JP2004124507A5 - Pile driving pile for rock and its piling method - Google Patents

Pile driving pile for rock and its piling method Download PDF

Info

Publication number
JP2004124507A5
JP2004124507A5 JP2002290139A JP2002290139A JP2004124507A5 JP 2004124507 A5 JP2004124507 A5 JP 2004124507A5 JP 2002290139 A JP2002290139 A JP 2002290139A JP 2002290139 A JP2002290139 A JP 2002290139A JP 2004124507 A5 JP2004124507 A5 JP 2004124507A5
Authority
JP
Japan
Prior art keywords
pile
bedrock
pile body
reinforcing steel
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002290139A
Other languages
Japanese (ja)
Other versions
JP3870146B2 (en
JP2004124507A (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2002290139A priority Critical patent/JP3870146B2/en
Priority claimed from JP2002290139A external-priority patent/JP3870146B2/en
Publication of JP2004124507A publication Critical patent/JP2004124507A/en
Publication of JP2004124507A5 publication Critical patent/JP2004124507A5/en
Application granted granted Critical
Publication of JP3870146B2 publication Critical patent/JP3870146B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【0001】
【発明の属する技術分野】
本発明は杭打用杭と、その杭を岩盤へ打設する際に、杭の打撃力により粉砕された粉砕岩を噴射水で排除しながら杭打ちをする岩盤への杭打工法に関する。
[0001]
Field of the Invention
The present invention relates to a pile driving pile and a pile driving method for a rock mass for piling while removing crushed rock crushed by impact force of the pile with jet water when the pile is drilled in a rock mass.

【0016】
【課題を解決するための手段】
本発明は、杭本体の下端に補強鋼を固着し、杭本体と補強鋼にわたって当て板を、その下端が補強鋼の下端より上方に位置するごとく取付けた岩盤への杭打用杭および、杭本体の下端に補強鋼を固着し、補強鋼のフランジ同士又はフランジとウエブを夫々連結するごとく補強部材を、夫々の補強鋼の下端より上方に取付けた岩盤への杭打用杭からなり、さらに杭本体と導水パイプとからなり、該導水パイプは該杭本体に対して上下方向に移動可能で、かつ隣接して該杭本体に取付けられ、該杭本体の先端を振動杭打機により岩盤に打ちつけて岩盤を破砕し、この破砕した岩石を該導水パイプからの噴射水で排除することにより岩盤中に杭を打込む岩盤への杭打工法において、杭本体の下端に補強鋼を固着し、杭本体と補強鋼にわたって当て板を、その下端が補強鋼の下端より上方に位置するごとく取付けた岩盤への杭打工法および杭本体と導水パイプとからなり、該導水パイプは該杭本体に対して上下方向に移動可能で、かつ隣接して該杭本体に取付けられ、該杭本体の先端を振動杭打機により岩盤に打ちつけて岩盤を破砕し、この破砕した岩石を該導水パイプからの噴射水で排除することにより岩盤中に杭を打込む岩盤への杭打工法において、杭本体の下端に補強鋼を固着し、補強鋼のフランジ同士又はフランジとウエブを夫々連結するごとく補強部材を、夫々の補強鋼の下端より上方に取付けた岩盤への杭打工法からなる。
[0016]
[Means for Solving the Problems]
In the present invention , a pile driving pile and a pile are mounted on a bedrock in which a reinforcing steel is fixed to the lower end of a pile main body and a caul plate is installed over the pile main body and the reinforcing steel with its lower end positioned above the lower end It consists of piles for pilings to the rock, with reinforcement members fixed at the lower end of the main body and reinforcement members to connect the flanges of the reinforcement steel or the flanges and the web, respectively, above the lower ends of the respective reinforcement steels Consisting of a pile body and a water pipe, the water pipe is vertically movable with respect to the pile body and is adjacently attached to the pile body, and the tip of the pile body is placed on a bedrock by a vibrating pile driver. In the piling method to the bedrock that drives a pile into the bedrock by fixing the reinforcing steel at the lower end of the pile body, by striking and breaking the bedrock and removing the crushed rock with the water jetted from the water transmission pipe, Battening plate across pile body and reinforcing steel The pile driving method for a bedrock mounted so that the lower end thereof is positioned above the lower end of the reinforcing steel, and a pile body and a water conveyance pipe, the water conveyance pipe is vertically movable with respect to the pile body, Adjacently attached to the pile body, the tip of the pile body is struck against the bedrock with a vibrating pile driver to break up the bedrock, and the crushed rock is expelled by the water jetted from the water transmission pipe into the bedrock In the pile driving method to the rock that drives the pile, the reinforcing members are fixed to the lower end of the pile main body and the flanges of the reinforcing steel or the flanges and the web are connected, respectively, above the lower ends of the respective reinforcing steels. It consists of pile driving method to the attached rock mass.

【0017】
【発明の実施の形態】
以下図面を参照して本発明の杭打用杭とその杭打工法の実施の形態を説明する。
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment of a pile driving pile of the present invention and a pile driving method thereof will be described below with reference to the drawings.

Claims (4)

杭本体の下端に補強鋼を固着し、杭本体と補強鋼にわたって当て板を、その下端が補強鋼の下端より上方に位置するごとく取付けた岩盤への杭打用杭 A pile driving pile for a bedrock in which a reinforcing steel is fixed to the lower end of the pile body and a caul plate is placed over the pile body and the reinforcing steel so that the lower end is positioned above the lower end of the reinforcing steel . 杭本体の下端に補強鋼を固着し、補強鋼のフランジ同士又はフランジとウエブを夫々連結するごとく補強部材を、夫々の補強鋼の下端より上方に取付けた岩盤への杭打用杭 A pile driving pile for a rock mass in which reinforcing steel is fixed to the lower end of the pile main body and reinforcing members are attached above the lower end of each reinforcing steel so as to connect the flanges of the reinforcing steel or the flange and the web respectively . 杭本体と導水パイプとからなり、該導水パイプは該杭本体に対して上下方向に移動可能で、かつ隣接して該杭本体に取付けられ、該杭本体の先端を振動杭打機により岩盤に打ちつけて岩盤を破砕し、この破砕した岩石を該導水パイプからの噴射水で排除することにより岩盤中に杭を打込む岩盤への杭打工法において、杭本体の下端に補強鋼を固着し、杭本体と補強鋼にわたって当て板を、その下端が補強鋼の下端より上方に位置するごとく取付けた岩盤への杭打工法。  Consisting of a pile body and a water pipe, the water pipe is vertically movable with respect to the pile body and is adjacently attached to the pile body, and the tip of the pile body is placed on a bedrock by a vibrating pile driver. In the piling method to the bedrock that drives a pile into the bedrock by fixing the reinforcing steel at the lower end of the pile body, by striking and breaking the bedrock and removing the crushed rock with the water jetted from the water transmission pipe, A pile driving method for a bedrock with a caul plate across the pile body and reinforcing steel, with the lower end positioned above the lower end of the reinforcing steel. 杭本体と導水パイプとからなり、該導水パイプは該杭本体に対して上下方向に移動可能で、かつ隣接して該杭本体に取付けられ、該杭本体の先端を振動杭打機により岩盤に打ちつけて岩盤を破砕し、この破砕した岩石を該導水パイプからの噴射水で排除することにより岩盤中に杭を打込む岩盤への杭打工法において、杭本体の下端に補強鋼を固着し、補強鋼のフランジ同士又はフランジとウエブを夫々連結するごとく補強部材を、夫々の補強鋼の下端より上方に取付けた岩盤への杭打工法。  Consisting of a pile body and a water pipe, the water pipe is vertically movable with respect to the pile body and is adjacently attached to the pile body, and the tip of the pile body is placed on a bedrock by a vibrating pile driver. In the piling method to the bedrock that drives a pile into the bedrock by fixing the reinforcing steel at the lower end of the pile body, by striking and breaking the bedrock and removing the crushed rock with the water jetted from the water transmission pipe, The piling method to the rock which installed the reinforcement member above the lower end of each reinforcement steel so that the flanges or the flange and the web of reinforcement steel may be connected respectively.
JP2002290139A 2002-10-02 2002-10-02 Piling piles for bedrock and the pile driving method Expired - Lifetime JP3870146B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002290139A JP3870146B2 (en) 2002-10-02 2002-10-02 Piling piles for bedrock and the pile driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002290139A JP3870146B2 (en) 2002-10-02 2002-10-02 Piling piles for bedrock and the pile driving method

Publications (3)

Publication Number Publication Date
JP2004124507A JP2004124507A (en) 2004-04-22
JP2004124507A5 true JP2004124507A5 (en) 2005-05-19
JP3870146B2 JP3870146B2 (en) 2007-01-17

Family

ID=32282115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002290139A Expired - Lifetime JP3870146B2 (en) 2002-10-02 2002-10-02 Piling piles for bedrock and the pile driving method

Country Status (1)

Country Link
JP (1) JP3870146B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007032254A (en) * 2005-06-21 2007-02-08 Mori Juki Kogyo:Kk Pile having tip reinforcing member and pile driving construction method using the same
JP6325809B2 (en) * 2013-12-18 2018-05-16 株式会社技研製作所 Steel sheet pile joining method
JP6630560B2 (en) * 2015-12-14 2020-01-15 東亜建設工業株式会社 Piling method for bedrock
JP7425301B2 (en) * 2020-03-24 2024-01-31 日本製鉄株式会社 Vertical joint structure of steel sheet piles and construction method of vertical joint structure

Similar Documents

Publication Publication Date Title
US4257722A (en) Pile driving method
JP4885313B2 (en) Steel member for foundation, method for placing steel member for foundation, and continuous steel wall for foundation
JP2004124507A5 (en) Pile driving pile for rock and its piling method
JP2009167734A (en) Method and device for intruding reinforcement steel plate into ground in seismic strengthening construction
JP2020026709A (en) Ring-shaped front end fitting
JP3870146B2 (en) Piling piles for bedrock and the pile driving method
CN202401460U (en) Sleeve pipe moisture injection process type steel sleeve pipe
JP3472562B2 (en) How to cast steel underground
JP2011117249A (en) Embankment reinforcing method
JP2002309575A (en) Pile driver and drawer
JPS63223219A (en) Piling work for hard ground
KR200214409Y1 (en) Ground Pile Cap
KR200402857Y1 (en) A concrete pile the head reinforcement utilized by steel pipe and cohesion construction with foundation concrete
CN215053006U (en) Bank protection pile cap
JP2001323464A (en) Assist device for driving steel sheet pile
WO1995008674A1 (en) Piling bell
KR200407951Y1 (en) A concrete pile the head reinforcement utilized by steel pipe and cohesion construction with foundation concrete
JPS6123072Y2 (en)
KR820002209B1 (en) Pile driving method
JP2004124506A (en) Piling method to bed rock
CN219298203U (en) Construction device for ground anchor
JPS6421119A (en) Concrete sheet pile having water-conveyance hole and driving said pile
JPS59192125A (en) Settlement work of concrete pile with screw
JP2004124505A (en) Piling method to base rock
JP2007032254A (en) Pile having tip reinforcing member and pile driving construction method using the same