JP2004294261A JP2003086955A JP2003086955A JP2004294261A JP 2004294261 A JP2004294261 A JP 2004294261A JP 2003086955 A JP2003086955 A JP 2003086955A JP 2003086955 A JP2003086955 A JP 2003086955A JP 2004294261 A JP2004294261 A JP 2004294261A
Authority
JP
Japan
Prior art keywords
lining concrete
existing tunnel
wave
soundness
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003086955A
Other languages
Japanese (ja)
Inventor
Kenichiro Egawa
顕一郎 江川
Kayo Go
佳曄 呉
Ichiro Suzuki
一郎 鈴木
Yoshinori Yagome
吉則 矢込
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CENTRAL GIKEN KK
Tokyo Electric Power Services Co Ltd
Original Assignee
CENTRAL GIKEN KK
Tokyo Electric Power Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CENTRAL GIKEN KK, Tokyo Electric Power Services Co Ltd filed Critical CENTRAL GIKEN KK
Priority to JP2003086955A priority Critical patent/JP2004294261A/en
Publication of JP2004294261A publication Critical patent/JP2004294261A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Radar Systems Or Details Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for diagnosing the healthiness of an existing tunnel, capable of diagnosing the healthiness of the existing tunnel easily and rapidly. <P>SOLUTION: This method for diagnosing the healthiness of the existing tunnel has a first step for measuring the depth of the crack formed to the cover concrete of the existing tunnel, a second step for measuring the dynamic characteristics of the cover concrete, a third step for measuring the winding thickness of the cover concrete, a fourth step for estimating the magnitute and distribution mode of the soil pressure acting on the existing tunnel on the basis of the depth of the crack, the dynamic characteristics of the cover concrete and the winding thickness, and a fifth process for calculating the cross-sectional force acting on the cover concrete on the basis of the magnitute and distribution mode of the soil pressure and comparing the cross-sectional force with the residual yield strength of the cover concrete to judge the healthiness of the existing tunnel. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、既設トンネルの健全性診断方法に関するものである。
【0002】
【従来の技術】
既設トンネルの健全性診断においては、トンネル覆工に作用する外力、すなわち土圧の大きさやその分布態様を把握することが最も重要な要素と考えられている。しかしながら、築造されてから幾年も経過した既設トンネルにおいて、それらを求めることは非常に難しいとされている(例えば、非特許文献1参照)。
【0003】
従来では、上記土圧の大きさや分布態様を測定する方法として、コアボーリングによる測定方法が知られている。この測定方法においては、先ず、トンネル横断面の数カ所でコアボーリングを行って、地盤の初期地圧や地盤材料の弾塑性的な物性を調査する。その後、上記コアボーリングを行った箇所にロックボルト等を埋設して、その部位における変位または応力の計測を行い、当該計測結果に基づいて上記土圧の大きさや分布態様を求めるようにしている。
【0004】
【非特許文献1】
社団法人日本道路協会「道路トンネル維持管理便覧」、平成5年11月、p.115−122
【0005】
【発明が解決しようとする課題】
しかしながら、上記コアボーリングによる測定方法にあっては、地盤の物性等を直接的に求めることができるという利点があるものの、長期に亘るモニタリングが必要になるという問題点や、コアボーリングの実施に際して多大な費用がかかるという問題点などがあった。
【0006】
このため、既設トンネルの健全性診断において、上記のようなコアボーリングによる土圧測定方法を採用するのは現実的ではなく、この種の土圧測定方法を用いずに、既設トンネルの健全性を容易かつ速やかに診断することができる健全性診断方法が強く要望されている。
【0007】
本発明は、かかる事情に鑑みてなされたもので、既設トンネルの健全性を容易かつ速やかに診断することができる既設トンネルの健全性診断方法を提供することを目的とする。
【0008】
【課題を解決するための手段】
請求項1に記載の本発明に係る既設トンネルの健全性診断方法は、既設トンネルの覆工コンクリートに生じているひび割れの深さを測定する第1ステップと、上記覆工コンクリートの力学特性(強度、弾性係数)を測定する第2ステップと、上記覆工コンクリートの巻厚を測定する第3ステップと、上記ひび割れの深さ、上記覆工コンクリートの力学特性および上記巻厚に基づいて、上記既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定する第4ステップと、上記土圧の大きさと分布態様に基づいて上記覆工コンクリートに作用する断面力を求め、この断面力と上記覆工コンクリートの残存耐力との比較により、上記既設トンネルの健全性を判定する第5ステップとを有することを特徴とするものである。
【0009】
請求項2に記載の発明は、請求項1に記載の既設トンネルの健全性診断方法における上記第1ステップにおいて、上記覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を、上記ひび割れに到達する前と通過した後の2地点で採取するとともに、各地点で採取した波動信号からレイリー波の振幅をそれぞれ求め、その振幅比に基づいて、上記ひび割れの深さを求めるようにしたことを特徴とするものである。
【0010】
請求項3に記載の発明は、請求項1または2に記載の既設トンネルの健全性診断方法における上記第2ステップにおいて、上記覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を、打撃面と同じ表面上の異なる複数の地点で採取するとともに、上記複数の地点で採取した波動信号からレイリー波の走行速度を求め、このレイリー波の走行速度に基づいて、上記覆工コンクリートの力学特性を導き出すようにしたことを特徴とするものである。
【0011】
請求項4に記載の発明は、請求項1〜3の何れかに記載の既設トンネルの健全性診断方法における上記第3ステップにおいて、上記既設トンネル内の空間から上記覆工コンクリートに向けて電磁波を照射し、その電磁波が地中の各層間の境界面に反射して照射位置に戻ってくるまでの時間、各反射波の位相および振幅を測定し、それら測定結果に基づいて、上記覆工コンクリートの巻厚を求めるようにしたことを特徴とするものである。
【0012】
請求項1〜4の何れかに記載の発明によれば、既設トンネルの覆工コンクリートに生じているひび割れの深さと、覆工コンクリートの力学特性と、覆工コンクリートの巻厚とを測定した後、それら測定データを用いて、既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定し、その後、推定した土圧の大きさと分布態様に基づいて覆工コンクリートに作用する断面力を求め、この断面力と覆工コンクリートの残存耐力との比較により、既設トンネルの健全性を判定するようにしたので、従来のようなコアボーリングによる土圧測定が不要となり、既設トンネルの健全性を容易かつ速やかに診断することができる。
【0013】
また、請求項2〜4に記載の発明によれば、ひび割れの深さ、覆工コンクリートの力学特性および巻厚をそれぞれ精度良く測定することができ、これにより、既設トンネルの健全性の診断結果に対する信頼度を高めることができる。しかも、上記診断に必要な各パラメータの大部分を非破壊で測定することができ、上記診断に要する時間と費用を大幅に縮減することができる。
【0014】
【発明の実施の形態】
以下、図面に基づいて、本発明に係る既設トンネルの健全性診断方法の一実施形態について説明する。この健全性診断方法は、図1のフローチャートに示すように、既設トンネルの覆工コンクリートに生じているひび割れの深さを測定する第1ステップと、覆工コンクリートの力学特性を測定する第2ステップと、覆工コンクリートの巻厚を測定する第3ステップと、第1〜第3ステップにおける測定結果に基づいて、既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定する第4ステップと、この第4ステップで推定した土圧の大きさと分布態様に基づいて、既設トンネルの健全性を判定する第5ステップとを有する。
【0015】
[第1ステップ:ひび割れ深さの測定]
この第1ステップ(S1)では、図2(a)および図2(b)に示すように、コンクリート表面を伝播するレイリー波がひび割れ位置を通過するときにその振幅が減衰するという現象を利用して、ひび割れの深さを測定する。
【0016】
先ず、図2(b)に示すように、ひび割れ位置の両側(幅方向の両側)に加速度ピックアップ等のセンサ10a、10bを設置した後、それらセンサ10a、10bを結ぶ線分の延長線上の所定位置で覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を上記センサ10a、10bでそれぞれ採取する。すなわち、ひび割れに到達する前と通過した後の衝撃弾性波の波動信号をそれぞれ採取する。
【0017】
次いで、各センサ10a、10bにより採取された波動信号からレイリー波の振幅をそれぞれ求め、両者の振幅比に基づいてひび割れの深さを求める。具体的には、両者の振幅比xとレイリー波の波長λとの関係から、数1の数式を用いて、ひび割れの深さHを求める。
【0018】
【数1】

Figure 2004294261
【0019】
なお、上記ひび割れ深さの測定においては、ひび割れ位置の両側にセンサを一つずつ設置するようにしているが、複数ずつ設置するようにしてもよい。また、打撃位置も1箇所に限られるものではなく、例えば、ひび割れ位置に関して対称となる2位置でそれぞれ打撃を加えるようにしてもよく、そうすることによって、測定誤差の低減を図ることが可能である。
【0020】
[第2ステップ:覆工コンクリートの力学特性の測定]
この第2ステップ(S2)においては、レイリー波の走行速度がその伝播媒体の剪断剛性に依存するという性質を利用して、覆工コンクリートの力学特性を測定する。
【0021】
先ず、図3に示すように、ハンマで覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を、打撃面と同じ表面上の異なる複数の地点に設けられたセンサ11a、11bで採取する。
【0022】
次いで、各地点で採取した波動信号からレイリー波の走行速度(位相速度)を求め、このレイリー波の走行速度に基づいて、覆工コンクリートの各力学特性(弾性係数、圧縮強度、引張強度)を導き出す。すなわち、レイリー波の走行速度と各力学特性との間には強い相関関係がある(例えば、レイリー波の走行速度と覆工コンクリートの圧縮強度の相関係数は0.7以上であることが本発明者等によって確認されている。)ことから、当該関係を表した数式あるいは対応表を予め求めておくことによって、レイリー波の走行速度から覆工コンクリートの各力学特性を推定することができる。
【0023】
なお、上記レイリー波の走行速度には、次の数2の関係式に基づいて推定された等価レイリー波の走行速度νRCを用いることが可能である。
【0024】
【数2】
Figure 2004294261
【0025】
この関係式において、Cは計測により得られた表面波(ラム波を含む。)の走行速度、Hは覆工コンクリートの巻厚、Lは上記表面波の波長、νREは覆工コンクリート背部の地山を走行するレイリー波の走行速度である。この関係式に基づいて推定された等価レイリー波の走行速度νRCは、覆工コンクリートの形状やその背部の地山の状態に依存しないことから、この等価レイリー波の走行速度νRCを用いることで、覆工コンクリートの各力学特性を精度良く測定することが可能となる。
【0026】
[第3ステップ:覆工コンクリートの巻厚の測定]
この第3ステップ(S3)においては、地中レーダー法と呼ばれる測定方法によって覆工コンクリートの巻厚を測定する。地中レーダー法とは、物質を通過する電磁波の速度が物質の比誘電率に依存し、その電磁波の一部が、比誘電率の変化する物質の境界面で反射するという性質を利用して、検査対象物の深度を測定する方法である。
【0027】
先ず、既設トンネル内の空間から覆工コンクリートに向けて電磁波を照射する。次いで、その電磁波が地中の各層間の境界面に反射して照射位置に戻ってくるまでの時間、各反射波の位相および振幅を測定し、それら測定結果に基づいて、覆工コンクリートの巻厚を求めるとともに、覆工コンクリートと地山との間に空洞が存在するか否かを判定し、存在する場合には、その大きさを求める。
【0028】
なお、上記地中レーダー法においては、対象物の比誘電率の設定が重要であり、その値はコンクリートの状態(湿潤の程度、密度等)や周辺地質の状態如何によって変化することが知られている。このため、簡単なコア抜き等を利用して比誘電率を実測し、この実測結果に基づいて比誘電率の設定を行うようにすれば、覆工コンクリートの巻厚をより一層正確に求めることが可能である。
【0029】
[第4ステップ:土圧の大きさと分布態様の推定]
この第4ステップ(S4)では、第1ステップで求めたひび割れの深さ、第2ステップで求めた覆工コンクリートの力学特性、第3ステップで求めた覆工コンクリートの巻厚を用いて、既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定する。すなわち、有限要素法や骨組み構造解析法等の数値解析法を利用して、第1ステップ〜第3ステップで求めた覆工コンクリートに係る既知データから、覆工コンクリートに作用している荷重(未知データ)を求めるという逆問題を解析する。
【0030】
[第5ステップ:既設トンネルの健全性の判定]
この第5ステップ(S5)では、第4ステップで推定した上記土圧の大きさと分布態様に基づき、既設トンネルの各断面について、覆工コンクリートに作用する断面力を求め、この断面力と各断面における残存耐力との比較により、既設トンネルの健全性を判定する。例えば、既設トンネルのすべての断面について、残存耐力が断面力を上回る場合には、その既設トンネルは健全であると判定することができ、一方、残存耐力が断面力を下回る部位が一つでも存在する場合には、その既設トンネルは補修が必要であると判定することができる。
【0031】
次に、図3に示す既設トンネルのモデルを用いて、既設トンネルの健全性の診断方法を具体的に説明する。このトンネルは、1923年に水力発電用水路トンネルとして築造された、直径約3mの標準馬蹄型の既設トンネルである。このトンネルの構造を詳細に観察したところ、当該トンネルは次のような境界条件で築造されたと推測される。
【0032】
(1)アーチ部からスプリングラインにかけては一体で施工され、スプリングラインが施工継目になっている。縦断方向のひび割れは、スプリングラインより上方のアーチ部にのみ存在し、他の部分には無い。
(2)側壁と敷部も施工継目になっている。この部分には縦断方向のひび割れは全く無い。
【0033】
前述した第1ステップ〜第3ステップに従って、ひび割れの深さ、覆工コンクリートの力学特性および巻厚を求めたところ、次のようなデータが得られた。
すなわち、縦断方向のひび割れはアーチ部に水平に2本あり、スプリングラインより上方の22度および59度の位置にあった。深さは何れも約15cmであり、覆工コンクリート面にほぼ直交していた。
覆工コンクリートの力学特性については、圧縮強度が約30N/mm、引張強度が約3N/mm、弾性係数が約30GPaであった。また、覆工コンクリートの巻厚は約30cmであった。
【0034】
トンネルに作用する荷重条件は次のように設定した。
先ず、水圧は施工継目を通して内外バランスしているとして考えないこととした。また、ひび割れの無い初期の状態においては、トンネルに等分布の土圧が作用しているとし、トンネルの上面と両側面には0.1MPaの等分布荷重を載荷し、敷部はこれに対する反力でバランスしていると考えた。
【0035】
以上の条件に対して、偏圧荷重を載荷し、ひび割れが発生している応力状態と等価となるような状況を推測した。すなわち、偏圧荷重の設定条件を複数パターン作成して、各設定条件のときに作用する応力状態を汎用の解析ソフト等を用いて有限要素法等により解析し、当該応力状態が、ひび割れが発生している応力状態と一致するか否かをそれぞれ判定することにより、ひび割れが発生している応力状態と等価となるような荷重条件を導き出すようにした。その結果、図4に示すように、トンネル左側部の上半分の位置に0.4MPa、トンネル上部の左側約1/3の位置に0.4MPaの荷重を載荷すると、スプリングラインより上部の覆工表面の約1/2のゾーン(図4のa部分)が引張りとなり、そのゾーンにおける応力の大きさが覆工コンクリートの引張強度(3N/mm)を超えて、ひび割れが発生する条件と一致することが判明した。なお、図4に示すように、覆工コンクリートのアーチ部の外周側にも引張りゾーン(図4のb部分)が表れるが、この部分の応力は3N/mm以下であり、ひび割れは発生しないと推定される。
【0036】
そして、上記のようにして求めた土圧の大きさと分布態様、覆工コンクリートの力学特性、ひび割れ深さ等を用いて、ひび割れが発生している部位の残存耐力と、当該部位に作用する断面力とを求め、両者の比較により、当該部位における安定性を検証した。この例では、残存耐力が約8N、断面力が約4Nとなったので、現時点での安定性は十分にあると考えられる。ただし、今後ひび割れは進展する可能性もあるので、定期的に安全性の検証を行う必要があると考えられる。
【0037】
以上のように、本実施形態によれば、第1ステップにおいて、既設トンネルの覆工コンクリートに生じているひび割れの深さを測定し、第2ステップにおいて、覆工コンクリートの力学特性を測定し、第3ステップにおいて、覆工コンクリートの巻厚を測定し、第4ステップにおいて、第1〜第3ステップで求めたひび割れの深さ、覆工コンクリートの力学特性および巻厚に基づいて、既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定し、第5ステップにおいて、第4ステップで得られた土圧の大きさと分布態様に基づいて覆工コンクリートに作用する断面力を求め、この断面力と覆工コンクリートの残存耐力との比較により、既設トンネルの健全性を判定するようにしたので、従来のようなコアボーリングによる土圧測定が不要となり、既設トンネルの健全性を容易かつ速やかに診断することができる。
【0038】
なお、本実施形態においては、第1ステップにおいて、既設トンネルの覆工コンクリートに生じているひび割れの深さを測定し、第2ステップにおいて、覆工コンクリートの力学特性を測定し、第3ステップにおいて、覆工コンクリートの巻厚を測定するようにしたが、その測定順序は如何なる順序であってもよく、例えば、各ステップの処理を並行して行うようにしてもよい。また、本実施形態で示した各パラメータ(覆工コンクリートの力学特性、巻厚、ひび割れの深さ)の測定方法は一例であって、各パラメータの測定に、その他の非破壊測定方法を適用することも可能である。
【0039】
【発明の効果】
以上説明したように、請求項1〜4の何れかに記載の発明によれば、従来のようなコアボーリングによる土圧測定が不要となり、既設トンネルの健全性を容易かつ速やかに診断することができる。
また、請求項2〜4に記載の発明によれば、ひび割れの深さ、覆工コンクリートの力学特性および巻厚をそれぞれ精度良く測定することができるので、上記診断結果に対する信頼性を高めることができる。しかも、上記診断に必要な各パラメータの大部分を非破壊で測定することができ、上記診断に要する時間と費用を大幅に縮減することができる。
【図面の簡単な説明】
【図1】本発明に係る既設トンネルの健全性診断方法の一実施形態を説明するためのフローチャートである。
【図2】ひび割れ深さの測定方法を説明するための模式図である。
【図3】覆工コンクリートの力学特性の測定方法を説明するための模式図である。
【図4】既設トンネルの健全性診断のモデルに用いたトンネルの横断面図である。
【図5】図4の既設トンネルに作用する土圧の大きさと分布態様を示す模式図である。[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for diagnosing the integrity of an existing tunnel.
[0002]
[Prior art]
In the soundness diagnosis of an existing tunnel, it is considered that the most important factor is to grasp the magnitude of the external force acting on the tunnel lining, that is, the magnitude of the earth pressure and its distribution mode. However, it is said that it is very difficult to find them in an existing tunnel many years after its construction (see, for example, Non-Patent Document 1).
[0003]
Conventionally, as a method for measuring the magnitude and distribution mode of the earth pressure, a measurement method using core boring is known. In this measurement method, first, core boring is performed at several locations in the cross section of the tunnel to investigate the initial ground pressure of the ground and the elasto-plastic physical properties of the ground material. After that, a rock bolt or the like is buried in the place where the core boring is performed, displacement or stress in the place is measured, and the magnitude and distribution mode of the earth pressure are determined based on the measurement result.
[0004]
[Non-patent document 1]
Japan Road Association, "Road Tunnel Maintenance Manual", November 1993, p. 115-122
[0005]
[Problems to be solved by the invention]
However, although the measurement method using core boring has the advantage that the physical properties of the ground can be directly obtained, it requires a long-term monitoring, and is extremely difficult when performing core boring. There is a problem that it costs a lot.
[0006]
For this reason, it is not realistic to adopt the earth pressure measurement method by core boring as described above in the soundness diagnosis of the existing tunnel, and to check the soundness of the existing tunnel without using this kind of earth pressure measurement method. There is a strong demand for a soundness diagnosis method that can easily and quickly make a diagnosis.
[0007]
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for diagnosing the soundness of an existing tunnel that can easily and quickly diagnose the soundness of the existing tunnel.
[0008]
[Means for Solving the Problems]
The method for diagnosing soundness of an existing tunnel according to the present invention according to claim 1 includes a first step of measuring the depth of cracks generated in the lining concrete of the existing tunnel, and the mechanical characteristics (strength) of the lining concrete. , A second step of measuring the thickness of the lining concrete, a third step of measuring the winding thickness of the lining concrete, and the existing step based on the depth of the cracks, the mechanical properties of the lining concrete, and the winding thickness. A fourth step of estimating the magnitude and distribution of the earth pressure acting on the tunnel by an inverse analysis, and calculating the sectional force acting on the lining concrete based on the magnitude and the distribution of the earth pressure; And a fifth step of judging the soundness of the existing tunnel by comparing the remaining strength of the lining concrete with the remaining strength.
[0009]
According to a second aspect of the present invention, in the first step of the method for diagnosing the soundness of an existing tunnel according to the first aspect, a shock is applied to the surface of the lining concrete to generate a shock elastic wave. The wave signal is sampled at two points before and after reaching the crack, the amplitude of the Rayleigh wave is obtained from the wave signal collected at each point, and the depth of the crack is determined based on the amplitude ratio. Is obtained.
[0010]
According to a third aspect of the present invention, in the second step of the method for diagnosing soundness of an existing tunnel according to the first or second aspect, a shock is applied to a surface of the lining concrete to generate impact elasticity. The wave signal of the wave is collected at a plurality of different points on the same surface as the hitting surface, and the running speed of the Rayleigh wave is determined from the wave signals collected at the plurality of points, based on the running speed of the Rayleigh wave, It is characterized in that the mechanical characteristics of the lining concrete are derived.
[0011]
According to a fourth aspect of the present invention, in the third step of the method for diagnosing soundness of an existing tunnel according to any one of the first to third aspects, electromagnetic waves are directed from the space in the existing tunnel toward the lining concrete. Irradiate, measure the time until the electromagnetic wave is reflected on the boundary surface between each layer in the ground and return to the irradiation position, the phase and amplitude of each reflected wave, and based on the measurement results, Is determined.
[0012]
According to the invention of any one of claims 1 to 4, after measuring the depth of cracks generated in the lining concrete of the existing tunnel, the mechanical properties of the lining concrete, and the winding thickness of the lining concrete. Using the measured data, the magnitude and distribution of the earth pressure acting on the existing tunnel are estimated by inverse analysis, and then the cross section acting on the lining concrete is estimated based on the estimated magnitude and distribution of the earth pressure. The strength of the existing tunnel was determined by comparing the sectional strength with the residual strength of the lining concrete.Therefore, it was not necessary to measure the earth pressure by core boring as in the past. Sex can be easily and quickly diagnosed.
[0013]
Further, according to the invention of claims 2 to 4, it is possible to accurately measure the depth of the crack, the mechanical properties of the lining concrete, and the thickness of the winding, respectively, and thereby, the diagnosis result of the soundness of the existing tunnel. Reliability can be increased. Moreover, most of the parameters required for the diagnosis can be measured in a non-destructive manner, and the time and cost required for the diagnosis can be greatly reduced.
[0014]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of a method for diagnosing the integrity of an existing tunnel according to the present invention will be described with reference to the drawings. As shown in the flowchart of FIG. 1, the soundness diagnosis method includes a first step of measuring the depth of cracks generated in the lining concrete of the existing tunnel, and a second step of measuring the mechanical properties of the lining concrete. And a third step of measuring the winding thickness of the lining concrete, and a third step of estimating the magnitude and distribution mode of the earth pressure acting on the existing tunnel based on the measurement results in the first to third steps by inverse analysis. The method includes four steps and a fifth step of determining the soundness of the existing tunnel based on the magnitude and distribution of the earth pressure estimated in the fourth step.
[0015]
[First step: Measurement of crack depth]
In this first step (S1), as shown in FIGS. 2 (a) and 2 (b), the phenomenon that the amplitude of the Rayleigh wave propagating on the concrete surface is attenuated when passing through the crack position is utilized. And measure the crack depth.
[0016]
First, as shown in FIG. 2 (b), after sensors 10a and 10b such as acceleration pickups are installed on both sides (both sides in the width direction) of the crack position, a predetermined line on an extension of a line connecting the sensors 10a and 10b is set. The surface of the lining concrete is hit at the position, and the wave signals of the impact elastic waves generated at that time are collected by the sensors 10a and 10b, respectively. That is, the wave signals of the impact elastic wave before and after passing through the crack are respectively collected.
[0017]
Next, the amplitude of the Rayleigh wave is determined from the wave signal collected by each of the sensors 10a and 10b, and the depth of the crack is determined based on the amplitude ratio between the two. Specifically, from the relationship between the amplitude ratio x of both of them and the wavelength λ of the Rayleigh wave, the depth H of the crack is obtained using the mathematical formula of Expression 1.
[0018]
(Equation 1)
Figure 2004294261
[0019]
In the measurement of the crack depth, one sensor is installed on each side of the crack position, but a plurality of sensors may be installed. In addition, the hitting position is not limited to one position. For example, hitting may be performed at two positions symmetrical with respect to the crack position, and by doing so, a measurement error can be reduced. is there.
[0020]
[Second step: Measurement of mechanical properties of lining concrete]
In the second step (S2), the mechanical properties of the lining concrete are measured by utilizing the property that the running speed of the Rayleigh wave depends on the shear rigidity of the propagation medium.
[0021]
First, as shown in FIG. 3, the surface of the lining concrete was hit with a hammer, and the wave signals of the impact elastic waves generated at that time were provided at a plurality of different points on the same surface as the hitting surface. Collected by the sensors 11a and 11b.
[0022]
Next, the running speed (phase speed) of the Rayleigh wave is obtained from the wave signal collected at each point, and based on the running speed of the Rayleigh wave, each mechanical property (elastic coefficient, compressive strength, tensile strength) of the lining concrete is determined. derive. That is, there is a strong correlation between the running speed of the Rayleigh wave and each mechanical property (for example, the correlation coefficient between the running speed of the Rayleigh wave and the compressive strength of the lining concrete is 0.7 or more. Thus, the mechanical properties of the lining concrete can be estimated from the running speed of the Rayleigh wave by obtaining a mathematical expression or a correspondence table representing the relationship in advance.
[0023]
Note that, as the running speed of the Rayleigh wave, the running speed ν RC of the equivalent Rayleigh wave estimated based on the following equation (2) can be used.
[0024]
(Equation 2)
Figure 2004294261
[0025]
In this relation, C is the traveling speed of the resulting surface wave by measuring (including Lamb waves.), H is winding thickness of lining concrete, L is the wavelength of the surface wave, [nu RE is the lining concrete back It is the traveling speed of Rayleigh waves traveling on the ground. Since the traveling speed ν RC of the equivalent Rayleigh wave estimated based on this relational expression does not depend on the shape of the lining concrete and the state of the ground behind it, use the traveling speed ν RC of this equivalent Rayleigh wave. Thus, it is possible to accurately measure each mechanical property of the lining concrete.
[0026]
[Third step: Measurement of roll thickness of lining concrete]
In the third step (S3), the winding thickness of the lining concrete is measured by a measuring method called an underground radar method. The underground radar method utilizes the property that the speed of electromagnetic waves passing through a substance depends on the relative permittivity of the substance, and a part of the electromagnetic wave is reflected at the interface of the substance whose relative permittivity changes. And a method for measuring the depth of the inspection object.
[0027]
First, electromagnetic waves are irradiated from the space in the existing tunnel toward the lining concrete. Next, the time until the electromagnetic wave is reflected on the boundary surface between the layers in the ground and returns to the irradiation position, the phase and the amplitude of each reflected wave are measured, and based on the measurement results, the winding of the lining concrete is performed. In addition to determining the thickness, it is determined whether or not a cavity exists between the lining concrete and the ground, and if so, the size is determined.
[0028]
In the above-mentioned underground radar method, it is important to set the relative permittivity of the object, and it is known that the value changes depending on the condition of the concrete (degree of wetness, density, etc.) and the condition of the surrounding geology. ing. Therefore, if the relative permittivity is measured using a simple coring, etc., and the relative permittivity is set based on the result of the measurement, the winding thickness of the lining concrete can be obtained more accurately. Is possible.
[0029]
[Fourth step: estimation of the magnitude and distribution of earth pressure]
In the fourth step (S4), the existing depth is determined using the crack depth determined in the first step, the mechanical properties of the lining concrete determined in the second step, and the winding thickness of the lining concrete determined in the third step. The magnitude and distribution of the earth pressure acting on the tunnel are estimated by inverse analysis. That is, by using a numerical analysis method such as a finite element method or a frame structure analysis method, the load (unknown load) acting on the lining concrete is determined from the known data on the lining concrete obtained in the first to third steps. Analyze the inverse problem of finding data).
[0030]
[Fifth Step: Judgment of Soundness of Existing Tunnel]
In the fifth step (S5), based on the magnitude and distribution of the earth pressure estimated in the fourth step, the section force acting on the lining concrete is determined for each section of the existing tunnel, and this section force and each section are determined. The soundness of the existing tunnel is determined by comparison with the residual proof stress in the above. For example, if the residual strength exceeds the sectional strength for all sections of the existing tunnel, it can be determined that the existing tunnel is sound.On the other hand, there is at least one part where the residual strength is lower than the sectional strength. In such a case, it can be determined that the existing tunnel needs repair.
[0031]
Next, a method of diagnosing the soundness of the existing tunnel will be specifically described using the model of the existing tunnel shown in FIG. This tunnel is a standard horseshoe-shaped tunnel with a diameter of about 3 m, which was built in 1923 as a hydropower tunnel. When the structure of this tunnel is observed in detail, it is assumed that the tunnel was constructed under the following boundary conditions.
[0032]
(1) From the arch part to the spring line, the construction is performed integrally, and the spring line is the construction seam. Cracks in the longitudinal direction exist only in the arch portion above the spring line, but not in other portions.
(2) Side walls and floors are also seams. There are no longitudinal cracks in this part.
[0033]
When the depth of the crack, the mechanical properties of the lining concrete, and the winding thickness were determined according to the first to third steps described above, the following data was obtained.
That is, there were two horizontal cracks in the longitudinal direction in the arch, and were located at 22 degrees and 59 degrees above the spring line. The depth was about 15 cm in each case, and was almost perpendicular to the lining concrete surface.
Regarding the mechanical properties of the lining concrete, the compressive strength was about 30 N / mm 2 , the tensile strength was about 3 N / mm 2 , and the elastic modulus was about 30 GPa. Moreover, the winding thickness of the lining concrete was about 30 cm.
[0034]
The load conditions acting on the tunnel were set as follows.
First, it was decided not to consider that the water pressure was balanced inside and outside through the construction seam. In the initial state without cracks, it is assumed that an evenly distributed earth pressure is acting on the tunnel, and a uniform load of 0.1 MPa is applied to the upper surface and both side surfaces of the tunnel. I thought it was balanced by power.
[0035]
Under the above conditions, a situation was assumed in which a partial pressure load was applied and this was equivalent to a stress state in which cracks occurred. That is, a plurality of patterns of the setting conditions of the unbalanced load are created, and the stress state acting under each setting condition is analyzed by a finite element method or the like using general-purpose analysis software or the like, and the stress state indicates that cracks are generated. By determining whether or not the stress state coincides with the stress state, a load condition that is equivalent to the stress state in which cracks are generated is derived. As a result, as shown in FIG. 4, when a load of 0.4 MPa is applied to the upper half position of the left side of the tunnel and 0.4 MPa is applied to a position about 1/3 of the upper left side of the tunnel, the lining above the spring line is applied. Approximately one-half of the surface zone (portion a in FIG. 4) is in tension, and the magnitude of the stress in that zone exceeds the tensile strength (3 N / mm 2 ) of the lining concrete, which is consistent with the conditions for cracking. It turned out to be. As shown in FIG. 4, a tensile zone (portion b in FIG. 4) also appears on the outer peripheral side of the arch portion of the lining concrete, but the stress in this portion is 3 N / mm 2 or less, and no cracking occurs. It is estimated to be.
[0036]
Then, using the magnitude and distribution mode of the earth pressure obtained as described above, the mechanical properties of the lining concrete, the crack depth, etc., the residual proof stress at the site where the crack is generated, and the cross section acting on the site And the stability was verified by comparing the two. In this example, the remaining proof stress was about 8 N and the sectional force was about 4 N, so it is considered that the stability at the present time is sufficient. However, cracks may develop in the future, so it is considered necessary to periodically verify safety.
[0037]
As described above, according to the present embodiment, in the first step, the depth of cracks generated in the lining concrete of the existing tunnel is measured, and in the second step, the mechanical properties of the lining concrete are measured, In the third step, the winding thickness of the lining concrete is measured, and in the fourth step, based on the crack depth, the mechanical properties and the winding thickness of the lining concrete obtained in the first to third steps, the existing tunnel is measured. The magnitude and distribution of the acting earth pressure are estimated by inverse analysis, and in a fifth step, the sectional force acting on the lining concrete is determined based on the magnitude and the distribution of the earth pressure obtained in the fourth step. By comparing this section force with the residual strength of the lining concrete, the soundness of the existing tunnel was determined. Measurement is not required, the integrity of the existing tunnel can be easily and quickly diagnosed.
[0038]
In the present embodiment, in the first step, the depth of cracks generated in the lining concrete of the existing tunnel is measured, and in the second step, the mechanical properties of the lining concrete are measured, and in the third step, Although the winding thickness of the lining concrete is measured, the measuring order may be any order. For example, the processing of each step may be performed in parallel. Further, the measuring method of each parameter (mechanical properties, wrapping thickness, crack depth) of the lining concrete shown in the present embodiment is an example, and other non-destructive measuring methods are applied to the measurement of each parameter. It is also possible.
[0039]
【The invention's effect】
As described above, according to the invention as set forth in any one of claims 1 to 4, the earth pressure measurement by the core boring as in the related art becomes unnecessary, and the soundness of the existing tunnel can be easily and promptly diagnosed. it can.
In addition, according to the invention described in claims 2 to 4, since the depth of the crack, the mechanical properties of the lining concrete, and the winding thickness can be each accurately measured, it is possible to increase the reliability of the diagnosis result. it can. Moreover, most of the parameters required for the diagnosis can be measured in a non-destructive manner, and the time and cost required for the diagnosis can be greatly reduced.
[Brief description of the drawings]
FIG. 1 is a flowchart illustrating an embodiment of an existing tunnel health diagnostic method according to the present invention.
FIG. 2 is a schematic diagram for explaining a method of measuring a crack depth.
FIG. 3 is a schematic diagram for explaining a method for measuring mechanical properties of lining concrete.
FIG. 4 is a cross-sectional view of a tunnel used for a model of soundness diagnosis of an existing tunnel.
FIG. 5 is a schematic diagram showing the magnitude and distribution of earth pressure acting on the existing tunnel of FIG. 4;

Claims (4)

既設トンネルの覆工コンクリートに生じているひび割れの深さを測定する第1ステップと、上記覆工コンクリートの力学特性を測定する第2ステップと、上記覆工コンクリートの巻厚を測定する第3ステップと、上記ひび割れの深さ、上記覆工コンクリートの力学特性および上記巻厚に基づいて、上記既設トンネルに作用している土圧の大きさと分布態様を逆解析により推定する第4ステップと、上記土圧の大きさと分布態様に基づいて上記覆工コンクリートに作用する断面力を求め、この断面力と上記覆工コンクリートの残存耐力との比較により、上記既設トンネルの健全性を判定する第5ステップとを有することを特徴とする既設トンネルの健全性診断方法。A first step of measuring the depth of cracks occurring in the lining concrete of the existing tunnel, a second step of measuring the mechanical properties of the lining concrete, and a third step of measuring the winding thickness of the lining concrete A fourth step of estimating, by inverse analysis, the magnitude and distribution of the earth pressure acting on the existing tunnel based on the depth of the crack, the mechanical properties of the lining concrete, and the winding thickness; Fifth step of determining the soundness of the existing tunnel by determining the sectional force acting on the lining concrete based on the magnitude and distribution mode of the earth pressure and comparing the sectional force with the residual strength of the lining concrete And a method for diagnosing the soundness of an existing tunnel. 上記第1ステップでは、上記覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を、上記ひび割れに到達する前と通過した後の2地点で採取するとともに、各地点で採取した波動信号からレイリー波の振幅をそれぞれ求め、その振幅比に基づいて、上記ひび割れの深さを求めるようにしたことを特徴とする請求項1に記載の既設トンネルの健全性診断方法。In the first step, the surface of the lining concrete is hit, and wave signals of impact elastic waves generated at that time are collected at two points before reaching the crack and after passing therethrough. 2. The method for diagnosing soundness of an existing tunnel according to claim 1, wherein the amplitude of the Rayleigh wave is obtained from the wave signal collected at each point, and the depth of the crack is obtained based on the amplitude ratio. . 上記第2ステップでは、上記覆工コンクリートの表面に打撃を加えて、そのときに発生する衝撃弾性波の波動信号を、打撃面と同じ表面上の異なる複数の地点で採取するとともに、上記複数の地点で採取した波動信号からレイリー波の走行速度を求め、このレイリー波の走行速度に基づいて、上記覆工コンクリートの力学特性を導き出すようにしたことを特徴とする請求項1または2に記載の既設トンネルの健全性診断方法。In the second step, the surface of the lining concrete is hit, and wave signals of impact elastic waves generated at that time are collected at different points on the same surface as the hitting surface, and the plurality of points are collected. The running speed of the Rayleigh wave is obtained from the wave signal collected at the point, and the mechanical characteristics of the lining concrete are derived based on the running speed of the Rayleigh wave. How to diagnose the soundness of existing tunnels. 上記第3ステップでは、上記既設トンネル内の空間から上記覆工コンクリートに向けて電磁波を照射し、その電磁波が地中の各層間の境界面に反射して照射位置に戻ってくるまでの時間、各反射波の位相および振幅を測定し、それら測定結果に基づいて、上記覆工コンクリートの巻厚を求めるようにしたことを特徴とする請求項1〜3の何れかに記載の既設トンネルの健全性診断方法。In the third step, the electromagnetic wave is irradiated from the space in the existing tunnel toward the lining concrete, and the time until the electromagnetic wave is reflected on the boundary surface between the layers under the ground and returns to the irradiation position, The soundness of the existing tunnel according to any one of claims 1 to 3, wherein the phase and the amplitude of each reflected wave are measured, and the winding thickness of the lining concrete is obtained based on the measurement results. Sex diagnosis method.
JP2003086955A 2003-03-27 2003-03-27 Method for diagnosing healthiness of existing tunnel Pending JP2004294261A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003086955A JP2004294261A (en) 2003-03-27 2003-03-27 Method for diagnosing healthiness of existing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003086955A JP2004294261A (en) 2003-03-27 2003-03-27 Method for diagnosing healthiness of existing tunnel

Publications (1)

Publication Number Publication Date
JP2004294261A true JP2004294261A (en) 2004-10-21

Family

ID=33401435

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003086955A Pending JP2004294261A (en) 2003-03-27 2003-03-27 Method for diagnosing healthiness of existing tunnel

Country Status (1)

Country Link
JP (1) JP2004294261A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011043427A (en) * 2009-08-21 2011-03-03 Tobishima Corp Internal defect detection device of structure
JP2011242269A (en) * 2010-05-19 2011-12-01 Shimizu Corp Inspection device
JP2012237561A (en) * 2011-05-10 2012-12-06 Shimizu Corp Inspection device
JP2014032123A (en) * 2012-08-03 2014-02-20 Fukui Prefecture Crack part evaluation method for ground surface reinforcement layer
KR101542419B1 (en) 2014-05-14 2015-08-07 한국과학기술원 Device for investigating structure of ground and method for investigating structure of ground using the same
CN108776033A (en) * 2018-03-30 2018-11-09 西南交通大学 A kind of lining model and production method for shield tunnel longitudinal direction model test
JP2020134299A (en) * 2019-02-19 2020-08-31 株式会社オリエンタルコンサルタンツ Display device, display method, and nondestructive inspection system
CN113125559A (en) * 2021-04-16 2021-07-16 山东正元地球物理信息技术有限公司 Method for identifying pipeline position based on micro-motion information
CN113898372A (en) * 2021-09-01 2022-01-07 武汉市政工程设计研究院有限责任公司 Full life cycle health monitoring system of deep tunnel of sewage
CN115507808A (en) * 2022-09-14 2022-12-23 中国地质大学(武汉) Test device and method for simulating stress deformation characteristic of existing tunnel under adjacent tunnel construction condition
CN116822033A (en) * 2023-08-30 2023-09-29 交通运输部公路科学研究所 Method for discriminating tunnel lining destruction mechanism in expansive rock area

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011043427A (en) * 2009-08-21 2011-03-03 Tobishima Corp Internal defect detection device of structure
JP2011242269A (en) * 2010-05-19 2011-12-01 Shimizu Corp Inspection device
JP2012237561A (en) * 2011-05-10 2012-12-06 Shimizu Corp Inspection device
JP2014032123A (en) * 2012-08-03 2014-02-20 Fukui Prefecture Crack part evaluation method for ground surface reinforcement layer
KR101542419B1 (en) 2014-05-14 2015-08-07 한국과학기술원 Device for investigating structure of ground and method for investigating structure of ground using the same
CN108776033B (en) * 2018-03-30 2023-09-22 西南交通大学 Lining model for shield tunnel longitudinal model test and manufacturing method
CN108776033A (en) * 2018-03-30 2018-11-09 西南交通大学 A kind of lining model and production method for shield tunnel longitudinal direction model test
JP2020134299A (en) * 2019-02-19 2020-08-31 株式会社オリエンタルコンサルタンツ Display device, display method, and nondestructive inspection system
JP7190138B2 (en) 2019-02-19 2022-12-15 株式会社オリエンタルコンサルタンツ Display device, display method and non-destructive exploration system
CN113125559A (en) * 2021-04-16 2021-07-16 山东正元地球物理信息技术有限公司 Method for identifying pipeline position based on micro-motion information
CN113898372A (en) * 2021-09-01 2022-01-07 武汉市政工程设计研究院有限责任公司 Full life cycle health monitoring system of deep tunnel of sewage
CN115507808A (en) * 2022-09-14 2022-12-23 中国地质大学(武汉) Test device and method for simulating stress deformation characteristic of existing tunnel under adjacent tunnel construction condition
CN116822033A (en) * 2023-08-30 2023-09-29 交通运输部公路科学研究所 Method for discriminating tunnel lining destruction mechanism in expansive rock area
CN116822033B (en) * 2023-08-30 2024-01-26 交通运输部公路科学研究所 Method for discriminating tunnel lining destruction mechanism in expansive rock area

Similar Documents

Publication Publication Date Title
Coulier et al. Experimental and numerical evaluation of the effectiveness of a stiff wave barrier in the soil
Gao et al. Estimation of effect of voids on frequency response of mountain tunnel lining based on microtremor method
Rivard et al. Monitoring of an hydraulic structure affected by ASR: A case study
JP2017090101A (en) Non-destructive inspection method and non-destructive inspection system of prefabricated concrete pile installed underground
Rausche Non-destructive evaluation of deep foundations
Russo Integrated assessment of monumental structures through ambient vibrations and ND tests: The case of Rialto Bridge
KR101294136B1 (en) Device for prediction underground dynamic behavior by using acoustic emission sensor and producing method thereof
Ha et al. Simulation of soil–foundation–structure interaction of Hualien large-scale seismic test using dynamic centrifuge test
Wang et al. Structural damage detection using local damage factor
JP2004294261A (en) Method for diagnosing healthiness of existing tunnel
KR101936849B1 (en) System and method for detecting cavity to non-contact type
Amoroso G-γ decay curves by seismic dilatometer (SDMT)
Ortega et al. Correlation between sonic pulse velocity and flat-jack tests for the estimation of the elastic properties of unreinforced brick masonry: Case studies from Croatia
Bungenstab et al. Continous Flight Auger (CFA) Piles–A Review of the Execution Process and Integrity Evaluation by Low Strain Test
JP3099042B2 (en) Judgment method for strength of ground improvement body
Zhang et al. Damage identification of piles based on vibration characteristics
JP3976318B2 (en) Geological prediction method in front of ground excavation
Zhou et al. Vibration characteristics of underground structure and surrounding soil underneath high speed railway based on field vibration tests
Jiang et al. The nature frequency identification of tunnel lining based on the microtremor method
Shaban et al. Comparative analyses of granular pavement moduli measured from lightweight deflectometer and miniaturized pressuremeter tests
Baraneedaran et al. Review of in-service assessment of timber poles
Gorzelanczyk et al. Nondestructive tests aimed at determining the thickness of the concrete shell of a heat pipe carrying tunnel
Wang et al. Relationship between local damage and structural dynamic behavior
CN112611805A (en) Method for evaluating surrounding rock loosening ring range based on attenuation coefficient
Dai et al. FIELD TESTING OF DIRECTLY EMBEDDED POLES.