JP2004252847A - Recycling support system, recycling support program and recycling support method - Google Patents

Recycling support system, recycling support program and recycling support method Download PDF

Info

Publication number
JP2004252847A
JP2004252847A JP2003044353A JP2003044353A JP2004252847A JP 2004252847 A JP2004252847 A JP 2004252847A JP 2003044353 A JP2003044353 A JP 2003044353A JP 2003044353 A JP2003044353 A JP 2003044353A JP 2004252847 A JP2004252847 A JP 2004252847A
Authority
JP
Japan
Prior art keywords
article
disassembly
information
dismantling
recycled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003044353A
Other languages
Japanese (ja)
Other versions
JP4019970B2 (en
Inventor
Takashi Tani
宇 谷
Hitoshi Yamakado
均 山門
Toru Miyamoto
徹 宮本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP2003044353A priority Critical patent/JP4019970B2/en
Priority to US10/756,424 priority patent/US7080435B2/en
Publication of JP2004252847A publication Critical patent/JP2004252847A/en
Priority to US11/339,656 priority patent/US7748096B2/en
Application granted granted Critical
Publication of JP4019970B2 publication Critical patent/JP4019970B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Refuse Collection And Transfer (AREA)
  • Processing Of Solid Wastes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a recycling support system by which a disassembling work can efficiently carried out. <P>SOLUTION: The recycling support system is provided with: a means for inputting article identification information for identifying a recycle object article; a means for storing article disassembling information for constituting a plurality of different disassembling drawings in the process at the time of disassembling the recycle object article corresponding to the article identification information; a means for retrieving the article dismantling information from the stored article dismantling information on the basis of the inputted article identification information; a means for constituting the dismantling drawing on the basis of the retrieved article disassembling information; and a means for outputting the constituted disassembling drawing. The means for constituting the disassembling drawing judges the progress conditions of the work process of disassembling the recycle object article by specifying a tool used in the work process and constitutes one of the plurality of the disassembling drawings which can be constituted by the article disassembling information retrieved in the article disassembling information retrieval means corresponding to the obtained progress conditions. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、OA製品や家電製品等のリサイクル対象物品を解体する作業を支援するシステムに係り、特に、解体作業を効率的に行うことができるリサイクル作業支援システム、リサイクル作業支援プログラム及びリサイクル作業支援方法に関する。
【0002】
【従来の技術】
従来、OA製品や家電製品等のリサイクル対象物品を解体する作業を支援する技術としては、例えば、特許文献1に開示されているリサイクル方法があった。
このリサイクル方法は、リサイクル対象物品の部品や材料をリサイクルする方法であって、次の(a)〜(g)の工程を経て行われる。
【0003】
(a)指定エリア内で発生したリサイクル対象物品を指定回収拠点に運搬して集積する。
(b)指定回収拠点は、リサイクル対象物品に付加されている第1の製品情報を読み込む入力部と、リサイクル対象物品に付加されている第1の製品情報と対応したそのリサイクル対象物品の照合、解体、分別するための情報の解体情報データベース(以下、データベースのことを単にDBと略記する。)を記憶する記憶部とを有し、指定回収拠点において入力部で得たリサイクル対象物品の第1の製品情報と解体情報DBに対応したそのリサイクル対象物品を照合する。
【0004】
(c)リサイクル対象物品の第1の製品情報と解体情報DBとの照合に基づきそのリサイクル対象物品を複数の第1分類に分別し、そのリサイクル対象物品の分別情報を第2の製品情報として解体情報DBに記憶する。
(d)指定回収拠点は、複数の第1分類に分別した各々のリサイクル対象物品を第1の製品情報または解体情報DBに基づきそのリサイクル対象物品の解体処理外装部材情報と非解体処理部材情報を認識し、認識結果を表示する表示部を有し、解体処理外装部材情報と非解体処理部材情報を解体情報DBに記憶する。
【0005】
(e)表示部により表示された結果に基づきそのリサイクル対象物品を解体処理外装部材と非解体処理部材に解体し、解体処理外装部材を複数の第2分類に分別する。
(f)複数の第2分類に分別した各々の解体処理外装部材および非解体処理部材において、解体処理外装部材を各々の材料メーカに、非解体処理部材を各々の製品メーカに運搬して集積する。
【0006】
(g)集積された解体処理外装部材を解体情報DBに基づいた処理方法で再生材料に加工し、再生材料の情報を解体情報DBに記憶する。
そして、指定回収拠点、材料メーカおよび製品メーカの間にネットワークを介して解体情報DBが共有化されている。
【0007】
【特許文献1】
特開2002−197147号公報
【0008】
【発明が解決しようとする課題】
上記従来のリサイクル方法にあっては、表示部により示された結果に基づきリサイクル対象物品を解体処理外装部材と非解体処理部材に解体する。具体的には、まず、解体情報を表示部に表示し、表示した解体情報に基づいて、リサイクル対象物品の外装部材・筐体部を解体する。このとき、解体情報には、リサイクル対象物品の外装部材および筐体部の解体情報と、外装部材および筐体部のリサイクル情報およびリユース情報を備え、少なくとも外装部材および筐体部の材質、外装部材および筐体部の材料メーカーの名称、外装部材および筐体部のリサイクル対象物品メーカーの名称、外装部材および筐体部の名称、外装部材および筐体部の部材番号が含まれている。
【0009】
しかしながら、こうした解体情報だけでは、リサイクル対象物品を具体的にどのように解体すればよいのかを解体作業者が把握するのが困難であるという問題があった。
また、解体作業者は、解体作業を効率的に進めるため、解体作業の進捗状況に応じて適切な手順を把握していることが望ましいが、十分な経験を必要とするし、リサイクル対象物品の種別が膨大である場合には、熟練者であっても把握するのに一定の限界がある。また、各リサイクル対象物品ごとにその解体手順を示したマニュアル等を参照しながら解体作業を進めることも考えられるが、リサイクル対象物品の種別が膨大であると、マニュアル等を参照するのに時間を要してしまい、解体作業を効率的に進めるには一定の限界がある。また、解体工程が複雑である場合も、マニュアル等を参照するのに時間を要してしまい、同様の問題がある。
【0010】
そこで、本発明は、このような従来の技術の有する未解決の課題に着目してなされたものであって、解体作業を効率的に行うことができるリサイクル作業支援システム、リサイクル作業支援プログラム及びリサイクル作業支援方法を提供することを目的としている。
【0011】
【課題を解決するための手段】
上記目的を達成するために、本発明のリサイクル作業支援システムは、リサイクルの対象となるリサイクル対象物品を解体する作業を支援するシステムであって、前記リサイクル対象物品を識別するための物品識別情報を入力する物品識別情報入力手段と、前記リサイクル対象物品を解体するにあたってその工程における異なる複数の解体図を構成するための物品解体情報を前記物品識別情報と対応付けて記憶する物品解体情報記憶手段と、前記物品識別情報入力手段で入力した物品識別情報をもとに前記物品解体情報記憶手段のなかから前記物品解体情報を検索する物品解体情報検索手段と、前記物品解体情報検索手段で索出した物品解体情報に基づいて前記解体図を構成する解体図構成手段と、前記解体図構成手段で構成した解体図を出力する解体図出力手段とを備え、前記解体図構成手段は、前記リサイクル対象物品を解体する作業工程において使用された工具を特定することにより、この作業工程の進捗状況を判定し、得られた進捗状況に応じて前記物品解体情報検索手段で索出した物品解体情報により構成可能な複数の解体図のうちいずれかを構成するようになっていることを特徴とする。
【0012】
このような構成であれば、リサイクル対象物品を解体する場合、まず、そのリサイクル対象物品を識別するための物品識別情報を物品識別情報入力手段により入力する。物品識別情報入力手段により物品識別情報が入力されると、物品解体情報検索手段により、入力された物品識別情報をもとに、物品解体情報記憶手段のなかから物品解体情報が検索される。その結果、該当の物品解体情報が索出されると、解体図構成手段により、リサイクル対象物品の解体作業の進捗状況に応じて、索出された物品解体情報により構成可能な複数の解体図のうちいずれかが構成され、解体図出力手段により、構成された解体図が出力される。
【0013】
解体作業者は、出力された解体図を参照しながら解体作業を進めることができる。また、解体図は、解体作業の進捗状況に応じて次々に出力されるので、次の解体図を参照するのに手間や時間をさほど要さずにすむ。特に、作業の進捗を使用された工具を特定することにより行うようにしたため、正確な進捗状況判断を行うことが可能となる。
これにより、解体作業者は、リサイクル対象物品をどのように解体すればよいのかの具体的な解体手順を解体図から把握することができ、また、手間や時間を要さずして、解体作業の進捗状況に応じて比較的適切な手順を把握することができるので、従来に比して、解体作業を効率的に行うことができるという効果が得られる。
【0014】
ここで、解体図とは、リサイクル対象物品を解体するにあたって解体の一工程において次の工程に移行するための作業手順を説明した図面または文章をいう。
【0015】
また、解体図出力手段は、表示、印刷その他五感で知覚可能な方法により解体図を出力するようになっていてもよいし、解体図をデータとして出力するようになっていてもよい。
また、物品解体情報とは、異なる複数の解体図を構成するための情報であって、それら解体図をすべて図面で構成してもよいし、それら解体図をすべて文章で構成してもよいし、各解体図を図面若しくは文章のいずれかまたはそれらの組み合わせで構成してもよい。
【0016】
また、物品解体情報記憶手段は、物品解体情報をあらゆる手段でかつあらゆる時期に記憶するものであり、物品解体情報をあらかじめ記憶してあるものであってもよいし、物品解体情報をあらかじめ記憶することなく、本システムの動作時に外部からの入力等によって物品解体情報を記憶するようになっていてもよい。
【0017】
また、本発明のリサイクル作業支援システムは、前記工具の特定は、該工具が使用された位置と回数を画像から検出することにより行うことを特徴とする。
この構成によれば、工程の進捗状況判断を正確にかつ自動的に行うことが可能であるため、解体作業者は、部品を認識するための情報を予め得ている必要はなく、また表示される解体図の指示にしたがって作業するだけでよいため、作業者の負担を軽減することができる。
【0018】
また、本発明のリサイクル作業支援システムは、前記工具の特定は、使用工具が電動工具である場合に、該工具の使用位置と回数に加え、工具のスイッチの状態遷移に応じて行うことを特徴とする。
この構成によれば、工程の進捗状況判断を正確にかつ自動的に行うことが可能であるため、解体作業者は、部品を認識するための情報を予め得ている必要はなく、また表示される解体図の指示にしたがって作業するだけでよいため、作業者の負担を軽減することができる。
【0019】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照しながら説明する。図1ないし図13は、本発明に係るリサイクル作業支援システム、リサイクル作業支援プログラム及びリサイクル作業支援方法の実施の形態を示す図である。
【0020】
本実施の形態は、本発明に係るリサイクル作業支援システム、リサイクル作業支援プログラム及びリサイクル作業支援方法を、図1に示すように、リサイクルセンタ20において、OA製品や家電製品等のリサイクル対象物品を解体・分別する場合について適用したものである。
【0021】
まず、本発明を適用するネットワークシステムの構成を図1を参照しながら説明する。
図1は、本発明を適用するネットワークシステムの構成を示すブロック図である。
図1において、複数の情報管理センタ10と、複数のリサイクルセンタ20とが各地に設置されている。各情報管理センタ10には、情報管理センタ設備100が、各リサイクルセンタ20には、リサイクルセンタ設備200がそれぞれ設置されており、情報管理センタ設備100およびリサイクルセンタ設備200はいずれも、インターネット199を介してそれぞれ通信可能に接続されている。
【0022】
次に、情報管理センタ設備100の構成を図2を参照しながら詳細に説明する。
図2は、情報管理センタ設備100の構成を示すブロック図である。
情報管理センタ設備100は、図2に示すように、制御プログラムに基づいて演算およびシステム全体を制御するCPU30と、所定領域にあらかじめCPU30の制御プログラム等を格納しているROM32と、ROM32等から読み出したデータやCPU30の演算過程で必要な演算結果を格納するためのRAM34と、外部装置に対してデータの入出力を媒介するI/F38とで構成されており、これらは、データを転送するための信号線であるバス39で相互にかつデータ授受可能に接続されている。
【0023】
I/F38には、外部装置として、リサイクル対象物品を解体するにあたってその工程における異なる複数の解体図を構成するための物品解体情報を登録した物品解体情報登録DB40と、リサイクル対象物品の外観画像および物品解体情報との対応付けを含む工程管理情報を登録した工程管理情報登録DB42と、インターネット199に接続するための信号線とが接続されている。
【0024】
図3は、物品解体情報登録DB40のデータ構造を示す図である。
物品解体情報登録DB40は、物品解体情報を、リサイクル対象物品を識別するための物品識別情報(例えば、製品番号や機種名)と対応付けて登録している。物品解体情報登録DB40には、図3に示すように、各物品識別情報ごとに1または複数のレコードが登録されている。各レコードは、解体の工程を区分したときの1つの区分について、その区分の工程において次の区分の工程に移行するための作業手順を説明した解体図を構成するための情報を登録するものであり、具体的には、解体情報参照キーを登録するフィールド400と、解体図を構成するためのCADデータを登録するフィールド402と、リサイクル対象物品を構成する部品に関する部品情報を登録するフィールド404とを含んで構成されている。
【0025】
部品情報は、リサイクル対象物品を構成する部品であって解体図を表示するに必要なものに関する情報であり、各部品ごとに、部品ID、部品種別、材質及び使用工具に関する情報を含んでいる。使用工具は、対象となる部品を外すのに必要な工具の情報を定義したもので、工具名、工具の使用方向、使用する位置、使用した場合の動作範囲、動作時間から構成される。図3の例では、部品の一つであるネジについては、部品IDとして「0001」が、部品種別として「ネジ」が、材質として「鉄」が、工具名として「プラスドライバ」が、工具方向として「工具方向」が、使用位置の座標として「(x,y,z)」が、動作範囲として「5mm」が、動作時間として「5秒」が部品情報として含まれている。また、工具を使用しない部品については、使用工具として、「未使用」が定義されている。
【0026】
図4は、工程管理情報登録DB42のデータ構造を示す図である。
工程管理情報登録DB42は、工程管理情報を物品識別情報と対応付けて登録している。工程管理情報登録DB42には、図4に示すように、各物品識別情報ごとに1または複数のレコードが登録されている。各レコードは、解体の工程を上記同様に区分したときの1つの区分について、その区分の工程を管理するための情報を登録するものであり、機種名を登録するフィールド420と、その工程の工程番号を登録するフィールド422と、その工程におけるリサイクル対象物品の外観画像(以下、単に工程画像という。)を登録するフィールド424と、その工程の解体図を構成するための物品解体情報の解体情報参照キーを登録するフィールド426とを含んで構成されている。図4の例では、第1段目のレコードには、機種名として「Printer001」が、工程番号として「工程1」が、工程画像として複数の角度からみたリサイクル対象物品の外観画像が、解体情報参照キーとして「解体情報001」がそれぞれ登録されている。これは、「Printer001」という機種名のリサイクル対象物品を解体する場合、実際の外観画像を各工程画像と照合して解体作業が第1番目の工程であるか否かを判定し、第1番目の工程であると判定したときは、解体情報参照キー「解体情報001」により特定される物品解体情報に基づいて解体図を構成することを意味している。
【0027】
CPU30は、マイクロプロセッシングユニットMPU等からなり、ROM32の所定領域に格納されている所定のプログラムを起動させ、そのプログラムに従って、図5のフローチャートに示す物品解体情報提供処理を実行するようになっている。
図5は、物品解体情報提供処理を示すフローチャートである。
【0028】
物品解体情報提供処理は、リサイクルセンタ設備200からの取得要求に応じて物品解体情報および工程管理情報をリサイクルセンタ設備200に提供する処理であって、CPU30において実行されると、図5に示すように、まず、ステップS100に移行するようになっている。
ステップS100では、物品解体情報および工程管理情報の取得要求を受信したか否かを判定し、取得要求を受信したと判定したとき(Yes)は、ステップS102に移行するが、そうでないと判定したとき(No)は、取得要求を受信するまでステップS100で待機する。
【0029】
ステップS102では、物品識別情報を受信し、ステップS104に移行して、受信した物品識別情報をもとに、その物品識別情報に対応するすべての物品解体情報を物品解体情報登録DB40のなかから検索し、ステップS106に移行する。
ステップS106では、該当の物品解体情報を索出したか否かを判定し、該当の物品解体情報を索出したと判定したとき(Yes)は、ステップS108に移行して、索出した物品解体情報に対応するすべての工程管理情報を工程管理情報登録DB42から読み出し、ステップS110に移行する。
【0030】
ステップS110では、索出した物品解体情報および読み出した工程管理情報をリサイクルセンタ設備200に送信し、一連の処理を終了して元の処理に復帰させる。
一方、ステップS106で、該当の物品解体情報を一つも索出しないと判定したとき(No)は、一連の処理を終了して元の処理に復帰させる。
【0031】
次に、リサイクルセンタ設備200の構成を図6を参照しながら詳細に説明する。
図6は、リサイクルセンタ設備200の構成を示すブロック図である。
リサイクルセンタ設備200は、図6に示すように、制御プログラムに基づいて演算およびシステム全体を制御するCPU50と、所定領域にあらかじめCPU50の制御プログラム等を格納しているROM52と、ROM52等から読み出したデータやCPU50の演算過程で必要な演算結果を格納するためのRAM54と、外部装置に対してデータの入出力を媒介するI/F58とで構成されており、これらは、データを転送するための信号線であるバス59で相互にかつデータ授受可能に接続されている。
【0032】
I/F58には、外部装置として、物品解体情報を登録する物品解体情報登録DB60と、工程管理情報を登録する工程管理情報登録DB62と、リサイクル対象物品を載置するための作業台としてのターンテーブル(不図示)を駆動するターンテーブル駆動装置64と、ターンテーブルに載置されているリサイクル対象物品の外観画像を撮影する画像撮影装置66と、画像信号に基づいて画面を表示する表示装置68と、工具の電源が投入されたか否かを検出する電源投入検出装置と、インターネット199に接続するための信号線とが接続されている。なお、物品解体情報登録DB60は、物品解体情報登録DB40と同一のデータ構造となっており、工程管理情報登録DB62は、工程管理情報登録DB42と同一のデータ構造となっている。
【0033】
図7は、画像撮影装置66および表示装置68の配置構成を示す図である。
図7において、ターンテーブル63には、リサイクル対象物品70が載置されている。ターンテーブル63に横には、解体作業者が解体作業をしながら表示内容を見られるように表示装置68が設置されている。表示装置68の上には、ターンテーブル63に載置されているリサイクル対象物品70の外観画像が撮影できるように画像撮影装置66が取り付けられている。
【0034】
CPU50は、マイクロプロセッシングユニットMPU等からなり、ROM52の所定領域に格納されている所定のプログラムを起動させ、そのプログラムに従って、図8および図9のフローチャートに示す物品解体情報取得処理および解体図表示処理をそれぞれ時分割で実行するようになっている。
初めに、物品解体情報取得処理を図8を参照しながら詳細に説明する。
【0035】
図8は、物品解体情報取得処理を示すフローチャートである。
物品解体情報取得処理は、図5の物品解体情報提供処理に対応し、物品解体情報および工程管理情報を情報管理センタ設備100から取得する処理であって、CPU50において実行されると、図8に示すように、まず、ステップS200に移行するようになっている。
【0036】
ステップS200では、画像撮影装置66により、ターンテーブル63に載置されているリサイクル対象物品70の外観画像を取り込み、ステップS202に移行して、取り込んだ外観画像に基づいてリサイクル対象物品70の物品識別情報を特定し、ステップS204に移行する。
ステップS204では、特定した物品識別情報に対応する物品解体情報および工程管理情報が物品解体情報登録DB60および工程管理情報登録DB62に存在するか否かを判定し、特定した物品識別情報に対応する物品解体情報および工程管理情報が存在しないと判定したとき(No)は、ステップS206に移行して、特定した物品識別情報を取得要求とともに情報管理センタ設備100に送信し、ステップS208に移行する。
【0037】
ステップS208では、物品解体情報および工程管理情報を受信したか否かを判定し、物品解体情報および工程管理情報を受信したと判定したとき(Yes)は、ステップS210に移行するが、そうでないと判定したとき(No)は、物品解体情報および工程管理情報を受信するまでステップS208で待機する。
ステップS210では、受信した物品解体情報を物品識別情報と対応付けて物品解体情報登録DB60に登録し、ステップS212に移行して、受信した工程管理情報を物品識別情報と対応付けて工程管理情報登録DB62に登録し、一連の処理を終了して元の処理に復帰させる。
【0038】
一方、ステップS204で、特定した物品識別情報に対応する物品解体情報および工程管理情報が物品解体情報登録DB60および工程管理情報登録DB62に存在すると判定したとき(Yes)は、一連の処理を終了して元の処理に復帰させる。
次に、解体図表示処理を図9を参照しながら詳細に説明する。
【0039】
図9は、解体図表示処理を示すフローチャートである。
解体図表示処理は、解体作業の開始に伴って実行され、リサイクル対象物品70の解体作業の進捗状況に応じて解体図を表示装置68に表示する処理であって、CPU50において実行されると、図9に示すように、まず、ステップS300に移行するようになっている。
【0040】
ステップS300では、ターンテーブル駆動装置64を駆動して、ターンテーブル63に載置されているリサイクル対象物品70の位置および角度を初期化し、ステップS302に移行して、画像撮影装置66により、ターンテーブル63に載置されているリサイクル対象物品70の外観画像を取り込み、ステップS304に移行して、取り込んだ外観画像に基づいてリサイクル対象物品70の物品識別情報を特定し、ステップS306に移行する。
【0041】
ステップS306では、特定した物品識別情報に対応するすべての工程管理情報を工程管理情報登録DB62から読み出し、ステップS308に移行して、取り込んだ外観画像を、読み出した工程管理情報に含まれる各工程画像と照合し、取り込んだ外観画像と同一または類似の工程画像をそのなかから特定し、ステップS310に移行する。ここでいう工程とは、「操作パネルを取り外す」等の作業のことである。この工程を実行するためには、「4カ所ネジを取り外す」、「操作パネル保護部材を取り外す」、「操作パネルを取り外す」というように複数の部品を取り外す作業を行う必要がある。
【0042】
ステップS310では、特定した工程画像から現在の工程を特定し、ステップS312に移行して、ステップS302,S324で取り込んだ外観画像に基づいて、ターンテーブル63に載置されているリサイクル対象物品70の角度を特定し、ステップS314に移行する。
ステップS314では、現在の工程が最終工程か否かを判定し、現在の工程が最終工程でないと判定したとき(No)は、ステップS316において、使用された工具を特定することにより外された部品を特定し、ステップS317において、現在の工程が終了したか否か(現在の工程に含まれる部品取り外し作業が全て終了したか否か)を判定し、現在の工程が終了するまでステップS316を繰り返す。そして、現在の工程が終了したと判定したときは、ステップS318に移行する。
【0043】
ステップS318では、特定した物品識別情報および現在の工程に対応する物品解体情報を物品解体情報登録DB60から読み出し、ステップS320に移行して、読み出した物品解体情報に基づいて解体図を構成する解体図構成処理を実行し、ステップS322に移行して、構成した解体図を表示装置68に表示し、ステップS324に移行して、画像撮影装置66により、ターンテーブル63に載置されているリサイクル対象物品70の外観画像を取り込み、ステップS308に移行する。
【0044】
一方、ステップS314で、現在の工程が最終工程であると判定したとき(Yes)は、一連の処理を終了して元の処理に復帰させる。
【0045】
次に、上記ステップS316の使用された工具の特定処理を図13を参照しながら詳細に説明する。図13は、使用された工具を特定する処理を示すフローチャートである。まず、ステップS500において、これから取り外す対象となる部品を画像撮影装置66によって得られた画像中における座標を特定する。次に、ステップS501で電源投入検出装置71の出力から電動工具のスイッチのオンオフ状態を入力するとともに、使用工具の位置を画像撮影装置66によって得られた画像中から取得する。そして、使用工具のオンオフされた時刻と使用工具の位置を一時的に記憶する。使用工具には予め所定の色が塗布されており、この色を画像から検出することにより位置を特定する。
【0046】
次に、ステップS501〜S505において、一時的に記憶した情報に基づいて電動工具が使用されたか否かを判定する。まず、「オフ」、「オン」、「オフ」のシーケンスがあり、「オン」から「オフ」までの位置変化が制限範囲(図3に示す動作範囲)であり、「オン」から「オフ」までの作業時間が規定値(図3に示す動作時間)を超えており、さらに「オン」から「オフ」までの使用位置が作業対象の位置(ステップS500において特定した位置)と一致した場合のみ、有効動作としてカウントする(ステップS506)。この状態以外は全て部品を取り外す作業でないと判断し、ステップS501へ戻り処理を繰り返す。そして、ステップS507で有効動作のカウント値が対象となる作業を行うのに必要な値になったか否かを判定し、カウント値が作業を行うのに必要な値になった場合は、現時点で対象となっている作業が行われたと判断することにより実施された作業を特定する。
【0047】
このように、想定される使用工具が使用されたか否かによって作業の進捗を判定するようにしたため、確実に作業進捗を把握することが可能となる。
【0048】
次に、上記ステップS320の解体図構成処理を図10を参照しながら詳細に説明する。
図10は、解体図構成処理を示すフローチャートである。
解体図構成処理は、上記ステップS320において実行されると、図10に示すように、まず、ステップS400に移行するようになっている。
ステップS400では、ステップS318で読み出した物品解体情報からCADデータを取得し、ステップS402に移行して、ステップS312で特定したリサイクル対象物品70の角度をもとに、解体作業者からみて正面図となるように解体図をCADデータから作成し、ステップS404に移行する。
【0049】
ステップS404では、読み出した物品解体情報に未処理の部品情報が存在するか否かを判定し、未処理の部品情報が存在すると判定したとき(Yes)は、ステップS406に移行して、読み出した物品解体情報から未処理の部品情報を取得し、ステップS410に移行して、取得した部品情報に基づいて解体図のうち該当の部品(読み出した部品情報に係る部品をいう。)についてその材質を表記し、ステップS412に移行する。
【0050】
ステップS412では、該当の部品の部品種別がネジであるか否かを判定し、該当の部品の部品種別がネジであると判定したとき(Yes)は、ステップS414に移行して、作業指示方向に応じた矢印を解体図に表記し、ステップS404に移行する。
一方、ステップS412で、該当の部品の部品種別がネジでないと判定したとき(No)は、ステップS404に移行する。
【0051】
一方、ステップS404で、読み出した物品解体情報に未処理の部品情報が存在しないと判定したとき(No)は、一連の処理を終了して元の処理に復帰させる。
【0052】
次に、本実施の形態の動作を説明する。
まず、リサイクルセンタ20では、リサイクル対象物品70を解体するに先立って、解体作業者は、物品解体情報を入手するために、リサイクル対象物品70をターンテーブル63に載置し、画像撮影装置66によりリサイクル対象物品70の外観画像を読み取る。
【0053】
リサイクルセンタ設備200では、リサイクル対象物品70の外観画像が取り込まれると、ステップS202〜S206を経て、取り込まれた外観画像に基づいてリサイクル対象物品70の物品識別情報が特定され、特定された物品識別情報が取得要求とともに情報管理センタ設備100に送信される。
情報管理センタ設備100では、取得要求とともに物品識別情報を受信すると、ステップS104を経て、受信した物品識別情報をもとに、その物品識別情報に対応するすべての物品解体情報が物品解体情報登録DB40のなかから検索される。その結果、該当の物品解体情報が索出されると、ステップS108,S110を経て、索出された物品解体情報に対応するすべての工程管理情報が工程管理情報登録DB42から読み出され、索出された物品解体情報および読み出された工程管理情報がリサイクルセンタ設備200に送信される。
【0054】
リサイクルセンタ設備200では、物品解体情報および工程管理情報を受信すると、ステップS210,S212を経て、受信した物品解体情報が物品識別情報と対応付けられて物品解体情報登録DB60に登録され、受信した工程管理情報が物品識別情報と対応付けられて工程管理情報登録DB62に登録される。これにより、リサイクルセンタ設備200では、解体作業に必要な物品解体情報および工程管理情報を入手することができる。
【0055】
次に、リサイクルセンタ20では、解体作業者は、画像撮影装置66により、ターンテーブル63に載置されているリサイクル対象物品70の外観画像を読み取る。
リサイクルセンタ設備200では、リサイクル対象物品70の外観画像が取り込まれると、ステップS304,S306を経て、取り込まれた外観画像に基づいてリサイクル対象物品70の物品識別情報が特定され、特定された物品識別情報に対応するすべての工程管理情報が工程管理情報登録DB62から読み出される。次いで、ステップS308を経て、取り込まれた外観画像が、読み出された工程管理情報に含まれる各工程画像と照合され、取り込まれた外観画像と同一または類似の工程画像がそのなかから特定される。
【0056】
次いで、ステップS310,S312を経て、特定された工程画像から現在の工程が特定され、取り込まれた外観画像に基づいて、ターンテーブル63に載置されているリサイクル対象物品70の角度が特定される。このとき、現在の工程が最終工程でない場合には、使用された工具を特定することにより現在の工程が終了したことを判定し、ステップS318,S320を経て、特定された物品識別情報および現在の工程に対応する物品解体情報が物品解体情報登録DB60から読み出され、読み出された物品解体情報に基づいて解体図が構成される。具体的には、ステップS400,S402を経て、物品解体情報からCADデータが取得され、リサイクル対象物品70の角度をもとに、解体作業者からみて正面図となるように解体図がCADデータから作成される。次いで、ステップS406,S410を経て、物品解体情報から部品情報が取得され、取得された部品情報に基づいて解体図のうち該当の部品についてその材質が表記される。さらに、該当の部品の部品種別がネジである場合には、ステップS414を経て、作業指示方向に応じた矢印が解体図に表記される。そして、ステップS406〜S414の処理は、物品解体情報に含まれるすべての部品情報について行われる。
【0057】
図11は、解体図の一例を示す図である。図11の例では、リサイクル対象物品70を構成する部品に材質表記80が付されており、リサイクル対象物品70を構成するネジに作業指示方向に応じた矢印表記82が付されている。なお、材質表記80のうち「PMMA」は、アクリルを示し、材質表記80のうち「ABS」は、ABS樹脂を示している。
【0058】
リサイクルセンタ設備200では、解体図が構成されると、ステップS322,S324を経て、構成された解体図が表示装置68に表示され、リサイクル対象物品70の外観画像が取り込まれる。そして、ステップS308〜S324の処理は、解体作業が最終工程となるまで繰り返し行われる。
このようにして、本実施の形態では、情報管理センタ設備100は、物品解体情報を物品識別情報と対応付けて登録した物品解体情報登録DB40を有し、物品識別情報を受信したときは、受信した物品識別情報をもとに物品解体情報登録DB40のなかから物品解体情報を検索し、その検索により索出した物品解体情報をリサイクルセンタ設備200に送信するようになっており、リサイクルセンタ設備200は、リサイクル対象物品70から物品識別情報を読み取り、読み取った物品識別情報を情報管理センタ設備100に送信し、その送信により物品解体情報を受信したときは、リサイクル対象物品70の解体作業の進捗状況に応じて、受信した物品解体情報により構成可能な複数の解体図のうちいずれかを構成し、構成した解体図を表示装置68に表示するようになっている。
【0059】
これにより、解体作業者は、リサイクル対象物品70をどのように解体すればよいのかの具体的な解体手順を解体図から把握することができ、また、手間や時間を要さずして、解体作業の進捗状況に応じて比較的適切な手順を把握することができるので、従来に比して、解体作業を効率的に行うことができる。
さらに、本実施の形態では、リサイクルセンタ設備200は、リサイクル対象物品70の外観画像を取り込む画像撮影装置66を有し、画像撮影装置66で取り込んだ外観画像に基づいてリサイクル対象物品70の解体作業の進捗状況を判定し、判定した進捗状況に応じて、受信した物品解体情報により構成可能な複数の解体図のうちいずれかを構成するようになっている。
【0060】
これにより、リサイクル対象物品70の外観から解体作業の進捗状況が判定されるので、解体作業者は、解体作業の進捗状況に応じてさらに適切な手順を把握することができる。また、解体作業者は、解体作業中にその進捗状況を特に指示したりしなくてすむ。したがって、解体作業をさらに効率的に行うことができる。
【0061】
さらに、本実施の形態では、情報管理センタ設備100は、工程管理情報を登録した工程管理情報登録DB42を有し、検索により索出した物品解体情報に対応する工程管理情報を工程管理情報登録DB42から読み出し、索出した物品解体情報および読み出した工程管理情報をリサイクルセンタ設備200に送信するようになっており、リサイクルセンタ設備200は、物品解体情報および工程管理情報を受信したときは、画像撮影装置66で取り込んだ外観画像を、受信した工程管理情報に含まれる各工程画像と照合し、画像撮影装置66で取り込んだ外観画像と同一または類似の外観画像をそのなかから特定し、受信した物品解体情報により構成可能な複数の解体図のうち特定した外観画像の区分に対応する解体図を構成するようになっている。
【0062】
これにより、リサイクル対象物品70の外観画像に対応する解体図が構成されるので、解体作業者は、解体作業の進捗状況に応じてさらに適切な手順を把握することができる。したがって、解体作業をさらに効率的に行うことができる。
さらに、本実施の形態では、リサイクルセンタ設備200は、解体作業者からみてリサイクル対象物品70の正面の図面となるように解体図を構成するようになっている。
【0063】
これにより、解体作業者からみて正面の解体図が表示されるので、解体作業者は、リサイクル対象物品70をどのように解体すればよいのかの具体的な解体手順を把握しやすくなる。したがって、解体作業をさらに効率的に行うことができる。
さらに、本実施の形態では、解体図は、リサイクル対象物品70を構成する部品の材質を分別するための材質表記80を含む。
【0064】
これにより、解体作業者は、表示された材質表記80を参照することにより、リサイクル対象物品70を構成する部品を分別することができるので、分別作業が容易となる。したがって、従来に比して、分別作業を効率的に行うことができる。
さらに、本実施の形態では、解体図は、リサイクル対象物品70を構成する部品を締結するネジの位置を指示するための矢印表記82を含む。
【0065】
これにより、解体作業者は、表示された矢印表記82を参照することにより、リサイクル対象物品70を構成する部品を締結するネジの位置を把握することができるので、解体作業が容易となる。したがって、解体作業をさらに効率的に行うことができる。
【0066】
なお、上記実施の形態においては、表示装置68をターンテーブル63に設け、画像撮影装置66を表示装置68に設けたが、これに限らず、図12に示すように、表示装置および画像撮影装置を解体作業者が装着するメガネ90に設けてもよい。
【0067】
図12は、表示装置および画像撮影装置を解体作業者が装着するメガネ90に設けた場合の構成を示す図である。
図12においては、メガネ90を装着した状態において解体作業者が表示装置69に表示される解体図を見ることができるように、メガネ90の一方のレンズ91にLCD(Liquid Crystal Display)等からなる表示装置69を設け、メガネ90を装着し、解体作業者がリサイクル対象物品70を見た状態においてリサイクル対象物品70の外観画像を取り込めるように、メガネ90のフレーム92に画像撮影装置67を設けている。
【0068】
このような構成であれば、リサイクルセンタ設備200では、メガネ90の一方のレンズ91に表示装置69が設けられているので、解体作業者がメガネ90を装着すると、表示装置69に表示された解体図を見ることができる。また、メガネ90のフレーム92に画像撮影装置67が設けられているので、解体作業者がメガネ90を装着した状態でリサイクル対象物品70を見ると、画像撮影装置67により、リサイクル対象物品70の外観画像が取り込まれる。
【0069】
これにより、解体作業者は、解体図をメガネ90越しに見ながら解体作業を進めることができるので、解体図を参照するのに手間や時間をさらに要さずにすむ。また、解体作業者の視点からリサイクル対象物品70の外観画像を取り込むことができ、解体作業の進捗状況を比較的正確に把握することができるので、解体作業の進捗状況に応じてさらに適切な手順を把握することができる。したがって、解体作業をさらに効率的に行うことができる。
【0070】
また、上記実施の形態において、図5のフローチャートに示す処理を実行するにあたっては、ROM32にあらかじめ格納されている制御プログラムを実行する場合について説明したが、これに限らず、これらの手順を示したプログラムが記憶された記憶媒体から、そのプログラムをRAM34に読み込んで実行するようにしてもよい。
【0071】
また、上記実施の形態において、図8ないし図10、図13のフローチャートに示す処理を実行するにあたってはいずれも、ROM52にあらかじめ格納されている制御プログラムを実行する場合について説明したが、これに限らず、これらの手順を示したプログラムが記憶された記憶媒体から、そのプログラムをRAM54に読み込んで実行するようにしてもよい。
【0072】
ここで、記憶媒体とは、RAM、ROM等の半導体記憶媒体、FD、HD等の磁気記憶型記憶媒体、CD、CDV、LD、DVD等の光学的読取方式記憶媒体、MO等の磁気記憶型/光学的読取方式記憶媒体であって、電子的、磁気的、光学的等の読み取り方法のいかんにかかわらず、コンピュータで読み取り可能な記憶媒体であれば、あらゆる記憶媒体を含むものである。
【0073】
また、上記実施の形態においては、本発明に係るリサイクル作業支援システム、リサイクルセンタ設備、情報管理センタ設備および設備用プログラム、並びにリサイクル作業支援方法を、インターネット199からなるネットワークシステムに適用した場合について説明したが、これに限らず、例えば、インターネット199と同一方式により通信を行ういわゆるイントラネットに適用してもよい。もちろん、インターネット199と同一方式により通信を行うネットワークに限らず、通常のネットワークに適用することもできる。
【0074】
また、上記実施の形態においては、本発明に係るリサイクル作業支援システム、リサイクルセンタ設備、情報管理センタ設備および設備用プログラム、並びにリサイクル作業支援方法を、図1に示すように、リサイクルセンタ20において、OA製品や家電製品等のリサイクル対象物品を解体・分別する場合について適用したが、これに限らず、本発明の主旨を逸脱しない範囲で他の場合にも適用可能である。
【図面の簡単な説明】
【図1】本発明を適用するネットワークシステムの構成を示すブロック図である。
【図2】情報管理センタ設備100の構成を示すブロック図である。
【図3】物品解体情報登録DB40のデータ構造を示す図である。
【図4】工程管理情報登録DB42のデータ構造を示す図である。
【図5】物品解体情報提供処理を示すフローチャートである。
【図6】リサイクルセンタ設備200の構成を示すブロック図である。
【図7】画像撮影装置66および表示装置68の配置構成を示す図である。
【図8】物品解体情報取得処理を示すフローチャートである。
【図9】解体図表示処理を示すフローチャートである。
【図10】解体図構成処理を示すフローチャートである。
【図11】解体図の一例を示す図である。
【図12】表示装置および画像撮影装置を解体作業者が装着するメガネ90に設けた場合の構成を示す図である。
【図13】使用された工具の特定処理を示すフローチャートである。
【符号の説明】
10...情報管理センタ,100...情報管理センタ設備,20...リサイクルセンタ,200...リサイクルセンタ設備,30,50...CPU,32,52...ROM,34,54...RAM,38,58...I/F,40,60...物品解体情報登録DB,42,62...工程管理情報登録DB,63...ターンテーブル,64...ターンテーブル駆動装置,66,67...画像撮影装置,68,69...表示装置,70...リサイクル対象物品,71...電源投入検出装置,80...材質表記,82...矢印表記,90...メガネ,91...レンズ,199...インターネット
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a system for assisting in dismantling an object to be recycled such as an OA product or a home appliance, and in particular, a recycling work support system, a recycling work support program, and a recycling work support capable of efficiently performing dismantling work. About the method.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, as a technique for supporting an operation of dismantling an object to be recycled such as an OA product or an electric home appliance, there is a recycling method disclosed in Patent Document 1, for example.
This recycling method is a method of recycling parts and materials of articles to be recycled, and is performed through the following steps (a) to (g).
[0003]
(A) Transport and accumulate items to be recycled generated in the designated area to the designated collection base.
(B) the designated collection base is an input unit for reading the first product information added to the article to be recycled, and collation of the article to be recycled corresponding to the first product information added to the article to be recycled; A storage unit for storing a disassembly information database of information for disassembly and sorting (hereinafter, the database is simply abbreviated as DB), and a first recycling target article obtained by the input unit at the designated collection base. And the recycle target article corresponding to the disassembly information DB.
[0004]
(C) Sorting the recycle target article into a plurality of first classifications based on a comparison between the first product information of the recycle target article and the disassembly information DB, and disassembling the recycle target article classification information as second product information The information is stored in the information DB.
(D) The designated collection base, based on the first product information or the disassembly information DB, disposes of the disassembly processing exterior member information and the non-disassembly processing member information of each recycle target article classified into a plurality of first categories. It has a display unit for recognizing and displaying the recognition result, and stores dismantling processing exterior member information and non-dismantling processing member information in the dismantling information DB.
[0005]
(E) disassembling the article to be recycled into a dismantled exterior member and a non-dismantled exterior member based on the result displayed by the display unit, and classifying the dismantled exterior member into a plurality of second categories;
(F) In each of the dismantling processing exterior members and the non-dismantling processing members classified into the plurality of second classifications, the dismantling processing exterior members are transported to each material maker and the non-dismantling processing members are transported to each product maker and accumulated. .
[0006]
(G) The disassembly processing exterior member that has been collected is processed into a recycled material by a processing method based on the disassembly information DB, and information on the recycled material is stored in the disassembly information DB.
The disassembly information DB is shared between the designated collection base, the material maker, and the product maker via a network.
[0007]
[Patent Document 1]
JP 2002-197147 A
[Problems to be solved by the invention]
In the above-mentioned conventional recycling method, the article to be recycled is disassembled into a disassembled processing exterior member and a non-dismantled processing member based on the result indicated by the display unit. Specifically, first, the disassembly information is displayed on the display unit, and based on the displayed disassembly information, the exterior member / housing of the article to be recycled is disassembled. At this time, the disassembly information includes disassembly information of the exterior member and the housing part of the article to be recycled, and recycling information and reuse information of the exterior member and the housing part. And the name of the material maker of the casing, the name of the maker of the exterior member and the article to be recycled of the casing, the name of the exterior member and the casing, and the member number of the exterior member and the casing.
[0009]
However, there has been a problem that it is difficult for a dismantling worker to know exactly how to disassemble an article to be recycled only with such dismantling information.
In addition, it is desirable that the demolition workers know the appropriate procedures according to the progress of the demolition work in order to promote the demolition work efficiently. When the types are enormous, there is a certain limit to grasp even the skilled person. In addition, it is conceivable to carry out dismantling work while referring to a manual or the like showing the disassembly procedure for each item to be recycled.However, if the types of items to be recycled are enormous, it takes time to refer to the manual and the like. That is, there are certain limits to the efficient demolition work. Further, even when the dismantling process is complicated, it takes time to refer to a manual or the like, and there is a similar problem.
[0010]
Therefore, the present invention has been made in view of such unresolved problems of the conventional technology, and a recycling work support system, a recycling work support program, and a recycling work support system capable of efficiently performing dismantling work. The purpose is to provide a work support method.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, a recycling work support system according to the present invention is a system for supporting a work of dismantling a recycling target article to be recycled, and includes article identification information for identifying the recycling target article. An article identification information inputting means for inputting, and an article dismantling information storing means for storing article disassembly information for composing a plurality of different disassembly diagrams in the process of disassembling the article to be recycled in association with the article identification information; An article disassembly information search means for searching for the article disassembly information from the article disassembly information storage means based on the article identification information input by the article identification information input means; and an article disassembly information search means. A disassembly diagram composing means for composing the disassembly diagram based on the article disassembly information and a disassembly diagram constituted by the disassembly diagram composing device are output. Disassembly drawing output means, and the disassembly drawing composing means determines the progress of the work process by identifying a tool used in the work process of dismantling the article to be recycled, and obtains the obtained progress. According to a situation, any one of a plurality of disassembly diagrams that can be constituted by the article disassembly information retrieved by the article disassembly information search means is configured.
[0012]
With such a configuration, when disassembling an article to be recycled, first, article identification information for identifying the article to be recycled is input by the article identification information input means. When the article identification information is input by the article identification information input means, the article disassembly information search means retrieves the article disassembly information from the article disassembly information storage means based on the input article identification information. As a result, when the corresponding article disassembly information is found, the disassembly diagram forming means selects one of a plurality of disassembly diagrams that can be constituted by the found article disassembly information according to the progress of the disassembly work of the article to be recycled. Either is configured, and the configured disassembly diagram is output by the disassembly diagram output means.
[0013]
The dismantling worker can proceed with the dismantling work while referring to the output dismantling diagram. Further, the disassembly diagrams are output one after another according to the progress of the disassembly work, so that it does not require much trouble and time to refer to the next disassembly diagram. In particular, since the progress of the operation is performed by specifying the used tool, it is possible to accurately determine the progress.
This enables the dismantling worker to understand the specific dismantling procedure for how to dismantle the recycling target item from the dismantling diagram, and also allows the dismantling work to be performed without any trouble or time. Since a relatively appropriate procedure can be grasped in accordance with the progress of the disassembly, it is possible to obtain an effect that the dismantling work can be performed more efficiently than in the related art.
[0014]
Here, the disassembly diagram refers to a drawing or a text explaining an operation procedure for shifting to the next step in one disassembly step in dismantling the article to be recycled.
[0015]
In addition, the disassembly diagram output means may output the disassembly diagram by display, printing, or any other method that can be perceived by the five senses, or may output the disassembly diagram as data.
Further, the article disassembly information is information for composing a plurality of different disassembly diagrams, and all of the disassembly diagrams may be constituted by drawings, or all of the disassembly diagrams may be constituted by sentences. Alternatively, each disassembly diagram may be composed of either a drawing or a sentence or a combination thereof.
[0016]
The article dismantling information storage means stores the article dismantling information by any means and at any time, and may store the article dismantling information in advance or store the article dismantling information in advance. Alternatively, article disassembly information may be stored by an external input or the like during operation of the present system.
[0017]
Further, the recycling work support system according to the present invention is characterized in that the specification of the tool is performed by detecting a position and the number of times the tool is used from an image.
According to this configuration, it is possible to accurately and automatically determine the progress of the process, so that the disassembly operator does not need to obtain information for recognizing parts in advance and is displayed. It is only necessary to work according to the instruction of the disassembly diagram, so that the burden on the operator can be reduced.
[0018]
Further, in the recycling work support system according to the present invention, when the tool to be used is an electric tool, the specification of the tool is performed in accordance with a state transition of a switch of the tool in addition to a use position and the number of times of the tool. And
According to this configuration, it is possible to accurately and automatically determine the progress of the process, so that the disassembly operator does not need to obtain information for recognizing parts in advance and is displayed. It is only necessary to work according to the instruction of the disassembly diagram, so that the burden on the operator can be reduced.
[0019]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1 to 13 are diagrams showing an embodiment of a recycling work support system, a recycling work support program, and a recycling work support method according to the present invention.
[0020]
In the present embodiment, a recycling work support system, a recycling work support program, and a recycling work support method according to the present invention, as shown in FIG.・ Applied to the case of separation.
[0021]
First, the configuration of a network system to which the present invention is applied will be described with reference to FIG.
FIG. 1 is a block diagram showing a configuration of a network system to which the present invention is applied.
In FIG. 1, a plurality of information management centers 10 and a plurality of recycling centers 20 are installed in various places. Each information management center 10 is provided with an information management center facility 100, and each recycling center 20 is provided with a recycling center facility 200. Both the information management center facility 100 and the recycling center facility 200 are connected to the Internet 199. Are communicably connected to each other.
[0022]
Next, the configuration of the information management center equipment 100 will be described in detail with reference to FIG.
FIG. 2 is a block diagram showing the configuration of the information management center equipment 100.
As shown in FIG. 2, the information management center equipment 100 includes a CPU 30 for controlling the arithmetic and the entire system based on the control program, a ROM 32 in which a control program for the CPU 30 is stored in a predetermined area in advance, and a read from the ROM 32 or the like. A RAM 34 for storing the data and the operation results required in the operation process of the CPU 30 and an I / F 38 for mediating the input and output of data to and from an external device. Are mutually connected so as to be able to exchange data.
[0023]
The I / F 38 includes, as an external device, an article disassembly information registration DB 40 that registers article disassembly information for composing a plurality of different disassembly drawings in the process of disassembling the article to be recycled, an appearance image of the article to be recycled, and A process management information registration DB 42 in which process management information including correspondence with article disassembly information is registered, and a signal line for connecting to the Internet 199 are connected.
[0024]
FIG. 3 is a diagram showing a data structure of the article disassembly information registration DB 40.
The article disassembly information registration DB 40 registers the article disassembly information in association with article identification information (for example, a product number or a model name) for identifying an article to be recycled. As shown in FIG. 3, one or a plurality of records are registered in the article disassembly information registration DB 40 for each article identification information. Each record is for registering information for forming a disassembly diagram that describes a work procedure for shifting to a process of the next section in one section when a disassembly step is divided. Yes, specifically, a field 400 for registering a disassembly information reference key, a field 402 for registering CAD data for composing a disassembly diagram, a field 404 for registering component information relating to components constituting a recycling target article, It is comprised including.
[0025]
The part information is information on parts constituting the article to be recycled that are necessary to display a disassembly diagram, and includes information on a part ID, a part type, a material, and a used tool for each part. The tool to be used defines information of a tool necessary for removing a target component, and includes a tool name, a tool use direction, a use position, an operation range when used, and an operation time. In the example of FIG. 3, for the screw which is one of the components, the component ID is “0001”, the component type is “screw”, the material is “iron”, the tool name is “plus screwdriver”, and the tool direction is , “(X, y, z)” as the coordinates of the use position, “5 mm” as the operation range, and “5 seconds” as the operation time as part information. In addition, “unused” is defined as a tool to be used for a part that does not use a tool.
[0026]
FIG. 4 is a diagram showing a data structure of the process management information registration DB 42.
The process management information registration DB 42 registers the process management information in association with the item identification information. As shown in FIG. 4, one or a plurality of records are registered in the process management information registration DB 42 for each article identification information. Each record is for registering information for managing the process of one section when the disassembly step is divided in the same manner as described above. A field 420 for registering a model name, a field 420 for registering a model name, A field 422 for registering a number, a field 424 for registering an external appearance image of the article to be recycled in the process (hereinafter, simply referred to as a process image), and disassembly information referencing disassembly information for forming a disassembly diagram of the process. And a field 426 for registering a key. In the example of FIG. 4, the first row record includes “Printer001” as the model name, “Step 1” as the process number, and the appearance image of the article to be recycled viewed from a plurality of angles as the process image. “Disassembly information 001” is registered as a reference key. This is because when an article to be recycled having a model name of “Printer001” is dismantled, the actual appearance image is compared with each process image to determine whether or not the dismantling work is the first step. When it is determined that this is the step, the disassembly diagram is formed based on the article disassembly information specified by the disassembly information reference key “disassembly information 001”.
[0027]
The CPU 30 includes a microprocessing unit MPU or the like, starts a predetermined program stored in a predetermined area of the ROM 32, and executes the article disassembly information providing process shown in the flowchart of FIG. 5 according to the program. .
FIG. 5 is a flowchart showing the article disassembly information providing process.
[0028]
The article disassembly information providing process is a process for providing article disassembly information and process management information to the recycling center facility 200 in response to an acquisition request from the recycling center facility 200, and when executed by the CPU 30, as shown in FIG. First, the process proceeds to step S100.
In step S100, it is determined whether or not an acquisition request for the article disassembly information and the process management information has been received. If it is determined that the acquisition request has been received (Yes), the process proceeds to step S102, but it has been determined that this is not the case. At this time (No), the process waits in step S100 until an acquisition request is received.
[0029]
In step S102, the article identification information is received, and the process proceeds to step S104 to search all the article disassembly information corresponding to the article identification information from the article disassembly information registration DB 40 based on the received article identification information. Then, control goes to a step S106.
In step S106, it is determined whether or not the corresponding article disassembly information has been found. If it is determined that the corresponding article disassembly information has been found (Yes), the process proceeds to step S108, and the searched article disassembly information is obtained. Are read from the process management information registration DB 42, and the process proceeds to step S110.
[0030]
In step S110, the retrieved article disassembly information and the read process management information are transmitted to the recycling center facility 200, and a series of processing is completed to return to the original processing.
On the other hand, when it is determined in step S106 that none of the corresponding article dismantling information is found (No), a series of processes is terminated and the process returns to the original process.
[0031]
Next, the configuration of the recycling center equipment 200 will be described in detail with reference to FIG.
FIG. 6 is a block diagram showing the configuration of the recycling center equipment 200.
As shown in FIG. 6, the recycling center equipment 200 reads out from the CPU 50 for controlling the calculation and the entire system based on the control program, the ROM 52 in which the control program of the CPU 50 is stored in a predetermined area in advance, and the ROM 52 and the like. A RAM 54 for storing data and a calculation result required in the calculation process of the CPU 50, and an I / F 58 for mediating input / output of data to and from an external device, are provided for transferring data. They are connected to each other via a signal line bus 59 so as to be able to exchange data.
[0032]
The I / F 58 includes, as external devices, an article disassembly information registration DB 60 for registering article disassembly information, a process management information registration DB 62 for registering process management information, and a turntable as a work table for placing articles to be recycled. A turntable driving device 64 for driving a table (not shown), an image photographing device 66 for photographing an external appearance image of the article to be recycled placed on the turntable, and a display device 68 for displaying a screen based on an image signal. And a power-on detecting device for detecting whether or not the power of the tool is turned on, and a signal line for connecting to the Internet 199. The article dismantling information registration DB 60 has the same data structure as the article dismantling information registration DB 40, and the process management information registration DB 62 has the same data structure as the process management information registration DB 42.
[0033]
FIG. 7 is a diagram showing an arrangement configuration of the image photographing device 66 and the display device 68.
In FIG. 7, a recycle target article 70 is placed on the turntable 63. A display device 68 is provided on the side of the turntable 63 so that the dismantling worker can view the display contents while performing the dismantling work. An image capturing device 66 is mounted on the display device 68 so that an external appearance image of the article 70 to be recycled placed on the turntable 63 can be captured.
[0034]
The CPU 50 includes a microprocessing unit MPU and the like, activates a predetermined program stored in a predetermined area of the ROM 52, and according to the program, obtains the article disassembly information acquisition process and the disassembly diagram display process shown in the flowcharts of FIGS. Are executed in a time-division manner.
First, the article disassembly information acquisition process will be described in detail with reference to FIG.
[0035]
FIG. 8 is a flowchart showing the article disassembly information acquisition processing.
The article disassembly information acquisition processing corresponds to the article disassembly information provision processing in FIG. 5, and is processing for acquiring the article disassembly information and the process management information from the information management center equipment 100. As shown, first, the process proceeds to step S200.
[0036]
In step S200, the external appearance image of the article 70 to be recycled placed on the turntable 63 is captured by the image photographing device 66, and the process proceeds to step S202, where the article identification of the article 70 to be recycled is performed based on the captured external image. The information is specified, and the process proceeds to step S204.
In step S204, it is determined whether the article disassembly information and the process management information corresponding to the specified article identification information are present in the article disassembly information registration DB 60 and the process management information registration DB 62, and the article corresponding to the specified article identification information is determined. If it is determined that the dismantling information and the process management information do not exist (No), the process proceeds to step S206, where the identified article identification information is transmitted to the information management center facility 100 together with the acquisition request, and the process proceeds to step S208.
[0037]
In step S208, it is determined whether or not the article disassembly information and the process management information have been received. If it is determined that the article disassembly information and the process management information have been received (Yes), the process proceeds to step S210. When it is determined (No), the process stands by in step S208 until the dismantling information and the process management information are received.
In step S210, the received article disassembly information is registered in the article disassembly information registration DB 60 in association with the article identification information, and the process proceeds to step S212, where the received process management information is associated with the article identification information and registered in the process management information. The information is registered in the DB 62, and a series of processing is ended to return to the original processing.
[0038]
On the other hand, when it is determined in step S204 that the article disassembly information and the process management information corresponding to the specified article identification information are present in the article disassembly information registration DB 60 and the process management information registration DB 62 (Yes), a series of processing ends. To return to the original processing.
Next, the disassembly diagram display processing will be described in detail with reference to FIG.
[0039]
FIG. 9 is a flowchart showing the disassembly diagram display processing.
The disassembly diagram display process is executed at the start of the disassembly work, and is a process of displaying the disassembly diagram on the display device 68 according to the progress of the disassembly work of the article 70 to be recycled. As shown in FIG. 9, first, the process proceeds to step S300.
[0040]
In step S300, the turntable driving device 64 is driven to initialize the position and the angle of the article 70 to be recycled placed on the turntable 63, and the process proceeds to step S302. The external appearance image of the article 70 to be recycled placed on 63 is fetched, the flow proceeds to step S304, the article identification information of the article 70 to be recycled is specified based on the fetched external image, and the flow proceeds to step S306.
[0041]
In step S306, all the process management information corresponding to the specified article identification information is read from the process management information registration DB 62, and the process proceeds to step S308, where the captured appearance image is stored in each of the process images included in the read process management information. Then, a process image that is the same as or similar to the captured appearance image is specified, and the process proceeds to step S310. The term “step” here refers to an operation such as “removing the operation panel”. In order to perform this step, it is necessary to perform a work of removing a plurality of components such as "remove screws at four locations", "remove the operation panel protection member", and "remove the operation panel".
[0042]
In step S310, the current process is specified from the specified process image, and the process proceeds to step S312. Based on the appearance image captured in steps S302 and S324, the recycle target article 70 placed on the turntable 63 is recalled. The angle is specified, and the routine goes to Step S314.
In step S314, it is determined whether or not the current process is the final process. If it is determined that the current process is not the final process (No), the part removed by specifying the used tool in step S316 Is determined, and in step S317, it is determined whether or not the current process has been completed (whether or not all component removal operations included in the current process have been completed), and step S316 is repeated until the current process has been completed. . When it is determined that the current process has been completed, the process proceeds to step S318.
[0043]
In step S318, the specified article identification information and the article disassembly information corresponding to the current process are read out from the article disassembly information registration DB 60, and the process proceeds to step S320, where a disassembly diagram is formed based on the read article disassembly information. The configuration process is executed, and the process proceeds to step S322, where the constructed disassembly diagram is displayed on the display device 68, and the process proceeds to step S324. The external image 70 is fetched, and the process proceeds to step S308.
[0044]
On the other hand, when it is determined in step S314 that the current process is the final process (Yes), a series of processes is terminated and the process returns to the original process.
[0045]
Next, the process of specifying the used tool in step S316 will be described in detail with reference to FIG. FIG. 13 is a flowchart illustrating a process of specifying a used tool. First, in step S500, the coordinates of the component to be removed from the image in the image obtained by the image capturing device 66 are specified. Next, in step S501, the on / off state of the switch of the power tool is input from the output of the power-on detection device 71, and the position of the tool to be used is acquired from the image obtained by the image capturing device 66. Then, the time when the used tool is turned on and off and the position of the used tool are temporarily stored. A predetermined color is applied to the tool to be used in advance, and the position is specified by detecting this color from the image.
[0046]
Next, in steps S501 to S505, it is determined whether the power tool has been used based on the temporarily stored information. First, there is a sequence of “off”, “on”, and “off”, and the position change from “on” to “off” is a limited range (operating range shown in FIG. 3), and “on” to “off”. Only when the work time until the operation time exceeds the specified value (the operation time shown in FIG. 3) and the use position from “on” to “off” matches the work target position (the position specified in step S500). , Are counted as valid operations (step S506). Other than this state, it is determined that it is not the operation of removing all the components, and the process returns to step S501 to repeat the process. Then, in step S507, it is determined whether or not the count value of the valid operation has become a value necessary for performing the target work. If the count value has become a value necessary for performing the work, the current The work performed is identified by determining that the target work has been performed.
[0047]
In this manner, the progress of the work is determined based on whether or not the expected tool has been used, so that the work progress can be reliably grasped.
[0048]
Next, the disassembly diagram configuration processing in step S320 will be described in detail with reference to FIG.
FIG. 10 is a flowchart showing the disassembly diagram configuration processing.
When the disassembly diagram configuration process is executed in step S320, as shown in FIG. 10, the process first proceeds to step S400.
In step S400, CAD data is acquired from the article dismantling information read out in step S318, and the process proceeds to step S402. Based on the angle of the recycling target article 70 specified in step S312, a front view and a view from the dismantling worker are displayed. A disassembly diagram is created from the CAD data so that the process proceeds to step S404.
[0049]
In step S404, it is determined whether or not unprocessed component information is present in the read article disassembly information. If it is determined that unprocessed component information is present (Yes), the process proceeds to step S406 and is read. Unprocessed component information is acquired from the article disassembly information, and the process proceeds to step S410, where the material of the corresponding component (refers to the component related to the read component information) in the disassembly diagram is determined based on the acquired component information. The process proceeds to step S412.
[0050]
In step S412, it is determined whether or not the component type of the corresponding component is a screw. If it is determined that the component type of the corresponding component is a screw (Yes), the process proceeds to step S414 and the work instruction direction is set. Is displayed on the disassembly diagram, and the process proceeds to step S404.
On the other hand, when it is determined in step S412 that the component type of the corresponding component is not a screw (No), the process proceeds to step S404.
[0051]
On the other hand, if it is determined in step S404 that there is no unprocessed component information in the read article disassembly information (No), a series of processes is terminated and the process returns to the original process.
[0052]
Next, the operation of the present embodiment will be described.
First, in the recycling center 20, prior to dismantling the article 70 to be recycled, the dismantling worker places the article 70 for recycling on the turntable 63 in order to obtain the article disassembly information. The appearance image of the article 70 to be recycled is read.
[0053]
In the recycling center equipment 200, when the appearance image of the article 70 to be recycled is captured, through steps S202 to S206, the article identification information of the article 70 to be recycled is identified based on the captured appearance image, and the identified article identification is performed. The information is transmitted to the information management center equipment 100 together with the acquisition request.
When the information management center equipment 100 receives the article identification information together with the acquisition request, through step S104, based on the received article identification information, all the article disassembly information corresponding to the article identification information is stored in the article disassembly information registration DB 40. Searched from within. As a result, when the corresponding article disassembly information is found, all the process management information corresponding to the found article disassembly information is read from the process management information registration DB 42 via steps S108 and S110, and is found. The dismantled article information and the read process management information are transmitted to the recycling center facility 200.
[0054]
When the recycling center equipment 200 receives the article disassembly information and the process management information, the received article disassembly information is registered in the article disassembly information registration DB 60 in steps S210 and S212 in association with the article identification information. The management information is registered in the process management information registration DB 62 in association with the article identification information. Thus, the recycling center equipment 200 can obtain the dismantling information and the process management information required for the dismantling work.
[0055]
Next, in the recycling center 20, the dismantling worker reads the appearance image of the article 70 to be recycled placed on the turntable 63 by the image photographing device 66.
In the recycling center facility 200, when the appearance image of the article 70 to be recycled is captured, the article identification information of the article 70 to be recycled is identified based on the captured exterior image through steps S304 and S306, and the identified article identification is performed. All the process management information corresponding to the information is read from the process management information registration DB 62. Next, through step S308, the captured appearance image is collated with each process image included in the read process management information, and a process image identical or similar to the captured appearance image is specified from among them. .
[0056]
Next, through steps S310 and S312, the current process is specified from the specified process image, and the angle of the article 70 to be recycled placed on the turntable 63 is specified based on the captured appearance image. . At this time, if the current process is not the final process, it is determined that the current process has been completed by specifying the used tool, and through steps S318 and S320, the specified article identification information and the current The article disassembly information corresponding to the process is read from the article disassembly information registration DB 60, and a disassembly diagram is formed based on the read article disassembly information. Specifically, through steps S400 and S402, CAD data is obtained from the article dismantling information, and based on the angle of the article 70 to be recycled, the disassembly diagram is converted from the CAD data so that the dismantling worker becomes a front view as viewed from the dismantling worker. Created. Next, through steps S406 and S410, part information is acquired from the article disassembly information, and the material of the corresponding part in the disassembly diagram is indicated based on the acquired part information. Further, when the component type of the corresponding component is a screw, an arrow corresponding to the work instruction direction is written in the disassembly drawing via step S414. Then, the processing of steps S406 to S414 is performed for all the component information included in the article disassembly information.
[0057]
FIG. 11 is a diagram illustrating an example of a disassembly diagram. In the example of FIG. 11, a material notation 80 is attached to a component constituting the article 70 to be recycled, and an arrow notation 82 corresponding to the work instruction direction is attached to a screw constituting the article 70 to be recycled. In addition, “PMMA” in the material notation 80 indicates acrylic, and “ABS” in the material notation 80 indicates ABS resin.
[0058]
In the recycling center facility 200, when the disassembly diagram is constructed, the constructed disassembly diagram is displayed on the display device 68 via steps S322 and S324, and the appearance image of the article 70 to be recycled is captured. Then, the processing of steps S308 to S324 is repeatedly performed until the disassembly operation becomes the final step.
As described above, in the present embodiment, the information management center equipment 100 has the article dismantling information registration DB 40 in which the article dismantling information is registered in association with the article identification information. The article dismantling information is retrieved from the article dismantling information registration DB 40 based on the retrieved article identification information, and the retrieved article dismantling information is transmitted to the recycling center equipment 200. Reads the article identification information from the article 70 to be recycled, transmits the read article identification information to the information management center equipment 100, and receives the article disassembly information by the transmission. Depending on the, configure one of a plurality of disassembly diagrams that can be configured by the received article disassembly information, and It is adapted to display to indicate device 68.
[0059]
Thereby, the dismantling worker can grasp the specific dismantling procedure of how to dismantle the recycling target article 70 from the dismantling diagram, and can dismantle without requiring any labor and time. Since a relatively appropriate procedure can be grasped according to the progress of the work, the dismantling work can be performed more efficiently than in the past.
Further, in the present embodiment, the recycling center equipment 200 has an image capturing device 66 that captures an external image of the article 70 to be recycled, and disassembly work of the article 70 to be recycled based on the external image captured by the image capturing device 66. Is determined, and according to the determined progress, any one of a plurality of disassembly diagrams that can be configured based on the received article disassembly information is configured.
[0060]
Thereby, the progress of the dismantling work is determined from the appearance of the article 70 to be recycled, so that the dismantling worker can grasp a more appropriate procedure according to the progress of the dismantling work. Further, the dismantling worker does not have to give any particular instructions on the progress during the dismantling work. Therefore, the dismantling work can be performed more efficiently.
[0061]
Further, in the present embodiment, the information management center equipment 100 has a process management information registration DB 42 in which process management information is registered, and stores the process management information corresponding to the article disassembly information retrieved by the search in the process management information registration DB 42. And sends the retrieved article dismantling information and the read process management information to the recycling center equipment 200. When the recycling center equipment 200 receives the article dismantling information and the process management information, The external appearance image captured by the device 66 is compared with each process image included in the received process management information, and the same or similar external appearance image as the external appearance image captured by the image capturing device 66 is specified, and the received article is identified. A disassembly diagram corresponding to the specified appearance image segment among a plurality of disassembly diagrams that can be configured based on the disassembly information is configured. To have.
[0062]
Thus, a disassembly diagram corresponding to the appearance image of the article 70 to be recycled is configured, so that the disassembly worker can grasp a more appropriate procedure according to the progress of the disassembly work. Therefore, the dismantling work can be performed more efficiently.
Further, in the present embodiment, the recycling center equipment 200 is configured to have a disassembly diagram so as to be a drawing of the front of the article 70 to be recycled as viewed from the disassembly operator.
[0063]
Thereby, the disassembly diagram of the front as viewed from the disassembly operator is displayed, so that the disassembly operator can easily understand the specific disassembly procedure on how to dismantle the article 70 to be recycled. Therefore, the dismantling work can be performed more efficiently.
Further, in the present embodiment, the disassembly diagram includes a material notation 80 for separating the materials of the parts constituting the article 70 to be recycled.
[0064]
Thus, the disassembly worker can separate the components making up the article 70 to be recycled by referring to the displayed material notation 80, thereby facilitating the sorting operation. Therefore, the sorting operation can be performed more efficiently than in the past.
Further, in the present embodiment, the disassembly drawing includes an arrow notation 82 for indicating a position of a screw for fastening a component constituting the article 70 to be recycled.
[0065]
Thereby, the dismantling worker can refer to the displayed arrow notation 82 to know the positions of the screws that fasten the components that constitute the article 70 to be recycled, thereby facilitating the dismantling work. Therefore, the dismantling work can be performed more efficiently.
[0066]
In the above embodiment, the display device 68 is provided on the turntable 63, and the image capturing device 66 is provided on the display device 68. However, the present invention is not limited to this, and as shown in FIG. May be provided on the glasses 90 worn by the dismantling operator.
[0067]
FIG. 12 is a diagram illustrating a configuration in a case where the display device and the image capturing device are provided on glasses 90 worn by a disassembly worker.
In FIG. 12, one lens 91 of the glasses 90 is formed of an LCD (Liquid Crystal Display) or the like so that the disassembly worker can view the disassembly diagram displayed on the display device 69 with the glasses 90 mounted. An image capturing device 67 is provided on the frame 92 of the glasses 90 so that the display device 69 is provided, the glasses 90 are worn, and the disassembling worker can take in the appearance image of the items 70 to be recycled while looking at the items 70 to be recycled. I have.
[0068]
With such a configuration, in the recycling center facility 200, the display device 69 is provided on one of the lenses 91 of the glasses 90, so that when the disassembling worker wears the glasses 90, the disassembly displayed on the display device 69 is performed. You can see the figure. Further, since the image capturing device 67 is provided on the frame 92 of the glasses 90, when the dismantling worker views the article 70 to be recycled with the glasses 90 attached, the appearance of the article 70 to be recycled is determined by the image capturing device 67. The image is captured.
[0069]
Thus, the dismantling worker can proceed with the dismantling work while looking at the disassembly diagram through the glasses 90, so that it does not require much trouble and time to refer to the disassembly diagram. In addition, since the appearance image of the article 70 to be recycled can be captured from the viewpoint of the demolition worker and the progress of the demolition work can be relatively accurately grasped, a more appropriate procedure can be performed according to the progress of the demolition work. Can be grasped. Therefore, the dismantling work can be performed more efficiently.
[0070]
Further, in the above embodiment, the case where the control program stored in the ROM 32 is executed in executing the processing shown in the flowchart of FIG. 5 has been described. However, the present invention is not limited to this. The program may be read from the storage medium storing the program into the RAM 34 and executed.
[0071]
Further, in the above-described embodiment, a case has been described in which the control programs stored in the ROM 52 are executed before executing the processes shown in the flowcharts of FIGS. 8 to 10 and 13. Instead, the program may be read from the storage medium storing the program indicating these procedures into the RAM 54 and executed.
[0072]
Here, the storage medium is a semiconductor storage medium such as a RAM or a ROM, a magnetic storage type storage medium such as an FD or HD, an optical read type storage medium such as a CD, CDV, LD, or DVD, or a magnetic storage type storage such as an MO. / Optical reading type storage media, including any storage media that can be read by a computer, regardless of an electronic, magnetic, optical, or other reading method.
[0073]
Further, in the above embodiment, a case is described in which the recycling work support system, the recycling center facility, the information management center facility and the facility program according to the present invention, and the recycling work support method are applied to a network system composed of the Internet 199. However, the present invention is not limited to this. For example, the present invention may be applied to a so-called intranet that performs communication in the same manner as the Internet 199. Of course, the present invention is not limited to a network that performs communication by the same method as the Internet 199, but can be applied to a normal network.
[0074]
Further, in the above embodiment, the recycling work support system, the recycling center equipment, the information management center equipment and the program for the equipment, and the recycling work support method according to the present invention, as shown in FIG. Although the present invention has been applied to the case where articles to be recycled, such as OA products and home electric appliances, are dismantled and sorted, the present invention is not limited to this, and can be applied to other cases without departing from the gist of the present invention.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of a network system to which the present invention is applied.
FIG. 2 is a block diagram showing a configuration of the information management center equipment 100.
FIG. 3 is a diagram showing a data structure of an article dismantling information registration DB 40.
FIG. 4 is a diagram showing a data structure of a process management information registration DB 42.
FIG. 5 is a flowchart illustrating an article disassembly information providing process.
FIG. 6 is a block diagram showing a configuration of a recycling center facility 200.
FIG. 7 is a diagram showing an arrangement configuration of an image photographing device 66 and a display device 68.
FIG. 8 is a flowchart showing article disassembly information acquisition processing.
FIG. 9 is a flowchart illustrating disassembly diagram display processing.
FIG. 10 is a flowchart illustrating disassembly diagram configuration processing.
FIG. 11 is a diagram showing an example of a disassembly diagram.
FIG. 12 is a diagram illustrating a configuration in which a display device and an image capturing device are provided on glasses 90 worn by a disassembly worker.
FIG. 13 is a flowchart showing a process of specifying a used tool.
[Explanation of symbols]
10. . . Information management center, 100. . . Information management center equipment, 20. . . Recycling center, 200. . . Recycling center equipment, 30, 50. . . CPU, 32, 52. . . ROM, 34, 54. . . RAM, 38, 58. . . I / F, 40, 60. . . Article dismantling information registration DB, 42, 62. . . Process management information registration DB, 63. . . Turntable, 64. . . Turntable driving device, 66, 67. . . Image photographing device, 68, 69. . . Display device, 70. . . Items to be recycled, 71. . . Power-on detection device, 80. . . Material notation, 82. . . Arrow notation, 90. . . Glasses, 91. . . Lens, 199. . . the Internet

Claims (5)

リサイクルの対象となるリサイクル対象物品を解体する作業を支援するシステムであって、
前記リサイクル対象物品を識別するための物品識別情報を入力する物品識別情報入力手段と、
前記リサイクル対象物品を解体するにあたってその工程における異なる複数の解体図を構成するための物品解体情報を前記物品識別情報と対応付けて記憶する物品解体情報記憶手段と、
前記物品識別情報入力手段で入力した物品識別情報をもとに前記物品解体情報記憶手段のなかから前記物品解体情報を検索する物品解体情報検索手段と、
前記物品解体情報検索手段で索出した物品解体情報に基づいて前記解体図を構成する解体図構成手段と、
前記解体図構成手段で構成した解体図を出力する解体図出力手段とを備え、
前記解体図構成手段は、前記リサイクル対象物品を解体する作業工程において使用された工具を特定することにより、この作業工程の進捗状況を判定し、得られた進捗状況に応じて前記物品解体情報検索手段で索出した物品解体情報により構成可能な複数の解体図のうちいずれかを構成するようになっていることを特徴とするリサイクル作業支援システム。
A system that supports the work of dismantling recyclable items to be recycled,
Article identification information input means for inputting article identification information for identifying the article to be recycled,
Article dismantling information storage means for storing article disassembly information for composing a plurality of different disassembly diagrams in the process in disassembling the recycling target article in association with the article identification information,
Article dismantling information search means for searching for the article disassembly information from the article disassembly information storage means based on the article identification information input by the article identification information input means,
Dismantling diagram constituting means for composing the dismantling diagram based on the article dismantling information retrieved by the article dismantling information searching means,
Disassembly diagram output means for outputting a disassembly diagram configured by the disassembly diagram configuration means,
The disassembly diagram forming means determines the progress of this work process by specifying a tool used in the work process of dismantling the article to be recycled, and searches for the article disassembly information according to the obtained progress. A recycling work support system characterized in that any one of a plurality of disassembly diagrams that can be constituted by the article disassembly information retrieved by the means is constituted.
前記工具の特定は、該工具が使用された位置と回数を画像から検出することにより行うことを特徴とする請求項1に記載のリサイクル作業支援システム。2. The recycling work support system according to claim 1, wherein the specification of the tool is performed by detecting a position and the number of times the tool is used from an image. 前記工具の特定は、使用工具が電動工具である場合に、該工具の使用位置と回数に加え、工具のスイッチの状態遷移に応じて行うことを特徴とする請求項2に記載のリサイクル作業支援システム。The recycling tool according to claim 2, wherein, when the tool to be used is an electric tool, the tool is specified in accordance with a state transition of a switch of the tool in addition to a use position and the number of times of the tool. system. リサイクルの対象となるリサイクル対象物品を解体する作業を支援する方法であって、
前記リサイクル対象物品を識別するための物品識別情報を入力する物品識別情報入力過程と、
前記リサイクル対象物品を解体するにあたってその工程における異なる複数の解体図を構成するための物品解体情報を前記物品識別情報と対応付けて記憶する物品解体情報記憶過程と、
前記物品識別情報入力過程で入力した物品識別情報をもとに前記物品解体情報記憶過程で記憶した情報のなかから前記物品解体情報を検索する物品解体情報検索過程と、
前記物品解体情報検索過程で索出した物品解体情報に基づいて前記解体図を構成する解体図構成過程と、
前記解体図構成過程で構成した解体図を出力する解体図出力過程とを有し、
前記解体図構成過程は、前記リサイクル対象物品を解体する作業工程において使用された工具を特定することにより、この作業工程の進捗状況を判定し、得られた進捗状況に応じて前記物品解体情報検索手段で索出した物品解体情報により構成可能な複数の解体図のうちいずれかを構成するようになっていることを特徴とするリサイクル作業支援方法。
A method for assisting in dismantling a recyclable item to be recycled,
An article identification information input step of inputting article identification information for identifying the article to be recycled,
An article dismantling information storing step of storing article disassembly information for configuring a plurality of different disassembly diagrams in the process in disassembling the recycling target article in association with the article identification information,
An article disassembly information search step of searching for the article disassembly information from information stored in the article disassembly information storage step based on the article identification information input in the article identification information input step;
A disassembly diagram configuration process for configuring the disassembly diagram based on the article disassembly information retrieved in the article disassembly information search process;
A disassembly diagram output step of outputting a disassembly diagram configured in the disassembly diagram configuration process,
The disassembly diagram forming process determines the progress of the work process by specifying a tool used in the work process of dismantling the article to be recycled, and searches the article disassembly information according to the obtained progress. A recycling work support method, wherein any one of a plurality of disassembly diagrams that can be constituted by the article disassembly information retrieved by the means is configured.
リサイクルの対象となるリサイクル対象物品を解体する作業を支援するプログラムであって、
前記リサイクル対象物品を識別するための物品識別情報を入力する物品識別情報入力処理と、
前記リサイクル対象物品を解体するにあたってその工程における異なる複数の解体図を構成するための物品解体情報を前記物品識別情報と対応付けて記憶する物品解体情報記憶処理と、
前記物品識別情報入力処理で入力した物品識別情報をもとに前記物品解体情報記憶処理で記憶した情報のなかから前記物品解体情報を検索する物品解体情報検索処理と、
前記物品解体情報検索処理で索出した物品解体情報に基づいて前記解体図を構成する解体図構成処理と、
前記解体図構成処理で構成した解体図を出力する解体図出力処理とを含み、
前記解体図構成処理は、前記リサイクル対象物品を解体する作業工程において使用された工具を特定することにより、この作業工程の進捗状況を判定し、得られた進捗状況に応じて前記物品解体情報検索手段で索出した物品解体情報により構成可能な複数の解体図のうちいずれかを構成するようになっていることを特徴とするリサイクル作業支援プログラム。
A program that assists in dismantling recyclable items to be recycled,
Article identification information input processing for inputting article identification information for identifying the article to be recycled,
Article dismantling information storage processing for storing article disassembly information for composing a plurality of different disassembly diagrams in the process in disassembling the recycling target article in association with the article identification information;
Article disassembly information search processing for searching for the article disassembly information from among the information stored in the article disassembly information storage processing based on the article identification information input in the article identification information input processing,
A disassembly diagram configuration process for configuring the disassembly diagram based on the article disassembly information retrieved in the article disassembly information search process;
Including a disassembly diagram output process for outputting a disassembly diagram configured in the disassembly diagram configuration process,
The disassembly diagram configuration process determines the progress of the work process by identifying the tool used in the work process of dismantling the article to be recycled, and searches the article disassembly information according to the obtained progress. A recycling work support program, wherein any one of a plurality of disassembly diagrams that can be constituted by the article disassembly information retrieved by the means is configured.
JP2003044353A 2003-01-27 2003-02-21 Recycling work support system, recycling work support program, and recycling work support method Expired - Fee Related JP4019970B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2003044353A JP4019970B2 (en) 2003-02-21 2003-02-21 Recycling work support system, recycling work support program, and recycling work support method
US10/756,424 US7080435B2 (en) 2003-01-27 2004-01-14 Recycling facilitating system, recycling facilitating program, and recycling facilitating method
US11/339,656 US7748096B2 (en) 2003-01-27 2006-01-26 Recycling facilitating system, recycling facilitating program, and recycling facilitating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003044353A JP4019970B2 (en) 2003-02-21 2003-02-21 Recycling work support system, recycling work support program, and recycling work support method

Publications (2)

Publication Number Publication Date
JP2004252847A true JP2004252847A (en) 2004-09-09
JP4019970B2 JP4019970B2 (en) 2007-12-12

Family

ID=33027078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003044353A Expired - Fee Related JP4019970B2 (en) 2003-01-27 2003-02-21 Recycling work support system, recycling work support program, and recycling work support method

Country Status (1)

Country Link
JP (1) JP4019970B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014171167A1 (en) * 2013-04-18 2014-10-23 オムロン株式会社 Work management system and work management method
JP2015181024A (en) * 2015-05-14 2015-10-15 オムロン株式会社 Operation management system and operation management method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014171167A1 (en) * 2013-04-18 2014-10-23 オムロン株式会社 Work management system and work management method
JP2014211763A (en) * 2013-04-18 2014-11-13 オムロン株式会社 Operation management system and operation management method
US9953374B2 (en) 2013-04-18 2018-04-24 Omron Corporation Work management system and work management method
US9953375B2 (en) 2013-04-18 2018-04-24 Omron Corporation Work management system and work management method
US9953376B2 (en) 2013-04-18 2018-04-24 Omron Corporation Work management system and work management method
US9959578B2 (en) 2013-04-18 2018-05-01 Omron Corporation Work management system and work management method
US10019764B2 (en) 2013-04-18 2018-07-10 Omron Corporation Work management system and work management method
JP2015181024A (en) * 2015-05-14 2015-10-15 オムロン株式会社 Operation management system and operation management method

Also Published As

Publication number Publication date
JP4019970B2 (en) 2007-12-12

Similar Documents

Publication Publication Date Title
JP4019907B2 (en) Recycling work support system, recycling center equipment, information management center equipment and equipment program, and recycling work support method
US7748096B2 (en) Recycling facilitating system, recycling facilitating program, and recycling facilitating method
US6308141B1 (en) Method of and apparatus for analyzing alarms of an injection molding machine
JP4019959B2 (en) Recycling work analysis system, recycling work analysis program, and recycling work analysis method
CN111045612A (en) Printing order parameter matching method, storage medium and computer equipment
TWI622003B (en) Method and system for logistics management
JP4019970B2 (en) Recycling work support system, recycling work support program, and recycling work support method
JP4019957B2 (en) Recycling work support system, recycling work support program, and recycling work support method
JP4168782B2 (en) Recycling work support system, recycling work support program, and recycling work support method
JP2008197674A (en) Support information providing method, support information providing program and information providing management system
JPH11212471A (en) Assembly and recycling device
JP2000099729A (en) Disassembling information sampling device of display device, and display device disassembling system
JP4150651B2 (en) Support information providing method, support information providing program, and information providing management system
JP2004199117A (en) Action support system, work support system, recycle work support system, recycle center facility, information management center facility, action support program, program for equipment and action support method
JP3858341B2 (en) Product disassembly support method, product disassembly support system, and computer-readable recording medium recording product disassembly support program
JP2002059147A (en) Regeneration work support system and method of supporting regeneration work
WO2021033285A1 (en) Processing device, processing method, and program
JP3840075B2 (en) Frame for image forming apparatus and method for recycling image forming apparatus
JPH11300330A (en) Recycling system for electric/electronic equipment
JP2000066717A (en) Man-machine interface device
JPH10277529A (en) Product decomposition information database
JPH10207899A (en) Product decomposing information data base
JP2003030453A (en) Method for specifying transaction in ocr converged image entry system, ocr converged image entry system and program
JPH10277528A (en) Product decomposition information database
JP2003164843A (en) Method and system for calculating disassembling time

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051111

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20051111

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20051114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070612

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070904

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070917

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111005

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131005

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees