JP2004213135A - Mold linkage system and mold linking method - Google Patents

Mold linkage system and mold linking method Download PDF

Info

Publication number
JP2004213135A
JP2004213135A JP2002379141A JP2002379141A JP2004213135A JP 2004213135 A JP2004213135 A JP 2004213135A JP 2002379141 A JP2002379141 A JP 2002379141A JP 2002379141 A JP2002379141 A JP 2002379141A JP 2004213135 A JP2004213135 A JP 2004213135A
Authority
JP
Japan
Prior art keywords
mold
information
die
linking
link information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002379141A
Other languages
Japanese (ja)
Inventor
Tamio Takeda
民男 竹田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP2002379141A priority Critical patent/JP2004213135A/en
Publication of JP2004213135A publication Critical patent/JP2004213135A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a mold linkage system and a mold linking method for enabling simple conducting of a mold discard task without fail, and without having to collate mold information with fixed assets information when discarding a mold. <P>SOLUTION: Mold linkage information, registered in a mold cooperation information storage part 11, is information in which the mold information is collated with the information on fixed assets, the mold information has management numbers as key items and includes at least the parts numbers, the account numbers, a keeping manufactures and condition divisions, the fixed assets information has fixed assets numbers as key items and includes at least the information necessary to pay the tax for fixed assets. A fixed assets master maintenance processing part 13 reflects, to a fixed assets master 5, the registration of new mold linkage information in the storage part 11, the correction of the mold linkage information registered in the storage part 11 and the changes of the fixed assets, accompanying the delete of the mold linkage information registered in the storage part 11. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、金型情報を管理する金型連係システムおよび金型連係方法に関し、特に金型情報に固定資産情報を連係させて管理する金型連係システムおよび金型連係方法に関する。
【0002】
【従来の技術】
従来、自動車のモデルチェンジがある度に、ブランドメーカの工場で生産に使っていた旧モデルの金型(例えばドアー・ボンネット等のプレス用金型、バンパー等の樹脂成形用金型)は、ブランドメーカの補修部品部門で引取り、旧型補修部品加工専門メーカに委託している。旧型補修部品加工専門メーカに委託する金型には、固定資産になるものもあるため、金型情報と固定資産情報とを管理する必要があり、金型情報は、金型管理マスターで管理され、固定資産情報は、固定資産マスターで管理され、金型情報と固定資産情報とは、異なる2つのデータベースで別々に管理されている。また、旧型補修部品加工専門メーカに委託された金型の管理は、ブランドメーカの補修部品部門で行われている。
【0003】
なお、固定資産を管理する固定資産管理システムとしては、固定資産群を階層別にコードで分類し、各階層間を系統ごとにリンク付けすると共に、最下層の各固定資産に耐用年数を対応付けて登録した固定資産の耐用年数データベースと、特定の固定資産を登録した固定資産データベースと、入力手段と、入力手段により入力された情報に基づき、耐用年数データベースを検索する耐用年数検索手段と、入力手段より入力された情報に基づき、固定資産データベースを検索する固定資産検索手段と、前記耐用年数検索手段または固定資産検索手段により検索された結果を出力する出力手段とを備える固定資産管理システムが提案されている(例えば、特許文献1参照)。
【0004】
【特許文献1】
特開2002−318898号公報
【0005】
【発明が解決しようとする課題】
しかしながら、従来技術では、金型廃却時に金型管理マスターと固定資産マスターの両方から必要な金型情報と固定資産情報とをそれぞれ取り出して、金型情報と固定資産情報とを照合する必要があり、作業の遅れおよび工数がかかると共に、人手による照合を行っているために、読み間違い等の人為的ミスが発生してしまうという問題点があった。
【0006】
本発明は斯かる問題点を鑑みてなされたものであり、その目的とするところは、金型廃却時に金型情報と固定資産情報とを照合する必要がなく、金型廃却作業をミス無く簡便に行うことができる金型連係システムおよび金型連係方法を提供する点にある。
【0007】
【課題を解決するための手段】
本発明は上記課題を解決すべく、以下に掲げる構成とした。
本発明の金型連係システムは、金型の金型情報を管理する金型連係システムであって、前記金型情報と前記金型の固定資産としての情報を示す固定資産情報とを連係させた金型連係情報を登録する金型連係情報記憶手段と、該金型連係情報記憶手段への新たな前記金型連係情報の登録、前記金型連係情報記憶手段に登録されている前記金型連係情報の一部又は全ての修正、および前記金型連係情報記憶手段に登録されている前記金型連係情報の一部又は全ての抹消に伴う固定資産の変化を固定資産マスターに反映させる固定資産マスターメンテナンス処理手段を具備することを特徴とする。
また、前記金型連係情報記憶手段に登録されている前記金型連係情報の前記金型情報には、前記金型によって製造される部品が用いられている補修部品を示す口座番号および該口座を構成する部品の1又は複数の金型管理番号が含まれており、前記金型連係情報記憶手段を前記口座番号で検索し、前記口座番号で関連づけられる前記金型連係情報を掲載した金型関連リストを作成する金型連係情報管理手段を具備するようにすることもできる。
また、前記金型連係情報管理手段は、前記補修部品の需要予測情報が管理されている需要予測データベースと接続されており、前記金型関連リストに掲載される前記金型連係情報に含まれている全ての口座番号で示される前記補修部品の需要予測を前記需要予測データベースから取得させ、取得された需要予測を前記金型関連リストに掲載させるようにすることもできる。
本発明の金型連係方法は、金型の金型情報を管理する金型連係方法であって、前記金型情報と前記金型の固定資産としての情報を示す固定資産情報とを連係した金型連係情報を登録し、新たな前記金型連係情報の登録、登録している前記金型連係情報の一部又は全ての修正、および登録している前記金型連係情報の一部又は全ての抹消に伴う固定資産の変化を固定資産マスターに反映することを特徴とする。
また、登録している前記金型連係情報の前記金型情報は、前記金型によって製造される部品が用いられている補修部品を示す口座番号および該口座を構成する部品の1又は複数の金型管理番号を含み、登録している前記金型連係情報を前記口座番号で検索し、前記口座番号で関連づけられる前記金型連係情報を掲載した金型関連リストを作成するようにすることもできる。
また、前記補修部品の需要予測情報が管理されている需要予測データベースと接続しておき、該需要予測データベースから前記金型関連リストに掲載される前記金型連係情報に含まれている全ての口座番号で示される前記補修部品の需要予測を前記需要予測データベースから取得し、取得した需要予測を前記金型関連リストに掲載するようにすることもできる。
【0008】
このような構成によって本発明は、金型廃却時に金型情報と固定資産情報とを照合する必要がなく、金型廃却作業をミス無く簡便に行うことができるという効果を奏する。さらに、本発明は、廃却が要求されている金型の廃却の要否の検討が正確に行えると共に、廃却が要求されている金型と同時に廃却すべき金型を特定することができ、金型の廃却作業の効率化が図れるという効果を奏する。
【0009】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。
【0010】
図1は、本発明に係る金型連係システムの実施の形態の構成を示すブロック図である。
【0011】
本実施の形態の金型連係システムは、金型連係データベース1と、補修部品部門に設置されている管理者端末2と、金型が委託される旧型補修部品加工専門メーカである取引先に設置されている取引先端末3と、固定資産マスター5と、需要予測データベース6とから構成され、金型連係データベース1、管理者端末2および取引先端末3とは、インターネットやLAN等のネットワーク4で接続されている。
【0012】
金型連係データベース1は、図1を参照すると、金型連係情報が登録される金型連係情報記憶部11と、金型連係情報記憶部11に登録されている金型連係情報を管理する金型連係情報管理部12と、金型連係情報の登録、修正および削除による固定資産情報の変化を固定資産マスター5に反映させる固定資産マスターメンテナンス処理部13からなり、金型連係情報管理部12と需要予測データベース6とが接続され、固定資産マスターメンテナンス処理部13と固定資産マスター5とが接続された構成となっている。
【0013】
金型連係情報記憶部11に登録される金型連係情報は、金型情報と固定資産情報とが連係された情報であり、金型情報は、管理番号の内一部の識別番号をキー項目とし、部品番号、口座番号、保管メーカおよび状況区分を少なくとも含む情報であり、固定資産情報は、固定資産番号をキー項目とし、固定資産税の納付に必要な情報を少なくとも含む情報である。なお、部品番号は、その金型を用いて製造される部品の番号であり、口座番号は、その金型を用いて製造された部品が用いられている補修部品(補修部品リストに載せられている部品)の番号である。従って、金型情報には、その金型を用いて製造された部品が複数の補修部品に用いられている場合には、複数の口座番号が登録される。
【0014】
金型連係情報管理部12は、金型連係情報記憶部11への新たな金型連係情報の登録、金型連係情報記憶部11に登録されている金型連係情報の一部又は全ての修正、および金型連係情報記憶部11に登録されている金型連係情報の一部又は全ての抹消を実行すると共に、金型廃却確認処理を行って廃却金型関連リストを作成する。
【0015】
固定資産マスターメンテナンス処理部13は、金型連係情報記憶部11への新たな金型連係情報の登録、金型連係情報記憶部11に登録されている金型連係情報の一部又は全ての修正、および金型連係情報記憶部11に登録されている金型連係情報の一部又は全ての抹消に伴う固定資産の変化を固定資産マスター5に反映させる。
【0016】
固定資産マスター5は、金型を含む固定資産が管理されているデータベースであり、需要予測データベース6は、各補修部品の需要予測情報が管理されているデータベースである。
【0017】
次に、本実施の形態の動作について図2乃至図4を参照して詳細に説明する。
図2は、本発明に係る金型連係システムの実施の形態の通常廃却処理動作を示すジョブフローであり、図3は、図2に示す金型廃却確認処理動作を示すフローチャートであり、図4は、本発明に係る金型連係システムの実施の形態の年限廃却処理動作を示すジョブフローである。
【0018】
まず金型連係情報の登録作業について説明する。
金型を旧型補修部品加工専門メーカに委託する際には、管理者端末2から金型連係データベース1に金型連係情報の登録を要求する。金型連係情報管理部12は、金型連係情報を登録する画面として金型情報登録画面および固定資産情報登録画面を用意しており、管理者端末2からの登録要求に応じて金型情報登録画面および固定資産情報登録画面を管理者端末2に送信し、管理者端末2において金型情報登録画面および固定資産情報登録画面に基づいて金型情報および固定資産情報を入力する。入力された金型情報および固定資産情報は、金型連係情報管理部12によって金型連係情報として金型連係情報記憶部11に登録される。
【0019】
次に金型情報と固定資産情報の通常廃却作業について説明する。
通常廃却とは、取引先からの廃却要求によって個別の金型を廃却するもので、不定期に行われる作業であり、図2を参照すると、まず、取引先端末3において金型の廃却を要求する金型廃却検討書が作成され(ステップA1)、作成された金型廃却検討書が取引先端末3から管理者端末2に送信される(ステップA2)。なお、金型廃却検討書では、廃却を要求する金型の管理番号が特定されている。
【0020】
補修部品部門では、送られてきた金型廃却検討書を参照して、管理番号を含む金型廃却確認指示を管理者端末2から金型連係データベース1に送信する金型廃却確認指示処理を行う(ステップA3)。
【0021】
管理番号を含む金型廃却確認指示を受信した金型連係情報管理部12は、金型廃却確認処理を行い(ステップA4)、廃却金型関連リストを作成し(ステップA5)、作成した廃却金型関連リストを管理者端末2に送信する(ステップA6)。
【0022】
金型廃却確認処理は、図3を参照すると、金型連係情報管理部12が金型廃却確認指示を受信することによって開始される(ステップB1)。金型連係情報管理部12は、金型廃却確認指示に含まれる管理番号で特定される金型連係情報に登録されている口座番号で金型連係情報記憶部11を検索し(ステップB2)、検索された金型連係情報を抽出する。次に金型廃却確認指示に含まれる管理番号で特定される金型連係情報に登録されている口座番号と、検索された金型連係情報に登録されている口座番号との需要予測を需要予測データベース6から取得し(ステップB3)、検索された金型連係情報と取得した需要予測とが掲載された廃却金型関連リストを作成する(ステップB4)。
【0023】
廃却金型関連リストには、金型廃却検討書で廃却が要求されている金型で製造される部品が用いられている補修部品(以下、廃却対象補修部品と称す)およびその需要予測と、廃却対象補修部品に用いられている他の部品を製造する金型と、当該金型で製造される部品が用いられている補修部品(廃却対象補修部品以外)およびその需要予測とが含まれる。従って、金型廃却検討書で廃却が要求されている金型の廃却の要否の検討が正確に行えると共に、金型廃却検討書で廃却が要求されている金型と同時に廃却すべき金型を特定することができる。
【0024】
補修部品部門では、送られてきた廃却金型関連リストを参照して、金型廃却検討書で廃却が要求されている金型と、廃却金型関連リストに載っている金型との廃却の要否を決定し、廃却を決定した金型の廃却指示処理が行われる(ステップA7)。金型廃却指示処理としては、廃却する金型を決定し、該当する金型の廃却指示を管理者端末2から取引先端末3に送信すると共に、管理者端末2によって廃却を指示する金型に対応する金型連係情報の状況区分に廃却指示を示す「Y」をセットする。
【0025】
取引先では、廃却指示によって該当する金型の廃却を行う廃却処理を行い(ステップA8)、廃却処理結果を取引先端末3から管理者端末2に送信する。
【0026】
補修部品部門では、廃却処理結果を参照して、金型廃却承認処理が行われる(ステップA9)。金型廃却承認処理としては、管理者端末2によって廃却された金型に対応する金型連係情報の状況区分に廃却を示す「Z」をセットする。
【0027】
次に、固定資産マスターメンテナンス処理部13は、状況区分に「Z」がセットされている金型連係情報を抽出し、金型の廃却を固定資産マスター5に反映させる固定資産マスター反映処理を行い(ステップA10)、金型の廃却に伴う固定資産の抹消を行う。なお、一部の金型の廃却においては、廃却金型固定資産のみ除いた固定資産に減ずる修正を行う。
【0028】
次に、金型情報と固定資産情報の年限廃却作業について説明する。
年限廃却作業とは、耐用年数等で選択された金型の廃却を定期的に検討して廃却する作業であり、図4を参照すると、まず、金型連係データベース1で金型廃却データ作成処理が実行され(ステップC1)、廃却対象データが作成される(ステップC2)と共に、作成された廃却対象データが廃却対象リストとして管理者端末2に送信される(ステップC3)。金型廃却データ作成処理は、金型連係データベース1が金型廃却データ作成指示と共に廃却対象とする金型の条件を受信することによって開始され、金型連係情報管理部12は、廃却対象とする金型の条件に基づいて共に金型連係情報記憶部11を検索し、廃却対象とする金型の条件を満たす金型を抽出することによって廃却対象データが作成される。
【0029】
廃却対象リストは、補修部品部門で確認された後(ステップC4)、取引先端末3に送信される(ステップC5)。また、金型連係情報管理部12によって作成された廃却対象データを金型連係情報記憶部11に反映させる反映処理が行われ(ステップC6)、廃却対象リストに載っている金型に対応する金型連係情報の状況区分が廃却指示待ちを示す「X」に書き換えられる。
【0030】
取引先では、送られてきた廃却対象リストの載っている金型の廃却の要否を判断する判断処理が行われる(ステップC7)。判断処理としては、廃却対象リストへの廃却要否の入力が行われ、廃却要否が入力された廃却対象リストは、取引先端末3から管理者端末2に送信される(ステップC8)。
【0031】
補修部品部門では、廃却要否が入力された廃却対象リストを参照して、金型廃却指示処理が行われる(ステップC9)。金型廃却指示処理としては、廃却する金型を決定し、該当する金型の廃却指示を管理者端末2から取引先端末3に送信すると共に、管理者端末2によって廃却を指示する金型に対応する金型連係情報の状況区分に廃却指示を示す「Y」をセットする。
【0032】
取引先では、廃却指示によって該当する金型の廃却を行う廃却処理を行い(ステップC10)、廃却処理結果を取引先端末3から管理者端末2に送信する。
【0033】
補修部品部門では、廃却処理結果を参照して、金型廃却承認処理が行われる(ステップC11)。金型廃却承認処理としては、管理者端末2によって廃却された金型に対応する金型連係情報の状況区分に廃却を示す「Z」をセットする。
【0034】
次に、固定資産マスターメンテナンス処理部13は、状況区分に「Z」がセットされている金型連係情報を抽出し、金型の廃却を固定資産マスター5に反映させる固定資産マスター反映処理を行い(ステップC12)、金型の廃却に伴う固定資産の抹消を行う。なお、一部の金型の廃却においては、廃却金型固定資産のみ除いた固定資産に減ずる修正を行う。
【0035】
なお、本発明が上記各実施の形態に限定されず、本発明の技術思想の範囲内において、各実施の形態は適宜変更され得ることは明らかである。また、上記構成部材の数、位置、形状等は上記実施の形態に限定されず、本発明を実施する上で好適な数、位置、形状等にすることができる。なお、各図において、同一構成要素には同一符号を付している。
【0036】
【発明の効果】
本発明の金型連係システムおよび金型連係方法は、金型情報と固定資産情報とが連係された金型連係情報を金型連係情報記憶部11に登録し、金型連係情報によって委託した金型を管理するように構成することにより、金型廃却時に金型情報と固定資産情報とを照合する必要がなく、金型廃却作業をミス無く簡便に行うことができるという効果を奏する。
【0037】
さらに、本発明の金型連係システムおよび金型連係方法は、金型廃却確認指示によって廃却を要求された金型に関連する情報が記載された廃却金型関連リストが出力されるように構成することにより、廃却が要求されている金型の廃却の要否の検討が正確に行えると共に、廃却が要求されている金型と同時に廃却すべき金型を特定することができ、金型の廃却作業の効率化が図れるという効果を奏する。
【図面の簡単な説明】
【図1】本発明に係る金型連係システムの実施の形態の構成を示すブロック図である。
【図2】本発明に係る金型連係システムの実施の形態の通常廃却処理動作を示すジョブフローである。
【図3】図2に示す金型廃却確認処理動作を示すフローチャートである。
【図4】本発明に係る金型連係システムの実施の形態の年限廃却処理動作を示すジョブフローである。
【符号の説明】
1 金型連係データベース
2 管理者端末
3 取引先端末
4 ネットワーク
5 固定資産マスター
6 需要予測データベース
11 金型連係情報記憶部
12 金型連係情報管理部
13 固定資産マスターメンテナンス処理部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a die linking system and a die linking method for managing die information, and more particularly to a die linking system and a die linking method for linking and managing fixed asset information with die information.
[0002]
[Prior art]
In the past, every time there was a model change of an automobile, the molds of the old model (for example, the press molds for doors and bonnets and the resin molding molds for bumpers, etc.) used for production at the factory of the brand manufacturer It is picked up by the repair parts department of the manufacturer and outsourced to a manufacturer specializing in processing old repair parts. Since some molds outsourced to the old repair parts processing maker become fixed assets, it is necessary to manage the mold information and fixed asset information.The mold information is managed by the mold management master. The fixed asset information is managed by a fixed asset master, and the mold information and the fixed asset information are separately managed by two different databases. The management of the molds entrusted to a manufacturer specializing in the processing of old repair parts is performed by a repair parts department of a brand manufacturer.
[0003]
In addition, as a fixed asset management system that manages fixed assets, fixed asset groups are classified by code according to hierarchy, links between each hierarchy are made for each system, and service life is associated with each fixed asset at the lowest level. Service life database of registered fixed assets, fixed asset database in which specific fixed assets are registered, input means, service life search means for searching the service life database based on information input by the input means, input means There has been proposed a fixed asset management system including fixed asset search means for searching a fixed asset database based on input information, and output means for outputting a result searched by the useful life search means or the fixed asset search means. (For example, see Patent Document 1).
[0004]
[Patent Document 1]
JP-A-2002-318898
[Problems to be solved by the invention]
However, in the conventional technology, it is necessary to extract necessary mold information and fixed asset information from both the mold management master and the fixed asset master when the mold is discarded, and to compare the mold information with the fixed asset information. In addition, there is a problem that the operation is delayed and the man-hour is required, and the human collation is performed, so that a human error such as a reading error occurs.
[0006]
The present invention has been made in view of such a problem, and an object of the present invention is to eliminate the necessity of collating mold information with fixed asset information at the time of mold scrapping, and making mistakes in mold scrapping work. Another object of the present invention is to provide a mold linking system and a mold linking method which can be performed easily and simply.
[0007]
[Means for Solving the Problems]
The present invention has the following configurations in order to solve the above problems.
A mold linking system according to the present invention is a mold linking system for managing mold information of a mold, wherein the mold information and fixed asset information indicating information as fixed assets of the mold are linked. Mold linkage information storage means for registering mold linkage information; registration of new mold linkage information in the mold linkage information storage means; and mold linkage registered in the mold linkage information storage means A fixed asset master that reflects a change in fixed assets due to a modification of part or all of the information, and a part or all of the mold linkage information registered in the mold linkage information storage means to the fixed asset master It is characterized by having a maintenance processing means.
Further, the mold information of the mold linkage information registered in the mold linkage information storage means includes an account number indicating a repair part using a part manufactured by the mold and the account. One or a plurality of die management numbers of constituent parts are included, and the die linkage information storage means is searched by the account number, and the die related information in which the die linkage information associated with the account number is posted. It is also possible to provide a die linking information management means for creating a list.
The mold link information management means is connected to a demand forecast database in which demand forecast information of the repair part is managed, and is included in the mold link information posted on the mold related list. Demand forecasts of the repair parts indicated by all the account numbers that are present may be acquired from the demand forecast database, and the acquired demand forecasts may be posted on the mold related list.
A mold linking method according to the present invention is a mold linking method for managing mold information of a mold, wherein the mold linking the mold information and fixed asset information indicating information as fixed assets of the mold. Register the mold link information, register the new mold link information, correct some or all of the registered mold link information, and part or all of the registered mold link information. It is characterized in that changes in fixed assets due to erasure are reflected in the fixed asset master.
Further, the registered mold information of the registered mold link information includes an account number indicating a repair part in which a part manufactured by the mold is used, and one or a plurality of molds of parts constituting the account. It is also possible to search for the registered mold link information including the mold management number by the account number, and to create a mold related list in which the mold link information associated with the account number is posted. .
Further, it is connected to a demand forecasting database in which demand forecasting information of the repair parts is managed, and all accounts included in the mold linking information posted in the mold related list from the demand forecasting database. A demand forecast of the repair part indicated by a number may be acquired from the demand forecast database, and the acquired demand forecast may be posted on the mold related list.
[0008]
With such a configuration, the present invention has an effect that it is not necessary to check the mold information and the fixed asset information when the mold is discarded, so that the mold discarding operation can be performed easily without errors. Further, the present invention is capable of accurately examining the necessity of discarding a mold whose disposal is required, and specifying a mold to be disposed at the same time as a mold whose disposal is required. Thus, there is an effect that the efficiency of the mold disposal work can be improved.
[0009]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0010]
FIG. 1 is a block diagram showing a configuration of an embodiment of a mold linking system according to the present invention.
[0011]
The mold linking system according to the present embodiment is installed in a mold linking database 1, an administrator terminal 2 installed in the repair parts department, and a supplier who is an old mold repair parts processing maker to which the mold is outsourced. And a fixed asset master 5 and a demand forecasting database 6. The die linking database 1, the manager terminal 2, and the client terminal 3 are connected via a network 4 such as the Internet or a LAN. It is connected.
[0012]
Referring to FIG. 1, the mold link database 1 includes a mold link information storage unit 11 in which mold link information is registered, and a mold for managing the mold link information registered in the mold link information storage unit 11. The mold linking information management unit 12 includes a fixed asset master maintenance processing unit 13 that reflects a change in fixed asset information due to registration, correction, and deletion of the mold link information on the fixed asset master 5. The demand forecast database 6 is connected, and the fixed asset master maintenance processing unit 13 and the fixed asset master 5 are connected.
[0013]
The mold link information registered in the mold link information storage unit 11 is information in which the mold information and the fixed asset information are linked, and the mold information uses the identification number of a part of the management number as a key item. The fixed asset information is information including at least the information necessary for payment of the fixed asset tax using the fixed asset number as a key item and the fixed asset number as a key item. Note that the part number is the number of a part manufactured using the mold, and the account number is a repair part in which a part manufactured using the mold is used. Part number). Accordingly, in the mold information, when a part manufactured using the mold is used for a plurality of repair parts, a plurality of account numbers are registered.
[0014]
The die link information management unit 12 registers new die link information in the die link information storage unit 11 and corrects part or all of the die link information registered in the die link information storage unit 11. , And part or all of the mold link information registered in the mold link information storage unit 11 is deleted, and a mold scrap check process is performed to create a scrap mold related list.
[0015]
The fixed asset master maintenance processing unit 13 registers new die linkage information in the die linkage information storage unit 11 and corrects part or all of the die linkage information registered in the die linkage information storage unit 11. The change in the fixed assets resulting from the deletion of part or all of the die linkage information registered in the die linkage information storage unit 11 is reflected in the fixed asset master 5.
[0016]
The fixed asset master 5 is a database in which fixed assets including molds are managed, and the demand forecast database 6 is a database in which demand forecast information of each repair part is managed.
[0017]
Next, the operation of the present embodiment will be described in detail with reference to FIGS.
FIG. 2 is a job flow showing the normal disposal processing operation of the embodiment of the mold linking system according to the present invention, and FIG. 3 is a flowchart showing the mold disposal confirmation processing operation shown in FIG. FIG. 4 is a job flow showing the term disposal processing operation of the embodiment of the mold linking system according to the present invention.
[0018]
First, the operation of registering the mold link information will be described.
When outsourcing a mold to an old mold repair parts processing manufacturer, the manager terminal 2 requests registration of the mold linkage information in the mold linkage database 1. The die link information management unit 12 prepares a die information registration screen and a fixed asset information registration screen as screens for registering die link information, and registers die information in response to a registration request from the manager terminal 2. The screen and the fixed asset information registration screen are transmitted to the manager terminal 2, and the manager terminal 2 inputs the mold information and the fixed asset information based on the mold information registration screen and the fixed asset information registration screen. The input die information and fixed asset information are registered in the die link information storage unit 11 as die link information by the die link information management unit 12.
[0019]
Next, the normal disposal work of the mold information and the fixed asset information will be described.
Normal disposal is a process in which individual molds are discarded in response to a disposal request from a business partner, and is a work that is performed irregularly. Referring to FIG. A mold retirement study form requesting disposal is created (step A1), and the created mold retirement study form is transmitted from the supplier terminal 3 to the manager terminal 2 (step A2). It should be noted that in the mold retirement study form, the management number of the mold for which disposal is requested is specified.
[0020]
In the repair parts department, the mold disposal confirmation instruction including the management number and transmitting the mold disposal confirmation instruction including the control number from the manager terminal 2 to the mold association database 1 with reference to the transmitted mold disposal examination document. Processing is performed (step A3).
[0021]
The mold linking information management unit 12 that has received the mold disposal confirmation instruction including the management number performs mold disposal confirmation processing (step A4), creates a disposal mold related list (step A5), and creates it. The rejected mold related list is transmitted to the administrator terminal 2 (step A6).
[0022]
Referring to FIG. 3, the mold rejection confirmation process is started when the mold link information management unit 12 receives a mold rejection confirmation instruction (step B1). The die link information management unit 12 searches the die link information storage unit 11 with the account number registered in the die link information specified by the management number included in the die disposal confirmation instruction (step B2). Then, the searched die link information is extracted. Next, the demand forecast of the account number registered in the mold link information specified by the management number included in the mold disposal confirmation instruction and the account number registered in the searched mold link information is calculated. It is acquired from the prediction database 6 (step B3), and a retired mold related list in which the retrieved mold link information and the acquired demand forecast are published is created (step B4).
[0023]
The list of retired molds includes repair parts that use parts manufactured with the molds that are required to be discarded in the mold rejection study form (hereinafter referred to as “repair parts to be discarded”). Demand forecast, molds for manufacturing other parts used for repair parts to be discarded, repair parts (other than repair parts to be discarded) using parts manufactured by the molds and their demands Predictions and included. Therefore, it is possible to accurately determine whether or not to dispose of the molds that are required to be discarded in the mold retirement study form, and at the same time as the molds that are required to be discarded in the mold retirement study form. A mold to be discarded can be specified.
[0024]
In the repair parts department, referring to the sent waste mold related list, the molds that are required to be discarded in the mold disposal study and the molds listed in the waste mold related list It is determined whether or not it is necessary to dispose of the mold, and a disposal instruction process for the mold that has been decided to be discarded is performed (step A7). In the mold disposal instruction processing, a mold to be discarded is determined, a disposal instruction of the corresponding mold is transmitted from the administrator terminal 2 to the supplier terminal 3, and the disposal is instructed by the administrator terminal 2. "Y" indicating a disposal instruction is set in the status category of the die link information corresponding to the die to be performed.
[0025]
The supplier performs a disposal process for disposing of the corresponding mold in accordance with the disposal instruction (step A8), and transmits the result of the disposal process from the supplier terminal 3 to the administrator terminal 2.
[0026]
In the repair parts department, the mold disposal approval processing is performed with reference to the disposal processing result (step A9). In the mold rejection approval process, “Z” indicating disposal is set in the status category of the mold link information corresponding to the mold rejected by the manager terminal 2.
[0027]
Next, the fixed asset master maintenance processing unit 13 extracts the mold link information in which the status category is set to “Z”, and performs fixed asset master reflection processing for reflecting the disposal of the mold to the fixed asset master 5. (Step A10), and the fixed assets are deleted when the molds are discarded. For the disposal of some dies, a revision will be made to reduce the fixed assets to the exclusion of fixed assets.
[0028]
Next, a description will be given of a work for term-removing mold information and fixed asset information.
The term retirement work is a task of periodically examining and discarding the molds selected based on the service life and the like. Referring to FIG. The rejection data creation process is executed (step C1), and the rejection target data is created (step C2), and the created rejection target data is transmitted to the administrator terminal 2 as a rejection list (step C3). ). The mold rejection data creation processing is started when the mold linking database 1 receives the mold discarding data creation instruction and the condition of the mold to be discarded, and the mold linking information management unit 12 Based on the condition of the mold to be rejected, the mold linking information storage unit 11 is searched together, and a mold that satisfies the condition of the mold to be discarded is extracted to create data to be discarded.
[0029]
After the disposal target list is confirmed by the repair parts department (step C4), it is transmitted to the supplier terminal 3 (step C5). In addition, a reflection process is performed to reflect the discard target data created by the die link information management unit 12 in the die link information storage unit 11 (step C6), and the reflection is performed for the die listed in the discard target list. Is changed to “X” indicating waiting for the disposal instruction.
[0030]
At the supplier, a determination process is performed to determine whether or not it is necessary to dispose of the dies on the received disposal target list (step C7). In the determination process, the necessity of disposal is input to the disposal target list, and the disposal target list in which the disposal necessity is input is transmitted from the business partner terminal 3 to the administrator terminal 2 (step C8).
[0031]
In the repair parts department, a mold disposal instruction process is performed with reference to the disposal target list in which the necessity of disposal is input (step C9). In the mold disposal instruction processing, a mold to be discarded is determined, a disposal instruction of the corresponding mold is transmitted from the administrator terminal 2 to the supplier terminal 3, and the disposal is instructed by the administrator terminal 2. "Y" indicating a disposal instruction is set in the status category of the die link information corresponding to the die to be performed.
[0032]
The supplier performs a disposal process for disposing of the corresponding mold in accordance with the disposal instruction (step C10), and transmits the result of the disposal process from the supplier terminal 3 to the administrator terminal 2.
[0033]
In the repair parts department, the mold disposal approval processing is performed with reference to the disposal processing result (step C11). In the mold rejection approval process, “Z” indicating disposal is set in the status category of the mold link information corresponding to the mold rejected by the manager terminal 2.
[0034]
Next, the fixed asset master maintenance processing unit 13 extracts the mold link information in which the status category is set to “Z”, and performs fixed asset master reflection processing for reflecting the disposal of the mold to the fixed asset master 5. (Step C12), and the fixed assets are deleted when the mold is discarded. For the disposal of some dies, a revision will be made to reduce the fixed assets to the exclusion of fixed assets.
[0035]
It should be noted that the present invention is not limited to the above embodiments, and it is clear that each embodiment can be appropriately modified within the scope of the technical idea of the present invention. Further, the number, position, shape, and the like of the constituent members are not limited to the above-described embodiment, and can be set to numbers, positions, shapes, and the like suitable for carrying out the present invention. In the drawings, the same components are denoted by the same reference numerals.
[0036]
【The invention's effect】
According to the mold linking system and the mold linking method of the present invention, the mold linking information in which the mold information and the fixed asset information are linked is registered in the mold linking information storage unit 11, and the mold commissioned by the mold linking information is registered. By configuring so as to manage the mold, there is no need to collate the mold information with the fixed asset information when the mold is discarded, so that there is an effect that the mold discarding operation can be performed easily without error.
[0037]
Further, in the mold linking system and the mold linking method of the present invention, the discarded mold related list in which information related to the mold requested to be discarded by the mold discarding confirmation instruction is described is output. With this configuration, it is possible to accurately examine the necessity of disposing of the molds required to be discarded, and to specify the molds to be discarded at the same time as the molds required to be discarded. Thus, there is an effect that the efficiency of the mold disposal work can be improved.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of an embodiment of a mold linking system according to the present invention.
FIG. 2 is a job flow showing a normal disposal processing operation of the embodiment of the mold linking system according to the present invention.
FIG. 3 is a flowchart showing a mold disposal confirmation processing operation shown in FIG. 2;
FIG. 4 is a job flow illustrating a term disposal process operation of the embodiment of the mold linking system according to the present invention.
[Explanation of symbols]
REFERENCE SIGNS LIST 1 mold link database 2 manager terminal 3 supplier terminal 4 network 5 fixed asset master 6 demand forecast database 11 mold link information storage unit 12 mold link information management unit 13 fixed asset master maintenance processing unit

Claims (6)

金型の金型情報を管理する金型連係システムであって、
前記金型情報と前記金型の固定資産としての情報を示す固定資産情報とを連係させた金型連係情報を登録する金型連係情報記憶手段と、
該金型連係情報記憶手段への新たな前記金型連係情報の登録、前記金型連係情報記憶手段に登録されている前記金型連係情報の一部又は全ての修正、および前記金型連係情報記憶手段に登録されている前記金型連係情報の一部又は全ての抹消に伴う固定資産の変化を固定資産マスターに反映させる固定資産マスターメンテナンス処理手段を具備することを特徴とする金型連係システム。
A mold linking system that manages mold information of molds,
Mold link information storage means for registering mold link information in which the mold information and fixed asset information indicating information as fixed assets of the mold are linked,
Registration of the new die link information in the die link information storage means, modification of part or all of the die link information registered in the die link information storage means, and the die link information A mold associating system comprising a fixed asset master maintenance processing means for reflecting a change in fixed assets due to erasure of part or all of the mold linkage information registered in a storage means to a fixed asset master. .
前記金型連係情報記憶手段に登録されている前記金型連係情報の前記金型情報には、前記金型によって製造される部品が用いられている補修部品を示す口座番号および該口座を構成する部品の1又は複数の金型管理番号が含まれており、
前記金型連係情報記憶手段を前記口座番号で検索し、前記口座番号で関連づけられる前記金型連係情報を掲載した金型関連リストを作成する金型連係情報管理手段を具備することを特徴とする請求項1記載の金型連係システム。
The die information of the die linkage information registered in the die linkage information storage means includes an account number indicating a repair part in which a part manufactured by the die is used and the account. Contains one or more mold control numbers for the part,
A mold linking information managing unit that searches the mold linking information storage unit with the account number and creates a mold linking list in which the mold linking information associated with the account number is posted. The mold linking system according to claim 1.
前記金型連係情報管理手段は、前記補修部品の需要予測情報が管理されている需要予測データベースと接続されており、前記金型関連リストに掲載される前記金型連係情報に含まれている全ての口座番号で示される前記補修部品の需要予測を前記需要予測データベースから取得させ、取得された需要予測を前記金型関連リストに掲載させることを特徴とする請求項2記載の金型連係システム。The mold linking information management means is connected to a demand forecasting database in which demand forecasting information of the repair parts is managed, and includes all of the mold linking information included in the mold linking list. The mold linking system according to claim 2, wherein a demand forecast of the repair part indicated by the account number is acquired from the demand forecast database, and the acquired demand forecast is posted on the mold related list. 金型の金型情報を管理する金型連係方法であって、
前記金型情報と前記金型の固定資産としての情報を示す固定資産情報とを連係した金型連係情報を登録し、
新たな前記金型連係情報の登録、登録している前記金型連係情報の一部又は全ての修正、および登録している前記金型連係情報の一部又は全ての抹消に伴う固定資産の変化を固定資産マスターに反映することを特徴とする金型連係方法。
A mold linking method for managing mold information of a mold,
Registering die link information linking the die information and fixed asset information indicating information as fixed assets of the die,
Change of fixed assets due to registration of new mold link information, modification of part or all of registered mold link information, and deletion of part or all of registered mold link information Is reflected in the fixed asset master.
登録している前記金型連係情報の前記金型情報は、前記金型によって製造される部品が用いられている補修部品を示す口座番号および該口座を構成する部品の1又は複数の金型管理番号を含み、
登録している前記金型連係情報を前記口座番号で検索し、前記口座番号で関連づけられる前記金型連係情報を掲載した金型関連リストを作成することを特徴とする請求項4記載の金型連係方法。
The die information of the registered die linkage information includes an account number indicating a repair part in which a part manufactured by the die is used, and one or a plurality of die management of the parts constituting the account. Number,
5. The mold according to claim 4, wherein the registered mold link information is searched by the account number, and a mold related list containing the mold link information associated with the account number is created. Linkage method.
前記補修部品の需要予測情報が管理されている需要予測データベースと接続しておき、
該需要予測データベースから前記金型関連リストに掲載される前記金型連係情報に含まれている全ての口座番号で示される前記補修部品の需要予測を前記需要予測データベースから取得し、
取得した需要予測を前記金型関連リストに掲載することを特徴とする請求項5記載の金型連係方法。
Connected to a demand forecast database where demand forecast information of the repair parts is managed,
Obtaining from the demand forecast database the demand forecast of the repair parts indicated by all the account numbers included in the mold link information posted in the mold related list from the demand forecast database,
6. The mold linking method according to claim 5, wherein the acquired demand forecast is posted in the mold related list.
JP2002379141A 2002-12-27 2002-12-27 Mold linkage system and mold linking method Pending JP2004213135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002379141A JP2004213135A (en) 2002-12-27 2002-12-27 Mold linkage system and mold linking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002379141A JP2004213135A (en) 2002-12-27 2002-12-27 Mold linkage system and mold linking method

Publications (1)

Publication Number Publication Date
JP2004213135A true JP2004213135A (en) 2004-07-29

Family

ID=32815727

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002379141A Pending JP2004213135A (en) 2002-12-27 2002-12-27 Mold linkage system and mold linking method

Country Status (1)

Country Link
JP (1) JP2004213135A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7453750B2 (en) 2006-10-19 2008-11-18 Samsung Electronics Co., Ltd. Flash memory device with word line discharge unit and data read method thereof
CN110197334A (en) * 2019-05-31 2019-09-03 珠海金鑫标业科技有限公司 A kind of Maintenance Management System for fixed assets

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7453750B2 (en) 2006-10-19 2008-11-18 Samsung Electronics Co., Ltd. Flash memory device with word line discharge unit and data read method thereof
CN110197334A (en) * 2019-05-31 2019-09-03 珠海金鑫标业科技有限公司 A kind of Maintenance Management System for fixed assets

Similar Documents

Publication Publication Date Title
RU2661285C2 (en) Managing component information during component life cycle
CN100456290C (en) System and method for automatically and dynamically composing document management application program
US8340995B2 (en) Method and system of using artifacts to identify elements of a component business model
CN101273355B (en) Update processes in an enterprise planning system
US20090299513A1 (en) Product recovery management system
US20220335553A1 (en) System and a method for generating and managing machine executable digital contracts
KR102451735B1 (en) Service system and method for providing customized bidding information for overseas public procurement based on artificial intelligence and machine learning
CN110032154B (en) Production control method and system for small-batch products
US20240062235A1 (en) Systems and methods for automated processing and analysis of deduction backup data
CN114281795A (en) Data model construction method based on service data standard table
KR101365481B1 (en) System for generating and managing a portal for program management
CN115982429B (en) Knowledge management method and system based on flow control
JP6502816B2 (en) Planning support system and planning support method
US20040215618A1 (en) Automated quality compliance system
JP2004213135A (en) Mold linkage system and mold linking method
JP7227118B2 (en) RESOURCE OPERATION PLANNING SUPPORT DEVICE, RESOURCE OPERATION PLANNING SUPPORT METHOD, AND PROGRAM
CN113592614A (en) Internet agent billing intelligent platform based on block chain technology
JP2005025495A (en) Design change automation system
JP2000181954A (en) Data processing system
CA2414217A1 (en) Repair parts ordering and receipt inspection system
KR102439764B1 (en) Automatic data mapping apparatus and method based on big data
JP4824884B2 (en) Information processing apparatus, information management system, information management method, storage medium, and program
CN114565188A (en) Method and system for predicting user travel intention, electronic device and storage medium
CN113868227A (en) Data migration method and device
CN116882723A (en) Tobacco shredding big data and AI information processing method