JP2005348507A - 受変電設備の最適システム決定方法 - Google Patents
受変電設備の最適システム決定方法 Download PDFInfo
- Publication number
- JP2005348507A JP2005348507A JP2004164672A JP2004164672A JP2005348507A JP 2005348507 A JP2005348507 A JP 2005348507A JP 2004164672 A JP2004164672 A JP 2004164672A JP 2004164672 A JP2004164672 A JP 2004164672A JP 2005348507 A JP2005348507 A JP 2005348507A
- Authority
- JP
- Japan
- Prior art keywords
- transforming
- power receiving
- transformer
- determining
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000001131 transforming effect Effects 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims abstract description 38
- 238000011156 evaluation Methods 0.000 claims description 10
- 230000009466 transformation Effects 0.000 claims description 6
- 230000010485 coping Effects 0.000 abstract 1
- 230000003287 optical effect Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 10
- 239000000047 product Substances 0.000 description 8
- 238000009434 installation Methods 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- 239000003921 oil Substances 0.000 description 5
- 230000007613 environmental effect Effects 0.000 description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 2
- 229910000808 amorphous metal alloy Inorganic materials 0.000 description 2
- 239000003990 capacitor Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 239000011162 core material Substances 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 229910000976 Electrical steel Inorganic materials 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000013066 combination product Substances 0.000 description 1
- 229940127555 combination product Drugs 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】 この受変電設備の最適システム決定方法は、顧客ニーズを把握し、当該顧客の現状の受変電設備を把握し、前記顧客ニーズに基づいて、各種受変電システムを想定して評価し、前記各種受変電システムから最適システムを決定する。更に、前記各種受変電システムを想定して評価するステップは、変圧器の選定に関して、顧客ニーズを把握し、新たな想定検針データを作成し、前記想定検針データに基づき各変圧器の負荷率を計測し、少なくとも、想定検針データ及び負荷率を含むデータから変電ロスを算出し、算出された変電ロスに基づき最適な組み合わせの変圧器の決定方法を有しているようにする。
【選択図】 図2
Description
前記想定検針データに基づき各変圧器の負荷率を計測し、少なくとも、想定検針データ及び負荷率を含むデータから変電ロスを算出し、算出された変電ロスに基づき最適な組み合わせの変圧器の決定方法を有しているようにすることもできる。
[顧客ニーズに応じた受変電設備及びその最適システム決定方法]
(受変電設備)
図1は、本実施形態の対象となる受変電設備の一例であり、特に特高受変電設備の例を示している。この受変電設備は、構成機器として、電圧検知器(VD)1と、変流器(CT)2と、定常状態での開閉及び事故時の自動遮断を行う真空遮断器(VCB)3と、電路を遮断する断路器(DS)4と、多機能複合形監視制御ユニット(ICU)5と、計器用変成器(VCT)5と、避雷器(LA)6と、電圧を降下する三相三線式(Δ−Δ)結線変圧器(TR)7と、VCB8と、非常用発電機(SG)9と、VCB10と、定常状態で所定の電流の開閉及び短絡電流の遮断を行う負荷開閉器(LBS)11と、単相三線式(一−三)結線TR13-1と、三相三線式(Y−Δ)結線TR13-2と、力率改善用の進相用コンデンサ(SC)14とを備えている。受変電設備では、概して、要素1〜8を受電設備、要素10〜13を変電設備、それ以降(図示せず。)を配電設備と呼んでいる。この受変電設備は、TR7で電力会社から供給される特別高圧22kVを高圧6.6kVに降圧し、TR13で高圧6.6kVから低圧(顧客の機器の使用電圧)440−210Vに降圧している。しかし、これに限定されるものではない。
図2は、本実施形態に係る受変電設備の決定方法を示すフローチャートである。なお、例えば図2及び4に示すようなフローチャートに示す方法は、コンピュータで読取り可能且つ実行可能なプログラムとされ、例えば図3、5及び6で説明するようなプログラム実行に必要なデータは適当な記録媒体にデータベース化されていることを承知されたい。
(1)イニシャルコスト重視型。従来と同じである。しかし、建設時には、土地、建物、内部の機械、設備等に多額に費用を必要とするため、依然としてイニシャルコストを重視する場合がある。
(2)ランニングコスト重視型。このランニングコスト重視型というのは、単にランニングコストの高低に止まらず、算出されたランニングコストに基づき、受変電設備の平均稼働寿命を通したトータルコスト(即ち、イニシャルコスト+ランニングコスト)の高低を重視する場合である。
(3)環境性(CO2排出量等)重視型。近年における企業の社会的責任を最重要視し、環境汚染を極力回避すべきとの観点から受変電設備を決定する場合である。
(4)スペース重視型。特に都会に位置する企業では、その家賃の平方単価は非常に高額なものとなる。従来の受変電設備の占有スペースに比較して、占有スペースを減少することが出来るなら、ランニングコストとして減少スペース分の家賃相当金額がコストダウンできたことに相当する。このような観点から、省スペースを重視する場合である。
(1)C−GIS(キュービクル型ガス絶縁開閉装置)、
(2)SWG(一般型スイッチギア)、
(3)SWG(コンパクト型スイッチギア)、
一方、変圧器では、特別高圧−高圧の変圧器と高圧−低圧の変圧器とに分けて、次の種類の変圧器に対して、各機器の特性から判断した結果として、最良(◎)、良(○)、普通(△)、適用無し(−)の評価を付けている。
(1)一般型油入変圧器、
(2)一般型モールド変圧器、
(3)珪素綱板使用の超高効率型、
(4)鉄心素材にアモルファス合金を採用して無負荷損、負荷損を低減したアモルファス変圧器、
(5)ガス絶縁式変圧器
なお、コンピュータの記録媒体内には、この表を、例えば最良を6点、良を4点、普通を2点のように数値化して蓄積する。設備及び使用電圧別に優先すべき顧客ニーズを入力することにより、機器の組み合わせ毎に、この表を用いて数値化された評価結果を得ることが出来る。
[最適な組み合わせの変圧器を備えた受変電設備及びその決定方法]
図1の受変電設備の変圧器(TR)7と変圧器(TR)13として、最終的に図7(A)に示すような構成で、図7(B)に示すような6種類の提案(A〜Fタイプ)をする場合について説明する。
図4は、受変電設備の変圧器に関して、種々の変圧器の組み合わせを評価する方法を示すフローチャートである。
ここで、負荷率={1時間当たりの電力量(KW)×入力換算値}(KVA)/変圧器容量(KVA)である。
(1)Aタイプ(普及品−普及品の組み合わせ)
(2)Bタイプ(超高効率品−普及品の組み合わせ)
(3)Cタイプ(普及品−超高効率品の組み合わせ)
(4)Dタイプ(超高効率品−超高効率品の組み合わせ)
(5)Eタイプ(普及品−アモルファスの組み合わせ)
(6)Fタイプ(超高効率品−アモルファスの組み合わせ)
図7(B)に示すように、これらのタイプ別のランニングコスト(年間損失電力料金)を比較すると、Aタイプの損失額が最も多く、Fタイプのそれが最も少ない。この年間損失電力料金は、想定検針データに基づき負荷率を決定し(S25)、図6で説明したデータに基づき算出する。図8(A)は、この状況を変圧器の耐用年数15年で累積して表示している。
Claims (8)
- 受変電設備の決定方法において、
顧客ニーズを把握し、
当該顧客の現状の受変電設備を把握し、
前記顧客ニーズに基づいて、各種受変電システムを想定して評価し、
前記各種受変電システムから最適システムを決定する、受変電設備の最適システム決定方法。 - 請求項1に記載の受変電設備の最適システム決定方法において、
前記顧客ニーズは、イニシャルコスト重視型、ランニングコスト重視型、環境性重視型及びスペース重視型の群から選択された1又は優先順位を付けた2以上のものからなる、受変電設備の最適システム決定方法。 - 請求項1に記載の受変電設備の最適システム決定方法において、
前記各種受変電システムを想定して評価するステップは、設備、顧客ニーズ、製品種別、適用電圧の各々に対して評価を決定し、この評価を数値化して評価する、受変電設備の最適システム決定方法。 - 請求項1に記載の受変電設備の最適システム決定方法において、
前記各種受変電システムを想定して評価するステップは、変圧器の選定に関して、
顧客ニーズを把握し、
新たな想定検針データを作成し、
前記想定検針データに基づき各変圧器の負荷率を計測し、
少なくとも、想定検針データ及び負荷率を含むデータから変電ロスを算出し、
算出された変電ロスに基づき最適な組み合わせの変圧器の決定方法を有している、受変電設備の最適システム決定方法。 - 請求項1〜4のいずれか一項の受変電設備の最適システム決定方法により決定される特高受変電設備。
- 請求項4に記載の最適な組み合わせの変圧器の決定方法に基づいて決定された変圧器を備えた特高受変電設備。
- 請求項1〜4のいずれか一項の受変電設備の決定方法を規定した、コンピュータで読取且つ実行可能なプログラム。
- 請求項7に記載のプログラムを蓄積した記憶媒体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004164672A JP3874767B2 (ja) | 2004-06-02 | 2004-06-02 | 受変電設備の最適システム決定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004164672A JP3874767B2 (ja) | 2004-06-02 | 2004-06-02 | 受変電設備の最適システム決定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005348507A true JP2005348507A (ja) | 2005-12-15 |
JP3874767B2 JP3874767B2 (ja) | 2007-01-31 |
Family
ID=35500375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004164672A Expired - Fee Related JP3874767B2 (ja) | 2004-06-02 | 2004-06-02 | 受変電設備の最適システム決定方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3874767B2 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011222561A (ja) * | 2010-04-02 | 2011-11-04 | Mitsubishi Electric Corp | 変圧器結線切替装置および三相電力供給変圧器 |
JP2012050289A (ja) * | 2010-08-30 | 2012-03-08 | Mitsubishi Electric Corp | 自動力率調整器 |
KR101154232B1 (ko) | 2011-11-03 | 2012-06-07 | 정운태 | 톱러너 배전반의 설계방법 |
JP5560433B1 (ja) * | 2013-08-19 | 2014-07-30 | 義和 寺上 | 変圧器の選定方法 |
JP2016051458A (ja) * | 2014-09-01 | 2016-04-11 | 義和 寺上 | 変圧器の選定方法 |
JP2018142105A (ja) * | 2017-02-27 | 2018-09-13 | 栗田工業株式会社 | 水処理システム提案支援装置、水処理システム提案支援方法、及びプログラム |
-
2004
- 2004-06-02 JP JP2004164672A patent/JP3874767B2/ja not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011222561A (ja) * | 2010-04-02 | 2011-11-04 | Mitsubishi Electric Corp | 変圧器結線切替装置および三相電力供給変圧器 |
JP2012050289A (ja) * | 2010-08-30 | 2012-03-08 | Mitsubishi Electric Corp | 自動力率調整器 |
KR101154232B1 (ko) | 2011-11-03 | 2012-06-07 | 정운태 | 톱러너 배전반의 설계방법 |
JP5560433B1 (ja) * | 2013-08-19 | 2014-07-30 | 義和 寺上 | 変圧器の選定方法 |
JP2015039277A (ja) * | 2013-08-19 | 2015-02-26 | 義和 寺上 | 変圧器の選定方法 |
JP2016051458A (ja) * | 2014-09-01 | 2016-04-11 | 義和 寺上 | 変圧器の選定方法 |
JP2018142105A (ja) * | 2017-02-27 | 2018-09-13 | 栗田工業株式会社 | 水処理システム提案支援装置、水処理システム提案支援方法、及びプログラム |
Also Published As
Publication number | Publication date |
---|---|
JP3874767B2 (ja) | 2007-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zarei et al. | Reliability considerations and economic benefits of dynamic transformer rating for wind energy integration | |
Lachman et al. | Real-time dynamic loading and thermal diagnostic of power transformers | |
Abu-Elanien et al. | A techno-economic method for replacing transformers | |
US20080203826A1 (en) | Distributing Board Embedded Panel Transformer | |
Timmers et al. | All‐DC offshore wind farms: When are they more cost‐effective than AC designs? | |
Bongers et al. | Impact of curtailment of renewable energy sources on high voltage network expansion planning | |
JP6101319B2 (ja) | 電力損失監視システムおよびキュービクル | |
Humayun et al. | Optimal capacity management of substation transformers over long-run | |
KR20230049226A (ko) | 인공지능 기반 전기설비 고장 징후 감지 시스템 | |
JP3874767B2 (ja) | 受変電設備の最適システム決定方法 | |
JP4229602B2 (ja) | 機器監視/運転支援方法 | |
Borge-Diez et al. | Parallel distribution transformer loss reductions: A proposed method and experimental validation | |
JP2005073478A (ja) | 機器監視装置及び機器監視システム | |
JP2008072791A (ja) | 計測器設置位置の決定装置、決定方法及び決定用プログラム | |
KR20120033189A (ko) | 배전변압기 부하 관리장치 및 방법 | |
Barnes et al. | The feasibility of replacing or upgrading utility distribution transformers during routine maintenance | |
JP2017522670A (ja) | 技術的設備のメンテナンス期日を状態に基づいて算定する方法、装置およびコンピュータプログラム製品 | |
KR100894882B1 (ko) | 온실 가스 배출 관리 시스템 | |
Mohapatra et al. | Risk and asset management of transmission system in a reformed power sector | |
Zarei | Analysis of reliability improvements of transformers after application of dynamic rating | |
Mahoor et al. | Leveraging sensory data in estimating transformer lifetime | |
Bouford et al. | Many states of distribution | |
Haacke et al. | Plan ahead for substation automation | |
Atanasov et al. | Changes of iron losses during the service of distribution transformers | |
JP2010278369A (ja) | 変圧器の機器定数推定システムおよび機器定数推定プログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060426 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060510 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060706 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060927 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061024 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3874767 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091102 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131102 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |