JP2005213772A - Dimension measuring tool - Google Patents

Dimension measuring tool Download PDF

Info

Publication number
JP2005213772A
JP2005213772A JP2004018950A JP2004018950A JP2005213772A JP 2005213772 A JP2005213772 A JP 2005213772A JP 2004018950 A JP2004018950 A JP 2004018950A JP 2004018950 A JP2004018950 A JP 2004018950A JP 2005213772 A JP2005213772 A JP 2005213772A
Authority
JP
Japan
Prior art keywords
tip
tape measure
eaves
dimension measuring
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004018950A
Other languages
Japanese (ja)
Other versions
JP4085984B2 (en
Inventor
Daijiro Iwashita
大二郎 岩下
Yoshinori Tanaka
良典 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP2004018950A priority Critical patent/JP4085984B2/en
Publication of JP2005213772A publication Critical patent/JP2005213772A/en
Application granted granted Critical
Publication of JP4085984B2 publication Critical patent/JP4085984B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tape Measures (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a dimension measuring tool enabling one person to perform dimension measuring work in eaves gutter arrangement construction and improving work efficiency in dimension measuring work by utilizing an existing tape measure already owned by a user, and easily fixing the tip of a graduation tape of the tape measure to the end of an eaves gutter in the adjusted state of a reference point of a graduation. <P>SOLUTION: A vertical piece 7 for hooking a hook piece 6 provided at the tip of the graduation tape 3 of the tape measure 2 is provided in an almost vertically projecting manner at the tip of a tool body 5 along which the graduation tape 3 of the tape measure 2 is arranged. Upper horizontal pieces 8 are extended in the tip direction of the tool body 5 from the tip of the tool body 5, and a lower horizontal piece 9 is provided projecting in the tip direction of the tool body 5 from the projecting tip of the vertical piece 7. The upper horizontal pieces 8 and the lower horizontal pieces 9 form an insertion groove 10 for inserting the end 4a of the eaves gutter 4 toward the vertical piece 7. The insertion groove 10 is formed by a clamping means 16 for fixing the end 4a of the eaves gutter 4 inserted in the insertion groove 10 in a state of pressing the hook piece 6 of the tape measure 2 to the vertical piece 7. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、巻尺の目盛帯の先端を軒樋に取付けるための寸法測定治具に関するものである。   The present invention relates to a dimension measuring jig for attaching the tip of a tape measure scale band to an eaves.

従来から、軒樋配設施工では寸法測定作業が頻繁に行われる。たとえば屋根の軒先に沿って軒樋を配設するには、図5のように、一定長さに製造された軒樋4を屋根の軒先17に沿わせて順に配設していくのであるが、屋根の軒樋方向の長さ寸法は必ずしも一定長さの軒樋4の倍数ではないため、順に配設した最後の軒樋4は適宜長さで切断しなければならない。この切断させる軒樋4の長さ寸法は施工現場での寸法測定によって決定される。この寸法測定作業は、具体的に、脚立18などに登った施工者19が軒先17に既に取り付けられた軒樋4の長さ方向の端部4aに巻尺2の目盛帯3の先端を合わせて保持し、他方、脚立18などに登った施工者20が所定位置の目盛帯3の目盛りを読むことで行われる。このように軒樋配設施工での寸法測定作業は、巻尺2の目盛帯3の先端を押さえる施工者19と、巻尺2の目盛帯3の目盛りを読む施工者20との2人の施工者を同時に必要とする煩雑な作業であることから、必要とされる施工者数を一人にして作業の容易化が図られることが切望されている。   Conventionally, the dimension measurement work is frequently performed in the eaves wall arrangement construction. For example, in order to dispose the eaves along the eaves of the roof, the eaves 4 manufactured to a certain length are sequentially arranged along the eaves 17 of the roof as shown in FIG. Since the length dimension of the roof eaves direction is not necessarily a multiple of the fixed eaves 4, the last eaves 4 arranged in order must be cut to an appropriate length. The length dimension of the eaves rod 4 to be cut is determined by measuring the dimensions at the construction site. Specifically, the dimension measuring operation is performed by aligning the tip of the scale band 3 of the tape measure 2 with the end portion 4a in the length direction of the eaves rod 4 already attached to the eaves edge 17 by the installer 19 climbing the stepladder 18 or the like. On the other hand, the contractor 20 climbing the stepladder 18 or the like reads the scale on the scale band 3 at a predetermined position. As described above, the dimension measurement work in the eaves-arrangement construction includes two installers, an installer 19 holding the tip of the scale band 3 of the tape measure 2 and an installer 20 reading the scale of the scale band 3 of the tape measure 2. Therefore, it is eagerly desired to facilitate the work with the required number of installers.

ところで、巻尺の目盛帯の先端に吸盤を付設したり(たとえば特許文献1参照)、目盛帯の先端に永久磁石を付設したりして(たとえば特許文献2参照)、吸盤や永久磁石によって巻尺2の目盛帯3の先端を軒樋4などの被測定物に固定させて一人の施工者で寸法測定作業を行おうとするものはあった。   By the way, a suction cup is attached to the tip of the scale band of the tape measure (see, for example, Patent Document 1), or a permanent magnet is attached to the tip of the scale band (see, for example, Patent Document 2). In some cases, one builder tried to perform the dimension measurement work by fixing the tip of the graduation band 3 to the object to be measured such as the eaves 4.

しかしながら、被測定物としての軒樋4は、薄板状断面の樹脂成形品であるのが一般的であり、また丸型軒樋のように曲面状の壁面を有するものであるから、上記吸盤や永久磁石によっては巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させられない場合が多く、また仮に巻尺2の目盛帯3の先端を軒樋4の端部4aに固定できたとしても、目盛りの基準点(0点)を軒樋4の端部4aに一致させて固定できないことも多く、この場合、目盛りの値と実際の距離寸法とがずれていることから、寸法測定作業の作業性が煩雑になると共に測定ミス発生の原因となってしまうものであった。更に言うと、特許文献1や2の巻尺2は目盛帯3に吸盤や永久磁石を直接取り付けた構造のものであるから、既にユーザーが所有する通常の巻尺は利用できないといったもどかしさがある。
実開昭60−501号公報 実開平5−36302号公報
However, the eaves bowl 4 as an object to be measured is generally a resin molded product having a thin plate-like cross section, and has a curved wall surface like a round eave bowl. Depending on the permanent magnet, the tip of the scale band 3 of the tape measure 2 is often not fixed to the end 4a of the eaves rod 4, and the tip of the scale band 3 of the tape measure 2 can be temporarily fixed to the end 4a of the eave rod 4. In many cases, however, the reference point (0 point) of the scale cannot be fixed so as to coincide with the end 4a of the eaves 4 and in this case, the scale value and the actual distance dimension are misaligned. The workability of the measurement work becomes complicated and causes measurement errors. Furthermore, since the tape measure 2 of Patent Documents 1 and 2 has a structure in which a suction cup and a permanent magnet are directly attached to the graduation band 3, a normal tape measure already owned by the user cannot be used.
Japanese Utility Model Publication No. 60-501 Japanese Utility Model Publication No. 5-36302

本発明は上記の従来の問題点に鑑みて発明したものであって、既にユーザーが所有する既存の巻尺を利用でき、この巻尺の目盛帯の先端を軒樋の端部に目盛りの基準点を合わせた状態で簡単に固定できて、一人での軒樋配設施工における寸法測定作業を可能にするのは勿論、その寸法測定作業の作業性も良好にし得る寸法測定治具を提供することを課題とするものである。   The present invention has been invented in view of the above-described conventional problems, and an existing tape measure already owned by a user can be used, and the reference point of the scale is set at the end of the eaves with the tip of the scale band of this tape measure. To provide a dimension measuring jig that can be easily fixed in a combined state and can perform the dimension measuring work in the eaves-laying construction work alone, and can also improve the workability of the dimension measuring work. It is to be an issue.

上記課題を解決するために本発明の請求項1に係る寸法測定治具は、巻尺2の目盛帯3の先端に着脱自在に取付けて軒樋4の端部4aに巻尺2の目盛帯3の先端を固定させる寸法測定治具1であって、巻尺2の目盛帯3を沿わせて配置させる治具本体5の先端に、巻尺2の目盛帯3の先端に垂設した引掛片6を引掛けるための縦片部7を略垂直に突設し、治具本体5の先端から治具本体5の先端方向に上横片部8を延設すると共に縦片部7の突出先端から治具本体5の先端方向に下横片部9を突設し、この上横片部8と下横片部9とで軒樋4の端部4aを縦片部7に向けて挿入させる挿入溝10を形成し、巻尺2の引掛片6を縦片部7に押圧させた状態で挿入溝10内に挿入させた軒樋4の端部4aを固定させるクランプ手段16を挿入溝10に設けたことを特徴とする。   In order to solve the above-mentioned problem, a dimension measuring jig according to claim 1 of the present invention is detachably attached to the tip of the scale band 3 of the tape measure 2 and the scale band 3 of the tape measure 2 is attached to the end 4a of the eaves rod 4. It is a dimension measuring jig 1 for fixing the tip, and a hook piece 6 suspended from the tip of the scale band 3 of the tape measure 2 is pulled on the tip of the jig body 5 which is arranged along the scale band 3 of the tape measure 2. The vertical piece 7 for hanging is projected substantially vertically, the upper horizontal piece 8 is extended from the tip of the jig body 5 toward the tip of the jig body 5, and the jig is projected from the protruding tip of the vertical piece 7. A lower horizontal piece portion 9 is projected in the direction of the distal end of the main body 5, and the insertion groove 10 for inserting the end 4 a of the eaves 4 toward the vertical piece portion 7 with the upper horizontal piece portion 8 and the lower horizontal piece portion 9. The clamping means 16 for fixing the end portion 4a of the eaves rod 4 inserted into the insertion groove 10 in a state where the hook piece 6 of the tape measure 2 is pressed against the vertical piece portion 7 is inserted into the insertion groove 1. Characterized by providing the.

これによると、巻尺2の目盛帯3の先端に着脱自在に取付けて軒樋4の端部4aに巻尺2の目盛帯3の先端を固定させる寸法測定治具1であるから、既にユーザーが所有する既存の巻尺2に寸法測定治具1を取付けてこの巻尺2の目盛帯3の先端を軒樋4の端部4aに固定でき、一人での軒樋配設施工における寸法測定作業を可能にするものであり、そして、目盛帯3の先端の引掛片6を縦片部7に引掛け係止させて治具本体5に巻尺2の目盛帯3を沿わせることで、寸法測定治具1に対して巻尺2の目盛帯3を所定の状態に簡単に配置させることができ、更に治具本体5に設けた挿入溝10内に挿入された軒樋4の端部4aは巻尺2の引掛片6を縦片部7に押圧させた状態でクランプ手段16にて寸法測定治具1に固定されるから、軒樋4の端部4aが巻尺2の引掛片6に当接して目盛帯3の基準点(0点)が軒樋4の端部4aに一致した状態で巻尺2の目盛帯3と軒樋4の端部4aとを寸法測定治具1に同時に取り付けることができ、つまり、目盛帯3の基準点(0点)を軒樋4の端部4aに簡単に一致させることができ、その状態で巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させることができるから、寸法測定作業の良好な作業性の確保も可能にするものである。   According to this, since it is the dimension measurement jig 1 which attaches to the front-end | tip of the scale band 3 of the tape measure 2 detachably, and fixes the front-end | tip of the scale band 3 of the tape measure 2 to the edge part 4a of the eaves rod 4, it has already owned by a user. The dimension measuring jig 1 can be attached to the existing tape measure 2 and the tip of the scale band 3 of the tape measure 2 can be fixed to the end 4a of the eave rod 4 so that the dimension measurement work can be carried out in the eave rod arrangement work alone. The hook 6 on the tip of the scale band 3 is hooked and locked to the vertical piece 7 and the scale band 3 of the tape measure 2 is placed along the jig main body 5 so that the dimension measuring jig 1 On the other hand, the scale band 3 of the tape measure 2 can be easily arranged in a predetermined state, and the end 4 a of the eaves rod 4 inserted into the insertion groove 10 provided in the jig body 5 is hooked to the tape measure 2. Since the piece 6 is pressed against the vertical piece 7 and is fixed to the dimension measuring jig 1 by the clamping means 16, the eaves 4 The ends of the scale band 3 and the eaves 4 of the tape measure 2 with the end 4a in contact with the hook 6 of the tape measure 2 and the reference point (0 point) of the scale 3 matching the end 4a of the eaves 4 4a can be attached to the dimension measuring jig 1 at the same time, that is, the reference point (0 point) of the scale band 3 can be easily aligned with the end 4a of the eaves 4 and Since the tip of the scale band 3 can be fixed to the end portion 4a of the eaves rod 4, it is possible to ensure good workability of the dimension measurement work.

また、請求項2に係る寸法測定治具は、請求項1において、目盛帯3の両幅方向から目盛帯3を挟み込む爪部11を、少なくとも目盛帯3の幅寸法よりも広い間隔をあけて目盛帯3の長さ方向に互い違いにして治具本体5に形成したことを特徴とする。   The dimension measuring jig according to claim 2 is the same as that of claim 1, except that the claw portion 11 sandwiching the scale band 3 from both width directions of the scale band 3 is spaced at least wider than the width dimension of the scale band 3. It is characterized by being formed in the jig body 5 in a staggered manner in the length direction of the scale band 3.

これによると、治具本体5に沿わせて配置した目盛帯3は治具本体5に形成した爪部11によってその両幅方向から挟み込まれるので、目盛帯3を治具本体5に爪部11によって保持させる仮保持状態が得られると共に目盛帯3の寸法測定治具1への取付強度を向上させることができ、また、この爪部11は少なくとも目盛帯3の幅寸法よりも広い間隔をあけて目盛帯3の長さ方向に互い違いに配設されているので、まず、爪部11を直線状に結んだ方向に対して略直交する方向に目盛帯3の長手方向を合わせるようにして爪部11の間に目盛帯3を配置し、次いで、巻尺2の引掛片6を縦片部7に係止させるように目盛帯3を水平回動させることで、確実に爪部11によって目盛帯3をその幅方向から挟み込ませることができ、つまり簡単な作業で爪部11によって目盛帯3を治具本体5に取付けることができるのであって、寸法測定作業の作業性を向上できるのである。   According to this, since the scale band 3 arranged along the jig body 5 is sandwiched from both width directions by the claw portions 11 formed on the jig body 5, the scale band 3 is clamped to the jig body 5. The temporary holding state to be held can be obtained, and the attachment strength of the scale band 3 to the dimension measuring jig 1 can be improved, and the claw portions 11 are spaced at least wider than the width dimension of the scale band 3. Since the scale bands 3 are alternately arranged in the length direction, first, the claws are adjusted so that the longitudinal direction of the scale band 3 is aligned with the direction substantially perpendicular to the direction in which the claw portions 11 are linearly tied. The scale band 3 is arranged between the parts 11, and then the scale band 3 is horizontally rotated so that the hook piece 6 of the tape measure 2 is locked to the vertical piece part 7. 3 can be sandwiched from the width direction. The scale band 3 by the claw portion 11 in the work there as it can be attached to the jig body 5, it can improve the workability of the dimension measurement operation.

本発明は、既にユーザーが所有する既存の巻尺に寸法測定治具を取付けてこの巻尺の目盛帯の先端を軒樋の端部に固定できると共に一人での軒樋配設施工における寸法測定作業を可能にするといった効果を有しており、また、寸法測定治具に対して巻尺の目盛帯を所定の状態に簡単に配置させることができるといった効果を有しており、更に、寸法測定治具を軒樋の端部に取付けたときには目盛帯の基準点(0点)が軒樋の端部に一致した状態とでき、つまり簡単に目盛帯の基準点(0点)が軒樋の端部に簡単に一致させることができて寸法測定作業の良好な作業性を確保できるといった効果を有している。   The present invention attaches a dimension measuring jig to an existing tape measure already owned by the user and can fix the tip of the scale band of the tape measure to the end of the eaves as well as the dimension measurement work in the eaves installation work alone. And has an effect that the scale band of the tape measure can be easily arranged in a predetermined state with respect to the dimension measuring jig, and further, the dimension measuring jig. Is attached to the edge of the eaves so that the reference point (0 point) of the graduation band coincides with the end of the eaves, that is, the reference point (0 point) of the graduation band is easily the end of the eaves Can be easily matched with each other, and good workability of the dimension measurement work can be secured.

本発明は、巻尺2の目盛帯3の先端に着脱自在に取付けて軒樋4の端部4aに巻尺2の目盛帯3の先端を固定させる寸法測定治具1である。つまり、既にユーザーが所有する既存の巻尺2に寸法測定治具1を取付けてこの巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させ、一人での軒樋配設施工における寸法測定作業を可能にさせる軒樋用の寸法測定治具1である。以下、その構成を詳述する。   The present invention is a dimension measuring jig 1 that is detachably attached to the tip of the scale band 3 of the tape measure 2 and that fixes the tip of the scale band 3 of the tape measure 2 to the end 4 a of the eaves 4. In other words, the dimension measuring jig 1 is attached to the existing tape measure 2 already owned by the user, and the tip of the scale band 3 of the tape measure 2 is fixed to the end portion 4a of the eaves rod 4, so that the eaves rod installation work alone This is a dimension measuring jig 1 for eaves that enables dimension measuring work. The configuration will be described in detail below.

本例の寸法測定治具1は、図2に示すように、平面視矩形状の水平板状の治具本体5を有しており、この治具本体5の先端から垂直下方に縦片部7が垂設され、この縦片部7の下端から先端方向に水平板状の下横片部9が延設され、また治具本体5の先端部位における治具本体5の両幅端部からは先端方向に水平板状の上横片部8がそれぞれ突設されている。ところで、上記先端方向(図2(a)中矢印a)は寸法測定治具1に取付ける軒樋4が位置する方向であり、この先端方向に対して反対方向(図2(a)矢印b)は基端方向と称するものとする。この基端方向は寸法測定治具1に取付ける巻尺2が位置する方向である。つまり、寸法測定治具1を介して巻尺2の目盛帯3の先端を軒樋4の端部4aに固定した状態では、巻尺2と軒樋4は寸法測定治具1を介して一直線状にある位置関係を有するようになる。また、便宜上、図2(b)の矢印cを上方向と、矢印dを下方向と称するものとする。   As shown in FIG. 2, the dimension measuring jig 1 of the present example has a horizontal plate-shaped jig main body 5 having a rectangular shape in plan view, and a vertical piece portion vertically downward from the tip of the jig main body 5. 7, a horizontal plate-like lower horizontal piece 9 extends from the lower end of the vertical piece 7 in the distal direction, and from both width ends of the jig body 5 at the distal end portion of the jig body 5. Each has a horizontal plate-like upper horizontal piece 8 projecting from the tip. By the way, the tip direction (arrow a in FIG. 2A) is the direction in which the eaves 4 attached to the dimension measuring jig 1 is located, and the direction opposite to the tip direction (arrow b in FIG. 2A). Is referred to as the proximal direction. This proximal direction is the direction in which the tape measure 2 attached to the dimension measuring jig 1 is located. That is, in a state where the tip of the scale band 3 of the tape measure 2 is fixed to the end portion 4 a of the eaves rod 4 via the dimension measuring jig 1, the tape measure 2 and the eaves rod 4 are aligned in a straight line via the dimension measuring jig 1. It has a certain positional relationship. For convenience, the arrow c in FIG. 2B is referred to as the upward direction, and the arrow d is referred to as the downward direction.

図2(b)のように、水平板状の上横片部8と下横片部9とは、縦片部7の上下高さ分の間隔をあけて上下位置に配置されており、この間隔には先端方向から基端方向に向けて薄板状の軒樋4の端部4aが挿入される。つまり、上横片部8と下横片部9とで軒樋4の端部4aを縦片部7に向けて挿入させる挿入溝10が形成されている。なお、この上横片部8と下横片部9とは厳密には上下方向には重ならない位置関係を有しており(図2(a)参照)、上記挿入溝10は先端方向のみならず上方にも開放された形状を有している。また、挿入溝10の溝外に位置する下横片部9の下面にはナット材12が溶接にて固着されている。ここで、ナット材12の雌ネジ孔12aは下横片部9の中央部分に穿孔した貫通孔9aに連通されている。なお、この連通する雌ネジ孔12a及び貫通孔9aは便宜上、取付孔13と称する。この取付孔13には図1のように下方から蝶ネジ14が上下に螺進自在に螺着される。この下横片部9の取付孔13に蝶ネジ14を螺進自在に付設させた構造は、蝶ネジ14の締め付けによって挿入溝10に挿入した軒樋4の端部4aを上横片部8に圧接させて固定可能にするものであって、クランプ手段16を構成している。   As shown in FIG. 2 (b), the horizontal plate-like upper horizontal piece 8 and lower horizontal piece 9 are arranged at vertical positions with an interval corresponding to the vertical height of the vertical piece 7, The end portion 4a of the eaves-like eaves 4 having a thin plate shape is inserted into the interval from the distal direction toward the proximal direction. In other words, the upper horizontal piece 8 and the lower horizontal piece 9 form an insertion groove 10 for inserting the end 4 a of the eaves 4 toward the vertical piece 7. Strictly speaking, the upper horizontal piece 8 and the lower horizontal piece 9 have a positional relationship that does not overlap in the vertical direction (see FIG. 2A). Moreover, it has a shape opened upward. A nut material 12 is fixed to the lower surface of the lower horizontal piece portion 9 located outside the insertion groove 10 by welding. Here, the female screw hole 12 a of the nut member 12 is communicated with a through hole 9 a drilled in the central portion of the lower horizontal piece portion 9. The female screw hole 12a and the through hole 9a that communicate with each other are referred to as a mounting hole 13 for convenience. As shown in FIG. 1, a thumbscrew 14 is screwed into the mounting hole 13 from below so as to be able to be screwed up and down. In the structure in which the thumbscrew 14 is attached to the attachment hole 13 of the lower horizontal piece portion 9 so as to be able to be screwed, the end portion 4a of the eaves rod 4 inserted into the insertion groove 10 by tightening the thumbscrew 14 is connected to the upper horizontal piece portion 8. The clamp means 16 is configured so that the clamp means 16 can be fixed.

また、治具本体5の上面における両幅端部にはそれぞれL字片状の爪部11が突設されている。この一対の爪部11は水平板状の治具本体5の上面に巻尺2の目盛帯3を沿わせて配置させたときに巻尺2の目盛帯3をその両幅方向から挟み込むものである。各々の爪部11は治具本体5から垂直上方に突出した基部11aの突出先端で水平且つ幅方向の中央に向けて先端部11bを突設して形成されており、隙間を介して平行に対向する先端部11bと治具本体5とで目盛帯3を上下に挟持できるようにしている。そして、この一対の爪部11は、少なくとも目盛帯3の幅寸法よりも広い間隔をあけて、目盛帯3の長さ方向に互い違いにして治具本体5の両幅端部の位置に配設されている。   In addition, L-shaped claw portions 11 project from both width end portions on the upper surface of the jig body 5. The pair of claw portions 11 sandwich the scale band 3 of the tape measure 2 from both width directions when the scale band 3 of the tape measure 2 is disposed along the upper surface of the horizontal plate-shaped jig body 5. Each claw portion 11 is formed by projecting a distal end portion 11b toward the center in the horizontal and width direction at the projecting distal end of the base portion 11a projecting vertically upward from the jig body 5, and in parallel through a gap. The scale band 3 can be clamped up and down by the front-end | tip part 11b and the jig | tool main body 5 which oppose. And this pair of nail | claw part 11 is arrange | positioned in the position of the both width | variety edge part of the jig | tool main body 5 at intervals larger than the width dimension of the scale band 3, and staggered in the length direction of the scale band 3. FIG. Has been.

ところで、上記構成の本例の寸法測定治具1は、一枚の金属材料板(たとえばSUS板材)を板金加工し、これにナット材12を溶着することで形成されている。詳しくは、まず、一枚の金属材料板を切欠15の切り込みや貫通孔9aの穿孔を伴って所定形状に施し、次に、爪部11や縦片部7及び下横片部9などを折り曲げ形成し、最後に、下横片部9にナット材12を溶着させて形成されるのである。このように本例の寸法測定治具1は、一枚の金属材料板にて形成される良好な製造性を備えているものである。   By the way, the dimension measuring jig 1 of this example having the above configuration is formed by sheet metal processing a single metal material plate (for example, SUS plate material) and welding a nut material 12 thereto. Specifically, first, a single metal material plate is formed into a predetermined shape with the notch 15 being cut and the through hole 9a being drilled, and then the claw portion 11, the vertical piece 7 and the lower horizontal piece 9 are bent. Finally, the nut material 12 is welded to the lower horizontal piece 9 and formed. As described above, the dimension measuring jig 1 of the present example has good manufacturability formed by a single metal material plate.

上記構成の寸法測定治具1は、巻尺2の目盛帯3の先端に着脱自在に取付け、巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させるように軒樋4の端部4aに取り付けて使用される。以下、その使用につき詳述する。   The dimension measuring jig 1 having the above configuration is detachably attached to the tip of the scale band 3 of the tape measure 2, and the end of the eaves rod 4 is fixed to the end 4a of the eave rod 4 so that the tip of the scale band 3 of the tape measure 2 is fixed. Used by attaching to the part 4a. Hereinafter, the use will be described in detail.

寸法測定治具1に巻尺2の目盛帯3の先端を取付けるにはまず仮取付が行われる。この仮取付は治具本体5の上面に沿わせて配置した巻尺2の目盛帯3を爪部11によって保持させた状態である。この巻尺2の目盛帯3の寸法測定治具1への仮取付のプロセスは、まず図3(a)のように、一方の爪部11に目盛帯3を引掛けるように、爪部11を直線状に結んだ方向に対して略直交する方向に目盛帯3の長手方向を合わせるようにして、爪部11の間に目盛帯3を治具本体5の基端方向から挿入して配置する。ここで、上述したように1対の爪部11は少なくとも目盛帯3の幅寸法よりも広い間隔をあけて配設されているので、一対の爪部11の間への目盛帯3の挿入は確実に行い得るようにされている。次に図3(b)→図3(c)のように、目盛帯3を水平回動させて目盛帯3を他方の爪部11に引掛ける(矢印A)。ここで、図3(c)の状態では、目盛帯3はその長手方向を治具本体5の先端―基端方向に合致させて一対の爪部11にてその幅方向の両側から挟持されているのであるが、目盛帯3の先端に下方に垂設した引掛片6は治具本体5の遥か先端方向の位置にある。そして、最後に図3(c)→図3(d)のように、目盛帯3を治具本体5の基端方向に引っ張り(矢印B)、目盛帯3の先端の引掛片6を縦片部7に係止させるのである。このように、この寸法測定治具1は、簡単な手順、つまり良好な作業性で、目盛帯3の引掛片6を縦片部7に係止させた所定状態で巻尺2の目盛帯3の先端に仮取付させることが可能にされているのである。なお、巻尺2の目盛帯3の先端への寸法測定治具1の仮取付け状態では、爪部11によって目盛帯3が上下左右にずれないように治具本体5に支持されているので、たとえ寸法測定治具1の上面を下方に向けても目盛帯3と治具本体5とが外れないようにされている。   In order to attach the tip of the scale band 3 of the tape measure 2 to the dimension measuring jig 1, first, temporary attachment is performed. This temporary attachment is a state in which the scale band 3 of the tape measure 2 arranged along the upper surface of the jig body 5 is held by the claw portion 11. The process of temporarily attaching the scale band 3 of the tape measure 2 to the dimension measuring jig 1 is as follows. First, as shown in FIG. The scale band 3 is inserted between the claw portions 11 from the base end direction of the jig body 5 so as to be aligned with the longitudinal direction of the scale band 3 in a direction substantially orthogonal to the linearly tied direction. . Here, as described above, since the pair of claw portions 11 are arranged at an interval wider than at least the width of the scale band 3, the insertion of the scale band 3 between the pair of claw portions 11 is performed. It is made sure that it can be done. Next, as shown in FIG. 3 (b) → FIG. 3 (c), the scale band 3 is horizontally rotated to hook the scale band 3 on the other claw portion 11 (arrow A). Here, in the state of FIG. 3C, the scale band 3 is sandwiched from both sides in the width direction by the pair of claw portions 11 with the longitudinal direction thereof matched with the distal end-base end direction of the jig body 5. However, the hook piece 6 suspended downward from the tip of the scale band 3 is at a position far from the tip of the jig body 5. Finally, as shown in FIG. 3 (c) → FIG. 3 (d), the scale band 3 is pulled toward the proximal end of the jig body 5 (arrow B), and the hook piece 6 at the tip of the scale band 3 is a vertical piece. It is locked to the part 7. In this way, the dimension measuring jig 1 has a simple procedure, that is, good workability, and the scale strip 3 of the tape measure 2 in the predetermined state in which the hook piece 6 of the scale strip 3 is locked to the vertical piece 7. It can be temporarily attached to the tip. In addition, in the temporary attachment state of the dimension measuring jig 1 to the tip of the scale band 3 of the tape measure 2, since the scale band 3 is supported by the jig body 5 so as not to be shifted vertically and horizontally by the claw portion 11, Even if the upper surface of the dimension measuring jig 1 is directed downward, the scale band 3 and the jig main body 5 are prevented from being detached.

上記仮取付の後には本取付が行われて、寸法測定治具1への巻尺2の目盛帯3の取付けが為されるが、この寸法測定治具1への巻尺2の目盛帯3の本取付は寸法測定治具1を軒樋4の端部4aに取付けたとき同時に行われる。軒樋4の端部4aに寸法測定治具1を取り付けるには、寸法測定治具1の挿入溝10に軒樋4の端部4aを挿入させてクランプ手段16にて軒樋4の端部4aを挿入溝10に固定させることで行われるのであるが、上記のように目盛帯3を仮取付した寸法測定治具1にあっては目盛帯3の引掛片6が寸法測定治具1の縦片部7に沿って位置し、つまり挿入溝10の最奥部に引掛片6が位置しているから、図1,4のように、寸法測定治具1の挿入溝10に挿入した軒樋4の端部4aは目盛帯3の引掛片6を縦片部7に押し当てるのであって、この状態でクランプ手段16によって軒樋4の端部4aを挿入溝10に固定させると、目盛帯3の引掛片6が縦片部7と軒樋4の端部4aとで挟持、固定されるのである。このように、寸法測定治具1への目盛帯3の本取付は、軒樋4の端部4aへの寸法測定治具1の取付けと同時に行われるので、簡単な手順、つまり良好な作業性で行わせることが可能にされているのである。   After the temporary attachment, the main attachment is performed and the scale band 3 of the tape measure 2 is attached to the dimension measuring jig 1. The scale band 3 of the tape measure 2 is attached to the dimension measuring jig 1. The attachment is performed at the same time when the dimension measuring jig 1 is attached to the end 4 a of the eaves 4. To attach the dimension measuring jig 1 to the end 4 a of the eaves 4, the end 4 a of the eaves 4 is inserted into the insertion groove 10 of the dimension measuring jig 1 and the end of the eaves 4 is clamped by the clamping means 16. 4a is fixed to the insertion groove 10, but in the dimension measuring jig 1 to which the scale band 3 is temporarily attached as described above, the hooking piece 6 of the scale band 3 is provided on the dimension measuring jig 1. Since the hook piece 6 is located along the vertical piece 7, that is, at the innermost part of the insertion groove 10, the eaves inserted into the insertion groove 10 of the dimension measuring jig 1 as shown in FIGS. The end 4a of the ridge 4 presses the hook piece 6 of the scale band 3 against the vertical piece 7, and in this state, when the end 4a of the eave ridge 4 is fixed to the insertion groove 10 by the clamp means 16, the scale The hook piece 6 of the belt 3 is sandwiched and fixed between the vertical piece 7 and the end 4a of the eaves 4. As described above, the main attachment of the scale band 3 to the dimension measuring jig 1 is performed simultaneously with the attachment of the dimension measuring jig 1 to the end 4a of the eaves rod 4, so that a simple procedure, that is, good workability. It is possible to make it happen.

上述のようにして寸法測定治具1を介して巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させた状態を図1,4に示す。まず、本例の寸法測定治具1は爪部11によって巻尺2の目盛帯3を着脱自在に取付け、この巻尺2の目盛帯3が取付けられた寸法測定治具1を軒樋4の端部4aに取付けることで、巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させているので、既にユーザーが所有する既存の巻尺2を用いて寸法測定治具1を用いた軒樋配設施工における寸法測定作業を行わせることができるのものである。また、この軒樋配設施工における寸法測定作業は、上述のように巻尺2の目盛帯3の先端を寸法測定治具1を介して軒樋4の端部4aに固定させた状態で行わせることができるので、巻尺2の目盛帯3の先端を軒樋4の端部4aに固定させる施工者19(図5参照)は必要なくなり、目盛りを読む一人の施工者20によって行わせることが可能にされている。また、この巻尺2の目盛帯3の先端を軒樋4の端部4aに取付けた状態では、軒樋4の端部4aが目盛帯3の引掛片6を寸法測定治具1の縦片部7に押し付けた状態となっており、つまり目盛帯3の引掛片6にある目盛りの基準点(0点)を軒樋4の端部4aに一致させた状態とされているので、軒樋配設施工における寸法測定作業は目盛りの値と実際の距離寸法とが一致した状態で行え、寸法測定作業の良好な作業性が確保されているのである。更に言うと、この目盛りの基準点(0点)を軒樋4の端部4aに一致させる作業は、上述したように軒樋1の端部4aへの寸法測定治具1の取付け作業時に必然的になされるのであり、つまり基準点(0点)の軒樋4の端部4aへの位置決め作業は別途必要とされることはないため、良好な作業性で寸法測定作業が行えるようになっているのである。なお、図1では寸法測定治具1は軒樋4の縦壁状部位に取付けた状態を示しているが、寸法測定治具1と目盛帯3との仮取付状態では寸法測定治具1がいかなる姿勢にあっても巻尺2の目盛帯3と治具本体5との係合状態が爪部11によって維持されるので、寸法測定治具1の軒樋4への取付け姿勢及び取付け位置は任意の姿勢及び位置に設定できることは言うまでもない。   1 and 4 show a state in which the tip of the scale band 3 of the tape measure 2 is fixed to the end 4a of the eaves rod 4 through the dimension measuring jig 1 as described above. First, the dimension measuring jig 1 of this example is detachably attached to the scale band 3 of the tape measure 2 by the claw portion 11, and the dimension measuring jig 1 to which the scale band 3 of the tape measure 2 is attached is attached to the end of the eaves 4. Since the tip of the scale band 3 of the tape measure 2 is fixed to the end portion 4a of the eaves rod 4 by being attached to 4a, the eaves using the dimension measuring jig 1 using the existing tape measure 2 already owned by the user It is possible to perform the dimension measurement work in the installation work of the eaves. In addition, the dimension measurement work in the eaves rod arrangement construction is performed in a state where the tip of the scale band 3 of the tape measure 2 is fixed to the end portion 4a of the eaves rod 4 via the dimension measurement jig 1 as described above. Therefore, the installer 19 (see FIG. 5) for fixing the tip of the scale 3 of the tape measure 2 to the end 4a of the eaves rod 4 is not necessary, and can be performed by one installer 20 who reads the scale. Has been. In addition, when the tip of the scale band 3 of the tape measure 2 is attached to the end 4 a of the eaves 4, the end 4 a of the eaves 4 is connected to the hook 6 of the scale 3 and the vertical piece of the dimension measuring jig 1. 7, that is, the reference point (0 point) of the scale on the hooking piece 6 of the scale band 3 is aligned with the end 4 a of the eaves 4. The dimension measurement work in the construction can be performed in a state where the scale value and the actual distance dimension coincide with each other, and good workability of the dimension measurement work is ensured. Furthermore, the operation of matching the reference point (0 point) of the scale with the end 4a of the eaves rod 4 is inevitably performed when the dimension measuring jig 1 is attached to the end 4a of the eaves rod 1 as described above. In other words, the positioning work of the reference point (0 point) to the end portion 4a of the eaves rod 4 is not required separately, so that the dimension measuring work can be performed with good workability. -ing 1 shows a state in which the dimension measuring jig 1 is attached to the vertical wall portion of the eaves rod 4, but in the temporarily attached state of the dimension measuring jig 1 and the scale band 3, the dimension measuring jig 1 is Since the engagement state between the scale band 3 of the tape measure 2 and the jig body 5 is maintained by the claw portion 11 in any posture, the attachment posture and the attachment position of the dimension measuring jig 1 to the eave rod 4 are arbitrary. Needless to say, the posture and position can be set.

本発明の実施の形態の例の寸法測定治具の使用状態を示す斜視図である。It is a perspective view which shows the use condition of the dimension measurement jig | tool of the example of embodiment of this invention. 同上の寸法測定治具であり、(a)は正面図であり、(b)は下面図であり、(c)は側面図である。It is a dimension measuring jig same as the above, (a) is a front view, (b) is a bottom view, (c) is a side view. (a)〜(d)は同上の寸法測定治具に巻尺の目盛帯を仮取付させるプロセスを順に説明する説明図である。(A)-(d) is explanatory drawing explaining the process of temporarily attaching the scale band of a tape measure to the dimension measuring jig same as the above in order. 同上の寸法測定治具を介して巻尺の目盛り帯を軒樋の端部に取付けた状態の縦断面図である。It is a longitudinal cross-sectional view of the state which attached the scale band of the tape measure to the edge part of the eaves via the dimension measuring jig same as the above. 従来の軒樋配設施工における寸法測定作業の例を示す斜視図である。It is a perspective view which shows the example of the dimension measurement operation | work in the conventional eaves arrangement | positioning construction.

符号の説明Explanation of symbols

1 寸法測定治具
2 巻尺
3 目盛帯
4 軒樋
4a 端部
5 治具本体
6 引掛片
7 縦片部
8 上横片部
9 下横片部
10 挿入溝
11 爪部
16 クランプ手段
DESCRIPTION OF SYMBOLS 1 Dimension measuring jig 2 Tape measure 3 Scale band 4 Eaves 4a End part 5 Jig body 6 Hook piece 7 Vertical piece part 8 Upper horizontal piece part 9 Lower horizontal piece part 10 Insertion groove 11 Claw part 16 Clamp means

Claims (2)

巻尺の目盛帯の先端に着脱自在に取付けて軒樋の端部に巻尺の目盛帯の先端を固定させる寸法測定治具であって、巻尺の目盛帯を沿わせて配置させる治具本体の先端に、巻尺の目盛帯の先端に垂設した引掛片を引掛けるための縦片部を略垂直に突設し、治具本体の先端から治具本体の先端方向に上横片部を延設すると共に縦片部の突出先端から治具本体の先端方向に下横片部を突設し、この上横片部と下横片部とで軒樋の端部を縦片部に向けて挿入させる挿入溝を形成し、巻尺の引掛片を縦片部に押圧させた状態で挿入溝内に挿入させた軒樋の端部を固定させるクランプ手段を挿入溝に設けたことを特徴とする寸法測定治具。   A dimension measuring jig that is detachably attached to the tip of the tape measure scale band and fixes the tip of the tape measure scale band to the end of the eaves bowl, and the tip of the jig body that is arranged along the tape measure scale band In addition, a vertical piece for hooking a hanging piece suspended from the tip of the tape measure scale band is projected substantially vertically, and the upper horizontal piece extends from the tip of the jig body to the tip of the jig body. At the same time, a lower horizontal piece is projected from the protruding tip of the vertical piece to the tip of the jig body, and the upper horizontal piece and the lower horizontal piece are inserted with the end of the eaves facing the vertical piece. The insertion groove is formed, and the insertion groove is provided with clamping means for fixing the end portion of the eaves rod inserted into the insertion groove with the hook piece of the tape measure pressed against the vertical piece. Measurement jig. 目盛帯の両幅方向から目盛帯を挟み込む爪部を、少なくとも目盛帯の幅寸法よりも広い間隔をあけて目盛帯の長さ方向に互い違いにして治具本体に形成したことを特徴とする請求項1記載の寸法測定治具。   The claws that sandwich the graduation band from both width directions of the graduation band are formed in the jig body by staggering in the length direction of the graduation band at least at intervals larger than the width of the graduation band. Item 2. A dimension measuring jig according to Item 1.
JP2004018950A 2004-01-27 2004-01-27 Dimension measurement jig Expired - Fee Related JP4085984B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004018950A JP4085984B2 (en) 2004-01-27 2004-01-27 Dimension measurement jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004018950A JP4085984B2 (en) 2004-01-27 2004-01-27 Dimension measurement jig

Publications (2)

Publication Number Publication Date
JP2005213772A true JP2005213772A (en) 2005-08-11
JP4085984B2 JP4085984B2 (en) 2008-05-14

Family

ID=34903306

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004018950A Expired - Fee Related JP4085984B2 (en) 2004-01-27 2004-01-27 Dimension measurement jig

Country Status (1)

Country Link
JP (1) JP4085984B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103486923A (en) * 2013-10-14 2014-01-01 无锡艾科瑞思产品设计与研究有限公司 Multifunctional flexible rule

Also Published As

Publication number Publication date
JP4085984B2 (en) 2008-05-14

Similar Documents

Publication Publication Date Title
CA2084559C (en) Pipe hanging clamp adapted for soldering
US20120311880A1 (en) Measuring device system
US5848481A (en) Combination square and tape measure for use with a tool belt
US20160068118A1 (en) U-based fastener with improved rib attachment
US8001668B2 (en) Connector installation tool
US7478485B1 (en) Obtuse angle range adjustable square and method
US6434853B2 (en) Lap siding hanger
JP4085984B2 (en) Dimension measurement jig
US20090094924A1 (en) Sectioning scheme applied to two or four foot cross tee members associated with a ceiling grid system and for resizing both the cross tee and associated ceiling tile for installation at a border cut location between a main tee and parallel extending wall angle
US6622395B1 (en) Measuring device for pipefitters
JP3912359B2 (en) Dimension measurement jig
WO2007087530A2 (en) Universal installation template and method of use for placement of in-wall or in-ceiling speakers
US10794061B2 (en) Roofing alignment assembly
JP4596561B2 (en) Mounting brackets for fixtures such as pipes and cables
JP3963166B2 (en) Tape measure with fixture
US6804891B1 (en) Door and drawer pull jig
JP3912360B2 (en) Tape measure with fixture
JP4541927B2 (en) Positioning member and headboard mounting method
AU2007200805A1 (en) Cable clip
JP2006064477A (en) Tool for tape measure
US11618153B1 (en) Panel marking device
ATE471072T1 (en) DEVICE FOR FIXING WIRES, PARTICULARLY IN VINEYARDING
JP3114342U (en) Snow stopper mounting bracket
JP2005321254A (en) Harness length measuring implement and length measuring method using the same
JP3694214B2 (en) Expansion joint mounting structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060126

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080211

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140228

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees