JP2005147774A - Periodic inspection managing method in nuclear power plant and its device - Google Patents

Periodic inspection managing method in nuclear power plant and its device Download PDF

Info

Publication number
JP2005147774A
JP2005147774A JP2003383269A JP2003383269A JP2005147774A JP 2005147774 A JP2005147774 A JP 2005147774A JP 2003383269 A JP2003383269 A JP 2003383269A JP 2003383269 A JP2003383269 A JP 2003383269A JP 2005147774 A JP2005147774 A JP 2005147774A
Authority
JP
Japan
Prior art keywords
inspection
periodic inspection
personal computer
camera
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003383269A
Other languages
Japanese (ja)
Other versions
JP4861600B2 (en
Inventor
Toshihisa Shirakawa
白川利久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003383269A priority Critical patent/JP4861600B2/en
Publication of JP2005147774A publication Critical patent/JP2005147774A/en
Application granted granted Critical
Publication of JP4861600B2 publication Critical patent/JP4861600B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Abstract

<P>PROBLEM TO BE SOLVED: To enhance the rate of operation and to prevent an increase in power generation cost by shortening a nuclear reactor shutdown period. <P>SOLUTION: A periodic inspection apparatus 8, an S personal computer 114, an Si personal computer 115, and an Sij personal computer 116, are LAN-connected to a new-type periodic inspection control computer 111 to control the progress of periodic inspection processing by means of electronic signature checking; evidences are preserved by LAN-connected monitoring cameras; and material balances are controlled by a carry-in-and-out controller 140; thereby shortening examination time and consultation time on whether an examination is passed or not. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、原子力発電所における定期検査支援に関わる。 The present invention relates to periodic inspection support in a nuclear power plant.

図1は、従来の定期検査に関わる概観図である。定期検査が必要な主たる箇所は原子炉建屋(2)内の制御棒等制御機械(6)と測定器(7)と核燃料を内包する原子炉圧力容器(4)である。両端矢印は信号の行き交う様を示す。
原子炉等の運転中を制御するのは隣接する中央制御室(1)で実施する。中央制御室(1)にはプラント総合制御装置(3)があり、盤の上には各種操作ボタンがある。プラント総合制御装置(3)は原子炉建屋(1)内の制御棒等制御機械(6)に信号を送ったり、測定器(7)からの信号を受けて原子炉運転状況を監視したりする。
定期検査時には、原子炉建屋内に扉(9)から各種定期検査器(8)を持ち込む。
定期検査の進み具合等の工程管理は、原子炉発電所敷地内の建物に配置せる定期検査管理計算機(11)により実施する。定期検査管理計算機(11)には多数のLANパソコン(12)がLAN接続されている。
従来の沸騰水型原子炉の定期検査工程を図2に示す(非特許文献1)。
定期検査は、監督機関が認めた審査機関の立会い審査による審査を受けて合否の判定が下される。詳細には図3に示すように、定期検査内容記載表の一例(非特許文献2)のように示される。燃料棒の毛筋程の貫通口漏洩を調べるシッピング検査、安全弁等の分解点検手入れと作動試験、ディーゼル機関外観検査等多岐に亘る。定期検査管理計算機(11)は、定期検査の進捗状況を確認するのに利用される。
(財)火力原子力発電技術協会「原子力発電所の定期点検の手引き」17頁. 電力新報社、原子力発電課編「原子力発電便覧‘76」360頁
FIG. 1 is an overview diagram related to a conventional periodic inspection. The main points that require periodic inspection are the control rod (6) in the reactor building (2), the measuring device (7), and the reactor pressure vessel (4) containing the nuclear fuel. The double-ended arrows indicate how the signals go and go.
Control of the operation of the nuclear reactor or the like is performed in the adjacent central control room (1). The central control room (1) has a plant integrated control device (3), and there are various operation buttons on the panel. The plant integrated control device (3) sends a signal to a control machine (6) such as a control rod in the reactor building (1) or receives a signal from the measuring device (7) to monitor a reactor operation state. .
At the time of periodic inspection, various periodic inspection devices (8) are brought into the reactor building from the door (9).
Process management, such as the progress of periodic inspections, is carried out by a periodic inspection management computer (11) placed in a building on the reactor power plant site. A large number of LAN personal computers (12) are LAN-connected to the periodic inspection management computer (11).
A regular inspection process for a conventional boiling water reactor is shown in FIG. 2 (Non-Patent Document 1).
Periodic inspections are judged by the auditing body approved by the supervisory body, and then passed or rejected. In detail, as shown in FIG. 3, it is shown as an example (non-patent document 2) of the periodic inspection content description table. It covers a wide variety of areas, such as shipping inspections that check for leaks through the fuel rod hair, disassembly and maintenance of safety valves, operation tests, and diesel engine appearance inspections. The periodic inspection management computer (11) is used to confirm the progress of the periodic inspection.
Page 17 of “The Manual for Periodic Inspection of Nuclear Power Plants”, Japan Thermal Engineering Association. Electric Power Shinposha, Nuclear Power Generation Division "Nuclear Power Handbook '76", p. 360

最近、原子力発電所に関わる諸規制が変わり、新品状態での品質が経年劣化しても所要の機能や品質が保てるなら原子力発電所の運転ができるようになってきた。しかし、定期検査等により欠陥が検出されて工事修理をする場合は元より、検査自身にも厳密さが要求され関係各所に報告し、場合によっては申請し許可を得ることが厳格になってきた。勝手に工事や部品の変更や修理をやらない、やらせないといったことが大事になってきた。
第三者的審査組織の審査とは言っても審査者の主観が入る。原子力発電所所有者側の判断と違いが出てくる。双方の見方が相容れない場合は長期に発電が停止し続けることも考えられる。
審査者と原子力発電所所有者側の双方の主観をできるだけ排除し、意見の違いが生じた時は審査が通らなければ発電できない訳であるから当然審査者の意見を入れ、その後で
簡易裁判所が如き(例えば監督機関)に速やかに判断して貰えかつ双方が納得する判断材料を迅速に提供する必要がある。
Recently, various regulations relating to nuclear power plants have changed, and even if the quality under new conditions deteriorates over time, the nuclear power plants can be operated if the required functions and quality can be maintained. However, when defects are detected by periodic inspections, etc., repair work is required, the inspection itself is required to be rigorous and reported to relevant places, and in some cases it has become strict to apply and obtain permission. . It has become important not to perform construction or change or repair parts without permission.
Even if it is an examination by a third party examination organization, the subjectivity of the examiner is included. This is different from the judgment of the nuclear power plant owner. If both sides do not agree, it is possible that power generation will stop for a long time.
The subjectivity of both the examiner and the owner of the nuclear power plant is eliminated as much as possible, and if there is a difference in opinion, it is impossible to generate electricity unless the examination passes. It is necessary to promptly provide such judgment materials (such as supervisory bodies) that can be quickly judged and understood by both parties.

本発明での定期検査内容記載表は、一例として図4に示すように電気工作物はiとして通し番号を付し設備はjとして番号を付すことにより、電気工作物iの設備jの検査を検査(i,j)と表し管理しやすくした。図5に示す電気工作物の検査の進捗状況を示す期間線図は、電気工作物に関する前回定期検査工程図を参照して作成される。図6に示す電気工作物iに属する設備の検査の進捗状況を示す期間線図は、電気工作物iに属する設備に関する前回定期検査工程図を参照して作成される。
図7は本発明の定期検査支援装置に関わる概観図である。図中の太線は情報伝達のための無線や光ケーブル等の接続を示す。
本発明の装置は、本発明の新型定期検査制御計算機(111)にLAN接続せる、中央制御室(1)内での定期検査を監視するために搬入せるカメラ1(121)及び、原子炉建屋(2)内での定期検査時に搬入せる監視するためのカメラ2(131)と定期検査器(8)及び、定期検査時に設置せる搬入出制御装置(140)及び、金具電源キー付きLAN接続のSパソコン(114)及び、金具電源キー付きLAN接続のSiパソコン(115)及び、LAN接続のSijパソコン(116)からなる。外部に接続せるパソコンは、金具電源キー付き外部接続のSSパソコン(113)である。
カメラ1(121)は、中央制御室(1)のプラント総合制御装置(3)で行われる制御棒動作確認試験等を監視記録する。
搬入出制御装置(140)は、新型定期検査制御計算機(111)にLAN接続されている搬入出制御計算機(141)と搬入出監視のカメラ3(142)とゲート(143)とからなり、搬入出制御計算機(141)はゲート(143)とカメラ3(142)をLAN接続し定期検査関連物資に付帯されているICタグから記録を読みとり現品の重量や形状と比較してゲート(143)を自動的に開閉制御しその状況をカメラ3(142)で監視記録する。
定期検査時に原子炉建屋(2)に搬入する定期検査器(8)を新型定期検査制御計算機(111)にLAN接続することにより、新型定期検査制御計算機(111)は電気事業者と第三者的審査組織とが合意に達した内蔵せる審査基準と定期検査器(8)検査の測定値を比較し検査を制御し、この状況をカメラ2(131)で監視記録する。
新型定期検査制御計算機(111)に内蔵するソフトウエアとLAN接続せる上記機器設備により定期検査を制御する。特に、作業順序は処理を施した時刻または送受信した時刻から処理を制御する。規定の電子署名等をチェックして前処理が完結していないならば、後処理の実施は制限され警告が発せられる。
As shown in FIG. 4 as an example, the periodic inspection content description table in the present invention inspects the inspection of the equipment j of the electric work i by attaching the serial number as i for the electric work and the number as j for the equipment. (I, j), which makes it easier to manage. The period diagram showing the progress of the inspection of the electric workpiece shown in FIG. 5 is created with reference to the previous periodic inspection process diagram regarding the electric workpiece. The period diagram indicating the progress of the inspection of the equipment belonging to the electric workpiece i shown in FIG. 6 is created with reference to the previous periodic inspection process diagram regarding the equipment belonging to the electric workpiece i.
FIG. 7 is an overview diagram relating to the periodic inspection support apparatus of the present invention. Thick lines in the figure indicate connections such as wireless and optical cables for information transmission.
The apparatus of the present invention is connected to the new periodic inspection control computer (11 1) of the present invention via a LAN, the camera 1 (121) carried in to monitor the periodic inspection in the central control room (1), and the reactor building (2) Camera 2 (131) and periodic inspection device (8) for monitoring that can be carried in at the time of periodic inspection, and a loading / unloading control device (140) that is installed at the time of periodic inspection, and LAN connection with bracket power key It consists of an S personal computer (114), a LAN connected Si personal computer (115) with a metal power key, and a LAN connected Sij personal computer (116). The externally connected personal computer is an externally connected SS personal computer (113) with a metal power key.
The camera 1 (121) monitors and records a control rod operation confirmation test and the like performed in the plant integrated control device (3) in the central control room (1).
The carry-in / out control device (140) comprises a carry-in / out control computer (141) connected to the new periodic inspection control computer (11) via a LAN, a carry-in / out monitoring camera 3 (142), and a gate (143). The output control computer (141) connects the gate (143) and the camera 3 (142) via LAN, reads the records from the IC tag attached to the periodic inspection-related materials, and compares the weight and shape of the actual product with the gate (143). Open / close control is automatically performed, and the situation is monitored and recorded by the camera 3 (142).
By connecting the periodic inspection device (8), which is carried into the reactor building (2) during the periodic inspection, to the new periodic inspection control computer (11 1) via a LAN, the new periodic inspection control computer (11 1) can be connected to an electric power company and a third party. The inspection standard is controlled by comparing the built-in inspection standard that has been agreed with the general inspection organization and the measured value of the periodic inspection device (8) inspection, and this situation is monitored and recorded by the camera 2 (131).
The periodic inspection is controlled by the above equipment that is connected to the LAN with the software built in the new periodic inspection control computer (11). In particular, the work order is controlled from the time when processing is performed or the time when transmission / reception is performed. If the pre-processing is not completed by checking a prescribed electronic signature or the like, post-processing is restricted and a warning is issued.

電気事業者と第三者的審査組織とが合意に達した審査基準を計算機に託しているため、検査結果と審査結果には思惑といったような人間の個人的判断が入りにくい。
検査状況はカメラで監視記録されているため検査に誤魔化しが少なく、後日の証拠となる。
担当者は淡々と自己職務を遂行すればよく、悩むことがなくなり疲れることが減り間違いが減る。定期検査が早く確実に遂行され管理費用が軽減され発電コスト低減になる。
今回検査作業を実施するに当たり、前回定期検査の録画を見てイメージトレイニングすることができるようになり、作業ミスが減り作業効率が向上する。
審査する側も、審査に誤りや行き過ぎがあれば賠償等の損害を受けるため不用意に審査時間を費やしたり、合否に対して過度の要求が少なくなるため審査が迅速に進む。
審査機関経営者も審査員の過剰審査により損害を蒙る可能性を排除するために、審査機関経営者は審査員に対する瞬時人事権や瞬時最終審査権を持つであろうし、監督機関は審査機関経営者の瞬時任命権を持つことになろうから、審査される電気事業者へ安心感を与えることができる。
Since the electric company and the third-party examination organization have agreed to the computer the examination standards that have been agreed upon, it is difficult for human judgments such as speculation to enter the examination results and examination results.
Since the inspection status is monitored and recorded by the camera, the inspection is less likely to be falsified and becomes evidence later.
The person in charge only needs to perform his / her own duties, and he / she does not have to worry and is less tired and less mistakes. Periodic inspection is performed quickly and reliably, management costs are reduced, and power generation costs are reduced.
In carrying out the inspection work this time, it becomes possible to perform image training by looking at the recording of the previous periodic inspection, thereby reducing work mistakes and improving work efficiency.
Even if the screening side has an error or oversight, the screening time will be inadvertently spent due to damages such as compensation, and the screening will proceed quickly because there will be less demand for pass / fail.
In order to eliminate the possibility that the management of the auditing organization will suffer damage due to excessive auditing by the auditors, the management of the auditing organization will have the right to instantaneous personnel and the final final auditing right to the auditor, and the supervisory authority will manage the auditing organization. It will give a sense of security to the electric utility to be judged.

所内監督者SはSパソコン(114)とSSパソコン(113)を管理する。図5に示す電気工作物i毎に施錠と開錠するパスワードを所有する。所内監督者Sは新型定期検査制御計算機(111)、カメラ1(121)、カメラ2(131)と搬入出制御装置(140)の電源を管理する。所内監督者Sは電気工作物iの検査に施錠と開錠をするパスワードKiを管理することにより現場責任者Siを管理下に置くが、現場には原則として立ちいれない。外部の審査機関との接触は所内監督者Sのみとし、SSパソコン(113)から暗号電子メールにて接触する。
現場責任者Siは電気工作物iに属する設備の検査を管理する。図6に示す電気工作物iの設備j毎の検査の進捗状況を示す期間線図に沿って管理する。現場責任者SiはSiパソコン(115)を管理し、Sijパソコン(116)も使用できる。検査(i,j)に施錠と開錠をするパスワードを管理することにより担当者Sijを管理下に置く。電気工作物iが開錠していなければ、図5に示す電気工作物iの設備jの検査の進捗状況を示す期間線図を開くことはできない。定期検査工程に変更が生じた場合は図5、図6の工程期間線図を修正する権限を有する。
担当者Sijは、検査(i,j)を検査する。担当者SijはSijパソコン(116)を使用できる。Sijパソコン(116)は無線接続携帯端末として作業現場に持ち込むこともできる。
各人は電子署名を以って作業の指令または終わりとなす。受信者は5分以内に返信する。5分以内に返信が無い時は、送信者は自分自身と常在者(例えばカメラを常時モニターしている警備室)に携帯電話連絡する。更に無い時は送信者が受信者の権限を持ち各所に連絡することができる。
定期検査関係者は新型定期検査制御計算機(111)にIP接続せるカメラ付携帯電話を持つ義務があり圏外または電源切の場合は新型定期検査制御計算機(111)から警備室(200)に警報が発せられる。
審査機関と所内監督者Sと現場責任者Siと担当者Sijの独立を図る。
図8、図9、図10は新型定期検査制御計算機(111)に内蔵するソフトウエアによるフロー処理図である。図中、破線枠は社内監督者Sの行う処理を表し、長二点鎖線枠は電気工作物iに関わる現場責任者Siの行う処理を表し、実線枠は電気工作物iの設備jに関わる担当者Sijの行う処理を表している。
処理1(501)は、定期検査開始。
処理2(502)は、社内監督者Sが定期検査を開始するための処理である。
・社内監督者Sは、SSパソコン(113)、Sパソコン(114)に電源を金具キーから入れる。
・Sパソコン(114)から新型定期検査制御計算機(111)に電源起動信号を送付する。カメラ1(121)、カメラ2(131)、搬入出制御計算機(141)に起動信号を送付する。カメラ3(142)は自動的に起動する。
警備室(200)にモニター(210)の監視を指令する。
・Sパソコン(114)から社内監督者Sの電子署名により、新型定期検査制御計算機(111)に内蔵する電気工作物の前回の図5に示す定期検査工程図から電気工作物iをパスワードOKiで開錠する(工程期間線青)。パスワードをKiに変更しKiで再度開錠する。
上記作業を各電気工作物に実施する。
・全現場責任者へ一斉に作業開始指示を電子メール及び携帯電話に送信する。
処理3(503)は、現場責任者Siが社内監督者Sからの作業開始指示を電子メール及び
携帯電話で受信することにより、電気工作物iの定期検査を開始するための処理である。
・現場責任者Siは、Siパソコン(115)に電源を金具キーから入れる。
・Siパソコン(115)から現場責任者Siの電子署名により電気工作物iの定期検査を開始する。
・電気工作物iに属する設備の前回の図6に示す定期検査工程図から各設備jをパスワードOKijで開錠する(工程期間線青)。パスワードをKijに変更しKijで再度開錠する。
・工程期間線を青から黒に変換する。
・設備j毎の前回定期検査開始日をゼロとした工程期間黒線図の自動作成。
・設備j毎の今回定期検査開始日を今回日とした工程期間黒線図の自動作成。
・現場任者Si管理下の全担当者へ一斉に作業開始指示を電子メール及び携帯電話で送信する。
・(全現場責任者は本作業を実施する)
処理4(504)は、担当者Sijが現場責任者Siからの作業開始指示を電子メール及び携帯電話で受信することにより、電気工作物iの設備jの検査(i,j)検査を開始する。
・担当者Sijは、Sijパソコン(116)から電子署名により検査(i,j)の定期検査を開始する。
・検査中の工程期間黒線を赤線に変換する。
・現場写真デジタル撮影後、検査を開始する。
処理5(505)は、担当社Sijの検査が、
「異常無し」であれば処理6(506)に行く。
「異常無し」でなければ処理9(509)に行く。
処理6(506)は、検査が「異常無し」の場合の担当者Sijの処理である。
・担当者Sijは検査中の工程期間赤線を青点線に変換する。
・現場責任者Siに「異常無し」を電子署名後、電子メール及び携帯電話で送信する。
処理7(507)は、検査が「異常無し」の場合の現場責任者Siの処理である。
・現場責任者Siは「異常無し」を現場で確認し、Sijパソコン(116)から工程期間青点線を青実線に変換し、Kijで施錠する。
・現場責任者Siの管理下にある全設備に上記作業を実施する。
処理8(508)は、電気工作物iに関わる検査が全て「異常無し」の場合の現場責任者Siの処理である。
・現場責任者Siは工程期間線が全て青実線であることを確認したら、電気工作物iの「異常無し」を現場で確認し、各現場毎にSijパソコン(116)から検査前後のデジタル現場写真差異が規定値よりも小さいという比較結果と共に社内監督者Sに電気工作物iの検査完了を電子メールする。
・Siパソコン(115)の電源を金具キーで切る。
・処理24(524)に行く。

処理9(509)は、検査が「異常有り」の場合の担当者Sijの処理である。
・担当者Sijは所与の緊急処理をする。例えば失火があった場合大声で周囲に知らせると同時に初期消火に務め、周囲者と発見者は携帯電話火災報知ボタンで警備室(200)のモニター(210)監視者に知らせる。
・事態沈静後、現場責任者Siに「異常有り」を携帯電話または電子メール送信する。
・作業中の工程期間赤線を赤点線に変換する。
処理10(510)は、検査が「異常有り」の場合の現場責任者Siの処理である。
・現場責任者Siは、現場確認後Siパソコン(115)またはSijパソコン(116)で検査(i,j)をKijで施錠する。
・現場責任者Siは、発電所名や設置場所や出力等の予め定められている形式の異常報告メモ画面の表示をする。
・担当者Sijに「画面埋めよ」と携帯電話及び電子メールで知らせる。
処理11(511)は、担当者SijがSijパソコン(116)で異常報告メモ画面に設備や日時や検査状況等の必要項目を記載し電子署名後、現場責任者Siに携帯電話及び電子メールで知らせる。
処理12(512)は、現場責任者Siが異常報告メモ画面に記載ミスがないことを確認し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理13 (513)は、社内監督者SがSパソコン(114)で異常報告メモに署名後、CD-ROMを介してSSパソコン(113)から社外の審査機関にメモを電子送信する。
処理14(514)は、現場責任者Siが担当者Sijと製造メーカ等の関係者を呼び修理に関する検討をした議事録を新型定期検査制御計算機(111)に入力する。
処理15(515)は、処理14(514)での検討結果が、
「修理必要」であれば処理20(520)に行く。
「修理必要」でなければ処理16(516)に行く。
処理16(516)は、「修理必要」でない場合の現場責任者Siの処理である。現場責任者Siは異常報告メモの表題を「修理不要申請書(案)」と訂正し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理17(517)は、「修理必要」でない場合の社内監督者Sの処理である。
・社内監督者SはSパソコン(114)で「修理不要申請書(案)」に電子署名し「修理不要申請書」とする。
・CD-ROMを介してSSパソコン(113)から社外の審査機関に電子送信する。審査機関からの「修理不要受理」を受信する。
審査機関から「修理必要」を受信した場合は、現場責任者Siに審査機関と協議させる。「修理必要」となった場合は処理21(521)へ行く。
・Sパソコン(114)から「修理不要受理」を現場責任者Siに携帯電話及び電子メールで知らせ検査続行を指示する。
処理18(518)は、現場責任者Siが「修理不要受理」を担当者Sijに転送し、パスワードKijで検査(i,j)を開錠し検査続行を指示する。
処理19(519)は、担当者Sijが工程期間赤点線を赤線に変換し検査を続行する。
・処理4(504)へ行く。

処理20(520)は、処理15 (515) の「修理必要」な場合である。
処理21(521)は、「修理必要」な場合の現場責任者Siの処理である。現場責任者Siは異常報告メモの表題を「修理必要申請書(案)」と訂正し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理22(522)は、「修理必要」な場合の社内監督者Sの処理である。
・社内監督者SはSパソコン(114)で「修理申請書(案)」に電子署名し「修理申請書」とする。
・SSパソコン(113)から審査機関にCD-ROMから送信する。審査機関からの「修理申請書受理」を受信する。
・Sパソコン(114)から「修理申請書受理」を現場責任者Siに電子メールすると共に修理計画書作成指示。
・社内監督者Sは電子署名Sij、Si、Sのある「修理計画書」が入っているCD-ROMを審査機関に送付する。
・審査機関から「修理計画書受理」を受信後、現場責任者Siに「修理開始」を携帯電話及び電子メールで知らせる。
審査機関から「修理計画書要修正」を受信した場合は、現場責任者Siに審査機関と協議させる。修正した場合は改訂版を「修理計画書」とする。
処理23(523)は、現場責任者Siが「修理計画書受理」を担当者Sijに転送し、検査(i,j)をパスワードKijで開錠し「修理開始」を携帯電話及び電子メールで知らせる。
・修理完了後、処理4 (504) に戻る。

処理24(524)は、処理8 (508) の電気工作物iの検査が完了した場合の社内監督者Sの処理である。
・社内監督者Sは現場責任者Siからの完了受信後、検査前後現場写真比較差異小結果を確認し電子署名後、パスワードKiで電気工作物iの検査に施錠する。
・SSパソコン(113)から、電気工作物iの立会い審査を審査機関に申し込む。
・(電気工作物検査が全て完了し、全ての工程期間線が青線になるまで続ける)
処理25(525)は、審査機関による立会い審査である。
不合格なら社内監督者SがパスワードKiで開錠。処理3 (503) に戻る。
合格なら処理26 (526) に進む。
処理26(526)は、処理25 (525) の審査機関による立会い審査に合格した場合の社内監督者Sの処理である。
・社内監督者Sは全ての電気工作物の工程期間線が青線であることを確認し、定期検査器(8)、カメラ1(121)、カメラ2(131)の撤収を余計な物がないことの確認のための現場掃除機掛けをした写真で確認する。
・搬入出制御計算機(141)の物質収支確認後電子署名し、電源切信号を送信する。
カメラ3(142)の電源は自動的に切れる。
・SSパソコン(113)から定期検査終了を審査機関に電子メールを送信し、総合立会い審査を申し込む。
処理27(527)は、審査機関による総合立会い審査である。
電気工作物iが不合格ならKiで開錠し処理3 (503) に戻る。
合格なら処理28 (528) に進む。
処理28(528)社内監督者Sは審査機関から合格書を受理する。
・新型定期検査制御計算機(111)に電源切信号を送信する。
・SSパソコン(113)、Sパソコン(114)の電源を金具キーで切る。
定期検査終了。
The in-house supervisor S manages the S personal computer (114) and the SS personal computer (113). Each electric work i shown in FIG. 5 has a password for locking and unlocking. The in-house supervisor S manages the power sources of the new periodic inspection control computer (11 1), the camera 1 (121), the camera 2 (131), and the carry-in / out control device (140). The in-house supervisor S puts the site manager Si under control by managing the password Ki that locks and unlocks the inspection of the electrical work i, but as a general rule, it cannot stand on the site. Contact only with the in-house supervisor S, and contact with the external reviewing organization via the SS personal computer (113) by encrypted e-mail.
Site manager Si manages the inspection of equipment belonging to electrical work i. Management is performed in accordance with a period diagram showing the progress of inspection for each facility j of the electric workpiece i shown in FIG. The site manager Si manages the Si personal computer (115) and can also use the Sij personal computer (116). The person in charge Sij is put under control by managing a password for locking and unlocking in the inspection (i, j). If the electric workpiece i is not unlocked, the period diagram indicating the progress of the inspection of the equipment j of the electric workpiece i shown in FIG. 5 cannot be opened. If there is a change in the periodic inspection process, it has the authority to modify the process period diagrams in FIGS.
The person in charge Sij inspects the inspection (i, j). The person in charge Sij can use the Sij personal computer (116). The Sij personal computer (116) can be brought into the work site as a wireless connection portable terminal.
Each person will sign or end the work with an electronic signature. The recipient will reply within 5 minutes. If there is no reply within 5 minutes, the sender contacts the mobile phone to himself and a permanent person (for example, a security room that constantly monitors the camera). When there is no more, the sender has the authority of the receiver and can contact each place.
Persons in charge of periodic inspections are obligated to have a camera-equipped mobile phone that can be connected to the new periodic inspection control computer (11) by IP. Be emitted.
The inspector, in-house supervisor S, site manager Si and person in charge Sij will be made independent.
FIGS. 8, 9 and 10 are flowcharts of software processing built into the new periodic inspection control computer (11 1). In the figure, the broken line frame represents the process performed by the in-house supervisor S, the long two-dot chain line frame represents the process performed by the site manager Si related to the electric workpiece i, and the solid line frame represents the facility j of the electric workpiece i. This represents processing performed by the person in charge Sij.
Process 1 (501) starts periodic inspection.
Process 2 (502) is a process for the in-house supervisor S to start a periodic inspection.
-The in-house supervisor S turns on the power to the SS personal computer (113) and S personal computer (114) from the fitting key.
A power activation signal is sent from the S personal computer (114) to the new periodic inspection control computer (111). An activation signal is sent to the camera 1 (121), the camera 2 (131), and the carry-in / out control computer (141). The camera 3 (142) is automatically activated.
Command the security room (200) to monitor the monitor (210).
・ With the electronic signature of the internal supervisor S from the S personal computer (114), the password OKi for the electric work i from the previous periodic inspection process diagram shown in Fig. 5 of the electric work built in the new periodic inspection control computer (111) Unlock (process period line blue). Change the password to Ki and unlock again with Ki.
The above work is carried out on each electric workpiece.
・ Send work start instructions to all site managers simultaneously by e-mail and mobile phone.
Process 3 (503) is a process for the site manager Si to start a periodic inspection of the electric workpiece i by receiving a work start instruction from the in-house supervisor S by e-mail and a mobile phone.
・ The site manager Si turns on the power to the Si personal computer (115) from the bracket key.
・ Start periodic inspection of electrical work i from the Si personal computer (115) with the electronic signature of the site manager Si.
・ Each equipment j is unlocked with the password OKij from the periodic inspection process diagram shown in FIG. 6 of the previous equipment belonging to the electric workpiece i (process period line blue). Change the password to Kij and unlock again with Kij.
Convert the process period line from blue to black.
・ Automatic creation of a black line diagram of the process period with the previous periodic inspection start date for each equipment j as zero.
・ Automatic creation of a black line diagram of the process period with the current periodic inspection start date for each equipment j as the current date.
・ Sends the work start instruction to all the personnel under the supervision of the site manager Si by e-mail and mobile phone.
・ (All site managers carry out this work)
In process 4 (504), the person in charge Sij receives the work start instruction from the site manager Si by e-mail and a mobile phone, thereby starting the inspection (i, j) inspection of the equipment j of the electric workpiece i. .
The person in charge Sij starts periodic inspection (i, j) from the Sij personal computer (116) by electronic signature.
-Convert black line to red line during the process period under inspection.
・ Begin inspection after digital photography of on-site photographs.
Process 5 (505) is the inspection of the responsible company Sij,
If “no abnormality”, the process goes to process 6 (506).
If it is not “abnormal”, the process goes to process 9 (509).
Process 6 (506) is the process of the person in charge Sij when the inspection is “no abnormality”.
-The person in charge Sij converts the red line during the process period being inspected into a blue dotted line.
・ After the electronic signature of “no abnormality” to the site manager Si, send it by e-mail and mobile phone.
Process 7 (507) is a process of the site manager Si when the inspection is “no abnormality”.
-Site manager Si confirms "no abnormality" on site, converts the blue dotted line from the Sij personal computer (116) into a blue solid line, and locks it with Kij.
・ Perform the above operations on all facilities under the control of the site manager Si.
Process 8 (508) is a process of the site manager Si when all the inspections related to the electric workpiece i are “no abnormality”.
・ After confirming that all process period lines are blue solid lines, the site manager Si confirms that there is no abnormality in the electrical work i at the site, and from each Sij personal computer (116) to the digital site before and after the inspection. An e-mail is sent to the in-house supervisor S about the completion of the inspection of the electric workpiece i together with the comparison result that the difference in photograph is smaller than the prescribed value.
・ Turn off the Si personal computer (115) with the metal key.
Go to process 24 (524).

Process 9 (509) is the process of the person in charge Sij when the inspection is “abnormal”.
• The person in charge Sij performs the given emergency process. For example, if there is a misfire, it informs the surroundings loudly and at the same time serves for the initial fire extinguishing, and the surrounding person and the discoverer inform the monitor (210) monitor of the security room (200) with the mobile phone fire notification button.
・ After the situation has subsided, send “Abnormal” to the site manager Si by mobile phone or e-mail.
-Convert the red line during the working process into a red dotted line.
Process 10 (510) is a process of the site manager Si when the inspection is “abnormal”.
The site manager Si locks the inspection (i, j) with Kij using the Si personal computer (115) or the Sij personal computer (116) after confirming the site.
・ The site manager Si displays an abnormality report memo screen in a predetermined format such as the power plant name, installation location, and output.
・ Inform the person in charge Sij of “Fill the screen” with a mobile phone or e-mail.
In process 11 (511), the person in charge Sij uses the Sij personal computer (116) to describe necessary items such as equipment, date and time, inspection status, etc. on the abnormality report memo screen, and after signing electronically to the site manager Si by mobile phone and e-mail. Inform.
In process 12 (512), the site manager Si confirms that there are no errors in the abnormality report memo screen, and notifies the in-house supervisor S by mobile phone and e-mail after electronic signature.
In process 13 (513), after the in-house supervisor S signs the abnormality report memo with the S personal computer (114), the memo is electronically transmitted from the SS personal computer (113) to an external examination organization via the CD-ROM.
In the process 14 (514), the site manager Si calls the person in charge Sij and related parties such as the manufacturer and the like, and inputs the minutes for the repair, and inputs them to the new periodic inspection control computer (111).
Process 15 (515) is the result of the examination in process 14 (514).
If “repair is necessary”, the process goes to process 20 (520).
If “repair is not required”, the process goes to process 16 (516).
The process 16 (516) is a process of the site manager Si when it is not “repair required”. Site manager Si corrects the title of the abnormal report memo as “Application for Repair Not Required (Draft)” and notifies the in-house supervisor S by mobile phone and e-mail after electronic signature.
Process 17 (517) is the process of the internal supervisor S when it is not “repair required”.
-The in-house supervisor S digitally signs the “repair-free application form (draft)” on the S-computer (114) and sets it as the “repair-free application form”.
-Electronically send it from the SS personal computer (113) to an external examination organization via CD-ROM. Receive "Repair not accepted" from the reviewing organization.
If “repair required” is received from the inspection body, the site manager Si will consult with the inspection body. If "repair is necessary", the process goes to process 21 (521).
・ Instruct the site manager Si to receive "repair not required" from the S personal computer (114) by mobile phone and e-mail, and instruct to continue the inspection.
In process 18 (518), the site manager Si transfers “reception not required” to the person in charge Sij, unlocks the inspection (i, j) with the password Kij, and instructs to continue the inspection.
In process 19 (519), the person in charge Sij converts the red dotted line into a red line during the process period and continues the inspection.
-Go to process 4 (504).

Process 20 (520) is a case where “repair is necessary” of process 15 (515).
The process 21 (521) is a process of the site manager Si when “repair is necessary”. Site manager Si corrects the title of the abnormal report memo as “Application for repair required (draft)”, and after electronic signature, informs internal supervisor S by mobile phone and e-mail.
The process 22 (522) is a process of the internal supervisor S when “repair is necessary”.
-The in-house supervisor S digitally signs the “Repair Application Form (Draft)” on the S PC (114) and sets it as the “Repair Application Form”.
・ Send from CD-ROM from SS PC (113) to the certification body. Receive “Repair Application Acceptance” from the certification body.
・ S-PC (114) e-mails “Repair Application Acceptance” to site manager Si and instructs repair plan creation.
・ In-house supervisor S sends a CD-ROM containing a “repair plan” with electronic signatures Sij, Si, S to the reviewing organization.
・ After receiving "Repair Plan Acceptance" from the examination body, inform the site manager Si of "Start Repair" via mobile phone and e-mail.
When “Repair plan required correction” is received from the inspection body, the site manager Si is consulted with the inspection body. When amended, the revised version shall be the “Repair Plan”.
In process 23 (523), site manager Si forwards “Repair Plan Acceptance” to person in charge Sij, unlocks inspection (i, j) with password Kij, and “Starts Repair” via mobile phone and e-mail. Inform.
・ After repair is complete, return to Process 4 (504).

The process 24 (524) is a process of the in-house supervisor S when the inspection of the electric workpiece i in the process 8 (508) is completed.
・ After receiving the completion from the site manager Si, the in-house supervisor S confirms the results of the on-site photo comparison before and after the inspection, digitally signs it, and locks it for the inspection of the electric workpiece i with the password Ki.
・ Apply for inspection of electrical work i from the SS PC (113).
・ (Continue until all electrical work inspection is completed and all process period lines become blue lines)
Process 25 (525) is a witnessed examination by a certification body.
If unsuccessful, internal supervisor S unlocks with password Ki. Return to process 3 (503).
If successful, the process proceeds to process 26 (526).
The process 26 (526) is a process of the internal supervisor S when the attending examination by the examination body of the process 25 (525) is passed.
・ In-house supervisor S confirms that the process period line of all electric works is a blue line, and there is an extra thing to withdraw the periodic inspection device (8), camera 1 (121), and camera 2 (131). Check with a photo of a vacuum cleaner on site to confirm that there is no.
・ After confirming the material balance of the loading / unloading control computer (141), digitally sign and send a power off signal.
The camera 3 (142) is automatically turned off.
-Send an e-mail from the SS PC (113) to the reviewing organization to confirm the end of the periodic inspection, and apply for a comprehensive witnessed review.
Process 27 (527) is a general witness examination by the examination organization.
If electric work i is unacceptable, unlock with Ki and return to process 3 (503).
If it passes, the process proceeds to Step 28 (528).
Process 28 (528) The internal supervisor S receives a certificate of acceptance from the examination organization.
-A power-off signal is transmitted to the new periodic inspection control computer (111).
・ Turn off the power of SS PC (113) and S PC (114) with the metal key.
Periodic inspection ends.

その他実施例1Other Example 1

原子炉建屋(2)内にある核燃料を内包し発燃させる原子炉圧力容器(4)において、蓋を開けて定期検査をする際、原子炉圧力容器(4)全液面を監視する広角レンズ付き8mmカメラ1台と原子炉圧力容器(4)全液面を数台で監視する通常レンズ8mmカメラ数台と録画装置とからなることを特徴とする監視装置。異物落下を監視するために液面の波紋を監視することを特徴とする。
小さいものの落下確認は難しい。しかし波紋であるなら大きく長い時間兆候が残るため落下物があったと言うことが確認できる。波紋が生じた時刻とおおよその位置を広角レンズ付き8mmカメラの録画から特定し、その数秒前からの通常レンズ8mmカメラの録画を再生することにより落下物の特定をすることができる。
原子炉圧力容器(4)蓋開け後原子炉圧力容器(4)内を検査しない期間は、原子炉圧力容器(4)への落下物防止のためにプラスチックの透明蓋をするかまたは原子炉圧力容器(4)の周囲に約2mの高さの透明の覆いをする。
原子炉圧力容器(4)の観察は、検査員のポケット等から物が落下するのを防ぐために、自走式通常望遠カメラまたは自走式水中望遠カメラを遠隔操作する。
A wide-angle lens that monitors the entire liquid level of the reactor pressure vessel (4) when performing periodic inspection by opening the lid in the reactor pressure vessel (4) that encloses and burns the nuclear fuel in the reactor building (2) A monitoring device comprising one 8mm camera with a reactor and a reactor pressure vessel (4) several regular lens 8mm cameras that monitor the whole liquid level with several units and a recording device. In order to monitor the fall of the foreign matter, the liquid surface ripple is monitored.
It is difficult to confirm the fall of small objects. However, if it is a ripple, it can be confirmed that there was a fallen object because the sign remains large and long. The time and the approximate position of the ripples are identified from the recording of the 8mm camera with a wide-angle lens, and the fallen object can be identified by playing back the recording of the normal lens 8mm camera several seconds before.
During the period when the reactor pressure vessel (4) is not inspected after the reactor pressure vessel (4) is opened, a plastic transparent lid or a reactor pressure vessel is used to prevent falling objects to the reactor pressure vessel (4). Put a transparent cover about 2m high around (4).
Observation of the reactor pressure vessel (4) is performed by remotely operating a self-propelled normal telephoto camera or a self-propelled underwater telephoto camera in order to prevent an object from falling from an inspector's pocket or the like.

部品性能は経年劣化する。所与の性能が維持できれば使用し続けることができる。維持基準に従って定期検査は厳重にされねばならない。効率よくやらねばコスト上昇となる。検査員が保守的になり萎縮する。担当者は本装置の制御に従って淡々と作業をすればよいから、余計な配慮をすることが不必要になり疲れない。
電力会社は、電力自由化で供給義務がなくなり利益追求のみでも許されるようになった。現在電力会社は火力・原子力・風力発電、配電、分散電源販売、通信事業と多岐に亘る経営を行っている。原子力発電以外を売却し異常なまでに批難されることがある原子力発電だけの専門会社になるか、既存の原子力発電専門会社が一括買い上げしたほうが効率よくなることがあり得る。専門会社が本装置を採用することにより、設備管理点検に手順や連絡上の漏れがなくなり効率がよくなる。効率が良い電子取引的特長を備えた本装置を採用すれば1会社1発電所になっても発電コストは上昇しない。また、検査に不備があったとしても装置の欠陥であり外部委員会の助言を得て改良すればよいから社員が傷つくことが少なくなる。特に、不祥事毎に社長が辞任では人的資源が枯渇する。管理部門上流に行く程希少になる人的資源の保護が図れる。
Component performance degrades over time. If a given performance can be maintained, it can continue to be used. Periodic inspections must be rigorous according to maintenance standards. If you do it efficiently, the cost will increase. The inspector becomes conservative and shrinks. Since the person in charge only needs to work in accordance with the control of this apparatus, it is unnecessary to take extra care and do not get tired.
Electric power companies have become free from power supply obligations due to the liberalization of electric power and are allowed to pursue profits alone. Currently, electric power companies have a wide range of management including thermal power, nuclear power, wind power generation, power distribution, distributed power supply sales, and telecommunications business. It may be more efficient to become a specialized company that only sells non-nuclear power and be criticized to an anomaly, or an existing nuclear power company to purchase in bulk. By adopting this equipment by a specialized company, there will be no omissions in procedures and communication in equipment management inspection, and efficiency will be improved. By adopting this device with efficient electronic trading features, power generation costs will not increase even if one company has one power plant. Moreover, even if there is a defect in the inspection, it is a defect of the device, and it is less likely to hurt employees because it can be improved with the advice of the external committee. In particular, if the president resigns for each scandal, human resources will be exhausted. It is possible to protect human resources that become scarce as you go upstream.

従来の定期検査に関わる概観図。Overview of conventional regular inspection. 従来の沸騰水型原子炉の定期検査工程。Regular inspection process for conventional boiling water reactors. 従来の定期検査内容記載表の一例。An example of the conventional regular inspection content description table. 本発明の定期検査内容記載表の一例。An example of the regular inspection content description table | surface of this invention. 電気工作物の検査の進捗状況を示す期間線図。The period diagram which shows the progress of the inspection of an electric workpiece. 電気工作物iに属する設備の検査の進捗状況を示す期間線図。The period diagram which shows the progress of the inspection of the equipment which belongs to the electric workpiece i. 本発明の定期検査支援装置に関わる概観図。1 is an overview diagram related to a periodic inspection support device of the present invention. 新型定期検査制御計算機(111)に内蔵せるソフトウエアーによる処理フロー図。The processing flowchart by the software built in a new type periodic inspection control computer (111). 図8の続き。Continuation of FIG. 図9の続き。Continuation of FIG.

符号の説明Explanation of symbols

1は中央制御室。
2は原子炉建屋。
3はプラント総合制御装置。
4は原子炉圧力容器。
6は制御棒等制御機械。
7は測定器。
8は定期検査器。
9は扉。
11は定期検査管理計算機。
12はLAN接続パソコン。
13は外部接続パソコン。
14は電子メール接続パソコン。
111は新型定期検査制御計算機。
113はSSパソコン。
114はSパソコン。
115はSiパソコン。
116はSijパソコン。
121はカメラ1。
131はカメラ2。
140は搬入出制御装置。
141は搬入出制御計算機。
142はカメラ3。
143はゲート。
200は警備室。
210はモニター。
501は処理1。
502は処理2。
503は処理3。
504は処理4。
505は処理5。
506は処理6。
507は処理7。
508は処理8。
509は処理9。
510は処理10。
511は処理11。
512は処理12。
513は処理13。
514は処理14。
515は処理15。
516は処理16。
517は処理17。
518は処理18。
519は処理19。
520は処理20。
521は処理21。
522は処理22。
523は処理23。
524は処理24。
525は処理25。
526は処理26。
527は処理27。
528は処理28。
1 is a central control room.
2 is a reactor building.
3 is a plant integrated control device.
4 is a reactor pressure vessel.
6 is a control machine such as a control rod.
7 is a measuring instrument.
8 is a periodic inspection device.
9 is a door.
11 is a periodic inspection management computer.
12 is a LAN connection personal computer.
13 is an externally connected personal computer.
14 is an e-mail connection personal computer.
111 is a new periodic inspection control computer.
113 is an SS personal computer.
114 is an S personal computer.
115 is a Si personal computer.
116 is a Sij personal computer.
Reference numeral 121 denotes a camera 1.
131 is a camera 2.
140 is a loading / unloading control device.
141 is a carry-in / out control computer.
Reference numeral 142 denotes a camera 3.
143 is a gate.
200 is a security room.
210 is a monitor.
Reference numeral 501 denotes processing 1.
502 is process 2.
Reference numeral 503 denotes process 3.
Reference numeral 504 denotes processing 4.
Reference numeral 505 denotes processing 5.
Reference numeral 506 denotes processing 6.
Reference numeral 507 denotes processing 7.
Reference numeral 508 denotes processing 8.
Reference numeral 509 denotes processing 9.
510 is process 10.
Reference numeral 511 denotes processing 11.
512 is process 12.
Reference numeral 513 denotes processing 13.
Reference numeral 514 denotes processing 14.
Reference numeral 515 denotes processing 15.
Reference numeral 516 denotes processing 16.
Reference numeral 517 denotes processing 17.
Reference numeral 518 denotes processing 18.
Reference numeral 519 denotes processing 19.
Reference numeral 520 denotes processing 20.
Reference numeral 521 denotes processing 21.
Reference numeral 522 denotes processing 22.
Reference numeral 523 denotes processing 23.
Reference numeral 524 denotes processing 24.
Reference numeral 525 denotes processing 25.
Reference numeral 526 denotes processing 26.
Reference numeral 527 denotes processing 27.
Reference numeral 528 denotes processing 28.

Claims (2)

本発明は、原子力発電所における定期検査において、
新型定期検査制御計算機(111)にLAN接続せる、中央制御室(1)内での定期検査時に搬入せるカメラ1(121)及び、原子炉建屋(2)内での定期検査時に搬入せるカメラ2(131)と定期検査器(8)及び、定期検査時に設置せる搬入出制御装置(140)及び、金具電源キー付きSパソコン(114)及び、金具電源キー付きSiパソコン(115)及び、Sijパソコン(116)及び、警備室(200)に設置せるモニター(210)と、外部に接続せる金具電源キー付きSSパソコン(113)からなり、
カメラ1(121)は中央制御室(1)のプラント総合制御装置(3)で行われる制御棒動作確認試験等を監視記録し、
新型定期検査制御計算機(111)は内蔵せる審査基準と定期検査器(8)検査の測定値を比較し検査を制御し、この状況をカメラ2(131)で監視記録し、
搬入出制御装置(140)は新型定期検査制御計算機(111)にLAN接続されている搬入出制御計算機(141)と搬入出監視のカメラ3(142)とゲート(143)とからなり、搬入出制御計算機(141)はゲート(143)とカメラ3(142)をLAN接続し定期検査関連物資に付帯されているICタグから記録を読みとり現品の重量や形状と比較してゲート(143)を自動的に開閉制御しその状況をカメラ3(142)で監視記録し、
新型定期検査制御計算機(111)に内蔵するソフトウエアにより上記LAN接続せる機器設備からの検査に付随する処理を規定の電子署名等を施した時刻または送受信した時刻から前処理が完結していないならば、後処理の実施は制限または警告を発することにより定期検査を管理制御する装置。
The present invention is a periodic inspection in a nuclear power plant,
Camera 1 (121) that can be carried in at the time of periodic inspection in the central control room (1) and camera 2 that can be carried in at the periodic inspection in the reactor building (2), which is connected to the new periodic inspection control computer (11 1) via LAN. (131), periodic inspection device (8), loading / unloading control device (140) installed during periodic inspection, S personal computer with bracket power key (114), Si personal computer with bracket power key (115), and Sij personal computer (116) and a monitor (210) to be installed in the security room (200), and an SS personal computer (113) with a metal power key connected to the outside,
The camera 1 (121) monitors and records a control rod operation confirmation test and the like performed by the plant integrated control device (3) in the central control room (1).
The new periodic inspection control computer (11 1) controls the inspection by comparing the built-in inspection standard and the measurement value of the periodic inspection device (8) inspection, and this situation is monitored and recorded by the camera 2 (131).
The loading / unloading control device (140) comprises a loading / unloading control computer (141) connected to the new periodic inspection control computer (11) via a LAN, a loading / unloading monitoring camera 3 (142), and a gate (143). The control computer (141) automatically connects the gate (143) to the camera 3 (142), reads the records from the IC tag attached to the periodic inspection-related materials, and compares the weight and shape of the actual product with the gate (143) automatically. Open / close control and monitor and record the situation with camera 3 (142),
If the pre-processing is not completed from the time when the specified electronic signature etc. is applied or the time of sending and receiving the processing associated with the inspection from the equipment connected to the LAN by the software built in the new periodic inspection control computer (11) For example, a device that manages and controls regular inspections by issuing post-processing restrictions or warnings.
請求項1における新型定期検査制御計算機(111)に内蔵するソフトウエアにおける処理において、下記の如くしたことを特徴とする。
現場には立入れない所内監督者Sは、Sパソコン(114)とSSパソコン(113)を管理し、新型定期検査制御計算機(111)、カメラ1(121)、カメラ2(131)と搬入出制御装置(140)の電源を管理し、電気工作物iの検査に施錠と開錠をするパスワードKiを管理することにより現場責任者Siを管理下に置き、外部の審査機関とはSSパソコン(113)から暗号電子メールにて接触する。
電気工作物iに属する設備の検査を電気工作物iの設備j毎の検査の進捗状況を示す期間線図に沿って管理をし定期検査工程に変更が生じた場合は期間線図を修正する権限を有する現場責任者Siは、Siパソコン(115)を管理し、Sijパソコン(116)も使用でき、検査(i,j)に施錠と開錠をするパスワードを管理することにより担当者Sijを管理下に置く。
担当者Sijは、検査(i,j)を検査し、無線接続携帯端末として作業現場に持ち込むこともできるSijパソコン(116)を使用できる。
各人は電子署名を以って作業の指令または終わりとなす。受信者は規定時間以内に返信し、送信者は規定時間内に返信が無い時は常在者に携帯電話連絡するも更に無い時は送信者が受信者の権限を持ち各所に連絡することを許可する。
定期検査関係者は新型定期検査制御計算機(111)にIP接続せるカメラ付携帯電話を持つ義務があり圏外または電源切の場合は新型定期検査制御計算機(111)から警備室(200)に警報が発せられる。
The processing in the software built in the new periodic inspection control computer (11 1) according to claim 1 is as follows.
In-house supervisor S who cannot enter the site manages S personal computer (114) and SS personal computer (113), and carries in and out of new periodic inspection control computer (11 1), camera 1 (121), camera 2 (131). By managing the power supply of the control device (140) and managing the password Ki, which locks and unlocks the electrical work i, the site manager Si is under control. 113), contact by encrypted e-mail.
The inspection of the equipment belonging to the electric workpiece i is managed according to the period diagram indicating the progress of the inspection for each equipment j of the electric workpiece i, and the period diagram is corrected when the periodic inspection process changes. The authorized site manager Si manages the Si personal computer (115), can also use the Sij personal computer (116), and manages the person in charge Sij by managing the password to lock and unlock the inspection (i, j). Put under control.
The person in charge Sij can use the Sij personal computer (116) that can inspect the inspection (i, j) and bring it into the work site as a wireless connection portable terminal.
Each person will sign or end the work with an electronic signature. The receiver will reply within the specified time, and if the sender does not reply within the specified time, he / she will contact the resident with a mobile phone, but if there is no further response, the sender will have the authority of the receiver and contact each place. to approve.
Persons in charge of periodic inspections are obliged to have a mobile phone with a camera that can be connected to the new periodic inspection control computer (11) by IP. If the power is out of service or the power is off, the new periodic inspection control computer (11 1) will alert the security room (200). Be emitted.
JP2003383269A 2003-11-13 2003-11-13 Regular inspection support equipment for nuclear power plants Expired - Fee Related JP4861600B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003383269A JP4861600B2 (en) 2003-11-13 2003-11-13 Regular inspection support equipment for nuclear power plants

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003383269A JP4861600B2 (en) 2003-11-13 2003-11-13 Regular inspection support equipment for nuclear power plants

Publications (2)

Publication Number Publication Date
JP2005147774A true JP2005147774A (en) 2005-06-09
JP4861600B2 JP4861600B2 (en) 2012-01-25

Family

ID=34692036

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003383269A Expired - Fee Related JP4861600B2 (en) 2003-11-13 2003-11-13 Regular inspection support equipment for nuclear power plants

Country Status (1)

Country Link
JP (1) JP4861600B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112967016A (en) * 2021-03-02 2021-06-15 岭东核电有限公司 Nuclear power test procedure confirmation method and device, computer equipment and storage medium
JP2021144517A (en) * 2020-03-12 2021-09-24 株式会社東芝 Regular inspection process creation support device, regular inspection process creation support method, and regular inspection information cooperation system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09243781A (en) * 1996-03-07 1997-09-19 Toshiba Corp Carrying article monitoring device
JPH10148694A (en) * 1996-11-20 1998-06-02 Toshiba Corp Information communication system in plant
JP2001228249A (en) * 2000-02-15 2001-08-24 Toshiba Corp System for monitoring carrying in and out article
JP2003185782A (en) * 2001-12-18 2003-07-03 Kansai Electric Power Co Inc:The Process management program and process management system
JP2003263475A (en) * 2002-03-11 2003-09-19 Hitachi Ltd Pump inspection work support system
JP2003307585A (en) * 2002-04-16 2003-10-31 Okano Valve Mfg Co Working equipment under highly-dosed and highly- polluted environment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09243781A (en) * 1996-03-07 1997-09-19 Toshiba Corp Carrying article monitoring device
JPH10148694A (en) * 1996-11-20 1998-06-02 Toshiba Corp Information communication system in plant
JP2001228249A (en) * 2000-02-15 2001-08-24 Toshiba Corp System for monitoring carrying in and out article
JP2003185782A (en) * 2001-12-18 2003-07-03 Kansai Electric Power Co Inc:The Process management program and process management system
JP2003263475A (en) * 2002-03-11 2003-09-19 Hitachi Ltd Pump inspection work support system
JP2003307585A (en) * 2002-04-16 2003-10-31 Okano Valve Mfg Co Working equipment under highly-dosed and highly- polluted environment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021144517A (en) * 2020-03-12 2021-09-24 株式会社東芝 Regular inspection process creation support device, regular inspection process creation support method, and regular inspection information cooperation system
JP7379224B2 (en) 2020-03-12 2023-11-14 株式会社東芝 Periodic inspection process creation support device, periodic inspection process creation support method, and periodic inspection information linkage system
CN112967016A (en) * 2021-03-02 2021-06-15 岭东核电有限公司 Nuclear power test procedure confirmation method and device, computer equipment and storage medium

Also Published As

Publication number Publication date
JP4861600B2 (en) 2012-01-25

Similar Documents

Publication Publication Date Title
US6816088B1 (en) Marine vessel monitoring system
JP5675237B2 (en) Equipment inspection system
JP4861600B2 (en) Regular inspection support equipment for nuclear power plants
CN112381413B (en) Two-ticket software system based on industrial Internet and digital technology
CN108108782A (en) The construction equipment security information management system and method for a kind of nuclear power station
CN109359953A (en) A kind of Fire-Fighting Service system
CN114881549A (en) Job management method, apparatus, terminal device, and storage medium
JP2004164311A (en) Apparatus and system for remote monitoring of electronic component manufacturing equipment
Balistreri et al. Operation of the Notified Body according to the Directive 2014/68/UE (PED) during the covid-19 emergency. Case study of a surveillance audit according to module H1
US20220198591A1 (en) Defense Property Management System
MAH Portable Tritium Recoverr, s t System (TRS)■■■ Operational Readiness Check
Brewer et al. Preliminary, Qualitative Human Reliability Analysis For Spent Fuel Handling
GUIDE Maintenance, Testing, Surveillance and Inspection in Nuclear Power Plants
Glover Dear Mr Glover
GUIDE Conduct of Operations at Nuclear Power Plants
Fewell et al. Accidents and Innovation Shaping the Nuclear Regulatory Landscape
CN118037064A (en) Targeted security authentication method, device and system based on risk pre-control
RAHIMINIA EVOLUTION OF MOBILE CRANE INSPECTION REQUIREMENTS IN ONTARIO OCCUPATIONAL HEALTH AND SAFETY REGULATIONS
Hughes I&C inspection and regulatory control
Lee A Study on Introducing Cyber Security Incident Reporting Regulations for Nuclear Facilities
Binnig et al. Change with the Changing Times: 100 Years of Telecom Lawyering
Park et al. Quality Assurance in the ITER Construction
Kojima et al. Quality assurance activity focused on achieving nuclear safety
Guide Inspection and Enforcement by the Regulatory Body for Nuclear Power Plants
Overbeck SUBJECT: PALO VERDE NUCLEAR GENERATING STATION-NRC INTEGRATED INSPECTION REPORT 05000528/2004004, 05000529/2004004, AND 05000530/2004004 Dear Mr. Overbeck: On September 30, 2004, the US Nuclear Regulatory Commission (NRC) completed an

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051213

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090512

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090601

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090707

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100209

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100323

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100720

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20101015

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110920

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110926

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111101

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111107

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4861600

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141111

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees