JP2005146584A - Alc external wall maintenance system and alc external wall maintenance control method - Google Patents

Alc external wall maintenance system and alc external wall maintenance control method Download PDF

Info

Publication number
JP2005146584A
JP2005146584A JP2003383327A JP2003383327A JP2005146584A JP 2005146584 A JP2005146584 A JP 2005146584A JP 2003383327 A JP2003383327 A JP 2003383327A JP 2003383327 A JP2003383327 A JP 2003383327A JP 2005146584 A JP2005146584 A JP 2005146584A
Authority
JP
Japan
Prior art keywords
maintenance
alc
external wall
information
repair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2003383327A
Other languages
Japanese (ja)
Inventor
Masayuki Nishikawa
賢之 西川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Metal Mining Siporex KK
Original Assignee
Sumitomo Metal Mining Siporex KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Mining Siporex KK filed Critical Sumitomo Metal Mining Siporex KK
Priority to JP2003383327A priority Critical patent/JP2005146584A/en
Publication of JP2005146584A publication Critical patent/JP2005146584A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an ALC external wall maintenance system which can efficiently prevent degradation of the life of a so-called ALC external wall, i.e. an ALC panel sheathing an external wall of a building, due to neglect of the deteriorated state of a sealing material and a finish coat of the ALC external wall, and acceleration of aging deterioration of basic ALC caused by the neglect, and to provide an ALC external wall maintenance control method. <P>SOLUTION: The maintenance system includes a control server 1 to which control terminals are connected, and a computer system for connecting customer terminals 3 to the control server via a communication network N. The control server is comprised of a subject database storing therein information of the building, information of ALC, sealing, and coating, information of an external wall maintenance schedule and maintenance execution, etc., a means for registering various kinds of information in the subject database, a means for automatically creating the maintenance schedule, a means for displaying the maintenance schedule on each terminal at the time of creation of the maintenance schedule and before a maintenance date of the same, and a deterioration diagnosing system for carrying out deterioration diagnosis of the ALC external wall and determination of a repairing and modification method. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、建物の外壁をALCパネルで建造した、いわゆるALC造外壁のメンテナンスシステム及びメンテナンス管理方法に関する。更に詳しくは、新築もしくは既存の建物外壁を構成するALCパネルおよび目地部シーリングと仕上塗装を含めたALC造外壁を計画的にメンテナンスするシステムおよび管理方法に関するものである。   The present invention relates to a maintenance system and a maintenance management method for a so-called ALC outer wall in which an outer wall of a building is constructed with an ALC panel. More specifically, the present invention relates to a system and a management method for systematically maintaining an ALC panel including a newly constructed or existing building outer wall and an ALC outer wall including joint sealing and finish coating.

従来、例えば鉄骨造の建物で外壁にALCを張った新築のビル・倉庫・工場・店舗などでは、一般に目地シーリングや仕上塗料の耐久年数に応じて不定期な点検は行われていたが、基材のALCを含めた計画的なメンテナンス(劣化診断と補修改修工事)は行われていなかった。また、外壁にALCを張った既存建物が経年劣化した場合、外壁のメンテナンス工事は行われていたが、工事後にALC・シーリング・塗装の計画的なメンテナンスは行われていなかった。   Conventionally, for example, in newly constructed buildings, warehouses, factories, stores, etc., which have ALC on the outer wall of a steel structure building, etc., regular inspections have been performed according to the durability of joint sealing and finishing paint. There was no planned maintenance (deterioration diagnosis and repair / renovation work) including ALC of materials. In addition, when an existing building with ALC on the outer wall deteriorated over time, maintenance work on the outer wall was carried out, but no planned maintenance of ALC, sealing, or painting was carried out after the work.

例えば、本出願人は先に下記特許文献1に示すように、ALCパネルの劣化診断と補修改修方法の決定について提案した。それによれば、ALCパネルの劣化状況を良好に診断して、それに適する補修改修方法を実行することが可能となるが、ALCパネルのみを無計画に補修改修しても外壁としての性能を長期間安定に維持することはできない。例えばシーリング材や塗膜が劣化した状態のままで放置すると、基材のALCの経年劣化が加速され、それによって外壁の寿命が短くなったり、漏水などの事態が発生して初めて外壁の異常が判明することが少なくなかった。   For example, the present applicant has previously proposed the deterioration diagnosis of ALC panels and the determination of repair / repair methods as shown in Patent Document 1 below. According to this, it is possible to properly diagnose the deterioration status of the ALC panel and execute a repair / repair method suitable for it, but even if only the ALC panel is repaired and repaired unplanned, the performance as an outer wall will be extended for a long time. It cannot be kept stable. For example, if the sealing material or coating film is left in a deteriorated state, the ALC deterioration of the base material is accelerated, thereby shortening the life of the outer wall or causing an abnormality of the outer wall only when a situation such as water leakage occurs. Often found.

特開2003−35657号公報JP 2003-35657 A

本発明は上記の問題点に鑑みて提案されたもので、その目的とするところは、ALC造外壁のシーリング材や仕上塗膜が劣化した状態のまま放置されたり、それによって基材ALCの経年劣化が加速されて外壁の寿命が低下するのを良好に防止することのできるALC造外壁のメンテナンスシステムとメンテナンス管理方法を提供することにある。   The present invention has been proposed in view of the above-mentioned problems, and the object of the present invention is to leave the sealing material and finishing coating film of the ALC outer wall in a deteriorated state, thereby causing the aging of the base material ALC. An object of the present invention is to provide a maintenance system and a maintenance management method for an ALC-made outer wall that can satisfactorily prevent deterioration of the outer wall from accelerating deterioration.

本発明によるALC造外壁のメンテナンスシステムは、建物の外面にALCパネルを取付け、その隣り合うパネル間に目地シーリングを施すと共に上記パネル表面に塗装仕上を施したALC造外壁のメンテナンスを行うためのシステムであって、管理用端末が接続されている管理サーバと、その管理サーバに通信ネットワークを通じて顧客端末が接続されるコンピュータシステムを備え、上記管理サーバには、上記建物の情報、ALC・シーリング・塗装の情報、外壁のメンテナンス計画、メンテナンス実施情報などを格納した案件データベースと、その案件データベースに種々の情報を登録するための手段と、メンテナンス計画を自動的に作成する手段と、メンテナンス計画作成時とメンテナンス実施日が来る前にメンテナンス計画を各端末に表示する手段と、ALC造外壁の劣化診断と補修改修方法の決定を行う劣化診断システムとを備えたことを特徴とする。   A maintenance system for an ALC external wall according to the present invention is a system for attaching an ALC panel to the outer surface of a building, performing joint sealing between adjacent panels, and performing maintenance on the ALC external wall having a painted finish on the panel surface. A management server to which a management terminal is connected, and a computer system to which a customer terminal is connected to the management server through a communication network. The management server includes information on the building, ALC, sealing, and painting. Information database, external wall maintenance plan, maintenance implementation information, etc., a means for registering various information in the matter database, a means for automatically creating a maintenance plan, a maintenance plan creation time, Maintenance plan at each end before the maintenance date And means for displaying, characterized in that a degradation diagnostic system for determination of repair repair method and the degradation diagnosis of the ALC Zogaiheki.

また本発明によるALC造外壁のメンテナンス管理方法は、新築ALC造外壁の建物、及び新築もしくは既存のALC造外壁で劣化診断や補修改修が行われた建物について、担当者が管理用端末から当該建物の情報、ALC・シーリング・塗装の情報、メンテナンス実施情報を案件データベースに登録した後に、外壁のメンテナンス計画を自動作成するプロセスと、その自動作成したメンテナンス計画を顧客端末に表示することによって顧客とメンテナンス契約を行うプロセスと、そのメンテナンス契約を行った顧客に対してメンテナンス実施日の所定期日前になると、メンテナンス計画表示プログラムが自動起動してメンテナンス計画が顧客端末に表示されるプロセスと、そのメンテナンス計画の内容を確認した顧客からのメンテナンス工事発注を受けて、外壁の劣化を診断すると共に、適切な補修改修方法を決定するプロセスと、その補修改修方法によって補修改修工事を実施するプロセスと、その補修改修工事終了後にメンテナンス情報を案件データベースに登録するプロセスとを有することを特徴とする。なお本発明において新築とは、必ずしも厳密に全体が新規な建物に限る必要はなく、例えば築後数年経たものや一部を増築もしくは改築したものであってもよい。   In addition, the maintenance management method for an ALC external wall according to the present invention is as follows. The person in charge of a newly constructed ALC external wall and a building that has undergone deterioration diagnosis or repair / renovation on a new or existing ALC external wall from the management terminal After registering ALC information, ALC / sealing / painting information, and maintenance execution information in the project database, the maintenance process for the external wall is automatically created, and the maintenance plan created by the customer is displayed on the customer terminal. The process of making a contract, the process of automatically starting the maintenance plan display program and displaying the maintenance plan on the customer's terminal when the maintenance contract date for the customer who has made the maintenance contract is a predetermined date, and the maintenance plan Maintenance work from a customer who confirmed the contents of Upon receiving an order, the exterior wall is diagnosed for deterioration, a process for determining an appropriate repair / repair method, a process for performing repair / renovation work by the repair / repair method, and maintenance information after completion of the repair / repair work in the project database. And a process of registering. In the present invention, the term “new construction” is not necessarily strictly limited to a new building as a whole. For example, a new construction may be a few years after construction or a part of the building may be extended or renovated.

上記のように構成された本発明によるALC造外壁のメンテナンスシステムとメンテナンス管理方法によれば、メンテナンスに必要な種々の情報に基づいて最適なメンテナンス計画が作成され、またメンテナンス実施時期の前になると必ず顧客に連絡が入るため、シーリング材や塗膜が劣化した状態のまま放置されることがなくなるので、基材ALCの経年劣化が抑制され、外壁の寿命を延ばすことが可能となる。また、基材の劣化状態を定期的に監視できるため、漏水などの異常事態による損害発生の可能性も著しく減らすことができる。   According to the maintenance system and the maintenance management method for an ALC external wall according to the present invention configured as described above, an optimum maintenance plan is created based on various information necessary for maintenance, and before the maintenance execution time is reached. Since the customer is always contacted, the sealing material and the coating film are not left in a deteriorated state, so that the aging of the base material ALC is suppressed and the life of the outer wall can be extended. Moreover, since the deterioration state of the base material can be monitored periodically, the possibility of occurrence of damage due to an abnormal situation such as water leakage can be significantly reduced.

以下に本発明によるALC造外壁のメンテナンスシステムおよびメンテナンス管理方法を、図に示す実施形態に基づいて具体的に説明する。   A maintenance system and a maintenance management method for an ALC external wall according to the present invention will be specifically described below based on the embodiments shown in the drawings.

図1は本発明に基づいてALC造外壁のメンテナンス管理を行うコンピュータシステムの一例を示すもので、図において、1はALC造外壁のメンテナンスを管理するコンピュータの管理サーバで、例えばALC生産会社等に配置される。その管理サーバ1には、管理担当者用のコンピュータ(PC)等の管理用端末2が接続され、また上記管理サーバ1には、顧客のコンピュータ(PC)等の顧客端末3が電話回線やインターネット等のネットーワークNを介して接続されている。   FIG. 1 shows an example of a computer system that performs maintenance management of an ALC external wall according to the present invention. In FIG. 1, reference numeral 1 denotes a computer management server that manages the maintenance of an ALC external wall. Be placed. A management terminal 2 such as a computer (PC) for a manager is connected to the management server 1, and a customer terminal 3 such as a customer computer (PC) is connected to the management server 1 via a telephone line or the Internet. Or the like via a network N such as

上記管理サーバ1には、情報処理部11と記憶部12などがあり、その記憶部12には案件(建物)情報等を記録した案件データベースと、案件データベース登録プログラム、メンテナンス計画作成プログラムおよびメンテナンス計画表示プログラムなどが備えられている。さらに上記管理サーバ1には、ALCパネルの劣化診断と、その診断結果に基づいて補修改修方法を選択的に決定する劣化診断システムが備えられており、本実施形態においては前記特許文献1に準拠したコンピュータソフトである劣化診断システムが格納されている。   The management server 1 includes an information processing unit 11 and a storage unit 12. The storage unit 12 stores a case database in which case (building) information and the like are recorded, a case database registration program, a maintenance plan creation program, and a maintenance plan. A display program is provided. Further, the management server 1 is provided with a deterioration diagnosis system that selectively determines a deterioration diagnosis of the ALC panel and a repair / repair method based on the diagnosis result. In this embodiment, the management server 1 conforms to Patent Document 1. A deterioration diagnosis system, which is computer software, is stored.

上記管理サーバ1の記憶部12に格納した案件データベースの情報を下記表1に示す。その情報は、大別して案件関連とメンテナンス計画およびメンテナンス実施内容の3つの種類があり、それらの詳細は下記表1に記載の通りである。   Table 1 shows information on the case database stored in the storage unit 12 of the management server 1. The information is broadly divided into three types: project relations, maintenance plans, and maintenance implementation details, the details of which are as shown in Table 1 below.

Figure 2005146584
Figure 2005146584

また下記表2(a)〜(c)は、メンテナンス計画作成プログラムで使用する案件毎のALCとシーリングおよび塗装の耐久年数テーブルを示す。   Tables 2 (a) to 2 (c) below show ALC, sealing, and paint durability years tables for each project used in the maintenance plan creation program.

Figure 2005146584
Figure 2005146584

ALC素材としては、前記特許文献1に記述されているものであって、従来から使用されてる住友金属鉱山シポレックス株式会社製のシポレックス一般パネルと耐炭酸化性能に優れたシポジュールパネルまたはドライパネルに対して、仕上塗材が樹脂リシンのように廉価な場合と弾性タイル以上の高品質な場合とで耐久年数を決定する。本実施形態においは、後述するALC劣化レベルが4に到達するまでの年数を耐久年数としたもので、上記表2(a)のように一般パネルで廉価仕上のものは15年、高品質仕上のものは30年、またシポジュールパネルまたはドライパネルで廉価仕上のものは30年、高品質仕上のものは50年とした。   As the ALC material, it is described in the above-mentioned Patent Document 1, and a conventional Sipolex panel manufactured by Sumitomo Metal Mining Sipolex Co., Ltd. and a Sipojoule panel or a dry panel excellent in carbonation resistance are used. On the other hand, the durable years are determined depending on whether the finish coating material is inexpensive, such as resin lysine, and the case where the finish coating material is higher quality than the elastic tile. In this embodiment, the number of years until the ALC deterioration level, which will be described later, reaches 4, is defined as the durable life. As shown in Table 2 (a) above, the low cost finish for general panels is 15 years, and the high quality finish is used. 30 years for products, 30 years for low-priced panels and dry panels, and 50 years for high-quality finishes.

シーリング材は、上記表2(b)のようにポリウレタン系、変成シリコン系およびその他に分類され、シーリング材の耐久年数(標準耐用年数)に対して管理担当者が材料および建物毎に設定する建築条件係数を掛け合せて見直し耐久年数を決定する。また塗料は、上記表2(c)のように樹脂リシン、弾性タイル、アクリル系塗膜防水材、フッ素樹脂トップコートおよびその他に分類され、シーリング材と同様に材料および建物毎に見直し耐久年数を決定する。   Sealing materials are classified into polyurethane-based, modified silicon-based, and others as shown in Table 2 (b) above, and the construction staff sets for each material and building with respect to the durable life (standard service life) of the sealing material. Multiply the condition coefficient to determine the durable life. Also, paints are classified into resin lysine, elastic tiles, acrylic film waterproofing materials, fluororesin top coats, and others as shown in Table 2 (c) above. decide.

なお上記の見直し耐久年数は、例えばシーリング材にあっては、シーリング材の標準耐用年数に、被着体の材料係数、被着体の色や方位係数、接着難易係数、加工難易係数、施工技量係数、劣化外力係数、維持保全係数などを掛け算して推定耐用年数を算出し、その推定耐用年数を勘案して見直し耐久年数を決定する。塗料の見直し耐久年数についても略同様である。また上記の見直し耐久年数は、所定年数を単位として決定するとよく、本実施形態においては、5年を単位として見直し耐久年数を決定している。すなわち見直し耐久年数が5の倍数となるようにしている。   For example, in the case of a sealing material, the above-mentioned revised durability years include the standard life of the sealing material, the material coefficient of the adherend, the color and orientation coefficient of the adherend, the adhesion difficulty coefficient, the processing difficulty coefficient, and the construction workmanship. The estimated useful life is calculated by multiplying the coefficient, deterioration external force coefficient, maintenance factor, etc., and the durable life is determined by considering the estimated useful life. The same applies to the durability of the paint. In addition, the above review durability years may be determined in units of a predetermined number of years, and in this embodiment, the review durability years are determined in units of 5 years. In other words, the review durability is set to be a multiple of 5.

下記表3はALCの劣化状態をレベル分けするALC劣化レベルテーブルの一例を示すものである。   Table 3 below shows an example of an ALC deterioration level table for classifying the deterioration state of ALC.

Figure 2005146584
Figure 2005146584

本例においては、前記特許文献1に記載の要件と同様にALCの炭酸化進行に伴う炭酸化度によって、ALCの劣化状態をレベル1〜5の5段階にレベル分けした。すなわち、炭酸化度が0〜20%の場合は劣化レベル1、炭酸化度が20〜30%の場合は劣化レベル2、炭酸化度が30〜40%の場合は劣化レベル3、炭酸化度が40〜50%の場合は劣化レベル4、炭酸化度が50%以上の場合は劣化レベル5としたものである。なお炭酸化度は、測定される全酸化カルシウム含有量(質量%)、および600〜900℃における重量減少量に相当する炭酸ガス含有量(質量%)により、{(炭酸ガス含有量)×56/44}/(全酸化カルシウム含有量)×100なる式で与えられる。   In this example, the degradation state of ALC was classified into five levels of levels 1 to 5 according to the degree of carbonation accompanying the progress of carbonation of ALC as in the requirement described in Patent Document 1. That is, when the carbonation degree is 0 to 20%, the deterioration level is 1, when the carbonation degree is 20 to 30%, the deterioration level is 2, and when the carbonation degree is 30 to 40%, the deterioration level is 3, and the carbonation degree is Is 40 to 50%, the degradation level is 4, and when the carbonation degree is 50% or more, the degradation level is 5. The degree of carbonation depends on the total calcium oxide content (mass%) to be measured and the carbon dioxide gas content (mass%) corresponding to the weight loss at 600 to 900 ° C. {(carbon dioxide gas content) × 56 / 44} / (total calcium oxide content) × 100.

下記表4はメンテナンス計画作成プログラムによりメンテナンス計画を自動作成する際に基準となる塗料やシーリング材およびALCの耐久年数の組合せを示すもので、(1)は新築の場合、(2)はALC補修・改修工事以降にメンテナンス計画を作成する場合である。   Table 4 below shows the combination of the paint, sealant and ALC durability that will be used as the basis for automatically creating a maintenance plan using the maintenance plan creation program. (1) is for new construction and (2) is for ALC repair.・ This is a case of creating a maintenance plan after the renovation work.

Figure 2005146584
Figure 2005146584

上記表4(1)の新築の場合、使用されている塗料、シーリング材、ALCの耐久年数を前記表2に示した耐久年数テーブルにより決定し、それに基づいてメンテナンス計画を自動で作成する。なお、表中の計画No.は、後述する表5に一例として示すメンテナンス計画の番号である。   In the case of the new construction shown in Table 4 (1), the durable years of the paint, sealing material, and ALC used are determined by the durable years table shown in Table 2, and a maintenance plan is automatically created based on the durable years table. The plan No. in the table is a maintenance plan number shown as an example in Table 5 to be described later.

またメンテナンス計画に従い新築ALC造外壁を劣化診断してALCを補修・改修した場合または既存のALC造外壁を劣化診断してALCを補修・改修した場合は、上記表4の(2)に基づいてALC補修・改修工事以降のメンテナンス計画を自動作成する。この場合には、使用されている塗料、シーリング材の耐久年数は表2に示した耐久年数テーブルにより決定し、ALCの耐久年数は表3に示したALC劣化レベルテーブルの劣化段階に応じて決定してメンテナンス計画を自動で作成する。   In addition, if a newly diagnosed ALC exterior wall is repaired and repaired according to the maintenance plan and ALC is repaired / refurbished, or if an existing ALC exterior wall is degraded and repaired / refurbished, based on (2) in Table 4 above Maintenance plan after ALC repair / renovation work is automatically created. In this case, the durable years of the paint and sealant used are determined by the durable years table shown in Table 2, and the durable years of ALC are determined according to the deterioration stage of the ALC deterioration level table shown in Table 3. And create a maintenance plan automatically.

下記の表5は(1)新築の場合と(2)ALCを補修・改修した場合のメンテナンス計画の一例を示すものである。   Table 5 below shows an example of a maintenance plan in the case of (1) new construction and (2) repair / renovation of ALC.

Figure 2005146584
Figure 2005146584

本例はメンテナンス時に新築時と同じ材質または耐久年数の塗料およびシーリング材を継続して使用することを前提にして、前述のようにALC・シーリング・塗装の耐久年数に応じて5年毎にメンテナンスを行う基本的なメンテナンス計画を示したものである。   This example is based on the premise that the same material or durable life paint and sealing material as in the new construction will continue to be used for maintenance, as described above, every 5 years depending on the durable life of ALC, sealing, and painting. It shows the basic maintenance plan to perform.

上記表5(1)の計画No.1は、前記表4(1)において塗料およびシーリング材の耐久年数がそれぞれ5年、ALC素材の耐久年数が15年である場合のメンテナンス計画を示す。具体的には、例えば前記表2におけるALC素材の種類は一般パネルで、シーリング材はポリウレタン系、塗料の種類は樹脂リシンである新築のALC造外壁をメンテナンスする場合において、上記塗料およびシーリング材の見直し耐久年数がそれぞれ5年、ALC素材の耐久年数が15年であるような場合がこれに該当する。   Plan No. 1 in Table 5 (1) shows a maintenance plan in the case where the durability of the paint and the sealing material is 5 years and the durability of the ALC material is 15 years in Table 4 (1). Specifically, for example, when maintaining a newly constructed ALC outer wall in which the type of ALC material in Table 2 is a general panel, the sealing material is polyurethane, and the type of paint is resin lysine, the above-mentioned paint and sealing material This is the case when the endurance years are 5 years and the endurance life of the ALC material is 15 years.

因みに、上記表5の計画No.1は、塗装診断/工事として築後5年、10年、15年目には、それぞれ塗料の耐久年数に当たるので再塗装を施し、シーリング診断/工事としては上記各年目がシーリング材の耐久年数に当たるのでシーリング材を打ち替える。またALCの診断/工事は、築後5年と10年目はALCの耐久年数未満であるので原則として現状のままで維持管理し、築後15年目はALCの耐久年数に当たるので所定の劣化診断を行った上で補修改修工事を行うという計画である。この補修改修工事は上記劣化診断の結果に基づいて行うもので、部分的な補修もしくは改修で済む場合と、全面張替えを行う場合とがある。後述する計画No.2〜4についても同様である。   By the way, Plan No.1 in Table 5 above is the paint diagnosis / construction, 5 years, 10 years, and 15 years after the construction, because it is the durable life of the paint. Each year is the endurance of the sealant, so the sealant is replaced. In addition, ALC diagnosis / construction is less than the endurance years of ALC for the 5th and 10th years after construction, so in principle it is maintained and maintained as it is, and 15th year after construction is the endurance for ALC, so it is subject to predetermined deterioration. The plan is to carry out repair and repair work after making a diagnosis. This repair / renovation work is performed based on the result of the deterioration diagnosis described above, and there are cases where a partial repair or repair is required and a case where the entire surface is replaced. The same applies to the plans No. 2 to 4 described later.

また表5(1)の計画No.2は、上記と同様に表4(1)において塗料の耐久年数が15年、シーリング材の耐久年数が5年、ALC素材の耐久年数が30年である新築のALC造外壁のメンテナンス計画を示す。なお、表中の「維持管理シーリング部塗装」は、塗料が耐久限度年未満である場合の塗装診断/工事としてパネルの塗装部分は原則としてそのままの状態で維持管理し、シーリング部については塗装を施すという作業を表す。他の作業は上記計画No.1と同様である。   In addition, the plan No. 2 in Table 5 (1) is the same as above, but in Table 4 (1), the durability of the paint is 15 years, the durability of the sealing material is 5 years, and the durability of the ALC material is 30 years. The maintenance plan for the new ALC external wall is shown. The “maintenance sealant coating” in the table is used for diagnosis and construction when the paint is less than the endurance limit year. In principle, the painted part of the panel is maintained as it is, and the sealing part is painted. It represents the work of applying. Other work is the same as the plan No.1.

一方、新築もしくは既存のALC造外壁を補修改修を行った後に引き続きメンテナンス管理を行う場合、具体的には、例えば上記メンテナンス計画No.1やNo.2により、それらの最終年にALCの補修改修を行った後に引き続きメンテナンス管理を行う場合、または既存のALC造外壁を所望の時期に劣化診断してALCを補修・改修した後に引き続きメンテナンス管理を行う場合には、前述のように表4の(2)に基づいてメンテナンス計画を自動作成する。   On the other hand, when maintenance management is to be continued after repairing or renovating a new or existing ALC exterior wall, specifically, for example, according to the maintenance plan No.1 or No.2, repairing and refurbishing ALC in those final years. When performing maintenance management after performing the maintenance, or performing maintenance management after repairing and renovating the ALC after diagnosing the deterioration of the existing ALC external wall at a desired time, as shown in Table 4 ( A maintenance plan is automatically created based on 2).

この場合、使用されている塗料およびシーリング材の耐久年数(見直し耐久年数)は前記表2に示した耐久年数テーブルにより決定し、ALCの耐久年数は先にALCを補修改修する際に行ったALCの劣化診断等に基づいて決定する。また本実施形態においては、表4の(2)に示すように前記のALC劣化レベルが1〜3の場合には、ALCの耐久年数を一律に20年とし、ALC劣化レベルが4または5の場合には、ALCの耐久年数を一律に10年としたものである。   In this case, the durability of the paint and sealant used (reviewed durability) is determined by the durability table shown in Table 2 above, and the durability of ALC is the ALC performed when the ALC was repaired and repaired first. This is determined based on the deterioration diagnosis of the product. Further, in this embodiment, as shown in Table 4 (2), when the ALC deterioration level is 1 to 3, the durable life of the ALC is uniformly 20 years, and the ALC deterioration level is 4 or 5. In this case, the durable life of ALC is uniformly 10 years.

表5(2)の計画No.3および計画No.4は、新築もしくは既存のALC造外壁を補修改修を行った後に引き続きメンテナンス管理を行う場合のメンテナンス計画の一例を示すもので、計画No.3は、上記表4の(2)に示すようにALC劣化レベルが1〜3のいずれかで、ALCの耐久年数を20年とし、塗料の耐久年数が5年、シーリング材の耐久年数が10年である場合のメンテナンス計画である。また計画No.4は、上記表4の(2)に示すようにALC劣化レベルが4または5で、ALCの耐久年数を10年とし、塗料の耐久年数が15年、シーリング材の耐久年数が5年である場合のメンテナンス計画を示すものである。 Plan No. 3 and Plan No. 4 in Table 5 (2) show an example of a maintenance plan in the case where maintenance management is continued after repairing or renovating a new or existing ALC external wall. 3, ALC degradation level is any one of 1 to 3 as shown in (2) of Table 4 above, the durability of ALC is 20 years, the durability of paint is 5 years, and the durability of sealant is 10 This is a maintenance plan for the year. Plan No.4 shows that the ALC deterioration level is 4 or 5 as shown in Table 4 (2) above, the ALC durability is 10 years, the paint durability is 15 years, and the sealing material durability is 15 years. This shows the maintenance plan for 5 years.

なお上記表5(2)において、「維持管理部分補修」とあるのは、ALCが耐久年数に至る前は原則として特に不都合がなければALCをそのままの状態で維持管理し、部分的に劣化、損傷等がある場合にはその部分を補修するというものである。この部分補修は前記表5(1)の計画No.1および計画No.2においても必要に応じて行ってもよい。   In Table 5 (2) above, “maintenance for maintenance management” means that ALC is maintained and maintained as it is, unless there is any particular inconvenience before ALC reaches the endurance life, and partially deteriorated. If there is damage, repair the part. This partial repair may be performed as necessary in the plan No. 1 and the plan No. 2 in Table 5 (1).

図2は前記図1のコンピュータシステムを用いて、ALC造外壁案件の登録からメンテナンス計画作成、顧客とのメンテナンス契約、メンテナンス実施案内、メンテナンス実施までの一連の管理を行うプロセスの一例を示すもので、以下順を追って説明する。   FIG. 2 shows an example of a process for performing a series of management from registration of an ALC external wall project to creation of a maintenance plan, maintenance contract with a customer, maintenance execution guidance, and maintenance using the computer system of FIG. In the following, description will be given in order.

先ず、図2中の(1)の新規案件登録では、新築ALC造外壁もしくは既存建物で劣化診断を行ったALC造外壁の建物について、例えばALC生産会社の担当者は案件データベース登録プログラムを起動させて、管理用端末2から当該建物の情報、ALC・シーリング・塗装の情報、過去のメンテナンス実施情報等を入力し、案件データベースに登録する。すると、前記図1のメンテナンス計画作成プログラムが自動的に起動し、前記表5に示すようなALC造外壁のメンテナンス計画が自動作成される。   First, in the new project registration (1) in FIG. 2, the person in charge of the ALC production company, for example, starts the project database registration program for a newly constructed ALC exterior wall or an ALC exterior wall building that has undergone a deterioration diagnosis on an existing building. Then, the building information, ALC / sealing / painting information, past maintenance information, etc. are input from the management terminal 2 and registered in the project database. Then, the maintenance plan creation program of FIG. 1 is automatically started, and a maintenance plan for the ALC outer wall as shown in Table 5 is automatically created.

上記のようにして自動作成されたメンテナンス計画は、前記の案件データベースに格納されると共に、前記のメンテナンス計画表示プログラムが自動起動して担当者の管理用端末2と、当該案件の顧客端末3にメンテナンス計画が表示される。そこで、担当者は顧客と連絡を取り、当該案件に対して顧客とメンテナンス契約を行う。   The maintenance plan automatically created as described above is stored in the case database, and the maintenance plan display program is automatically activated to the management terminal 2 of the person in charge and the customer terminal 3 of the case. The maintenance plan is displayed. Therefore, the person in charge contacts the customer and makes a maintenance contract with the customer for the matter.

次に、図2中の(2)のメンテナンス実施日の所定期間前(例えば1〜6ヶ月前、本実施形態では3ヶ月前)になると、メンテナンス計画表示プログラムが自動起動し、メンテナンス計画が担当者の管理用端末2と対応する顧客端末3に表示される。そのメンテナンス計画を確認した担当者は顧客と連絡を取り、当該案件のメンテナンス工事の詳細を顧客に説明する。そして顧客からのメンテナンス工事依頼が顧客端末から入力されると、案件データベース登録プログラムが自動起動し、メンテナンス工事受注情報が案件データベースに格納される。   Next, when a predetermined period before the maintenance execution date (2) in FIG. 2 (for example, 1 to 6 months before, 3 months in the present embodiment), the maintenance plan display program is automatically started and the maintenance plan is in charge. Displayed on the customer terminal 3 corresponding to the management terminal 2 of the user. The person in charge confirming the maintenance plan contacts the customer and explains the details of the maintenance work for the case to the customer. When the maintenance work request from the customer is input from the customer terminal, the case database registration program is automatically started, and the maintenance work order information is stored in the case database.

次いで、図2中の(3)のメンテナンス実施当日になると、軽量気泡コンクリートの劣化診断システムが起動して外壁の劣化診断がなされて補修改修方法が決定される。本実施形態においては前記特許文献1に準拠した劣化診断システムによって外壁の劣化状況を評価し、適切な補修改修方法を決定して補修改修工事を実施する。具体的には、例えば前記特許文献1にも記載のように、仕上げ補修、シーリング補修、U(V)カットモルタル充填工法、U(V)カットシーリング充填工法、浸透性表面強化剤、発泡性樹脂注入工法、ネット張り補強工法、パネル表面繊維補強工法、鋼材補強工法、パネル取り替え等の改修処理方法の中から劣化状況やコスト等を勘案して適宜選択して施工すればよい。   Next, when the maintenance day (3) in FIG. 2 is reached, the lightweight foam concrete deterioration diagnosis system is activated and the outer wall deterioration diagnosis is performed to determine a repair / repair method. In this embodiment, the deterioration diagnosis system based on the said patent document 1 evaluates the deterioration condition of an outer wall, determines an appropriate repair and repair method, and implements repair repair work. Specifically, for example, as described in Patent Document 1, finishing repair, sealing repair, U (V) cut mortar filling method, U (V) cut sealing filling method, permeable surface reinforcing agent, foamable resin What is necessary is just to select suitably from a repairing method such as an injection method, a net reinforcement method, a panel surface fiber reinforcement method, a steel material reinforcement method, and a panel replacement method in consideration of deterioration conditions and costs.

上記のようにして補修改修方法が決定されたところで、その補修改修方法に従って補修改修工事を実施する。なお上記補修改修方法の決定や補修改修工事は、劣化診断、特に炭素化度の測定結果が判明するまでに時間が掛かる場合には、それらの結果が判明した後に行われることもある。そして、補修改修工事終了後には、案件データベース登録プログラムを起動させ、実施した工事内容などのメンテナンス情報を案件データベースに追加する。以後は前記メンテナンス計画に記載した予定期日が近づく度毎に図2(2)および(3)の操作を繰り返し、全ての計画が終了した後、更に新たなメンテナンス計画を進める場合には図2(1)からの操作を再度繰り返えせばよい。   When the repair / repair method is determined as described above, the repair / renovation work is carried out according to the repair / repair method. The determination of the repair / repair method and the repair / repair work may be performed after the results of the deterioration diagnosis, especially when it takes time to determine the measurement result of the degree of carbonization. After the repair / renovation work is completed, the project database registration program is started, and maintenance information such as the details of the performed work is added to the project database. Thereafter, each time the scheduled date described in the maintenance plan approaches, the operations in FIGS. 2 (2) and (3) are repeated, and when all plans are completed, a new maintenance plan is further advanced as shown in FIG. The operation from 1) may be repeated again.

なお上記実施形態は、表2におけるシーリング材や塗料の見直し耐久年数や、表5におけるメンテナンス施工年を5年を基準に設定したが、それらの年数や、表4におけるALCの耐久年数、およびその他の年数も適宜変更可能である。また表5におけるメンテナンス終了年数も建物の存続年数や所有者の管理希望年数等に応じて適宜変更することができる。   In the above-described embodiment, the review durable years of the sealing material and paint in Table 2 and the maintenance work years in Table 5 are set on the basis of five years, but those years, the durable years of ALC in Table 4, and others The number of years can be changed as appropriate. Also, the maintenance end years in Table 5 can be changed as appropriate according to the lifetime of the building, the number of years the owner wants to manage, and the like.

また前記実施形態は、メンテナンス工事の際に、新築時と同じ材質または耐久年数の材料(塗料、シーリング材、パネル)を繰り返し使用することを前提としてメンテナンス計画を作成したが、必ずしも同じ材質または耐久年数の材料でなくてもよく、耐久年数が異なる場合にはその耐久年数を勘案してメンテナンス計画を作成すればよい。   In the above-described embodiment, the maintenance plan is created on the assumption that the same material or the durable material (paint, sealing material, panel) of the new construction is used repeatedly during the maintenance work. The material does not have to be years, and if the durability is different, a maintenance plan may be created in consideration of the durability.

以上説明したように本発明によるALC造外壁のメンテナンスシステム及びメンテナンス管理方法によれば、パネルだけでなくシーリング材や塗膜が劣化した状態で放置されることがなくなるので、基材ALCの経年劣化が低減され、最低限の費用で外壁の寿命を最大限に延ばすことが可能となる。また基材の劣化状態を定期的に且つ計画的に監視できるので、漏水などの異常事態による損害発生の可能性や、建物の耐久性および寿命が低下するのを良好に防止することができる。さらに建物の種類や使用目的もしくは所有者のニーズに応じたメンテナンス管理が可能となると共に、メンテナンス方法や時期の選択の自由度を増大させることができる。   As described above, according to the maintenance system and the maintenance management method for an ALC external wall according to the present invention, not only the panel but also the sealing material and the coating film are not left in a deteriorated state. And the lifetime of the outer wall can be maximized at a minimum cost. Further, since the deterioration state of the base material can be monitored regularly and systematically, it is possible to satisfactorily prevent the possibility of damage due to an abnormal situation such as water leakage and the deterioration of the durability and life of the building. Furthermore, maintenance management according to the type of building, purpose of use, or owner's needs is possible, and the degree of freedom in selecting a maintenance method and time can be increased.

本発明に基づいてALC造外壁のメンテナンス管理を行うコンピュータシステムの概略構成説明図。The schematic structure explanatory drawing of the computer system which performs maintenance management of the ALC building outer wall based on this invention. 本発明に基づいてALC造外壁のメンテナンス管理を行う場合のプロセスの一例を示す説明図。Explanatory drawing which shows an example of the process in the case of performing maintenance management of the ALC building outer wall based on this invention.

符号の説明Explanation of symbols

1 管理サーバ
11 情報処理部
12 記憶部
2 管理用端末
3 顧客端末
N ネットワーク
DESCRIPTION OF SYMBOLS 1 Management server 11 Information processing part 12 Storage part 2 Management terminal 3 Customer terminal N Network

Claims (2)

建物の外面にALCパネルを取付け、その隣り合うパネル間に目地シーリングを施すと共に上記パネル表面に塗装仕上を施したALC造外壁のメンテナンスを行うためのシステムであって、管理用端末が接続されている管理サーバと、その管理サーバに通信ネットワークを通じて顧客端末が接続されるコンピュータシステムを備え、上記管理サーバには、上記建物の情報、ALC・シーリング・塗装の情報、外壁のメンテナンス計画、メンテナンス実施情報などを格納した案件データベースと、その案件データベースに種々の情報を登録するための手段と、メンテナンス計画を自動的に作成する手段と、メンテナンス計画作成時とメンテナンス実施日が来る前にメンテナンス計画を各端末に表示する手段と、ALC造外壁の劣化診断と補修改修方法の決定を行う劣化診断システムとを備えたことを特徴とするALC造外壁のメンテナンスシステム。   A system for attaching an ALC panel to the exterior surface of a building, providing joint sealing between adjacent panels, and maintaining the ALC external wall with a painted finish on the panel surface, with a management terminal connected Management server and a computer system to which customer terminals are connected to the management server through a communication network. The management server includes information on the building, information on ALC / sealing / painting, maintenance plan for external walls, and maintenance execution information. Each item is stored in the case database, a means for registering various information in the matter database, a means for automatically creating a maintenance plan, and a maintenance plan at the time of maintenance plan preparation and before the maintenance execution date. Means to display on terminal, deterioration diagnosis and repair of ALC external wall Maintenance system of ALC Zogaiheki characterized in that a degradation diagnostic system for the determination method. 新築ALC造外壁の建物、及び新築もしくは既存のALC造外壁で劣化診断や補修改修が行われた建物について、担当者が管理用端末から当該建物の情報、ALC・シーリング・塗装の情報、メンテナンス実施情報を案件データベースに登録した後に、外壁のメンテナンス計画を自動作成するプロセスと、その自動作成したメンテナンス計画を顧客端末に表示することによって顧客とメンテナンス契約を行うプロセスと、メンテナンス実施日の所定期日前になると、メンテナンス計画表示プログラムが自動起動してメンテナンス契約を行った顧客端末にメンテナンス計画が表示されるプロセスと、そのメンテナンス計画の内容を確認した顧客からのメンテナンス工事発注を受けて、外壁の劣化を診断すると共に、適切な補修改修方法を決定するプロセスと、その補修改修方法によって補修改修工事を実施するプロセスと、その補修改修工事終了後にメンテナンス情報を案件データベースに登録するプロセスとを有することを特徴とするALC造外壁のメンテナンス管理方法。   For newly constructed ALC exterior walls, and for newly constructed or existing ALC exterior walls that have undergone deterioration diagnosis and repair / repair, the person in charge uses the management terminal to provide information on the building, ALC / sealing / painting information, and maintenance. After the information is registered in the matter database, a process for automatically creating a maintenance plan for the outer wall, a process for performing a maintenance contract with the customer by displaying the automatically created maintenance plan on the customer terminal, and a predetermined date before the maintenance execution date When the maintenance plan display program starts automatically, the maintenance plan is displayed on the customer terminal that has entered into the maintenance contract, and the maintenance work order from the customer who confirmed the contents of the maintenance plan is received. And determine appropriate repair and repair methods And process, the process of implementing a repairing renovation by its repair renovation process, the maintenance management method for ALC Zogaiheki characterized by having a process of registering the maintenance information after the repair renovation ended case database.
JP2003383327A 2003-11-13 2003-11-13 Alc external wall maintenance system and alc external wall maintenance control method Withdrawn JP2005146584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003383327A JP2005146584A (en) 2003-11-13 2003-11-13 Alc external wall maintenance system and alc external wall maintenance control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003383327A JP2005146584A (en) 2003-11-13 2003-11-13 Alc external wall maintenance system and alc external wall maintenance control method

Publications (1)

Publication Number Publication Date
JP2005146584A true JP2005146584A (en) 2005-06-09

Family

ID=34692080

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003383327A Withdrawn JP2005146584A (en) 2003-11-13 2003-11-13 Alc external wall maintenance system and alc external wall maintenance control method

Country Status (1)

Country Link
JP (1) JP2005146584A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011144557A (en) * 2010-01-14 2011-07-28 Toyota Home Kk Building and member selecting system for building
JP2011231483A (en) * 2010-04-26 2011-11-17 Toyota Home Kk Method to diagnose degradation of joint
JP2012068855A (en) * 2010-09-22 2012-04-05 Toyota Home Kk Building maintenance management system
JP2012103960A (en) * 2010-11-11 2012-05-31 Toyota Home Kk Residence maintenance system
JP2012241325A (en) * 2011-05-16 2012-12-10 Toyota Motor Corp Residential house maintenance system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011144557A (en) * 2010-01-14 2011-07-28 Toyota Home Kk Building and member selecting system for building
JP2011231483A (en) * 2010-04-26 2011-11-17 Toyota Home Kk Method to diagnose degradation of joint
JP2012068855A (en) * 2010-09-22 2012-04-05 Toyota Home Kk Building maintenance management system
JP2012103960A (en) * 2010-11-11 2012-05-31 Toyota Home Kk Residence maintenance system
JP2012241325A (en) * 2011-05-16 2012-12-10 Toyota Motor Corp Residential house maintenance system

Similar Documents

Publication Publication Date Title
Chen et al. An application of bar-code system for reducing construction wastes
US5737227A (en) Software planning program for coatings
laili Jabar et al. Construction manager's competency in managing the construction process of IBS projects
Ong et al. Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices
da Silva et al. Statistical survey on inspection, diagnosis, and repair of architectural concrete surfaces
Brosque et al. Comparative analysis of manual and robotic concrete drilling for installation hangers
Bagdiya et al. Review paper on construction defects
JP2005146584A (en) Alc external wall maintenance system and alc external wall maintenance control method
Ismail Improving maintenance management practices for building facility
Christiansen The planning process at a construction site
Nguyen et al. Hybrid Simulation for Value Stream Mapping to Improve the Environmental Performance of the Construction Phase
Swami et al. Implementation of six sigma methodology in construction industry for quality process improvement
Dahanayake et al. Assessment on defects occurence and rework costs in housing construction sector in Srilanka
Jabar et al. Managing IBS Project: The evolving roles and competencies of project manager
Hu et al. Construction Automation and Robotics for Concrete Construction: Case Studies on Research, Development, and Innovations
Zainudin Application of drone in visual inspection for construction project
CN110322026A (en) Dynamic reliability device management method based on equipment fault data
JP2002245146A (en) Method and system for calculating structure maintenance cost, program for making computer perform the calculating method and recording medium with the program recorded thereon
JP5197384B2 (en) How to plan sheet pile wall sections
Ramprasad et al. Sustainability in Construction Projects: Setting and measuring impacts
Nurlaelah VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING
Schimanski et al. Promoting Collaborative Construction Process Management by means of a Normalized Workload Approach
CN115965207B (en) Resource allocation method, system and storage medium
JP2007025774A (en) Maintenance system and maintenance control method for alc external wall
Huhnt et al. Modification management for construction processes

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300