JP2005045901A - Automatic designing system for optimal overhead distribution line and method therefor - Google Patents
Automatic designing system for optimal overhead distribution line and method therefor Download PDFInfo
- Publication number
- JP2005045901A JP2005045901A JP2003202352A JP2003202352A JP2005045901A JP 2005045901 A JP2005045901 A JP 2005045901A JP 2003202352 A JP2003202352 A JP 2003202352A JP 2003202352 A JP2003202352 A JP 2003202352A JP 2005045901 A JP2005045901 A JP 2005045901A
- Authority
- JP
- Japan
- Prior art keywords
- distribution line
- overhead distribution
- design
- overhead
- optimum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 68
- 238000010276 construction Methods 0.000 claims abstract description 11
- 238000004364 calculation method Methods 0.000 claims description 27
- 238000005457 optimization Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 14
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000002068 genetic effect Effects 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、架空配電線を設計する際に用いる架空配電線最適自動設計システム及びその方法に関する。
【0002】
【従来の技術】
従来、架空配電線の設計においては、設計者が設計基準に基づいて手計算または個別のツールを用いて強度計算や電圧降下計算などを行って、電柱、電線および変圧器などの組合せや配置を決定している。
【0003】
【発明が解決しようとする課題】
しかしながら、上記した従来の架空配電線設計方法では、設計者が手計算や個別のツールを用いて設計を行うため、作業効率が悪く、設計時間が長期化し、設備コストがかかるなどの問題がある。
【0004】
このような問題を解決するために、顧客の負荷に応じて強度計算や電圧計算などを行うことにより電柱や変圧器などの機器選択部分を自動化および最適化する方法が実用化されているが、変圧器の配置、低圧系統、電柱および電線などの組合せを自動化および最適化したものはない。
【0005】
なお、本発明の架空配電線最適自動設計システム及びその方法に関連する技術を開示するものとしては、以下の特許文献がある。
【特許文献1】
特許第3403554号公報(特開平9−70141号公報)
【特許文献2】
特開平2000−184594号公報
【0006】
しかしながら、特許第3403554号公報に開示された配電系統計画支援装置は、配電高圧系統における設備増設計画の検討や策定を機械的に行うものである。
また、特開平2000−184594号公報に開示された配電系統計画作成方法は、電力供給支障が生じた場合に、各配電線の経路断続を行う開閉器、および同一の変電所から給電される配電線同士の間の連系断続を行う開閉器の開閉組合せを、電力供給支障が発生しないように遺伝的アルゴリズムを用いて作成するものである。
【0007】
本発明の目的は、変圧器の配置、低圧系統、電柱および電線などの組合せを自動化および最適化することにより、作業効率の向上、設計時間の短縮および設備コストの低減などが図れる架空配電線最適自動設計システムおよびその方法を提供することにある。
【0008】
【課題を解決するための手段】
本発明の架空配電線最適自動設計システム(80)は、少なくとも分岐元柱、電柱位置、配電線ルート、各電柱の負荷および制約条件を含む初期設定項目を入力する入力手段(81)と、前記初期設定項目に基づいて架空配電線設計の初期解を求めるとともに、該架空配電線設計の初期解に基づいて建設コストおよび電力ロスを最小化する架空配電線設計の最適解を求める演算手段(82)とを備える。
【0009】
前記演算手段(82)が、ロジック手法を用いて前記架空配電線設計の初期解を求めるとともに、該架空配電線設計の初期解に基づいてメタヒューリスティック手法を用いて前記架空配電線設計の最適解を求めてもよい。
前記演算手段(82)が、電柱の数に応じて山登り法またはタブサーチを使用して前記架空配電線設計の最適解を求めてもよい。
前記演算手段(82)が、電柱の数が所定の数よりも少ない場合には前記山登り法を使用し、電柱の数が所定の数よりも多い場合には前記タブサーチを使用してもよい。
前記演算手段(82)が、電柱をグループ分けすることにより前記架空配電線設計の初期解を求めたのちに、変更可能な電柱を前記架空配電線設計の初期解として求められたグループから他のグループに移動させる移動処理と、変更可能な電柱を前記架空配電線設計の初期解として求められたグループから他のグループに移動させるとともに別のグループから電柱を追加する交換処理とを用いて前記架空配電線設計の最適解を求めてもよい。
前記演算手段(82)が、次式で表される最適化計算を行って前記架空配電線設計の最適解を求めてもよい。
【数3】
【0010】
本発明の架空配電線最適自動設計方法は、架空配電線を設計する際に用いる架空配電線最適自動設計方法であって、少なくとも分岐元柱、電柱位置、配電線ルート、各電柱の負荷および制約条件を含む初期設定項目をコンピュータ(82)に入力するステップと、前記初期設定項目に基づいて前記コンピュータ(82)によりロジック手法を用いて架空配電線設計の初期解を求めるステップと、前記架空配電線設計の初期解に基づいて前記コンピュータ(82)によりメタヒューリスティック手法を用いて建設コストおよび電力ロスを最小化する架空配電線設計の最適解を求めるステップとを備える。
前記コンピュータ(82)が、電柱の数が所定の数よりも少ない場合には前記山登り法を使用し、電柱の数が所定の数よりも多い場合には前記タブサーチを使用して前記架空配電線設計の最適解を求めてもよい。
前記コンピュータ(82)が、次式で表される最適化計算を行って前記架空配電線設計の最適解を求めてもよい。
【数4】
【0011】
【発明の実施の形態】
以下、本発明の架空配電線最適自動設計システムおよびその方法の実施の形態について図面を用いて説明する。
【0012】
本発明の一実施の形態による架空配電線最適自動設計システム80は、図1に示すように、電柱情報(初期設定項目など)を格納するための電柱情報ファイル81と、電柱情報ファイル81から入力される電柱情報に基づいて架空配電線設計の初期解を求めるとともにこの架空配電線設計の初期解に基づいて架空配電線設計の最適解を求めるためのコンピュータ82と、コンピュータ82によって求めた架空配電線設計の初期解を格納するための初期解ファイル83と、コンピュータ82によって求めた架空配電線設計の最適解を格納するための最適解ファイル84と、架空配電線設計の最適解に基づいてコンピュータ82によって求めた装柱データを格納するための装柱ファイル85と、コンピュータ82における処理の経過を格納するための処理経過ログ出力ファイル86と、後述する初期条件ファイル87とを備える。
【0013】
次に、本実施の形態による架空配電線最適自動設計システム80の動作について図2から図6を用いて説明する。
まず、設計者は、GUIプログラムを用いて、初期設定項目(分岐元柱、電柱位置、支線、配電線ルート、各電柱の負荷(顧客の契約種別、契約電力、戸数など)、および設備設置制限などの制約条件)をコンピュータ82に入力する。なお、この初期設定項目は電柱情報として電柱情報ファイル81に格納される。
すなわち、設計者は、データ入力として、分岐元柱として図3に示す電柱1を設定したのち(図2のステップS1)、電柱1〜14の位置を設定するとともに支線を設定する(ステップS2)。その後、設計者は、配電線のルートを設定したのち(ステップS3)、各電柱の負荷(顧客の契約種別、契約電力、戸数など)を設定する(ステップS4)。その後、設計者は、設備設置制限などの制約条件を設定する(ステップS5)。なお、変圧器容量、低圧電線の許容電流値、線路許容亘長、負荷電流計算式、電圧降下計算式、風圧荷重計算式、許容風圧荷重値、工事費単価などは、初期条件ファイル87としてプログラムに予め設定されている(変更可能)。
その後、設計者は、前処理として、コンピュータ82を用いて全電柱1〜14間の距離を計算する(ステップS6)。
【0014】
続いて、設計者は、コンピュータ82を用いてロジック手法により、変圧器柱を決定したのち、末端電柱までのルートを低圧系統に加え、低圧線の電圧降下や許容電流を考慮しつつ変圧器容量、変圧器位置および低圧線の線種を変更して、低圧系統を決定していく処理を繰り返す(図4から図6に示す初期解作成処理)。
すなわち、まず、電柱ファイル81から入力された電柱情報に基づいて、分岐元柱である電柱1(始点)に最小容量(5kVA)の変圧器(不図示)が設置され、電柱1が第1のグループとされる。その後、図4に示すように、始点である電柱1から最小距離(24m+38m+24m+47m=133m)の末端電柱(電柱5)までの全電柱2〜5が第1のグループに追加される。このとき、電柱1に設置された最小容量の変圧器では過負荷となるため、この変圧器は容量10kVAの変圧器31に変更される。その後、負荷密度と負荷合計とを計算し、その計算結果に基づいて最小コストの電線が選定される。たとえば、負荷密度0.5kVA/本超過かつ負荷合計3.7kVA超過の場合には、低圧線OW58または低圧線MOE55が選定される。なお、図4に示す例では、低圧線MOE55の亘長制約が105m以内であるため、図5に示すように低圧線OW58が選定される(以上、ステップS7,S8)。その後、これらの処理が、以下のように繰り返される。
【0015】
電柱1(始点)から2番目に最小距離(24m+38m+24m+53m+48m=187m)の末端電柱である電柱14までの電柱11,14が第1のグループに追加される。このとき、電圧降下が5Vを超過するため、変圧器位置(始点)を電柱1から順次移動していき、最終的に容量20kVAの変圧器32が電柱3に設置される。したがって、これ以降は、電柱3が始点とされる。また、電柱3(始点)から最も遠い場所にある電柱14までの距離は24m+53m+48m=125mであり低圧線MOE55の亘長制約105m以内を満たさないため、線種は低圧線OW58のままとされる。
続いて、電柱3(始点)からグループ以外で最小距離(24m+53m+48m+35m=160m)の末端電柱である電柱13までの電柱12,13が第1のグループに追加される。このとき、電圧降下が5Vを超過するため、変圧器位置(始点)を電柱3から順次移動していき、最終的に容量20kVAの変圧器33が電柱11に設置される。したがって、これ以降は、電柱11が始点とされる。また、電柱11(始点)から最も遠い場所にある電柱1までの距離は24m+38m+24m+53m=139mであり低圧線MOE55の亘長制約105m以内を満たさないため、線種は低圧線OW58のままとされる。
【0016】
続いて、残りの電柱6〜10が第1のグループに追加されるが、電圧降下が5Vを超過し、かつ、変圧器位置(始点)を電柱11から順次移動しても電圧降下が5Vを超過するため、電柱6〜10は図6に示すように第2のグループとされる。なお、第1のグループにおける線種は低圧線OW58のままとされる。
第2のグループについては、まず、最も若番である電柱6に変圧器を設置して上記と同様の処理が繰り返される。その結果、最終的に、電柱8に容量20kVAの変圧器34が設置される。このとき、電柱8(始点)から最も遠い場所にある電柱6との距離は55m+55m=110mであり低圧線MOE55の亘長制約105m以内を満たさないため、第2のグループに使用される線種は低圧線OW58とされる。
以上のようにしてすべての電柱1〜14がグループ分けされると、分岐元柱から変圧器柱(電柱11と電柱8)に対して高圧線が図6に実線で示すように配置される(ステップS9)。
【0017】
続いて、コンピュータ82は、架空配電線設計の初期解として初期解作成処理により得られた架空配電線の総合コストを計算するとともに(ステップS11)、最適解探索処理(建設コストおよび電力ロスの最小化)を行うため、次式で表わされる最適化計算を行う(ステップS12)。ここで、建設コストおよびロス電力量については複数年の累計としてもよい。
【数5】
【0018】
この最適化計算の結果に基づいて(ステップS13)、コンピュータ82は、メタヒューリスティック手法である山登り法またはタブサーチを使用して、ランダムに移動処理または交換処理を選択して解の更新をすることにより、最適解探索処理を行う。なお、基本的には山登り法を使用すればよいが、山登り法では局所解に陥ったときに十分に探索が行われないため、大規模なケース(たとえば、電柱が99本以上)ではタブサーチを使用することが好ましい。
ここで、移動処理は、図8に示すように、選択した変更可能電柱を当該グループから削除して隣接グループに追加する処理である。また、交換処理は、図9に示すように、同一グループで変更可能電柱を2箇所選択し、選択された変更可能電柱の中の1本をグループから削除して隣接グループに追加するとともに、もう1本の選択された変更可能電柱の隣接グループの変更可能電柱の1本を追加する処理である。ただし、変更可能電柱が変圧器柱である場合は、グループすべてを移動・追加する。
【0019】
図7に示す最適解探索処理の例では、移動処理によって電柱6を第2のグループから第1のグループに移動することにより、電柱8(始点)から電柱10までの距離(47m+22m=69m)と電柱8(始点)から電柱7までの距離(55m)とを低圧線MOE55の亘長制約105m以内とする。これにより、第2のグループに使用する線種を低圧線OW58から、それよりも低コストである低圧線MOE55に変更することができ、建設コストダウンを図ることができる。
【0020】
なお、最適解探索処理にかかる平均計算時間の一例を表1に示すとともに、最適解探索回数を1000回としたときの計算結果の一例を表2に示す。
【表1】
【表2】
【0021】
表2の計算結果によれば、小規模の架空配電線(電柱23本)の場合には再現性は問題ないが、規模が大きくなるに従って再現性が悪くなった。しかし、たとえば、プログラムの内部処理として最適解探索回数を1000回×10回程度実行して、その中で最適解を採用するなどの対策をとれば、再現性が問題となることはないと考える。
【0022】
図10に、本発明の架空配電線最適自動設計システムにおける最適解探索処理の結果の他の一例を示す。この例では、架空配電線設計の初期解として、電柱1〜3が第1のグループに、電柱4〜6が第2のグループに、電柱7〜12が第3のグループに、電柱13〜15が第4のグループに、電柱16〜23が第5のグループにグループ分けされたが、最適解探索処理の結果、電柱13,14を第4のグループから第5のグループに移動して、電柱15を第4のグループにし、電柱13,14,16〜23を第5のグループとし直すことにより、建設コストの最小化および電力ロスの最小化を図っている。
【0023】
【発明の効果】
以上説明したように、本発明の架空配電線最適自動設計システムおよびその方法は、次の効果を有する。
(1)電柱位置、支線位置、電線ルートおよび顧客の負荷を入力するだけで設計基準および工事基準を満たしたコストミニマムな電柱、電線および変圧器などの組合せおよび配置を短時間に選択できるため、これまでと比べて作業効率の向上、設計時間の短縮、設備コストの低減などができる。
(2)コストミニマムな組合せおよび配置(最適解)を決定する手法には、ロジック手法で求めた架空配電線設計の初期解からメタヒューリスティック手法を用いて架空配電線設計の最適解を探索することにより、組合せ数が膨大な場合でも効率的に架空配電線設計の最適解を探索することができる。
(3)架空配電線設計の初期解を求めるのにロジック手法を用いることにより、架空配電線設計の初期解の段階で架空配電線設計の最適解に近い解を求めることができるため、架空配電線設計の最適解の探索時間を短縮することができる。
【図面の簡単な説明】
【図1】本発明の架空配電線最適自動設計システムの一実施の形態を示すブロック図である。
【図2】図1示した架空配電線最適自動設計システム80の動作を説明するためのフローチャートである。
【図3】図1示した架空配電線最適自動設計システム80の動作を説明するための図であり、電柱の初期設定の一例を示す図である。
【図4】図1示した架空配電線最適自動設計システム80の動作を説明するための図であり、初期解作成処理の一例を示す図である。
【図5】図1示した架空配電線最適自動設計システム80の動作を説明するための図であり、初期解作成処理の一例を示す図である。
【図6】図1示した架空配電線最適自動設計システム80の動作を説明するための図であり、初期解作成処理の一例を示す図である。
【図7】図1示した架空配電線最適自動設計システム80の動作を説明するための図であり、最適解探索処理の一例を示す図である。
【図8】移動処理について説明するための図である。
【図9】交換処理について説明するための図である。
【図10】本発明の架空配電線最適自動設計システムにおける最適解探索処理の結果の他の一例を示す図である。
【符号の説明】
1〜23 電柱
31〜34 変圧器
80 架空配電線最適自動設計システム
81 電柱情報ファイル
82 コンピュータ
83 初期解ファイル
84 最適解ファイル
85 装柱ファイル
86 処理経過ログ出力ファイル
87 初期条件ファイル
S1〜S14 ステップ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an overhead automatic distribution line optimum automatic design system and method used when designing an overhead distribution line.
[0002]
[Prior art]
Conventionally, in the design of overhead distribution lines, the designer performs the strength calculation and voltage drop calculation using manual calculation or individual tools based on the design standards, and the combination and arrangement of utility poles, wires and transformers, etc. Has been decided.
[0003]
[Problems to be solved by the invention]
However, the above-described conventional overhead distribution line design method has problems such as poor work efficiency, long design time, and high equipment costs because the designer performs design using manual calculation and individual tools. .
[0004]
In order to solve such problems, a method of automating and optimizing equipment selection parts such as utility poles and transformers by performing strength calculation and voltage calculation according to customer's load has been put into practical use, There is no automated and optimized combination of transformer placement, low voltage system, utility poles and wires.
[0005]
In addition, there exist the following patent documents as what discloses the technique relevant to the aerial distribution line optimal automatic design system and its method of this invention.
[Patent Document 1]
Japanese Patent No. 3403554 (Japanese Patent Laid-Open No. 9-70141)
[Patent Document 2]
Japanese Laid-Open Patent Publication No. 2000-184594
However, the distribution system planning support apparatus disclosed in Japanese Patent No. 3403554 mechanically examines and formulates a facility expansion plan in the distribution high-voltage system.
In addition, the distribution system planning method disclosed in Japanese Patent Application Laid-Open No. 2000-184594 discloses a switch for interrupting the route of each distribution line and a distribution supplied from the same substation when a power supply failure occurs. A switch combination for switching between the wires is created using a genetic algorithm so as not to cause a problem in power supply.
[0007]
The purpose of the present invention is to optimize overhead distribution lines that can improve work efficiency, shorten design time and reduce equipment costs by automating and optimizing combinations of transformer arrangement, low voltage system, utility poles and wires. It is to provide an automatic design system and method.
[0008]
[Means for Solving the Problems]
The aerial distribution line optimum automatic design system (80) of the present invention includes an input means (81) for inputting initial setting items including at least a branching source pole, a power pole position, a distribution line route, a load of each power pole, and a constraint condition; Calculation means (82) for obtaining an initial solution for the overhead distribution line design based on the initial setting items and for obtaining an optimum solution for the overhead distribution line design that minimizes the construction cost and power loss based on the initial solution for the overhead distribution line design ).
[0009]
The calculation means (82) obtains an initial solution of the overhead distribution line design using a logic method, and uses the metaheuristic method based on the initial solution of the overhead distribution line design to determine an optimal solution for the overhead distribution line design. You may ask for.
The computing means (82) may obtain an optimal solution for the overhead distribution line design using a hill-climbing method or a tab search according to the number of utility poles.
The computing means (82) may use the hill-climbing method when the number of utility poles is smaller than a predetermined number, and may use the tab search when the number of utility poles is greater than a predetermined number. .
After the calculation means (82) obtains an initial solution of the overhead distribution line design by grouping the utility poles, a changeable utility pole is obtained from the group obtained as the initial solution of the overhead distribution line design. Using the moving process of moving to a group and the replacement process of moving a changeable power pole from a group obtained as an initial solution of the overhead distribution line design to another group and adding a power pole from another group An optimal solution for distribution line design may be obtained.
The calculation means (82) may perform an optimization calculation represented by the following formula to obtain an optimal solution for the overhead distribution line design.
[Equation 3]
[0010]
The overhead automatic distribution line optimum automatic design method of the present invention is an optimum overhead distribution line automatic design method used when designing an overhead distribution line, and includes at least a branch source pole, a utility pole position, a distribution line route, loads and constraints on each utility pole. A step of inputting initial setting items including conditions to a computer (82); a step of obtaining an initial solution of an overhead distribution line design using a logic method by the computer (82) based on the initial setting items; Obtaining an optimal solution for overhead distribution line design that minimizes construction cost and power loss using the metaheuristic technique by the computer (82) based on the initial wire design solution.
The computer (82) uses the hill-climbing method when the number of utility poles is smaller than a predetermined number, and uses the tab search when the number of utility poles is greater than the predetermined number. You may obtain | require the optimal solution of an electric wire design.
The computer (82) may perform an optimization calculation represented by the following equation to obtain an optimal solution for the overhead distribution line design.
[Expression 4]
[0011]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of an aerial distribution line optimum automatic design system and method according to the present invention will be described below with reference to the drawings.
[0012]
As illustrated in FIG. 1, the overhead automatic distribution line optimum automatic design system 80 according to an embodiment of the present invention is input from a utility pole information file 81 for storing utility pole information (initial setting items and the like) and the utility pole information file 81. The computer 82 for obtaining the initial solution for the overhead distribution line design based on the utility pole information and the optimum solution for the overhead distribution line design based on the initial solution for the overhead distribution line design, and the overhead distribution obtained by the computer 82 An initial solution file 83 for storing the initial solution of the wire design, an optimal solution file 84 for storing the optimum solution of the overhead distribution line design obtained by the computer 82, and a computer based on the optimum solution of the overhead distribution line design The column file 85 for storing the column data obtained by 82 and the process progress in the computer 82 are stored. Comprising the processing progress log output file 86, and an
[0013]
Next, the operation of the overhead distribution line optimum automatic design system 80 according to the present embodiment will be described with reference to FIGS.
First, the designer uses the GUI program to make initial setting items (branch source pole, utility pole position, branch line, distribution line route, load of each utility pole (customer contract type, contract power, number of units, etc.), and facility installation restrictions. Or the like) is input to the computer 82. This initial setting item is stored in the utility pole information file 81 as utility pole information.
That is, the designer sets the
Thereafter, the designer calculates the distance between all the
[0014]
Subsequently, the designer determines the transformer pole by a logic method using the computer 82, adds the route to the terminal pole to the low-voltage system, and considers the voltage drop of the low-voltage line and the allowable current. Then, the transformer position and the line type of the low voltage line are changed, and the process of determining the low voltage system is repeated (initial solution creation process shown in FIGS. 4 to 6).
That is, first, based on the utility pole information input from the utility pole file 81, a transformer (not shown) with a minimum capacity (5 kVA) is installed on the utility pole 1 (starting point) that is the branch source pole, and the
[0015]
The
Subsequently, the
[0016]
Subsequently, the remaining
For the second group, first, a transformer is installed on the
When all the
[0017]
Subsequently, the computer 82 calculates the total cost of the overhead distribution lines obtained by the initial solution creation process as the initial solution of the overhead distribution line design (step S11), and also searches for the optimum solution (minimum construction cost and power loss). ), An optimization calculation represented by the following equation is performed (step S12). Here, the construction cost and the amount of lost power may be accumulated for a plurality of years.
[Equation 5]
[0018]
Based on the result of this optimization calculation (step S13), the computer 82 uses the hill-climbing method or tab search, which is a metaheuristic method, to randomly select the moving process or the exchange process and update the solution. Thus, the optimum solution search process is performed. Basically, the hill-climbing method should be used, but the hill-climbing method does not perform a sufficient search when it falls into a local solution, so tab search in large-scale cases (for example, 99 or more utility poles) Is preferably used.
Here, the moving process is a process of deleting the selected changeable utility pole from the group and adding it to the adjacent group, as shown in FIG. In addition, as shown in FIG. 9, in the replacement process, two changeable power poles are selected in the same group, and one of the selected changeable power poles is deleted from the group and added to the adjacent group. This is a process of adding one of the changeable power poles in the adjacent group of one selected changeable power pole. However, if the changeable utility pole is a transformer pole, move and add all groups.
[0019]
In the example of the optimum solution search process shown in FIG. 7, the distance from the utility pole 8 (start point) to the utility pole 10 (47 m + 22 m = 69 m) is obtained by moving the
[0020]
An example of the average calculation time for the optimum solution search process is shown in Table 1, and an example of the calculation result when the optimum solution search count is 1000 is shown in Table 2.
[Table 1]
[Table 2]
[0021]
According to the calculation results in Table 2, there is no problem in reproducibility in the case of a small-scale overhead distribution line (23 power poles), but the reproducibility deteriorates as the scale increases. However, for example, if the optimal solution search is executed about 1000 × 10 times as an internal process of the program and the optimal solution is adopted in the program, reproducibility will not be a problem. .
[0022]
FIG. 10 shows another example of the result of the optimum solution search process in the overhead distribution line optimum automatic design system of the present invention. In this example, as an initial solution for the overhead distribution line design, the
[0023]
【The invention's effect】
As described above, the overhead distribution line optimum automatic design system and method of the present invention have the following effects.
(1) The combination and arrangement of cost-minimum utility poles, wires, transformers, etc. that meet the design and construction standards can be selected in a short time simply by entering the pole position, branch line position, wire route, and customer load. Compared with the past, work efficiency can be improved, design time can be shortened, and equipment costs can be reduced.
(2) As a method of determining cost-minimum combinations and arrangements (optimal solutions), search for the optimal solution for overhead distribution line design using the metaheuristic method from the initial solution for overhead distribution line design obtained by the logic method. Thus, even when the number of combinations is enormous, it is possible to efficiently search for the optimum solution for the design of the overhead distribution line.
(3) By using a logic method to obtain the initial solution for overhead distribution line design, a solution close to the optimum solution for overhead distribution line design can be obtained at the initial solution stage of overhead distribution line design. The search time for the optimal solution of the electric wire design can be shortened.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an embodiment of an optimum automatic design system for overhead distribution lines according to the present invention.
FIG. 2 is a flowchart for explaining the operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1;
3 is a diagram for explaining an operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1, and is a diagram showing an example of initial setting of a utility pole. FIG.
4 is a diagram for explaining the operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1, and is a diagram showing an example of an initial solution creation process; FIG.
5 is a diagram for explaining the operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1, and is a diagram showing an example of an initial solution creation process; FIG.
6 is a diagram for explaining an operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1, and is a diagram showing an example of an initial solution creation process; FIG.
7 is a diagram for explaining the operation of the overhead distribution line optimum automatic design system 80 shown in FIG. 1, and is a diagram showing an example of optimum solution search processing; FIG.
FIG. 8 is a diagram for explaining a movement process.
FIG. 9 is a diagram for explaining exchange processing;
FIG. 10 is a diagram showing another example of the result of the optimum solution search process in the overhead distribution line optimum automatic design system of the present invention.
[Explanation of symbols]
1-23 Electric poles 31-34 Transformer 80 Overhead distribution line optimum automatic design system 81 Electric pole information file 82 Computer 83 Initial solution file 84 Optimal solution file 85 Pole file 86 Processing progress
Claims (9)
前記初期設定項目に基づいて架空配電線設計の初期解を求めるとともに、該架空配電線設計の初期解に基づいて建設コストおよび電力ロスを最小化する架空配電線設計の最適解を求める演算手段(82)と、
を備えることを特徴とする、架空配電線最適自動設計システム。An input means (81) for inputting initial setting items including at least a branch source pole, a power pole position, a distribution line route, a load of each power pole and a constraint condition;
An arithmetic means for obtaining an initial solution for the overhead distribution line design based on the initial setting items and obtaining an optimum solution for the overhead distribution line design that minimizes the construction cost and power loss based on the initial solution for the overhead distribution line design ( 82)
An optimum automatic design system for overhead distribution lines, characterized by comprising:
少なくとも分岐元柱、電柱位置、配電線ルート、各電柱の負荷および制約条件を含む初期設定項目をコンピュータ(82)に入力するステップと、
前記初期設定項目に基づいて前記コンピュータ(82)によりロジック手法を用いて架空配電線設計の初期解を求めるステップと、
前記架空配電線設計の初期解に基づいて前記コンピュータ(82)によりメタヒューリスティック手法を用いて建設コストおよび電力ロスを最小化する架空配電線設計の最適解を求めるステップと、
を備えることを特徴とする、架空配電線最適自動設計方法。In the optimum automatic design method for overhead distribution lines used when designing overhead distribution lines,
Inputting, to the computer (82), initial setting items including at least a branching source pole, a power pole position, a distribution line route, a load of each power pole, and constraint conditions;
Obtaining an initial solution for overhead distribution line design using a logic technique by the computer (82) based on the initial setting items;
Obtaining an optimal solution for an overhead distribution line design that minimizes construction costs and power loss using a metaheuristic approach by the computer (82) based on the initial solution for the overhead distribution line design;
A method for optimally designing an aerial distribution line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003202352A JP4094993B2 (en) | 2003-07-28 | 2003-07-28 | Overhead distribution line optimum automatic design system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003202352A JP4094993B2 (en) | 2003-07-28 | 2003-07-28 | Overhead distribution line optimum automatic design system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005045901A true JP2005045901A (en) | 2005-02-17 |
JP4094993B2 JP4094993B2 (en) | 2008-06-04 |
Family
ID=34262097
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003202352A Expired - Fee Related JP4094993B2 (en) | 2003-07-28 | 2003-07-28 | Overhead distribution line optimum automatic design system and method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4094993B2 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006277071A (en) * | 2005-03-28 | 2006-10-12 | Chugoku Electric Power Co Inc:The | Assembling facility support system |
JP2007006667A (en) * | 2005-06-27 | 2007-01-11 | Chugoku Electric Power Co Inc:The | Distribution line system route decision/support system |
JP2010009136A (en) * | 2008-06-24 | 2010-01-14 | Chugoku Electric Power Co Inc:The | Electricity bill calculation system and electricity bill calculation method |
JP2012517791A (en) * | 2009-02-11 | 2012-08-02 | アクセンチュア グローバル サービスィズ リミテッド | Method and system for reducing feeder circuit losses using demand response |
US8655500B2 (en) | 2009-02-11 | 2014-02-18 | Accenture Global Services Limited | Method and system for reducing feeder circuit loss using demand response |
CN106066924A (en) * | 2016-06-24 | 2016-11-02 | 国网四川省电力公司达州供电公司 | A kind of computational methods of overhead transmission line |
CN106374454A (en) * | 2016-09-07 | 2017-02-01 | 国电南瑞科技股份有限公司 | Modeling method of unit system power distribution network control model |
WO2017124132A1 (en) * | 2016-01-22 | 2017-07-27 | Biarri Networks Pty Ltd | Method and system for designing an electricity distribution network |
CN111563636A (en) * | 2020-07-13 | 2020-08-21 | 北京富通东方科技有限公司 | Three-stage meta-heuristic parking space allocation optimization method |
-
2003
- 2003-07-28 JP JP2003202352A patent/JP4094993B2/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4703229B2 (en) * | 2005-03-28 | 2011-06-15 | 中国電力株式会社 | Pillar equipment facility support system |
JP2006277071A (en) * | 2005-03-28 | 2006-10-12 | Chugoku Electric Power Co Inc:The | Assembling facility support system |
JP2007006667A (en) * | 2005-06-27 | 2007-01-11 | Chugoku Electric Power Co Inc:The | Distribution line system route decision/support system |
JP2010009136A (en) * | 2008-06-24 | 2010-01-14 | Chugoku Electric Power Co Inc:The | Electricity bill calculation system and electricity bill calculation method |
JP2012517791A (en) * | 2009-02-11 | 2012-08-02 | アクセンチュア グローバル サービスィズ リミテッド | Method and system for reducing feeder circuit losses using demand response |
US8655500B2 (en) | 2009-02-11 | 2014-02-18 | Accenture Global Services Limited | Method and system for reducing feeder circuit loss using demand response |
WO2017124132A1 (en) * | 2016-01-22 | 2017-07-27 | Biarri Networks Pty Ltd | Method and system for designing an electricity distribution network |
US11227076B2 (en) | 2016-01-22 | 2022-01-18 | Biarri Networks Pty Ltd | Method and system for designing an electricity distribution network |
CN106066924A (en) * | 2016-06-24 | 2016-11-02 | 国网四川省电力公司达州供电公司 | A kind of computational methods of overhead transmission line |
CN106374454B (en) * | 2016-09-07 | 2018-11-30 | 国电南瑞科技股份有限公司 | A kind of modeling method of unit style power distribution network Controlling model |
CN106374454A (en) * | 2016-09-07 | 2017-02-01 | 国电南瑞科技股份有限公司 | Modeling method of unit system power distribution network control model |
CN111563636A (en) * | 2020-07-13 | 2020-08-21 | 北京富通东方科技有限公司 | Three-stage meta-heuristic parking space allocation optimization method |
CN111563636B (en) * | 2020-07-13 | 2020-11-06 | 北京富通东方科技有限公司 | Three-stage meta-heuristic parking space allocation optimization method |
Also Published As
Publication number | Publication date |
---|---|
JP4094993B2 (en) | 2008-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ramirez-Rosado et al. | Genetic algorithms applied to the design of large power distribution systems | |
Ghadiri et al. | Comprehensive approach for hybrid AC/DC distribution network planning using genetic algorithm | |
Huang et al. | Three-phase balancing of distribution feeders using immune algorithm | |
Singh et al. | GA based optimal sizing & placement of distributed generation for loss minimization | |
US9728971B2 (en) | Apparatus and method for optimal phase balancing using dynamic programming with spatial consideration | |
Lin et al. | Heuristic rule-based phase balancing of distribution systems by considering customer load patterns | |
CN107256441B (en) | Power distribution network planning construction scheme design method based on non-dominated sorting genetic algorithm | |
JP4742238B2 (en) | Support system and program for determining conditions for connecting distributed power supply to distribution network | |
JP4094993B2 (en) | Overhead distribution line optimum automatic design system and method | |
JP2013143839A (en) | Power storage deice arrangement support device and program and power storage deice disposition support method | |
JP4831479B2 (en) | Reduced model creation method and reduced model creation system for distribution system | |
CN110688724A (en) | Intelligent identification method for distribution network line co-tower erection | |
JP3945697B2 (en) | Method and apparatus for creating optimal distribution system | |
Díaz-Dorado et al. | Optimal planning of unbalanced networks using dynamic programming optimization | |
Ravadanegh | A multistage expansion planning method for optimal substation placement | |
França et al. | Long-range planning of power distribution systems: primary networks | |
CN112101708A (en) | Expert knowledge fused power grid short circuit safety intelligent decision method and system | |
Lin et al. | Optimal phase arrangement of distribution feeders using immune algorithm | |
Valencia et al. | Integrated Planning of MV/LV Distribution Systems with DG Using Single Solution‐Based Metaheuristics with a Novel Neighborhood Search Method Based on the Zbus Matrix | |
Wesz Da Silva et al. | Optimized allocation of control and protective devices in electric distribution systems | |
Resende et al. | Metaheuristics applied to power systems | |
CN114441899B (en) | Method, system, equipment and storage medium for deploying broadband oscillation monitoring points of power grid | |
JP3922828B2 (en) | How to create a distribution system expansion plan | |
Li et al. | A study of distribution load transfer operation based on gis | |
Islam et al. | Economical optimization of conductor selection in planning radial distribution networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060406 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071012 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071023 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071112 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080304 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080306 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110314 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4094993 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110314 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110314 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120314 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120314 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130314 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130314 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130314 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140314 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |