JP2004171484A - Automatic preparation device for production line information - Google Patents

Automatic preparation device for production line information Download PDF

Info

Publication number
JP2004171484A
JP2004171484A JP2002339622A JP2002339622A JP2004171484A JP 2004171484 A JP2004171484 A JP 2004171484A JP 2002339622 A JP2002339622 A JP 2002339622A JP 2002339622 A JP2002339622 A JP 2002339622A JP 2004171484 A JP2004171484 A JP 2004171484A
Authority
JP
Japan
Prior art keywords
production line
information
processing
unit
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002339622A
Other languages
Japanese (ja)
Inventor
Katsuto Arai
克仁 荒井
Toshiyuki Maruyama
俊之 丸山
Tetsuya Chiba
哲也 千葉
Saburo Kurashina
三郎 倉品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2002339622A priority Critical patent/JP2004171484A/en
Publication of JP2004171484A publication Critical patent/JP2004171484A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an automatic preparation device for production line information capable of improving the precision of cost evaluation. <P>SOLUTION: This automatic preparation device for production line information includes a working site analytic part 1 for analyzing a working site to be worked from a rough material to a product, setting working processes while determining a working procedure, and calculating the time necessary for work; a using facility analytic part 2 for distributing working facilities to each process; a process information formation part 3 for automatically forming production line information including the number of workers necessary for each process; and a production line evaluation part 4 for generating a simulation model in which the working facilities are virtually arranged along the working processes, and calculating an evaluation of production cost by use of the simulation model. The process information preparation part is constituted so that it has a worker skill database storing data for each worker's ability in association with the working facilities, so that the worker is allocated to each working process according to his/her ability, and the necessary labor time of each working process is calculated on the basis of the ability of the allocated worker and the calculated time necessary for work. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、機械部品を製造、加工する生産ラインを新設する場合あるいは既存の生産ラインを改善する場合あるいは一旦設定した生産ライン情報を更新する場合に、例えば、粗材から製品に加工するための加工部位、加工部位を加工するための加工法および工具、工程、加工設備、作業者の配置とシフト、加工設備のレイアウト、ライン物流等、必要な生産ラインの情報を作成するための生産ライン情報自動作成装置に係り、特に、これらの作成された生産ライン情報から生産ラインをトータルに評価してその評価が目標値を満たさない場合には評価が目標値を満すように各生産ライン情報を再設定する生産ライン情報自動作成装置に関する。
【0002】
【従来の技術】
生産ライン情報自動作成装置に関しては、特許文献1に開示されている。特許文献1に開示されている生産ライン情報自動作成装置においては、原価計算の過程でラインの作業者数が算出される。しかし、その作業内容が作業者個人の熟練スキルに大きく依存する工程と、未熟練者が簡単な指導を受けることで従事できる作業が混在する。また、作業者は保有するスキルによって同じ作業でも所要時間が異なる。
【0003】
【特許文献1】
特開平11−85852号公報
【発明が解決しようとする課題】
上記特許文献1に開示されている生産ライン情報自動作成装置においては、与えられた条件(設定原価や機械稼働率など)の元で算出された作業者数には、作業者個人のスキルとそれに伴う生産性や賃金の違いが考慮されていない。また、上記特許文献1に開示されている生産ライン情報自動作成装置においては作業者のシフト情報が考慮されていない。しかし実際の作業ラインでは、作業者のシフト情報が要求される。例えば、ある工程に4人の作業者を配置するとする。通常の昼勤務以外にも夜勤務や3直2交代による変則勤務などがあり、単位時間当たりの賃金も異なる。上記特許文献1に開示されている生産ライン情報自動作成装置においては、与えられた条件(設定原価や機械稼働率など)の元で算出された作業者数には、作業者シフトの違いによる賃金の変化が考慮されていない。
【0004】
上述のように、特許文献1に開示されているような、従来から行われている一般的な技術では、例えばタービンブレードを生産する際に、作業者スキルの違いから生産性の評価を正確に行うことができない。また、通常の昼勤務、夜勤務、3直2交代による変則勤務がある場合の作業者賃金が原価に与える影響を正確に評価することが出来ない。
【0005】
本発明の目的は、同一形状の機械部品を複数個加工する生産ラインを構築するために必要な生産ライン情報を、必要な作業工数を含め、予め設定された各種条件に基づいて自動的に作成・評価することができ、さらに、生産ラインの所定の評価が所望の納期、及びコストの目標値を満たすように生産ライン情報を設定することができる生産ライン情報自動作成装置において、コスト評価の精度を向上させることにある。
【0006】
【課題を解決するための手段】
本発明は、上記目的を達成するため、粗材から製品に加工するための加工部位を解析し、加工手順を定めて加工工程を設定するとともに加工所要時間を算出する加工部位解析部と、該設定された加工工程に基づいて加工設備を各工程に配分する使用設備解析部と、前記各工程に必要な作業者数を含む生産ライン情報を自動作成する工程情報作成部と、前記加工部位解析部と使用設備解析部と工程情報作成部の出力情報に基づいて前記加工設備を前記加工工程に沿って仮想配置したシミュレーションモデルを生成し、このシミュレーションモデルを用いて生産原価の評価を算出する生産ライン評価部とを含んで生産ライン情報自動作成装置を構成し、前記工程情報作成部を、各作業者の能力のデータを前記加工設備に対応させて格納した作業者スキルデータベースを備え、作業者をその能力に応じて各加工工程に割り付け、各加工工程の段取り時間を含む作業所要時間を割り付けられた作業者の能力と前記算出された加工時間に基づいて算出するよう構成したことを特徴とするものである。
【0007】
このように構成することで、割り付けられる作業者の能力を加味した作業時間が得られ、生産能力の算定精度が向上し、コスト評価の精度がよくなる。
【0008】
また、前記工程情報作成部を、作業者を予め設定された作業シフトのいずれかに割り付けて配置するように構成し、かつ、前記生産ライン評価部は、予め該生産ライン評価部に格納された、作業者の作業シフトに対応した工数単価情報と、各工程に割り付けられた作業者の作業シフトのデータに基づいて、コストを算定するようにするのが望ましい。
【0009】
このように構成することで、作業シフトが、通常の昼勤務、夜勤務、あるいは3直2交代などに亘る場合でも、それぞれに対応した工数単価情報によりコストが算定され、コスト評価の精度がよくなる。
【0010】
さらに、生産ライン情報自動作成装置に、使用設備解析部と工程情報作成部のいずれか一方もしくは双方の出力情報を、生産ラインの評価が目標値を満たすように自動修正するフィードバック処理部を備え、生産ライン評価部は自動修正された情報に基づいて前記シミュレーションモデルを再構成し、再構成したシミュレーションモデルを用いて生産原価の評価を算出するようにしてもよい。
【0011】
このように構成することで、生産ライン評価部で算出された生産原価が目標を満たさない場合に、使用する加工設備あるいは人員配置を換えて、より目標に近い生産原価を見積もることが可能になる。
【0012】
上記目的はまた、粗材から製品に加工するための加工部位を解析し、加工手順を定めて加工工程を設定するとともに加工所要時間を算出する加工部位解析手順と、該設定された加工工程に基づいて加工設備を各工程に配分する使用設備解析手順と、前記各工程に必要な作業者数を含む生産ライン情報を自動作成する工程情報作成手順と、前記加工部位解析手順と使用設備解析手順と工程情報作成手順で生成された情報に基づいて前記加工設備を前記加工工程に沿って仮想配置したシミュレーションモデルを生成し、このシミュレーションモデルを用いて生産原価の評価を算出する生産ライン評価手順とを含んでなる生産ライン情報自動作成方法であって、前記工程情報作成手順では、各作業者の能力のデータを前記加工設備に対応させて格納した作業者スキルデータベースを用い、作業者をその能力に応じて各加工工程に割り付け、各加工工程の段取り時間を含む作業所要時間が割り付けられた作業者の能力と前記算出された加工時間に基づいて算出されることを特徴とする生産ライン情報自動作成方法によっても同様に達成される。
【0013】
前記工程情報作成手順では、作業者は予め設定された作業シフトのいずれかに指定して割り付けられ、かつ、前記生産ライン評価手順では、作業者の作業シフトに対応した工数単価情報と、各工程に配置された作業者の作業シフトのデータに基づいて、コストが算定されるようにすることが望ましい。
【0014】
さらに、生産ラインの評価が目標値を満たさないとき、前記使用設備解析手順と工程情報作成手順のいずれか一方もしくは双方で生成された情報を、生産ラインの評価が目標値を満たすように自動修正するフィードバック処理手順を備え、生産ライン評価手順では自動修正された情報に基づいて前記シミュレーションモデルを再構成し、再構成したシミュレーションモデルを用いて生産原価の評価が算出されるようにしてもよい。
【0015】
【発明の実施の形態】
以下、本発明をタービンブレードの生産ラインの情報を生成する生産ライン情報自動作成装置に適用した実施の形態を図1に基づいて説明する。なお、本実施の形態では、タービンブレードの生産ラインについて説明するが、自動車生産ラインやその他の生産ラインに用いてもよい。なお、図において同一符号は同一部品または相当部分とする。
【0016】
図1に示すように、本実施の形態の生産ライン情報自動作成装置は、所定の生産ライン情報を作成するコンピュータ装置であって、演算部と、この演算部に接続された入出力インターフェース6と、それぞれ入出力インターフェース6に接続されたキーボード等の入力装置7、ディスプレイ8、プリンタ9と、演算部に付属する各種データベースと、を含んで構成されている。
【0017】
演算部は、粗材から製品に加工するための加工部位を解析する加工部位解析部1と、該解析された加工部位を加工するために工作機械等の加工設備などの工場設備を工程に配分する使用設備解析部2と、該解析・配分された各工程に必要な生産ライン情報を自動作成する工程情報作成部3と、該加工設備を仮想配置し生産原価の見積等の評価を算出する生産ライン評価部4とを備え、さらに、この実施の形態においては、算出された原価の見積りが目標値を満たすように、加工部位解析部1,使用設備解析部2,工程情報作成部3,生産ライン評価部4にて解析された各情報の少なくとも一つを自動修正するフィードバック処理部5を備えている。加工部位解析部1,使用設備解析部2,工程情報作成部3,生産ライン評価部4は、フィードバック処理部5にそれぞれ独立して接続され、また、入出力インターフェース6を介して入力装置7、ディスプレイ8およびプリンタ9等の出力装置とそれぞれ独立して接続されている。加工部位解析部1はまた、入出力インターフェース6を介して製品形状CADデータファイル15にアクセスできるようになっている。
【0018】
なお、演算部を構成する加工部位解析部1,使用設備解析部2,工程情報作成部3,生産ライン評価部4、フィードバック処理部5は、それぞれ独立したハードウェアで構成してもよいし、一つの共通のハードウェアにソフトウェアとして搭載されたものでもよい。
【0019】
また、この実施の形態においては、生産ラインの評価として、シフト変更による生産原価の改善案を算出する場合について説明するが、本発明はこれに限定されることなく、生産に要するサイクル時間、生産に要する設備台数、生産可能製品数等、他の生産ラインの評価を行う場合にも適用することができる。
【0020】
加工部位解析部1は、図2に示すように、翼形状判断部11と、使用粗材参照部12と、加工法・工具指定部13と、加工時間算出部14とを備え、使用粗材参照部12には粗材形状データベース16が、加工法・工具指定部13には工具データベース17が、加工時間算出部14には加工時間データベース18が、それぞれ付与されている。そして、加工部位解析部1は、必要に応じて、製品形状CADデータファイル15と粗材形状データベース16と工具データベース17と加工時間データベース18にアクセスして、これらに格納された情報を読み取ることができるようになっている。製品形状CADデータファイル15には、製品の寸法や材質や製品構成表情報の他に製品の製作本数が記憶されている。
【0021】
翼形状判断部11は、製品形状CADデータファイル15から、図2に示すように根部や幹部、翼端部といった予め定められた加工部位ごとの形状の特徴を抽出する。
【0022】
使用粗材参照部12は、図2に示すように、製品形状CADデータファイル15にアクセスして製品の寸法や材質や製作本数を読み取り、さらに粗材形状データベース16にアクセスして格納された情報を読み取り、目的とする翼形状の特徴の条件を満足する、すなわち目的とする翼形状の部品になり得る粗材をリストアップする。粗材形状データベース16には、粗材の形状や大きさや単価や主な仕入れ先先などが記憶されている。
【0023】
工具データベース17には、現在保有している工具の、割りつけた番号、種類、加工可能な長さや径等の大きさ、刃具枚数、一度に加工可能な穴等の部位の数等を含む工具データが格納されている。
【0024】
加工法・工具指定部13は、図2に示すように、工具データベース17にアクセスして工具データの中から、例えば加工部位が穴である場合には穴あけ加工が可能なドリルを選択し、また加工部位が翼をローターに植え付ける根部部分であれば、根部形状を纏めた溝番という体系に沿って、加工が可能な工作機械群をリストアップ、というように根部や幹部といった、前記予め定められた加工部位ごとに、リストアップされた前記粗材と抽出された形状の特徴に基づいて加工法、加工順序(加工工程)とそのための使用工具・機械の種類をそれぞれ割り当てる。
【0025】
加工時間算出部14は、図2に示すように、加工部位毎の切削等の加工条件と加工時間を算出するものである。切削条件は工具の送り速度および加工距離により求められ、加工時間と段取り時間と見本測定時間は翼形状判断部11で抽出した加工部位の特徴的な形状及び使用粗材参照部12でリストアップされた粗材を参照し、加工時間データベース18に格納された最も近い形状の加工時間と段取り時間と見本測定時間が割り当てられ、各加工部位の加工時間と段取り時間と見本測定時間が算出される。
【0026】
なお、加工時間や段取り時間や見本測定時間は、例えばタービンブレードの幹部加工を行う場合、翼の有効長により変化する。また、一般の生産ラインでも加工時間や段取り時間や見本測定時間は、加工部位の長さにより変化しうる。加工時間の算出には、工具を駆動する設備の主軸の所定回転数に達するまでの加減速に要する時間、および寿命による工具交換のための時間等も考慮される。
【0027】
前記見本測定時間は、最初の1本を加工するときに、加工後の形状を測定して、所定の形状に加工されているかどうかを確認し、所定の形状に加工されていれば、その後に加工されるものについては検査を簡略化するので、最初の1本について予定される測定時間である。
【0028】
加工時間データベース18には、各加工手段の加工時間データが格納されており、加工時間データには、工具の材質と粗材の材質との各種組み合わせや、各加工条件において推奨される加工速度や送り速度および最大加速度や送り速度が格納されている。
【0029】
翼形状判断部11により抽出された製品の3次元CADデータ、各加工部位の特徴形状、使用粗材参照部12により抽出された使用可能粗材種類、加工法・工具指定部13により指定された加工法(加工工程)、切削等の加工条件、工具、機械種類や、加工時間算出部14により算出された段取り時間、加工時間、見本測定時間は、生産ライン情報として、使用設備解析部2へ出力される。
【0030】
使用設備解析部2は、図3に示すように、使用設備判定部21と、同時加工数算出部22と、工具軌跡算出部23を備えている。そして、使用設備解析部2は、設備データベース24を備え、必要に応じて前記工具データベース17や設備データベース24にアクセスして、これらに格納された情報を読み取ることが可能となっている。
【0031】
工具データベース17では、加工法・工具指定部12により指定された、各工程で使用される工具の工具データが参照され、工具データには工具交換のための停止頻度が含まれている。また、設備データベース24には、各工程で使用される各種工具を駆動するための加工設備の設備データが格納されている。設備データには、実際の各設備の外形形状を模してディスプレイ8に表示させることができるように、各設備の形状に関する情報や、メンテナンスのための設備停止頻度の他、各設備の生産ライン内での設備順序、設備番号、設備性能データ等が含まれている。
【0032】
使用設備判定部21では、加工部位解析部1から出力される生産ライン情報に基づき、工具データベース17にアクセスして各工具の工具データを読み取ると共に、その工具を駆動するための適切な設備(例えばボール盤やフライス盤等)を、設備データベース24に格納されている設備データの中から指定する。指定された加工設備は、前記生産ライン情報に追加して同時加工数算出部22に出力される。
【0033】
同時加工数算出部22は、入力される生産ライン情報に基づき、設備データベース24にアクセスして、翼の寸法を参照して、1台の機械で同時に加工できる本数、つまりバッチ数を算出し、同時にその作業1回に従事する作業者数を算出する。例えば、タービンブレード製造に限らず一般的に多くのNC加工工程は作業者1人で行うことができる。ところが、特にNC工作機械を用いず汎用機による加工では、一つの工程に複数の従事作業者数が必要になることがある。例えば、タービンブレード生産に関して、有効長の長い翼の曲がり直し作業では1本の翼の加工に2人の作業者を要するように、従事作業者数は翼の種類と加工工程によって変化する。算出されたバッチ数及び作業者数は、前記生産ライン情報に追加して工程情報作成部3に出力される。
【0034】
工具軌跡算出部23は、各工程における各加工部位に対する工具の送り移動軌跡と、工具の加工部位に対する近接退避移動軌跡と、加工部位間の移動軌跡とを算出する。なお、これらの軌跡上での工具の移動速度は、あらかじめ設定されている。得られたデータは、工具移動距離として、加工時間の算出(修正)に用いられる。
【0035】
工程情報作成部3は、図4に示すように、作業者別作業可能工程判定部31と作業者シフト割り当て部32と加工時間修正部33と搬送形態指定部34と工程データファイル37を備えている。そして、作業者別作業可能工程判定部31には作業者スキルデータベース35が、作業者シフト割り当て部32には作業者シフトデータベース36が、加工時間修正部33には作業者スキルデータベース35が、それぞれアクセス可能に設けられ、搬送形態指定部34には前記設備データベース24がアクセス可能になっている。作業者別作業可能工程判定部31と作業者シフト割り当て部32と加工時間修正部33と搬送形態指定部34は、それぞれ、アクセス可能なデータベースに格納された情報を読み取ることができるようになっている。
【0036】
工程情報作成部3は、生産ライン情報が入力されたら、加工部位ごとに、加工部位解析部1と使用設備解析部2により出力された、製作本数、加工工程、加工時間、段取り作業時間、見本測定時間、使用工具、工具加工距離、加工設備、機械別同時加工数、作業必要人数に基づき、搬送単位、作業者シフトデータベース36、作業者スキルデータベース35、設備データベース24を参照して作業者にシフト情報を割り付けるとともに搬送単位を設定し、入力された前記生産ライン情報に、シフト情報、作業者スキル情報、及び搬送単位を追加して工程データを作成する。工程データは工程データファイル37内に記憶される。そして、工程データは、必要に応じてディスプレイ9に表示したり、プリンタ9によってプリントアウトされる。
【0037】
なお、本実施の形態では、加工部位解析部1から出力されたデータが生産ライン情報として使用設備解析部2に入力され、使用設備解析部2で生成されたデータが入力された前記生産ライン情報に追加されて工程情報作成部3に入力され、工程情報作成部3で生成されたデータが入力された前記生産ライン情報に追加されて工程データとして工程データファイル37内に記憶されるが、加工部位解析部1から出力されたデータはまず工程データファイル37内に記憶され、使用設備解析部2は工程データファイル37内に記憶されたデータを読み出して所要のデータを生成した後、生成したデータを工程データファイル37内に追加して記憶し、工程情報作成部3は、使用設備解析部2の生成データが追加格納されたあと、工程データファイル37内に記憶されたデータを読み出して所要のデータを生成した後、生成したデータを工程データファイル37内に追加して記憶するというように、工程データファイル37を、加工部位解析部1、使用設備解析部2、工程情報作成部3、生産ライン評価部4で、共通に使用するデータファイルとしてもよい。
【0038】
作業者別作業可能工程判定部31は、図4に示すように、作業者スキルデータベース35にアクセスして、各作業者が従事できる工程(例えば作業者Aは旋盤加工ができる、作業者Bはフライス切削ができる、等)をリストアップする。言い換えると、設定された各加工工程(加工設備)ごとに、その加工設備に割り付け可能な(配置可能な)作業者名をリストアップする。また、加工設備には難易度の順位をつけておき、複数の加工設備に割り付け可能としてリストアップされた作業者は、そのうちの難易度の高い加工設備にのみ、割り付けるようにする。さらに、作業可能な加工設備の難易度の低い作業者から順に加工設備に割り付けるようにするのが望ましい。
【0039】
作業者スキルデータベース35は、例えば現場担当者が日々更新するもので、管理者が作業者一人一人の作業理解度・熟練度を定性的・定量的に評価したものである。管理者が作業者一人一人の作業理解度・熟練度を定量的に評価したものは、例えば加工設備ごとの作業者別加工所要時間などが含まれ、作業者がある加工設備で、その加工設備に設定された単位作業を終わらせるのに要する時間の違いが生産ライン情報に反映される。管理者が作業者の作業理解度・熟練度を定性的に評価したものは、例えば旋盤1級取得などの社内外資格所持状態などが含まれ、各作業者が作業可能な工程の種類が生産ライン情報に反映される。
【0040】
作業者シフト割り当て部32は、図4に示すように、作業者シフトデータベース36に基づき、各加工設備につき、当該加工設備に対応してリストアップされた作業者毎にシフト情報を指定する(割り当てる)。作業者シフトデータベース36は作業シフト、作業者の勤休連絡、長期休暇予定、平均有休休暇取得日数などを纏めたもので、例えば現場担当者が日々更新する日報に含まれるものである。
【0041】
加工時間修正部33は、作業者別作業可能工程判定部31でリストアップされた作業者に対して作業者スキルデータベース35を参照し、作業者ごとのスキルに沿って、加工時間算出部14で算出された加工時間や段取り時間を修正する。例えば、同じ段取り作業でも、熟練工では標準時間よりも数段早く作業することができるが、新任者(未熟練者)は標準時間以上の時間が掛かる。管理者が作業者の作業理解度・熟練度を作業者別加工所要時間として定量的に評価し、結果を作業者スキルデータベース35に工程に対応して格納しておくことで、加工時間修正部33は、作業者ごとのスキルの差を容易に取り込むことができる。
【0042】
搬送形態指定部34は、各加工設備(加工機械)間の翼(タービンブレード)を搬送するための搬送単位(タービンブレード本数)・搬送手段と台数(個数)を決定する。これは大きな翼では数本単位、比較的小さな翼では100本単位で搬送するためである。
【0043】
工程情報作成部3により生成された工程情報は、生産ライン情報に追加され、工程データとして工程データファイル37に格納される。
【0044】
生産ライン評価部4は、図5に示すように、工程情報読み取り部41とライン物流解析部42と原価見積り部43を備えている。
【0045】
工程情報読み取り部41は、工程情報作成部3または別に設けられた工程データファイル37に記憶された工程データを読み取り、この読み取った工程データをライン物流解析部42に供給する。
【0046】
ライン物流解析部42は、供給された工程データを用いて、仮想配置された模擬的な設備を構成して各設備の動作を定義し、実際のワークの流れおよび生産ラインの動きを模した状態でディスプレイ8等に表示することが可能な物流解析用シミュレーションモデルを自動作成する。ライン物流解析部42はまた、このシミュレーションモデルを元に生産ラインシミュレータを用いて、単位時間あたりの製品生産数といった生産能力の予測や、仕掛品の数や、機械稼働率や、作業者稼働率の算出を行う。工程情報作成部3により一元化して作成された工程データに基づいて、物流解析用シミュレーションモデルを自動作成するため、生産ライン全体の設備レイアウトの作成・検討や生産能力の予測を短時間で行うことが可能となる。また、スケジューラを用いて変数の組み合わせが納期を守ることが出来るか否かを判定し、日程計画を作成する。この生産能力の予測や仕掛品の数や機械稼働率や作業者稼働率や日程計画は工程データファイル37に追加され、必要に応じてディスプレイ9に表示したり、プリンタ9によってプリントアウトされる。
【0047】
ライン物流解析部42により組み合わせられた模擬的な設備および搬送手段は生産ライン情報として工程データファイル37に追加され、ライン物流解析部42により予測された生産能力は生産ラインの評価の対象とされる。
【0048】
原価見積り部43は、粗材形状データベース16に記憶されている粗材の単価、加工法・工具指定部13により割り当てられた工具の数、工具の交換頻度、使用設備解析部2により指定された設備、その消費電力、搬送形態指定部34により指定された搬送手段の台数、ライン物流解析部42により予測された生産能力、割り付けられた作業者と作業シフトに基づく作業者固定費(作業者の工数単価、時間当りの単価等のデータは原価見積り部43に格納されている。)等から、一製品(同じ形状のものの発注単位)の製作本数あたりの原価を算出する。算出された原価は、ディスプレイ8に表示され、あるいはプリンタ9によりプリントアウトされ、あらかじめ設定された目標となる原価の基準値と比較されて評価される。
【0049】
フィードバック処理部5は、本実施の形態の場合、原価見積り部43により算出された原価を予め設定された基準値(目標値)と比較し、両原価の差が所定量を越えている場合(生産ラインの評価が目標値を満たさない場合)には、前記加工部位解析部1,使用設備解析部2,工程情報作成部3,生産ライン評価部4にて解析された加工部位情報、工程情報、加工設備情報等の情報の変更可能パラメータの組み合わせを変えて解析を再度行わせるものである。ここでいう変更可能パラメータの組み合わせを変えるという意味は、例えばそれぞれ異なる加工能力のNC旋盤A,B,Cがあり、当初NC旋盤Aを用いて加工を行う設定になっていたものを、NC旋盤BあるいはNC旋盤Cに変更すること、作業者のシフトを変更すること、あるいは作業者の機械への割り付けを変更すること、などである。設定を変更した後、原価見積り部43により再度原価を算出する。
【0050】
そして目標原価を満たす場合には、所定の解析データが修正されたことにより、原価を概算する際に暫定的に利用されたそれ以降の解析データも設定変更した上で、解析データが修正された以降の解析を再度行って生産ラインの評価の対象となる原価を算出する。本発明システムにおいては、リストアップしたパラメータの組み合わせでその都度原価を算出する。
【0051】
また、概算原価と目標原価を比較して目標原価を満たさない場合には、次の所定の条件を自動修正し、原価を概算し、概算原価と目標原価を比較する。
【0052】
このようにして、所定の変更可能条件組み合わせの変更は、算出原価と目標原価を比較し、算出された原価が目標原価を満たすまで繰り返し行なわれる。両原価の比較は、原価見積り部43またはフィードバック処理部5で原価の目標基準値をあらかじめ記憶させておき、原価見積り部43から原価の見積りが算出された際に自動的に比較するようにしてもよく、また、原価見積り部43により算出された原価の見積りをディスプレイ8に表示するかあるいはプリンタ9からプリントアウトし、その値をオペレータが見て比較するようにしてもよい。
【0053】
次に、以上のように構成された生産ライン情報自動作成装置を使用して各種生産ライン情報の作成を行うための一連の制御について説明する。図6および図7は、本実施の形態の生産ライン情報自動作成装置の制御手順を示すフローチャートである。
【0054】
図6に示すように、装置が動作を開始すると(S1)、翼形状判断部11は、製品形状CADデータファイル15にアクセスして、予め定められた加工部位ごとの製品形状の形状特徴を読み取り(S2)、粗材の形状から所望の製品形状に加工するための部位を抽出する(S3)。
【0055】
使用粗材参照部12が粗材形状データベース16を参照し、この製品を製作することのできる材料をリストアップする。(S4)。
【0056】
その後、この抽出された加工部位に応じて加工法・工具指定部13が加工法、加工手順(加工工程)を指定し、そのための使用工具の種類を指定する(S5)。
【0057】
続いて、加工時間算出部14により工具の送り速度や加工距離、類似形状による切削条件に基づいて各部位の加工時間、段取り時間、見本測定時間を算出する(S6)。全加工部位に関してステップ5ないしステップ6が終了したかを判断し(S7)、終了していない場合にはステップ5に戻る。
【0058】
続いて、使用設備判定部21が、加工部位解析部1の出力に基づいて工具データベース317にアクセスして各工具の工具データを読み取り、設備データベース24に格納されている機械スペックの中から、工具を駆動するための適切な機械設備(S9)を指定し、同時加工数算出部22により、機械設備毎で一度に同時加工できる数を指定する(S10)。
【0059】
作業者別作業可能工程判定部31により、作業者スキルデータベース35から作業者別作業可能工程をリストアップし、作業者シフト割り当て部32により、作業者シフトデータベース36から作業者シフトを割り当て、工程情報を作成する。(S11)
ライン物流解析部42により、あらかじめ設定した工程順序(例えば、根部、幹部、翼端の順に加工を行う)に沿ってシミュレーションモデルが自動的に作成され、生産能力が予測される(S12)。作成されたシミュレーションモデルを用いて、スケジューラにより納期を守ることの出来る変数の組み合わせが割り出され、生産ラインシミュレータにより、納期を守ることのできる組み合わせに対する単位時間あたりの製品生産数といった生産能力の予測や、仕掛変動や、機械稼働率や、作業者稼働率が算出される。算出されたデータに基づき、仕掛品を溜めるスペースの確保や作業者シフト割当をオペレータが検討することが可能となる。
【0060】
原価見積もり部43により、予測された生産能力等に基づいて一製品あたりの原価が算出され(S13)、生産ラインの評価として、この実施の形態の場合、あらかじめ設定した目標となる原価の基準値と比較して目標原価を満たすかどうかが判断される(S14)。算出された原価が目標原価を満たす場合には、必要に応じて、算出・解析された各生産ライン情報がディスプレイ9に表示され、あるいはプリンタ10によりプリントアウトされて、生産ライン情報の作成が終了する(S15)。
【0061】
算出された原価が目標原価を満たさない場合には、以下のように処理される。すなわち、この実施の形態の場合、原価を低減させるための変更設定の方法として、作業者シフトの変更による固定費削減、工程組替えによる設備削減と、加工方法・工具・切削条件を変更して加工時間を短縮することによる設備削減と、加工距離を削減させるように粗材・製品形状を変更することによる設備削減があらかじめ設定されている。そして、これらの原価低減方法は、変更設定の容易な順序で定めることができる。この実施の形態の場合、変更設定は、複数の変更要素の組み合わせが出来る。
【0062】
ステップ14(S14)で算出された原価が目標原価を満たさないと判断された場合には、図7に示したように、原価低減方法が入力され(S20)、サブルーチンに従って処理される。なお、この原価低減方法の入力は、設定された順序で自動的に行われるように構成されているが、必要に応じて入力装置8により所望の原価低減方法の順序(まず作業者シフトを変更し、それでも十分でない場合に加工方法も変更するか、)で、あるいは所望の原価低減方法のみ(作業者シフトのみ、あるいは加工方法と作業者シフトの両方)を実行するよう指示することもできる。
【0063】
加工法を変更せずに作業者シフトの変更を行う(S21でNOの場合)には、作業者シフトを変更して作業者の稼働率が偏らないように(特定の作業者の作業時間が過大にならないように注意しながら)シフトを変更する。変更されたシフトの適用(S22)によるスループットや仕掛量の改善を確認し(S23)、その後、原価計算をやり直して(S24)、この算出された原価の概算が目標原価を満たすかどうかを判断する(S25)。
【0064】
加工時間の短縮を行う場合(S21でYESの場合)には、加工時間を短縮して設備の台数を削減させるように加工方法・工具・切削条件を変更すると同時に作業者シフトの変更を行う。この実施の形態の場合では、加工法・工具指定部12により指定された使用工具の種類を、工具の材質を異なるものに変更指定し(S30)、工具送り速度を変更設定する。そして加工時間を修正し(S31)、S21でNOの場合と同様に変更されたシフトを適用し(S32)、これによるスループットや仕掛量の改善を確認し(S33)、これを元に工具の変更分を考慮して原価の概算を算出し(S34)、この算出された原価の概算が目標原価を満たすかどうかを判断する(S35)。算出された原価の概算が目標原価を満たす場合には、設定された生産ライン情報が満足すべきものであるとして、装置の動作を終了する(S36)。
【0065】
一方、原価の概算が目標原価を満たさないと判断された場合には、加工可能距離を減少させるように粗材または製品の少なくとも一方の形状の変更を提案し、装置の動作を終了する(S37)。
【0066】
本実施の形態によれば、与えられた形状、数量の製品を所要の期間内に生産する生産ラインを実現するのに必要な設備、人員配置の情報を得ることができ、かつ、人員の割り付けに際して、作業者の個々の能力、技両、さらには工数単価を考慮して作業シフトを設定できるので、精度のいいコスト評価が可能になる。
【0067】
【発明の効果】
本発明によれば、同一形状の機械部品を複数個加工する生産ラインを構築するために必要な生産ライン情報を、必要な作業工数を含め、予め設定された各種条件に基づいて自動的に作成・評価することができ、さらに、生産ラインの所定の評価が所望の納期、及びコストの目標値を満たすように生産ライン情報を設定することができる生産ライン情報自動作成装置において、コスト評価の精度を向上させることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態に係る生産ライン情報自動作成装置の要部構成を示すブロック図である。
【図2】図1に示す実施の形態の加工部位解析部1が行う作業の概要を示す説明図である。
【図3】図1に示す実施の形態の使用設備解析部2が行う作業の概要を示す説明図である。
【図4】図1に示す実施の形態の工程情報作成部3が行う作業の概要を示す説明図である。
【図5】図1に示す実施の形態の生産ライン評価部4が行う作業の概要を示す説明図である。
【図6】図1に示す実施の形態の動作手順の例を示すフローチャートである。
【図7】図1に示す実施の形態の動作手順の他の例を示すフローチャートである。
【符号の説明】
1 加工部位解析部
2 使用設備解析部
3 工程情報作成部
4 生産ライン評価部
5 フィードバック処理部
6 入出力インターフェース
7 入出力装置
8 ディスプレイ
9 プリンタ
11 翼形状判断部
12 使用素材参照部
13 加工法・工具指定部
14 加工時間算出部
15 製品形状3DCADデータ
16 素材形状データベース
17 工具データベース
18 加工時間データベース
21 使用設備判定部
22 同時加工数判定部
23 工具軌跡算出部
24 設備データベース
31 作業者別作業可能工程判定部
32 作業者シフト割り当て部
33 加工時間修正部
34 搬送形態指定部
35 作業者スキルデータベース
36 作業者シフトデータベース
37 工程データファイル
41 工程情報読み取り部
42 ライン物流解析部
43 原価見積り部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for processing a rough material to a product when a new production line for manufacturing and processing machine parts is to be established, or when an existing production line is to be improved, or when production line information once set has been updated. Production line information for creating necessary production line information such as machining area, machining method and tool for machining the machining area, process, machining equipment, arrangement and shift of workers, layout of machining equipment, line logistics, etc. In particular, the production line is evaluated from the production line information generated in total, and if the evaluation does not satisfy the target value, the production line information is adjusted so that the evaluation satisfies the target value. The present invention relates to a production line information automatic creation device to be reset.
[0002]
[Prior art]
Patent Document 1 discloses a production line information automatic creation device. In the production line information automatic creation device disclosed in Patent Document 1, the number of line workers is calculated in the course of cost calculation. However, there are processes in which the contents of the work largely depend on the skill of the individual worker and work that can be performed by an unskilled person by receiving simple guidance. In addition, the required time for the same task varies depending on the skills possessed by the worker.
[0003]
[Patent Document 1]
JP-A-11-85852
[Problems to be solved by the invention]
In the production line information automatic creation device disclosed in Patent Document 1, the number of workers calculated under given conditions (set cost, machine operation rate, etc.) includes the skills of The differences in productivity and wages are not taken into account. Further, in the automatic production line information creating apparatus disclosed in Patent Document 1, the shift information of the worker is not considered. However, in an actual work line, shift information of the worker is required. For example, assume that four workers are assigned to a certain process. In addition to the usual day shift, there are night shifts and irregular shifts with three shifts and two shifts, and the wages per unit time are also different. In the production line information automatic creation device disclosed in Patent Document 1, the number of workers calculated under given conditions (set cost, machine operation rate, etc.) includes wages due to differences in worker shifts. Changes are not taken into account.
[0004]
As described above, in the conventional general technology disclosed in Patent Literature 1, for example, when producing a turbine blade, it is necessary to accurately evaluate the productivity due to a difference in worker skills. Can't do it. In addition, it is not possible to accurately evaluate the influence of the worker wage on the cost in the case where there are irregular day shifts, night shifts, and three shifts and two shifts.
[0005]
An object of the present invention is to automatically create production line information necessary for constructing a production line for processing a plurality of mechanical parts having the same shape, based on various preset conditions including necessary man-hours. A production line information automatic creation device capable of evaluating and further setting production line information so that a predetermined evaluation of the production line satisfies a desired delivery date and a target value of cost; Is to improve.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention analyzes a processing part for processing from a rough material to a product, determines a processing procedure, sets a processing step, and calculates a required processing time, a processing part analysis unit, A used equipment analysis unit that distributes processing equipment to each process based on the set processing process, a process information creation unit that automatically creates production line information including the number of workers required for each process, and the processing site analysis A simulation model in which the machining equipment is virtually arranged along the machining process based on output information of a unit, a used equipment analysis unit, and a process information creation unit, and a production cost is calculated using the simulation model. An operator who constitutes a production line information automatic creation device including a line evaluation unit, and stores the process information creation unit in such a manner that the data of the ability of each worker is stored in correspondence with the processing equipment. It has a kill database, allocates workers to each processing step according to its ability, and calculates work required time including setup time of each processing step based on the allocated worker's ability and the calculated processing time. It is characterized by having such a configuration.
[0007]
With this configuration, it is possible to obtain a work time in consideration of the ability of the worker to be assigned, to improve the calculation accuracy of the production capacity, and to improve the accuracy of the cost evaluation.
[0008]
Further, the process information creating unit is configured to allocate and arrange workers to any of preset work shifts, and the production line evaluation unit is stored in the production line evaluation unit in advance. It is preferable to calculate the cost based on the man-hour unit price information corresponding to the worker's work shift and the worker's work shift data allocated to each process.
[0009]
With such a configuration, even when the work shift involves normal day shift, night shift, or three shifts and two shifts, the cost is calculated based on the man-hour unit price information corresponding to each shift, and the accuracy of cost evaluation is improved. .
[0010]
Further, the production line information automatic creation device, provided with a feedback processing unit that automatically corrects output information of one or both of the used equipment analysis unit and the process information creation unit so that the evaluation of the production line satisfies the target value, The production line evaluation unit may reconfigure the simulation model based on the automatically corrected information, and calculate an evaluation of the production cost using the reconfigured simulation model.
[0011]
With this configuration, when the production cost calculated by the production line evaluation unit does not satisfy the target, it is possible to estimate the production cost closer to the target by changing the processing equipment or the staffing to be used. .
[0012]
The above-mentioned object is also to analyze a processing part for processing from rough material to a product, determine a processing procedure, set a processing step, and calculate a required processing time, and a processing part analysis procedure, A used equipment analysis procedure for allocating processing equipment to each process based on the above, a process information creation procedure for automatically creating production line information including the number of workers required for each of the processes, a machining site analysis procedure and a used equipment analysis procedure And a production line evaluation procedure of generating a simulation model in which the processing equipment is virtually arranged along the processing step based on the information generated in the process information generation procedure, and calculating an evaluation of a production cost using the simulation model. A production line information automatic creation method, wherein in the process information creation procedure, data of the ability of each worker is stored in correspondence with the processing equipment. Using the worker skill database, the worker is assigned to each processing step according to the ability, and the required processing time including the setup time of each processing step is assigned to the worker's ability and the calculated processing time. This is also achieved by a production line information automatic creation method characterized in that the production line information is automatically calculated.
[0013]
In the process information creation procedure, the worker is assigned to one of the preset work shifts, and in the production line evaluation procedure, the man-hour unit price information corresponding to the worker's work shift, It is desirable that the cost is calculated based on the data of the work shift of the worker assigned to the job.
[0014]
Further, when the evaluation of the production line does not satisfy the target value, the information generated in one or both of the used equipment analysis procedure and the process information creating procedure is automatically corrected so that the evaluation of the production line satisfies the target value. In the production line evaluation procedure, the simulation model may be reconfigured based on the automatically corrected information, and the evaluation of the production cost may be calculated using the reconfigured simulation model.
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment in which the present invention is applied to a production line information automatic creation device that generates information of a turbine blade production line will be described with reference to FIG. In the present embodiment, a turbine blade production line will be described, but the turbine blade production line may be used in an automobile production line or other production lines. The same reference numerals in the drawings denote the same parts or corresponding parts.
[0016]
As shown in FIG. 1, the production line information automatic creation device according to the present embodiment is a computer device for creating predetermined production line information, and includes an arithmetic unit, an input / output interface 6 connected to the arithmetic unit, , An input device 7 such as a keyboard connected to the input / output interface 6, a display 8, a printer 9, and various databases attached to the calculation unit.
[0017]
The arithmetic unit distributes a processing part analysis unit 1 for analyzing a processing part for processing a rough material into a product and a factory equipment such as a processing machine such as a machine tool for processing the analyzed processing part. Used equipment analysis unit 2, process information creation unit 3 that automatically creates production line information required for each analyzed and allocated process, and virtually evaluates the production equipment by arranging the processing equipment. A production line evaluation unit 4; and, in this embodiment, a processing part analysis unit 1, a used equipment analysis unit 2, a process information generation unit 3, A feedback processing unit 5 that automatically corrects at least one of the pieces of information analyzed by the production line evaluation unit 4 is provided. The machining part analyzing unit 1, the used equipment analyzing unit 2, the process information creating unit 3, and the production line evaluating unit 4 are independently connected to the feedback processing unit 5, respectively. Output devices such as a display 8 and a printer 9 are independently connected to each other. The processing part analysis unit 1 can also access the product shape CAD data file 15 via the input / output interface 6.
[0018]
In addition, the machining part analyzing unit 1, the used equipment analyzing unit 2, the process information creating unit 3, the production line evaluating unit 4, and the feedback processing unit 5 that constitute the arithmetic unit may be configured by independent hardware, respectively. The software may be mounted on one common hardware as software.
[0019]
Further, in this embodiment, a description will be given of a case where, as an evaluation of a production line, an improvement plan of a production cost due to a shift change is calculated. However, the present invention is not limited to this. The present invention can also be applied to the case of evaluating other production lines, such as the number of equipment required for the production, the number of products that can be produced, and the like.
[0020]
As shown in FIG. 2, the processing part analysis unit 1 includes a blade shape determination unit 11, a coarse material reference unit 12, a processing method / tool designation unit 13, and a processing time calculation unit 14. The reference part 12 is provided with a coarse material shape database 16, the machining method / tool designation part 13 is provided with a tool database 17, and the machining time calculation part 14 is provided with a machining time database 18. Then, the machining part analysis unit 1 can access the product shape CAD data file 15, the coarse material shape database 16, the tool database 17, and the machining time database 18 as needed to read information stored therein. I can do it. The product shape CAD data file 15 stores the number of manufactured products in addition to the product dimensions, materials, and product configuration table information.
[0021]
The wing shape determining unit 11 extracts, from the product shape CAD data file 15, a shape characteristic for each predetermined processing portion such as a root, a trunk, and a wing tip as shown in FIG.
[0022]
As shown in FIG. 2, the used rough material reference unit 12 accesses the product shape CAD data file 15 to read the dimensions, materials, and the number of products manufactured, and further accesses the coarse material shape database 16 to store the stored information. Is read, and coarse materials that satisfy the conditions of the characteristics of the target wing shape, that is, can become parts of the target wing shape, are listed. The coarse material shape database 16 stores the shape, size, unit price, main supplier, and the like of the coarse material.
[0023]
The tool database 17 includes tools, including assigned numbers, types, sizes such as lengths and diameters that can be machined, the number of cutting tools, the number of holes and the like that can be machined at a time, and the like of the tools currently held. Data is stored.
[0024]
As shown in FIG. 2, the machining method / tool designation unit 13 accesses the tool database 17 and selects, from the tool data, a drill capable of drilling, for example, when the machining portion is a hole, If the processing site is the root portion where the wings are planted on the rotor, a list of machine tools that can be processed is listed along a system of groove numbers that summarizes the root shape, and so on. A machining method, a machining sequence (machining process), and types of tools / machines used for the machining method, machining sequence (machining process) are assigned to each of the machined parts based on the listed coarse material and the extracted feature of the shape.
[0025]
As shown in FIG. 2, the processing time calculation unit 14 calculates processing conditions such as cutting for each processing part and processing time. The cutting conditions are determined by the feed rate and the processing distance of the tool, and the processing time, setup time, and sample measurement time are listed in the characteristic shape of the processing part extracted by the wing shape determination unit 11 and the coarse material reference unit 12 used. The processing time, setup time, and sample measurement time of the closest shape stored in the processing time database 18 are assigned with reference to the rough material, and the processing time, setup time, and sample measurement time of each processing part are calculated.
[0026]
The processing time, the setup time, and the sample measurement time vary depending on the effective length of the blade, for example, when processing the main part of a turbine blade. Further, even in a general production line, the processing time, the setup time, and the sample measurement time can vary depending on the length of the processing part. The calculation of the machining time also takes into account the time required for acceleration / deceleration until the spindle of the equipment for driving the tool reaches a predetermined number of revolutions, the time required for tool replacement based on life, and the like.
[0027]
The sample measurement time, when processing the first one, by measuring the shape after processing, to confirm whether it has been processed to a predetermined shape, if it has been processed to a predetermined shape, after that This is the measurement time scheduled for the first one to simplify the inspection of what is processed.
[0028]
The machining time database 18 stores machining time data of each machining means. The machining time data includes various combinations of the material of the tool and the material of the coarse material, the machining speed recommended under each machining condition, and the like. The feed rate, the maximum acceleration and the feed rate are stored.
[0029]
The three-dimensional CAD data of the product extracted by the wing shape determining unit 11, the characteristic shape of each processing portion, the usable coarse material type extracted by the used coarse material reference unit 12, and the processing method / tool specification unit 13 designated The processing method (processing step), processing conditions such as cutting, tools, machine types, and the setup time, processing time, and sample measurement time calculated by the processing time calculation unit 14 are sent to the used equipment analysis unit 2 as production line information. Is output.
[0030]
As shown in FIG. 3, the used equipment analysis unit 2 includes a used equipment determination unit 21, a simultaneous machining number calculation unit 22, and a tool path calculation unit 23. The used equipment analysis unit 2 includes an equipment database 24, and can access the tool database 17 and the equipment database 24 as needed to read information stored therein.
[0031]
In the tool database 17, the tool data of the tool used in each process specified by the machining method / tool specifying unit 12 is referred to, and the tool data includes a stop frequency for tool change. The equipment database 24 stores equipment data of processing equipment for driving various tools used in each process. The equipment data includes information on the shape of each equipment, the frequency of equipment stoppage for maintenance, and the production line of each equipment so that the actual outer shape of each equipment can be displayed on the display 8. It contains the equipment order, equipment number, equipment performance data, and the like.
[0032]
The used equipment determination unit 21 accesses the tool database 17 based on the production line information output from the processing part analysis unit 1 to read the tool data of each tool, and also uses appropriate equipment for driving the tool (for example, A drilling machine, a milling machine, etc.) is designated from the equipment data stored in the equipment database 24. The designated processing equipment is output to the simultaneous processing number calculation unit 22 in addition to the production line information.
[0033]
The simultaneous machining number calculation unit 22 accesses the equipment database 24 based on the input production line information, refers to the dimensions of the blades, and calculates the number of machines that can be machined simultaneously by one machine, that is, the number of batches. At the same time, the number of workers engaged in one work is calculated. For example, not only turbine blade manufacturing but also many NC processing steps can be generally performed by one worker. However, in particular, in the case of machining using a general-purpose machine without using an NC machine tool, a single process may require a plurality of engaged workers. For example, in the production of turbine blades, the number of engaged workers varies depending on the type of blade and the processing process, such that in the re-bending operation of a blade having a long effective length, two workers are required to process one blade. The calculated number of batches and the number of workers are output to the process information creating unit 3 in addition to the production line information.
[0034]
The tool trajectory calculation unit 23 calculates a feed movement trajectory of the tool with respect to each processing portion in each process, a proximity retreat movement trajectory of the tool with respect to the processing portion, and a movement trajectory between the processing portions. The moving speed of the tool on these trajectories is set in advance. The obtained data is used for calculating (correcting) the machining time as the tool moving distance.
[0035]
As shown in FIG. 4, the process information creating unit 3 includes an operator-specific workable process determining unit 31, an operator shift assigning unit 32, a processing time correcting unit 33, a transport mode designating unit 34, and a process data file 37. I have. The worker-skill database 35 is stored in the worker-specific work-possible process determining section 31, the worker shift database 36 is stored in the worker shift assigning section 32, and the worker skill database 35 is stored in the machining time correcting section 33. The equipment database 24 is accessible so that the transport mode designation unit 34 can be accessed. The worker-specific work-possible process determining unit 31, the worker shift assigning unit 32, the processing time correcting unit 33, and the transport mode designating unit 34 can read information stored in an accessible database. I have.
[0036]
When the production line information is input, the process information creating unit 3 outputs the number of production units, the processing steps, the processing time, the setup work time, and the sample output by the processing part analysis unit 1 and the used equipment analysis unit 2 for each processing part. Based on the measurement time, the tool used, the tool processing distance, the processing equipment, the number of simultaneous processing by machine, and the number of required work, the transfer unit, the worker shift database 36, the worker skill database 35, and the facility database 24 Shift information is assigned and a transport unit is set, and shift data, worker skill information, and a transport unit are added to the input production line information to create process data. The process data is stored in the process data file 37. The process data is displayed on the display 9 or printed out by the printer 9 as needed.
[0037]
In this embodiment, the data output from the machined part analysis unit 1 is input as production line information to the used equipment analysis unit 2, and the data generated by the used equipment analysis unit 2 is input to the production line information. Is added to the process information creating unit 3 and the data generated by the process information creating unit 3 is added to the input production line information and stored in the process data file 37 as process data. The data output from the part analyzing unit 1 is first stored in the process data file 37, and the used equipment analyzing unit 2 reads out the data stored in the process data file 37 and generates necessary data, and then generates the generated data. Is added to the process data file 37 and stored. The process information creating unit 3 further stores the process data file after the data generated by the used equipment analyzing unit 2 is additionally stored. After reading out the data stored in the memory 37 and generating the required data, the generated data is added to the process data file 37 and stored. The data file may be commonly used by the equipment analysis unit 2, the process information creation unit 3, and the production line evaluation unit 4.
[0038]
As shown in FIG. 4, the worker-specific work-possible process determination unit 31 accesses the worker skill database 35 to allow each worker to engage in a process (for example, the worker A can perform lathing, the worker B Milling, etc.) are listed. In other words, for each set processing step (processing equipment), a list of the worker names that can be assigned (arranged) to the processing equipment is listed. In addition, the processing equipment is ranked in order of difficulty, and the workers listed as assignable to a plurality of processing equipment are assigned only to the processing equipment having the highest difficulty. Further, it is desirable to allocate the processing equipment to the processing equipment in ascending order of difficulty.
[0039]
The worker skill database 35 is, for example, updated daily by a site person in charge, and is a qualitatively and quantitatively evaluated by a manager of the degree of understanding and skill of each worker. The manager quantitatively evaluates the level of understanding and skill of each worker, for example, includes the required processing time for each worker for each processing facility. The difference in the time required to end the unit work set in the item is reflected in the production line information. The qualitative evaluation of the worker's work comprehension and skill level includes the status of possession of qualifications inside and outside the company, such as lathe class 1, and the types of processes that each worker can work on are produced. Reflected in line information.
[0040]
As shown in FIG. 4, the worker shift assignment unit 32 designates (assigns) shift information for each processing facility for each of the workers listed corresponding to the processing facility, based on the worker shift database 36. ). The worker shift database 36 summarizes work shifts, worker's work leave notices, long-term leave schedules, average number of days taken for vacation, and is included in, for example, a daily report updated daily by site staff.
[0041]
The processing time correction unit 33 refers to the worker skill database 35 for the workers listed in the worker-specific workable process determination unit 31 and performs processing in the processing time calculation unit 14 according to the skill of each worker. Correct the calculated machining time and setup time. For example, even in the same setup work, a skilled worker can work several steps earlier than the standard time, but a new employee (unskilled person) takes more time than the standard time. The manager quantitatively evaluates the worker's degree of understanding and skill of the work as the required processing time for each worker, and stores the result in the worker skill database 35 corresponding to the process. 33 can easily capture the difference in skills among the workers.
[0042]
The transfer mode designation unit 34 determines a transfer unit (number of turbine blades), a transfer unit, and the number (number) of transfer blades (turbine blades) between the respective processing facilities (processing machines). This is because a large wing is transported in units of several, and a relatively small wing is transported in units of 100.
[0043]
The process information generated by the process information creating section 3 is added to the production line information and stored in the process data file 37 as process data.
[0044]
As shown in FIG. 5, the production line evaluation unit 4 includes a process information reading unit 41, a line distribution analysis unit 42, and a cost estimation unit 43.
[0045]
The process information reading unit 41 reads the process data stored in the process information creating unit 3 or the separately provided process data file 37, and supplies the read process data to the line distribution analyzing unit 42.
[0046]
Using the supplied process data, the line logistics analysis unit 42 configures simulated equipment that is virtually arranged, defines the operation of each equipment, and simulates the actual work flow and movement of the production line. Automatically creates a simulation model for distribution analysis that can be displayed on the display 8 or the like. The line logistics analysis unit 42 also uses a production line simulator based on this simulation model to predict the production capacity such as the number of products produced per unit time, the number of work in process, the machine operation rate, and the worker operation rate. Is calculated. To automatically create a simulation model for logistics analysis based on the process data centralized and created by the process information creation unit 3, it is possible to create and examine equipment layout of the entire production line and estimate production capacity in a short time. Becomes possible. The scheduler is used to determine whether the combination of variables can meet the delivery date and create a schedule. The forecast of the production capacity, the number of work-in-progress, the machine operation rate, the operator operation rate, and the schedule are added to the process data file 37 and displayed on the display 9 or printed out by the printer 9 as necessary.
[0047]
The simulated equipment and transport means combined by the line logistics analysis unit 42 are added to the process data file 37 as production line information, and the production capacity predicted by the line logistics analysis unit 42 is a target of the production line evaluation. .
[0048]
The cost estimating unit 43 specifies the unit price of the coarse material stored in the coarse material shape database 16, the number of tools allocated by the machining method / tool specifying unit 13, the tool replacement frequency, and the number specified by the used equipment analysis unit 2. Equipment, the power consumption thereof, the number of transport means specified by the transport mode specifying unit 34, the production capacity predicted by the line logistics analysis unit 42, the allocated workers and the worker fixed costs based on the work shifts (worker fixed costs). Data such as the man-hour unit price and the unit price per hour are stored in the cost estimating unit 43.) and the like, the cost per unit of production of one product (ordering unit of the same shape) is calculated. The calculated cost is displayed on the display 8 or printed out by the printer 9, and is evaluated by comparing it with a preset reference value of the target cost.
[0049]
In the case of the present embodiment, the feedback processing unit 5 compares the cost calculated by the cost estimating unit 43 with a preset reference value (target value), and when the difference between the two costs exceeds a predetermined amount ( If the evaluation of the production line does not satisfy the target value), the processing part analysis unit 1, the used equipment analysis unit 2, the process information creation unit 3, the processing part information analyzed by the production line evaluation unit 4, the process information The analysis is performed again by changing the combination of changeable parameters of information such as processing equipment information. The meaning of changing the combination of changeable parameters here means, for example, NC lathes A, B, and C having different machining capacities, and the NC lathe A was initially set to perform machining using the NC lathe. Changing to B or NC lathe C, changing the shift of the worker, changing the assignment of the worker to the machine, and the like. After the setting is changed, the cost estimation unit 43 calculates the cost again.
[0050]
When the target cost is satisfied, the predetermined analysis data has been modified, and the analysis data has been modified after the setting of the subsequent analysis data provisionally used in estimating the cost has been changed. The subsequent analysis is performed again to calculate the cost to be evaluated for the production line. In the system of the present invention, the cost is calculated each time by a combination of the listed parameters.
[0051]
If the target cost is not satisfied by comparing the estimated cost with the target cost, the following predetermined condition is automatically corrected, the cost is estimated, and the estimated cost is compared with the target cost.
[0052]
In this manner, the change of the predetermined changeable condition combination is repeated until the calculated cost satisfies the target cost by comparing the calculated cost with the target cost. The comparison between the two costs is performed by storing the target standard value of the cost in advance in the cost estimating unit 43 or the feedback processing unit 5 and automatically comparing when the cost estimating unit 43 calculates the cost estimate. Alternatively, the cost estimate calculated by the cost estimating unit 43 may be displayed on the display 8 or printed out from the printer 9, and the operator may see the value and compare the values.
[0053]
Next, a series of controls for creating various kinds of production line information using the automatic production line information creating apparatus configured as described above will be described. 6 and 7 are flowcharts showing a control procedure of the automatic production line information creating apparatus according to the present embodiment.
[0054]
As shown in FIG. 6, when the apparatus starts operating (S1), the wing shape determining unit 11 accesses the product shape CAD data file 15 and reads out the shape characteristics of the product shape for each predetermined processing part. (S2) A part to be processed into a desired product shape from the shape of the coarse material is extracted (S3).
[0055]
The used rough material reference unit 12 refers to the rough material shape database 16 and lists the materials from which this product can be manufactured. (S4).
[0056]
Thereafter, the machining method / tool designation unit 13 designates a machining method and a machining procedure (machining process) according to the extracted machining region, and designates a type of a tool to be used therefor (S5).
[0057]
Subsequently, the machining time calculation unit 14 calculates the machining time, setup time, and sample measurement time of each part based on the feed speed of the tool, the machining distance, and the cutting conditions for similar shapes (S6). It is determined whether Steps 5 and 6 have been completed for all the processed parts (S7). If not, the process returns to Step 5.
[0058]
Subsequently, the used equipment determining unit 21 accesses the tool database 317 based on the output of the processing part analysis unit 1 to read the tool data of each tool, and selects a tool from among the machine specifications stored in the equipment database 24. Then, the appropriate machine equipment (S9) for driving is designated, and the simultaneous machining number calculation unit 22 designates the number of machines that can be simultaneously machined at one time for each machine equipment (S10).
[0059]
The workable process determination section 31 for each worker lists the workable processes for each worker from the worker skill database 35, and the worker shift allocating section 32 allocates the worker shift from the worker shift database 36, and the process information Create (S11)
The line distribution analysis unit 42 automatically creates a simulation model in accordance with a preset process sequence (for example, processing is performed in the order of a root, a trunk, and a wing tip), and the production capacity is predicted (S12). Using the created simulation model, the combination of variables that can meet the delivery date is determined by the scheduler, and the production line simulator predicts the production capacity such as the number of products produced per unit time for the combination that can meet the delivery date using the production line simulator. In addition, the in-process variation, the machine operation rate, and the worker operation rate are calculated. Based on the calculated data, it is possible for the operator to consider securing a space for storing work-in-progress and assigning a worker shift.
[0060]
The cost estimating unit 43 calculates the cost per product based on the predicted production capacity and the like (S13), and in this embodiment, as the evaluation of the production line, the reference value of the preset target cost is set. Then, it is determined whether or not the target cost is satisfied (S14). If the calculated cost satisfies the target cost, the calculated and analyzed production line information is displayed on the display 9 or printed out by the printer 10 as necessary, and the production line information creation is completed. (S15).
[0061]
If the calculated cost does not satisfy the target cost, it is processed as follows. In other words, in the case of this embodiment, as a method of setting changes to reduce costs, fixed costs can be reduced by changing worker shifts, equipment can be reduced by changing processes, and machining methods, tools, and cutting conditions can be changed to perform machining. The equipment reduction by shortening the time and the equipment reduction by changing the coarse material / product shape so as to reduce the processing distance are set in advance. These cost reduction methods can be determined in an easy order of change setting. In the case of this embodiment, the change setting can be a combination of a plurality of change elements.
[0062]
If it is determined that the cost calculated in step 14 (S14) does not satisfy the target cost, a cost reduction method is input as shown in FIG. 7 (S20), and the process is performed according to a subroutine. The input of the cost reduction method is configured to be automatically performed in a set order. However, the order of the desired cost reduction method (first, the operator shift is changed by the input device 8 if necessary). Then, if that is not enough, the processing method may be changed, or the desired cost reduction method (only the worker shift or both the processing method and the worker shift) may be instructed.
[0063]
When the operator shift is changed without changing the processing method (NO in S21), the operator shift is changed so that the operation rate of the operator is not biased (the work time of a specific operator is changed). Change the shift), being careful not to overdo it. The improvement of the throughput and the amount of work-in-progress due to the application of the changed shift (S22) is confirmed (S23), and then the cost calculation is performed again (S24), and it is determined whether or not the estimated cost thus calculated satisfies the target cost. (S25).
[0064]
If the machining time is to be shortened (YES in S21), the machining method / tool / cutting conditions are changed so that the machining time is shortened to reduce the number of equipment, and at the same time, the operator shift is changed. In the case of this embodiment, the type of the used tool specified by the machining method / tool specifying unit 12 is changed and specified to a different material of the tool (S30), and the tool feed speed is changed and set. Then, the machining time is corrected (S31), and the changed shift is applied in the same manner as in the case of NO in S21 (S32), and the improvement of the throughput and the amount of work in process is confirmed (S33). A cost estimate is calculated in consideration of the change (S34), and it is determined whether the calculated cost estimate satisfies the target cost (S35). If the calculated estimated cost satisfies the target cost, it is determined that the set production line information is to be satisfied, and the operation of the apparatus is terminated (S36).
[0065]
On the other hand, if it is determined that the estimated cost does not satisfy the target cost, a change in the shape of at least one of the coarse material and the product is proposed so as to reduce the workable distance, and the operation of the apparatus ends (S37). ).
[0066]
According to the present embodiment, it is possible to obtain information on equipment and staffing necessary for realizing a production line for producing a given shape and quantity of products within a required period, and assigning personnel. At this time, the work shift can be set in consideration of the individual abilities and skills of the worker and the unit cost of man-hour, so that accurate cost evaluation can be performed.
[0067]
【The invention's effect】
According to the present invention, production line information necessary for constructing a production line for processing a plurality of mechanical parts having the same shape is automatically created based on various preset conditions including necessary man-hours. A production line information automatic creation device capable of evaluating and further setting production line information so that a predetermined evaluation of the production line satisfies a desired delivery date and a target value of cost; Can be improved.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a main configuration of an automatic production line information creating apparatus according to an embodiment of the present invention.
FIG. 2 is an explanatory diagram showing an outline of an operation performed by a machined part analysis unit 1 of the embodiment shown in FIG.
FIG. 3 is an explanatory diagram illustrating an outline of a work performed by a facility-in-use analyzing unit 2 of the embodiment illustrated in FIG. 1;
FIG. 4 is an explanatory diagram illustrating an outline of an operation performed by a process information creating unit 3 according to the embodiment illustrated in FIG. 1;
FIG. 5 is an explanatory diagram showing an outline of an operation performed by a production line evaluation unit 4 of the embodiment shown in FIG.
FIG. 6 is a flowchart showing an example of an operation procedure of the embodiment shown in FIG. 1;
FIG. 7 is a flowchart showing another example of the operation procedure of the embodiment shown in FIG. 1;
[Explanation of symbols]
1 Processing part analysis part
2 Used equipment analysis department
3 Process information creation department
4 Production Line Evaluation Department
5 Feedback processing unit
6 I / O interface
7 I / O device
8 Display
9 Printer
11 Wing shape judgment unit
12 Reference material section
13 Machining method / Tool designation section
14 Machining time calculator
15 Product shape 3D CAD data
16 Material Shape Database
17 Tool Database
18 Processing Time Database
21 Used equipment judgment section
22 Simultaneous machining number judgment unit
23 Tool path calculator
24 Equipment Database
31 Workable process determination unit for each worker
32 Worker shift assignment unit
33 Processing time correction unit
34 Transport mode designation section
35 worker skill database
36 Worker shift database
37 Process data file
41 Process information reading unit
42 Line Logistics Analysis Department
43 Cost Estimation Department

Claims (10)

粗材から製品に加工するための加工部位を解析し、加工手順を定めて加工工程を設定するとともに加工所要時間を算出する加工部位解析部と、該設定された加工工程に基づいて加工設備を各工程に配分する使用設備解析部と、前記各工程に必要な作業者数を含む生産ライン情報を自動作成する工程情報作成部と、前記加工部位解析部と使用設備解析部と工程情報作成部の出力情報に基づいて前記加工設備を前記加工工程に沿って仮想配置したシミュレーションモデルを生成し、このシミュレーションモデルを用いて生産原価の評価を算出する生産ライン評価部とを含んで構成された生産ライン情報自動作成装置であって、前記工程情報作成部は、各作業者の能力のデータを前記加工設備に対応させて格納した作業者スキルデータベースを備え、作業者をその能力に応じて各加工工程に割り付け、各加工工程の段取り時間を含む作業所要時間を割り付けられた作業者の能力と前記算出された加工時間に基づいて算出するよう構成されていることを特徴とする生産ライン情報自動作成装置。Analyze the processing part for processing from coarse material to product, determine the processing procedure, set the processing step, and calculate the processing required time and the processing part analysis unit, and based on the set processing step, the processing equipment A used equipment analyzing unit to be allocated to each process, a process information creating unit for automatically creating production line information including the number of workers required for each process, the machining part analyzing unit, a used equipment analyzing unit, and a process information creating unit A production line evaluation unit that generates a simulation model in which the processing equipment is virtually arranged along the processing step based on the output information of the processing line, and calculates an evaluation of the production cost using the simulation model. An automatic line information creation device, wherein the process information creation unit includes an operator skill database that stores data of each worker's ability in association with the processing equipment. An operator is assigned to each processing step according to the ability thereof, and the required work time including setup time of each processing step is calculated based on the assigned ability of the worker and the calculated processing time. An automatic production line information creating apparatus. 請求項1記載の生産ライン情報自動作成装置において、前記工程情報作成部は、作業者を予め設定された作業シフトのいずれかに指定して割り付けるように構成され、かつ、前記生産ライン評価部は、予め該生産ライン評価部に格納された、作業者の作業シフトに対応した工数単価情報と、各工程に配置された作業者の作業シフトのデータに基づいて、コストを算定するよう構成されていることを特徴とする生産ライン情報自動作成装置。2. The production line information automatic creation device according to claim 1, wherein the process information creation unit is configured to assign and assign an operator to one of preset work shifts, and the production line evaluation unit includes: The cost is calculated based on man-hour unit price information corresponding to the worker's work shift previously stored in the production line evaluation unit and the worker's work shift data arranged in each process. Production line information automatic creation device characterized by the following. 請求項1または2記載の生産ライン情報自動作成装置において、生産ラインの評価が目標値を満たさないとき、前記使用設備解析部と工程情報作成部のいずれか一方もしくは双方の出力情報を、生産ラインの評価が目標値を満たすように自動修正するフィードバック処理部を備え、生産ライン評価部は自動修正された情報に基づいて前記シミュレーションモデルを再構成し、再構成したシミュレーションモデルを用いて生産原価の評価を算出するように構成されていることを特徴とする生産ライン情報自動作成装置。3. The production line information automatic creation device according to claim 1, wherein when the evaluation of the production line does not satisfy the target value, the output information of one or both of the used equipment analysis unit and the process information creation unit is output to the production line. A feedback processing unit that automatically corrects the evaluation so that the evaluation satisfies the target value, the production line evaluation unit reconfigures the simulation model based on the automatically corrected information, and uses the reconfigured simulation model to reduce the production cost. An automatic production line information creating apparatus configured to calculate an evaluation. 請求項3記載の生産ライン情報自動作成装置において、フィードバック処理部が自動修正する情報は、工程情報作成部が設定した作業者シフト情報であることを特徴とする生産ライン情報自動作成装置。4. The production line information automatic creation device according to claim 3, wherein the information automatically corrected by the feedback processing unit is worker shift information set by the process information creation unit. 請求項3記載の生産ライン情報自動作成装置において、フィードバック処理部が自動修正する情報は、工程情報作成部が設定した作業者割り付け情報であることを特徴とする生産ライン情報自動作成装置。4. The production line information automatic creation device according to claim 3, wherein the information automatically corrected by the feedback processing unit is operator assignment information set by the process information creation unit. 粗材から製品に加工するための加工部位を解析し、加工手順を定めて加工工程を設定するとともに加工所要時間を算出する加工部位解析手順と、該設定された加工工程に基づいて加工設備を各工程に配分する使用設備解析手順と、前記各工程に必要な作業者数を含む生産ライン情報を自動作成する工程情報作成手順と、前記加工部位解析手順と使用設備解析手順と工程情報作成手順で生成された情報に基づいて前記加工設備を前記加工工程に沿って仮想配置したシミュレーションモデルを生成し、このシミュレーションモデルを用いて生産原価の評価を算出する生産ライン評価手順とを含んでなる生産ライン情報自動作成方法であって、前記工程情報作成手順では、各作業者の能力のデータを前記加工設備に対応させて格納した作業者スキルデータベースを用い、作業者をその能力に応じて各加工工程に割り付け、各加工工程の段取り時間を含む作業所要時間が割り付けられた作業者の能力と前記算出された加工時間に基づいて算出されることを特徴とする生産ライン情報自動作成方法。Analyze the processing part for processing from coarse material to product, determine the processing procedure, set the processing step and calculate the processing time required, and processing equipment based on the set processing step. Use equipment analysis procedure allocated to each process, process information creation procedure for automatically creating production line information including the number of workers required for each process, machining part analysis procedure, use equipment analysis procedure, and process information creation procedure A production line evaluation procedure of generating a simulation model in which the processing equipment is virtually arranged along the processing steps based on the information generated in step (a), and calculating an evaluation of a production cost using the simulation model. A line information automatic creation method, wherein in the process information creation procedure, worker skills in which data of each worker's ability is stored in association with the processing equipment. And a worker is assigned to each processing step in accordance with the ability thereof, and the required work time including the setup time of each processing step is calculated based on the assigned ability of the worker and the calculated processing time. A method for automatically creating production line information. 請求項6記載の生産ライン情報自動作成方法において、前記工程情報作成手順では、作業者は予め設定された作業シフトのいずれかに指定して割り付けられ、かつ、前記生産ライン評価手順では、作業者の作業シフトに対応した工数単価情報と、各工程に配置された作業者の作業シフトのデータに基づいて、コストが算定されることを特徴とする生産ライン情報自動作成方法。7. The production line information automatic creation method according to claim 6, wherein in the process information creation procedure, the worker is assigned to one of the preset work shifts, and in the production line evaluation procedure, the worker is assigned. A cost is calculated based on the man-hour unit price information corresponding to the work shift and the work shift data of the worker arranged in each process. 請求項6または7記載の生産ライン情報自動作成方法において、生産ラインの評価が目標値を満たさないとき、前記使用設備解析手順と工程情報作成手順のいずれか一方もしくは双方で生成された情報を、生産ラインの評価が目標値を満たすように自動修正するフィードバック処理手順を備え、生産ライン評価手順では自動修正された情報に基づいて前記シミュレーションモデルを再構成し、再構成したシミュレーションモデルを用いて生産原価の評価が算出されることを特徴とする生産ライン情報自動作成方法。The production line information automatic creation method according to claim 6, wherein when the evaluation of the production line does not satisfy the target value, the information generated in one or both of the used equipment analysis procedure and the process information creation procedure, A feedback processing procedure for automatically correcting the evaluation of the production line so as to satisfy the target value is provided.In the production line evaluation procedure, the simulation model is reconfigured based on the automatically corrected information, and the production is performed using the reconfigured simulation model. A method for automatically producing production line information, wherein a cost evaluation is calculated. 請求項8記載の生産ライン情報自動作成方法において、フィードバック処理手順で自動修正される情報は、工程情報作成手順で設定された作業者シフト情報であることを特徴とする生産ライン情報自動作成方法。9. The production line information automatic creation method according to claim 8, wherein the information automatically corrected in the feedback processing procedure is worker shift information set in the process information creation procedure. 請求項8記載の生産ライン情報自動作成方法において、フィードバック処理手順で自動修正される情報は、工程情報作成手順で設定された作業者割り付け情報であることを特徴とする生産ライン情報自動作成方法。9. The production line information automatic creation method according to claim 8, wherein the information automatically corrected in the feedback processing procedure is operator assignment information set in the process information creation procedure.
JP2002339622A 2002-11-22 2002-11-22 Automatic preparation device for production line information Pending JP2004171484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002339622A JP2004171484A (en) 2002-11-22 2002-11-22 Automatic preparation device for production line information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002339622A JP2004171484A (en) 2002-11-22 2002-11-22 Automatic preparation device for production line information

Publications (1)

Publication Number Publication Date
JP2004171484A true JP2004171484A (en) 2004-06-17

Family

ID=32702534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002339622A Pending JP2004171484A (en) 2002-11-22 2002-11-22 Automatic preparation device for production line information

Country Status (1)

Country Link
JP (1) JP2004171484A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006077930A1 (en) * 2005-01-20 2006-07-27 Kao Corporation Production scheduling system
JPWO2006100753A1 (en) * 2005-03-22 2008-08-28 富士通株式会社 Cost information management system, cost information management method, and cost information management program
JP2018206020A (en) * 2017-06-02 2018-12-27 ローレル精機株式会社 Estimate calculation device, estimate calculation method, and program
JP6775701B1 (en) * 2020-04-21 2020-10-28 Dmg森精機株式会社 Processing systems, information processing equipment, information processing methods, and information processing programs
JP2020177580A (en) * 2019-04-22 2020-10-29 株式会社ジェイテクト Cyber-physical production system type production system
JP2021163324A (en) * 2020-04-01 2021-10-11 株式会社日立製作所 Line configuration plan device
US20220129830A1 (en) * 2020-10-26 2022-04-28 Canon Kabushiki Kaisha System, control method, and storage medium
WO2022208652A1 (en) * 2021-03-30 2022-10-06 三菱電機株式会社 Work assistance device, work assistance system, and work assistance method
WO2023214481A1 (en) * 2022-05-02 2023-11-09 株式会社日立製作所 Manufacturing evaluation system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006077930A1 (en) * 2005-01-20 2006-07-27 Kao Corporation Production scheduling system
JP2006202038A (en) * 2005-01-20 2006-08-03 Kao Corp Production scheduling system
JP4648013B2 (en) * 2005-01-20 2011-03-09 花王株式会社 Production scheduling system
JPWO2006100753A1 (en) * 2005-03-22 2008-08-28 富士通株式会社 Cost information management system, cost information management method, and cost information management program
JP4800299B2 (en) * 2005-03-22 2011-10-26 富士通株式会社 Cost information management system, cost information management method, and cost information management program
JP2018206020A (en) * 2017-06-02 2018-12-27 ローレル精機株式会社 Estimate calculation device, estimate calculation method, and program
JP7239106B2 (en) 2019-04-22 2023-03-14 株式会社ジェイテクト Cyber-physical production system type production system
JP2020177580A (en) * 2019-04-22 2020-10-29 株式会社ジェイテクト Cyber-physical production system type production system
JP2021163324A (en) * 2020-04-01 2021-10-11 株式会社日立製作所 Line configuration plan device
JP7405679B2 (en) 2020-04-01 2023-12-26 株式会社日立製作所 Line configuration planning device
JP2021174091A (en) * 2020-04-21 2021-11-01 Dmg森精機株式会社 Machining system, information processing device, information processing method and information processing program
JP6775701B1 (en) * 2020-04-21 2020-10-28 Dmg森精機株式会社 Processing systems, information processing equipment, information processing methods, and information processing programs
US20220129830A1 (en) * 2020-10-26 2022-04-28 Canon Kabushiki Kaisha System, control method, and storage medium
WO2022208652A1 (en) * 2021-03-30 2022-10-06 三菱電機株式会社 Work assistance device, work assistance system, and work assistance method
JPWO2022208652A1 (en) * 2021-03-30 2022-10-06
JP7412633B2 (en) 2021-03-30 2024-01-12 三菱電機株式会社 Work support device, work support system, and work support method
WO2023214481A1 (en) * 2022-05-02 2023-11-09 株式会社日立製作所 Manufacturing evaluation system

Similar Documents

Publication Publication Date Title
US4648023A (en) Method for resource allocation for the manufacture of a product
Kumar et al. Integration of scheduling with computer aided process planning
Mudgal et al. Approach to value stream mapping for make-to-order manufacturing
CN105427021A (en) Intelligent clothes production scheduling method
US20090043625A1 (en) Process Management System and Method
Esfandyari et al. Application of value stream mapping using simulation to decrease production lead time: a Malaysian manufacturing case
US10234846B2 (en) Method and apparatus for determining an optimum manufacturing alternative for manufacturing a product
JP5958227B2 (en) Process management system
US20070117230A1 (en) Computer readable storage medium for work-in-process schedules
KR20040086735A (en) Production management method in a plurality of production lines
JP2004171484A (en) Automatic preparation device for production line information
JP2003162313A (en) Method and device for production system planning
Stecke Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
Kuric et al. Computer aided process planning in machinery industry
JP3570474B2 (en) Automatic production line information creation device
CN103679310A (en) Method and device for simulating production line
Concannon et al. SIMUL8-planner simulation-based planning and scheduling
Danilczuk The use of simulation environment for solving the assembly line balancing problem
JPH05174030A (en) Job shop scheduling expert system
KR102188017B1 (en) Measurement and Management System for Mold Manufacture Machine
Renna et al. Controllable processing time policy in job shop manufacturing systems: design and evaluation by simulation modelling
US6266646B1 (en) Method and apparatus for providing choices for a facility
JP2000317779A (en) Simulation system for discrete phenomena
Košturiak et al. Total production control
WO2006077930A1 (en) Production scheduling system