JP2004110455A - Power source controller and power source controlling method - Google Patents

Power source controller and power source controlling method Download PDF

Info

Publication number
JP2004110455A
JP2004110455A JP2002272546A JP2002272546A JP2004110455A JP 2004110455 A JP2004110455 A JP 2004110455A JP 2002272546 A JP2002272546 A JP 2002272546A JP 2002272546 A JP2002272546 A JP 2002272546A JP 2004110455 A JP2004110455 A JP 2004110455A
Authority
JP
Japan
Prior art keywords
user
power
video
power supply
information indicating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002272546A
Other languages
Japanese (ja)
Inventor
Yutaka Numajiri
沼尻 裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2002272546A priority Critical patent/JP2004110455A/en
Publication of JP2004110455A publication Critical patent/JP2004110455A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Power Sources (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a power source controller and a power source controlling method capable of flexibly controlling a power source in compliance with a changed schedule of a user. <P>SOLUTION: A control part 10 in a home server 1 checks schedule contents of the user in a memory 11, and if it is time planned to go out, the control part 10 checks detection conditions of sensors 6 and 7 before performing power source breaking processing for various home electric appliances 5. If a user is detected by the sensors 6 and 7, the control part 10 executes excitation of the power source for the home electric appliances 5 around the sensors 6 and 7. If the user is not detected by the sensor 6 and 7, the control part 10 executes power source breaking processing associated with departure for the home electric appliances 5. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、被電源制御装置に対する電源投入や遮断処理を行う電源制御装置及び電源制御方法に関する。
【0002】
【従来の技術】
現在の家庭内には、リモコン操作等で制御可能なように、常に待機電力を持ち、電力消費を行っている電気機器が多数存在する。近年、環境問題として省エネが取り上げられると、電気機器の未使用時の待機電力を減少させる方法が考えられている。
【0003】
例えば従来の技術として、特開2001−159935号公報には、予め電源投入日付時刻及び電源遮断日付時刻が格納(設定)されており、現在の日付・時刻と一致した場合に、電源投入あるいは電源遮断処理を行う電源制御システムの構成が開示されている。
【0004】
【特許文献1】
特開2001−159935号公報(第4図)
【0005】
【発明が解決しようとする課題】
しかしながら、従来の装置では、予め設定された電源投入日付時刻あるいは電源遮断日付時刻とは異なるスケジュールをユーザが取った場合に、設定の変更入力を行う以外にはユーザの変更スケジュールに対して対応することができず、ユーザが家屋内に居るにも関わらず周辺機器の電源が遮断される虞がある。
【0006】
本発明は、以上の点に鑑みなされたもので、ユーザの変更スケジュールに対して柔軟な電源制御が対応可能な電源制御装置及び電源制御方法を提供することを目的とする。
【0007】
【課題を解決するための手段】
上記目的を達成するために、本発明の電源制御装置は、家屋内に設置された各種機器に対して電源を供給する分電盤を制御する電源制御装置において、ユーザのスケジュールを記憶する記憶手段と、家屋内におけるユーザの有無を示す情報を受信する受信手段と、前記受信手段によって受信された前記ユーザの有無を示す情報と前記記憶手段に記憶されたユーザのスケジュール情報とに基づいて前記分電盤に対して各種機器の電源の投入及び遮断処理を制御する制御手段と、を有することを特徴とする。
【0008】
上記目的を達成するために、本発明の電源制御方法は、家屋内に設置された各種機器に対して電源を供給する分電盤を制御する電源制御装置における電源制御方法において、外部より受信する家屋内におけるユーザの有無を示す情報と予め記憶されたユーザのスケジュール情報とに基づいて前記分電盤に対して各種機器の電源の投入及び遮断処理を制御することを特徴とする。
【0009】
上記目的を達成するために、本発明の電源制御装置は、家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置において、ビデオ予約情報を記憶する記憶手段と、家屋内に設置されたビデオ機器から使用状況及び電源供給状況を示す情報を受信する受信手段と、前記記憶手段に記憶された前記ビデオ予約情報に基づき、ビデオ予約開始時間以前に、前記受信手段によって前記ビデオ機器に電源が供給されていないことを示す情報が受信されると、前記分電盤に対して前記ビデオ機器の電源の投入処理を実行するとともに、前記ビデオ機器に対して初期設定及びビデオ予約処理を実行するよう制御する制御手段と、を有することを特徴とする。
【0010】
上記目的を達成するために、本発明の電源制御装置は、家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置において、ビデオ予約情報を記憶する記憶手段と、家屋内に設置されたビデオ機器から使用状況及び電源供給状況を示す情報を受信する第1の受信手段と、家屋内におけるユーザの有無を示す情報を受信する第2の受信手段と、前記記憶手段に記憶されたビデオ予約情報に基づいたビデオ予約終了時間以降に、前記第1の受信手段によって前記ビデオ機器が使用されていないことを示す情報が受信され、かつ前記第2の受信手段によってユーザが家屋内に居ないことを示す情報が受信されると、前記分電盤に対して前記ビデオ機器の電源の遮断処理を実行するよう制御する制御手段と、を有することを特徴とする。
【0011】
【発明の実施の形態】
以下、本発明に係る実施の形態について図面を参照して詳細に説明する。図1は、本発明の一実施の形態に係る電源制御装置としてのホームサーバ1及びその周辺機器の構成を概略的に示す図である。また、図2は、ホームサーバ1及びその周辺機器の構成の変形例を概略的に示す図である。
【0012】
図1に示すように、ホームサーバ1は、制御手段としての制御部10と、記憶手段としてのメモリ11を保持し、分電盤2と接続されている。そして、制御部10は、分電盤2に対して、分電盤2から電源を供給される各種家電機器5の電源の遮断処理あるいは投入処理に関する電源制御信号を出力する。ホームサーバ1の制御部10は、また、後述するように入力部(図示せぬ)から入力されたユーザのスケジュールをメモリ11に記憶する。
【0013】
分電盤2は、電源ケーブル4を介して、家屋内の各種家電機器5(テレビ5a、ビデオデッキ5b、ステレオセット5c、エアコン5d等)と接続されている。これら家電機器5はIPv6に対応している。
【0014】
そして、分電盤2は、ホームサーバ1による電源制御信号に従って、各種家電機器5に対して電源ケーブル4を介して供給される電源の遮断処理や投入処理を個別に行う。
【0015】
更に、ホームサーバ1は、家屋内の各部屋に設置された複数の赤外線センサ6と、複数の重量センサ7と接続されている。そして、この検出手段としての赤外線センサ6や重量センサ7からの検出情報がホームサーバ1に入力され、ホームサーバ1の制御部10が家屋内のユーザの居る場所を判断できるようになっている。
【0016】
そして、ホームサーバ1の制御部10は、接続された各種センサ6、7からの検出情報、更には内部メモリ11に登録されたユーザのスケジュールに基いて、各種家電機器5の未使用時にはその電源を遮断するようにし、各種家電機器5の使用時には電源を投入するよう、分電盤2を制御する。
【0017】
尚、図示しないが、ホームサーバ1は、各種家電機器5と、有線あるいは無線で、制御信号や応答信号を送受信することができるようになっている。従って、ホームサーバ1は、各種家電機器5の使用状況を確認することができる。
【0018】
また、図1は、ホームサーバ1と分電盤2が一体となった分電盤一体型ホームサーバ3からなる構成を示す図であるが、これに限らず、図2に示すような、ホームサーバ1と分電盤2が別々に構成されたものであっても良い。
【0019】
図3は、ホームサーバ1のメモリ11に記憶されるユーザのスケジュール登録にについて説明する図である。
【0020】
ホームサーバ1の制御部10は、図示せぬ表示部と入力部を用いてユーザによってスケジュールが入力されると、メモリ11に記憶する。本実施例では、ユーザによって、日程、時間、用件を入力されるようになっている。
【0021】
ホームサーバ1の制御部10は、入力されたスケジュールをメモリ11に記憶するとともに、入力されたスケジュールに基いて、ユーザの外出予定時刻と帰宅予定時刻を割り出し、同様にメモリ11に記憶する。
【0022】
本実施例では、例えば、ユーザによって、『○月2日は8時から20時まで仕事である』とスケジュール入力されると、ホームサーバ1の制御部10は、メモリ11に『日程:○月2日』『時間:8時〜20時』『用件:仕事』を記憶すると共に、外出予定時刻として8時を、帰宅予定時刻として20時を割り出し、記憶する。
【0023】
同様に、例えば、ユーザによって、『○月4日の6時から○月6日20時まで旅行である』とスケジュール入力されると、ホームサーバ1の制御部10は、メモリ11に『日程:○月4日』『時間:6時〜』『用件:旅行』、『日程:○月5日』『時間:終日』『用件:旅行』、『日程:○月6日』『時間:〜20時』『用件:旅行』を記憶する。
【0024】
更にホームサーバ1の制御部10は、外出予定時刻として○月4日6時を、帰宅予定時刻として○月6日20時を割り出し、メモリ11に記憶する。そして、このメモリ11に記憶された外出予定時刻及び帰宅予定時刻に基いて、後述する電源制御を実行する。
【0025】
図4は、ホームサーバ1による電源制御方法を説明するためのフローチャート図である。
まず、ホームサーバ1の制御部10は、メモリ11に記憶されたユーザのスケジュール内容を確認する。即ち、ホームサーバ1がカウントする現在時刻と、スケジュール内容とを比較し、スケジュール内容に変化が生じる時刻であるか、スケジュールに変化が生じた時刻は外出予定時刻であるか、または帰宅予定時刻であるかを判断する(ST11)。
【0026】
また、ST11の判断の結果、スケジュールに変化が生じる時刻であり、外出予定時刻であると判断されると(ST12のY、ST13のY)、制御部10は、ユーザの外出に伴う各種家電機器5の電源遮断処理を実行する前に、センサ6、7からの検出情報を確認する(ST14)。
【0027】
ST14による確認の結果、センサ6、7によりユーザが居ることを検出されている場合には(ST15のY)、制御部10は、センサ6、7が検出している部屋周辺の家電機器5に電源を供給するよう電源制御信号を分電盤2へ出力する。分電盤2は、センサ6、7が検出している部屋周辺の家電機器5で、電源供給されていない(OFF状態の)家電機器5に対して電源を供給する(電源ON状態とする)(ST16)。
【0028】
センサ6、7によってユーザの家屋内の所在位置が検出されている間は、制御部10は、検出センサ6、7の周辺の家電機器5に対して電源を供給するよう分電盤2に電源制御信号を出力して電源投入処理を実施し、検出しなくなったセンサ6、7の周辺の家電機器5に対しては、供給電源を遮断するよう分電盤2に電源制御信号を出力して電源遮断処理を実施する(ST14、ST15のY、ST16)。
【0029】
ST14による確認の結果、いずれのセンサ6、7もユーザの所在を検出しない場合には(ST15のN)、制御部10は、予め電源OFF(遮断)してはいけないと設定されている家電機器5(例えば電話やFAX等)以外の家電機器5の電源を遮断するよう電源制御信号を分電盤2へ出力する。分電盤2は、家電機器5の中で電源が供給されている(電源ON状態の)機器に対して供給電源を遮断(電源OFF状態と)し(ST17)、ST11の処理へと戻る。
【0030】
ST11の判断の結果、スケジュールに変化が生じる時刻であるが、外出予定時刻でも帰宅予定時刻でもない場合(ST12のY、ST13のN、ST18のN)、外出や帰宅と関係しないスケジュール内容であると判断し、例えば後述するような対応する所定の処理を実行後(ST19)、ST11の処理へと戻る。
【0031】
ST11の判断の結果、スケジュールに変化が生じる時刻であり、帰宅予定時刻であると判断された場合(ST12のY、ST13のN、ST18のY)、またはST11の判断の結果、スケジュールに変化が生じないと判断された場合(ST12のN)、制御部10は、まずセンサ6、7からの検出情報を確認する(ST20)。
【0032】
ST20による確認の結果、センサ6、7がユーザが居ることを検出している場合には(ST21のY)、制御部10は、センサ6、7が検出している部屋周辺の家電機器5に電源を供給するよう電源制御信号を分電盤2へ出力する。分電盤2は、センサ6、7が検出している部屋周辺の家電機器5で、電源供給されていない(OFF状態の)家電機器5に対して電源を供給する(電源ON状態とする)(ST22)。
【0033】
センサ6、7によってユーザの家屋内の所在位置が検出されている間は、制御部10は、検出センサ6、7の周辺の家電機器5に対して電源を供給するよう分電盤2に電源制御信号を出力して電源投入処理を実施し、検出しなくなったセンサ6、7の周辺の家電機器5に対しては、供給電源を遮断するよう分電盤2に電源制御信号を出力して電源遮断処理を実施する(ST20、ST21のY、ST22)。
【0034】
ST20による確認の結果、いずれのセンサ6、7もユーザの所在を検出しない場合には(ST21のN)、制御部10は、現在時刻と帰宅予定時刻とを比較し、帰宅予定時刻より所定時間だけ前(本実施例では15分前)の時間であるかを確認する(ST23)。
【0035】
ST23の確認の結果、帰宅予定時刻の所定時間だけ前(本実施例では15分前)ではないと判断された場合(ST24のN)、ST11の処理へと戻る。
【0036】
ST23の確認の結果、帰宅予定時刻の所定時間だけ前(本実施例では15分前)であると判断された場合(ST24のY)、制御部10は家屋内の家電機器、特にエアコン5dの状態(使用状況や電源ON/OFF状況)を確認する(ST25)。
【0037】
ST25の確認の結果、エアコン5dが使用されていると確認された場合には(ST26のY)、エアコン5dの状態はそのままに、ST11の処理へと戻る。ST25の確認の結果、エアコン5dが不使用であると確認された場合には(ST26のN)、制御部10は、エアコン5dへ電源を供給するよう分電盤2に電源制御信号を出力する。
【0038】
分電盤2は、エアコン5dに対して電源を供給し(電源ON状態とし)、ホームサーバ1の制御部10は電源が供給されると、エアコン5dのスイッチをONとしてエアコン5dを稼動させ(ST27)、ST11の処理へと戻る。
【0039】
上述するように、本実施例では、予め設定されたユーザのスケジュール情報に基き、更には各種センサからのユーザ情報に基いて、各種家電機器の電源投入処理や電源遮断処理を実行するようになっている。
【0040】
これにより、予め設定されている情報(この場合ユーザのスケジュール情報)のみならず、センサの検出情報を考慮して、各種家電機器の電源制御を行うことができ、急なユーザのスケジュール変更に柔軟に対応しながら、待機電力消費を低く押させることが可能となる。
【0041】
次に、図5は、電源投入処理の一応用例としての、ビデオデッキに対するビデオ予約開始処理方法を説明するためのフローチャート図であり、本実施例の図4におけるST19の処理に対応する。
【0042】
図4に示すST11の判断の結果、スケジュールに変化が生じる時刻であるが、外出予定時刻でも帰宅予定時刻でもない場合、即ち本実施例ではビデオ予約開始時刻より所定時間だけ前(本実施例では3分前)の時間であるかを確認すると(ST12のY、ST13のN、ST18のN)、ホームサーバ1の制御部10は、予約ビデオデッキ5bの状態(使用状況や電源ON/OFF状況)を確認する(ST43)。
【0043】
ST43の確認の結果、ビデオデッキ5bの電源が遮断された状態(OFF状態)であった場合には(ST44のN)、制御部10は、ビデオデッキ5bに電源を供給するよう電源制御信号を分電盤2へ出力する。分電盤2は、電源供給されていない(OFF状態の)ビデオデッキ5bに対して電源を供給する(電源ON状態とする)(ST48)。
【0044】
ST43の確認の結果、ビデオデッキ5bの電源が供給されている状態(ON状態)で、かつ使用されていない場合(ST44のY、ST45のN)、あるいは、ST48でビデオデッキ5bを電源ON状態とした後、制御部10は、ビデオデッキ5bの初期設定情報(例えば現在日付や現在時刻など)をビデオデッキ5bに送信し、ビデオデッキ5bに設定する(ST49)。
【0045】
ST49による初期設定情報の設定が終了すると、次に制御部10は、予約情報をビデオデッキ5bに対して送信し、ビデオデッキ5bにタイマー設定し、ビデオデッキ予約開始処理を終了し(ST50)、図4に示すST11の処理へと戻る。
【0046】
ビデオデッキ5bは、ST49で設定された現在の日付や時刻に関する情報と予約情報とから、予約された時刻と判断されると、予約情報に従って、録画を開始する。
【0047】
また、ST43の確認の結果、ビデオデッキ5bの電源が供給されている状態(ON状態)で、かつ使用されている場合(ST44のY、ST45のY)、制御部10は、ビデオデッキ5bに対して、予約情報が設定されていることを示す警告画面を表示するよう指示する制御信号を出力する(ST46)。
【0048】
ST46の指示の結果、ビデオ予約がキャンセルされず、ビデオデッキ5bが継続的に使用されており予約録画を行えない場合には(ST47のN、ST45のY)、制御部10は、本実施例では、定期的にビデオデッキ5bに対して、予約情報が設定されていることを示す警告画面を表示するよう指示する制御信号を出力する(ST46)。
【0049】
ST46の指示の結果、ビデオ予約がキャンセルされた場合(ST47のY)、ビデオデッキ5bが使用されているので、ホームサーバ1の制御部10は、ビデオデッキ5bに対して電源遮断処理を行うことなく、ビデオデッキ予約開始処理を終了し、図4に示すST11の処理へと戻る。
【0050】
次に、図6は、電源遮断処理の一応用例としての、ビデオデッキに対するビデオ予約終了処理方法を説明するためのフローチャート図であり、本実施例の図4におけるST19の処理に対応する。
【0051】
図4に示すST11の判断の結果、スケジュールに変化が生じる時刻であるが、外出予定時刻でも帰宅予定時刻でもない場合、即ち本実施例ではビデオ予約終了時刻を過ぎたことを確認すると(ST12のY、ST13のN、ST18のN)、ホームサーバ1の制御部10は、予約ビデオデッキ5bの状態(使用状況や電源ON/OFF状況)を確認する(ST61)。
【0052】
ST61の確認の結果、ビデオデッキ5bが予約録画の終了後にも使用されている場合(ST62のY)、あるいはST61の確認の結果、ビデオデッキ5bは使用されていないが、ビデオデッキ5b周辺に設置されたセンサ6、7でユーザが検出されている場合(ST62のN、ST63のY)、ホームサーバ1の制御部10は、ビデオデッキ5bに対して電源遮断処理を行うことなく、ビデオデッキ予約終了処理を終了し、図4に示すST11の処理へと戻る。
【0053】
ST61の確認の結果、ビデオデッキ5bは使用されておらず、ビデオデッキ5b周辺に設置されたセンサ6、7でユーザが検出されていない場合(ST62のN、ST63のN)、ホームサーバ1の制御部10は、分電盤2に対して、ビデオデッキ5bに供給する電源を遮断する(OFF状態とする)よう電源制御信号を出力する。
【0054】
分電盤2は、電源制御信号を受けて、ビデオデッキ5bに対する電源供給を遮断し、電源OFF状態として、ビデオ予約終了処理を終了し(ST56)、図4に示すST11の処理へと戻る。
【0055】
上述するように、本実施例では、予め設定されたビデオ予約情報に基き、更には各種センサからのユーザ情報やビデオデッキの使用状況等に基いて、ビデオ予約開始時刻よりも早くにビデオデッキに電源投入処理、ビデオ予約設定処理を実行するようになっている。また、ビデオ予約終了時刻を過ぎると、各種センサからのユーザ情報やビデオの使用状況等に基いて、ビデオデッキの電源遮断処理を実行するようになっている。
【0056】
これにより、予め設定されている情報(この場合予約情報)のみならず、センサの検出情報やビデオの使用状況等を考慮して、ビデオデッキの電源をホームサーバで制御し、待機電力消費を低く押させることが可能となる。
【0057】
【発明の効果】
以上説明したように、本発明によれば、ユーザの変更スケジュールに対して柔軟な電源制御が対応できる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係る電源制御装置としてのホームサーバ1及びその周辺機器の構成を示す図。
【図2】本発明の一実施の形態に係る電源制御装置としてのホームサーバ1及びその周辺機器の他の構成を示す図。
【図3】ホームサーバ1に登録されたスケジュールを説明するための図。
【図4】ホームサーバ1による電源制御方法を説明するためのフローチャート図。
【図5】ホームサーバ1によるビデオデッキ5bのビデオ予約開始処理を説明するためのフローチャート図。
【図6】ホームサーバ1によるビデオデッキ5bのビデオ予約終了処理を説明するためのフローチャート図。
【符号の説明】
1  ホームサーバ
2  分電盤
3  分電盤一体型ホームサーバ
4  電源ケーブル
5a、5b、5c、5d  家電機器
6  赤外線センサ
7  重量センサ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a power supply control device and a power supply control method for performing power-on and power-off processing for a power-supplied control device.
[0002]
[Prior art]
At present, there are a large number of electric appliances that always have standby power and consume power so that they can be controlled by remote control operation or the like. In recent years, when energy saving is taken up as an environmental problem, a method of reducing standby power when an electric device is not used has been considered.
[0003]
For example, Japanese Patent Application Laid-Open No. 2001-159935 stores (sets) a power-on date and a power-off date and time as a conventional technique. A configuration of a power supply control system that performs a shutdown process is disclosed.
[0004]
[Patent Document 1]
JP 2001-159935 A (FIG. 4)
[0005]
[Problems to be solved by the invention]
However, in the conventional apparatus, when the user takes a schedule different from the preset power-on date / time or power-off date / time, the user responds to the user's change schedule except for performing a setting change input. And the power of the peripheral device may be shut down even though the user is in the house.
[0006]
The present invention has been made in view of the above points, and an object of the present invention is to provide a power supply control device and a power supply control method capable of responding flexibly to a change schedule of a user.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, a power supply control device of the present invention is a power supply control device that controls a distribution board that supplies power to various devices installed in a house, wherein the storage device stores a user's schedule. Receiving means for receiving information indicating the presence or absence of a user in the house; and the minute based on the information indicating the presence or absence of the user received by the receiving means and the schedule information of the user stored in the storage means. And control means for controlling power-on and power-off processing of various devices to the power board.
[0008]
In order to achieve the above object, a power supply control method according to the present invention is a power supply control method for a power supply control device that controls a distribution board that supplies power to various devices installed in a house. The present invention is characterized in that power on / off processing of various devices to the distribution board is controlled based on information indicating the presence or absence of a user in the house and user schedule information stored in advance.
[0009]
In order to achieve the above object, a power supply control device of the present invention is a power supply control device for controlling a distribution board for supplying power to video equipment installed in a house, wherein a storage means for storing video reservation information Receiving means for receiving information indicating a use situation and a power supply situation from a video device installed in the house; and, based on the video reservation information stored in the storage means, before the video reservation start time, the reception is performed. When the information indicating that power is not supplied to the video equipment is received by the means, the power supply processing of the video equipment is performed on the distribution board, and the video equipment is initialized. And control means for controlling the execution of the video reservation processing.
[0010]
In order to achieve the above object, a power supply control device of the present invention is a power supply control device for controlling a distribution board for supplying power to video equipment installed in a house, wherein a storage means for storing video reservation information A first receiving unit that receives information indicating a use state and a power supply state from a video device installed in a house, a second receiving unit that receives information indicating the presence or absence of a user in the house, After the video reservation end time based on the video reservation information stored in the storage means, information indicating that the video device is not used is received by the first reception means, and the second reception means Control means for controlling, when information indicating that the user is not in the house is received, the power supply of the video equipment to the power distribution board to be cut off; And it features.
[0011]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a diagram schematically showing a configuration of a home server 1 as a power control device according to an embodiment of the present invention and peripheral devices thereof. FIG. 2 is a diagram schematically showing a modification of the configuration of the home server 1 and its peripheral devices.
[0012]
As shown in FIG. 1, the home server 1 holds a control unit 10 as a control unit and a memory 11 as a storage unit, and is connected to the distribution board 2. Then, the control unit 10 outputs, to the distribution board 2, a power supply control signal related to a power-off processing or a power-on processing of various electric home appliances 5 to which power is supplied from the distribution board 2. The control unit 10 of the home server 1 also stores the user's schedule input from the input unit (not shown) in the memory 11 as described later.
[0013]
The distribution board 2 is connected via a power cable 4 to various household electrical appliances 5 (television 5a, VCR 5b, stereo set 5c, air conditioner 5d, etc.) in the house. These home appliances 5 are compatible with IPv6.
[0014]
Then, the distribution board 2 individually performs a power-off process and a power-on process for supplying power to the various home appliances 5 via the power cable 4 in accordance with a power control signal from the home server 1.
[0015]
Further, the home server 1 is connected to a plurality of infrared sensors 6 and a plurality of weight sensors 7 installed in each room in the house. Then, detection information from the infrared sensor 6 and the weight sensor 7 as the detecting means is input to the home server 1 so that the control unit 10 of the home server 1 can determine the location of the user in the house.
[0016]
Then, based on the detection information from the connected various sensors 6 and 7 and the user's schedule registered in the internal memory 11, the control unit 10 of the home server 1 supplies power to the various home electric appliances 5 when not in use. The power distribution panel 2 is controlled so that the power is turned on when the various home electric appliances 5 are used.
[0017]
Although not shown, the home server 1 is capable of transmitting and receiving control signals and response signals to and from various home appliances 5 by wire or wirelessly. Therefore, the home server 1 can check the usage status of the various home appliances 5.
[0018]
FIG. 1 is a diagram showing a configuration including a distribution board integrated type home server 3 in which a home server 1 and a distribution board 2 are integrated, but the present invention is not limited to this. The server 1 and the distribution board 2 may be configured separately.
[0019]
FIG. 3 is a diagram illustrating registration of a user schedule stored in the memory 11 of the home server 1.
[0020]
When a user inputs a schedule using a display unit and an input unit (not shown), the control unit 10 of the home server 1 stores the schedule in the memory 11. In this embodiment, the user inputs a schedule, a time, and a task.
[0021]
The control unit 10 of the home server 1 stores the input schedule in the memory 11, calculates the user's scheduled go-out time and the scheduled return time based on the input schedule, and stores the same in the memory 11 in the same manner.
[0022]
In the present embodiment, for example, when the user inputs a schedule such as “work is performed from 8:00 to 20:00 on month 2”, the control unit 10 of the home server 1 stores “schedule: month 2 days, "time: 8:00 to 20:00" and "work: work" are stored, and 8:00 is calculated as the scheduled time to go out and 20:00 is calculated as the scheduled time to return home.
[0023]
Similarly, for example, when the user inputs a schedule “Travel is from 6:00 on March 4 to 20:00 on March 6” by the user, the control unit 10 of the home server 1 stores “Schedule: ○ Month 4 ”,“ Time: 6: 00 ~ ”,“ Requirement: Travel ”,“ Schedule: ○ May 5 ”,“ Time: All Day ”,“ Requirement: Travel ”,“ Schedule: ○ Month 6 ”,“ Time: 20:00 ”and“ message: travel ”are stored.
[0024]
Further, the control unit 10 of the home server 1 determines 6:00 on March 4 as the scheduled time to go out and 20:00 on March 6 as the scheduled return time, and stores it in the memory 11. Then, based on the scheduled out-of-home time and the scheduled home-coming time stored in the memory 11, the power supply control described later is executed.
[0025]
FIG. 4 is a flowchart for explaining a power control method by the home server 1.
First, the control unit 10 of the home server 1 checks the contents of the user's schedule stored in the memory 11. In other words, the current time counted by the home server 1 is compared with the schedule contents, and the time at which the schedule contents change is the scheduled outing time, or the scheduled home return time. It is determined whether there is (ST11).
[0026]
Further, as a result of the determination in ST11, when it is determined that the time is a time at which a change occurs in the schedule and it is determined that the scheduled time is for going out (Y in ST12, Y in ST13), the control unit 10 causes the various home electric appliances to accompany the user's going out. Before executing the power cutoff process of No. 5, the detection information from the sensors 6 and 7 is confirmed (ST14).
[0027]
When the presence of the user is detected by the sensors 6 and 7 as a result of the confirmation in ST14 (Y in ST15), the control unit 10 sends the home appliance 5 around the room detected by the sensors 6 and 7 to the A power control signal is output to the distribution board 2 to supply power. The distribution board 2 supplies power (turns on the power) to the home appliances 5 around the room which are detected by the sensors 6 and 7 and which are not supplied with power (OFF state). (ST16).
[0028]
While the position of the user's house is detected by the sensors 6 and 7, the control unit 10 supplies power to the distribution board 2 so as to supply power to the home electric appliances 5 around the detection sensors 6 and 7. A control signal is output to execute power-on processing, and a power control signal is output to the distribution board 2 so as to cut off the supply power to the home electric appliances 5 around the sensors 6 and 7 that have stopped detecting the power. The power supply cutoff process is performed (ST14, ST15, Y, ST16).
[0029]
As a result of the confirmation in ST14, if none of the sensors 6 and 7 detects the location of the user (N in ST15), the control unit 10 sets in advance that the power must not be turned off (cut off). A power supply control signal is output to the distribution board 2 so as to cut off the power supply of the home electric appliance 5 other than the home electric appliance 5 (for example, a telephone or a fax). The distribution board 2 shuts off the power supply (turns off the power) for the appliance to which power is being supplied (the power is on) in the household electric appliance 5 (ST17), and returns to the process of ST11.
[0030]
As a result of the determination in ST11, it is the time when the schedule changes, but when it is neither the scheduled outing time nor the scheduled return time (Y in ST12, N in ST13, N in ST18), the schedule content is not related to going out or returning home. After performing the corresponding predetermined process as described later (ST19), the process returns to the process of ST11.
[0031]
As a result of the determination in ST11, it is determined that the schedule is a time at which a change occurs, and it is determined that it is the scheduled return time (Y in ST12, N in ST13, Y in ST18), or as a result of the determination in ST11, the schedule changes. When it is determined that the error does not occur (N in ST12), control unit 10 first confirms the detection information from sensors 6 and 7 (ST20).
[0032]
As a result of the confirmation in ST20, when the sensors 6 and 7 have detected that the user is present (Y in ST21), the control unit 10 sends the home appliance 5 around the room detected by the sensors 6 and 7 to the A power control signal is output to the distribution board 2 to supply power. The distribution board 2 supplies power (turns on the power) to the home appliances 5 around the room which are detected by the sensors 6 and 7 and which are not supplied with power (OFF state). (ST22).
[0033]
While the position of the user's house is detected by the sensors 6 and 7, the control unit 10 supplies power to the distribution board 2 so as to supply power to the home electric appliances 5 around the detection sensors 6 and 7. A control signal is output to execute power-on processing, and a power control signal is output to the distribution board 2 so as to cut off the supply power to the home electric appliances 5 around the sensors 6 and 7 that have stopped detecting the power. The power supply cutoff process is performed (Y of ST20, ST21, ST22).
[0034]
As a result of the confirmation in ST20, if none of the sensors 6 and 7 detects the location of the user (N in ST21), the control unit 10 compares the current time with the scheduled return time and sets a predetermined time from the scheduled return time. It is checked whether the time is just before (15 minutes before in this embodiment) (ST23).
[0035]
As a result of the confirmation in ST23, if it is determined that the current time is not a predetermined time before the scheduled home return time (15 minutes before in this embodiment) (N in ST24), the process returns to ST11.
[0036]
As a result of the confirmation in ST23, when it is determined that the time is a predetermined time before the scheduled return time (15 minutes before in this embodiment) (Y in ST24), the control unit 10 controls the home electric appliances in the house, especially the air conditioner 5d. The status (usage status or power ON / OFF status) is confirmed (ST25).
[0037]
As a result of the confirmation in ST25, when it is confirmed that the air conditioner 5d is being used (Y in ST26), the process returns to the processing in ST11 while keeping the state of the air conditioner 5d. As a result of the confirmation in ST25, when it is confirmed that the air conditioner 5d is not used (N in ST26), the control unit 10 outputs a power control signal to the distribution board 2 to supply power to the air conditioner 5d. .
[0038]
The distribution board 2 supplies power to the air conditioner 5d (power is turned on), and when the power is supplied, the control unit 10 of the home server 1 turns on the switch of the air conditioner 5d to operate the air conditioner 5d ( ST27), and return to the processing of ST11.
[0039]
As described above, in the present embodiment, power-on processing and power-off processing for various home electric appliances are executed based on preset user schedule information and further based on user information from various sensors. ing.
[0040]
Accordingly, it is possible to perform power control of various home electric appliances in consideration of not only preset information (in this case, user's schedule information) but also sensor detection information, and is flexible to a sudden user's schedule change. , While keeping the standby power consumption low.
[0041]
Next, FIG. 5 is a flowchart for explaining a video reservation start processing method for a video deck as an application example of the power-on processing, and corresponds to the processing of ST19 in FIG. 4 of the present embodiment.
[0042]
As a result of the determination in ST11 shown in FIG. 4, it is the time at which the schedule changes, but it is neither the scheduled go-out time nor the scheduled return time, that is, in this embodiment, a predetermined time before the video reservation start time (in this embodiment, When it is determined whether the time is 3 minutes ago (Y in ST12, N in ST13, N in ST18), the control unit 10 of the home server 1 determines the state (usage state or power ON / OFF state) of the reserved VCR 5b. ) Is confirmed (ST43).
[0043]
As a result of the confirmation in ST43, when the power supply of the video deck 5b is in a cut-off state (OFF state) (N in ST44), the control unit 10 sends a power control signal to supply power to the video deck 5b. Output to distribution board 2. The distribution board 2 supplies power (turns on the power) to the video deck 5b that is not supplied with power (is in the OFF state) (ST48).
[0044]
As a result of the confirmation in ST43, when the power supply of the video deck 5b is supplied (ON state) and not used (Y in ST44, N in ST45), or the power supply of the video deck 5b is turned on in ST48. After that, the control unit 10 transmits initial setting information (for example, current date and current time) of the video deck 5b to the video deck 5b and sets the information on the video deck 5b (ST49).
[0045]
When the setting of the initial setting information in ST49 is completed, the control section 10 transmits the reservation information to the video deck 5b, sets a timer in the video deck 5b, and ends the video deck reservation start processing (ST50). It returns to the process of ST11 shown in FIG.
[0046]
When it is determined that the time is the reserved time from the information on the current date and time and the reservation information set in ST49, the video deck 5b starts recording according to the reservation information.
[0047]
Also, as a result of the confirmation in ST43, when the power of the video deck 5b is supplied (ON state) and used (Y in ST44, Y in ST45), the control unit 10 transmits the video deck 5b to the video deck 5b. On the other hand, a control signal is output to instruct to display a warning screen indicating that the reservation information is set (ST46).
[0048]
As a result of the instruction in ST46, when the video reservation is not canceled and the video deck 5b is continuously used and the scheduled recording cannot be performed (N in ST47, Y in ST45), the control unit 10 sets the present embodiment. Then, a control signal for instructing the video deck 5b to display a warning screen indicating that the reservation information is set is periodically output (ST46).
[0049]
If the video reservation has been canceled as a result of the instruction in ST46 (Y in ST47), since the video deck 5b is being used, the control unit 10 of the home server 1 performs a power-off process on the video deck 5b. Then, the VCR reservation start process ends, and the process returns to ST11 shown in FIG.
[0050]
Next, FIG. 6 is a flowchart for explaining a video reservation end processing method for a video deck as an application example of the power shutoff processing, and corresponds to the processing of ST19 in FIG. 4 of the present embodiment.
[0051]
As a result of the determination in ST11 shown in FIG. 4, when it is the time at which the schedule changes, but it is neither the scheduled go-out time nor the scheduled return time, that is, if it is confirmed that the video reservation end time has passed in this embodiment (ST12). Y, N in ST13, N in ST18), the control unit 10 of the home server 1 checks the state (usage state and power ON / OFF state) of the reserved video deck 5b (ST61).
[0052]
As a result of the confirmation in ST61, if the video deck 5b is still used after the end of the scheduled recording (Y in ST62), or as a result of the confirmation in ST61, the video deck 5b is not used, but is installed around the video deck 5b. If the detected sensors 6 and 7 detect a user (N in ST62, Y in ST63), the control unit 10 of the home server 1 performs the video deck reservation without performing the power-off process on the video deck 5b. The end processing ends, and the process returns to ST11 shown in FIG.
[0053]
As a result of the confirmation in ST61, if the video deck 5b is not used and the user is not detected by the sensors 6, 7 installed around the video deck 5b (N in ST62, N in ST63), the home server 1 The control unit 10 outputs a power control signal to the distribution board 2 so as to shut off (turn off) the power supplied to the video deck 5b.
[0054]
The distribution board 2 receives the power control signal, cuts off the power supply to the video deck 5b, turns off the power, ends the video reservation ending process (ST56), and returns to the process of ST11 shown in FIG.
[0055]
As described above, in the present embodiment, based on the preset video reservation information, and further based on the user information from various sensors, the usage status of the VCR, and the like, the VCR is transferred to the VCR earlier than the video reservation start time. Power-on processing and video reservation setting processing are executed. Further, after the end time of the video reservation, the power supply of the video deck is cut off based on the user information from the various sensors, the usage status of the video, and the like.
[0056]
In this way, the power supply of the VCR is controlled by the home server in consideration of not only the preset information (in this case, the reservation information) but also the detection information of the sensor and the usage status of the video, thereby reducing standby power consumption. It can be pushed.
[0057]
【The invention's effect】
As described above, according to the present invention, flexible power control can be performed in response to a user's change schedule.
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration of a home server 1 as a power control device according to an embodiment of the present invention and peripheral devices thereof.
FIG. 2 is a diagram showing another configuration of a home server 1 as a power supply control device according to the embodiment of the present invention and peripheral devices thereof.
FIG. 3 is a diagram for explaining a schedule registered in the home server 1.
FIG. 4 is a flowchart for explaining a power control method by the home server 1.
FIG. 5 is a flowchart for explaining video reservation start processing of the video deck 5b by the home server 1.
FIG. 6 is a flowchart for explaining video reservation end processing of the video deck 5b by the home server 1.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Home server 2 Distribution board 3 Distribution board integrated type home server 4 Power supply cable 5a, 5b, 5c, 5d Home appliance 6 Infrared sensor 7 Weight sensor

Claims (13)

家屋内に設置された各種機器に対して電源を供給する分電盤を制御する電源制御装置において、
ユーザのスケジュールを記憶する記憶手段と、
家屋内におけるユーザの有無を示す情報を受信する受信手段と、
前記受信手段によって受信された前記ユーザの有無を示す情報と前記記憶手段に記憶されたユーザのスケジュール情報とに基づいて前記分電盤に対して各種機器の電源の投入及び遮断処理を制御する制御手段と、
を有することを特徴とする電源制御装置。
In a power supply control device that controls a distribution board that supplies power to various devices installed in a house,
Storage means for storing a user's schedule;
Receiving means for receiving information indicating the presence or absence of a user in the house,
Control for controlling power-on and power-off processing of various devices to the distribution board based on the information indicating the presence or absence of the user received by the receiving unit and the user's schedule information stored in the storage unit Means,
A power supply control device comprising:
前記制御部は、
前記記憶手段に記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの外出あるいは帰宅に関連する時刻であるかを判断する判断手段と、
この判断手段により外出あるいは帰宅に関連する時刻であると判断されると、前記受信手段で受信される前記ユーザの有無を示す情報を確認する確認手段と、
この確認手段により前記受信情報がユーザが家屋内に居ないことを示す場合、前記記憶手段に記憶されたユーザのスケジュールに基づいて外出に伴う前記機器への電源遮断処理あるいは帰宅に伴う前記機器への電源投入処理を実行する処理手段と、
を有することを特徴とする請求項1記載の電源制御装置。
The control unit includes:
Based on the user's schedule stored in the storage means, determining means for determining whether the current time is a time related to leaving the user or returning home,
When it is determined that the time is related to going out or returning home by this determination means, a confirmation means for confirming information indicating the presence or absence of the user received by the reception means,
When the received information indicates that the user is not in the house by the confirmation means, the power supply to the equipment accompanying the going out or the equipment accompanying the return based on the user's schedule stored in the storage means Processing means for performing power-on processing of
The power supply control device according to claim 1, comprising:
前記制御部は、
前記記憶手段に記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの外出あるいは帰宅に関連する時刻であるかを判断する判断手段と、
この判断手段により外出あるいは帰宅に関連する時刻であると判断されると、前記受信手段で受信される前記ユーザの有無を示す情報を確認する確認手段と、
この確認手段により前記受信情報がユーザが家屋内に居ることを示す場合、受信された前記ユーザの有無を示す情報に応じて前記機器への電源遮断処理及び電源投入処理を実行する処理手段と、
を有することを特徴とする請求項1記載の電源制御装置。
The control unit includes:
Based on the user's schedule stored in the storage means, determining means for determining whether the current time is a time related to leaving the user or returning home,
When it is determined that the time is related to going out or returning home by this determination means, a confirmation means for confirming information indicating the presence or absence of the user received by the reception means,
When the received information indicates that the user is in the house by the confirmation means, processing means for executing power-off processing and power-on processing for the device according to the received information indicating the presence or absence of the user,
The power supply control device according to claim 1, comprising:
前記制御部は、
前記記憶手段に記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの帰宅に関連する時刻よりも所定時間だけ早い時刻であるかを判断する判断手段と、
この判断手段により帰宅に関連する時刻よりも所定時間だけ早い時刻であると判断されると前記受信手段で受信される前記ユーザの有無を示す情報を確認する確認手段と、
この確認手段により前記受信情報がユーザが家屋内に居ないことを示す場合、前記記憶手段に記憶されたユーザのスケジュールに基づいて帰宅に伴うエアコン機器の電源投入処理及び前記電源投入されたエアコン機器を起動する処理手段と、
を有することを特徴とする請求項1記載の電源制御装置。
The control unit includes:
Based on the user's schedule stored in the storage means, determining means for determining whether the current time is a time earlier by a predetermined time than the time associated with returning home of the user,
Checking means for checking the information indicating the presence or absence of the user received by the receiving means when it is determined that the time is earlier than the time related to returning home by a predetermined time by the determining means,
If the received information indicates that the user is not in the house by the confirmation means, the power-on processing of the air-conditioning equipment upon returning home and the power-on air-conditioning equipment based on the user's schedule stored in the storage means Processing means for activating
The power supply control device according to claim 1, comprising:
家屋内に設置された各種機器に対して電源を供給する分電盤を制御する電源制御装置における電源制御方法において、
外部より受信する家屋内におけるユーザの有無を示す情報と予め記憶されたユーザのスケジュール情報とに基づいて前記分電盤に対して各種機器の電源の投入及び遮断処理を制御することを特徴とする電源制御方法。
In a power supply control method in a power supply control device that controls a distribution board that supplies power to various devices installed in a house,
It is characterized by controlling power-on and power-off processing of various devices with respect to the distribution board based on information indicating presence or absence of a user in a house received from outside and schedule information of the user stored in advance. Power control method.
前記予め記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの外出あるいは帰宅に関連する時刻である時に、前記受信されたユーザの有無を示す情報を確認し、前記受信情報がユーザが家屋内に居ないことを示す場合、前記ユーザのスケジュールに基づいて外出に伴う前記機器への電源遮断処理あるいは帰宅に伴う前記機器への電源投入処理を実行することを特徴とする請求項5記載の電源制御方法。Based on the pre-stored user schedule, when the current time is a time related to the user going out or returning home, confirm the received information indicating the presence or absence of the user, and confirm that the received information indicates that the user is indoors. 6. The power supply according to claim 5, wherein, when indicating that the user is not present, a power-off process for the device when going out or a power-on process for the device when returning home is executed based on the schedule of the user. Control method. 前記予め記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの外出あるいは帰宅に関連する時刻である時に、前記受信されたユーザの有無を示す情報を確認し、前記受信情報がユーザが家屋内に居ることを示す場合、受信された前記ユーザの有無を示す情報に応じて前記機器への電源遮断処理及び電源投入処理を実行することを特徴とする請求項5記載の電源制御方法。Based on the pre-stored user schedule, when the current time is a time related to the user going out or returning home, confirm the received information indicating the presence or absence of the user, and confirm that the received information indicates that the user is indoors. 6. The power supply control method according to claim 5, wherein when indicating that the user is present, a power-off process and a power-on process for the device are executed according to the received information indicating the presence or absence of the user. 前記予め記憶されたユーザのスケジュールに基づいて、現在時刻がユーザの帰宅に関連する時刻よりも所定時間だけ早い時刻である時に、前記受信されたユーザの有無を示す情報を確認し、前記受信情報がユーザが家屋内に居ないことを示す場合、前記ユーザのスケジュールに基づいて帰宅に伴うエアコン機器の電源投入処理及び前記エアコン機器の起動を実行することを特徴とする請求項5記載の電源制御方法。Based on the pre-stored user schedule, when the current time is a predetermined time earlier than the time related to the return of the user, check the information indicating the presence or absence of the received user, the reception information 6. When the user indicates that the user is not in the house, power-on processing of the air conditioner device upon returning home and activation of the air conditioner device are executed based on the schedule of the user. Method. 家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置において、
ビデオ予約情報を記憶する記憶手段と、
家屋内に設置されたビデオ機器から使用状況及び電源供給状況を示す情報を受信する受信手段と、
前記記憶手段に記憶された前記ビデオ予約情報に基づき、ビデオ予約開始時間以前に、前記受信手段によって前記ビデオ機器に電源が供給されていないことを示す情報が受信されると、前記分電盤に対して前記ビデオ機器の電源の投入処理を実行するとともに、前記ビデオ機器に対して初期設定及びビデオ予約処理を実行するよう制御する制御手段と、
を有することを特徴とする電源制御装置。
In a power supply control device that controls a distribution board that supplies power to video equipment installed in a house,
Storage means for storing video reservation information;
Receiving means for receiving information indicating the use status and the power supply status from video equipment installed in the house,
Based on the video reservation information stored in the storage unit, when information indicating that power is not supplied to the video device is received by the reception unit before the video reservation start time, the distribution board receives the information. Control means for performing a power-on process of the video device, and controlling the video device to execute an initial setting and a video reservation process;
A power supply control device comprising:
前記制御手段は、前記受信手段によって前記ビデオ機器に電源が供給されているが使用されていないことを示す情報が受信されると、前記ビデオ機器に対して初期設定を実行し、前記記憶手段に記憶された前記ビデオ予約情報に基づいてビデオ予約処理を実行する処理手段を有することを特徴とする請求項9記載の電源制御装置。The control unit executes an initial setting for the video device when information indicating that power is supplied to the video device but is not used is received by the receiving unit, and the storage unit performs 10. The power supply control device according to claim 9, further comprising processing means for executing a video reservation process based on the stored video reservation information. 家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置において、
ビデオ予約情報を記憶する記憶手段と、
家屋内に設置されたビデオ機器から使用状況及び電源供給状況を示す情報を受信する第1の受信手段と、
家屋内におけるユーザの有無を示す情報を受信する第2の受信手段と、
前記記憶手段に記憶されたビデオ予約情報に基づいたビデオ予約終了時間以降に、前記第1の受信手段によって前記ビデオ機器が使用されていないことを示す情報が受信され、かつ前記第2の受信手段によってユーザが家屋内に居ないことを示す情報が受信されると、前記分電盤に対して前記ビデオ機器の電源の遮断処理を実行するよう制御する制御手段と、
を有することを特徴とする電源制御装置。
In a power supply control device that controls a distribution board that supplies power to video equipment installed in a house,
Storage means for storing video reservation information;
First receiving means for receiving information indicating a use situation and a power supply situation from a video device installed in a house;
Second receiving means for receiving information indicating the presence or absence of a user in the house;
After the video reservation end time based on the video reservation information stored in the storage unit, information indicating that the video device is not used is received by the first reception unit, and the second reception unit When the information indicating that the user is not in the house is received by, control means for controlling the power distribution board to execute a power-off process of the video equipment for the distribution board,
A power supply control device comprising:
家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置の電源制御方法において、
予め設定されたビデオ予約情報に基づいて、ビデオ予約開始時間以前に、外部より前記ビデオ機器に電源が供給されていないことを示す情報が受信と検出されると、前記分電盤に対して前記ビデオ機器の電源の投入処理を実行し、前記ビデオ機器に対して初期設定を実行し、前記ビデオ予約情報に基づいてビデオ予約処理を実行するよう制御することを特徴とする電源制御方法。
In a power supply control method of a power supply control device that controls a distribution board that supplies power to video equipment installed in a house,
Based on the preset video reservation information, before the video reservation start time, if it is detected that information indicating that power is not supplied to the video device from the outside is received, the distribution board to the distribution board A power supply control method, comprising: performing a power-on process of a video device, performing an initial setting for the video device, and performing a video reservation process based on the video reservation information.
家屋内に設置されたビデオ機器に対して電源を供給する分電盤を制御する電源制御装置の電源制御方法において、
予め設定されたビデオ予約情報に基づいて、ビデオ予約開始時間以前に、外部より前記ビデオ機器が使用されていない情報およびユーザが家屋内に居ないことを示す情報が受信されると、前記分電盤に対して前記ビデオ機器の電源の遮断処理を実行するよう制御することを特徴とする電源制御方法。
In a power supply control method of a power supply control device that controls a distribution board that supplies power to video equipment installed in a house,
Based on preset video reservation information, when information indicating that the video device is not used and information indicating that the user is not indoors are received from outside before the video reservation start time, the power distribution is performed. A power supply control method, characterized by controlling the board to execute a power-off process of the video equipment.
JP2002272546A 2002-09-19 2002-09-19 Power source controller and power source controlling method Pending JP2004110455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002272546A JP2004110455A (en) 2002-09-19 2002-09-19 Power source controller and power source controlling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002272546A JP2004110455A (en) 2002-09-19 2002-09-19 Power source controller and power source controlling method

Publications (1)

Publication Number Publication Date
JP2004110455A true JP2004110455A (en) 2004-04-08

Family

ID=32269534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002272546A Pending JP2004110455A (en) 2002-09-19 2002-09-19 Power source controller and power source controlling method

Country Status (1)

Country Link
JP (1) JP2004110455A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008294683A (en) * 2007-05-23 2008-12-04 Yahoo Japan Corp Administration server, system and method, for preventing tv program recording omission
JP5485448B1 (en) * 2013-04-26 2014-05-07 三菱電機株式会社 Electrical equipment management apparatus, electrical equipment management system, electrical equipment, terminal device, electrical equipment management method, and program.
WO2014132428A1 (en) 2013-02-28 2014-09-04 富士通株式会社 Information processing device and start-up control program
JP2015177475A (en) * 2014-03-17 2015-10-05 株式会社リコー Apparatus control system, apparatus control device, apparatus control method and program

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008294683A (en) * 2007-05-23 2008-12-04 Yahoo Japan Corp Administration server, system and method, for preventing tv program recording omission
WO2014132428A1 (en) 2013-02-28 2014-09-04 富士通株式会社 Information processing device and start-up control program
JP5485448B1 (en) * 2013-04-26 2014-05-07 三菱電機株式会社 Electrical equipment management apparatus, electrical equipment management system, electrical equipment, terminal device, electrical equipment management method, and program.
WO2014174714A1 (en) * 2013-04-26 2014-10-30 三菱電機株式会社 Electric device management device, electric device management system, electric device, terminal device, electric device management method and program
JP2014217047A (en) * 2013-04-26 2014-11-17 三菱電機株式会社 Electrical device management apparatus, electrical device, terminal device, electrical device management method, and program
JP2014217048A (en) * 2013-04-26 2014-11-17 三菱電機株式会社 Electrical device management apparatus, electrical device, terminal device, electrical device management method, and program
JP2015177475A (en) * 2014-03-17 2015-10-05 株式会社リコー Apparatus control system, apparatus control device, apparatus control method and program

Similar Documents

Publication Publication Date Title
US8527096B2 (en) Programmable controller and a user interface for same
US7902959B2 (en) Radio communication system of water heater
CA2633200A1 (en) Programmable thermostat with preemptive setpoint adaptation based upon detection of occupancy
US10083132B2 (en) Management of building and household appliances using portable computing device
JP2005045866A (en) Power control system
JP2009240065A (en) Power supply system and power supply management system
JPH0783366B2 (en) Building management system
JP2004110455A (en) Power source controller and power source controlling method
JP5760861B2 (en) Air conditioner system
JP7482144B2 (en) Home appliance system, control method, and control program
JP2007215313A (en) Energy saving support system
JP2008205882A (en) Startup mode setting method of electronic apparatus, and electronic apparatus
JPH07129277A (en) Environment maintaining device of computer system
JP2004294029A (en) Remote control device for air conditioner and air conditioner system
JP5325133B2 (en) Equipment control system
JP5232131B2 (en) Equipment control system
JP2007309813A (en) Reserved operation system of heating/cooling equipment and its program
JP6559231B2 (en) Remote control setting device
KR101664014B1 (en) System for shutting off neglected power using consolidated remote controller and method thereof
WO2015173931A1 (en) Home electric appliance control apparatus
KR101577457B1 (en) Apparatus and Method for controlling an Alarm establishment information output
JP4670607B2 (en) Air conditioner
JP2008306539A (en) Electric appliance and method for setting on timer function thereof
JP2006177607A (en) Air conditioner
JPH1063377A (en) Automatic power application controller

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20050415

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050606