JP2004304867A - Joint use investigation tool and output program thereof - Google Patents

Joint use investigation tool and output program thereof Download PDF

Info

Publication number
JP2004304867A
JP2004304867A JP2003091409A JP2003091409A JP2004304867A JP 2004304867 A JP2004304867 A JP 2004304867A JP 2003091409 A JP2003091409 A JP 2003091409A JP 2003091409 A JP2003091409 A JP 2003091409A JP 2004304867 A JP2004304867 A JP 2004304867A
Authority
JP
Japan
Prior art keywords
pole
survey
investigated
telephone
utility pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003091409A
Other languages
Japanese (ja)
Inventor
Fusao Beppu
房雄 別府
Kenji Ando
賢治 安藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AINEKKUSU KK
Original Assignee
AINEKKUSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AINEKKUSU KK filed Critical AINEKKUSU KK
Priority to JP2003091409A priority Critical patent/JP2004304867A/en
Publication of JP2004304867A publication Critical patent/JP2004304867A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)
  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a joint use investigation tool which can mitigate the investigative work of joint use objects and the totalizing work and also can improve the reliability on fruits, and its output program. <P>SOLUTION: This joint use investigation tool serves for investigation of joint use objects such as communication lines, laid on a utility pole. This indicates attribute data 5a which specify the investigation utility pole, contract data 9a which are registered beforehand as the joint use objects of the utility pole to be investigated, map information 20 about the environs of the utility pole to be investigated, and entry columns 2 to enter investigation results. In the map information 20, the utility pole to be investigated is arranged in the vicinity of the center, and also at least one utility pole adjacent to the investigation utility pole is indicated. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
この発明は、市街地及び市外地に配置される電柱に、配電線とは別に架設された通信線等の共架物の施設状況調査に供される共架調査用具とその出力プログラムに関するものである。
【0002】
【従来の技術】
市街地や市外地の各所に配置されている電柱には、配電線以外に、通信線及び標識等の共架物が架設されており、これら共架物の重量が電柱の許容荷重以下であるか、又は未契約の共架物が架設されていないか等の調査が定期的に行われている。
上記のような共架調査では、先ず、調査地域内の各電柱毎の共架設備調査用紙を準備し、次いで、この調査用紙を用いて現場調査を行い、調査用紙のデータ記入欄に調査データを記入しながら、スケッチ欄には、主としてケーブル等の線物件の施設状況を周辺の地形及び電柱と共にスケッチしていく。そして、最後に調査結果をまとめて所定の成果物を作成している(例えば、特許文献1参照。)。
ここで、前記調査用紙のデータ記入欄は、所定の調査結果を記入するための表が設けられており、スケッチ欄は、調査結果を自由に書き込めるように外枠のみが設けられている。
【0003】
【特許文献1】
特開2002−132873号公報
【0004】
【発明が解決しようとする課題】
しかしながら、電柱に架設される共架物はその数が多く、また、線物件においては周辺の電柱に複雑に掛け渡されているため、現場調査におけるスケッチ欄への書き込みが複雑になり、調査作業の負担が増加するという問題がある。
また、スケッチ欄への書き込みが多くなった結果、調査結果の集計作業の負担も増加し、集計ミス等の原因となって成果物の精度を低下させるという問題がある。
この発明は上記の事情に鑑みてなされたもので、共架物の調査作業及び集計作業の軽減を図ると共に、成果物の信頼性の向上を図ることができる共架調査用具及びその出力プログラムを提供することを目的としている。
【0005】
【課題を解決するための手段】
上記課題の解決手段として、以下の発明を採用した。
請求項1に係る発明は、電柱に架設された通信線等の共架物の調査に供される共架調査用具であって、調査すべき電柱を特定する特定情報と、調査すべき電柱の共架物として予め登録されている契約共架物情報と、調査すべき電柱の周囲の地図情報と、調査結果を記入する記入欄とを同時に表示し、前記地図情報に、調査すべき電柱が中心近傍に配置され、且つ、該調査すべき電柱に隣接する少なくとも1本の電柱が表示されている共架調査用具を提供するものである。
この共架調査用具によれば、現場調査において、調査すべき電柱の特定情報、契約共架物情報と実際の電柱とを対比させながら調査を行うことが可能となる。
また、上記調査結果を記入欄に記入すると共に、線物件の周辺の電柱等への架設状況の調査結果の記入を、地図情報に線物件を書き込むことのみで完了させることが可能となる。
【0006】
請求項2に係る発明は、前記地図情報に、調査すべき電柱の周囲の道路及び建造物等が、電柱よりも色調の低い色で表示されている請求項1に記載の共架調査用具を提供するものである。
この共架調査用具によれば、調査対象となる電柱及び周辺の電柱を明確に表示することが可能となる。
【0007】
請求項3に係る発明は、前記地図情報中の電柱が、電柱の種類に応じて異なる記号で表示されている請求項1又は請求項2に記載の共架調査用具を提供するものである。
この共架調査用具によれば、地図情報中に表示される各電柱を設備別及び標識別等に識別することが可能となる。
【0008】
請求項4に係る発明は、電柱に架設された通信線等の共架物の調査に供される共架調査用具を出力する出力プログラムであって、調査すべき電柱を特定する特定情報に基づいて、電柱の種類と位置とを対応づけて記憶する電柱データベースから、調査すべき電柱及びその周辺の電柱の位置情報を抽出するステップと、前記調査すべき電柱の周辺の地形情報を、配電地域の地形データベースから抽出するステップと、前記各電柱の位置情報と地形情報とを合成してなる地図情報を作成するステップと、調査すべき電柱が中心近傍に配置され、且つ、調査すべき電柱に隣接する少なくとも1本の電柱が表示されるように画像枠を決定するステップと、前記地図情報が表示された前記共架調査用具を出力するステップとを、コンピュータに実行させる出力プログラムを提供するものである。
この出力プログラムによれば、共架調査用具における地図情報中に調査すべき電柱を中心近傍に配置し、且つ、調査すべき電柱に隣接する少なくとも1本の電柱を表示することが可能となる。
【0009】
【発明の実施の形態】
以下、この発明の実施の形態を図面と共に説明する。
図1に示すように、この実施の形態における共架調査用具は紙を媒体とした形態であり、右側略半分をデータ記入欄3、左側略半分をスケッチ欄4とする調査結果の記入欄2が表示された調査用紙1として構成されている。
【0010】
図2に示すように、データ記入欄3の右上には、電柱属性欄5、調査者データ記入欄6、電柱相違記入欄7及び電柱属性欄5の一部であるシリアルナンバー記載欄8が上から順に設けられている。
電柱属性欄5は、調査すべき電柱(以下、調査電柱という)の属性データ(特定情報)5aが記載されている欄であり、各電柱が有する電柱ナンバ、本柱や支線柱等の設備名、重複柱である場合には柱順位、標識名及び配電ブロックナンバが記載され、更に、電力会社のデータに基づく柱種類、店所名及びコードが記載されている。尚、シリアルナンバ記載欄8には、調査用紙の配電ブロック毎の通し番号が記載されている。
尚、標識名は地名で表示される。また、配電ブロックとは、電力会社の事業所が管理する配電地域を複数のブロックに分割した際の一区画を示す。
【0011】
調査者データ記入欄6は、調査担当者及び調査内容に係るデータを記入する欄であり、調査担当者コード、調査日を記入し、更に、調査時に写真撮影を行った場合の撮影順位(デジタルカメラであればどのメモリカードの何枚目か等)、調査電柱の番号札枚数及び近接撮影枚数を記入する欄が設けられている。
【0012】
電柱相違記入欄7は、調査電柱の電柱属性が現場の電柱と異なっている場合に相違項目を記入する欄であり、電柱ナンバ、配電ブロックナンバ及び柱種類の記入欄が設けられている。
【0013】
電柱属性欄5等の左側には、共架物の契約データ欄9、点物件記入欄10が右側から順に設けられている。
尚、点物件とは、街灯や信号等、調査電柱のみに架設されているものを指し、後述する線物件とは、複数の電柱に架け渡される通信ケーブル等を指す。
契約データ欄9は、調査電柱に架設される共架物の契約データ(契約共架物情報)9aが記載されている欄であり、点物件か線物件かの区分、契約者ナンバ、工作物が契約されている場合はそのコード、線種が契約されている場合はそのコードが、これらを横軸とした表中の上から順に記載されている。
【0014】
点物件記入欄10は、調査電柱に架設されている共架物の調査結果を記入する欄であり、契約者ナンバ、共架物件の種類を示すコード、工作物コード、共架物の地上高、施設形態コード(この実施形態ではPHS、スピードネットに限る)及び街路灯が設けられている場合はそのナンバを各々記入する欄とメモ欄とが設けられており、これらを横軸とした表中の左から順に設けられている。
【0015】
契約データ欄9及び点物件記入欄10の上方には、簡易記入用のチェック欄11として、調査結果集計時にシステム上においてのみに必要となる調査電柱であるか否かを判別可能とするチェックボックスと、調査電柱に点物件も線物件もない場合、若しくは調査電柱が撤去されている場合を判別可能とするチェックボックスとが設けられている。
尚、システム上においてのみ必要となる調査電柱とは、点物件がなく、且つ、線物件の全てが他の電柱を第1電柱として(標識内電柱が第1電柱となる場合と、他標識電柱が第1電柱となる場合とがある)調査済み若しくは調査予定であるものを指す。また、調査電柱に架設される線物件が架け渡される電柱を第2電柱とし、その第2電柱に対して調査電柱を第1電柱としている。
【0016】
データ記入欄3の下側略半分には、線物件記入欄12が設けられており、調査電柱に架設されている共架物の調査結果を記入できるようになっている。
この線物件記入欄12には、物件の種類(略称で記入)、契約者ナンバ、線物件の線種コード、条数、施設地上高及び施設形態(取り付け状態)コードを各々記入する欄と、この調査電柱に対する第2電柱の設備コード、電柱ナンバ、重複柱である場合の柱順位、他標識電柱である場合の配電ブロックナンバ及び他店所電柱である場合の店所コードを各々記入する欄とメモ欄とが、これらを横軸とした表中の左から順に設けられている。
【0017】
また、データ記入欄3の右側の欄外には、調査単位マークナンバ13として、上から順に1から15までの整数が等間隔で記載されている。
尚、線物件記入欄の下方には、調査内容に係る事項を記入するための備考欄14が設けられている。また、備考欄14の下方であって、データ記入欄3の欄外には、例えば調査電柱頂部のアンテナ取り付け地上高等、調査時に利用可能な付加情報15が記載されている。
【0018】
図3に示すように、スケッチ欄4には、地図情報20として、画像枠21内の中央に調査電柱の電柱シンボル22が表示され、且つ調査電柱の周辺の電柱の電柱シンボル23が、調査電柱の周辺の地形図24(地形情報)と共に表示されている。ここで、地図情報20とは、調査電柱の属性データ5a及び座標データ(位置情報)31a、並びに調査電柱の周辺の電柱の属性データ5b及び座標データ31bと、地形図24とを合成して表示したものである。
地形図24は、上方が北を指すように表示され、また、調査用紙1がA4サイズである場合は、縮尺1/750を標準として表示されている。
そして、この地形図24上において、標識内電柱は、例えば黒の電柱シンボル内に黒の電柱ナンバを記載して表示されており(図中25)、他標識電柱は、例えば標識内電柱の表示を白黒反転して表示されている(図中26)。
【0019】
また、各電柱シンボル22,23は、例えば円形のものは電力会社の本柱を示し、方形のものはその支線柱を示す。また、2重円形のものは電話会社の本柱を示し、2重方形のものはその支線柱を示す。更に、三角形のものは支柱を示す等、各電柱の属性データ5a,5bに対応してその形状を使い分けて表示されている。
そして、調査電柱の電柱シンボル22は、その周辺の電柱シンボル23と区別するために、その内側が例えば灰色に着色されている。また、調査電柱の周囲の道路及び建造物等を示す地形図24の表示は、例えば灰色のように、各電柱シンボル22,23よりも色調の低い色で表示されている。
【0020】
また、地形図24の縮尺は、一般の1/75三角スケールが使い易いように1/750を標準としているが(スケッチ欄の左下には、地形図の縮尺表示27が記載されている)、調査電柱の周辺の状況によって、例えば周辺に電柱が密集しているような場合は大縮尺とし、逆の場合は小縮尺とする等、後述する出力プログラムにより適宜変更可能とされている。
【0021】
ここで、上記調査用紙1をコンピュータに出力させるための出力プログラムの動作を図4に示すフローチャートに基づいて説明する。
先ず、調査電柱の属性データ5aに基づき、電柱の種類と位置とを対応づけて記憶する電柱データベースから、調査電柱の座標データ31aを抽出する(ステップS1)。この時、調査電柱の周辺の電柱の属性データ5b及び座標データ31bも同時に抽出される。
次いで、調査電柱の座標データ31aに対応して、調査電柱の周辺の地形図24を地形データベースから抽出する(ステップS2)。
【0022】
そして、各電柱の属性データ5a,5b及び座標データ31a,31bと地形図24とを合成して地図情報20を作成すると共に(ステップS3)、調査電柱が調査用紙のスケッチ欄の中心に配置され、且つ、調査電柱に隣接する少なくとも1本の電柱が表示されるよう画像枠21を決定する。この時、周辺の電柱数が所定の範囲内であるか否かの判断が行われる(ステップS4)。この判断がYESの場合は、地形図24の縮尺が標準値(調査用紙がA4の時は1/750)となるよう画像枠21が決定され(ステップS5)、NOの場合は、任意のパラメータにより、電柱数が所定の範囲内となるよう地形図24の縮尺を調整して画像枠21が決定される(ステップS6)。
【0023】
一方、契約データベースから調査電柱に架設される共架物の契約データ9aが抽出され、この契約データ9a及び属性データ5aの必要事項が前記記入欄2と合成される。そして、この記入欄2と地図情報20とを重ね合わせて紙面上に出力し、調査用紙1を作成する(ステップS7)。この時、属性データ5a,5bに基づいて、画像枠21内に表示される電柱の電柱シンボル22,23の形状等が決定される。また、調査電柱の電柱シンボル22は、その内側が例えば灰色で着色され、地形図24の表示は、例えば灰色のように、各電柱シンボル22,23より色調の低い色で出力される。
尚、調査対象となる配電ブロックを指定すると、そのブロック内に配設されている各電柱についての上記作業が順次行われるようになっている。
【0024】
次に、作用について説明する。
先ず、調査対象とする配電ブロックを主管する電力会社との協議により決定し、最新の電柱配置図(図示略)を用意する。
【0025】
次いで、電力会社が契約者と締結している共架物の契約情報、例えば契約者ナンバ、共架物の種類、共架物が線物件である場合はその線種及びルート等を、電柱配置図に記載されている各電柱と照合させながらコンピュータに入力し、電力会社より支給される各電柱の座標データ、属性データ及び地形データとあわせて、調査対象とする配電ブロックのデータベースを作成する。そして、このデータベースに基づき、前記出力プログラムを利用して、各電柱の共架設備調査用紙1を作成する。
【0026】
次いで、作成した調査用紙1を調査する道順に沿って準備し、現場作業で必要な電柱配置図、共架物の設置位置測定に必要なメジャーポール、現場状況を撮影するカメラを準備する。
【0027】
そして現場へ行き、属性データ5aから調査電柱を確認した後に、その電柱における共架物の調査を開始する。
点物件においては、物件に記載されている契約者ナンバ、物件種類コード及び工作物コードを確認し、更に、PHS、スピードネットに係る共架物及び街路灯が架設されている場合には、これらのコード又はナンバを確認し、各共架物の架設高(地上高)と共に、調査用紙1の点物件記入欄10へ所定の書式で記入する。
この時、契約データ9aと対比させながら調査を行うことで、作業効率が高まると共に契約内容との相違点を確実に発見することができる。
尚、契約内容との相違点を発見した場合には、後にその状況を把握できるよう物件及びその周辺の撮影を行っておく。
【0028】
また、線物件においては、物件の種類、契約者ナンバ、線種コード及び条数を確認し、施設地上高及び施設形態コードと共に調査用紙1の線物件記入欄12へ所定の書式で記入する。また、調査電柱を第1電柱として、対称となる線物件が架け渡されている第2電柱の設備名及び電柱ナンバと、必要に応じて柱順位、配電ブロックナンバ及び点所コードとを記入する。線物件においても、契約データ9aと対比させることで、作業効率が高まり、契約内容との相違点を確実に発見することができる。
尚、契約内容との相違点を発見した場合には、点物件の場合と同様、物件及びその周辺の撮影を行っておく。
【0029】
更に、線物件の調査内容については、図5に示すように、各線物件が調査電柱からどの電柱に架け渡されているか等を、スケッチ欄4の地図情報20上に矢印35等の所定の書式により書き込んでいく。つまり、第1電柱と第2電柱とを結ぶ矢印35を書き込んでいく。また、物件の種類の略称及び条数等も矢印35付近に書き込んでいく(図中36)。必要であれば、電柱シンボルや基地局についての書き込みも行う(図中37)。尚、図中矢印38は電柱の地支線、39は物件の施設形態を示すものであり、これらを含め、前記書き込み内容と紛らわしくない範囲で自由に記入することができる。
【0030】
スケッチ欄4には、地形図24と共に予め調査電柱に隣接する少なくとも1本の電柱を含む複数の電柱シンボル23が表示されているため、正確な位置に記載された第2電柱との間に線物件を書き込むことのみで調査結果の記入が完了し、記入作業が正確で且つ効率が高い。また、紙媒体である調査用紙に書き込みを行うため、記入作業が容易で且つ自由度が高く、きめ細かな調査を行うことができる。
更に、地形図24が電柱シンボル22,23より色調の低い色で表示されているため、電柱の表示が強調されて見落とし等を防ぐと共に、書き込み内容とも識別し易い。しかも、各電柱シンボル22,23が各々の属性データ5a,5bに基づいて使い分けて表示されているため、より一層調査を高効率化できる。
また、調査電柱に点物件がなく、且つ線物件の全てが他の電柱を第1電柱として調査済み若しくは調査予定である場合、又は調査電柱に点物件も線物件もない場合若しくは調査電柱が撤去されている場合には、前記チェック欄11のチェックを行うのみでよい。
【0031】
また、調査用紙1の左側の欄外に設けられた調査単位マークナンバ13を利用することで、調査用紙1に共通する記載(担当者コード、調査日等)の記入を省略すことができる。具体的には、図6に示すように、担当者及び調査日等が同一の調査用紙1をまとめ、一枚目の調査用紙1に担当者コードと調査日を記入した後、各調査用紙1を右側端部1aを傾斜させた状態で揃え、調査単位マークナンバ13の任意のナンバ位置に油性ペン等で全頁に渡ってマークすることで、2枚目以降の調査用紙1に担当者及び調査日を記入しなくても識別が可能となる。
【0032】
そして帰社後、調査結果の記載漏れを点検し、また電力会社の各種コード番号との相違を点検しながら、各調査用紙1に記入された調査内容をコンピュータに入力していく。この時、スケッチ欄4に記載された線物件等の調査内容は、上述したように、細かな情報まで正確に記入されているため、線物件を認識し易く、また第2電柱の位置関係及び詳細情報等を確認しながら入力作業を行うことができ、作業負担が軽減されると共に入力ミス等を防止できる。
【0033】
次いで、契約内容と異なり共架物が撤去されているもの、又は現場で発見した未契約の共架物が架設されているもの等、データベースと調査内容との相違点をコンピュータに入力し、データベースの修正を行う。
【0034】
次いで、現場で撮影した、契約内容と相違点のある共架物、特に線種が不明の線物件の外形を、撮影した写真に基づいて既存の通信ケーブル外形測定システムにより計測する。そして、この計測結果に基づいてデータベースの修正を行うと共に、電力会社制定の線種コード番号をデータベースに付加する。
【0035】
最後に、第8工程として、電力会社の各配電ブロックのデータベースの点検を行うと共に、既存の帳票への記載及び電力会社へ納入するための記憶媒体への書き込み処理等、納品用成果物の作成を行う。
【0036】
上述した実施の形態によれば、共架物調査における調査作業を正確に行うと共に作業負担を軽減できる。特に、線物件においては、地図情報20上に記載された各電柱との間に線物件を書き込むことのみで調査結果の記入が完了するため、記入作業が正確で且つ効率が高い。
また、調査内容をコンピュータに入力する作業においても、正確に記入された調査用紙1によって作業負担が軽減できると共に、入力ミス等を防止できる。
【0037】
尚、この発明は上記実施の形態に限られるものではなく、例えば、調査用具として、調査用紙ではなく携帯端末等を用いてもよい。
【0038】
【発明の効果】
以上説明してきたように、請求項1に係る発明は、現場調査において、調査すべき電柱の特定情報、契約共架物情報と実際の電柱とを対比させながら調査を行うことが可能となるため、共架物調査における調査作業を正確に行うと共に作業負担を軽減できる効果がある。
また、線物件の周辺の電柱等への架設状況の調査結果の記入を、地図情報に線物件を書き込むことのみで完了させることが可能となるため、記入作業の効率を高める効果がある。
【0039】
請求項2に係る発明は、調査対象となる電柱及び周辺の電柱を明確に表示することが可能となるため、電柱の見落とし等を防ぐと共に、書き込み内容との混同を防止できる効果がある。
【0040】
請求項3に係る発明は、地図情報中に表示される各電柱を設備別及び標識別に識別することが可能となるため、より一層調査を高効率化できる効果がある。
【0041】
請求項4に係る発明は、共架調査用具における地図情報中に調査すべき電柱を中心近傍に配置し、且つ、調査すべき電柱に隣接する少なくとも1本の電柱を表示することが可能となるため、共架物調査における作業効率の高い調査用具とすることができる効果がある。
【図面の簡単な説明】
【図1】この発明の実施の形態の調査用紙の平面図である。
【図2】調査用紙のデータ記入欄の平面図である。
【図3】調査用紙のスケッチ欄の平面図である。
【図4】調査用紙出力プログラムの動作を示すフローチャート図である。
【図5】調査結果記入時のスケッチ欄の平面図である。
【図6】調査単位マークナンバ使用時の斜視説明図である。
【符号の説明】
1 調査用紙(調査用具)
2 記入欄
3 データ記入欄
4 スケッチ欄
5a 属性データ(特定情報)
9a 契約データ(契約共架物情報)
13 調査単位マークナンバ
20 地図情報
21 画像枠
22,23 電柱シンボル(記号)
24 地形図(地形情報)
31a 座標データ(位置情報)
[0001]
TECHNICAL FIELD OF THE INVENTION
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint survey tool and an output program for a facility survey of a shared object such as a communication line erected separately from a distribution line on electric poles arranged in an urban area and a suburban area. .
[0002]
[Prior art]
Telegraph poles located in urban areas and suburban areas are equipped with common objects such as communication lines and signs other than distribution lines, and the weight of these common objects is less than the allowable load of the telephone pole. Investigations are regularly conducted to determine whether uncontracted joints have been installed.
In the joint survey described above, first, a joint survey sheet for each utility pole in the survey area is prepared, and then a site survey is performed using this survey sheet, and the survey data is entered in the data entry column of the survey sheet. While filling in, the sketch field mainly sketches the facilities of the line property such as cables together with the surrounding terrain and telephone poles. Finally, the result of the survey is compiled to create a predetermined product (for example, see Patent Document 1).
Here, the data entry column of the survey sheet is provided with a table for entering a predetermined survey result, and the sketch column is provided with only an outer frame so that the survey result can be freely written.
[0003]
[Patent Document 1]
JP 2002-132873 A
[Problems to be solved by the invention]
However, the number of co-piers installed on telephone poles is large, and in the case of line properties, it is complicatedly wrapped around the surrounding telephone poles, which makes writing in the sketch column in the field survey complicated, and the survey work There is a problem that the burden on the user increases.
In addition, as a result of increasing the number of writings in the sketch column, the burden of the work of counting the survey results also increases, and there is a problem in that the accuracy of the product is reduced due to a counting error or the like.
The present invention has been made in view of the above circumstances, and aims to reduce the work of investigating and summarizing joint objects, and to provide a joint inspection tool and an output program thereof that can improve the reliability of the product. It is intended to provide.
[0005]
[Means for Solving the Problems]
The following inventions have been adopted as means for solving the above problems.
The invention according to claim 1 is a joint survey tool used for examining a common object such as a communication line laid on a utility pole, comprising: identification information for identifying a utility pole to be investigated; Simultaneously displays the contracted joint information, which is registered in advance as a joint object, map information around the electric pole to be investigated, and an entry column for filling in the survey result. An object of the present invention is to provide a survey tool which is arranged near the center and on which at least one utility pole adjacent to the utility pole to be investigated is displayed.
According to the joint survey tool, it is possible to conduct a survey while comparing the specific information of the electric pole to be investigated, the contract common object information, and the actual telephone pole in the field investigation.
In addition, it is possible to complete the survey result in the entry column and complete the survey result of the erection status on the electric poles and the like around the line property only by writing the line property in the map information.
[0006]
The invention according to claim 2 provides the joint survey tool according to claim 1, wherein the map information indicates roads, buildings, and the like around the power pole to be investigated in a color having a lower color tone than the power pole. To provide.
According to this joint survey tool, it becomes possible to clearly display the utility pole to be investigated and the surrounding utility poles.
[0007]
The invention according to claim 3 provides the joint survey tool according to claim 1 or 2, wherein the utility pole in the map information is displayed with a different symbol depending on the type of utility pole.
According to this joint survey tool, it becomes possible to identify each utility pole displayed in the map information for each facility, each sign, and the like.
[0008]
The invention according to claim 4 is an output program for outputting a joint survey tool to be used for examination of a common object such as a communication line installed on a telephone pole, based on specific information for specifying a telephone pole to be investigated. Extracting, from a utility pole database storing the types and locations of utility poles in association with each other, the location information of the utility poles to be investigated and the utility poles around the utility poles; and Extracting from the terrain database, creating map information by synthesizing the position information and terrain information of each telephone pole, the telephone pole to be investigated is arranged near the center, and Causing a computer to execute a step of determining an image frame so that at least one adjacent utility pole is displayed, and a step of outputting the joint survey tool on which the map information is displayed. There is provided an output program.
According to this output program, it is possible to arrange the utility pole to be investigated in the map information of the joint survey tool near the center and to display at least one utility pole adjacent to the utility pole to be investigated.
[0009]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
As shown in FIG. 1, the survey tool in this embodiment is a form using paper as a medium, and a substantially right half of the data is a data entry column 3 and a substantially half of the left is a sketch column 4. Is configured as a survey sheet 1 on which is displayed.
[0010]
As shown in FIG. 2, at the upper right of the data entry column 3, a telephone pole attribute column 5, an investigator data entry column 6, a telephone pole difference entry column 7, and a serial number entry column 8, which is a part of the utility pole attribute column 5, are displayed. Are provided in order.
The utility pole attribute column 5 is a column in which attribute data (specific information) 5a of a utility pole to be investigated (hereinafter referred to as a survey utility pole) is described, and the equipment name of each utility pole such as a utility pole number, a main pole, a branch pole, and the like. If the column is an overlapping column, the column ranking, the sign name, and the distribution block number are described, and further, the column type, shop name, and code based on the data of the power company are described. In the serial number entry column 8, a serial number for each power distribution block of the survey paper is described.
Note that the sign name is displayed as a place name. Further, the power distribution block indicates one section when a power distribution area managed by an office of a power company is divided into a plurality of blocks.
[0011]
The surveyor data entry column 6 is a column for entering data relating to the surveyor and the contents of the survey. The surveyor's code and the survey date are entered. In the case of a camera, the memory card number and the number of the memory card, etc.), the number of the number tag of the survey pole, and the number of close-up images are provided.
[0012]
The utility pole difference entry column 7 is a column for entering a difference item when the utility pole attribute of the survey utility pole is different from the on-site utility pole, and has entry columns for the utility pole number, the distribution block number, and the pole type.
[0013]
On the left side of the telephone pole attribute column 5 and the like, a contract data column 9 and a spot article entry column 10 of a shared object are provided in order from the right side.
In addition, a point property refers to a thing erected only on a survey pole, such as a streetlight or a signal, and a line property described later refers to a communication cable or the like laid over a plurality of poles.
The contract data column 9 is a column in which the contract data (contract common vehicle information) 9a of the common object erected on the survey telephone pole is described. Are contracted, and if the line type is contracted, the code is described in order from the top in the table with these as the horizontal axis.
[0014]
The point article entry column 10 is a column for entering a survey result of a shared object erected on the survey telephone pole, and includes a contractor number, a code indicating the type of the shared object, a work code, and a ground clearance of the common object. In the case where a facility form code (in this embodiment, PHS and speed net are limited) and a street light are provided, a column for entering the number and a memo column are provided, and a table with these as the horizontal axis is provided. They are provided in order from the left in the middle.
[0015]
A check box 11 for simple entry is provided above the contract data box 9 and the point article entry box 10 so that it is possible to determine whether or not the survey telephone pole is necessary only on the system at the time of compiling the survey results. A check box is provided to enable the user to determine whether there is no point or line property on the survey pole, or whether the survey pole has been removed.
In addition, the survey pole required only on the system is that there is no point property and all of the line properties have the other pole as the first pole (when the pole inside the sign is the first pole, when the other pole is the other pole) May be the first telephone pole). In addition, a telephone pole on which a line object laid on the survey telephone pole is bridged is defined as a second telephone pole, and a survey telephone pole is defined as a first telephone pole for the second telephone pole.
[0016]
A line property entry column 12 is provided in substantially the lower half of the data entry column 3 so that a survey result of a shared object erected on a survey telephone pole can be entered.
The line property entry column 12 is a column for entering a property type (entered in abbreviated name), a contractor number, a line type code of the line property, the number of lines, a facility ground clearance, and a facility form (attachment state) code. Columns for entering the equipment code of the second pole for this survey pole, the pole number, the pole order if it is an overlapping pole, the distribution block number if it is another sign pole, and the shop code if it is another shop pole And a memo column are provided in order from the left in the table with these as the horizontal axis.
[0017]
In addition, outside the right-hand column of the data entry column 3, integers from 1 to 15 are written at regular intervals as a survey unit mark number 13 from the top.
Note that a remarks column 14 is provided below the line property entry column for entering items related to the contents of the survey. Further, below the remarks column 14 and outside the data entry column 3, additional information 15 that can be used at the time of the survey, such as the antenna mounting ground height at the top of the survey pole, is described.
[0018]
As shown in FIG. 3, in the sketch column 4, as the map information 20, a utility pole symbol 22 of the survey utility pole is displayed in the center of the image frame 21, and a utility pole symbol 23 of the utility pole around the survey utility pole is displayed. Is displayed together with the topographic map 24 (terrain information) around the area. Here, the map information 20 is displayed by combining the attribute data 5a and coordinate data (position information) 31a of the survey pole, the attribute data 5b and coordinate data 31b of the pole around the survey pole, and the topographic map 24. It was done.
The topographic map 24 is displayed so that the upper part points to the north, and when the survey sheet 1 is A4 size, the scale 1/750 is displayed as a standard.
On the topographical map 24, the power poles in the sign are displayed, for example, with black power pole numbers written in black power pole symbols (25 in the figure), and the other sign power poles are displayed, for example, in the sign. Are displayed in black and white inverted (26 in the figure).
[0019]
Further, as for the utility pole symbols 22 and 23, for example, a circular one indicates a main pole of a power company, and a square one indicates a branch pole thereof. A double circle indicates the main post of the telephone company, and a double square indicates the branch post. Further, the triangles indicate the poles, and the shapes of the poles are displayed according to the attribute data 5a and 5b of each utility pole.
The inside of the utility pole symbol 22 of the survey utility pole is colored, for example, gray in order to distinguish it from the utility pole symbols 23 around the utility pole. The display of the topographic map 24 showing the roads, buildings, and the like around the investigation utility pole is displayed in a lower color tone than the utility pole symbols 22, 23, for example, gray.
[0020]
The scale of the topographic map 24 is 1/750 as a standard so that a general 1/75 triangular scale is easy to use (a scale display 27 of the topographic map is described at the lower left of the sketch column). Depending on the situation around the survey power pole, for example, if the power poles are densely packed around the power pole, the scale is set to a large scale, and if the power pole is converse, the scale is set to a small scale.
[0021]
Here, the operation of the output program for causing the computer to output the survey sheet 1 will be described with reference to the flowchart shown in FIG.
First, based on the attribute data 5a of the survey pole, coordinate data 31a of the survey pole is extracted from a pole database that stores the type and position of the pole in association with each other (step S1). At this time, the attribute data 5b and the coordinate data 31b of the telephone pole around the investigation telephone pole are also extracted at the same time.
Next, a topographical map 24 around the survey pole is extracted from the topographic database in accordance with the coordinate data 31a of the survey pole (step S2).
[0022]
Then, the attribute data 5a and 5b and the coordinate data 31a and 31b of each telephone pole are combined with the topographic map 24 to create the map information 20 (step S3), and the survey telephone pole is arranged at the center of the sketch column of the survey paper. The image frame 21 is determined so that at least one utility pole adjacent to the survey utility pole is displayed. At this time, it is determined whether the number of telephone poles in the vicinity is within a predetermined range (step S4). If this determination is YES, the image frame 21 is determined so that the scale of the topographic map 24 becomes a standard value (1/750 when the survey paper is A4) (step S5), and if NO, an arbitrary parameter is set. Thus, the scale of the topographic map 24 is adjusted so that the number of utility poles falls within a predetermined range, and the image frame 21 is determined (step S6).
[0023]
On the other hand, the contract data 9a of the shared object erected on the survey pole is extracted from the contract database, and the necessary items of the contract data 9a and the attribute data 5a are combined with the entry column 2. Then, the entry column 2 and the map information 20 are superimposed on each other and output on a sheet of paper to create the survey sheet 1 (step S7). At this time, the shapes of the utility pole symbols 22, 23 of the utility pole displayed in the image frame 21 are determined based on the attribute data 5a, 5b. The inside of the pole symbol 22 of the survey pole is colored, for example, in gray, and the display of the topographic map 24 is output in a color with a lower tone than the pole symbols 22, 23, for example, gray.
When a distribution block to be investigated is specified, the above-mentioned work is sequentially performed for each power pole provided in the block.
[0024]
Next, the operation will be described.
First, a decision is made in consultation with the power company in charge of the distribution block to be surveyed, and the latest utility pole layout (not shown) is prepared.
[0025]
Next, the contract information of the common object that the power company has concluded with the contractor, such as the contractor number, the type of common object, and the line type and route if the common object is a line object, are placed on a telephone pole. The data is input to a computer while being collated with each of the poles shown in the figure, and a database of distribution blocks to be surveyed is created together with coordinate data, attribute data, and topographical data of each pole provided by a power company. Then, based on this database, using the output program, a survey sheet 1 for each telephone pole is prepared.
[0026]
Next, the created survey sheet 1 is prepared along the route of the survey, and a pole pole diagram required for on-site work, a major pole required for measuring the installation position of the shared object, and a camera for photographing the situation of the site are prepared.
[0027]
Then, after going to the site and confirming the investigation telephone pole from the attribute data 5a, the investigation of the shared object at the telephone pole is started.
For point properties, check the contractor number, property type code and work code described on the property, and if PHS, speed net joints and street lights are installed, Confirm the code or the number of the object, and fill in the spot entry box 10 of the survey form 1 in a predetermined format together with the erection height (ground clearance) of each joint.
At this time, by performing the investigation while comparing the contract data 9a, it is possible to improve the working efficiency and to surely find a difference from the contract contents.
If a difference from the contract is found, the property and its surroundings are photographed so that the situation can be grasped later.
[0028]
In the case of a line property, the type of the property, the contractor number, the line type code and the number of lines are checked, and the property is entered in the line property entry column 12 of the survey sheet 1 together with the ground clearance and the facility form code in a predetermined format. In addition, using the survey pole as the first pole, fill in the equipment name and pole number of the second pole on which the symmetrical line object is bridged, and if necessary, the pole rank, distribution block number, and point code. . By comparing the line property with the contract data 9a, the work efficiency is improved, and the difference from the contract contents can be surely found.
If a difference from the contract content is found, the property and its surroundings are photographed as in the case of the point property.
[0029]
Further, as for the survey contents of the line property, as shown in FIG. 5, in a predetermined format such as an arrow 35 on the map information 20 in the sketch column 4, the information such as which pole the each line property is laid from the survey pole is shown. To write. That is, the arrow 35 connecting the first telephone pole and the second telephone pole is written. In addition, the abbreviation of the type of article and the number of articles are also written near the arrow 35 (36 in the figure). If necessary, writing is performed on the utility pole symbol and the base station (37 in the figure). In the figure, arrow 38 indicates the ground line of the telephone pole, and 39 indicates the facility type of the property. These can be freely entered within the range not to be confused with the written contents.
[0030]
In the sketch column 4, since a plurality of utility pole symbols 23 including at least one utility pole adjacent to the survey utility pole are displayed in advance together with the topographic map 24, the line between the utility pole symbol and the second utility pole described at the correct position is displayed. The entry of the survey result is completed only by writing the property, and the entry work is accurate and efficient. In addition, since writing is performed on a survey sheet that is a paper medium, the entry operation is easy, the degree of freedom is high, and a detailed survey can be performed.
Further, since the topographic map 24 is displayed in a color having a lower color tone than the utility pole symbols 22 and 23, the display of the utility pole is emphasized to prevent oversight and the like, and it is easy to identify the written contents. Moreover, since the utility pole symbols 22 and 23 are selectively used and displayed based on the attribute data 5a and 5b, the efficiency of the investigation can be further improved.
Also, if there is no point on the survey pole and all of the line properties have been surveyed or scheduled to be surveyed with another pole as the first pole, or if there are no point or line properties on the survey pole, or the survey pole has been removed If the check has been performed, it is only necessary to check the check column 11.
[0031]
Further, by using the survey unit mark number 13 provided on the left margin of the survey form 1, it is possible to omit the entry of the description (person-in-charge code, survey date, etc.) common to the survey form 1. Specifically, as shown in FIG. 6, the survey papers 1 having the same person in charge and the same survey date are put together, and the person in charge code and the survey date are written in the first survey paper 1. Are aligned in a state where the right end 1a is inclined, and an arbitrary number of the survey unit mark number 13 is marked over the entire page with an oil-based pen or the like, so that the person in charge and the Identification is possible without entering the survey date.
[0032]
Then, after returning to the office, while checking for omissions in the survey results and checking for differences from the various code numbers of the power company, the survey contents entered in each survey sheet 1 are input to the computer. At this time, since the survey contents of the line property and the like described in the sketch column 4 are accurately entered as detailed information as described above, it is easy to recognize the line property and the positional relationship of the second telephone pole and The input operation can be performed while checking detailed information and the like, so that the work load can be reduced and input mistakes can be prevented.
[0033]
Next, enter the differences between the database and the survey contents into the computer, such as the case where the shared object has been removed unlike the contract contents, or the case where an uncontracted shared object found at the site has been erected, and input it to the computer. Make corrections.
[0034]
Next, the outer shape of a joint object having a difference from the contract content, particularly a line object whose line type is unknown, is measured by an existing communication cable outer shape measuring system based on the photographed image. Then, the database is corrected based on the measurement result, and the line type code number established by the power company is added to the database.
[0035]
Finally, as an eighth step, the database of each power distribution block of the power company is inspected, and the delivery products are created, such as writing on an existing form and writing to a storage medium for delivery to the power company. I do.
[0036]
According to the above-described embodiment, it is possible to accurately carry out the investigation work in the joint object investigation and to reduce the work load. In particular, in the case of a line property, since the entry of the survey result is completed only by writing the line property between each telephone pole described on the map information 20, the entry operation is accurate and highly efficient.
Also, in the work of inputting the contents of the survey into the computer, the work load can be reduced by the accurately filled out survey sheet 1, and the input mistake and the like can be prevented.
[0037]
The present invention is not limited to the above embodiment. For example, a portable terminal or the like may be used as a survey tool instead of a survey sheet.
[0038]
【The invention's effect】
As described above, the invention according to claim 1 enables the investigation to be performed while comparing the specific information of the telephone pole to be investigated, the contract common object information and the actual telephone pole in the field investigation. In addition, there is an effect that the survey work in the joint survey can be accurately performed and the work load can be reduced.
In addition, the entry of the survey result of the erection status on telephone poles and the like around the line object can be completed only by writing the line object in the map information, which has the effect of increasing the efficiency of the entry operation.
[0039]
The invention according to claim 2 is capable of clearly displaying the electric pole to be investigated and the electric poles in the vicinity thereof, so that it is possible to prevent the electric pole from being overlooked, and to prevent confusion with the written contents.
[0040]
The invention according to claim 3 has the effect of making it possible to further increase the efficiency of the survey, since each utility pole displayed in the map information can be identified for each facility and each sign.
[0041]
According to the fourth aspect of the present invention, it is possible to arrange a telephone pole to be investigated in the map information of the joint survey tool near the center and to display at least one telephone pole adjacent to the telephone pole to be investigated. Therefore, there is an effect that a surveying tool with high work efficiency in the joint article survey can be provided.
[Brief description of the drawings]
FIG. 1 is a plan view of a survey sheet according to an embodiment of the present invention.
FIG. 2 is a plan view of a data entry column of a survey sheet.
FIG. 3 is a plan view of a sketch column of a survey sheet.
FIG. 4 is a flowchart illustrating the operation of a survey sheet output program.
FIG. 5 is a plan view of a sketch column when a survey result is entered.
FIG. 6 is an explanatory perspective view when a survey unit mark number is used.
[Explanation of symbols]
1 Survey Form (Survey Tool)
2 Entry field 3 Data entry field 4 Sketch field 5a Attribute data (specific information)
9a Contract data (contract information)
13 Survey unit mark number 20 Map information 21 Image frames 22, 23 Telephone pole symbol (symbol)
24 Topographic Map (Topographic Information)
31a Coordinate data (position information)

Claims (4)

電柱に架設された通信線等の共架物の調査に供される共架調査用具であって、
調査すべき電柱を特定する特定情報と、調査すべき電柱の共架物として予め登録されている契約共架物情報と、調査すべき電柱の周囲の地図情報と、調査結果を記入する記入欄とを同時に表示し、
前記地図情報に、調査すべき電柱が中心近傍に配置され、且つ、該調査すべき電柱に隣接する少なくとも1本の電柱が表示されている共架調査用具。
It is a joint survey tool used for surveying a common object such as a communication line installed on a telephone pole,
Specific information for specifying the telephone pole to be surveyed, information on the contract common object registered in advance as a joint of the telephone pole to be investigated, map information around the telephone pole to be investigated, and an entry field for entering the survey results And are displayed at the same time,
A joint survey tool in which a telephone pole to be investigated is arranged near the center of the map information and at least one telephone pole adjacent to the telephone pole to be investigated is displayed.
前記地図情報に、調査すべき電柱の周囲の道路及び建造物等が、電柱よりも色調の低い色で表示されている請求項1に記載の共架調査用具。2. The tool according to claim 1, wherein the map information indicates roads, buildings, and the like around the utility pole to be investigated in a color having a lower color tone than the utility pole. 前記地図情報中の電柱が、電柱の種類に応じて異なる記号で表示されている請求項1又は請求項2に記載の共架調査用具。3. The tool according to claim 1, wherein the utility pole in the map information is displayed with a different symbol depending on a type of the utility pole. 4. 電柱に架設された通信線等の共架物の調査に供される共架調査用具を出力する出力プログラムであって、
調査すべき電柱を特定する特定情報に基づいて、電柱の種類と位置とを対応づけて記憶する電柱データベースから、調査すべき電柱及びその周辺の電柱の位置情報を抽出するステップと、
前記調査すべき電柱の周辺の地形情報を、配電地域の地形データベースから抽出するステップと、
前記各電柱の位置情報と地形情報とを合成してなる地図情報を作成するステップと、
調査すべき電柱が中心近傍に配置され、且つ、調査すべき電柱に隣接する少なくとも1本の電柱が表示されるように画像枠を決定するステップと、
前記地図情報が表示された前記共架調査用具を出力するステップとを、コンピュータに実行させる出力プログラム。
An output program for outputting a joint survey tool to be used for surveying a common object such as a communication line installed on a telephone pole,
Based on the specific information identifying the telephone pole to be investigated, from the telephone pole database that stores the type and position of the telephone pole in association with each other, extracting position information of the telephone pole to be investigated and telephone poles in the vicinity thereof,
Extracting terrain information around the power pole to be investigated from a terrain database of the distribution area;
Creating map information by combining the position information and the terrain information of each telephone pole,
Determining an image frame such that the utility pole to be investigated is arranged near the center and at least one utility pole adjacent to the utility pole to be investigated is displayed;
Outputting a computer-aided survey tool on which the map information is displayed.
JP2003091409A 2003-03-28 2003-03-28 Joint use investigation tool and output program thereof Pending JP2004304867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003091409A JP2004304867A (en) 2003-03-28 2003-03-28 Joint use investigation tool and output program thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003091409A JP2004304867A (en) 2003-03-28 2003-03-28 Joint use investigation tool and output program thereof

Publications (1)

Publication Number Publication Date
JP2004304867A true JP2004304867A (en) 2004-10-28

Family

ID=33404781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003091409A Pending JP2004304867A (en) 2003-03-28 2003-03-28 Joint use investigation tool and output program thereof

Country Status (1)

Country Link
JP (1) JP2004304867A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209548A (en) * 2005-01-28 2006-08-10 Kansai Electric Power Co Inc:The Management system for joint use
JP2006216278A (en) * 2005-02-01 2006-08-17 Chugoku Electric Power Co Inc:The Data management device and data management method for grounding electrode construction work
JP2006277622A (en) * 2005-03-30 2006-10-12 Softbank Bb Corp Path designing system and method
JP2006277071A (en) * 2005-03-28 2006-10-12 Chugoku Electric Power Co Inc:The Assembling facility support system
JP2007010905A (en) * 2005-06-29 2007-01-18 Pioneer Electronic Corp Investigation form information, investigation sheet, and information generating device
JP2007034426A (en) * 2005-07-22 2007-02-08 Chugoku Electric Power Co Inc:The Electric pole use application system and server
JP2007219324A (en) * 2006-02-17 2007-08-30 Chugoku Electric Power Co Inc:The Location information providing system, method and program
CN108599012A (en) * 2018-04-03 2018-09-28 山东克曼特电气集团有限公司 A kind of cable communication paving system of self power generation
JP2020165729A (en) * 2019-03-28 2020-10-08 東北電力株式会社 Distance measurement device, distance measurement method, and distance measurement program

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209548A (en) * 2005-01-28 2006-08-10 Kansai Electric Power Co Inc:The Management system for joint use
JP4681894B2 (en) * 2005-01-28 2011-05-11 関西電力株式会社 Kyocera management system
JP2006216278A (en) * 2005-02-01 2006-08-17 Chugoku Electric Power Co Inc:The Data management device and data management method for grounding electrode construction work
JP4683941B2 (en) * 2005-02-01 2011-05-18 中国電力株式会社 Grounding management system
JP2006277071A (en) * 2005-03-28 2006-10-12 Chugoku Electric Power Co Inc:The Assembling facility support system
JP4703229B2 (en) * 2005-03-28 2011-06-15 中国電力株式会社 Pillar equipment facility support system
JP2006277622A (en) * 2005-03-30 2006-10-12 Softbank Bb Corp Path designing system and method
JP2007010905A (en) * 2005-06-29 2007-01-18 Pioneer Electronic Corp Investigation form information, investigation sheet, and information generating device
JP2007034426A (en) * 2005-07-22 2007-02-08 Chugoku Electric Power Co Inc:The Electric pole use application system and server
JP2007219324A (en) * 2006-02-17 2007-08-30 Chugoku Electric Power Co Inc:The Location information providing system, method and program
CN108599012A (en) * 2018-04-03 2018-09-28 山东克曼特电气集团有限公司 A kind of cable communication paving system of self power generation
JP2020165729A (en) * 2019-03-28 2020-10-08 東北電力株式会社 Distance measurement device, distance measurement method, and distance measurement program

Similar Documents

Publication Publication Date Title
US9183646B2 (en) Apparatus, systems and methods to generate electronic records of underground facility marking operations performed with GPS-enabled marking devices
US7693658B2 (en) Navigation apparatus
JPWO2006092853A1 (en) Map display device and map display method
KR20070026278A (en) Computerized system for aerial photograph interpretation management
AU2009213151B2 (en) Searchable electronic records of underground facility locate marking operations
JP2004304867A (en) Joint use investigation tool and output program thereof
KR20160060275A (en) Method of providing high-precision vector map
CN112685822A (en) Electronic sand table demonstration method and device of railway BIM system based on web real-time modeling
JP5081311B2 (en) Map information processing apparatus, map information processing method, map information processing program, and recording medium
JP2010086485A (en) Method and system for conversion from residence indication number to registered lot number
Sakimura et al. Development of a new generation imaging total station system
KR100705575B1 (en) Method for making a road register using gps
JP3728417B2 (en) Traffic safety facility management system
JP2005031490A (en) Road sign management program
JP2003281154A (en) Geographical information retrieval system and geographical information retrieval program
JP2002132873A (en) Joint body research support system
Haanen et al. A vision for a fully digital cadastral survey system
Poloprutský et al. Analytical maps as a basis for understanding the development of rural architecture
Przewięźlikowska et al. Methodology of Analysing Geodetic Network as Basis for Developing Mobile Application for Its Ongoing Update
Pronkin Use cases of Sitevision system in bridge and road infrastructures
Akumu The Use Of Linear Referencing In Mapping Of Roads Case Study: Machakos Turnoff-Syongila (C97) Road
Akingbade Challenges and Prospects Associated with Paradigm Shift in Land Administration and Surveying among Private Practitioners in Nigeria
AU2012241082B2 (en) Searchable electronic records of underground facility locate marking operations
BR102019022293A2 (en) method of converting geographic coordinates into mile markers and stakes
JP5043417B2 (en) Inter-residential building agreement search program, apparatus, method, and brush-related information creation program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060106

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071204

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02