JP2006087264A - Operation controller for generator - Google Patents

Operation controller for generator Download PDF

Info

Publication number
JP2006087264A
JP2006087264A JP2004271843A JP2004271843A JP2006087264A JP 2006087264 A JP2006087264 A JP 2006087264A JP 2004271843 A JP2004271843 A JP 2004271843A JP 2004271843 A JP2004271843 A JP 2004271843A JP 2006087264 A JP2006087264 A JP 2006087264A
Authority
JP
Japan
Prior art keywords
generator
generated power
control
computer
set value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2004271843A
Other languages
Japanese (ja)
Inventor
Hideki Iwawaki
秀喜 岩脇
Mitsuru Iwata
満 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2004271843A priority Critical patent/JP2006087264A/en
Publication of JP2006087264A publication Critical patent/JP2006087264A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an operation controller for a generator, which can operate the generator by freely changing the generated power value of the generator corresponding to a change in a loading pattern even on the occurrence of variations in the load pattern of the generator, can simplify and facilitate the control of a generating apparatus, and can be easily applied to the generating apparatus capable of selecting/using both of the received electric value from the outside and the electric power generated by the generator. <P>SOLUTION: The operation controller for a generator is constituted so that a generated power setting value is transmitted to a generator control board via a communication means from a remote control terminal, and the generator is operated/controlled by a generated power control signal calculated on the basis of the generated power setting value in the generator control board. The generator control board is provided with a computer having a generated power target value computing means for computing the generated power target value of the generator on the basis of the generated power setting value from the remote control terminal, and having a generated power setting value restoring means for restoring the generated power setting value, and with a control sequencer for operating/controlling the plurality of generators based on the generated power target value which is input from the computer. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、外部からの受電値及び発電機による発電電力の双方を選択利用可能にした発電装置に適用され、発電制御値を遠隔制御端末から通信手段を介して発電機制御盤に伝送し、該発電機制御盤において前記発電制御値に基づき算出された発電機運転制御信号により1台または複数台の発電機を運転制御するように構成された発電機運転制御装置に関する。   The present invention is applied to a power generator that can selectively use both an externally received value and power generated by a generator, and transmits a power generation control value from a remote control terminal to a generator control panel via communication means. The present invention relates to a generator operation control device configured to control operation of one or a plurality of generators by a generator operation control signal calculated based on the power generation control value in the generator control panel.

中央制御室内に設置された遠隔制御用の遠隔制御端末から、複数の発電機が設置された発電設備の発電電力を制御するようにした発電機運転制御装置の1つとして、特許文献1(特開平11−262298号公報)の技術が提供されている。
かかる技術においては、発電機の励磁を制御する励磁コントローラにおいて、現地端末から送られてきた制御パラメータに基づいて制御関数を調整し、遠隔制御端末において通信回線を介して現地端末から送られた発電機の制御要目を表示装置に表示し、かつ制御パラメータの設定変更を行い、設定変更された制御パラメータを通信回線を介して現地端末と中央監視制御盤に送出するように構成されている。
As one of the generator operation control devices that control the generated power of a power generation facility in which a plurality of generators are installed from a remote control terminal for remote control installed in a central control room, Patent Document 1 No. 11-262298) is provided.
In such a technique, an excitation controller that controls the excitation of a generator adjusts a control function based on a control parameter sent from a local terminal, and generates power generated from the local terminal via a communication line in a remote control terminal. The control points of the machine are displayed on the display device, the setting of the control parameter is changed, and the changed control parameter is sent to the local terminal and the central monitoring control panel via the communication line.

特開平11−262298号公報JP-A-11-262298

しかしながら、前記特許文献1(特開平11−262298号公報)の技術にあっては、大規模な発電所における発電機の運転制御を対象としていることから、制御の遅れをカバーするため、発電機の励磁を制御する際には、励磁コントローラからの制御パラメータを中央監視制御盤とともに、通信回線を介して現地端末に直接送っている。
このため、かかる従来技術にあっては、発電機の負荷パターンが変化する毎に発電機側端末(現地端末)の制御パラメータを変更する必要があり、発電装置の制御が煩雑となって制御性が低下する。
また、かかる従来技術にあっては、外部からの受電値及び発電機による発電電力の双方を選択利用可能にした発電装置への適用については開示されていない。
However, since the technique of Patent Document 1 (Japanese Patent Application Laid-Open No. 11-262298) is intended for generator operation control in a large-scale power plant, the generator is covered to cover the control delay. When controlling the excitation, the control parameters from the excitation controller are sent directly to the local terminal via the communication line together with the central monitoring control panel.
For this reason, in such a conventional technique, it is necessary to change the control parameter of the generator side terminal (local terminal) every time the load pattern of the generator changes, and the control of the power generator becomes complicated and controllability is increased. Decreases.
Moreover, in this prior art, it is not disclosed about the application to the power generator which can selectively use both the externally received value and the power generated by the generator.

本発明はかかる従来技術の課題に鑑み、発電機の負荷パターンの変化があっても該負荷パターンの変化に応じて発電機の発電電力値を自在に変化させて運転可能となって、発電装置の制御を簡単かつ容易化でき、かつ外部からの受電値及び発電機による発電電力の双方を選択利用可能にした発電装置に容易に適用可能な発電機運転制御装置を提供することを目的とする。   In view of the problems of the prior art, the present invention can be operated by freely changing the generated power value of the generator in accordance with the change of the load pattern even if the load pattern of the generator is changed. It is an object of the present invention to provide a generator operation control device that can be easily and easily controlled, and can be easily applied to a power generation device that can selectively use both an externally received value and power generated by a generator. .

本発明はかかる目的を達成するもので、発電電力設定値を遠隔制御端末から通信手段を介して発電機制御盤に伝送し、該発電機制御盤において前記発電電力設定値に基づき算出された発電電力制御信号により発電機を運転制御するように構成された発電機運転制御装置において、前記発電機制御盤は、前記遠隔制御端末からの発電電力設定値に基づき前記発電機の発電電力目標値を算出する発電電力目標値算出手段、前記発電電力設定値を記憶する発電電力設定値記憶手段を有するコンピュータと、該コンピュータから入力される前記発電電力目標値に基づき前記複数台の発電機を運転制御する制御シーケンサとを備えてなることを特徴とする。   The present invention achieves such an object by transmitting a generated power set value from a remote control terminal to a generator control panel via communication means, and generating the power generated by the generator control panel based on the generated power set value. In the generator operation control device configured to control the operation of the generator based on the power control signal, the generator control panel sets the generated power target value of the generator based on the generated power set value from the remote control terminal. A computer having generated power target value calculation means for calculating, a generated power set value storage means for storing the generated power set value, and operation control of the plurality of generators based on the generated power target value input from the computer And a control sequencer.

かかる発明によれば、発電機制御盤のコンピュータにおいて、遠隔制御端末からの発電電力設定値に基づき複数台の発電機の発電電力目標値を算出し前回の発電電力目標値を更新して蓄積し、かかる更新を行った後の発電電力目標値を制御シーケンサに自動的に書き込み、該制御シーケンサにより発電機に発電電力値を出力して該発電機を運転制御するように構成されているので、従来技術のように発電機の負荷パターンの変化による発電機側端末の制御パラメータの変更を必要とせずに、発電機の負荷パターンの変化に応じて、該発電機の発電電力値を自在に変化させて運転でき、発電装置の制御を簡単かつ容易化できる。   According to this invention, in the computer of the generator control panel, the generated power target value of the plurality of generators is calculated based on the generated power set value from the remote control terminal, and the previous generated power target value is updated and stored. Then, the generated power target value after such an update is automatically written in the control sequencer, and the generated power value is output to the generator by the control sequencer so that the generator is operated and controlled. Without changing the control parameters of the generator-side terminal due to changes in the load pattern of the generator as in the prior art, the generated power value of the generator can be changed freely according to the change in the load pattern of the generator The power generator can be easily and easily controlled.

かかる発明において好ましくは、前記コンピュータの発電電力設定値記憶手段は、前記発電電力設定値の変更履歴を蓄積するとともに、該変更履歴を前記遠隔制御端末に取り込み可能に構成されてなる。
このように構成すれば、発電電力設定値の変更履歴を発電電力設定値記憶手段に記憶させ、この変更履歴を発電機の機側及び遠隔制御端末側から確認できるので、発電電力の変化を発電機の機側及び遠隔制御端末側の双方から把握でき、信頼性、安全性が向上する。
In this invention, preferably, the generated power set value storage means of the computer is configured to accumulate a change history of the generated power set value and to import the change history into the remote control terminal.
According to this configuration, the change history of the generated power set value is stored in the generated power set value storage means, and this change history can be confirmed from the generator side and the remote control terminal side. It can be grasped from both the machine side and the remote control terminal side, and reliability and safety are improved.

また本発明は、外部からの発電機の運転スケジュールを遠隔制御端末から通信手段を介して発電機制御盤に伝送し、該発電機制御盤において前記発電装置の運転スケジュールに基づき算出された発電電力制御信号により発電機を運転制御するように構成された発電機運転制御装置において、前記発電機制御盤は、前記遠隔制御端末から入力される前記発電装置の運転スケジュールに基づき該運転スケジュールに対応する前記発電装置の必要発電電力目標値を算出する発電電力目標値算出手段、運転スケジュールを記憶する運転スケジュール記憶手段を有するコンピュータと、該コンピュータから入力される前記必要発電電力設定値と前記発電装置の総発電電力とに基づき前記発電機での発電電力制御値を算出し、該発電電力制御値に基づき前記複数台の発電機を運転制御する制御シーケンサとを備えてなることを特徴とする。   Further, the present invention transmits an external generator operation schedule from a remote control terminal to a generator control panel via communication means, and the generated power calculated based on the operation schedule of the power generator in the generator control panel. In the generator operation control apparatus configured to control the operation of the generator by a control signal, the generator control panel corresponds to the operation schedule based on the operation schedule of the power generator input from the remote control terminal. Generated power target value calculation means for calculating a required generated power target value of the power generator, a computer having an operation schedule storage means for storing an operation schedule, the required generated power set value input from the computer, and the power generator Calculate the generated power control value at the generator based on the total generated power, and based on the generated power control value, Characterized by comprising a control sequencer controls the operation of the plurality of generators.

かかる発明によれば、発電機制御盤のコンピュータにおいて、遠隔制御端末から入力される外部からの発電機の運転スケジュールに基づき、運転スケジュールに対応する必要発電電力目標値を算出し、前回の必要発電電力目標値を更新して、かかる更新を行った後の必要発電電力目標値を制御シーケンサに自動的に書き込み、該制御シーケンサにおいて前記必要発電電力目標値と発電装置の総発電電力とに基づき複数台の発電機での目標発電電力を算出し、発電機に前記目標発電電力値を出力して該発電機を運転制御するように構成されているので、運転スケジュールを発電機制御盤のコンピュータに入力するのみで、複数台の発電機を前記目標発電電力にて自動的に運転制御できる。
また、発電機の負荷パターンの変化があっても、更新を行った後の必要発電電力目標値を随時コンピュータから取り出して、該発電機の発電電力値を自在に変化させて運転でき、従来技術のように発電機の負荷パターンの変化による発電機側端末の制御パラメータの変更を必要としない。
According to this invention, in the computer of the generator control panel, the required generated power target value corresponding to the operation schedule is calculated based on the external generator operation schedule input from the remote control terminal, and the previous required power generation is calculated. The power target value is updated, and the necessary generated power target value after such update is automatically written to the control sequencer, and a plurality of values are generated based on the required generated power target value and the total generated power of the power generator in the control sequencer. Since it is configured to calculate the target generated power in one generator and output the target generated power value to the generator to control the operation of the generator, the operation schedule is stored in the computer of the generator control panel. Only by inputting, it is possible to automatically control the operation of a plurality of generators with the target generated power.
Moreover, even if there is a change in the load pattern of the generator, the necessary generated power target value after updating can be taken out from the computer at any time, and the generated power value of the generator can be freely changed and operated. Thus, it is not necessary to change the control parameter of the generator side terminal due to the change of the load pattern of the generator.

かかる発明において好ましくは、前記コンピュータの発電電力設定値記憶手段は、設定値の変更履歴を蓄積するとともに、該変更履歴を前記遠隔制御端末に取り込み可能に構成されてなる。
このように構成すれば、外部からの発電電力設定値の変更履歴を発電電力設定値記憶手段に記憶させ、この変更履歴を発電機の機側及び遠隔制御端末側から確認できるので、発電電力の変化を発電機の機側及び遠隔制御端末側の双方から把握でき、信頼性、安全性が向上する。
In this invention, preferably, the generated power set value storage means of the computer is configured to store a change history of set values and to import the change history into the remote control terminal.
With this configuration, the change history of the generated power set value from the outside is stored in the generated power set value storage means, and this change history can be confirmed from the generator side and the remote control terminal side. Changes can be grasped from both the generator side and the remote control terminal side, improving reliability and safety.

前記遠隔制御端末は、外部からの発電電力設定値を前記コンピュータに入力する発電電力設定値入力手段と、前記発電装置の運転スケジュールを前記コンピュータに入力する運転スケジュール入力手段とを備えてなる。
このように構成すれば、運転スケジュールを、発電機の機側及び遠隔制御端末側の双方からコンピュータに入力できるので、制御の自由度が広がり、制御性が向上する。
The remote control terminal includes a generated power set value input means for inputting a generated power set value from the outside to the computer, and an operation schedule input means for inputting an operation schedule of the power generator to the computer.
If comprised in this way, since an operation schedule can be input into a computer from both the machine side of a generator, and the remote control terminal side, the freedom degree of control spreads and controllability improves.

また、かかる発明において好ましくは、前記コンピュータは、前記発電装置の運転スケジュールを発電優先及び受電優先の2つに分けてそのいずれかを選出可能にした運転スケジュール設定手段を備え、該コンピュータの発電電力目標値算出手段は、前記運転スケジュール入力手段からの運転スケジュールあるいは前記運転スケジュール設定手段の運転スケジュールのいずれか一方または双方を取り込み可能に構成されてなる。
このように構成すれば、発電装置の運転スケジュールを、発電機側の発電電力を受電電力よりも大きくする発電優先と、及び受電電力を発電機側の発電電力よりも大きくする受電優先との2つに分け、発電優先あるいは受電優先のいずれかをコンピュータの受電設定値算出手段に入力するのみで、複数台の発電機を発電優先モードあるいは受電優先モードの目標発電電力にて自動的に運転制御でき、発電機の運転制御を簡単化できる。
In this invention, it is preferable that the computer includes an operation schedule setting unit that divides the operation schedule of the power generation apparatus into two generation priority and power reception priority, and makes it possible to select one of them. The target value calculation means is configured to be able to capture either or both of the operation schedule from the operation schedule input means and the operation schedule of the operation schedule setting means.
If comprised in this way, the operation schedule of a generator is made into 2 priority of the generation priority which makes the electric power generated on the generator side larger than the received electric power, and the electric power reception priority which makes the received electric power larger than the electric power generated on the generator side. By simply inputting either power generation priority or power reception priority to the computer's power receiving setting value calculation means, multiple generators are automatically controlled for operation with the target power generation in the power generation priority mode or the power reception priority mode. It is possible to simplify the operation control of the generator.

本発明によれば、発電機制御盤のコンピュータにおいて、遠隔制御端末から入力される外部からの発電機の運転スケジュールに基づき、外部からの発電機の運転スケジュールに基づき、必要運転スケジュールに対応する必要発電電力目標値を算出し、前回の運転スケジュールに対応する必要発電電力目標値を更新して蓄積し、かかる更新を行った後の発電電力目標値を制御シーケンサに自動的に書き込み、該制御シーケンサにより発電機に発電電力値を出力して該発電機を運転制御するように構成されているので、発電機の負荷パターンの変化による発電機側端末の制御パラメータの変更を必要とせずに、発電機の負荷パターンの変化に応じて、該発電機の発電電力値を自在に変化させて運転でき、発電装置の制御を簡単かつ容易化できる。
また、発電機の負荷パターンの変化があっても、更新を行った後の必要発電電力目標値を随時コンピュータから取り出して、該発電機の発電電力値を自在に変化させて運転でき、従来技術のように発電機の負荷パターンの変化による発電機側端末の制御パラメータの変更を必要としない。
According to the present invention, in the computer of the generator control panel, it is necessary to correspond to the required operation schedule based on the external generator operation schedule input from the remote control terminal, based on the external generator operation schedule. Calculates the generated power target value, updates and accumulates the necessary generated power target value corresponding to the previous operation schedule, and automatically writes the generated power target value after such update to the control sequencer. Since the generator is configured to output the generated power value to the generator and control the operation of the generator, it is possible to generate power without changing the control parameters of the generator-side terminal due to the change in the load pattern of the generator. According to the change in the load pattern of the generator, the generator can be operated by freely changing the generated power value of the generator, and the control of the generator can be simplified and facilitated.
Moreover, even if there is a change in the load pattern of the generator, the necessary generated power target value after updating can be taken out from the computer at any time, and the generated power value of the generator can be freely changed and operated. Thus, it is not necessary to change the control parameter of the generator side terminal due to the change of the load pattern of the generator.

以下、本発明を図に示した実施例を用いて詳細に説明する。但し、この実施例に記載されている構成部品の寸法、材質、形状、その相対配置などは特に特定的な記載がない限り、この発明の範囲をそれのみに限定する趣旨ではなく、単なる説明例にすぎない。   Hereinafter, the present invention will be described in detail with reference to the embodiments shown in the drawings. However, the dimensions, materials, shapes, relative arrangements, and the like of the component parts described in this example are not intended to limit the scope of the present invention only to specific examples unless otherwise specified. Only.

図2は本発明の実施例に係る発電機制御装置の全体構成図であり、図において、100は中央制御室であり、後述する制御信号を伝送するための遠隔制御端末1を備えている。103は発電機で、この例では3個のNo.1発電機盤4、No.2発電機盤5、No.3発電機盤6の3個(1個でも複数個でもよい)の発電機盤を備えている。
101は前記発電機103を運転制御する発電機制御盤で、前記遠隔制御端末1から入力される外部からの受電値及び発電機の運転スケジュールに基づき後述する演算、制御を行うパネルコンピュータ2及び該パネルコンピュータ2からの制御パラメータによって前記No.1発電機盤4、No.2発電機盤5、No.3発電機盤6を制御する制御シーケンサ3を備えている。
FIG. 2 is an overall configuration diagram of a generator control device according to an embodiment of the present invention. In FIG. 2, reference numeral 100 denotes a central control room, which includes a remote control terminal 1 for transmitting control signals to be described later. 103 is a generator, and in this example, three Nos. 1 generator panel 4, No. 1 2 generator panel 5, no. Three generator panels 6 (one or a plurality of generator panels) may be provided.
101 is a generator control panel for controlling the operation of the generator 103, and a panel computer 2 for performing calculation and control, which will be described later, based on an externally received power value inputted from the remote control terminal 1 and an operation schedule of the generator, and the computer According to the control parameters from the panel computer 2, the above-mentioned No. 1 generator panel 4, No. 1 2 generator panel 5, no. 3 A control sequencer 3 for controlling the generator panel 6 is provided.

図1は前記実施例に係る発電機制御装置の制御ブロック図であり、図1において、前記遠隔制御端末1には外部からの受電値を前記パネルコンピュータ2に入力する発電電力設定値入力手段11及び前記発電機103の運転スケジュール12を前記パネルコンピュータ2に入力する運転スケジュール入力手段12を備えている。
前記運転スケジュール入力手段12は、発電機103の運転日及び運転時間帯をパネルコンピュータ2に入力するものであり、前記発電電力設定値入力手段11は該運転スケジュール入力手段12から入力される運転日及び運転時間帯によって決められる受電値即ち受電一定値をパネルコンピュータ2に入力するものである。
FIG. 1 is a control block diagram of the generator control apparatus according to the embodiment. In FIG. 1, a generated power set value input means 11 for inputting a received power value from the outside to the panel computer 2 in the remote control terminal 1. And an operation schedule input means 12 for inputting the operation schedule 12 of the generator 103 to the panel computer 2.
The operation schedule input means 12 inputs an operation date and an operation time zone of the generator 103 to the panel computer 2, and the generated power set value input means 11 is an operation date input from the operation schedule input means 12. In addition, a power reception value determined by the operation time zone, that is, a constant power reception value is input to the panel computer 2.

前記運転スケジュール入力手段12からの運転日及び運転時間帯の入力信号及び前記発電電力設定値入力手段11からの発電電力設定値は電話線等の通信手段を介してパネルコンピュータ2の発電電力目標値演算部21に入力される。
該発電電力目標値演算部21においては、前記運転スケジュール入力手段12から入力される運転日及び運転時間帯によって、発電機103側の発電電力を外部からの受電電力よりも大きくする発電優先とするか、外部からの受電電力を発電機103側の発電電力よりも大きくする受電優先とするかが予め設定されており、該発電電力目標値演算部21においては、前記運転スケジュール入力手段12からの運転スケジュールと前記発電電力設定値入力手段11からの発電電力設定値とにより、前記発電優先あるいは受電優先のいずれかを選択して、該運転スケジュールに対応する発電装置の必要受電設定値を算出する。
The operation date and operation time input signal from the operation schedule input means 12 and the generated power set value from the generated power set value input means 11 are generated power target values of the panel computer 2 via communication means such as a telephone line. It is input to the calculation unit 21.
In the generated power target value calculation unit 21, power generation priority is set so that the generated power on the generator 103 side is larger than the received power from the outside depending on the operation date and the operation time zone input from the operation schedule input unit 12. In addition, it is set in advance whether to give priority to receiving power to increase the received power from the outside to the generated power on the generator 103 side. In the generated power target value calculation unit 21, the operation schedule input means 12 Based on the operation schedule and the generated power set value from the generated power set value input means 11, either the power generation priority or the power reception priority is selected, and the required power receiving set value of the power generation device corresponding to the operation schedule is calculated. .

また、前記運転スケジュールは、パネルコンピュータ2に設置された運転スケジュール記憶部22からも前記発電電力目標値演算部21に入力可能となっている。
このように構成すれば、運転スケジュールを、発電機103の機側であるパネルコンピュータ2内及び遠隔制御端末1側の双方から該パネルコンピュータ2に入力できるので、制御の自由度が広がり、制御性が向上する。
The operation schedule can also be input to the generated power target value calculation unit 21 from an operation schedule storage unit 22 installed in the panel computer 2.
With this configuration, since the operation schedule can be input to the panel computer 2 from both the panel computer 2 on the machine side of the generator 103 and the remote control terminal 1 side, the degree of freedom of control is expanded and controllability is increased. Will improve.

また、前記発電電力目標値演算部21においては、運転スケジュール及び発電電力設定値により設定した必要受電設定値を含む発電電力制御値を発電電力設定値記憶部23に出力し、該発電電力設定値記憶部23に記憶されている前回の発電電力目標値を更新し、かかる更新を行った後の必要発電電力目標値を制御シーケンサ3の発電電力制御値演算部31に入力する。
該発電電力制御値演算部31においては、前記必要受電設定値P及び総負荷設定手段32に設定されている運転総負荷Lと、発電機運転台数設定部33に設定されている現在の発電機運転台数Nとにより、次の(1)式で発電機103の発電による発電機1台当たりの目標電力Wを算出する。
W=(L−P)/N
従って、前記発電電力制御値演算部31で算出された目標電力Wが、発電機103のNo.1発電機盤4、No.2発電機盤5、No.3発電機盤6に入力され、No.1発電機盤4、No.2発電機盤5、No.3発電機盤6の発電機は前記目標電力Wで運転される。
Further, the generated power target value calculation unit 21 outputs a generated power control value including a necessary power receiving set value set by the operation schedule and the generated power set value to the generated power set value storage unit 23, and the generated power set value The previous generated power target value stored in the storage unit 23 is updated, and the necessary generated power target value after the update is input to the generated power control value calculation unit 31 of the control sequencer 3.
In the generated power control value calculation unit 31, the required power receiving set value P and the operating total load L set in the total load setting means 32 and the current generator set in the generator operating number setting unit 33 are set. Based on the number of operating units N, the target power W per generator generated by the generator 103 is calculated by the following equation (1).
W = (LP) / N
Therefore, the target power W calculated by the generated power control value calculation unit 31 is the No. of the generator 103. 1 generator panel 4, No. 1 2 generator panel 5, no. 3 is input to the generator panel 6, 1 generator panel 4, No. 1 2 generator panel 5, no. The generator of the three generator panel 6 is operated with the target power W.

かかる実施例によれば、発電機制御盤101のパネルコンピュータ2において、遠隔制御端末1から入力される発電電力設定値及び発電装置の運転スケジュールに基づき、該運転スケジュールに対応する発電電力目標値を算出し、この算出値により前回の発電電力目標値を更新して、かかる更新を行った後の必要発電電力目標値を制御シーケンサ3に自動的に書き込み、該制御シーケンサ3において前記発電電力目標値と発電装置の総発電電力とに基づき複数台の発電機での目標発電電力Wを算出し、発電機103の発電機盤4、5、6に前記目標発電電力値Wを出力して該発電機103を運転制御するように構成されているので、運転スケジュールとこれに対応する外部からの受電値を発電機制御盤101のパネルコンピュータ2に入力するのみで、複数台の発電機103を前記目標発電電力Wにて自動的に運転制御できる。
また、発電機103の負荷パターンの変化があっても、更新を行った後の必要発電電力目標値を随時パネルコンピュータ2から取り出して、該発電機103の発電電力値を自在に変化させて運転でき、従来技術のように発電機の負荷パターンの変化による発電機側端末の制御パラメータの変更を必要としない。
According to this embodiment, in the panel computer 2 of the generator control panel 101, the generated power target value corresponding to the operation schedule is set based on the generated power setting value input from the remote control terminal 1 and the operation schedule of the power generator. The generated power target value of the previous time is updated with the calculated value, and the necessary generated power target value after the update is automatically written in the control sequencer 3, and the generated power target value in the control sequencer 3 is calculated. And the total generated power of the power generator, the target generated power W for a plurality of generators is calculated, and the target generated power value W is output to the generator panels 4, 5, 6 of the generator 103 to generate the power Since it is configured to control the operation of the machine 103, the operation schedule and the corresponding received power value from the outside are input to the panel computer 2 of the generator control panel 101. Alone, a plurality of generators 103 may automatically operated control by the target generated power W.
In addition, even if there is a change in the load pattern of the generator 103, the necessary generated power target value after the update is taken out from the panel computer 2 as needed, and the generated power value of the generator 103 is freely changed to operate. In addition, unlike the prior art, it is not necessary to change the control parameters of the generator side terminal by changing the load pattern of the generator.

また、前記パネルコンピュータ2の発電電力設定値記憶部23は、前記必要発電電力目標値の変更履歴を蓄積するとともに、該変更履歴を前記発電電力目標値演算部21及び前記遠隔制御端末1の双方に取り込み可能に構成されているので、発電電力目標値の変更履歴を発電電力設定値記憶部23に記憶させ、この変更履歴を発電機の機側及び遠隔制御端末側から確認できる。即ち、発電電力の変化を発電機103の機側及び遠隔制御端末1側の双方から把握できることとなり、信頼性、安全性が向上する。   The generated power set value storage unit 23 of the panel computer 2 accumulates the change history of the required generated power target value and stores the change history in both the generated power target value calculation unit 21 and the remote control terminal 1. The change history of the generated power target value is stored in the generated power set value storage unit 23, and this change history can be confirmed from the machine side of the generator and the remote control terminal side. That is, the change in the generated power can be grasped from both the machine side of the generator 103 and the remote control terminal 1 side, and the reliability and safety are improved.

また、かかる実施例によれば、前記パネルコンピュータ2は、発電装置の運転スケジュールを発電優先及び受電優先の2つに分けてそのいずれかを選出可能にし、運転スケジュール入力手段12からの運転スケジュール入力値あるいは運転スケジュール記憶部22の運転スケジュールのいずれか一方を取り込み可能に構成されているので、発電装置の運転スケジュールを、発電機103側の発電電力を受電電力よりも大きくする発電優先と、受電電力を発電機側の発電電力よりも大きくする受電優先との2つに分け、発電優先あるいは受電優先のいずれかをパネルコンピュータ2の発電電力目標値演算部21に入力するのみで、複数台の発電機103を発電優先モードあるいは受電優先モードの目標発電電力Wにて自動的に運転制御でき、発電機103の運転制御を簡単化できる。   Further, according to this embodiment, the panel computer 2 divides the operation schedule of the power generation device into two generation priority and power reception priority, which can be selected, and the operation schedule input from the operation schedule input means 12 Since either one of the values or the operation schedule stored in the operation schedule storage unit 22 can be taken in, the operation schedule of the power generator is configured so that the power generation priority for making the generated power on the generator 103 side larger than the received power, The power is divided into two types, that is, power reception priority that is larger than the power generated on the generator side, and only one of power generation priority or power reception priority is input to the generated power target value calculation unit 21 of the panel computer 2, so The generator 103 can be automatically operated and controlled with the target generated power W in the power generation priority mode or the power reception priority mode. It can be simplified operational control of the machine 103.

本発明によれば、発電機の負荷パターンの変化があっても該負荷パターンの変化に応じて発電機の発電電力値を自在に変化させて運転可能となって、発電装置の制御を簡単かつ容易化でき、かつ外部からの受電値及び発電機による発電電力の双方を選択利用可能にした発電装置に容易に適用可能な発電機運転制御装置を提供できる。   According to the present invention, even if there is a change in the load pattern of the generator, the generator can be operated by freely changing the value of the generated power of the generator according to the change in the load pattern, and the control of the power generator can be simplified and It is possible to provide a generator operation control device that can be easily applied and can be easily applied to a power generation device that can selectively use both an external power reception value and power generated by a power generator.

本発明の実施例に係る発電機制御装置の制御ブロック図である。It is a control block diagram of the generator control apparatus which concerns on the Example of this invention. 前記実施例における全体構成図である。It is a whole block diagram in the said Example.

符号の説明Explanation of symbols

100 中央制御室
101 発電機制御盤
103 発電機
1 遠隔制御端末
2 パネルコンピュータ
3 制御シーケンサ
4、5、6 発電機盤
DESCRIPTION OF SYMBOLS 100 Central control room 101 Generator control panel 103 Generator 1 Remote control terminal 2 Panel computer 3 Control sequencer 4, 5, 6 Generator panel

Claims (6)

発電電力設定値を遠隔制御端末から通信手段を介して発電機制御盤に伝送し、該発電機制御盤において前記発電電力設定値に基づき算出された発電電力制御信号により発電機を運転制御するように構成された発電機運転制御装置において、前記発電機制御盤は、前記遠隔制御端末からの発電電力設定値に基づき前記発電機の発電電力目標値を算出する発電電力目標値算出手段、前記発電電力設定値を記憶する発電電力設定値記憶手段を有するコンピュータと、該コンピュータから入力される前記発電電力目標値に基づき前記複数台の発電機を運転制御する制御シーケンサとを備えてなることを特徴とする発電機運転制御装置。   The generated power set value is transmitted from the remote control terminal to the generator control panel via the communication means, and the generator is controlled by the generated power control signal calculated based on the generated power set value in the generator control panel. In the generator operation control device configured as described above, the generator control panel includes: a generated power target value calculating unit that calculates a generated power target value of the generator based on a generated power set value from the remote control terminal; A computer having generated power set value storage means for storing a power set value, and a control sequencer for controlling the operation of the plurality of generators based on the generated power target value input from the computer. A generator operation control device. 前記コンピュータの発電電力設定値記憶手段は、前記発電電力設定値の変更履歴を蓄積するとともに、該変更履歴を前記遠隔制御端末に取り込み可能に構成されてなることを特徴とする請求項1記載の発電機運転制御装置。   The generated power set value storage means of the computer is configured to accumulate a change history of the generated power set value and to be able to capture the change history into the remote control terminal. Generator operation control device. 外部からの発電機の運転スケジュールを遠隔制御端末から通信手段を介して発電機制御盤に伝送し、該発電機制御盤において前記発電装置の運転スケジュールに基づき算出された発電電力制御信号により発電機を運転制御するように構成された発電機運転制御装置において、前記発電機制御盤は、前記遠隔制御端末から入力される前記発電装置の運転スケジュールに基づき該運転スケジュールに対応する前記発電装置の必要発電電力目標値を算出する発電電力目標値算出手段、運転スケジュールを記憶する運転スケジュール記憶手段を有するコンピュータと、該コンピュータから入力される前記必要発電電力設定値と前記発電装置の総発電電力とに基づき前記発電機での発電電力制御値を算出し、該発電電力制御値に基づき前記複数台の発電機を運転制御する制御シーケンサとを備えてなることを特徴とする発電機運転制御装置。   An external generator operating schedule is transmitted from the remote control terminal to the generator control panel via the communication means, and the generator is controlled by the generated power control signal calculated based on the operating schedule of the power generator in the generator control panel. In the generator operation control device configured to control the operation of the generator, the generator control panel needs the power generation device corresponding to the operation schedule based on the operation schedule of the power generation device input from the remote control terminal. Generated power target value calculating means for calculating the generated power target value, a computer having an operation schedule storage means for storing the operation schedule, the necessary generated power set value input from the computer, and the total generated power of the power generator Based on the generated power control value, the generated power control value for the generator is calculated based on the generated power control value. Generator operation control apparatus characterized by comprising a control sequencer controls the operation of the. 前記コンピュータの発電電力設定値記憶手段は、設定値の変更履歴を蓄積するとともに、該変更履歴を前記遠隔制御端末に取り込み可能に構成されてなることを特徴とする請求項3記載の発電機運転制御装置。   4. The generator operation according to claim 3, wherein the generated power set value storage means of the computer is configured to accumulate a change history of the set value and to capture the change history into the remote control terminal. Control device. 前記遠隔制御端末は、外部からの発電電力設定値を前記コンピュータに入力する発電電力設定値入力手段と、前記発電装置の運転スケジュールを前記コンピュータに入力する運転スケジュール入力手段とを備えてなることを特徴とする請求項3記載の発電機運転制御装置。   The remote control terminal comprises a generated power set value input means for inputting a generated power set value from the outside to the computer, and an operation schedule input means for inputting an operation schedule of the power generator to the computer. The generator operation control device according to claim 3, wherein: 前記コンピュータは、前記発電装置の運転スケジュールを発電優先及び受電優先の2つに分けてそのいずれかを選出可能にした運転スケジュール設定手段を備え、該コンピュータの発電電力目標値算出手段は、前記運転スケジュール入力手段からの運転スケジュールあるいは前記運転スケジュール設定手段の運転スケジュールのいずれか一方または双方を取り込み可能に構成されてなることを特徴とする請求項5記載の発電機運転制御装置。   The computer includes an operation schedule setting unit that divides the operation schedule of the power generation device into two types of generation priority and power reception priority and makes it possible to select one of them, and the generated power target value calculation unit of the computer includes the operation schedule 6. The generator operation control device according to claim 5, wherein either one or both of the operation schedule from the schedule input means and the operation schedule of the operation schedule setting means can be taken in.
JP2004271843A 2004-09-17 2004-09-17 Operation controller for generator Withdrawn JP2006087264A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004271843A JP2006087264A (en) 2004-09-17 2004-09-17 Operation controller for generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004271843A JP2006087264A (en) 2004-09-17 2004-09-17 Operation controller for generator

Publications (1)

Publication Number Publication Date
JP2006087264A true JP2006087264A (en) 2006-03-30

Family

ID=36165289

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004271843A Withdrawn JP2006087264A (en) 2004-09-17 2004-09-17 Operation controller for generator

Country Status (1)

Country Link
JP (1) JP2006087264A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023276437A1 (en) * 2021-06-28 2023-01-05 ダイキン工業株式会社 Information processing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023276437A1 (en) * 2021-06-28 2023-01-05 ダイキン工業株式会社 Information processing system
JP2023004712A (en) * 2021-06-28 2023-01-17 ダイキン工業株式会社 Information processing system

Similar Documents

Publication Publication Date Title
KR940002588A (en) Optimization of Chemical Process
TW200619895A (en) Method and apparatus for customizing a power supply based on load characteristic data
MX2007007417A (en) Wind turbine comprising a multiplied redundancy control system and method of controlling a wind turbine.
JP2004007297A5 (en)
US10650794B2 (en) Timing control method and timing control device
EP1862983A3 (en) Remote control system
TW200615446A (en) Apparatus and method for controlling a plant
DE50303812D1 (en) Control unit, control module, module battery and control system
JP2007115176A (en) Plant operation support apparatus
JP2006178854A (en) Electronic circuit
CN104024535B (en) For arranging the device of construction equipment manipulation degree
JP2006087264A (en) Operation controller for generator
KR20100056921A (en) Electronic apparatus and remote control method of the same
JP2005117809A (en) Remote control device of generation system
JP2007073008A (en) Positioning apparatus
JP5500370B2 (en) Operation control apparatus and operation control method using multivariable model prediction
JP2009232234A (en) Remote control apparatus
JP2008232505A (en) Remote control device for water heater
JP2006258392A (en) Target practice system
JP2008310725A (en) Field equipment system and system construction method thereof
JP2006087207A (en) Generator operating controller
JP2009048524A (en) Plant optimum operation control system
ATE358349T1 (en) METHOD FOR CONTROLLING OUTPUT PARAMETERS OF AN ENERGY SUPPLY
WO2023074163A1 (en) Control parameter generation method, program, recording medium, and control parameter generating device
JP5726775B2 (en) Plant operation training simulator, simulation method, and simulation program

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20071204