, 10% is calculated for the consumption predicted value fi + the simultaneous same amount correction value hi.

同時同量補正値h1を0とすると、図22に示すように、予測誤差分布P(h)を表す曲線Kと、同時同量ペナルティ関数L(hi)を表す曲線Jとを得ることができる。そして、ペナルティ×発生確率の予測誤差との関係は、図23に示したようになる。損失期待値は、全ての予測誤差についてペナルティ×発生確率を加算することにより得られる。   When the simultaneous equal amount correction value h1 is set to 0, as shown in FIG. 22, a curve K representing the prediction error distribution P (h) and a curve J representing the simultaneous equal amount penalty function L (hi) can be obtained. . The relationship between the penalty times the occurrence probability prediction error is as shown in FIG. The expected loss value is obtained by adding the penalty × occurrence probability for all prediction errors.

このような計算の結果、例えば0時から8時まで及び23及び24時の同時同量補正値が−9で、8時から22時までの同時同量補正値が−15という計算結果が得られたとすると、合計で−300(=日補正量)となる。   As a result of such a calculation, for example, a calculation result is obtained in which the same amount correction value from 0:00 to 8:00 and 23:00 and 24:00 is -9, and the same amount correction value from 8:00 to 22:00 is -15. If it is, the total is −300 (= day correction amount).

上でも述べたように、各時間について(a)、(b)及び(c)の制約を満たす同時同量補正値hiを算出して、補正値データ格納部313に格納する。補正値データ格納部313には、例えば図24及び図25に示すようなデータフォーマットのデータが格納される。図24の例は、今回算出されたデータについてのフォーマットであって、顧客IDと、年月日と、時刻と、計画値(託送計画値)とが登録されるようになっている。また、計画値データ格納部310には、例えば図25に示すようなデータフォーマットの過去の計画値データが格納されている。すなわち、顧客IDと、年月日と、時刻と、計画値(託送計画値)と、送付履歴と、送付時刻とが登録されている。送付履歴は、例えば古いものから順番に数値が割り当てられるようになっている。   As described above, the simultaneous same amount correction value hi that satisfies the constraints (a), (b), and (c) is calculated for each time, and stored in the correction value data storage unit 313. The correction value data storage unit 313 stores data in a data format as shown in FIGS. 24 and 25, for example. The example of FIG. 24 is a format for the data calculated this time, and the customer ID, date, time, and plan value (consignment plan value) are registered. Further, the plan value data storage unit 310 stores past plan value data in a data format as shown in FIG. 25, for example. That is, the customer ID, date, time, plan value (consignment plan value), sending history, and sending time are registered. For example, numerical values are assigned to the sending history in order from the oldest.

なお、ステップS11及びS13をまとめて簡略化した手法を採用する場合もある。例えば、1時間毎に予測誤差の統計値(平均及び標準偏差σ)を算出し、例えば予測誤差平均×(1−σ/σmax)として補正値を算出するようにしても良い。なお、σmaxは、各時間帯における標準偏差の最大値である。このように、標準偏差が大きい時間帯ほど予測誤差平均の補正を小さくするものである。 In some cases, a method in which steps S11 and S13 are simplified together is employed. For example, a statistical value (average and standard deviation σ) of prediction errors may be calculated every hour, and a correction value may be calculated as, for example, prediction error average × (1−σ / σ max ). Note that σ max is the maximum value of the standard deviation in each time zone. In this way, the correction of the prediction error average is made smaller in the time zone where the standard deviation is larger.

図5の説明に戻って、計画値算出部314は、補正値データ格納部313と消費予測値データ格納部309とからデータを読み出し、各時間について計画値(=消費予測値−補正値)を算出して計画値データ格納部310に格納する(ステップS15)。   Returning to the description of FIG. 5, the plan value calculation unit 314 reads data from the correction value data storage unit 313 and the consumption prediction value data storage unit 309, and calculates a plan value (= consumption prediction value−correction value) for each time. The calculated value is stored in the planned value data storage unit 310 (step S15).

上で述べた例では、1時から8時まで及び23及び24時の時間ごとの計画値はそれぞれ21(=予測値+補正値=30−9)であり、8時から22時までの計画値は35(=予測値+補正値=50−15)という結果が得られる。   In the example described above, the plan value for each hour from 1 o'clock to 8 o'clock and 23 and 24 o'clock is 21 (= predicted value + correction value = 30−9), and the plan from 8 o'clock to 22 o'clock A value of 35 (= predicted value + correction value = 50-15) is obtained.

なお、この段階で図26のような表示を託送計画システム3の表示装置、又は託送計画システム3に接続されたクライアント端末の表示装置に行って、ユーザの確認をとるようにしても良い。   At this stage, the display as shown in FIG. 26 may be performed on the display device of the consignment planning system 3 or the display device of the client terminal connected to the consignment planning system 3 to confirm the user.

図26の画面例では、託送予定日(翌日)、託送計画値の列と、顧客からの顧客計画値の列と、消費予測値の列と、計画補正値の列とが設けられている。ここでは消費予測値の予測手法選択欄が設けられており、ユーザは特定の予測手法を選択することができる。また、計画補正値の補正手法選択欄が設けられており、例えば「補正無し」「累積誤差修正1(図15の処理フローに従った累積誤差によるペナルティを低減させるための処理を実施)」「累積誤差修正2(簡便な累積誤差によるペナルティを低減させるための処理を実施)」「同時同量補正のみ(ステップS11及びS13をまとめて簡便化した処理)」などから選択することができる。   In the screen example of FIG. 26, a scheduled delivery date (next day), a scheduled delivery value column, a customer planned value column from a customer, a consumption forecast value column, and a planned correction value column are provided. Here, a prediction method selection field for a consumption prediction value is provided, and the user can select a specific prediction method. Also, a correction method selection field for the planned correction value is provided, for example, “No correction” “Cumulative error correction 1 (perform processing for reducing penalty due to cumulative error according to the processing flow of FIG. 15)” “ It is possible to select from cumulative error correction 2 (implementing a process for reducing a penalty due to a simple cumulative error), “simultaneous correction of the same amount (a process in which steps S11 and S13 are simplified together)”, and the like.

ユーザは、この画面において予測手法を他の手法に変更したり、補正手法についても他の手法に変更するようにしても良い。また、図26のような画面において具体的な数値をユーザが直接修正又は設定するようにしても良い。   The user may change the prediction method to another method on this screen, or change the correction method to another method. Also, the user may directly correct or set specific numerical values on the screen as shown in FIG.

ステップS15の後に、計画値データ送信部315は、計画値データ格納部310に格納された翌日分の各時間についての計画値のデータを、ネットワーク1を介して託送事業者コンピュータ7に送信する(ステップS17)。この時、送信済みの計画値については、図25の示したフォーマットにおける送付時刻及び送付履歴を確認する。   After step S15, the plan value data transmission unit 315 transmits the plan value data for each time for the next day stored in the plan value data storage unit 310 to the consigner computer 7 via the network 1 ( Step S17). At this time, the transmission time and the transmission history in the format shown in FIG.

このようにして毎日の託送事業者への計画値通知が行われる。なお、この後、託送事業者コンピュータ7から翌日の計画確定値を通知してくるため、託送計画システム3は当該通知を受信する。もし、当該通知が予め定められた条件を満たすような異常を示している場合には、担当者に警報メールなどを送信する。なお、託送計画システム3内のデータ格納部に格納されたデータは、権限のあるユーザからのアクセスに応じて読み出され、出力される。   In this way, the planned value is notified to the daily consignment company. After that, since the planned final value of the next day is notified from the consignment carrier computer 7, the consignment planning system 3 receives the notification. If the notification indicates an abnormality that satisfies a predetermined condition, an alarm mail or the like is transmitted to the person in charge. The data stored in the data storage unit in the consignment planning system 3 is read and output in response to access from an authorized user.

以上本発明の一実施の形態を説明したが、本発明はこれに限定されるものではない。例えば、図3及び図4に示した託送計画システム3の機能ブロックは、必ずしもプログラムモジュール構成と合致するものではない。また、託送計画システム3については複数のコンピュータにより構成するようにしても良い。   Although one embodiment of the present invention has been described above, the present invention is not limited to this. For example, the functional blocks of the consignment planning system 3 shown in FIGS. 3 and 4 do not necessarily match the program module configuration. Further, the consignment planning system 3 may be configured by a plurality of computers.

また、消費予測値の予測手法についても上で述べた手法に限定するものではなく、様々な手法を採用することができる。また、補正値についても上で述べたような手法に限定されるものではなく、他の手法を用いても良い。但し、上で述べたように累積ペナルティ及び同時同量ペナルティを最小限に抑えるように各時間についての補正値を算出するようにする。   Also, the prediction method of the predicted consumption value is not limited to the method described above, and various methods can be employed. Further, the correction value is not limited to the method described above, and other methods may be used. However, as described above, the correction value for each time is calculated so as to minimize the cumulative penalty and the simultaneous equal amount penalty.

また、託送計画システム3、託送事業者コンピュータ7、顧客コンピュータ9、気象データ配信サーバ5についてはコンピュータ装置であって、図27に示すように当該コンピュータ装置においては、メモリ2501(記憶部)とCPU2503(処理部)とハードディスク・ドライブ(HDD)2505と表示装置2509に接続される表示制御部2507とリムーバブル・ディスク2511用のドライブ装置2513と入力装置2515とネットワークに接続するための通信制御部2517とがバス2519で接続されている。オペレーティング・システム(OS)及びWebブラウザを含むアプリケーション・プログラムは、HDD2505に格納されており、CPU2503により実行される際にはHDD2505からメモリ2501に読み出される。必要に応じてCPU2503は、表示制御部2507、通信制御部2517、ドライブ装置2513を制御して、必要な動作を行わせる。また、処理途中のデータについては、メモリ2501に格納され、必要があればHDD2505に格納される。このようなコンピュータは、上で述べたCPU2503、メモリ2501などのハードウエアとOS及び必要なアプリケーション・プログラムとが有機的に協働することにより、上で述べたような各種機能を実現する。   Further, the consignment planning system 3, the consignment carrier computer 7, the customer computer 9, and the weather data distribution server 5 are computer devices. As shown in FIG. 27, the computer device includes a memory 2501 (storage unit) and a CPU 2503. (Processing unit), hard disk drive (HDD) 2505, display control unit 2507 connected to display device 2509, drive device 2513 for removable disk 2511, input device 2515, and communication control unit 2517 for connecting to the network Are connected by a bus 2519. Application programs including an operating system (OS) and a Web browser are stored in the HDD 2505, and are read from the HDD 2505 to the memory 2501 when executed by the CPU 2503. If necessary, the CPU 2503 controls the display control unit 2507, the communication control unit 2517, and the drive device 2513 to perform necessary operations. Further, data in the middle of processing is stored in the memory 2501 and stored in the HDD 2505 if necessary. Such a computer realizes various functions as described above by organically cooperating hardware such as the CPU 2503 and the memory 2501 described above with the OS and necessary application programs.

従来の託送の概要を示す模式図である。It is a schematic diagram which shows the outline | summary of the conventional consignment. 本発明における託送の概要を示す模式図である。It is a schematic diagram which shows the outline | summary of the consignment in this invention. 本発明の実施の形態における機能ブロック図である。It is a functional block diagram in an embodiment of the present invention. 補正値算出部の機能ブロック図である。It is a functional block diagram of a correction value calculation unit. 本実施の形態におけるメイン処理フローを示す図である。It is a figure which shows the main process flow in this Embodiment. 実績値データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a performance value data storage part. 顧客計画値データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a customer plan value data storage part. 気象データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a weather data storage part. 気象データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a weather data storage part. 消費予測値データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a consumption estimated value data storage part. 同時同量ペナルティの概要を説明するための図である。It is a figure for demonstrating the outline | summary of simultaneous equal amount penalty. 累積ペナルティの概要を説明するための図である。It is a figure for demonstrating the outline | summary of a cumulative penalty. 同時同量ペナルティ関数の概要を示す図である。It is a figure which shows the outline | summary of a simultaneous equal amount penalty function. 累積ペナルティ関数の概要を示す図である。It is a figure which shows the outline | summary of a cumulative penalty function. 日補正量の算出処理の処理フローを示す図である。It is a figure which shows the processing flow of the calculation process of a daily correction amount. 日単位の予測誤差分布の一例を示す図である。It is a figure which shows an example of the prediction error distribution of a day unit. ペナルティ×発生確率と予測誤差との関係を表す図である。It is a figure showing the relationship between a penalty x occurrence probability and a prediction error. 日補正量データ格納部に格納されるデータの一例を示す図である。It is a figure which shows an example of the data stored in a daily correction amount data storage part. 日単位の予測誤差分布を補正値に応じて修正した場合の例を示す図である。It is a figure which shows the example at the time of correcting the prediction error distribution of a day unit according to a correction value. 図19の場合におけるペナルティ×発生確率と予測誤差との関係を表す図である。FIG. 20 is a diagram illustrating a relationship between penalty × occurrence probability and prediction error in the case of FIG. 19. 補正値と損失期待値の関係を表す図である。It is a figure showing the relationship between a correction value and a loss expected value. 同時同量ペナルティ関数と特定の時間の予測誤差分布とを表す図である。It is a figure showing the simultaneous amount penalty function and the prediction error distribution of specific time. 予測誤差とペナルティ×発生確率の関係を表す図である。It is a figure showing the relationship between prediction error and penalty x occurrence probability. 補正値データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a correction value data storage part. 計画値データ格納部に格納されるデータのフォーマット例を示す図である。It is a figure which shows the example of a format of the data stored in a plan value data storage part. 表示画面例を示す図である。It is a figure which shows the example of a display screen. コンピュータの機能ブロック図である。It is a functional block diagram of a computer.

符号の説明Explanation of symbols

1 ネットワーク 3 託送計画システム
5 気象データ配信サーバ 7 託送事業者コンピュータ
9 顧客コンピュータ
301 実績値データ取得部 302 顧客計画値データ取得部
303 気象データ取得部 304 実績値データ格納部
305 顧客計画値データ格納部 306 気象データ格納部
307 消費予測値算出部 308 予測手法指定
309 消費予測値データ格納部 310 計画値データ格納部
311 補正手法指定 312 補正値算出部
313 補正値データ格納部 314 計画値算出部
315 計画値データ送信部
3121 日補正量算出部 3122 ペナルティ関数データ格納部
3123 ペナルティ関数生成部 3124 パラメタデータ格納部
3125 日補正量データ格納部 3126 同時同量補正値算出部
3127 予測誤差分布データ格納部
DESCRIPTION OF SYMBOLS 1 Network 3 Consignment planning system 5 Weather data delivery server 7 Consignment company computer 9 Customer computer 301 Actual value data acquisition part 302 Customer planned value data acquisition part 303 Weather data acquisition part 304 Actual value data storage part 305 Customer planned value data storage part 306 Weather data storage unit 307 Consumption predicted value calculation unit 308 Prediction method designation 309 Consumption prediction value data storage unit 310 Plan value data storage unit 311 Correction method designation 312 Correction value calculation unit 313 Correction value data storage unit 314 Plan value calculation unit 315 Plan Value data transmission unit 3121 Daily correction amount calculation unit 3122 Penalty function data storage unit 3123 Penalty function generation unit 3124 Parameter data storage unit 3125 Daily correction amount data storage unit 3126 Simultaneous same amount correction value calculation unit 3127 Prediction error distribution data storage unit

Claims (9)

託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量を特定することなく前記託送依頼者の顧客による託送対象の利用実績量と当該顧客の利用計画値との誤差に基づきペナルティが課される場合において用いられる、託送依頼者向けのコンピュータ・システムであって、
前記託送事業者のコンピュータから前記顧客について第1の単位時間毎の前記託送対象の利用実績量のデータを取得し、実績量データ格納部に格納する手段と、
前記実績量データ格納部に格納されたデータを用いて、前記顧客の前記託送対象の予測計画値を特定のアルゴリズムに従って前記第1の単位時間毎に算出し、予測計画値データ格納部に格納する手段と、
前記実績量データ格納部に格納されたデータを用いて、前記第1の単位時間より長い第2の単位時間における、前記利用実績量と前記利用計画値との累積誤差に基づくペナルティを減少させつつ、前記第1の単位時間における、前記利用実績量と前記利用計画値との誤差に基づくペナルティを最小化するための、前記予測計画値に対する補正値を前記第1の単位時間毎に算出し、補正値データ格納部に格納する手段と、
前記予測計画値データ格納部と前記補正値データ格納部とに格納されたデータを用いて、前記第1の単位時間毎の利用計画値を算出し、利用計画値データ格納部に格納する手段と、
を有するコンピュータ・システム。
Without specifying the actual amount of the consignment target supplied to the consignment carrier's consignment network by the consignment requester, the error between the actual use amount of the consignment target by the customer of the consignment requester and the planned use value of the customer A computer system for consignees used when penalties are imposed
Means for obtaining data of the actual usage amount of the object of consignment for each first unit time for the customer from the computer of the consignment carrier, and storing it in the actual amount data storage unit;
Using the data stored in the actual amount data storage unit, the predicted plan value of the customer to be consigned is calculated for each first unit time according to a specific algorithm, and stored in the predicted plan value data storage unit Means,
Using data stored in the actual amount data storage unit, while reducing a penalty based on a cumulative error between the actual usage amount and the usage plan value in a second unit time longer than the first unit time. Calculating a correction value for the predicted plan value for each first unit time in order to minimize a penalty based on an error between the actual usage amount and the use plan value in the first unit time; Means for storing in the correction value data storage unit;
Means for calculating a use plan value for each first unit time using data stored in the predicted plan value data storage unit and the correction value data storage unit and storing the use plan value in the use plan value data storage unit; ,
A computer system.
託送事業者の託送ネットワークに接続された、託送依頼者の顧客の施設に供給される託送対象について顧客の利用計画値を、処理部及びデータ格納部を有するコンピュータにより算出する方法であって、
前記処理部により、前記顧客の前記託送対象の利用実績量を第1の単位時間毎に格納する実績量データ格納部に格納されたデータを用いて、前記顧客の前記託送対象の予測計画値を特定のアルゴリズムに従って前記第1の単位時間毎に算出し、予測計画値データ格納部に格納するステップと、
前記処理部により、前記実績量データ格納部に格納されたデータを用いて、前記第1の単位時間より長い第2の単位時間における、前記利用実績量と前記利用計画値との累積誤差を減少させるためであって前記第1の単位時間より長く前記第2の単位時間より短い第3の単位時間における前記第1の補正値を算出し、第1補正値データ格納部に格納する第1補正値算出ステップと、
前記処理部により、前記実績量データ格納部と前記第1補正量データ格納部とに格納されたデータを用いて、前記第3の単位時間における前記第1の補正値を満たしつつ、前記第1の単位時間における前記利用実績量と前記利用計画値との誤差に基づくペナルティを最小化するように、前記第3の単位時間内の前記第1の単位時間毎に第2の補正値を算出し、第2補正値データ格納部に格納するステップと、
前記処理部により、前記予測計画値データ格納部と前記第2補正値データ格納部とに格納されたデータを用いて、前記第3の単位時間内における前記第1の単位時間毎に前記予測計画値と前記第2の補正値との和である利用計画値を算出し、利用計画値データ格納部に格納するステップと、
を含む利用計画値算出方法。
A method for calculating a customer's use plan value for a consignment target to be supplied to a customer facility of a consignment requester connected to a consignment network of a consignment carrier by a computer having a processing unit and a data storage unit,
Using the data stored in the actual amount data storage unit that stores the actual usage amount of the customer to be entrusted by the processing unit for each first unit time, the predicted planned value of the customer to be entrusted by the processor is obtained. Calculating for each of the first unit time according to a specific algorithm, and storing in the predicted plan value data storage unit;
Using the data stored in the actual amount data storage unit, the processing unit reduces an accumulated error between the actual usage amount and the usage plan value in a second unit time longer than the first unit time. A first correction value calculated in a third unit time longer than the first unit time and shorter than the second unit time, and stored in a first correction value data storage unit. A value calculation step;
Using the data stored in the actual amount data storage unit and the first correction amount data storage unit by the processing unit, while satisfying the first correction value in the third unit time, the first unit A second correction value is calculated for each first unit time within the third unit time so as to minimize a penalty based on an error between the actual usage amount and the planned use value in a unit time. Storing in the second correction value data storage unit;
Using the data stored in the predicted plan value data storage unit and the second correction value data storage unit by the processing unit, the prediction plan for each first unit time within the third unit time. Calculating a use plan value that is the sum of the value and the second correction value, and storing the use plan value in a use plan value data storage unit;
Usage plan value calculation method including
前記第1補正値算出ステップが、
前記処理部により、前記第1の補正値の候補値を特定するステップと、
前記処理部により、前記第2の単位時間における、前記利用実績量と前記利用計画値との累積誤差に対するペナルティ関数の元となるパラメタデータを格納するペナルティ関数データ格納部と前記実績量データ格納部と過去の予測計画値をも格納する前記予測計画値データ格納部とに格納されたデータを用いて、前記第1の補正値の候補値に対応して、前記第3の単位時間における、前記利用実績量と前記予測計画値との累積予測誤差についての確率密度関数のデータと、前記第2の単位時間における、前記ペナルティ関数のデータとを算出する第1ステップと、
前記処理部により、前記確率密度関数のデータと前記ペナルティ関数のデータとからペナルティの期待値を算出する第2ステップと、
前記処理部により、前記第1の補正値の異なる候補値について前記第1及び第2ステップを実行して、前記ペナルティの期待値が最小となる前記第1の補正値を特定するステップと、
を含む請求項2記載の利用計画値算出方法。
The first correction value calculating step includes:
Identifying a candidate value for the first correction value by the processing unit;
A penalty function data storage unit for storing parameter data as a basis of a penalty function for a cumulative error between the actual usage amount and the usage plan value in the second unit time by the processing unit, and the actual amount data storage unit And the predicted plan value data storage unit that also stores the past predicted plan value, and corresponding to the candidate value of the first correction value, in the third unit time, A first step of calculating probability density function data on a cumulative prediction error between the actual usage amount and the predicted planned value, and the penalty function data in the second unit time;
A second step of calculating an expected value of a penalty from the probability density function data and the penalty function data by the processing unit;
Executing the first and second steps for candidate values different in the first correction value by the processing unit to identify the first correction value that minimizes the expected value of the penalty;
The utilization plan value calculation method according to claim 2, including:
前記第1補正値算出ステップが、
前記処理部により、前記実績量データ格納部と過去の利用計画値をも格納している前記利用計画値データ格納部とに格納されたデータを用いて、前記第2の単位時間において現在までに発生している前記利用実績量と前記利用計画値との累積誤差を算出するステップと、
前記累積誤差を前記第2の単位時間における残りの前記第3の単位時間数でキャンセルするための補正値を前記第1の補正値として算出するステップと、
を含む請求項2記載の利用計画値算出方法。
The first correction value calculating step includes:
The processing unit uses the data stored in the actual amount data storage unit and the usage plan value data storage unit that also stores past usage plan values to the present in the second unit time. Calculating a cumulative error between the generated usage amount and the planned usage value;
Calculating a correction value for canceling the accumulated error by the remaining third unit time number in the second unit time as the first correction value;
The utilization plan value calculation method according to claim 2, including:
前記第2補正値算出ステップが、
前記処理部により、前記第1の単位時間ついての特定の単位時間における補正候補値を特定するステップと、
前記処理部により、前記第1の単位時間における、前記利用実績量と前記利用計画値との誤差に対するペナルティ関数の元となるパラメタデータを格納するペナルティ関数データ格納部と前記実績量データ格納部と過去の予測計画値をも格納している前記予測計画値データ格納部とに格納されたデータを用いて、前記補正候補値に対応して、前記特定の単位時間における、前記利用実績量と前記予測計画値との予測誤差についての確率密度関数のデータと、前記特定の単位時間における前記ペナルティ関数のデータとを算出する第1ステップと、
前記処理部により、前記確率密度関数のデータと前記ペナルティ関数のデータとからペナルティの期待値を算出する第2ステップと、
前記処理部により、前記第3の単位時間内の全ての第1の単位時間について複数の補正候補値に対して前記第1及び第2ステップを実行して、前記第3の単位時間についての前記第1の補正値を満たしつつ前記第3の単位時間内の各前記第1の単位時間について前記ペナルティの期待値が最小となる第2の補正値を特定するステップと、
を含む請求項2記載の利用計画値算出方法。
The second correction value calculating step includes:
Identifying a correction candidate value in a specific unit time for the first unit time by the processing unit;
A penalty function data storage unit that stores parameter data that is a basis of a penalty function for an error between the actual usage amount and the usage plan value in the first unit time, and the actual amount data storage unit. Using the data stored in the predicted plan value data storage unit that also stores past predicted plan values, corresponding to the correction candidate values, the actual usage amount in the specific unit time and the A first step of calculating data on a probability density function for a prediction error from a predicted plan value and data on the penalty function in the specific unit time;
A second step of calculating an expected value of a penalty from the probability density function data and the penalty function data by the processing unit;
The processing unit executes the first and second steps for a plurality of correction candidate values for all the first unit times within the third unit time, and the processing unit performs the first unit time for the third unit time. Identifying a second correction value that minimizes the expected value of the penalty for each of the first unit times within the third unit time while satisfying a first correction value;
The utilization plan value calculation method according to claim 2, including:
託送対象のコストと販売単価の少なくともいずれかの変動に応じて前記パラメタデータを変更する処理を実施し、前記ペナルティ関数データ格納部に格納するステップ
をさらに含む請求項3又は5記載の利用計画値算出方法。
The utilization plan value according to claim 3 or 5, further comprising a step of performing a process of changing the parameter data in accordance with a change in at least one of a consignment cost and a sales unit price, and storing the parameter data in the penalty function data storage unit. Calculation method.
請求項2乃至6のいずれか1つ記載の利用計画値算出方法をコンピュータに実行させるためのプログラム。   The program for making a computer perform the utilization plan value calculation method of any one of Claims 2 thru | or 6. 託送依頼者により託送事業者の託送ネットワークに対して供給される託送対象の実績量を特定することなく前記託送依頼者の顧客による託送対象の利用実績量と当該顧客の利用計画値との誤差に基づきペナルティが課される場合において用いられる、託送依頼者向けのコンピュータ・システムであって、
前記託送事業者のコンピュータから前記顧客について単位時間毎の前記託送対象の利用実績量のデータを取得し、実績量データ格納部に格納する手段と、
前記実績量データ格納部に格納されたデータを用いて、前記顧客の前記託送対象の予測計画値を特定のアルゴリズムに従って前記単位時間毎に算出し、過去の予測計画値をも格納する予測計画値データ格納部に格納する手段と、
前記実績量データ格納部と前記予測計画値データ格納部とに格納されたデータを用いて、前記単位時間毎に、当該単位時間における、前記利用実績量と前記予測計画値との予測誤差の統計量を算出し、当該統計量に基づき、前記予測計画値に対する補正値を前記単位時間毎に算出し、補正値データ格納部に格納する手段と、
前記予測計画値データ格納部と前記補正値データ格納部とに格納されたデータを用いて、前記単位時間毎の利用計画値を算出し、前記利用計画値データ格納部に格納する手段と、
を有するコンピュータ・システム。
Without specifying the actual amount of the consignment target supplied to the consignment carrier's consignment network by the consignor requester, the error between the actual use amount of the consignment target by the customer of the consignment requester and the planned use value of the customer A computer system for consignees used when penalties are imposed
Means for obtaining data on the actual usage amount of the target of consignment for each unit time for the customer from the computer of the consignment carrier, and storing it in the actual amount data storage unit;
Using the data stored in the actual amount data storage unit, the forecast plan value of the customer to be entrusted is calculated for each unit time according to a specific algorithm, and the forecast plan value is also stored in the past forecast plan value Means for storing in the data storage;
Using the data stored in the actual amount data storage unit and the predicted plan value data storage unit, for each unit time, statistics of the prediction error between the actual use amount and the predicted plan value in the unit time Means for calculating an amount, calculating a correction value for the predicted plan value for each unit time based on the statistic, and storing the correction value in a correction value data storage unit;
Means for calculating a use plan value for each unit time using data stored in the predicted plan value data storage unit and the correction value data storage unit, and storing in the use plan value data storage unit;
A computer system.
託送事業者の託送ネットワークに接続された、託送依頼者の顧客の施設に供給される託送対象について顧客の利用計画値を算出するコンピュータ・システムであって、
前記処理部により、前記顧客の前記託送対象の利用実績量を第1の単位時間毎に格納する実績量データ格納部に格納されたデータを用いて、前記顧客の前記託送対象の予測計画値を特定のアルゴリズムに従って前記第1の単位時間毎に算出し、予測計画値データ格納部に格納する手段と、
前記処理部により、前記実績量データ格納部に格納されたデータを用いて、前記第1の単位時間より長い第2の単位時間における、前記利用実績量と前記利用計画値との累積誤差を減少させるためであって前記第1の単位時間より長く前記第2の単位時間より短い第3の単位時間における前記第1の補正値を算出し、第1補正値データ格納部に格納する第1補正値算出手段と、
前記処理部により、前記実績量データ格納部と前記第1補正量データ格納部とに格納されたデータを用いて、前記第3の単位時間における前記第1の補正値を満たしつつ、前記第1の単位時間における前記利用実績量と前記利用計画値との誤差に基づくペナルティを最小化するように、前記第3の単位時間内の前記第1の単位時間毎に第2の補正値を算出し、第2補正値データ格納部に格納する手段と、
前記処理部により、前記予測計画値データ格納部と前記第2補正値データ格納部とに格納されたデータを用いて、前記第3の単位時間内における前記第1の単位時間毎に前記予測計画値と前記第2の補正値との和である利用計画値を算出し、利用計画値データ格納部に格納する手段と、
を有するコンピュータ・システム。
A computer system that calculates a customer's usage plan value for a consignment target that is connected to a consignor's customer facility connected to a consignment carrier's consignment network,
Using the data stored in the actual amount data storage unit that stores the actual usage amount of the customer to be entrusted by the processing unit for each first unit time, the predicted planned value of the customer to be entrusted by the processor is obtained. Means for calculating the first unit time according to a specific algorithm and storing it in the predicted plan value data storage unit;
Using the data stored in the actual amount data storage unit, the processing unit reduces an accumulated error between the actual usage amount and the usage plan value in a second unit time longer than the first unit time. A first correction value calculated in a third unit time longer than the first unit time and shorter than the second unit time, and stored in a first correction value data storage unit. A value calculating means;
Using the data stored in the actual amount data storage unit and the first correction amount data storage unit by the processing unit, while satisfying the first correction value in the third unit time, the first unit A second correction value is calculated for each first unit time within the third unit time so as to minimize a penalty based on an error between the actual usage amount and the planned use value in a unit time. Means for storing in the second correction value data storage unit;
Using the data stored in the predicted plan value data storage unit and the second correction value data storage unit by the processing unit, the prediction plan for each first unit time within the third unit time. Means for calculating a use plan value that is the sum of the value and the second correction value, and storing the use plan value in a use plan value data storage unit;
A computer system.
JP2005039986A 2005-02-17 2005-02-17 Use plan value calculation method and computer system Pending JP2006227852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005039986A JP2006227852A (en) 2005-02-17 2005-02-17 Use plan value calculation method and computer system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005039986A JP2006227852A (en) 2005-02-17 2005-02-17 Use plan value calculation method and computer system

Publications (1)

Publication Number Publication Date
JP2006227852A true JP2006227852A (en) 2006-08-31

Family

ID=36989196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005039986A Pending JP2006227852A (en) 2005-02-17 2005-02-17 Use plan value calculation method and computer system

Country Status (1)

Country Link
JP (1) JP2006227852A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017117356A (en) * 2015-12-25 2017-06-29 株式会社東芝 Imbalance price prediction device, method, and program
JP2018045615A (en) * 2016-09-16 2018-03-22 株式会社東芝 Imbalance price prediction device, method, program and electric power trading system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002230640A (en) * 2001-02-05 2002-08-16 Osaka Gas Co Ltd Utility supply system
JP2002369385A (en) * 2001-06-06 2002-12-20 Toshiba Eng Co Ltd Power transmission control system, power reception control system and power transmission and reception control system
JP2003143757A (en) * 2001-10-30 2003-05-16 Hitachi Ltd Operation support system
JP2004178478A (en) * 2002-11-29 2004-06-24 Ishikawajima Harima Heavy Ind Co Ltd Distributed gas volume control method in gas consignment
JP2005012912A (en) * 2003-06-19 2005-01-13 Hitachi Ltd Operation planning method for power generation facility, and operation planning system for power generation facility

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002230640A (en) * 2001-02-05 2002-08-16 Osaka Gas Co Ltd Utility supply system
JP2002369385A (en) * 2001-06-06 2002-12-20 Toshiba Eng Co Ltd Power transmission control system, power reception control system and power transmission and reception control system
JP2003143757A (en) * 2001-10-30 2003-05-16 Hitachi Ltd Operation support system
JP2004178478A (en) * 2002-11-29 2004-06-24 Ishikawajima Harima Heavy Ind Co Ltd Distributed gas volume control method in gas consignment
JP2005012912A (en) * 2003-06-19 2005-01-13 Hitachi Ltd Operation planning method for power generation facility, and operation planning system for power generation facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017117356A (en) * 2015-12-25 2017-06-29 株式会社東芝 Imbalance price prediction device, method, and program
JP2018045615A (en) * 2016-09-16 2018-03-22 株式会社東芝 Imbalance price prediction device, method, program and electric power trading system

Similar Documents

Publication Publication Date Title
JP7161818B2 (en) SYSTEM AND METHOD FOR CONTROLLING START-UP OF GENERATING UNITS
US8103560B2 (en) Inventory management system, inventory management method and computer-readable recording medium
US8219439B2 (en) Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer
WO2018161908A1 (en) Product object processing method and device, storage medium and electronic device
US8818889B2 (en) Technique for aggregating an energy service
JP2016062191A (en) Power transaction support device, power transaction support system, control method, and program
US7792692B2 (en) Adaptive estimation of gain and revenue
JP4154373B2 (en) Power supply business risk management support system
US8412614B2 (en) System and method for electrical power derivatives
JP2008225755A (en) Power transaction prediction system and power transaction prediction program
CN111178692A (en) Resource usage amount estimation method and device and electronic equipment
CN111932314A (en) Method, device and equipment for pushing recommended content and readable storage medium
JP2008154430A (en) Supply plan creation system, program, and method
US20080091446A1 (en) Method and system for maximizing revenue generated from service level agreements
JP2009043291A (en) System for predicting demand of merchandise and system for adjusting number of sales of merchandise
JP6519215B2 (en) Power transaction support system, power transaction support method and program
JP2005012912A (en) Operation planning method for power generation facility, and operation planning system for power generation facility
JP4261471B2 (en) Distribution system load assumption method and apparatus
JP2006227852A (en) Use plan value calculation method and computer system
US20220292535A1 (en) Negotiation system, negotiation method, and negotiation program
JP6520142B2 (en) Optimal trading volume determination system, optimal trading volume determination method and program
JP7101403B2 (en) Electric power transaction support device and electric power transaction support method
JP2017126183A (en) Power transaction support device, power transaction support method, and program
JP2004334327A (en) Ordering proposal system and method
CN111242767A (en) User on-schedule payment prediction method and device and electronic equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100824

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100831

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110104